Loading...
HomeMy WebLinkAboutAgenda - Agenda Packets - Regular Meeting 5/1/2018 AGENDA CITY COUNCIL - REGULAR MEETING TUESDAY, MAY 1, 2018 5:30 PM CLOSED SESSION 6:30 PM OPEN SESSION SAN JACINTO UNIFIED SCHOOL DISTRICT BOARD ROOM 2045 S. SAN JACINTO SAN JACINTO, CA 92583 951-487-7339 City of San Jacinto Page 1 Updated 4/26/2018 6:05 PM ANDREW KOTYUK, COUNCILMEMBER CRYSTAL RUIZ, MAYOR RUSS UTZ, MAYOR PRO TEM ALONSO LEDEZMA, COUNCILMEMBER SCOTT MILLER, COUNCILMEMBER 1. ORGANIZATION 1.1. Public Comments on Closed Session Items 1.2. Closed Session 1.2.1. APN: 430-110-016, 430-120-013, 430-150-002, 430-160-001, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director and Seth Merewitz, Best Best & Krieger, Negotiating Parties: San Jacinto 300 LLC, Under Negotiation: Price and Terms 1.2.2. APN: 430-160-002, -011 and 430-200-010, -014, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Building Management Services, Under Negotiation: Price and Terms 1.2.3. APN: 430-190-025, 430-200-015, 430-210-001, -016, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Ronald Haringa 1.2.4. APN: 430-200-016, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Danny Moradzadeh and Daryoush Yamtoobian, Under Negotiation: Price and Terms 1.2.5. APN: 430-220-003, -011, and 433-020-017, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Valley-Wide Recreation & Park District, Under Negotiation: Price and Terms City of San Jacinto Page 2 Updated 4/26/2018 6:05 PM 1.2.6. APN: 430-220-008, -009, -010, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: MWD, Under Negotiation: Price and Terms 1.2.7. APN: 433-020-018, -019, 433-040-049, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Robert Holcomb/Larry & Shirley Maddox, Under Negotiation: Price and Terms 1.2.8. APN: 433-040-052, -054, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Maria Trejo and Francisco Gonzales, Under Negotiation: Price and Terms 1.2.9. APN: 433-040-056, -063, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Thomas & Emily Quast, Under Negotiation: Price and Terms 1.2.10. APN: 433-040-057, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: San Jacinto Colinas LLC, Under Negotiation: Price and Terms 1.2.11. APN: 433-060-009, -013, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: James Conner, Under Negotiation: Price and Terms 1.2.12. APN: 433-060-011 and 433-080-002, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Western Riverside County Regional Conservation Authority, Under Negotiation: Price and Terms 1.3. Closed Session Report 1.4. Roll Call 1.5. Invocation 1.6. Pledge of Allegiance - Mayor Pro Tem Russ Utz 1.7. Mayor / Council Member Reports / Discussions 1.8. Late Items 2. PUBLIC COMMENTS 3. JOINT CONSENT CALENDARS City of San Jacinto Page 3 Updated 4/26/2018 6:05 PM 3.A. Consent Calendar - City Council 3.A.1. Waiver of Full Reading of Ordinance(s), and Reading by Title Only 3.A.2. Minutes of the Regular City Council Meeting Held April 17, 2018 RECOMMENDATION: Staff recommends that the City Council approve the draft minutes of the Regular City Council meeting held April 17, 2018. Department: City Clerk 3.A.3. 2018 Biennial Notice for Conflict of Interest Codes Review RECOMMENDATION: Staff recommends that the City Council direct the City Manager to: 1) Review the City of San Jacinto’s Conflict of Interest Code, pursuant to Government Code Section 87306.5; 2) File a Statement of Review with the City Clerk no later than October 1, 2018; and 3) Have the Conflict of Interest Code revised based upon said review, if necessary. Department: City Clerk 3.A.4. Resolution No. 3703, Authorizing Participation in Employment Risk Management Authority (ERMA) RECOMMENDATION: Approve Resolution No. 3703 Authorizing Participation in Employment Risk Management Authority (ERMA). Department: Human Resources 3.A.5. San Marcos/7th Street Water Line (CIP 18-018) RECOMMENDATION: Staff recommends that the City Council award the construction contract for the San Marcos/7th Street Water Line Project to El-Co Contractors, Inc. of San Bernardino for the sum of $292,943; allocate $50,000 from Water Funds to cover soft and construction cost contingencies, and reject all other bids. Department: Engineering 3.A.6. Approve Amendment No. 1 to Agreement for Completion of Public Improvements for Tract 31154 - Project Royal, LP and RSI Communities - California LLC RECOMMENDATION: Staff recommends that the City Council approve Amendment No. 1 to the Agreement for Completion of Public Improvements for Project Royal, LP and RSI Communities - California LLC, Tract 31154, located at DeAnza Drive and Lyon Avenue. Department: Engineering City of San Jacinto Page 4 Updated 4/26/2018 6:05 PM 3.A.7. Approve Amendment No. 1 to Agreement for Completion of Public Improvements for Tract 31037-3 - Project Royal, LP and RSI Communities - California LLC RECOMMENDATION: Staff recommends that the City Council approve Amendment No. 1 to the Agreement for Completion of Public Improvements for Project Royal, LP and RSI Communities - California LLC, Tract 31037-3; located at DeAnza Drive and Lyon Avenue. Department: Engineering 3.A.8. Approval of Resolution No. 3705 Electing to Participate with the County of Riverside Mortgage Credit Certificate Program RECOMMENDATION: Staff recommends that the City Council approve and adopt Resolution No. 3705 electing to participate with the County of Riverside Mortgage Credit Certificate Program. Department: Community Development 3.A.9. General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17 RECOMMENDATION: Staff recommends that the City Council receive and file the 2017 Annual Progress Report. Department: Community Development 3.B. Consent Calendar - Successor Agency to the Redevelopment Agency of the City of San Jacinto 3.B.1. Resolution SA 18-01 of the Successor Agency for Quitclaim Deed Conveying Assessor Parcel No. 439-112-031 RECOMMENDATION: Staff recommends that the Governing Board adopt and approve the attached Resolution No. SA 18-01 to (i) approve the Quitclaim Deed Conveying Assessor Parcel No. 439-112-031, from the Successor Agency to Fun Properties, LLC (ii) authorize the Executive Director to execute the Quitclaim Deed. Department: Community Development 3.B.2. Resolution SA 18-02 of the Successor Agency for Termination of Disposition and Development Agreement RECOMMENDATION: Staff recommends that the Governing Board adopt and approve the attached Resolution to (i) approve the termination of Disposition and Development Agreement, as amended by Amendment No. 1, and Related Deed Covenants and Lease and Option Agreement for 1635 S. San Jacinto Ave, (ii) approve the accompanying Termination Agreement, and (iii) authorize the Executive City of San Jacinto Page 5 Updated 4/26/2018 6:05 PM Director to execute the agreement, and to take all necessary actions to effectuate the termination described herein and in the attached Resolution. Department: Community Development 3.B.3. Resolution SA 18-03 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency approve and adopt the attached Resolution No. SA 18-03. Department: Community Development 3.B.4. Resolution SA 18-04 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency, by motion, approve and adopt the attached Resolution SA 18-04. Department: Community Development 3.B.5. Resolution SA 18-05 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency approve and adopt the attached Resolution SA 18-05. Department: Community Development 3.B.6. Resolution SA 18-06 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency, by motion, approve and adopt the attached Resolution SA 18-06. Department: Community Development 3.B.7. Resolution SA 18-07 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency approve and adopt attached Resolution SA 18-07. Department: City Clerk 4. PUBLIC HEARING City of San Jacinto Page 6 Updated 4/26/2018 6:05 PM 4.1. Introduction and First Reading of Ordinance for Change of Zone 17-03 and a proposal of MW Advantage 1, LLC, for the Commonwealth Crossing Project to subdivide a 9.51 acre parcel into five parcels and one lettered lot and to develop a commercial project consisting of five retail/office buildings for a total of 45,3 72 square feet, with a variance to permit beer and wine sales within 1,000- feet of adjacent sales, located on the west side of San Jacinto Avenue, at the terminus of Commonwealth Avenue RECOMMENDATION: 1. INTRODUCE Ordinance No. 18-05 for first reading approving Change of Zone 17-03 to change the Zone from CN - Commercial Neighborhood to CG - Commercial General; AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA APPROVING CHANGE OF ZONE 17-03, A ZONE CHANGE FROM COMMERCIAL NEIGHBORHOOD TO COMMERCIAL GENERAL LOCATED ON THE WEST SIDE OF SAN JACINTO AVENUE AT THE TERMINUS OF COMMONWEALTH (APN 439-120-042) 2. CONTINUE the Public Hearing to May 15, 2018. Department: Community Development 5. DISCUSSION ITEMS 5.1. Discussion/Potential Action Pertaining to Senate Bill (SB) 54 RECOMMENDATION: That the City Council discuss and provide direction pertaining to SB 54. Department: City Manager 5.2. Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project RECOMMENDATION: Direct staff to continue discussing property acquisition options and place an item on a future City Council agenda for the City Council to determine whether to continue participation in and funding of the Project. Department: Community Development 6. CITY MANAGER UPDATE 6.1. Community Development Update 7. FUTURE REQUESTS FROM CITY COUNCIL TO STAFF 8. ADJOURNMENT City of San Jacinto Page 7 Updated 4/26/2018 6:05 PM DOCUMENTS RELATED TO OPEN SESSION AGENDAS (SB343) - Any public record, relating to an open session agenda item, that is distributed within 72 hours prior to the meeting is available for public inspection at the public counter located in the Administration Building of City Hall, 595 S San Jacinto Avenue, San Jacinto, CA 92583. I, Angela Walton, City Clerk of the City of San Jacinto, do hereby certify that I caused to be posted the foregoing agenda this 26th day of April 2018 as requested by law. Angela Walton, City Clerk May 1, 2018 TO: City Council REQUESTED BY: Angela Walton, City Clerk APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Minutes RECOMMENDATION: Staff recommends that the City Council approve the draft minutes of the Regular City Council meeting held April 17, 2018. ATTACHMENTS: 4-17-18 Regular Action Minutes DRAFT 3.A.2 Packet Pg. 8 ACTION MINUTES CITY COUNCIL – REGULAR MEETING TUESDAY, APRIL 17, 2018 5:30 PM CLOSED SESSION 6:30 PM OPEN SESSION SAN JACINTO UNIFIED SCHOOL DISTRICT BOARD ROOM 2045 S. SAN JACINTO AVE SAN JACINTO, CA 92583 951-487-7339 1. ORGANIZATION Mayor Crystal Ruiz called the meeting to order at 5:30 pm. 1.1. Public Comments on Closed Session Items There were no public comments on Closed Session Items. Upon recommendation of City Attorney Michael J. Maurer, the City Council took action to find that (1) an item arose after the agenda was posted, (2) the item requires an immediate closed session in order to conference with legal counsel, and (3) the item shall be added to the agenda as: CONFERENCE WITH LEGAL COUNSEL Significant exposure to litigation pursuant to Government Code sections 54956.9(d)(2) and (3) (1 case – facts and circumstances unknown to potential plaintiffs) Mayor Crystal Ruiz adjourned the meeting to Closed Session at 5:32 p.m. 1.2. Closed Session 1.2.1. APN: 430-110-016, 430-120-013, 430-150-002, 430- 160-001, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director and Seth Merewitz, Best Best & Krieger, Negotiating Parties: San Jacinto 300 LLC, Under Negotiation: Price and Terms 1.2.2. APN: 430-160-002, -011 and 430-200-010, -014, Agency Negotiators: Robert A. Johnson, City Manager, Sharon CRYSTAL RUIZ, MAYOR RUSS UTZ, MAYOR PRO TEM ANDREW KOTYUK, COUNCILMEMBER ALONSO LEDEZMA COUNCILMEMBER SCOTT MILLER, COUNCILMEMBER 3.A.2.a Packet Pg. 9 Attachment: 4-17-18 Regular Action Minutes DRAFT (Minutes) Action Minutes April 17, 2018 ____________________________________________________________________________________Pa ge 2 of 6 Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Building Management Services, Under Negotiation: Price and Terms 1.2.3. APN: 430-190-025, 430-200-015, 430-210-001, -016, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Ronald Haringa 1.2.4. APN: 430-200-016, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Danny Moradzadeh and Daryoush Yamtoobian., Under Negotiation: Price and Terms 1.2.5 APN: 430-220-003, -011, and 433-020-017, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Valley-Wide Recreation & Park District, Under Negotiation: Price and Terms 1.2.6. APN: 430-220-008, -009, -010, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: MWD, Under Negotiation: Price and Terms 1.2.7. APN: 433-020-018, -019, 433-040-049, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Robert Holcomb/Larry & Shirley Maddox, Under Negotiation: Price and Terms 1.2.8. APN: 433-040-052, 053, -054, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Maria Trejo and Francisco Gonzales, Under Negotiation: Price and Terms 3.A.2.a Packet Pg. 10 Attachment: 4-17-18 Regular Action Minutes DRAFT (Minutes) Action Minutes April 17, 2018 ____________________________________________________________________________________Pa ge 3 of 6 1.2.9. APN: 433-040-056, -063, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Thomas & Emily Quast, Under Negotiation: Price and Terms 1.2.10. APN: 433-040-057, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: San Jacinto Colinas LLC, Under Negotiation: Price and Terms 1.2.11. APN: 433-060-009, -013, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: James Conner, Under Negotiation: Price and Terms 1.2.12. APN: 433-060-011 and 433-080-002, Agency Negotiators: Robert A. Johnson, City Manager, Sharon Paisley, Development Director, and Seth Merewitz, Best Best & Krieger, Negotiating Parties: Western Riverside County Regional Conservation Authority, Under Negotiation: Price and Terms 1.2.13. CONFERENCE WITH LEGAL COUNSEL: Potential initiation of litigation pursuant to Government Code section 54956.9(d)(4) (1 case) 1.2.14. CONFERENCE WITH LEGAL COUNSEL Significant exposure to litigation pursuant to Government Code sections 54956.9(d)(2) and (3) (1 case – facts and circumstances unknown to potential plaintiffs) 1.3. Closed Session Report City Attorney Maurer stated there was no report from Closed Session. Mayor Ruiz called the regular meeting to order at 6:50 p.m. 1.4. Roll Call Deputy City Clerk Jan Catron conducted the roll call: Present: Kotyuk, Ledezma, Utz, Ruiz Absent: Miller 3.A.2.a Packet Pg. 11 Attachment: 4-17-18 Regular Action Minutes DRAFT (Minutes) Action Minutes April 17, 2018 ____________________________________________________________________________________Pa ge 4 of 6 M/S/C (Kotyuk/Utz) moved to approve the absence of Councilman Scott Miller. Motion carried 4/0. Ayes: Kotyuk, Ledezma, Ruiz, Utz Nays: None Absent: Miller Abstain: None 1.5. Invocation Pastor Rick Patterson of Crossroads Baptist Church gave the invocation. 1.6. Pledge of Allegiance Councilman Andrew Kotyuk led the Pledge of Allegiance. 1.7. Special Presentations Introductions of Battalion Chiefs Dan Harris and Richard Tovar: Fire Chief Bill Weiser introduced Battalion Chiefs Dan Harris and Richard Tovar to the City Council and provided their backgrounds. May is Mental Health Month Proclamation: Mayor Ruiz read the proclamation and presented it to Gloria Williams, Regional Board Member, Mid-County Regional Behavioral Health Advisory Board. 1.8. Mayor / Council Member Reports / Discussions Council Members gave their reports. 1.9. Late Items There were no late items. 2. PUBLIC COMMENTS Public Speakers:  Arvid Anderson 3. JOINT CONSENT CALENDARS (SECTIONS 3A AND 3B) 3.A Consent Calendar - City Council 3.A.1 Waiver of Full Reading of Ordinance(s), and Reading by Title Only / Approve / City Clerk, City Attorney 3.A.2.a Packet Pg. 12 Attachment: 4-17-18 Regular Action Minutes DRAFT (Minutes) Action Minutes April 17, 2018 ____________________________________________________________________________________Pa ge 5 of 6 3.A.2 Minutes of the Regular City Council Meeting held April 3, 2018 / Approve / City Clerk 3.A.3 Warrants and Disbursements - March 2018 / Approve / Finance Director 3.A.4 Proposed Amendment to Administrative Services Agreement with the California Choice Energy Authority/ Approve / Finance Director 3.A.5 New Paying Agent, Wilmington Trust for SCE Purchase and Retrofit Project / Approve / Parks / Stormwater Superintendent M/S/C (Kotyuk/Utz) moved to approve the Consent Calendar. Motion carried 4/0. Ayes: Kotyuk, Utz, Ruiz Nays: None Absent: Miller Abstain: Kotyuk, Item 3.A.2, line items #’s 120869, 120915, 120916, 121051 and 121090 Utz, Item 3.A.2, line item #120910 4. DISCUSSION ITEMS 4.1 Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project/ Approve / Development Director By general consensus, Item 4.1 was continued to the next meeting of May 1, 2018. 4.2 Esplanade Avenue Rehab Project / Approve / City Engineer City Engineer Habib Motlagh presented the staff report. M/S/C (Ledezma/Utz) moved to approve the Item 4.2 as presented. Motion carried 4/0. Ayes: Kotyuk, Ledezma, Ruiz, Utz Nays: None Absent: Miller Abstain: None 3.B Consent Calendar - Successor Agency To The Redevelopment Agency Of The City Of San Jacinto 3.A.2.a Packet Pg. 13 Attachment: 4-17-18 Regular Action Minutes DRAFT (Minutes) Action Minutes April 17, 2018 ____________________________________________________________________________________Pa ge 6 of 6 5. CITY MANAGER UPDATE – Robert A. Johnson, City Manager City Manager Johnson provided a brief update and presentation of the following items:  City of San Jacinto 130th Birthday  International Council of Shopping Centers  Water service line repair for Bradley Gardens Convalescent Center  Announcement of Arthur Mullen being selected to succeed Dan Mudrovich as Waters Utilities Superintendent  Several Development Updates 6. FUTURE REQUESTS FROM CITY COUNCIL TO STAFF Councilman Kotyuk – requested placing an item on the City Council agenda for discussion and resolution for opting out of SB 54. Mayor Ruiz – requested having the panhandling ordinance reviewed to determine if the ordinance may be strengthened. 7. ADJOURNMENT With no further business before the City Council, Mayor Ruiz adjourned the Regular Meeting of the City Council at 7:55 p.m. in honor of former First Lady Barbara Bush who passed away today. CITY OF SAN JACINTO: ____________________ Crystal Ruiz, Mayor ATTEST: ________________________ Angela Walton, City Clerk Approved as read: _______ Approved as amended ____ 3.A.2.a Packet Pg. 14 Attachment: 4-17-18 Regular Action Minutes DRAFT (Minutes) May 1, 2018 TO: City Council REQUESTED BY: Angela Walton, City Clerk APPROVED BY: Robert A. Johnson, City Manager SUBJECT: 2018 Biennial Notice for Conflict of Interest Codes RECOMMENDATION: Staff recommends that the City Council direct the City Manager to: 1) Review the City of San Jacinto’s Conflict of Interest Code, pursuant to Government Code Section 87306.5; 2) File a Statement of Review with the City Clerk no later than October 1, 2018; and 3) Have the Conflict of Interest Code revised based upon said review, if necessary. DISCUSSION: The Political Reform Act of 1974 (the “Act”) and in particular, Government Code Section 87306.5 requires that no later than July 1 of each even-numbered year, the City Council, as the City’s code-reviewing body, directs the City Manager to review the City’s Conflict of Interest Code and, if a change in the code is necessary by changed circumstances, that a revised code be submitted to the City Council for approval. The primary effect of the Conflict of Interest Code is to establish Conflict of Interest disclosure requirements for various city and redevelopment agency positions involved in the requisite level of decision-making as set forth in the Political Reform Act. The Act requires each city to adopt a local Conflict of Interest code which designates and covers City (and Successor Agency) positions not otherwise designated in the Act itself, that are involved in making City (or Agency) decisions. The Act also requires that the City Manager file a statement regarding the result of the review no later than October 1st of the same year. If a change in the code is necessary by this review, it must be submitted to the City Council for approval within ninety (90) days of the filing of the statement of review. FISCAL IMPACT: None. 3.A.3 Packet Pg. 15 May 1, 2018 TO: City Council REQUESTED BY: Denise Wolsieffer, Human Resources Manager APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Employment Risk Management Authority (ERMA) RECOMMENDATION: Approve Resolution No. 3703 Authorizing Participation in Employment Risk Management Authority (ERMA). DISCUSSION: The City is currently a member of the Public Entity Risk Management Authority (PERMA), a self-insured risk management pool that provides for general liability and other coverage as established in the memorandum of coverage. PERMA’s program does not provide for coverage against potentially unlawful employment practices and discrimination claims. This creates a gap in the City’s risk management profile, and therefore staff has researched options to obtain this coverage. The Employment Risk Management Authority (ERMA) is a self-insured joint powers authority created for the special purpose of providing public entities with Employment Practices Liability Coverage. ERMA was formed primarily because government entities have not historically been able to secure Employment Practices Liability (EPL) coverage at a competitive cost through the commercial insurance marketplace. ERMA is fully accredited by the California Association of Joint Powers Authorities (CAJPA) and meets CAJPA’s high standards in the areas of governance, finance, claims control, safety and loss control. Staff has been working with ERMA to determine the City’s actuarial risk and develop coverage costs and options. Staff has provided ERMA with the City’s employment profile, past claims history and other background information. By Resolution No. 3703, the City would become a member in ERMA and be eligible for its EPL coverage. By closing this gap in the City’s risk management profile, the City will be better protected against potential losses and against potential high-value claims. FISCAL IMPACT: The annual cost to the City is estimated to be $22,000 with a $25,000 self-insured retention. The EPL program will provide the City with coverage of up to $1 million per occurrence for costs related to unlawful employment practices and discrimination claims. ATTACHMENTS: Resolution No. 3703 3.A.4 Packet Pg. 16 STATE OF CALIFORNIA ) RESOLUTION NO: 3703 COUNTY OF RIVERSIDE)ss CITY OF SAN JACINTO ) A RESOLUTION OF THE CITY OF SAN JACINTO AUTHORIZING PARTICIPATION IN THE EMPLOYMENT RISK MANAGEMENT AUTHORITY WHEREAS, the City of San Jacinto wishes to obtain Employment Practices Liability coverage for the period (date); and WHEREAS, the Employment Risk Management Authority (ERMA) is a self-insured joint powers authority created for the sole purpose of Employment Practices Liability Coverage. ERMA is comprised of various public entitles who risk share up to $1 million against potentially unlawful employment practices and discrimination claims; and WHEREAS, ERMA formed primarily due to the fact that government entitles have not historically been able to secure Employment Practices Liability (EPL) coverage at a competitive cost through the commercial insurance marketplace; and WHEREAS, ERMA has met all of the high professional standards established by the California Association of Joint Powers Authorities (CAJPA) in the areas of governance, finance, claims control, safety and loss control and ERMA is fully accredited by CAJPA. CAJPA’s accreditation process requires reviews by independent consultants in the areas of accounting, claims adjusting, and actuarial analysis; and WHEREAS, ERMA provides services to both Joint Powers Insurance Authorities and individual public entitles; and WHEREAS, the City of San Jacinto has determined that it is in the best interest to become a member of ERMA for the purpose of obtaining Emp loyment Practices Liability coverage; and WHEREAS, ERMA requires the City of San Jacinto to pass a resolution expressing the desire and commitment of the City of San Jacinto’s participation in ERMA, which requires a three year minimum participation period. City of San Jacinto also understands our entity will be bound by the provisions in the ERMA Joint Powers Agreement just as though it were fully set forth and incorporated herein whether our entity had signed it individually or through an underlying Join t Powers Insurance Authority. NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF SAN JACINTO: THAT, the City of San Jacinto approves participation in ERMA (date); and THAT, Denise D. Wolsieffer, Human Resources Manager on behalf of the City of San Jacinto hereby is authorized to take any and all actions necessary to implement the foregoing resolution. 3.A.4.a Packet Pg. 17 Attachment: Resolution No. 3703 (Employment Risk Management Authority (ERMA)) PASSED, APPROVED AND ADOPTED this 1st day of May 2018 by the following vote. Ayes: Nays: Absent: Abstain: CITY OF SAN JACINTO: By: ______________________________ Crystal Ruiz, Mayor ATTEST: ___________________________________ Angela Walton, City Clerk APPROVED AS TO FORM: BEST BEST & KRIEGER, LLP Michael J. Maurer, City Attorney 3.A.4.a Packet Pg. 18 Attachment: Resolution No. 3703 (Employment Risk Management Authority (ERMA)) CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss CITY OF SAN JACINTO ) I, Angela Walton, City Clerk of the City of San Jacinto, do hereby certify that the foregoing Resolution No. 3703 was passed, approved, and adopted at the Regular Meeting of the San Jacinto City Council held on the 1st day of May 2018. Ayes: Nays: Absent: Abstain: WITNESS MY HAND AND OFFICIAL SEAL this 1st day of May 2018. _____________________________________ Angela Walton, City Clerk City of San Jacinto 3.A.4.a Packet Pg. 19 Attachment: Resolution No. 3703 (Employment Risk Management Authority (ERMA)) May 1, 2018 TO: City Council REQUESTED BY: Habib Motlagh, City Engineer APPROVED BY: Robert A. Johnson, City Manager SUBJECT: San Marcos/7th Street Water Line (CIP 18-018) RECOMMENDATION: Staff recommends that the City Council award the construction contract for the San Marcos/7th Street Water Line Project to El-Co Contractors, Inc. of San Bernardino for the sum of $292,943; allocate $50,000 from Water Funds to cover soft and construction cost contingencies, and reject all other bids. DISCUSSION: At the bid opening on April 19, 2018, the City Clerk received and opened four bids ranging from $292,943 to $476,248. The lowest qualified bid was from El-Co Contractors Inc. for the sum of $292,943. Staff has reviewed the contractor’s qualifications and references provided and recommends the award of the bid. The project consists of:  Constructing 600 feet of new parallel 8” water line to replace a failed line on San Marcos Place, from 6th Street to 7th Street  Constructing 350 feet of new 8” water line to replace a failed line on 7th street, from San Marcos Place to Santa Fe Avenue  Replacing 15 water service connections and installing 2 fire hydrants throughout the project area The preliminary schedule for the project is as follows:  Bid Award: May 1, 2018  Start Construction: May 21, 2018  Complete Construction: July 20, 2018 FISCAL IMPACT: Available budget of $295,000 as of March 2018. ATTACHMENTS: San Marcos-7th Street Water Line Bid Results 3.A.5 Packet Pg. 20 3.A.5.aPacket Pg. 21Attachment: San Marcos-7th Street Water Line Bid Results (San Marcos/7th Street Water Line (CIP 18-018)) May 1, 2018 TO: City Council REQUESTED BY: Habib Motlagh, City Engineer APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements RECOMMENDATION: Staff recommends that the City Council approve Amendment No. 1 to the Agreement for Completion of Public Improvements for Project Royal, LP and RSI Communities - California LLC, Tract 31154, located at DeAnza Drive and Lyon Avenue. DISCUSSION: In September of 2005, an Agreement for Completion of Public Improvements for Tract 31154 listed the conditions that were mutually agreed upon between the City and Young California San Jacinto, LP. The developer that purchased the project, Project Royal, in conjunction with RSI Communities - California LLC, is proposing to complete the balance of the public improvements to Tract 31154, and as such, is required to establish new agreements and post new securities. The City Engineers' office has reviewed and approved the cost estimate and the City Attorney has reviewed and approved the attached agreements. FISCAL IMPACT: None. All costs associated with the completion of public improvements are the responsibility of the developer. ATTACHMENTS: 31154 RSI-Project Royal SA Amend 1 31154 Bonds 3.A.6 Packet Pg. 22 3.A.6.aPacket Pg. 23Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 24Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 25Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 26Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 27Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 28Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 29Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 30Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 31Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 32Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 33Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.aPacket Pg. 34Attachment: 31154 RSI-Project Royal SA Amend 1 (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 35Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 36Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 37Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 38Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 39Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 40Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 41Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 42Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 43Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 44Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.6.bPacket Pg. 45Attachment: 31154 Bonds (Tract 31154 Amendment No. 1 Agreement for Completion of Public Improvements) May 1, 2018 TO: City Council REQUESTED BY: Habib Motlagh, City Engineer APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements RECOMMENDATION: Staff recommends that the City Council approve Amendment No. 1 to the Agreement for Completion of Public Improvements for Project Royal, LP and RSI Communities - California LLC, Tract 31037-3; located at DeAnza Drive and Lyon Avenue. DISCUSSION: In December of 2006, an Agreement for Completion of Public Improvements for Tract 31037-3 listed the conditions that were mutually agreed upon between the City and Potter Ranch 2004, LLC. Project Royal, the new developer of the project, in conjunction with RSI Communities - California LLC, is proposing to complete the balance of the public improvements to Tract 31037-3, and as such, is required to establish new agreements and post new securities. The City Engineers' office has reviewed and approved the cost estimate and the City Attorney has reviewed and approved the attached agreements. FISCAL IMPACT: All costs associated with the completion of public improvements are the responsibility of the developer. ATTACHMENTS: 31037-3 RSI-Project Royal SA Amend 1 31037-3 Bonds 3.A.7 Packet Pg. 46 3.A.7.aPacket Pg. 47Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 48Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 49Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 50Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 51Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 52Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 53Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 54Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 55Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 56Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 57Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 58Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 59Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.aPacket Pg. 60Attachment: 31037-3 RSI-Project Royal SA Amend 1 (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 61Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 62Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 63Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 64Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 65Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 66Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 67Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 68Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 69Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 70Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) 3.A.7.bPacket Pg. 71Attachment: 31037-3 Bonds (Tract 31037-3 Amendment No. 1 Agreement for Completion of Public Improvements) May 1, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Resolution No. 3705 Electing to Participate with the County of Riverside Mortgage Credit Certificate RECOMMENDATION: Staff recommends that the City Council approve and adopt Resolution No. 3705 electing to participate with the County of Riverside Mortgage Credit Certificate Program. DISCUSSION: The County of Riverside Economic Development Agency (EDA) must apply to the California Debt Limit Allocation Committee (CDLAC) for the Mortgage Credit Certificate (MCC) Program. In preparation of the application, the EDA requests jurisdictions within the County to join with them in participating in the Program. If a jurisdiction agrees to participate, qualified lower-income applicants may use an MCC to purchase a home within those jurisdictions and/or the unincorporated county area. Since 2012, 193 homebuyers throughout Riverside County benefitted from the program. Of that amount, 26 purchased homes within the San Jacinto city limits. A Mortgage Credit Certificate (MCC) entitles qualified homebuyers to reduce the amount of their federal income tax liability by 20% of the interest paid during the year on the primary mortgage loan. Therefore, homebuyers can qualify more easily for a loan as lenders may factor the tax credit when underwriting the loan application, which may allow the borrower to qualify for a larger loan amount or improve the borrower’s qualifying debt ratios. If th e amount of the MCC exceeds the homebuyer’s tax liability, the unused portion of the credit can be carried forward to the next three years or until used, whichever comes first. The following table illustrates how a MCC increases a borrower’s "effective home buying power": Effective Home Buying Power With and Without an MCC Without MCC With MCC First Mortgage Amount $300,000 $300,000 Mortgage Interest Rate 4% 4% Monthly Mortgage (Principal & Interest Only) $1,432 $1,432 3.A.8 Packet Pg. 72 MCC Rate N/A 20% Monthly Credit Amount N/A $200 "Effective" Monthly Mortgage Payment $1,432 $1,232 Annual Income Needed * $61,371 $52,800 Annual Income needed is based on monthly Principal and Interest (P&I) not exceeding 28% of monthly income. The residence purchased in conjunction with an MCC must be the borrower’s principal residence and may not be used as a business, rental or vacation home. This program can be used with all housing types including, new, and resale detached or attached single-family, condominium, co- op, or a manufactured home on a permanent foundation. There are three basic criteria for determining a homebuyer’s eligibility for the MCC tax credits: 1. The borrower must be a first time Home Buyer defined as a person who has not had an ownership interest in an improved-upon residential real property, nor filed any mortgage or real estate related tax deductions during the most recent three (3) years. 2. The borrower’s annual income must fall within the program income limits as follows:  Maximum Income Outside Target Area* o Household with 1-2 persons: $73,300 o Household with 3+ persons: $84,295  Maximum Income Inside Target Area o Household with 1-2 persons: $87,960 o Household with 3+ persons: $102,620 3. The home being purchased must fall within the program purchase price limits as follows:  Maximum Home Purchase Price o Outside Target Area: $349,411 o Inside Target Area: $427,058 *Target Areas are census tracts designated by the Federal Government to encourage investment. In addition, if the home is located in a Target Area census tract, then the first-time buyer requirement does not apply and the income and purchase price limits are higher. There are target area census tracts throughout Riverside County. The following are the target areas in San Jacinto: 429.03, 436.01, 436.02, and 436.09. FISCAL IMPACT: Participating in this program will not have an impact to the City’s budget. ATTACHMENTS: Resolution No. 3705 3.A.8 Packet Pg. 73 STATE OF CALIFORNIA ) RESOLUTION NO. 3705 COUNTY OF RIVERSIDE)ss CITY OF SAN JACINTO ) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA, PARTICIPATING WITH THE COUNTY OF RIVERSIDE MORTGAGE CREDIT CERTIFICATE (MCC) PROGRAM WHEREAS, the Tax Reform Act of 1986 established the Mortgage Credit Certificate Program (“MCC Program”) as a means of assisting qualified individuals with the acquisition of new and existing single family housing; and WHEREAS, pursuant to Division 31, Part 1, Chapter 3.5, Article 3.4 of the California Health and Safety Code Sections 50197 et seq, local issuers are authorized to issue Mortgage Credit Certificates ("Certificates") and administer MCC Program; and WHEREAS, the Board of Supervisors of the County of Riverside adopted Resolution No 87-564 on December 22, 1987 establishing a Mortgage Credit Certificate Program; and WHEREAS, the Board of Supervisors of the County of Riverside has authorized the Riverside County Economic Development Agency (“EDA”) to administer the MCC Program pursuant to the applicable federal, state and local policies an d procedures, and to enter into those agreements necessary for efficient administration of the MCC Program; and WHEREAS, the County of Riverside (“County”) will be applying to the California Debt Limit Allocation Committee (“CDLAC”) for a mortgage credit certifi cate allocation in July 2018 or thereabouts; and WHEREAS, the City of San Jacinto (“City”) wishes to participate in the MCC Program administered by the EDA in connection with mortgage loans it will make available for the acquisition of new and existing single-family housing in Riverside County; and WHEREAS, the adoption of this resolution is necessary to include the City of San Jacinto as a participating unit of general government under County’s MCC program; and WHEREAS, the City agrees to cooperate with the County of Riverside to undertake the MCC program within City jurisdiction to assist persons or households of limited income to purchase new and existing single family residences located in the city; and 3.A.8.a Packet Pg. 74 Attachment: Resolution No. 3705 (Resolution No. 3705 Electing to Participate with the County of Riverside Mortgage Credit Certificate) WHEREAS, the City by adopting this Resolution, hereby gives notice of its election to participate in the Riverside County MCC program. NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of San Jacinto as follows: The City of San Jacinto agrees 1. to participate in the MCC Program administered by the EDA in connection with mortgage loans it will make available for the acquisition of new and existing single-family housing in Riverside County; 2. to assist the County of Riverside to market the MCC Program within the city’s jurisdictional boundary by publishing a general public notice in the local newspaper at least twice a year. PASSED, APPROVED AND ADOPTED by the City Council of the City of San Jacinto, California, at a regular meeting of the City Council held on the 1 st day of May, 2018, by the following vote: Ayes: Nays: Absent: Abstain: CITY OF SAN JACINTO: By: ______________________________ Crystal Ruiz, Mayor ATTEST: ___________________________________ Angela Walton, City Clerk APPROVED AS TO FORM: BEST BEST & KRIEGER, LLP Michael J. Maurer, City Attorney 3.A.8.a Packet Pg. 75 Attachment: Resolution No. 3705 (Resolution No. 3705 Electing to Participate with the County of Riverside Mortgage Credit Certificate) CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss CITY OF SAN JACINTO ) I, Angela Walton, City Clerk of the City of San Jacinto, do hereby certify that the foregoing Resolution No. 3705 was passed, approved, and adopted at the Regular Meeting of the San Jacinto City Council held on the 1st day of May 2018. Ayes: Nays: Absent: Abstain: WITNESS MY HAND AND OFFICIAL SEAL this 1st day of May 2018. _____________________________________ Angela Walton, City Clerk City of San Jacinto 3.A.8.a Packet Pg. 76 Attachment: Resolution No. 3705 (Resolution No. 3705 Electing to Participate with the County of Riverside Mortgage Credit Certificate) May 1, 2018 TO: City Council REQUESTED BY: Travis Randel, Community Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17 RECOMMENDATION: Staff recommends that the City Council receive and file the 2017 Annual Progress Report. BACKGROUND: Government Code Section 65400 mandates cities to prepare and submit an Annual Progress Report (APR) on the status and implementation of the General Plan and Housing Element. The report must be submitted to the City Council, the Governor’s Office of Planning and Research (OPR), and the Department of Housing and Community Development (HCD). The APR provides local legislative bodies with information regarding the implementation of the General Plan, and it provides OPR with the opportunity to identify statewide trends in land use decisions, and how local planning and development activities relate to statewide planning goals and policies. Providing a copy of the APR to HCD fulfills statutory requirements to report certain housing information, including the local agency’s progress in meeting its share of regional housing needs, and local efforts to remove governmental constraints to the development of affordable housing. The attached APR represents staff’s annual effort to provide this information in the format suggested by the State, and it includes the housing data that is required by current statutes. FISCAL IMPACT: There is no fiscal impact by receiving and filing this report. ATTACHMENTS: Attachment 1 - 2017 Annual Report, City of San Jacinto 3.A.9 Packet Pg. 77 City of San Jacinto General Plan and Housing Element Annual Report 01/01/17 to 12/31/17 Prepared by: City of San Jacinto Community Development Department 595 S. San Jacinto Avenue San Jacinto, CA 92583 Phone: 951.487.7330 3.A.9.a Packet Pg. 78 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17) 2 Table of Contents Page Purpose of the Annual Report 3 Background on the Existing City of San Jacinto General Plan 3 Date of Presentation/Acceptance by the Local Legislative Body 4 Date of Last Update to the General Plan 4 Measures Associated With Implementation of the General Plan 5 Planning/Construction Activities in 2017 5 General Plan Amendments in 2017 6 Appendix Table A 6 Table A2 7 Table A3 8 Table B 9 Table C 10 3.A.9.a Packet Pg. 79 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17) 3 Purpose of the Annual Report Government Code Section 65400 mandates that certain cities and all 58 counties submit an Annual Progress Report (APR) on the status of the General Plan and progress in its implementation to their legislative bodies to the Governors’ Office of Planning and Research (OPR), and the State Department of Housing and Community Development (HCD), by April 1 of each year. The APR provides local legislative bodies with information regarding the implementation of the General Plan for their city or county. APRs must be presented to the local legislative body for its review and acceptance, usually as a consent or discussion item on a regular meeting agenda. Therefore, the APR should provide enough information for decision makers to assess how the General Plan was implemented during the 12-month reporting period – either calendar year or fiscal year. More specifically, APRs explain how land use decisions relate to adopted goals, policies, and implementation measures of the General Plan. The APR should provide enough information to identify necessary “course adjustments” or modifications to the General Plan, and means to improve local implementation. The State uses the APR to identify statewide trends in land use decision making and how local planning and development activities relate to statewide planning goals and policies. APRs may identify needed modifications and improvements to OPR’s General Plan Guidelines. In addition, OPR is able to track progress on a local jurisdiction’s comprehensive General Plan update using information provided in the APR.1 Background on the Existing City of San Jacinto General Plan In 2006, the City Council adopted the current General Plan, which replaced the prior General Plan that was adopted in 1985. The adoption of the General Plan in 2006 culminated a multi - year effort that was initiated in 2000, when the Council identified the need to comprehensively update the General Plan. California State law requires each city and county to adopt a comprehensive General Pan to guide the long term physical development of the community. A City’s General Plan serves as a blueprint for future growth and development, and is a City’s foremost policy document for both short and long term planning and development. Per State law, the General Plan must address and include at least the following seven elements: land use, circulation, housing, noise, safety, conservation, and open space. The law allows a city to include other elements that are deemed locally important, such as community services and facilities. The San Jacinto General Plan addresses these required and optional issues in the following elements:  Land Use  Community Services and Facilities  Circulation 1 Governor’s Office of Planning and Research. State of California: 2007 General Plan Annual Progress Report Guidance. Office of Planning and Research: Sacramento, 2007. 3.A.9.a Packet Pg. 80 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17) 4  Resource Management  Public Safety  Noise  Housing  Arts and Culture Since the adoption of the San Jacinto General Plan in 2006, there were no amendments to the issues, goals, and policies until 2012. The adoption of a new Housing Element for the 4th planning cycle covering the 2008-2014 planning period was completed in 2012. Extensive updates to the Land Use Element and Land Use Policy map in conjunction with the adoption of a new Development Code and Zoning Map were completed in December 2012. A new Housing Element of the General Plan for the 5th planning cycle covering 2013-2021, drafted by staff and a consultant continued through the certification process with State HCD. On September 17, 2013, the City Council adopted the Housing Element for 2013-2021. On September 26, 2013, the City received a letter from State HCD finding the adopted housing element in full compliance with the State Housing Element Law and in compliance with statutory requirements. The City also adopted a new Arts and Culture Element as part of the General Plan on December 3, 2013. The Arts and Culture Element describes the existing arts and cultural resources in the area, identifies opportunities for arts enrichment, and defines goals, polices, and implementation strategies to further integrate arts and culture in the City’s future. Date of Presentation/Acceptance by the Local Legislative Body The 2017 General Plan Annual Report was received and filed at a regularly scheduled City Council meeting on May 1, 2018. Date of Last Update to the General Plan The San Jacinto General Plan underwent a comprehensive review and update, and was formally approved on May 4, 2006, with the adoption of Resolution No. 2895. The 2012 adoption of the Housing Element and updated Land Use Element was formally approved/adopted on October 19, 2012, with City Council adoption of Resolution No. 3444 for General Plan Amendment No. 1- 12. The Housing Element for 2013-2021 was adopted as General Plan Amendment No. 1-13 on September 17, 2013. The Arts and Culture Element was adopted as General Plan Amendment No. 2-13 on December 3, 2013. 3.A.9.a Packet Pg. 81 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17) 5 3.A.9.a Packet Pg. 82 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17) 6 Measures Associated With Implementation of the General Plan Planning / Construction Activities in 2017 Public Improvements  San Jacinto Avenue Pavement Rehabilitation FPN: STPLN-5075 (018)  HSIP Cycle 5: Signalized Intersection Pedestrian Upgrades  HSIP Cycle 6: Pedestrian Upgrades at Unsignalized Intersections  Sanderson and Ramona Boulevard Traffic Signal  Active Transportation Program Cycle  2017 CDBG Downtown Street Improvements  Streetlight pole retrofitting of 350 City owned poles from LPS to LED. Includes residential, Lake Park bridge, Main Street’s Downtown areas. These new lights provide higher visibility, safety, and reduce electricity billing.  Street light conduit installation - Villines / Garrett Way Pedestrian Upgrades:  Sidewalk improvements along Ramona Blvd from Skyview to Chase  Sidewalk improvements San Jacinto / Esplanade  Sidewalk improvements and cross cut at Grand / Industrial Way  Sidewalk improvements at Santa Fe, North of Menlo  Sidewalk improvements at Esplanade (in front of Valley wide)  ADA Ramp and Sidewalk improvements on Main St. Brown  Storm Water catch basin and culvert installation at Lyon and Ramona Blvd., Idyllwild near State (repair only), Esplanade near Palm (in front of Valley wide), and Shaver and Hewitt (repair only)  Curb and Gutter repair and replacement at Gladiolus and Burgundy Place, Cherry Laurel Lane, Grand Avenue, and Industrial Way  Thermoplastic and paint striping State St. from Quant Ranch Road to Esplanade Avenue and Main Street to Ramona Expressway  Street repair and replacement on Seventh Street from Ivy Crest to Kirby Planning Projects  Preparation of a Downtown Specific Plan continued into 2017. Utilizing funding from the California’s Strategic Growth Council, the City of San Jacinto is beginning a community-based planning process for revitalization of its Downtown. The Plan will provide long-term guidance for positive-growth, focusing on the creation of mixed use, compact, and pedestrian scale development, as well as, support for future regional transportation and transit. The Plan will also focus on a new Transit Oriented Development (TOD) Corridor to include higher density along transportation corridors. This effort will also include preparation of a new General Plan Health Element.  Commercial development continued to increase with new commercial and residential development applications submitted for processing, as follows. 3.A.9.a Packet Pg. 83 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17) 7 Commercial Projects o Aldi Retail Store and Dental Building o Wienerschnitzel Fast Food Drive Through o Seventh Street/Sanderson Commercial Project o Luiseno Village Commercial Center o Commonwealth Crossing Commercial Development Residential Projects (For Sale Single-Family Homes) o Luz Del Sol o The Cove o Maravilla Senior Living o Potter Ranch o Santiago Ranch o Sandlewood o Arterra  A Development Code Amendment to permit Commercial Marijuana Cultivation was approved. Outdoor cannabis cultivation in focused in the western portion of the City which currently has more agricultural uses, with indoor cultivation in the specified areas of the Industrial Zones. General Plan Amendments in 2017 The City adopted General Plan Amendment (GPA) 17-01, amending the General Plan Land Use Policy Map to change the land use designation of two properties from Community Commercial to Residential Medium. Two new tentative tract maps were approved to provide a total of 154 new residential lots. 3.A.9.a Packet Pg. 84 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element Reporting Period 01/01/17 to 12/31/17) 7 TABLE A ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation (CCR Title 25 §6202 ) Jurisdiction San Jacinto Reporting Period 1/1/2017 - 12/31/2017 Table A Annual Building Activity Report Summary - New Construction Very Low-, Low-, and Moderate-Income Units and Mixed-Income Multifamily Projects Housing Development Information Housing with Financial Assistance and/or Deed Restrictions Housing without Financial Assistance or Deed Restrictions 1 2 3 4 5 5a 6 7 8 Project Identifier (may be APN No., project name or address) Unit Categor y Tenure R=Rent er O=Own er Affordability by Household Incomes Total Units per Project Est. # Infill Units** Assistance Programs for Each Developm ent Deed Restricted Units Note below the number of units determined to be affordable without financial or deed restrictions and attach an explanation how the jurisdiction determined the units were affordable. Refer to instructions. Very Low- Income Low- Income Moderate- Income Above Moderate- Income See Instruction s See Instruction s The Cove SF O 45 Luz Del Sol SF O 43 Potter Ranch SF O 60 Arterra SF O 3 Maravilla SF O 4 Infill SF O 1 Santiago SF O 1 Stallion’s Crossing SF O 59 (9) Total of Moderate and Above Moderate from Table A3 ► ► ► ► ► ► 216 (10) Total by income Table A/A3 ► ► (11) Total Extremely Low-Income Units* * Note: These fields are voluntary 3.A.9.a Packet Pg. 85 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element 9 Table A2 Annual Building Activity Report Summary - Units Rehabilitated, Preserved and Acquired pursuant to GC Section 65883.1(c)(1) Please note: Units may only be credited to the table below when a jurisdiction has included a program in its housing element to rehabilitate, preserve or acquire units to accommodate a portion of its RHNA which meet the specific criteria as outlined in GC Section 65583.(c)(1) Activity Type Affordability by Household Incomes (4) Description of Activity Including Housing Element Program Reference Very Low- Income Low- Income Moderate- Income TOTAL UNITS (1) Rehabilitation Activity 0 (2) Preservation of Units At-Risk 36 36 3. Conservation of Existing and Future Affordable Units – Supported the application for Tax Credits to preserve the affordable units. (3) Acquisition of Units 0 (5) Total Units by Income 0 0 0 0 3.A.9.a Packet Pg. 86 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element 10 Table A3 Annual building Activity Report Summary for Above Moderate-Income Units (not including those units reported on Table A) 1. Single Family 2. 2 - 4 Units 3. 5+ Units 4. Second Unit 5. Mobile Homes 6. Total 7. Number of infill units* No. of Units Permitted for Moderate (<1600 sf) No. of Units Permitted for Above Moderate (>1600 sf) * Note: This field is voluntary 3.A.9.a Packet Pg. 87 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element 11 TABLE B Regional Housing Needs Allocation Progress Permitted Units Issued by Affordability Enter Calendar Year starting with the first year of the RHNA allocation period. See Example. 2014 2015 2017 2017 2018 2019 2020 2021 Total Units to Date (all years) Total Remaining RHNA by Income Level Income Level RHNA Allocation by Income Level Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Very Low Deed Restricted 562 562 Non-deed restricted Low Deed Restricted 394 394 Non-deed restricted Moderate Deed Restricted 441 209 Non-deed restricted 4 4 8 216 Above Moderate 1036 51 92 137 756 Total RHNA by COG. Enter allocation number: 2,433 55 96 145 216 2,137 Total Units ► ► ► Remaining Need for RHNA Period ► ► ► ► ► 3.A.9.a Packet Pg. 88 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element 12 Table C 2013-2021 Housing Element Program Evaluation Program Responsible Agency Funding Source Program Objectives Accomplishments and Future Actions Conserve and Improve Affordable Housing 1. Code Enforcement Code Enforcement Staff Redevelopment Set Aside, CDBG, and General Fund Continue to implement code enforcement program. By the end of FY 14/15, complete a comprehensive housing conditions survey. Use the survey to target funding priorities of Program 2B. Ongoing. Funded by General Fund and CDBG. Comprehensive housing conditions survey has not been completed due to funding and staffing constraints. 2A. Housing Rehabilitation Loan Programs - Single- Family Homeowner Redevelopment Agency, Planning Department Redevelopment set- aside, CDBG, Federal HOME, and General fund Strive to assist at least two units annually. The City does not have a replacement funding source, since the loss of Redevelopment. Future funding to continue the program is uncertain at this time. 2B. Enhanced Senior Home Repair Grant Program Redevelopment Agency, Planning Department, Code Enforcement team Redevelopment set- aside, CDBG, Federal HOME, and General fund Strive to assist at least 2 units annually. The City does not have a replacement funding source, since the loss of Redevelopment. Future funding to continue the program is uncertain at this time. 3. Conservation of Existing and Future Affordable Units Community Development Department, HUD, HCD, and the Housing Authority of Riverside County (HARIVCO) HUD Section 8 vouchers, other funding sources as available Monitor the status of assisted projects (none were at-risk during the planning period). The City supported the a Tax Credit application for one housing project and it received Tax Credit funding to rehabilitate units and add a small community room. The rehabilitation was completed in 2017. 4. Section 8 Rental Assistance Housing Authority of Riverside County Section 8 vouchers Continue to support the HARIVCO’s applications for additional Section 8 allocations and efforts to provide vouchers for lower income San Jacinto residents. Ongoing - continue to support. 3.A.9.a Packet Pg. 89 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element 13 Provide Adequate Housing Sites 5. Land Use Element Planning Department General fund Maintain land use designations on adequate sites to accommodate San Jacinto’s regional housing needs. The Land Use Element was amended in 2012 to provide additional capacity for high-density housing commensurate with the RHNA (see also Program 11). This program should be continued although no Land Use Element amendments are necessary in the new planning period. Facilitate the Provision of Affordable Housing 6. Provide Incentives and Assistance to Affordable Housing Developments Planning Department General Fund Facilitate affordable housing development commensurate with the RHNA. No new projects were assisted in 2017. The City did support a successful Tax Credit application and fast tracked the rehabilitation plans and review process for an existing 36- unit low income apartment development. The City will continue to review opportunities for affordable housing development. 7. Downpayment Assistance Redevelopment Agency Redevelopment set- aside Provide downpayment or closing cost assistance to five qualified persons or families annually. The City does not have a replacement funding source, since the loss of Redevelopment. Future funding to continue the program is uncertain at this time 8. Single-Family Infill Housing Program Planning Department Redevelopment set- aside, CDBG, HOME, tax credits, bond financing Assist in the development of one single-family home annually through the end of the planning period. Prior to the dissolution of the RDA, the City was working with Habitat for Humanity to acquire sites for new homes. The City does not have a replacement funding source, since the loss of Redevelopment. Future funding to continue the program is uncertain at this time 9. Pursue State and Federal Funding Redevelopment Agency, County of Riverside EDA, HCD, CalHFA, and others Redevelopment set- aside, CDBG, HOME, tax credits, and bonds Work with at least one developer or interested entity annually. When a developer expresses interest in developing affordable or special needs housing in San Jacinto, determine funding priorities and sources and support applications for funding. With the loss of RDA set-aside funds, continuation of the program is uncertain at this time. The City continues to discuss opportunities with potential affordable housing developers. 10. Mortgage Credit Certificate Program Riverside County EDA EDA and federal tax credits Provide information regarding the MCC Program to eligible home buyers. The City worked with Riverside County EDA to facilitate MCCs for homebuyers in San Jacinto. 3.A.9.a Packet Pg. 90 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element 14 Promote Equal Housing Opportunities 11. Fair Housing Services Redevelopment Agency General fund Continue to work with the County of Riverside to provide fair housing services to residents of San Jacinto Services are provided through Riverside County EDA. The Fair Housing Council provided homebuyer workshops. 12. Reasonable Accommodation in Housing for Persons with Disabilities Planning Department Department budget Establish a formal policy or procedure for processing requests for reasonable accommodation. Updated Reasonable Accommodation procedures were added to the Development Code in 2014. This program has been completed. 13. Housing for Extremely- Low-Income Persons Planning Department Grant funds, Riverside County EDA  Provide expedited permit processing for new housing that includes ELI units, such as SROs and transitional/supportive housing  Provide regulatory concessions and/or financial incentives when developers include ELI units in affordable developments  Conduct annual outreach to non-profit developers The City has continued to work with affordable housing developers to identify potential sites, although no ELI units were produced. 13. Housing for Extremely- Low-Income Persons Planning Department General fund, Grant funds, Work cooperatively with property owners, utility companies and other government agencies to reduce energy use in residential developments. The City has supported the WRCOG HERO program for providing low interest loans to qualified property owners for energy efficient upgrades. 3.A.9.a Packet Pg. 91 Attachment: Attachment 1 - 2017 Annual Report, City of San Jacinto (General Plan and Housing Element May 1, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying Assessor Parcel No. 439-112-031 RECOMMENDATION: Staff recommends that the Governing Board adopt and approve the attached Resolution No. SA 18-01 to (i) approve the Quitclaim Deed Conveying Assessor Parcel No. 439-112-031, from the Successor Agency to Fun Properties, LLC (ii) authorize the Executive Directo r to execute the Quitclaim Deed. DISCUSSION: The former San Jacinto Redevelopment Agency (“Former RDA”) entered into a Disposition and Development Agreement with Fun Properties, LLC for the purpose of conveying that certain real property commonly described as 1635 South San Jacinto Avenue, and more specifically described in the Resolution accompanying this staff report (the “Property”), from the Former RDA to Fun Properties, LLC. It has come to the parties’ attention that Assessor Parcel No. 439 - 112-031 (“Subject Parcel”), which bisects the property transferred to Fun Properties, LLC under the DDA, appears on title as owned by the Former RDA. The Subject Parcel is an abandoned Eastern Municipal Water District water line, and has no economic value to the Successor Agency, or to the City of San Jacinto. Pursuant to Health and Safety Code Section 34172, the Former RDA was dissolved as of February 1, 2012. Pursuant to Health and Safety Code Section 34173, the City of San Jacinto elected to become the Successor Agency to the Former RDA (“Successor Agency”). The Successor Agency is a separate legal entity from the City. In order to effectuate the intent and purpose of the DDA, staff recommends that the attached Quitclaim Deed be approved for the transfer of the Subject Parcel from the Successor Agency to Fun Properties, LLC, and that the Executive Director be authorized to execute the Quitclaim Deed. The Oversight Board is responsible for approving or directing the actions of the Successor Agency pursuant to Health and Safety Code Section 34179 and 34181. Should the Quitclaim Deed be approved by the Board of the Successor Agency, it would also require the approval by the Oversight Board in order to be legally effective. FISCAL IMPACT: The Subject Parcel has no economic value to the Successor Agency. Transfer of the Subject 3.B.1 Packet Pg. 92 Parcel will have no fiscal impact on the Successor Agency. ATTACHMENTS: Resolution SA 18-01 Quitclaim Deed Conveying Parcel No. 439-112-031 3.B.1 Packet Pg. 93 24438.31000\31009442.1 1 STATE OF CALIFORNIA ) RESOLUTION NO. SA 18-01 COUNTY OF RIVERSIDE ) ss CITY OF SAN JACINTO ) A RESOLUTION OF THE SUCCESSOR AGENCY TO THE SAN JACINTO REDEVELOPMENT AGENCY APPROVING A QUITCLAIM DEED CONVEYING ASSESSOR PARCEL NO. 439-112-031 FROM THE SUCCESSOR AGENCY TO FUN PROPERTIES, LLC TO EFFECTUATE THE DISPOSITION AND DEVELOPMENT AGREEMENT ENTERED INTO BY AND BETWEEN THE FORMER SAN JACINTO REDEVELOPMENT AGENCY AND FUN PROPERTIES, LLC WHEREAS, pursuant to Health and Safety Code Section 34173(d), the City of San Jacinto elected to become the successor agency (“Successor Agency”) to the dissolved San Jacinto Redevelopment Agency (“Former RDA”), and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is a separate legal entity from the City. WHEREAS, the Former RDA and Fun Properties, LLC entered into a Disposition and Development Agreement, dated February 7, 1995, as subsequently amended, (“DDA”) for the transfer of that certain real property generally described as 1635 South San Jacinto Avenue, and more specifically described in Exhibit “A” attached to this Resolution (the “Property”) to Fun Properties, LLC. WHEREAS, pursuant to the DDA, the Property was transferred to Fun Properties, LLC and was developed in accordance with the terms of the DDA, and currently includes an operating gym. WHEREAS, due to an apparent oversight, the Successor Agency, as successor to the Former RDA, owns that certain real property identified as Assessor Parcel No. 439-112-031, in the City of San Jacinto, California (“Subject Parcel”), which parcel bisects the Property, and has been developed as part of the development of the Property. The Subject Parcel is legally described in that certain Quitclaim Deed attached as Exhibit “B” to this Resolution. WHEREAS, the Subject Parcel is an abandoned Eastern Municipal Water District water line, and has no economic value to the Successor Agency, or to the City of San Jacinto. WHEREAS, in order to effectuate the intent and purpose of the DDA, the Successor Agency desires to convey the Property to Fun Properties, LLC, and Fun Properties, LLC desires to accept such conveyance of the Property. 3.B.1.a Packet Pg. 94 Attachment: Resolution SA 18-01 [Revision 1] (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying Assessor Parcel No. 24438.31000\31009442.1 2 NOW, THEREFORE, BE IT RESOLVED, ordered, and determined by the Governing Board of the Successor Agency to the San Jaci nto Redevelopment Agency as follows: SECTION 1. Recitals. The Recitals set forth above are true and correct and are incorporated into this Resolution by this reference. SECTION 2. Quitclaim of Subject Parcel to Fun Properties, LLC. The Successor Agency hereby directs and approves the transfer of the Subject Parcel to Fun Properties, LLC pursuant to the Quitclaim Deed attached as Exhibit “B” to this Resolution. Contingent on approval of the Oversight Board, the Executive Director is hereby authorized to execute the Quitclaim Deed for the Subject Parcel. SECTION 3. Further Acts. The Executive Director, or his designee, is hereby authorized and directed to take any action necessary to carry out the purposes of this Resolution and comply with applicable law. SECTION 4. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Successor Agency declares that the Successor Agency would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution. SECTION 5. Certification. The Secretary to the Successor Agency shall certify to the adoption of this Resolution. SECTION 6. Effective Date. This Resolution shall become effective immediately upon its adoption. MOVED, PASSED AND ADOPTED at a regular meeting of the Successor Agency on May 1, 2018 by the following vote: AYES: NAYS: ABSENT: ABSTAIN: [continued on following page] 3.B.1.a Packet Pg. 95 Attachment: Resolution SA 18-01 [Revision 1] (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying Assessor Parcel No. 24438.31000\31009442.1 3 Governing Board of the Successor Agency to the former San Jacinto Redevelopment Agency ______________________________ Crystal Ruiz, Chair of the Successor Agency ATTEST: ______________________________ Angela Walton, Board Secretary 3.B.1.a Packet Pg. 96 Attachment: Resolution SA 18-01 [Revision 1] (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying Assessor Parcel No. 24438.31000\31009442.1 3.B.1.a Packet Pg. 97 Attachment: Resolution SA 18-01 [Revision 1] (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying Assessor Parcel No. 3.B.1.bPacket Pg. 98Attachment: Quitclaim Deed Conveying Parcel No. 439-112-031 (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying 3.B.1.bPacket Pg. 99Attachment: Quitclaim Deed Conveying Parcel No. 439-112-031 (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying 3.B.1.bPacket Pg. 100Attachment: Quitclaim Deed Conveying Parcel No. 439-112-031 (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying 3.B.1.bPacket Pg. 101Attachment: Quitclaim Deed Conveying Parcel No. 439-112-031 (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying 3.B.1.bPacket Pg. 102Attachment: Quitclaim Deed Conveying Parcel No. 439-112-031 (Resolution SA 18-01 of Successor Agency for Quitclaim Deed Conveying May 1, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Resolution SA 18-02 of Successor Agency for Termination of Disposition and Development Agreement RECOMMENDATION: Staff recommends that the Governing Board adopt and approve the attached Resolution to (i) approve the termination of Disposition and Development Agreement, as amended by Amendment No. 1, and Related Deed Covenants and Lease and Option Agreement for 1635 S. San Jacinto Ave, (ii) approve the accompanying Termination Agreement, and (iii) authorize the Executive Director to execute the agreement, and to take all necessary actions to effectuate the termination described herein and in the attached Resolution. DISCUSSION: Fun Properties LLC (“Redeveloper”) owns certain real property in the City of San Jacinto, California generally described as 1635 S. San Jacinto Avenue (the “Property”). The Property is currently operated as the Powerhouse Gym, and is part of an area formerly referred to in the City as the “Superblock.” The former Redevelopment Agency of the City of San Jacinto (“Former RDA”) and Redeveloper entered into that certain Disposition and Development Agreement, dated February 7, 1995, (the “DDA”) for the transfer of the Property and construction by Redeveloper of an entertainment center, an indoor skating rink, an outdoor skating rink, and a parking lot on the Property, and a loan from the RDA to Redeveloper, in the sum of 327,484.00, for the project (“RDA Loan”). The Property was transferred to Redeveloper pursuant to a form of deed provided for under the DDA which includes redevelopment related covenants including, but not limited to, a covenant to operate the Property as a commercial retail/entertainment establishment (“Deed Covenants”). The Former RDA and Redeveloper entered into an Amendment No. 1 to the DDA, dated May 17, 2001, (“Amendment No. 1”) to change the use of the Property from a skating rink to a gym, to provide for a parking lot lease and option to purchase in favor of the RDA (“Parking Lot Lease Agreement”), and to make changes to the RDA Loan terms under the DDA, including to reflect the original principal amount and interest owed under the RDA Loan, totaling $342,742.46. The RDA Loan has been fully repaid by Redeveloper. As a result of the passage of Assembly Bill 1X 26 and AB 1484, and pursuant to Health and Safety Code Section 34173, the City of San Jacinto elected to become the Successor Agency to 3.B.2 Packet Pg. 103 the Former RDA (“Successor Agency”) and now stands in the shoes of the Former RDA under the terms of the DDA, and related agreements described above. The Successor Agency is a separate legal entity from the City. The original purpose of the DDA, as amended, has been satisfied, the Property has been developed and continues to operate as intended, the site of the Property is zoned commercial, ensuring the continued operation of the Property for commercial purposes, and the RDA Loan has been repaid in full. The City has never used the parking lot identified in the Parking Lot Lease Agreement, and has no evidence that the Parking Lot Lease Agreement was actually executed. Neither the City nor the Successor Agency anticipate any future need for use of the parking lot for City purposes. The continued effect of the DDA and related agreements described above serve no beneficial purpose to the Successor Agency or to the City. The Redeveloper desires to sell the Property, and the potential purchaser has concerns with the continued existence of the DDA, as amended by Amendment No. 1, the Parking Lot Lease Agreement, and the Deed Covenants (“DDA and Related Agreements”). In order to promote the free sale and transfer of property in the City, and since the DDA and Related Agreements no longer serve any beneficial purpose to the City or the Successor Agency, staff recommends the termination of the DDA and Related Agreements. Should the Termination Agreement be approved by the Board of the Successor Agency, it would also require the approval by the Oversight Board in order to be legally effective. FISCAL IMPACT: The approval of the accompanying Termination Agreement is not expected to have a fiscal impact on the City. ATTACHMENTS: Resolution SA 18-02 Successor Agency -Termination of DDA and Related Agreements - Fun Properties Legal Description_Fun Properties 3.B.2 Packet Pg. 104 24438.31000\31009442.1 1 STATE OF CALIFORNIA ) RESOLUTION SA 18-02 COUNTY OF RIVERSIDE ) ss CITY OF SAN JACINTO ) A RESOLUTION OF THE GOVERNING BOARD OF THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO APPROVING THE TERMINATION OF DISPOSITION AND DEVELOPMENT AGREEMENT, AS AMENDED, DEED COVENANTS AND PARKING LOT LEASE AND OPTION AGREEMENT FOR PROPERTY GENERALLY DESCRIBED AS 1635 SOUTH SAN JACINTO AVENUE AND APPROVING A TERMINATION AGREEMENT TO EFFECTUATE THE SAME WHEREAS, Fun Properties LLC (“Redeveloper”) owns certain real property in the City of San Jacinto, California (“Property”). WHEREAS, the Property is more specifically described in Exhibit “A” to the Termination Agreement attached to the staff report accompanying this Resol ution. WHEREAS, the former Redevelopment Agency of the City of San Jacinto (“Former RDA”) and Redeveloper entered into that certain Disposition and Development Agreement, dated February 7, 1995, (the “DDA”) for the transfer of the Property and construction by Redeveloper of an entertainment center, an indoor skating rink, an outdoor skating rink, and a parking lot on the Property, and a loan from the RDA to Redeveloper, in the sum of 327,484.00, for the project (“RDA Loan”). WHEREAS, the Property was transferred to Redeveloper pursuant to a form of deed provided for under the DDA which includes various redevelopment related covenants regarding the use and operation of the Property including, but not limited to, a covenant that the Property be used as a commercial retail/entertainment establishment (“Deed Covenants”). WHEREAS, the Former RDA and Redeveloper entered into an Amendment No. 1 to the DDA, dated May 17, 2001, (“Amendment No. 1”) to change the use of the Property from a skating rink to a gym, to p rovide for a parking lot lease and option to purchase in favor of the RDA (“Parking Lot Lease Agreement”), and to make changes to the RDA Loan terms under the DDA, including to reflect the original principal amount and interest owed under the RDA Loan, tot aling $342,742.46. WHEREAS, the RDA Loan has been fully repaid by Redeveloper, and the Property is currently operated as the Powerhouse Gym. 3.B.2.a Packet Pg. 105 Attachment: Resolution SA 18-02 (Resolution SA 18-02 of Successor Agency for Termination of Disposition and Development Agreement) 24438.31000\31009442.1 2 WHEREAS, as a result of the passage of Assembly Bill 1X 26 and AB 1484, and pursuant to Health and Safety Code Section 34173, the City of San Jacinto elected to become the Successor Agency to the Former RDA (“Successor Agency”) and now stands in the shoes of the Former RDA under the terms of the DDA, and related agreements described above. The Successor Agency is a s eparate legal entity from the City. WHEREAS, the original purpose of the DDA, as amended, has been satisfied, the Property has been developed and continues to operate as intended, the site of the Property is zoned commercial, ensuring the continued operat ion of the Property for commercial purposes, and the RDA Loan has been repaid in full. WHEREAS, the City has never used the parking lot identified in the Parking Lot Lease Agreement; the City and Successor Agency do not anticipate the need for any future use of the parking lot for City purposes; and the Successor Agency has no evidence that the Parking Lot Lease and Agreement was executed. WHEREAS, the continued effect of the DDA and related agreements described above serve no beneficial purpose to the Successor Agency or to the City. WHEREAS, the Redeveloper desires to sell the Property, and the potential purchaser has concerns with the continued existence of the DDA, as amended by Amendment No. 1, the Parking Lot Lease Agreement, and the Deed Covenants (“DDA and Related Agreements”). WHEREAS, in order to promote the free transfer and beneficial use of Property in the City, the Successor Agency desires to terminate the DDA and Related Agreements. WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred. NOW, THEREFORE, BE IT RESOLVED, ordered, and determined by the governing board of the Successor Agency to the San Jacinto Redevelopment Agency: SECTION 1. Recitals. The Recitals set forth above are true and correct and are incorporated into this Resolution by this reference. SECTION 2. Termination of DDA and Related Agreements. The Governing Board of the Successor Agency hereby adopts the findings set forth in the Recitals, and agrees to terminate the DDA and Related Agreements pursuant to the attached Termination of Agreements and Deed Covenants (“Termination Agreement”). Contingent on approval of the Oversight Board of the Termination Agreement, the Executive Director is authorized and directed to execute the Termin ation Agreement. 3.B.2.a Packet Pg. 106 Attachment: Resolution SA 18-02 (Resolution SA 18-02 of Successor Agency for Termination of Disposition and Development Agreement) 24438.31000\31009442.1 3 SECTION 3. Further Acts. The Executive Director, or his designee, is hereby authorized and directed to take any action necessary to carry out the purposes of this Resolution and comply with applicable law. SECTION 4. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Successor Agency declares that the Successor Agency would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution. SECTION 5. Certification. The Secretary of the Board shall certify to the adoption of this Resolution. SECTION 6. Effective Date. This Resolution shall become effective immediately upon its adoption. MOVED, PASSED AND ADOPTED at a regular meeting of the Successor Agency on May 1, 2018 by the following vote: AYES: NAYS: ABSENT: ABSTAIN: Governing Board of the Successor Agency to the former San Jacinto Redevelopment Agency _____________________________________ Crystal Ruiz, Chair of the Successor Agency ATTEST: ______________________________ Angela Walton, Board Secretary 3.B.2.a Packet Pg. 107 Attachment: Resolution SA 18-02 (Resolution SA 18-02 of Successor Agency for Termination of Disposition and Development Agreement) 24438.31000\31009442.1 EXHIBIT A TERMINATION AGREEMENT [Attached behind this page] 3.B.2.a Packet Pg. 108 Attachment: Resolution SA 18-02 (Resolution SA 18-02 of Successor Agency for Termination of Disposition and Development Agreement) -1- 24438.31000\31009582.1 TERMINATION OF AGREEMENTS AND DEED COVENANTS THIS AGREEMENT is dated for reference purposes only as of May 1, 2018 by and between the SUCCESSOR AGENCY TO THE CITY OF SAN JACINTO REDEVELOPMENT AGENCY (“Successor Agency”) and FUN PROPERTIES, LLC, a California limited liability company (“Redeveloper”). R E C I T A L S A. Redeveloper owns certain real property in the City of San Jacinto, California generally described as 1635 South San Jacinto Avenue (“Property”). B. The Property is more specifically described in Exhibit “A” attached to this Agreement and incorporated herein by reference. C. The former Redevelopment Agency of the City of San Jacinto (“Former RDA”) and Redeveloper entered into that certain Disposition and Development Agreement, dated February 7, 1995, (the “DDA”) for the transfer of the Property and construction by Redeveloper of an entertainment center, an indoor skating rink, an outdoor skating rink, and a parking lot on the Property, and a loan from the RDA to Redeveloper, in the sum of 327,484.00, for the project (“RDA Loan”). D. The Property was transferred to Redeveloper pursuant to a form of deed provided for under the DDA which includes redevelopment related covenants including, but not limited to, a covenant to operate the Property as a commercial retail/entertainment establishment (“Deed Covenants”). E. The Former RDA and Redeveloper entered into an Amendment No. 1 to the DDA, dated May 17, 2001, (“Amendment No. 1”) to change the use of the Property from a skating rink to a gym, to provide for a parking lot lease and option to purchase in favor of the RDA (“Parking Lot Lease Agreement”), and to make changes to the RDA Loan terms under the DDA, including to reflect the original principal amount and interest owed under the RDA Loan, totaling $342,742.46. F. As result of the passage of Assembly Bill 1X 26 and AB 1484, and pursuant to Health and Safety Code Section 34173, the City of San Jacinto elected to become the Successor Agency to the Former RDA (“Successor Agency”) and now stands in the shoes of the Former RDA under the terms of the DDA, and related agreements described above. The Successor Agency is a separate legal entity from the City. G. The original purpose of the DDA, as amended, has been satisfied, the Property has been developed and continues to operate as intended, the site of the Property is zoned commercial, ensuring the continued operation of the Property for commercial purposes, and the RDA Loan has been repaid in full. 3.B.2.b Packet Pg. 109 Attachment: Successor Agency -Termination of DDA and Related Agreements - Fun Properties (Resolution SA 18-02 of Successor Agency for -2- 24438.31000\31009582.1 H. The City has never used the parking lot identified in the Parking Lot Lease Agreement; the City and Successor Agency do not anticipate the need for any future use of the parking lot for City purposes; and the Successor Agency has no evidence that the Parking Lot Lease Agreement was executed. I. Redeveloper desires to sell the Property, and the existence of the DDA, as amended by Amendment No. 1, the Deed Covenants and the Parking Lot Lease Agreement (“DDA and Related Agreements”), has impeded the Redeveloper’s ability to freely sell and transfer the Property. J. Since the Successor Agency has determined that the DDA and Related Agreements have no beneficial purpose for the City or the Successor Agency, the Successor Agency desires to terminate the DDA and Related Agreements. NOW, THEREFORE, in consideration of the agreements of the parties herein contained, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: A G R E E M E N T 1. Termination of DDA and Related Agreements. Successor Agency and Redeveloper hereby acknowledge and agree that to the extent the DDA and Related Agreements have any effect, the DDA and Related Agreements are hereby terminated and of no further force or effect whatsoever. 2. Effective Date. This Agreement shall be effective on the date that this Agreement is approved by Successor Agency Board, the Oversight Board of the City of San Jacinto, and is executed by the parties. 3. Further Acts. The parties shall take any other further acts necessary to carry out the purposes of this Agreement. 4. Counterparts. This Agreement may be executed in any number of counterparts, all of which taken together shall constitute one agreement. SIGNATURES ON FOLLOWING PAGES 3.B.2.b Packet Pg. 110 Attachment: Successor Agency -Termination of DDA and Related Agreements - Fun Properties (Resolution SA 18-02 of Successor Agency for -3- 24438.31000\31009582.1 SIGNATURE PAGE TO TERMINATION OF AGREEMENTS AND USE COVENANT REDEVELOPER Fun Properties, LLC Date: ______________ By: Its: _______________________________ SUCCESSOR AGENCY TO THE CITY OF SAN JACINTO REDEVELOPMENT AGENCY Date: ________________ By: Robert A. Johnson, Executive Director ATTEST: APPROVED AS TO FORM: Angela Walton, Board Secretary By: Best Best & Krieger LLP Counsel to Successor Agency 3.B.2.b Packet Pg. 111 Attachment: Successor Agency -Termination of DDA and Related Agreements - Fun Properties (Resolution SA 18-02 of Successor Agency for Exhibit A 24438.31000\31009582.1 EXHIBIT A Legal Description of the Property [attached behind this page] 3.B.2.b Packet Pg. 112 Attachment: Successor Agency -Termination of DDA and Related Agreements - Fun Properties (Resolution SA 18-02 of Successor Agency for 3.B.2.cPacket Pg. 113Attachment: Legal Description_Fun Properties (Resolution SA 18-02 of Successor Agency for Termination of Disposition and Development 3.B.2.cPacket Pg. 114Attachment: Legal Description_Fun Properties (Resolution SA 18-02 of Successor Agency for Termination of Disposition and Development May 1, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Resolution SA 18-03 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency approve and adopt the attached Resolution No. SA 18-03. DISCUSSION: 501 S. San Jacinto Avenue, specifically Identified as Assessor Parcel Nos. 437-076-001 and 437- 076-002, (“Property”) are vested to the Redevelopment Agency of the City of San Jacinto (“RDA”). As stated in the City’s Long Range Property Management Plan (“LRPMP”), the Property was acquired by the RDA for the creation of a Civic Center. The intent was to expand the Police Department into the adjacent Community Center, and relocate the Community Center next to City Hall. In addition, it was envisioned that the new property would accommodate a library and parking facilities. In order to dispose of the Property in accordance with the LRPMP, the Successor Agency should transfer the Property to the City. The City plans to maintain this Property to be used as a municipal parking lot for the Library Upgrade Project, which is part of the envisioned Civic Center. The City is currently making headway in obtaining the remaining properties necessary to commence construction of the Library Upgrade Project. Pursuant to Health and Safety Code Section 34172, the San Jacinto Redevelopment Agency was dissolved as of February 1, 2012. The City of San Jacinto is the successor agenc y of the Redevelopment Agency, and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City. The Oversight Board is responsible for approving or directing the actions of the Successor Agency pursuant to Health and Safety Code Section 34179 and 34181. In December 2015, the California Department of Finance (“DOF”) approved the Successor Agency’s Long Range Property Management Plan (“LRPMP”). FISCAL IMPACT: No funds are involved with the approval and direction of the Successor Agency to transfer the Property to the City. ATTACHMENTS: Resolution SA 18-03 Quit Claim (APNs 437-076-001, -002) from Successor Agency to City 3.B.3 Packet Pg. 115 24438.31000\30997049.1 STATE OF CALIFORNIA ) RESOLUTION SA 18-03 COUNTY OF RIVERSIDE ) ss CITY OF SAN JACINTO ) A RESOLUTION OF THE GOVERNING BOARD OF THE SUCCESSOR AGENCY TO THE SAN JACINTO REDEVELOPMENT AGENCY APPROVING A QUITCLAIM DEED CONVEYING 501 S. SAN JACINTO AVENUE, SPECIFICALLY IDENTIFIED AS ASSESSOR PARCEL NOS. 437-076-001 AND 437-076-002 FROM THE SUCCESSOR AGENCY TO THE CITY OF SAN JACINTO AS AUTHORIZED BY THE LONG RANGE PROPERTY MANAGEMENT PLAN APPROVED BY THE CALIFORNIA DEPARTMENT OF FINANCE IN DECEMBER 2015 WHEREAS, pursuant to Health and Safety Code Section 34173(d), the City of San Jacinto elected to become the successor agency (“Successor Agency”) to the dissolved San Jacinto Redevelopment Agency (“Redevelopment Agency”), and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City; and WHEREAS, the Successor Agency owns that certain real property located at 501 S. San Jacinto Avenue, Specifically Identified as Assessor Parcel Nos. 437-076-001 and 437-076-002, in the City of San Jacinto, California (“Property”); and WHEREAS, the Successor Agency prepared and the Department of Finance (“DOF”) approved a single property Long Range Property Management Plan that allows for the Property to be transferred to the City for governmental use for the creation of a Civic Center and Library; and WHEREAS, the City will use the property as a municipal parking lot to serve the upgraded Library in accordance with the Long Range Property Management Plan; and WHEREAS, Pursuant to Health and Safety Code section 34181.2, property that is used for a parking lot that generates no more revenue than reasonably necessary for maintenance may be conveyed to the City as a governmental use property; and WHEREAS, the Successor Agency desires to convey the Property to the City, and the City desires to accept such conveyance of the Propert y for purposes of ensuring that the Property be used as a municipal parking lot to serve the upgraded Library. 3.B.3.a Packet Pg. 116 Attachment: Resolution SA 18-03 (Resolution SA 18-03 of the Successor Agency to the San Jacinto Redevelopment Agency) 24438.31000\30997049.1 NOW, THEREFORE, BE IT RESOLVED, ordered, and determined by the Governing Board of the Successor Agency to the San Jacinto Redevelopment Agency, as follows: SECTION 1. Recitals. The Recitals set forth above are true and correct and are incorporated into this Resolution by this reference. SECTION 2. CEQA Compliance. Pursuant to California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) (“CEQA”) and the State and local CEQA Guidelines, the Governing Board of the Successor Agency determines that t he approval of the Property Management Plan through this Resolution does not commit the Successor Agency to any action that may have a significant effect on the environment. As a result, such action does not constitute a project subject to the requirements of the California Environmental Quality Act. The City Clerk, acting on behalf of the Successor Agency, is authorized and directed to file a Notice of Exemption with the appropriate official of the County of Riverside, California, within five (5) days following t he date of adoption of this Resolution. SECTION 3. Transfer of Properties to the City. The Successor Agency hereby directs and approves the transfer of ownership to the City of the Properties, constituting properties of the dissolved Redevelopment Agency that were constructed or used for a governmental purpose, pursuant to Health and Safety Code Sections 34177 and 34181. SECTION 4. Consistent with LRPMP. The Successor Agency hereby finds that the disposition of the Property pursuant to the Agreement i s consistent with and is for the purpose of implementing the Long Range Property Management Plan previously approved by DOF for the Property. SECTION 5. Further Acts. Pursuant to Health and Safety Code Section 34180(j), the staff of the Successor Agen cy is hereby authorized and directed to take any action necessary to carry out the purposes of this Resolution and comply with applicable law regarding the Property Management Plan, including without limitation submittal of the Property Management Plan to the DOF for approval, and posting the approved Property Management Plan on the Successor Agency’s website. SECTION 6. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invali d, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Oversight Board declares that it would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution. SECTION 7. Certification. The Secretary to the Successor Agency shall certify to the adoption of this Resolution. 3.B.3.a Packet Pg. 117 Attachment: Resolution SA 18-03 (Resolution SA 18-03 of the Successor Agency to the San Jacinto Redevelopment Agency) 24438.31000\30997049.1 MOVED, PASSED AND ADOPTED at a regular meeting of the Governing Board of the Successor Agency to the dissolved San Jacinto Redevelopment Agency, on the _______ day of _____________, 2018, by the following vote: AYES: NAYS: ABSENT: ABSTAIN: Governing Board of the Successor Agency to the former San Jacinto Redevelopment Agency _____________________________________ Crystal Ruiz, Chair of the Successor Agency ATTEST: __________________________ Angela Walton, Board Secretary 3.B.3.a Packet Pg. 118 Attachment: Resolution SA 18-03 (Resolution SA 18-03 of the Successor Agency to the San Jacinto Redevelopment Agency) 24438.31000\30996743.1 RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City of San Jacinto 595 S. San Jacinto Ave., Building A San Jacinto, CA 92583 Attention: City Clerk APN: 437-076-001 and 002-9 SPACE ABOVE THIS LINE FOR RECORDER'S USE EXEMPT FROM RECORDING FEES – GOVERNMENT CODE SECTION 27383 QUITCLAIM DEED FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, a California public agency, does hereby remise, release and forever quitclaim to CITY OF SAN JACINTO, a California municipal corporation, all right, title and interest of Transferor in that certain real property in the City of San Jacinto, County of Riverside, State of California, specifically described in Exhibit “A” attached to this Quitclaim Deed (“Property”) and made a part of this Quitclaim Deed by this reference. Dated:_____________________________ CITY OF SAN JACINTO, a California municipal corporation By:_____________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________ Angela Walton, City Clerk 3.B.3.b Packet Pg. 119 Attachment: Quit Claim (APNs 437-076-001, -002) from Successor Agency to City (Resolution SA 18-03 of the Successor Agency to the San 24438.31000\30996743.1 Exhibit “A” To City of San Jacinto Quitclaim Deed Property Legal Description REAL PROPERTY IN THE CITY OF SAN JACINTO, RIVERSIDE COUNTY, CALIFORNIA DESCRIBED AS: LOTS 1, 2, 3, 4 AND 5 IN BLOCK 21 OF THE TOWN OF SAN JACINTO, AS SHOWN BY MAP ON FILE IN BOOK 7 PAGE 329 OF MAPS, RECORDS OF SAN DIEGO, CALIFORNIA. [APN’S 437-076-001-8 AND 437-076-002-9] 3.B.3.b Packet Pg. 120 Attachment: Quit Claim (APNs 437-076-001, -002) from Successor Agency to City (Resolution SA 18-03 of the Successor Agency to the San 24438.31000\30996743.1 CERTIFICATE OF ACCEPTANCE This is to certify that the interest in real property conveyed by the above Quitclaim Deed from the SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, a California public agency, to the CITY OF SAN JACINTO, a California municipal corporation, is hereby accepted by the undersigned officer on behalf of the City of San Jacinto and the City of San Jacinto consents to recordation of such Quitclaim Deed in the official records of the County of Riverside, California. City of San Jacinto, a California municipal corporation By: ____________________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________________ Angela Walton, City Clerk 3.B.3.b Packet Pg. 121 Attachment: Quit Claim (APNs 437-076-001, -002) from Successor Agency to City (Resolution SA 18-03 of the Successor Agency to the San A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. ALL-PURPOSE ACKNOWLEDGMENT NOTARY FOR CALIFORNIA STATE OF CALIFORNIA ) COUNTY OF ) On ____________________, 2018 , before me, , personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of Notary Public OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual  Corporate Officer Title(s) Title or Type of Document  Partner(s)  Limited  General  Attorney-In-Fact Number Of Pages  Trustee(s)  Guardian/Conservator  Other: Signer is representing: Name Of Person(s) Or Entity(ies) Date Of Document Signer(s) Other Than Named Above 3.B.3.b Packet Pg. 122 Attachment: Quit Claim (APNs 437-076-001, -002) from Successor Agency to City (Resolution SA 18-03 of the Successor Agency to the San May 1, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Resolution SA 18-04 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency, by motion, approve and adopt the attached Resolution SA 18-04. DISCUSSION: Assessor Parcel Nos. 435-211-001, 435-211-002, 435-211-003, and 435-220-024, (“Property”) are vested to the Successor Agency of the Redevelopment Agency o f the City of San Jacinto (“RDA”). As stated in the City’s Long Range Property Management Plan (“LRPMP”), the Property was acquired by the RDA on September 8, 2010 to eliminate blight and stimulate commercial development. The Property consisted of 15 substandard units occupied by 10 households consisting of 26 individuals, all of whom were relocated. The Property is currently vacant and is located adjacent to the San Jacinto Branch Line (railroad) and is the original home site of the founder of San Jacinto. In order to dispose of the Property in accordance with the LRPMP, the Successor Agency should transfer the Property to the City. The City plans to use the Property as a train/multi-modal transportation facility. The site will be utilized for commuter rail services provided by Metro link, as well as local and regional bus services provided by the Riverside Transit Agency. Pursuant to Health and Safety Code Section 34172, the San Jacinto Redevelopment Agency was dissolved as of February 1, 2012. The City of San Jacinto is the successor agency of the Redevelopment Agency, and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City. The Oversight Board is responsible for approving or directing the actions of the Successor Agency pursuant to Health and Safety Code Section 34179 and 34181. In December 2015, the California Department of Finance (“DOF”) approved the Successor Agency’s Long Range Property Management Plan (“LRPMP”). FISCAL IMPACT: No funds are involved with the approval and direction of the Successor Agency to transfer the Property to the City. ATTACHMENTS: Resolution SA 18-04 Quit Claim (APNs 435-211-001 002 003 435-220-024) from SA to City 3.B.4 Packet Pg. 123 STATE OF CALIFORNIA ) RESOLUTION SA 18-04 COUNTY OF RIVERSIDE ) ss CITY OF SAN JACINTO ) A RESOLUTION OF THE GOVERNING BOARD OF THE SUCCESSOR AGENCY TO THE SAN JACINTO REDEVELOPMENT AGENCY APPROVING A QUITCLAIM DEED CONVEYING ASSESSOR PARCEL NOS. 435-211-001, 435-211-002, 435-211-003, AND 435- 220-024 FROM THE SUCCESSOR AGENCY TO THE CITY OF SAN JACINTO AS AUTHORIZED BY THE LONG RANGE PROPERTY MANAGEMENT PLAN APPROVED BY THE CALIFORNIA DEPARTMENT OF FINANCE IN DECEMBER 2015 WHEREAS, pursuant to Health and Safety Code Section 34173(d), the City of San Jacinto elected to become the successor agency (“Successor Agency”) to the dissolved San Jacinto Redevelopment Agency (“Redevelopment Agency”), and pursuant to Health and Safety Code Section 34173 (g), the Successor Agency is now a separate legal entity from the City; and WHEREAS, the Successor Agency owns that certain real property Identified as Assessor Parcel Nos. 435-211-001, 425-211-002, 435-211-003, and 435-220-024, in the City of San Jacinto, California (“Property”); and WHEREAS, the Successor Agency prepared and the Department of Finance (“DOF”) approved a single property Long Range Property Management Plan that allows for the Property to be transferred to the City for governmental use for the creation of a train/multi-modal transportation facility; and WHEREAS, Pursuant to Health and Safety Code section 34181.2, property that is used for a parking lot that generates no more revenue than reasonably necessary for maintenance may be conveyed to the City as a governmental use property; and WHEREAS, the Successor Agency desires to convey the Property to the City, and the City desires to accept such conveyance of the Propert y for purposes of ensuring that the Property be used as a train/multi-modal transportation facility. NOW, THEREFORE, BE IT RESOLVED, ordered, and determined by the Governing Board of the Successor Agency to the San Jacinto Redevelopment Agency, as follows: SECTION 1. Recitals. The Recitals set forth above are true and correct and are incorporated into this Resolution by this reference. 3.B.4.a Packet Pg. 124 Attachment: Resolution SA 18-04 (Resolution SA 18-04 of the Successor Agency to the San Jacinto Redevelopment Agency) SECTION 2. CEQA Compliance. Pursuant to California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) (“CEQA”) and the State and local CEQA Guidelines, the Governing Board of the Successor Agency determines that the approval of the Property Management Plan through this Resolution does not commit the Successor Agency to any action that may have a significant effect on the environment. As a result, such action does not constitute a project subject to the requirements of the California Environmental Quality Act. The City Clerk, acting on behalf of the Successor Agency, is authorized and directed to file a Notice of Exemption with the appropriate official of the County of Riverside, California, within five (5) days following the date of adoption of this Resolution. SECTION 3. Transfer of Properties to the City. The Successor Agency hereby directs and approves the transfer of ownership to the City of the Properties, constituting properties of the dissolved Redevelopment Agency that were constructed or used for a governmental purpose, pursuant to Health and Safety Code Sections 34177 and 34181. SECTION 4. Consistent with LRPMP. The Successor Agency hereby finds that the disposition of the Property pursuant to the Agreement is consistent with and is for the purpose of implementing the Long Range Property Management Plan previously approved by DOF for the Property. SECTION 5. Further Acts. Pursuant to Health and Safety Code Section 34180(j), the staff of the Successor Agency is hereby authorized and directed to take any action necessary to carry out the purposes of this Resolution and comply with applicable law regarding the Property Management Plan, including without limitat ion submittal of the Property Management Plan to the DOF for approval, and posting the approved Property Management Plan on the Successor Agency’s website. SECTION 6. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Oversight Board declares that it would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution. SECTION 7. Certification. The Secretary to the Successor Agency shall certify to the adoption of this Resolution. 3.B.4.a Packet Pg. 125 Attachment: Resolution SA 18-04 (Resolution SA 18-04 of the Successor Agency to the San Jacinto Redevelopment Agency) MOVED, PASSED AND ADOPTED at a regular meeting of the Governing Board of the Successor Agency to the dissolved San Jacinto Redevelopment Agency, on the _______ day of _____________, 2018, by the following vote: AYES: NAYS: ABSENT: ABSTAIN: Governing Board of the Successor Agency to the former San Jacinto Redevelopment Agency _____________________________________ Crystal Ruiz, Chair of the Successor Agency ATTEST: _________________________ Angela Walton, Board Secretary 3.B.4.a Packet Pg. 126 Attachment: Resolution SA 18-04 (Resolution SA 18-04 of the Successor Agency to the San Jacinto Redevelopment Agency) 24438.31000\30999387.1 RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City of San Jacinto 595 S. San Jacinto Ave., Building A San Jacinto, CA 92583 Attention: City Clerk APN: 435-211-001, 435-211-002, 435-211-003, and 435-220-024 SPACE ABOVE THIS LINE FOR RECORDER'S USE EXEMPT FROM RECORDING FEES – GOVERNMENT CODE SECTION 27383 QUITCLAIM DEED FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, a California public agency, does hereby remise, release and forever quitclaim to CITY OF SAN JACINTO, a California municipal corporation, all right, title and interest of Transferor in that certain real property in the City of San Jacinto, County of Riverside, State of California, specifically described in Exhibit “A” attached to this Quitclaim Deed (“Property”) and made a part of this Quitclaim Deed by this reference. Dated:_____________________________ CITY OF SAN JACINTO, a California municipal corporation By:_____________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________ Angela Walton, City Clerk 3.B.4.b Packet Pg. 127 Attachment: Quit Claim (APNs 435-211-001 002 003 435-220-024) from SA to City (Resolution SA 18-04 of the Successor Agency to the San 24438.31000\30999387.1 Exhibit “A” To City of San Jacinto Quitclaim Deed Property Legal Description REAL PROPERTY IN THE CITY OF SAN JACINTO, RIVERSIDE COUNTY, CALIFORNIA DESCRIBED AS: PARCEL 1: LOTS 76 AND 77 OF ESTUDILLO LAND AND WATER COMPANY'S ADDITION TO SAN JACINTO, AS SHOWN BY MAP ON FILE IN BOOK 9 PAGE 410 OF MAPS, SAN DIEGO COUNTY RECORDS. TOGETHER WITH THAT PORTION OF VACATED ELEVENTH STREET VACATED APRIL 21, 1891 PER BOOK 8 PAGE 292 MISCELLANEOUS RECORDS, SAN DIEGO COUNTY, THAT WOULD ATTACH BY OPERATION OF LAW. PARCEL 2: THE NORTH HALF OF LOT 78 OF ESTUDILLO LAND AND WATER COMPANY'S ADDITION TO SAN JACINTO, AS SHOWN BY MAP ON FILE IN BOOK 9 PAGE 410 OF MAPS, SAN DIEGO COUNTY RECORDS, PARCEL 3: LOTS 70 AND 72 OF ESTUDILLO LAND AND WATER COMPANY'S ADDITION TO SAN JACINTO, AS SHOWN BY MAP ON FILE IN BOOK 9 PAGE 410 OF MAPS, SAN DIEGO COUNTY RECORDS. TOGETHER WITH THAT PORTION OF VACATED ELEVENTH STREET VACATED APRIL 21, 1891 PER BOOK 8 PAGE 292 MISCELLANEOUS RECORDS, SAN DIEGO COUNTY, THAT WOULD ATTACH BY OPERATION OF LAW, EXCEPTING THEREFROM THOSE PORTIONS LYING NORTHERLY OF THE S OUTHERLY BOUNDARY OF THE LAND CONVEYED TO L.O. LYNCH AND MAMIE L. LYNCH, HUSBAND AND WIFE, BY DEED RECORDED JANUARY 5, 1960 AS INSTRUMENT NO. 435, OFFICIAL RECORDS OF RIVERSIDE COUNTY, AND THE WESTERLY AND EASTERLY PROLONGATION THEREOF. ALSO EXCEPTING THEREFROM THAT PORTION OF LOT 70 CONVEYED TO THE RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT BY DEED RECORDED SEPTEMBER 14, 1987 AS INSTRUMENT NO. 265806, OFFICIAL RECORDS OF RIVERSIDE COUNTY, APN: 435-211-001-1 (Affects Parcel 1); 435-211-002-2 (Affects Portion of Parcel 2); 435-211-003-3 (Affects Parton of Parcel 2) and 435-220-024-0 (Affects Parcel 3) 3.B.4.b Packet Pg. 128 Attachment: Quit Claim (APNs 435-211-001 002 003 435-220-024) from SA to City (Resolution SA 18-04 of the Successor Agency to the San 24438.31000\30999387.1 CERTIFICATE OF ACCEPTANCE This is to certify that the interest in real property conveyed by the above Quitclaim Deed from the SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, a California public agency, to the CITY OF SAN JACINTO, a California municipal corporation, is hereby accepted by the undersigned officer on behalf of the City of San Jacinto and the City of San Jacinto consents to recordation of such Quitclaim Deed in the official records of the County of Riverside, California. City of San Jacinto, a California municipal corporation By: ____________________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________________ Angela Walton, City Clerk 3.B.4.b Packet Pg. 129 Attachment: Quit Claim (APNs 435-211-001 002 003 435-220-024) from SA to City (Resolution SA 18-04 of the Successor Agency to the San 24438.31000\30999387.1 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. ALL-PURPOSE ACKNOWLEDGMENT NOTARY FOR CALIFORNIA STATE OF CALIFORNIA ) COUNTY OF ) On ____________________, 2018 , before me, , personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person (s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of Notary Public OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual  Corporate Officer Title(s) Title or Type of Document  Partner(s)  Limited  General  Attorney-In-Fact Number Of Pages  Trustee(s)  Guardian/Conservator  Other: Signer is representing: Name Of Person(s) Or Entity(ies) Date Of Document Signer(s) Other Than Named Above 3.B.4.b Packet Pg. 130 Attachment: Quit Claim (APNs 435-211-001 002 003 435-220-024) from SA to City (Resolution SA 18-04 of the Successor Agency to the San May 1, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Resolution SA 18-05 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency approve and adopt the attached Resolution SA 18- 05. DISCUSSION: Assessor Parcel No. 435-020-031 (“Property”) is vested to the Successor Agency of the Redevelopment Agency of the City of San Jacinto (“RDA”). As stated in the City’s Long Range Property Management Plan (“LRPMP”), the vacant one-acre Property was transferred from the City to the RDA on August 2, 2002 for development purposes. Due to the lack of development opportunities, the parcel remained vacant. The LRPMP’s disposition of the Property states that the site should be transferred to the City as governmental purpose property to facilitate the expansion of the Public Works Corporate Yard, which has reached capacity. Because the site is in the immediate vicinity of the Corporate Yard, as well as the City-owned well site, the location and adjacent City-owned parcels were identified for the expansion of the Corporate Yard and related uses. Pursuant to Health and Safety Code Section 34172, the San Jacinto Redevelopment Age ncy was dissolved as of February 1, 2012. The City of San Jacinto is the successor agency of the Redevelopment Agency, and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City. The Oversight Board is responsible for approving or directing the actions of the Successor Agency pursuant to Health and Safety Code Section 34179 and 34181. In December 2015, the California Department of Finance (“DOF”) approved the Successor Agency’s Long Range Property Management Plan (“LRPMP”). FISCAL IMPACT: No funds are involved with the approval and direction of the Successor Agency to transfer the Property to the City. ATTACHMENTS: Resolution SA 18-05 Quitclaim (APNs 435-020-031) from Successor Agency to City 3.B.5 Packet Pg. 131 STATE OF CALIFORNIA ) RESOLUTION SA 18-05 COUNTY OF RIVERSIDE ) ss CITY OF SAN JACINTO ) A RESOLUTION OF THE GOVERNING BOARD OF THE SUCCESSOR AGENCY TO THE SAN JACINTO REDEVELOPMENT AGENCY APPROVING A QUITCLAIM DEED CONVEYING ASSESSOR PARCEL NO. 435-020-031 FROM THE SUCCESSOR AGENCY TO THE CITY OF SAN JACINTO AS AUTHORIZED BY THE LONG RANGE PROPERTY MANAGEMENT PLAN APPROVED BY THE CALIFORNIA DEPARTMENT OF FINANCE IN DECEMBER 2015 WHEREAS, pursuant to Health and Safety Code Section 34173(d), the City of San Jacinto elected to become the successor agency (“Successor Agency”) to the dissolved San Jacinto Redevelopment Agency (“Redevelopment Agency”), and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City; and WHEREAS, the Successor Agency owns that certain real property Identified as Assessor Parcel No. 435-020-031 in the City of San Jacinto, California (“Property”); and WHEREAS, the Successor Agency prepared and the Department of Finance (“DOF”) approved a single property Long Range Property Management Plan that allows for the Property to be transferred to the City for governmental use to facilitate the expansion of the Public Works Corporate Yard; and WHEREAS, Pursuant to Health and Safety Code section 34181.2, property that is used for a parking lot that generates no more revenue than reasonably necessary for maintenance may be conveyed to the City as a governmental use property; and WHEREAS, the Successor Agency desires to convey the Property to the City, and the City desires to accept such conveyance of the Propert y for purposes of ensuring that the Property be used to facilitate the expansion of the Public Works Corporate Yard. NOW, THEREFORE, BE IT RESOLVED, ordered, and determined by the Governing Board of the Successor Agency to the San Jacinto Redevelopment Agency, as follows: SECTION 1. Recitals. The Recitals set forth above are true and correct and are incorporated into this Resolution by this reference. 3.B.5.a Packet Pg. 132 Attachment: Resolution SA 18-05 (Resolution SA 18-05 of the Successor Agency to the San Jacinto Redevelopment Agency) SECTION 2. CEQA Compliance. Pursuant to California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) (“CEQA”) and the State and local CEQA Guidelines, the Governing Board of the Successor Agency determines that t he approval of the Property Management Plan through this Resolution does not commit the Successor Agency to any action that may have a significant effect on the environment. As a result, such action does not constitute a project subject to the requirements of the California Environmental Quality Act. The City Clerk, acting on behalf of the Successor Agency, is authorized and directed to file a Notice of Exemption with the appropriate official of the County of Riverside, California, within five (5) days following the date of adoption of this Resolution. SECTION 3. Transfer of Properties to the City. The Successor Agency hereby directs and approves the transfer of ownership to the City of the Properties, constituting properties of the dissolved Redevelopment Agency that were constructed or used for a governmental purpose, pursuant to Health and Safety Code Sections 34177 and 34181. SECTION 4. Consistent with LRPMP. The Successor Agency hereby finds that the disposition of the Property pursuant to the Agreement is consistent wit h and is for the purpose of implementing the Long Range Property Management Plan previously approved by DOF for the Property. SECTION 5. Further Acts. Pursuant to Health and Safety Code Section 34180(j), the staff of the Successor Agency is hereby authorized and directed to take any action necessary to carry out the purposes of this Resolution and comply with applicable law regarding the Property Management Plan, including without limitation submittal of the Property Management Plan to the DOF for appr oval, and posting the approved Property Management Plan on the Successor Agency’s website. SECTION 6. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Oversight Board declares that it would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution. SECTION 7. Certification. The Secretary to the Successor Agency shall certify to the adoption of this Resolution. 3.B.5.a Packet Pg. 133 Attachment: Resolution SA 18-05 (Resolution SA 18-05 of the Successor Agency to the San Jacinto Redevelopment Agency) MOVED, PASSED AND ADOPTED at a regular meeting of the Governing Board of the Successor Agency to the dissolved San Jacinto Redevelopment Agency, on the _______ day of _____________, 2018, by the following vote: AYES: NAYS: ABSENT: ABSTAIN: Governing Board of the Successor Agency to the former San Jacinto Redevelopment Agency _____________________________________ Crystal Ruiz, Chair of the Successor Agency ATTEST: ______________________________ Angela Walton, Board Secretary 3.B.5.a Packet Pg. 134 Attachment: Resolution SA 18-05 (Resolution SA 18-05 of the Successor Agency to the San Jacinto Redevelopment Agency) 24438.31000\30999382.1 RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City of San Jacinto 595 S. San Jacinto Ave., Building A San Jacinto, CA 92583 Attention: City Clerk APN: 435-020-031-8 SPACE ABOVE THIS LINE FOR RECORDER'S USE EXEMPT FROM RECORDING FEES – GOVERNMENT CODE SECTION 27383 QUITCLAIM DEED FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, CITY OF SAN JACINTO, a California municipal corporation, AS SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, does hereby remise, release and forever quitclaim to CITY OF SAN JACINTO, a California municipal corporation, all right, title and interest of Transferor in that certain real property in the City of San Jacinto, County of Riverside, State of California, specifically described in Exhibit “A” attached to this Quitclaim Deed (“Property”) and made a part of this Quitclaim Deed by this reference. Dated:_____________________________ CITY OF SAN JACINTO, a California municipal corporation By:_____________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________ Angela Walton, City Clerk 3.B.5.b Packet Pg. 135 Attachment: Quitclaim (APNs 435-020-031) from Successor Agency to City (Resolution SA 18-05 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 Exhibit “A” To City of San Jacinto Quitclaim Deed Property Legal Description REAL PROPERTY IN THE CITY OF SAN JACINTO, RIVERSIDE COUNTY, CALIFORNIA DESCRIBED AS: PARCEL 2, AS SHOWN BY PARCEL MAP NO. 30570, IN THE CITY OF SAN JACINTO, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, ON FILE IN BOOK 202, PAGES 62 AND 63 OF PARCEL MAPS, RECORDS OF RIVERSIDE COUNTY, CALIFORNIA. [APN 435-020-031-8] 3.B.5.b Packet Pg. 136 Attachment: Quitclaim (APNs 435-020-031) from Successor Agency to City (Resolution SA 18-05 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 CERTIFICATE OF ACCEPTANCE This is to certify that the interest in real property conveyed by the above Quitclaim Deed from the CITY OF SAN JACINTO, a California municipal corporation, as SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, to the CITY OF SAN JACINTO, a California municipal corporation, is hereby accepted by the undersigned officer on behalf of the City of San Jacinto and the City of San Jacinto consents to recorda tion of such Quitclaim Deed in the official records of the County of Riverside, California. City of San Jacinto, a California municipal corporation By: ____________________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________ Angela Walton, City Clerk 3.B.5.b Packet Pg. 137 Attachment: Quitclaim (APNs 435-020-031) from Successor Agency to City (Resolution SA 18-05 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that doc ument. ALL-PURPOSE ACKNOWLEDGMENT NOTARY FOR CALIFORNIA STATE OF CALIFORNIA ) COUNTY OF ) On ____________________, 2018 , before me, , personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of Notary Public OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual  Corporate Officer Title(s) Title or Type of Document  Partner(s)  Limited  General  Attorney-In-Fact Number Of Pages  Trustee(s)  Guardian/Conservator  Other: Signer is representing: Name Of Person(s) Or Entity(ies) Date Of Document Signer(s) Other Than Named Above 3.B.5.b Packet Pg. 138 Attachment: Quitclaim (APNs 435-020-031) from Successor Agency to City (Resolution SA 18-05 of the Successor Agency to the San Jacinto May 1, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Resolution SA 18-06 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency, by motion, approve and adopt the attached Resolution SA 18-06. BACKGROUND: Assessor Parcel No. 435-020-031 (“Property”) is vested to the Successor Agency of the Redevelopment Agency of the City of San Jacinto (“RDA”). As stated in the City’s Long Range Property Management Plan (“LRPMP”), the vacant one-acre Property was transferred from the City to the RDA on August 2, 2002 for development purposes. Due to the lack of development opportunities the parcel remained vacant. The LRPMP’s disposition of the Property states that the site should be transferred to the City as governmental purpose property to facilitate the expansion of the Public Works Corporate Yard which has reached capacity. Because the site is in the immediate vicinity of the Corporate Yard, as well as the City-owned well site, the location and adjacent City-owned parcels were identified for the expansion of the Corporate Yard and related uses. Pursuant to Health and Safety Code Section 34172, the San Jacinto Redevel opment Agency was dissolved as of February 1, 2012. The City of San Jacinto is the successor agency of the Redevelopment Agency, and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City. The Oversight Board is responsible for approving or directing the actions of the Successor Agency pursuant to Health and Safety Code Section 34179 and 34181. In December 2015, the California Department of Finance (“DOF”) approved the Successor Agency’s Long Range Property Management Plan (“LRPMP”). FISCAL IMPACT: No funds are involved with the approval and direction of the Successor Agency to transfer the Property to the City. ATTACHMENTS: Resolution SA 18-06 Quitclaim (APNs 435-020-031) from Successor Agency to City 3.B.6 Packet Pg. 139 STATE OF CALIFORNIA ) RESOLUTION SA 18-06 COUNTY OF RIVERSIDE ) ss CITY OF SAN JACINTO ) A RESOLUTION OF THE GOVERNING BOARD OF THE SUCCESSOR AGENCY TO THE SAN JACINTO REDEVELOPMENT AGENCY APPROVING A QUITCLAIM DEED CONVEYING ASSESSOR PARCEL NO. 435-020-031 FROM THE SUCCESSOR AGENCY TO THE CITY OF SAN JACINTO AS AUTHORIZED BY THE LONG RANGE PROPERTY MANAGEMENT PLAN APPROVED BY THE CALIFORNIA DEPARTMENT OF FINANCE IN DECEMBER 2015 WHEREAS, pursuant to Health and Safety Code Section 34173(d), the City of San Jacinto elected to become the successor agency (“Successor Agency”) to the dissolved San Jacinto Redevelopment Agency (“Redevelopment Agency”), and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City; and WHEREAS, the Successor Agency owns that certain real property Identified as Assessor Parcel No. 435-020-031 in the City of San Jacinto, California (“Property”); and WHEREAS, the Successor Agency prepared and the Department of Finance (“DOF”) approved a single property Long Range Property Management Plan that allows for the Property to be transferred to the City for governmental use to facilitate the expansion of the Public Works Corporate Yard; and WHEREAS, Pursuant to Health and Safety Code section 34181.2, property that is used for a parking lot that generates no more revenue than reasonably necessary for maintenance may be conveyed to the City as a governmental use property; and WHEREAS, the Successor Agency desires to convey the Property to the City, and the City desires to accept such conveyance of the Propert y for purposes of ensuring that the Property be used to facilitate the expansion of the Public Works Corporate Yard. NOW, THEREFORE, BE IT RESOLVED, ordered, and determined by the Governing Board of the Successor Agency to the San Jacinto Redevelopment Agency, as follows: SECTION 1. Recitals. The Recitals set forth above are true and correct and are incorporated into this Resolution by this reference. 3.B.6.a Packet Pg. 140 Attachment: Resolution SA 18-06 (Resolution SA 18-06 of the Successor Agency to the San Jacinto Redevelopment Agency) SECTION 2. CEQA Compliance. Pursuant to California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) (“CEQA”) and the State and local CEQA Guidelines, the Governing Board of the Successor Agency determines that t he approval of the Property Management Plan through this Resolution does not commit the Successor Agency to any action that may have a significant effect on the environment. As a result, such action does not constitute a project subject to the requirements of the California Environmental Quality Act. The City Clerk, acting on behalf of the Successor Agency, is authorized and directed to file a Notice of Exemption with the appropriate official of the County of Riverside, California, within five (5) days following the date of adoption of this Resolution. SECTION 3. Transfer of Properties to the City. The Successor Agency hereby directs and approves the transfer of ownership to the City of the Properties, constituting properties of the dissolved Redevelopment Agency that were constructed or used for a governmental purpose, pursuant to Health and Safety Code Sections 34177 and 34181. SECTION 4. Consistent with LRPMP. The Successor Agency hereby finds that the disposition of the Property pursuant to the Agreement is consistent with and is for the purpose of implementing the Long Range Property Management Plan previously approved by DOF for the Property. SECTION 5. Further Acts. Pursuant to Health and Safety Code Section 34180(j), the staff of the Successor Agency is hereby authorized an d directed to take any action necessary to carry out the purposes of this Resolution and comply with applicable law regarding the Property Management Plan, including without limitation submittal of the Property Management Plan to the DOF for approval, and posting the approved Property Management Plan on the Successor Agency’s website. SECTION 6. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Oversight Board declares that it would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution. SECTION 7. Certification. The Secretary to the Successor Agency shall certify to the adoption of this Resolution. 3.B.6.a Packet Pg. 141 Attachment: Resolution SA 18-06 (Resolution SA 18-06 of the Successor Agency to the San Jacinto Redevelopment Agency) MOVED, PASSED AND ADOPTED at a regular meeting of the Governing Board of the Successor Agency to the dissolved San Jacinto Redevelopment Agency, on the _______ day of _____________, 2018, by the following vote: AYES: NAYS: ABSENT: ABSTAIN: Governing Board of the Successor Agency to the former San Jacinto Redevelopment Agency _____________________________________ Crystal Ruiz, Chair of the Successor Agency ATTEST: ______________________________ Angela Walton, Board Secretary 3.B.6.a Packet Pg. 142 Attachment: Resolution SA 18-06 (Resolution SA 18-06 of the Successor Agency to the San Jacinto Redevelopment Agency) 24438.31000\30999382.1 RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City of San Jacinto 595 S. San Jacinto Ave., Building A San Jacinto, CA 92583 Attention: City Clerk APN: 435-020-031-8 SPACE ABOVE THIS LINE FOR RECORDER'S USE EXEMPT FROM RECORDING FEES – GOVERNMENT CODE SECTION 27383 QUITCLAIM DEED FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, CITY OF SAN JACINTO, a California municipal corporation, AS SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, does hereby remise, release and forever quitclaim to CITY OF SAN JACINTO, a California municipal corporation, all right, title and interest of Transferor in that certain real property in the City of San Jacinto, County of Riverside, State of California, specifically described in Exhibit “A” attached to this Quitclaim Deed (“Property”) and made a part of this Quitclaim Deed by this reference. Dated:_____________________________ CITY OF SAN JACINTO, a California municipal corporation By:_____________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________ Angela Walton, City Clerk 3.B.6.b Packet Pg. 143 Attachment: Quitclaim (APNs 435-020-031) from Successor Agency to City (Resolution SA 18-06 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 Exhibit “A” To City of San Jacinto Quitclaim Deed Property Legal Description REAL PROPERTY IN THE CITY OF SAN JACINTO, RIVERSIDE COUNTY, CALIFORNIA DESCRIBED AS: PARCEL 2, AS SHOWN BY PARCEL MAP NO. 30570, IN THE CITY OF SAN JACINTO, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, ON FILE IN BOOK 202, PAGES 62 AND 63 OF PARCEL MAPS, RECORDS OF RIVERSIDE COUNTY, CALIFORNIA. [APN 435-020-031-8] 3.B.6.b Packet Pg. 144 Attachment: Quitclaim (APNs 435-020-031) from Successor Agency to City (Resolution SA 18-06 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 CERTIFICATE OF ACCEPTANCE This is to certify that the interest in real property conveyed by the above Quitclaim Deed from the CITY OF SAN JACINTO, a California municipal corporation, as SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, to the CITY OF SAN JACINTO, a California municipal corporation, is hereby accepted by the undersigned officer on behalf of the City of San Jacinto and the City of San Jacinto consents to recorda tion of such Quitclaim Deed in the official records of the County of Riverside, California. City of San Jacinto, a California municipal corporation By: ____________________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________ Angela Walton, City Clerk 3.B.6.b Packet Pg. 145 Attachment: Quitclaim (APNs 435-020-031) from Successor Agency to City (Resolution SA 18-06 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that doc ument. ALL-PURPOSE ACKNOWLEDGMENT NOTARY FOR CALIFORNIA STATE OF CALIFORNIA ) COUNTY OF ) On ____________________, 2018 , before me, , personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of Notary Public OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual  Corporate Officer Title(s) Title or Type of Document  Partner(s)  Limited  General  Attorney-In-Fact Number Of Pages  Trustee(s)  Guardian/Conservator  Other: Signer is representing: Name Of Person(s) Or Entity(ies) Date Of Document Signer(s) Other Than Named Above 3.B.6.b Packet Pg. 146 Attachment: Quitclaim (APNs 435-020-031) from Successor Agency to City (Resolution SA 18-06 of the Successor Agency to the San Jacinto May 1, 2018 TO: City Council REQUESTED BY: Angela Walton, City Clerk APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Resolution SA 18-07 of the Successor Agency to the San Jacinto Redevelopment Agency RECOMMENDATION: Staff recommends that the Successor Agency approve and adopt attached Resolution SA 18-07. BACKGROUND: 201 E. Main Street, specifically Identified as Assessor Parcel No. 437-045-020-9 (“Property”) is vested to the City of San Jacinto as Successor Agency to the Redevelopment Agency of the City of San Jacinto (“RDA”). As stated in the City’s Long Range Property Management Plan (“LRPMP”), the Property was originally acquired by the City on October 1, 1977 and utilized as a portion of City Hall. The building was deemed structurally unsound by the Building Official in 2007 and demolished in 2009. The Property was transferred to the RDA on April 16, 2009 for development purposes. Due to the lack of development opportunities the parcel was converted into a park in 2010. The LRPMP’s disposition of the Property states that the site should be transferred to the City as governmental purpose property and the City shall continue to use the Property as a downtown pocket park. Pursuant to Health and Safety Code Section 34172, the San Jacinto Redevelopment Agency was dissolved as of February 1, 2012. The City of San Jacinto is the successor agency of the Redevelopment Agency, and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City. The Oversight Board is responsible for approving or directing the actions of the Successor Agency pursuant to Health and Safety Code Section 34179 and 34181. In December 2015, the California Department of Finance (“DOF”) approved the Successor Agency’s Long Range Property Management Plan (“LRPMP”). FISCAL IMPACT No funds are involved with the approval and direction of the Successor Agency to transfer the Property to the City. ATTACHMENTS: Resolution SA 18-07 Quitclaim (APNs 437-045-020) from Successor Agency to City 3.B.7 Packet Pg. 147 1 STATE OF CALIFORNIA ) RESOLUTION SA 18-07 COUNTY OF RIVERSIDE ) ss CITY OF SAN JACINTO ) A RESOLUTION OF THE GOVERNING BOARD OF THE SUCCESSOR AGENCY TO THE SAN JACINTO REDEVELOPMENT AGENCY APPROVING A QUITCLAIM DEED CONVEYING 201 E. MAIN STREET, SPECIFICALLY IDENTIFIED AS ASSESSOR PARCEL NO. 437-045-020 FROM THE SUCCESSOR AGENCY TO THE CITY OF SAN JACINTO AS AUTHORIZED BY THE LONG RANGE PROPERTY MANAGEMENT PLAN APPROVED BY THE CALIFORNIA DEPARTMENT OF FINANCE IN DECEMBER 2015 WHEREAS, pursuant to Health and Safety Code Section 34173(d), the City of San Jacinto elected to become the successor agency (“Successor Agency”) to the dissolved San Jacinto Redevelopment Agency (“Redevelopment Agency”), and pursuant to Health and Safety Code Section 34173(g), the Successor Agency is now a separate legal entity from the City; and WHEREAS, the Successor Agency owns that certain real property located at 201 E. Main Street, Specifically Identified as Assessor Parcel No. 437-040-020, in the City of San Jacinto, California (“Property”); and WHEREAS, the Successor Agency prepared and the Department of Finance (“DOF”) approved a single property Long Range Property Management Plan that allows for the Property to be transferred to the City for the continued governmental use as a pocket park; and WHEREAS, the City will continue to use the property as a municipal a pocket park in accordance with the Long Range Property Management Plan ; and WHEREAS, the Successor Agency desires to convey the Property to the City, and the City desires to accept such conveyance of the Prope rty for purposes of ensuring that the Property be used as a pocket park. NOW, THEREFORE, BE IT RESOLVED, ordered, and determined by the Governing Board of the Successor Agency to the San Jacinto Redevelopment Agency, as follows: SECTION 1. Recitals. The Recitals set forth above are true and correct and are incorporated into this Resolution by this reference. 3.B.7.a Packet Pg. 148 Attachment: Resolution SA 18-07 (Resolution SA 18-07 of the Successor Agency to the San Jacinto Redevelopment Agency) 2 SECTION 2. CEQA Compliance. Pursuant to California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) (“CEQA”) and the State and local CEQA Guidelines, the Governing Board of the Successor Agency determines that t he approval of the Property Management Plan through this Resolution does not commit the Successor Agency to any action that may have a significant effect on the environment. As a result, such action does not constitute a project subject to the requirements of the California Environmental Quality Act. The City Clerk, acting on behalf of the Successor Agency, is authorized and directed to file a Notice of Exemption with the appropriate official of the County of Riverside, California, within five (5) days following the date of adoption of this Resolution. SECTION 3. Transfer of Properties to the City. The Oversight Board hereby directs and approves the transfer of ownership to the City of the Properties, constituting properties of the dissolved Redevelopment Agency that were constructed or used for a governmental purpose, pursuant to Health and Safety Code Sections 34177 and 34181. SECTION 4. Consistent with LRPMP. The Oversight Board hereby finds that the disposition of the Property pursuant to the Agreement is consistent with and is for the purpose of implementing the Long Range Property Management Plan previous ly approved by DOF for the Property. SECTION 5. Further Acts. Pursuant to Health and Safety Code Section 34180(j), the staff of the Successor Agency is hereby authorized and directed to take any action necessary to carry out the purposes of this Resol ution and comply with applicable law regarding the Property Management Plan, including without limitation submittal of the Property Management Plan to the DOF for approval, and posting the approved Property Management Plan on the Successor Agency’s website. SECTION 6. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are severable. The Oversight Board declares that it would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution. SECTION 7. Certification. The Secretary to the Successor Agency shall certify to the adoption of this Resolution. 3.B.7.a Packet Pg. 149 Attachment: Resolution SA 18-07 (Resolution SA 18-07 of the Successor Agency to the San Jacinto Redevelopment Agency) 3 MOVED, PASSED AND ADOPTED at a regular meeting of the Governing Board of the Successor Agency to the dissolved San Jacin to Redevelopment Agency, on the _______ day of _____________, 2018, by the following vote: AYES: NAYS: ABSENT: ABSTAIN: Governing Board of the Successor Agency to the former San Jacinto Redevelopment Agency _____________________________________ Crystal Ruiz, Chair of the Successor Agency ATTEST: __________________________ Angela Walton, Board Secretary 3.B.7.a Packet Pg. 150 Attachment: Resolution SA 18-07 (Resolution SA 18-07 of the Successor Agency to the San Jacinto Redevelopment Agency) EXHIBIT A LONG-RANGE PROPERTY MANAGEMENT PLAN [Attached behind this page] 3.B.7.a Packet Pg. 151 Attachment: Resolution SA 18-07 (Resolution SA 18-07 of the Successor Agency to the San Jacinto Redevelopment Agency) 24438.31000\30999382.1 RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City of San Jacinto 595 S. San Jacinto Ave., Building A San Jacinto, CA 92583 Attention: City Clerk APN: 437-045-020-9 SPACE ABOVE THIS LINE FOR RECORDER'S USE EXEMPT FROM RECORDING FEES – GOVERNMENT CODE SECTION 27383 QUITCLAIM DEED FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, CITY OF SAN JACINTO, a California municipal corporation, AS SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, does hereby remise, release and forever quitclaim to CITY OF SAN JACINTO, a California municipal corporation, all right, title and interest of Transferor in that certain real property in the City of San Jacinto, County of Riverside, State of California, specifically described in Exhibit “A” attached to this Quitclaim Deed (“Property”) and made a part of this Quitclaim Deed by this reference. Dated:_____________________________ CITY OF SAN JACINTO, a California municipal corporation By:_____________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________ Angela Walton, City Clerk 3.B.7.b Packet Pg. 152 Attachment: Quitclaim (APNs 437-045-020) from Successor Agency to City (Resolution SA 18-07 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 Exhibit “A” To City of San Jacinto Quitclaim Deed Property Legal Description REAL PROPERTY IN THE CITY OF SAN JACINTO, RIVERSIDE COUNTY, CALIFORNIA DESCRIBED AS: LOT 6 IN BLOCK 10 OF THE TOWN OF SAN JACINTO, IN THE CITY OF SAN JACINTO, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, AS SHOWN BY MAP ON FILE IN BOOK 7, PAGE 329 OF MAPS, RECORDS OF SAN COUNTY, CALIFORNIA. APN: 437 -045-020-9 3.B.7.b Packet Pg. 153 Attachment: Quitclaim (APNs 437-045-020) from Successor Agency to City (Resolution SA 18-07 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 CERTIFICATE OF ACCEPTANCE This is to certify that the interest in real property conveyed by the above Quitclaim Deed from the CITY OF SAN JACINTO, a California municipal corporation, as SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JACINTO, to the CITY OF SAN JACINTO, a California municipal corporation, is hereby accepted by the undersigned officer on behalf of the City of San Jacinto and the City of San Jacinto consents to recorda tion of such Quitclaim Deed in the official records of the County of Riverside, California. City of San Jacinto, a California municipal corporation By: ____________________________________ Robert A. Johnson City Manager ATTEST: By: ____________________________ Angela Walton, City Clerk 3.B.7.b Packet Pg. 154 Attachment: Quitclaim (APNs 437-045-020) from Successor Agency to City (Resolution SA 18-07 of the Successor Agency to the San Jacinto 24438.31000\30999382.1 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. ALL-PURPOSE ACKNOWLEDGMENT NOTARY FOR CALIFORNIA STATE OF CALIFORNIA ) COUNTY OF ) On ____________________, 2018 , before me, , personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature of Notary Public OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT  Individual  Corporate Officer Title(s) Title or Type of Document  Partner(s)  Limited  General  Attorney-In-Fact Number Of Pages  Trustee(s)  Guardian/Conservator  Other: Signer is representing: Name Of Person(s) Or Entity(ies) Date Of Document Signer(s) Other Than Named Above 3.B.7.b Packet Pg. 155 Attachment: Quitclaim (APNs 437-045-020) from Successor Agency to City (Resolution SA 18-07 of the Successor Agency to the San Jacinto May 1, 2018 TO: City Council REQUESTED BY: Travis Randel, Community Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- 17-06, 07, 08, VAR-17-04, and CZ-17-03) RECOMMENDATION: 1. INTRODUCE Ordinance No. 18-05 for first reading approving Change of Zone 17-03 to change the Zone from CN - Commercial Neighborhood to CG - Commercial General; AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA APPROVING CHANGE OF ZONE 17-03, A ZONE CHANGE FROM COMMERCIAL NEIGHBORHOOD TO COMMERCIAL GENERAL LOCATED ON THE WEST SIDE OF SAN JACINTO AVENUE AT THE TERMINUS OF COMMONWEALTH (APN 439-120-042) 2. CONTINUE the Public Hearing to May 15, 2018. BACKGROUND: On April 16, 2018 the Planning Commission held a Public Hearing and unanimously recommended that the City Council approve the Commonwealth Crossing Project. The Project, consisting of 9.51 acres, is located on the west side of San Jacinto Avenue at the terminus of Commonwealth Avenue, and across from the Walmart Supercenter development and includes the following:  a 2,720-square-foot Fast Food Drive-Through;  a 3,062-square-foot Convenience Store with Off-sale Alcohol Sales;  a 12,000-square-foot Tire Store;  a 3,590-square-foot Automated Car Wash; and  a 24,000-square-foot Office/Retail Building; To facilitate the project, the applicant is requesting approval of the following entitlements:  Site Plan and Design Review (SPDR-17-11);  Parcel Map (PM-37407) to divide the parcel lot into five parcels and one lettered lot;  Conditional Use Permit (CUP-17-06) to permit a Service Station with a Convenience Store to have an Off-sale Beer and Wine license (Findings of Public Convenience or Necessity are required);  Minor Use Permit (MUP-17-06) to permit a Fast Food Restaurant with a Drive-Through 4.1 Packet Pg. 156  Minor Use Permit (MUP-17-07) to permit an Automated Car Wash;  Minor Use Permit (MUP-17-08) to permit a Tire Store;  Variance (VAR-17-04) to allow Off-sale Beer and Wine sales within 1,000-feet of adjacent sales; and,  Change of Zone (CZ-17-03) to change the Zone from Commercial Neighborhood to Commercial General. Details of the Project can be found in the attached Planning Commission staff report. Subsequent to the Planning Commission Hearing, Staff received a letter from Caltrans expressing concern over the Traffic Impact Analysis (Attachment 29). The applicant’s Traffic Engineer has provided a formal response which has been included as Attachment 30. To ensure all issues have been adequately addressed, staff is recommending that the City Council continue the public hearing to May 15. DISCUSSION: The Commonwealth Crossing Project will be welcome addition to the San Jacinto Avenue corridor providing additional food, gas, and retail venues for area residents. Sonic and 7-Eleven will anchor the center in the first phase of development. The property had a temporary U-Haul rental facility on a portion of the property, which has closed and the remainder property vacant. The existing, nonconforming Billboard, is required to be removed when property is developed pursuant to Section 17.335.160.D.5 of the Development Code. Therefore, staff recommends a Condition of Approval for the Billboard to be removed. The applicant is in escrow to purchase the property to build the multi-building/tenant commercial development. No previous development applications are on file. ENVIRONMENTAL ANALYSIS: Based upon the information contained in the Initial Study and pursuant to the requirements of CEQA, it has been determined that this Project, with the incorporation of mitigation measures, will not have a significant impact on the environment. The mitigation measures required to reduce or mitigate the impacts of this Project on the environment are included in the Project design and/or the Mitigation Monitoring Program and will be included as part of the Mitigated Negative Declaration for this Project FISCAL IMPACT: There is no impact to the General Fund since all project costs are borne by the applicant. CONCLUSION: As designed and conditioned, the Project will be a welcome addition along San Jacinto Avenue and in the City. The Project offers the constituents of the City another choice for gasoline and food, car wash, retail sales, and office uses, promoting job opportunities and local buying power. 4.1 Packet Pg. 157 ATTACHMENTS: Attachment 1 - Ordinance 18-05 Attachment 2 - Resolution 3704 Attachment 3 - Planning Commission Staff Report Attachment 4 - Findings of Fact Attachment 5 - Change of Zone Conditions of Approval Attachment 8 - Aerial Location Map Attachment 9 - General Plan Map Attachment 10 - Zoning Map Attachment 11 - Site Plan Attachment 12 - Phasing Plan Attachment 13 - TPM 37407 Attachment 14 - Preliminary Grading Plan Attachment 15 - Sonic Elevations Attachment 16 - 7-Eleven Elevations Attachment 17 - Carwash Elevations Attachment 18 - Conceptual Landscape Plan Attachment 19 - Radii Map for Alcohol Sales Attachment 20 - Applicants PCorN Findings Attachment 21 - 7-Eleven Floor Plan with Alcohol Sales Attachment 22 - Sonic Drive-Through Operatons Attachment 23 - Project Site Photos Attachment 24 - Mitigated Negative Declaration Initial Study Attachment 25 - Mitigation Monitoring Reporting Program Attachment 26 - Letter from SCAQMD Attachment 27 - Response to SCAQMD Attachment 28 - Valley Wide Letter Attachment 29 - Letter from Caltrans Attachment 30 - Response to Caltrans 4.1 Packet Pg. 158 Page 1 of 6 STATE OF CALIFORNIA ) ORDINANCE NO: 18-05 COUNTY OF RIVERSIDE )ss CITY OF SAN JACINTO ) AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA APPROVING CHANGE OF ZONE 17-03, A ZONE CHANGE FROM COMMERCIAL NEIGHBORHOOD TO COMMERCIAL GENERAL LOCATED ON THE WEST SIDE OF SAN JACINTO AVENUE AT THE TERMINUS OF COMMONWEALTH (APN 439-120-042) WHEREAS, Devon Wesselink filed a Change of Zone 17-03 application on October 18, 2017 for Commonwealth Crossing (“Applications), located on the west side of San Jacinto Avenue at the terminus of Commonwealth Avenue (“Subject Site”); WHEREAS, the Application Change of Zone 17-03 proposes to change the Zone from CN – Commercial Neighborhood to CG – Commercial (“Project”) ; WHEREAS, the Application was reviewed, studied, and found to comply with the California Environmental Quality Act (“CEQA”) as more fully described below: WHEREAS, on April 16, 2018, the Planning Commission of the City of San Jacinto (“Commission”) conducted a duly noticed public hearing on the Project at which time all persons wishing to testify in connection with the Project were heard, and the Project was comprehensively reviewed, and the Project was recommended for approval by the City Council; and WHEREAS, on May 1st and May 15th, 2018, the City Council the City of San Jacinto conducted duly noticed public hearings on the Application at which time all persons wishing to testify in connection with the Application were heard and the Application was comprehensively reviewed by the City Council; and THE CITY COUNCIL OF THE CITY OF SAN JACINTO DOES HEREBY ORDAIN AS FOLLOWS: Section 1. Incorporation of Recitals. The Recitals set forth above are incorporated herein and made an operative part of this Ordinance as though fully set forth herein. Section 2. Based on the entire record before the City Council, all written and oral evidence presented, the recommendation and the findings made in this Ordinance, the City Council hereby approves Change of Zone 17-03, subject to the Findings of Fact and Conditions of Approval. 4.1.a Packet Pg. 159 Attachment: Attachment 1 - Ordinance 18-05 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and Page 2 of 6 Section 3. Findings of Fact. The City Council of the City of San Jacinto hereby finds and determines: A. The proposed map amendment to change the Zoning from CN – Commercial Neighborhood to CG – Commercial General. B. The proposed Change of Zone is consistent with the General Plan, in that the Community Commercial Land Use Designation includes both the current Commercial Neighborhood Zone and proposed Commercial General Zone. There is not a specific plan for this location. C. The proposed Change of Zone and Project promotes the growth of the City consistent with the City’s Development Code and General Plan. The Change of Zone will facilitate commercial development along San Jacinto Avenue, as envisioned by the Genera l Plan. As the project is conditioned, it will not adversely affect the public convenience, health, interest, safety or general welfare. D. The site is physically suitable for development, as it is generally flat, rectangular, of adequate size for commercial development, and can utilize the signalized intersection at San Jacinto and Commonwealth Avenues. Adequate City infrastructure exists to support the project site and projects will be conditioned to ensure that their design accommodates and provides for pu blic and emergency vehicles including solid waste haulers, City crews, and other service and utility providers, as not to constitute a hazard. Section 4. That the official Zoning Map of the City Council is hereby amended by adding thereto Zone Change 17-03 rezoning, the certain properties as described in Attachment “A” attached hereto from CN – Commercial Neighborhood to – CG – Commercial General. Section 5. That this Ordinance shall become effective on the 31st day following its adoption. Section 6. That an environmental analysis has been conducted which evaluated information and impacts based on the specifics of this proposed project. This analysis determined that, although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent and other effects will be mitigated to a level of less than significant impact. Therefore, a Mitigated Negative Declaration and its associated Mitigation Monitoring Plan is recommended. Section 7. The City Clerk shall certify the adoption of this ordinance and cause the same to be published in a newspaper of general circulation printed and published in the County of Riverside, State of California. 4.1.a Packet Pg. 160 Attachment: Attachment 1 - Ordinance 18-05 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and Page 3 of 6 Introduced at a regular meeting of the City Council on the 1st day of May 2018. MOVED, PASSED, AND ADOPTED at a regular meeting of the City Council on the 15th Day of May 2018 by the following vote. AYES: NAYS: ABSENT: ABSTAIN: City of San Jacinto ___________________________ by Crystal Ruiz, Mayor ATTEST: _________________________ Angela Walton, City Clerk 4.1.a Packet Pg. 161 Attachment: Attachment 1 - Ordinance 18-05 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and Page 4 of 6 ATTACHMENT “A” PROPERTY DESCRIPTION THE SOUTH 165 FEET OF FAR LOT 77 AND THE NORTH HALF OF FARM LOT 79 OF THE SAN JACINTO LAND ASSOCIATION AS SHOWN BY MAP ON FILE BOOK 8, PAGE 357 OF MAPS SAN DIEGO CO. RECORDS. EXCEPT THEREFROM THE WEST 450 FEET, MEASURED FROM THE CENTERLINE OF SANTA FE STREET. 4.1.a Packet Pg. 162 Attachment: Attachment 1 - Ordinance 18-05 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and Page 5 of 6 ZONING MAP 4.1.a Packet Pg. 163 Attachment: Attachment 1 - Ordinance 18-05 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and Page 6 of 6 ZONE CHANGE PLAT 4.1.a Packet Pg. 164 Attachment: Attachment 1 - Ordinance 18-05 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and STATE OF CALIFORNIA) RESOLUTION NO: 3704 COUNTY OF RIVERSIDE)ss CITY OF SAN JACINTO) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA APPROVING SITE PLAN AND DESIGN REVIEW 17-11, TENTATIVE PARCEL MAP 37407 TO SUBDIVIDE ONE PARCEL INTO FIVE PARCELS AND ONE LETTERED LOT, A CONDITIONAL USE PERMIT CUP-17-06 TO PERMIT A SERVICE STATION WITH CONVENIENCE STORE TO HAVE OFF-SALE BEER AND WINE LICENSE WITH FINDING OF CONVENIENCE AND NECESSITY, MINOR USE PERMIT 17-06 TO PERMIT A FAST FOOD RESTAURANT WITH DRIVE-THROUGH, A MINOR USE PERMIT 17-07 TO PERMIT AN AUTOMATED CAR WASH, MINOR USE PERMIT TO PERMIT A TIRE STORE, VARIANCE 17-04 TO ALLOW FOR OFF-SALE BEER AND WINE WITHIN 1,000 OF ADJACENT SALES LOCATED ON THE WEST SIDE OF SAN JACINTO AVENUE AT THE TERMINUS OF COMMONWEALTH WHEREAS, Devon Wesselink filed applications on October 18, 2017: 1) Site Plan and Design Review (SPDR) 17-11; 2) Tentative Parcel Map (TPM) 37407; 3) Conditional Use Permit (CUP) 17-06; 4) Variance (VAR) 17-04; 5) Minor Use Permit (MUP) 17-06; 6) Minor Use Permit (MUP) 17-07; 7) Minor Use Permit (MUP) 17-08; 8) Change of Zone (CZ) 17-01 for Commonwealth Crossing (“Applications”), located on the west side of San Jacinto Avenue at the terminus of Commonwealth Avenue (“Subject Site”); WHEREAS, the Applications are proposed to develop the Commonwealth Crossing Project as a commercial development with SPDR 17 -11 for the review of the overall site and building designs, a TPM 37407 to subdivide 9.51 acres into five parcels with one lettered lot, CUP 17-06 to permit a service station with a convenience store to have an off-sale beer and wine license, VAR 17-04 to allow off-sale beer and wine sales within 1,000-feet of adjacent sales, MUP 17-06 to permit a fast food restaurant with a drive-through, MUP 17-07 to permit an automated car wash, and MUP 17-08 to permit a tire store (“Project”) ; WHEREAS, the Application was reviewed, studied, and found to comply with the California Environmental Quality Act (“CEQA”) as more fully described below: WHEREAS, on April 16, 2018, the Planning Commission of the City of San Jacinto (“Commission”) conducted a duly noticed public hearing on the Project at which time all persons wishing to testify in connection with the Project were heard , and the Project was comprehensively reviewed, and the project was recommended for approval by the City Council; and WHEREAS, on May 1st and May 15th, 2018, the City Council the City of San Jacinto conducted duly noticed public hearings on the Application at which time all persons wishing to testify in connection with the A pplication were heard and the Application was comprehensively reviewed by the City Council; and 4.1.b Packet Pg. 165 Attachment: Attachment 2 - Resolution 3704 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred. NOW, THEREFORE, BE IT RESOLVED, ordered and determined by the City Council of the City of San Jacinto: SECTION 1. Based on the entire record before the City Council, all written and oral evidence presented, the recommendation of the Planning Commission and the findings made in this Resolution, the City Council hereby approves SPDR 17-11, TPM 37407, CUP 17-06, MUP 17-06, MUP 17-07, MUP 17-08, and VAR 17-04, subject to the Findings of Fact and Conditions of Approval in the staff report. SECTION 2. Based on the entire record before the City Council and all written and oral evidence presented, the City Council finds the Application: A. The proposed zoning designation of the Subject Site provides for land uses that are compatible with the Community Commercial General Pl an designation for the Subject Site: B. The Project is permitted in the requested CG – Commercial General Zone and as conditioned will be consistent with the General Plan and the City’s Landscape Design Guidelines. C. The Project, as conditioned, will comply with City’s – Commercial General Zone and Standards of the Development Code. D. The Project, as conditioned, provides for land uses compatible with the surrounding area, as the surrounding area is developed with similar commercial development. E. The Project is consistent with City standards, ordinances, and policies. F. The Subject Site is physically suitable for the type and density of development proposed under because the Project is proposed to be developed at a density that is consistent with the General Plan Land Use designations and Zoning. G. The Project, as conditioned, will provide adequate access, design, water efficient landscaping, and has mitigated traffic and other environmental impacts. H. The Project implements the following General Plan goals: Land Use Goal 1: Develop a balanced land use pattern that meets community needs for residential, commercial, industrial, public, and recreational uses. Land Use Goal 2: Manage and direct growth so that the community and its neighborhoods are protected and enhanced. 4.1.b Packet Pg. 166 Attachment: Attachment 2 - Resolution 3704 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and Land Use Goal 4: Promote high-quality development that ensures compatibility with surrounding land uses and major transportation corridors. Land Use Goal 9: Encourage thoughtful community design that enhances San Jacinto’s quality of life. Circulation Goal 1: Provide a circulation system that meets the needs of existing, and future land uses. I. Adequate City infrastructure exists to support the Project , and the Project has been reviewed by Police, Fire, and Engineering to ensure that the design accommodates public and emergency vehicles including solid waste haulers, City crews, and other service providers. J. The Tentative Parcel Map is designed for consistency with surrounding development in terms of both design and density. K. As designed and conditioned, the Project will not be detrimental to surrounding properties and the neighborhood. In fact, the signal at Commonwealth and San Jacinto Avenues will accommodate both vehicular and pedestrian access to the project. L. The proposed use will not adversely affect the welfare of residents in the area or result in an undue concentration in the neighborhood of establishments dispensing alcoholic beverages, including beer and wine, as surrounding establishments are grocery/pharmacy stores. M. The proposed use will not adversely impact the suitability of adjacent commercially zoned properties for commercial uses as the proposed service station with convenience store is compatible with planned and surrounding uses along San Jacinto Avenue and as planned and condi tioned, will be compatible with surrounding and future commercial uses. PUBLIC CONVENIENCE OR NECESSITY (PCorN) FINDINGS OF FACT: N. The public convenience would be served by the establishment of the proposed use. Census Tract 435.08 is permitted for four off-site sales licenses. Of the six existing Type 20/21 licenses in Census Tract 435.08, three are for grocery/pharmacy stores, one for the existing 7 -Eleven Convenience Store, one for a service station/convenience store that is closed, and one is in the City of Hemet. The convenience store provides a selection of foods and beverages the community with a quick and convenient alternative to quick serve restaurants. O. The Project as designed and conditioned will not be a source of nuisance behavior associated with excessive consumption of alcoholic beverages. P. The proposed use would not be detrimental to the public health, safety, or welfare, as conditioned, in particular under the operational conditions,. 4.1.b Packet Pg. 167 Attachment: Attachment 2 - Resolution 3704 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and Q. The convenience store would not increase the severity of existing law enforcement or public nuisance problems in the surrounding area. R. The proposed use is consistent with the objectives, policies, general land uses, and programs of the general plan, and any applicable specific plan. SECTION 3. Based on the entire record before the City Council and all written and oral evidence presented, the City Council finds the A pplication complies with CEQA for the following reasons: An environmental analysis has been conducted which evaluated information and impacts based on the specifics of this proposed project. This analysis determined that, although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent and other effects will be mitigated to a level of less than significant impact. Therefore, a Mitigated Negative Declaration and its associated Mitigation Monitoring Plan is recommended. SECTION 4. The location and custodian of the documents and any other material which constitute the record of proceedings upon which the City Council based its decision is as follows: Planning Director, City of San Jacinto Planning Department, 248 E. Main Street, San Jacinto, CA 92583. (909) 487-7330. SECTION 7. Effective Date. This Resolution shall become effective upon its adoption. MOVED, PASSED, AND ADOPTED at a regular meeting of the City Council on the 15th Day of May 2018 by the following vote. AYES: NAYS: ABSENT: ABSTAIN: City of San Jacinto ___________________________ by Crystal Ruiz, Mayor ATTEST: _________________________ Angela Walton, City Clerk 4.1.b Packet Pg. 168 Attachment: Attachment 2 - Resolution 3704 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 1 of 11 April 16, 2018 TO: Chairperson and Members of the Planning Commission REQUESTED BY: Mary E. Lanier, Planning Consultant APPROVED BY: Travis Randel, Planning & Community Development Director SUBJECT: A proposal of MW Advantage 1, LLC, for the Commonwealth Crossing Project to subdivide a vacant parcel, totaling 9.51 gross acres, into five parcels and 1 lettered lot for the development of a 2,720-square-foot Fast Food Drive-Through on Parcel 1, a 3,062-square-foot Convenience Store with Off-sale Alcohol Sales, and a 3,600-square-foot canopy for an 7 Eleven Service Station on Parcel 2, 12,000-square-foot Tire Store on Parcel 3, a 3,590-square-foot Automated Car Wash on Parcel 4, a 24,000- square-foot Office/Retail Building on Parcel 5, and a Bioretention/Detention basin on Lot A. To facilitate the Project, the applicant is requesting a Site Plan and Design Review (SPDR-17-11), a Parcel Map (PM-37407) to divide the parcel lot into five parcels and one lettered lot, a Conditional Use Permit (CUP-17-06) to permit a Service Station with a Convenience Store to have an Off-sale Beer and W ine license (Findings of Public Convenience or Necessity are required), a Minor Use Permit (MUP-17-06) to permit a Fast Food Restaurant with a Drive-Through, a Minor Use Permit (MUP-17-07) to permit an Automated Car Wash, a Minor Use Permit (MUP-17-08) to permit a Tire Store, Variance (VAR-17-04) to allow Off-sale Beer and W ine sales within 1,000- feet of adjacent sales, and (CZ) 17-03 to change the Zone from Commercial Neighborhood to Commercial General, located on the west side of San Jacinto Avenue at the terminus of Commonwealth Avenue . APN 439-120-042 RECOMMENDATION: Staff recommends that the Planning Commission: 1. DETERMINE that this proposed Project will not have a significant effect on the environment based on the findings set forth in the case record and RECOMMEND that the City Council: a. ADOPT A Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) pursuant to the California Environmental Quality Act (CEQA); and 2. RECOMMEND that the City Council: 4.1.c Packet Pg. 169 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 2 of 11 a. APPROVE Site Plan Design Review 17-11 (SPDR-17-11) for a Commercial Center to be built in two phases; and b. APPROVE Tentative Parcel Map 37407 (TPM-37407) to subdivide 9.51 acres into five parcels and one lettered lot; and c. APPROVE Conditional Use Permit 17-06 (CUP-17-06) for a service station and convenience store with off-sale alcohol sales and findings of public convenience or necessity (PCorN), and Variance 17-04 (VAR-17- 04) to allow to allow off-sale beer and wine sales within 1,000-feet of adjacent sales; and d. APPROVE Minor Use Permit 17-06 (MUP-17-06) to permit a fast food restaurant with a drive-through; and e. APPROVE Minor Use Permit 17-07 (MUP-17-07) to permit an automated car wash; and f. APPROVE Minor Use Permit 17-08 (MUP-17-08) to permit a tire store; and g. APPROVE Change of Zone 17-03 (CZ-17-03), to change the Zone from CN - Commercial Neighborhood to CG – Commercial General; and ADOPT the necessary Zone Change Ordinance. 3. ADOPT Planning Commission Resolution 18-09 recommending City Council approval of SPDR 17-11, TPM 37407, CUP 17-06, VAR 17-04, MUP 17-06, MUP 17-07, MUP 17-08, and CZ 17-03, subject to Findings of Fact and Conditions of Approval set forth in the case record. DESCRIPTION: The Project is located on the west side of San Jacinto Avenue at the terminus of Commonwealth Avenue, and across from the Walmart Supercenter development. The property is rectangular in shape and encompasses 9.51 acres. The Project includes a number of discretionary approvals as follows:  Site Plan Design Review SPDR-17-11 for the review of the overall site and building designs (Site Plan – Attachment 11 and Project Elevations – Attachments 15-17).  Tentative Parcel Map 37407 to subdivide 9.51 acres into five parcels with one lettered lot (Parcel Map – Attachment 13).  Conditional Use Permit CUP-17-06 to permit a service station with a convenience store to have an off-sale beer and wine license.  Variance VAR-17-04 to allow off -sale beer and wine sales within 1,000-feet of adjacent sales. 4.1.c Packet Pg. 170 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 3 of 11  Minor Use Permit MUP-17-06 to permit a fast food restaurant with a drive- through.  Minor Use Permit MUP-17-07 to permit an automated car wash.  Minor Use Permit MUP-17-08 to permit a tire store.  Change of Zone CZ-17-03 to change the Zone from Commercial Neighborhood to Commercial General. LOCATION/SURROUNDING LAND USES: The Location, General Plan, and Zoning Maps are included as Attachments 8, 9, 10 respectively. Land Use General Plan Zoning Project Site Vacant Land/U-Haul Lot CC – Community Commercial CN – Commercial Neighborhood North Mobile Home Park MDR – Medium Density Residential RM – Residential Medium South Vacant Land CC – Community Commercial CN – Commercial Neighborhood East Commercial Shopping Center – Walmart CC – Community Commercial CG – Commercial General West Residential Apartments/RV Storage MDR – Medium Density Residential MHDR – Medium High- Density Residential RM – Residential Medium RMH – Residential Medium High BACKGROUND: The property has a temporary U-Haul rental facility on a portion of the property, with of the remainder property vacant. The applicant is in escrow to purchase the property to build a multi-building/tenant commercial development. No previous development applications are on file. DISCUSSION/ANALYSIS: Change of Zone (CZ 17-03) A Change of Zone from Commercial Neighborhood (CN) to Commercial General (CG) is requested to accommodate the service station, alcohol sales, tire store, and a wider range of commercial and office uses. San Jacinto Avenue, as a major transportation corridor through the City, is an ideal location to focus commercial/office uses. The proposed CG Zone is a continuation of the CG Zone found across San Jacinto Avenue and both sides Commonwealth Avenue. The General Plan Land Use Designation of the property is Community Commercial, which covers both the existing Commercial Neighborhood and proposed Commercial General Zones. Furthermore, the General Plan Environmental Impact Report evaluated the greater commercial impacts of uses found in the CG Zone. Therefore, a General Plan Amendment is not required. 4.1.c Packet Pg. 171 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 4 of 11 Site Plan Design Review (SPDR-17-11) Under the SPDR-17-11, the City will ensure that the Project respects the physical environmental characteristics of the property, provides safe and convenient access and circulation for pedestrians and vehicles, provides high quality design practices, minimizes, or eliminates negative or undesirable visual impacts, provides for adequate dedication of land for public purposes and provides needed public infrastructure . The buildings are set back from the adjacent residential uses to the north by a minimum of 33 feet, with a 10-foot landscape setback and 6-foot block wall (Site Plan – Attachment 11). *Final parcel acreage and parcel dimensions to be consistent with the Final Parcel Map **Although Parcel 3 exceeds the impervious Surface calculation for the individual parcel, the overall project maintains a maximum Impervious Surface of 77.1% which is below the maximum standard of 85%. Therefore, the project complies with this development standard. ***10-foot required front setback/25-foot landscaped parkway per Landscape Guidelines setback for San Jacinto Avenue (setback area combined). Access DEVELOPMENT STANDARDS FOR THE PROPOSED CG ZONE Required Permitted Parcel 1 Parcel 2 Parcel 3 Parcel 4 Parcel 5 Parcel 6 Basins Parcel Area (Net) Minimum 5,000 sq. ft. 12,000 sq. ft. Drive- Through 50,508 sq. ft. 73,395 sq. ft. 68,086 sq. ft. 53,646 sq. ft. 137,492 sq. ft. 22,858 sq. ft. Parcel Width 50 ft. 285 ft. 247 ft. 210 ft. 284 ft. 322 ft. (varies) 173 ft. Parcel Depth 100 ft. 258 ft. 253 ft. 323 ft. 189 ft. 374 ft. (varies) 126 ft. (varies) FAR (Maximum) .40 .06 .05 .17 .03 .16 N/A Building Size Varies 2,720 3,062 12,000 3,590 24,000 N/A Building Height 45 ft. 24 ft. 23.8 ft. TBD 26 ft. TBD N/A Impervious Surface (Max) 85% 80.1% 72.4% 87.3%** 81% 82.4% N/A Structure / Lot Coverage (Max) 50% 5.7% 4.9% 16.9% 6.8% 16.5% N/A Setbacks San Jacinto Avenue 10/25 ft. *** Landscape 29 ft. Landscape 29 ft. Landscape --- --- --- N/A Side (Abutting Residential) 10 ft. Landscape 10 ft. --- 10 ft- --- --- N/A Rear (Abutting Residential) 15 ft. --- --- --- --- N/A Side (Abutting Non- Residential) --- ---- 10 ft. --- 10 ft 10 ft. N/A 4.1.c Packet Pg. 172 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 5 of 11 The Project is being designed and built as a single commercial complex. As such access will be shared between all 5 parcels. The 38-foot wide main entry is located at the signalized intersection at the terminus of Commonwealth Avenue and provides one entrance lane and two lanes for egress. A second 30-foot wide driveway is located on the southern property line. To minimize vehicle and pedestrian conflicts at this location, the driveway has been conditioned for right-in only. The applicant will work with the adjacent property owner for additional land for right-in/right-out only driveway access. Parking A total of 257 parking stalls are proposed where 215 parking stalls are required for the entire Project. Parking may be adjusted on the final site plan but will exceed the City’s requirement. Bicycle parking is required at a ratio of ten percent of the required parking. Adjacent to each building is a bicycle rack in front or the side providing for short -term bicycle parking and long-term lockers provided on the sides or rear of the buildings. As proposed, the project meets the Cal Green requirements for bicycle parking. PARKING ANALYSIS Ratio (Gross Floor Area) Calculation Required Provided Parcel 1 Fast Food #1 w/Drive-Through – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. 2,000/200 + 720/60 32 20 + 12 Parcel 1 Total 32 32 Parcel 2 Convenience Store – 1:225 – plus 1 space for each employee on duty during heaviest traffic 8-hour shift 3,062/225 14 22 Parcel 2 Total 14 22 Parcel 3 Tire Store 12,000/250 4/Bay 48 57 Parcel 3 Total 48 57 Parcel 4 Car Wash 1/Employee/Shift 1 3 Parcel 4 Total 1 3 Parcel 5 Office/Retail 24,000/200 Off/ 250 Retail 96-120 143 Parcel 5 Total 96-120 143 Phasing The Site Plan is the master design and site layout for the entire Project, which is proposed to be built in two phases as noted in the table below (Phasing Plan – Attachment 12). 4.1.c Packet Pg. 173 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 6 of 11 Phase 1 includes the development of Parcel 1, Parcel 2, Parcel 4 , the construction of the on-site main drive-aisle, a detention basin, and all required off-site improvements. Phase 2 include the development of Parcel 3 and Parcel 5 PHASING PLAN Phase Parcel # Parcel Net Square Footage Building Square Footage Projected Construction Completion PHASE 1 Fast Food with Drive-Through 1 4.6 acres 2,720 2nd quarter 2019 Convenience Store 2 3,062 12-Pump Dispenser Canopy 3,600 Car wash 4 3,590 Common Drive Aisles, sidewalks, and detention/retention basins 1, 2, portion of 3, 4, & 6 Off-Site Improvements – parkway, utilities, roadway improvements Off-site PHASE 2 Tire Store 3 4.72 acres 12,000 3rd quarter 2020 Office/Retail 5 24,000 *Final parcel acreage to be consistent with the Final Parcel Map Architecture and Design The proposed center includes five primary buildings and multiple ancillary structures. Three of the primary buildings have been designed and are being considered under SPDR 17-11. Two additional buildings, a tire/retail and office/retail with the building footprints included on the site plan but are not being considered under this application. A separate application will be required for the development of these building. The Project includes buildings that are of a contemporary commercial building design and are consistent with existing and proposed commercial buildings in the area. The buildings feature four-sided architecture. Stucco walls make up the upper portions of the buildings in varying shades of earth tone colors, “Toasty” and “Sand Dune” are used for both wall color and trim on all of the buildings, with “Aesthetic White” as an accent color on the upper elevations. Entry and column elements will feature Coronado Stone Tuscan Villa – Seville. The design of the buildings provides varying heights, column features, canopies, and recesses/pop-outs to create visual interest. All roof mounted equipment is proposed below the parapet and is completely screened. The following provides additional detail for each building. Sonic (Parcel 1) is a drive-through restaurant that features four-sided architecture using the center colors and materials. W ith its front entry (east) facing San Jacinto Avenue, it is consistent with the Urban Combining Overlay Zone , which encourages buildings to have entries facing the street. The front also includes an outdoor seating area. The traditional Sonic yellow metal awnings provide an accent as a roof element and drive - through awning. Sonic Drive-In stalls are covered with metal canopies and are located in the parking area, with one adjacent to San Jacinto Avenue. The Sonic building is designed to meet their unique operational needs, with a “bump-out” drive-through lane 4.1.c Packet Pg. 174 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 7 of 11 and drive-in stalls serve as order areas, where customers order, pay and are served by carhops. (Sonic Elevations – Attachment 15). 7-Eleven (Parcel 2) is a service station with convenience store and 12 -pump dispenser canopy. The store also utilizes the center colors and materials. The building entry faces the interior (north) of the project and also includes four -sided architecture. The south and east building elevations are visible from San Jacinto Avenue and include stone column and arch features with trellis’ with vines. The 12-pump “Aesthetic White” painted galvanized canopy features “Toasty” painted posts, and stone columns (7-Eleven Elevations – Attachment 16). The Automated Carwash (Parcel 4) utilizes the center colors and materials and will also include the CMU Split Face Orco “Nufad” Integral Color as a primary building material. The front of the building faces the interior (west) of the project for better circulation and business operation, with the exterior (east) on the San Jacinto side. Staff recommends as a condition of approval that canopies be added to the rear (east) elevation since it is visible from San Jacinto Avenue. The sides of the building where the entrance and exit to the carwash, include tower features, which complement the center. Individual stalls with vacuums are covered by a bronze arched canopy. (Car Wash Elevations – Attachment 17). The tire store and office/retail buildings are included on the site plan and once tenants are identified will be reviewed for architecture and site layout through a Changes to an Approved Project by the Planning and Community Development Director. The buildings will be reviewed for compatibility with the approved buildings and are to utilize the same color pallet, materials, and architecture features and design elements on the approved buildings. Requirements for design will be included in Conditions Covenants and Restrictions (CC&R’s) required under the Parcel Map. No Signage is approved under this application and p reparation of a sign program required. The sign program will be reviewed administratively. Landscaping Landscaping is proposed along the San Jacinto Avenue frontage, adjacent to the northern, southern, and eastern property lines, and throughout the parking lots. Water quality will be maintained throughout the site before flowing into a detention basin to the northwest corner of the property on Lot A. A final landscape plan, which must meet the City’s Water Efficient Landscape Irrigation requirements in the Development Code, as well as the City’s Landscape Guidelines, will be required. Conditions of Approval are included to guide the preparation of the final plans. (Conceptual Landscape Plan – Attachment 18). 4.1.c Packet Pg. 175 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 8 of 11 Tentative Parcel Map 37407 (PM-37407) The proposed Tentative Parcel Map subdivides the existing parcel totaling 9.51 gross acres (9.32 net acres), into five parcels and one letter lot summarized in the table below (TTM 37407 – Attachment 13). PM-37407 SUMMARY Parcel # Net Acres Use Parcel 1 1.16 Fast Food w/Drive-Through Parcel 2 1.69 Service Station w/Convenience Store/Beer and Wine Sales Parcel 3 1.56 Tire Store Parcel 4 1.23 Car wash Parcel 5 3.16 Office Retail Building Lot A .52 Detention/Retention Basins Total 9.32 net acres *Final parcel acreage to be consistent with the Final Parcel Map Conditional Use Permit (CUP-17-06) – 7-Eleven Convenience Store with Off-Sale Beer and Wine Sales and Findings for Public Convenience or Necessity and Service Station/Variance (VAR-17-04) Conditional Use Permit, CUP-17-06, is required to permit the off-sale alcohol sales under a Type 20 Alcoholic Beverage Control (ABC) license in conjunction with a service station and convenience market. Also, included in the CUP review is the request that the City make findings of Public Convenience or Necessity (PCorN) to support the requested alcohol license type in Census Tract 435.08 which is currently over concentrated with six Type 20/21 licenses where four are permitted. Of the six Type 20/21 licenses in Census Tract 435.08, three are for grocery/pharmacy stores, one for the existing 7-Eleven Convenience Store, one for a service station/convenience store that is closed, and one is in the City of Hemet. The findings of PCorN are required per State Law and included in the Findings of Fact (Attachment 1). 7-Eleven is the proposed tenant for Service Station/Convenience Store and is anticipating a premise to premise transfer of its existing ABC License. The Development Code requires a CUP for a premise to premise transfer of a license and for new licenses. Since the Project is for a new center, it is recommended that this CUP provide the findings of PCorN for both a premise to premise transfer of and a new Type 20 License for the convenience store, to facilitate the opportunity for alcohol sales, should the transfer not occur. The store is proposed to operate 24-hours a day, seven days a week, with three shifts of employees with an average of two employees per shift. The area proposed for the alcohol sales makes up approximately 33-square-feet or approximately 1% of the total square footage of the store space. A separation variance (VAR 17-04) is requested to permit the sale of alcohol within 1,000-feet of other buildings selling alcohol. Walgreen Pharmacy is located across San Jacinto Avenue to the east and Aldi market (currently 4.1.c Packet Pg. 176 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 9 of 11 under construction) at the northeast corner of San Jacinto Avenue and Commonwealth (Attachments 19, 20, and 21). Minor Use Permits Minor Use Permits are required for the following uses. These MUP’s normally would be processed administratively with action by the Planning and Community Development Director; however, Since the Project includes a Change of Zone request, the entire project is required to be reviewed by the highest approving authority which will be the City Council. MUP-17-06 – Sonic Fast Restaurant with a Drive-Through The proposed Sonic is the only drive-through restaurant within the Project. Sonic has unique operation standards, which includes the bump-out drive lanes since it features primarily beverage and ice cream products. This allows customers ordering beverages and ice cream products to exit the lane when their order is delivered . They are also one of the few restaurants that utilize “carhops” to serve food to customers to eat in their cars, under covered canopies. General hours of operation are 6:00 a.m. to midnight, daily. (Operational Information – Attachment 22). The proposal complies with all applicable development standards for drive-thru restaurants. MUP-17-07 – Automated Car Wash The applicant is currently working with a major automated car wash company for Parcel 4. Preliminary information has been provided to evaluate a proposed car wash including the traditional tunnel for wash services and covered parking stalls for drying and vacuuming vehicles. With new water efficiency requirements for car washes, the anticipated facility would utilize reclaimed water from the tunnel and recycled. Wash cycles are generally expected to be approximately three to five minutes. General hours of operation are 7:00 a.m. to 7 p.m. normal business hours, 7:00 a.m. to 9:00 p.m. summer hours for seven days per week. MUP-17-08 – Tire Store The applicant is working on a proposed tire store Parcel 3. As such, the building footprint has been identified, but elevations have not yet been prepared. When a tenant is identified, the elevations would be processed administratively. The building architecture, colors, and materials would be required to match and compliment the other buildings approved with this application. 4.1.c Packet Pg. 177 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 10 of 11 PUBLIC NOTICE AND COMMENTS: The environmental review (Initial Study) and public hearing for this Project were advertised on March 23, 2018, opening the public comment period with comments due by April 11, 2018. On March 27, 2018 Mr. Ray Friedman called to inquire about the project and expressed support. On April 4, 2018 the City received a comprehensive letter from South Coast Air Quality Management District (SCAQMD) prepared by Lijin Sun, J.D. Program Supervisor, CEQA IGR Planning, Rule Development & Area Sources. The projects’ Air Quality Consultant from MD Acoustics, Inc. prepared a letter of response which was e-mailed to Ms. Sun. As of the writing of this report, no additional responses have been received from SCAQMD. Nevertheless. Staff believes the response prepared by MD Acoustics, Inc. does not bring up any new issues requiring further environmental analysis. On April 10, 2018 the City received a letter from Valley Wide Recreation and Park District which indicated they had no comments. ENVIRONMENTAL ANALYSIS: Based upon the information contained in the Initial Study and pursuant to the requirements of CEQA; it has been determined that this Project, with the incorporation of mitigation measures, will not have a significant impact on the environment. The mitigation measures required to reduce or mitigate the impacts of this Project on the environment are included in the Project design and/or the Mitigation Monitoring Program and will be included as part of the Mitigated Negative Declaration for this Project (Attachments 24 and 25). As a result, it is recommended that the Planning Commission adopt a Mitigated Negative Declaration for this Project. ALTERNATIVES: 1) Recommend that the City Council Approve the Project as recommended. 2) Do not recommend the City Council approve the Project to accommodate a commercial center leaving the site available for future commercial development. 3) Continue this action for further information or take no action. FISCAL IMPACT: There is no impact to the General Fund since all project costs are borne by the applicant. 4.1.c Packet Pg. 178 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/ VAR-17-04/ Planning Commission Hearing April 16, 2018 MUP-17-06, 07,08/CZ17-03 Page 11 of 11 CONCLUSION: As designed and conditioned, the Project will be a welcome addition along San Jacinto Avenue and in the City. The Project offers the constituents of the City another choice for gasoline and food, car wash, retail sales, and office uses, promoting job opportunities and local buying power. ATTACHMENTS: 1. Findings of Fact 2. Planning Commission Resolution 18-09 3. SPDR-17-11 Conditions of Approval 4. TPM-37407 Conditions of Approval 5. CUP-17-06/VAR-17-04 Conditions of Approval 6. MUP-17-06, 17-07, 17-08 Conditions of Approval 7. CZ-17-03 Conditions of Approval 8. Aerial Location Map 9. General Plan Map 10. Zoning Map 11. Site Plan 12. Phasing Plan 13. TPM-37407 14. Preliminary Grading Plan 15. Sonic Elevations 16. 7-Eleven Elevations 17. Car Wash Elevations 18. Conceptual Landscape Plan 19. Radii Map for Alcohol Sales 20. Applicant’s PCorN Findings 21. 7-Eleven Floor Plan with Alcohol Sale Area 22. Sonic Drive-Through Operations 23. Site Photos 24. Mitigated Negative Declaration Initial Study 25. Mitigation Monitoring and Reporting Program 26. Letter from SCAQMD 27. Response to SCAQMD 28. Letter from Valley Wide Recreation and Park District 4.1.c Packet Pg. 179 Attachment: Attachment 3 - Planning Commission Staff Report (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 1 of 15 SPDR-17-11, TPM-37407, CUP-17-06 (w /PCorN), VAR-17-04 MUP-17-06, MUP 17-07, MUP 17-08 & CZ 17-03 SITE PLAN DESIGN REVIEW PERMIT FINDINGS OF FACT (SPDR-17-11): The proposed Project will: 1. Be allowed within the subject zone; The proposed commercial center will be consistent with the CG – Commercial General Zone and CC – Community Commercial General Plan Land Use designations, with Change of Zone 17-03. The CG zone is applied to areas appropriate for general commercial and daily shopping needs of a broad market area and it allows a wide range of retail sales and business, professional, and personal services that are accessible to transit corridors. San Jacinto Avenue is a major transit corridor in the City and the proposed center will provide needed retail, office, and services for the community. Transit corridors are important to the City in that they can project a positive image of the community while also enhancing the quality of life for the users and occupants. As conditioned, the Project will help to project that positive image of the community as intended by the zone. 2. Be in compliance with all the applicable criteria below: a. Compliance with 17.630 – Site Plan and Design Review of the Development Code, and all other applicable City regulations and policies; As noted in the staff report and as conditioned, the Project will comply with Chapter 17.630 of the Development Code. b. Efficient site layout and design; As designed the Project provides an efficient site layout and design with two points of access and an internal circulation system that serves the Project and provides an opportunity for future joint access at the southern driveway. c. Compatibility with neighboring properties and developments; The Project provides compatibility with neighboring properties and developments, as the properties to the east are currently developed with a Walmart Super Center and a planned commercial development at the northeast corner of San Jacinto Avenue and Commonwealth Avenue. Although currently vacant the property to the south is commercially zoned. 4.1.d Packet Pg. 180 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 2 of 15 Properties to the north and west are zoned Residential Medium and Residential Medium High. A mobile home park is located to the north and an apartment complex and RV Storage to the west. The project will as designed meet the setbacks and provides landscape buffering between the uses, as well as provides commercial services to surrounding residents. d. Efficiency and safety of public access and parking; As previously stated the Project provides an efficient site layout and design with two points of access and an internal circulation system that not only serves the Project but provides an opportunity for joint access with the property to the south. Therefore, the Project provides efficient and safe public access and parking. e. The arrangement and relationship of proposed structures and signs to one another and to other developments in the vicinity and whether the relationship is harmonious and based on good standards of design; Overall, the Project design provides a good relationship and arrangement of the proposed structures to one another and developments in the vicinity. The design features and colors are compatible with existing surrounding commercial development. The proposed Project has lined up one of the proposed driveways with Commonwealth Avenue to utilize the existing signal. f. The compatibility in scale and aesthetic treatment of proposed structures with public areas; The site and building design provide a compatible scale and aesthetic treatment for the public areas (i.e., pedestrian and parking areas). g. The adequacy of proposed driveways, landscaping, parking spaces, potential on-site and off-site parking and traffic impacts and other potential impacts on the environment; The City Engineer and Traffic Engineer have reviewed the site design and Traffic Impact Analysis and have determined that as conditioned the Project will provide for safe vehicular and pedestrian movements to and from the site. Further, as noted in the staff report, the Project meets the required landscaping and parking requirements. All other potential environmental impacts have been thoroughly analyzed in the Initial Study and as mitigated/conditioned the Project will have less than significant environmental impacts. 4.1.d Packet Pg. 181 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 3 of 15 h. Appropriate open space and use of water-efficient landscaping; The Project design provides adequate open space in the form of on -site landscaping. As conditioned, the Project will provide landscaping in conformance with Chapter 17.325 – Water Efficient Landscaping and Irrigation of the Development Code in conformance with State law. i. Consistency with the General Plan and any applicable specific plan; and The CC – Community Commercial General Plan land use designation provides for a variety of retail and service-oriented business activities, including office uses, at various intensities to serve the local community and population, as well as the broader market area. The Project is consistent with the General Plan land use designation and it is not located within a Specific Plan. j. Consistency with any adopted design guidelines/standards. As conditioned, the Project will be consistent with the City’s Landscape Design Guidelines, including, but not limited to, the special landscaping setback requirements along San Jacinto Avenue. 3. Be in keeping with the character of the neighborhood, in terms of the structure(s) general appearance; and As conditioned, the Project will be compatible with the neighborhood and other commercial uses along the San Jacinto Avenue corridor. 4. Not be detrimental to the harmonious and orderly growth of the City. The Project promotes the growth of the City consistent with the City’s Development Code and General Plan. SUBDIVISION FINDINGS OF FACT (TPM-37407): 1. The proposed subdivision of land has been found to be consistent with the General Plan. The proposed Parcel Map (TPM-37407) further the intent of the General Plan by facilitating commercial development as planned. The Project implements the following General Plan goals and policies: 4.1.d Packet Pg. 182 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 4 of 15 Land Use Goal 1: Develop a balanced land use pattern that meets community needs for residential, commercial, industrial, public, and recreational uses. Specifically implementing policies 1.1 and 1.7. Land Use Goal 2: Manage and direct growth so that the community and its neighborhoods are protected and enhanced. Specifically implementing policies 2.1 and 2.7. Land Use Goal 4: Promote high-quality development that ensures compatibility with surrounding land uses and major transportation corridors. Implementing all of the policies associated with this goal, Policies 4.1 through 4.6. Land Use Goal 9: Encourage thoughtful community design that enhances San Jacinto’s quality of life. Specifically implementing policies 9.1, 9.2, 9.3, 9.6, and 9.8. Circulation Goal 1: Provide a circulation system that meets the needs of existing and future land uses. Specifically implementing policies 1.1, 1.2, 1.4, and 1.6. The proposal implements the General Plan by promoting high-quality development along major transportation corridors. 2. The design or improvement of the proposed subdivision of land has been found to be consistent with applicable General Plan. The design or improvement of the proposed subdivision of land has been found to be consistent with applicable General Plan. As noted above, the proposed Parcel Map (TPM-37407) implement the goals and policies of the General Plan. 3. The site of the proposed subdivision of land is physically suitable for the proposed design of the development. The proposed Parcel Map (TPM-37407) is physically suitable for the proposed Project as the site is generally flat and the design utilizes the signalized intersection at San Jacinto and Commonwealth Avenues. In addition, the proposed internal circulation system will provide for a secondary access at it 4.1.d Packet Pg. 183 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 5 of 15 southern boundary that can accommodate a future joint driveway with the adjacent property. 4. The site of the proposed subdivision of land is physically suitable for the proposed density of the development. The site is physically suitable for the proposed intensity of the Project as the site layout accommodates a project that meets the requirements of the Development Code, General Plan and Landscape Design Guidelines. 5. The design of the proposed subdivision of land and the proposed improvements are not likely to cause substantial environmental damage or substantially and avoidably injure fish and wildlife or their habitat. An Initial Study was prepared for the Project to determine the Project’s potential to result in significant environmental impacts. The Initial Study determined, based upon substantial evidence, that with the incorporation of identified mitigation measures, no significant impact would occur as a result of the Project. The mitigation measures required to reduce or mitigate the impacts of this Project on the environment are included in the Project design and/or the Mitigation Monitoring Program and will be made enforceable through the Conditions of Approval for the Project. 6. The design of the proposed subdivision of land and the type of improvements are not likely to cause serious public health problems. The implementation of the proposed conditions will ensure that the Project will not be detrimental to the public interest, health, safety, convenience, or welfare of the City. 7. That the design of the proposed subdivision of land and the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision of land. The Approving Authority may approve a subdivision of land if it finds that alternate easements for access or for use will be provided and that they will be subsequently equivalent to ones previously acquired by the public. This subsection shall apply only to easements of record or to easements established by the judgment of a court of competent jurisdiction. Proposed Parcel Map (TPM-37407) as designed and conditioned will not conflict with existing easements. 4.1.d Packet Pg. 184 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 6 of 15 CONDITIONAL USE PERMIT AND ALCOHOL SALES FINDINGS OF FACT (CUP-17- 06): 1. The proposed use will not be detrimental to surrounding properties and neighborhoods including ensuring that the use does not contribute to loitering, public drunkenness, noise, obstructing pedestrian and vehicular traffic, parking, crime, interference with pedestrian corridors used by children, defacement, and damage to structures; As designed and conditioned, the Project will not be detrimental to surrounding properties and the neighborhood. In fact, the signal at Commonwealth and San Jacinto Avenues will accommodate both vehicular and pedestrian access to the project. The convenience store is located at the southeast corner of the Project and furthest away from the residential uses. Conditions of Approval include requirements to address loitering, noise, and property maintenance. 2. The proposed use will not adversely impact the suitability of adjacent commercially zoned properties for commercial uses; The proposed use will not adversely impact the suitability of adjacent commercially zoned properties for commercial uses as the proposed service station with convenience store is compatible with planned and surrounding uses along San Jacinto Avenue and as planned and conditioned, will be compatible with surrounding and future commercial uses. 3. The proposed use will not adversely affect the welfare of residents in the area or result in an undue concentration in the neighborhood of establishments dispensing alcoholic beverages, including beer and wine. For purposes of this subparagraph, “undue concentration” shall be as defined in the Business and Professions Code Section 23958.4; and Excerpt of Business and Professions Code Section 23958.4 – For purposes of Section 23958, “undue concentration” means the case in which the applicant premises for an original or premises-to-premises transfer of any retail license are located in an area where any of the following conditions e xist: (1) The applicant premises are located in a crime reporting district that has a 20 percent greater number of reported crimes, as defined in subdivision (c), than the average number of reported crimes as determined from all crime reporting districts within the jurisdiction of the local law enforcement agency. (2) As to on-sale retail license applications, the ratio of on -sale retail licenses to population in the census tract or census division in which the applicant premises are located exceeds the ratio of on-sale retail licenses to population in the county in which the applicant premises are located. – Not Applicable to this Project 4.1.d Packet Pg. 185 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 7 of 15 (3) As to off-sale retail license applications, the ratio of off-sale retail licenses to population in the census tract or census division in which the applicant premises are located exceeds the ratio of off-sale retail licenses to population in the county in which the applicant premises are located. The proposed use will not adversely affect the welfare of residents in the area or result in an undue concentration in the neighborhood of establishments dispensing alcoholic beverages, including beer and wine. The City’s Police Department does not keep crime statistics by Census Tracts, so the City is unable to determine if crime in this Census Tract is any greater than crime in other Census Tracts within the City. Nevertheless, the Census Tract is over concentrated with off-site sales licenses, having six licenses where four are permitted. See the Findings of Fact for Public Convenience or Necessity below. 4. Notwithstanding subparagraph 3 above, the Approving Authority may approve a Conditional Use Permit despite an undue concentration of establishments dispensing alcoholic beverages, as defined in the Business and Professions Code 23958.4, if the Approving Authority first finds the public convenience and necessity would be served by the issuance of the Conditional Use Permit and the use otherwise meets the remaining findings; See the Findings of Fact for Public Convenience or Necessity below. 5. The proposed use is consistent with the General Plan and any applicable specific plan; The proposed use is consistent with the General Plan and any applicable specific plan. The CC – Community Commercial General Plan land use designation provides for a variety of retail and service-oriented business activities, including office uses, at various intensities to serve the local community and population, as well as the broader market area. The service station with convenience store is consistent with the General Plan land use designation and it is not located within a Specific Plan. 6. The proposed use is allowed within the applicable zone and complies with all other applicable provisions of this Development Code and the Municipal Code; The proposed use is allowed within the applicable zone and complies with all other applicable provisions of this Development Code and the Municipal Code. The proposed service station with convenience store is consistent with the CG – Commercial General Zone and CC – Community Commercial General Plan land use designations. The CG Zone is applied to areas appropriate for general commercial and daily shopping needs of a broad market area and it allows a wide range of retail sales and business, professional, and personal services that 4.1.d Packet Pg. 186 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 8 of 15 are accessible to transit corridors. San Jacinto Avenue is a major transit corridor in the City and the proposed center will provide needed retail, office, and services for the community. Transit corridors are important to the City in that they can project a positive image of the community while also enhancing the quality of life for the users and occupants. As conditioned, the Project will help to project that positive image of the community as intended by the zone. 7. The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity; The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The Project is physically suitable for the proposed Project as the site is generally flat, and the design of the commercial center under SPDR-17-11 utilizes an existing signal at San Jacinto and Commonwealth Avenues that accommodates both a driveway of the proposed Project as well as the secondary driveway at its southern boundary. 8. The site is physically suitable in terms of: a. Its design, location, shape, size, and operating characteristics of the proposed use; The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The Project is physically suitable for the proposed Project as the site is generally flat, and the design of the commercial center under SPDR-17-11. b. The provision of public and emergency vehicle (e.g., fire and medical) access; The site is designed to provide adequate access for emergency vehicles. As well the site plan has been reviewed by the Police and Fire Departments, and as conditioned, meets their requirements. c. Public protection services (e.g., fire protection, police protection, etc.); and The Project is consistent with the General Plan which helps to ensure that public protection services are available. As well the site plan has been reviewed by the Police and Fire Departments, and as conditioned, meets their requirements. 4.1.d Packet Pg. 187 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 9 of 15 d. The provision of utilities (e.g., potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.). The Project will be connecting to all required utilities and as conditioned will be providing the required trash enclosures for solid waste disposal. 9. The measure of site suitability shall be required to ensure that the type, density, and intensity of use being proposed will not adversely affect the public convenience, health, interest, safety, or general welfare, constitute a nuisance, or be materially injurious to the improvements, persons, property, or uses in the vicinity and zone in which the property is located; and The Project site is physically suitable for the proposed Project as the site is generally flat, and the design accommodates neighboring uses by providing utilizing the existing signal at San Jacinto and Commonwealth Avenues for its main driveway. In addition, the proposed internal circulation system will provide for access to the proposed project to the south. The Project will be a welcome addition at the intersection of and completes commercial development at the intersection of San Jacinto and Commonwealth Avenues, providing needed services to the neighborhood and the City. As conditioned, the Project will not adversely affect the public convenience, health, interest, safety or general welfare. 10. The applicant agrees in writing to comply with any and all of the conditions imposed by the Approving Authority in the approval of the Conditional Use Permit. The applicant is required to sign the conditions of approval reflecti ng their agreement with the conditions. PUBLIC CONVENIENCE OR NECESSITY (PCorN) FINDINGS OF FACT: 1. The public convenience would be served by the establishment of the proposed use. The public convenience would be served by the establishment of the proposed use. Census Tract 435.08 is permitted for four off-site sales licenses. Of the six existing Type 20/21 licenses in Census Tract 435.08, three are for grocery/pharmacy stores, one for the existing 7 -Eleven Convenience Store, one for a service station/convenience store that is closed, and one is in the City of Hemet. 4.1.d Packet Pg. 188 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 10 of 15 Walmart, Walgreens, Rite Aid, and the proposed Aldi, are grocery/pharmacy stores and, the proposed convenience store will be the only convenience store within 1,000 feet providing beer and wine sales, therefore, the addition of a seventh off-sale alcohol license will provide convenience to the public. As well, the sale of alcohol will be clearly incidental as evidenced by the relatively small display area for beer and wine (on shelves and within coolers) that will constitute approximately 1% of the gross floor area. The store caters to shoppers who come in for general merchandise and purchase alcoholic beverages as a convenience while purchasing vehicle fuel and other merchandise. Therefore, the sale of alcohol is a convenience for shoppers, not typically the sole purpose for the visit to the store. As noted in the applicant’s findings, the convenience store provides a selection of foods and beverages to the community with a quick and convenient alternative to quick serve restaurants. Therefore, the service station will provide a convenience by offering alcohol sales in conjunction with other retail items that can be easily picked up while fueling a vehicle and creating a one -stop shopping alternative. 2. The proposed use is not anticipated to be the source of nuisance behavior associated with excessive consumption of alcoholic beverages. The proposed use is not anticipated to be the source of nuisance behavior associated with excessive consumption of alcoholic beverages. The Project as designed and conditioned will not be a source of nuisance behavior associated with excessive consumption of alcoholic beverages. The proposed service station has been developed to provide adequate parking, visibility, access, and lighting and thus would provide a safe and secure environment in which to conduct alcohol sales. Conditions for all landscaping and parking lot lighting to be maintained in good condition and having the site posted to indic ate that it is unlawful for any person to drink or consume any alcoholic beverage in any public place or posted premises are just two of the conditions that will ensure the use is not a source of nuisance behavior. As well, as noted in the applicant’s fin dings, convenience store provides interior and exterior surveillance systems to deter nuisance behavior and operates 24 hours a day providing personnel on the premises at all times. 3. The proposed use would not be detrimental to the public health, safety, or welfare. The proposed use would not be detrimental to the public health, safety, or welfare. As conditioned, in particular under the operational conditions, the proposed use, will not be detrimental to the public health, safety or welfare. 4.1.d Packet Pg. 189 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 11 of 15 4. The proposed use would not increase the severity of existing law enforcement or public nuisance problems in the surrounding area. The convenience store would not increase the severity of existing law enforcement or public nuisance problems in the surrounding area. The Police Department has reviewed this proposal and does not oppose the project. As well, as noted in the applicant’s findings, the company provides interior and exterior surveillance systems to deter nuisance behavior and operates 24 hours a day providing personnel on the premises at all times. 5. The proposed use is consistent with the objectives, policies, general land uses, and programs of the general plan, and any applicable specific plan. The proposed use is consistent with the objectives, policies, general land uses, and programs of the general plan, and any applicable specific plan. The CC – Community Commercial General Plan land use designation provides for a variety of retail and service-oriented business activities, including office uses, at various intensities to serve the local community and population, as well as the broader market area. The service station with convenience store is consistent with the General Plan land use designation and it is not located within a Specific Plan. MINOR USE PERMITS (MUP-17-06, MUP-17-07, MUP-17-08) FINDINGS OF FACT: 1. The proposed use is consistent with the General Plan and any applicable specific plan. The proposed uses are consistent with the General Plan and any applicable specific plan. The CC – Community Commercial General Plan land use designation provides for a variety of retail and service -oriented business activities, including office uses, at various intensities to serve the local community and population, as well as the broader market area. The proposal of a fast food restaurant with a drive-through, automated car wash, and tire store is consistent with the General Plan land use designation and it is not located within a Specific Plan. 2. The proposed use is allowed within the applicable zone and complies with all other applicable provisions of this Development Code and the Municipal Code. The proposed uses are allowed within the applicable zone, with Change of Zone 17-03 and comply with all other applicable provisions of this Development Code and the Municipal Code. The proposed fast-food restaurant with a drive-through, automated car wash, and tire store is consistent with the CG – Commercial General Zone and CC – Community Commercial General Plan land use designations. The CG zone is applied to areas appropriate for general commercial and daily shopping needs of a broad market area and it allows a 4.1.d Packet Pg. 190 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 12 of 15 wide range of retail sales and business, professional, and personal services that are accessible to transit corridors. San Jacinto Avenue is a major transit corridor in the City and the proposed center will provide needed retail and services for the community. Transit corridors are important to the City in that they can project a positive image of the community while also enhancing the quality of life for the users and occupants. As conditioned, the Project will help to project that positive image of the community as intended by the zone. 3. The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The Project is physically suitable for the proposed Project as the site is generally flat, and the design of the commercial center under SPDR-17-11 accommodates neighboring uses by utilizing the signal at San Jacinto and Commonwealth Avenues. The design of SPDR-17-11 planned for the proposed uses. 4. The site is physically suitable in terms of: a. Its design, location, shape, size, and operating characteristics of the proposed use; The Project site is physically suitable for the proposed Project as the site is generally flat and rectangular in shape, and the design accommodates neighboring uses by providing utilizing the existing signal at San Jacinto and Commonwealth Avenues for its main driveway. In addition, the proposed internal circulation system will provide for access to the proposed project to the south. The Project will be a welcome addition at the intersection of and completes commercial development at the intersection of San Jacinto and Commonwealth Avenues, providing needed services to the neighborhood and the City. As conditioned, the Project will not adversely affect the public convenience, health, interest, safety or general welfare. b. The provision of public and emergency vehicle (e.g., fire and medical) access; The site is designed to provide adequate access for emergency vehicles. As well the site plan has been reviewed by the Police and Fire Departments, and as conditioned, meets their requirements. 4.1.d Packet Pg. 191 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 13 of 15 c. Public protection services (e.g., fire protection, police protection, etc.); and The Project is consistent with the General Plan which helps to ensure that public protection services are available. As well the site plan has been reviewed by the Police and Fire Departments, and as conditioned, meets their requirements. d. The provision of utilities (e.g., potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.). The Project will be connecting to all required utilities and as conditioned will be providing the required trash enclosures for solid waste disposal. 5. The measure of site suitability shall be required to ensure that the type, density, and intensity of use being proposed will not adversely affect the public convenience, health, interest, safety, or general welfare, constitute a nuisance, or be materially injurious to the improvements, persons, property, or uses in the vicinity and zone in which the property is located. The Project site is physically suitable for the proposed Project as the site is generally flat, and the design under SPDR-17-11 accommodates neighboring uses by providing utilizing the signal at San Jacinto and Commonwealth Avenues for its main driveway access. In addition, the Project proposes a second driveway at its southern boundary. SPDR-17-11 was designed to accommodate this use as designed. As conditioned, the Project will not adversely affect the public convenience, health, interest, safety or general welfare. 6. The applicant agrees in writing to comply with any and all of the conditions imposed by the review authority in the approval of the Minor Use Permit. The applicant is required to sign the conditions of approval reflecting their agreement with the conditions. VARIANCE (VAR-17-04) FINDINGS OF FACT: To allow a separation variance to permit alcohol sales within 1,000 -feet of other buildings selling alcohol. 1. There are special circumstances applicable to the subject property (e.g., location, shape, size, surroundings, topography, or other physical features) that do not apply generally to other properties in the vicinity under an identical zoning classification; 4.1.d Packet Pg. 192 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 14 of 15 There are special circumstances applicable to the subject property as t he project site, while located within 1,000-feet from the other off-sale alcohol establishments, is separated by a San Jacinto Avenue, a major corridor with raised medians. The median forms a significant barrier between the businesses, such that the proximity between uses will not be perceived by the general public and each business will serve a different segment of the community. 2. Strict compliance with Development Code requirements would deprive the subject property of privileges enjoyed by other property in the vicinity and under an identical zoning classification; Strict compliance of the Development Code requirements would deprive the subject property of privileges enjoyed by other property in the vicinity and under identical zoning due to the large size of the Census Tract and the focus of San Jacinto Avenue as a major commercial corridor for such uses, the limit of four off- sale alcohol licenses deprives the property owner of the availability to provide alcohol sales in an area designed as a major commercial corridor. 3. Approving the Variance would not constitute a grant of special privileges inconsistent with the limitations on other properties in the same vicinity and zone in which the subject property is situated; and Approving the Variance would not constitute a grant of special privileges inconsistent with the limitations on other properties in the same vicinity and zone in which the subject property is situated on a major commercial corridor. The flow of traffic in the area, the medians in San Jacinto support the requested variance without constituting a grant of special privileges. The Project is designed and will be operated similarly to other neighboring projects. 4. The requested Variance would not allow a use or activity that is not otherwise expressly authorized by the regulations governing the subject parcel. The requested Variances would not allow a use or activity that is not otherwise expressly authorized by the regulations governing the subject parcel as the Project is permitted under the CG – Commercial General Zone and is designed and will be operated similarly to other neighboring projects. 4.1.d Packet Pg. 193 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 1 Commonwealth Crossing SPDR-17-11/PM-37407/CUP-17-06/VAR 17-04 Planning Commission Hearing April 16, 2018 MUP-17-06/MUP 17-07/MUP 17-08/CZ 17-03 Page 15 of 15 CHANGE OF ZONE (CZ-17-03) FINDINGS OF FACT: 1. The proposed Zoning Map amendment is consistent with the General Plan and applicable specific plan; The proposed Change of Zone is consistent with the General Plan, in that the Community Commercial Land Use Designation includes both the current Commercial Neighborhood Zone and proposed Commercial General Zone. There is not a specific plan for this location. 2. The proposed amendment will not be detrimental to the public interest, health, safety, convenience, or welfare of the City; The proposed Change of Zone and Project promotes the growth of the City consistent with the City’s Development Code and General Plan . The Change of Zone will facilitate commercial development along San Jacinto Avenue, as envisioned by the General Plan. As the project is conditioned, it will not adversely affect the public convenience, health, interest, safety or general welfare. 3. The affected site is physically suitable in terms of design, location, shape, size, operation characteristics, and the provision of public services and utilities (e.g., fire protection, police protection, potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.), to ensure that the requested zoning designation and the proposed or anticipated uses and/or development will not endanger, jeopardize, or otherwise constitute a hazard to the property or improvements in the vicinity in which the property is located; The site is physically suitable for development, as it is generally flat, rectangular, of adequate size for commercial development, and can utilize the signalized intersection at San Jacinto and Commonwealth Avenues . Adequate City infrastructure exists to support the project site and projects will be conditioned to ensure that their design accommodates and provides for public and emergency vehicles including solid waste haulers, City crews, and other service and utility providers, as not to constitute a hazard. 4.1.d Packet Pg. 194 Attachment: Attachment 4 - Findings of Fact (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and ATTACHMENT 7 ZC-17-01 Conditions of Approval Page 1 of 2 Planning Commission December 11, 2017 CONDITIONS OF APPROVAL ZONE CHANGE ZC-17-03 PLANNING COMMISSION HEARING DATE: April 16, 2018 CITY COUNCIL HEARING DATE: Tentatively planned – May 15, 2018 APPLICANT: MW Advantage 1, LLC 26400 La Alameda, Suite 100 Mission Viejo, CA 92691 (949) 680-4300 Phone office@coast2coastcommercial.com PROJECT LOCATION: West side of San Jacinto Avenue at the terminus of Com- monwealth Avenue, (439-120-042). ACCEPTED AND AGREED TO BY: Devon Wesselink Date GENERAL CONDITIONS: PLANNING DIVISION General Provisions 1. The approval of this Project Change of Zone (CZ-17-03) and related cases SPDR-17-10, PM-37407, CUP-17-06, MUP-17-06, MUP-17-07, MUP-17-08, and VAR-17-04 is to change the Zoning from Commercial Neighborhood to Comme r- ical General and all other Development Code and Subdivision Code require- ments. 2. The effective date of this Zone Change will be on the 31st day following its ap- proval by the City Council. 3. The Zoning of CG – Commercial General shall be applied to APN 439-120-042. 4. The applicant is advised that the commercial uses, which this Project is granted cannot be legally conducted on the subject property until all Conditions of Ap- proval of the Project cases SPDR-17-10, PM-37407, CUP-17-06, MUP-17-06, MUP-17-07, MUP-17-08, and VAR-17-04, and CZ-17-03 have been met to the satisfaction of the Planning Department. 5. The applicant agrees to indemnify, hold harmless, and defend the City, its off i- cials, officers, agents, and employees, from any and all liability, claims, actions or proceedings that may be brought arising out of its approval of this permit, and 4.1.e Packet Pg. 195 Attachment: Attachment 5 - Change of Zone Conditions of Approval (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, ATTACHMENT 7 ZC-17-01 Conditions of Approval Page 2 of 2 Planning Commission December 11, 2017 any approvals associated with the Project, including, without limitation, any CEQA review or approval, except to the extent caused by the negligence of the City. 6. Upon City Council approval, the applicant shall submit a check to the City, paya- ble to Riverside County, in the amount of the current fee requirements, for pay- ment of State Fish and Game fees and County documentary handling fee in con- junction with the filing of a Notice of Determination. In accordance with Section 711.4 of the State Fish and Game Code, no project shall be operative, vested, or final until the filing fees have been paid. 4.1.e Packet Pg. 196 Attachment: Attachment 5 - Change of Zone Conditions of Approval (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, ! ! ! ! ! ! ! ! ! ! ! ! !! !! ! ! ! ! AutoZone Chase Bank Burger King Bank of Hemet Wal-Mart #5425 Wendy's #10660 Rite Aide #6293 Golden Chipstix Walgreens #09021 Blue Fountain Park El Pollo Loco #6036 San Jacinto Dental Gp Stater Bros Market #121 GIRARDSAN JACINTOLA ENTRADA COMMONWEALTH Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS UserCommunity O SPDR 17-11Location Map Subject Site ATTACHMENT 8 4.1.f Packet Pg. 197 Attachment: Attachment 8 - Aerial Location Map (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, GIRARDESPLANADE SAN JACINTOLA ENTRADA COMMONWEALTH Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS UserCommunity O SPDR 17-11General Plan Map Subject Site GPLU Medium Density Residential High Density Residential Very High Density Residential Community Commercial ATTACHMENT 9 4.1.g Packet Pg. 198 Attachment: Attachment 9 - General Plan Map (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, GIRARDSAN JACINTOLA ENTRADA COMMONWEALTH CG RM CN RVH RMH O SPDR 17-11Zoning Map Subject Site SPDR 17-11Propsed ZoningCG (Commercial General) Commercial General Commercial Neighborhood Residential Medium Residential Medium High Residential Very High Urban Corridor Combining Overlay Zone ATTACHMENT 10 4.1.h Packet Pg. 199 Attachment: Attachment 10 - Zoning Map (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ- 4.1.iPacket Pg. 200Attachment: Attachment 11 - Site Plan (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.jPacket Pg. 201Attachment: Attachment 12 - Phasing Plan (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 1 2 3 4 5 COMMONWEALTH AVE SAN JACINTO AVEZONE: RM APN 439-111-012 APN 439-120-025ZONE: RMEXIST. RESIDENTIALAPN 439-120-026ZONE: RMHEXIST. APARTMENTSAPN 439-120-032 ZONE: RMH VACANT LAND VACANT LAND ZONE: CN APN 439-120-032 1ƒ : 1ƒ ( 1ƒ : 1ƒ ( 1ƒ : 1ƒ :841.07'1ƒ : 1ƒ : 323'240'16'173'21' 114'322'126' 17'66'211'323'26'285'210'117'284'258'210'0.52 AC NET LOT 'A' 143'107'240' 258'189' 189'374' 12,000 SF MAJOR B 24,000 SF RETAIL OFFICE / 2,720 SF SONIC TDO NOT ENTERDRIVE THRUDO NOT ENTEREXISTING MOBILE HOME PARK (62.0)(63.0)(64.0)(65.0)(66.0)(67.0)(68.0)(62.0)VACANT LAND0.5%1.2% 1.0%TC67.0TC67.2TC67.3TC67.51% 1% TC 67.3 FL 67.0 TC68.0TC68.2TC68.3TC68.5TC68.5TC68.9TC68.81% 1% 2.0%1%2%TC70.1(69.0)(70.0)TC70.3TC 70.5 TC 70.9 TC 71.0 FF 70.6 1.7%1%MIN.(64.0)(65.0)(66.0)(68.0)(70.0)(76.0)(72.0)(71.0)(69.0)(67.0)1%MIN.1%MIN.(61.0)(63.0)P SUMP PUMP, DISCHARGE TO EXIST. CONC. CHANNEL MAX Q OUT = 0.45cfs BR BASIN OVERFLOW TO DETENTION BASIN BASIN BOTT. ELEV = 1556.0 DETENTION BR BASIN OVERFLOW TO DETENTION BASIN COMMONWEALTH AVE SAN JACINTO AVE(TC 7 4. 0)(FL 73. 3)(1.1%)(TC 7 6. 0)(FL 75. 3) (T C 7 2 . 6 ) (F L 7 1 . 9 )(TC 71.3)(FL 70.6)TC 65.5 TC 64.0 1.2% 0.7 65.5 TC TC 65.3 TC 65.6 TC 66.0 TC 66.3 66.6 TC 67.0 TC 66.2 TC 65.4 TC 0.5%1.1% FF = 67.0 68.0 TC1.0%1.7%1%65.3 TC 1.0% 1.0% MIN 1.0% MIN MIN TC 63.8 FF = 67.3 TC 64.0 T C 62 . 8 1.5% T C 6 5 . 4 63.8 TC T C 6 3 . 3 1.2% 1.2%T C 6 4 . 2 TC 66.7 1.4% 2 . 7% 1.1% GRD BRK. CURB OPENINGS FOR DRAINAGE GRD BRK.285'PARCEL 3 PARCEL 1 1.16 AC NET 1.22 AC GROSS PARCEL 2 1.69 AC NET 1.80 AC GROSS 1.23 AC NET PARCEL 4 3.16 AC NET PARCEL 5 SHTS SHEET NO.: OF APPROVED BY: PREPARED BY: DATE EXP. DATE EXP. DATE DATE BENCHMARK CITY OF SAN JACINTO 1 1 Park City, UT 84098, 5133 Cove Canyon Dr, #302, Phone (801)859-9755, Fax (801)261-2219 Hemet, CA. 92544, 41555 E Florida Ave., Suite G, Phone (951)658-1727 Fax (951)658-9347 CIVIL ENGINEERING#BLAINE A. WOMER 1"=30 SEPTEMBER, 2017 TENTATIVE PARCEL MAP NO. 37407 IN THE CITY OF SAN JACINTO TENTATIVE PARCEL MAP NO. 37407 R.C.E. NO. 46354 BLAINE A. WOMER COMMONWEALTH CROSSING 1" = 40' 1. AN EASEMENT GRANTED TO THE THE SAN JACINTO VALLEY WATER COMPANY FOR A CEMENT DITCH, RECORDED APRIL 7, 1906 IN BOOK 221, PAGE 332 OF DEEDS, OF OFFICIAL RECORDS. TO BE QUITCLAIMED. 2. AN EASEMENT GRANTED TO FRUITVALE MUTUAL WATER COMPANY FOR PIPELINES TOGETHER WITH RIGHTS OF INGRESS AND EGRESS, RECORDED FEBRUARY 28, 1931 IN BOOK 11, PAGE 359 OF OFFICIAL RECORDS. TO BE QUITCLAIMED. 3. C/L OF AN EASEMENT GRANTED TO NEVADA-CALIFORNIA ELECTRIC CORPORATION FOR POLE LINES, CONDUITS OR UNDERGROUND FACILITIES, RECORDED NOVEMBER 20, 1939 IN BOOK 440, PAGE 51 OF OFFICIAL RECORDS. TO REMAIN. 4. AN EASEMENT GRANTED TO EASTERN MUNICIPAL WATER DISTRICT FOR PIPE LINES, RECORDED AUGUST 21, 1981 AS INSTRUMENT No. 159444 OF OFFICIAL RECORDS. TO REMAIN. 5. AN EASEMENT GRANTED TO SOUTHERN CALIFORNIA EDISON COMPANY, A CORPORATION FOR EITHER OR BOTH POLE LINES, CONDUITS OR UNDERGROUND FACILITIES, RECORDED OCTOBER 1, 1981 AS INSTRUMENT No. 185139 OF OFFICIAL RECORDS. TO REMAIN. EASEMENT NOTES 0 40 80 120 COMMONWEALTH CROSSING DATE PREPARED: SEPTEMBER, 2017 ACCESS NOTE: ACCESS TO ALL PARCELS TO BE PROVIDED THROUGH RECIPROCAL ACCESS EASEMENTS PROVIDED IN THE PROJECT CONDITIONS COVENANTS AND RESTRICTIONS (CC&Rs) 33' A.C. PAVEMENT C&G 55' R/W EXISTING SECTION SAN JACINTO STREET 23'12' R/W EXIST. SIDEWALK EXISTING MEDIAN 67' EXIST. EXIST. 6' EXIST./PROP. SIDEWALK 88' 56' 19' SETBACK LANDSCAPE C&G EXIST. APPLICANT MW VANTAGE1, LLC 26400 LA ALAMEDA, SUITE 100 MISSION VIEJO, CA 92691 (949) 680-4300 OWNERS CANON LIVING TRUST 16902 MARINA BAY DRIVE HUNTINGTON BEACH, CA 92649 (562) 331-0074 ASSESSOR'S PARCEL NO. 439-120-042 ADJACENT LAND USE NORTH RESIDENTIAL MOBILE HOME SOUTH VACANT/STORAGE EAST COMMERCIAL WEST RESIDENTIAL - - - - ZONING RM CN/RMH CG RM/RMH EXISTING LAND USE COMMUNITY COMMERCIAL- PROPOSED LAND USE COMMUNITY COMMERCIAL EXISTING ZONING CN PROPOSED ZONING CG PROPERTY DESCRIPTION THE SOUTH 165 FEET OF FAR LOT 77 AND THE NORTH HALF OF FARM LOT 79 OF THE SAN JACINTO LAND ASSOCIATION AS SHOWN BY MAP ON FILE BOOK 8, PAGE 357 OF MAPS SAN DIEGO CO. RECORDS. EXCEPT THEREFROM THE WEST 450 FEET, MEASURED FROM THE CENTERLINE OF SANTA FE STREET. NUMBER OF PARCELS 5 AND 1 LETTERED LOT (LOT A) FOR PROJECT DRAINAGE. AREA 9.51 AC GROSS 9.32 AC NET SOURCE OF TOPOGRAPHY AERIAL SURVEY BY INLAND AERIAL SURVEYS. DATED 8-15-17 FLOOD ZONE ZONE X COMMUNITY PANEL NO. 06065C1490G DATED: AUGUST 28, 2008 SCHOOL DISTRICT SAN JACINTO UNIFIED UTILITES SEWER WATER GAS ELECTRIC TELEPHONE CABLE CITY OF SAN JACINTO EASTERN MUNICIPAL WATER DISTRICT SOUTHERN CALIFORNIA GAS COMPANY EDISON CO. FRONTIER FRONTIER - - - - - - BRODIE SAN JACINTO INVESTMENTS, LLC 16675 HUERTA ROAD ENCINO, CA 92436 (818) 694-0552 THE IMPERIAL CORONA, LLC 2747 PARADISE ROAD, UNIT 2702 LAS VEGAS, NV 79101 (818) 585-5580 GONDA TRUST 767 ROSARITA DRIVE FULLERTON, CA 92835 (714) 488-4967 4.1.k Packet Pg. 202 Attachment: Attachment 13 - TPM 37407 (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 12,000 SF MAJOR B 24,000 SF RETAIL OFFICE / 2,720 SF SONIC TDO NOT ENTERDRIVE THRUDO NOT ENTEREXISTING MOBILE HOME PARK (62.0)(63.0)(64.0)(65.0)(66.0)(67.0)(68.0)(62.0)VACANT LAND0.5%1.2% 1.0%TC67.0TC67.2TC67.3TC67.51% 1% TC 67.3 FL 67.0 TC 68.0TC68.2TC68.3TC68.5TC68.5TC 68.9TC68.81% 1% 2.0%1%2%TC 70.1(69.0)(70.0)TC70.3TC 70.5 TC 70.9 TC 71.0 FF 70.6 1.7%1%MIN.(64.0)(65.0)(66.0)(68.0)(70.0)(76.0)(72.0)(71.0)(69.0)(67.0)1%MIN.1%MIN.(61.0)(63.0)P SUMP PUMP, DISCHARGE TO EXIST. CONC. CHANNEL MAX Q OUT = 0.45cfs BR BASIN OVERFLOW TO DETENTION BASIN BASIN BOTT. ELEV = 1556.0 DETENTION BR BASIN OVERFLOW TO DETENTION BASIN COMMONWEALTH AVE SAN JACINTO AVE(TC 7 4. 0)(FL 73. 3)(1.1%)(TC 7 6. 0)(FL 75. 3) (T C 7 2 . 6 ) (F L 7 1 . 9 )(TC 71.3)(FL 70.6)TC 65.5 TC 64.0 1.2% 0.7 65.5 TC TC 65.3 TC 65.6 TC 66.0 TC 66.3 66.6 TC 67.0 TC 66.2 TC 65.4 TC 0.5%1.1% FF = 67.0 68.0 TC1.0%1.7%1%65.3 TC 1.0% 1.0% MIN 1.0% MIN MIN TC 63.8 FF = 67.3 TC 64.0 T C 6 2 . 8 1.5% T C 6 5 . 4 63.8 TC T C 63 . 3 1.2% 1.2%T C 64 . 2 TC 66.7 1.4% 2 . 7% 1.1% GRD BRK. CURB OPENINGS FOR DRAINAGE GRD BRK. SHTS SHEET NO.: OF APPROVED BY: PREPARED BY: DATE EXP. DATE EXP. DATE DATE BENCHMARK CITY OF SAN JACINTO 1 1 Park City, UT 84098, 5133 Cove Canyon Dr, #302, Phone (801)859-9755, Fax (801)261-2219 Hemet, CA. 92544, 41555 E Florida Ave., Suite G, Phone (951)658-1727 Fax (951)658-9347 CIVIL ENGINEERING#BLAINE A. WOMER 1"=30 JANUARY, 2017 FOR CONCEPTUAL GRADING PLAN IN THE CITY OF SAN JACINTO CONCEPTUAL GRADING PLAN R.C.E. NO. 46354 BLAINE A. WOMER COMMONWEALTH CROSSING 1" = 40' 1. AN EASEMENT GRANTED TO THE THE SAN JACINTO VALLEY WATER COMPANY FOR A CEMENT DITCH, RECORDED APRIL 7, 1906 IN BOOK 221, PAGE 332 OF DEEDS, OF OFFICIAL RECORDS. TO BE QUITCLAIMED. 2. AN EASEMENT GRANTED TO FRUITVALE MUTUAL WATER COMPANY FOR PIPELINES TOGETHER WITH RIGHTS OF INGRESS AND EGRESS, RECORDED FEBRUARY 28, 1931 IN BOOK 11, PAGE 359 OF OFFICIAL RECORDS. TO BE QUITCLAIMED. 3. C/L OF AN EASEMENT GRANTED TO NEVADA-CALIFORNIA ELECTRIC CORPORATION FOR POLE LINES, CONDUITS OR UNDERGROUND FACILITIES, RECORDED NOVEMBER 20, 1939 IN BOOK 440, PAGE 51 OF OFFICIAL RECORDS. TO REMAIN. 4. AN EASEMENT GRANTED TO EASTERN MUNICIPAL WATER DISTRICT FOR PIPE LINES, RECORDED AUGUST 21, 1981 AS INSTRUMENT No. 159444 OF OFFICIAL RECORDS. TO REMAIN. 5. AN EASEMENT GRANTED TO SOUTHERN CALIFORNIA EDISON COMPANY, A CORPORATION FOR EITHER OR BOTH POLE LINES, CONDUITS OR UNDERGROUND FACILITIES, RECORDED OCTOBER 1, 1981 AS INSTRUMENT No. 185139 OF OFFICIAL RECORDS. TO REMAIN. EASEMENT NOTES 0 40 80 120 COMMONWEALTH CROSSING ESPLANADE AVENUE ESPLANADE AVENUE SAN JACINTO AVENUECOMMONWEALTH AVENUE GIRARD ST. HEWITT ST.HEWITT ST.SITESAN J A CI NT O VICINITY MAP NTS CURB AND GUTTER SIDEWALK EDGE OF DIRT EDGE OF ASPH. EDGE OF CONC. FIRE HYDRANT FENCE STANDPIPE MANHOLE DROP INLET VAULT POWER POLE STREET LIGHT POWER POLE STREET LIGHT MISCELLANEOUS UTILITIES STOP LIGHT GUY WIRE SP SIGN LEGEND WATER LINE (SIZE NOTED) GAS LINE (SIZE NOTED) ELECTRIC LINE STORM DRAIN (SIZE NOTED) SEWER LINE (SIZE NOTED) PROPOSED ASPHALT SURFACE PROPOSED CONCRETE SURFACE 33' A.C. PAVEMENT C&G 55' R/W EXISTING SECTION SAN JACINTO STREET 23'12' R/W EXIST. SIDEWALK EXISTING MEDIAN 67' EXIST. EXIST. 6' EXIST./PROP. SIDEWALK 88' 56' 19' SETBACK LANDSCAPE APPLICANT MARK R. COOPER PAGE PLAZA PARTNERS, LLC 38011 STONE MEADOW DRIVE MURRIETA, CA. 92562 (951) 643-4711 OWNER FERNANDO B. CANON & ADELIA M. CANON, TRUSTEES FOR THE CONON LIVING TRUST DATED APRIL 8, 1987, AS TO AN UNDIVIDED 30% INTEREST. JULIUS STEVE BRODIE & GLORIA JEAN BRODIE, TRUSTEES OF THE BRODIE LIVING TRUST DATED DEC. 1, 1983 AS TO AN UNDIVIDED 25% INTEREST. FRANCISCO G. GONDA & ETHELREDE S. CONZA, AS CO-TRUSTEES OF THE GONDA TRUST DATED JUNE 23, 1988, AS TO AN UNDIVIDED 15% INTEREST. THE IMPERIAL CORONA, LLC, AS TO AN UNDIVIDED 30% INTEREST. ASSESSOR'S PARCEL NO. 439-120-042 PROPERTY DESCRIPTION THE SOUTH 165 FEET OF FAR LOT 77 AND THE NORTH HALF OF FARM LOT 79 OF THE SAN JACINTO LAND ASSOCIATION AS SHOWN BY MAP ON FILE BOOK 8, PAGE 357 OF MAPS SAN DIEGO CO. RECORDS. EXCEPT THEREFROM THE WEST 450 FEET, MEASURED FROM THE CENTERLINE OF SANTA FE STREET. AREA 9.51 AC GROSS 9.10 AC NET SOURCE OF TOPOGRAPHY AERIAL SURVEY BY INLAND AERIAL SURVEYS. DATED 8-15-17 12" TYP 6" PLANTER CURB CURB CUT EVERY OTHER SPACE ALONG BIORETENTION BASIN TYPICAL CURB CUT DETAIL NTS C&G EXIST. 4.1.l Packet Pg. 203 Attachment: Attachment 14 - Preliminary Grading Plan (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.m Packet Pg. 204 Attachment: Attachment 15 - Sonic Elevations (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.m Packet Pg. 205 Attachment: Attachment 15 - Sonic Elevations (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.m Packet Pg. 206 Attachment: Attachment 15 - Sonic Elevations (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.n Packet Pg. 207 Attachment: Attachment 16 - 7-Eleven Elevations (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.n Packet Pg. 208 Attachment: Attachment 16 - 7-Eleven Elevations (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.n Packet Pg. 209 Attachment: Attachment 16 - 7-Eleven Elevations (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.o Packet Pg. 210 Attachment: Attachment 17 - Carwash Elevations (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 4.1.o Packet Pg. 211 Attachment: Attachment 17 - Carwash Elevations (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) 36" HIGH SCREEN HEDGE 36" HIGH SCREEN HEDGE PROJECT SIGNAGE PROJECT SIGNAGE ENTRY ACCENT TREE PARKING LOT SHADE TREE ACCENT TREE PERIMETER SCREENING TREE STREET TREE SAN JACINTO STREET63 24,000 SF OFFICE/ RETAIL PARCEL 5 3.42 AC (149,132 SF±) PARCEL 3 1.63 AC (71,093 SF±) 2,720 SF SONIC T 33 PARCEL 1 1.09 AC (47,509 SF±) PARCEL 2 1.43 AC (62,371 SF±) 32 DETENTION BASIN 4,968 SF 7-ELEVENDO NOT ENTERDRIVE THRUDO NOT ENTERN 89°57'03" W 846.06' N 89°57'58" W 846.07' MODIFY (E) TRAFFIC SIGNAL PROPOSED LEFT TURN LANE PARCEL 4 1.22 AC (53,064 SF±) 3 3,590 SFCARWASHALIGN RM ZONE (EXISTING RESIDENTIAL)RM ZONE(EXISTING RESIDENTIAL)CN ZONE (VACANT) RMH ZONE (EXISTING RV STORAGE) P BIORETENTION BASIN SITE ELECTRICAL PEDESTAL PARCEL 6 0.52 AC (22,858 SF±) 12,000 SF RETAIL 144 8' CMU WALL (E) 6' CMU WALL TO REMAIN 6' HIGH TUBULAR STEEL FENCE PLANT PALETTE SYMBOL BOTANICAL NAME COMMON NAME SIZE TREES Sapium sebiferum Chinese Tallow 24" Box M 100% OF TREES SHALL BE PLANTED AT 24" BOX SIZE MINIMUM. 30% OF TREES SHALL BE 36" BOX OR LARGER WUCOLS Brachychiton populneus Bottle Tree 24" Box M Pyrus calleryana 'Aristocrat'Callery Pear 36" Box M Lagerstroemia indica Crape Myrtle 24" Box M Coprosma x kirkii SHRUBS NCN 1 Gal Rosa 'White Meidland'Groundcover Rose 5 Gal M M VINES Dietes vegeta Fortnight Lily 5 Gal M Ligustrum japonicum 'Texanum'Texas Privet 5 Gal M 80% OF SHRUBS (MINIMUM) SHALL BE INSTALLED AT 5 GALLON SIZE. SHRUBS SHALL BE PLACED AT A MAXIMUM OF 36" APART ON AVERAGE Parthenocissus tricuspidata Boston Ivy 5 Gal M Myrtus communis 'Compacta'Dwarf Myrtle 5 Gal M Rhaphiolepis indica 'Indian Princess'Indian Hawthorne 5 Gal M SYMBOL BOTANICAL NAME COMMON NAME SIZE WUCOLS HARDSCAPE LEGEND SYMBOL MATERIAL NATURAL GREY CONCRETE MEDIUM BROOM FINISH Compact Texas Ranger LLeucophyllum frutescens 'Compacta'5 Gal Salvia leucantha 'Santa Barbara'Mexican Sage 5 Gal L Carex pansa California Meadow Sedge 1 Gal M Festuca mairei Atlas Fescue 1 Gal M Photinia x fraseri Fraser's Photinia 5 Gal M Westringia fruticosum Coast Rosemary 5 Gal L Nerium oleander Oleander 5 Gal L LANDSCAPE NOTES LANDSCAPE CALCULATIONS: SITE AREA (GROSS): 401,121 SF LANDSCAPE AREA: 94,991 SF LANDSCAPE PERCENTAGE: 23.7% 1.LANDSCAPE PLANS AND INSTALLATIONS SHALL COMPLY WITH CITY OF SAN JACINTO CODES, ORDINANCES, AND LANDSCAPE DESIGN GUIDELINES AS APPLY TO PLANTING DESIGN AND IRRIGATION. 2.VINES OR OTHER LANDSCAPE SCREENING SHALL BE PLANTED AROUND TRASH ENCLOSURES . 3.LANDSCAPE SCREENING SHALL BE PROVIDED FOR ANY ABOVE GROUND EQUIPMENT. 4.LANDSCAPE ONSITE SHALL BE PERMANENTLY MAINTAINED BY THE DEVELOPER OR HIS SUCCESSORS. 5.PARKWAYS AND MEDIANS SHALL BE MAINTAINED BY CFD/LMD. 6.PLANT SPECIES HEREIN MAY BE ADDED OR REMOVED DURING THE CONSTRUCTION DOCUMENT PHASE SUBJECT TO APPROVAL BY THE CITY OF SAN JACINTO. MAXIMUM ANNUAL WATER ALLOWANCE MAWA = (Eto) (0.62) ((0.45) (LA) + (0.3) (SLA)) = GAL/YR MAWA = (56.65) (0.62) ((0.45) (94,991 SF) + (0.3) (0)) = 1,501,366 GAL/YR IRRIGATION SYSTEM DESIGN STATEMENT A PERMANENT AUTOMATIC IRRIGATION SYSTEM SHALL BE DESIGNED AND INSTALLED TO IRRIGATE ALL PLANTING AREAS. THE DESIGN OF THE IRRIGATION SYSTEM SHALL EMPHASIZE WATER CONSERVATION AND PROVIDE EFFICIENT AND UNIFORM DISTRIBUTION OF IRRIGATION WATER. IN PLANTERS WHERE APPROPRIATE, DRIP AND/OR BUBBLER IRRIGATION, OR OTHER LOW-VOLUME, LOW-PRESSURE, MICRO-IRRIGATION SYSTEM MAY BE INSTALLED TO PROVIDE WATER DIRECTLY TO THE ROOT ZONE OF PLANTS. THE SYSTEM MAY UTILIZE EFFICIENT ROTATOR NOZZLES IN LARGER PLANTING AREAS. THE AUTOMATIC IRRIGATION SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH CITY OF SAN JACINTO ORDINANCES. WHERE POTABLE WATER IS USED FOR IRRIGATION, A REDUCED PRESSURE BACKFLOW PREVENTER SHALL BE INSTALLED AS PART OF THE IRRIGATION SYSTEM TO PROTECT THE POTABLE WATER SUPPLY IN ACCORDANCE WITH STATE OF CALIFORNIA, CITY OF SAN JACINTO AND LOCAL WATER DISTRICT STANDARDS AND REQUIREMENTS. EAWU = (Eto) (0.62) (PF) (LA) = GAL/YR EAWU = (56.65) (0.62) (0.4) (94,991 SF) = 1,334,548 GAL/YR ESTIMATED ANNUAL WATER USE Bougainvillea spp Bougainvillea 5 Gal L Coprosma repens 'Marble Queen'Mirror Plant 5 Gal M Daylily MHemerocallis hybrids 5 Gal Liriope muscari Big Blue Lily Turf 1 Gal M Lophostemon confertus Brisbane Box 24" Box M TOTAL PARKING SPACES: 275 PARKING LOT SHADE TREES REQUIRED: 46 PARKING LOT SHADE TREES PROPOSED: 82 - Per San Jacinto Parkway and Median Master Plan Myoporum parvifolium Creeping Myoporum 1 Gal L Escallonia 'Compakta'Compact Escallonia 1 Gal M Phormium tenax New Zealand Flax 5 Gal M Pittosporum tobira 'Variegata'Varigated Mock Orange 5 Gal M Xylosma congestum 'Compacta'Compact Xylosma 5 Gal M SCALE: 1" = 40.00' 0 40'20'80' MW VANTAGE 1, LLC 26400 LA ALAMEDA, SUITE 100 MISSION VIEJO, CA 92691 949.680.4300 C 3 OVERTURE ALISO VIEJO, CA 92656 T 949.344.2710 F 949.344.2720 PIERCE GK PIERCE ARCHITECTS, INC. 2017C G KPG K A R C H I T E C T S PROJECT NORTH TRUE NORTH CONCEPTUAL LANDSCAPE PLAN SCHEME W VERSION 5 COMMONWEALTH CROSSING SAN JACINTO, CALIFORNIA GKPA PROJECT #14119.01 5 APRIL 2018 COMMONWEALTH CROSSING SAN JACINTO, CA LANDSCAPE ARCHITECTURE 2523 ANTLERS WAY, SAN MARCOS, CA 92078 P: 805.440.8047 SITE PLANNING Pacific Landscape Studio PLS PROJECT #17012.1 4.1.p Packet Pg. 212 Attachment: Attachment 18 - Conceptual Landscape Plan (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) Ê Ê Ê Ê Ê Ê Ê 043508 043507 043512 Cardenas Aldi Market Rite Aid 6293 Walgreens 09021 Wal Mart Store 5425 7 Eleven Store 2171 Stater Bros Market 121 ESPLANADE SANTA FEGIRARDSAN JACINTOCOMMONWEALTH LA ENTRADA INDEPEN D E N C E ALTA VISTA OAKWOODCOMMERCE CONGRESSBUENA VISTARAYAHANCOCKESPLANADE Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS,AeroGRID, IGN, and the GIS User Community O SPDR 17-11ABC Map Subject Site 100' 600' 1000' ATTACHMENT 19 4.1.q Packet Pg. 213 Attachment: Attachment 19 - Radii Map for Alcohol Sales (Commonwealth Crossing (SPDR-17-11, PM- April 10, 2018 To: Mary Lanier Planning Consultant City of San Jacinto Community Development Department Re: San Jacinto & Commonwealth 7-Eleven Beer & Wine Sales Dear Ms. Lanier: 7-Eleven is excited with having another successful store in the City of San Jacinto. Below is a list of facts that we ask you to consider for your approval of our conditional use permit to sell beer and wine. Our goal is to provide this public convenience in such a way that: a.It will not be a source of disruptive behavior. b. It will not be detrimental to the public health, safety or welfare. c.It will not cause a burden on existing law enforcement or create a public nuisance problem in the surrounding areas. d. It will be consistent with the objectives, policies, general land uses, and programs of the general plan and municipal code of San Jacinto, CA. 7-Eleven must be a designated length away, property line to property line, from certain uses and sites. 7-Eleven must be 600 feet from an existing place of worship, schools, and parks. 7-Eleven must also be 100 feet from existing residential uses or land that is zoned for residential uses. Additionally, the 7-Eleven must be 1000 feet from existing parolee-probationer homes, emergency shelters, supportive housing, or transitional housing. a.The nearest school, Hyatt Preschool, is approximately 4,752 feet from the site. b. The nearest church, Diamond Valley Community Church, is approximately 3,168 feet from the site. c.The nearest park, Searl Youth Sports Park, is approximately 2,200 feet from the site. d. The nearest tract for residential uses/zoning areas is, Blue Fountain Mobile Home Park, which is approximately over 158 feet from the site. e.The nearest existing parolee-probationer homes, emergency shelters, supportive housing, or transitional housing is the, Valley Restart Shelter, which is approximately 7,392 feet from the site. ATTACHMENT 20 4.1.r Packet Pg. 214 Attachment: Attachment 20 - Applicants PCorN Findings (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, 2. The 7-Eleven site must be fully visible from a public street with an unobstructed view from the public street for public safety. a. The 7-Eleven site has clear visibility from surrounding public streets, San Jacinto Avenue and E Commonwealth Avenue. Given that the site is located on the corner near a commercial plaza, it has an unobstructed view from the public street to ensure public safety. Per aerial image below, the site is fully visible for the public eye to see. 3. The proposed use will not be detrimental to surrounding properties and neighborhoods, as it will be ensured that the use does not contribute to loitering, public drunkenness or noise. Additionally, the site shall not obstruct pedestrian and vehicular traffic, parking, crime, interference with pedestrian corridors used by children, defacement and/or damage to surrounding structures. a. Per the San Jacinto Municipal Code, the owner will post a sign to indicate that it is unlawful to consume alcoholic beverages in a public place. b. As stated in the San Jacinto Municipal Code, “No Loitering” signs will be posted and actively enforced. The licensee shall regularly police the area under its control to prevent the loitering of persons about the premises. 7-Eleven will ensure to enforce its own internal program to deter loitering which includes but is not limited to: training store personnel on how to administer loiters and ask them to leave unproblematically, ensure the surrounding vicinity maintains unobstructed lines of sight so that external activity can be easily monitored, and ensure the store front/back, parking lot and surrounding sidewalks are well-lit and litter-free. 4.1.r Packet Pg. 215 Attachment: Attachment 20 - Applicants PCorN Findings (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, c. The owner and management shall educate the public regarding driving under the influence of intoxicating beverages, driving with open containers and the penalties associated with the violation of each of these laws. This will be facilitated by posting signage, decals and other brochures at points of purchases. d. As stated in San Jacinto Municipal Code, the owner or operator of 7-Eleven shall provide ABC approved or certified training for all employees who sell alcoholic beverages within 30 days of opening for business, and all new employees thereafter shall be trained within 30 days of the date of their employment. Through 7-Eleven’s internal training program, all employees will be trained to control the sale of beer and wine products, through the following methods (but not limited to): knowing the applicable laws regarding beer and wine, the ability to identify minors through ensuring ID-Checks are always conducted, refusing beer and wine sales to minors, and maintaining constant cooperation with local law enforcement. Only after employees have completed the internal training program will they be allowed to work the cash register, and even then, employees must be re-certified annually. e. As stated in California Business and Professions Code 23790.5 (d), Employees on duty between the hours of 10 p.m. and 2 a.m. shall be at least 21 in order to sell beer or wine. Employees on duty between the hours of 6 a.m. and 10 p.m. shall be at least 18 in order to sell beer or wine. There will be no liquor sales between 2 a.m. and 6 a.m. f. As stated in California Business and Professions Code 23790.5 (d), no displays of beer, wine or other alcoholic beverages shall be located within 5 feet of any building entrance or checkout counter unless it is in a cooler. g. No exterior advertising or signage of any kind or type promoting or indicating the availability of alcoholic beverages shall be placed in windows or doors facing the exterior of the store. h. No display of beer or wine shall be made from an ice tub, barrel, or similar container. i. To further ensure crime is deterred and public safety is intact, 7-Eleven will enforce their 30-plus year internal Crime-Deterrence Program. Per 7-Eleven’s Crime- Deterrence Program, all employees will undergo internal training which includes the teaching of (but not limited to): security procedures, proper store maintenance, violence avoidance, and recommended behaviors for managing a robbery or other potentially violent encounters. 7-Eleven’s Crime-Deterrence Program requires all stores to locate cash registers in the front of the store, ensure the installation of bright interior and exterior lighting, and keeping windows in front of the sales area free of signs and merchandise so police and others can see inside. Another 4.1.r Packet Pg. 216 Attachment: Attachment 20 - Applicants PCorN Findings (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, significant component of the program requires that employees keep no more than $50 ($30 at night) in the cash register. Signs are also posted notifying would-be culprits that less than $30 is kept in the cash register after dark and the fact store staffers cannot open the safe. j. As stated in San Jacinto Municipal Code, Surveillance cameras and equipment shall be installed to record all purchases and attempted purchases of beer and wine products in accordance with the specifications provided by local law enforcement. The equipment shall be able to record a minimum of 24 hours of operation. The facility operator shall maintain the recordings for the prior 30 days. Per 7-Eleven’s Crime-Deterrence Program, each store includes camera systems featuring a 24- hour, closed-circuit video camera with audio capabilities and a high-resolution color monitor mounted in clear view of the customers. k. As stated in San Jacinto Municipal Code, Lighting will provide illumination for the security and safety of parking and access areas. The lighting shall be provided at a level of no less than one foot-candle throughout in parking lots and access areas. 4. The proposed use will not adversely impact the suitability of adjacent commercially zoned properties for commercial uses. a. Per Census Tract 435.08, where the site is located, six (6) on-sale and four (4) off- sale alcohol licenses are allowed. b. Currently, the area only has four (4) active ABC license for the on-site sale of alcohol in a public eating space. c. There is an existing 7-11 within the same census tract. 7-11 is working with ABC to transfer the Type 20 license from this location for the proposed store. This action will result in no net increases to the ABC license in this census tract. 5. 7-11 locates all beer and wine as for from the front door as possible. At this location, the five cooler doors located furthest from the front entrance is the proposed location for beer/wine. Total shelve space for beer/wine sales is approximately 33 SF, or less than 5% of the total shelf space. Thank you again for your time and consideration. We look forward to working with you on this matter in any way we can. Please do not hesitate to contact myself via phone 714-560-8200 or email: mmacfarland@tait.com Sincerely, Mike MacFarland 4.1.r Packet Pg. 217 Attachment: Attachment 20 - Applicants PCorN Findings (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, 4.1.s Packet Pg. 218 Attachment: Attachment 21 - 7-Eleven Floor Plan with Alcohol Sales (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) Description of the Sonic Drive-In Operation Sonic Drive-In SONIC, America's Drive-In (NASDAQ/SONC) is the nation’s largest chain of drive-in restaurants. Sonic started as a hamburger and root beer stand in 1953 in Shawnee, Oklahoma, called Top Hat Drive-In, and then changed its name to SONIC in 1959. The first drive-in to adopt the Sonic name is still serving customers in Stillwater, Oklahoma. Throughout its 65-year history SONIC has enjoyed one of the highest customer frequency rates in the quick-service restaurant industry. Coast to Coast Commercial, LLC. Is the approved franchisee developer/operator for Sonic Drive-In restaurants throughout Southern California. More than a million customers eat at Sonic every day. For more than 60 years, Sonic Corp has built a dominate position in the drive-in restaurant business. Sonic currently operates more than 3,500 drive-in’s specializing in made-to-order food, and is known for its specialty menu items and unique drink combinations with a wide variety of frozen favorite treats. You can order over a million drink combinations making Sonic your ultimate drink stop. The new Sonic Drive-In restaurant will provide customers with a unique dining experience. Sonic's distinctive use of drive-in stall speakers allows customers to place food orders without ever leaving their cars. The Sonic Drive-In will provide drive-in stalls, handicap parking, indoor dining, outdoor patio dining, and drive-thru service as well. Carhops Personal carhop service is one of many reasons customers enjoy visiting Sonic Drive-In. Frequently seen spinning by on roller skates, smiling carhops personally deliver orders right to customers’ cars and can provide correct change that is always carried with them. What’s more, carhops check back to ensure a quality experience. Each customer receives a mint with a drink, dessert or meal purchase – a tradition started by company founder Troy Smith Sr. to remind customers they are worth a mint at Sonic. In addition to carhops, we plan to hire from within the local community for other positions such as, kitchen crew and management. We anticipate a full time staff of around 50 employees, with about 7-9 employees per shift. Menu Sonic's award-winning menu offers a variety of unique menu items made after you order. Sonic has one of the most extensive and diverse menu’s in the Quick Service Restaurant industry. Unique menu items include TOASTER Sandwiches (made with thick Texas toast), Extra-Long Chili Cheese Coney Hot Dogs, hand-battered Onion Rings, Tater Tots and a plethora of drink and dessert choices, such as Cherry Limeades. Sonic has more than a million drink combinations, making it Your Ultimate Drink Stop! Sonic’s diverse menu and large assortment of snack foods and drinks help evenly spread the Sonic day part. This evenly spread demand gives the Sonic operation an edge when compared to other QSR’s. Most other QSR’s experience heavy lunch and dinner rush times, often creating longer wait times and therefore congestion. ATTACHMENT 22 4.1.t Packet Pg. 219 Attachment: Attachment 22 - Sonic Drive-Through Operatons (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, Drive-In Stalls The Sonic Drive-In stall is covered with a canopy, and customers can pull into the drive-in stall and order at the digital LED menu board located right at the driver side window. Once they are ready to order food or drinks, customers will simply press a button on the menu board. A Sonic employee from inside the building will greet the customer and take the order from a two way speaker located on the menu board. To pay for the food, the customer can insert a credit card or a MySonic card into a built-in credit card reader on the menu board. Currently mobile payment is being rolled out as well. After the payment is processed, the customer can wait in the comfort of their car for their order to be delivered by a smiling carhop. If the customer would prefer to use cash, a carhop will collect the money and give the customer the appropriate change at the time the food is delivered. The carhop will deliver the order on roller skates to the car on window hanging trays, just like an old fashion drive-in. After the customer has finished eating, the carhop will collect the tray and trash from the customer, which is part of their job as a server. The carhop service hours are 6 am – Midnight, every day of the week. Inside/Patio Dining Sonic Drive-In offers both inside dining and a small outdoor dining patio. Customers will place their order through the front order counter inside the restaurant. The order is delivered to the customer’s table by a carhop. The dining service hours are 6 am – Midnight, every day of the week. Drive-thru Service The drive-thru component is essential for the expansion of Sonic out West due to the fast-paced lifestyle associated with California. Typical quick service restaurants with drive-thru in California generate 65 - 75% of their volume through the drive-thru service. However, the Sonic drive-thru is unique due to the utilization of what is called the “bump out lane”. Below is an example of how Sonic utilizes the “bump out lane”. At other drive-thru restaurants, if a customer has a small order they may be stuck waiting in line behind a large order for many minutes. At Sonic, we recognize the small orders that we can service quickly. If a small order such as a drink is ready to be served to a car waiting in line, a carhop will come out of a special “bump out door” next to the pickup window, the carhop will deliver the customer the small order, collect their money or credit card, and process the transaction curbside. After the customer has received their order and any change, the customer can simply and cautiously pull their car out of the drive-thru lane into the adjacent “bump out lane” (with the assistance of the carhop) and exit the property. With this “bump out lane” service we are able to increase the speed of service and therefore increase the drive-thru stacking potential by moving cars through the drive-thru at a much quicker pace. This is just another unique feature to Sonic Drive-In! The drive thru service hours are 6 am – Midnight, during the weekdays, and open 24 Hours on the weekend. 4.1.t Packet Pg. 220 Attachment: Attachment 22 - Sonic Drive-Through Operatons (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, ATTACHMENT 23 PROJECT SITE PHOTOS Photo of Project Site (west) from across San Jacinto Avenue Photo of Project Site (west) from San Jacinto Avenue and Commonwealth Avenue Intersection 4.1.u Packet Pg. 221 Attachment: Attachment 23 - Project Site Photos (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, ATTACHMENT 30 Photo of Project Site Frontage from San Jacinto Avenue (south) at Commonwealth Avenue Photo of Project Site Frontage (north) from San Jacinto Avenue toward Commonwealth Avenue Intersection 4.1.u Packet Pg. 222 Attachment: Attachment 23 - Project Site Photos (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, ATTACHMENT 30 Photo from Project Site (east) to Commonwealth Avenue and Adjacent Commercial 4.1.u Packet Pg. 223 Attachment: Attachment 23 - Project Site Photos (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 1 ENVIRONMENTAL ASSESSMENT FORM INITIAL STUDY (IS) 1.Case Number(s):SPDR-17-11 – Site Plan Design Review CZ-17-03 – Change of Zone to Commercial General PM-37407 – Tentative Parcel Map CUP-17-06 – Conditional Use Permit – 7 Eleven VAR-17-04 – Alcohol Sales w/in 1,000 feet MUP-17-06 – Minor Use Permit – Fast Food w/Drive MUP-17-07 – Minor Use Permit – Car Wash MUP-17-08 – Minor Use Permit – Tire Store 2.Project Title:Commonwealth Crossing (Project) 3.Public Comment Period: March 23, 2018 – April 11, 2018 4.Lead Agency:City of San Jacinto Planning Department 595 S. San Jacinto Avenue San Jacinto, CA 92583 http://www.ci.san-jacinto.ca.us/city- govt/departments/planning-environmental-docs.html 5.Contact Planner:Tammy Figueroa City of San Jacinto 595 S. San Jacinto Avenue San Jacinto, CA 92583 (951) 654-7337 – Phone (951)654-3728 – Fax tfigueroa@sanjacintoca.us 6.Prepared By:Diane Jenkins, AICP McKenna Lanier Group, Inc. (909) 519-8887 Diane@McKennaLanier.com 7.Project Location: West side of San Jacinto Avenue at the terminus of Com- monwealth Avenue, in the City of San Jacinto, California, as shown in Figure A – Aerial Map. The Project site is located within the Section 2 of Township 5 South, Range 1 West, San Bernardino Base and Meridian (SBBM) and is comprised of Tax Assessor parcel number APN 439-120-042. ATTACHMENT 244.1.v Packet Pg. 224 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 2 8. Project Sponsor: Applicant/Developer Applicant/Developer MW Advantage 1, LLC Mark Cooper, Page Plaza Partners, LLC 26400 La Alameda, Suite 100 38011 Stone Meadow Drive Mission Viejo. CA 92691 Murrieta, CA 92562 (949) 680-4300 (951) 643-4711 Property Owner Property Owner Brodie San Jacinto Investments, LLC The Imperial Corona, LLC 16675 Huerta Road 2747 Paradise Road, Unit 2702 Encino, CA 92436 Las Vegas, NV 79101 Property Owner Property Owner Gonda Trust Cannon Living Trust 767 Rosarita Drive 16092 Marian Bay Drive Fullerton, CA 92835 Huntington Beach, CA 92694 9. General Plan Designation: CC – Community Commercial The Community Commercial land use designation provides for a variety of retail and service-oriented business activities, including offices uses, at various intensities to serve the local community and population, as well as the broader market area. The maximum intensity of development is a FAR of 0.40, with an average intensity of a FAR of 0.25. (Figure B – General Plan Map) 10. General Plan Neighborhood Designation: California Neighborhood Planning Concept 11. Specific Plan Name and Designation: Not located within a Specific Plan 12. Existing Zoning: CG-UC – Commercial Neighborhood and Urban Corridor Combining Overlay Zones. The CG Zone is a “Clearly Compatible” Zone with the CC General Plan designation. The CG Zone is applied to areas appropriate for general commercial and daily shopping needs of a broad market area. The CG zone may allow a wide range of retail sales and business, professional, and personal services that are accessible to transit corridors. This zone allows a maximum floor area ratio (FAR) of 0.40 with an average intensity of a FAR of 0.12. The UC – Urban Corridor Combining Overlay Zone is applied to various zones along the major urban corridors of the City. The intent is to establish community design principles and standards that promote land use compatibility among the diverse zones situated along the corridors. The corridors are important to the City in project- ing a positive image of the community while also enhancing the quality of life for the users and occupants. The UC – Combining/Overlay Zone is consistent with all land use designations in the General Plan. (Figure C – Zoning). 4.1.v Packet Pg. 225 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 3 13. Surrounding Land Uses and Setting: Land Use General Plan Zoning Project Site Vacant Land/U-Haul Lot CC – Community Com- mercial CN – Commercial Neigh- borhood North Mobile Home Park MDR – Medium Density Residential RM – Residential Medium South Vacant Land CC – Community Commer- cial CN – Commercial Neigh- borhood East Commercial Shopping Center – Walmart CC – Community Commer- cial CG – Commercial General West Residential Apartments MDR – Medium Density Residential MHDR – Medium High- Density Residential RM – Residential Medium RMH – Residential Medium High 14. Description of the Project: The Project proposes a change of zone CZ-17-03 to change the zone from CN-UC – Commercial Neighborhood and Urban Corridor Combining Overlay Zones to CG-UC – Commercial General and Urban Corridor Combining Overlay Zones and a parcel map to subdivide (PM-37407) a single parcel, totaling 9.51 gross acres/9.32 net acres, into five parcels and one lettered lot, for the development of the following us- es (Figure C – Zoning and Figure D – Site Plan): • Service Station and Convenience Store with Off-sale Alcohol Sales • A Quick Quack Automated Car Wash • Sonic Fast Food Drive-Through • A Tire Store • Office Retail Building Environmental Setting The Project site is rectangular and encompasses 9.51 acres. The site has two struc- tures and is partially used for a U-Haul rental lot, with the remaining vacant and un- used. It is relatively level with an average elevation of approximately 1,570-feet above mean sea level (MSL) (Figure G – Preliminary Grading). The site is relatively flat with a gradient of approximately 1.5 percent to the north- west. The property naturally drains to a small concrete channel which begins at the northwest corner of the property. The channel conveys site runoff west to Santa Fe Avenue. An approximately three to four-foot-high wood slat fence exists along the northern property line adjacent to the mobile home park. A six-foot high CMU wall exists along the westerly property adjacent to residential uses. Construction of the Project is to be completed in phases. The phases of construc- tion activities include 1) demolition, 2) grading, 3) building, 4) paving and 5) architec- tural coating. 4.1.v Packet Pg. 226 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 4 Proposed Project The Project includes a number of discretionary approvals as follows: • Site Plan Design Review SPDR-17-11 for the review of the overall site and building designs. • Change of zone CZ-17-06 to change the zoning from CN-UC – Commercial Neighborhood and Urban Corridor Combining Overlay Zones to CG-UC – Commercial General and Urban Corridor Combining Overlay Zones. • Tentative Parcel Map 37407 to subdivide 9.51 gross acres/9.32 net acres into five parcels and one lettered lot. • Conditional Use Permit CUP-17-06 to permit a service station with a conven- ience store to have off-sale beer and wine sales. • Variance VAR 17-04 to allow off-sale beer and wine sales within 1,000-feet of adjacent sales. • Minor Use Permit MUP-17-06 to permit a fast food drive-through. • Minor Use Permit MUP-17-07 to permit an automated drive-through car wash. • Minor Use Permit MUP-17-05 to permit a tire store. Site Plan Design Review (SPDR-17-11) Under the Site Plan Design Review case, SPDR-17-11, the City will ensure that the Project respects the physical environmental characteristics of the property, provides safe and convenient access and circulation for pedestrians and vehicles, provides high quality design practices, minimizes, or eliminates negative or undesirable visual impacts, provides for adequate dedication of land for public purposes and provides needed public infrastructure. 4.1.v Packet Pg. 227 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 5 The Project is proposed to be built in two phases as noted in the table below. (Figure E – Phasing Plan) PHASING PLAN Phase Parcel # Parcel Net Square Foot- age Building Square Foot- age Projected Con- struction Comple- tion PHASE 1 Fast Food with Drive- Through 1 196,000 sq. ft. 2,720 2nd quarter 2019 Convenience Store 2 3,062 12-Pump Dispenser Canopy 3,600 Car wash 4 3,590 Common Drive Aisles, sidewalks, and deten- tion/retention basins 1, 2, portion of 3, 4, & 6 Off-Site Improvements – parkway, underground utilities, roadway im- provements Off-site PHASE 2 Tire Store 3 219,978 sq. ft. 12,000 3rd quarter 2020 Office/Retail 5 24,000 Phase 1 Phase 1 includes the development of Parcel 1 for a 2,720-square-foot fast food Drive-Through restaurant. It also includes the development of Parcel 2 for a service station and convenience store totaling 3,062-square-feet with off-sale beer and wine sales and findings of Public Convenience or Necessity. Beer and wine sales will make up approximately 35-square-feet of the sales area. Because Census Tract number 435.08 already has the six off-sale where a maximum number of four off- sale alcohol licenses are permitted findings of Public Convenience or Necessity (PCorN) is required per State law. In addition, a separation variance to permit alco- hol sales within 1,000-feet of other buildings selling alcohol is also required. The convenience store is within 1,000-feet the Rite Aid, Wal Mart, Walgreens, and the newly approved ALDI Store. The convenience store is also within 100-feet of resi- dential uses. The convenience store is proposed to be open 24-hours a day, seven days a week. It is anticipated that there will three shifts of employees with an aver- age of two employees per shift. Also included on Parcel 2 is a 3,600-square-foot canopy for the 12 service station pump dispensers (six double-sided). This phase also includes the development of Parcel 4 with 3,590-square-foot auto- mated car wash with 22 vacuum stations. The car wash will be open 7:00 a.m. to 7:00 p.m. during normal business hours and 7:00 a.m. to 9:00 p.m. during the sum- mer hours, seven days a week. At any given time, there will be two to three employ- ees on site. 4.1.v Packet Pg. 228 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 6 Lastly, Phase 1 will include the construction of the on-site main drive-aisles and common sidewalks serving Parcels 1 – 4 and the detention/retention basins on Let- tered Lot A. Off-site improvements will also be constructed during this phase (i.e., parkway and roadway improvements). Phase 2 Phase 2 includes the development of Parcel 3 for a 12,000-square-foot tire store and Parcel 5 for a 24,000 office/retail building. Project Standards The design of the Project has been compared against City standards as noted be- low. DEVELOPMENT STANDARDS FOR THE PROPOSED CG ZONE Required Permitted Parcel 1 Parcel 2 Parcel 3 Parcel 4 Parcel 5 Parcel 6 Basins Parcel Area (Net) Mini- mum 5,000 sq. ft. 12,000 sq. ft. Drive- Through 47,524 62,291 71,003 52,708 148,975 22,651 Parcel Width 50 ft. 198 ft. 247 ft. 211 ft. 259 ft. 332 ft. 173 ft. Parcel Depth 100 ft. 240 ft. 253 ft. 323 ft. 193 ft. 374 ft. (var- ies) 126 ft. (var- ies) FAR (Maxi- mum) .40 .06 .05 .17 .03 .16 N/A Building Size Varies 2,720 3,062 12,000 3,590 24,000 N/A Building Height 45 ft. 130 ft. 23.8 ft. TBD 26 ft. TBD N/A Impervious Surface (Max) 85% 78.8 77.1 87.9 94.5 80.6 N/A Struc- ture/Lot Coverage (Max) 50% 5.7% 4.9% 16.9% 6.8% 16.5% N/A Setbacks San Jacinto Avenue 25 ft. Landscape __ ft. 19 ft. on-site ___ ft. 19 ft. on-site --- --- --- N/A Side (Abut- ting Resi- dential) 10 ft. Landscape 10 ft. --- 10 ft- --- --- N/A Rear (Abut- ting Resi- dential) 15 ft. --- --- --- --- N/A Side (Abut- ting Non- Residential) --- ---- 10 ft. --- 10 ft 10 ft. N/A Access The Project, although five parcels, is being designed and built as a single commer- cial complex. As such access will be shared. A 38-foot wide signalized driveway access is proposed off of San Jacinto Avenue between Parcels 1 and 2. This ac- 4.1.v Packet Pg. 229 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 7 cess feeds into and through the site, connecting at the rear of the parcel to a 30-foot driveway along the southern boundary, also connecting to San Jacinto Avenue. Parking A total of 261 parking stalls are proposed where 217 parking stalls are required for the entire Project. Bicycle parking is required at a ratio of ten percent of the required parking. Adjacent to each building is a 2-4-space bicycle racks providing for 2-4 short-term bicycle parking spaces where 2-4 are required. Pursuant to CalGreen five-percent of the required 1-2 bicycle spaces must be long-term spaces. As well, two of the proposed uses are greater than 10,000-square-feet and therefore, they are required to have one 10-foot by 25-foot loading space each. The Project will be conditioned to provide the required bicycle and loading parking spaces. PARKING ANALYSIS Ratio (Gross Floor Ar- ea) Calculation Required Provided Parcel 1 Fast Food #1 w/Drive- Through – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. 2,000/200 + 720/60 32 20 + 12 Parcel 1 Total 32 20+12 Parcel 2 Convenience Store – 1:225 – plus 1 space for each employee on duty during heaviest traffic 8- hour shift 3,062/225 14 26 Parcel 2 Total 14 26 Parcel 3 Tire Store 12,000/250 4/Bay 48 57 Parcel 3 Total 48 57 Parcel 4 Car Wash 1/Employee/Shift 1 3 Parcel 4 Total 1 3 Parcel 5 Office/Retail 24,000/200 Off/ 250 Retail 96-120 143 Parcel 5 Total 96-120 143 Landscaping Landscaping is proposed along the Project boundaries and throughout the parking lots. Much of the proposed landscaping will be used either as self-retaining or sur- face draining bioretention. Water quality mitigation is proposed as a Master Water Quality Management Plan (WQMP) for the six parcels. CC&R’s will be prepared, detailing parcel owner shared flow management throughout the site. The site has been hydraulically divided into three drainage areas. The first drainage area in- cludes the service station only. The second drainage area includes the south drive aisle and the office/retail building parking lot. The third drainage area includes the car wash, Sonic restaurant, tire store, office/retail building and associated parking 4.1.v Packet Pg. 230 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 8 and drive aisles. All of the Drainage Management Areas (DMAs) drain to the biore- tention basins located throughout the site. Bioretention was chosen due to the sub- standard infiltration rates of the native soil based on site-specific testing. Although the site is exempt from Hydraulic Conditions of Concern (HCOC) mitigation, a deten- tion basin has been incorporated into the site design for flood control purposes. Change of Zone CZ-17-03 The Project also includes the request for a zone change from CN-UC – Commercial Neighborhood and Urban Corridor Combining Overlay Zones to CG-UC – Commer- cial General and Urban Corridor Combining Overlay Zones (Figure C – Zoning). The CG zone is applied to areas appropriate for general commercial and daily shop- ping needs of a broad market area. The CG zone may allow a wide range of retail sales and business, professional, and personal services that are accessible to transit corridors. This zone allows a maximum floor area ratio (FAR) of 0.40. The CG zone is consistent with the Community Commercial land use designation of the General Plan. Tentative Parcel Map 37299 (PM-37407) The proposed parcel map subdivides an existing 9.51-acre site, into five parcels and one lettered lot summarized in the table below. This proposed parcel map accom- modates the proposed commercial development. (Figure F – Parcel Map 37407) PM-37407 SUMMARY Parcel # Size Sq. Ft. (Net) Use Parcel 1 47,480.4 Fast Food w/Drive-Through Parcel 2 62,290.8 Service Station w/Convenience Store/Beer and Wine Sales Parcel 3 71,002.8 Tire Store Parcel 4 52,707.6 Car wash Parcel 5 148,975.2 Office Retail Building Lot A 22,651.2 Detention/Retention Basins Total 405,108 sq. ft. or 9.3 net acres Conditional Use Permit (CUP-17-06) – Convenience Store with Off-Sale Beer and Wine Sales and Findings for Public Convenience or Necessity and Service Station Conditional Use Permit, CUP-17-06, is required to permit a service station with a convenience market with off-sale alcohol sales under a Type 20 Alcoholic Beverage Control (ABC) license. Also, included in the CUP review is the request that the City make findings of Public Convenience or Necessity (PCorN) to support the requested alcohol license type in Census Tract 435.08 which currently has 6 Off-sale licenses where 4 are permitted. Since the census tract is already over-concentrated the addi- tion of another Off-sale license requires PCorN findings. 4.1.v Packet Pg. 231 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 9 The store will operate between 24-hours a day, seven days a week. The area pro- posed for the alcohol sales makes up 35-square-feet or less than 2 % of the total square footage of the store space. Under the CUP, a separation variance is requested to permit the sale of alcohol within 1,000-feet of other buildings selling alcohol. These buildings include Walgreens, Wal Mart, Rite Aid, and the proposed ALDI Store. Variance (VAR-17-04) As previously discussed, this Project requires one variance, as follows: Under CUP-17-06 case: 1. Parcel 2 – a separation variance to permit alcohol sales within 1,000-feet of other buildings selling alcohol. Minor Use Permit (MUP-17-06) – Fast Food Restaurant with a Drive-Through This MUP is for the fast food restaurant with the Drive-Through lane on Parcel 1. As designed the site meets all requirements for the use. Minor Use Permit (MUP-17-07) – Automated Car Wash This MUP is for an automated car wash with a drive-through lane and 22 stalls with vacuums on Parcel 4. As designed the site meets all requirements for the use. Minor Use Permit (MUP-17-08) – Tire Store This MUP is for a proposed retail tire store with installation services on Parcel 3. At this time the tenant for the retail tire store is unknown, therefore details of the store’s exterior elevations are not established. This environmental review covers the design of tire store as shown on the site plan in terms of the building size and placement, parking areas, and service bay openings. Once a tenant is secure this Minor Use Permit will be evaluated thoroughly for City standards. 15. Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1? if so, has consultation begun? (Note: Conducting consultation early in the CEQA process allows tribal governments, lead agencies, and project proponents to discuss the level of environmental review, identify and address potential adverse impacts to tribal cultural resources, and reduce the potential for delay and conflict in the environmental review process. (See Public Resources Code section 21083.3.2.) Information may also be available from the California Native American Heritage Commission’s Sa- cred Lands File per Public Resources Code section 5097.96 and the California Historical Resources Information System administered by the California Office of Historic Preservation. Please also note that Public Resources Code section 21082.3(c) contains provisions specific to confidentiality.) Consultation under AB 52 commenced on December 18, 2017. The 30-day re- sponse period ended on January 18, 2018. Information on the consultation process can be found in Appendix A of this Initial Study. 4.1.v Packet Pg. 232 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 10 16. Other public agencies whose approval is required (e.g., permits, financing ap- proval, or participation agreement): a. Eastern Municipal Water District b. Riverside County Flood Control and Water Conservation District c. California Department of Alcoholic Beverage Control d. Southern California Edison e. Riverside County Environmental Health f. South Coast Air Quality Management District g. Statewide Construction General Permit 17. Other Environmental Reviews Incorporated by Reference in this Review: a. General Plan as amended through October 19, 2012 b. General Plan EIR April 2006 c. General Plan EIR Addendum August 2012, GPA-1-12 d. Riverside County DEIR No. 521 18. Other Technical Studies Referenced in this Initial Study: a. Air Quality and Greenhouse Gas Impact Study, San Jacinto Commonwealth De- velopment, prepared by MD Acoustics, November 3, 2017, and Memo from MD Acoustics, February 19, 2018 b. General Biological Report, prepared by Glenn Lukos Associates, Inc., April 2018 c. Report of Findings from Record Search Conducted for Assessor’s Parcel Num- ber 439-120-042, prepared by SRS, October 5, 2017 d. Geotechnical Engineering Investigation Proposed Commercial Development Commonwealth Avenue at San Jacinto Avenue, San Jacinto, California, pre- pared by Sladden Engineering, November 2, 2017 e. Preliminary Hydrology Study Commonwealth Crossing, SPDR-17-11, prepared by Blaine A. Womer Civil Engineering, October 2, 2017, and Revised February 8, 2018 f. Noise Impact Study, San Jacinto Commonwealth Development, prepared by MD Acoustics, October 30, 2017, and Memo from MD Acoustics, February 19, 2018 g. Commonwealth Crossing Traffic Impact Analysis, prepared by Trames Solutions, Inc., October 10, 2017, and Revised March 7, 2018 h. Water Quality Management Plan Commonwealth Crossing, prepared by Blaine A. Womer Civil Engineering, September 21, 2017 i. Results of Phase I Environmental Site Assessment Proposed Commercial De- velopment West of San Jacinto Avenue & Commonwealth Avenue, prepared by Sladden Engineering, September 14, 2017 j. Phase II Limited Soil Sampling and Excavation, prepared by Vertex Companies, Inc., February 2, 2018 4.1.v Packet Pg. 233 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 11 19. Acronyms: ALUC - Airport Land Use Commission ALUCP - Airport Land Use Compatibility Plan AMSL - Above Mean Sea Level AQMP - Air Quality Management Plan CERCLIS - Comprehensive Environmental Response, Compensation, & Liability Information System CEQA - California Environmental Quality Act CIWMD - California Integrated Waste Management District CMP - Congestion Management Plan DTSC - Department of Toxic Substance Control EIR - Environmental Impact Report EMWD - Eastern Municipal Water District EOP - Emergency Operations Plan FEMA - Federal Emergency Management Agency GIS - Geographic Information System GHG - Greenhouse Gas GP - General Plan HCM Highway Capacity Manual HOA - Home Owners’ Association HUSD - Hemet Unified School District IS - Initial Study LHMP - Local Hazard Mitigation Plan LHMWD - Lake Hemet Municipal Water District LOS Level of Service LST - Localized Significance Threshold MSHCP - Multiple Species Habitat Conservation Plan MWD - Metropolitan Water District NCCP - Natural Communities Conservation Plan OEM - Office of Emergency Services OPR - Office of Planning & Research, State PEIR - Program Environmental Impact Report PW - Public Works RCEH - Riverside County Environmental Health RCFCWCD - Riverside County Flood Control & Water Conservation District RCP - Regional Comprehensive Plan RCTC - Riverside County Transportation Commission RTA - Riverside Transit Agency RTIP - Regional Transportation Improvement Plan RTP - Regional Transportation Plan SCAG - Southern California Association of Governments SCAQMD - South Coast Air Quality Management District SCE - Southern California Edison SCH - State Clearinghouse SKRHCP - Stephens’ Kangaroo Rat Habitat Conservation Plan SWPPP - Storm Water Pollution Prevention Plan TRI - Toxic Release Inventory USFWS - United States Fish and Wildlife 4.1.v Packet Pg. 234 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 12 USGS - United States Geologic Survey WQMP - Water Quality Management Plan WRCOG - Western Riverside Council of Governments 4.1.v Packet Pg. 235 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 13 Figure A – Aerial Map 4.1.v Packet Pg. 236 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 14 Figure B – General Plan 4.1.v Packet Pg. 237 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 15 Figure C – Zoning 4.1.v Packet Pg. 238 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 16 Figure D – Site Plan 4.1.v Packet Pg. 239 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 17 Figure E – Phasing Map 4.1.v Packet Pg. 240 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 18 Figure F – Parcel Map 37407 4.1.v Packet Pg. 241 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 19 Figure G – Preliminary Grading 4.1.v Packet Pg. 242 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 20 Figure H – Sonic Elevations 4.1.v Packet Pg. 243 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 21 Figure I – Quick Quack Elevations 4.1.v Packet Pg. 244 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 22 Figure J – 7 Eleven Elevations 4.1.v Packet Pg. 245 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 23 Figure J – 7 Eleven Elevations 4.1.v Packet Pg. 246 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 24 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Aesthetics Agriculture/Forestry Re- sources Air Quality Biological Resources Cultural Resources Geology/Soils Greenhouse Gas Emissions Hazards & Hazardous Ma- terials Hydrology/Water Quality Land Use/Planning Mineral Resources Noise Population/Housing Public Services Recreation Transportation/Traffic Tribal Cultural Resources Utilities/Service Systems Mandatory Findings of Significance DETERMINATION (To be completed by the Lead Agency): On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the envi- ronment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the envi- ronment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a "potentially significant" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT RE- PORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the envi- ronment, because all potentially significant effects (a) have been analyzed ade- quately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Signature Date Travis Randel, Planning & Community De- velopment Director Printed Name City of San Jacinto For 4.1.v Packet Pg. 247 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 25 EVALUATION OF ENVIRONMENTAL IMPACTS: 1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a Lead Agency cites in the parentheses following each question. A "No Impact" answer is adequately sup- ported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g. the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project-specific factors as well as general standards (e.g. the project will not ex- pose sensitive receptors to pollutants, based on a project-specific screening analysis). 2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts. 3) Once the Lead Agency has determined that a particular physical impact may oc- cur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potential- ly Significant Impact" is appropriate if there is substantial evidence that an effect is significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) Less Than Significant with Mitigation Incorporated" applies where the incorpora- tion of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less than Significant Impact." The Lead Agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses," may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or another CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a) Earlier Analyses Used. Identify and state where they are available for re- view. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier anal- ysis. c) Mitigation Measures. For effects that are "Less than Significant with Miti- gation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 4.1.v Packet Pg. 248 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 26 6) Lead agencies are encouraged to incorporate into the checklist references to in- formation sources for potential impacts (e.g. general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropri- ate, include a reference to the page or pages where the statement is substantiat- ed. 7) Supporting Information Sources. A source list should be attached, and other sources used, or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different for- mats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify: a) the significance criteria or threshold, if any, used to evaluate each ques- tion; and b) the mitigation measure identified, if any, to reduce the impact to less than significance. 4.1.v Packet Pg. 249 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 27 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact I. AESTHETICS – Would the project: a) Have a substantial adverse effect on a scenic vista? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012, GPA-1-12; & General Plan EIR Figure 5.1-1 – Major Scenic Resources) San Jacinto's eastern and western borders are largely defined by steep sloping hillsides and ridge- lines on unincorporated lands surrounding the City associated with the San Jacinto Mountain Range. The City of San Jacinto itself also has several scenic vistas in the form of open space and agricul- tural lands. However, this Project is proposed along a developing urban corridor and it will not im- pact these scenic vistas. The Project is located on San Jacinto Avenue in the UC – Urban Corridor Combining Overlay District Zone. Mitigation Measure A-6 of the General Plan EIR requires the City to apply the standards of Section 17.235.040 of the Development Code to all properties in the UC Zone to help ensure the protection of scenic vistas. This Project includes a Site Plan and Design Review (SPDR) process where the Project has been evaluated against the standards and has been found, as conditioned, to meet the standards. Therefore, the Project will have a less than significant impact, directly, indirectly, or cu- mulatively to scenic vistas. b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element – Figure RM-4 – Cultural Resources; Arts & Culture Element – Figure AC-1; General Plan EIR; General Plan EIR Addendum August 2012, GPA-1-12; Gen- eral Plan EIR Figure 5.1-1 – Major Scenic Resource;, City of San Jacinto Landscape Design Guidelines – Appendix One – Parkway & Median Master Plan; & Municipal Code Chapter 12.20 – Street Trees and Shrubs) No trees, rock outcroppings and/or historic buildings exist on the site. A 1920’s craftsman style re residence is located on the site and proposed for demolition. This structure has been heavily altered and recently damaged by fire. In its current state, it would not qualify as a significant resource under the guidelines for the national and state registers or under the City’s local guidelines. No adopted scenic highway exists in San Jacinto. However, the City does recognize certain streets for distinctive design treatments in the City’s Landscape Design Guidelines. Both San Jacinto Ave- nue and Commonwealth Avenue are included in the Landscape Design Guidelines. This Project includes a Site Plan and Design Review (SPDR) process where the Project has been evaluated against the Landscape Design Guidelines and has been found, as conditioned, to meet the guidelines. There- fore, the Project will have a less than significant impact, directly, indirectly, or cumulatively, to scenic resources within a State scenic highway. c) Substantially degrade the existing visual character or quality of the site and its surroundings? Response: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012, GPA- 1-12) The Project is a well-designed addition to this urban corridor and will enhance the visual character of the area. Implementation of Mitigation Measure A-6 of the General Plan EIR helps promote the revi- talization of the older portions of the community and ensure that new development and redevelop- ment is compatible and complementary to existing development. Mitigation Measure A-6 calls for the City to enforce the Urban Corridor Combining Overlay Zone standards on all properties having front- age on San Jacinto Avenue between Seventh Avenue and Menlo Avenue. As previously stated, his Project includes a Site Plan and Design Review (SPDR) process where the Project has been evaluated against the standards and has been found, as conditioned, to meet the standards. Therefore, the Project will have a less than significant impact, directly, indirectly, or cumulatively, to the existing visual charac- ter. d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? 4.1.v Packet Pg. 250 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 28 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Response: (General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012, GPA-1- 12; Development Code Section 17.300.080 – Outdoor Light & Glare; Riverside County Ordinance 655 – Regulating Light Pollution; & San Jacinto Valley Area Plan of the Riverside County General Plan) The City of San Jacinto is in Zone B of the Mount Palomar Observatory, located in San Diego County. Zone B is the area defined as a circular ring forty-five (45) miles in radius centered on Palomar Observa- tory. The Project site is 28.92 miles from Mount Palomar Observatory. As well, the City enjoys limited night sky impacts due to its rural nature. To preserve the night sky, lighting must be designed to limit leak spillage that may obstruct or hinder the view of the nighttime sky. To reduce impacts related to light pollu- tion, the City requires that all developments introducing new light sources, or modifications to existing light sources, to shield all such devices. An exterior lighting plan shall be submitted to Design Review staff for review and approval. A photometric study and manufacturer’s cut sheets of all exterior lighting on the building, in the landscaped areas, and in the parking lot shall be submitted with the exterior lighting plan. All on-site lighting shall provide a minimum intensity of one foot-candle and a maximum intensity of ten foot-candles at ground level throughout the areas serving the public and used for parking, with a ratio of average light to minimum light of four to one (4:1). The light sources shall be shielded to minimize off- site glare, shall not direct light skyward and shall be directed away from adjacent properties and public rights-of-ways. If lights are proposed to be mounted on buildings, down-lights shall be utilized. Light poles shall not exceed twenty (20) feet in height, including the height of any concrete or other base mate- rial. The property is adjacent to mobile home parks in the residential zone on the north, west, and southwest- ern portion of the Project site. As such, light spillage could cause an impact to these residential uses. Therefore, Mitigation Measure MM AES-1 shall be applied to ensure the residential properties are not impacted by light spillage. In addition, the design of the buildings reduces the number of reflective surfaces used in the construction to minimize new sources of glare. Exterior building materials will use earth tone light colors with a low- reflectance. Any bare metallic surfaces found on infrastructures such as pipes and poles shall be painted to minimize reflectance and glare. As designed the impacts to the nighttime sky and the potential for glare will be less than significant with mitigation, directly, indirectly, and cumulatively. MM AES-1: Outdoor lighting shall maintain a minimum of one-foot candle illumination for all parking and pedestrian areas and shall not exceed one-half foot candle along property lines of the subject site. A photometric plan shall be submitted for Planning review and approval. The plan must include details such as beam spreads and/or photometric calculations, lo- cation and type of fixtures, and arrangement of exterior lighting that does not create glare or hazardous interference to adjacent streets or properties. II. AGRICULTURE AND FOREST RESOURCES – Would the project: In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the Cali- fornia Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an op- tional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest protocols adopted by the California Air Resources Board. a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farm- land Mapping and Monitoring Program of the Cali- fornia Resources Agency, to non-agricultural use? Or pursuant to the City of San Jacinto’s General Plan (page RM-28), convert Farmland of Local Im- portance as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use? 4.1.v Packet Pg. 251 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 29 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Response: (General Plan as amended October 19, 2012; Figure RM-5 – Agricultural Resources; RM-6 – Important Farmland; RM-3 – Vegetation Communities; General Plan EIR; Figure 5.2-1 – Agricultural Resources; Figure 5.2-1 – Important Farmland; General Plan EIR Addendum August 2012, GPA-1-12; Development Code Section 17.305.040 – Agriculture (Right to Farm); 2014 Farmland Mapping and Monitoring Program Map, & Results of Phase I Environmental Site Assessment Proposed Commercial De- velopment west of San Jacinto Avenue and Commonwealth Avenue, prepared by Sladden Engineering, September 14, 2017) A review of aerial photography dating back to 1938 indicates that this property was not used field crops or farming. The property is currently vacant and annually disced. Figure RM-6 – Important Farmland of the General Plan shows the site designated as Other Land. Other Land includes a variety of miscellaneous uses, such as low density rural residential development, mining areas, vacant areas, and nonagricul- tural vegetation. The latest Farmland Map, dated 2014 shows the northern portion of the site designated as Other Land and the southern portion of the site designated as Urban and Built-up Land. Urban and Built-up Land includes residential, industrial, recreational, infrastructure and institutional uses. This portion of San Jacinto Avenue is in the UC – Urban Corridor Combining Overlay Zone. The intent is to establish community design principles and standards that promote land use compatibility among the diverse zones situated along the corridor. In this case, San Jacinto Avenue is developing as a commer- cial corridor precluding farmland uses. Therefore, the proposed Project will no impact, directly, indirectly, or cumulatively to farmland. b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? Response: (General Plan as amended October 19, 2012; Figure RM-5 – Agricultural Resources; RM-6 – Important Farmland; RM-3 – Vegetation Communities; General Plan EIR; Figure 5.2-1 – Agricultural Resources; Figure 5.2-1 – Important Farmland; General Plan EIR Addendum August 2012, GPA-1-12; Development Code Section 17.305.040 – Agriculture (Right to Farm); & 2014 Farmland Mapping and Monitoring Program Map) The Project site is General Plan designated for commercial uses and the CG Zoning is consistent with this General Plan designation. There are no Williamson Act contracts on the subject property. No agri- cultural uses are currently being operated in or around the subject property. Therefore, the Project will have no impact, directly, indirectly, or cumulatively, on zoning for an agricultural use or on a Williamson Act contract. c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timber- land zoned Timberland Production (as defined by Government Code section 51104(g))? Response: (Riverside County DEIR No. 521 – Section 04-05 – Agricultural and Forestry Resources) In Southern California, including Riverside County and the City of San Jacinto, climate and topography limit the types and locations of forest lands and their potential for commercial or industrial timber utiliza- tion. Accordingly, there is no existing or currently proposed zoning of forest land, timberland, or Timber- land Production Zones within the City of San Jacinto. In addition, figures released by the State of Califor- nia indicate that no “California forest land” ownership, either public or private, is mapped for Riverside County including the City of San Jacinto. Therefore, the Project would not conflict with the existing zoning for, or cause rezoning of, forest land, timberland, or timberland zoned Timberland Production and the Pro- ject will have no impact, directly, indirectly, or cumulatively to forest land. d) Result in the loss of forest land or conversion of forest land to non-forest use? Response: (Source: Riverside County DEIR No. 521 – Section 04-05 – Agricultural and Forestry Resources) There is no commercial forestry or timber production industry within the City of San Jacinto other than Christmas tree farms or nursery stock production (that is, cultivated, rather than wild-harvested); there- fore, the Project would not result in the loss of forest land or the conversion of forest land to non-forest use and the Project will have no impact, directly, indirectly or cumulatively to the loss of forest land or conversion of forest land to non-forest use. 4.1.v Packet Pg. 252 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 30 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact e) Involve other changes in the existing environment which, due to their location or nature, could result in the conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use? Response: (General Plan as amended October 19, 2012; Figure RM-5 – Agricultural Resources; RM-6 – Important Farmland; RM-3 – Vegetation Communities; General Plan EIR; Figure 5.2-1 – Agricultural Resources; Figure 5.2-1 – Important Farmland; General Plan EIR Addendum August 2012, GPA-1-12; Development Code Section 17.305.040 – Agriculture (Right to Farm); 2014 Farmland Mapping and Monitoring Program Map; & Riverside County DEIR No. 521 – Section 04-05 – Agricultural and Forestry Resources) The Project is consistent with the City’s General Plan and Development Code and, as discussed above will have no impact, directly, indirectly, or cumulatively to the conversion of Farmland to another use. As noted above, there is no commercial forestry or timber production industry within the City of San Jacin- to other than Christmas tree farms or nursery stock production (that is, cultivated, rather than wild- harvested); therefore, the Project would not result in the loss of forest land or the conversion of forest land to non-forest use and the Project will have no impact, directly, indirectly or cumulatively. III. AIR QUALITY – Would the project: Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. a) Conflict with or obstruct implementation of the ap- plicable air quality plan? Response: (Source: South Coast Air Quality Management District’s 2016 Air Quality Management Plan; Air Quality and Green- house Gas Study, prepared by MD Acoustics, November 3, 2017; & Memo from MD Acoustics, February 19, 2018) The SCAQMD CEQA Handbook states that "[n]ew or amended General Plan Elements (including land use zoning and density amendments), Specific Plans, and significant projects must be analyzed for con- sistency with the AQMP." Strict consistency with all aspects of the plan is usually not required. A pro- posed Project is considered consistent with the AQMP if it furthers one or more policies and does not obstruct other policies. The SCAQMD CEQA Handbook identifies two key indicators of consistency: (1) Whether the project will result in an increase in the frequency or severity of existing air quality viola- tions or cause or contribute to new violations or delay timely attainment of air quality standards or the interim emission reductions specified in the AQMP. (2) Whether the project will exceed the assumptions in the AQMP in 2016 or increments based on the year of project buildout and phase. Both criteria are evaluated in the following sections. Criterion 1 - Increase in the Frequency or Severity of Violations Based on the air quality modeling analysis contained in this Air Analysis, neither short-term construction impacts nor long-term operations will not result in significant impacts based on the SCAQMD regional and local thresholds of significance. Therefore, the proposed Project is not projected to contribute to the exceedance of any air pollutant concentration standards and is found to be consistent with the AQMP for the first criterion. Criterion 2 - Exceed Assumptions in the AQMP? Consistency with the AQMP assumptions is determined by performing an analysis of the proposed Pro- ject with the assumptions in the AQMP. The emphasis of this criterion is to ensure that the analyses conducted for the proposed Project are based on the same forecasts as the AQMP. The 2016- 2040 Regional Transportation/Sustainable Communities Strategy, prepared by SCAG, 2016, includes chap- ters on the challenges in a changing region, creating a plan for our future, and the road to greater mobili- ty and sustainable growth. These chapters currently respond directly to federal and state requirements placed on SCAG. Local governments are required to use these as the basis of their plans for purposes of consistency with applicable regional plans under CEQA. For this Project, the City of San Jacinto Land Use Plan defines the assumptions that are represented in the AQMP. 4.1.v Packet Pg. 253 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 31 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The proposed Project is a commercial land uses and would be consistent with the General Plan land use designation. Therefore, it is not anticipated that the Project would exceed the AQMP assumptions for the Project site and is found to be consistent with the AQMP for the second criterion. Based on the above, the proposed Project will not result in an inconsistency with the SCAQMD AQMP. Therefore, a less than significant impact will occur on the SCAQMD AQMP directly, indirectly, or cu- mulatively. b) Violate any air quality standard or contribute sub- stantially to an existing or projected air quality vio- lation? Response: (Source: Air Quality and Greenhouse Gas Study, prepared by MD Acoustics, November 3, 2017; & Memo from MD Acoustics, February 19, 2018) The latest version of CalEEMod was used to estimate the onsite and offsite construction emissions. The emissions incorporate Rule 402 and 403. Rule 402 and 403 (fugitive dust) are not considered mitigation measures as the Project by default is required to incorporate these rules during construction. Regional Construction Emissions The construction emissions for the Project would not exceed the SCAQMD’s daily emission thresholds at the regional level as demonstrated in the table below, and therefore would be considered less than sig- nificant. Regional Significance - Construction Emissions (pounds/day) Activity Pollutant Emissions (pounds/day) VOC NOx CO SO2 PM10 PM2.5 Demolition On-Site2 3.72 38.32 22.30 0.04 2.00 1.81 Off-Site3 0.09 0.26 0.77 0.00 0.18 0.05 Total 3.81 38.58 23.07 0.04 2.18 1.86 Grading On-Site2 2.77 30.67 16.58 0.03 4.11 2.74 Off-Site3 0.16 3.46 1.14 0.01 0.40 0.12 Total 2.94 34.13 17.71 0.04 4.51 2.86 Building Construction On-Site2 2.68 23.39 17.58 0.03 1.50 1.41 Off-Site3 0.53 3.79534.1931 0.02 0.02 1.01 0.30 Total 3.21 23.39 17.60 0.04 2.51 1.71 Paving On-Site2 1.86 15.24 14.66 0.02 0.82 0.76 Off-Site3 0.08 0.05 0.67 0.00 0.17 0.05 Total 1.94 15.29 15.33 0.02 0.99 0.80 Architectural Coating On-Site2 24.02 1.84 1.84 0.00 0.13 0.13 Off-Site3 0.08 0.05 0.62 0.00 0.16 0.04 Total 24.10 1.88 2.46 0.00 0.29 0.17 Total of overlapping phases4 29.26 40.57 35.39 0.07 3.79 2.68 SCAQMD Thresholds 75 100 550 150 150 55 Exceeds Thresholds No No No No No No 4.1.v Packet Pg. 254 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 32 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Notes: 1 Source: CalEEMod Version 2016.3.2 2 On-site emissions from equipment operated on-site that is not operated on public roads. 3 Off-site emissions from equipment operated on public roads. 4 Construction, architectural coatings, and paving phases may overlap. Localized Construction Emissions The data provided in the table below shows that none of the analyzed criteria pollutants would exceed the local emissions thresholds at the nearest sensitive receptors. Therefore, a less than significant local air quality impact would occur from the construction of the proposed Project. Localized Significance -- Construction Phase On-Site Pollutant Emissions (pounds/day)1 NOx CO PM10 PM2.5 Demolition 38.32 22.30 2.00 1.81 Grading 30.67 16.58 4.11 2.74 Building Construction 23.39 17.58 1.50 1.41 Paving 15.24 14.66 0.82 0.76 Architectural Coating 1.84 1.84 0.13 0.13 SCAQMD Threshold for 25 meters (82 feet) or less2 234 1,100 7 4 Exceeds Threshold? No No No No Notes: 1 Source: Calculated from CalEEMod and SCAQMD’s Mass Rate Look-up Tables for two acres in Hemet/San Jacinto Val- ley Source-Receptor Area (SRA-28). The Project will disturb a maximum of 3 acres per day. 2 The nearest sensitive receptors are located to the west and north of the Project site, however, according to LST methodology, any receptor located closer than 25 meters should be based on the 25-meter threshold. Operational Air Quality Emissions Impact The operations-related criteria air quality impacts created by the proposed Project have been analyzed through the use of CalEEMod model. The operating emissions were based on the year 2020, which is the anticipated opening year for the Project. The summer and winter emissions created by the proposed Project’s long-term operations were calculated and the highest emissions from either summer or winter are summarized in the table below. Regional Significance – Unmitigated Operational Emissions (lbs/day) Activity Pollutant Emissions (pounds/day)1 VOC NOx CO SO2 PM10 PM2.5 Area Sources2 1.12 0.00 0.03 0.00 0.00 0.00 Energy Usage3 0.04 0.36 0.30 0.00 0.03 0.03 Mobile Sources4 7.61 47.38 48.58 0.02 9.76 2.71 Total Emissions 8.77 47.73 48.91 0.02 9.78 2.74 SCAQMD Thresholds 55 55 550 150 150 55 Exceeds Threshold? No No No No No No Notes: 1 Source: CalEEMod Version 2016.3.2 2 Area sources consist of emissions from consumer products, architectural coatings, and landscaping equipment. 3 Energy usage consists of emissions from on-site natural gas usage. 4 Mobile sources consist of emissions from vehicles and road dust. 4.1.v Packet Pg. 255 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 33 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The table above provides the Project's unmitigated operational emissions. The table above shows that the Project does not exceed the SCAQMD daily emission threshold and regional operational emissions are considered to be less than significant. Localized Operational Emissions The table below shows the calculated emissions for the proposed operational activities compared with appropriate LSTs. The LST analysis only includes on-site sources; however, the CalEEMod software outputs do not separate on-site and off-site emissions for mobile sources. For a worst-case scenario as- sessment, the emissions shown in the table below include all on-site Project-related stationary sources and 10% of the project-related new mobile sources. This percentage is an estimate of the amount of pro- ject-related new vehicle traffic that will occur on-site. Localized Significance – Operation Emissions On-Site Emission Source On-Site Pollutant Emissions (pounds/day)1 NOx CO PM10 PM2.5 Area Sources2 0.00 0.03 0.00 0.00 Energy Usage3 0.36 0.30 0.03 0.03 On-Site Vehicle Emissions4 4.74 4.86 0.98 0.27 Total Emissions 5.10 5.19 1.00 0.30 SCAQMD Threshold for 25 meters (82 feet)5 371 1,965 4 2 Exceeds Threshold? No No No No Notes: 1 Source: Calculated from CalEEMod and SCAQMD’s Mass Rate Look-up Tables for five acres in Hemet/San Jacinto Valley Source-Receptor Area (SRA-28). 2 Area sources consist of emissions from consumer products, architectural coatings, and landscaping equipment. 3 Energy usage consists of emissions from the generation of electricity and on-site natural gas usage. 4 On-site vehicular emissions based on 1/10 of the gross vehicular emissions and road dust. 5 The nearest sensitive receptors are located adjacent to the west and north of the Project site, however, according to LST methodology, any receptor located closer than 25 meters should be based on the 25-meter threshold. 2 2 The table above indicates that the local operational emission would not exceed the LST thresholds at the nearest sensitive receptors, located adjacent to the Project. Furthermore, the Project includes the con- struction and operation of a convenience market with 16 fuel pumps. The fuel pump-portion of the Project will be permitted by SCAQMD and fuel-related emissions will be regulated by the SCAQMD Rule 461 and be required to obtain a Permit to Operate. Gasoline dispensing facilities are required to use Phase I/II EVR (enhanced vapor recovery) systems. Phase II EVR have an average efficiency of 95.1 percent and Phase I EVR have an average efficiency of 98 percent. Therefore, the potential for fugitive VOC or TAC emissions from the gasoline pumps is negligible. As such, the Project will not be a source of toxic air con- taminants or fugitive VOC emissions and sensitive receptors (located as close as approximately 300+ feet from the proposed gasoline fueling pumps) would not be exposed to toxic sources of air pollution. There- fore, the Project will not result in significant Localized Operational emissions. CO Hot Spot Emissions The SCAQMD recommends that a local CO hot spot analysis be conducted if the intersection meets one of the following criteria: 1) the intersection is at level of service (LOS) D or worse and where the Project increases the volume to capacity ratio by 2 percent, or 2) the Project decrease at an intersection from C to D. Micro-scale air quality emissions have traditionally been analyzed in environmental documents where the air basin was a non-attainment area for CO. However, the SCAQMD has demonstrated in the CO at- tainment re-designation request to EPA that there are no “hot spots” anywhere in the air basin, even at intersections with much higher volumes, much worse congestion, and much higher background CO levels 4.1.v Packet Pg. 256 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 34 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact than anywhere in Riverside County. If the worst-case intersections in the air basin have no “hot spot” po- tential, any local impacts will be below thresholds and less than significant. The Project would generate a maximum of 4,478 trips per day. The 1992 Federal Attainment Plan for Carbon Monoxide (1992 CO Plan) showed that an intersection which has a daily traffic volume of approx- imately 100,000 vehicles per day would not violate the CO standard. The volume of traffic at Project buildout with cumulative projects would be well below 100,000 vehicles and below the necessary volume to even get close to causing a violation of the CO standard. Therefore, no CO “hot spot” modeling was performed, and no significant long-term air quality impact is anticipated to local air quality with the on-going use of the proposed project. c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard (including re- leasing emissions which exceed quantitative thresholds for ozone precursors)? Response: (Source: Air Quality and Greenhouse Gas Study, prepared by MD Acoustics, November 3, 2017; & Memo from MD Acoustics, February 19, 2018) Cumulative projects include local development as well as general growth within the Project area. Howev- er, as with most development, the greatest source of emissions is from mobile sources, which travel well out of the local area. Therefore, from an air quality standpoint, the cumulative analysis would extend be- yond any local projects and when wind patterns are considered, would cover an even larger area. Ac- cordingly, the cumulative analysis for the project’s air quality must be generic by nature. The Project area is out of attainment for both ozone and PM10 particulate matter. Construction and op- eration of cumulative projects will further degrade the local air quality, as well as the air quality of the South Coast Air Basin. The greatest cumulative impact on the quality of regional air cell will be the in- cremental addition of pollutants mainly from increased traffic from residential, commercial, and industrial development and the use of heavy equipment and trucks associated with the construction of these pro- jects. Air quality will be temporarily degraded during construction activities that occur separately or simul- taneously. However, in accordance with the SCAQMD methodology, projects that do not exceed the SCAQMD criteria or can be mitigated to less than criteria levels are not significant and do not add to the overall cumulative impact. The Project does not exceed any of the thresholds of significance and there- fore is considered less than significant. d) Expose sensitive receptors to substantial pollutant concentrations? Response: (Source: Air Quality and Greenhouse Gas Study, prepared by MD Acoustics, November 3, 2017; & Memo from MD Acoustics, February 19, 2018) As noted in Response 3 b) above, the operational emission rates would not exceed the LST thresholds for the Project. Therefore, the Project will have a less than significant impact on Localized Operational emissions. Construction-Related Toxic Air Contaminant Impact The greatest potential for toxic air contaminant emissions would be related to diesel particulate emissions associated with heavy equipment operations during construction of the proposed Project. The Office of Environmental Health Hazard Assessment (OEHHA) has issued the Air Toxic Hot Spots Program Risk Assessment Guidelines and Guidance Manual for the Preparation of Health Risk Assessments, February 2015 to provide a description of the algorithms, recommended exposure variates, cancer, and noncancer health values, and the air modeling protocols needed to perform a health risk assessment (HRA) under the Air Toxics Hot Spots Information and Assessment Act of 1987. All substances that are evaluated for cancer risk and/or noncancer acute, 8-hour, and chronic health impacts. In addition, identify any multi- pathway substances that present a cancer risk or chronic noncancer hazard via non-inhalation routes of exposure. 4.1.v Packet Pg. 257 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 35 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Given the relatively limited number of heavy-duty construction equipment and construction schedule, the proposed Project would not result in a long-term substantial source of toxic air containment emissions and corresponding individual cancer risk. Furthermore, construction-based particulate matter (PM) emis- sions (including diesel exhaust emissions) do not exceed any local or regional thresholds. Therefore, no significant short-term toxic air contaminant impacts would occur during construction of the pro- posed Project. Therefore, no significant short-term toxic air containment impacts would occur dur- ing construction of the Project. e) Create objectionable odors affecting a substantial number of people? Response: (Source: Air Quality and Greenhouse Gas Study, prepared by MD Acoustics, November 3, 2017; & Memo from MD Acoustics, February 19, 2018) Construction Potential sources that may emit odors during construction activities include the application of materials such as asphalt pavement. The objectionable odors that may be produced during the construction pro- cess are of short-term in nature and the odor emissions are expected cease upon the drying or hardening of the odor-producing materials. Diesel exhaust and VOCs would be emitted during construction of the Project, which are objectionable to some; however, emissions would disperse rapidly from the Project site and therefore should not reach an objectionable level at the nearest sensitive receptors. Due to the short-term nature and limited amounts of odor-producing materials being utilized, no significant impact related to odors would occur during construction of the proposed Project. Operational The fuel pump-portion of the Project will be permitted by SCAQMD and fuel-related emissions will be reg- ulated by the SCAQMD Rule 461, requiring a “Permit to Operate” from SCAQMD. Gasoline dispensing facilities are required to use Phase I/II EVR (enhanced vapor recovery) systems. Phase II EVR have an average efficiency of 95.1 percent and Phase I EVR have an average efficiency of 98 percent. Therefore, the potential for fugitive VOC or TAC emissions from the gasoline pumps is negligible. As such, the Pro- ject will not be a source of toxic air contaminants, fugitive VOC emissions, or odors and sensitive recep- tors (located as close as approximately 245 feet from the proposed gasoline fueling pumps) would not be exposed to toxic sources of air pollution and a less than significant impact related to odors will occur under the operation of the proposed Project. IV. BIOLOGICAL RESOURCES – Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species iden- tified as a candidate, sensitive, or special status species in local or regional plans, policies, or regu- lations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element – Figure RM-1 – Open Space Resources; RM-3 – Vegetation Communities; General Plan EIR; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.4-1 – Vegetation Communities; Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria; Riverside County Multiple Species Habitat Conservation Plan (MSHCP); Development Code Chapter 17.520 – Natural Resource Conservation; & General Biological Report, prepared by Glenn Lukos Associates, Inc., April 2018 ) Glenn Lukos Associates, Inc. (GLA) surveyed the 9.46-acre site on January 1, February 16, and March 16 and 19, 2018. The surveys included habitat assessments and focused surveys for resources covered under the MSHCP survey requirements, including the burrowing owl (Athene cunicularia) and listed fairy shrimp. Plant Communities Approximately three-fourths of the site contains a plant community dominated by non-native ruderal spe- cies and non-native grasses, including London rocket (Sisymbrium irio), red-stemmed filaree (Erodium cicutarium), cheeseweed (Malva parviflora), Russian thistle (Salsola tragus), bur-clover (Medicago polymorpha), shepherd’s purse (Capsella bursa-pastoris), curly dock (Rumex crispus), lamb’s quarters 4.1.v Packet Pg. 258 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 36 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact (Chenopodium album), red brome (Bromus madritensis rubens), and foxtail barley (Hordeum murinum). The site supports some native forbs, including common fiddleneck (Amsinckia menziesii), adobe popcorn flower (Plagiobothrys acanthocarpus), and western ragweed (Ambrosia psilostachya). The remaining fourth of the site contains a U-Haul rental and storage facility, which consists predominant- ly of a gravel covered lot. The lot does contain a cluster of three Mexican fan palms (Washingtonia ro- busta) but does not contain any other trees or support shrub cover. The Project site is not located within the Western Riverside County MSHCP Narrow Endemic Plant Spe- cies Survey Area (NEPSSA) or the Criteria Area Plant Species Survey Area (CAPSSA). As such, fo- cused plant surveys are not required for NEPSSA and CAPSSA species, and the Project would not have any conservation/mitigation requirements for any NEPSSA or CAPSSA species. Small numbers of a special-status plant (smooth tarplant, Centromadia pungens ssp. laevis) was detected at the site; howev- er, since the site is not within the CAPSSA, the Project is not required to avoid the tarplant, is not required to mitigate the loss of smooth tarplant, and does not require a Determination of Biologically Equivalent or Superior Preservation (DBESP). Impacts to smooth tarplant would be less than significant. Wildlife Several bird species were observed foraging at the site, including house finch (Haemorhous mexicanus), Cassin’s kingbirds (Tyrannus vociferans), Say’s phoebe (Sayornis saya), and white-crowned sparrow (Zonotrichia leucophrys). Other bird species were observed flying near or over the site, including the common raven (Corvus corax), red-tailed hawk (Buteo jamaicensis), and rock pigeon (Columba livia). The site is located within the MSHCP survey area for the burrowing owl (Athene cunicularia). Habitat for burrowing owl was assessed over the entire Project site in accordance with MSHCP “Burrowing Owl Sur- vey Instructions”. The assessment included looking for burrowing owl burrows, whitewash, pellets, animal remains, and other burrowing owl indicators. The site provides suitable habitat for the burrowing owl, in- cluding a few suitable burrows. Focused burrowing owls were performed for the site; however, no bur- rowing owls or diagnostic sign were detected at the site. As such, the burrowing owl was determined to be absent from the site and based on current conditions, the Project would not impact burrowing owls. However, because the site has the potential to support burrowing owls in the future, the MSHCP requires that pre-construction surveys be conducted prior to disturbance of the site. Therefore, MM BIO 1 is rec- ommended for compliance with the MSHCP burrowing owl requirements. The Project will have a less than significant impact with mitigation, directly, indirectly, and cumulative- ly, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Ser- vice. MM BIO 1: A pre-construction burrowing owl breeding bird survey following the recommended guide- lines of the MSHCP will be required no more than 30 days prior to disturbance (demoli- tion, grading, construction) of the site. If burrowing owls are detected at the site, they will be relocated either passively or actively from the site outside of the nesting season with the approval of the California Department of Fish and Wildlife (CDFW) and the Regional Conservation Authority (RCA). Occupied burrows will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non- invasive methods that either (a) the adult birds have not begun egg-laying and incubation, or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival. If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. For the burrowing owl, the recommended distance is a minimum of 160 feet. b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community iden- tified in local or regional plans, policies, regula- tions or by the California Department of Fish and 4.1.v Packet Pg. 259 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 37 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Game or U.S. Fish and Wildlife Service? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element – Figure RM-1 – Open Space Resources; RM-3 – Vegetation Communities; General Plan EIR; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.4-1 – Vegetation Communities; Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria; Riverside County Multiple Species Habitat Conservation Plan (MSHCP); Development Code Chapter 17.520 – Natural Resource Conservation; & General Biological Report, prepared by Glenn Lukos Associates, Inc., April 2018) Riparian/Riverine Areas Riparian/Riverine Areas are defined by the MSHCP as “lands which contain Habitat dominated by tress [sic], shrubs, persistent emergents, or emergent mosses and lichens, which occur close to or which de- pend upon soil moisture from a nearby fresh water source; or areas with fresh water flow during all or a portion of the year”. The site is almost flat and has no riparian or riverine areas. California Department of Fish and Wildlife The California Department of Fish and Wildlife (CDFW), through provisions of the State of California Ad- ministrative Code, is empowered to issue agreements for any alteration of a river, stream or lake where fish or wildlife resources may adversely be affected. Streams (and rivers) are defined by the presence of a channel bed and banks, and at least an intermittent flow of water. Lateral limits of jurisdiction are not clearly defined, but generally include any riparian resources associated with a stream or lake, CDFW reg- ulates wetland areas only to the extent that those wetlands are part of a river, stream or lake as defined by CDFW. The Project site does not contain any MSHCP riparian/riverine areas or CDFW jurisdiction, including ri- parian habitat. Therefore, the Project will have no impact, directly, indirectly, or cumulatively, to riparian or riverine areas. c) Have a substantial adverse effect on federally pro- tected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element – Figure RM-1 – Open Space Resources; RM-3 – Vegetation Communities; General Plan EIR; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.4-1 – Vegetation Communities; Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria; Riverside County Multiple Species Habitat Conservation Plan (MSHCP); Development Code Chapter 17.520 – Natural Resource Conservation; & General Biological Report, prepared by Glenn Lukos Associates, Inc., April 2018) Vernal Pools Vernal pools are defined by the MSHCP as “seasonal wetlands that occur in depression areas that have wetlands indicators of all three parameters (soils, vegetation, and hydrology) during the wetter portion of the growing season but normally lack wetlands indicators of hydrology and/or vegetation during the drier portion of the growing season. Evidence concerning the persistence of an area's wetness can be ob- tained from its history, vegetation, soils, and drainage characteristics of the use to which it has been sub- jected, and weather and hydrologic records” (Riverside County Transportation and Land Management Agency). GLA biologists monitored the site during the 2018 rainy season to observe for any ponding that might suggest the presence of a vernal pool. The site is occasionally disced for weed control, which obscures any signs of past inundation. Limited areas of short-duration inundation were observed at the site, but these areas did not support wetland vegetation communities’ characteristic of vernal pools. Listed Fairy Shrimp The MSHCP requires habitat assessments for listed fairy shrimp, including the vernal pool fairy shrimp (Branchinecta lynchi) and the Riverside fairy shrimp (Streptocephalus woottoni), and focused surveys where suitable habitat is present. The vernal pool fairy shrimp is found in grasslands in ponded areas such as vernal pools, cattle watering holes, basins, etc. Fairy shrimp are confined to temporary pools that fill in spring and evaporate by late 4.1.v Packet Pg. 260 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 38 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact spring to early summer. In southern California, this species is found primarily in the interior of western Riverside County, central Santa Barbara County, and eastern Orange County and more recently in Los Angeles County. Since most pools preferred by fairy shrimp are found in flat areas, many have been lost to agricultural activities and residential development. The limited extent of available habitat, plus the on- going loss has resulted in the vernal pool fairy shrimp being listed as threatened by the USFWS. The Riverside fairy shrimp is known only from ephemeral pools in farmlands and similar open, flat terrain. Fairy shrimp are confined to temporary pools that fill in spring and evaporate by late spring to early sum- mer. The Riverside fairy shrimp is known only from southern Orange and western Riverside and San Di- ego Counties. Ongoing farming and development in these areas have resulted in the loss and degrada- tion of these habitats. Therefore, the USFWS has listed the Riverside fairy shrimp as endangered. Pursuant to the USFWS protocol for surveys of listed branchiopods, GLA biologists performed a wet sea- son fairy shrimp survey during the 2017-2018 wet season. GLA monitoring the site following rainfall events to determine if suitable ponding was present with the potential to support fairy shrimp. Pursuant to USFWS protocol, the sampling of pools is required seven days following the initial inundation, and every seven days thereafter until features are no longer ponded. The site did not exhibit ponding seven days after rain events, including after events resulting in more than one inch of rainfall, and therefore sampling was not required for the site. Based on the lack of suitable ponding, it was determined that the site does not have the potential to support listed fairy shrimp. Army Corps of Engineers The Corps regulates discharges of dredged or fill material into waters of the United States. These water- sheds include wetlands and non-wetland bodies of water that meet specific criteria. The lateral limit of Corps jurisdiction extends to the Ordinary High-Water Mark (OHWM) and to any wetland areas extending beyond the OHWM; thus, the maximum jurisdictional area is represented by the OHWM or wetland limit, whichever is greater. Corps regulatory jurisdiction pursuant to Section 404 of the Clean Water Act is founded on a connection or nexus between the water body in question and interstate (waterway) commerce. This connection may be direct, through a tributary system linking a stream channel with traditional navigable waters used in interstate or foreign commerce, or may be indirect, through a nexus identified in the Corps regulations. The Project site does not contain any waters of the United States, including wetlands, that would be sub- ject to Corps jurisdiction pursuant Section 404 of the Clean Water Act. Regional Water Quality Control Board The Corps has delegated the authority for use of 404 permits to each individual state. The use of a 404 permit in California is regulated by the State Water Resources Control Board (SWRCB) under Section 401 of the Clean Water Act regulations. The Board has authority to issue a 401 permit that allows the use of a 404 permit in the state, with the authority in the state being vested in regional offices known as Re- gional Water Quality Control Boards (RWQCB). Under the Porter-Cologne Act of 2003, the SWRCB has extended its responsibilities to include impacts to water quality from non-point source pollution. In addition, the SWRCB has the responsibility to require that projects address groundwater and water quality issues, which would be evaluated as part of the ge- otechnical and hydrology studies. Their authority extends to all waters of the State (of California). The Project site does not contain any waters that would come under the jurisdiction of the Santa Ana RWQCB or provide any Beneficial Uses (BUs) that might come under the RWQCB protection. Therefore, the Project will have no impact, directly, indirectly, and cumulatively on federally protected wetlands. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with an established native resident or migratory 4.1.v Packet Pg. 261 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 39 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact wildlife corridors, or impede the use of native wild- life nursery sites? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element – Figure RM-1 – Open Space Resources; RM-3 – Vegetation Communities; General Plan EIR; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.4-1 – Vegetation Communities; Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria; Riverside County Multiple Species Habitat Conservation Plan (MSHCP); Development Code Chapter 17.520 – Natural Resource Conservation; & General Biological Report, prepared by Glenn Lukos Associates, Inc., April 2018) Habitat Fragmentation and Wildlife Movement Wildlife movement and the fragmentation of wildlife habitat are recognized as critical issues that must be considered in assessing impacts to wildlife. In summary, habitat fragmentation is the division or breaking up of larger habitat areas into smaller areas that may or may not be capable of independently sustaining wildlife and plant populations. Wildlife movement (more properly recognized as species movement) is the temporal movement of species along diverse types of corridors. Wildlife corridors are especially important for connecting fragmented wildlife habitat areas. The Project site is in an area already fragmented and is surrounded by paved roads, commercial, resi- dential and agricultural development There are few native habitats left in the nearby surrounding areas and impacts to wildlife movement and habitat fragmentation have already occurred. Therefore, the Project will have less than significant impact on habitat fragmentation and wildlife movement. Raptors, Migratory Birds, and Habitat Most of the raptor species (eagles, hawks, falcons, and owls) are experiencing population declines be- cause of habitat loss. Some, such as the peregrine falcon, have also experienced population losses as a result of environmental toxins affecting reproductive success, animals destroyed as pests or collected for falconry, and other direct impacts on individuals. Only a few species, such as the red-tailed hawk and barn owl, have expanded their range despite or a result of human modifications to the environment. As a group, raptors are of concern to state and federal agencies. Raptors and all migratory bird species, whether listed or not, also receive protection under the Migratory Bird Treaty Act (MBTA) of 1918. The MBTA prohibits individuals to kill, take, possess or sell any migratory bird, bird parts (including nests and eggs) except per regulations prescribed by the Secretary of the Inte- rior Department (16 U. S. Code 703). Additional protection is provided to all bald and golden eagles under the Bald and Golden Eagle Protec- tion Act of 1940, as amended. State protection is extended to all birds of prey by the CDFW Code, Sec- tion 2503.5. No take is allowed under these provisions except through the approval of the agencies or their designated representatives. The Project site has a limited potential to support nesting birds. With the exception of the three palm trees and an additional ornamental tree located within the U-Haul facility lot, the site does not contain any trees or shrubs. The remainder of the site contains weedy groundcover with some potential to support common ground-nesting birds. This context of potential nesting habitat does not constitute a wildlife nursery site, and the loss of nesting habitat would be considered a less than significant impact. Although the loss of nesting habitat would be less than significant, impacts to active bird nests are still prohibited by the MBTA and the California Fish and Game Code, and therefore a mitigation measure (MM BIO 2) is recommended to prevent impacts to active bird nests. With Mitigation Measure MM BIO-2 the Project will have a less than significant impact with mitigation, directly, indirectly, or cumulatively on the movement of any native resident or migratory fish or wildlife species or with an established native resident or migratory wildlife corridors or impede the use of native wildlife nursery sites. MM BIO 2: Demolition, grading and/or construction activities shall occur outside of the nesting sea- son (February 1 through August 31), if feasible. If the nesting season cannot be avoided, then a breeding bird survey will be required no more than 7 days prior to the disturbance 4.1.v Packet Pg. 262 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 40 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact of potential nesting habitat to determine if nesting is occurring. Nests will not be disturbed unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation, or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival. If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. e) Conflict with any local policies or ordinances pro- tecting biological resources, such as a tree preser- vation policy or ordinance? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element – Figure RM-1 – Open Space Resources; RM-3 – Vegetation Communities; General Plan EIR; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.4-1 – Vegetation Communities; Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria; Riverside County Multiple Species Habitat Conservation Plan (MSHCP); Development Code Chapter 17.520 – Natural Resource Conservation; & General Biological Report, prepared by Glenn Lukos Associates, Inc., April 2018) The Project will not conflict with any local policies or ordinances protecting biological resources; therefore it will have no impact, directly, indirectly, or cumulatively. f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conserva- tion Plan, or another approved local, regional, or state habitat conservation plan? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element – Figure RM-1 – Open Space Resources; RM-3 – Vegetation Communities; General Plan EIR; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.4-1 – Vegetation Communities; Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria; Riverside County Multiple Species Habitat Conservation Plan (MSHCP); Development Code Chapter 17.520 – Natural Resource Conservation; Revised Biological Survey – Burrowing Owl and Narrow Endemic Species, prepared by Salem Engineering Group, Inc., April 3, 2017; Municipal Code Chapter 58 – Planning and Development; Article IV – Habitat Con- servation; Municipal Code Chapter 31 – Multiple Species Habitat Conservation Plan Mitigation Fee; & General Biological Report, prepared by Glenn Lukos Associates, Inc., April 2018) The subject property is located within the boundaries of the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) and the Stephens’ Kangaroo Rat Habitat Conservation Plan (SKRHCP). As such, the Project will be conditioned for the payment of the MSHCP Development Mitiga- tion Fee, which will mitigate potential impacts to MSHCP covered species, and the SKR fee. The Project site is not within the MSHCP Criteria Area, or adjacent to an MSHCP-designated Conserva- tion Area, or within an SKRHCP Core Reserve, so no additional mitigation measures or provisions are required. The Project will not conflict with the provisions of any Habitat Conservation Plans or Natural Community Conservation Plans. The Project will have a less than significant impact, directly, indirectly, and cumulatively, on an adopted Habitat Conservation Plan, Natural Community Conservation Plan or other approved local, regional, or state habitat conservation plan. V. CULTURAL RESOURCES – Would the project: a) Cause a substantial adverse change in the signifi- cance of a historical resource as defined in § 15064.5? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Re- sources; General Plan FEIR; Figure 5.5-1 – Existing Cultural Resources; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.1-1 – Existing Cultural Resources; Development Code Chapter 17.500 – Archaeological and Paleontological Protec- tion; Chapter 17.510 – Historic Preservation; & Report of Findings From a Record Search Conducted for Assessor’s Parcel Number 439-120-042, prepared by SRS, October 5, 2017) The results of an in-depth archaeological and historical records search for the Project area did not yield evidence of prehistoric or historic properties within the Project area. However, forty-eight (48) cultural resources have been identified and recorded within a one-mile radius of the Project area, many of these tribal in nature. Therefore, archaeological monitoring by a Riverside County Certified archaeologist and a Native American Tribal Monitor is strongly recommended during all earth-moving activities (see MM CR-1 4.1.v Packet Pg. 263 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 41 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact and MM CR-2). The existing structures on the property were prior residential units that have been used as office and storage space for the U-Haul business currently on the site. Although these structures are over 50-years of age, they have been heavily altered and are in a poor state of repair. In their current state, these struc- tures would not qualify as significant resources, as they would not be regarded as the work of a master architect or possess high artistic value. As well, these structures were not recognized on the County In- ventory. The Project meets the City’s resource management goals and the Project will have no effect on the historic downtown core. The Project will have a less than significant impact with mitigation, directly, indirectly, and cumulative- ly on any historical resource or archeological resource as defined in § 15064.5, or on any Tribal Cultural Resource as defined in Public Resources Code Section 21074. MM CR 1: An Archaeological Mitigation and Monitoring Plan (AMMP) shall be developed in coordi- nation with the Soboba Band of Luiseño Indians and the City of San Jacinto prior to initi- ating demolition and/or grading. The plan shall involve monitoring of all ground disturbing activities by a Riverside County qualified archaeologist and a Native American Monitor. The plan shall include a protocol for the mitigation and significance testing of inadvertent archaeological finds. MM CR-2: Prior to demolition permit and/or grading permit issuance the developer shall enter into a Treatment and Disposition Agreement (TDA) with the Soboba Band of Luiseño Indians to address treatment and disposition of archaeological/cultural resources and human re- mains associated with Soboba Band of Luiseño Indians that may be uncovered or other- wise discovered during ground disturbing activities related to the Project and provide the City with a copy of the executed agreement. The TDA will establish provisions for tribal monitors. b) Cause a substantial adverse change in the signifi- cance of an archaeological resource pursuant to § 15064.5? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Re- sources; General Plan FEIR; Figure 5.5-1 – Existing Cultural Resources; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.1-1 – Existing Cultural Resources; Development Code Chapter 17.500 – Archaeological and Paleontological Protec- tion; Chapter 17.510 – Historic Preservation; & Report of Findings From a Record Search Conducted for Assessor’s Parcel Number 439-120-042, prepared by SRS, October 5, 2017) See response V a) above. c) Directly or indirectly destroy a unique paleontolog- ical resource or site or unique geologic feature? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Re- sources; General Plan FEIR; Figure 5.5-1 – Existing Cultural Resources; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.1-1 – Existing Cultural Resources; Development Code Chapter 17.500 – Archaeological and Paleontological Protec- tion; Chapter 17.510 – Historic Preservation; & Report of Findings From a Record Search Conducted for Assessor’s Parcel Number 439-120-042, prepared by SRS, October 5, 2017) The Records Search prepared for this site did not find any prehistoric sites identified on nearby proper- ties. Nevertheless, grading could impact unknown resources and the site is located in an area of High Sensitivity (High B) which is based on the occurrence of fossils at a specified depth below the surface. The category High B indicates that fossils are likely to be encountered at or below four feet of depth and may be impacted during excavation by construction activities. Therefore, the Project as currently de- signed would have a less than significant impact with mitigation, directly, indirectly, and cumulatively. MM PALEO -1: If paleontological resources are encountered during demolition and/or grading, ground disturbance activities shall cease so a qualified paleontological monitor can evaluate any paleontological resources exposed during the grading activity. If paleontological re- sources are encountered, the developer shall provide adequate funding to collect, curate and report on these resources to ensure the values inherent in the resources are ade- 4.1.v Packet Pg. 264 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 42 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact quately characterized and preserved. Collected specimens will be sent to the appropriate authorities for collection. d) Disturb any human remains, including those in- terred outside of formally dedicated cemeteries (see Public Resources Code, Ch. 1.75, §5097.98, and Health and Safety Code § 7050.5(b))? Response: (Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Re- sources; General Plan FEIR; Figure 5.5-1 – Existing Cultural Resources; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.1-1 – Existing Cultural Resources; Development Code Chapter 17.500 – Archaeological and Paleontological Protec- tion; Chapter 17.510 – Historic Preservation; & Report of Findings From a Record Search Conducted for Assessor’s Parcel Number 439-120-042, prepared by SRS, October 5, 2017) No cemeteries or human remains are known to occur on-site and it is unlikely that human remains will be uncovered during Project development. Implementation of mitigation measure MM CR 3 will assure that impacts will be less than significant with mitigation, directly, indirectly, or cumulatively. MM CR-3: In the event of the discovery of human remains, the County coroner shall be immediately notified. If human remains of Native American origin are discovered during ground- disturbing activities, the applicant shall comply with the state relating to the disposition of Native American burials that fall within the jurisdiction of the NAHC (PRC Section 5097). According to California Health and Safety Code, six or more human burials at one loca- tion constitute a cemetery (Section 8100), and disturbance of Native American cemeter- ies is a felony (Section 7052). Section 7050.5 requires that excavation is stopped near discovered human remains until the coroner can determine whether the remains are those of a Native American. If the remains are determined to be Native American, the California Native American Heritage Commission, Morongo Band of Mission Indians and the Soboba Band of Luiseño Indians shall be notified, and appropriate measures provid- ed by State law shall be implemented to determine the most likely living descendant(s). Disposition of the remains shall be overseen by the most likely living descendants to de- termine the most appropriate means of treating the human remains and any associated grave artifacts. VI. GEOLOGY AND SOILS – Would the project: a) Expose people or structures to potential substan- tial adverse effects, including the risk of loss, injury or death involving: i) Rupture of a known earthquake fault, as delineat- ed on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Ge- ology Special Publication 42. Response: (Source: General Plan as amended October 19, 2012; Public Safety Element; Figure PS-1 – Geologic & Seismic Hazards; General Plan FEIR; Figure 5.6-1 – Seismic Hazards; General Plan EIR Addendum August 2012; SJMC Chapter 15.24 – Earthquake Hazard Reduction Code; SJMC Chapter 16.28 – Soils Report; & Geotechnical Investigation Proposed Commercial De- velopment Commonwealth Avenue at San Jacinto Avenue, prepared by Sladden Engineering, November 2, 2017) The Peninsular Range has historically been a province of relatively high seismic activity. The nearest faults to the Project site are associated with the San Jacinto-San Jacinto Valley Fault system located less than 1.2 miles from the site. The Project site is not located within any State of California or County of Riverside designated fault zone. The Project is likely to experience strong seismic shaking during the design life of the proposed Project. In general, the intensity of ground shaking will depend on several fac- tors including the distance to the earthquake focus, the earthquake magnitude, the response characteris- tics of the underlying materials, and the quality and type of construction. Surface Rupture Surface rupture is expected to occur along preexisting, known active fault traces. However, a surface rupture could potentially splay or step from known active faults or rupture along unidentified traces. 4.1.v Packet Pg. 265 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 43 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Based on Sladden’s review of Jennings (1994), CDMG (1980), Dibblee (2003) and RCPR (2017) known faults are not mapped on or projecting toward the site. In addition, no signs of active surface faulting were observed during their review of non-stereo digitized photographs of the site and site vicinity (Google, 2017). Finally, no signs of active surface fault rupture or secondary seismic effects (lateral spreading, lurching etc.) were identified on-site during their field investigation. Therefore, it is their opinion that risks associated with primary surface ground rupture should be considered "low". Ground Shaking The site has been subjected to past ground shaking by faults that traverse through the region. Strong seismic shaking from nearby active faults is expected to produce strong seismic shaking during the de- sign life of the proposed Project. A probabilistic approach was employed to the estimate the peak ground acceleration (aim.) that could be experienced at the site. Based on the USGS Unified Hazard Tool (USGS, 2017c) and shear wave velocity (Vs30) of 259 m/s, the site could be subjected to ground motions on the order of 0.62g. The peak ground acceleration at the site is judged to have a 475-year return peri- od and a 10 percent chance of exceedance in 50 years. Based on this analysis, compliance with an approved Geotechnical report, California Building Code and SJMC Chapters 15.24 – Earthquake Hazard Reduction Code and Chapter 16.28 – Soils Report will en- sure that risks associated with primary surface ground rupture should be considered "low". Therefore, the potential hazards associated with fault rupture and ground shaking are considered less than significant with mitigation, directly, indirectly, and cumulatively. MM GEO-1: The recommendations of the Geotechnical Report prepared by Sladden Engineering, shall be followed through site preparation and building construction. A Geotechnical En- gineer shall be present at the site during site demolition and preparation to observe site clearing/demolition, preparation of exposed surface after clearing, and placement, treat- ment, and compaction of fill material. ii) Strong seismic ground shaking? Response: (Source: General Plan as amended October 19, 2012; Public Safety Element; Figure PS-1 – Geologic & Seismic Hazards; General Plan FEIR; Figure 5.6-1 – Seismic Hazards; General Plan EIR Addendum August 2012; SJMC Chapter 15.24 – Earthquake Hazard Reduction Code; SJMC Chapter 16.28 – Soils Report; & Geotechnical Investigation Proposed Commercial De- velopment Commonwealth Avenue at San Jacinto Avenue, prepared by Sladden Engineering, November 2, 2017) See response VI a) i) above. iii) Seismic-related ground failure, including liquefac- tion? Response: (Source: General Plan as amended October 19, 2012; Public Safety Element; Figure PS-1 – Geologic & Seismic Hazards; General Plan FEIR; Figure 5.6-1 – Seismic Hazards; General Plan EIR Addendum August 2012; SJMC Chapter 15.24 – Earthquake Hazard Reduction Code; SJMC Chapter 16.28 – Soils Report; & Geotechnical Investigation Proposed Commercial De- velopment Commonwealth Avenue at San Jacinto Avenue, prepared by Sladden Engineering, November 2, 2017) Liquefaction is the process in which loose, saturated granular soil loses strength because of cyclic load- ing. The strength loss is a result of a decrease in granular sand volume and a positive increase in pore pressures. Generally, liquefaction can occur if all the following conditions apply: liquefaction-susceptible soil, groundwater within a depth of 50- feet or less, and strong seismic shaking. Riverside County reports that the liquefaction potential at this site is “moderate.” However, ground- water data available at CDWR (2017) indicates groundwater depths greater than 50-feet below ground surface (bgs) in the vicinity of the site. Based on the depth to groundwater Sladden’s opinion is that risk associated with liquefaction should be considered “low.” Implementation of existing state and local laws and regulations concerning soil liquefaction and ground failure is required of all projects in the City. As well, implementation of MM GEO-1 will ensure all ge- otechnical issues are addressed. Therefore, impacts related to liquefaction and ground failure would be less than significant with mitigation, directly, indirectly, and cumulatively. iv) Landslides? 4.1.v Packet Pg. 266 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 44 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Response: (Source: General Plan as amended October 19, 2012; Public Safety Element; Figure PS-1 – Geologic & Seismic Hazards; General Plan FEIR; Figure 5.6-1 – Seismic Hazards; General Plan EIR Addendum August 2012; SJMC Chapter 15.24 – Earthquake Hazard Reduction Code; SJMC Chapter 16.28 – Soils Report; & Geotechnical Investigation Proposed Commercial De- velopment Commonwealth Avenue at San Jacinto Avenue, prepared by Sladden Engineering, November 2, 2017) The site is located on the relatively flat ground and not immediately adjacent to any slopes or hillsides. Therefore, impacts related to landsliding and slope failure would be less than significant, directly, indi- rectly, and cumulatively. b) Result in substantial soil erosion or the loss of top- soil? Response: (Source: General Plan as amended October 19, 2012; Public Safety Element; Figure PS-1 – Geologic & Seismic Hazards; General Plan FEIR; Figure 5.6-1 – Seismic Hazards; General Plan EIR Addendum August 2012; SJMC Chapter 15.24 – Earthquake Hazard Reduction Code; SJMC Chapter 16.28 – Soils Report; & Geotechnical Investigation Proposed Commercial De- velopment Commonwealth Avenue at San Jacinto Avenue, prepared by Sladden Engineering, November 2, 2017) Erosion is a large-scale impact caused by human activity and disturbance of surface soil, wind, and wa- ter. Erosion cannot be eliminated altogether, although existing regulations such as the CBC (which in- cludes erosion control measures and best management practices) and NPDES permit requirements can reduce the potential impacts of erosion. No signs of erosion were observed during Sladden’s field inves- tigation conducted on September 7, 2017. The Project does propose to import 5,000 cubic yards of soil. To ensure the imported soils meet all nec- essary geotechnical requirements the imported soil will require additional soils investigation. Adherence to state and local regulations will reduce impacts related to erosion to less than significant with mitigation, directly, indirectly, and cumulatively. MM GEO-2: Submit an updated geotechnical soils reports covering the imported soils to the site, to the Engineering Department for review and approval prior to issuance of a grading per- mit. c) Be located on a geologic unit or soil that is unsta- ble, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefac- tion, or collapse? Response: (Source: General Plan as amended October 19, 2012; Public Safety Element; Figure PS-1 – Geologic & Seismic Hazards; General Plan FEIR; Figure 5.6-1 – Seismic Hazards; General Plan EIR Addendum August 2012; SJMC Chapter 15.24 – Earthquake Hazard Reduction Code; SJMC Chapter 16.28 – Soils Report; & Geotechnical Investigation Proposed Commercial De- velopment Commonwealth Avenue at San Jacinto Avenue, prepared by Sladden Engineering, November 2, 2017) Liquefaction is a process whereby strong earthquake shaking causes sediment layers that are saturated with groundwater to lose strength and behave as a fluid. This sub-surface process can lead to near- surface or surface ground failure that can result in property damage and structural failure. If surface ground failure does occur, it is usually expressed as lateral spreading, flow failures, ground oscillation, and/or general loss of bearing strength. Sand boils (injections of fluidized sediment) can commonly ac- company these different types of failure. See response VI a) iii) above. Collapsible Soils are low-density, silty to very fine-grained, predominantly granular soils containing minute pores and voids. When saturated, these soils undergo a rearrangement of their grains and a loss of ce- mentation, causing substantial, rapid settlement under even relatively light loads. A rise in the groundwa- ter table or an increase in surface water infiltration, combined with the weight of a building or structure, can cause rapid settlement and consequent cracking of foundations and walls. Collapsible soils generally result from rapid deposition close to the source of the sediment where the materials have not been suffi- ciently moistened to form a compact soil. Subsidence is the sinking of the land surface. Evidence of subsidence includes ground cracking and damage to roadways, aqueducts, and structures. Subsidence caused by excessive groundwater pumping is a common occurrence in areas of California where groundwater is pumped for agricultural and munici- 4.1.v Packet Pg. 267 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 45 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact pal wells. Landslides are characterized by steep slopes. Due to the depth of groundwater, hazards resulting from liquefaction is negligible. A thin mantle of fill/disturbed soil was encountered to a depth of approximately three-feet below existing grade. Underly- ing the fill soil and extending to the maximum depth explored, native alluvium was encountered. The site soil consists of interbedded silty sand (SM) and sandy silt (ML). Based on the results of Sladden’s la- boratory testing (EI=69), the materials underlying the site are considered to have a “medium” expansion potential. The expansion potential of the surface soil should be reevaluated after grading. Locally, no fissures or other surficial evidence of subsidence were observed at or near the subject site. However, site-specific effects resulting from long-term regional subsidence was beyond the scope of Sladden’s investigation. Due to the presence of artificial fill soil and the loose conditions of the near-surface soil, remedial grading including over-excavation and re-compaction is recommended. Through adherence to state and local seismic and structural regulations (i.e., California Seismic Hazards Mapping Act, California Building Code, San Jacinto Municipal Code, NPDES Permit Requirements) and MM GEO 1 and MM GEO 2 the impacts of unstable soils resulting in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse will be less than significant with mitigation, directly, indirectly, and cumulatively. d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code, creating substantial risks to life or property? Response: (Source: General Plan as amended October 19, 2012; Public Safety Element; Figure PS-1 – Geologic & Seismic Hazards; General Plan FEIR; Figure 5.6-1 – Seismic Hazards; General Plan EIR Addendum August 2012; SJMC Chapter 15.24 – Earthquake Hazard Reduction Code; SJMC Chapter 16.28 – Soils Report; & Geotechnical Investigation Proposed Commercial De- velopment Commonwealth Avenue at San Jacinto Avenue, prepared by Sladden Engineering, November 2, 2017) Expansive soils contain certain types of clay minerals that shrink or swell as the moisture content chang- es; the shrinking or swelling can shift, crack, or break structures built on such soils. Arid or semi-arid are- as with seasonal changes of soil moisture experience a much higher frequency of problems from expan- sive soils than areas with higher rainfall and more constant soil moisture. The California Building Code (CBC) 2016, Volume 2, Chapter 18, Division 1 Section 1803.2 mandates that special foundation design consideration is employed if the soil expansion Index is 20, or greater in accordance with Table 18-1-B. The methodology and scope for a geotechnical investigation are de- scribed in UBC Section 1803 and requires an assessment of a variety of factors, such as slope stability, soil strength, adequacy of load-bearing soils, the presence of compressible or expansive soils, and the potential for liquefaction. The required content of the geotechnical report includes recommendations for foundation type and design criteria. These recommendations can include foundation design provisions that are intended to mitigate the effects of expansive soils, liquefaction, and differential settlement. In general, mitigation can be accomplished through a combination of ground modification techniques (i.e., stone columns, reinforcing nail and anchors, deep soil mixing, etc.), selection of an appropriate founda- tion type and configuration, and use of appropriate building/foundation structural systems. Section 1804.5 Excavation, Grading, and Fill require the preparation of a geotechnical report where a building will be constructed on compacted fill. The International Building Code (IBC) replaced earlier regional building codes (including the Uniform Building Code) in 2000 and established consistent construction guidelines for the nation. In 2006, the IBC was incorporated into the 2007 California Building Code (CBC), and currently applies to all structures being constructed in California. The national model codes are therefore incorporated by reference into the building codes of local municipalities. The CBC includes building design and construction criteria that take into consideration the State’s seismic conditions. 4.1.v Packet Pg. 268 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 46 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Expansion Index testing of select samples of soil was performed to evaluate the expansion potential of the materials underlying the site. Based on the results of the laboratory testing (EI=69). Accordingly, the risk of structural damage caused by volumetric changes in the subgrade soil is considered "medium. Therefore, the site shall be prepared in accordance with the recommendations of the Geotechnical Report (see MM GEO-1) and the imported soils will require further soils investigation (see MM GEO-2). With adherence to the UBC and IBC and recommendations of the Geotechnical Report impacts related to ex- pansive soils will be less than significant with mitigation, directly, indirectly, and cumulatively. e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater dis- posal systems where sewers are not available for the disposal of wastewater? Response: (Source: General Plan as amended October 19, 2012; Public Safety Element; Figure PS-1 – Geologic & Seismic Hazards; General Plan FEIR; Figure 5.6-1 – Seismic Hazards; General Plan EIR Addendum August 2012; SJMC Chapter 15.24 – Earthquake Hazard Reduction Code; SJMC Chapter 16.28 – Soils Report; & Geotechnical Investigation Proposed Commercial De- velopment Commonwealth Avenue at San Jacinto Avenue, prepared by Sladden Engineering, November 2, 2017) The proposed Project will be served by the City of San Jacinto’s sewer infrastructure. Therefore, the Pro- ject will have no impact, directly, indirectly, or cumulatively. VII. GREENHOUSE GAS EMISSIONS – Would the project: a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? Response: (Source: Air Quality and Greenhouse Gas Study, prepared by MD Acoustics, November 3, 2017; & Memo from MD Acoustics, February 19, 2018) Construction Greenhouse Gas Emissions Impact The greenhouse gas emissions from Project construction equipment and worker vehicles are shown in the Table below. The emissions are from all phases of construction. The total construction emissions amortized over a period of 30 years are estimated at 17.93 metric tons of CO2e per year. Annual CalE- EMod output calculations are provided in Appendix B of the Air Quality and Greenhouse Gas Impact Study, prepared by MD Acoustics for this Project. Construction Greenhouse Gas Emissions Activity Emissions (MTCO2e)1 Onsite Offsite Total Demolition 35.4 2.0 37.4 Grading 27.3 10.7 38.0 Building Construction2 274.1 162.4 436.5 Paving 20.6 1.4 22.1 Coating 2.6 1.3 3.9 Total 324.6 175.9 537.9 Averaged over 30 years3 11 6 17.93 Notes: 1. MTCO2e=metric tons of carbon dioxide equivalents (includes carbon dioxide, methane, and nitrous oxide). 2. Building Construction is estimated to last less than a year. 3. The emissions are averaged over 30 years because the average is added to the operational emissions, pursuant to SCAQMD. * CalEEMod output (Appendix B of the Air Quality and Greenhouse Gas Study) 4.1.v Packet Pg. 269 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 47 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Operational Greenhouse Gas Emissions Impact Operational emissions occur over the life of the Project. The unmitigated operational emissions for the Project are 3,164.17 metric tons of CO2e per year as shown in the table below. These emissions exceed the SCAQMD screening threshold for all land uses of 3,000 metric tons of CO2e per year, and mitigation is required. Therefore, the impact is less than significant with mitigation, directly, indirectly, and cu- mulatively. Opening Year Project-Related Greenhouse Gas Emissions Category Greenhouse Gas Emissions (Metric Tons/Year)1 Bio-CO2 NonBio-CO2 CO2 CH4 N2O CO2e Area Sources2 0.00 0.01 0.01 0.00 0.00 0.01 Energy Usage3 0.00 270.65 270.65 0.01 0.00 271.79 Mobile Sources4 0.00 2,760.94 2,760.94 0.26 0.00 2,767.33 Solid Waste6 22.98 0.00 22.98 1.36 0.00 56.93 Water7 2.13 40.89 43.02 0.22 0.00 50.19 Construction8 0.00 16.62 16.62 0.00 0.00 17.93 Total Emissions 25.11 3,089.11 3,114.22 1.85 0.01 3,164.17 SCAQMD Draft Screening Threshold 3,000 Exceeds Threshold? Yes Notes: 1 Source: CalEEMod Version 2016.3.2 2 Area sources consist of GHG emissions from consumer products, architectural coatings, and landscape equipment. 3 Energy usage consists of GHG emissions from electricity and natural gas usage. 4 Mobile sources consist of GHG emissions from vehicles. 5 Solid waste includes the CO2 and CH4 emissions created from the solid waste placed in landfills. 6 Water includes GHG emissions from electricity used for transport of water and processing of wastewater. 7 Construction GHG emissions based on a 30-year amortization rate. The data provided in the table below shows that the proposed Project's mitigated emissions would be re- duced to 2,236.36 MTCO2e per year. As shown in the table, with the incorporation of mitigation measures MM GHG-1 through MM GHG-4, the Project’s emissions would no longer exceed the SCAQMD draft local agency tier 3 threshold of 3,000 MTCO2e per year for all land use types. Therefore, the pro- ject's GHG emissions are considered to be less than significant with mitigation, directly and indirectly on the generation of greenhouse gases. Opening Year Mitigated Project-Related Greenhouse Gas Emissions Category Greenhouse Gas Emissions (Metric Tons/Year)1 Bio-CO2 NonBio-CO2 CO2 CH4 N2O CO2e Area Sources2 0.00 0.01 0.01 0.00 0.00 0.01 Energy Usage3 0.00 269.51 269.51 0.01 0.00 270.64 Mobile Sources4 0.00 1,885.04 1,885.04 0.23 0.00 1,890.80 Solid Waste6 5.74 0.00 5.74 0.34 0.00 14.23 Water7 1.71 35.31 37.01 0.18 0.00 42.76 Construction8 0.00 16.62 16.62 0.00 0.00 17.93 Total Emissions 7.45 2,206.48 2,213.93 0.76 0.01 2,236.36 SCAQMD Draft Screening Threshold 3,000 Exceeds Threshold? No Notes: 1 Source: CalEEMod Version 2016.3.2 4.1.v Packet Pg. 270 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 48 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact 2 Area sources consist of GHG emissions from consumer products, architectural coatings, and landscape equipment. 3 Energy usage consists of GHG emissions from electricity and natural gas usage. 4 Mobile sources consist of GHG emissions from vehicles. 5 Solid waste includes the CO2 and CH4 emissions created from the solid waste placed in landfills. 6 Water includes GHG emissions from electricity used for transport of water and processing of wastewater. 7 Construction GHG emissions based on a 30-year amortization rate. MM GHG-1: The Project applicant shall require that: all faucets, toilets, and showers installed in the proposed structures utilize low-flow fixtures that would reduce indoor water demand by 20% per CalGreen Standards and that water-efficient landscaping practices are em- ployed on-site. MM GHG-2: The Project applicant shall require recycling programs that reduce waste to landfills by a minimum of 75 percent (per AB 341). MM GHG-3: The Project applicant shall provide sidewalks that connect on and offsite. MM GHG-4: The Project applicant will ensure that Energy Star appliances are used onsite, wherever appliances are required. b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emission of greenhouse gases? Response: (Source: Air Quality and Greenhouse Gas Assessment, prepared by MD Acoustics, November 3, 2017; & Memo from MD Acoustics, February 19, 2018) The Project will be subject to the policies and ordinances pertaining to air quality and climate change stated in the City's General Plan. The City of San Jacinto is participating the Western Riverside Council of Governments (WRCOG) Subregional Climate Action Plan. The WRCOG Subregional CAP establishes a community-wide emissions reduction target of 15% below 2010, following guidance from CARB and the Governor’s Office of Planning and Research. CARB and the California Attorney General have deter- mined this approach to be consistent with the state-wide AB 32 goal of reducing emissions to 1990 levels. As the City of San Jacinto does not currently have their own Climate Action Plan (CAP), and the goal of the Subregional CAP is to be consistent with AB-32 and the CARB Scoping Plan (based on the goals of AB-32), the Project has been compared to the applicable measures of the CARB Scoping Plan. The next table below Project compliance with the applicable measures of the CARB Scoping Plan. As shown in the table, the Project complies with the goals of the Scoping Plan. Consistency with SB-32 and AB-32 SCAQMD's tier 3 thresholds used Executive Order S-3-05 goal as the basis for deriving the screening level. The California Governor issued Executive Order S-3-05, GHG Emission, in June 2005, which established the following reduction targets: • 2010: Reduce greenhouse gas emissions to 2000 levels • 2020: Reduce greenhouse gas emissions to 1990 levels • 2050: Reduce greenhouse gas emissions to 80 percent below 1990 levels. In 2006, the California State Legislature adopted AB 32, the California Global Warming Solutions Act of 2006. AB 32 requires CARB, to adopt rules and regulations that would achieve GHG emissions equiva- lent to statewide levels in 1990 by 2020 through an enforceable statewide emission cap which was phased in 2012. Therefore, as the Project's emissions meet the threshold for compliance with Executive Order S-3-05, the Project's emissions also comply with the goals of AB 32. Additionally, as the project meets the current interim emissions targets/thresholds established by SCAQMD (as described above), the Project would also be on track to meet the reduction target of 40 percent below 1990 levels by 2030 mandated by SB-32. Furthermore, all of the post-2020 reductions in GHG emissions are addressed via regulatory requirements at the State level and the Project will be required to comply with these regula- 4.1.v Packet Pg. 271 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 49 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact tions as they come into effect. Therefore, the Project will not conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases. Impacts are considered to be less than significant, directly indirectly, and cumulatively. CARB Scoping Plan Measure Project Comparison Scoping Plan Measures to Reduce Greenhouse Gas Emissions Project Compliance with Measure California Light-Duty Vehicle Greenhouse Gas Stand- ards – Implement adopted standards and planned second phase of the program. Align zero-emission ve- hicle, alternative and renewable fuel, and vehicle tech- nology programs with long-term climate change goals. Consistent. These are CARB enforced standards; vehi- cles that access the project that are required to comply with the standards will comply with the strategy Energy Efficiency – Maximize energy efficiency building and appliance standards; pursue additional efficiency including new technologies, policy, and implementation mechanisms. Pursue comparable investment in energy efficiency from all retail providers of electricity in Cali- fornia. Consistent. The project will be compliant with the cur- rent Title 24 standards. Low Carbon Fuel Standard – Develop and adopt the Low Carbon Fuel Standard. Consistent. These are CARB enforced standards; vehi- cles that access the project that are required to comply with the standards will comply with the strategy. Vehicle Efficiency Measures – Implement light-duty vehicle efficiency measures. Consistent. These are CARB enforced standards; vehi- cles that access the project that are required to comply with the standards will comply with the strategy. Medium/Heavy-Duty Vehicles – Adopt medium and heavy-duty vehicle efficiency measures. Consistent. These are CARB enforced standards; vehi- cles that access the project that are required to comply with the standards will comply with the strategy. Green Building Strategy – Expand the use of green building practices to reduce the carbon footprint of Cali- fornia’s new and existing inventory of buildings. Consistent. The California Green Building Standards Code (proposed Part 11, Title 24) was adopted as part of the California Building Standards Code in the CCR. Part 11 establishes voluntary standards, that became mandatory in the 2016 edition of the Code, on planning and design for sustainable site development, energy efficiency (in excess of the California Energy Code re- quirements), water conservation, material conservation, and internal air contaminants. The project will be sub- ject to these mandatory standards. High Global Warming Potential Gases – Adopt measures to reduce high global warming potential gas- es. Consistent. CARB identified five measures that reduce HFC emissions from vehicular and commercial refriger- ation systems; vehicles that access the project that are required to comply with the measures will comply with the strategy. Recycling and Waste – Reduce methane emissions at landfills. Increase waste diversion, composting, and commercial recycling. Move toward zero-waste. Consistent. The state is currently developing a regula- tion to reduce methane emissions from municipal solid waste landfills. The project is part of the County's pro- gram for recycling and waste reduction and will assist in reaching the State's waste reduction goals. Water – Continue efficiency programs and use cleaner energy sources to move and treat water. Consistent. The project will comply with all applicable City ordinances. 1 Source: CARB Scoping Plan (2008) VIII. HAZARDS AND HAZARDOUS MATERIALS – Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Results of Phase I Environmental Site Assessment Proposed Commercial Development West of San Jacinto Avenue & Commonwealth Avenue, prepared by Sladden Engineering, September 14, 2017; & Phase II Limited Soil Sampling and Excavation, prepared by Vertex Companies, Inc., February 2, 2018) 4.1.v Packet Pg. 272 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 50 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Hazardous materials are highly regulated in California, including the methods in which they are transport- ed, used, and stored. The proposed Project will be comprised of a convenience store, service station, car wash, retail space, fast food drive-throughs and parking areas. It will require the ongoing use, storage and routine transport of hazardous materials consisting primarily of gasoline and diesel fuel. Common cleaning chemicals, pesticides, and fertilizers will also be used on-site. The service station will be de- signed and operated consistent with City, County, State and Federal regulations pertaining to the under- ground storage and dispensation of flammable materials that including, but not limited to the following: • 2013 California Fire Code Title 24, Part 9 (CFC 8003.1.3.2) Spill Control Requirements; • California Code of Regulations Title 13, Motor Vehicles Division 1, 2 and 3; • California Code of Regulations Title 27, Environmental Protection, as applicable; • California Mechanical Code (CMC); • California Code of Regulations, Title 8, Industrial Relations, Chapter 4, Industrial Safety; • Health and Safety Code, Section 13240 – 1343.6 (California Propane Storage and Handling Safety Act); and • National Fire Protection Association (NFPA) Code Section 30a. With adherence to all applicable regulations pertaining to the construction and operation of a service sta- tion containing below ground fuel storage tanks, as well as the regulation concerning all hazardous mate- rial handling the Project would not emit or release hazardous waste or emissions or otherwise adversely impact public safety through the storage of flammable materials on-site. The storing or dispensing of hazardous materials will be designed and operated consistent with all appli- cable City, County, State and Federal regulations and will be subject to routine inspection. Based on these factors, Project-related impacts associated with the transport or disposal of hazardous materials will be less than significant, directly, indirectly, or cumulatively. b) Create a significant hazard to the public or the en- vironment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Results of Phase I Environmental Site Assessment Proposed Commercial Development West of San Jacinto Avenue & Commonwealth Avenue, prepared by Sladden Engineering, September 14, 2017; & Phase II Limited Soil Sampling and Excavation, prepared by Vertex Companies, Inc., February 2, 2018) In addition to VIII a) above concerning the underground tanks and dispensing of fuel, the Project will not create hazards to the public through upset or accident, as through the construction process any hazard- ous materials will be handled, stored, and used in compliance with all Federal, State and City regulations. In addition to the underground fuel tanks, the Project will use various chemicals for routine housekeeping and landscaping purposes. However, none of these chemicals will be used in sufficient quantities to pose a threat to humans or the environment if handled and maintained in compliance with City, State, and Federal regulations. Project-related impacts associated with the hazardous materials will be less than significant, directly, indirectly, or cumulatively. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Results of Phase I Environmental Site Assessment Proposed Commercial Development West of San Jacinto Avenue & Commonwealth Avenue, prepared by Sladden Engineering, September 14, 2017; & Phase II Limited Soil Sampling and Excavation, prepared by Vertex Companies, Inc., February 2, 2018) The Hyatt Preschool is approximately 2,225-feet from the closest point of the subject property. Through the construction process, any hazardous materials will be handled, stored, and used in compliance with all Federal, State and City regulations. As noted in VIII a-b) above, the Project will create convenience 4.1.v Packet Pg. 273 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 51 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact store, service station, car wash, retail space, tire store, fast food Drive-Through, and parking areas that will include underground fuel storage tanks and that will store and use various chemicals for routine housekeeping and landscaping purposes. A tire store has the potential for the storage of used car batteries, tires, oil, and other hazardous materials regulated by the State of California. The storage either indoor or outdoor of these hazardous items has a potential for hazardous effects. For example, the stockpiling whole tires create two significant hazards: mosquitoes and fires. Due to their shape and impermeability, tires managed in stockpiles tend to hold water for long periods of time. This stagnant water provides an ideal breeding ground for mosquitoes and sites for mosquito larvae development. Stockpiling whole tires also pose a significant fire hazard. These fires generate large amounts of heat and smoke and are difficult to extinguish. As well, the landfilling of whole tires consumes a large volume of landfill space because the tires are relatively incompressible and 75% of the space a tire occupies is void. This void space provides potential sites for gas collection and harboring of rodents. Through compliance with City, County, State and Federal regulations and mitigation measure MM HAZ-1 the Project will not emit hazardous emissions or handle hazardous or acutely hazardous materials, sub- stances, or waste to cause danger to surrounding schools, therefore less than significant impacts, di- rectly, indirectly, or cumulatively to schools will occur. MM HAZ-1: The storage of tires outside will be strictly prohibited. All used tires shall be sent to a re- cycling facility on a regular basis. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code section 65962.5 and, as a re- sult, would it create a significant hazard to the pub- lic or the environment? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; CERCLIS Facility Information; Regulated Facilities in TRI Information; DTSC EnviroStor Database Listed Sites; Results of Phase I Environmental Site Assessment Proposed Commercial Development West of San Jacinto Avenue & Commonwealth Ave- nue, prepared by Sladden Engineering, September 14, 2017; & Phase II Limited Soil Sampling and Excavation, prepared by Vertex Companies, Inc., February 2, 2018) The subject property is not located on a site, which is included on a list compiled pursuant to Government Code Section 65962.3. In addition, a Phase I Environmental Report was prepared for the Project site which indicates the site is not listed on any agency record and readily available public documents from standard sources in regard to hazardous materials. The Report does note that there are 13 sites within a one-mile radius of the Project site. As part of the Phase I analysis the following observation was made: • An oil stain measuring approximately 15-feet in diameter was observed on the unpaved area to the rear (west) of the existing office building. As part of the Phase II Analysis Vertex performed soil sampling to evaluate surface and subsurface con- ditions in the stained soil and performed excavation activities on December 7, 2017, and January 24, 2018, to remove impacted soil as identified in the Phase I Report. Based on the data, the constituents of concern identified at the site were Total Petroleum Hydrocarbons-Diesel Range Organics (TPH-DRO) and Total Petroleum Hydrocarbons-Motor Oil Range Organics (TPH-MRO). Based on visual observations, Photoionization Detector (PID) readings and confirmation soil sample results, Vertex successfully re- moved impacted soil to concentrations below the California Regional Water Quality Control Board San Francisco Bay (CRWQCB-SFB) Commercial/Industrial Use Environmental Screening Levels (ESLs. Therefore, no additional investigation or excavation is recommended. Therefore, this Project will have no impact, directly, indirectly, or cumulatively in terms of creating a sig- 4.1.v Packet Pg. 274 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 52 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact nificant hazard to the public or the environment. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? Response: (Source: Riverside County Land Use Commission – Hemet-Ryan Airport Plan Final 2017) The City of San Jacinto is outside the Airport Influence Area for the Hemet-Ryan Airport and therefore, the Project would have no impact on this public airport and there are no other private airports within two miles of the City. f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? Response: (Source: Riverside County Land Use Commission – Hemet-Ryan Airport Plan Final 2017) There are no private airports within two miles of the City and therefore this Project will have no impact, directly, indirectly, or cumulatively resulting in a safety hazard. g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) The City’s Emergency Operation Plan describes the City’s process for responding to emergencies or dis- asters. In addition, the City, along with most other jurisdictions in Riverside County, joined with the Coun- ty of Riverside to submit a Multi-Jurisdictional LHMP providing a framework for emergency response. Project access will be provided on San Jacinto Avenue from a signalized intersection with a secondary access point along the southern property line to San Jacinto Avenue (right-in/right-out). San Jacinto and Commonwealth Avenues are existing streets within the City’s established street system. The proposed Project will not alter the existing circulation pattern in the Project area. Emergency access and evacua- tion routes will be unaffected by the proposed Project. The Project provides adequate access for emergency vehicles, including adequate street widths and ver- tical clearance. Implementation of federal, state, and local laws and regulations in the construction of this Project would result in less than significant impacts, directly, indirectly, and cumulatively to an adopted emergency response or evacuation plan h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, includ- ing where wildlands are adjacent to urbanized ar- eas or where residences are intermixed with wildlands? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; Figure 5.7-1 – Fire Hazards; & General Plan EIR Addendum August 2012) The Project site is not within a High Fire Hazards Area. The Project will not expose people or structures to significant risks associated with wildfires and therefore, no impact directly, indirectly, or cumulatively will occur. IX. HYDROLOGY AND WATER QUALITY – Would the project: a) Violate any water quality standards or waste dis- charge requirements? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain 4.1.v Packet Pg. 275 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 53 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Pre- liminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Pro- ject Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) The Project will have approximately 65% impervious surface area (i.e., asphalt, concrete, and rooftops). Water quality mitigation is provided through the use of bioretention basins located in the northwest portion of the site. Stormwater generated onsite is routed through one of three bioretention basins for treatment. Flows in excess of the water quality design storm are directed to an onsite detention basin for stormwater incremental increase mitigation. Stormwater quality mitigation is addressed in the Project Specific Prelim- inary Water Quality Management Plan, including designing landscaping to minimize irrigation and runoff. In addition, an underground grease interceptor is proposed for the restaurant building. This device is de- signed to intercept most greases and solids before they enter the wastewater disposal system. Pursuant to NPDES regulations, the City will require that the Project complies with existing Santa Ana a RWQCB and City stormwater controls, including compliance with NPDES construction and operation measures to prevent erosion, siltation, and transport of urban pollutants. The City of San Jacinto is a Co-Permittee and is required to comply with, the Riverside County municipal separate storm sewer system (MS4) permit adopted by the Regional Board on January 29, 2010. Since the Project is greater than one acre a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region - Order No. 00-65 and the City's MS4 permit (order no. R8-2002-0011 (NPDES No. CAS 618033) is required. Pursuant to Section 17.300.120 – Water Quality of the Development Code the Project will not be permit- ted to discharge any liquids into the public or private drainage system, or into the ground and applicable requirements and best management practices of RWQCB SWPPP and NPDES permits are required. Therefore, the Project will be designed for compliance with existing federal, state, and local water quality laws and regulations related to water quality standards will ensure a less than significant impact, direct- ly, indirectly, and cumulatively to water quality and discharge b) Substantially deplete groundwater supplies or in- terfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater ta- ble level (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Pre- liminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Pro- ject Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) San Jacinto is located within the San Jacinto Groundwater Basin (Basin). The Basin underlies the cities of San Jacinto, Perris, Moreno, and Menifee Valleys in western Riverside County. The basin is bound by the San Jacinto Mountains to the north, San Timoteo Badlands to the northeast, the Box Mountains to the north and the Santa Rosa Hills and Bell Mountain to the south. The basin is tran- sected by the San Jacinto fault zone creating groundwater barriers. The basin is primarily recharged through percolation in the San Jacinto River and associated tributaries. The Geotechnical Investigation did not encounter groundwater based on the exploratory bores. Groundwater level data from CDWR (2017) indicate that the site vicinity has been recorded in ex- cess of 100 feet below ground surface (bgs) and accordingly groundwater should not be a factor dur- ing construction. The Project proposes to connect to a 12-inch water line and an 18-inch sewer line in San Jacinto Avenue. No new wells or additional water infrastructure are proposed. The Project will be designed for compliance 4.1.v Packet Pg. 276 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 54 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact with existing Federal, State, and local water quality laws and regulations related to groundwater and will have less than significant impact on groundwater supplies, directly, indirectly, and cumulatively. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Pre- liminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Pro- ject Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) There are no natural drainages on the Project site, the Project will not alter any existing drainage pat- terns. Stormwater mitigation for this Project includes a detention basin located at the northwest corner. The basin has been preliminarily sized to detain the difference in runoff volume between the developed and undeveloped condition 10-year, 24-hour storm, in accordance with Riverside County Flood Control and Water Conservation District preliminary design criteria. Due to the lack of an acceptable infiltration rate, a sump pump is proposed in the basin to meter out stormwater flows at a rate substantially lower than that generated in the undeveloped condition. Through the implementation of the basin pump, the basin is empty approximately 37 hours after a storm event. The implementation of BMPs required by the City and implemented through the Project’s Water Quality Management Plans will mitigate potential erosion impacts to less than significant, directly, indirectly, and cumulatively. d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially in- crease the rate or amount of surface runoff in a manner which would result in flooding on- or off- site? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Pre- liminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Pro- ject Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) In addition to Response IX c) above, once construction of the Project is complete, landscaped open areas and the on-site WQMP basins and infrastructure will control storm flows and erosion from the Project. The design and implementation of these facilities will be reviewed and approved by the City Engineer to assure compliance with all applicable local, State, and Federal standards. Implementation of these and other applicable requirements will assure that drainage and stormwater will not create or contribute water which would exceed the capacity of existing or planned stormwater drain- age systems or provide substantial additional sources of polluted runoff. Therefore, the Project will have a less than significant impact, directly, indirectly, or cumulatively to the rate or amount of surface runoff in a manner which would result in flooding on- or off-site. e) Create or contribute runoff water which would ex- ceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Pre- liminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Pro- ject Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) 4.1.v Packet Pg. 277 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 55 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact See Response IX c) & d) above. f) Otherwise substantially degrade water quality? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Pre- liminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Pro- ject Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) As described throughout this section IX, the Project will be required to comply with all applicable water quality standards. To further minimize potential water quality degradation, the Project will be connected to the sewer system and on-site/off-site stormwater conveyance system. Project-related water quality degradation impacts will be less than significant, directly, indirectly, and cumulatively. g) Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood haz- ard delineation map? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Na- tional Flood Hazard Layer FEMA, 06065C1490H, April 19, 2017; Preliminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Project Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) The Project site is not located within a 100-year mapped flood zone (FEMA Flood Insurance Rate Map No. 06065C1490H (April 2017). The Project would redirect on-site drainage patterns; however, it would not impede or redirect flood flows. As referenced, all drainage would be managed to ensure pre- construction flows off-site are maintained. The Project would not expose people or structures to flood hazards from severe storm events. Compliance with existing Federal, State, and local flood hazard laws and regulations as they pertain to the design of the Project will result in a less than significant flood hazard impact, directly, indirectly, and cumulatively. h) Place within a 100-year flood hazard area struc- tures which would impede or redirect flood flows? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal(Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Na- tional Flood Hazard Layer FEMA, 06065C1490H, April 19, 2017; Preliminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Project Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) As noted in IX g) above, the Project site is not in the 100-year floodplain and will not place structures in an area that would impede or redirect flows. Compliance with existing Federal, State, and local flood hazard laws and regulations as they pertain to the design of the Project will result in a less than signifi- cant flood hazard impact, directly, indirectly, and cumulatively. i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Na- tional Flood Hazard Layer FEMA, 06065C1490H, April 19, 2017; Preliminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Project Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) 4.1.v Packet Pg. 278 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 56 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The subject property does not lie within an area of dam or levee inundation. Therefore, impacts from dam and levee inundation to the subject property are not significant, directly, indirectly, and cumulatively. j) Expose people or structures to inundation by seiche, tsunami, or mudflow? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Na- tional Flood Hazard Layer FEMA, 06065C1490H, April 19, 2017; Preliminary Hydrology Study, prepared by Blaine A. Womer Civil Engineering, October 2, 2017 and Revised February, 8, 2018; & Project Specific Water Quality Management Plan, Commonwealth Crossing, Blaine A. Womer Civil Engineering, September 21, 2017) Seiche is a temporary disturbance or oscillation in the water level of a lake or partially enclosed body of water, especially one caused by changes in atmospheric pressure. Tsunami is a long high sea wave caused by an earthquake, submarine landslide, or other disturbance. Mudflows (or debris flows) are rivers of rock, earth, and other debris saturated with water. They develop when water rapidly accumulates in the ground, such as during heavy rainfall or rapid snowmelt, changing the earth into a flowing river of mud. The Project site is not located near any bodies of water, is located inland, and is not located adjacent to hillsides; therefore, there will be no impacts, directly, indirectly, and cumulatively on structures caused by a seiche or tsunami. Standard erosion-prevention practices during grading and the lack of over-steepened slopes near existing development will result in a less than significant impact, directly, indirectly, and cumulatively related to mudflow hazards. X. LAND USE AND PLANNING – Would the pro- ject: a) Physically divide an established community? Response: (Source: General Plan as amended October 19, 2012: General Plan EIR; & General Plan EIR Addendum August 2012) The proposed Project will develop a convenience store, service station, car wash, retail, tire store, fast food Drive-Through, and parking lot on a relatively flat, undeveloped site. The Project is consistent with the General Plan designation for the site. The site is located in an area where commercial development is on the rise. The proposed Project would utilize the existing road network and not result in the construc- tion of improvements that would physically divide an existing community or otherwise impact circulation on public roads surrounding the site. Therefore, no impact either directly, indirectly, or cumulatively will occur to an established community. b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zon- ing ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? Response: (Source: General Plan as amended October 19, 2012: General Plan EIR; & General Plan EIR Addendum August 2012) The site is designated as CC – Community Commercial in the City’s General Plan and the applicant is requesting CG – Commercial General Zoning which is consistent with this land use designation. The Pro- ject will not result in a change to plans, policies, or regulations established in the General Plan or Zoning Ordinance; therefore, no impact, directly, indirectly, or cumulatively to any land use plans or zoning will occur. c) Conflict with any applicable habitat conservation plan or natural community conservation plan? 4.1.v Packet Pg. 279 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 57 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Response: (Source: General Plan as amended October 19, 2012; Resource Management Element – Figure RM-1 – Open Space Resources; RM-3 – Vegetation Communities; General Plan EIR; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.4-1 – Vegetation Communities; Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria; Riverside County Multiple Species Habitat Conservation Plan (MSHCP); Development Code Chapter 17.520 – Natural Resource Conservation; Revised Biological Survey – Burrowing Owl and Narrow Endemic Species, prepared by Salem Engineering Group, Inc., April 3, 2017; Municipal Code Chapter 58 – Planning and Development; Article IV – Habitat Con- servation; Municipal Code Chapter 31 – Multiple Species Habitat Conservation Plan Mitigation Fee; & General Biological Report, prepared by Glenn Lukos Associates, Inc., April 2018) The subject property is located within the boundaries of the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) and the Stephens’ Kangaroo Rat Habitat Conservation Plan (SKRHCP). As such, the Project will be conditioned for payment of the MSHCP Development Mitigation Fee, which will mitigate potential impacts to MSHCP covered species, and the SKR fee. The Project site is not within the MSHCP Criteria Area, or adjacent to a MSHCP-designated Conservation Area, or within a SKRHCP Core Reserve, so no additional mitigation measures or provisions are required. The Project will not conflict with the provisions of any Habitat Conservation Plans or Natural Community Conservation Plans. The Project will have a less than significant impact, directly, indirectly and cumulatively, on an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan. XI. MINERAL RESOURCES – Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) According to the California Geological Survey Surface Mining and Reclamation Act (SMARA) Mineral Land Classification system, the City of San Jacinto has been classified as MRZ-1. Therefore, imple- mentation of the Project will have no impact on mineral resources. b) Result in the loss of availability of a locally- important mineral resource recovery site delineat- ed on a local general plan, specific plan, or other land use plan? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) The Project site is not delineated for mineral resources on a local general plan, specific plan or other land use plan and will, therefore, have no impact, directly, indirectly, and cumulatively to the availability of an important mineral resources. XII. NOISE – Would the project result in: a) Exposure of persons to or generation of noise lev- els in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Response: (Source: General Plan as amended October 19, 2012; Noise Element Figure N-1 – Future Noise Contours; General Plan EIR; Figure 5.10.1 – Future Noise Contours; General Plan EIR Addendum August 2012; Municipal Code Chapter 8.40 – Noise Control; Noise Impact Study, San Jacinto Commonwealth Development, prepared by MD Acoustics, October 30, 2017; & Memo from MD Acoustics, February 19, 2018) dBA = A-weighted sound level in decibels as measured on a sound level meter using the A-weighted filter network. The A-weighting filter de-emphasizes the very low and very high-frequency components of the sound in a manner similar to the response of the human ear. A numerical method of rating human judgment of loudness. Leq = Equivalent Sound Level – the sound level corresponding to a steady noise level over a given sam- 4.1.v Packet Pg. 280 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 58 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact ple period with the same amount of acoustic energy as the actual time-varying noise level. The energy average noise level during the sample period. CNEL = Community Noise Equivalent Level – the average equivalent A-weighted sound level during a 24- hour day, obtained after addition of five (5) decibels to sound levels in the evening from 7:00 to 10:00 p.m. and after addition of ten (10) decibels to sound levels in the night before 7:00 a.m. and after 10:00 p.m. Study Method and Procedure Noise measurements were taken to determine the existing noise levels. A noise receiver or receptor is any location in the noise analysis in which noise might produce an impact. The following criteria are used to select measurement locations and receptors: • Locations expected to receive the highest noise impacts, such as the first row of houses • Locations that are acoustically representative and equivalent of the area of concern • Human land usage • Sites clear of major obstruction and contamination MD conducted the sound level measurements in accordance with CalTrans technical noise specifications. All measurements equipment meets American National Standards Institute (ANSI) specifications for sound level meters (S1.4-1983 identified in Chapter 19.68.020.AA). Long-Term Noise Measurement Location The noise monitoring location was selected based on the distance of the Project’s stationary noise sources to the nearest sensitive on-site receptors. The long-term noise measurement was conducted on the northern property line of the Project site and represents ambient levels at the site. Appendix A, of the Noise Impact Study, includes photos, field sheet, and measured noise data. The following exhibit illus- trates the location of the measurement. Measurement Locations Federal Highway Administration (FHWA) Traffic Noise Prediction Model Traffic noise from vehicular traffic was projected using a computer program that replicates the FHWA Traffic Noise Prediction Model (FHWA-RD-77-108). The FHWA model arrives at the predicted noise level 4.1.v Packet Pg. 281 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 59 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact through a series of adjustments to the Reference Energy Mean Emission Level (REMEL). Roadway vol- umes were provided by Trames Solutions, Inc. The referenced traffic data was applied to the model and is in Appendix B of the Noise Study. SoundPLAN Model SoundPLAN (SP) acoustical modeling software was utilized to model traffic noise level projections and future worst‐case Project operational noise impacts (stationary noise sources) to the on-site and nearest off‐site sensitive receptors. SP is capable of evaluating multiple stationary noise sources and transportation noise impacts at various receiver locations. SP’s software utilizes algorithms (based on the inverse square law and FHWA calcu- lations) to calculate noise level projections. The software allows the user to input specific noise sources, spectral content, sound barriers, building placement, topography, and sensitive receptor locations. The future worst-case noise level projections associated with the automatic car wash were modeled using reference sound level data for the Sonny’s enterprises BL1-45HP-1 blowers and Vacutec vacu- ums/turbines. The model assumes that the car wash tunnel is approximately 108 feet long, 16 to 18 feet tall with will have an approximate 10-foot-wide by 9-foot-tall exit opening. The blowers were modeled at 10 to 12 feet high with two (2) side blowers and one (1) central blower. The BL1-45HP-1 blowers will be located approximately 5 to 10 feet inside the exit of the tunnel. The car wash equipment was modeled as point sources with output noise levels reaching up to 82 dBA at the entrance of the tunnel and 92.5 dBA at the exit of the tunnel. The SP model assumes a total of 24 vacuums and the dyer systems are operating simultaneously (worst case), when in reality the noise will be intermittent and lower in level. The Project proposes to house the two (2) vacuum turbine motors (FT-CO-T350HP4) inside a 4-sided enclosure. All other noise producing equipment (e.g. compressors, pumps) will be housed within mechanical equipment rooms. Noise associated with the Drive-Through and commercial property includes idling cars, speakers at the Drive-Throughs, and parking lot movements. The Drive-Through speakers associated with the fast food restaurant were modeled as point sources with noise levels reaching 82.5 dBA at 3 feet from the source. Noise associated with the tire shop assumes six (6) pneumatic tools/screw guns operating simultaneously with the bay doors open. The noise level was modeled as point sources with noise levels reaching 95 dBA at 3 feet from the source. The parking lot was modeled as an area source based upon the number of parking spaces with an esti- mated 5 to 25% turnover rate during the peak hour (depending on location and parking lot). Noise asso- ciated with parking lots include but are not limited to idling cars, doors closing, and starting engine noise. Noise levels associated with parking lots can reach peak levels of 80 dBA. FHWA Roadway Construction Noise Model The construction noise analysis utilizes the Federal Highway Administration (FHWA) Roadway Construc- tion Noise Model (RNCM), together with several key construction parameters. Key inputs include dis- tance to the sensitive receiver, equipment usage, % usage factor, and baseline parameters for the Project site. The Project was analyzed based on the different construction phases. Construction noise is expected to be loudest during the grading, concrete and building phases of construction. The following assumptions relevant to short-term construction noise impacts were used: • It is estimated that construction will occur over a 6 month to the 1-year time period. Construction noise is expected to be the loudest during the grading, concrete, and building phases. 4.1.v Packet Pg. 282 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 60 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Existing Noise Environment An ambient noise measurement was conducted at the site to determine the existing baseline levels. Noise measurement data indicates that traffic noise propagating from San Jacinto Avenue and Common- wealth Avenue are the primary sources of noise impacting the site and surrounding areas. Long-Term Noise Measurement Results The results of the long-term noise data are presented in the table below. Long-Term Noise Measurement Data (dBA)1 Date Time dB(A LEQ LMAX LMIN L2 L8 L25 L50 L90 9/6/2017 11AM-12PM 48.5 67.4 43.5 55.1 49.7 47.1 46.0 44.8 9/6/2017 12PM-1PM 48.4 68.0 44.1 53.2 49.2 47.4 46.5 45.3 9/6/2017 1PM-2PM 48.5 69.6 44.3 53.9 49.3 47.9 46.9 45.4 9/6/2017 2PM-3PM 48.2 65.2 43.6 52.8 50.4 48.6 47.0 45.2 9/6/2017 3PM-4PM 48.6 65.2 43.1 54.1 51.4 48.8 47.0 44.8 9/6/2017 4PM-5PM 50.0 70.2 44.4 54.7 51.9 48.8 47.5 45.8 9/6/2017 5PM-6PM 50.2 65.0 46.1 53.5 52.0 50.6 49.5 47.9 9/6/2017 6PM-7PM 49.8 71.8 45.1 53.6 51.3 49.5 48.2 46.6 9/6/2017 7PM-8PM 48.6 61.2 44.6 52.8 50.3 49.0 48.0 46.5 9/6/2017 8PM-9PM 47.8 63.0 43.7 51.3 49.3 48.1 47.1 45.4 9/6/2017 9PM-10PM 48.0 67.9 40.7 53.7 50.1 48.2 46.7 44.0 9/6/2017 10PM-11PM 45.9 65.2 39.6 50.5 48.5 46.4 44.7 42.1 9/6/2017 11PM-12AM 46.6 66.4 37.0 51.9 48.5 46.0 43.9 40.3 9/6/2017 12AM-1AM 47.8 69.6 37.3 51.5 47.5 44.8 42.8 40.1 9/7/2017 1AM-2AM 42.4 61.8 34.3 49.5 44.7 41.9 39.0 36.0 9/7/2017 2AM-3AM 38.6 55.1 33.4 44.7 41.9 38.5 36.6 34.6 9/7/2017 3AM-4AM 44.4 62.4 34.5 51.6 47.4 44.1 41.4 36.8 9/7/2017 4AM-5AM 44.7 57.1 35.4 50.7 47.8 45.4 43.3 38.8 9/7/2017 5AM-6AM 46.8 57.8 39.4 51.7 50.0 47.7 45.7 42.3 9/7/2017 6AM-7AM 50.9 65.3 41.5 56.7 53.1 51.0 49.4 46.7 9/7/2017 7AM-8AM 54.2 75.5 41.2 61.9 57.9 52.9 50.2 45.5 9/7/2017 8AM-9AM 52.3 84.7 38.5 54.5 49.9 46.7 44.6 41.7 9/7/2017 9AM-10AM 45.9 61.5 38.4 53.9 48.6 45.2 43.4 41.1 9/7/2017 10AM-11AM 45.8 63.3 37.5 53.0 49.6 45.0 43.2 40.1 CNEL 55.3 Notes: 1. Long-term noise monitoring location 1 (LT1) is illustrated in Measurement Location Exhibit. The highest (loudest) hourly noise interval is highlighted in orange and the lowest (quietest) in blue during operational hours. The existing ambient levels ranged from 38.6 to 54.2 dBA, Leq(h) with maximum levels reaching 84.7 dBA. Future Noise Environment Impacts and Mitigation The Noise Study analyzes future noise impacts to and from the Project and compares the results to the City’s Noise Standards. The analysis details the estimated exterior noise levels associated with traffic from adjacent roadways and from on-site stationary noise sources. Noise Impacts to Off-Site Receptors Due to Project Generated Traffic Traffic noise along San Jacinto Avenue and Commonwealth Avenue will be the main source of noise im- pacting the Project site and the surrounding area. A worst-case Project generated traffic noise level was modeled utilizing the FHWA Traffic Noise Predic- tion Model - FHWA-RD-77-108. Traffic noise levels were calculated 50 feet from the centerline of the an- 4.1.v Packet Pg. 283 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 61 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact alyzed roadway. The modeling is theoretical and does not consider any existing barriers, structures, and/or topographical features that may further reduce noise levels. Therefore, the levels are shown for comparative purposes only to show the difference in “with and without Project conditions.” In addition, the noise contours for 60, 65 and 70 dBA CNEL were calculated. The potential off-site noise impacts caused by an increase of traffic from the operation of the proposed Project on the nearby roadways were calcu- lated for the following scenarios: Existing Year (without Project): This scenario refers to existing year traffic noise conditions. Existing Year (Plus Project): This scenario refers to existing year + project traffic noise conditions. The tables below compare the without and with Project scenarios and show the change in traffic noise levels as a result of the proposed Project. It takes a change of 3 dB or more to hear a perceptible differ- ence. As demonstrated in the tables, the Project is anticipated to change the noise 0.8 to 1.4 dBA CNEL. As a result, the Project would have a less than significant impact. The existing mobile home park to the north of the Project site falls within the 70 dBA CNEL contour which correlates to the first row of homes. The existing plus Project condition will further extend the 70 dBA CNEL contour an additional 28 feet (149 feet from the centerline of San Jacinto Avenue). The increase in the noise contour does not extend beyond the first row of mobile homes. According to the City’s 2006 Final General Plan EIR, Section 5: Environmental Impact Analysis, page 5.10-16, portions of existing residences where no noise barrier is present would be subject to noise levels exceeding the City’s noise standards from vehicular traffic. The City has stated as a mitigation measure (5.10-N3) that the City shall review discretionary development proposals for potential on and off-site sta- tionary and vehicular noise impacts per CEQA. Although there is a nominal increase along these two roadways, the proposed increase would not extend the impact beyond the first row of existing mobile homes (which currently fall within 70 dBA noise con- tour). All other sensitive receptors along the subject roadway would remain below the 65 dBA CNEL res- idential standard. The impact would, therefore, be less than significant. Existing Scenario – Noise Levels Along Roadways (dBA CNEL) Existing Without Project Exterior Noise Levels Roadway Segment CNEL at 50 Ft. (dBA) Distance to Contour (Ft) 70 dBA CNEL 65 dBA CNEL 60 dBA CNEL 55 dBA CNEL San Jacinto Avenue North of Site 75.9 121 260 560 1,206 San Jacinto Avenue South of Site 75.2 108 233 503 1,083 Commonwealth Av- enue East of San Jacinto Avenue 66.5 28 59 128 275 Existing With Project Exterior Noise Levels Roadway Segment CNEL at 50 Ft (dBA) Distance to Contour (Ft) 70 dBA CNEL 65 dBA CNEL 60 dBA CNEL 55 dBA CNEL San Jacinto Avenue North of Site 77.3 149 322 694 1,495 San Jacinto Avenue South of Site 76.0 123 264 569 1,225 Commonwealth Av- enue East of San Jacinto Avenue 67.9 34 74 159 343 4.1.v Packet Pg. 284 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 62 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Change in Existing Noise Levels as a Result of Project Roadway1 Segment CNEL at 50 Feet dBA2 Existing Without Project Existing With Project Change in Noise Level Potential Significant Impact San Jacinto Avenue North of Site 75.9 77.3 1.4 No San Jacinto Avenue South of Site 75.2 76.0 0.8 No Commonwealth Ave- nue East of San Jacinto Avenue 66.5 67.9 1.4 No Notes: 1 Exterior noise levels calculated at 5 feet above ground level. 2 Noise levels calculated from the centerline of the subject roadway. Noise Impacts to Off-Site Receptors Due to Stationary Sources Sensitive receptors that may be affected by Project operational noise include adjacent land uses to the immediate north, south, and west. The worst-case stationary noise was modeled using SoundPLAN acoustical modeling software. Worst-case daytime assumes the blowers, vacuums, equipment, Drive- Through, speakerphones, tire store and parking are always operational when in reality the noise will be intermittent and cycle on/off depending on the customer usage. The majority of Project operations are assumed to occur within the City’s allowable daytime (7 a.m. to 10 p.m.) hours. Worst-case nighttime assumes Drive-Through will operate beyond 10 p.m. A total of seven (7) receptors (R1 – R7) were modeled to evaluate the proposed Project’s operational im- pact. A receptor is denoted by a yellow dot in the following Exhibit. All yellow dots represent either a property line or a sensitive receptor such as an outdoor sensitive area (e.g. backyard, patio, common ar- ea). Future Daytime Operational Noise Levels This study compares the Project’s operational noise levels to two (2) different scenarios: 1) Project opera- tional noise level projections and, 2) Project plus ambient level projections. Project Operational Noise Levels The following Exhibits show the Project only daytime and nighttime operational noise levels at the proper- ty lines and/or sensitive receptor areas and illustrate the noise contours at the Project site and how the 4.1.v Packet Pg. 285 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 63 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact noise will propagate at the site. Daytime operational noise levels are anticipated to range between 45.0 to 61.2 dBA Leq(h) at the receptors R1 through R7. Nighttime operational noise levels are anticipated to range between 24.5 to 46.7 dBA Leq(h) at the receptors R1 through R7. Future Daytime Operational Noise Level Contours Future Nighttime Operational Noise Levels 4.1.v Packet Pg. 286 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 64 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Future Nighttime Operational Noise Level Contours The daytime noise projections to the residential and mobile home/multi-family units are below the City’s 65 dBA daytime limit. Allowable Exterior Noise Level1 Noise Zone Type of Land Use Allowed Equivalent Noise Level, Leq2 7:00 am to 10:00 pm 10:00 pm to 7:00 am I Single-Family Residential 65 dBA 45 dBA II Multifamily Residential, Mobile Home Parks 65 dBA 50 dBA III Commercial Property 65 dBA 60 dBA IV Residential Portion of Mixed Use 70 dBA 70 dBA V Manufacturing and Industrial, Other Uses 70 dBA 70 dBA Notes: 1. If the ambient noise exceeds the resulting standard, the ambient noise level shall be the standard 2. 2. Measurements for compliance are made on the affected property pursuant to Section 8.40.160. The nighttime noise projections to the residential units are below the City’s 45 dBA nighttime limit and below the City’s 50 dBA limit for mobile home/multi-family uses. Project Plus Ambient Operational Noise Levels The table below demonstrates the Project plus ambient (quietest measured hourly average level during proposed daytime operable hours) noise levels. Project plus ambient noise level projections are antici- pated to range between 50.1 to 61.3 dBA Leq(h) at the receptors R1 through R7. The noise projections to the mobile home park and residences are below the City’s 65 dBA daytime limit. 4.1.v Packet Pg. 287 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 65 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Worst-case Predicted Daytime (7AM – 10PM) Operational Noise Levels (dBA) Receptor1 Existing Ambient Noise Level (dBA, Leq(h))2 Project Noise Level (dBA, Leq(h))3 Total Combined Noise Level (dBA, Leq(h)) Daytime (7 AM - 10 PM) Stationary Noise Limit (dBA, Leq (h)) Change in Noise Level as Result of Project 1 45.8 51.6 52.6 65.0 6.8 2 45.8 54.1 54.7 8.9 3 45.8 50.4 51.7 5.9 4 45.8 50.0 51.4 5.6 5 45.8 49.7 51.2 5.4 6 45.8 48.1 50.1 4.3 7 45.8 61.2 61.3 15.5 Notes: 1. Receptors 1 through 6 are residential/mobile home areas and R7 is commercial land use. 2. The quietest hourly noise interval was selected (see Table 3, 45.8 dBA). 3. 3. See Exhibit Future Daytime Operational Noise Levels before the operational noise level projections at said recep- tors. In addition, the above table provides the anticipated change in noise level as a result of the proposed Pro- ject during daytime operable conditions. As shown in the above table, the daytime operational noise lev- els will result in a change of 5.4 to 15.5 dBA at the various receptors. Depending on the receptor loca- tion, the change in the noise level has the potential to be clearly noticeable. The change in noise level has the potential to be clearly noticeable but below the City’s allowable limits. The table below demonstrates the Project plus ambient (quietest measured hourly average level during proposed nighttime operable hours) noise levels. Project plus ambient noise level projections are antici- pated to range between 42.5 to 48.1 dBA Leq(h) at the receptors R1 through R7. The noise projections to the mobile home park and residences are below the City’s 50 dBA daytime limit and the City’s 45 dBA limit to single-family residences. Worst-case Predicted Nighttime (10PM – 7AM) Operational Noise Levels (dBA) Receptor1 Existing Ambient Noise Level (dBA, Leq(h))2 Project Noise Level (dBA, Leq(h))3 Total Combined Noise Level (dBA, Leq(h)) Daytime (7 AM - 10 PM) Stationary Noise Limit (dBA, Leq (h)) Change in Noise Level as Result of Project 1 42.4 46.7 48.1 50.0 5.7 2 42.4 42.7 45.6 3.2 3 42.4 37.5 43.6 1.2 4 42.4 28.7 42.6 45.0 0.2 5 42.4 26.7 42.5 0.1 6 42.4 24.5 42.5 50.0 0.1 7 42.4 36.5 43.4 1.0 Notes: 1. Receptors 1 through 6 are residential/mobile home areas and R7 is commercial land use. 2. The quietest hourly noise interval was selected (42.4 dBA from 1 AM - 2 AM). 3. See Exhibit Future Daytime Operational Noise Levels for the operational noise level projections at said receptors. In addition, the above table provides the anticipated change in noise level as a result of the proposed Pro- ject during nighttime operable conditions. As shown in the above table, the nighttime operational noise levels will result in a change of 0.1 to 5.7 dBA at the various receptors. Depending on the receptor loca- tion, the change in the noise level has the potential to be clearly noticeable but below the City’s limits. In both evaluated scenarios and during daytime and nighttime conditions, the noise level projections are below the City’s limits. Nevertheless, MM NOI-1 – MM NOI-6 shall be applied to ensure the greatest compatibility with existing residential uses. Therefore, the Project will comply with the City’s noise limit 4.1.v Packet Pg. 288 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 66 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact and the impact is considered less than significant with mitigation, directly, indirectly, and cumulatively. Construction Noise The degree of construction noise may vary for different areas of the Project site and also vary depending on the construction activities. Noise levels associated with the construction will vary with the different phases of construction. The Environmental Protection Agency (EPA) has compiled data regarding the noise generated character- istics of typical construction activities. The data is presented in the table below. Typical Construction Noise Levels1 Equipment Powered by Internal Combustion Engines Type Noise Levels (dBA) at 50 Feet Earth Moving Compactors (Rollers) 73 - 76 Front Loaders 73 - 84 Backhoes 73 - 92 Tractors 75 - 95 Scrapers, Graders 78 - 92 Pavers 85 - 87 Trucks 81 - 94 Materials Handling Concrete Mixers 72 - 87 Concrete Pumps 81 - 83 Cranes (Movable) 72 - 86 Cranes (Derrick) 85 - 87 Stationary Pumps 68 - 71 Generators 71 - 83 Compressors 75 - 86 Impact Equipment Type Noise Levels (dBA) at 50 Feet Saws 71 - 82 Vibrators 68 - 82 Notes: 1 Referenced Noise Levels from the Environmental Protection Agency (EPA) Construction noise is considered a short-term impact and would be considered significant if construction activities are taken outside the allowable times as described in the City’s Municipal Code (Section 8.40.090). Construction is anticipated to occur during the permissible hours according to the City’s Mu- nicipal Code. Construction noise will have a temporary or periodic increase in the ambient noise level above the existing within the project vicinity. Furthermore, noise reduction measures are provided as mit- igation MM NOI-7 – MM NOI-12 to further reduce construction noise. The impact is considered less than significant with mitigation, directly, indirectly, and cumulatively. Typical operating cycles for these types of construction equipment may involve one or two minutes of full power operation followed by three to four minutes at lower power settings. Noise levels will be loudest during grading phase. A likely worst-case construction noise scenario during grading assumes the use of a grader, a dozer, and two (2) excavators, two (2) backhoes and a scrapper operating at 50 feet from the nearest sensitive receptor. Assuming a usage factor of 40 percent for each piece of equipment, unmitigated noise levels at 50 feet have the potential to reach 90 dBA Leq and 92 dBA Lmax at the nearest sensitive receptors during grad- ing. Noise levels for the other construction phases would be lower and range between 85 to 90 dBA. MM NOI-1: The Project shall incorporate a minimum six-foot high decorative block walls along the 4.1.v Packet Pg. 289 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 67 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact northern and western property lines (adjacent to the existing mobile home park and resi- dences). MM NOI-2: Any rooftop or ground mounted HVAC units should be positioned at a physical distance as far as plausible from adjacent residences. In addition, the equipment should be shielded by a parapet wall with a height equal or greater than the equipment. The height of the wall must be taller than the HVAC units and shall be designed to completely shield any noise that may be able to flank around the parapet wall. MM NOI-3: Drive-Through and drive-up speakerphones shall be positioned in a direction facing away from the mobile home park to the north. The speakerphones shall incorporate a system that is capable of lowering the output volume during night-time conditions such that the levels are at or below ambient conditions. HM Electronics has a speaker system which adjusts the outbound volume on the system based on the ambient noise. Noise level es- timates based on the manufacturer’s specifications are provided in Appendix E of the Noise Impact Study. MM NOI-4: Ensure vacuum turbines are enclosed with a roof and properly fitted with silencer attenu- ators. MM NOI-5: The car wash mechanical equipment room shall be fitted with acoustic louver doors or equivalent. MM NOI-6: Trash collection to the site shall occur during daytime hours. MM NOI-7: Truck deliveries shall occur during daytime hours. MM NOI-8: Construction should occur during the permissible hours as defined in Section 8.40.090, that is Monday through Saturday between the hours of 7:00 a.m. and 7:00 p.m. No con- struction shall take place on Sundays or any Federal holiday. MM NOI-9: During construction, the contractor shall ensure all construction equipment is equipped with appropriate noise attenuating devices. MM NOI-10: The contractor shall locate equipment staging areas that will create the greatest distance between construction-related noise/vibration sources and sensitive receptors nearest the Project site during all Project construction. MM NOI-11: Idling equipment shall be turned off when not in use. MM NOI-12: Equipment shall be maintained so that vehicles and their loads are secured from rattling and banging. b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise lev- els? Response: (Source: General Plan as amended October 19, 2012; Noise Element Figure N-1 – Future Noise Contours; General Plan EIR; Figure 5.10.1 – Future Noise Contours; General Plan EIR Addendum August 2012; Municipal Code Chapter 8.40 – Noise Control; Noise Impact Study, San Jacinto Commonwealth Development, prepared by MD Acoustics, October 30, 2017; & Memo from MD Acoustics, February 19, 2018 ) PPV – Known as the peak particle velocity (PPV) which is the maximum instantaneous peak in vibration velocity, typically given in inches per second. RMS – Known as root mean squared (RMS) can be used to denote vibration amplitude VdB – A commonly used abbreviation to describe the vibration level (VdB) for a vibration source. 4.1.v Packet Pg. 290 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 68 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Ground-borne vibrations consist of rapidly fluctuating motions within the ground that have an average mo- tion of zero. The effects of ground-borne vibrations typically only cause a nuisance to people, but at ex- treme vibration levels, damage to buildings may occur. Although ground-borne vibration can be felt out- doors, it is typically only an annoyance to people indoors where the associated effects of the shaking of a building can be notable. Ground-borne noise is an effect of ground-borne vibration and only exists indoors since it is produced from noise radiated from the motion of the walls and floors of a room and may also consist of the rattling of windows or dishes on shelves. Typically, developed areas are continuously affected by vibration velocities of 50 VdB or lower. These continuous vibrations are not noticeable to humans whose threshold of perception is around 65 VdB. Outdoor sources that may produce perceptible vibrations are usually caused by construction equipment, steel-wheeled trains, and traffic on rough roads, while smooth roads rarely produce perceptible ground- borne noise or vibration. To counter the effects of ground-borne vibration, the Federal Transit Administra- tion (FTA) has published guidance relative to vibration impacts. According to the FTA, fragile buildings can be exposed to ground-borne vibration levels of 0.3 inches per second without experiencing structural damage. There are three main types of vibration propagation: surface, compression, and shear waves. Surface waves, or Rayleigh waves, travel along the ground’s surface. These waves carry most of their energy along an expanding circular wavefront, similar to ripples produced by throwing a rock into a pool of water. P-waves, or compression waves, are body waves that carry their energy along an expanding spherical wavefront. The particle motion in these waves is longitudinal (i.e., in a “push-pull” fashion). P-waves are analogous to airborne sound waves. S-waves, or shear waves, are also body waves that carry energy along an expanding spherical wavefront. However, unlike P-waves, the particle motion is transverse, or side-to-side and perpendicular to the direction of propagation. As vibration waves propagate from a source, the vibration energy decreases in a logarithmic nature and the vibration levels typically decrease by 6 VdB per doubling of the distance from the vibration source. As stated above, this drop-off rate can vary greatly depending on the soil but has been shown to be effective enough for screening purposes, in order to identify potential vibration impacts that may need to be studied through actual field tests. Operational Vibration The proposed Project does not propose uses that will cause vibration velocities of 50 VdB or higher which is the level typically expected in developed areas. To ensure that the Project does not go above the 50 VdB for operational, day-to-day activity, MM NOI-13 is proposed. With the implementation of MM NOI-13, the Project’s operational ground-borne vibration will be less than significant with mitigation, directly, indirectly, and cumulatively. Construction Vibration Construction activities can produce vibration that may be felt by adjacent land uses. The construction of the proposed Project would not require the use of equipment such as pile drivers, which are known to generate substantial construction vibration levels. The primary vibration source during construction may be from a bulldozer. A large bulldozer has a vibration impact of 0.089 inches per second peak particle velocity (PPV) at 25 feet which is perceptible but below any risk of architectural damage. The fundamental equation used to calculate vibration propagation through average soil conditions and distance is as follows: PPVequipment = PPVref (100/Drec)n Where: PPVref = reference PPV at 100ft. Drec = distance from equipment to receiver in ft. n = 1.1 (the value related to the attenuation rate through ground) 4.1.v Packet Pg. 291 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 69 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The thresholds from the Caltrans Transportation and Construction Induced Vibration Guidance Manual in the table below provides general thresholds and guidelines as to the vibration damage potential from vi- bratory impacts. Guideline Vibration Damage Potential Threshold Criteria Structure and Condition Maximum PPV (in/sec) Transient Sources Continuous/Frequent Intermittent Sources Extremely fragile historic buildings, ruins, ancient monu- ments 0.12 0.08 Fragile buildings 0.2 0.1 Historic and some old buildings 0.5 0.25 Older residential structures 0.5 0.3 New residential structures 1.0 0.5 Modern industrial/commercial buildings 2.0 0.5 Source: Table 19, Transportation and Construction Vibration Guidance Manual, Caltrans, Sept. 2013. Note: Transient sources create a single isolated vibration event, such as blasting or drop balls. Continuous/frequent intermit- tent sources include impact pile drivers, pogo-stick compactors, crack-and-seat equipment, vibratory pile drivers, and vibrato- ry compaction equipment. The table below gives approximate vibration levels for particular construction activities. This data pro- vides a reasonable estimate for a wide range of soil conditions. Vibration Source Levels for Construction Equipment1 Equipment Peak Particle Velocity (inches/second) at 25 feet Approximate Vibration Level LV (dVB) at 25 feet Pile driver (impact) 1.518 (upper range) 112 0.644 (typical) 104 Pile driver (sonic) 0.734 upper range 105 0.170 typical 93 Clam shovel drop (slurry wall) 0.202 94 Hydromill 0.008 in soil 66 (slurry wall) 0.017 in rock 75 Vibratory Roller 0.21 94 Hoe Ram 0.089 87 Large bulldozer 0.089 87 Caisson drill 0.089 87 Loaded trucks 0.076 86 Jackhammer 0.035 79 Small bulldozer 0.003 58 1 Source: Transit Noise and Vibration Impact Assessment, Federal Transit Administration, May 2006. At a distance of 20 feet, a large bulldozer would yield a worst-case 0.114 PPV (in/sec) which may be per- ceptible for short periods of time during grading along the western property line of the Project site but is below any threshold of damage. The impact is less than significant, directly, indirectly, and cumulative- ly. MM NOI-13: The day-to-day operation of the uses proposed for the Project site shall not exceed a VdB greater than 50. c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? Response: (Source: General Plan as amended October 19, 2012; Noise Element Figure N-1 – Future Noise Contours; General Plan EIR; Figure 5.10.1 – Future Noise Contours; General Plan EIR Addendum August 2012; Municipal Code Chapter 8.40 – Noise Control; Noise Impact Study, San Jacinto Commonwealth Development, prepared by MD Acoustics, October 30, 2017; & Memo from MD Acoustics, February 19, 2018 ) See Response XII a) above. 4.1.v Packet Pg. 292 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 70 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? Response: (Source: General Plan as amended October 19, 2012; Noise Element Figure N-1 – Future Noise Contours; General Plan EIR; Figure 5.10.1 – Future Noise Contours; General Plan EIR Addendum August 2012; Municipal Code Chapter 8.40 – Noise Control; Noise Impact Study, San Jacinto Commonwealth Development, prepared by MD Acoustics, October 30, 2017; & Memo from MD Acoustics, February 19, 2018 ) See Response XII a) above. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Response: (Source: General Plan as amended October 19, 2012; Noise Element Figure N-1 – Future Noise Contour; General Plan EIR; Figure 5.10.1 – Future Noise Contours; General Plan EIR Addendum August 2012; Municipal Code Chapter 8.40 – Noise Control; & Riverside County Land Use Commission – Hemet-Ryan Airport Plan Final 2017) The Project is not located within the influence area of the Hemet-Ryan Airport and would have no im- pact, directly, indirectly, or cumulatively from the airport and no additional mitigation is required. f) For a project within the vicinity of a private airstrip, would the project expose people residing or work- ing in the project area to excessive noise levels? Response: (Source: General Plan as amended October 19, 2012, Noise Element Figure N-1 – Future Noise Contours, General Plan EIR, Figure 5.10.1 – Future Noise Contours, General Plan EIR Addendum August 2012, Municipal Code Chapter 8.40 – Noise Control & Riverside County Land Use Commission – Hemet-Ryan Airport Plan Final 2017) There are no private airports within two miles of the City and therefore this Project will have no impact, directly, indirectly, or cumulatively resulting in a safety hazard. XIII. POPULATION AND HOUSING – Would the pro- ject: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through the extension of a road or other infrastruc- ture)? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) The Project will not induce growth as it is consistent with the City’s General Plan land use designation of CC – Community Commercial. The City’s General Plan establishes the development potential of the City to accommodate the City’s growth to 2050. The Project, as proposed, will help to accommodate that growth, but will not induce it. The development of the site will result in commercial buildings which are consistent with the City of San Jacinto’s General Plan. The Project site is located on existing streets, and utilities and public facilities are all available in the immediate area. No new road or utility infrastructure is required. Project-related im- pacts are expected to be less than significant. b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) The Project site is vacant and will not displace any persons or require the construction of replacement housing. Therefore, there is no impact on housing c) Displace substantial numbers of people, necessi- 4.1.v Packet Pg. 293 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 71 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact tating the construction of replacement housing elsewhere? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) The Project site is vacant, including the existing residence, and will not displace any persons, or require the construction of replacement housing. Therefore, there is no impact on housing. XIV. PUBLIC SERVICES – Would the project: a) Result in substantial adverse physical impacts as- sociated with the provision of new or physically al- tered governmental facilities, need for new or physically altered governmental facilities, the con- struction of which could cause significant environ- mental impacts, in order to maintain acceptable service ratios, response times or other perfor- mance objectives for any of the public services: Fire protection? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) The Project is located approximately 1.2 miles from Riverside County Fire Station #25 located at 132 S. San Jacinto Avenue. As a result, fire personnel will be able to reach the site within the recommended response time. The Fire Department will approve the Project site plan to ensure it meets applicable fire standards and regulations. As referenced in Section VIII – Hazards and Hazardous Materials, the Project will be designed consistent with California Building Code 2013 edition, the National Fire Protection Association (NFPA) Code Section 30a requirements for fueling stations and onsite storage of flammable material such as gasoline and die- sel and related state regulations governing the design and operation of fueling facilities. Like any devel- opment project, the Project may increase demand for fire service; however, the Project is consistent with the General Plan land use designation for the site and would not increase the population beyond what was anticipated in the General Plan. Further, the Project would be designed and constructed consistent with applicable codes and standards for access and fire suppression infrastructure. The Project will not require the construction of a new fire station to maintain service ratios. Through the implementation of all regulations and City policies for development projects, the Project will have a less than significant im- pact on fire services, directly, indirectly, and cumulatively. Police protection? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) To assure that police service is sufficient to meet demand, the City has established a Public Safety Capi- tal Improvement Fund, to which all new commercial development must pay at the time of building permit issuance. Through the implementation of all regulations and City policies for development projects, the Project will have a less than significant impact on police services, directly, indirectly, and cumulatively. Schools? Response: (Source: General Plan as amended October 19, 2012; Community Services & Facilities Element Figure CSF-1 – School Districts; General Plan EIR; General Plan EIR Addendum August 2012; San Jacinto Unified School District 2015 Facilities Master Plan) The Project is located within the service area boundary of the San Jacinto Unified School District. The Project is required to pay the state-mandated school fees in place at the time that development occurs. These fees are designed to mitigate impacts to schools by providing funds for the construction of new facilities. Through the implementation of all regulations and City and School District policies for develop- ment projects, the Project will have a less than significant impact on schools, directly, indirectly, and 4.1.v Packet Pg. 294 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 72 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact cumulatively. Parks? Response: (Source: General Plan as amended October 19, 2012; Community Services and Facilities Element Figure CSF-3 – Parks & Public Facilities; General Plan EIR; General Plan EIR Addendum August 2012; Parks Master Plan, November 2005; Munic- ipal Code Chapter 16.40 – Park Dedications and Fees; & Chapter 15.36 – Park and Open Space Development Fees) The City has a broad range of available recreation facilities, programs, and parks. The Project will not increase the demand for public parks. The Project will have a small incremental demand on park services which is covered through the payment of the Park Development Fee required for all new construction. Therefore, the Project will have a less than significant impact on recreational facilities, directly, indirect- ly, and cumulatively. Other public facilities? Response: (Source: General Plan as amended October 19, 2012; Community Services and Facilities Element Figure CSF-3 – Parks & Public Facilities; CSF-4 – Trails Opportunities Map; General Plan EIR; General Plan EIR Addendum August 2012; Parks Master Plan, November 2005; Municipal Code Chapter 16.40 – Park Dedications and Fees; & Chapter 15.36 – Park and Open Space Development Fees) The Project will not result in an increase in demand for other City services and facilities, including recrea- tional trails and library services. Therefore, no impacts to other public facilities will occur directly, indi- rectly, and cumulatively. XV. RECREATION – Would the project: a) Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? Response: (Source: General Plan as amended October 19, 2012; Community Services and Facilities Element Figure CSF-3 – Parks & Public Facilities; CSF-4 – Trails Opportunities Map; General Plan EIR; General Plan EIR Addendum August 2012; Parks Master Plan, November 2005; Municipal Code Chapter 16.40 – Park Dedications and Fees; & Chapter 15.36 – Park and Open Space Development Fees) The City and Valley-Wide Recreation provide a broad range of recreation facilities, programs, and parks. The City established a park ratio of 5.0 acres of developed parkland for every 1,000 residents. The City’s Parks Master Plan details recommendations and standards to meet park facility demand. There are 83.5 acres of parks and recreational facilities (General Plan Table CSF-1 – Existing Parks and Recreational Facilities) with another 50 acres planned (General Plan Table CSF-2 – Planned Parks and Recrea- tional Facilities). The Project will have a small incremental demand on existing parks which is covered through the pay- ment of the Park Development Fee required for all new construction. Therefore, the Project will have a less than significant impact on recreational facilities, directly, indirectly, and cumulatively. b) Does the project include recreational facilities or require the construction or expansion of recrea- tional facilities which have an adverse physical ef- fect on the environment? Response: (Source: General Plan as amended October 19, 2012; Community Services and Facilities Element Figure CSF-3 – Parks & Public Facilities; CSF-4 – Trails Opportunities Map; General Plan EIR; General Plan EIR Addendum August 2012; Parks Master Plan, November 2005; Municipal Code Chapter 16.40 – Park Dedications and Fees; & Chapter 15.36 – Park and Open Space Development Fees) The Project does not include the construction of recreational facilities or require the need to construct rec- reational facilities. The Project will have no impact, directly, indirectly, or cumulatively on recreational facilities. XVI. TRANSPORTATION / TRAFFIC – Would the project: a) Conflict with an applicable plan, ordinance or poli- cy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass 4.1.v Packet Pg. 295 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 73 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? Response: (Source: General Plan as amended October 19, 2012; Circulation Element Table C-1 – Overview of Street Classifi- cations; Figure C-1 – Roadway Cross Sections; Figure C-2 – Roadway System; Figure C-4 – Bikeways; Figure C-5 – Standard Bikeway Cross Sections; General Plan EIR; General Plan EIR Addendum August 2012; Figure 5.13-5 – Proposed City of San Jacin- to General Plan Network; Figure 5.13-6 – General Plan Roadway Cross-Sections; Commonwealth Crossing Traffic Impact Analysis, prepared by Trames Solutions, Inc., October 10, 2017; & Revised March 7, 2018) STREET/HIGHWAY FACILITIES San Jacinto Avenue is proposed as a Major Highway and Commonwealth Avenue is proposed as a Sec- ondary Highway in the City’s General Plan. A Major Highway is designated as a 112-foot wide four-lane roadway with a painted 12-foot median. Study Area and Intersections In general, the study area is based on the Projects’ trip generation and distribution assumptions. Inter- sections, where the Project is likely to add 50 or more peak hour trips, have been included for analysis purposes. STUDY AREA INTERSECTIONS 1. San Jacinto Ave./Commonwealth Ave. – Driveway 1 2. San Jacinto Ave./Esplanade Ave. 3. San Jacinto Ave./Menlo Ave. 4. Hewitt St./Commonwealth Ave. 5. State St./Esplanade Ave. 6. San Jacinto Ave./7th Street 7. San Jacinto Ave./Driveway 2 - (Future) Existing (2017) Traffic Existing traffic was counted to determine current conditions. This constitutes the environmental setting for a CEQA analysis at the time that the hearing body reviews the Project. Existing intersection level of service calculations are based on manual AM and PM peak hour turning movement counts made for Trames Solutions, Inc. in September 2017. The study area intersections are currently operating at an acceptable level of service (LOS “D” or better) during the peak hours with the existing geometry and traffic controls. Existing + Project 2017 Conditions For E+P conditions, the study area intersections are anticipated to continue to operate at an acceptable level of service (LOS “D” or better) during the peak hours with the existing geometry and traffic controls. For Project access purposes, the following intersections are configured as follows: San Jacinto Avenue / Commonwealth Avenue – Driveway 1 (#1) NB Approach: Provide a dedicated left turn lane. SB Approach: Maintain existing lanes. EB Approach: Provide a dedicated left turn lane and shared through right lane. WB Approach: Modify striping to provide 1 left turn lane, 1 through lane, and 1 right turn lane. San Jacinto Avenue / Driveway 2 (#7) - Install stop control on eastbound approach and restrict drive- way 2 to right in / right out (RI/RO) access only. NB Approach: Maintain existing lanes. 4.1.v Packet Pg. 296 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 74 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact SB Approach: Maintain existing lanes. EB Approach: Provide a right turn only lane. Existing + Ambient + Project (2020) Conditions For EAP conditions, the study area intersections are anticipated to continue to operate at an acceptable level of service (LOS “D” or better) during the peak hours with the existing geometry and traffic controls. Access improvements identified under E+P conditions still apply to E+A+P (2020) conditions. Existing + Ambient + Cumulative + Project (2020) Conditions For EACP conditions, there are no new intersections anticipated to operate at an unacceptable level of service in addition to the intersection previously identified under Existing and E+A+P conditions. Access improvements identified under E+P and E+A+P (2020) conditions still apply to E+A+C+P (2020) condi- tions. Vehicle Trip Reduction Program Chapter 10.28 – Vehicle Trip Reduction Program and Chapter 17.350 – Transportation Demand Man- agement applies to all new retail commercial projects where the development could employ fifty (50) or more persons based on a 500-square-foot to one employee ratio for retail and 300-square-feet to one employee for office. As proposed the Project generates 123 employees. The applicant shall submit a Trip Reduction Program (TRP) for Planning approval prior to building permit issuance. Once approved the program shall be used by all owners/tenants as stated in a covenant on the land (MM TRAF -3). Measures to be included in the TRP include the provision ten percent of all required parking stalls desig- nated as parking for any combination of low-emitting, fuel efficient and carpool/vanpool vehicles (MM TRAF -4) in compliance with table A5.106.5.1.1 of the CalGreen Code and four percent of all required parking stalls shall be electrical vehicle charging stations (MM TRAF -5). With mitigation measures, MM TRAF-1 – MM TRAF-5 the measures of effectiveness for the performance of the streets/highways system will be less than significant with mitigation, directly, indirectly, and cu- mulatively. ALTERNATIVE MODES OF TRANSPORTATION Alternative modes of transportation mean any other way to commute other than driving alone. Examples include biking, walking, carpooling, and taking public transportation. The Project proposes to develop a vacant lot with five different vehicle-oriented uses. Pedestrian Sidewalks along roadways and curb ramps at intersections are present in locations where development has occurred to serve the pedestrian. As well, the Project will provide all required sidewalks and ramps within the Project area. Decorative walkways with appropriate signage shall be designed throughout the site to provide the pedestrian with a safe way to maneuver through the site (MM TRAF -6). Bicycles Pursuant to the General Plan, no bikeways are proposed along San Jacinto Avenue or Commonwealth Avenue under the City’s General Plan. To promote bicycle usage the both, long-term and short-term bi- cycle parking stall be provided throughout the site (MM TRAF -7). Public Transit Services The City of San Jacinto is served by the Riverside Transit Agency (RTA) which provides bus service to 4.1.v Packet Pg. 297 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 75 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact western Riverside County. RTA has reviewed the Project and does not request any infrastructure up- grades for their service. RTA Routes 31, 32, 33, and 42 currently provide service to the Project area. Regular Bus Service • Route 31 travels between the Hemet Valley Mall – San Jacinto – Beaumont/Banning – Moreno Valley Mall • Route 32 travels between the Hemet Valley Mall – Mount San Jacinto College • Route 33 travels between the Hemet Valley Mall – Sanderson & Thornton – Stanford & Stetson • Route 42 travels between the Hemet Valley Mall – San Jacinto – Soboba Casino • Route 74 travels between San Jacinto – Hemet – Sun City – Perris Commuter Link Express RTA Routes 212 and 217 currently provide Commuter Link Express service to the Project area. • Route 212 travels between San Jacinto – Hemet – Perris – Riverside • Route 217 travels between San Jacinto – Hemet – Temecula – Escondido The Project will be adequately served by bus transportation. With the implementation of MM TRAF-6 and MM TRAF -7, the Project will have a less than significant impact with mitigation, directly, indirectly, and cumulatively on alternative modes of transportation. TEMPORARY TRAFFIC IMPACTS FROM CONSTRUCTION The Project will be importing approximately 5,000 cubic yards of fill dirt during the grading stage of con- struction. The applicant projects that this will relate to approximately 350 truckloads of dirt. To ensure that these truck trips do not significantly impact the roadway system, MM TRAF -8 is proposed. CITY CAPITAL IMPROVEMENT PROGRAM (CIP) San Jacinto Avenue has just recently undergone pavement rehabilitation from Esplanade Avenue to Main Street under the City’s CIP program. No other CIP projects are proposed for this section of San Jacinto Avenue. The Project will participate in the phased construction of off-site traffic signals through payment of traffic signal mitigation fees into the Traffic Signalization Fund which is used for the construction of traffic safety improvements such as traffic signals, warning lights, and signal coordinating equipment. Adherence to all Engineering requirements for San Jacinto Avenue and Commonwealth Avenue will en- sure that there is no impact to the City’s CIP, directly, indirectly, and cumulatively. WRCOG TRANSPORTATION UNIFORM MITIGATION FEE (TUMF) PROGRAM Under the TUMF plan, San Jacinto Avenue is planned as a four-lane roadway. At this time no roadway improvements for this portion of San Jacinto Avenue are proposed under the TUMF Program. Neverthe- less, the Project will participate in the cost of off-site improvements through payment of TUMF fees based on the current fees at the time of construction of the Project. Therefore, there is no impact under the TUMF guidelines, directly, indirectly, or cumulatively to a TUMF roadway. SUMMARY Therefore, the Project as designed and conditioned will have a less than significant impact with miti- gation, directly, indirectly, and cumulatively on the performance of the circulation system, non-motorized plans, and ordinances or policies establishing measures of effectiveness for the performance of the non- 4.1.v Packet Pg. 298 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 76 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact motorized circulation system. MM TRAF-1: Construction of on-site improvements shall occur in conjunction with adjacent Project de- velopment activity or as needed for Project access purposes. The recommended on-site roadway improvements are described below. • On-site traffic signing and striping should be implemented in conjunction with de- tailed construction plans for the Project. • Verify that minimum sight distance is provided at the Project access points. MM TRAF-2: Design of off-site improvements shall be approved by the City Engineer prior to grading permit issuance and built prior to building permit issuance. The recommended off-site roadway improvements are described below. • Construct the ultimate half section of San Jacinto Avenue as a major highway ad- jacent to the Project site between the northerly Project boundary and the souther- ly Project boundary in conjunction with development. • Provide a 150-foot northbound left turn lane on San Jacinto Avenue at the intersection with Commonwealth Avenue. MM TRAF-3: The applicant shall submit a Trip Reduction Program (TRP) for Planning approval prior to building permit issuance. Once approved the program shall be used by all own- ers/tenants as stated in a covenant on the land. MM TRAF-4: The site plan shall provide ten percent of all required parking stalls designated as parking for any combination of low-emitting, fuel efficient and carpool/vanpool vehicles in compli- ance with table A5.106.5.1.1 of the CalGreen Code. MM TRAF-5: The site plan shall provide four percent of all required parking stalls with electric vehicle charging stations pursuant to Chapter 17.430.361 of the Development Code and 5.106.5.3 of the CalGreen Code. MM TRAF-6: The site plan shall be redesigned prior to grading permit approval, for Planning approval, to provide decorative walkways with appropriate signage throughout the site. MM TRAF-7: The site plan shall provide long-term and short-term bicycle parking in accordance with Chapter 17.330.110 of the Development Code and Section 5.710.6.2 of the Cal Green Code. MM TRAF-8: Prior to demolition and/or grading permit issuance the applicant shall submit a haul route plan for Planning and Engineering review and approval. This plan shall include the street route, proposed time of day of the hauling, any required signage, and start/end dates. b) Conflict with an applicable congestion manage- ment program, including, but not limited to, level of service standards and travel demand measures, or other standards established by the county conges- tion management agency for designated roads or highways? Response: (Source: Riverside County Congestion Management Program, Riverside County Transportation Commission, De- cember 14, 2011; San Jacinto 5-Year Capital Improvement Program 2014; Western Riverside Council of Governments TUMF Pro- gram; General Plan as amended October 19, 2012; Circulation Element Table C-1 – Overview of Street Classifications; Figure C-1 – Roadway Cross Sections; Figure C-2 – Roadway System; Figure C-4 – Bikeways; Figure C-5 – Standard Bikeway Cross Sections; General Plan EIR; General Plan EIR Addendum August 2012; Figure 5.13-5 – Proposed City of San Jacinto General Plan Network; Figure 5.13-6 – General Plan Roadway Cross-Sections; Commonwealth Crossing Traffic Impact Analysis, prepared by Trames Solutions, Inc., October 10, 2017; & Revised March 7, 2018) 4.1.v Packet Pg. 299 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 77 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The Riverside County Transportation Commission (RCTC) 2014 Congestion Management Program (CMP) designates certain roadways as CMP facilities. SR 79 is a designated highway on RCTC’s CMP system. Currently, SR 79 is San Jacinto Avenue in the City and is the only CMP facility possibly impacted by this Project. The CMP designates a minimum acceptable LOS of E on CMP facilities (RCTC 2010). However, the City requires a LOS D or better for roadways. The City’s LOS standard for CMP roadways is more stringent than the RCTC standard. This Project does not lower the LOS on San Jacinto Avenue below LOS D there is no impact under the to the CMP guidelines, directly, indirectly, or cumulatively to a CMP road- way. c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; & Riverside County Land Use Commission – Hemet-Ryan Airport Plan Final 2017) The Project site is outside the airport influence area for the Hemet-Ryan Airport (2017). The Project will have no impact on the facilities or operations of the airport and will not result in a change in air traffic pat- terns. Therefore, the Project would have no impact, directly, indirectly, or cumulatively on airport opera- tions. d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersec- tions) or incompatible uses (e.g., farm equip- ment)? Response: (Source: Riverside County Congestion Management Program, Riverside County Transportation Commission, De- cember 14, 2011; General Plan as amended October 19, 2012; Circulation Element Table C-1 – Overview of Street Classifications; Figure C-1 – Roadway Cross Sections; Figure C-2 – Roadway System; Figure C-4 – Bikeways; Figure C-5 – Standard Bikeway Cross Sections; General Plan EIR; General Plan EIR Addendum August 2012; Figure 5.13-5 – Proposed City of San Jacinto Gen- eral Plan Network; Figure 5.13-6 – General Plan Roadway Cross-Sections; Commonwealth Crossing Traffic Impact Analysis, pre- pared by Trames Solutions, Inc., October 10, 2017; & Revised March 7, 2018) Most of the roadway improvements to the site are already developed. As designed the Project has been reviewed for both on-site and off-site safety hazards by Engineering and Fire. The Project will have less than significant impact, directly, indirectly, and cumulatively, as it will not create or increase hazards on the circulation system. e) Result in inadequate emergency access? Response: (Source: Riverside County Congestion Management Program, Riverside County Transportation Commission, De- cember 14, 2011; General Plan as amended October 19, 2012; Circulation Element Table C-1 – Overview of Street Classifications; Figure C-1 – Roadway Cross Sections; Figure C-2 – Roadway System; Figure C-4 – Bikeways; Figure C-5 – Standard Bikeway Cross Sections; General Plan EIR; General Plan EIR Addendum August 2012; Figure 5.13-5 – Proposed City of San Jacinto Gen- eral Plan Network; Figure 5.13-6 – General Plan Roadway Cross-Sections; Commonwealth Crossing Traffic Impact Analysis, pre- pared by Trames Solutions, Inc., October 10, 2017; & Revised March 7, 2018) The City’s continued implementation of General Plan 2050 policies and programs and the review of the Project by both the Police and Fire Departments will ensure a less than significant impact, directly, indi- rectly, and cumulatively on emergency access. f) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facil- ities, or otherwise decrease the performance or safety of such facilities? Response: (Source: Riverside County Congestion Management Program, Riverside County Transportation Commission, De- cember 14, 2011; General Plan as amended October 19, 2012; Circulation Element Table C-1 – Overview of Street Classifications; Figure C-1 – Roadway Cross Sections; Figure C-2 – Roadway System; Figure C-4 – Bikeways; Figure C-5 – Standard Bikeway Cross Sections; General Plan EIR; General Plan EIR Addendum August 2012; Figure 5.13-5 – Proposed City of San Jacinto Gen- eral Plan Network; Figure 5.13-6 – General Plan Roadway Cross-Sections; Commonwealth Crossing Traffic Impact Analysis, pre- pared by Trames Solutions, Inc., October 10, 2017; & Revised March 7, 2018) See response XVI d) above. 4.1.v Packet Pg. 300 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 78 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact XVII. TRIBAL CULTURAL RESOURCES – Would the project cause a substantial adverse change in the significance of a tribal cultural resource, de- fined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or ob- ject with cultural value to a California Native American tribe, and that is: a) Listed or eligible for listing in the California Regis- ter of Historical Resources, or in a local register of historical resources as defined in Public Re- sources Code section 5020.1(k), or Response: (Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Re- sources; General Plan FEIR; Figure 5.5-1 – Existing Cultural Resources; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.1-1 – Existing Cultural Resources; Development Code Chapter 17.500 – Archaeological and Paleontological Protec- tion; Chapter 17.510 – Historic Preservation; & Report of Findings From a Record Search Conducted for Assessor’s Parcel Number 439-120-042, prepared by SRS, October 5, 2017) See response V a). A NAHC record search found 48 cultural sites within a one-mile radius of the pro- posed Project. The NAHC provided a list of the tribes culturally affiliated to the Project area and recom- mended those tribes be contacted to further assess the presence or absence of cultural resources. To date, no responses have been received. As well, per Appendix A attached, the City conducted tribal consultation under AB 52, commencing on December 18, 2017. None of the consulted tribes noted the Project site as a Historical Resource for a Native American Tribe. Through the implementation of MM CR-1 to MM CR-3 and PALEO-1, the Project will have a less than significant impact with mitigation, directly, indirectly, and cumulatively on a Historical Resource. b) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivi- sion (c) of Public Resources Code Section 5024.1, the lead agency shall consider the signifi- cance of the resource to a California Native Amer- ican tribe. Response: (Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Re- sources; Ge(Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Re- sources; General Plan FEIR; Figure 5.5-1 – Existing Cultural Resources; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.1-1 – Existing Cultural Resources; Development Code Chapter 17.500 – Archaeological and Paleontological Protec- tion; Chapter 17.510 – Historic Preservation; & Report of Findings From a Record Search Conducted for Assessor’s Parcel Number 439-120-042, prepared by SRS, October 5, 2017) See response XVII a) above, the Records Search referenced above, did not identify the presence of sig- nificant resources on-site pursuant to criteria set forth in subdivision (c) of Public Resource Code Section 5024.1. However, as referenced, the Soboba and Rincon Bands of Luiseño Indians requested consulta- tion and implementation of MM CR-1 to MM CR-3 to address significant resources that may be present on the site. Therefore, the Project will have less than significant impact with mitigation, directly, indi- rectly, and cumulatively on a Tribal Historical Resource. XVIII. UTILITIES AND SERVICE SYSTEMS – a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) 4.1.v Packet Pg. 301 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 79 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Wastewater would be conveyed to the existing 18-inch sewer line located in San Jacinto Avenue and then to the EMWD’s Hemet/San Jacinto Regional Water Reclamation Facility. This 255-acre facility is located at 770 North Sanderson Avenue in the western portion of the City of San Jacinto. The plant per- forms primary, secondary, and tertiary treatment of wastewater, removing bacteria, viruses, and virtually all suspended solids. The facility’s current capacity is 14 million gallons per day (mgd) and the ultimate planned expansion capacity is 27 mgd. The plant currently treats approximately 9 mgd. The Project would create additional demand for existing facilities; however, the wastewater would be do- mestic waste and treatment standards would be met as required per the current National Pollutant Dis- charge Elimination System permit (CAS 618033) issued by the Santa Ana Regional Water Quality Control Board to the Riverside County Flood Control and Conservation District and co-permittees which include the City of San Jacinto. The addition of the proposed Project will not significantly impact EMWD’s capacity, and impacts associat- ed with wastewater treatment will be less than significant, directly, indirectly, and cumulatively. b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) As noted in XVIII a) above, the Project will not exceed the current capacity of the water and wastewater system s. The City implements all requirements of the Regional Water Quality Control Board pertaining to water quality and wastewater discharge. The Project will have a less than significant impact, directly, indirectly, and cumulatively on wastewater treatment. c) Require or result in the construction of new stormwater drainage facilities or expansion of ex- isting facilities, the construction of which could cause significant environmental effects? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 13.44 – Storm Water Management; Chapter 16.24 – Improvements; Chapter 13.04 – Water Service; Chapter 15.40 – Floodplain Management; Development Code Section 17.300.120 – Water Quality; Section 17.305.050 – Floodplain Management; Section 17.520.050 – Water Quality; Section 17.600.100 – Water Quality Management Plan (WQMP) Required; Pre- liminary Drainage Study, prepared by Salem Engineering Group, Inc., September 5, 2017; & Project Specific Water Quality Man- agement Plan, prepared by Salem Engineering Group, Inc., December 29, 2017) Pursuant to NPDES regulations, the City will require that the Project complies with existing Santa Ana WQCB and City stormwater controls, including compliance with NPDES construction and operation measures to prevent erosion, siltation, and transport of urban pollutants. In addition, the City of San Jacinto is a Co-Permittee and is required to comply with, the Riverside County municipal separate storm sewer system (MS4) permit (Waste Discharge Requirements for Riverside County - Order No. 2010-0033, NPDES No. CAS618033) adopted by the Regional Board on January 29, 2010. In conformance with this MS4 permit the Project is required to implement structural and non- structural Best Management Practices (BMPs) to retain and treat pollutants of concern (in dry-weather runoff and first-flush stormwater runoff, during and post-construction. The Project will not impact the existing stormwater management systems significantly. The Project will result in an incremental increase in the volume of stormwater; however, the City will require that the in- cremental increase in volume be managed on site. The preparation of site-specific hydrology studies, water management plans, and Project design and compliance with existing federal, state, and local water quality laws and regulations related to water quality standards will ensure a less than significant impact, directly, indirectly, and cumulatively to stormwater facilities. d) Have sufficient water supplies available to serve the project from existing entitlements and re- sources, or are new or expanded entitlements 4.1.v Packet Pg. 302 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 80 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact needed? In making this determination, the Lead Agency shall consider whether the project is sub- ject to the water supply assessment requirements of Water Code Section 10910, et. seq. (SB 610), and the requirements of Government Code Sec- tion 664737 (SB 221). Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; EMWD 2015 Urban Water Management Plan, June 2016; Hemet/San Jacinto Groundwater Management Area Groundwater Management Plan, November 7, 2007) Senate Bill (SB) 610 (Chapter 643, Statutes of 2001; Water Code Sections 10910–10915) made changes to the Urban Water Management Planning Act to require additional information in UWMPs if groundwater is identified as a source available to the supplier. The information required includes a copy of any groundwater management plan adopted by the supplier, a copy of the adjudication order or decree for adjudicated basins, and if non-adjudicated, whether the basin has been identified as being over drafted or projected to be over-drafted in the most current DWR publication on that basin. If the basin is in over- draft, that plan must include current efforts to eliminate any long-term overdraft. A key provision in SB 610 requires that large development projects supplied with water from a public water system and subject to CEQA be provided a specified water supply assessment, except as specified in the law. Large devel- opment projects include those with 500 or more residential units, 500,000 square feet of retail commercial space, or 250,000 square feet of office commercial space. These assessments, prepared by “public wa- ter systems” responsible for service, address whether there are adequate existing or projected water supplies available to serve proposed projects, in addition to urban and agricultural demands and other anticipated development in the service area in which the project is located. SB 221 (Chapter 642, Statutes of 2001; Government Code Section 66473.7) prohibits approval of subdi- visions consisting of more than 500 dwelling units unless there is verification of sufficient water supplies for the project from the applicable water supplier(s). This requirement also applies to approvals that would increase the number of service connections by 10% or more for public water systems with less than 500 service connections. The law defines criteria for determining “sufficient water supply” such as using normal, single-dry, and multiple-dry year hydrology and identifying the amount of water that the supplier can rely on to meet existing and future planned uses. Rights to extract additional groundwater, if used for the project, must be substantiated. The Project proposes less than 45,000-square-feet of commercial development and as such is not re- quired to get a water supply assessment from Eastern Municipal Water District, the water purveyor. Water line laterals will be extended to the site within the existing road right-of-way. The Project is con- sistent with the General Plan designation for the site as well as the City population projections used in the EMWD Urban Water Management Plan (approved June 2016). Per the 2016 UWMP, demand within EMWD through 2040 will be met through a combination of local supply development and ongoing water conservation. The Project will minimize water demand by installing low flow fixtures, drought-tolerant landscaping and use of a car wash system designed to capture, treat, and reuse potable water. No new water entitlements would be necessary to serve the Project. As the Project is consistent with the General Plan 2050 upon which EMWD has made their assumptions for planned water availability and with compliance with all State and local regulations impacts to water supplies will be less than significant, directly, indirectly, and cumulatively. e) Result in a determination by the wastewater treat- ment provider which serves or may serve the pro- ject that it has adequate capacity to serve the pro- ject's projected demand in addition to the provid- er's existing commitments? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) As noted in XVIII a) and b) above, the Project will not generate enough wastewater to exceed current ca- 4.1.v Packet Pg. 303 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 81 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact pacity of the wastewater system . San Jacinto Municipal Utilities implements all requirements of the Re- gional Water Quality Control Board pertaining to water quality and wastewater discharge. The Project will have a less than significant impact, directly, indirectly, and cumulatively on wastewater treatment. f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; Municipal Code Chapter 8.34 – Construction and Demolition Waste Management; & Cascadia Consulting Group. Waste Dis- posal and Diversion Findings for Select Industry Groups, Integrated Waste Management Board, June 2006) CR&R Waste and Recycling Services transports solid waste to the Lamb Canyon landfill. Prior to reach- ing the landfill, waste will be taken to a transfer station in Perris, CA for consolidation and transport to the sanitary landfill. The Project site is located approximately 9 miles south of the Lamb Canyon Landfill, a Riverside County regional municipal solid waste landfill. This facility is located at 16411 Lamb Canyon Road, Beaumont, California. The landfill is owned and operated by Riverside County Department of Waste Resources. The landfill property area consists of approximately 1,189 acres, including 580.5 acres total permitted area, of which 144.6 acres are permitted for solid waste disposal. The current per- mitted refuse disposal area includes approximately 74 acres of unlined area and approximately 70.6 acres of lined area. The landfill has a permitted capacity of 5,000 tons per day and has an estimated dis- posal capacity of 15.646 million tons. As of January 1, 2013, the facility had 7.616 tons of remaining dis- posal capacity. The disposal capacity is expected to last through the year 2021. During 2013, the Lamb Canyon Landfill accepted an average daily volume of 1,638 tons. The proposed Project will generate construction/demolition waste (CDW) as well as ongoing domestic waste from the commercial uses on-site. Solid waste generated by the proposed facility would likely be disposed of at the Lamb Canyon landfill. It is presumed that construction waste would be comprised of concrete, metals, wood, landscape, and typical domestic material. The California Integrated Waste Man- agement Act (CIWMA) of 1989 mandates that all cities and counties in California reduce solid waste dis- posed at landfills generated within their jurisdictions by 50% and has a long-term compliance goal of 70%. CDW associated with the proposed Project will be recycled to the extent practicable with the remainder sent to a landfill. The construction debris would be processed and recycled or sent to the landfill. Pursu- ant to Chapter 8.34 – Construction Demolition Waste Management of the Municipal Code 50% of the construction debris must be diverted. Annual Tons Disposed by Industry Group1 Annual Tons per Employee Annual Tons per Seat Annual Tons per Room Annual Pounds per Sq. Ft. Annual Pounds per Visitor Mean Mean StDv Mean StDv Mean StDv Mean StDv Mean StDv Fast Food Res- taurants 2.13 1.24 0.99 0.83 Full Service Restaurants 2.20 1.47 0.41 0.33 Food Stores 2.38 1.69 Durable Whole- sale Goods Distributors 1.23 1.24 Non-Durable Wholesale Goods Distribu- tors 1.43 1.22 Large Hotels 1.95 1.55 0.92 0.95 Building Materi- al & Garden, Big Box Stores 3.17 1.74 Building Materi- al & Garden, Other Stores 1.74 1.34 4.1.v Packet Pg. 304 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 82 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Retail, Big Box Stores 1.43 1.00 Retail, Other Stores 0.86 0.59 Shopping Malls 2.03 1.31 Anchor Stores at Shopping Malls * 2.10 1.09 Public Venues & Events 1.72 2.58 Large Office Buildings 1.87 1.56 Cascadia Consulting Group. Waste Disposal and Diversion Findings for Select Industry Groups, Integrated Waste Management Board, June 2006 APPLIED PROJECT DIVERSION RATES Parcel/Lot # Building Size Sq. Ft. Diversion Rate Annual Tons per Annual Mean Diversion in Tons per Year Average # Employees Use Parcel 1 2,720 2.13 employee 63.9 30 Fast Food w/Drive- Through Parcel 2 3,062 2.38 employee 42.84 18 Service Station w/Convenience Store/Beer and Wine Sales Parcel 3 12,000 1.23 employee 36.9 30 Tire Store Parcel 4 3,590 1.74 employee 8.7 5 Car wash Parcel 5 24,000 0.000935 Sq. Ft. 22.44 40 Office Retail Building Total Tons per Year 174.74 87 Total Pounds per Year 349,480 The employee estimates are overstated to get a worst-case figure for diversion. For the worst-case scenario, this Project would generate approximately 349,480 tons per year for the Pro- ject. Assuming 50% is recycled, a total of 174,740 tons would go to the landfill annually. Assuming Lamb Canyon receives the waste, this would increase the total volumes going to landfill daily by .096 percent. With the implementation of the City’s and CR&R’s recycling programs the City continues to divert waste from the landfill. As well, compliance with Municipal Code Chapter 8.34 – Construction and Demolition Waste Management will further divert waste to the landfill. Lastly, the tire store has the potential for the storage of used car batteries, tires, oil, and other hazardous materials regulated by the State of California. The storage either indoor or outdoor of these hazardous items has a potential for hazardous effects (see Section VIII of this Initial Study. As well, the landfilling of whole tires consumes a large volume of landfill space because the tires are relatively incompressible and 75% of the space a tire occupies is void. This void space provides potential sites for gas collection and harboring of rodents. To reduce the impact of used tires on the landfill MM HAZ -1 is also applied. Therefore, the Project will have a less than significant impact with mitigation, directly, indirectly, and cumulatively to landfills. g) Comply with federal, state, and local statutes and regulations related to solid waste? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; General Plan EIR Addendum August 2012; & Municipal Code Chapter 8.34 – Construction and Demolition Waste Management) 4.1.v Packet Pg. 305 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 83 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact See Response Xviii f) above. Federal, State, and local statutes and regulations regarding solid waste generation, transport, and dis- posal are intended to assure adequate landfill capacity through mandatory reductions in solid waste quantities (for example, through recycling and composting of green waste) and the safe and efficient transportation of solid waste. The Project will comply with all regulatory requirements regarding solid waste including AB 939 and AB 341. AB 939, which is administered by the California Department of Re- sources Recycling and Recovery required local governments to achieve a landfill diversion rate of at least 50 percent by January 1, 2000, through source reduction, recycling, and composting activities. Moreover, AB 341 increases the minimum solid waste diversion rate to 75 percent by 2020. Such regulations will be applicable to this Project and compliance is mandatory. Further, mandates set forth by the CALGreen Code aim to reduce solid waste generation and promote recycling and diversion design and activities, to which this Project is required to comply. There will be less than significant impacts with mitigation, directly, indirectly, or cumulatively regarding compliance with Federal, State, and local statutes and regu- lations related to solid waste. XIX. MANDATORY FINDINGS OF SIG- NIFICANCE – a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or re- strict the range of a rare or endangered plant or animal or eliminate important examples of the ma- jor periods of California history or prehistory? Biological Resources In Section IV (Biological Resources), it is noted that the MSHCP has identified burrowing owl as a species of concern. There was no sign of burrowing owl or burrowing owl use on the site. Depending upon the timing of the proposed construction, burrowing owl could move on site in the interim. Also, impacts to active bird nests could also occur. Therefore, m itigation measures, MM BIO-1 and MM BIO-2 are pro- posed to require a pre-construction survey for the burrowing owl and requiring demoli- tion/grading/construction to occur outside of the nesting season for birds. No other biological impacts are expected therefore, it was determined that the Project will have a less than significant impact with mit- igation, directly, indirectly, and cumulatively, on any species identified as a candidate, sensitive, or spe- cial status species in local or regional plans, or policies. Cultural & Tribal Resources In Section V (Cultural Resources) and Section XVII (Tribal Cultural Resources), the Records Search found that there was a risk to cultural resources and mitigation measures MM CR-1 through MM CR-3 and MM PALEO-1 are proposed to reduce impacts to less than significant levels with mitigation. b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumula- tively considerable" means that the incremental ef- fects of a project are considerable when viewed in connection with the effects of past projects, the ef- fects of another current project, and the effects of probable future projects.) The Project will contribute to the cumulative impacts of development in the City of San Jacinto and broader San Jacinto Valley. However, the Project is in conformance with the City’s General Plan and therefore it will have a less than significant impact cumulatively. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? Effects on human beings were evaluated as part of the Air Quality, Hydrology and W ater Quality, Land Use/Planning, Population and Housing, Public Services, and Recreation sections of this Initial Study and 4.1.v Packet Pg. 306 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 84 ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact were found to be less than significant for each of the above sections. As well, effects on human beings were evaluated as part of the Aesthetics, Geology, and Soils, Greenhouse Gas Emissions, Hazards and Hazards Materials, Noise, Transportation/Traffic, and Utilities/Service Systems sections of this Initial Study and were found to be less than significant with mitigation. Based on the analysis and conclu- sions in this Initial Study, the Project will not cause substantial adverse effects, directly or indirectly to human beings. Therefore, potential direct and indirect impacts on human beings that result from the pro- posed Project are less than significant with mitigation measures MM AES-1, MM GEO-1, MM GEO-2, MM GHG-1 through MM GHG-4, MM HAZ-1, MM NOI-1 through MM NOI-13, MM TRAF-1 through MM TRAF -8, and MM HAZ-1 for Utilities/Service Systems. Note: Authority cited: Sections 21083 and 21083.05, Public Resources Code. Reference: Section 65088.4, Gov. Code; Sections 21080(c), 21080.1, 21080.3, 21083, 21083.05, 21083.3, 21093, 21094, 21095, and 21151, Public Resources Code;, Sundstrom v. County of Mendocino,(1988) 202 Cal.App.3d 296; Leonoff v. Monterey Board of Supervisors, (1990) 222 Cal.App.3d 1337; Eureka Citizens for Responsible Govt. v. City of Eureka (2007) 147 Cal.App.4th 357; Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116 Cal.App.4th at 1109; San Franciscans Up- holding the Downtown Plan v. City and County of San Francisco (2002) 102 Cal.App.4th 656. 4.1.v Packet Pg. 307 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 85 APPENDIX A – AB 52 CONSULTATION LOG 4.1.v Packet Pg. 308 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- Initial Study – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 City of San Jacinto MUP-17-06/MUP-17-07/MUP-17-08 Page 86 4.1.v Packet Pg. 309 Attachment: Attachment 24 - Mitigated Negative Declaration Initial Study (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP- MMRP – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 MUP-17-06/MUP-17-07/MUP-17-08 Page 1 of 7 City of San Jacinto MITIGATION MONITORING & REPORTING PROGRAM (MMRP) FOR CEQA COMPLIANCE DATE: March 23, 2018 ASSESSORS PARCEL NO.: 439-120-042 CASE NO.: SPDR-17-11 – Site Plan Design Review CZ-17-03 – Change of Zone to Commercial General PM-37407 – Tentative Parcel Map CUP-17-06 – Conditional Use Permit – 7 Eleven VAR-17-04 – Alcohol Sales w/in 1,000 feet MUP-17-06 – Minor Use Permit – Fast Food w/Drive MUP-17-07 – Minor Use Permit – Car Wash MUP-17-08 – Minor Use Permit – Tire Store PROJECT LOCATION: West side of San Jacinto Avenue at the terminus of Commonwealth Avenue, in the City of San Jacinto, California, as shown in Figure A – Aerial Map. The Project site is located within the Section 2 of Township 5 South, Range 1 West, San Bernardino Base and Meridian (SBBM) and is comprised of Tax Assessor parcel number APN 439-120-042. SCH NO: N/A APPROVAL DATE: In Process APPLICANT: Applicant/Developer Applicant/Developer MW Advantage 1, LLC Mark Cooper, Page Plaza Partners, LLC 26400 La Alameda, Suite 100 38011 Stone Meadow Drive Mission Viejo. CA 92691 Murrieta, CA 92562 (949) 680-4300 (951) 643-4711 PROJECT MANAGER: Same as Applicant THE FOLLOWING REPRESENTS THE CITY’S MITIGATION MONITORING PROGRAM FOR THE MITIGATED NEGATIVE DECLARATION FOR THE ABOVE CASE NUMBER(S) ATTACHMENT 25 4.1.w Packet Pg. 310 Attachment: Attachment 25 - Mitigation Monitoring Reporting Program (Commonwealth Crossing (SPDR- MMRP – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 MUP-17-06/MUP-17-07/MUP-17-08 Page 2 of 7 City of San Jacinto MITIGATION MEASURES RESPONSIBLE PARTY TIMING TYPE OF VERIFICATION VERIFIED BY DATE I. AESTHETICS MM AES-1: Outdoor lighting shall maintain a minimum of one-foot candle illumination for all parking and pedestrian ar- eas and shall not exceed one-half foot candle along property lines of the subject site. A photometric plan shall be submitted for Planning review and approval. The plan must include de- tails such as beam spreads and/or photometric calculations, location and type of fixtures, and arrangement of exterior light- ing that does not create glare or hazardous interference to ad- jacent streets or properties. Project Proponent A photometric shall be submitted prior to Building Permit Issuance Planner will review and approve. IV. BIOLOGICAL RESOURCES MM BIO 1: A pre-construction burrowing owl breeding bird survey following the recommended guidelines of the MSHCP will be required no more than 30 days prior to disturbance (demoli- tion, grading, construction) of the site. If burrowing owls are de- tected at the site, they will be relocated either passively or ac- tively from the site outside of the nesting season with the ap- proval of the California Department of Fish and Wildlife (CDFW) and the Regional Conservation Authority (RCA). Occupied bur- rows will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation, or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival. If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. For the burrowing owl, the recommended distance is a minimum of 160 feet. Projec Proponent 30-days prior to ground disturb- ance (demolition, grading and/or construction) Report by qualified biologist. MM BIO 2: Demolition, grading and/or construction activi- ties shall occur outside of the nesting season (February 1 through August 31), if feasible. If the nesting season cannot be avoided, then a breeding bird survey will be required no more than 7 days prior to the disturbance of potential nesting habitat to determine if nesting is occurring. Nests will not be disturbed unless a qualified biologist verifies through non-invasive meth- ods that either (a) the adult birds have not begun egg-laying and incubation, or (b) the juveniles from the occupied nests are for- aging independently and are capable of independent survival. If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season with- Project Proponent 7-days prior to ground disturb- ance (demolition, grading and/or construction) Report by qualified biologist. 4.1.w Packet Pg. 311 Attachment: Attachment 25 - Mitigation Monitoring Reporting Program (Commonwealth Crossing (SPDR- MMRP – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 MUP-17-06/MUP-17-07/MUP-17-08 Page 3 of 7 City of San Jacinto MITIGATION MEASURES RESPONSIBLE PARTY TIMING TYPE OF VERIFICATION VERIFIED BY DATE in a distance determined by the qualified biologist for each nest or nesting site. V. CULTURAL RESOURCES MM CR 1: An Archaeological Mitigation and Monitoring Plan (AMMP) shall be developed in coordination with the Sobo- ba Band of Luiseño Indians and the City of San Jacinto prior to initiating demolition and/or grading. The plan shall involve moni- toring of all ground disturbing activities by a Riverside County qualified archaeologist and a Native American Monitor. The plan shall include a protocol for the mitigation and significance testing of inadvertent archaeological finds. Project Proponent Riverside County Qualified Archae- ologist Prior to any earthmoving ac- tivity. Provide the City with a Copy of AMMP MM CR-2: Prior to demolition permit and/or grading permit issuance the developer shall enter into a Treatment and Disposi- tion Agreement (TDA) with the Soboba Band of Luiseño Indians to address treatment and disposition of archaeological/cultural resources and human remains associated with Soboba Band of Luiseño Indians that may be uncovered or otherwise discovered during ground disturbing activities related to the Project and pro- vide the City with a copy of the executed agreement. The TDA will establish provisions for tribal monitors. Project Proponent Prior to any earthmoving ac- tivity (demolition, grading and/or construction) Provide the City with a copy of the executed agree- ment. MM CR-3: In the event of the discovery of human remains, the County coroner shall be immediately notified. If human re- mains of Native American origin are discovered during ground- disturbing activities, the applicant shall comply with the state relating to the disposition of Native American burials that fall within the jurisdiction of the NAHC (PRC Section 5097). Accord- ing to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 8100), and disturbance of Native American cemeteries is a felony (Section 7052). Section 7050.5 requires that excavation is stopped near discovered human remains until the coroner can determine whether the remains are those of a Native American. If the re- mains are determined to be Native American, the California Na- tive American Heritage Commission, Morongo Band of Mission Indians and the Soboba Band of Luiseño Indians shall be noti- fied, and appropriate measures provided by State law shall be implemented to determine the most likely living descendant(s). Disposition of the remains shall be overseen by the most likely living descendants to determine the most appropriate means of treating the human remains and any associated grave artifacts. Planning Department Project Proponent Archaeologist Native American Monitor During earthmov- ing activities Notification to the County Coroner and Planning De- partment. MM PALEO 1: If paleontological resources are encountered Planning During earthmov-Contact Planning 4.1.w Packet Pg. 312 Attachment: Attachment 25 - Mitigation Monitoring Reporting Program (Commonwealth Crossing (SPDR- MMRP – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 MUP-17-06/MUP-17-07/MUP-17-08 Page 4 of 7 City of San Jacinto MITIGATION MEASURES RESPONSIBLE PARTY TIMING TYPE OF VERIFICATION VERIFIED BY DATE during grading, ground disturbance activities shall cease so a qualified paleontological monitor can evaluate any paleontologi- cal resources exposed during the grading activity. If paleonto- logical resources are encountered, the developer shall provide adequate funding to collect, curate and report on these re- sources to ensure the values inherent in the resources are ade- quately characterized and preserved. Collected specimens will be sent to the appropriate authorities for collection. Department Project Proponent Archaeologist Native American Monitor ing activities Department and Project Proponent. Project Proponent will hire a qualified palaeontologist to prepare report for the Planning De- partment on re- quired mitigation. VI. GEOLOGY & SOILS MM GEO 1: The recommendations of the Geotechnical Report prepared by Sladden Engineering, shall be followed through site preparation and building construction. A Geotechnical Engineer shall be present at the site during site demolition and preparation to observe site clearing/demolition, preparation of exposed sur- face after clearing, and placement, treatment, and compaction of fill material. Project Proponent During earthmov- ing activities Engineering will verify during in- spections MM GEO-2: Submit an updated geotechnical soils reports covering the imported soils to the site, to the Engineering De- partment for review and approval prior to issuance of a grading permit. Project Proponent Prior to Grading Permit Issuance Engineering will review and approve VII. GREENHOUSE GAS EMISSIONS MM GHG-1: The Project applicant shall require that: all fau- cets, toilets, and showers installed in the proposed structures utilize low-flow fixtures that would reduce indoor water demand by 20% per CalGreen Standards and that water-efficient land- scaping practices are employed on-site. Project Proponent Prior to Building Permit Issuance Project Planner will verify through Plan Check MM GHG-2: The Project applicant shall require recycling programs that reduce waste to landfills by a minimum of 75 per- cent (per AB 341). Project Proponent Prior to Building Permit Issuance Project Planner will verify through Building Inspection MM GHG-3: The Project applicant shall provide sidewalks that connect on and offsite. Project Proponent Prior to Grading Permit Issuance Project Planner will verify through Grading Plan re- view MM GHG-4: The Project applicant will ensure that Energy Star appliances are used onsite, wherever appliances are re- quired. Project Proponent Prior to Building Permit Issuance Project Planner will verify through Building Inspection VIII. HAZARDS AND HAZARDOUS MATERIALS MM HAZ-1: The storage of tires outside will be strictly pro- hibited. All used tires shall be sent to a recycling facility on a regular basis. Project Proponent Prior to Building Permit Issuance Project Planner will verify through Site Inspection 4.1.w Packet Pg. 313 Attachment: Attachment 25 - Mitigation Monitoring Reporting Program (Commonwealth Crossing (SPDR- MMRP – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 MUP-17-06/MUP-17-07/MUP-17-08 Page 5 of 7 City of San Jacinto MITIGATION MEASURES RESPONSIBLE PARTY TIMING TYPE OF VERIFICATION VERIFIED BY DATE XII. NOISE MM NOI-1: The Project shall incorporate a minimum six - foot high decorative block walls along the northern and western property lines (adjacent to the existing mobile home park and residences). Project Proponent Prepare wall plans for Building Permit, under a separate applica- tion Planning Depart- ment will review the wall plans prior to permit issuance MM NOI-2: Any rooftop or ground mounted HVAC units should be positioned at a physical distance as far as plausible from adjacent residences. In addition, the equipment should be shielded by a parapet wall with a height equal or greater than the equipment. The height of the wall must be taller than the HVAC units and shall be designed to completely shield any noise that may be able to flank around the parapet wall. Project Proponent Show on plans for Plan Check Planning Depart- ment will verify dur- ing Plan Check MM NOI-3: Drive-Through and drive-up speakerphones shall be positioned in a direction facing away from the mobile home park to the north. The speakerphones shall incorporate a system that is capable of lowering the output volume during night-time conditions such that the levels are at or below ambi- ent conditions. HM Electronics has a speaker system which ad- justs the outbound volume on the system based on the ambient noise. Noise level estimates based on the manufacturer’s speci- fications are provided in Appendix E of the Noise Impact Study. Project Proponent Show on plans for Plan Check Planning Depart- ment will verify dur- ing Plan Check MM NOI-4: Ensure vacuum turbines are enclosed with a roof and properly fitted with silencer attenuators. Project Proponent Show on plans for Plan Check Planning Depart- ment will verify dur- ing Plan Check MM NOI-5: The car wash mechanical equipment room shall be fitted with acoustic louver doors or equivalent. Project Proponent Show on plans for Plan Check Planning Depart- ment will verify dur- ing Plan Check MM NOI-6: Trash collection to the site shall occur during daytime hours. Project Proponent During Project Operation Should complaints arise the City will ask for verification of equipment MM NOI-7: Truck deliveries shall occur during daytime hours. Project Proponent During Project Operation Should complaints arise the City will ask for verification of equipment MM NOI-8: Construction should occur during the permissi- ble hours as defined in Section 8.40.090, that is Monday through Saturday between the hours of 7:00 a.m. and 7:00 p.m. No con- struction shall take place on Sundays or any Federal holiday. Project Proponent Prior to Grading permit provide this note on Grading Plan Planning Depart- ment will verify dur- ing Grading Plan Review MM NOI-9: During construction, the contractor shall en-Project During Construc-Engineering will 4.1.w Packet Pg. 314 Attachment: Attachment 25 - Mitigation Monitoring Reporting Program (Commonwealth Crossing (SPDR- MMRP – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 MUP-17-06/MUP-17-07/MUP-17-08 Page 6 of 7 City of San Jacinto MITIGATION MEASURES RESPONSIBLE PARTY TIMING TYPE OF VERIFICATION VERIFIED BY DATE sure all construction equipment is equipped with appropriate noise attenuating devices Proponent tion verify during In- spections MM NOI-10: The contractor shall locate equipment staging areas that will create the greatest distance between construc- tion-related noise/vibration sources and sensitive receptors nearest the Project site during all Project construction. Project Proponent During Construc- tion Engineering will verify during In- spections MM NOI-11: Idling equipment shall be turned off when not in use. Project Proponent During Construc- tion Should complaints arise the City will ask for verification of equipment MM NOI-12: Equipment shall be maintained so that vehicles and their loads are secured from rattling and banging. Project Proponent During Construc- tion Should complaints arise the City will ask for verification of equipment MM NOI-13: The day-to-day operation of the uses proposed for the Project site shall not exceed a VdB greater than 50. Project Proponent During Construc- tion Should complaints arise the City will ask for verification of equipment XVI. TRANSPORTATION/TRAFFIC MM TRAF -1: Construction of on-site improvements shall oc- cur in conjunction with adjacent Project development activity or as needed for Project access purposes. The recommended on- site roadway improvements are described below. • On-site traffic signing and striping should be implement- ed in conjunction with detailed construction plans for the Project. • Verify that minimum sight distance is provided at the Project access points. Project Proponent Prior to Grading Permit Issuance Street Improvement plan to be reviewed and approve by Engineering MM TRAF-2: Design of off-site improvements shall be ap- proved by the City Engineer prior to grading permit issuance and built prior to building permit issuance. The recommended off- site roadway improvements are described below. • Construct the ultimate half section of San Jacinto Ave- nue as a major highway adjacent to the Project site between the northerly Project boundary and the southerly Project boundary in conjunction with development. • Provide a 150-foot northbound left turn lane on San Jacinto Avenue at the intersection with Commonwealth Avenue. Project Proponent Prior to Grading Permit Issuance Street Improvement plan to be reviewed and approve by Engineering 4.1.w Packet Pg. 315 Attachment: Attachment 25 - Mitigation Monitoring Reporting Program (Commonwealth Crossing (SPDR- MMRP – Commonwealth Crossing SPDR-17-11/CZ-17-03/PM-37407/CUP-17-06/VAR-17-04 MUP-17-06/MUP-17-07/MUP-17-08 Page 7 of 7 City of San Jacinto MITIGATION MEASURES RESPONSIBLE PARTY TIMING TYPE OF VERIFICATION VERIFIED BY DATE MM TRAF-3: The applicant shall submit a Trip Reduction Program (TRP) for Planning approval prior to building permit issuance. Once approved the program shall be used by all own- ers/tenants as stated in a covenant on the land. Project Proponent Prior to Building Permit Planning will review and approve the TRP and Covenant MM TRAF-4: The site plan shall provide ten percent of all re- quired parking stalls designated as parking for any combination of low-emitting, fuel efficient and carpool/vanpool vehicles in compliance with table A5.106.5.1.1 of the CalGreen Code. Project Proponent Prior to Grading Permit Planning will review and approve the revised site plan MM TRAF-5: The site plan shall provide four percent of all required parking stalls with electric vehicle charging stations pur- suant to Chapter 17.430.361 of the Development Code and 5.106.5.3 of the CalGreen Code. Project Proponent Prior to Grading Permit Issuance Planning will review and approve the revised site plan MM TRAF-6: The site plan shall be redesigned prior to grad- ing permit approval, for Planning approval, to provide decorative walkways with appropriate signage throughout the site. Project Proponent Prior to Grading Permit Issuance Planning will review and approve the revised site plan MM TRAF-7: The site plan shall provide long-term and short- term bicycle parking in accordance with Chapter 17.330.110 of the Development Code and Section 5.710.6.2 of the Cal Green Code. Project Proponent Prior to Grading Permit Issuance Planning will review and approve the revised site plan MM TRAF-8: Prior to demolition and/or grading permit issu- ance the applicant shall submit a haul route plan for Planning and Engineering review and approval. This plan shall include the street route, proposed time of day of the hauling, any re- quired signage, and start/end dates. Project Proponent Prior to Grading Permit Issuance Planning & Engi- neering will review Route XVII. TRIBAL CULTURAL RESOURCES See MM CR-1 through MM CR-5 above. XVIII. UTILITIES AND SERVICE SYSTEMS See MM HAZ-1 above. 4.1.w Packet Pg. 316 Attachment: Attachment 25 - Mitigation Monitoring Reporting Program (Commonwealth Crossing (SPDR- ATTACHMENT 254.1.xPacket Pg. 317Attachment: Attachment 26 - Letter from SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, 4.1.xPacket Pg. 318Attachment: Attachment 26 - Letter from SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, AZ Office CA Office 4960 S. Gilbert Rd, Suite 1-461 1197 Los Angeles Ave, Suite C-256 Chandler, AZ 85249 Simi Valley, CA 93065 p. (602) 774-1950 p. (805) 426-4477 www.mdacoustics.com JN:0144-13-1702_Memo#1 1 April 6, 2018 Mr. Devon Wesselink MW Vantage 1, LLC 26400 La Alameda, Ste 100 Mission Viejo, CA 92691 Subject: San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Study, City of San Jacinto, CA Response to Comments – Memo#1 Dear Mr. Wesselink: MD Acoustics, LLC (MD) has been working with MW Vantage 1, LLC on the san Jacinto Commonwealth Development project as it relates to the Air Quality and Greenhouse Gas Study. The original San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Impact Study (AQ/GHG) was prepared by MD on November 3, 2017. On April 4, 2018, MD received comments from South Coast Air Quality Management District (SCAQMD) Negative Declaration (ND) for the Proposed Commonwealth Crossing. Comment 1 Compliance with SCAQMDs Rules Since the Proposed Project includes gasoline service station, a permit from SCAQMD would be required, and SCAQMD should be identified as a Responsible Agency for this Project in the Final MND. The assumptions in the air quality analysis in the Final MND wi ll be the basis for permit conditions and limits. The Final MND should also demonstrate compliance with SCAQMD Rules, including, but are not limited to, Rule 201 – Permit to Construct, Rule 203 – Permit to Operate, and Rule 461 – Gasoline Transfer and Dispensing. If there are permitting questions concerning the gasoline service station, they can be directed to SCAQMD Engineering and Permitting staff at (909) 396 -2551. Response to Comment 1 As a condition of approval and prior to issuance to building permits, the applicant shall demonstrate compliance to Rule 201 – Permit to Construct and Rule 203 – Permit to Operate, and Rule 461 – Gasoline Transfer and Dispensing by obtaining proper permits. ATTACHMENT 27 4.1.y Packet Pg. 319 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Impact Study Response to Comments – Memo#1 JN:0144-13-1702_Memo#1 2 Comment 2 Air Quality Analysis In the Air Quality analysis, the Lead Agency found that the Proposed Project’s regional and localized construction and operational air quality impacts would be less than significant. However, it does not appear that the Air Quality analysis include operational ROG emissions generated fr om storage tanks or from the fueling process. This may have likely led to an under-estimation of the Proposed Project’s operational air quality impacts. It is important to note that while CalEEMod quantifies mobile source emissions (e.g., trip visits by patrons) associated with operating a gasoline service station, CalEEMod does not quantify the operational stationary source emissions from the storage tanks and fueling equipment. Therefore, it is recommended that the Lead Agency use its best efforts to quantify and disclose operational emissions from the fueling process in the Final MND. Response to Comment 2 The comment above states that "the Air Quality Analysis did not include emissions generated from the operation of the gasoline service station (CalEEMod does not quantify emissions from storage tanks or from the fueling process)". As shown in Appendix A and B of the AQ/GHG, the air quality impacts from both the construction and the operation of the gas station (part of the convenience market) were analyzed via the land use of Convenience Market With Gas Pumps, using the size and metric of 16 gas pumps respectively. Emissions from the dispensing of gasoline from the gas pumps were not analyzed as the gas station is subject to SCAQMD permitting requirements (as detailed above) and SCAQMD Rule 461. Furthermore, according to the ARB’s Attachment 1: Revised Emission Factors for Phase II Vehicle Fueling at California Gasoline Dispensing Facilities (12/23/2013), indicates that Phase II EVR (enhanced vapor recovery) systems have an average efficiency of 95.1% (Table II-3). The referenced document is located in Appendix A. According to the ARB’s: Revised Emission Factors for Gasoline Marketing Operations at California Gasoline Dispensing Facilities (12/23/2013), indicates that Phase I EVR systems have an average efficiency of 98% (page 3. 2nd paragraph). The referenced document is located in Appendix B. As stated within the referenced ARB documents, both Phase I and Phase II EVR systems have a minimum 95.1% efficiency at capturing emissions. Emission inventory is based upon two (2) factors: 8.4 lbs of TOG per thousand gallons dispensed (lbs/kgal) and 0.74 lbs/kgal for Gasoline Dispensing Facilities with Phase II pre-EVR vapor recovery. These factors are based upon pre-EVR vapor recovery systems. Assuming a 95% vapor recovery rate, the majority of the emissions would be captured and the additional VOCs that would potentially escape these mandatory recovery systems is anticipated to be relatively small. To fully understand the emissions, the estimated number of gallons per year would need to be provided. Per Table 1 0 from the AQ/GHG report, the project’s operational VOC emissions are 8.77 lbs/day. Even if an additional 8.4 lbs/day (the uncontrolled [no ORVR or phase II] vehicle fueling emission factor for each 1,000 gallons 4.1.y Packet Pg. 320 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Impact Study Response to Comments – Memo#1 JN:0144-13-1702_Memo#1 3 pumped) were added to the project’s operational VOC emissions), the emissions would still be well below the SCAQMD’s operational threshold of significance of 55 lbs per day for VOC. The vehicle fueling emissions factor with ORVR and Phase II EVR in place is 0.021 lbs per thousand gallons. Both ORVR and Phase II EVRs are required per regulation in California and the gas pumps at the project site would have to pump over a million gallons of fuel per day to exceed the daily VOC threshold. Therefore, no additional analysis or mitigation is required. Comment 3 Health Risk Assessment The Proposed Project would be sited in close proximity to existing residential uses. Benzene, which is a toxic air contaminant, may be emitted from the Proposed Project’s gasoline refueling operations. SCAQMD staff is concerned about the potential health impacts on the residents from being exposed to benzene. As such, it is recommended that the Lead Agency evaluate, quantify, and perform a health risk assessment for the Proposed Project in the Final MND. Guidance for performing a gasoline dispensing station health risk assessment can be found in the SCAQMD’s Emission Inventory and Risk Assessment Guidelines for Gasoline Dispensing Stations. Response to Comment 3 No gas station analysis was even warranted as the closest sensitive receptor to the fuel pumps (or even the gas station canopy) is over 280 feet (86 meters) from any source of potential gasoline or diesel fumes. See attached PDF of SJ Commons Site Plan overlaid on Google Earth (see Appendix C). By SCAQMD's own admission in their comment above, CARB (and CAPCOA) recommend a 50 foot separation between gas stations and sensitive receptors; therefore, the 280 foot separation should be more than adequate. Furthermore, the attached (Appendix D) SCAQMD gasoline station HRA screening tables show that the MICR at residential receptors 75 meters from the fuel source would not even exceed 1 in a million (assuming that this is a regular gas station where the throughput would not exceed 1,000,000 gallons per year; which is a reasonable assumption given the size of the project and number of pumps). Comment 4 Guidance Regarding Gasoline Dispensing Facilities Sited Near Sensitive Receptors SCAQMD staff recognizes that there are many factors Lead Agencies must consider when making local planning and land use decisions. To facilitate stronger collaboration between Lead Agencies and SCAQMD to reduce community exposure to source-specific and cumulative air pollution impacts, SCAQMD adopted the Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning in 2005. Additionally, it is recommended that a 50 -foot separation between a gasoline dispensing facility and sensitive land uses (e.g., residential uses). SCAQMD staff recommends that the Lead Agency review and consider these guidance when making local planning and land use decisions. 4.1.y Packet Pg. 321 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Impact Study Response to Comments – Memo#1 JN:0144-13-1702_Memo#1 4 Response to Comment 4 There is at least a 280-foot separation between the gas station and the closest sensitive receptor. See response to Comment 3 above. MD is pleased to provide this response to comments (Memo#1) to SCAQMD’s comments. If you have any questions call our office at (805) 426-4477. Sincerely, MD Acoustics, LLC Mike Dickerson, INCE Principal 4.1.y Packet Pg. 322 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Impact Study Response to Comments – Memo#1 JN:0144-13-1702_Memo#1 Appendix A Revised Emission Factors for Phase II Vehicle Fueling at California Gasoline Dispensing Facilities 4.1.y Packet Pg. 323 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Monitoring and Laboratory Division Attachment 1: Revised Emission Factors for Phase II Vehicle Fueling at California Gasoline Dispensing Facilities December 23, 2013 This report has been reviewed by the staff of the California Air Resources Board and approved for publication. Approval does not signify that the contents necessarily reflect the views and policies of the Air Resources Board, nor does the mention of trade names or commercial products constitute endorsement or recommendation for use. 4.1.y Packet Pg. 324 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Table of Contents Page I. INTRODUCTION 1 II. METHODOLOGY - REVISED VEHICLE REFUELING 2 EMISSION FACTORS III. REFERENCES 8 List of Tables Table I-1: Current and Revised Vehicle Refueling Emission Factors 1 Table I-2: Percent Gasoline Dispensed to ORVR Vehicles in California 2 Table II-1: Vapor Recovery Emission Test Results for Summer RVP Fuel 4 Vehicle Fueling UEF Table II-2: Vapor Recovery Emission Test Results for Winter RVP Fuel 4 Vehicle Fueling UEF Table II-3: Phase II EVR In-use Efficiency Test Results 6 4.1.y Packet Pg. 325 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 1 I. INTRODUCTION Vehicle fueling emissions occur when gasoline vapors are displaced by rising liquid in the vehicle fuel tank during gasoline dispensing. These vapors are adsorbed in a carbon canister installed on vehicles equipped with an on board refueling vapor recovery system (ORVR). When fueling non-ORVR vehicles, these vapors can be collected by a Phase II vapor recovery system and returned to the gasoline dispensing facility (GDF) storage tank. Without a Phase II vapor recovery system, the vapors displaced from fueling non-ORVR vehicles are uncontrolled and released to the atmosphere. The current Air Resources Board (ARB) total organic gases (TOG) emission factors for GDFs, in use since May 1999, do not reflect improvements in Phase II vapor recovery system performance achieved by ARB’s enhanced vapor recovery (EVR) program or the widespread penetration of ORVR in the vehicle fleet. Therefore, the current GDF emission factors for uncontrolled and controlled gasoline dispensing are representative of non-ORVR vehicles only. ARB staff has conducted field tests, literature research, and data analyses to account for these advances, resulting in the proposed revisions to the vehicle fueling emission factors presented in Table I-1 below. Table I-1 Current and Revised Vehicle Fueling Emission Factors (lbs/kgal) Category Emission Factors Current Revised Uncontrolled Emission Factor (No ORVR, No Phase II) 8.4 8.4 ORVR without Phase II NA 0.42 ORVR with Phase II pre-EVR NA 0.12 ORVR with Phase II EVR NA 0.021 No ORVR with Phase II pre-EVR 0.74 2.4 No ORVR with Phase II EVR NA 0.42 As shown in Table I-1, ARB’s current vehicle fueling emissions inventory is based on two emission factors: 8.4 pounds of TOG per thousand gallons dispensed (lbs/kgal) for GDFs with uncontrolled vehicle fueling and 0.74 lbs/kgal for GDFs with Phase II pre- EVR vapor recovery. ARB’s test results suggest that the uncontrolled emission factor (UEF) remains unchanged, but new or revised emission factors are needed to account for various levels of control efficiency resulting from different combinations of Phase II vapor recovery systems and ORVR technology, as well as improved Phase II vapor recovery system performance from implementation of ARB’s EVR program. 4.1.y Packet Pg. 326 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 2 ARB estimates that approximately 74 percent of the gasoline sold in California in 2013 will be dispensed to ORVR vehicles. With the current regulatory requirements for Phase II vapor recovery systems remaining in place, there will be a continuing decline in vehicle fueling emissions as the volume of fuel dispensed to ORVR vehicles increases. Table I-2 projects the gasoline fraction expected to be dispensed statewide to ORVR vehicles in calendar years 2013 through 2028 based on ARB’s model for on-road mobile sources (EMFAC2011). Table I-2 Percent Gasoline Dispensed to ORVR Vehicles in California Calendar Year Gasoline Dispensed to ORVR Vehicles (%) Calendar Year Gasoline Dispensed to ORVR Vehicles (%) 2013 74 2021 88 2014 76 2022 88 2015 78 2023 89 2016 80 2024 90 2017 82 2025 91 2018 83 2026 91 2019 85 2027 92 2020 87 2028 93 II. METHODOLOGY - REVISED VEHICLE FUELING EMISSION FACTORS The method used to develop the revised vehicle fueling emission factors consists of determining an uncontrolled vehicle fueling emission factor (UEF) and then applying control efficiency (CE) factors that are representative of each possible combination of vapor recovery control technologies. For example, the combined CE when both ORVR and Phase II vapor recovery systems are in use is calculated as: ORVR with Phase II = 1 - (1 - ORVR CE) * (1 - Phase II CE) DETERMINATION OF UEF Vehicle Fueling UEF The vehicle fueling UEF was determined from field data collected by ARB staff during various Phase II vapor recovery system efficiency tests. The tests were performed using the equipment and procedures specified in the version of ARB Vapor Recovery Test Procedure TP-201.2, Efficiency and Emission Factor for Phase II Systems in effect at the time each test was performed. 4.1.y Packet Pg. 327 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 3 All fueling events used for the determination of the UEF were conducted on non-ORVR vehicles. To minimize any bias introduced by the fueling of ORVR vehicles, only data from non-ORVR vehicles for which the preceding test vehicle was also a non-ORVR vehicle were used. (This was necessary because fueling an ORVR vehicle reduces the vapor concentration at the vapor return line sampling location, which causes a low bias in the vapor return mass for a subsequent fueling, even of a non-ORVR vehicle.) Data used to calculate the vehicle fueling UEF are presented in Table II-1 and Table II-2. Table II-1 summarizes data from eight tests used to calculate the vehicle fueling UEF for summer RVP fuel. Seven tests consisted of Phase II vapor recovery system efficiency tests in which 6,350 gallons of gasoline were dispensed to non-ORVR vehicles. The remaining test was an uncontrolled vehicle fueling emissions test in which 62 gallons of gasoline were dispensed to six non-ORVR vehicles at a GDF without Phase II vapor recovery. The average vehicle fueling UEF for summer RVP fuel determined from the eight tests is 7.65 lbs/kgal. Table II-2 summarizes data from the three tests used to calculate the vehicle fueling UEF for winter RVP fuel. In the first test, 1065 gallons of gasoline were dispensed to 101 non-ORVR vehicles at a GDF equipped with a Phase II vapor recovery system. The second test was an uncontrolled vehicle fueling emissions test performed by dispensing 460 gallons of gasoline to 41 non-ORVR vehicles at a GDF with a disabled Phase II vapor recovery system. The third test was an uncontrolled vehicle fueling emissions test performed by dispensing 116 gallons of gasoline to 10 non-ORVR vehicles at a GDF without Phase II vapor recovery. The average vehicle fueling UEF for winter RVP fuel determined from the three tests is 9.50 lbs/kgal. The annual vehicle fueling UEF is calculated by weighting the average summer and winter RVP fuel UEFs for statewide gasoline throughput during the respective summer and winter periods. The California State Board of Equalization (BOE) reported approximately 14.51 billion gallons of gasoline were dispensed statewide to motor vehicles in 2012.1 Of the total, approximately 8.59 billion gallons, or 59.2 percent, of gasoline was dispensed during the April through October summer RVP fuel period. The remaining 5.92 billion gallons, or 40.8 percent, was dispensed during the January through March and November through December winter RVP fuel periods. Based on the BOE throughput data, the vehicle fueling UEF, weighted for seasonal variation in statewide gasoline throughput, is calculated using the following equation: Vehicle Fueling UEF = Summer Fuel UEF*(59.2%) + Winter Fuel UEF*(40.8%) = 7.65 lbs/kgal*(0.592) + 9.50 lbs/kgal*(0.408) = 8.4 lbs/kgal Based on ARB test results, the average annual vehicle fueling UEF is 8.4 lbs/kgal, which equals the UEF estimated in the previous methodology. 4.1.y Packet Pg. 328 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 4 Table II-1 Vapor Recovery Emission Test Results for Summer RVP Fuel Vehicle Fueling UEF Vapor Recovery System Purpose of Test Location Date File Number Number of Fuelings Gallons Dispensed Vapor Mass (lbsx1000) UEF (lbs/kgal) Hirt Certification Sacramento Apr 1996 2000 ISOR 100 679 4535 6.68 Catlow Certification Sacramento Sep 1996 2000 ISOR 100 842 6732 8.00 Healy Certification Sacramento Sep 1996 2000 ISOR 100 939 6914 7.36 Hasstech Certification Sacramento Aug 1997 2000 ISOR 100 1012 9509 9.40 Healy Certification Sacramento Jun 1998 2000 ISOR 100 886 5712 6.45 Saber Certification Sacramento Apr 1999 2000 ISOR 100 981 6465 6.59 OPW Certification Sacramento Jul 1999 2000 ISOR 100 1012 8836 8.73 No Phase II Research San Jose July 2007 ST-08-12 6 61.6 354.4 5.75 Overall Summer RVP Fuel Results: 6412.6 49057 7.65 Note: 2000 ISOR – Initial Statement of Reasons for Proposed Amendments to the Vapor Recovery Certification and Test Procedures for Gasoline Loading and Motor Vehicle Refueling at Service Stations Table V-II, page 93. Table II-2 Vapor Recovery Emission Test Results for Winter RVP Fuel Vehicle Fueling UEF Vapor Recovery System Purpose of Test Location Date File Number Number of Fuelings Gallons Dispensed Vapor Mass (lbsx1000) UEF (lbs/kgal) Healy Certification Folsom Nov 1997 VOC Testing 101 1065.3 10091.5 9.47 Disabled Research Sacramento Dec 1999 ST-99-50 41 459.7 4438.4 9.65 No Phase II Research San Jose Dec 2007 ST-08-13 10 115.8 1065.6 9.20 Overall Winter RVP Fuel Results: 1640.8 15595.5 9.50 Note: VOC Testing – Phase II vapor recovery efficiency test performed by VOC Testing, an ARB certified independent tester. 4.1.y Packet Pg. 329 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, 5 DETERMINIATION OF CE ORVR CE The revised vehicle fueling emission factors assume 95 percent in-use CE for ORVR systems, based on the ORVR certification performance standard of 95 percent. U.S. Environmental Protection Agency (U.S. EPA) test data suggests greater than 95 percent in-use CE for ORVR systems.2, 3 However, U.S. EPA tests were performed on ORVR vehicles less than three model years old. Because data on longer-term efficiency of ORVR systems were not presented, ARB staff determined that the 95 percent certification performance standard represents the most conservative in-use CE for ORVR vehicles. Phase II Pre-EVR CE The revised vehicle refueling emission factors assume 71 percent in-use CE for Phase II pre-EVR systems, based primarily on results from a study conducted in 2000 by the San Diego County Air Pollution Control District (SDCAPCD) and data provided by the South Coast Air Quality Management District (SCAQMD). Phase II pre-EVR systems are required to achieve at least 95 percent efficiency during certification testing. However, the SDCAPCD study found that in-use Phase II pre-EVR balance systems were prone to malfunctions (e.g., hose blockages, nozzle faceplate gaps, and dispenser leaks) that resulted in a lower in-use control efficiency of approximately 70 percent, with 11 percent of the nozzles experiencing full system failure.4 Data provided by the South Coast Air Quality Management District (SCAQMD) shows that, as of 2006 (prior to the upgrade to Phase II EVR) about 92 percent of Phase II pre- EVR systems were balance systems and 8 percent were assist systems.5 To calculate the in-use CE of assist systems, ARB staff assumed that assist nozzles experience complete failure at the same rate (11 percent) reported for balance systems in the SDCAPCD report referenced above. However, assist systems, based on the way they operate are not expected to experience partial failures as reported for balance systems. Therefore, 11 percent of Phase II pre-EVR assist systems were assumed to have 0 percent efficiency due to an equipment failure such as a failed vapor pump, or a complete blockage in the vapor return line. The efficiency of the remaining 89 percent of assist systems was assumed to be 95 percent. Based on the SDCAPCD and SCAQMD data, and the stated assumptions for Phase II pre-EVR assist systems, the Phase II pre-EVR CE is calculated using the following equation: Phase II Pre-EVR CE = 0.92 * (Balance CE) + 0.08 (0.89 * Assist CE) = 0.92 * 70% + 0.08 * 0.89 * 95% = 71% Phase II EVR CE The revised vehicle fueling emission factors assume 95 percent in-use CE for Phase II EVR systems, based on both the certification performance standard of 95 percent and the results from thirteen separate in-use efficiency tests of Phase II EVR assist systems. Approximately 70 percent of Phase II EVR systems installed at California GDFs are 4.1.y Packet Pg. 330 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 6 assist systems. Phase II EVR in-use efficiency data was collected using the equipment and procedures referenced in the version of ARB Vapor Recovery Test Procedure TP- 201.2, Efficiency and Emission Factor for Phase II Systems, in effect at the time each test was performed. The thirteen efficiency tests represent 221 non-ORVR vehicle fueling events. Table II-3 summarizes results from the thirteen in-use efficiency tests of Phase II EVR assist Systems. The tests determined an average in-use efficiency of 95.1 percent for 221 non-ORVR fueling events. In addition, GDFs with Phase II EVR and throughputs above 600,000 gallons per year are required to install ARB certified in-station diagnostic (ISD) systems designed to alert GDF operators when critical parameters that affect efficiency do not comply with ISD performance criteria. If the operator ignores ISD warning alarms, ISD will suspend fueling. This requirement helps ensure a high level of emissions control for Phase II EVR systems and supports the assumption of a 95 percent overall CE. Table II-3 Phase II EVR In-Use Efficiency Test Results Test Site Date Non-ORVR Vehicle Fueling Events Phase II EVR Efficiency Arco Fruitridge 12/15/2008 13 93.2% Arco Fruitridge 12/16/2008 15 91.2% Arco Fruitridge 12/17/2008 16 91.0% Arco Fruitridge 12/17/2008 11 97.2% Arco Northgate 1/5/2009 15 91.7% Arco Northgate 1/6/2009 15 95.8% Arco Northgate 1/6/2009 15 97.8% Arco Northgate 1/8/2009 15 98.5% Arco Northgate 1/8/2009 16 95.2% Arco North 1/26/2010 25 94.2% Arco Harbour 3/9/2010 22 98.2% Arco North 7/12/2010 21 95.8% Arco Harbour 9/27/2010 22 96.8% Total Test Events: 221 Average Efficiency: 95.1% DETERMINATION OF EMISSION FACTORS ORVR without Phase II Vapor Recovery Emission Factor The revised emission factor for fueling ORVR vehicles at GDFs without Phase II vapor recovery systems is calculated from the UEF and ORVR CE using the following equation: 4.1.y Packet Pg. 331 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 7 ORVR w/o Phase II = UEF * (1 - ORVR CE) = 8.4 lbs/kgal * (1 - 0.95) = 0.42 lbs/kgal ORVR with Phase II pre-EVR Emission Factor The revised emission factor for fueling ORVR vehicles at GDFs with Phase II pre-EVR systems is calculated from the UEF, ORVR CE, and Phase II pre-EVR CE using the following equation: ORVR w/ Phase II EVR = UEF * (1 - ORVR CE) * (1 - Phase II pre-EVR CE) = 8.4 lbs/kgal * (1 - 0.95) * (1 - 0.71) = 0.12 lbs/kgal ORVR with Phase II EVR Emission Factor The revised emission factor for fueling ORVR vehicles at GDFs with Phase II EVR systems is calculated from the UEF, ORVR CE, and Phase II EVR CE using the following equation: ORVR w/ Phase II EVR = UEF * (1 - ORVR CE) * (1 - Phase II EVR CE) = 8.4 lbs/kgal * (1 - 0.95) * (1 - 0.95) = 0.021 lbs/kgal Non-ORVR with Phase II pre-EVR Emission Factor The revised emission factor for fueling non-ORVR vehicles at GDFs with Phase II pre- EVR systems is calculated from the UEF and Phase II pre-EVR CE using the following equation: Non-ORVR w/ Phase II pre-EVR = UEF * (1 - Phase II pre-EVR CE) = 8.4 lbs/kgal * (1 - 0.71) = 2.4 lbs/kgal Non-ORVR with Phase II EVR Emission Factor The revised emission factor for fueling non-ORVR vehicles at GDFs with Phase II EVR systems is calculated from the UEF and Phase II EVR CE using the following equation: Non-ORVR w/ Phase II EVR = UEF * (1 - Phase EVR II CE) = 8.4 lbs/kgal * (1 - 0.95) = 0.42 lbs/kgal 4.1.y Packet Pg. 332 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 8 III. REFERENCES 1. California State Board of Equalization Fuel Taxes and Statistics Report-2012. http://www.boe.ca.gov/sptaxprog/spftrpts12.htm 2. SHED test data for 337 2004-2005 model vehicles is available from David Good, U.S. EPA Office of Air and Radiation, Office of Transportation and Air Quality, Compliance Information Systems. 3. NESCAUM Report – Onboard Refueling Vapor Recovery Systems Analysis of Widespread Use, pages 9-10, Skelton and Rector, 8/20/2007. 4. Barnard R. McEntire, Performance of Balance Vapor Recovery Systems at Gasoline Dispensing Facilities, San Diego Air Pollution Control District, May 18, 2000. 5. Data on 2006 Balance/Assist Split for Pre-EVR systems provided to Frances Cameron by South Coast Air Quality Management District Staff 4.1.y Packet Pg. 333 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Impact Study Response to Comments – Memo#1 JN:0144-13-1702_Memo#1 Appendix B Revised Emission Factors for Gasoline Marketing Operations at California Gasoline Dispensing Facilities 4.1.y Packet Pg. 334 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Monitoring and Laboratory Division Revised Emission Factors for Gasoline Marketing Operations at California Gasoline Dispensing Facilities December 23, 2013 This report has been reviewed by the staff of the California Air Resources Board and approved for publication. Approval does not signify that the contents necessarily reflect the views and policies of the Air Resources Board, nor does the mention of trade names or commercial products constitute endorsement or recommendation for use. 4.1.y Packet Pg. 335 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- i ACKNOWLEDGEMENTS The author wishes to acknowledge the contributions by Gurjeet Bains, Frances Cameron, Basharat Iqbal, John Marconi, Jason McPhee and Frederick Medina, of the Air Resources Board Monitoring and Laboratory Division, in developing the emission factors presented in this proposal. In addition, thanks to Manjit Ahuja, Ranjit Bhullar, Cynthia Castronovo and George Lew for their editorial and technical review of the draft document. The author also wishes to give special acknowledgement to Gabriel Ruiz of the Air Resources Board Air Quality Planning and Science Division for his significant contributions in the review and editing of the draft emission factor document. 4.1.y Packet Pg. 336 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Table of Contents Page I. EXECUTIVE SUMMARY 1 II. INTRODUCTION 3 III. PHASE II FUELING - NON-ORVR AND ORVR VEHICLES 5 IV. PHASE I BULK TRANSFER LOSSES 7 V. PRESSURE DRIVEN LOSSES 9 VI. PHASE II FUELING – SPILLAGE 10 VII. GASOLINE DISPENSING HOSE PERMEATION 11 VIII. CONCLUSIONS 13 IX. REFERENCES 15 List of Tables Table I-I: Current and Revised TOG Emission Factors for Gasoline 2 Dispensing Facilities Table III-I: Current and Revised TOG Emission Factors for Vehicle 6 Refueling Emissions at Gasoline Dispensing Facilities Table IV-I: Current and Revised TOG Emission Factors for Phase I 8 Transfer Emissions at Gasoline Dispensing Facilities Table V-I: Current and Revised TOG Emission Factors for Pressure 9 Driven Emissions from Gasoline Dispensing Facilities Table VI-I: Current and Revised TOG Emission Factors for Gasoline 11 Spillage at Gasoline Dispensing Facilities Table VII-I: Year 2013 and 2017 Hose Permeation TOG Emission Factors 13 for Gasoline Dispensing Facilities 4.1.y Packet Pg. 337 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Table of Contents (cont.) List of Figures Figure II-I: Phase I, Phase II and Onboard Vapor Recovery Systems 3 Figure VII-I: Cutaways of Vapor Recovery GDF Hose Assemblies Showing 12 Vapor and Liquid Paths Attachments Attachment 1: Revised Emission Factors for Phase II Vehicle Fueling at California Gasoline Dispensing Facilities Attachment 2: Revised Emission Factors for Phase I Gasoline Bulk Transfer at California Gasoline Dispensing Facilities Attachment 3: Revised Emission Factors for Pressure Driven Emissions at California Gasoline Dispensing Facilities Attachment 4: Revised Emission Factors for Gasoline Spillage at California Gasoline Dispensing Facilities Attachment 5: Proposed Emission Factors for Gasoline Dispensing Hose Permeation at California Gasoline Dispensing Facilities 4.1.y Packet Pg. 338 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 1 I. EXECUTIVE SUMMARY Gasoline marketing operations in California presently distribute approximately 15 billion gallons of gasoline per year1 to motor vehicles, fuel containers, and gasoline-powered equipment. Hydrocarbon emissions, which are ozone precursors, can occur at several points during transfer, storage, or vehicle refueling as gasoline vapors are displaced from underground storage tanks (UST) or from vehicle fuel tanks. Vapor recovery systems are used to control emissions from California gasoline dispensing facilities (GDF). Phase I vapor recovery systems collect vapors displaced from an UST when a cargo tank truck delivers gasoline to a GDF. Phase II vapor recovery systems collect vapors displaced during storage or dispensing of gasoline. The Phase I and Phase II systems at a GDF work in combination with vapor recovery systems in vehicles and at gasoline loading terminals to control approximately 370 tons per day of hydrocarbon emissions2 from California gasoline marketing operations. The Air Resources Board (ARB) is in the process of updating the emissions inventory for GDFs. This category is currently composed of four subcategories associated with gasoline storage and transfer operations from cargo tank trucks to GDFs and from GDFs to vehicles, fuel containers, and gasoline-powered equipment. Total organic gas (TOG) emission factors for the four current GDF marketing subcategories were adopted in May 1999 and do not account for advances in vapor recovery system performance achieved through implementation of ARB’s enhanced vapor recovery (EVR) program; nor do they reflect the interaction between vapor recovery systems installed at California GDFs and vehicles equipped with onboard refueling vapor recovery (ORVR). Approximately 74 percent of gasoline dispensed statewide in 2013 will be to ORVR vehicles. Therefore, the purpose of this document is to present revised emission factors for four current gasoline marketing subcategories and two new subcategories developed since 1999. Current subcategories: i. Phase II Fueling - Non-ORVR Vehicles ii. Phase I Transfer Losses iii. Pressure Driven Losses iv. Phase II Fueling - Spillage New subcategories: v. Phase II Fueling - ORVR Vehicles vi. Gasoline Dispensing Hose Permeation This document describes the methodologies used to develop new or revised emission factors for the six GDF subcategories. The revised TOG emission factors are presented in Table I-I, along with the emission factors currently in use. The emission factors are segregated into three tiers, each representing varying degrees of vapor recovery equipment control: no vapor recovery system, or uncontrolled emission factor (UEF); 4.1.y Packet Pg. 339 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 2 Phase I and Phase II vapor recovery systems predating enhanced vapor recovery (Pre- EVR); and enhanced Phase I and Phase II vapor recovery systems (EVR). Table I-I Current and Revised TOG Emission Factors for Gasoline Dispensing Facilities Sub Category Currenta (lbs/kgal)b Revised (lbs/kgal)b UEF Pre-EVR UEF Pre-EVR EVR Phase II Fueling Non-ORVR Vehicles 8.4 0.74 8.4 2.4 0.42 ORVR Vehicles NA NA 0.42 0.12 0.021 Phase I Bulk Transfer Losses 8.4 0.42 7.7 0.38 0.15 Pressure Driven Losses 0.84 0.1 0.76 0.092 0.024 Phase II Fueling - Spillage 0.64 0.42 0.61 0.42 0.24 Gasoline Dispensing Hose Permeation Year 2013 NA NA 0.062 0.062 0.062 Year 2017 NA NA 0.009 0.009 0.009 Notes: a Current emission factors adopted May 1999, and predate EVR. b Pounds TOG emitted per thousand gallons dispensed or transferred. UEF - Uncontrolled emission factor. No Phase I vapor recovery system for bulk transfer emissions, no Phase II vapor recovery system for all other subcategories. Pre-EVR - Phase I pre-EVR system for bulk transfer emissions, Phase II pre-EVR system for all other subcategories. EVR - Phase I EVR system for bulk transfer emissions, Phase II EVR system for all other subcategories. NA - No current applicable emission factor. 4.1.y Packet Pg. 340 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 3 II. INTRODUCTION: Vapor recovery systems are installed at GDFs to collect gasoline vapors that would otherwise escape into the atmosphere. Gasoline vapor emissions at GDFs are controlled in two phases. Phase I vapor recovery collects vapors displaced from an UST when a cargo tank truck delivers gasoline to a GDF. Phase II vapor recovery collects vapors displaced during the transfer of gasoline from a GDF to a vehicle, fuel container, or gasoline-powered equipment; and the storage of gasoline at a GDF. ARB regulations establish standards for the level of emissions control vapor recovery systems must achieve during the transfer and storage of gasoline. All vapor recovery systems must undergo certification tests to demonstrate compliance with performance standards before they can be sold, offered for sale, or installed in California. Figure II-1 illustrates the interaction between Phase I, Phase II and onboard vapor recovery systems. Figure II-I: Phase I, Phase II and Onboard Vapor Recovery Systems Vapor recovery system performance standards for GDFs have become more stringent over the years. Since 2001, ARB has adopted a number of significant advancements as part of the EVR program. Phase I EVR requires more durable and leak-tight components, along with an increased collection efficiency of 98 percent. Phase II EVR includes three major advancements: (1) dispensing nozzles with less spillage and required compatibility with ORVR vehicles, (2) a processor to control the static pressure of the ullage, or vapor space, in the underground storage tank, and (3) an in-station diagnostic (ISD) system that provides warning alarms to alert a GDF operator of potential vapor recovery system malfunctions. Phase I EVR was fully implemented in 2005. Phase II EVR was fully implemented between 2009 and 2011. Only existing GDFs in areas that are designated attainment for the State ozone standard are exempt from Phase I and Phase II EVR requirements. Additionally, ARB’s air toxic control measure for benzene requires retail GDFs to install Phase I 4.1.y Packet Pg. 341 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 4 and Phase II systems at all GDFs except those which: (1) dispense from or transfer gasoline to a storage tank with a capacity less than 260 gallons, (2) dispense gasoline to implements of animal husbandry; or (3) only dispense to vehicles with fuel tanks less than 5 gallons capacity. The current emission inventory category for gasoline marketing and retailing consists of four subcategories that include processes associated with storage and fuel transfer operations from cargo tank trucks to GDFs and from GDFs to vehicles, fuel containers, and gasoline-powered equipment. The current emission factors have been in effect since May 1999 and do not account for advances in vapor recovery system performance achieved through implementation of ARB’s EVR program; nor do they address the interaction between GDF vapor recovery systems and ORVR vehicles. This document presents updated emission factors for the four current subcategories, and two new subcategories addressing ORVR vehicle refueling and gasoline dispensing hose permeation emissions. The processes that generate emissions in the six subcategories are described below: Current subcategories: i. Phase II Fueling - Non-ORVR Vehicles: When dispensing gasoline to vehicles not equipped with ORVR, the rising liquid level in the vehicle fuel tank displaces gasoline vapors back through the fill-pipe where they are captured by a Phase II vapor recovery system. Vapors not captured by the Phase II vapor recovery system are emitted to the atmosphere. ii. Phase I Bulk Transfer Losses: During transfer of gasoline from cargo tank trucks to a GDF UST, emissions are generated when gasoline vapors in an UST are displaced to the atmosphere by the rising level of the gasoline being loaded into an UST. Emissions are controlled with a Phase I vapor recovery system. iii. Pressure Driven (Breathing) Losses: Emissions are generated when gasoline vapors are displaced to the atmosphere during the day to day operation of a given GDF. During periods when there is either no dispensing or when there is a significant slowdown in the dispensing of fuel to vehicles, such as overnight periods, gasoline in an UST evaporates into the headspace above the liquid fuel. The vapor growth caused by this evaporation increases UST static pressure and results in pressure driven emissions. Pressure driven emissions are currently controlled by a processing unit that includes either a bladder tank, membrane separator, carbon canister or thermal oxidizer. iv. Phase II Fueling - Spillage: Emissions are generated from dispensing nozzle spillage of liquid gasoline during the act of vehicle fueling, including pre- fueling, fueling and post-fueling spillage. 4.1.y Packet Pg. 342 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 5 New subcategories: v. Phase II Fueling - ORVR Vehicles: These emissions occur at the vehicle fill- pipe during dispensing of gasoline to ORVR vehicles. ORVR systems were phased in beginning with 1998 model year passenger vehicles, and are now installed on all passenger, light-duty, and medium-duty vehicles manufactured since the 2006 model year. When an ORVR vehicle is fueled, almost all the gasoline vapor displaced from the fuel tank is routed to a carbon canister in the vehicle fuel system. At the start of dispensing, a small portion of the vapor in the vehicle fuel tank may escape through the fill-pipe before the onboard system is fully engaged. Uncontrolled fill-pipe emissions from ORVR vehicles are approximately two orders of magnitude lower than the same emissions from vehicles without ORVR, and are easily captured by Phase II vapor recovery systems. vi. Gasoline Dispensing Hose Permeation: These emissions are caused by the migration of liquid gasoline through the outer GDF hose material and to the atmosphere through permeation. This condition primarily occurs at GDFs equipped with vacuum assist Phase II vapor recovery systems or no Phase II vapor recovery system. The following sections present new or revised emission factors for the four current and two new subcategories identified above. The GDF emission factors are segregated into three tiers, each representing varying degrees of vapor recovery control equipment: uncontrolled (UEF), pre-EVR, and EVR. This document also includes attachments detailing the methodologies and identifying references used to derive the revised emission factors for each GDF subcategory. All revised emission factors are based on test data collected by ARB staff, using established ARB test procedures when applicable. III. PHASE II FUELING - NON-ORVR AND ORVR VEHICLES Vehicle fueling emissions occur when gasoline vapors are displaced by rising liquid in the vehicle fuel tank during gasoline dispensing. These vapors are adsorbed in a carbon canister installed on ORVR vehicles. When fueling non-ORVR vehicles, these vapors can be collected by a Phase II vapor recovery system and returned to a GDF storage tank. Without a Phase II vapor recovery system, the vapors displaced from fueling non-ORVR vehicles are uncontrolled and released to the atmosphere. The current TOG emission factors for vehicle fueling predate the conversion to EVR systems, and do not account for the introduction of ORVR vehicles to California’s motor vehicle fleet. Therefore, the current vehicle refueling emission factors are representative of non-ORVR vehicles only. Current and proposed vehicle fueling emission factors are presented in Table III-1 below. 4.1.y Packet Pg. 343 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 6 Table III-I Current and Revised TOG Emission Factors for Vehicle Fueling Emissions at Gasoline Dispensing Facilities Vehicle Category Current (lbs/kgal) Revised (lbs/kgal) UEF Pre-EVR UEF Pre-EVR EVR Non-ORVR Vehicles 8.4 0.74 8.4 2.4 0.42 ORVR Vehicles N/A N/A 0.42 0.12 0.021 The method used to develop the revised vehicle fueling emission factors consists of determining an UEF and then applying control efficiency (CE) factors that are representative of in-use ORVR and Phase II vapor recovery systems, resulting in controlled emission factors for each possible combination of fuel dispensing systems, ORVR vehicles, and non-ORVR vehicles. The revised UEF for non-ORVR vehicle fueling was determined from vapor recovery certification tests performed by ARB staff and independent contractors, using ARB Vapor Recovery Test Procedure TP-201.2, Efficiency and Emission Factor for Phase II Systems.3 In addition to vapor recovery certification testing, ARB staff has also performed tests of uncontrolled vehicle fueling at a GDF without a Phase II vapor recovery system, and at a GDF with a disabled Phase II vapor recovery system. The ARB test results determined the non-ORVR vehicle fueling UEF as 8.4 lbs/kgal, which agrees with and validates the current emission factor. The revised UEF for ORVR vehicles was calculated as 0.42 lbs/kgal based on the non- ORVR vehicle fueling UEF of 8.4 lbs/kgal and 95 percent control efficiency required for certification of ORVR systems. Test data from a U.S. Environmental Protection Agency study4, 5 suggest in-use efficiency greater than 95 percent. However, since the tests were performed on vehicles that were less than three model years old, ARB staff determined that the certification standard would represent the most conservative approach because an evaluation of the long term performance of the ORVR systems was not possible. Phase II pre-EVR in-use control efficiency is estimated at 71 percent, based on results presented in two studies by local air districts in California. The first, performed by San Diego County Air Pollution Control District (SDCAPCD) in 2000,6 concluded that pre- EVR balance systems experienced equipment defects at levels resulting in an estimated 70 percent collection efficiency (with complete failure about 11percent of the time). The second, performed by South Coast Air Quality Management District, shows that in 2006, prior to the Phase II EVR upgrade, about 92 percent of Phase II pre-EVR systems were balance type and 8 percent were vacuum assist type.7 Assuming pre- EVR vacuum assist systems experience the same 11 percent complete failure rate determined for balance systems by the SDCAPCD study, and the remaining 89 percent 4.1.y Packet Pg. 344 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 7 operate at 95 percent collection efficiency, the calculated in-use control efficiency for Phase II pre-EVR systems is: Phase II pre-EVR CE = 0.92 * (Balance CE) + 0.08 * (0.89 * Assist CE) = 0.92 * (0.70) + 0.08 * (0.89 * 0.95) = 0.71 The revised emission factors for Phase II pre-EVR systems were calculated using the non-ORVR vehicle fueling UEF of 8.4 lbs/kgal, 95 percent ORVR in-use control efficiency and 71 percent Phase II pre-EVR system in-use control efficiency as follows: ORVR, Phase II pre-EVR = (non-ORVR UEF)*(1 - ORVR CE)*(1- Ph II pre-EVR CE) = (8.4 lbs/kgal) * (1 - 0.95) * (1 - 0.71) = 0.12 lbs/kgal Non-ORVR, Phase II pre-EVR = (non-ORVR UEF)*(1 - Ph II pre-EVR CE) = (8.4 lbs/kgal) * (1 - 0.71) = 2.4 lbs/kgal Phase II EVR in-use control efficiency for non-ORVR vehicles is estimated at 95 percent based on results from 13 separate vapor recovery system efficiency tests performed by ARB staff between January 2009 and September 2010. The 13 tests represent 221 non-ORVR vehicle fueling events, and the overall vapor recovery system in-use control efficiency determined from these tests was 95 percent. The emission factors for Phase II EVR systems were calculated using the non-ORVR vehicle fueling UEF of 8.4 lbs/kgal, 95 percent ORVR in-use control efficiency and 95 percent Phase II EVR system in-use control efficiency as follows: ORVR, Phase II EVR = (non-ORVR UEF)*(1 - ORVR CE)*(1 - Ph II EVR CE) = (8.4 lbs/kgal)*(1 - 0.95)*(1 - 0.95) = 0.021 lbs/kgal Non-ORVR, Phase II EVR = (non-ORVR UEF)*(1 - Ph II EVR CE) = (8.4 lbs/kgal) * (1 - 0.95) = 0.42 lbs/kgal A more detailed description of the methodologies used to determine the revised vehicle fueling emission factors, including all applicable references is presented in Attachment 1 to this document, Revised Emission Factors for Phase II Vehicle Fueling at California Gasoline Dispensing Facilities. IV. PHASE I BULK TRANSFER LOSSES Phase I bulk transfer losses are TOG emissions produced during the delivery of gasoline to an UST from a cargo tank, and are also referred to as working losses or transfer emissions. Transfer emissions are controlled by a Phase I vapor recovery system, which operates on the balance principle. As gasoline is transferred by gravity from a cargo tank to an UST, the rising UST liquid level displaces hydrocarbon vapors which are captured by the Phase I vapor recovery system and returned to the headspace area in the cargo tank. This process is again repeated when the cargo tank 4.1.y Packet Pg. 345 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 8 is refilled at a gasoline bulk terminal, and the vapors displaced from the cargo tank are either recovered as liquid gasoline by and adsorption/absorption process or oxidized by a flare. The current TOG bulk transfer emission factors predate implementation of ARB’s EVR program. The current and revised TOG bulk transfer emission factors are presented in Table IV-I below. Table IV-I Current and Revised TOG Emission Factors for Phase I Transfer Emissions at Gasoline Dispensing Facilities Current (lbs/kgal) Revised (lbs/kgal) UEF Pre-EVR UEF Pre-EVR EVR 8.4 0.42 7.7 0.38 0.15 The method used to develop the revised gasoline bulk transfer emission factors consists of determining a gasoline bulk transfer UEF, and then applying CE factors that are representative of the level of control achieved by Phase I pre-EVR and Phase I EVR systems. The revised bulk transfer UEF was derived from UST headspace TOG concentration data obtained from five tests performed by ARB staff at a Sacramento, California GDF between February 2012 and September 2013. In determining the revised UEF, ARB staff assumes the average UST headspace TOG concentration measured in these tests is representative of the average TOG concentration of the vapor mass displaced from an UST during bulk gasoline transfer if the emissions were uncontrolled. Based on these test results, ARB staff determined the revised bulk transfer UEF as 7.7 lbs/kgal, which represents an 8 percent decrease from the current value of 8.4 lbs/kgal. Phase I pre-EVR in-use control efficiency is estimated at 95 percent, based on the performance standard for Phase I pre-EVR equipment certification and results from ten Phase I volumetric efficiency tests performed by ARB staff at gasoline bulk plant distribution facilities (bulk plant) prior to implementation of Phase I EVR. Results for each of the ten tests determined >95 percent volumetric efficiency during bulk transfer of gasoline from a cargo tank to the bulk plant UST. The revised emission factor for Phase I pre-EVR systems was calculated using the bulk transfer UEF of 7.7 lbs/kgal and 95 percent Phase I pre-EVR in-use control efficiency as follows: Phase I pre-EVR = (bulk transfer UEF) * (1 - Phase I pre-EVR CE) = (7.7 lbs/kgal) * (1 - 0.95) = 0.38 lbs/kgal Phase I EVR in-use control efficiency is estimated at 98 percent, based on the performance standard for Phase I EVR equipment certification and results from ten Phase I volumetric efficiency tests performed by ARB staff at bulk plants after 4.1.y Packet Pg. 346 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 9 implementation of Phase I EVR. Results for each of the ten tests determined >98 percent volumetric efficiency during bulk transfer of gasoline from a cargo tank to the bulk plant UST. The emission factor for Phase I EVR systems was calculated using the bulk transfer UEF of 7.7 lbs/kgal and 98 percent Phase I-EVR in-use control efficiency as follows: Phase I EVR = (bulk transfer UEF) * (1 - Phase I EVR CE) = (7.7 lbs/kgal) * (1 - 0.98) = 0.15 lbs/kgal A more detailed description of the methodologies used to determine the revised Phase I transfer emission factors, including all applicable references, is presented in Attachment 2 to this document, Revised Emission Factors for Phase I Gasoline Bulk Transfer at California Gasoline Dispensing Facilities V. PRESSURE DRIVEN LOSSES Pressure driven, or breathing, losses are fugitive emissions from UST vent riser and/or Phase II vapor recovery components resulting from the day to day operations at a given GDF. These emissions are influenced by several variables, most notably: gasoline Reid vapor pressure (RVP) and evaporation rate, ORVR vehicle throughput, overnight facility shutdown or extended facility inactivity, gasoline delivery schedule, vapor recovery system operating principle and vapor recovery system pressure integrity. These variables can act singularly or in combination to elevate static pressure in UST headspace, resulting in pressure driven emissions. Current and revised pressure driven emission factors are presented in Table V-I below. Current pressure driven emission factors for GDFs without Phase II vapor recovery (UEF) and with Phase II pre-EVR vapor recovery systems are 0.84 lbs/kgal and 0.10 lbs/kgal, respectively. There is no current emission factor applicable to GDFs equipped with Phase II EVR systems. Table V-I Current and Revised TOG Pressure Driven Emission Factors for Gasoline Dispensing Facilities Current (lbs/kgal) Revised (lbs/kgal) UEF Pre-EVR UEF Pre-EVR EVR 0.84 0.10 0.76 0.092 0.024 The revised UEF of 0.76 lbs/kgal was calculated from UST static pressure data collected at a fleet rental car GDF located in San Jose, California. This facility is exempt from Phase II vapor recovery requirements by Bay Area Air Quality Management District.8 UST static pressure data collected at this facility during two 30- day periods were combined with fugitive flow rate equations in ARB Vapor Recovery Test ProcedureTP-201.2F, Pressure Related Fugitive Emissions,9 a TOG concentration of 46 percent as propane, and the facility gasoline throughput of 12,000 gallons per 4.1.y Packet Pg. 347 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 10 month to yield the revised UEF for pressure driven emissions from GDFs without Phase II systems. The 46 percent TOG concentration value used in UEF calculation is based on the average UST headspace TOG concentration measured during ten tests performed by ARB staff at three GDFs between February 2012 and September 2013. TOG concentrations were determined using non-dispersive infrared gas analyzers and sampling and quality assurance procedures referenced in ARB Vapor Recovery Test Procedure TP-201.2, Efficiency and Emission Factor for Phase II Systems. The revised pressure driven emission factors for GDFs with Phase II pre-EVR and Phase II EVR systems were estimated as 0.092 lbs/kgal and 0.024 lbs/kgal, respectively. The revised emission factors were derived from data collected between November 2009 and October 2010 at six GDFs located in Northern California. These sites were randomly selected as part of an ARB program to examine the dynamics causing substantial increases in the number of ISD over-pressure alarms corresponding to the transition from summer formulated fuel with Reid vapor pressure (RVP) restricted to less than or equal to 7 pounds per square inch, to winter formulated fuel with no RVP restriction. The six sites represent a cross section of the characteristics associated with California GDFs, such as throughput category, vapor recovery system operating principle and 24-hour operation versus overnight closure. The reductions in revised pressure driven emission factors are primarily attributable to advancements in Phase II vapor recovery system technologies exclusive to EVR systems, such as: the Franklin-Healy vapor recovery nozzle which detects ORVR vehicles and reduces its V/L ratio, pressure management processors designed to maintain UST static pressure below defined levels, and ISD systems that monitor vapor recovery system operating parameters and alert GDF operators of vapor recovery equipment failures. A more detailed description of the methodologies used to determine revised pressure driven emission factors, including all applicable references, is presented in Attachment 3, Revised Emission Factors for Pressure Driven Emissions at California Gasoline Dispensing Facilities. VI. PHASE II FUELING - SPILLAGE Gasoline spillage emissions are generated from liquid gasoline spills associated with vehicle fueling, including pre-fueling, fueling, and post-fueling spillage. The current and revised emission factors for gasoline spillage during vehicle fueling are presented in Table VI-I below. 4.1.y Packet Pg. 348 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 11 Table VI-I Current and Revised TOG Emission Factors for Gasoline Spillage at Gasoline Dispensing Facilities Current (lbs/kgal) Revised (lbs/kgal) UEF Pre-EVR UEF Pre-EVR EVR 0.64 0.42 0.61 0.42 0.24 Current emission factors for gasoline spillage at GDFs without Phase II vapor recovery (UEF) and with Phase II pre-EVR systems are 0.64 lbs/kgal and 0.42 lbs/kgal, respectively, based on data from tests performed by ARB, (Morgester et al., 1992).10 There is no current emission factor applicable to GDFs equipped with Phase II EVR systems. ARB staff has reviewed the test data used to calculate the current gasoline spillage UEF and pre-EVR emission factor. Based on this review, ARB staff determined the revised gasoline spillage UEF is 0.61 lbs/kgal, and the revised gasoline spillage pre-EVR emission factor should remain at 0.42 lbs/kgal. The revised emission factors are essentially unchanged from the current values because there have been no technical advancements for the respective nozzles since the current factors were established. The gasoline spillage emission factor for GDFs with Phase II EVR is 0.24 lbs/kgal, which is the current performance standard referenced in ARB Certification Procedure CP-201,Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities.11 A more detailed description of the methodologies used to determine the revised gasoline spillage emission factors, including all applicable references, is presented in Attachment 4, Revised Emission Factors for Gasoline Spillage at California Gasoline Dispensing Facilities. VII. GASOLINE DISPENSING HOSE PERMEATION ARB adopted performance standards for gasoline dispensing hose permeation on July 26, 2012. Prior to adoption of these standards there were no hose permeation performance standards for California GDFs. Facilities subject to the standards will have four years from their effective date to comply. The effective date is defined as the date on which the first dispensing hose is certified by ARB to meet the new hose permeation performance standards. Hose permeation performance standards only apply to hoses in which liquid fuel comes into contact with the outer hose wall, specifically: Phase II vacuum assist and conventional (non-vapor recovery) hoses. Vacuum assist hoses account for approximately 70 percent of the almost 100,000 Phase II vapor recovery hoses installed at California GDFs.12 There are approximately 1,000 additional hoses installed at facilities without Phase II vapor recovery. The performance standards do not apply to 4.1.y Packet Pg. 349 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 12 hoses of balance Phase II vapor recovery systems, which dispense gasoline through the center region of a coaxial hose and transport vapor in the outer region. Figure VII-I illustrates the differences in fuel delivery and vapor return pathways for vacuum assist and balance vapor recovery hoses. Figure VII-I, Cutaways of Vapor Recovery GDF Hose Assemblies Showing Vapor and Liquid Paths Permeation rates are influenced by several factors, the most significant of which are: fuel temperature, gasoline formulation, and concentration gradient across the barrier material. As is the case with vehicle refueling emissions, gasoline throughput to ORVR vehicles plays a role in the permeation rates of balance type hoses, because refueling of ORVR vehicles affects the concentration gradient across the outer wall of these hoses. Therefore, balance hose permeation emissions are expected to decline in future years as gasoline throughput to ORVR vehicles increases. When considering an isolated GDF hose, the permeation rate of liquid gasoline through vacuum assist and conventional hoses is relatively unaffected by activity level (i.e., the volume of gasoline dispensed or throughput). These hoses should permeate at the same daily rate as long as there is some level of activity. Therefore, the hose permeation emissions in tons per day can be estimated directly, independent of activity level. However, because other GDF emissions calculations are activity based, hose permeation emission factors were estimated as a function of activity level in order to maintain dimensional consistency with the emission factors proposed for the five other GDF subcategories. 4.1.y Packet Pg. 350 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 13 Hose permeation emission factors based on GDF activity and ORVR penetration for years 2013 and 2017 are presented in Table VII-I below. Table VII-I Year 2013 and 2017 Hose Permeation TOG Emission Factors for Gasoline Dispensing Facilities Year 2013 (lbs/kgal) Year 2017 (lbs/kgal) UEF Pre-EVR EVR UEF Pre-EVR EVR 0.062 0.062 0.062 0.009 0.009 0.009 The 2013 emission factors represent the uncontrolled permeation rates determined from ARB laboratory tests on vacuum assist, conventional and balance hoses.13, 14 The 2017 controlled emission factors (CEF) assume full implementation of the 3.23 grams per meter squared per day (referenced to 71 oF) vacuum assist/conventional hose permeation standard at California GDFs. This factor reflects the predicted population of vacuum assist, conventional and balance hoses and their associated permeation rates using the following equation: GDF Hose CEF2017 = CEFvac/con, 2017 + UEFbal, 2017 = 0.002 lbs/kgal + 0.007 lbs/kgal = 0.009 lbs/kgal The 2017 hose permeation CEF of 0.009 lbs/kgal represents an 88% reduction in hose permeation emissions compared to the 2013 emissions baseline of 0.062 lbs/kgal. ARB’s cost analysis suggests cost savings15 associated with low permeation hose conversion in both vapor recovery and non-vapor recovery applications. A more detailed description of the methodologies used to determine the proposed GDF hose permeation emission factors, including all applicable references and intermediate variables such as: permeation rates, hose surface areas, hose populations and gasoline throughput is presented in Attachment 5, Proposed Emission Factors for Gasoline Dispensing Hose Permeation at California Gasoline Dispensing Facilities. VIII. CONCLUSIONS The revised GDF emission factors show no change to the current UEF for Phase II non- ORVR vehicle refueling of 8.4 lbs/kgal; and a 17 percent percent reduction to the current UEF for Phase I transfer losses from 8.4 lbs/kgal to 7.0 lbs/kgal. The revised emission factor for refueling non-ORVR vehicles with Phase II pre-EVR systems of 2.4 lbs/kgal is approximately 3 times its current value of 0.74 lbs/kgal, due to the lower in- use efficiency assigned to Phase II pre-EVR systems. However, Phase II pre-EVR systems only account for approximately 3 percent of gasoline dispensed at California GDFs. 4.1.y Packet Pg. 351 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 14 The revised emission factors also include categories for GDFs with EVR equipment, which currently dispense approximately 95 percent of gasoline sold in California. There are no current emission factors for EVR categories, as the current emission factors predate EVR systems. The revised emission factors proposed for EVR categories are all significantly lower than the current pre-EVR values; and are reflective of both advancements in vapor recovery system performance achieved through ARB’s EVR program and the increasing statewide gasoline throughput to ORVR vehicles. 4.1.y Packet Pg. 352 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 15 IX. REFERENCES 1. Preliminary Analysis of U.S. EPA’s Draft Regulation on Onboard Refueling Vapor Recovery (ORVR) Widespread Use Determination and California’s Enhanced Vapor Recovery (EVR) Requirements. J. Marconi, September 8, 2011. 2. California Air Resources Board Presentation: Enhanced Vapor Recovery Implementation Update, June 28, 2008. http://www.arb.ca.gov/vapor/archive/2008/evrtalk062608.pdf. 3. ARB Stationary Source Test Procedures, Volume II, Vapor Recovery Test Procedure TP-201.2. http://www.arb.ca.gov/testmeth/vol2/tp-201_2.pdf 4. SHED test data for 337 2004-2005 model vehicles is available from David Good, U.S. EPA Office of Air and Radiation, Office of Transportation and Air Quality, Compliance Information Systems. 5. NESCAUM Report – Onboard Refueling Vapor Recovery Systems Analysis of Widespread Use, pages 9-10, Skelton and Rector, 8/20/2007. 6. Barnard R. McEntire, Performance of Balance Vapor Recovery Systems at Gasoline Dispensing Facilities, San Diego Air Pollution Control District, May 18, 2000. 7. Data on 2006 Balance/Assist Split for Pre-EVR systems provided to Frances Cameron by South Coast Air Quality Management District Staff. 8. Bay Area Air Quality Management District Regulation 8, Rule 7, paragraph 112.9. http://www.baaqmd.gov/~/media/Files/Planning%20and%20Research/Rules%20a nd%20Regs/reg%2008/rg0807.ashx?la=en. 9. ARB Vapor Recovery Test ProcedureTP-201.2F, Pressure Related Fugitive Emissions. http://www.arb.ca.gov/testmeth/vol2/tp201.2f_Oct2003.pdf. 10. James J. Morgester, Robert L. Fricker, G. Henry Jordan (1992) Comparison of Spill Frequencies and Amounts at Vapor Recovery and Conventional Service Stations in California, Journal of Air & Waste Management Association, Vol 42, No. 3, pp284-289, March 1992. 11. ARB Certification Procedure CP-201,Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities. http://www.arb.ca.gov/testmeth/vol2/cp201_april2013.pdf 12. ARB, Initial Statement of Reasons August 3, 2011, Appendix 4, Gasoline Dispensing Facility hose Emissions Inventory for Vacuum Assist and conventional Hoses. http://www.arb.ca.gov/vapor/rulemaking.htm. 4.1.y Packet Pg. 353 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 16 13. ARB, Gasoline Dispensing Facility (GDF) Vacuum-Assist and Conventional Hose Permeation Study, July 19, 2010, Jason McPhee, P.E. 14. ARB, Gasoline Dispensing Facility (GDF) Balance Hose Permeation Study, June 19, 2008, revised October 6, 2010, Jason McPhee. 15. Cost Effectiveness Report: 2011 Amendments to the Regulation for Certification of Vapor Recovery Systems at Gasoline Dispensing Facilities, Jason McPhee, P.E. http://www.arb.ca.gov/vapor/rulemaking.htm. 4.1.y Packet Pg. 354 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Attachments Attachment 1: Revised Emission Factors for Phase II Vehicle Fueling at California Gasoline Dispensing Facilities Attachment 2: Revised Emission Factors for Phase I Gasoline Bulk Transfer at California Gasoline Dispensing Facilities Attachment 3: Revised Emission Factors for Pressure Driven Emissions at California Gasoline Dispensing Facilities Attachment 4: Revised Emission Factors for Gasoline Spillage at California Gasoline Dispensing Facilities Attachment 5: Proposed Emission Factors for Gasoline Dispensing Hose Permeation at California Gasoline Dispensing Facilities 4.1.y Packet Pg. 355 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Impact Study Response to Comments – Memo#1 JN:0144-13-1702_Memo#1 Appendix C Site Plan and Google Earth Overlay 4.1.y Packet Pg. 356 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 4.1.yPacket Pg. 357Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, San Jacinto Commonwealth Development Air Quality and Greenhouse Gas Impact Study Response to Comments – Memo#1 JN:0144-13-1702_Memo#1 Appendix D Screening Tables for Gasoline Dispensing Facilities & CARB 2005 Air Quality and Land Use Handbook Table 1-1 4.1.y Packet Pg. 358 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 4.1.y Packet Pg. 359 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 4.1.y Packet Pg. 360 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Table 1-1 Recommendations on Siting New Sensitive Land Uses Such As Residences, Schools, Daycare Centers, Playgrounds, or Medical Facilities* Source Category Advisory Recommendations Freeways and High-Traffic Roads Avoid siting new sensitive land uses within 500 feet of a freeway, urban roads with 100,000 vehicles/day, or rural roads with 50,000 vehicles/day. Distribution Centers Avoid siting new sensitive land uses within 1,000 feet of a distribution center (that accommodates more than 100 trucks per day, more than 40 trucks with operating transport refrigeration units (TRUs) per day, or where TRU unit operations exceed 300 hours per week). Take into account the configuration of existing distribution centers and avoid locating residences and other new sensitive land uses near entry and exit points. Rail Yards Avoid siting new sensitive land uses within 1,000 feet of a major service and maintenance rail yard. Within one mile of a rail yard, consider possible siting limitations and mitigation approaches. Ports Avoid siting of new sensitive land uses immediately downwind of ports in the most heavily impacted zones. Consult local air districts or the ARB on the status of pending analyses of health risks. Refineries Avoid siting new sensitive land uses immediately downwind of petroleum refineries. Consult with local air districts and other local agencies to determine an appropriate separation. Chrome Platers Avoid siting new sensitive land uses within 1,000 feet of a chrome plater. Dry Cleaners Using Perchloro- ethylene Avoid siting new sensitive land uses within 300 feet of any dry cleaning operation. For operations with two or more machines, provide 500 feet. For operations with 3 or more machines, consult with the local air district. Do not site new sensitive land uses in the same building with perc dry cleaning operations. Gasoline Dispensing Facilities Avoid siting new sensitive land uses within 300 feet of a large gas station (defined as a facility with a throughput of 3.6 million gallons per year or greater). A 50 foot separation is recommended for typical gas dispensing facilities. *Notes: These recommendations are advisory. Land use agencies have to balance other considerations, including housing and transportation needs, economic development priorities, and other quality of life issues. Page 4 4.1.y Packet Pg. 361 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Recommendations are based primarily on data showing that the air pollution exposures addressed here (i.e., localized) can be reduced as much as 80% with the recommended separation. The relative risk for these categories varies greatly (see Table 1-2). To determine the actual risk near a particular facility, a site-specific analysis would be required. Risk from diesel PM will decrease over time as cleaner technology phases in. These recommendations are designed to fill a gap where information about existing facilities may not be readily available and are not designed to substitute for more specific information if it exists. The recommended distances take into account other factors in addition to available health risk data (see individual category descriptions). Site-specific project design improvements may help reduce air pollution exposures and should also be considered when siting new sensitive land uses. This table does not imply that mixed residential and commercial development in general is incompatible. Rather it focuses on known problems like dry cleaners using perchloroethylene that can be addressed with reasonable preventative actions. A summary of the basis for the distance recommendations can be found in Table 1-2. Page 5 4.1.y Packet Pg. 362 Attachment: Attachment 27 - Response to SCAQMD (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- ATTACHMENT 28 4.1.z Packet Pg. 363 Attachment: Attachment 28 - Valley Wide Letter (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, 4.1.aaPacket Pg. 364Attachment: Attachment 29 - Letter from Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, 4.1.aaPacket Pg. 365Attachment: Attachment 29 - Letter from Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, 4.1.aaPacket Pg. 366Attachment: Attachment 29 - Letter from Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, Community Development Department 595 S. San Jacinto Ave. San Jacinto, CA 92583 (951) 487-7330 Fax (951) 654-9896 April 25, 2018 Mark Roberts, AICP, Office Chief Intergovernmental Review, Community and Regional Planning Department of Transportation, District 8 464 West Fourth Street, 6th Floor MS 725 San Bernardino, CA 92401-1400 SUBJECT: PM-37407, SPDR-17-11, CUP-17-06, MUPS-17-06, 17-07 & 17-08, VAR-17-0-4 AND CZ-17-03 – COMMONWEALTH CROSSING – AGENCY RESPONSE. Dear Mr. Roberts: The City appreciates the California Department of Transportation’s (Caltrans’) review of the Draft Mitigated Negative Declaration (MND) and provides this response. To address the comments regarding the Traffic Impact Analysis, Trames Solutions, Inc., has prepared the attached response. Regarding the comments under Land Use, the City is currently preparing the Downtown Specific Plan, which includes the “TOD Core” and the opportunity for increased residential densities, more compact Industrial/Services/Retails uses, as well as a potential location for future rail. As this plan is finalized, high-density residential uses will be considered more thoroughly. It is also noted, that the Project does include a Change of Zone to the CG-UC – Commercial General and Urban Corridor Combining Overlay Zones. Lastly, the Rancho San Jacinto Specific Plan (SP-01-88/SP-02-88) with the recent approval of Mountain Bridge Estates (TTM-37299 and TTM-37230) is essentially built out. Comments from Caltrans have become part of the public record. Best regards, Travis Randel Community Development Director Attachment: Response on Traffic Impact Analysis Concerns by Trames Solutions, Inc. 4.1.ab Packet Pg. 367 Attachment: Attachment 30 - Response to Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Trames #0290-0001 4225 Oceanside Blvd., 354H Oceanside, CA 92056 (760) 291 - 1400 April 24, 2018 Devon Wesselink MW VANTAGE 1 LLC 26400 La Alameda, Suite 100 Mission Viejo, CA 92691 Subject: SJ Commonwealth Response to Caltrans Comments (JN 0290-0001) Dear Mr. Wesselink: Trames Solutions Inc. is pleased to submit the following response to Caltrans Comments regarding the proposed SJ Commonwealth project. Previously, a traffic study was prepared (Commonwealth Crossing Traffic Impact Analysis, Trames Solutions, October 2017) that evaluated a 40,000 sf health club, a 5,800 sf retail use, an automatic car wash with a 108 foot tunnel, a 4,720 sf fast food w/drive thru, and a 16 vehicle fueling positions Convenience Store with a car wash facility. Since the traffic study was prepared, the project site has been updated and now consists of: • A 12,000 sf tire store • A 24,000 sf retail/office site • An automatic car wash with a 108 foot tunnel • A 2,720 sf fast food w/drive thru • A 12 vehicle fueling positions Convenience Store with a car wash facility Attachment A contains the site plan for the currently proposed project. The project site is located west of San Jacinto Street across from Commonwealth Avenue in the City of San Jacinto. The following comment was provided by Caltrans on April 23, 2018. The comment on the traffic study is provided below followed by our response. COMMENT 1 The proposed land uses in the project description don't match those used to calculate the proposed trip generation in the TIA (see table). The values in question are in red below; 4.1.ab Packet Pg. 368 Attachment: Attachment 30 - Response to Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Devon Wesselink MW VANTAGE 1 LLC April 24, 2018 Page 2 Trames #0290-0001 Land Use ITECode Quantity Peak Hour Trip Rates AM PM IN OUT Total IN OUT Total Daily Health/Fitness Club 492 40TSF 0.62 0.76 1.38 2.01 1.52 3.53 32.93 ShoooingCenter 820 S.STSF 2.93 1.8 4.73 7.36 7.97 15.33 183.97 Auto Car Wash Empirical Data Data 108LF 0.25 0.21 0.46 0.38 0.41 0.79 8.45 Fast Food w/ Drive Thru 934 4.72 TSF (2.72?) 23.16 22.26 45.42 16.98 15.67 32.65 496.12 Convenience Mkt. w Pumps 853 16VFP 8.28 8.29 16.57 9.53 9.54 19.07 542.6 We suggest the project proponent update the TIA by correcting the proposed trip generation table (Table 4-1) and subsequent LOS and fair share calculations. Additionally, it appears that the ratio between Office and Retail uses is unknown for the 24,000 square foot building on Parcel 5. If the ratio is known, we recommend using ITE code 710 for the office uses and ITE Code 820 for the retail uses. If the ratio is unknown, we recommend using ITE Code 820 for the entire building. RESPONSE 1 Based on the traffic study, the site was projected to generate a total of approximately 6,413 trip-ends per day with 293 vehicles per hour during the AM peak hour and 410 vehicles per hour during the PM peak hour. The report concluded that the intersections within the study area would operate an acceptable level of service in the future with the development of the proposed project. Therefore, no improvements were required except at the intersection of San Jacinto Avenue/Commonwealth (project access). Table 1 provides a summary of the daily, AM peak hour, and PM peak hour trip rates for the revised project land uses. Table 2 provides the summary of the estimated trips. As shown in Table 2, the proposed development is projected to generate a total of approximately 5,141 new trip-ends per day with 240 vehicles per hour during the AM peak hour and 348 vehicles per hour during the PM peak hour. This results in 1,272 fewer trip- ends per day with 53 fewer vehicles per hour during the AM peak hour and 62 fewer vehicles per hour during the PM peak hour as compared to the land uses evaluated in the traffic study. The currently proposed project consists of a reduced number of trips in comparison to what was analyzed in the traffic study as illustrated above. Based on the reduced number of trips, it is anticipated that the traffic impacts would be equal to or more likely less than what was determined in the traffic study. Therefore, it can be concluded that the impacts and improvement measures identified in the traffic study would represent a conservative estimate of the impacts of the currently proposed project 4.1.ab Packet Pg. 369 Attachment: Attachment 30 - Response to Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Devon Wesselink MW VANTAGE 1 LLC April 24, 2018 Page 3 Trames #0290-0001 If you have any questions, please contact me directly at (949) 244-2436. Respectfully submitted, Trames Solutions Inc. Scott Sato, P.E. Vice President Attachment A – Site Plan 4.1.ab Packet Pg. 370 Attachment: Attachment 30 - Response to Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- ITE Code IN OUT Total IN OUT Total Tire Store 848 12 TSF 1.82 1.07 2.89 1.78 2.37 4.15 24.87 Shopping Center 820 24 TSF 1.69 1.03 2.72 4.61 4.99 9.60 111.91 Auto Car Wash Empirical Data3 Data 108 LF 0.25 0.21 0.46 0.38 0.41 0.79 8.45 Fast Food w/ Drive Thru 934 2.72 TSF 23.16 22.26 45.42 16.98 15.67 32.65 496.12 Convenience Mkt. w/Pumps 853 12 VFP 8.28 8.29 16.57 9.53 9.54 19.07 542.60 1 Source: ITE (Institute of Transportation Engineers) Trip Generation Manual, 9th Edition, 2012. TABLE 1 PROJECT TRIP GENERATION RATES1 Land Use Peak Hour Trip Rates Daily AM PM Quantity2 2 TSF = Thousand Square Feet; LF = Linear Feet; VFP = Vehicle Fueling Position 4.1.ab Packet Pg. 371 Attachment: Attachment 30 - Response to Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- In Out Total In Out Total 12 TSF 22 13 35 21 28 49 298 -6 -4 -10 -6 -8 -14 -83 24 TSF 41 25 66 111 120 231 2,686 0 0 0 -38 -41 -79 -913 108 LF 27 23 50 41 44 85 913 -3 -2 -5 -4 -4 -8 -91 2.72 TSF 63 61 124 46 43 89 1,349 -31 -30 -61 -23 -21 -44 -661 12 VFP 99 99 198 114 114 228 6,511 -65 -65 -130 -75 -75 -150 -4,297 252 221 473 333 349 682 11,757 -105 -101 -206 -146 -149 -295 -6,045 -15 -12 -27 -19 -20 -39 -571 132 108 240 168 180 348 5,141 1 - Pass-by Reduction (10%) TABLE 2 PROJECT TRIP GENERATION SUMMARY Land Use Peak Hour Daily AM PM Quantity1 Tire Store - Pass-by Reduction (28%) Shopping Center - Pass-by Reduction (34%) Auto Car Wash Empirical Data Subotal Trips without Pass-By Subtotal Pass-By Trips Fast Food w/ Drive Thru - Pass-by Reduction (49%) Convenience Mkt. w/Pumps - Pass-by Reduction (66%) Internal Interaction (10%) TSF = Thousand Square Feet; LF = Linear Feet; VFP = Vehicle Fueling Position Total Project Trip Generation 4.1.ab Packet Pg. 372 Attachment: Attachment 30 - Response to Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- Trames #0290-0001 ATTACHMENT SITE PLAN 4.1.ab Packet Pg. 373 Attachment: Attachment 30 - Response to Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17- 4.1.abPacket Pg. 374Attachment: Attachment 30 - Response to Caltrans (Commonwealth Crossing (SPDR-17-11, PM-37407, CUP-17-06, MUP-17-06, 07, 08, VAR-17-04, and CZ-17-03)) May 1, 2018 TO: City Council REQUESTED BY: Robert Johnson, City Manager APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Senate Bill (SB) 54 RECOMMENDATION: That the City Council discuss and provide direction pertaining to SB 54. DISCUSSION: On January 1, 2018, SB54, passed by the State Legislature and signed by the Governor, became effective. SB54 made several amendments to the Government Code, including the addition of the California Values Act1. Together, the statutory changes are intended to limit the involvement of state and local law enforcement agencies in federal immigration enforcement efforts. Among other things, the statute specifically prohibits the following activities:  Precluding state and local officials from voluntarily providing to the United States information about the release date from state or local criminal custody of criminal aliens who may be subject to removal and are subject to detention by the United States  Precluding state and local officials from voluntarily providing to the United States other information relevant to the alien’s immigration status  Prohibiting state and local officials from transferring alien’s to the United States when they are scheduled to be released from state or local custody  Providing information about an individual’s release date, unless the information is publicly available or is in response to a notification request made in accordance with Section 7282.52 At the same time, Federal Law provides that no government entity may prohibit or restrict its official from sending to, or receiving from, United State immigration authorities’ information regarding the citizenship or immigration status of any individuals. Consequently, the United States of America is suing the State of California in the United State District Court for the Eastern District of California (Case No. 18-cv-00490) claiming that the California Values Act is unconstitutional, in whole or in part, and seeking an injunction against enforcement of the California Values Act. The City of San Jacinto is a political division of the State of California, and as such, is generally governed by the requirements of the State law. At the same time, members of the San Jacinto City Council have taken an oath to support and defend both the Constituti on of the United States and the Constitution of the State of California. With the adoption of SB54, law enforcement 1 The California Values Act is codified as Government Code Section 7284 et seq. All references to statutory sections are Government Code Sections, unless otherwise noted. 2 A “notification request” is a request that a law enforcement agency inform immigration authorities of the release date and time of an individual in custody, in advance of notifying the public. 5.1 Packet Pg. 375 agencies are placed in the untenable position of potentially violating State law just by complying with Federal law. Councilmember Andrew Kotyuk, who asked for this item to come before the City Council for discussion and potential action, has included two attachments with this agenda item for the Council’s discussion:  The first is an example of a staff report containing a resolution and ordi nance that was prepared by the City of San Jacinto.  The second is the amicus curiae brief filed by various California municipalities and elected officials in support of the Department of Justice’s lawsuit against the State of California. An amicus curiae or “friend of the court” is a third party who is not a party to litigation but has an interest in the litigation’s outcome and wishes to provide legal argument. The attached brief was filed on behalf of the cities of Yorba Linda, Hesperia, Escondido, Aliso Viejo, Mission Viejo, Fountain Valley, and Barstow, as well as several Southern California mayors, council members, and Congressman Dana Rohrabacher. The amicus brief was filed in support of the United States Department of Justice’s lawsuit against the State of California in an effort to declare SB54 as unconstitutional and preempted by Federal law. Although the amicus brief has already been filed, the City could inquire as to adding its name to the amicus brief or otherwise joining other amicus briefs i n support of litigation against SB54, either in the Department of Justice’s lawsuit or other such lawsuits. SB54 has received a significant amount of public attention both prior to and since its passage. Since March, several communities have taken steps to express support for or disapproval of the legislation, including in two separate lawsuits pending in state and federal court challenging the legislation and one lawsuit challenging a city’s decision to “exempt” itself from SB54. The chart below displays the City/County jurisdictions that have taken action: City/County Action(s) Los Alamitos  Adopted an Ordinance “exempting” Los Alamitos from the provisions of SB54. On April 18, 2018, the American Civil Liberties Union and the National Day Laborer Organizing Network filed a lawsuit challenging the Ordinance on the basis that public officials may not “unilaterally” declare state legislation unconstitutional. The plaintiffs also allege that the Ordinance amounts to an illegal waste of taxpayer funds.  Directed City Attorney to file amicus (“friend of the court”) brief in support of the DOJ. Aliso Viejo  Adopted Resolution to “adhere to the rule of law”, support local law enforcement and demand that Congress address the comprehensive immigration reform  Approved filing of amicus brief in support of the DOJ 5.1 Packet Pg. 376 Beaumont  Adopted Resolution declaring SB54 incompatible with Federal law Escondido  Approved filing of amicus brief in support of the DOJ Fountain Valley  Approved filing of amicus brief in support of the DOJ Hesperia  Approved filing of amicus brief in support of the DOJ Mission Viejo  Approved filing of amicus brief in support of the DOJ Newport Beach  Adopted Resolution in opposition to SB54  Approved “support” of DOJ in its lawsuit against California Santa Ana  Approve filing of amicus brief in support of the DOJ San Gabriel  Adopted Resolution declaring San Gabriel a “Safe City” and directing police department to comply with SB54 San Juan Capistrano  Adopted Resolution in opposition to SB54 Yorba Linda  Approved filing amicus brief in support of the DOJ Orange County  Adopted Resolution in opposition to SB54  Approved joining in the DOJ lawsuit  Adopted new policy for OC Sheriff’s Department, adding inmates’ release dates to an existing “Who’s in Jail” online database San Diego County  Approved filing amicus brief in support of the DOJ Yucaipa  Approved drafting a letter of opposition to SB54 Lake Elsinore  Adopted Resolution in opposition to SB54 The item before the City Council as requested by Councilmember Kotyuk is to discuss and take action to adopt a Resolution in opposition to SB54. If it is the City Council’s desire to adopt a resolution, it may approve the enclosed resolution based on the Villa Park model or it may provide direction to adopt a modified resolution. FISCAL IMPACT: There are no fiscal impacts associated with this item, however, there might be costs associated with filing an amicus brief (if not drafted pro bono), and more significant costs associated with joining a lawsuit challenging SB 54. ATTACHMENTS: 5.1 Packet Pg. 377 Proposed Resolution No. 3706 City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution Amicus Curiae Brief 5.1 Packet Pg. 378 STATE OF CALIFORNIA ) RESOLUTION NO: 3706 COUNTY OF RIVERSIDE)ss CITY OF SAN JACINTO ) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA, SUPPORTING COMPLIANCE WITH THE UNITED STATES CONSTITUTION AND OPPOSING THE CALIFORNIA VALUES ACT AS UNCONSTITUTIONAL WHEREAS, the United States is a nation of laws; and WHEREAS, the members of the City of San Jacinto City Council have taken an oath to support and defend the Constitution of the United States and the Constitution of the State of California; and WHEREAS, the Federal government has broad constitutional jurisdiction over immigration law; and WHEREAS, the State of California enacted SB54, called the California Values Act, effective January 1, 2018; and WHEREAS, the California Values Act may be in direct conflict with Federal laws and the Constitution of the United States; and WHEREAS, Federal Law provides that no government entity may prohibit or restrict its officials from sending to, or receiving from, United States immigration authorities information regarding the citizenship or immigration status of any individual; and WHEREAS, in addition to the foregoing legal restrictions, United States immigration authorities often request additional voluntary assistance from local governments and law enforcement agencies; and WHEREAS, the California Values Act impacts Federal immigration law and enforcement in several respects, including: (1) precluding state and local officials from voluntarily providing to the United States information about th e release date from state or local criminal custody of criminal aliens who may be subject to removal and are subject to detention by the United States; (2) precluding state and local officials from voluntarily providing to the United States other informati on relevant to the alien's immigration status; and (3) prohibiting state and local officials from transferring aliens to the Unites States when they are scheduled to be released from state or local custody; and WHEREAS, the United States of America is suing the State of California in the United States District Court for the Eastern District of California (Case No. 18 -cv-00490) claiming that the California Values Act is unconstitutional, in whole or in part, and seeking an injunction against enforcement of the California Values Act; and 5.1.a Packet Pg. 379 Attachment: Proposed Resolution No. 3706 (Senate Bill (SB) 54) WHEREAS, the City of San Jacinto is a political subdivision of the State of California and, as such, generally may not disregard the requirements of State law in the absence of a court order that the law is invalid; and WHEREAS, the City of San Jacinto should not be forced to decide whether to potentially violate Federal law or State law; and WHEREAS, the County of Riverside, who provides law enforcement services to the City of San Jacinto, receives, and prosecutes all those in criminal custody arrested within the City of San Jacinto; and WHEREAS, the City of San Jacinto respects the authority of the United Sates government to regulate immigration and supports the efforts by the United States to overturn the California Values Act as unconstitutional. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN JACINTO, as follows: SECTION 1: In all respects, the above recitals are hereby incorporated by reference. SECTION 2: The City Council of the City of San Jacinto supports compliance with the United States Constitution and opposes the California Values Act as unconstitutional. SECTION 3: The City Council of San Jacinto supports the ideals of federalism as reflected in the respective efforts of other California local government jurisdictions in adopting resolutions and passing ordinances in opposition to the California Values Act. SECTION 4: The support of this City Council described herein constitutes support for the United States Department of Justice's lawsuit in fed eral court against the State of California in invalidating several California laws, including the California Values Act. PASSED, APPROVED AND ADOPTED by the City Council of San Jacinto at a regular meeting held on the 1st day of May 2018 by the following vote. Ayes: Nays: Absent: Abstain: CITY OF SAN JACINTO: By: ______________________________ Crystal Ruiz, Mayor 5.1.a Packet Pg. 380 Attachment: Proposed Resolution No. 3706 (Senate Bill (SB) 54) ATTEST: ___________________________________ Angela Walton, City Clerk APPROVED AS TO FORM: BEST BEST & KRIEGER, LLP Michael J. Maurer, City Attorney 5.1.a Packet Pg. 381 Attachment: Proposed Resolution No. 3706 (Senate Bill (SB) 54) CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss CITY OF SAN JACINTO ) I, Angela Walton, City Clerk of the City of San Jacinto, do hereby certify that the foregoing Resolution No. 3706 was passed, approved, and adopted at the Regular Meeting of the San Jacinto City Council held on the 1st day of May 2018. Ayes: Nays: Absent: Abstain: WITNESS MY HAND AND OFFICIAL SEAL this 1st day of May 2018. _____________________________________ Angela Walton, City Clerk City of San Jacinto 5.1.a Packet Pg. 382 Attachment: Proposed Resolution No. 3706 (Senate Bill (SB) 54) 5.1.bPacket Pg. 383Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 384Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 385Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 386Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 387Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 388Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 389Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 390Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 391Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.bPacket Pg. 392Attachment: City of Villa Park Staff Report of April 24, 2018 with attached Ordinance and Resolution (Senate Bill (SB) 54) 5.1.cPacket Pg. 393Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 394Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 395Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 396Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 397Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 398Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 399Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 400Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 401Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 402Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 403Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 404Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 405Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 406Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 407Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 408Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 409Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 410Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 411Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 412Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 413Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 414Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 415Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 416Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 417Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 418Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 419Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 420Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 421Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 422Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) 5.1.cPacket Pg. 423Attachment: Amicus Curiae Brief (Senate Bill (SB) 54) May 1, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project RECOMMENDATION: Direct staff to continue discussing property acquisition options and place an item on a future City Council agenda for the City Council to determine whether to continue participation in and funding of the Project. DISCUSSION: At its March 6, 2018 meeting, the City Council directed staff to bring an agenda item back on April 3 to determine whether to continue the City’s participation in and funding of the San Jacinto River Levee project. Since the March 6 meeting, staff has engaged in various meetings with stakeholders. Staff is still engaged with the stakeholders to determine whether an agreeable option for financing and acquiring the necessary land may be reached. Therefore, staff recommends that this item be continued to the next regular meeting. Staff may present additional information during the meeting. The prior staff report containing background information about the project has been attached. FISCAL IMPACT: The City is currently incurring legal, engineering, and consulting costs on an ongoing basis as the project continues to progress. For this fiscal year, the City has budgeted $194,961 to the levee project and has so far expended $46,787. This amount will be increased as work performed to-date is invoiced and as further work continues. These costs will continue to accrue as long as the project is active. If the project moves forward, and the City Council elects to commit to future environmental costs, it is anticipated that such costs would be approximately $4 million. These costs would not be incurred unless the levee is constructed. To date, the City has spent approximately $5.1 million since 2002 on levee-related expenditures, most notably on the environmental and EIR costs. ATTACHMENTS: Current 100 Year Regulatory Floodplain Proposed 100-Year Floodplain Map Land Needed for Levee Footprint Land Proposed for Inclusion in a CFD Survey Form Given to Landowners 5.2 Packet Pg. 424 March 6 Staff Report 5.2 Packet Pg. 425 { Current 100-Ye ar Regulatory Floodplain 5.2.a Packet Pg. 426 Attachment: Current 100 Year Regulatory Floodplain (Update on San Jacinto River Levee, Stage 4 River Proposed 100-Ye ar Floodplain 5.2.b Packet Pg. 427 Attachment: Proposed 100-Year Floodplain Map (Update on San Jacinto River Levee, Stage 4 River { Land Needed for Levee Footprint 5.2.c Packet Pg. 428 Attachment: Land Needed for Levee Footprint (Update on San Jacinto River Levee, Stage 4 River Corridor Land Proposed for Inclusion In a CFD 5.2.d Packet Pg. 429 Attachment: Land Proposed for Inclusion in a CFD (Update on San Jacinto River Levee, Stage 4 River 5.2.ePacket Pg. 430Attachment: Survey Form Given to Landowners (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project) 5.2.ePacket Pg. 431Attachment: Survey Form Given to Landowners (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project) March 6, 2018 TO: City Council REQUESTED BY: Sharon Paisley, Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Update on San Jacinto River Levee, Stage 4 and River Corridor Expansion Project RECOMMENDATION: Receive and file report on San Jacinto River Levee, Stage 4 and River Corridor Expansion Project and Public-Private Partnership Financing Plan. Direct staff to place an item on the March 20 City Council agenda for the City Council to determine whether to continue participation in and funding of the Project. DISCUSSION: Executive Summary In 2002, the City entered into a Memorandum of Understanding with the Riverside County Flood Control and Water Conservation District (“District”) to partner in the construction of a new levee. If completed, the levee will provide 100-year flood protection to 1355 acres of land that is currently in the flood plain. Construction of the levee would enable this land to be developed for commercial, industrial, residential, or other similar uses. The estimated cost to complete the project is between $28 and $33 million dollars, depending on the cost to acquire the land needed to construct the levee, as well as various other factors. The District is committed to providing $20 million dollars to the project, which is to be used for design, construction, and engineering costs. In addition, the District has committed an additional $3.5 million dollars in the form of a Proposition 84 grant funding, which will be lost if there is no mechanism to finance right-of-way acquisition by June 2018. In order to complete the project, the City will need to acquire 248 acres of land. This land is currently owned by eight private landowners. (There is also some acreage owned by public entities.) In order to facilitate the commitment of funds needed for the acquisition of the land, the City has proposed to assist the landowners by forming a Community Facilities District (CFD). Formation of the CFD will enable the City to sell bonds to raise the money needed to purchase the land. The debt service on the bonds will be paid through a special tax on the 1355 acres directly benefitted from the project. 5.2.f Packet Pg. 432 Attachment: March 6 Staff Report (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project) City funds will not be used for any land acquisitions; however, the City will commit to paying any additional environmental, mitigation, endowment and legal costs, which may be up to $4 million. In order to form the CFD and enable construction of the project, all of the landowners who own the property that is needed for levee construction will have to agree to the sale. Moreover, the landowners of the property that is directly benefited by the levee construction will have to agree to the special tax. This plan has been presented to the primary landowners; however to date, City staff has received minimal positive feedback. The District has other unfunded flood control projects, and RCFCD has indicated that it will reallocate its funds to other projects if the San Jacinto River Levee is not able to move forward. Thus, without participation from the landowners, the project may not be completed. Background The proposed project constitutes the expanded implementation of the 1975 Flood Control Master Plan for the Lower San Jacinto River Basin. In 1945, the District was formed and assumed management responsibilities of all levees in the San Jacinto Levee District. The United States Army Corps of Engineers (USACE) conducted surveys along the river in 1946 to determine the need for flood control. As a result, a levee was constructed in 1961 by the USACE along the south side of the San Jacinto River from the mouth of Bautista Creek downstream to a point approximately 1-3/4 miles east of State Street. In 1975, the District prepared a Flood Control Master Plan (Plan) for the Lower San Jacinto River Basin. The Plan proposed construction of a new levee along the southerly side of the San Jacinto River from State Street west to a point approximately 3/4 of a mile west of Sanderson Avenue. The portion of the proposed levee between the Sanderson Avenue Bridge and State Street was part of the re commended alternative to provide flood control protection from the effects of 100-year flood events in this portion of the San Jacinto River. The existing levees do not provide 100-year flood protection. Recurring breaches of the existing levees have resulted in damage to agricultural lands, flooded roads, displaced local residents, and inundated large areas adjacent to the river. The existing unlined levees downstream of State Street and Sanderson Avenue could fail resulting in inundation of farmland and dairies with floodwater. Moreover, floodwaters that come into contact with dairy wastes and agricultural lands can contaminate local surface waters, and during large storm events impact impaired water bodies as far away as Canyon Lake and Lake Elsinore. In 2002, the City and District entered a Memorandum of Understanding to partner for completion of the project. Through substantial efforts, the City and District have been able to complete a 95% design of the project. Environmental review of the project was completed in 2015, and the City Council certified an Environmental Impact Report (EIR) at that time. The EIR is available on the City’s website. 5.2.f Packet Pg. 433 Attachment: March 6 Staff Report (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project) The 100-Year Flood Plain Attachment 1 to this report shows the existing 100-year floodplain. It encompasses a broad swath of land from the existing river down to and below the intersection of Ramona Expressway and Sanderson Avenue. Land within this area cannot be developed for commercial, industrial, or residential uses because such uses cannot be constructed within a floodplain. (The area is not currently zoned; however, the City’s General Plan indicates that it will eventually be developed for these uses.) Attachment 2 to this report shows the 100-year floodplain upon completion of the proposed project. As is apparent from the map, the intersection of Ramona Expressway and Sanderson Avenue is removed from the floodplain, and the area that is removed will become developable. Because this includes land that will be at the intersection of the Mid-County Parkway and Highway 79 realignment, once completed, there is potential for new development opportunities. Project Costs and Funding Through the efforts of City staff, District, and their consulting engineers to re-scale the project, the estimated costs have been reduced from approximately $30M plus right-of-way for the full project to $23M plus right-of-way for the currently proposed plan, while still protecting the intersection at Ramona Expressway and Sanderson Avenue. As it currently stands, the estimated costs of the project are as follows: $ 0.7M to complete planning, design, and engineering. $14.7M to complete construction. $ 5M to acquire the land needed to construct the levee (assuming a valuation of $ 20,000 per acre.) $ 4M to establish an endowment for ongoing environmental mitigation. The District has also steadily increased its funding commitment from $7 to $12 million in the last MOU (executed in 2010) to $20 million plus the $3.5 million in state grant funding. Unlike the District which receives tax dollars that are dedicated to flood control funding, the City has no revenue source that is dedicated to this project. Funding from the City to-date has mostly been from its drainage fee fund, with some coming from its former Redevelopment Agency fund. Because the City must provide a variety of public services to all of its residents, it does not have general fund or reserve fund dollars available to commit to the land acquisition costs. Thus, in order to acquire land, a funding source needs to be developed. 5.2.f Packet Pg. 434 Attachment: March 6 Staff Report (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project) Public-Private Partnership Financing Plan When property is developable, the value of the property increases. Because removal of land from the floodplain makes the land more valuable, the owners of property that are in the floodplain are the prime beneficiaries of the project. A “public-private partnership” or “P3” is a term used for any project that is developed jointly, and for the mutual benefit of, both public and private parties. It generally refers to a mechanism for financing public infrastructure that is needed to serve a private development, through some sort of private funding source. In this case, because the City does not have a revenue source to dedicate to debt service, the most logical mechanism for completing the project is a public-private partnership whereby the benefitted properties pay for a share of the project costs - i.e., the right-of-way acquisition costs. The payment is offset by the fact that the value of the land increases. City representatives met with the landowners owning land within the levee footprint, and proposed the formation of a Community Facilities District or “CFD”. A CFD is a tool that enables public financing of infrastructure needed to serve the development. The CFD establishes a special tax on the land that is within the CFD boundaries. Because this special tax creates a defined revenue source, the City is able to sell bonds that are secured by the special tax payments. The bond sale creates an immediate source of the funds needed to purchase the land. Once the City has acquired financing through the bonds, the City can use the revenues to purchase the needed land. This land will then be conveyed to the District, who will construct the levee on the land. The District will then maintain and operate the levee. In order to ensure that it can acquire all of the land needed to construct the levee, the City will need the landowners to grant the City the option to purchase the property at an agreed price subject to an appraisal prior to the issuance of the bonds. The City will not complete the purchase of any properties without the establishment of a financing mechanism to pay for the levee right - of-way (ROW). Special Tax Details The City has retained a consultant, Taussig & Associates, to provide a technical analysis of a potential Community Facilities District. To simplify, this analysis takes the cost of the land that the City needs to acquire, determines the number of acres that benefit from the levee and would be subject to the special tax, and then determines the per-acre annual amount needed to cover the debt service. The land that is needed for the levee is shown in Attachment 3. There are 248 acres needed. 5.2.f Packet Pg. 435 Attachment: March 6 Staff Report (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project) In an effort to establish an order of magnitude for the discussion with the landowners, the City has used for illustrative purposes a value of $20,000 per acre. The Trails development, which contains a specific plan and is fully entitled, is located nearby and is a reasonable comparison for developable land. It sold for approximately $19,500 per acre in 2018. Because the levee land is not entitled and not even developable without the levee, it likely does not exceed the value of the Trails. Attachment 4 shows the undeveloped properties that will benefit from construction of the levee. These properties total 1355 acres. Landowner Participation On February 8, 2018, City staff, District staff, and their consultants met with a consortium of landowners to explain the potential P3 financing opportunity and answer any questions. The meeting lasted approximately 4 hours; and the landowners also met separately without public agency representatives present. The City staff asked that the landowners send a completed survey to the City Manager by February 16 to indicate whether they would be interested in pursuin g this option further. (A sample blank survey is Attachment 5.) To date, City staff received very few responses in favor of the project. Some of the landowners have declined to provide any response at all. Others have agreed to participate only if they are not subject to a special tax. Others have indicated that they would only participate if the land were purchased at a higher cost. Without landowner participation, there is no public-private partnership and the project essentially cannot continue. Timeline The proposed timeline for the project is as follows:  Engage benefitting area property owners o Feb-March 2018  Financing Mechanism support o March 15, 2018  Develop ROW purchase-option agreements o March 2018  Implement ROW funding mechanism o March-May 2018  District and City confirm Phase 1 funding commitment o June 2018 Financing Alternatives City staff and its consultants have investigated a number of state, federal and private financing alternatives. Nonetheless, there is simply no other viable option to finance infrastructure improvements of this size without the participation of landowners. 5.2.f Packet Pg. 436 Attachment: March 6 Staff Report (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project) The City is subject to the constitutional debt limit, which prohibits the City from incurring any debt that cannot be paid with general fund revenues during a single fiscal year or which cannot be paid through a dedicated funding source. The land acquisition costs exceed available revenue during any fiscal year. Additionally, this rule prevents financing through traditional bank loans or mortgages. And even if the City could obtain such a loan, because liens cannot be placed on public property, any loan would have to be unsecured. In Spring 2017, the City submitted a Letter of Intent to apply for federal funding through the Water Infrastructure Finance and Innovation Act (WIFIA), which could have provided a low- interest loan. The Environmental Protection Agency, who administers WIFIA, did not invite the City to submit an application. There are other alternatives that are similar to a CFD, such as the formation of a benefit assessment district or the creation of a development impact fee with fee credits given for land dedication. However, while the mechanics of these options differ from a CFD, the end result is the same; the benefitted properties bear the land acquisition costs. City staff has proposed a CFD as it is generally the simplest and most straightforward financing option. City staff has considered a number of other theoretical options that are beyond the scope of this report; nevertheless, there is no other viable option that provides upfront funding for right-of- way acquisition without requiring a guarantee from the City’s general fund. Project Alternatives If the landowners do not participate in a P3, there are not currently any alternative projects being considered. Further reducing the project scope would be at the discretion of the District, which has indicated that it instead might reallocate funds to other projects that currently have funding gaps and/or have property owner’s financial participation, if the San Jacinto Levee project is unable to move forward. Next Steps At the time of the preparation of this report, the City has notified the landowners that City staff has not received sufficient landowner support to recommend that the City Council continue with the project. City staff has asked the landowners to give notice of any changes in their position prior to this Council meeting. If the landowners do not want the project to move forward, then City staff will bring an item to Council at the March 20 meeting recommending that the City Council discontinue funding the project and reallocate the City’s resources to other opportunities in the City. If sufficient landowners express an interest in working toward completion of the project, then City staff will continue meeting with landowners to develop and finalize the particulars of the CFD. Staff will then bring an item back to the City Council to begin formation of the CFD. 5.2.f Packet Pg. 437 Attachment: March 6 Staff Report (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project) FISCAL IMPACT: The City is currently incurring legal, engineering, and consulting costs on an ongoing basis as the project continues to progress. For this fiscal year, the City has budgeted $194,961 to the levee project and has so far expended $46,787. This amount will be increased as work performed to-date is invoiced and as further work continues. These costs will continue to accrue as long as the project is active. If the project moves forward, and the City Council elects to commit to future environmental costs, it is anticipated that such costs would be approximately $4 million. These costs would not be incurred unless the levee is constructed. To date, the City has spent approximately $5.1 million since 2002 on levee-related expenditures, most notably on the environmental and EIR costs. ATTACHMENTS: Existing 100-Year Floodplain Map Proposed 100-Year Floodplain Map Land Needed for Levee Footprint Land Proposed for Inclusion in a CFD Survey Form Given to Landowners 5.2.f Packet Pg. 438 Attachment: March 6 Staff Report (Update on San Jacinto River Levee, Stage 4 River Corridor Expansion Project)