HomeMy WebLinkAboutAgenda - Agenda Packets - Regular Meeting 3/3/2026
AGENDA
CITY COUNCIL - REGULAR MEETING
TUESDAY, MARCH 3, 2026
6:30 PM OPEN SESSION
COMMUNITY CENTER
625 S. PICO AVENUE
SAN JACINTO, CA 92583
951-487-7330
City of San Jacinto Page 1 Updated 2/26/2026 5:31 PM
CRYSTAL RUIZ, MAYOR
CLARISA SANCHEZ, MAYOR PRO TEM
PHIL AYALA, COUNCILMEMBER
VALERIE VANDEVER, COUNCILMEMBER
ALONSO LEDEZMA, COUNCILMEMBER
The City Council meeting may be observed virtually by joining the link on the City’s website at
https://vimeo.com/user115670369 or in person at the San Jacinto Community Center.
Public Comments will only be accepted in person during the meeting or in writing to the
City Clerk no later than 3:00 PM on the day of the meeting. Participants viewing the
Livestream will not have a comment option.
Written public comments may only be submitted via email to comments@sanjacintoca.gov or by
hard copy to the Office of the City Clerk at 595 S. San Jacinto Ave., San Jacinto, CA 92583, no
later than 3:00 p.m. on the day of the meeting. Comments via text and social media (Facebook,
Twitter, etc.) will not be accepted. Please identify the agenda item number and “PUBLIC
COMMENT” in the subject line of the email or hard copy document. All written correspondence
received by the 3:00 p.m. deadline will be distributed to the legislative body prior to the meeting
and retained with the official meeting record. All email comments shall be subject to the same
rules as would otherwise govern in-person speaker comments at the Council meeting.
Reading of Public Comments: The City Clerk will read all email comments, provided that the
reading shall not exceed three (3) minutes or such other time as the Council may provide,
consistent with the time limit for speakers at a Council meeting. The email comments submitted
shall become part of the record of the Council meeting.
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting,
please contact the office of the City Clerk at 951-487-7330 ext. 339. Notification 48 hours prior to a meeting will enable
the City to make reasonable arrangements to ensure accessibility to that meeting [28 CFR 35.102.35.104 ADA Title II].
City of San Jacinto Page 2 Updated 2/26/2026 5:31 PM
1. ORGANIZATION
1.1. Roll Call
1.2. Invocation
1.3. Pledge of Allegiance
1.4. Special Presentation
1.4.1. Women's History Month Proclamation
1.5. Mayor/Council Member Reports
1.6. Late Items
2. PUBLIC COMMENTS
3. CONSENT CALENDARS
3.A. Consent Calendar - City Council
3.A.1. Waiver of Full Reading of Ordinance(s), and Reading by Title Only
3.A.2. Minutes of the Regular City Council Meeting of February 17, 2026
RECOMMENDATION:
Staff recommends that the City Council approve the City Council Regular
Meeting Minutes of February 17, 2026.
Department: City Clerk
3.A.3. Lake Park Well Rehabilitation - Patch Casing
RECOMMENDATION:
Staff recommends that the City Council:
1. Appropriate $241,566 from the Water Enterprise Reserve Fund (052) to Fund
050-9000-450.33-30 for FY 25/26;
2. Award the construction contract for the Repair and Testing of the Lake Park
Well to Well Tec Services, Inc. in the amount of $199,650 plus a 10%
contingency of $19,965 for a total of $219,615;
3. Award a Professional Services Agreement to Kyle Groundwater for
hydrogeologic construction management and well rehabilitation support
services in the amount of $21,951;
City of San Jacinto Page 3 Updated 2/26/2026 5:31 PM
4. Determine the proposed project is not subject to environmental review under
the California Environmental Quality Act (“CEQA”) pursuant to State CEQA
Guidelines (Cal. Code Regs., § 15000 et seq.) Sections 15061(b)(2) in that the
proposed project is categorically exempt from environmental review pursuant
to CEQA Guidelines Sections 15301, 15302 and Section 15061 (b)(3) -
Common Sense Exemption in that it can be seen with certainty that there is no
possibility that the project may have a significant effect on the environment;
5. Reject all other bids and;
6. Authorize the City Manager to execute all contract documents.
Department: Water
3.A.4. AB 1632 (Johnson) Support Letter
RECOMMENDATION:
Staff recommends that the City Council approve the support letter for AB
1632 (Johnson).
Department: City Clerk
4. DISCUSSION ITEM
4.1. Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
145)
RECOMMENDATION:
Staff recommends the City Council take the following actions:
1. Approve the plans and specifications for the Esplanade Avenue Widening Phase 1
Warren Road to Sanderson Avenue (CIP# 06-145);
2. Award the construction contract to the lowest responsible bidder submitting a
responsive bid, Granite Construction Company, for the sum of $8,083,808;
3. Allocate 10% ($808,381) of total bid for construction contingencies;
4. Allocate 8.66% ($700,000) of total bid for construction administration,
inspection, and testing; and
5. Authorize the City Manager to execute the construction contract.
Department: Engineering
5. FUTURE REQUESTS FROM CITY COUNCIL TO CITY MANAGER
6. ADJOURNMENT
City of San Jacinto Page 4 Updated 2/26/2026 5:31 PM
DOCUMENTS RELATED TO OPEN SESSION AGENDAS (SB343) - Any public record, relating to an
open session agenda item, that is distributed within 72 hours prior to the meeting is available for public
inspection at the public counter located in the Administration Building of City Hall, 595 S. San Jacinto
Avenue, San Jacinto, CA 92583.
I, Jill Theriot, Deputy City Clerk of the City of San Jacinto, do hereby certify that I caused to be posted the
foregoing agenda this 26th day of February 2026 as requested by law.
Jill Theriot, Deputy City Clerk
March 3, 2026
TO: City Council
REQUESTED BY: Julia Espinoza, City Clerk
APPROVED BY: Robert A. Johnson, City Manager
SUBJECT: Women's History Month Proclamation
ATTACHMENTS:
Women's History Month 2026
1.4.1
Packet Pg. 5
Proclamation
Of The City of San Jacinto
Women’s History Month
WHEREAS, the City of San Jacinto recognizes the month of March as Women’s History
Month, established in 1987 by Congress to celebrate the contributions American women
have made to strengthen and lead the nation since its inception; and
WHEREAS, Women’s History Month honors women of every race, status, and ethnicity
who have challenged the social and legal structures that have kept women’s labor
underappreciated and underrepresented throughout history to establish an equal role
for women, ensuring the appreciation and value of equitable labor for future generations;
and
WHEREAS, American women have been leaders not only in securing their own rights of
suffrage and equal opportunity but also at the forefront of every major progressive social
change movement in history, paving the way for future generations to enjoy the
unalienable rights, duties, and responsibilities afforded equally to all citizens of the
United States of America; and
WHEREAS, each woman is extraordinary in her own way, proving that women working
inside the home or outside in academia, science, technology, business, labor, governance,
and more maintain a critical role in every sphere of society; and
WHEREAS, the City of San Jacinto proudly acknowledges the leadership and
contributions of its three women council members, Crystal Ruiz, Clarisa Sanchez, and
Valerie Vandever, who continue to inspire and empower others through their service,
dedication, and commitment to bettering our community.
NOW THEREFORE, the San Jacinto City Council does hereby recognize March 2026 as
Women’s History Month to honor women everywhere for their outstanding
achievements and invaluable contributions to society.
Crystal Ruiz, Mayor
Valerie Vandever, Councilmember Alonso Ledezma, Councilmember
Phil Ayala, Councilmember Clarisa Sanchez, Mayor Pro Tem
1.4.1.a
Packet Pg. 6 Attachment: Women's History Month 2026 (Women's History Month Proclamation)
March 3, 2026
TO: City Council
REQUESTED BY: Julia Espinoza, City Clerk
APPROVED BY: Robert A. Johnson, City Manager
SUBJECT: Regular Meeting Minutes of February 17, 2026
RECOMMENDATION:
Staff recommends that the City Council approve the City Council Regular Meeting Minutes of
February 17, 2026.
ATTACHMENTS:
February 17, 2026 City Council Regular Meeting Minutes
3.A.2
Packet Pg. 7
Page 1
City Council Regular Meeting Action Minutes February 17, 2026
CRYSTAL RUIZ, MAYOR
CLARISA SANCHEZ, MAYOR PRO TEM
PHIL AYALA, COUNCILMEMBER
VALERIE VANDEVER, COUNCILMEMBER
ALONSO LEDEZMA, COUNCILMEMBER
ACTION MINUTES
REGULAR MEETING OF THE SAN JACINTO CITY COUNCIL
TUESDAY, FEBRUARY 17, 2026
6:30 PM OPEN SESSION
LIVE STREAM LINK: https://vimeo.com/user115670369
COMMUNITY CENTER
625 S. PICO AVENUE
SAN JACINTO, CA 92583
951-487-7330
1. ORGANIZATION
Mayor Crystal Ruiz called the meeting to order at 6:30 p.m.
1.1. Roll Call
Deputy City Clerk Jill Theriot conducted the roll call:
Present: Mayor Crystal Ruiz, Mayor Pro Tem Clarisa Sanchez, Councilmember Valerie
Vandever, Councilmember Alonso Ledezma
Absent: Councilmember Phil Ayala
M/S/C (Vandever/Sanchez) to approve the absence of Councilmember Ayala. Motion
carried 4/0.
Ayes: Sanchez, Vandever, Ledezma, Ruiz
Nays: None
Absent: Ayala
Abstain: None
1.2. Invocation
Councilmember Vandever gave the invocation.
1.3. Pledge of Allegiance
Councilmember Ledezma led the Pledge of Allegiance.
1.4. Special Presentations
3.A.2.a
Packet Pg. 8 Attachment: February 17, 2026 City Council Regular Meeting Minutes (Regular Meeting Minutes of February 17, 2026)
Page 2
City Council Regular Meeting Action Minutes February 17, 2026
1.4.1. Employee of the Month Recognition for January
1.4.2. Nominator of the Month Recognition for January
1.4.3. Rev. Lowell Thomas, Senior Pastor, Lighthouse Church
1.4.4. Darnae Wynn, NFC Ambassador & Community Fitness Leader
1.4.5. Nalaisha Burnett, Board Vice-President, Trustee Area #5
1.4.6. Aree Williams Jr. Proclamation
1.5. Mayor/Council Member Reports
Councilmembers provided their reports
1.6. Late Items
There were no late items.
2. PUBLIC COMMENTS
There were two (2) public comments:
• Dr. Stephanie Bruce
• Marianne Derouin
3. CONSENT CALENDAR
3.A. Consent Calendar - City Council
3.A.1. Waiver of Full Reading of Ordinance(s), and Reading by Title Only
3.A.2. Minutes of the Regular City Council Meeting of February 3, 2026/City
Clerk/Approved
3.A.3. Warrants and Disbursement – January 2026/Finance/Approved
3.A.4. Treasurer’s Report at November 30, 2025/Finance/Approved
3.A.5. Treasurer’s Report at December 31, 2025/Finance/Approved
3.A.6. FY 2024-25 Development Impact Fee Report/Finance/Approved
3.A.7. Continuing Appropriations FY 2025-26/Finance/Approved
M/S/C (Ledezma/Sanchez) moved to approve the consent calendar. Motion carried 4/0.
3.A.2.a
Packet Pg. 9 Attachment: February 17, 2026 City Council Regular Meeting Minutes (Regular Meeting Minutes of February 17, 2026)
Page 3
City Council Regular Meeting Action Minutes February 17, 2026
Ayes: Vandever, Ledezma, Sanchez, Ruiz
Nays: None
Absent: Ayala
Abstain: None
4. DISCUSSION ITEMS
4.1. International Council of Shopping Centers (ICSC) 2026
Economic Development and Special Projects Administrator Tara Magner presented the
staff report.
M/S/C (Ruiz/Vandever) moved to approve the mayor’s appointment and authorize
travel requests for four council members to attend the International Council of
Shopping Centers (ICSC) Real Estate Convention (RECON), Las Vegas, on May 18-
20, 2026. Motion carried 4/0.
Ayes: Sanchez, Vandever, Ledezma, Ruiz
Nays: None
Absent: Ayala
Abstain: None
5. CITY MANAGER UPDATE
6. FUTURE REQUESTS FROM CITY COUNCIL TO CITY MANAGER
7. ADJOURNMENT
With no further business before the City Council, Mayor Ruiz adjourned the meeting at 7:42 p.m.
in honor of the passing of Isaia Fa’alafua.
CITY OF SAN JACINTO:
____________________________
Crystal Ruiz, Mayor
ATTEST:
____________________________
Jill Theriot, Deputy City Clerk
Approved as read:
Approved as amended:
3.A.2.a
Packet Pg. 10 Attachment: February 17, 2026 City Council Regular Meeting Minutes (Regular Meeting Minutes of February 17, 2026)
March 3, 2026
TO: City Council
REQUESTED BY: Mathew Osborn, Superintendent
APPROVED BY: Robert A. Johnson, City Manager
SUBJECT: Lake Park Well Rehabilitation - Patch Casing
RECOMMENDATION:
Staff recommends that the City Council:
1. Appropriate $241,566 from the Water Enterprise Reserve Fund (052) to Fund 050-9000-
450.33-30 for FY 25/26;
2. Award the construction contract for the Repair and Testing of the Lake Park Well to Well
Tec Services, Inc. in the amount of $199,650 plus a 10% contingency of $19,965 for a
total of $219,615;
3. Award a Professional Services Agreement to Kyle Groundwater for hydrogeologic
construction management and well rehabilitation support services in the amount of
$21,951;
4. Determine the proposed project is not subject to environmental review under the
California Environmental Quality Act (“CEQA”) pursuant to State CEQA Guidelines
(Cal. Code Regs., § 15000 et seq.) Sections 15061(b)(2) in that the proposed project is
categorically exempt from environmental review pursuant to CEQA Guidelines Sections
15301, 15302 and Section 15061 (b)(3) - Common Sense Exemption in that it can be seen
with certainty that there is no possibility that the project may have a significant effect on
the environment;
5. Reject all other bids and;
6. Authorize the City Manager to execute all contract documents.
DISCUSSION:
Lake Park Well is one of the City’s highest-producing groundwater sources and plays a key role
in maintaining system reliability and operational flexibility, especially during peak demand and
when other facilities are offline. Recent inspections identified deteriorated casing sections that
require rehabilitation to protect the long-term integrity of the well and maintain reliable
production. The proposed work includes removal and reinstallation of pumping equipment,
mechanical brushing of the casing, installation of steel casing patches, downhole video
inspections, disinfection, and startup testing.
Due to the specialized nature of well rehabilitation, staff conducted a formal competitive
procurement process consistent with the Uniform Public Construction Cost Accounting Act
(CUPCCAA). The project was publicly advertised on PlanetBids for thirty (30) days and
3.A.3
Packet Pg. 11
distributed to trade journals and the Press Enterprise to ensure broad contractor outreach. 21
vendors were identified as Prospective Bidders and three bids were received.
Contractor Proposal
Well Tec Service Inc. $199,650
Layne Christensen Company $380,512
General Pump Company $499,500
After review of pricing, responsiveness, and contractor qualifications, Well Tec Services, Inc.
was determined to be the lowest responsive and responsible bidder with a total bid of $199,650.
Staff verified that the bid reflects competitive market pricing for similar rehabilitation work and
recommends award.
Because well rehabilitation involves technical downhole work that directly affects long-term
performance, staff also solicited proposals using the informal procurement process for
hydrogeologic construction management support. Independent oversight during brushing, casing
repair, and testing helps ensure work is completed correctly and reduces the risk of future
operational issues. Three proposals were received.
Contractor Proposal
Kyle Groundwater $21,951
Kleinfelder $29,011
Dudek $31,573
After review Kyle Groundwater was identified as the lowest-cost qualified firm with a total bid
of $21,951. The scope includes construction coordination, field observation during critical
phases, technical review, and preparation of a final summary memorandum documenting the
rehabilitation results.
Completing this work is necessary to address known casing deficiencies that currently limit the
operation of the well and pose a risk of further damage if the facility continues to run under
existing conditions. The competitive bidding process resulted in favorable pricing, and staff
recommends awarding the contracts to Well Tec Services, Inc., and Kyle Groundwater, as the
most cost-effective and operationally responsible approach to restoring this critical groundwater
asset to reliable service.
ENVIRONMENTAL REVIEW:
The proposed project consists of rehabilitation and repair of the existing Lake Park Well,
including removal and reinstallation of pumping equipment, mechanical brushing of the well
casing, installation of steel casing patches, downhole video inspection, disinfection, and startup
testing. No expansion of capacity, change in use, modification of the well site footprint, or
3.A.3
Packet Pg. 12
increase in production beyond currently permitted levels is proposed. All work will occur within
the existing well structure and previously disturbed site.
The project is exempt from the California Environmental Quality Act pursuant to State CEQA
Guidelines Section 15301 (Existing Facilities), which applies to the repair, maintenance, or
minor alteration of existing public facilities involving negligible or no expansion of existing use.
The project also qualifies under Section 15302 (Replacement or Reconstruction), as the work
involves rehabilitation and partial replacement of deteriorated well casing components within an
existing structure serving substantially the same purpose and capacity.
In addition, the project qualifies under the common sense exemption pursuant to CEQA
Guidelines Section 15061(b)(3), as it can be seen with certainty that there is no possibility that
the proposed activity may have a significant effect on the environment. The work is limited to
maintenance and rehabilitation of existing infrastructure within a developed site and will not
result in physical expansion, increased groundwater extraction beyond established operational
limits, or new environmental impacts.
Accordingly, the project is not subject to further environmental review under CEQA.
FISCAL IMPACT:
Funding for the Lake Park Well rehabilitation project, including both construction and
hydrogeologic construction management services, requires an additional appropriation to Fund
050-9000-450.33-30 for FY25/26 from the Water Enterprise Reserve Fund (Fund 052). The total
project cost is $241,566. The project will have no impact on the general fund.
ATTACHMENTS:
Bid Result (PlanetBids)
Well Tec Services Estimate for Lake Park
Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft
Proposals for Construction Management for Lake Park Well Rehabilitation
Professional Services Agreement - KYLE Groundwater
3.A.3
Packet Pg. 13
CITY OF SAN JACINTO
Bid Results for Project Repair and Testing of the Lake Park Well (SJ-PU-26-001)
Issued on 01/26/2026
Bid Due on February 23, 2026 1:00 PM (PST)
Exported on 02/23/2026
Line Totals (Unit Price * Quantity)
Item #Section Item Code Description Unit of Measure Qty Well Tec Services Inc Layne Christensen Company General Pump Company
1 Bid Schedule A101 Mobilization, demobilization, site clean-up, and site restoration. *LS 1 $25,000.00 $66,372.29 $100,000.00
2 Bid Schedule A102 Remove existing well pump, motor, column, line-shaft, and ancillary equipment.LS 1 $22,000.00 $42,457.83 $40,000.00
3 Bid Schedule A103 Perform mechanical cleaning of previously patched casing sections.HR 2 $1,000.00 $1,672.28 $15,000.00
4 Bid Schedule A104 Provide dual-cam downhole video survey of previously patched sections of casing.LS 1 $1,800.00 $1,445.78 $2,500.00
5 Bid Schedule A105 Install 18-inch 12-guage steel casing patches.FT 22 $59,999.94 $49,566.22 $132,000.00
6 Bid Schedule A106 Provide post-repair dual-cam downhole video survey.LS 1 $1,800.00 $1,445.78 $2,500.00
7 Bid Schedule A107 Provide, install, and remove development test pump and motor.LS 1 $34,000.06 $116,145.78 $114,000.00
8 Bid Schedule A108 Provide dynamic dual-cam downhole video survey.LS 1 $1,800.00 $7,646.99 $3,500.00
9 Bid Schedule A109 Provide well disinfection.LS 1 $22,000.00 $42,016.87 $45,000.00
10 Bid Schedule A110 Reinstall existing pumping equipment and perform startup testing, including bac-t.LS 1 $30,250.00 $51,742.17 $45,000.00
$199,650.00 $380,511.99 $499,500.00
$199,650.00 $380,511.99 $499,500.00Total Cost
3.A.3.a
Packet Pg. 14 Attachment: Bid Result (PlanetBids) (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-1 00 41 43 – BID FORMS
00 41 43 – BID FORMS
BID
Bids will be received on www.planetbids.com , until Error! Reference source not found. on
Error! Reference source not found. 23rd 2026 .
Repair And Testing Of The Lake Park Well
NAME OF BIDDER: ______________________________________________
To the City of San Jacinto, with its principal place of business at: 595 S. San Jacinto Ave,
San Jacinto, CA 92583
A. In response to the Notice Inviting Bids and in accordance with the accompanying
Instructions to Bidders, the undersigned hereby proposes to the City to furnish all
labor, technical and professional services, supervision, materials and equipment,
other than materials and equipment specified as furnished by the City, and to perform
all operations necessary and required to construct the Project in accordance with the
provisions of the Contract Documents and any addenda thereto, and at the prices
stated opposite the respective items set forth in the Bid Schedule.
B. This Bid constitutes a firm offer to the City which cannot be withdrawn for 90 calendar
days after the date set for opening of bids, or until a Contract is executed by the City
and a third party, whichever is earlier.
C. The undersigned certifies that it has examined and is fully familiar with all of the
provisions of the Contract Documents and any addenda thereto; that it has carefully
checked all of the words and figures shown in its Bid Schedule; that it has carefully
reviewed the accuracy of all statements in this Bid and attachments hereto; and that
it understands and agrees that the City will not be responsible for any errors or
omissions on the part of the undersigned in preparing this Bid.
D. If awarded a Contract, the undersigned agrees to execute and deliver to the City
within ten (10) calendar days after date of receipt of Notice of Award, a signed
Contract and the necessary performance bond, payment bond, and certificates of
insurance and endorsements.
E. The following Bid Forms, which have been completed and executed by the
undersigned Bidder, are incorporated by this reference and made a part of this Bid:
1. Bid Schedule
2. Bid security in the amount of not less than 10% of the Total Bid Price.
3. Completed Designation of Subcontractors form.
4. Fully executed Noncollusion Declaration form.
5. Completed Iran Contracting Act Certification form.
6. Completed Public Works Contractor DIR Registration Certification form.
7. Completed Contractor’s Certificate Regarding Workers’ Compensation form.
8. Completed Bidder Information and Experience form.
9. Completed Executive Order N-22 Certification form.
Well Tec Services
3.A.3.b
Packet Pg. 15 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-2 00 41 43 – BID FORMS
10. Completed Fleet Compliance Certification form.
F. Bidder is an ◯ individual, or ◯ corporation, or ◯ partnership, organized under the
laws of the State of _______________________________.
G. The undersigned is hereby representing that it is and will be properly licensed both at
the time that it submits a Bid as well as at the time the Contract is awarded, if the
Contract is awarded to the undersigned.
1. Individual Contractor. Undersigned certifies that it is now licensed in accordance
with the provisions of the Contractor's License Law of the State of California.
License number
Expiration date
License classification
1. Joint Venture. Undersigned certifies that the individual members of the joint
venture are now licensed in accordance with the provisions of the Contractor's
License Law of the State of California.
Member No. 1
Name
License number
Expiration date
License classification
Member No. 2
Name
License number
Expiration date
License classification
(If there are more than two members of the joint venture, attach a page for the
additional member(s) with the above information.)
The undersigned acknowledges receipt, understanding, and full consideration of the following
addenda to the Contract Documents:
Addenda No. ________________________________________________
802369
08/31/2026
C57, A, B, C-8
California
3.A.3.b
Packet Pg. 16 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-3 00 41 43 – BID FORMS
[SIGNATURE ON NEXT PAGE]
3.A.3.b
Packet Pg. 17 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-4 00 41 43 – BID FORMS
I hereby certify under penalty of perjury under the laws of the State of California that all of the
information submitted in connection with this Bid and all of the representations made herein are
true and correct.
BIDDER: Bidder's Business Address:
(Company Name)
By
(Signature)
___________________________________
(Type or print name) (Phone Number)
___________________________________
(Title) (Email Address)
(Where signed) (City, State)
(corporate seal)
Dated: , 20
State of Incorporation:
Names and addresses of all partners or joint venturers:
Statement of the authority of signatory to bind Bidder:
Well Tec Services 531 Edgar Ave Beaumont CA 92223
Mike Rentz 909-754-7020
President rwelltec@aol.com
Beaumont, CA
26February 20
California
3.A.3.b
Packet Pg. 18 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-5 00 41 43 – BID FORMS
The costs for any work shown or required in the Contract Documents, but not specifically identified
as a bid line item are to be included in the related bid line items and no additional compensation
shall be due to Contractor for the performance of the work.
All blank spaces appearing above must be filled in. Failure to fill in any blank spaces may render
the Bid non-responsive. In case of discrepancy between the Unit Price and Item Cost set forth
for a unit basis item, the Unit Price shall prevail and be utilized as the basis for determining the
lowest responsive, responsible Bidder. However, if the amount set forth as a Unit Price is
ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the
entry in the Item Cost column, then the amount set forth in the Item Cost column for the item shall
prevail and shall be divided by the estimated quantity for the item and the price thus obtained
shall be the Unit Price.
For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit
prices and any apparent errors in the addition of lump sum and extended prices.
The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City
makes no representation that the actual quantities of work performed will not vary from the
estimates. Final payment shall be determined by the City from measured quantities of work
performed based upon the Unit Price.
The undersigned agrees that this Bid Schedule constitutes a firm offer to the City which cannot
be withdrawn for the number of calendar days indicated in the Notice Inviting Bids from and after
the bid opening, or until a Contract for the work is fully executed by the City and a third party,
whichever is earlier.
If the Contract Documents specify alternate bid items, the City can choose to include any, all, or
none of the alternate bid items in the Work. If the City selects any of the alternate bid items, the
corresponding alternate bid prices shall be added to or deducted from Base Bid Price for the work.
The City can award/select alternate bid items at any time(s).
TOTAL AMOUNT BASE BID IN WORDS:___________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
List of Addenda Received: _______________________________________________________
Name of Bidder:
Signature:
Name and Title:
Dated:
Well Tec Services
Mike Rentz, President
February 20, 2026
One hundred ninety-nine thousand six hundred fifty dollars and zero cents.
N/A
3.A.3.b
Packet Pg. 19 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
3.A.3.bPacket Pg. 20Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
3.A.3.bPacket Pg. 21Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
3.A.3.bPacket Pg. 22Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
3.A.3.bPacket Pg. 23Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-9 00 41 43 – BID FORMS
DESIGNATION OF SUBCONTRACTORS
The subcontractor listed below will perform work or labor or render service to the successful
Bidder in or about the construction of the work or improvement, or are subcontractors licensed by
the State of California who will, under subcontract to the successful Bidder, specially fabricate
and install a portion of the work or improvement according to detailed drawings contained in the
Contract Documents, in an amount in excess of one-half of one percent (1/2 of 1%) of the Bidder’s
total bid. Notwithstanding the foregoing, if the work involves the construction of streets and
highways, then the Bidder shall list each subcontractor who will perform work or labor or render
service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%)
of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be
granted to provide the below requested information.
In compliance with the Subletting and Subcontracting Fair Practices Act Chapter 4 (commencing
at Section 4100), Part 1, Division 2 of the California Public Contract Code, the Bidder shall set
forth below:
(a) The portion of the work to be done by the subcontractor;
(b) The name and the location of the place of business;
(c) The California contractor license number; and
(d) The DIR public works contractor registration number.
If a Bidder fails to specify a subcontractor or if a Bidder specifies more than one subcontractor for
the same portion of work, then the Bidder shall be deemed to have agreed that it is fully qualified
to perform that portion of work and that it shall perform that portion itself.
Portion of
Work to be
done by
Subcontractor
Name of
Subcontractor
Location of
Business
CSLB
Contractor
License No.
DIR
Registration
Number
Swage Kings Fresno, CA 1003102 200001468725%
3.A.3.b
Packet Pg. 24 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-10 00 41 43 – BID FORMS
Portion of
Work to be
done by
Subcontractor
Name of
Subcontractor
Location of
Business
CSLB
Contractor
License No.
DIR
Registration
Number
(Attach additional sheets if necessary)
Name of Bidder
Signature
Name and Title
Dated
Well Tec Services
Mike Rentz, President
February 20, 2026
3.A.3.b
Packet Pg. 25 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-11 00 41 43 – BID FORMS
BIDDER INFORMATION AND EXPERIENCE FORM
A. INFORMATION ABOUT BIDDER
(Indicate not applicable (“N/A”) where appropriate.)
NOTE: Where Bidder is a joint venture, pages shall be duplicated and information provided
for all parties to the joint venture.
1.0 Name of Bidder: ___________________________________________
2.0 Type, if Entity: ___________________________________________
3.0 Bidder Address: ___________________________________________
_____________________________________________________________
_____________________________________________________________
Telephone Number
_____________________________________________________________
Email Address
4.0 How many years has Bidder’s organization been in business as a Contractor?
______________________________
5.0 How many years has Bidder’s organization been in business under its present
name? ________________________
5.1 Under what other or former names has Bidder’s organization
operated?_______________________________________________
6.0 If Bidder’s organization is a corporation, answer the following:
6.1 Date of Incorporation: ________________________________
6.2 State of Incorporation: ________________________________
6.3 President’s Name: ________________________________
6.4 Vice-President’s Name(s): ________________________________
________________________________
6.5 Secretary’s Name: ________________________________
6.6 Treasurer’s Name: ________________________________
Well Tec Services
531 Edgar Ave Beaumont CA 92223
909-754-7020
rwelltec@aol.com
25 years
25 years
N/A
California
Mike Rentz
S Corporation
December 18, 2001
Larry Lawrence
Mike Rentz
Mike Rentz
3.A.3.b
Packet Pg. 26 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-12 00 41 43 – BID FORMS
7.0 If an individual or a partnership, answer the following:
7.1 Date of Organization: ______________________________________
7.2 Name and address of all partners (state whether general or limited
partnership):
___________________________________________________________
___________________________________________________________
___________________________________________________________
8.0 If other than a corporation or partnership, describe organization and name
principals:
___________________________________________________________
___________________________________________________________
9.0 List other states in which Bidder’s organization is legally qualified to do business.
___________________________________________________________
___________________________________________________________
___________________________________________________________
10.0 What type of work does the Bidder normally perform with its own forces?
___________________________________________________________
___________________________________________________________
___________________________________________________________
11.0 Has Bidder ever failed to complete any work awarded to it? If so, note when, where,
and why:
___________________________________________________________
___________________________________________________________
12.0 Within the last five years, has any officer or partner of Bidder’s organization ever
been an officer or partner of another organization when it failed to complete a
contract? If so, attach a separate sheet of explanation:
___________________________________________________________
___________________________________________________________
December 18, 2001
N/A
N/A
N/A
Well drilling, pump services and maintenance
No
No
3.A.3.b
Packet Pg. 27 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-13 00 41 43 – BID FORMS
13.0 List Trade References:
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
14.0 List Bank References (Bank and Branch Address):
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
15.0 Name of Bonding Company and Name and Address of Agent:
___________________________________________________________
___________________________________________________________
___________________________________________________________
[REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]
Primo Brands (formerly Nestle Waters)
Fontana Water Company/ San Gabriel Water Company
San Bernardino County
Cucamonga Valley Water District
Citi Bank 777 Beaumont Ave Beaumont, CA 92223
Federated Insurance 5701 W Talavi Blvd Suite 200 Glendale, AZ 85306
3.A.3.b
Packet Pg. 28 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-14 00 41 43 – BID FORMS
B. LIST OF CURRENT PROJECTS (BACKLOG)
[Duplicate page if needed for listing additional current projects.]
Project Client Reference
(agency
name/contact
info)
Description of
Bidder’s Work
Completion Date Cost of Bidder’s
Work
South Rancho San ManuelRod Garton Pump & boosterstation & pipeline 3/13/26 $679,281.00
Catholic booster Montecito MemorialKai Koslowski booster pull & inspect 2/27/26 $1475.00
126 Discharge Head Rancho WaterSteve Drew
Discharge HeadFabrication 3/13/26 $9893.00
SP Borehole Primo BrandsTam Pham Roof repairs 3/2/26 $9679.00
Lucerne Valley $10,795.002/27/26Pull, brush, bail
Oak Hills
County of San Bernardino
Zach Tipton
County of San Bernardino
Zach Tipton
Install check valve 2/27/26 $2396.12
5/1/26 $359,510.957 Boosters Equipment for 7 boosters
Rancho WaterSteve Drew
Injection Well Redevelopment
3 year contract for injection well redevelopment
Orange County WaterDavid Field 2029 TBD
Existing Ag Well County of San BernardinoJon Aldana Well Rehab 4/1/26 $34,195.00
3.A.3.b
Packet Pg. 29 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-15 00 41 43 – BID FORMS
C. LIST OF COMPLETED PROJECTS – LAST THREE YEARS
[Duplicate page if needed for listing additional completed projects.]
Please include only those projects which are similar enough to demonstrate Bidder’s ability to
perform the required work on the Project.
Project Client Reference
(agency
name/contact
info)
Description of
Bidder’s Work
Completion Date Cost of Bidder’s
Work
Oak Hills Well 4 San BernardinoCounty SD Well Rehab &Packer Install August 2023 $230,000.00
Well F10A Well Rehab & Pump Installation May 2024 $37,000.00
Well 17B Fontana Water Company Well Rehab June 2024 $282,698.50
Well 44B Fontana Water Company
Well Rehab June 2024 $83,964.00
Well F29A Fontana WaterCompany $212,900.00Well Rehab
Well 5 Cabazon WaterDistrict Well Rehab January 2024 $19,700.00
March 2023
Fontana Water Company
Snow Valley Well Rehab
South Well
Well 2
Primo Brands
Well 1
Primo Brands
Well Rehab
Well Rehab
Well Rehab
$611,842.44August 2025
$67,000.00Harmony Haven
Twin Pines
Riverside County
$33,000.00August 2024Riverside County
November 2025
Well Rehab
November 2024 $42,589.00
January 2026 $34,548.20
3.A.3.b
Packet Pg. 30 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-16 00 41 43 – BID FORMS
D. EXPERIENCE AND TECHNICAL QUALIFICATIONS QUESTIONNAIRE
Personnel:
The Bidder shall identify the key personnel to be assigned to this project in a management,
construction supervision or engineering capacity.
1. List each person’s job title, name and percent of time to be allocated to this project:
2. Summarize each person’s specialized education:
3. List each person’s years of construction experience relevant to the project:
4. Summarize such experience:
Bidder agrees that personnel named in this Bid will remain on this Project until completion of all
relevant work, unless substituted by personnel of equivalent experience and qualifications
approved in advance by the City.
Mike Rentz, President 100%
Larry Lawrence, VP of Operations, 100%
Mike Rentz 30+ years in the well drilling, well and pump maintenance, and underground work
Larry Lawrence 30+ years of engineering experience, 25 years of experience in water supply and treatment
Mike Rentz 30 years
Larry Lawrence: 30+ years
New well contruction, well maintenance, equipment specialty installation, booster installation and
maintenance, VFD installation and maintenance, and system design
3.A.3.b
Packet Pg. 31 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-17 00 41 43 – BID FORMS
E. ADDITIONAL BIDDER’S STATEMENTS:
If the Bidder feels that there is additional information which has not been included in the
questionnaire above, and which would contribute to the qualification review, it may add that
information in a statement here or on an attached sheet, appropriately marked:
_______
Name of Bidder
Signature
Name and Title
Dated
Well Tec Services
Mike Rentz, President
February 20, 2026
3.A.3.b
Packet Pg. 32 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-18 00 41 43 – BID FORMS
NON-COLLUSION DECLARATION
The undersigned declares:
I am the ___________________ of ______________________________, the party making the
foregoing Bid.
The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation. The Bid is genuine and not collusive or sham.
The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or
sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with
any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in
any manner, directly or indirectly, sought by agreement, communication, or conference with
anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost
element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are
true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation,
partnership, company, association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or
entity for such purpose.
Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint
venture, limited liability company, limited liability partnership, or any other entity, hereby
represents that he or she has full power to execute, and does execute, this declaration on behalf
of the Bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is
true and correct and that this declaration is executed on __________ [date], at
___________________ [city], ___________________ [state].
Name of Bidder
Signature
Name and Title
Dated
President Well Tec Services
Beaumont California
Well Tec Services
Mike Rentz, President
February 20, 2026
2/20/26
3.A.3.b
Packet Pg. 33 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-19 00 41 43 – BID FORMS
IRAN CONTRACTING ACT CERTIFICATION.
(Public Contract Code section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to
penalty for perjury that the option checked below relating to the Contractor’s status in regard to
the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:
The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities
in Iran prepared by the California Department of General Services in accordance
with subdivision (b) of Public Contract Code Section 2203; or
(2) a financial instruction that extends, for 45 days or more, credit in the amount of
$20,000,000 or more to any other person or entity identified on the current list of
persons and entities engaging in investment activities in Iran prepared by the
California Department of General Services in accordance with subdivision (b) of
Public Contract Code Section 2203, if that person or entity uses or will use the
credit to provide goods or services in the energy sector in Iran.
The City has exempted the Contractor from the requirements of the Iran Contracting
Act of 2010 after making a public finding that, absent the exemption, the City will be
unable to obtain the goods and/or services to be provided pursuant to the Contract.
The amount of the Contract payable to the Contractor for the Project does not exceed
$1,000,000.
Signature:
Printed Name:
Title:
Firm Name:
Date:
Note: In accordance with Public Contract Code Section 2205, false certification of this form shall
be reported to the California Attorney General and may result in civil penalties equal to the greater
of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on
contracts for three years.
Mike Rentz
President
Well Tec Services
February 20, 2026
3.A.3.b
Packet Pg. 34 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-20 00 41 43 – BID FORMS
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that
wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be
registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public-
Works/PublicWorks.html for additional information.
No bid will be accepted nor any contract entered into without proof of the contractor’s and
subcontractors’ current registration with the Department of Industrial Relations to perform public
work.
Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code
sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of
Industrial Relations.1
Name of Bidder:
DIR Registration Number:
DIR Registration Expiration:_________________________
Small Project Exemption: _____ Yes or _____ No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:
1. Bidder shall maintain a current DIR registration for the duration of the project.
2. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1
in its contract with subcontractors and ensure that all subcontractors are registered
at the time of bid opening and maintain registration status for the duration of the
project.
3. Failure to submit this form or comply with any of the above requirements may result
in a finding that the bid is non-responsive.
Name of Bidder
Signature
Name and Title
Dated
1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code
Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”
Well Tec Services
1000018493
06/30/2027
Well Tec Services
Mike Rentz, President
February 20, 2026
3.A.3.b
Packet Pg. 35 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-21 00 41 43 – BID FORMS
CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION.
I am aware of the provisions of section 3700 of the Labor Code which require every employer to
be insured against liability for workers’ compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions before
commencing the performance of the work of this Contract.
Name of Bidder
Signature
Name and Title
Dated
Well Tec Services
Mike Rentz, President
February 20, 2026
3.A.3.b
Packet Pg. 36 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well C-22 00 41 43 – BID FORMS
EXECUTIVE ORDER N-6-22 CERTIFICATION.
Executive Order N-6-22 issued by Governor Gavin Newsom on March 4, 2022, directs all
agencies and departments that are subject to the Governor’s authority to (a) terminate any
contracts with any individuals or entities that are determined to be a target of economic sanctions
against Russia and Russian entities and individuals; and (b) refrain from entering into any new
contracts with such individuals or entities while the aforementioned sanctions are in effect.
Executive Order N-6-22 also requires that any contractor that: (1) currently has a contract with
District funded through grant funds provided by the State of California; and/or (2) submits a bid or
proposal or otherwise proposes to or enter into or renew a contract with the District funded by
State of California grant funds, certify that the person is not the target of any economic sanctions
against Russia and Russian entities and individuals.
The contractor hereby certifies, SUBJECT TO PENALTY FOR PERJURY, that a) the contractor
is not a target of any economic sanctions against Russian and Russian entities and individuals
as discussed in Executive Order N-6-22 and b) the person signing below is duly authorized to
legally bind the Contractor. This certification is made under the laws of the State of California.
Signature:
Printed Name:
Title:
Firm Name:
Date:
Mike Rentz
President
Well Tec Services
February 20, 2026
3.A.3.b
Packet Pg. 37 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
Repair And Testing Of The Lake Park Well D-1 00 41 43 – BID FORMS
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s
policies, rules and regulations and are familiar with the requirements of Title 13, California Code
of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder
hereby certifies, subject to penalty for perjury, that the option checked below relating to the
Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate
Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed
description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel
as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed
records describing the normal refueling methods, their attempts to procure renewable
diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third
party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4)
because this Project has been deemed an Emergency, as defined under section
2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation
and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed
reasoning is attached hereto.
Signature:
Printed Name:
Title:
Firm Name:
Date:
Mike Rentz
President
Well Tec Services
February 20, 2026
3.A.3.b
Packet Pg. 38 Attachment: Well Tec Services Estimate for Lake Park (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 1 of 92
CITY OF SAN JACINTO
CONTRACT FOR CONSTRUCTION BETWEEN
THE CITY OF SAN JACINTO
AND
WELL TEC SERVICES, INC
FOR THE REPAIR AND TESTING OF THE LAKE PARK WELL
3.A.3.c
Packet Pg. 39 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 2 of 92
This Contract for Construction (“Contract”), is made and entered into this 3rd day of March,
2026, by and between City of San Jacinto, with its principal place of business at 595 S. San
Jacinto Ave, San Jacinto CA 92583, sometimes hereinafter called the “City” and WELL TEC
SERVICES, INC, sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
SCOPE OF WORK
The Contractor shall perform all Work within the time stipulated in the Contract, and shall
provide all labor, materials, equipment, tools, utility services, and transportation to complete
all of the Work required in strict compliance with the General Conditions, Special Conditions,
Technical Specifications, Plans and Drawings, and other Contract Documents as specified
in Article 5, below, for the following Project:
Repair and Testing of the Lake Park Well
Contractor is an independent contractor and not an agent of the City. The Contractor and its
surety shall be liable to the City for any damages arising as a result of the Contractor’s failure
to comply with this obligation.
TIME FOR COMPLETION
Time is of the essence in the performance of the Work. The Work shall be commenced on
the date stated in the City’s Notice to Proceed. The Contractor shall complete all Work
required by the Contract Documents within 30 days from the commencement date stated in
the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion
set forth above is adequate and reasonable to complete the Work.
CONTRACT PRICE
The City shall pay to the Contractor as full compensation for the performance of the Contract,
subject to any additions or deductions as provided in the Contract Documents, and including
all applicable taxes and costs, the sum of One hundred ninety-nine thousand six hundred
and fifty dollars ($199,650.00). Payment shall be made as set forth in the General Conditions.
The City will pay to Contractor compensation based upon the prices set forth in the Bid
Schedule.
LIQUIDATED DAMAGES
Contractor acknowledges that the City will sustain actual damages for each and every Day
completion of the Project is delayed beyond the Contract Time. Because of the nature of the
Project, it would be impracticable or extremely difficult to determine the City’s actual
damages. Accordingly, in accordance with Government Code section 53069.85, it is agreed
that the
Contractor will pay the City the sum of **$1,000 per calendar day** for each and every calendar
day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as
liquidated damages and not as a penalty or forfeiture. This Article does not exclude recovery
3.A.3.c
Packet Pg. 40 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 3 of 92
of other damages specified in the Contract Documents. Liquidated damages may be deducted
from progress payments due Contractor, Project retention or may be collected directly from
Contractor, or from Contractor's surety. These provisions for liquidated damages shall not
prevent the City, in case of Contractor's default, from terminating the Contractor.
Consistent with Public Contract Code Section 7102, Contractor will be compensated for
damages incurred due to delays for which the City is responsible. The parties agree that
determining Contractor’s exact delay damages is and will continue to be impracticable and
extremely difficult. As such, for each calendar day in excess of the Contract Time, the City
shall pay to the Contractor $492.33 per day as reverse liquidated damages and not as ap
penalty or forfeiture. Such amount shall constitute the only payment allowed for any City
caused delays and shall necessarily include all overhead, all profits, all administrative costs,
all bond costs, all labor, materials, equipment and rental costs and any other costs, expenses
and fees incurred or sustained as a result of such delays. Notice of requests for delay
damages and additional days shall be provided to the City within five (5) Days from the
discovery of the circumstances giving rise to any delay or three (3) Days from the discovery
of any latent or subsurface conditions giving rise to a delay.
COMPONENT PARTS OF THE CONTRACT
The “Contract Documents” include the following
Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid
Bid Schedule
Bid Security
Designation Of Subcontractors
Bidder Information and Experience Form
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Executive Order N-22 Certification
Fleet Compliance Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition
Applicable Local Agency Standards and Specifications, as last revised
Reference Specifications
Approved and fully executed Change Orders
Permits
3.A.3.c
Packet Pg. 41 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 4 of 92
Any other documents contained in or incorporated into the Contract
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of
the Contract Documents and not by others shall be done as if required by all. In the event
of conflict, the various Contract Documents will be given effect in the order set forth in the
General Conditions. This Contract shall supersede any prior agreement of the parties.
PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE
Each and every provision of law required to be included in these Contract Documents shall
be deemed to be included in these Contract Documents. The Contractor shall comply with
all requirements of applicable federal, state and local laws, rules and regulations, including,
but not limited to, the provisions of the California Labor Code and California Public Contract
Code which are applicable to this Work.
INDEMNIFICATION
Contractor shall provide indemnification and defense as set forth in the General Conditions.
RECORD RETENTION
The Contractor shall maintain accounts and records as set forth in the General Conditions.
PREVAILING WAGES
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor
Code which such rates shall be made available at the City or may be obtained online at
http://www.dir.ca.gov and which must be posted at the job site.
EXAMINATION OF PLANS, SPECIFICATIONS, PROVISIONS, & PROJECT SITE
Contractor shall follow the provisions set forth in Article 3 of the Instructions to Bidders. No
information derived from inspection of records or investigations or compilations of same
made by the City will in any way relieve the Contractor from his or her obligations under the
Contract Documents nor entitle the Contractor to any additional compensation. The
Contractor will not and agrees not to make any claims against the City based upon ignorance
or misunderstanding of any condition of the work site or of the requirements set forth in the
Contract Documents.
FALSE CLAIMS
Contractor acknowledges that if a false claim is submitted to the City, it may be considered
fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that
the False Claims Act, California Government Code sections 12650, et seq., provides for civil
penalties where a person knowingly submits a false claim to a public entity. These provisions
include within their scope false claims made with deliberate ignorance of the false information
or in reckless disregard of the truth or falsity of the information. In the event the City seeks
to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation
costs, including attorneys’ fees. Contractor hereby acknowledges that the filing of a false
3.A.3.c
Packet Pg. 42 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 5 of 92
claim may the Contractor to an administrative debarment proceeding wherein Contractor
may be prevented from further bidding on public contracts for a period of up to five (5) years.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] [SIGNATURES ON
FOLLOWING PAGE]
3.A.3.c
Packet Pg. 43 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 6 of 92
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties,
on the day and year above written.
CITY OF SAN JACINTO WELL TEC SERVICES, INC
By: By:
Robert A. Johnson Michael T. Rentz
City Manager President
ATTEST:
By: __________________________________
Jill Theriot
Deputy City Clerk
APPROVED AS TO FORM:
By: _________________________________
Best Best & Krieger LLP
City Attorney
____802369 C57, A, B, C-8___
Contractor’s License Number & Classification
____1000018493_____________
DIR Registration Number
CONTRACTOR’S SIGNATURE MUST BE NOTARIZED AND CORPORATE SEAL AFFIXED, IF APPLICABLE.
Note: The Notary Acknowledgment must specify that the signer of the Contract is authorized to execute the
Contract.
3.A.3.c
Packet Pg. 44 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 7 of 92
00 61 13 – BOND FORMS
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the City of San Jacinto, with its principal place of business at 595 San
Jacinto Ave, San Jacinto, CA 92583, (hereinafter referred to as the “City”) has awarded to
____________________________, (hereinafter referred to as the “Contractor”) an agreement
for Repair and Testing of the Lake Park Well (hereinafter referred to as the “Project”);
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein
by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms
thereof and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, ________________________________, the undersigned
Contractor, and ________________________________________________ as Surety, a
corporation organized and duly authorized to transact business under the laws of the State of
California, are held and firmly bound unto the City in the sum of
________________________________ Dollars, ($________________), said sum being not
less than one hundred percent (100%) of the total amount of the Contract, for which amount
well and truly to be made, we bind ourselves, our heirs, executors and administrators,
successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee
of all materials and workmanship; and shall indemnify and save harmless the City, its officials,
officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then
this obligation shall become null and void; otherwise it shall be and remain in full force and
effect.
As a part of the obligation secured hereby and in addition to the face amount specified
therefore, there shall be included costs and reasonable expenses and fees including
reasonable attorney’s fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by the City, during which time if
Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally
protect the City from loss or damage resulting from or caused by defective materials or faulty
workmanship. The obligations of Surety hereunder shall continue so long as any obligation of
3.A.3.c
Packet Pg. 45 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 8 of 92
Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s
obligations under the Contract, law or equity, including, but not limited to, California Code of
Civil Procedure Section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions
in the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses
sufficient funds to pay the cost of completion of the Project, less the balance of
the contract price, including other costs and damages for which Surety may be
liable. The term “balance of the contract price” as used in this paragraph shall
mean the total amount payable to Contractor by the City under the Contract
and any modification thereto, less any amount previously paid by the City to
the Contractor and any other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable
to Contractor by the City under the Contract and any modification thereto, less
any amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the City, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of
the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice
of any such change, extension of time, alteration or addition to the terms of the Contract
Documents or to the Project.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
[SIGNATURES ON FOLLOWING PAGE]
3.A.3.c
Packet Pg. 46 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 9 of 92
IN WITNESS WHEREOF, we have hereunto set our hands and seals this ___________ day
of ______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of
corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ______________ per thousand. The total amount of
premium charges is $_______________________________. (The above must be filled in by
corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of ___________________________________________
process in California, if different
from above)
___________________________________________
(Telephone number of Surety
and Agent or Representative for
service of process in California)
___________________________________________
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety
to do so must be attached hereto.
3.A.3.c
Packet Pg. 47 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 10 of 92
Notary Acknowledgment
A notary public or other officer completing this certificate
verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is
true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent
fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal
3.A.3.c
Packet Pg. 48 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 11 of 92
Notary Acknowledgment
A notary public or other officer completing this certificate
verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me
that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)
on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is
true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could preve nt
fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to
local representatives of the bonding company must also be attached.
3.A.3.c
Packet Pg. 49 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 12 of 92
PAYMENT BOND (LABOR AND MATERIALS).
KNOW ALL MEN BY THESE PRESENTS:
THAT WHEREAS, the City of San Jacinto, with its principal place of business at 595 San
Jacinto Ave, San Jacinto, CA 92583 (hereinafter designated as the “City”), has awarded to
________________________, (hereinafter designated as the “Principal”) an agreement for
Repair And Testing Of The Lake Park Well, (hereinafter referred to as the “Project”);
WHEREAS, the work to be performed by the Principal is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein
by reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract;
providing that if said Principal or any of its subcontractors shall fail to pay for any materials,
provisions, provender, equipment, or other supplies used in, upon, for or about the
performance of the work contracted to be done, or for any work or labor done thereon of any
kind, or for amounts due under the Unemployment Insurance Code or for any amounts required
to be deducted, withheld, and paid over to the Employment Development Department from the
wages of employees of said Principal and its subcontractors with respect to such work or labor
the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________, as Surety, are
held and firmly bound unto the City in the penal sum of ______________ Dollars
($___________) lawful money of the United States of America, for the payment of which sum
well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors
and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its
subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of
the persons named in Civil Code section 9100, fail to pay for any materials, provisions or other
supplies, used in, upon, for or about the performance of the work contracted to be done, or for
any work or labor thereon of any kind, or amounts due under the Unemployment Insurance
Code with respect to work or labor performed under the contract, or for any amounts required
to be deducted, withheld, and paid over to the Employment Development Department or
Franchise Tax Board from the wages of employees of the contractor and his subcontractors
pursuant to Revenue and Taxation Code Section 18663, with respect to such work and labor
the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above
specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by
the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and
investigation expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so
as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or
released from the obligation of this bond by any change, extension of time for performance,
addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement
3.A.3.c
Packet Pg. 50 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 13 of 92
pertaining or relating to any scheme or work of improvement herein above described, or
pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any
change or modification of any terms of payment or extension of the time for any payment
pertaining or relating to any scheme or work of improvement herein above described, nor by
any rescission or attempted rescission or attempted rescission of the contract, agreement or
bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right
of recovery of claimants otherwise entitled to recover under any such contract or agreement or
under the bond, nor by any fraud practiced by any person other than the claimant seeking to
recover on the bond and that this bond be construed most strongly against the Surety and in
favor of all persons for whose benefit such bond is given, and under no circumstances shall
Surety be released from liability to those for whose benefit such bond has been given, by
reason of any breach of contract between the owner or the City and original contractor or on
the part of any obligee named in such bond, but the sole conditions of recovery shall be that
claimant is a person described in Civil Code Section 9100, and has not been paid t he full
amount of his claim.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract to be performed thereunder, shall in any way
affect its obligations on this bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of Contract, including but not limited to,
the provisions of Sections 2819 and 2845 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate
authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do
so much be attached hereto.
3.A.3.c
Packet Pg. 51 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 14 of 92
Notary Acknowledgment
A notary public or other officer completing this certificate
verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is
true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could preve nt
fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
3.A.3.c
Packet Pg. 52 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 15 of 92
Notary Acknowledgment
A notary public or other officer completing this certificate
verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the
instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and
correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent
fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to
local representatives of the bonding company must also be attached.
3.A.3.c
Packet Pg. 53 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 16 of 92
00 72 00 – GENERAL CONDITIONS
ARTICLE 1 -TERMS; DEFINITIONS
1.1 Defined Terms.
A. Whenever used in the Contract Documents and printed with initial capital letters, the
terms listed below will have the meanings indicated which are applicable to both
the singular and plural thereof. In addition to terms specifically defined below, terms
with initial capital letters in the Contract Documents include references to identified
articles and paragraphs, and the titles of other documents or forms.
1. Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale
or a tidal wave.
2. Addenda -- Written or graphic instruments issued prior to the submission of Bids
which clarify, correct, or change the Contract Documents.
3. Additional Work -- New or unforeseen work will be classified as “Additional
Work” when the Engineer determines that it is not covered by the Contract.
4. Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations,
permits, and licenses of any kind, issued by local, state or federal governmental
authorities or private authorities with jurisdiction (including utilities), to the extent
they apply to the Work.
5. Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting
forth the prices and other terms for the Work to be performed.
6. Bid Security -- The bid bond, cashier’s check, or certified check to be made by
the Bidder, which is to accompany the Bid as a guaranty of good faith to enter
into a written contract.
7. Bidder -- The individual or entity who submits a Bid directly to the City.
8. Change Order (“CO”) -- A document that authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract
Times, issued on or after the Effective Date of the Contract, in accordance with
the Contract Documents and in the form contained in the Contract Documents.
9. Change Order Request (“COR”) -- A request made by the Contractor for an
adjustment in the Contract Price and/or Contract Times as the result of a
Contractor-claimed change to the Work.
10. Contract -- The entire integrated written agreement between the City and
Contractor concerning the Work. “Contract” may be used interchangeably with
“Agreement” in the Contract Documents. The Contract supersedes prior
3.A.3.c
Packet Pg. 54 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 17 of 92
negotiations, representations, or agreements, whether written or oral, and
includes all Contract Documents.
11. Contract Documents -- The documents listed in Section 00 52 13, Article 5 of
the Contract for Construction. Some documents provided by the City to the
Bidders and Contractor, including but not limited to reports and drawings of
subsurface and physical conditions are not Contract Documents.
12. Contract Price -- Amount to be paid by the City to the Contractor as full
compensation for the performance of the Contract and completion of the Work,
subject to any additions or deductions as provided in the Contract Documents,
and including all applicable taxes and costs.
13. Contract Time -- The number of days or the dates stated in the Contract
Documents to: achieve defined milestones, if any; and to fully complete the
Work.
14. Contractor -- The individual or entity with which the City has contracted for
performance of the Work.
15. Critical Supply Shortage -- An unusual shortage in materials that is (a)
supported by documented proof that Contractor made every effort to obtain
such materials from all available sources; (b) such shortage is due to the fact
that such materials are not physically available from single or multiple sources
or could have been obtained only at exorbitant prices entirely inconsistent with
current and standard rates taking into account the quantities involved and the
usual industry practices in obtaining such quantities; and (c) such shortages
and the difficulties in obtaining alternate sources of materials could not have
been known or anticipated by Contractor at the time it submitted its bid or
entered the Contract. Market fluctuations in prices of materials, whether or not
resulting from a Force Majeure Event, does not constitute a Critical Supply
Shortage.
16. Day -- A calendar day of 24 hours measured from midnight to the next midnight.
17. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does
not conform to the Contract Documents; or that does not meet the requirements
of any inspection, reference standard, test, or approval referenced in the
Contract Documents.
18. Drawings -- That part of the Contract Documents prepared by of the Engineer
of Record which graphically shows the scope, extent, and character of the Work
to be performed by Contractor. Shop Drawings and other Contractor Submittals
are not Drawings as so defined.
19. Effective Date of the Contract -- The date indicated in the Contract on which it
becomes effective, but if no such date is indicated, it means the date on which
the Contract is signed and delivered by the last of the two parties to sign and
deliver.
3.A.3.c
Packet Pg. 55 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 18 of 92
20. Engineer -- Whenever not qualified, shall mean the City Engineer or the
Engineer authorized to act for and in behalf of the City, acting either directly or
through properly authorized agents, such agents acting severally within the
scope of the particular duties entrusted to them.
21. Engineer of Record -- The individual, partnership, corporation, joint venture, or
other legal entity that prepares the Drawings.
22. Force Majeure Event -- An event that materially affects a party’s performance
and is one or more of the following: (1) Acts of God or other natural disasters
occurring at the Site; (2) terrorism or other acts of a public enemy; (3) orders of
governmental authorities (including, without limitation, unreasonable and
unforeseeable delay in the issuance of permits or approvals by governmental
authorities that are required for the Work); (4) pandemics, epidemics or
quarantine restrictions; (5) strikes and other organized labor action occurring at
the Site and the effects thereof on the Work, only to the extent such strikes and
other organized labor action are beyond the control of Contractor and its
Subcontractors, of every tier, and to the extent the effects thereof cannot be
avoided by use of replacement workers; and (6) a Critical Supply Shortage. For
purposes of this section, “orders of governmental authorities,” includes
ordinances, emergency proclamations and orders, rules to protect the public
health, welfare and safety, and other actions of the City in its capacity as a
municipal authority.
23. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning
provided in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as
amended from time to time, or any substance or material identified as
hazardous under any state or federal statute governing handling, disposal
and/or cleanup of any such substance or material, whichever is more restrictive.
24. Holiday – Holidays occur on:
New Year’s Day - January 1
Martin Luther King Day – Third Monday in January
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day - December 25
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding
Friday are both Holidays. If the Holiday should fall on a Sunday, Sunday and
the following Monday are both Holidays.
3.A.3.c
Packet Pg. 56 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 19 of 92
25. Notice of Award -- The written notice by the City to the successful Bidder stating
that upon timely compliance by the successful Bidder with the conditions
precedent listed therein, the City will sign and deliver the Contract.
26. Notice of Completion -- The form which may be executed by the City constituting
final acceptance of the Project.
27. Notice to Proceed -- A written notice given by the City to Contractor fixing the
date on which the Contractor may proceed with the Work and when the Contract
Time will commence to run.
28. Project -- The total construction of which the Work to be performed under the
Contract Documents, may be the whole, or a part.
29. Record Drawings – The record set of as-builts prepared by the Contractor
during the Work in accordance with the requirements of the General Conditions.
30. Recyclable Waste Materials -- Materials removed from the Site which are
required to be diverted to a recycling center rather than an area landfill.
Recyclable Waste Materials include, but are not limited to, asphalt, concrete,
brick, concrete block, and rock.
31. Sample -- A physical example furnished by the Contractor to illustrate materials,
equipment or workmanship; to establish standards by which the Work will be
judged.
32. Schedule of Submittals -- A schedule, prepared and maintained by Contractor,
of required submittals and the time requirements to facilitate scheduled
performance of related construction activities.
33. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other
data or information which are specifically prepared or assembled by or for
Contractor and submitted by Contractor to illustrate some portion of the Work.
34. Site -- Lands or areas indicated in the Contract Documents as being furnished
by the City upon which the Work is to be performed, including rights-of-way and
easements for access thereto, and such other lands furnished by the City which
are designated for the use of Contractor.
35. Specifications -- That part of the Contract Documents consisting of written
requirements for materials, equipment, systems, standards and workmanship
as applied to the Work, and certain administrative requirements and procedural
matters applicable thereto.
36. Subcontractor -- An individual or entity other than a Contractor having a contract
with any other entity than the City for performance of any portion of the Work at
the Site.
37. Submittal -- Written and graphic information and physical samples prepared and
supplied by the Contractor demonstrating various portions of the Work.
3.A.3.c
Packet Pg. 57 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 20 of 92
38. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or
vendor having a direct contract with Contractor or with any Subcontractor to
furnish materials or equipment used in the performance of the Work or to be
incorporated in the Work.
39. Underground Facilities -- All underground pipelines, conduits, ducts, cables,
wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments,
and any encasements containing such facilities, including those that convey
electricity, gases, steam, liquid petroleum products, telephone or other
communications, cable television, water, wastewater, storm water, other liquids
or chemicals, or traffic or other control systems.
40. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by
the Contractor in its Bid or as adjusted in accordance with the Contract
Documents.
41. Warranty -- A guarantee provided to the City by the Contractor that the Work
will remain free of defects and suitable for its intended use for the period
required by the Contract Documents or the longest period permitted by the law
of this state, whichever is longer.
42. Work -- The entire construction or the various separately identifiable parts
thereof required to be provided under the Contract Documents. Work includes
and is the result of performing or providing all labor, services, and
documentation necessary to produce such construction, and furnishing,
installing, and incorporating all materials and equipment into such construction,
all as required by the Contract Documents.
1.2 Terminology.
A. The words and terms below are not defined but, when used in the Contract
Documents, have the indicated meaning.
1. The word “furnish,” when used in connection with services, materials, or
equipment, shall mean to supply and deliver said services, materials, or
equipment to the Site (or some other specified location) ready for use or
installation and in usable or operable condition.
2. The word “install,” when used in connection with services, materials, or
equipment, shall mean to put into use or place in final position said services,
materials, or equipment complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services,
materials, or equipment, shall mean to furnish and install said services,
materials, or equipment complete and ready for intended use.
4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in
connection with services, materials, or equipment, an obligation of Contractor
is implied.
3.A.3.c
Packet Pg. 58 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 21 of 92
B. Unless stated otherwise in the Contract Documents, words or phrases that have a
well-known technical or construction industry or trade meaning are used in the
Contract Documents in accordance with such recognized meaning.
ARTICLE 2 -PRELIMINARY MATTERS
2.1 Delivery of Contract Documents.
A. Within ten (10) Days after receipt of the Notice of Award and before the City will
execute the Contract, the Contractor shall furnish and file with the City a signed
Contract and the necessary performance bond, payment bond, and certificates of
insurance and endorsements, as well as any other documents specified in the
Contract Documents.
2.2 Bonds.
A. Contractor shall submit the bonds on the forms provided with the Contract
Documents, duly executed by a responsible corporate surety admitted to transact
surety business in the State of California, as defined in Code of Civil Procedure
section 995.120, and listed in the United States Department of the Treasury
circular entitled "Companies Holding Certificates of Authority as Acceptable
Sureties on Federal Bonds and as Acceptable Reinsuring Companies,"
authorized to do business in the State of California and acceptable to the City
conditioned upon the faithful performance by the Contractor of all requirements of
the Contract Documents. Each of the bonds shall be in a sum no less than one
hundred percent (100%) of the Contract Price. Bonds shall be delivered to the
City within ten (10) Days after receipt of the Notice of Award and before execution
of the Contract by the City.
2.3 Evidence of Insurance.
A. Prior to commencing any Work but no later than ten (10) Days after receipt of the
Notice of Award, the Contractor shall submit or cause to be submitted any and all
certificates of insurance and endorsements, showing that the Contractor has the
required insurance, to the attention of the City. Such insurance is to be provided
at the sole cost and expense of the Contractor. No Work shall be performed until
all of the required insurance has been received and approved.
2.4 Execution of the Contract.
A. Upon receipt of the required documents, the City will execute the Contract,
establishing the Effective Date of the Contract.
2.5 Contractor’s Failure to Perform.
A. Should Contractor fail to comply with timelines provided above, the City shall retain
the right to enforce and collect on the Contractor’s Bid Security, rescind award to
the Contractor and award the Contract to the next lowest responsible Bidder
providing a responsive Bid as determined by the City. If the City elects to accept
bonds and insurance submitted late, the Contract Time will begin to run as of the
3.A.3.c
Packet Pg. 59 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 22 of 92
date stated in the Notice to Proceed. However, the number of Days beyond the
original ten (10) Days it took to receive the properly executed Contract and related
items may be deducted from the Contract Time.
2.6 Commencement of Contract Times; Notice to Proceed.
A. The City will not issue a Notice to Proceed until after the Effective Date of the
Contract. Work shall commence within ten (10) Days of the date stated in the
Notice to Proceed. The Contract Time begin to run on the date specified in the
Notice to Proceed. No Work shall be done at the Site prior to the issuance of the
Notice to Proceed.
2.7 Copies of Documents.
A. Contractor will be furnished, free of charge, copies of the Contract Documents.
Contractor shall maintain a clean, undamaged set of Contract Documents,
including Submittals, at the Project site.
2.8 Substitution Requests, Schedule of Submittals, and Schedule.
A. Substitution Requests. Within thirty-five (30) Days of Contract award (unless
otherwise specified in the Contract Documents), Contractor shall provide all
substitution requests as further described in the General Conditions.
B. Schedule of Submittals. Within ten (10) Days after the issuance of the Notice of
Proceed (unless otherwise specified in the Contract Documents), Contractor shall
submit to the City a Schedule of Submittals that conforms with the requirements
of the Contract Documents.
C. Schedule. Within ten (10) Days after the issuance of the Notice to Proceed
(unless otherwise specified in the Contract Documents), the Contractor shall
submit a construction schedule that conforms with the requirements of the
Contract Documents.
2.9 Preconstruction Meeting; Designation of Authorized Representatives.
A. Before any Work at the Site is started, a meeting attended by the City, Contractor,
Engineer, and others as appropriate will be held to establish a working
understanding among the parties as to the Work and to discuss the schedules
referred to herein, procedures for handling Submittals and Shop Drawings,
processing applications for payment, and maintaining required records. At this
meeting the City and Contractor each shall designate, in writing, a specific
individual to act as its authorized representative with respect to the services and
responsibilities under the Contract. Such individuals shall have the authority to
transmit instructions, receive information, render decisions relative to the
Contract, and otherwise act on behalf of each respective party.
2.10 Mobilization.
3.A.3.c
Packet Pg. 60 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 23 of 92
A. When a bid item is included in the Bid Schedule for mobilization, the costs of Work
in advance of construction operations and not directly attributable to any specific
bid item will be included in the progress estimate. When no bid item is provided
for mobilization payment for such costs will be deemed to be included in the other
items of the Work.
B. Payment for mobilization based on the lump sum provided in the Bid Schedule,
shall constitute full compensation for all such Work. The lump sum price provided
for mobilization shall not be more than 5% of the Total Bid Price. No payment for
mobilization will be made until all of the listed items have been completed to the
satisfaction of the Engineer. The scope of the Work included under mobilization
shall include, but shall not be limited to, the following principal items:
1. Obtaining and paying for all bonds, insurance, and permits.
2. Moving on to the Project Site of all Contractor’s plant and equipment required
for the first month’s operations.
3. Installing temporary construction power, wiring, and lighting facilities, as
applicable.
4. Establishing fire protection system, as applicable.
5. Developing and installing a construction water supply, as applicable.
6. Providing and maintaining the field office trailers for the Contractor, if necessary,
and the Engineer, if specified, complete, with all specified furnishings and utility
services.
7. Providing on-site sanitary facilities and potable water facilities as specified per
CalOSHA and these Contract Documents.
8. Furnishing, installing, and maintaining all storage buildings or sheds required
for temporary storage of products, equipment, or materials that have not yet
been installed in the Work. All such storage shall meet manufacturer’s specified
storage requirements, and the specific provisions of the specifications, including
temperature and humidity control, if recommended by the manufacturer, and for
all security.
9. Arranging for and erection of Contractor’s work and storage yard.
10. Posting all OSHA required notices and establishment of safety programs per
CalOSHA.
11. Full-time presence of Contractor’s superintendent at the job Site as required
herein.
12. Submittal of construction schedule, Submittals, and Shop Drawings as required
by the Contract Documents.
3.A.3.c
Packet Pg. 61 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 24 of 92
ARTICLE 3 -CONTRACT DOCUMENTS; INTENT
3.1 Examination of Drawings, Specifications, and Site of Work.
A. Examination of Contract Documents; Site. Before commencing any portion of the
Work, Contractor shall again carefully examine all applicable Contract
Documents, the Project Site, and other information given to Contractor as to
materials and methods of construction and other Project requirements. Contractor
shall immediately notify the Engineer of any potential error, inconsistency,
ambiguity, conflict, or lack of detail or explanation. If Contractor performs,
permits, or causes the performance of any Work which is in error, inconsistent or
ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and
all resulting costs, including, without limitation, the cost of correction. In no case
shall the Contractor or any Subcontractor proceed with Work if uncertain as to the
applicable requirements.
B. Additional Instructions. After notification of any error, inconsistency, ambiguity,
conflict, or lack of detail or explanation, the Engineer will provide any required
additional instructions, by means of drawings or other written direction, necessary
for proper execution of Work.
C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the
best quality of their respective kinds and the Contractor must use all diligence to
inform itself fully as to the required construction and finish.
D. Contractor’s Variation from Contract Document Requirements. If it is found that
the Contractor has varied from the requirements of the Contract Documents
including the requirement to comply with all Applicable Laws, the Engineer may
at any time, before or after completion of the Work, order the improper Work
removed, remade or replaced by the Contractor at the Contractor’s expense.
3.2 Intent of Contract Documents.
A. The Contract Documents are complementary; what is required by any one will be
binding as if required by all. It is the intent of the Contract Documents to describe
a functionally complete Project (or part thereof) to be constructed in accordance
with the Contract Documents. Any labor, documentation, services, materials, or
equipment that reasonably may be inferred from the Contract Documents or from
prevailing custom or trade usage as being required to produce the indicated result
will be provided whether or not specifically called for, at no additional cost to the
City.
B. The Contractor shall furnish, unless otherwise provided in the Contract
Documents, all materials, implements, machinery, equipment, tools, supplies and
labor necessary to the prosecution and completion of the Project. If utilities to
equipment/fixtures are not shown but are necessary to operate the
equipment/fixtures, the utilities service installation is considered to be part of the
Work. The implied Work will conform to the appropriate sections of the Contract
Documents.
3.A.3.c
Packet Pg. 62 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 25 of 92
C. Organization of the Contract Documents into divisions, sections, and articles, and
arrangement of drawings shall not control the Contractor in dividing Work among
Subcontractors or in establishing the extent of Work to be performed by any trade.
D. Clarifications and interpretations of the Contract Documents shall be issued by
the Engineer as provided in these General Conditions.
3.3 Reference Standards.
A. Standards, Specifications, Codes, Laws, and Regulations.
1. Reference to federal specifications, federal standards, other standards,
specifications, manuals, or codes of any technical society, organization, or
association, or to Applicable Laws, whether such reference be specific or by
implication, shall mean the standard, specification, manual, code, or Applicable
Laws in effect at the time of opening of Bids (or on the Effective Date of the
Contract if there were no Bids), except as may be otherwise specifically stated
in the Contract Documents.
2. No provision of any such standard, specification, manual, or code, or any
instruction of a Supplier, shall be effective to change the duties or
responsibilities of the City, Contractor, or any of their Subcontractors,
consultants, agents, or employees, from those set forth in the Contract
Documents. No such provision or instruction shall be effective to assign to the
City, or any of their officers, directors, members, partners, employees, agents,
consultants, or subcontractors, any duty or authority to supervise or direct the
performance of the Work or any duty or authority to undertake responsibility
inconsistent with the provisions of the Contract Documents.
3.4 Reporting and Resolving Discrepancies; Order of Precedence.
A. Reporting Discrepancies. The Contract Documents are intended to be fully
cooperative and complementary. Before undertaking each part of the Work,
Contractor shall carefully study and compare the Contract Documents and check and
verify pertinent figures therein and all applicable field measurements. Contractor
shall promptly report in writing to the City any conflict, error, ambiguity, or discrepancy
which Contractor discovers, should have discovered, or has actual knowledge of, and
shall obtain a written interpretation or clarification from the City before proceeding
with any Work affected thereby. If, during the performance of the Work, Contractor
discovers any conflict, error, ambiguity, or discrepancy within the Contract
Documents, or between the Contract Documents and (i) any Applicable Law, (ii) any
standard, specification, manual, or code, or (iii) any instruction of any Supplier, then
Contractor shall promptly submit a written Request for Information (RFI) to the City.
Contractor shall not proceed with the Work affected thereby (except in an emergency)
until an amendment or supplement to the Contract Documents has been issued by
one of the methods indicated in the Contract Documents, and any Work performed
by Contractor before receipt of an amendment or supplement shall be at Contractor’s
own risk. B. Order of Precedence.
3.A.3.c
Packet Pg. 63 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 26 of 92
1. In case of conflicts between the Contract Documents, the order of precedence
shall be as follows:
a. Permits from other agencies as may be required by law
b. Change Orders, most recent first
c. Contract
d. Addenda, most recent first
e. Special Conditions
f. Specifications
g. Construction Plans and Drawings(Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Contractor’s Bid (Bid Forms)
l. Standard Specifications for Public Works Construction “Greenbook” latest
edition
m. Applicable Local Agency Standards and Specifications
n. Standard Drawings
o. Reference Documents
2. With reference to the drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Drawings govern over Standard Drawings
e. Drawings govern over Shop Drawings
3. Notwithstanding the orders of precedence established above, in the event of
conflicts, the higher standard, higher quality and most expensive shall always
apply.
3.5 Amending and Supplementing Contract Documents.
3.A.3.c
Packet Pg. 64 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 27 of 92
A. The Contract Documents may be amended to provide for additions, deletions,
and revisions in the Work or to modify the terms and conditions thereof only by
Change Order or written amendment to the Contract duly executed by the parties.
B. The requirements of the Contract Documents may be supplemented, and minor
variations and deviations in the Work may be authorized at no cost to the City, by
one or more of the following ways:
1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request
without exception (subject to the provisions of the Contract Documents); or
2. The City’s issuance of a response to an RFI.
C. However, no review or RFI response will reduce or modify the Contractor’s
obligation to fully satisfy and comply with the requirements of the Contract
Documents.
3.6 Reuse of Documents.
A. Contractor and any Subcontractor or Supplier shall not:
1. Have or acquire any title to or ownership rights in any of the Drawings,
Specifications, or other documents (or copies of any thereof) prepared by or
bearing the seal of Engineer of Record or its consultants, including electronic
media editions; or
2. Reuse any such Drawings, Specifications, other documents, or copies thereof
on extensions of the Project or any other project without written consent of the
City and Engineer of Record and specific written verification or adaptation by
Engineer of Record.
B. The prohibitions of this Article will survive final payment or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the
Contract Documents for record purposes.
ARTICLE 4 -INDEMNIFICATION; INSURANCE
4.1 Indemnification.
A. To the fullest extent permitted by law, Contractor shall immediately defend (with
counsel of the City’s choosing), indemnify and hold harmless the City, its officials,
officers, employees, agents, and authorized volunteers, and each of them from
and against:
1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses
or liabilities, in law or in equity, of every kind or nature whatsoever, but not
limited to, injury to or death, including wrongful death, of any person, and
damages to or destruction of property of any person, arising out of, related to,
or in any manner directly or indirectly connected with the Work or this Contract,
including claims made by subcontractors for nonpayment, including without
3.A.3.c
Packet Pg. 65 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 28 of 92
limitation the payment of all consequential damages and attorney’s fees and
other related costs and expenses, however caused, regardless of whether the
allegations are false, fraudulent, or groundless, and regardless of any
negligence of the City or its officials, officers, employees, agents, or authorized
volunteers (including passive negligence), except such loss or damages caused
by the sole negligence or willful misconduct or active negligence of the City or
its officials, officers, employees, or authorized volunteers.
2. Contractor’s defense and indemnity obligation herein includes, but is not limited
to damages, fines, penalties, attorney’s fees and costs arising from claims under
the Americans with Disabilities Act (ADA) or other federal or state disability
access or discrimination laws arising from Contractor’s Work during the course
of construction of the improvements or after the Work is complete, as the result
of defects or negligence in Contractor’s construction of the improvements.
3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties
or liabilities, in law or equity, of every kind or nature whatsoever, arising out of,
resulting from, or on account of the violation of any governmental law or
regulation, compliance with which is the responsibility of Contractor.
4. Any and all losses, expenses, damages (including damages to the Work itself),
attorney’s fees, and other costs, including all costs of defense which any of them
may incur with respect to the failure, neglect, or refusal of Contractor to faithfully
perform the Work and all of Contractor’s obligations under Contract. Such costs,
expenses, and damages shall include all costs, including attorney’s fees,
incurred by the indemnified parties in any lawsuit to which they are a party.
B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk,
with the counsel of the City choosing, any and all such aforesaid suits, actions or
other legal proceedings of every kind that may be brought or instituted against the
City or its officials, officers, employees, agents, or authorized volunteers.
Contractor shall pay and satisfy any judgment, award or decree that may be
rendered against the City or its officials, officers, employees, agents, or
authorized volunteers, in any such suit, action or other legal proceeding.
Contractor shall reimburse the City and its officials, officers, employees, agents,
and authorized volunteers for any and all legal expenses and costs incurred by
each of them in connection therewith or in enforcing the indemnity herein
provided. The only limitations on this provision shall be those imposed by Civil
Code section 2782.
C. The provisions of this Article shall survive the termination of this Contract
howsoever caused, and no payment, partial payment, or acceptance of
occupancy in whole or part of the Work shall waive or release any of the
provisions of this Article. Contractor’s obligation to indemnify the City shall not be
restricted to insurance proceeds, if any, received by the City and its officials,
officers, employees, agents, and authorized volunteers.
4.2 Insurance.
3.A.3.c
Packet Pg. 66 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 29 of 92
A. General Requirements. The Contractor shall obtain, and at all times during
performance of the Work of Contract, maintain all of the insurance described in
this Article. Contractor shall not commence Work under this Contract until it has
provided evidence satisfactory to the City that it has secured all insurance
required hereunder. Contractor shall not allow any Subcontractor to commence
work on any subcontract until it has provided evidence satisfactory to the City that
the subcontractor has secured all insurance required under this Article. Failure
to provide and maintain all required insurance shall be grounds for the City to
terminate this Contract for cause. Contractor shall furnish the City with original
certificates of insurance and endorsements effective coverage required by this
Contract on forms satisfactory to the City. The certificates and endorsements for
each insurance policy shall be signed by a person authorized by that insurer to
bind coverage on its behalf, and shall be on forms acceptable to the City. All
certificates and endorsements must be received and approved by the City before
Work commences.
B. Additional Insureds; Waiver of Subrogation. The City, its officials, officers,
employees, agents and authorized volunteers shall be named as Additional
Insureds on Contractor’s All Risk policy and on Contractor’s and its
Subcontractors’ policies of Commercial General Liability and Automobile Liability
insurance using, for Contractor’s policy/ies of Commercial General Liability
insurance, ISO CG forms 20 10 and 20 37 (or endorsements providing the exact
same coverage, including completed operations), and, for Subcontractors’
policies of Commercial General Liability insurance, ISO CG form 20 38 (or
endorsements providing the exact same coverage). Notwithstanding the
minimum limits set forth in this Contract for any type of insurance coverage, all
available insurance proceeds in excess of the specified minimum limits of
coverage shall be available to the parties required to be named as Additional
Insureds hereunder. All insurance coverage maintained or procured pursuant to
this Contract shall be endorsed to waive subrogation against the City, its officers,
officials, agents, employees or volunteers or shall specifically allow Contractor -
or others providing insurance evidence in compliance with these specifications -
to waive their right of recovery prior to a loss. Contractor hereby waives its own
right of recovery against the City, and shall require similar written express waivers
and insurance clauses from each of its subcontractors. Copies of these waivers
shall be submitted to the City prior to commencement of work.
C. Workers’ Compensation Insurance. The Contractor shall provide workers’
compensation insurance for all of the employees engaged in Work under this
Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall
require the subcontractor similarly to provide workers’ compensation insurance
for all the latter’s employees as prescribed by State law. Any class of employee
or employees not covered by a subcontractor’s insurance shall be covered by the
Contractor’s insurance. In case any class of employees engaged in work under
this Contract, on or at the Site, is not protected under the Workers’ Compensation
Statutes, the Contractor shall provide or shall cause a subcontractor to provide,
adequate insurance coverage for the protection of such employees not otherwise
protected. The Contractor is required to secure payment of compensation to his
employees in accordance with the provisions of section 3700 of the Labor Code.
3.A.3.c
Packet Pg. 67 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 30 of 92
The Contractor shall file with the City certificates of his insurance protecting
workers. Company or companies providing insurance coverage shall be
acceptable to the City, if in the form and coverage as set forth in the Contract
Documents.
D. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability
Insurance, including Occupational Disease, in the amount of at least one million
dollars ($1,000,000.00) per person per accident. Contractor shall provide the City
with a certificate of Employer’s Liability Insurance. Such insurance shall comply
with the provisions of the Contract Documents. The policy shall be endorsed, if
applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and
contain a Waiver of Subrogation in favor of the City.
E. Commercial General Liability Insurance. Contractor shall provide “occurrence”
form Commercial General Liability insurance coverage at least as broad as the
most current ISO CGL Form 00 01, including but not limited to, premises liability,
contractual liability, products/completed operations, personal and advertising
injury which may arise from or out of Contractor’s operations, use, and
management of the Site, or the performance of its obligations hereunder. The
policy shall not contain any exclusion contrary to this Contract including but not
limited to endorsements or provisions limiting coverage for (1) contractual liability
(including but not limited to ISO CG 24 26 or 21 39); or (2) cross-liability for claims
or suits against one insured against another. Policy limits shall not be less than
$2,000,000 per occurrence for bodily injury, personal injury and property damage.
If Commercial General Liability Insurance or other form with a general aggregate
limit is used, either the general aggregate limit shall apply separately to this
project/location or the general aggregate limit shall be twice the required
occurrence limit. Defense costs shall be paid in addition to the limits.
1. Such policy shall comply with all the requirements of this Article. The limits set
forth herein shall apply separately to each insured against whom claims are
made or suits are brought, except with respect to the limits of liability. Further
the limits set forth herein shall not be construed to relieve the Contractor from
liability in excess of such coverage, nor shall it limit Contractor’s indemnification
obligations to the City, and shall not preclude the City from taking such other
actions available to the City under other provisions of the Contract Documents
or law.
2. All general liability policies provided pursuant to the provisions of this Article
shall comply with the provisions of the Contract Documents.
3. All general liability policies shall be written to apply to all bodily injury, including
death, property damage, personal injury, owned and non-owned equipment,
blanket contractual liability, completed operations liability, explosion, collapse,
under-ground excavation, removal of lateral support, and other covered loss,
however occasioned, occurring during the policy term, and shall specifically
insure the performance by Contractor of that part of the indemnification
contained in these General Conditions relating to liability for injury to or death
of persons and damage to property.
3.A.3.c
Packet Pg. 68 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 31 of 92
4. If the coverage contains one or more aggregate limits, a minimum of 50% of
any such aggregate limit must remain available at all times; if over 50% of any
aggregate limit has been paid or reserved, the City may require additional
coverage to be purchased by Contractor to restore the required limits.
Contractor may combine primary, umbrella, and as broad as possible excess
liability coverage to achieve the total limits indicated above. Any umbrella or
excess liability policy shall include the additional insured endorsement
described in the Contract Documents.
5. All policies of general liability insurance shall permit and Contractor does hereby
waive any right of subrogation which any insurer of Contractor may acquire from
Contractor by virtue of the payment of any loss.
F. Automobile Liability Insurance. Contractor shall provide Automobile Liability
Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at
least, one million dollars ($1,000,000) per accident for bodily injury and property
damage. Such insurance shall provide coverage with respect to the ownership,
operation, maintenance, use, loading or unloading of any auto owned, leased,
hired or borrowed by Contractor or for which Contractor is responsible, in a form
and with insurance companies acceptable to the City. All policies of automobile
insurance shall permit and Contractor does hereby waive any right of
subrogation which any insurer of Contractor may acquire from Contractor by
virtue of the payment of any loss.
G. Builder’s Risk [“All Risk”].
1. It is the Contractor’s responsibility to maintain or cause to be maintained
Builder’s Risk [“All Risk”] extended coverage insurance on all work, material,
equipment, appliances, tools, and structures that are or will become part of the
Work and subject to loss or damage by fire, and vandalism and malicious
mischief, in an amount to cover 100% of the replacement cost. The City accepts
no responsibility for the Work until the Work is formally accepted by the City.
The Contractor shall provide a certificate evidencing this coverage before
commencing performance of the Work.
2. The named insureds shall be Contractor, all Subcontractors of any tier
(excluding those solely responsible for design work), Suppliers, and the City, its
elected officials, officers, employees, agents and authorized volunteers, as their
interests may appear. Contractor shall not be required to maintain property
insurance for any portion of the Work following acceptance by the City.
3. Policy shall be provided for replacement value on an “all risk” basis. There shall
be no coinsurance penalty provision in any such policy. Policy must include:
(1) coverage for any ensuing loss from faulty workmanship, nonconforming
work, omission or deficiency in design or specifications; (2) coverage against
machinery accidents and operational testing; (3) coverage for removal of debris,
and insuring the buildings, structures, machinery, equipment, materials,
facilities, fixtures and all other properties constituting a part of the Project; (4)
transit coverage, including ocean marine coverage (unless insured by the
3.A.3.c
Packet Pg. 69 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 32 of 92
supplier), with sub-limits sufficient to insure the full replacement value of any
key equipment item; and (5) coverage with sub-limits sufficient to insure the full
replacement value of any property or equipment stored either on or off the Site.
Such insurance shall be on a form acceptable to the City to ensure adequacy
and sublimit.
4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any
extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit.
c. Coverage shall include Contractor’s tools and equipment.
d. Insurance shall include boiler, machinery and material hoist coverage.
H. Professional Liability Insurance. All architects, engineers, consultants or design
professionals retained by Contractor shall also procure and maintain, for a period
of five (5) years following completion of the Contract, errors and omissions liability
insurance with a limit of not less than $1,000,000 per occurrence. This insurance
shall name the City, its directors, officials, officers, employees, agents and
volunteers as additional and insureds with respect to Work performed, and shall
otherwise comply with all requirements of this Section. Defense costs shall be
paid in addition to the limits.
I. Contractor’s Pollution Liability Coverage. Environmental Impairment Liability
Insurance shall be written on a Contractor’s Pollution Liability form or other form
acceptable to the City providing coverage for liability arising out of sudden,
accidental and gradual pollution and remediation. The policy limit shall be no less
than $1,000,000 dollars per claim and in the aggregate. All activities contemplated
in this Contract shall be specifically scheduled on the policy as “covered
operations.” The policy shall provide coverage for the hauling of waste from the
Project site to the final disposal location, including non-owned disposal sites.
J. Contractor shall require all tiers of Subcontractors working under this Contract to
provide the insurance required under this Article unless otherwise agreed to in
writing by the City. Contractor shall make certain that any and all Subcontractors
hired by Contractor are insured in accordance with this Contract. If any
Subcontractor’s coverage does not comply with the foregoing provisions,
Contractor shall indemnify and hold the City harmless from any damage, loss,
cost, or expense, including attorneys’ fees, incurred by the City as a result thereof.
K. Notwithstanding the minimum limits set forth in this Contract for any type of
insurance coverage, if Contractor maintains higher limits than the minimums
shown above, the City requires and shall be entitled to coverage for the higher
limits maintained by the Contractor. Any available insurance proceeds in excess
of the specified minimum limits of insurance and coverage shall be available to
the City. L. Form and Proof of Carriage of Insurance.
3.A.3.c
Packet Pg. 70 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 33 of 92
1. Any insurance carrier providing insurance coverage required by the Contract
Documents shall be admitted to and authorized to do business in the State of
California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall
have an A.M. Best rating of not less than an A:VII. Insurance deductibles or
selfinsured retentions must be declared by the Contractor. At the election of the
City the Contractor shall either 1) reduce or eliminate such deductibles or self-
insured retentions, or 2) procure a bond which guarantees payment of losses
and related investigations, claims administration, and defense costs and
expenses. If umbrella or excess liability coverage is used to meet any required
limit(s) specified herein, the Contractor shall provide a “follow form”
endorsement satisfactory to the City indicating that such coverage is subject to
the same terms and conditions as the underlying liability policy.
2. Each insurance policy required by this Contract shall be endorsed to state that:
(1) coverage shall not be suspended, voided, reduced or cancelled except after
thirty (30) days prior written notice by certified mail, return receipt requested,
has been given to the City; and (2) any failure to comply with reporting or other
provisions of the policies, including breaches of warranties, shall not affect
coverage provided to the City, its officials, officers, agents, employees, and
volunteers.
3. The Certificates(s) and policies of insurance shall contain or shall be endorsed
to contain the covenant of the insurance carrier(s) that it shall provide no less
than thirty (30) days written notice be given to the City prior to any material
modification or cancellation of such insurance. In the event of a material
modification or cancellation of coverage, the City may terminate the Contract or
stop the Work in accordance with the Contract Documents, unless the City
receives, prior to such effective date, another properly executed original
Certificate of Insurance and original copies of endorsements or certified original
policies, including all endorsements and attachments thereto evidencing
coverage’s set forth herein and the insurance required herein is in full force and
effect. Contractor shall not take possession, or use the Site, or commence
operations under this Contract until the City has been furnished original
Certificate(s) of Insurance and certified original copies of endorsements or
policies of insurance including all endorsements and any and all other
attachments as required in this Article. The original endorsements for each
policy and the Certificate of Insurance shall be signed by an individual
authorized by the insurance carrier to do so on its behalf.
4. The Certificate(s) of Insurance, policies and endorsements shall so covenant
and shall be construed as primary, and the City’s insurance and/or deductibles
and/or self-insured retentions or self-insured programs shall not be construed
as contributory.
5. The City reserves the right to adjust the monetary limits and types of insurance
coverages during the term of this Contract including any extension thereof if, in
the City’s reasonable judgment, the amount or type of insurance carried by the
Contractor becomes inadequate.
3.A.3.c
Packet Pg. 71 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 34 of 92
6. Contractor shall report to the City, in addition to the Contractor’s insurer, any
and all insurance claims submitted by the Contractor in connection with the
Work under this Contract.
7. Products/completed operations coverage shall extend a minimum of three years
after the project completion. Coverage shall be included on behalf of the insured
for covered claims arising out of the actions of independent contractors. If the
insured is using subcontractors, the policy must include work performed “by or
on behalf” of the insured. Policy shall contain no language that would invalidate
or remove the insurer’s duty to defend or indemnify for claims or suits expressly
excluded from coverage. Policy shall specifically provide for a duty to defend on
the part of the insurer. The City, its officers, officials, agents employees, and
volunteers shall be included as insureds under the policy.
ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS
5.1 Applicable Laws.
A. Contractor shall give all notices required by and shall comply with all Applicable
Laws applicable to the performance of the Work. Except where otherwise
expressly required by Applicable Laws, neither the City nor the Engineer shall be
responsible for monitoring Contractor’s compliance with any Applicable Laws. If
Contractor performs any Work knowing or having reason to know that it is contrary
to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects,
attorneys, and other professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to such Work.
5.2 Permits and Licenses.
A. Contractor will apply for necessary encroachment permits for Work within the
public rights-of-way. City will waive encroachment permit fee(s) and issue
encroachment permit(s) upon approval. All other necessary permits and licenses
necessary for prosecution of the Work shall be secured and paid for by
Contractor, including, but not limited to, permits, licenses and fees required by
agencies with authority in the jurisdiction in which the Work will be located, unless
otherwise expressly provided by the Contract Documents. The Contractor shall
arrange and pay for all off-site inspection of the Work related to permits and
licenses, including certification, required by the Contract Documents or by
governing authorities, except for such offsite inspections delineated as the City’s
responsibility pursuant to the Contract Documents. Before acceptance of the
Work, the Contractor shall submit all licenses, permits, certificates of inspection
and required approvals to the City.
5.3 Taxes.
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to
be paid in accordance with the Applicable Laws of the place of the Project which
are applicable during the performance of the Work. In accordance with Revenue
3.A.3.c
Packet Pg. 72 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 35 of 92
and Taxation Code section 107.6, the Contract Documents may create a
possessory interest subject to personal property taxation for which Contractor will
be responsible.
5.4 Traffic Control.
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic
control shall be performed at Contractor’s expense in accordance with the
requirements of the City and/or the local agency with jurisdiction. Costs for traffic
control plans, implementation of traffic control, or traffic signal services required
by the City shall be included in the Contractor’s Bid.
B. All warning signs and safety devices used by the Contractor to perform the Work
shall conform to the requirements contained in the State of California, Department
of Transportation’s current edition of “CA Manual on Uniform Traffic Control
Devices” or to the requirements of the local agency. The Contractor shall also be
responsible for all traffic control required by the agency having jurisdiction over
the Project on the intersecting streets. Contractor must submit a traffic control
plan to the agency having jurisdiction over the Project for approval prior to starting
Work.
C. The Contractor’s representative on the Site responsible for traffic control shall
produce evidence that he or she has completed training acceptable to the
California Department of Transportation for safety through construction zones. All
of the streets in which the Work will occur shall remain open to traffic and one
lane of traffic maintained at all times unless otherwise directed by the agency of
jurisdiction. Businesses and residences adjacent to the Work shall be notified
forty-eight (48) hours in advance of closing of driveways. The Contractor shall
make every effort to minimize the amount of public parking temporarily eliminated
due to construction in areas fronting businesses. No stockpiles of material will be
allowed in traveled rightof-ways after working hours unless otherwise approved
by the Engineer.
5.5 Safety.
A. Contractor shall be solely responsible for all safety precautions and programs in
connection with the Work. Such responsibility does not relieve Subcontractors of their
responsibility for the safety of persons or property in the performance of their work,
nor for compliance with applicable safety laws. Contractor shall comply with all
Applicable Laws relating to the safety of persons or property, or to the protection of
persons or property from damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection. Contractor shall notify owners
of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the
protection, removal, relocation, and replacement of their property. Contractor shall
be responsible for coordinating any exchange of material safety data sheets or
other hazard communication information required to be made available to or
3.A.3.c
Packet Pg. 73 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 36 of 92
exchanged between or among employers at the Site in accordance with
Applicable Laws.
B. The Contractor shall maintain emergency first aid treatment for his employees which
complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. §
651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division
1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the
availability of emergency medical services for its employees in accordance with
California Code of Regulations, Title 8, Section 1512. The Contractor shall submit
an Illness and Injury Prevention Program and a Project Site specific safety program
to the City prior to beginning Work. Contractor shall maintain a confined space
program that meets or exceeds the City’s standards. Contractor needs to make
themselves aware of the City’s safety policies and procedures, and shall meet or
exceed all City standards in areas where the City must enter to perform inspections.
5.6 Hazardous Waste.
A. The City shall not be responsible for any Hazardous Waste brought to the site by
the Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous
Waste onto the site in a manner not specified by the Contract Documents; and/or
(ii) disturbs a Hazardous Material identified in the Contract Documents, the
Contractor shall hire a qualified remediation contractor at Contractor’s sole cost
to eliminate the condition as soon as possible. Under no circumstance shall the
Contractor perform Work for which it is not qualified. The City, in its sole
discretion, may require the Contractor to retain at Contractor’s cost an
independent testing laboratory.
B. If the Contractor encounters Hazardous Waste which may cause foreseeable
injury or damage, Contractor shall immediately: (i) secure or otherwise isolate
such condition; (ii) stop all Work in connection with such material or substance
(except in an emergency situation); and (iii) notify the City (and promptly thereafter
confirm such notice in writing). The City shall contract for any services required to
directly remove and/or abate Hazardous Waste, if required, and shall not require
the Contractor to subcontract for such services. The Work in the affected area
shall not thereafter be resumed except by written agreement of the City and
Contractor.
C. Contractor shall indemnify and hold harmless the City from and against claims,
damages, losses and expenses, arising from a Hazardous Waste on the Project
Site, if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or
levels which would classify the material as a state of California or federal
hazardous waste, and was either i) shown on the Contract Documents or
information available to bidders; or (ii) brought to the site by Contractor. Nothing
in this paragraph shall obligate the Contractor to indemnify the City in the event
of the sole or active negligence or willful misconduct of the City, its officers,
agents, or employees.
5.7 Sanitary Facilities.
3.A.3.c
Packet Pg. 74 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 37 of 92
A. Contractor shall provide sanitary temporary toilet buildings and hand washing
facilities for the use of all workers. All toilets and hand washing facilities shall
comply with Applicable Laws. Toilets shall be placed inside sealed secondary
containment devices installed on a flat, level surface. Accumulated liquids in the
secondary containment devices shall be properly removed and legally disposed
without spillage onto the ground. Toilets shall be kept supplied with toilet paper
and shall have workable door fasteners. Toilets and hand washing facilities shall
be serviced no less than once weekly and shall be present in a quantity of not
less than 1 per 20 workers as required by Cal/OSHA regulations. The toilets and
hand washing facilities shall be maintained in a sanitary condition at all times. Use
of toilet and hand washing facilities in the Work under construction shall not be
permitted. Any other sanitary facilities required by Cal/OSHA shall be the
responsibility of the Contractor.
5.8 Dust Control.
A. Contractor, at its expense, shall maintain all excavations, embankments, haul
roads, permanent access roads, plant sites, waste disposal areas, borrow areas,
and all other work areas free from dust. Industry accepted methods of dust control
suitable for the area involved, such as sprinkling, chemical treatment, light
bituminous treatment or similar methods, will be permitted.
5.9 Air Pollution Control.
A. Contractor shall comply with all air pollution control rules, regulations, ordinances
and statutes. All containers of paint, thinner, curing compound, solvent or liquid
asphalt shall be labeled to indicate that the contents fully comply with the
applicable material requirements.
B. Without limiting the foregoing, Contractor must fully comply with all applicable
laws, rules and regulations in furnishing or using equipment and/or providing
services, including, but not limited to, emissions limits and permitting
requirements imposed by the Air Quality Management District with jurisdiction
over the Project and/or California Air Resources Board (CARB). Contractor shall
specifically be aware of the application of these limits and requirements to
"portable equipment", which definition includes any item of equipment with a fuel-
powered engine. Contractor shall indemnify the City against any fines or penalties
imposed by the air quality management district, CARB, or any other governmental
or regulatory agency for its violations of Applicable Laws as well as those of its
Subcontractors or others for whom Contractor is responsible under its indemnity
obligations provided for in the Contract Documents.
5.10 Water Quality Management and Compliance.
A. Storm, surface, ground, nuisance, or other waters may be encountered at various
times during construction of the Work. The Contractor hereby acknowledges that
it has investigated the risk arising from such waters, has prepared its Bid
accordingly, and assumes any and all risks and liabilities arising therefrom.
3.A.3.c
Packet Pg. 75 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 38 of 92
B. Contractor shall keep itself and all Subcontractors, staff, and employees fully
informed of and in compliance with all local, state and federal laws, rules and
regulations that may impact, or be implicated by the performance of the Work
including, without limitation, all applicable provisions regulating discharges of
storm water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.);
the California Porter-Cologne Water Quality Control Act (Cal Water Code §§
1300014950); and any and all regulations, policies, or permits issued pursuant to
any such authority. These include, but are not limited to California State Water
Resources Control Board Order Number 2009-0009-DWQ (NPDES Permit No.
CAS000002), as amended by Order Numbers 2010-0014-DWQ, 2012-0006-
DWQ, and any subsequent amendment to or renewal thereof, State Water
Resources Control Board Order No. 2013-0001-DWQ (NPDES Order No.
CAS000004), Santa Ana Regional Water Quality Control Board No. R8-2010-
0036 (NPDES No. CAS618036), and any amendment or renewal thereof.
C. Contractor shall comply with all conditions of the State Water Resources Control
Board National Pollutant Discharge Elimination System General Permit for Waste
Discharge Requirements for Discharges of Storm Water Runoff Associated with
Construction Activity (“Construction General Permit”) for all construction activity
which results in the disturbance of in excess of one acre of total land area or which
is part of a larger common area of development or sale. Contractor shall comply
with the lawful requirements of the City, and any other applicable municipality,
drainage district, or other local agency with jurisdiction over the location where
the Work is to be conducted, regarding discharges of storm water to separate
storm drain systems or other watercourses under their jurisdiction, including
applicable requirements in municipal storm water management programs.
D. Failure to comply with the Construction General Permit, laws, regulations, and
ordinances listed in this Article is a violation of federal and state law.
Notwithstanding any other indemnity contained in these Contract Documents,
Contractor agrees to indemnify and hold harmless the City, its officials, officers,
agents, employees and authorized volunteers from and against any and all
claims, demands, fees, costs, expenses, or losses or liabilities of any kind or
nature which the City, its officials, officers, agents, employees and authorized
volunteers may sustain or incur for noncompliance with the Construction General
Permit, laws, regulations, and ordinances listed above, arising out of or in
connection with the Work, except for liability resulting from t he sole established
negligence, willful misconduct or active negligence of the City, its officials,
officers, agents, employees or authorized volunteers. The City reserves the right
to defend any enforcement action or civil action brought against the City for
Contractor’s failure to comply with any applicable water quality law, regulation, or
policy. Contractor hereby agrees to be bound by, and to reimburse the City for
the costs associated with, any settlement reached between the City and any
relevant enforcement entity.
5.11 Environmental Quality Protection.
A. The Contractor shall comply with all requirements of applicable federal, state, and
local environmental rules and regulations. Any infractions of said rules and
3.A.3.c
Packet Pg. 76 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 39 of 92
regulations by the Contractor during the term of the Contract, which result in
penalties, will be the responsibility of the Contractor. The City operates under a
number of environmental permits issued by various agencies. If due to an action,
inaction, or negligence by the Contractor, the City becomes subject to
noncompliance penalties, the cost of such penalties shall be borne by the
Contractor.
B. The Contractor shall exercise care to preserve the natural landscape and
vegetation, and shall conduct operations so as to prevent unnecessary
destruction, scarring, or defacing of the natural surroundings in the vicinity of the
Work. Movement of crews and equipment within the rights-of-way and over
routes provided
for access to the Work shall be performed in a manner to prevent damage to
property. When no longer required, construction roads shall be restored to original
contours. Upon completion of the Work, and following removal of construction
facilities and required cleanup, land used for construction purposes and not
required for the completed installation shall be scarified and regraded, as
required, so that all surfaces are left in a condition that will facilitate natural
revegetation, provide for proper drainage, and prevent erosion.
C. If, in the performance of the Work, evidence of the possible occurrence of any
Federally listed threatened or endangered plant or animal is discovered, the
Contractor shall notify the City immediately, giving the location and nature of the
findings. Written confirmation of the evidence, location and nature of the findings
shall be forwarded to City within two (2) Days. The Contractor shall immediately
cease all construction activities in the immediate area of the discovery to the
extent necessary to protect the endangered plant or animal. If directed by the City,
Contractor will refrain from working in the immediate area, suspend the Work in
its entirety, or alter its performance to ensure full compliance with all applicable
permits, laws and regulations. Any City directed changes to the Work as a result
of a siting will be pursuant to the Contract Documents. Any costs or delays
incurred by City or the Contractor due to unreasonable or false notification of an
endangered plant or animal will be borne by the Contractor.
D. If, in the performance of the Work, Contractor should unearth cultural resources
(for example, human remains, animal bones, stone tools, artifacts and/or midden
deposits) through excavation, grading, watering or other means, the Contractor
shall notify the construction/archeological monitor and/or the City immediately,
giving the location and nature of the findings. Written confirmation of the evidence,
location and nature of the findings shall be forwarded to the
construction/archeological monitor and/or City within two (2) Days. Contractor
shall immediately cease all construction activities in the immediate area of the
discovery to the extent necessary to protect the cultural resource. If directed by
the City, Contractor will refrain from working in the immediate area, suspend the
Work in its entirety, or re-sequence and/or alter its performance to ensure full
compliance with all applicable permits, laws and regulations. Should the
presence of cultural resources be confirmed, the Contractor will assist the City
and the construction/archeological monitor in the preparation and implementation
3.A.3.c
Packet Pg. 77 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 40 of 92
of a data recovery plan. The Contractor shall provide such cooperation and
assistance as may be necessary to preserve the cultural resources for removal
or other disposition. Any City directed changes to the Work as a result of the
cultural resource will be pursuant to the Contract Documents. Should Contractor,
without permission, injure, destroy, excavate, appropriate, or remove any cultural
resource on or adjacent to the Site, it will be subject to disciplinary action, arrest
and penalty under applicable law. Contractor shall be principally responsible for
all costs of mitigation and/or restoration of cultural resources related to the
unauthorized actions identified above. Contractor shall be required to pay for
unauthorized damage and mitigation costs to cultural resources (historical and
archeological resources) as a result of unauthorized activities that damage
cultural resources and shall indemnify City pursuant to the Contract Documents.
5.12 Noise Restrictions.
A. Contractor shall use only such equipment on the Work and in such state of repair
so that the emission of sound therefrom is within the noise tolerance level of that
equipment as established by Cal/OSHA. Contractor shall comply with the most
restrictive of the following: (1) local sound control and noise level rules,
regulations and ordinances and (2) the requirements contained in these Contract
Documents, including hours of operation requirements. No internal combustion
engine shall be operated on the Project without a muffler of the type
recommended by the manufacturer. Should any muffler or other control device
sustain damage or be determined to be ineffective or defective, the Contractor
shall promptly remove the equipment and shall not return said equipment to the
job until the device is repaired or replaced. Said noise and vibration level
requirements shall apply to all equipment on the job or related to the job, including
but not limited to, trucks, transit mixers or transit equipment that may or may not
be owned by the Contractor.
5.13 Diversion of Recyclable Waste Material.
A. In compliance with the applicable City’s waste reduction and recycling efforts,
Contractor shall divert all Recyclable Waste Materials to appropriate recycling
centers as required for compliance with the local jurisdiction’s waste diversion
ordinances. Contractor will be required to submit weight tickets and written proof
of diversion with its monthly progress payment requests. Contractor shall
complete and execute any certification forms required by the City or other
applicable agencies to document Contractor’s compliance with these diversion
requirements. All costs incurred for these waste diversion efforts shall be the
responsibility of the Contractor.
5.14 Workers; Contractor’s Supervision.
A. Contractor shall be an independent contractor for the City and not an employee.
Contractor understands and agrees that it and all of its employees shall not be
considered officers, employees, or agents of the City and are not entitled to
benefits of any kind normally provided employees of the City, including but not
limited to, state unemployment compensation or workers’ compensation.
3.A.3.c
Packet Pg. 78 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 41 of 92
Contractor assumes full responsibility for the acts and omissions of its employees
or agents related to the Work.
B. By executing the Contract, Contractor verifies that it fully complies with all
requirements and restrictions of state and federal law respecting the employment
of undocumented aliens, including, but not limited to, the Immigration Reform and
Control Act of 1986, as may be amended from time to time, and shall require all
Subcontractors, sub-subcontractors and consultants to comply with the same.
Each person executing this Contract on behalf of Contractor verifies that he or
she is a duly authorized officer of Contractor and that any of the following shall be
grounds for the City to terminate the Contract for cause: (1) failure of the
Contractor or its Subcontractors, sub-subcontractors or consultants to meet any
of the requirements provided for in this Article; (2) any misrepresentation or
material omission concerning compliance with such requirements; or (3) failure to
immediately remove from the Work any person found not to be in compliance with
such requirements.
C. Contractor shall at all times enforce strict discipline and good order among its
employees. Contractor shall not employ on the Project any unfit person or any
one not skilled in the Work assigned to him or her. Any person in the employ of
the Contractor whom the City may deem incompetent or unfit shall be dismissed
from the Work and shall not be employed on this Project.
D. Contractor shall continuously keep at the Project site, a competent and
experienced full-time Project superintendent acceptable to the City.
Superintendent must be able to proficiently speak, read and write in English and
shall have the authority to make decisions on behalf of the Contractor. Contractor
shall continuously provide efficient supervision of the Project.
5.15 Labor.
A. Hours of Work.
1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7,
Division 2 of the Labor Code, Contractor stipulates that eight (8) hours of labor
shall constitute a legal day’s work. The time of service of any worker employed
at any time by the Contractor or by any subcontractor on any subcontract under
this Contract upon the Work or upon any part of the Work contemplated by this
Contract is limited and restricted to eight (8) hours during any one calendar day
and 40 hours during any one calendar week, except as hereinafter provided.
Notwithstanding the provisions herein above set forth, work performed by
employees of Contractor in excess of eight (8) hours per day, and 40 hours
during any one week, shall be permitted upon this public work upon
compensation for all hours worked in excess of eight (8) hours per day at not
less than one and onehalf times the basic rate of pay.
2. The Contractor and every Subcontractor shall keep an accurate record showing
the name of and actual hours worked each calendar day and each calendar
week by each worker employed in connection with the Work or any part of the
3.A.3.c
Packet Pg. 79 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 42 of 92
Work contemplated by this Contract. The record shall be kept open at all
reasonable hours to the inspection of the City and to the Division of Labor Law
Enforcement, Department of Industrial Relations of the State of California.
3. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for
each worker employed in the execution of this Contract by the Contractor or by
any subcontractor for each calendar day during which such worker is required
or permitted to work more than eight (8) hours in any calendar day and 40 hours
in any one calendar week in violation of the provisions of Article 3 (commencing
at section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.
4. Any work necessary to be performed after regular working hours, or on
Saturdays and Sundays or other holidays, shall be performed without additional
expense to the City.
5. It shall be unlawful for any person to operate, permit, use, or cause to operate
any of the following at the Project Site, other than between the hours of 7:00
a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on Holidays,
unless otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance.
1. Pursuant to Labor Code section 1776, Contractor and all Subcontractors shall
maintain weekly certified payroll records, showing the names, addresses, Social
Security numbers, work classifications, straight time and overtime hours worked
each day and week, and the actual per diem wages paid to each journeyman,
apprentice, worker, or other employee employed by them in connection with the
Work under this Contract. Contractor shall certify under penalty of perjury that
records maintained and submitted by Contractor are true and accurate.
Contractor shall also require Subcontractor(s) to certify weekly payroll records
under penalty of perjury.
2. In accordance with Labor Code section 1771.4, the Contractor and each
Subcontractor shall furnish the certified payroll records directly to the
Department of Industrial Relations (“DIR”) on the specified interval and format
prescribed by the DIR, which may include electronic submission. Contractor
shall comply with all requirements and regulations from the DIR relating to labor
compliance monitoring and enforcement. The requirement to submit certified
payroll records directly to the Labor Commissioner under Labor Code section
1771.4 shall not apply to work performed on a public works project that is
exempt pursuant to the small project exemption specified in Labor Code Section
1771.4.
3.A.3.c
Packet Pg. 80 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 43 of 92
3. Any stop orders issued by the DIR against Contractor or any Subcontractor that
affect Contractor’s performance of Work, including any delay, shall be
Contractor’s sole responsibility. Any delay arising out of or resulting from such
stop orders shall be considered Contractor caused delay subject to any
applicable liquidated damages and shall not be compensable by the City.
Contractor shall defend, indemnify and hold the City, its officials, officers,
employees and agents free and harmless from any claim or liability arising out
of stop orders issued by the DIR against Contractor or any Subcontractor.
4. The payroll records described herein shall be certified and submitted by the
Contractor at a time designated by the City. The Contractor shall also provide
the following:
a. A certified copy of the employee’s payroll records shall be made available
for inspection or furnished to such employee or his or her authorized
representative on request.
b. A certified copy of all payroll records described herein shall be made
available for inspection or furnished upon request of the DIR.
5. Unless submitted electronically, the certified payroll records shall be on forms
provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR
or shall contain the same information as the forms provided by the DLSE.
6. Any copy of records made available for inspection as copies and furnished upon
request to the public or any public agency, the City, the Division of
Apprenticeship Standards or the Division of Labor Standards Enforcement shall
be marked or obliterated in such a manner as to prevent disclosure of an
individual's name, address and social security number. The name and address
of the Contractor awarded the Contract or performing the Contract shall not be
marked or obliterated.
7. In the event of noncompliance with the requirements of this Article, the
Contractor shall have ten (10) Days in which to comply subsequent to receipt of
written notice specifying in what respects the Contractor must comply with this
Article. Should noncompliance still be evident after such 10-day period, the
Contractor shall pay a penalty of one hundred dollars ($100.00) to the City for
each calendar day, or portion thereof, for each worker, until strict compliance is
effectuated. Upon the request of the Division of Apprenticeship Standards or
the Division of Labor Standards Enforcement, such penalties shall be withheld
from progress payment then due.
8. The responsibility for compliance with this Article shall rest upon the Contractor.
C. Prevailing Rates of Wages.
1. The Contractor is aware of the requirements of Labor Code sections 1720 et
seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section
16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing
wage rates and the performance of other requirements on certain “public works”
3.A.3.c
Packet Pg. 81 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 44 of 92
and “maintenance” projects. Since this Project involves an applicable “public
works” or “maintenance” project, as defined by the Prevailing Wage Laws, and
since the total compensation is $1,000 or more, Contractor agrees to fully
comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of
the prevailing rates of per diem wages at the commencement of this Contract
from the website of the Division of Labor Statistics and Research of the
Department of Industrial Relations located at www.dir.ca.gov. In the alternative,
the Contractor may view a copy of the prevailing rate of per diem wages which
are on file at the City and shall be made available to interested parties upon
request. Contractor shall make copies of the prevailing rates of per diem wages
for each craft, classification, or type of worker needed to perform work on the
Project available to interested parties upon request, and shall post copies at the
Contractor’s principal place of business and at the Project site. Contractor shall
defend, indemnify and hold the City, its officials, officers, employees and
authorized volunteers free and harmless from any claims, liabilities, costs,
penalties or interest arising out of any failure or allege failure to comply with the
Prevailing Wage Laws.
2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred
Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day,
or portion thereof, for each worker paid less than the prevailing wage rate as
determined by the Director of the DIR for such work or craft in which such worker
is employed for any public work done under the Contract by it or by any
Subcontractor under it. The difference between such prevailing wage rate and
the amount paid to each worker for each calendar day or portion thereof, for
which each worker was paid less than the prevailing wage rate, shall be paid to
each worker by the Contractor.
3. Contractor shall post, at appropriate conspicuous points on the Project Site, a
schedule showing all determined general prevailing wage rates and all
authorized deductions, if any, from unpaid wages actually earned.
D. Public Works Contractor Registration. Pursuant to Labor Code sections 1725.5
and 1771.1, the Contractor and its Subcontractors must be registered with the
DIR prior to the execution of a contract to perform public works. By entering into
this Contract, Contractor represents that it is aware of the registration requirement
and is currently registered with the DIR. Contractor shall maintain a current
registration for the duration of the Project. Contractor shall further include the
requirements of Labor Code sections 1725.5 and 1771.1 in any subcontract and
ensure that all Subcontractors are registered at the time this Contract is entered
into and maintain registration for the duration of the Project. Notwithstanding the
foregoing, the contractor registration requirements mandated by Labor Code
Sections 1725.5 and 1771.1 shall not apply to work performed on a public works
project that is exempt pursuant to the small project exemption specified in Labor
Code Sections 1725.5 and 1771.1.
E. Employment of Apprentices. Contractor and all Subcontractors shall comply with
the requirements of Labor Code sections 1777.5 and 1777.6 in the employment
3.A.3.c
Packet Pg. 82 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 45 of 92
of apprentices. Information relative to apprenticeship standards, wage schedules,
and other requirements may be obtained from the Director of Industrial Relations,
ex officio the Administrator of Apprenticeship, San Francisco, California, or from
the Division of Apprenticeship Standards and its branch offices. Knowing
violations of Labor Code section 1777.5 will result in forfeiture not to exceed one
hundred dollars ($100.00) for each calendar day of non-compliance pursuant to
Labor Code section 1777.7.
F. Nondiscrimination/Equal Employment Opportunity. Pursuant to Labor Code
section 1735 and other applicable provisions of law, the Contractor and its
Subcontractors shall not discriminate against any employee or applicant for
employment because of race, religious creed, color, national origin, ancestry,
physical disability, mental disability, medical condition, marital status, sex, age,
sexual orientation, or any other classifications protected by law on this Project.
The Contractor will take affirmative action to insure that employees are treated
during employment or training without regard to their race, religious creed, color,
national origin, ancestry, physical disability, mental disability, medical condition,
marital status, sex, age, sexual orientation, or any other classifications protected
by law.
G. Debarment of Contractors and Subcontractors. Contractors or Subcontractors
may not perform work on a public works project with a subcontractor who is
ineligible to perform work on a public project pursuant to Labor Code section
1777.1 or 1777.7. Any contract on a public works project entered into between a
contractor and a debarred subcontractor is void as a matter of law. A debarred
subcontractor may not receive any public money for performing work as a
subcontractor on a public works contract. Any public money that is paid, or may
have been paid to a debarred subcontractor by a contractor on the project shall
be returned to the City. The Contractor shall be responsible for the payment of
wages to workers of a debarred subcontractor who has been allowed to work on
the Project.
5.16 Subcontracts.
A. Contractor agrees to bind every Subcontractor to the terms of the Contract
Documents as far as such terms are applicable to Subcontractor’s portion of the
Work. Contractor shall be as fully responsible to the City for the acts and
omissions of its Subcontractors and of persons either directly or indirectly
employed by its Subcontractors, as Contractor is for acts and omissions of
persons directly employed by Contractor. Nothing contained in these Contract
Documents shall create any contractual relationship between any Subcontractor
and the City. The City reserves the right to accept all Subcontractors. The City’s
acceptance of any Subcontractor under this Contract shall not in any way relieve
Contractor of its obligations in the Contract Documents. Prior to substituting any
Subcontractor listed in the Bid Forms, Contractor must comply with the
requirements of the Subletting and Subcontracting Fair Practices Act pursuant to
California Public Contract Code section 4100 et seq.
5.17 Progress Meetings.
3.A.3.c
Packet Pg. 83 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 46 of 92
A. The Contractor shall schedule and hold regular progress meetings at least weekly
and at other times as requested by Engineer or as required by progress of the
Work. The Contractor and City shall attend each meeting. Contractor may at its
discretion request attendance by representatives of its Suppliers, manufacturers,
and other Subcontractors. The purpose of the meetings is to review the progress
of the Work, maintain coordination of efforts, discuss changes in scheduling, and
resolve other problems which may develop. During each meeting, the Contractor
shall present any issues which may impact its progress with a view to resolve
these issues expeditiously.
5.18 Submittals
A. Schedule of Submittals. Within five (5) Days after the Notice to Proceed (unless
otherwise specified in the Contract Documents), Contractor will prepare and deliver
a Schedule of Submittals to the City that has been fully integrated with the progress
schedule and identifies each Submittal required by the Contract Documents as well
as the date on which Contractor will deliver each Submittal to the City. Each Submittal
must be delivered to the City at least thirty (30) Days prior to the date the material or
equipment is scheduled to be incorporated into the Work. The Contractor is
responsible for any schedule delays resulting from the Submittal process. B.
Submittal Procedures.
1. Contractor will follow the following procedures for each Submittal, Shop
Drawing and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised
Submittals with original number and sequential alphabetic suffix.
c. Each Submittal will identify the Project, Contractor, Subcontractor and
Supplier, pertinent Drawing and detail number, and Specification Section
number appropriate to Submittal.
d. By transmitting a Submittal, Contractor certifies it has reviewed and
approved each Submittal, verified products required, field dimensions,
adjacent construction Work, and that coordination of information is
according to requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system
limitations that may differ and/or be detrimental to successful
performance of completed Work.
f. When Submittal is revised for resubmission, Contractor shall promptly
address the City’s comments and resubmit. Contractor shall identify
changes made since previous submission.
g. The City’s review of Shop Drawings shall not relieve Contractor from
responsibility for deviations from the Contract Documents unless
Contractor has, in writing, called the City’s attention to such deviations at
3.A.3.c
Packet Pg. 84 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 47 of 92
time of submission and the City has taken no exception to the deviation.
The City’s review of Shop Drawings shall not relieve Contractor from
responsibility for errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the
City will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting
from incomplete Submittals are not the responsibility of the City.
j. Contractor shall not be entitled to any extension of the Contract Times
as a result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of
Submittals unless otherwise specified in the Contract Documents.
2. Where a Submittal, Shop Drawing or Sample is required by the Contract
Documents or the Schedule of Submittals, any related Work performed prior
to the City review and approval of the pertinent submittal will be performed at
the risk and sole expense and responsibility of Contractor.
C. Schedule Milestone for Submittals. Contractor must submit all Submittals
required by the Contract Documents in accordance with the Schedule of
Submittals. If Contractor fails to submit the Submittals in accordance with the
Schedule of Submittals, Contractor will be solely liable for any delays or impacts
caused by the delayed Submittal, whether direct or indirect. Contractor will be
liable for the time calculated from the date the Submittal is due until the date a
compliant Submittal is made. A compliant Submittal will be one that is complete
and satisfies the requirements of the Contract Documents.
5.19 Shop Drawings and Sample Submittal Procedures.
A. Before submitting each Shop Drawing or Sample, Contractor shall have:
1. Reviewed and coordinated each Shop Drawing or Sample with other Shop
Drawings and Samples and with the requirements of the Work and the
Contract Documents;
2. Determined and verified all field measurements, quantities, dimensions,
specified performance and design criteria, installation requirements,
materials, catalog numbers, and similar information with respect thereto;
3. Determined and verified the suitability of all materials offered with respect to
the indicated application, fabrication, shipping, handling, storage, assembly,
and installation pertaining to the performance of the Work; and
4. Determined and verified all information relative to Contractor’s responsibilities
for means, methods, techniques, sequences, and procedures of construction,
and safety precautions and programs incident thereto.
3.A.3.c
Packet Pg. 85 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 48 of 92
B. With each Submittal, Contractor shall give the City specific written notice of any
variations that the Shop Drawing or Sample may have from the requirements of the
Contract Documents. This notice shall be both a written communication separate
from the Shop Drawings or Sample Submittal and, in addition, a specific notation
made on each Shop Drawing or Sample submitted to the City for review and approval
of each such variation. C. Shop Drawings.
1. Data shown on the Shop Drawings will be complete with respect to quantities,
dimensions, specified performance and design criteria, materials, and similar
data to show the City the services, materials, and equipment Contractor
proposes to provide and to enable the City to review the information for
assessing conformance with information given and design concept expressed
in Contract Documents.
2. When required by individual Specification sections, provide Shop Drawings
signed and sealed by a professional engineer responsible for designing
components shown on Shop Drawings. Shop Drawings must include signed
and sealed calculations to support design in a form suitable for submission to
and approval by authorities having jurisdiction.
3. Shop Drawings for steel structures shall consist of shop details, erection and
other working Drawings showing details, dimensions, sizes of members and
other information necessary for the complete fabrication and erection of the
metal work.
4. Shop Drawings of concrete structures shall consist of such detailed drawings
as may reasonably be required for the successful prosecution of the Work
and which are not included in the Drawings furnished by the Engineer. These
may include drawings for false work, bracing, centering and form work,
masonry layout diagrams, and diagrams for bent reinforcement.
5. Contractor shall make revisions and provide additional information when
required by authorities having jurisdiction.
D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data
such as catalog numbers, the use for which intended and other data as required
to enable the City to review the submittal for assessing conformance with
information given and design concept expressed in Contract Documents.
Samples should be of appropriate size and detail to assess functional, aesthetic,
color, texture, patterns and finish selection. E. City’s Review.
1. The City will review Shop Drawings and Samples in accordance with the
Schedule of Submittals. The City’s review and acceptance will be only to
determine if the items covered by the Submittals will, after installation or
incorporation in the Work, conform to the information given in the Contract
Documents and be compatible with the design concept of the completed
Project as a functioning whole as indicated by the Contract Documents.
2. The City review and approval will not extend to means, methods, techniques,
sequences, or procedures of construction (except where a particular means,
method, technique, sequence, or procedure of construction is specifically and
3.A.3.c
Packet Pg. 86 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 49 of 92
expressly called for by the Contract Documents) or to safety precautions or
programs incident thereto. The review and approval of a separate item as
such will not indicate approval of the assembly in which the item functions.
3. The City’s review and acceptance shall not relieve Contractor from
responsibility for any variation from the requirements of the Contract
Documents unless the City has given written approval of each such variation
by specific written notation thereof incorporated in or accompanying the Shop
Drawing or Sample.
F. Resubmittal Procedures. Contractor shall make corrections required by the City
and shall return corrected Shop Drawings and submit, as required, new Samples
for review and approval. Contractor shall direct specific attention in writing to
revisions other than the corrections called for by the City on previous Submittals.
5.20 Record (“As-Built”) Drawings.
A. The Contractor shall maintain one record set of Contract Documents at the Site
or digitally in an acceptable format. On these, it shall mark all Project conditions,
locations, configurations, and any other changes or deviations which may vary
from the information represented in the original Contract Documents, including
buried or concealed construction and utility features which are revealed during
the course of construction. Special attention shall be given to recording the
horizontal and vertical location of all buried utilities that differ from the locations
indicated, or which were not indicated on the Drawings. For all Projects involving
the installation of any pipeline, Contractor shall survey and record the top of the
pipe at a minimum of every 100 linear feet, and at each bend, recording both the
horizontal and vertical locations. Drawings shall be supplemented by any detailed
sketches as necessary or directed to fully indicate the Work as actually
constructed. Any required as-built drawings of civil engineering elements of the
Work shall be prepared by a registered civil engineer.
B. These master Record Drawings of the as-built conditions, including all revisions
made necessary by Addenda and Change Orders, shall be maintained up-to-date
during the progress of the Project. Red ink shall be used for alterations and notes.
Notes shall identify relevant Change Orders by number and date. Record
Drawings shall be accessible to the Engineer at all times during the construction
period. Failure on the Contractor’s part to keep Record Drawings current could
result in withholding partial payment.
C. Upon completion of the Project and as a condition of final acceptance, the
Contractor shall finalize and deliver a complete set of Record Drawings to the
Engineer. The information submitted by the Contractor will be assumed to be
correct, and the Contractor shall be responsible for, and liable to the City, for the
accuracy of such information, and for any errors or omissions which may or may
not appear on the Record Drawings.
5.21 Layout and Field Engineering.
3.A.3.c
Packet Pg. 87 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 50 of 92
A. The Contractor shall utilize a properly licensed surveyor to perform all layout
surveys required for the control and completion of the Work and all necessary
surveys to compute quantities of Work performed.
5.22 Separate Contracts and Cooperation.
A. Separate Contracts. The City reserves the right to let other contracts in
connection with this Work or on the Project site. Contractor shall permit other
contractors reasonable access and storage of their materials and execution of
their work and shall properly connect and coordinate its Work with theirs. To
ensure proper execution of its subsequent Work, Contractor shall immediately
inspect work already in place and shall at once report to the Engineer any
problems with the Work in place or discrepancies with the Contract Documents.
B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the
Project and nature of any other contracts that have been or may be awarded by
the City in prosecution of the Project to the end that Contractor may perform this
Contract in the light of such other contracts, if any. Nothing herein contained shall
be interpreted as granting to Contractor exclusive occupancy at site of the Project.
Contractor shall not cause any unnecessary hindrance or delay to any other
contractor working on the Project. If simultaneous execution of any contract for
the Project is likely to cause interference with performance of some other contract
or contracts, the Engineer shall decide which Contractor shall cease Work
temporarily and which contractor shall continue or whether work can be
coordinated so that contractors may proceed simultaneously. The City shall not
be responsible for any damages suffered or for extra costs incurred by Contractor
resulting directly or indirectly from award, performance, or attempted performance
of any other contract or contracts on the Project Site.
5.23 Work Site.
A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights-
of entry for the Work will be provided by the City. Unless otherwise specified in
the Special Provisions, the Contractor shall make arrangements, pay for, and
assume all responsibility for acquiring, using, and disposing of additional work
areas and facilities temporarily required. The Contractor shall indemnify and hold
the City harmless from all claims for damages caused by such actions. Contractor
shall confine construction equipment, the storage of materials and equipment,
and the operations of workers to the Site and other areas permitted by Applicable
Laws, and shall not unreasonably encumber the Site and other areas with
construction equipment or other materials or equipment. Contractor shall assume
full responsibility for any damage to any such land or area, or to City or occupant
thereof, or of any adjacent land or areas resulting from the performance of the
Work.
B. Site Maintenance. During the progress of the Work, Contractor shall keep the
Site and other areas free from accumulations of waste materials, rubbish, and
other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to Applicable Laws. The Contractor shall furnish trash bins
3.A.3.c
Packet Pg. 88 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 51 of 92
for all debris from construction. All debris shall be placed in trash bins daily. Forms
and false-work that are to be re-used shall be stacked neatly concurrently with
their removal. Forms and false-work that are not to be re-used shall be disposed
of concurrently with their removal.
C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and
make it ready for utilization by the City. At the completion of the Work Contractor
shall remove from the Site all tools, appliances, construction equipment and
machinery, and surplus materials and shall restore to original condition all
property not designated for alteration by the Contract Documents.
5.24 Utility Usage.
A. All temporary utilities, including but not limited to electricity, water, gas, and
telephone, used on the Work shall be furnished and paid for by Contractor.
Contractor shall provide necessary temporary distribution systems, including
meters, if necessary, from distribution points to points on the Work where the
utility is needed. Upon completion of the Work, Contractor shall remove all
temporary distribution systems. Contractor shall provide necessary and adequate
utilities and pay all costs for water, electricity, gas, oil, and sewer charges required
for completion of the Work, including but not limited to startup and testing required
in the Contract Documents. All permanent meters installed shall be listed in the
Contractor’s name until the Work is accepted. For Work to be performed in
existing City facilities, Contractor may use the City’s existing utilities, provided
such use is reasonable under the circumstances. If Contractor uses the City
utilities, it will not need to compensate the City for reasonably consumption of
utilities, but Contractor will be responsible for any excessive, unreasonable or
wasteful utility usage. Amounts due the City under this section may be deducted
from progress payments.
5.25 Protection of Work and Property.
A. The Contractor shall digitally record video and take photographs of the Project
site and adjacent improvements in a manner and quality that clearly depicts the
existing condition of the Project Site and adjacent improvements immediately
prior to the start of Work (minimum 1080p video and 4MP photo). All videos and
photographs shall be date and time stamped. The Contractor shall submit the
video and photos in digital format on a memory stick before the commencement
of Work, along with a map outlining the route and locations of the videos and/or
photographs. The Contractor shall be responsible for all damages to persons or
property that occur as a result of the Work. Contractor shall be responsible for the
proper care and protection of all materials delivered and Work performed until
completion and final acceptance by the City. All Work shall be solely at the
Contractor’s risk.
B. Contractor shall adequately protect adjacent property from settlement or loss of
lateral support as necessary. Contractor shall comply with all applicable safety
laws and building codes to prevent accidents or injury to persons on, about, or
adjacent to the Project site where Work is being performed. Contractor shall erect
3.A.3.c
Packet Pg. 89 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 52 of 92
and properly maintain at all times, as required by field conditions and progress of
work, all necessary safeguards, signs, barriers, lights, and watchmen for
protection of workers and the public, and shall post danger signs warning against
hazards created in the course of construction. Contractor shall provide such heat,
covering, and enclosures as are necessary to protect all Work, materials,
equipment, appliances, and tools against damage by weather conditions.
C. Contractor shall take adequate precautions to protect existing sidewalks, curbs,
pavements, utilities, and other adjoining property and structures, and to avoid
damage thereto, and Contractor shall repair any damage thereto caused by the
Work operations. Contractor shall:
1. Enclose the working area with a substantial barricade, and arrange work to
cause minimum amount of inconvenience and danger to the public.
2. Provide substantial barricades around any shrubs or trees indicated to be
preserved.
3. Deliver materials to the Site over a route designated by the City.
4. Confine Contractor’s apparatus, the storage of materials, and the operations
of its workers to limits required by law, ordinances, permits, or directions of
the City. Contractor shall not unreasonably encumber the Site with its
materials.
5. Take care to prevent disturbing or covering any survey markers, monuments,
or other devices marking property boundaries or corners. If such markers are
disturbed by accident, they shall be replaced by a civil engineer or land
surveyor acceptable to the City, at no cost to the City.
6. Ensure that existing facilities, fences and other structures are all adequately
protected and that, upon completion of all Work, all facilities that may have
been damaged are restored to a condition acceptable to the City.
7. Preserve and protect from injury all buildings, pole lines and all directional,
warning and mileage signs that have been placed within the right-of-way.
8. At the completion of work each day, leave the Work and the Site in a clean,
safe condition.
9. Comply with any stage construction and/or traffic handling plans. Access to
residences and businesses shall be maintained at all times, except with the
City’s written approval. Any request for approval to reduce or restrict access
to residences and business must be submitted to the City at least seven (7)
Days in advance, and the City may issue or withhold approval in its sole
discretion.
D. These precautionary measures will apply continuously and not be limited to
normal working hours. Full compensation for the work involved in the protection
and preservation of life, safety and property as above specified shall be
3.A.3.c
Packet Pg. 90 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 53 of 92
considered as included in the prices paid for the various contract items of Work,
and no additional allowance will be made therefor.
E. Should damage to persons or property occur as a result of the Work, Contractor
shall promptly notify the City, in writing. Contractor shall be responsible for proper
investigation, documentation, including video or photography, to adequately
memorialize and make a record of what transpired. The City shall be entitled to
inspect and copy any such documentation, video, or photographs. Contractor
shall maintain all investigation documentation including video and/or photographs
for a minimum of four (4) years following completion of the Project.
5.26 Emergencies.
A. In emergencies affecting the safety or protection of persons or the Work or
Property at the Site or adjacent thereto, the Contractor, without special instruction
or authorization from the City or the Engineer, is obligated to act to prevent
threatened damage, injury or loss. The Contractor shall give the Engineer prompt
written notice if the Contractor believes that any significant changes in the Work
or variations from the Contract Documents have been caused thereby.
5.27 California Air Resources Board Regulations.
A. To the extent applicable, Contractor, shall comply, and shall ensure all
Subcontractors comply, with all requirements of the most current version of the
California Air Resources Board (“CARB”) including, without limitation, all
applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9
and all pending amendments (“Regulation”).
B. Throughout Project, and for five (5) years thereafter, Contractor shall make
available for inspection and copying any and all documents or information
associated with Contractor’s and subcontractors’ fleet including, without limitation,
the CRCs, fuel/refueling records, maintenance records, emissions records, and
any other information the Contractor is required to produce, keep or maintain
pursuant to the Regulation upon two (2) calendar days’ notice from City.
C. Contractor shall be solely liable for any and all costs associated with complying
with the Regulation as well as for any and all penalties, fines, damages, or costs
associated with any and all violations, or failures to comply with the Regulation.
Contractor shall defend, indemnify and hold harmless the City, its officials,
officers, employees and authorized volunteers free and harmless from any claims,
liabilities, costs, penalties or interest arising out of any failure or alleged failure to
comply with the Regulation.
ARTICLE 6 -MATERIALS; INSPECTION
6.1 Access to Work.
A. The City, Engineer, their consultants and other representatives and personnel,
independent testing laboratories, and governmental agencies with jurisdictional
interests will have access to the Site and the Work at reasonable times for their
3.A.3.c
Packet Pg. 91 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 54 of 92
observation, inspection, and testing. Contractor shall provide them proper and
safe conditions for such access and advise them of Contractor’s safety
procedures and programs.
6.2 Materials.
A. Except as otherwise specifically stated in the Contract Documents, Contractor
shall provide and pay for all materials, labor, tools, equipment, water, lights,
power, transportation, superintendence, temporary constructions of every nature,
and all other services and facilities whatsoever necessary to execute and
complete this Contract within the Contract Time. Unless otherwise specified, all
materials, parts, and equipment furnished by the Contractor in the Work shall be
new, the best of their respective kinds and grades as noted and/or specified, and
workmanship shall be of good quality.
B. No materials, supplies, or equipment for Work under this Contract shall be
purchased subject to any chattel mortgage or under a conditional sale or other
agreement by which an interest therein or in any part thereof is retained by the
seller or Supplier. Contractor warrants good title to all material, supplies, and
equipment installed or incorporated in the Work and agrees upon completion of
all work to deliver the Project, to the City free from any claims, liens, or charges.
C. Materials shall be furnished in ample quantities and at such times as to ensure
uninterrupted progress of the Work and shall be stored properly and protected as
required by the Contract Documents. Contractor shall be entirely responsible for
damage or loss by weather or other causes to materials or Work. Materials shall
be stored on the Project Site in such manner so as not to interfere with any
operations of the City or any independent contractor.
D. Contractor shall verify all measurements, dimensions, elevations, and quantities
before ordering any materials or performing any Work, and the City shall not be
liable for Contractor’s failure to so. No additional compensation, over and above
payment for the actual quantities at the prices set out in the Bid Schedule, will be
allowed because of differences between actual measurements, dimension,
elevations and quantities and those indicated on the Plans and in the
Specifications. Any difference therein shall be submitted to the Engineer for
consideration before proceeding with the Work.
6.3 Test and Inspections.
A. Inspection of Work.
1. If the Contract Documents, the Engineer, or any instructions, laws,
ordinances, or public authority requires any part of the Work to be tested or
approved, Contractor shall provide the Engineer at least two (2) Days’ notice
of its readiness for observation or inspection. If inspection is by a public
authority other than the City, Contractor shall promptly inform the City of the
date fixed for such inspection. Required certificates of inspection (or similar)
shall be secured by Contractor. Costs for City testing and inspection shall be
3.A.3.c
Packet Pg. 92 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 55 of 92
paid by the City. Costs of tests for Work found not to be in compliance shall
be paid by the Contractor.
2. If Contractor gives notice of an inspection pursuant to the Contract
Documents, the City will provide inspection during normal working hours from
7:00 a.m. to 3:30 p.m. Monday through Friday. Requested inspections before
or after this time will be charged to the Contractor as reimbursable inspection
time. Inspections on weekends requires two (2) Days’ notice for review and
approval. Upon written request and approval the 8.5 hour working day may
be changed to other limits.
3. The Contractor shall pay for the cost of any minimum “show up” costs of a
materials testing technician that was called for by the Contractor but ultimately
the Contractor work was not ready for the inspection. Any such costs shall be
deducted from any amounts due to the Contractor.
4. If any Work is done or covered up without the required testing or approval,
the Contractor shall uncover or deconstruct the Work, and the Work shall be
redone after completion of the testing at the Contractor’s cost in compliance
with the Contract Documents.
5. Where inspection and testing are to be conducted by an independent
laboratory or agency, materials or samples of materials to be inspected or
tested shall be selected by such laboratory or agency, or by the City, and not
by Contractor. Unless otherwise stated and as provided by the Contract
Documents, the City shall employ and pay for the services of an independent
testing laboratory to perform all inspections, tests, or approvals required by
the Contract Documents. All tests or inspections of materials shall be made
in accordance with the commonly recognized standards of national
organizations.
6. Reexamination of Work may be ordered by the City. If so ordered, Work must
be uncovered or deconstructed by Contractor. If Work is found to be in
accordance with the Contract Documents, the City shall pay the costs of
reexamination and reconstruction. If such work is found not to be in
accordance with the Contract Documents, Contractor shall pay all costs.
B. Testing of Materials.
1. In advance of manufacture of materials to be supplied by Contractor which
must be tested or inspected, Contractor shall notify the City so that the City
may arrange for testing at the source of supply. Any materials which have not
satisfactorily passed such testing and inspection shall not be incorporated
into the Work.
2. If the manufacture of materials to be inspected or tested will occur in a plant
or location greater than sixty (60) miles from the City, the Contractor shall pay
for any excessive or unusual costs associated with such testing or inspection,
including but not limited to excessive travel time, standby time and required
lodging.
3.A.3.c
Packet Pg. 93 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 56 of 92
3. Unless otherwise specified in the Special Provisions, all initial testing and a
reasonable amount of retesting will be performed under the direction of the
Engineer, and at no expense to the Contractor. The Contractor shall notify
the Engineer in writing, at least 15 days in advance, of its intention to use
materials for which tests are specified, to allow sufficient time to perform the
tests. The notice shall name the proposed Supplier and source of material. If
the notice of intent to use is sent before the materials are available for testing
or inspection, or is sent so far in advance that the materials on hand at the
time will not last but will be replaced by a new lot prior to use on the Work, it
will be the Contractor's responsibility to re-notify the Engineer when samples
which are representative may be obtained.
4. A Certificate of Compliance shall be furnished to the Engineer prior to the use
of any material or assembled material for which these Specifications so
require or if so required by the Engineer. The Engineer may waive the
materials testing requirements and accept a Certificate of Compliance.
Material test data may be required by the Engineer to be included with the
Submittal. Materials used on the basis of a Certificate of Compliance may be
sampled and tested at any time. The submission of a Certificate of
Compliance shall not relieve the Contractor of responsibility for incorporating
material into the Work which conforms to the requirements of the Contract
Documents, and any material not conforming to the requirements will be
subject to rejection by the Engineer whether in place or not.
5. Copies of mill certificates of composition and quality of all component
materials (reinforcing steel, structural steel, lumber, etc.) incorporated in the
construction of the Work shall be provided to the City at the time of delivery.
City shall retain the right to reject any raw material not provided with a mill
certificate at the time of delivery.
6. If, after incorporating such materials into the Work, it is found that sources of
supply that have been approved do not furnish a uniform product, or if the
product from any source proves unacceptable at any time, the Contractor
shall furnish approved material from other approved sources. If any product
proves unacceptable after improper storage, handling or for any other reason
it shall be rejected, not incorporated into the Work, and shall be removed from
the Project Site all at the Contractor’s expense.
6.4 Requests for Substitutions.
A. For the purposes of this provision, the term “substitution” shall mean the
substitution of any material, method or service substantially equal to or better in
every respect to that indicated in the Contract Documents or otherwise referenced
herein.
B. Pursuant to Public Contract Code section 3400(b), the City may make a finding
that is described in the Notice Inviting Bids that designates certain products,
things, or services by specific brand or trade name.
3.A.3.c
Packet Pg. 94 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 57 of 92
C. Unless specifically designated in the Special Conditions, whenever any material,
process, or article is indicated or specified by grade, patent, or proprietary name
or by name of manufacturer, such specifications shall be deemed to be used for
the purpose of facilitating the description of the material, process, or article
desired and shall be deemed to be followed by the words “or equal.” Contractor
may, unless otherwise stated, offer for substitution any material, process, or
article which may be substantially equal to or better in every respect to that so
indicated or specified in the Contract Documents. However, the City has adopted
uniform standards for certain materials, processes, and articles.
D. The Contractor shall submit substitution requests, together with substantiating
data, for substitution of any “or equal” material, process, or article no later than
thirty-five (30) Days after award of Contract. Provisions regarding submission of
substitution requests shall not in any way authorize an extension of time for the
performance of this Contract. If a substitution request is rejected by the City, the
Contractor shall provide the material, method or service specified herein. The City
shall not be responsible for any costs incurred by the Contractor associated with
substitution requests. The burden of proof as to the equality of any material,
process, or article shall rest with the Contractor. The Engineer has the complete
and sole discretion to determine if a material, process, or article is substantially
equal to or better than that specified and to approve or reject all substitution
requests.
E. Substantiating data as described above shall include, at a minimum, the following
information:
1. A signed affidavit from the Contractor stating that the material, process, or
article proposed as a substitution is substantially equal to or better than that
specified in every way except as may be listed on the affidavit.
2. Illustrations, specifications, catalog cut sheets, and any other relevant data
required to prove that the material, process, or article is substantially equal to
or better than that specified.
3. A statement of the cost implications of the substitution being requested,
indicating whether and why the proposed substitution will reduce or increase
the amount of the contract.
4. Information detailing the durability and lifecycle costs of the proposed
substitution.
F. Failure to submit all the required substantiating data detailed above in a timely
manner so that the substitution request can be adequately reviewed may result
in rejection of the substitution request. The Engineer is not obligated to review
multiple submittals related the same substitution request resulting from the
Contractor’s failure to initially submit a complete package.
G. Time limitations within this Article shall be strictly complied with and in no case
will an extension of time for completion of the contract be granted because of
3.A.3.c
Packet Pg. 95 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 58 of 92
Contractor’s failure to provide substitution requests at the time and in the manner
described herein.
H. If substitution requests approved by the Engineer require that Contractor furnish
materials, methods or services more expensive than that specified, the increased
costs shall be borne by Contractor.
ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES
7.1 Soils Investigations.
A. Reports and Drawings. The Special Conditions identify: those reports known to
the City of explorations and tests of subsurface conditions at or contiguous to the
site; and those drawings known to the City of physical conditions relating to
existing surface or subsurface structures at the site (except Underground
Facilities).
B. Limited Reliance by Contractor on Technical Data Authorized. Contractor may
rely upon the accuracy of the “technical data” contained in such reports and
drawings, which were expressly not created or obtained to evaluate or assist in
the evaluation of constructability, and are not Contract Documents. Contractor
shall make its own interpretation of the “technical data” and shall be solely
responsible for any such interpretations. Except for reliance on the accuracy of
such “technical data,” Contractor may not rely upon or make any claim against
the City, City’s Representative, or Engineer of Record, or any of their officers,
directors, members, partners, employees, agents, consultants, or subcontractors,
with respect to:
1. the completeness of such reports and drawings for Contractor’s purposes,
including without limitation any aspects of the means, methods, techniques,
sequences, and procedures of construction to be employed by Contractor,
and safety precautions and programs incident thereto;
2. other data, interpretations, opinions, conclusions and information contained
in such reports or shown or indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any “technical data”
or any such other data, interpretations, opinions, or information.
7.2 Ownership of Site Materials Found.
A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials
developed or obtained in the excavation or other operations of Contractor or any
of its Subcontractors in the performance of the Contract, and the right to use said
items in carrying out the Contract, or to dispose of same, is hereby expressly
reserved by
the City. Neither Contractor nor any of its Subcontractors nor any of their
representatives or employees shall have any right, title, or interest in said
materials, nor shall they assert or make any claim thereto. Contractor will, as
3.A.3.c
Packet Pg. 96 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 59 of 92
determined by the City, be permitted to use in the Work without charge, any such
materials which meet the requirements of the Contract Documents, provided the
City shall have the right to use or consume these materials without payment to a
third party.
7.3 Existence of Utilities at the Work Site.
A. Existing Utilities. The location of known existing utilities and pipelines are shown
on the Drawings in their approximate locations. However, nothing herein shall be
deemed to require the City to indicate the presence of existing service laterals or
appurtenances whenever the presence of such utilities on the site of the project can
be inferred from the presence of other visible facilities, such as buildings, cleanouts,
meter and junction boxes, on or adjacent to the Site of the Project. The City will
assume the responsibility for the timely removal, relocation, or protection of existing
main or trunk line utility facilities located on the Project site if such utilities are not
identified by the City in the Contract Documents or which cannot reasonably be
inferred from the presence of other visible facilities. B. Utility Location.
1. It shall be the Contractor’s responsibility to determine the exact location and
depth of all utilities, including service connections, which the Contractor
believes may affect or be affected by the Contractor’s operations, by taking
all reasonable steps necessary including, but not limited to, calling
Underground Service Alert to locate utilities in accordance with the
procedures described in Government Code 4216 et seq. The Contractor shall
not be entitled to additional compensation nor time extensions for work
necessary to avoid interferences nor for repair to damaged utilities if the
Contractor does not expose all such existing utilities as required by this
Article. The locating of utilities shall be in conformance with Government
Code section 4216 et seq. except for the City’s utilities located on the City’s
property and not on public right-of-way.
2. A “High Priority Subsurface Installation” is defined in Government Code
section 4216 (j) as “high-pressure natural gas pipelines with normal operating
pressures greater than 415kPA gauge (60psig) or greater than six inches
nominal pipe diameter, petroleum pipelines, pressurized sewage pipelines,
high-voltage electric supply lines, conductors, or cables that have a potential
to ground of greater than or equal to 60kv, or hazardous materials pipelines
that are potentially hazardous to workers or the public if damaged.”
3. A “Subsurface Installation” is defined in Government Code section 4216 (s)
as “any underground pipeline, conduit, duct, wire, or other structure, except
nonpressurized sewer lines, nonpressurized storm drains, or other
nonpressurized drain lines.”
4. Pursuant to Government Code section 4216.2 the Contractor shall contact
the appropriate regional notification center at least two (2) working days but
not more than 14 Days before performing any excavation. The date of the
notification shall not count as part of the two-working-day notice. Before
notifying
3.A.3.c
Packet Pg. 97 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 60 of 92
the appropriate regional notification center, the Contractor shall delineate the
area to be excavated. The Contractor shall request that the utility owners
conduct a utility survey and mark or otherwise indicate the location of their
service. The Contractor shall furnish to the Engineer written documentation
of its contact(s) with the regional notification center prior to commencing
excavation at such locations.
5. After the utility survey is completed, the Contractor shall commence
“potholing” or hand digging to determine the actual location of the pipe, duct,
or conduit and in accordance with Government Code section 4216.4 if the
excavation within the “tolerance zone” of a subsurface installation. The
Engineer shall be given notice prior to commencing potholing operations. The
Contractor shall uncover all piping and conduits, to a point one (1) foot below
the pipe, where crossings, interferences, or connections are shown on the
Drawings, prior to trenching or excavating for any pipe or structures, to
determine actual elevations. New pipelines shall be laid to such grade as to
clear all existing facilities, which are to remain in service for any period
subsequent to the construction of the run of pipe involved.
6. The Contractor's attention is directed to the requirements of Government
Code section 4216.2 (c) which provides: “When the excavation is proposed
within 10 feet of a high priority subsurface installation, the operator of the high
priority subsurface installation shall notify the excavator of the existence of
the high priority subsurface installation to set up an onsite meeting prior to the
legal excavation start date and time or at a mutually agreed upon time to
determine actions or activities required to verify the location and prevent
damage to the high priority subsurface installation. As part of the meeting, the
excavator shall discuss with the operator the method and tools that will be
used during the excavation and the information the operator will provide to
assist in verifying the location of the subsurface installation. The excavator
shall not begin excavating until after the completion of the onsite meeting.”
The Contractor shall notify the Engineer in advance of this meeting.
C. Utility Relocation and Repair. If interferences occur at locations other than those
indicated in the Contract Documents with reasonable accuracy, the Contractor
shall notify the Engineer in writing. The Engineer will supply a method for
correcting said interferences in accordance with the responsibilities of this Article
and Government Code section 4215. Care shall be exercised by the Contractor
to prevent damage to adjacent existing facilities and public or private works;
where equipment will pass over these obstructions, suitable planking shall be
placed. If high priority subsurface installations are damaged and the operator
cannot be contacted, the Contractor shall call 911 emergency services.
Temporary or permanent relocation or alteration of utilities desired by the
Contractor for its own convenience shall be the Contractor’s responsibility and it
shall make arrangements and bear all costs for such work
D. Construction at Existing Utilities. Where the Work to be performed crosses or
otherwise interferes with water, sewer, gas, or oil pipelines; buried cable; or other
public or private utilities, the Contractor shall perform construction in such a
3.A.3.c
Packet Pg. 98 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 61 of 92
manner so that no damage will result to either public or private utilities. It shall be
the responsibility of the Contractor to determine the actual locations of, and make
accommodates to maintain, all utilities. Before any utility is taken out of service,
permission shall be obtained by the Contractor from the owner. The owner, any
impacted resident or business owner and the City will be advised of the nature
and duration of the utility outage as well as the Contractor’s plan for providing
temporary utilities if required by the owner. The Contractor shall be liable for all
damage which may result from its failure to maintain utilities during the progress
of the Work, and the Contractor shall indemnify City as required by the Contract
Documents from all claims arising out of or connected with damage to utilities
encountered during construction; damages resulting from disruption of service;
and injury to persons or damage to property resulting from the negligent,
accidental, or intentional breaching of utilities.
7.4 Trenches.
A. Trenches Five Feet or More in Depth. Contractor shall submit to the City at the
preconstruction meeting, a detailed plan showing the design of shoring, bracing,
sloping or other provisions to be made for worker protection from hazards of caving
ground during the excavation of any trench or trenches five feet or more in depth. If
such plan varies from shoring system standards established by the Construction
Safety Orders of the California Code of Regulations, Department of Industrial
Relations, the plan shall be prepared by a California registered civil or structural
engineer. The plan shall not be less effective than the shoring, bracing, sloping, or
other provisions of the Construction Safety Orders, as defined in the California Code
of Regulations. The Contractor shall designate in writing the “competent person” as
defined in Title 8, California Code of Regulations, who shall be present at the Work
Site each day that trenching/excavation is in progress. The “competent person” shall
prepare and provide daily trenching/excavation inspection reports to the Engineer.
Contractor shall also submit a copy of its annual California Occupational Safety and
Health Administration (Cal/OSHA) trench/excavation permit. B. Excavations Deeper
than Four Feet.
1. If the Work involves excavating trenches or other excavations that extend
deeper than four (4) feet below the surface, Contractor shall promptly within
three (3) Days, and before the excavation is further disturbed, notify the City
in writing of any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous
waste, as defined in section 25117 of the Health and Safety Code that is
required to be removed to a Class I, Class II, or Class III disposal site in
accordance with provisions of existing law.
b. Subsurface or latent physical conditions at the site differing from those
indicated by information made available to bidders prior to the deadline
for submitting bids.
3.A.3.c
Packet Pg. 99 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 62 of 92
c. Unknown physical conditions at the site of any unusual nature, different
materially from those ordinarily encountered and generally recognized as
inherent in work of the character provided for in the Contract
2. The City shall promptly investigate the conditions, and if it finds that the
conditions do so materially differ, or do involve hazardous waste, and cause
a decrease or increase in Contractor’s cost of, or the time required for,
performance of any part of the Work, shall issue a Change Order under the
procedures described in Article 9.1 Change Orders and Time Extensions.
3. In the event that a dispute arises between the City and the Contractor as to
whether the conditions materially differ, or involve hazardous waste, or cause
a decrease or increase in the Contractor’s cost of, or time required for,
performance of any part of the Work, the Contractor shall not be excused from
any scheduled completion date provided for by the Contract, but shall
proceed with all Work to be performed under the Contract. Contractor shall
retain any and all rights provided either by contract or by law which pertain to
the resolution of disputes and protests between the parties.
ARTICLE 8 -PROSECUTION OF THE WORK
8.1 Contractor’s Means and Methods.
A. Contractor is solely responsible for the means and methods utilized to perform the
Work. Contractor shall perform all Work in a skillful and workmanlike manner, and
consistent with the standards generally recognized as being employed by
professionals in the same discipline in the State of California. Contractor warrants
that all employees and Subcontractors shall have sufficient skill and experience
to perform the Work assigned to them. Contractor represents that it, its employees
and Subcontractors have all licenses, permits, qualifications and approvals of
whatever nature that are legally required to perform the Work, and that such
licenses and approvals shall be maintained throughout the term of this Contract.
Contractor shall perform the Work in full compliance with all applicable state,
federal and local laws and to the all jurisdictions having authority over the Project.
8.2 Construction Schedule.
A. General Requirements. The schedule shall be prepared in a critical path method
format and in an electronic scheduling program acceptable to the City and as
specified in the Contract Documents. Contractor shall deliver the schedule and all
updates to the City in both paper and electronic form. The electronic versions
shall be in the format and include all data used to prepare the schedule.
B. Schedule. The receipt or approval of any schedules by the City shall not in any
way relieve the Contractor of its obligations under the Contract Documents. The
Contractor is fully responsible to determine and provide for any and all staffing
and resources at levels which allow for good quality and timely completion of the
Project. Contractor’s failure to incorporate all elements of Work required for the
performance of the Contract or any inaccuracy in the schedule shall not excuse
3.A.3.c
Packet Pg. 100 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 63 of 92
the Contractor from performing all Work required for a completed Project within
the specified Contract Time. If the required schedule is not received by the time
the first payment under the Contract is due, Contractor shall not be paid until the
schedule is received, reviewed and accepted by the City.
C. Schedule Contents. The schedule shall indicate the beginning and completion
dates of all phases of construction; critical path for all critical, sequential time
related activities; and “float time” for all “slack” or “gaps” in the non-critical
activities. The schedule shall include appropriate time allowances and constraints
for Submittals, items of interface with Work performed by others, and specified
construction, startup and performance tests. All float shall be owned by the
Project. Schedules indicating early or late completion shall not modify or have any
effect on the Contract Time, regardless of whether the schedules are reviewed
and/or accepted by the City.
D. Material Lead Times. Contractor shall include anticipated material delivery lead
times in the submitted construction schedule and identify long lead time items that
could become critical path items and affect the overall construction schedule.
E. Schedule Updates. Contractor shall continuously update its construction
schedule. Contractor shall submit an updated and accurate construction
schedule to the City:
(1) prior to the start of construction, if there are any changes to the initial schedule;
(2) with each progress payment request; and (3) whenever requested to do so by
the City. The City may withhold progress payments or other amounts due under
the Contract Documents if Contractor fails to submit an updated and accurate
construction schedule. Upon the City’s request, Contractor shall submit any
schedules or updates to the City in the native electronic format of the software
used to create the schedule. Contractor shall also submit schedules showing a
two-week detailed look-ahead at weekly meetings conducted with the City. The
two-week lookahead schedule shall clearly identify all staffing and other
resources which in the Contractor’s judgment are needed to complete the Work
within the Contract Time, and it shall clearly state the number of staff to be used
on each daily segment of the Work.
F. Acceptance. Acceptance of the schedules by the City will not impose on
responsibility for accuracy, for sequencing, scheduling, or progress of the Work,
or compliance with the Contract Documents. Acceptance will not interfere with or
relieve Contractor from Contractor’s full responsibility therefor.
8.3 Time for Completion and Liquidated Damages.
A. Time for Completion. The time for completion set forth in the Contract for
Construction shall commence: (1) on the date stated in the Notice to Proceed, or
(2) if the Notice to Proceed does not specify a commencement date, then on the
date of the Notice to Proceed and shall be completed by Contractor in the time
specified in the Contract Documents. The City is under no obligation to consider
early completion of the Project; and the Contract completion date shall not be
amended by the City’s receipt or acceptance of the Contractor’s proposed earlier
3.A.3.c
Packet Pg. 101 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 64 of 92
completion date. Any difference in time between the Contractor’s early completion
and the Contract Time shall be considered a part of the Project float. Contractor
shall not be entitled to compensation, and the City will not compensate
Contractor, for delays which impact early completion. Contractor shall not, under
any circumstances, receive additional compensation from the City (including but
not limited to indirect, general, administrative or other forms of overhead costs)
for the period between the time of earlier completion proposed by the Contractor
and the Contract completion date.
B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it
is understood that the City will suffer damage. In accordance with Government
Code section 53069.85 and Public Contract Code section 7102, being impractical
and infeasible to determine the amount of actual damage, it is agreed that
Contractor shall pay to the City as fixed and liquidated damages, and not as a
penalty, the sum stipulated in the Contract for each calendar day of delay until the
Work is fully completed. Contractor and its surety shall be liable for any liquidated
damages. Any money due or to become due the Contractor may be retained to
cover liquidated damages.
C. Inclement Weather. Contractor shall abide by the City’s determination of what
constitutes inclement weather. Time extensions for inclement weather shall only
be granted when the Work stopped during inclement weather is on the critical
path of the Project schedule. Contractor shall not be entitled to reverse liquidated
damages for time extensions resulting from inclement weather.
D. Extension of Time. Contractor’s entitlement to an extension of the Contract Times
is limited to a City-caused extension of the critical path, reduced by the
Contractor’s concurrent delays, and established by a proper time impact analysis.
No time extension shall be allowed unless, and then only to the extent that, the
City-caused delay extends the critical path beyond the previously approved
Contract Time. The City shall ascertain the facts and extent of delay and grant
extension of time for completing the Work when, in its judgment, the facts justify
such an extension. Contractor shall not be entitled to an adjustment in the
Contract Times for delays within the control of Contractor. Delays attributable to
and within the control of a Subcontractor or Supplier shall be deemed to be delays
within the control of Contractor. If approved, the increase in time required to
complete the Work shall be added to the Contract Time.
E. Reverse Liquidated Damages. Consistent with Public Contract Code section
7102, Contractor will be compensated for damages incurred due to unreasonable
delays to the critical path for which the City is responsible. The parties agree that
determining Contractor’s exact delay damages are and will continue to be
impracticable and extremely difficult. As such, for each calendar day in excess of
the time for completion set forth in the Contract, the City shall pay to the
Contractor the amount stipulated in the Contract. Such amount shall constitute
the only payment allowed for any City-caused delays and shall necessarily
include all overhead, all profits, all administrative costs, all bond costs, all labor,
materials, equipment and rental costs and any other costs, expenses and fees
incurred or sustained as a result of such delays. Contractor shall not be entitled
3.A.3.c
Packet Pg. 102 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 65 of 92
to reverse liquidated damages for any change in the Work in which Contractor is
compensated for overhead and profit through a change in Unit Price Work or a
Change Order resulting in a lump sum or allowed mark-up for the additional Work.
The amount of reverse liquidated damages shall be reduced by Contractor’s
concurrent delays.
F. Force Majeure. If a delay to the critical path results from a Force Majeure Event,
the Contractor will be entitled to a time extension but will not receive an
adjustment to the Contract Price or any other compensation. Such a non-
compensable adjustment shall be Contractor’s sole and exclusive remedy for
such delays.
G. No Damages for Reasonable Delay. The City’s liability to Contractor for delays
for which the City is responsible shall be limited to only an extension of time unless
such delays were unreasonable under the circumstances. In no case shall the
City be liable for any costs which are borne by the Contractor in the regular course
of business, including, but not limited to, home office overhead and other ongoing
costs. Damages caused by unreasonable City delay shall be based on actual
costs only, no proportions or formulas shall be used to calculate any delay
damages.
H. Procedure for Time Extensions and Delay Damages. Contractor shall not be
entitled to any extension of time or any reverse liquidated damages unless
Contractor properly notices the delay and adjustment to compensation and
requests a Change Order in accordance with Article 9.1 Change Orders and Time
Extensions. Contractor’s failure to timely and fully comply with the Change Order
procedures in the Contract Documents shall constitute a waiver of Contractor’s
right to a time extension or reverse liquidated damages.
8.4 Contractor’s Responsibility for Work.
A. Responsibility for, and security of, all Work and materials related to Contractor’s
Work is the responsibility of Contractor until final acceptance of the Contractor’s
Work by the City. The City shall not be held responsible for the care or protection
of any material or parts of the Work prior to final acceptance. Contractor shall take
every necessary precaution against injury or damage to any part thereof by the
action of the elements or from any cause whether arising from the execution or
non-execution of the Work and all loss or damage shall be borne by Contractor.
The Contractor shall rebuild, repair, restore and make good at its own expense
all injuries or damages to any portion of the Work before its completion and
acceptance. In the event of damage proximately caused by an Act of God, as
defined by Section 7105 of the Public Contract Code, the City will pay for repair
or restoration to damaged Work in excess of 5% of the total Bid.
8.5 Occupancy.
A. The City reserves the right to occupy or utilize any portion of the Work at any time
before completion, and such occupancy or use shall not constitute acceptance of
3.A.3.c
Packet Pg. 103 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 66 of 92
any part of Work covered by this Contract. This use shall not relieve the
Contractor of its responsibilities under the Contract.
8.6 Securities for Money Withheld.
A. Pursuant to section 22300 of the Public Contract Code of the State of California,
Contractor may request the City to make retention payments directly to an escrow
agent or may substitute securities for any money withheld by the City to ensure
performance under the contract. At the request and expense of Contractor,
securities equivalent to the amount withheld shall be deposited with the City or
with a state or federally chartered bank as the escrow agent who shall return such
securities to Contractor upon satisfactory completion of the contract. Deposit of
securities with an escrow agent shall be subject to a written agreement
substantially in the form provided in section 22300 of the Public Contract Code.
8.7 The City’s Right to Suspend/Terminate the Contract.
A. Suspension of Work by the City.
1. The City in its sole and absolute discretion for any reason or no reason
whatsoever may at any time, with or without cause, suspend performance of
all or any part of the Work by giving not less than five (5) Days written notice
to the Contractor. Such notice of suspension of Work will designate the
amount and type of plant, labor, and equipment to be committed to the Project
during the period of suspension. Contractor shall use its best efforts to utilize
its plant, labor, and equipment in such a manner as to minimize costs
associated with suspension.
2. Upon receipt of any such notice, Contractor shall, unless the notice requires
otherwise: (1) immediately discontinue Work on the date and to the extent
specified in the notice; (2) place no further orders or subcontracts for material,
services, or facilities with respect to suspended Work other than to the extent
required in the notice; (3) promptly make every reasonable effort to obtain
suspension upon terms satisfactory to the City of all orders, subcontracts, and
rental agreements to the extent they relate to performance of Work
suspended; and (4) continue to protect and maintain the Work including those
portions on which Work has been suspended.
3. The City shall not be liable for any additional costs, damages or anticipated
profits incurred by Contractor or its Subcontractors and the Contract Price
shall not be increased during the period of suspension, except the actual
costs incurred by Contractor, excluding overhead and profit for (a) the
purpose of safeguarding the Work and material and equipment in transit or at
the Site during the period of suspension, (b) Contractor’s or its
Subcontractor’s rented equipment which are maintained at the Site, or (c)
other reasonable and unavoidable costs of shutting down the Work, or
reassembling personnel and equipment resulting directly from such
suspension. Contractor shall be granted an extension of the Contract Time
equal to the number of days performance of Work is suspended; provided,
3.A.3.c
Packet Pg. 104 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 67 of 92
however, that no actual costs or extension of Contract Time shall be granted
if the suspension results from Contractor's noncompliance with the
requirements of the Contract. B. Termination for Cause by the City.
1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute
the Work or any separable part thereof with such diligence as will insure its
completion within the time specified by the Contract Documents, or any
extension thereof, or fails to complete such Work within such time, or if the
Contractor should be adjudged a bankrupt, or if it should make a general
assignment for the benefit of its creditors, or if a receiver should be appointed
on account of its insolvency, or the Contractor or any of its subcontractors
should violate any of the provisions of this Contract, the City may serve written
notice upon the Contractor and its surety of the City's intention to terminate
this Contract. This notice of intent to terminate shall contain the reasons for
such intention to terminate this Contract, and a statement to the effect that
the Contractor's right to perform this Contract shall cease and terminate upon
the expiration of ten (10) Days unless such violations have ceased and
arrangements satisfactory to the City have been made for correction of said
violations.
2. After expiration of the ten (10) Day period, the City may terminate the Contract
by providing a Notice of Termination to the Contractor. The City may take
over and complete the Work by any method it may deem appropriate,
including enforcement of the Project performance bond. If the City takes over
the Work, the City may, without liability for so doing, take possession of and
utilize in completing the Work such materials, appliances, plant, and other
property belonging to the Contractor as may be on the Site.
3. Contractor shall not be entitled to receive any further payment hereunder as
a result of such termination. Contractor and its surety shall be liable to the
City for any excess costs or other damages incurred by the City to complete
the Work, including professional services and expenses, reasonable
overhead, profit, and attorneys' fees. This payment obligation shall survive
completion of the Project and termination or expiration of this Contract. C.
Termination for Convenience by the City:
1. The City may terminate performance of the Work called for by the Contract
Documents in whole or, from time to time, in part, upon ten (10) Days written
notice if the City determines that a termination is in the City's interest. The
Contractor shall terminate all or any part of the Work upon delivery to the
Contractor of a Notice of Termination specifying that the termination is for the
convenience of the City, the extent of termination, and the effective date of
such termination.
2. After receipt of Notice of Termination, and except as directed by the City, the
Contractor shall, regardless of any delay in determining or adjusting any
amounts due under this termination for convenience clause, immediately
proceed with the following obligations: (1) stop Work as specified in the
Notice; (2) complete any Work specified in the Notice of Termination in a least
3.A.3.c
Packet Pg. 105 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 68 of 92
cost/shortest time manner while still maintaining the quality called for under
the Contract Documents; (3) leave the property upon which the Contractor
was working and upon which the facility (or facilities) forming the basis of the
Contract Document is situated in a safe and sanitary manner such that it does
not pose any threat to the public health or safety; (4) terminate all
subcontracts to the extent that they relate to the portions of the Work
terminated; and (5) place no further subcontracts or orders, except as
necessary to complete the continued portion of the Contract.
3. In case of such termination for the City’s convenience, the Contractor shall
be entitled to receive payment for Work actually completed by Contractor in
conformity with this Contract prior to Contractor’s receipt of City’s Notice and
costs incurred by reason of such termination. Any documentation
substantiating costs incurred by the Contractor solely as a result of the City's
exercise of its right to terminate this Contract pursuant to this clause, which
costs the Contractor is authorized under the Contract documents to incur,
shall: (1) be submitted to and received by the City no later than 30 Days after
the effective date of the Notice of Termination; (2) describe the costs incurred
with particularity; and (3) be conspicuously identified as “Termination Costs
occasioned by the City's Termination for Convenience.” If the City rejects any
costs, Contractor shall be deemed to waive the rejected costs unless
Contractor files a Claim within thirty (30) Days of the rejection pursuant to
Article 9.2.
4. Contractor shall be entitled to receive only the amounts payable under this
Article, and Contractor specifically waives any claim for any other amounts or
damages, including, but not limited to, any claim for consequential damages
or lost profits. The provisions in this Article are in addition to and not in
limitation of any other rights or remedies available to the City.
5. Termination of the Contract shall not relieve surety of its obligation for any
just claims arising out of or relating to the Work performed.
6. Notwithstanding any other provision of this Article, when immediate action is
necessary to protect life and safety or to reduce significant exposure or
liability, the City may immediately order Contractor to cease Work on the
Project until such safety or liability issues are addressed to the satisfaction of
the City or the Contract is terminated.
7. If the City terminates Contractor for cause, and if it is later determined that
the termination was wrongful, such default termination shall automatically be
converted to and treated as a termination for convenience. In such event,
Contractor shall be entitled to receive only the amounts payable under this
Article, and Contractor specifically waives any claim for any other amounts or
damages, including, but not limited to, any claim for consequential damages
or lost profits.
8.8 Defective Work.
3.A.3.c
Packet Pg. 106 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 69 of 92
A. The City May Correct Defective Work.
1. If Contractor fails to correct Defective Work, or to remove and replace rejected
Work as required by the City, or if Contractor fails to perform the Work in
accordance with the Contract Documents, or if Contractor fails to comply with
any other provision of the Contract Documents, the City may, after seven (7)
Days written notice to Contractor, correct, or remedy any such deficiency.
2. In connection with such corrective or remedial action, the City may exclude
Contractor from all or part of the Site, take possession of all or part of the
Work and suspend Contractor’s services related thereto, take possession of
Contractor’s tools, appliances, construction equipment and machinery at the
Site, and incorporate in the Work all materials and equipment stored at the
Site or for which the City has paid Contractor but which are stored elsewhere.
Contractor shall allow the City, and the agents, employees, other contractors,
and consultants of each of them, access to the Site to enable the City to
exercise the rights and remedies to correct the Defective Work.
3. All claims, costs, losses, and damages (including but not limited to all fees
and charges of engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs) incurred or sustained
by the City correcting the Defective Work will be charged against Contractor,
and a Change Order will be issued incorporating the necessary revisions in
the Contract Documents with respect to the Work; and the City shall be
entitled to an appropriate decrease in the Contract Price. Such claims, costs,
losses and damages will include but not be limited to all costs of repair, or
replacement of work of others destroyed or damaged by correction, removal,
or replacement of defective Work.
4. If the Change Order is executed after all payments under the Contract have
been paid by the City and the Project retention is held in an escrow account
as permitted by the Contract Documents, Contractor will promptly alert the
escrow holder, in writing, of the amount of retention to be paid to the City. If
the Change Order is executed after release of the Project retention, an
appropriate amount will be paid by Contractor to the City. Contractor shall not
be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the City correcting Defective Work.
B. Acceptance of Defective Work.
1. If, instead of requiring correction or removal and replacement of defective
Work, the City prefers to accept it, the City may do so. Contractor shall pay
all claims, costs, losses, and damages (including but not limited to all fees
and charges of engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs) attributable to the
City’s evaluation of and determination to accept such defective Work and for
the diminished value of the Work. If any acceptance of Defective Work occurs
prior to release of the Project retention, a Change Order will be issued
incorporating the necessary revisions in the Contract Documents with respect
to the Work, and the City shall be entitled to an appropriate decrease in the
3.A.3.c
Packet Pg. 107 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 70 of 92
Contract Price, reflecting the diminished value of Work and all costs incurred
by the City. If the acceptance of defective work occurs after release of the
Project retention, an appropriate amount will be paid by Contractor to the City.
8.9 Completion and Acceptance of Work.
A. Final Inspection. Upon written notice from Contractor that the entire Work is
complete, the Engineer will promptly make a final inspection with the City and
Contractor and will notify Contractor in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective. Contractor shall
immediately take such measures as are necessary to complete such Work or
remedy such deficiencies.
B. Final Acceptance. The acceptance of the Work on behalf of the City will be made
by the Engineer. Such acceptance by the City shall not constitute a waiver of
defects. After Contractor has, in the opinion of the Engineer, satisfactorily
completed all corrections identified during the final inspection and has delivered,
in accordance with the Contract Documents, all maintenance and operating
instructions, schedules, guarantees, bonds, certificates or other evidence of
insurance, certificates of inspection, Record Documents, and other documents
required by the Contract Documents, the City shall execute a Notice of
Completion, constituting final acceptance and completion of the Project, except
as may be expressly noted.
8.10 Guarantee of Work.
A. Neither the final payment nor any provision in the Contract Documents shall
relieve Contractor of responsibility for faulty materials or workmanship. Contractor
hereby guarantees that materials and Work shall be completed in conformance
with the Contract Documents and that the materials and Work provided will fulfill
the requirements of this guarantee. Contractor hereby agrees to repair or replace,
at the discretion of the City, any or all Work that may prove to be defective in its
workmanship, materials furnished, methods of installation or fail to conform to the
Contract Document requirements together with any other Work which may be
damaged or displaced by such defect(s) within a period of one (1) year (or as
otherwise indicated in the Contract Documents or in any guarantee or warranty
provided by any manufacturer or supplier of equipment or materials incorporated
into the Work, whichever is later) from the date of the Notice of Completion of the
Project without any expense whatever to the City, ordinary wear and tear and
unusual abuse and neglect excepted. Contractor shall be required to promptly
repair or replace defective equipment or materials, at Contractor’s option. The
Contractor shall remedy at its expense any damage to City-owned or controlled
real or personal property. All costs associated with such corrective actions and
testing, including the removal, replacement, and reinstitution of equipment and
materials necessary to gain access, shall be the sole responsibility of the
Contractor.
B. For any Work so corrected, Contractor’s obligation hereunder to correct defective
Work shall be reinstated for an additional one (1) year period, commencing with
3.A.3.c
Packet Pg. 108 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 71 of 92
the date of acceptance of such corrected Work. The reinstatement of the one (1)
year warranty shall apply only to that portion of Work that was corrected.
Contractor shall perform such tests as the City may require to verify that any
corrective actions, including, without limitation, redesign, repairs, and
replacements comply with the requirements of the Contract Documents. In the
event of Contractor’s failure to comply with the above-mentioned conditions within
ten (10) Days after being notified in writing of required repairs, to the reasonable
satisfaction of the City, the City shall have the right to correct and replace any
defective or non-conforming Work and any work damaged by such work or the
replacement or correction thereof at Contractor’s sole expense. Contractor shall
be obligated to fully reimburse the City for any expenses incurred hereunder
immediately upon demand.
C. In addition to the warranty set forth in this Article, Contractor shall obtain for the
City all warranties that would be given in normal commercial practice and assign
to the City any and all manufacturer’s or installer’s warranties for equipment or
materials not manufactured by Contractor and provided as part of the Work, to
the extent that such third-party warranties are assignable and extend beyond the
warranty period set forth in this Article. Contractor shall furnish the City with all
warranty and guarantee documents prior to final acceptance of the Project by the
City as required.
D. When specifically indicated in the Contract Documents or when directed by the
Engineer, the City may furnish materials or products to the Contractor for
installation. In the event any act or failure to act by Contractor shall cause a
warranty applicable to any materials or products purchased by the City for
installation by the Contractor to be voided or reduced, Contractor shall indemnify
the City from and against any cost, expense, or other liability arising therefrom,
and shall be responsible to the City
for the cost of any repairs, replacement or other costs that would have been
covered by the warranty but for such act or failure to act by Contractor.
E. The City shall notify the Contractor, in writing, within a reasonable time after the
discovery of any failure, defect, or damage. The Contractor shall within ten (10)
Days after being notified commence and perform with due diligence all necessary
work to remedy the failure, defect, or damage. If the Contractor fails to promptly
remedy any defect or damage, the City shall have the right to replace, repair or
otherwise remedy the defect, or damage at the Contractor’s expense.
F. In the event of any emergency constituting an immediate hazard to health, safety,
property, or licensees, when caused by Work of the Contractor not in accordance
with the Contract requirements, the City may undertake at Contractor’s expense,
and without prior notice, all Work necessary to correct such condition.
G. This Article shall not limit City’s rights under this Contract or with respect to latent
defects, gross mistakes, or fraud. Nothing in the warranty or in the Contract
Documents shall be construed to limit the rights and remedies available to the
3.A.3.c
Packet Pg. 109 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 72 of 92
City at law or in equity, including, but not limited to, Code of Civil Procedure
section 337.15.
ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION
9.1 Change Orders and Time Extensions.
A. Change Orders. All changes to the Contract, including compensation increases
and time extensions, shall be through a written Change Order in accordance with
this Article. The City, without invalidating the Contract, may order changes in the
Work consisting of additions, deletions or other revisions, and Contractor’s
compensation and the time for completion shall be adjusted accordingly. Whenever
any change is made as provided for herein, such change shall be considered and
treated as though originally included in the Contract, and shall be subject to all
terms, conditions, and provisions of the original Contract. Contractor shall not be
entitled to claim or bring suit for damages, whether for loss of profits or otherwise,
on account of any decrease or omission of any item or portion of Work to be done.
No dispute, disagreement, or failure of the parties to reach agreement on the terms
of the Change Order shall relieve the Contractor from the obligation to proceed with
performance of the Work, including Additional Work, promptly and expeditiously.
Any alterations, extensions of time, Additional Work, or any other changes may be
made without securing consent of the Contractor’s surety or sureties.
B. City Directive. The City may direct changes in the Work by delivering a written
directive. To the extent the work directive results in a change to compensation or
time, Contractor must timely request a Change Order and comply with all Change
Order procedures in accordance with this Article. Notwithstanding issuance of a
work directive, Contractor’s failure to timely request a Change Order shall constitute
a waiver by Contractor of any adjustment to compensation or time extension for
Work performed under the directive. The City shall not be liable to Contractor for
Work performed or omitted by Contractor in reliance on verbal orders.
C. Contractor’s Notice of Change/Delay. If Contractor intends to initiate a Change
Order Request, then Contractor shall provide the City with written notice of the
underlying facts and circumstances that gave rise to the proposed change within
the following times:
1. If due to unknown subsurface or latent physical conditions, within three (3) days
from the discovery date or prior to the alterations of the conditions, whichever
is earlier.
2. If due to a Force Majeure Event, as soon as reasonably practicable under the
conditions, which shall be no longer than three (3) days from the date the
Contractor discovers that the Force Majeure Event gives rise to a change,
unless that the conditions are such that notice within three (3) days is not
possible or practicable.
3. If due to any other matter that may involve an adjustment to the Contract Time
or the Contract Price, within seven (7) Days from the discovery date.
3.A.3.c
Packet Pg. 110 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 73 of 92
To be considered valid and complete, the notice of change/delay shall include
a general statement of the circumstances giving rise to the notice of
change/delay and a reasonable order of magnitude estimate of the additional
costs and/or time. If the circumstances give rise to both a cost adjustment and
time extension, Contractor shall submit the notice of change and notice of delay
concurrently.
D. Request for Change in Compensation and/or Extension of Time. Contractor shall
submit a Change Order Request for any adjustment to Contractor’s compensation
and/or any extension of time. The Change Order Request shall be made prior to
incurring any expense and within fourteen (14) Days from either Contractor’s notice
of change/delay or the City’s directive ordering the change. For any costs or
information that cannot be determined at the time Contractor submits the Change
Order Request, Contractor shall submit to the City notice of the costs or information
and all supporting documentation within five (5) Days of when the costs or other
information become subject to determination. The Change Order Request shall
include all of the following information (unless inapplicable to the change):
1. A detailed description of the circumstances giving rise to the request;
2. A complete itemized cost proposal, including itemized pricing for first tier
Subcontractors;
3. Supporting documentation for all costs;
4. A time impact analysis showing the impact of the delay to the critical path to
completion;
5. If any added costs or information cannot be determined at the time of the
Change Order Request, the reason the costs or information cannot be
determined at the time; and
6. Certification to the accuracy of the Change Order Request under penalty of
perjury.
The time impact analysis shall be in the critical path method format and shall
show the sequencing of all critical and non-critical new activities and/or activity
revisions affected by the delay, with logic ties to all affected existing activities
noted on the schedule. The City may demand, and Contractor shall provide,
any additional information supporting the Change Order Request, including but
not limited to native electronic format version of schedules and time impact
analyses. Contractor shall provide the requested additional information within
five (5) Days of the request.
E. City’s Final Decision on Change Order; Ordered Changes. If the City denies the
Change Order Request or disagrees with the proposal submitted by Contractor, it
will notify the Contractor, and the City will provide its opinion of the appropriate price
and/or time extension. If no agreement can be reached, the City shall have the right
to order the Work performed on a time and materials basis or to issue a unilateral
Change Order setting forth the City’s determination of the reasonable additions or
3.A.3.c
Packet Pg. 111 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 74 of 92
savings in costs and time attributable to the extra or deleted work. The City shall
also have the right to order changes in the Work to be performed promptly by the
Contractor on a time and materials basis or to issue a unilateral Change Order
setting forth the City’s determination of the reasonable additions or savings in costs
and time attributable to the extra or deleted work. The City’s determination shall
become final and binding if the Contractor fails to submit a claim in writing in
accordance with Article 9.2 to the City within fourteen (14) Days of the issuance of
the unilateral Change Order, disputing the terms of the unilateral Change Order and
providing such supporting documentation for its position as the City may reasonably
require. F. Contractor’s Waiver of Further Relief.
1. Contractor recognizes and acknowledges that timely submission of a formal
written notice of change/delay and Change Order Request, whether or not the
circumstances of the change may be known to the City or available to the City
through other means, is not a mere formality but is of crucial importance to the
ability of the City to promptly identify, prioritize, evaluate and mitigate the
potential effects of changes. Any form of informal notice, whether verbal or
written (including, without limitation, statements in requests for information,
statements in Submittals, statements at any job meeting or entries on monthly
reports, daily logs or job meeting minutes), that does not strictly comply with the
formal requirements of this Article, shall accordingly be insufficient.
2. CONTRACTOR’S FAILURE TO PROVIDE A COMPLETE AND TIMELY
NOTICE OF CHANGE/DELAY AND/OR CHANGE ORDER REQUEST, OR TO
COMPLY WITH ANY OTHER REQUIREMENT OF THIS ARTICLE, SHALL
CONSTITUTE A WAIVER BY CONTRACTOR OF THE RIGHT TO A
CONTRACT ADJUSTMENT ON ACCOUNT OF SUCH CIRCUMSTANCES
AND A WAIVER OF ANY RIGHT TO FURTHER RECOURSE OR RECOVERY
BY REASON OF OR RELATED TO SUCH CHANGE BY MEANS OF THE
CLAIMS DISPUTE RESOLUTION PROCESS OR BY ANY OTHER LEGAL
PROCESS OTHERWISE PROVIDED FOR UNDER APPLICABLE LAWS.
G. Change Order Format. A Change Order signed by the Contractor indicates the
Contractor's agreement therewith, including any adjustment in compensation or
extension of time, and the full and final settlement of all costs (direct, indirect and
overhead) related to the Work authorized by the Change Order. The City may
designate the forms to be used for notices, requests, and Change Orders. If so
designated, Contractor may only use such forms. Contractor shall not reserve a
right to assert impact costs, extended job site costs, extended overhead,
constructive acceleration and/or actual acceleration beyond what is stated in the
Change Order. No Claims shall be allowed for impact, extended overhead costs,
constructive acceleration and/or actual acceleration due to a multiplicity of
changes and/or clarifications. The Contractor may not change or modify the
City’s Change Order form in an attempt to reserve additional rights.
H. Determining Adjustments to Compensation.
1. Limitation on Costs. Contractor shall not be entitled to any compensation for
Work subject to a Change Order except as expressly set forth in this Article.
3.A.3.c
Packet Pg. 112 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 75 of 92
The markup added in instances of Additional Work shall constitute the entire
amount of profit, any mark-ups, any field or home office overhead costs,
including personnel, equipment or office space, any materials, or any costs of
equipment idle time for such Work.
2. Unit Price Change Orders.
a. When the actual quantity of a Unit Price Work item varies from the Bid
Schedule, compensation for the change in quantity will be calculated by
multiplying the actual quantity by the unit price. This calculation may result
in either an additive or deductive Change Order. Bid items included on the
Bid Schedule may be deducted from the Work in their entirety without any
negotiated extra costs. Because Unit Price Work includes overhead and
profit as determined by Contractor at the time of its Bid submission, no mark
up or deduction for overhead and profit will be allowed.
b. The City or Contractor may initiate a Change Order or Change Order
Request to adjust the Contract Price in accordance with Contractor
Documents based on actual quantities of Unit Price Work. The City or
Contractor may make a claim for an adjustment in the Unit Price in
accordance with the Contract Documents if: (1) the quantity of any item of
Unit Price Work performed by Contractor differs by twenty-five percent
(25%) or more from the estimated quantity of such item indicated in the
Contract; (2) there is no corresponding adjustment with respect to any other
item of Work; and (3) Contractor believes that Contractor is entitled to an
increase in unit price as a result of having incurred additional expense or
the City believes that the City is entitled to a decrease in unit price and the
parties are unable to agree as to the amount of any such increase or
decrease.
3. Lump Sum Change Orders. Whenever possible, any changes affecting
compensation shall be in a lump sum mutually agreed by the Contractor and
the
City.
4. Time and Materials Change Orders. The City may direct the Contractor to
proceed with the Additional Work with payment to be made on the basis of
actual cost of the labor and materials required to complete the Additional Work.
If the Project is federally funded, a time and materials Change Order shall only
be issued after a determination that no other Change Order is suitable and the
Change Order shall include a ceiling price that the Contractor exceeds at its
own risk.
5. Federally Funded Projects. For any change in price to the Contract, general
and administrative expenses shall be negotiated and must conform to the cost
principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be
negotiated as a separate element of the cost. To establish a fair and reasonable
profit, consideration must be given to the complexity of the Additional Work to
be performed, the risk borne by the Contractor, the Contractor's investment, the
3.A.3.c
Packet Pg. 113 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 76 of 92
amount of subcontracting, the quality of its record of past performance, and
industry profit rates in the surrounding geographical area for similar work.
6. Allowed Costs. Estimates for lump sum quotations and accounting for time and
material work shall be limited to direct expenditures necessitated specifically by
the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally
for each craft or type of worker at the time the work is done, plus employer
payments of payroll taxes and insurance, health and welfare, pension,
vacation, apprenticeship funds, and other direct costs resulting from federal,
state or local laws, as well as assessment or benefits required by lawful
collective bargaining agreements. The use of a labor classification which
would increase the cost will not be permitted unless the Contractor
establishes the necessity for such additional costs. Labor costs for
equipment operators and helpers shall be reported only when such costs
are not included in the invoice for equipment rental. Estimated labor hours
must only include hours for those workmen and working foremen directly
involved in performing the change order work. Supervision above the level
of working foremen (such as general foremen, superintendent, project
manager, etc.) is considered to be included in the markup percentages as
outlined below. Note that no separate allowances for warranty expense will
be allowed as a direct cost of a change order. Costs attributed to warranty
expenses will be considered to be covered by the markup. Labor burden
allowable in Change Orders shall be defined as employer's net actual cost
of payroll taxes (FICA, Medicare, SUTA, FUTA), net actual cost for
employer's cost of union benefits (or other usual and customary fringe
benefits if the employees are not union employees), and net actual cost to
employer for worker's compensation insurance taking into consideration
adjustments for experience modifiers, premium discounts, dividends,
rebates, expense constants, assigned risk pool costs, net cost reductions
due to policies with deductibles for self-insured losses, assigned risk
rebates, etc. Contractor shall reduce their standard payroll tax percentages
to properly reflect the effective cost reduction due to the estimated impact
of the annual maximum wages subject to payroll taxes. An estimated
percentage for labor burden may be used for pricing change orders.
However, the percentage used for labor burden to price Change Orders will
be examined at the conclusion of the Project and an adjustment to the
approved Change Orders will be processed if it is determined that the actual
labor burden percentage should have been more or less than the estimated
percentage used.
b. Materials. The cost of materials reported shall be at the lowest current price
at which such materials are locally available in the quantities involved, plus
sales tax, freight and delivery. Materials costs shall be based upon Supplier
or manufacturer’s invoice.
c. Tool and Equipment Use. Regardless of ownership, the rates to be used in
determining equipment use shall not exceed listed rates prevailing locally at
3.A.3.c
Packet Pg. 114 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 77 of 92
equipment rental agencies, or distributors, at the time the work is performed.
The Contractor shall furnish cost data supporting the establishment of the
rental rate. The rental rate to be applied for use of each items of equipment
shall be the rate resulting in the least total cost to the City for the total period
of use. The City shall make the final determination as to an equitable rental
rate for the equipment. No payment will be made for the use of small tools,
which have a replacement value of $1,000 or less. The rental time to be paid
for equipment shall be the time the equipment is in productive operation on
the Additional Work being performed. Rental time will not be allowed while
equipment is inoperative due to breakdowns. All equipment shall, in the
opinion of the City, be in good working condition and suitable for the purpose
for which the equipment is to be used. Equipment with no direct power unit
shall be powered by a unit of at least the minimum rating recommended by
the manufacturer. Before construction equipment is used on any Additional
Work, the Contractor shall plainly stencil or stamp an identifying number
thereon at a conspicuous location, and shall furnish to the City, in duplicate,
a description of the equipment and its identifying number. When hourly rates
are listed, any part of an hour less than 30 minutes of operation shall be
considered to be 1/2hour of operation, and any part of an hour greater than
30 minutes will be considered one hour of operation. When daily rates are
listed, any part of a day less than 4 hours operation shall be considered to
be 1/2-day of operation.
7. Allowed Mark-up. The allowed mark-up for any and all overhead (including
supervision and home and field office costs) and profit on work added to the
Contract shall be determined in accordance with the following provisions:
a. “Net Cost” is defined as the actual costs of labor, materials and tools and
equipment only, excluding overhead and profit. The costs of applicable
insurance and bond premium will be reimbursed to the Contractor and
Subcontractors at cost only, without mark-up. Contractor shall provide the
City with documentation of the costs, including but not limited to payroll
records, invoices, and such other information as the City may reasonably
request.
b. For Work performed by the Contractor’s forces the allowed mark-up shall
not exceed fifteen (15%) percent of labor costs, ten percent (10%) of
material costs, and ten percent (10%) of the cost of tools and equipment
use.
c. For Work performed by a Subcontractor, the added cost for overhead and
profit shall not exceed fifteen percent (15%) of the Subcontractor’s Net Cost
of the Work to which the Contractor may add up to five percent (5%) of the
Subcontractor’s Net Cost.
d. For Work performed by a sub-subcontractor, the added cost for overhead
and profit shall not exceed fifteen percent (15%) of the sub-subcontractor’s
Net Cost for Work to which the Subcontractor and Contractor may each add
3.A.3.c
Packet Pg. 115 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 78 of 92
up to an additional five percent (5%) of the Net Cost of the lower tier
subcontractor.
e. No additional mark-up will be allowed for lower tier subcontractors, and in
no case shall the added cost for overhead and profit payable by the City
exceed twenty-five percent (25%) of the Net Cost as defined herein, of the
party that performs the Work.
8. Documentation of Time-and-Material Costs.
a. T&M Daily Sheets. Contractor must submit timesheets, materials invoices,
records of equipment hours, and records of rental equipment hours to the
City’s for an approval signature each day that Work is performed on a time-
and material basis. The Engineer’s signature on time sheets only serves as
verification that the Work was performed and is not indicative of the City’s
agreement to Contractor’s entitlement to the cost.
b. T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet,
which shall include total actual costs, within five (5) Days following
completion of Additional Work on a time-and-material basis. Contractor’s
total actual cost shall be presented in a summary table in an electronic
spreadsheet file by labor, material, equipment, and any other costs, along
with documentation supporting the costs. Contractor’s failure to submit the
T&M Summary Sheet within five (5) Days of completion of the Additional
Work will result in Contractor’s waiver for any reimbursement of any costs
associated with the Additional Work.
9. Excluded Costs. The following costs or any other home or field office overhead
costs, all of which are to be considered administrative costs covered by the
Contractor’s mark-up, shall not be allowed costs and shall not be included in
any lump sum proposals or time-and-materials invoices:
a. Overhead Cost. Payroll costs and other compensation of Contractor’s
officers, executives, principals, general managers, engineers, architects,
estimators, attorneys, auditors, accountants, purchasing and contracting
agents, timekeepers, clerks, and other personnel employed by Contractor
whether at the Site or in Contractor’s principal office or any branch office,
material yard, or shop for general administration of the Work;
b. Office Expenses. Expenses of Contractor’s principal and branch offices;
c. Capital Expenses. Any part of Contractor’s capital expenses, including
interest on Contractor’s capital employed for the Additional Work and
charges against Contractor for delinquent payments;
d. Negligence. Costs due to the negligence of Contractor or any Subcontractor
or Supplier, or anyone directly or indirectly employed by any of them or for
whose acts any of them may be liable, including without limitation the
correction of Defective Work, disposal of materials or equipment wrongly
supplied, and making good any damage to property;
3.A.3.c
Packet Pg. 116 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 79 of 92
e. Small Tools. Cost of small tools valued at less than $1,000 and that remain
the property of Contractor;
f. Administrative Costs. Costs associated with the preparation of Change
Orders (whether or not ultimately authorized), cost estimates, or the
preparation or filing of Claims;
g. Anticipated Lost Profits. Expenses of Contractor associated with
anticipated lost profits or lost revenues, lost income or earnings, lost interest
on earnings, or unpaid retention;
h. Home Office Overhead. Costs derived from the computation of a “home
office overhead” rate by application of the Eichleay, Allegheny, burden
fluctuation, or other similar methods;
i. Special Consultants and Attorneys. Costs of special consultants or
attorneys, whether or not in the direct employ of Contractor, employed for
services specifically related to the resolution of a Claim, dispute, or other
matter arising out of or relating to the performance of the Additional Work.
j. Other. Other overhead or general expense costs of any kind and the cost
of any item not specifically and expressly included in the Contract
Documents; including but not limited to: submittals, drawings, field drawings,
shop drawings, including submissions of drawings; field inspection; general
superintendence; computer services; reproduction services; salaries of
project engineer, superintendent, timekeeper, storekeeper, and secretaries;
janitorial services; small tools, incidentals and consumables; temporary on-
site facilities (offices, telephones, high speed internet access, plumbing,
electrical power, lighting; platforms, fencing, water); surveying; estimating;
protection of work; handling and disposal fees; final cleanup; other incidental
work; related warranties; insurance and bond premiums.
9.2 Procedure for Resolving Claims.
A. Prerequisites. Contractor shall timely comply with any and all
requirement of the Contract Documents pertaining to notices and
requests for changes to the Contract Time or Contract Price, including
but not limited to all requirements of Article 9.1, as a prerequisite to filing
any claim governed by this Article. The failure to timely submit a notice
of delay or notice of change, or to timely request a change to the time
for completion or Contractor’s compensation, or to timely provide any
other notice or request required herein shall constitute a waiver of the
right to further pursue the claim under the Contract or at law.
B. Intent. Effective January 1, 1991, Section 20104 et seq., of the
California Public Contract Code prescribes a process utilizing informal
conferences, non-binding judicial supervised mediation, and judicial
arbitration to resolve disputes on construction claims of $375,000 or
less. Effective January 1, 2017, Section 9204 of the Public Contract
3.A.3.c
Packet Pg. 117 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 80 of 92
Code prescribes a process for negotiation and mediation to resolve
disputes on construction claims. The intent of this Article is to implement
Sections 20104 et seq. and Section 9204 of the California Public
Contract Code. This Article shall be construed to be consistent with all
applicable law, including but not limited to these statutes.
C. Claims. For purposes of this Article, “Claim” means a separate demand
by the Contractor for:
1. An adjustment to the time for completion including, without limitation, for relief
from damages or penalties for delay assessed by the City;
2. Payment by the City of money or damages arising from Work done by or on
behalf of the Contractor pursuant to the Contract, payment for which is not
otherwise expressly provided or to which the Contractor is not otherwise
entitled; or
3. An amount the payment of which is disputed by the City.
A “Claim” does not include any demand for payment for which the Contractor has
failed to provide notice, request a Change Order, or otherwise failed to follow any
procedures contained in the Contract Documents.
D. Filing Claims. Claims governed by this Article may not be filed unless and until
the Contractor completes any and all requirements of the Contract Documents
pertaining to notices and requests for changes to the Contract Time or Contract
Price, and Contractor’s request for a change has been denied in whole or in part.
Claims governed by this Article must be filed no later than thirty (30) Days after a
request for change has been denied in whole or in part or after any other event
giving rise to the Claim. The Claim shall be submitted in writing to the City and
shall include on its first page the following words in 16 point capital font: “THIS IS
A CLAIM.” The Claim shall include all information and documents necessary to
substantiate the Claim, including but not limited to those identified below. Nothing
in this Article is intended to extend the time limit or supersede notice requirements
otherwise provided by Contract Documents. Failure to follow such contractual
requirements shall bar any Claims or subsequent proceedings for compensation
or payment thereon.
E. Documentation. The Contractor shall submit all Claims in the following format:
1. Summary description of Claim including basis of entitlement, merit and amount
of time or money requested, with specific reference to the Contract Document
provisions pursuant to which the Claim is made
2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other
3.A.3.c
Packet Pg. 118 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 81 of 92
3. Chronology of events and correspondence
4. Narrative analysis of Claim merit
5. Analysis of Claim cost, including calculations and supporting documents
6. Time impact analysis in the form required by the Contract Documents or, if the
Contract Documents do not require a particular format, CPM format, if an
adjustment of the Contract Time is requested
F. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall
conduct a reasonable review of the Claim and, within a period not to exceed 45
Days, shall provide the Contractor a written statement identifying what portion of
the Claim is disputed and what portion is undisputed. Any payment due on an
undisputed portion of the Claim will be processed and made within 60 Days after
the City issues its written statement.
1. If the City needs approval from its governing body to provide the Contractor a
written statement identifying the disputed portion and the undisputed portion of
the Claim, and the City’s governing body does not meet within the 45 Days or
within the mutually agreed to extension of time following receipt of a Claim sent
by registered mail or certified mail, return receipt requested, the City shall have
up to three (3) Days following the next duly publicly noticed meeting of the City’s
governing body after the 45-Day period, or extension, expires to provide the
Contractor a written statement identifying the disputed portion and the
undisputed portion.
2. Within 30 Days of receipt of a Claim, the City may request in writing additional
documentation supporting the Claim or relating to defenses or Claims the City
may have against the Contractor. If additional information is thereafter required,
it shall be requested and provided pursuant to this subdivision, upon mutual
agreement of the City and the Contractor. The City’s written response to the
Claim, as further documented, shall be submitted to the Contractor within 30
Days (if the Claim is less than $50,000, within 15 Days) after receipt of the
further documentation, or within a period of time no greater than that taken by
the Contractor in producing the additional information or requested
documentation, whichever is greater.
G. Meet and Confer. If the Contractor disputes the City’s written response, or the
City fails to respond within the time prescribed, the Contractor may so notify the
City, in writing, either within 15 Days of receipt of the City’s response or within 15
Days of the City’s failure to respond within the time prescribed, respectively, and
demand in writing an informal conference to meet and confer for settlement of the
issues in dispute. Upon receipt of a demand, the City shall schedule a meet and
confer conference within 30 Days for settlement of the dispute.
H. Mediation. Within 10 business days following the conclusion of the meet and
confer conference, if the Claim or any portion of the Claim remains in dispute, the
City shall provide the Contractor a written statement identifying the portion of the
Claim that remains in dispute and the portion that is undisputed. Any payment
due on an undisputed portion of the Claim shall be processed and made within
3.A.3.c
Packet Pg. 119 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 82 of 92
60 Days after the City issues its written statement. Any disputed portion of the
Claim, as identified by the Contractor in writing, shall be submitted to nonbinding
mediation, with the City and the Contractor sharing the associated costs equally.
The public entity and Contractor shall mutually agree to a mediator within 10
business days after the disputed portion of the Claim has been identified in writing,
unless the parties agree to select a mediator at a later time.
1. If the parties cannot agree upon a mediator, each party shall select a mediator
and those mediators shall select a qualified neutral third party to mediate with
regard to the disputed portion of the Claim. Each party shall bear the fees and
costs charged by its respective mediator in connection with the selection of the
neutral mediator.
2. For purposes of this Article, mediation includes any nonbinding process,
including, but not limited to, neutral evaluation or a dispute review board, in
which an independent third party or board assists the parties in dispute
resolution through negotiation or by issuance of an evaluation. Any mediation
utilized shall conform to the timeframes in this Article.
3. Unless otherwise agreed to by the City and the Contractor in writing, the
mediation conducted pursuant to this section shall excuse any further obligation
under Section 20104.4 to mediate after litigation has been commenced.
4. The mediation shall be held no earlier than the date the Contractor completes
the Work or the date that the Contractor last performs Work, whichever is
earlier. All unresolved Claims shall be considered jointly in a single mediation,
unless a new unrelated Claim arises after mediation is completed.
I. Procedures After Mediation. If following the mediation, the Claim or any portion
remains in dispute, the Contractor must file a Claim pursuant to Chapter 1
(commencing with Section 900) and Chapter 2 (commencing with Section 910) of
Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.
For purposes of those provisions, the running of the period of time within which a
Claim must be filed shall be tolled from the time the Contractor submits his or her
written Claim pursuant to subdivision (a) until the time the Claim is denied,
including any period of time utilized by the meet and confer conference.
J. Civil Actions. The following procedures are established for all civil actions filed to
resolve Claims of $375,000 or less:
1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive
pleadings, the court shall submit the matter to non-binding mediation unless
waived by mutual stipulation of both parties or unless mediation was held prior
to commencement of the action in accordance with Public Contract Code
section 9204 and the terms of this Contract. The mediation process shall
provide for the selection within 15 Days by both parties of a disinterested third
person as mediator, shall be commenced within 30 Days of the submittal, and
shall be concluded within 15 Days from the commencement of the mediation
unless a time requirement is extended upon a good cause showing to the court.
3.A.3.c
Packet Pg. 120 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 83 of 92
2. If the matter remains in dispute, the case shall be submitted to judicial arbitration
pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3
of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code.
The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of
Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any
proceeding brought under this subdivision consistent with the rules pertaining
to judicial arbitration. In addition to Chapter 2.5 (commencing with Section
1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall,
when possible, be experienced in construction law, and (B) any party appealing
an arbitration award who does not obtain a more favorable judgment shall, in
addition to payment of costs and fees under that chapter, also pay the attorney’s
fees on appeal of the other party.
K. Government Code Claim Procedures.
1. This Article does not apply to tort claims and nothing in this Article is intended
nor shall be construed to change the time periods for filing tort claims or actions
specified by Chapter 1 (commending with Section 900) and Chapter 2
(commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the
Government Code.
2. In addition to any and all requirements of the Contract Documents pertaining to
notices of and requests for adjustment to the Contract Time, Contract Price, or
compensation or payment for Additional Work, disputed Work, construction
claims and/or changed conditions, the Contractor must comply with the claim
procedures set forth in Government Code Section 900, et seq. prior to filing any
lawsuit against the City.
3. Such Government Code claims and any subsequent lawsuit based upon the
Government Code claims shall be limited to those matters that remain
unresolved after all procedures pertaining to adjustment of the Contract Time
or Contract Price for Additional Work, disputed Work, construction claims,
and/or changed conditions have been followed by Contractor. If Contractor does
not comply with the Government Code claim procedure or the prerequisite
contractual requirements, Contractor may not file any action against the City.
4. A Government Code claim must be filed no earlier than the date the Work is
completed or the date the Contractor last performs Work on the Project,
whichever occurs first. A Government Code claim shall be inclusive of all
unresolved Claims known to Contractor or that should reasonably by known to
Contractor excepting only new unrelated Claims that arise after the Government
Code claim is submitted.
L. Non-Waiver. The City’s failure to respond to a Claim from the
Contractor within the time periods described in this Article or to
otherwise meet the time requirements of this Article shall result in the
Claim being deemed rejected in its entirety, and shall not constitute a
waiver of any rights under this Article.
3.A.3.c
Packet Pg. 121 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 84 of 92
ARTICLE 10 - MEASUREMENT; PAYMENT
10.1 Cost Breakdown.
A. Lump Sum Work. Contractor shall furnish on forms approved by the City within
ten (10) Days of the Notice to Proceed, a schedule of values allocating the entire
Contract Price to the various portions of the Work and prepared in such a form
and supported by such data to substantiate its accuracy as the Engineer may
require. This schedule of values, unless objected to by the Engineer, shall be
used as a basis for reviewing the Contractor’s applications for payment.
Contractor shall submit the schedule of values prior to submitting its first
application for payment, and the City will not issue any payment until it receives
and approves the schedule of values.
B. Unit Price Work. Where the Contract Documents provide that all or part of the
Work is to be Unit Price Work, initially the Contract Price will be deemed to include
for all Unit Price Work an amount equal to the sum of the unit price for each
separately identified item of Unit Price Work multiplied by the estimated quantity
of each item as indicated in the Contract. The estimated quantities of items of Unit
Price Work are not guaranteed and are solely for the purpose of comparison of
Bids and determining an initial Contract Price. Each unit price will be deemed to
include an amount considered by Contractor to be adequate to cover Contractor’s
overhead and or profit for each separately identified item. Unless otherwise
specified, payment will be based on the actual quantities of Work as verified and
approved by the Engineer, based on the price per unit as set forth in the Bid
Schedule.
10.2 Progress Estimates and Payment.
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit
to Engineer a payment request which shall set forth in detail the value of the Work
done for the period beginning with the date Work was first commenced and ending
on the end of the calendar month for which the payment request is prepared.
Contractor shall include an adjusted list of actual quantities, verified by the
Engineer, for unit price items listed, if any, in the Bid. Contractor shall include any
amount earned for authorized Change Orders. Contractor shall certify under
penalty of perjury, that all cost breakdowns and periodic estimates accurately
reflect the Work on the Project.
B. From the total thus computed, a deduction shall be made in the amount of five
percent (5%) for retention, except where the City has adopted a finding that the
Work done under the Contract is substantially complex, and then the amount
withheld as retention shall be the percentage specified in the Notice Inviting Bids.
The amount computed, less the amount withheld for retention and any amounts
withheld as set forth below, shall be the amount of the Contractor’s payment
request.
3.A.3.c
Packet Pg. 122 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 85 of 92
C. The City may withhold a sufficient amount or amounts of any payment or
payments otherwise due to Contractor, as in its judgment may be necessary to
cover:
1. Payments which may be past due and payable for just claims against Contractor
or any Subcontractors for labor or materials furnished in and about the
performance of work on the Project under this Contract.
2. Defective Work not remedied.
3. Failure of Contractor to make proper payments to his Subcontractor or for
material or labor.
4. Completion of the Contract if there is a reasonable doubt that the Work can be
completed for balance then unpaid.
5. Damage to another contractor or a third party.
6. Amounts which may be due the City for claims against Contractor.
7. Failure of Contractor to keep the Record Drawings up to date.
8. Failure to provide update on construction schedule as required herein.
9. Site cleanup.
10. Failure to comply with Contract Documents.
11. Liquidated damages.
12. Legally permitted penalties.
D. The City may apply such withheld amount or amounts to payment of such claims
or obligations at its discretion with the exception of subsections (C)(1), (3), and
(5) of this Article, which must be retained or applied in accordance with applicable
law. In so doing, the City shall be deemed the agent of Contractor and any
payment so made by the City shall be considered as a payment made under
contract by the City to Contractor and the City shall not be liable to Contractor for
such payments made in good faith. Such payments may be made without prior
judicial determination of claim or obligations. The City will render Contractor a
proper accounting of such funds disbursed on behalf of Contractor.
E. Upon receipt, the Engineer shall review the payment request to determine
whether it is undisputed and suitable for payment. If the payment request is
determined to be unsuitable for payment, it shall be returned to Contractor as
soon as practicable but not later than seven (7) Days after receipt, accompanied
by a document setting forth in writing the reasons why the payment request is not
proper. The City shall make the progress payment within 30 Days after the receipt
of an undisputed and properly submitted payment request from Contractor,
provided that a release of liens and claims has been received from the Contractor
3.A.3.c
Packet Pg. 123 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 86 of 92
pursuant to Civil Code section 8132. The number of days available to the City to
make a payment without incurring interest pursuant to this paragraph shall be
reduced by the number of Days by which the Engineer exceeds the seven (7) Day
requirement.
F. A payment request shall be considered properly executed if funds are available
for payment of the payment request and payment is not delayed due to an audit
inquiry by the financial officer of the City.
G. The City shall have the right to adjust any estimate of quantity and to subsequently
correct any error made in any estimate for payment.
10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the
City a written statement of the final quantities of unit price items for inclusion in
the final payment request. The City shall have the right to adjust any estimate of
quantity and to correct any error made in any estimate for payment.
B. When the Work has been accepted there shall be paid to Contractor a sum equal
to the Contract Price less any amounts previously paid Contractor and less any
amounts withheld by the City from Contractor under the terms of the Contract.
The final five percent (5%), or the percentage specified in the Notice Inviting Bids
where the City has adopted a finding of substantially complete, shall not become
due and payable until as required by Public Contract Code section 7107. If the
Contractor has placed securities with the City as described herein, the Contractor
shall be paid a sum equal to one hundred percent (100%) of the Contract Price
less any amounts due the City under the terms of the Contract.
C. Unless Contractor advises the City in writing prior to acceptance of the final five
percent (5%) or the percentage specified in the Notice Inviting Bids where the City
has adopted a finding of completion, or the return of securities held as described
herein, said acceptance shall operate as a release to the City of all claims and all
liability to Contractor for all things done or furnished in connection with this Work
and for every act of negligence of the City and for all other claims relating to or
arising out of this Work. If Contractor advises the City in writing prior to
acceptance of final payment or return of the securities that there is a dispute
regarding the amount due the Contractor, the City may pay the undisputed
amount contingent upon the Contractor furnishing a release of all undisputed
claims against the City with the disputed claims in stated amounts being
specifically excluded by Contractor from the operation of the release. No
payments, however, final or otherwise, shall operate to release Contractor or its
sureties from the faithful performance bond, labor and material payment bond, or
from any other obligation under this Contract.
D. In case of termination of the Contract any unpaid balance shall be and become
the sole and absolute property of the City to the extent necessary to repay the
City any excess in the cost of the Work above the Contract Price.
3.A.3.c
Packet Pg. 124 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 87 of 92
E. Final payment shall be made no later than 60 Days after the date of acceptance
of the Work by the City or the date of occupation, beneficial use and enjoyment
of the Work by the City including any operation only for testing, start-up or
commissioning accompanied by cessation of labor on the Work, provided that a
release of liens and claims has been received from the Contractor pursuant to
Civil Code section 8136. In the event of a dispute between the City and the
Contractor, the City may withhold from the final payment an amount not to exceed
150% of the disputed amount.
F. Within ten (10) Days from the time that all or any portion of the retention proceeds
are received by Contractor, Contractor shall pay each of its Subcontractors from
whom retention has been withheld each Subcontractor’s share of the retention
received. However, if a retention payment received by Contractor is specifically
designated for a particular Subcontractor, payment of the retention shall be made
to the designated Subcontractor if the payment is consistent with the terms of the
subcontract.
ARTICLE 11 -MISCELLANEOUS
11.1 Patents.
A. Contractor shall hold and save the City, officials, officers, employees, and
authorized volunteers harmless from liability of any nature or kind of claim
therefrom including costs and expenses for or on account of any patented or
unpatented invention, article or appliance manufactured, furnished or used by
Contractor in the performance of this Contract.
11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and
the Contractor shall be subject to examination and audit by the State Auditor
General for a period of three (3) years after final payment. Contractor shall make
available to the City any of the Contractor’s other documents related to the Project
immediately upon request of the City. In addition to the State Auditor rights above,
the City shall have the right to examine and audit all books, estimates, records,
contracts, documents, bid documents, subcontracts, and other data of the
Contractor (including computations and projections) related to negotiating,
pricing, or performing the modification in order to evaluate the accuracy and
completeness of the cost or pricing data at no additional cost to the City, for a
period of five (5) years after final payment.
11.3 Notice.
A. All notices shall be in writing and either served by personal delivery or mailed to
the other party. Written notice to the Contractor shall be addressed to Contractor’s
principal place of business unless Contractor designates another address in
writing for service of notice. Notice to the City shall be addressed to the City as
designated in the Notice Inviting Bids unless the City designates another address
in writing for service of notice. Notice shall be effective upon receipt or five (5)
3.A.3.c
Packet Pg. 125 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 88 of 92
Days after being sent by first class mail, whichever is earlier. Notice given by
facsimile shall not be effective unless acknowledged in writing by the receiving
party.
11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the
Contractor with timely notification of the receipt of any third-party claims relating
to the Contract. The City is entitled to recover reasonable costs incurred in
providing such notification.
11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’
State License Board which has jurisdiction to investigate complaints against
contractors if a complaint regarding a patent act or omission is filed within four (4)
years of the date of the alleged violation. A complaint regarding a latent act or
omission pertaining to structural defects must be filed within ten (10) years of the
date of the alleged violation. Any questions concerning a contractor may be
referred to the Registrar, Contractors’ State License Board, P.O. Box 26000,
Sacramento, California 95826.
11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the
rights or title of interest of any or all of this contract without the prior written
consent of the City. Any assignment or change of Contractor’s name of legal entity
without the written consent of the City shall be void. Any assignment of money
due or to become due under this Contract shall be subject to a prior lien for
services rendered or material supplied for performance of Work called for under
the Contract Documents in favor of all persons, firms, or corporations rendering
such services or supplying such materials to the extent that claims are filed
pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.
11.7 Change In Name And Nature Of Contractor’s Legal Entity.
A. Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be
taken to have the change reflected on the Contract and all related documents. No
change of Contractor’s name or nature will affect the City’s rights under the
Contract, including but not limited to the bonds.
11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf
of City to negotiate, supervise, make, accept, or approve, or to take part in
negotiating, supervising, making, accepting or approving any engineering,
inspection, construction, or material supply contract or any subcontract in
connection with construction of the project, shall be or become directly or
indirectly interested financially in the Contract.
3.A.3.c
Packet Pg. 126 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 89 of 92
11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any Subcontractor,
Supplier, or other person or organization performing any part of the Work, this
Contract shall be governed by the law of the State of California excluding any
choice of law provisions.
11.10 Jurisdiction; Venue
A. Contractor and any Subcontractor, Supplier, or other person or organization
performing any part of the Work agrees that any action or suits at law or in equity
arising out of or related to the bidding, award, or performance of the Work shall
be maintained in the Superior Court of Riverside County, California, and expressly
consent to the jurisdiction of said court, regardless of residence or domicile, and
agree that said court shall be a proper venue for any such action.
11.11 Cumulative Remedies.
A. The duties and obligations imposed by these General Conditions and the rights
and remedies available hereunder to the parties hereto are in addition to, and are
not to be construed in any way as a limitation of, any rights and remedies available
to any or all of them which are otherwise imposed or available by Applicable Laws,
by special warranty or guarantee, or by other provisions of the Contract
Documents. The provisions of this Article will be as effective as if repeated
specifically in the Contract Documents in connection with each particular duty,
obligation, right, and remedy to which they apply.
11.12 Survival of Obligations.
A. All representations, indemnifications, warranties, and guarantees made in,
required by, or given in accordance with the Contract Documents, as well as all
continuing obligations indicated in the Contract Documents, will survive final
payment, completion, and acceptance of the Work or termination or completion
of the Contract or termination of the services of Contractor.
11.13 Headings.
A. Article and paragraph headings are inserted for convenience only and do not
constitute parts of these General Conditions.
11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor
and Subcontractors must conform to the following requirements:
1. In entering into a public works contract or a subcontract to supply goods,
services, or materials pursuant to a public works contract, Contractor or
Subcontractor offer and agree to assign to the awarding body all rights, title,
and interest in and to all causes of action it may have under §4 of the Clayton
Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing
3.A.3.c
Packet Pg. 127 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 90 of 92
with §16700) of Part 2 of Division 7 of the Business and Professions Code)
arising from purchases of goods, services, or materials pursuant to the public
works contract or the subcontract.
2. This assignment must be made and become effective at the time the awarding
body tenders to Contractor, without further acknowledgment by the parties.
11.15 Other Legal Provisions.
A. Contractor shall give all notices and comply with all federal, state and local laws,
ordinances, rules and regulations bearing on conduct of work as indicated and
specified by their terms. References to specific laws, rules, or regulations in this
Contract are for reference purposes only, and shall not limit or affect the
applicability of provisions not specifically mentioned. If Contractor observes that
drawings and specifications are at variance therewith, he shall promptly notify City
in writing and any necessary changes shall be adjusted as provided for in this
Contract for changes in Work. If Contractor performs any Work knowing it to be
contrary to such laws, ordinances, rules and regulations, and without such notice
to City, he shall bear all costs arising therefrom.
B. Contractor shall be responsible for familiarity with the Americans with Disabilities
Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in
compliance with ADA laws, rules and regulations. Contractor shall comply with
the Historic Building Code, including, but not limited to, as it relates to the ADA,
whenever applicable.
C. Contractor acknowledges and understands that, pursuant to Public Contract
Code section 20676, sellers of "mined material" must be on an approved list of
sellers published pursuant to Public Resources Code section 2717(b) in order to
supply mined material for this Contract.
D. No City official or representative who is authorized in such capacity and on behalf
of City to negotiate, supervise, make, accept, or approve, or to take part in
negotiating, supervising, making, accepting, or approving any engineering,
inspection, construction or material supply contract or any subcontract in
connection with construction of the Work, shall be or become directly or indirectly
interested financially in the Contract.
E. All provisions of law required to be inserted in the Contract or Contract Documents
pursuant to any Applicable Laws shall be and are inserted herein. If through
mistake, neglect, oversight, or otherwise, any such provision is not herein inserted
or inserted in improper form, upon the application of either party, the Contract or
Contract Documents shall be changed by City, at no increase in Contract Price or
extension in Contract Times, so as to strictly comply with the Applicable Laws and
without prejudice to the rights of either party hereunder.
END OF GENERAL CONDITIONS
3.A.3.c
Packet Pg. 128 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 91 of 92
APPENDIX “A”
PLANS, DRAWINGS, TECHNICAL SPECIFICATIONS AND SCOPE OF WORK
See attachment labeled APPENDIX A-1 for Plans, Drawings, Technical Specifications and
Scope of Work
3.A.3.c
Packet Pg. 129 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
City of San Jacinto | Repair and Testing of the Lake Park Well Contract Page 92 of 92
APPENDIX “B”
PREVAILING WAGE RATES – FEDERAL GENERAL DECISION
See Attachment labeled B-1 for Prevailing Wage Rates – Federal General Decision
https://sam.gov/wage-determination/CA20260025/1
3.A.3.c
Packet Pg. 130 Attachment: Construction Contract between Well Tec Service, Inc. and City of San Jacinto - Draft (Lake Park Well Rehabilitation - Patch Casing)
Principal
Hydrogeologist
Senior
Hydrogeologist
Project
Hydrogeologis
Staff
Hydrogeologist GSI Technician Project
Coordinator
Item Description Labor Direct Costs Total Labor Direct Costs Total Labor Direct Costs Total
1 Project Management and Progress Meetings 2 4 1,190$ 1,190$ 1,482$ 30$ 1,512$ 1,620$ 1,620$
2
Provide Construction Management and Support, including Pre-Construction Meeting,
Submittal Review, Response to RFIs, COR Review, Schedule Review, Progress Payment
Review, and Construction Updates
2 8 4 2,590$ 129$ 2,719$ 3,326$ 357$ 3,683$ 3,540$ 3,540$
3 Field Observation during Mechanical Brushing 1 3 6 1,530$ 129$ 1,659$ 1,927$ 357$ 2,284$ 2,240$ 161$ 2,401$
4 Field Observation during Pre-Repair Video Survey 1 3 6 1,530$ 129$ 1,659$ 1,927$ 357$ 2,284$ 2,240$ 161$ 2,401$
5 Field Observation During Installation of Casing Patches 1 1 6 16 3,650$ 257$ 3,907$ 4,546$ 357$ 4,903$ 5,415$ 483$ 5,898$
6 Field Observation during Post-Repair Video Survey 1 3 6 1,530$ 129$ 1,659$ 1,927$ 357$ 2,284$ 2,240$ 161$ 2,401$
7 Field Observation during Dynamic Video Survey 2 4 8 2,430$ 129$ 2,559$ 3,194$ 357$ 3,551$ 3,500$ 161$ 3,661$
8 Field Observation during Well Disinfection 1 3 8 1,820$ 129$ 1,949$ 2,273$ 357$ 2,630$ 2,670$ 161$ 2,831$
9 Prepare Summary TM with Recommendations for Next Steps 2 4 8 12 4 4,650$ 4,650$ 5,750$ 130$ 5,880$ 6,820$ 6,820$
9 25 38 54 4 0 20,920$ 1,031$ 21,951$ 26,352$ 2,659$ 29,011$ 30,285$ 1,288$ 31,573$
IMPORTANT: This notice is an award of bid only. No work is to be started on-site until the City issues a formal Notice to Proceed. Any work performed prior to that date is done at the Contractor's own risk and expense.
Dudek
Cost Proposal for Professional Hydrogeological Services
City Of San Jacinto
Kyle Groundwater Kleinfelder
Total Hours and Cost:
3.A.3.d
Packet Pg. 131 Attachment: Proposals for Construction Management for Lake Park Well Rehabilitation (Lake Park Well
24438.00000\30452526.3
(BB&K 2021) -1- Professional Services Agreement
CITY OF SAN JACINTO
PROFESSIONAL SERVICES AGREEMENT BETWEEN
THE CITY OF SAN JACINTO
AND
KYLE GROUNDWATER, INC
3.A.3.e
Packet Pg. 132 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -2- Professional Services Agreement
1. PARTIES AND DATE.
This Agreement is made and entered into this 4th day of March, 2026, by and between
the City of San Jacinto, a municipal corporation, organized under the laws of the State of
California, with its principal place of business at 595 South San Jacinto Avenue, San Jacinto,
California 92583 ("City") and KYLE Groundwater, Inc., a California Corporation, with its
principal place of business at 2377 W. Foothill Blvd., Suite 7, Upland, CA 91786 ("Consultant").
City and Consultant are sometimes individually referred to herein as "Party" and collectively as
"Parties."
2. RECITALS.
2.1 Consultant.
Consultant desires to perform and assume responsibility for the provision of certain
professional services required by the City on the terms and conditions set forth in this
Agreement. Consultant represents that it is experienced in providing professional
hydrogeological services to public clients, is licensed in the State of California, and is familiar
with the plans of City.
2.2 Project.
City desires to engage Consultant to render such professional services for the Repair
and Testing of the Lake Park Well Project ("Project") as set forth in this Agreement.
3. TERMS.
3.1 Scope of Services and Term.
3.1.1 General Scope of Services. Consultant promises and agrees to furnish to
the City all labor, materials, tools, equipment, services, and incidental and customary work
necessary to fully and adequately supply the professional hydrogeological consulting services
necessary for the Project ("Services"). The Services are more particularly described in Exhibit
"A" attached hereto and incorporated herein by reference. All Services shall be subject to, and
performed in accordance with, this Agreement, the exhibits attached hereto and incorporated
herein by reference, and all applicable local, state and federal laws, rules and regulations.
3.1.2 Term. The term of this Agreement shall be from March 4, 2026, until full
completion of the Lake Park well rehabilitation project, unless earlier terminated as provided
herein. Consultant shall complete the Services within the term of this Agreement, and shall meet
any other established schedules and deadlines.
3.2 Compensation.
3.2.1 Compensation. Consultant shall receive compensation, including
authorized reimbursements, for all Services rendered under this Agreement at the rates set forth
in Exhibit "B" attached hereto and incorporated herein by reference. The total compensation
shall not exceed Twenty one thousand nine hundred and fifty-one dollars with zero cents
3.A.3.e
Packet Pg. 133 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -3- Professional Services Agreement
($21,951.00) without written approval of the City Council or City Manager, as applicable. Extra
Work may be authorized, as described below, and if authorized, will be compensated at the
rates and manner set forth in this Agreement.
3.2.2 Payment of Compensation. Consultant shall submit to City a monthly
invoice which indicates work completed and hours of Services rendered by Consultant. The
invoice shall describe the amount of Services provided since the initial commencement date, or
since the start of the subsequent billing periods, as appropriate, through the date of the invoice.
City shall, within 30 days of receiving such invoice, review the invoice and pay all non-disputed
and approved charges. If the City disputes any of Consultant's fees, the City shall give written
notice to Consultant within thirty (30) days of receipt of an invoice of any disputed fees set forth
therein. Payment shall not constitute acceptance of any Services completed by Consultant.
The making of final payment shall not constitute a waiver of any claims by the City for any
reason whatsoever.
3.2.3 Reimbursement for Expenses. Consultant shall not be reimbursed for
any expenses unless authorized in writing by City, or included in Exhibit "B" of this Agreement.
3.2.4 Extra Work. At any time during the term of this Agreement, City may
request that Consultant perform Extra Work. As used herein, "Extra Work" means any work
which is determined by City to be necessary for the proper completion of the Project, but which
the Parties did not reasonably anticipate would be necessary at the execution of this
Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written
authorization from the City.
3.2.5 Rate Increases. In the event that this Agreement is renewed pursuant to
Section 3.1.2, the rate set forth in Exhibit “B” may be adjusted each year at the time of renewal
as set forth in Exhibit “B.”
3.3 Responsibilities of Consultant.
3.3.1 Independent Contractor; Control and Payment of Subordinates. The
Services shall be performed by Consultant or under its supervision. Consultant will determine
the means, methods and details of performing the Services subject to the requirements of this
Agreement. City retains Consultant on an independent contractor basis and not as an
employee. Consultant retains the right to perform similar or different services for others during
the term of this Agreement. Any personnel performing the Services on behalf of Consultant
shall also not be employees of City and shall at all times be under Consultant's exclusive
direction and control. Neither City, nor any of its officials, officers, directors, employees or
agents shall have control over the conduct of Consultant or any of Consultant's officers,
employees, or agents, except as set forth in this Agreement. Consultant shall pay all wages,
salaries, and other amounts due such personnel in connection with their performance of
Services under this Agreement and as required by law. Consultant shall be responsible for all
reports and obligations respecting such additional personnel, including, but not limited to: social
security taxes, income tax withholding, unemployment insurance, disability insurance, and
workers' compensation insurance.
3.3.2 Schedule of Services. Consultant shall perform the Services
expeditiously, within the term of this Agreement, and in accordance with the Schedule of
Services set forth in Exhibit "B" attached hereto and incorporated herein by reference.
3.A.3.e
Packet Pg. 134 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -4- Professional Services Agreement
Consultant represents that it has the professional and technical personnel required to perform
the Services in conformance with such conditions. In order to facilitate Consultant's
conformance with the Schedule, City shall respond to Consultant's submittals in a timely
manner. Upon request of City, Consultant shall provide a more detailed schedule of anticipated
performance to meet the Schedule of Services.
3.3.3 Conformance to Applicable Requirements. All work prepared by
Consultant shall be subject to the approval of City.
3.3.4 Substitution of Key Personnel. Consultant has represented to City that
certain key personnel will perform and coordinate the Services under this Agreement. Should
one or more of such personnel become unavailable, Consultant may substitute other personnel
of at least equal competence upon written approval of City. In the event that City and
Consultant cannot agree as to the substitution of key personnel, City shall be entitled to
terminate this Agreement for cause. The key personnel for performance of this Agreement are
as follows: Mathew Osborn, Public Utilities Superintendent.
3.3.5 City's Representative. The City hereby designates Mathew Osborn,
Public Utilities Superintendent, or his/her designee, to act as its representative in all matters
pertaining to the administration and performance of this Agreement ("City's Representative").
City's Representative shall have the power to act on behalf of the City for review and approval
of all products submitted by Consultant but not the authority to enlarge the Scope of Services or
change the total compensation due to Consultant under this Agreement. The City Manager
shall be authorized to act on City's behalf and to execute all necessary documents which
enlarge the Scope of Services or change the Consultant's total compensation subject to the
provisions contained in this Agreement. Consultant shall not accept direction or orders from any
person other than the City Manager, City's Representative or his/her designee.
3.3.6 Consultant's Representative. Consultant hereby designates Russell Kyle,
President/ Principal Hydrogeologist, or his/her designee, to act as its representative for the
performance of this Agreement ("Consultant's Representative"). Consultant's Representative
shall have full authority to represent and act on behalf of the Consultant for all purposes under
this Agreement. The Consultant's Representative shall supervise and direct the Services, using
his/her best skill and attention, and shall be responsible for all means, methods, techniques,
sequences, and procedures and for the satisfactory coordination of all portions of the Services
under this Agreement.
3.3.7 Coordination of Services. Consultant agrees to work closely with City
staff in the performance of Services and shall be available to City's staff, consultants and other
staff at all reasonable times.
3.3.8 Standard of Care; Performance of Employees. Consultant shall perform
all Services under this Agreement in a skillful and competent manner, consistent with the
standards generally recognized as being employed by professionals in the same discipline in
the State of California. Consultant represents and maintains that it is skilled in the professional
calling necessary to perform the Services. Consultant warrants that all employees and
subconsultants shall have sufficient skill and experience to perform the Services assigned to
them. Finally, Consultant represents that it, its employees and subconsultants have all licenses,
permits, qualifications and approvals of whatever nature that are legally required to perform the
Services, and that such licenses and approvals shall be maintained throughout the term of this
3.A.3.e
Packet Pg. 135 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -5- Professional Services Agreement
Agreement. Consultant shall perform, at its own cost and expense and without reimbursement
from the City, any services necessary to correct errors or omissions which are caused by the
Consultant's failure to comply with the standard of care provided for herein. Any employee of
the Consultant or its subconsultants who is determined by the City to be uncooperative,
incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety
of persons or property, or any employee who fails or refuses to perform the Services in a
manner acceptable to the City, shall be promptly removed from the Project by the Consultant
and shall not be re-employed to perform any of the Services or to work on the Project.
3.3.9 Period of Performance.
3.3.9.1 Consultant shall perform and complete all Services under this
Agreement within the term set forth in Section 3.1.2 above (“Performance Time”). Consultant
shall also perform the Services in strict accordance with any completion schedule or Project
milestones described in Exhibits “A” or “B” attached hereto, or which may be separately agreed
upon in writing by the City and Consultant (“Performance Milestones”). Consultant agrees that if
the Services are not completed within the aforementioned Performance Time and/or pursuant to
any such Project Milestones developed pursuant to provisions of this Agreement, it is
understood, acknowledged and agreed that the City will suffer damage.
3.3.9.2 Neither City nor Consultant shall be considered in default of
this Agreement for delays in performance caused by circumstances beyond the reasonable
control of the non-performing Party. For purposes of this Agreement, such circumstances
include a Force Majeure Event. A Force Majeure Event shall mean an event that materially
affects a Party’s performance and is one or more of the following: (1) Acts of God or other
natural disasters; (2) terrorism or other acts of a public enemy; (3) orders of governmental
authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance
of permits or approvals by governmental authorities that are required for the services); (4)
strikes and other organized labor action occurring at the site and the effects thereof on the
services, only to the extent such strikes and other organized labor action are beyond the control
of Consultant and its subcontractors, and to the extent the effects thereof cannot be avoided by
use of replacement workers; and (5) pandemics, epidemics or quarantine restrictions. For
purposes of this section, “orders of governmental authorities,” includes ordinances, emergency
proclamations and orders, rules to protect the public health, welfare and safety, and other
actions of a public agency applicable to the services and Agreement.
3.3.9.3 Should a Force Majeure Event occur, the non-performing Party
shall, within a reasonable time of being prevented from performing, give written notice to the
other Party describing the circumstances preventing continued performance and the efforts
being made to resume performance of this Agreement. Force Majeure Events and/or delays,
regardless of the Party responsible for the delay, shall not entitle Consultant to any additional
compensation. Notwithstanding the foregoing in this section, the City may still terminate this
Agreement in accordance with the termination provisions of this Agreement.
3.3.10 Laws and Regulations; Employee/Labor Certification. Consultant shall
keep itself fully informed of and in compliance with all local, state and federal laws, rules and
regulations in any manner affecting the performance of the Project or the Services, including all
Cal/OSHA requirements, and shall give all notices required by law. Consultant shall be liable
for all violations of such laws and regulations in connection with Services. If Consultant
performs any work knowing it to be contrary to such laws, rules and regulations, Consultant
3.A.3.e
Packet Pg. 136 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -6- Professional Services Agreement
shall be solely responsible for all costs arising therefrom. Consultant shall defend, indemnify
and hold City, its officials, directors, officers, employees, agents, and volunteers free and
harmless, pursuant to the indemnification provisions of this Agreement, from any claim or
liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.
3.3.10.1 Employment Eligibility; Consultant. Consultant certifies that it
fully complies with all requirements and restrictions of state and federal law respecting the
employment of undocumented aliens, including, but not limited to, the Immigration Reform and
Control Act of 1986, as may be amended from time to time and shall require all subconsultants
and sub-subconsultants to comply with the same. Consultant certifies that it has not committed
a violation of any such law within the five (5) years immediately preceding the date of execution
of this Agreement, and shall not violate any such law at any time during the term of the
Agreement.
3.3.10.2 Employment Eligibility; Failure to Comply. Each person
executing this Agreement on behalf of Consultant verifies that they are a duly authorized officer
of Consultant, and understands that any of the following shall be grounds for the City to
terminate the Agreement for cause: (1) failure of Consultant or its subcontractors, consultants,
sub-subcontractors or subconsultants to meet any of the requirements provided for in Sections
3.3.10.1 or 3.3.10.2; (2) any misrepresentation or material omission concerning compliance with
such requirements (including in those verifications provided to the Consultant under Section
3.3.10.2); or (3) failure to immediately remove from the Project any person found not to be in
compliance with such requirements.
3.3.10.3 Equal Opportunity Employment. Consultant represents that it
is an equal opportunity employer and it shall not discriminate against any subconsultant,
employee or applicant for employment because of race, religion, color, national origin, handicap,
ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities
related to initial employment, upgrading, demotion, transfer, recruitment or recruitment
advertising, layoff or termination. Consultant shall also comply with all relevant provisions of
City's Minority Business Enterprise program, Affirmative Action Plan or other related programs
or guidelines currently in effect or hereinafter enacted.
3.3.10.4 Air Quality. To the extent applicable, Consultant must fully
comply with all applicable laws, rules and regulations in furnishing or using equipment and/or
providing services, including, but not limited to, emissions limits and permitting requirements
imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air
Resources Board (CARB). Consultant shall indemnify City against any fines or penalties
imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of
applicable laws, rules and/or regulations by Consultant, its subconsultants, or others for whom
Consultant is responsible under its indemnity obligations provided for in this Agreement.
3.3.10.5 Water Quality Management and Compliance. Consultant shall
keep itself and all subcontractors, staff, and employees fully informed of and in compliance with
all local, state and federal laws, rules and regulations that may impact, or be implicated by the
performance of the Services including, without limitation, all applicable provisions of the City’s
ordinances regulating water quality and storm water; the Federal Water Pollution Control Act (33
U.S.C. § 1251, et seq.); the California Porter-Cologne Water Quality Control Act (Water Code
§ 13000 et seq.); and any and all regulations, policies, or permits issued pursuant to any such
authority. Consultant must additionally comply with the lawful requirements of the City, and any
3.A.3.e
Packet Pg. 137 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -7- Professional Services Agreement
other municipality, drainage district, or other local agency with jurisdiction over the location
where the Services are to be conducted, regulating water quality and storm water discharges.
City may seek damages from Consultant for delay in completing the Services caused by
Consultant’s failure to comply with the laws, regulations and policies described in this Section,
or any other relevant water quality law, regulation, or policy.
3.3.10.6 Safety. Consultant shall execute and maintain its work so as to
avoid injury or damage to any person or property. In carrying out its Services, the Consultant
shall at all times be in compliance with all applicable local, state and federal laws, rules and
regulations, and shall exercise all necessary precautions for the safety of employees
appropriate to the nature of the work and the conditions under which the work is to be
performed.
3.3.11 Insurance. [CITY RISK MANAGER TO REVIEW PRIOR TO EACH USE]
3.3.11.1 Time for Compliance. Consultant shall not commence work
under this Agreement until it has provided evidence satisfactory to the City that it has secured
all insurance required under this section. In addition, Consultant shall not allow any
subconsultant to commence work on any subcontract until it has provided evidence satisfactory
to the City that the subconsultant has secured all insurance required under this section. Failure
to provide and maintain all required insurance shall be grounds for the City to terminate this
Agreement for cause.
3.3.11.2 Types of Insurance Required. As a condition precedent to the
effectiveness of this Agreement for work to be performed hereunder, and without limiting the
indemnity provisions of the Agreement, the Consultant, in partial performance of its obligations
under such Agreement, shall procure and maintain in full force and effect during the term of the
Agreement the following policies of insurance. If the existing policies do not meet the insurance
requirements set forth herein, Consultant agrees to amend, supplement or endorse the policies
to do so.
(A) Commercial General Liability: Commercial General
Liability Insurance which affords coverage at least as broad as Insurance Services Office
"occurrence" form CG 00 01, or the exact equivalent, with limits of not less than $1,000,000 per
occurrence and no less than $2,000,000 in the general aggregate. Defense costs shall be paid
in addition to the limits. The policy shall contain no endorsements or provisions (1) limiting
coverage for contractual liability; (2) excluding coverage for claims or suits by one insured
against another (cross-liability); (3) products/completed operations liability; or (4) containing any
other exclusion(s) contrary to the terms or purposes of this Agreement.
(B) Automobile Liability Insurance: Automobile Liability
Insurance with coverage at least as broad as Insurance Services Office Form CA 00 01
covering "Any Auto" (Symbol 1), or the exact equivalent, covering bodily injury and property
damage for all activities with limits of not less than $1,000,000 combined limit for each
occurrence. [***NOTE: If Consultant does not own any company vehicles or may not be
able to purchase a Business Automobile Insurance Policy, the requirement may be
satisfied by providing either of the following: (1) a Personal Automobile Liability policy for
the Consultant's own vehicle stipulating "Automobile Liability Insurance with a limit of not less
than $1,000,000 each accident"; or (2) a non-owned auto endorsement to the Commercial
3.A.3.e
Packet Pg. 138 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -8- Professional Services Agreement
General Liability policy if Consultant uses vehicles of others (e.g., vehicles of employees).
ALWAYS DELETE THIS SECTION IF NOT USED.***]
(C) Workers' Compensation: Workers' Compensation
Insurance, as required by the State of California and Employer's Liability Insurance with a limit
of not less than $1,000,000 per accident for bodily injury and disease.
(D) Professional Liability (Errors & Omissions): [***INCLUDE
THIS SUB-SECTION ONLY IF APPLICABLE; DELETE OTHERWISE***]Professional Liability
insurance or Errors & Omissions insurance appropriate to Consultant’s profession with limits of
not less than $1,000,000. Covered professional services shall specifically include all work to be
performed under the Agreement and delete any exclusions that may potentially affect the work
to be performed (for example, any exclusions relating to lead, asbestos, pollution, testing,
underground storage tanks, laboratory analysis, soil work, etc.). If coverage is written on a
claims-made basis, the retroactive date shall precede the effective date of the initial Agreement
and continuous coverage will be maintained or an extended reporting period will be exercised
for a period of at least five (5) years from termination or expiration of this Agreement.
(E) Pollution Liability: [***OPTIONAL: include the following
provision if there is a pollution liability exposure; otherwise, always delete.]Pollution Liability
Insurance covering all of the consultant’s operations to include onsite and offsite coverage for
bodily injury (including death and mental anguish), property damage, defense costs and cleanup
costs with limits of not less than $5,000,000 per loss and $10,000,000 total all losses. The
policy shall contain no endorsements or provisions limiting contractual liability or coverage for
cross liability of claims or suits by one insured against another. If coverage is written on a
claims-made basis, the retroactive date shall precede the effective date of the initial Agreement
and continuous coverage will be maintained or an extended reporting period will be exercised
for a period of at least three (3) years from termination or expiration of this Agreement.
[***ALWAYS DELETE IF NOT USED***]
3.3.11.3 Insurance Endorsements. Required insurance policies shall
contain the following provisions, or Consultant shall provide endorsements on forms approved
by the City to add the following provisions to the insurance policies:
(A) Commercial General Liability [***INSERT "and Pollution
Liability"; OTHERWISE, ALWAYS DELETE]: (1) Additional Insured: The City, its officials,
officers, employees, agents, and volunteers shall be additional insureds with regard to liability
and defense of suits or claims arising out of the performance of the Agreement. Additional
Insured Endorsements shall not (1) be restricted to "ongoing operations"; (2) exclude
"contractual liability"; (3) restrict coverage to "sole" liability of Consultant; or (4) contain any
other exclusions contrary to the terms or purposes of this Agreement. For all policies of
Commercial General Liability insurance, Consultant shall provide endorsements in the form of
ISO CG 20 10 10 01 and 20 37 10 01 (or endorsements providing the exact same coverage) to
effectuate this requirement. (2) Cancellation: Required insurance policies shall not be canceled
or the coverage reduced until a thirty (30) day written notice of cancellation has been served
upon the City except ten (10) days shall be allowed for non-payment of premium.
(B) Automobile Liability. (1) Cancellation: Required insurance
policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of
3.A.3.e
Packet Pg. 139 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -9- Professional Services Agreement
cancellation has been served upon the City except ten (10) days shall be allowed for non-
payment of premium.
(C) Professional Liability (Errors & Omissions): [***INCLUDE
THIS SUB-SECTION ONLY IF APPLICABLE; DELETE OTHERWISE***](1) Cancellation:
Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day
written notice of cancellation has been served upon the City except ten (10) days shall be
allowed for non-payment of premium. (2) Contractual Liability Exclusion Deleted: This
insurance shall include contractual liability applicable to this Agreement. The policy must “pay
on behalf of” the insured and include a provision establishing the insurer’s duty to defend.
(D) Pollution Liability: [***INCLUDE THIS SUB-SECTION
ONLY IF APPLICABLE; DELETE OTHERWISE***](1) Additional Insured: The City, its officials,
officers, employees, agents, and volunteers shall be additional insureds with regard to liability
and defense of suits or claims arising out of the performance of the Agreement.
(E) Workers' Compensation: (1) Cancellation: Required
insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written
notice of cancellation has been served upon the City except ten (10) days shall be allowed for
non-payment of premium. (2) Waiver of Subrogation: A waiver of subrogation stating that the
insurer waives all rights of subrogation against the City, its officials, officers, employees, agents,
and volunteers.
3.3.11.4 Primary and Non-Contributing Insurance. All policies of
insurance shall be primary and any other insurance, deductible, or self-insurance maintained by
the City, its officials, officers, employees, agents, or volunteers shall not contribute with this
primary insurance. Policies shall contain or be endorsed to contain such provisions.
3.3.11.5 Waiver of Subrogation. All required insurance coverages,
except for the professional liability coverage, shall contain or be endorsed to waiver of
subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall
specifically allow Consultant or others providing insurance evidence in compliance with these
specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own
right of recovery against City, and shall require similar written express waivers and insurance
clauses from each of its subconsultants.
3.3.11.6 Deductibles and Self-Insured Retentions. Any deductible or
self-insured retention must be approved in writing by the City and shall protect the City, its
officials, officers, employees, agents, and volunteers in the same manner and to the same
extent as they would have been protected had the policy or policies not contained a deductible
or self-insured retention.
3.3.11.7 Evidence of Insurance. The Consultant, concurrently with the
execution of the Agreement, and as a condition precedent to the effectiveness thereof, shall
deliver either certified copies of the required policies, or original certificates on forms approved
by the City, together with all endorsements affecting each policy. Required insurance policies
shall not be in compliance if they include any limiting provision or endorsement that has not
been submitted to the City for approval. The certificates and endorsements for each insurance
policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At
least fifteen (15 days) prior to the expiration of any such policy, evidence of insurance showing
3.A.3.e
Packet Pg. 140 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -10- Professional Services Agreement
that such insurance coverage has been renewed or extended shall be filed with the City. If such
coverage is cancelled or reduced and not replaced immediately so as to avoid a lapse in the
required coverage, Consultant shall, within ten (10) days after receipt of written notice of such
cancellation or reduction of coverage, file with the City evidence of insurance showing that the
required insurance has been reinstated or has been provided through another insurance
company or companies.
3.3.11.8 Acceptability of Insurers. Each such policy shall be from a
company or companies with a current A.M. Best's rating of no less than A:VII and authorized to
transact business of insurance in the State of California, or otherwise allowed to place insurance
through surplus line brokers under applicable provisions of the California Insurance Code or any
federal law.
3.3.11.9 Enforcement of Agreement Provisions (non estoppel).
Consultant acknowledges and agrees that actual or alleged failure on the part of the City to
inform Consultant of non-compliance with any requirement imposes no additional obligation on
the City nor does it waive any rights hereunder.
3.3.11.10 Requirements Not Limiting. Requirement of specific coverage
or minimum limits contained in this Section are not intended as a limitation on coverage, limits,
or other requirement, or a waiver of any coverage normally provided by any insurance.
3.3.11.11 Additional Insurance Provisions
(A) The foregoing requirements as to the types and limits of
insurance coverage to be maintained by Consultant, and any approval of said insurance by the
City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations
otherwise assumed by the Consultant pursuant to this Agreement, including but not limited to,
the provisions concerning indemnification.
(B) If at any time during the life of the Agreement, any policy of
insurance required under this Agreement does not comply with these specifications or is
canceled and not replaced, City has the right but not the duty to obtain the insurance it deems
necessary and any premium paid by City will be promptly reimbursed by Consultant or City will
withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City
may cancel this Agreement.
(C) The City may require the Consultant to provide complete
copies of all insurance policies in effect for the duration of the Project.
(D) Neither the City nor any of its officials, officers, employees,
agents or volunteers shall be personally responsible for any liability arising under or by virtue of
this Agreement.
(E) The limits set forth herein shall apply separately to each
insured against whom claims are made or suits are brought, except with respect to the limits of
liability. Further the limits set forth herein shall not be construed to relieve the Consultant from
liability in excess of such coverage, nor shall it limit the Consultant’s indemnification obligations
to the City and shall not preclude the City from taking such other actions available to the City
under other provisions of the Agreement or law.
3.A.3.e
Packet Pg. 141 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -11- Professional Services Agreement
(F) Consultant shall report to the City, in addition to
Consultant’s insurer, any and all insurance claims submitted by Consultant in connection with
the Services under this Agreement.
3.3.11.12 Insurance for Subconsultants. Consultant shall include all
subconsultants engaged in any work for Consultant relating to this Agreement as additional
insureds under the Consultant's policies, or the Consultant shall be responsible for causing
subconsultants to purchase the appropriate insurance in compliance with the terms of these
Insurance Requirements, including adding the City, its officials, officers, employees, agents, and
volunteers as additional insureds to the subconsultant's policies. All policies of Commercial
General Liability insurance provided by Consultant’s subconsultants performing work relating to
this Agreement shall be endorsed to name the City, its officials, officers, employees, agents and
volunteers as additional insureds using endorsement form ISO CG 20 38 04 13 or an
endorsement providing equivalent coverage. Consultant shall not allow any subconsultant to
commence work on any subcontract relating to this Agreement until it has received satisfactory
evidence of subconsultant’s compliance with all insurance requirements under this Agreement,
to the extent applicable. The Consultant shall provide satisfactory evidence of compliance with
this section upon request of the City.
3.4 Labor Code Requirements.
3.4.1 Prevailing Wages. Consultant is aware of the requirements of California
Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations,
Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of
prevailing wage rates and the performance of other requirements on "public works" and
"maintenance" projects. If the Services are being performed as part of an applicable "public
works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total
compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage
Laws. City shall provide Consultant with a copy of the prevailing rates of per diem wages in
effect at the commencement of this Agreement. Consultant shall make copies of the prevailing
rates of per diem wages for each craft, classification or type of worker needed to execute the
Services available to interested parties upon request, and shall post copies at the Consultant's
principal place of business and at the project site. It is the intent of the parties to effectuate the
requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 of the Labor Code
within this Agreement, and Consultant shall therefore comply with such Labor Code sections to
the fullest extent required by law. Consultant shall defend, indemnify and hold the City, its
officials, officers, employees, agents, and volunteers free and harmless from any claim or
liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
3.4.2 Registration/DIR Compliance. If the Services are being performed on a
public works project of over $25,000 when the project is for construction, alteration, demolition,
installation, or repair work, or a public works project of over $15,000 when the project is for
maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5
and 1771.1, the Consultant and all subconsultants must be registered with the Department of
Industrial Relations (“DIR”). Consultant shall maintain registration for the duration of the Project
and require the same of any subconsultants.
3.4.3 Compliance Monitoring. This Project may also be subject to compliance
monitoring and enforcement by the DIR. It shall be Consultant’s sole responsibility to comply
with all applicable registration and labor compliance requirements, including the submission of
3.A.3.e
Packet Pg. 142 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -12- Professional Services Agreement
payroll records directly to the DIR. Any stop orders issued by the DIR against Consultant or any
subconsultant that affect Consultant’s performance of services, including any delay, shall be
Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall
be considered Consultant caused delay and shall not be compensable by the City. Consultant
shall defend, indemnify and hold the City, its officials, officers, employees and agents free and
harmless from any claim or liability arising out of stop orders issued by the DIR against
Consultant or any subconsultant.
3.4.4 Labor Certification. By its signature hereunder, Consultant certifies that it
is aware of the provisions of Section 3700 of the California Labor Code which require every
employer to be insured against liability for Worker's Compensation or to undertake self-
insurance in accordance with the provisions of that Code, and agrees to comply with such
provisions before commencing the performance of the Services.
3.5 Accounting Records.
3.5.1 Maintenance and Inspection. Consultant shall maintain complete and
accurate records with respect to all costs and expenses incurred under this Agreement. All
such records shall be clearly identifiable. Consultant shall allow a representative of City during
normal business hours to examine, audit, and make transcripts or copies of such records and
any other documents created pursuant to this Agreement. Consultant shall allow inspection of
all work, data, documents, proceedings, and activities related to the Agreement for a period of
three (3) years from the date of final payment under this Agreement.
3.6 General Provisions.
3.6.1 Termination of Agreement.
3.6.1.1 Grounds for Termination. City may, by written notice to
Consultant, terminate the whole or any part of this Agreement at any time and without cause by
giving written notice to Consultant of such termination, and specifying the effective date thereof,
at least seven (7) days before the effective date of such termination. Upon termination,
Consultant shall be compensated only for those Services which have been adequately rendered
to City, and Consultant shall be entitled to no further compensation. Consultant may not
terminate this Agreement except for cause. The rights and remedies of the City provided in this
section shall not be exclusive and are in addition to any other rights and remedies provided by
law, equity or under this Agreement.
3.6.1.2 Effect of Termination. If this Agreement is terminated as
provided herein, City may require Consultant to provide all finished or unfinished Documents
and Data and other information of any kind prepared by Consultant in connection with the
performance of Services under this Agreement. Consultant shall be required to provide such
document and other information within fifteen (15) days of the request.
3.6.1.3 Additional Services. In the event this Agreement is terminated
in whole or in part as provided herein, City may procure, upon such terms and in such manner
as it may determine appropriate, services similar to those terminated.
3.6.2 Delivery of Notices. All notices permitted or required under this
Agreement shall be given to the respective parties at the following address, or at such other
3.A.3.e
Packet Pg. 143 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -13- Professional Services Agreement
address as the respective parties may provide in writing for this purpose:
Consultant: KYLE Groundwater, Inc
2377 W. Foothill Blvd., Suite 7
Upland, CA 91786
ATTN: RUSSELL KYLE
City: City of San Jacinto
595 S. San Jacinto Avenue
San Jacinto, CA 92583
ATTN: MATHEW OSBORN
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48)
hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its
applicable address. Actual notice shall be deemed adequate notice on the date actual notice
occurred, regardless of the method of service.
3.6.3 Ownership of Materials and Confidentiality.
3.6.3.1 Documents & Data; Licensing of Intellectual Property. This
Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse,
or sublicense any and all copyrights, designs, and other intellectual property embodied in plans,
specifications, studies, drawings, estimates, and other documents or works of authorship fixed
in any tangible medium of expression, including but not limited to, physical drawings or data
magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be
prepared by Consultant under this Agreement ("Documents & Data"). All Documents & Data
shall be and remain the property of City, and shall not be used in whole or in substantial part by
Consultant on other projects without the City’s express written permission. Within thirty (30)
days following the completion, suspension, abandonment or termination of this Agreement,
Consultant shall provide to City reproducible copies of all Documents & Data, in a form and
amount required by City. City reserves the right to select the method of document reproduction
and to establish where the reproduction will be accomplished. The reproduction expense shall
be borne by City at the actual cost of duplication. In the event of a dispute regarding the
amount of compensation to which the Consultant is entitled under the termination provisions of
this Agreement, Consultant shall provide all Documents & Data to City upon payment of the
undisputed amount. Consultant shall have no right to retain or fail to provide to City any such
documents pending resolution of the dispute. In addition, Consultant shall retain copies of all
Documents & Data on file for a minimum of fifteen (15) years following completion of the
Project, and shall make copies available to City upon the payment of actual reasonable
duplication costs. Before destroying the Documents & Data following this retention period,
Consultant shall make a reasonable effort to notify City and provide City with the opportunity to
obtain the documents.
3.6.3.2 Subconsultants. Consultant shall require all subconsultants to
agree in writing that City is granted a non-exclusive and perpetual license for any Documents &
Data the subconsultant prepares under this Agreement. Consultant represents and warrants
that Consultant has the legal right to license any and all Documents & Data. Consultant makes
no such representation and warranty in regard to Documents & Data which were prepared by
design professionals other than Consultant or its subconsultants, or those provided to
Consultant by the City.
3.A.3.e
Packet Pg. 144 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -14- Professional Services Agreement
3.6.3.3 Right to Use. City shall not be limited in any way in its use or
reuse of the Documents and Data or any part of them at any time for purposes of this Project or
another project, provided that any such use not within the purposes intended by this Agreement
or on a project other than this Project without employing the services of Consultant shall be at
City’s sole risk. If City uses or reuses the Documents & Data on any project other than this
Project, it shall remove the Consultant’s seal from the Documents & Data and indemnify and
hold harmless Consultant and its officers, directors, agents and employees from claims arising
out of the negligent use or re-use of the Documents & Data on such other project. Consultant
shall be responsible and liable for its Documents & Data, pursuant to the terms of this
Agreement, only with respect to the condition of the Documents & Data at the time they are
provided to the City upon completion, suspension, abandonment or termination. Consultant
shall not be responsible or liable for any revisions to the Documents & Data made by any party
other than Consultant, a party for whom the Consultant is legally responsible or liable, or
anyone approved by the Consultant.
3.6.3.4 Indemnification. Consultant shall defend, indemnify and hold
the City, its directors, officials, officers, employees, volunteers and agents free and harmless,
pursuant to the indemnification provisions of this Agreement, for any alleged infringement of any
patent, copyright, trade secret, trade name, trademark, or any other proprietary right of any
person or entity in consequence of the use on the Project by City of the Documents & Data,
including any method, process, product, or concept specified or depicted.
3.6.3.5 Confidentiality. All ideas, memoranda, specifications, plans,
procedures, drawings, descriptions, computer program data, input record data, written
information, and other Documents & Data either created by or provided to Consultant in
connection with the performance of this Agreement shall be held confidential by Consultant.
Such materials shall not, without the prior written consent of City, be used by Consultant for any
purposes other than the performance of the Services. Nor shall such materials be disclosed to
any person or entity not connected with the performance of the Services or the Project. Nothing
furnished to Consultant which is otherwise known to Consultant or is generally known, or has
become known, to the related industry shall be deemed confidential. Consultant shall not use
City's name or insignia, photographs of the Project, or any publicity pertaining to the Services or
the Project in any magazine, trade paper, newspaper, television or radio production or other
similar medium without the prior written consent of City.
3.6.3.6 Confidential Information. The City shall refrain from releasing
Consultant’s proprietary information ("Proprietary Information") unless the City's legal counsel
determines that the release of the Proprietary Information is required by the California Public
Records Act or other applicable state or federal law, or order of a court of competent jurisdiction,
in which case the City shall notify Consultant of its intention to release Proprietary Information.
Consultant shall have five (5) working days after receipt of the release notice to give City written
notice of Consultant's objection to the City's release of Proprietary Information. Consultant shall
indemnify, defend and hold harmless the City, and its officers, directors, employees, and agents
from and against all liability, loss, cost or expense (including attorney’s fees) arising out of a
legal action brought to compel the release of Proprietary Information. City shall not release the
Proprietary Information after receipt of the objection notice unless either: (1) Consultant fails to
fully indemnify, defend (with City's choice of legal counsel), and hold City harmless from any
legal action brought to compel such release; and/or (2) a final and non-appealable order by a
court of competent jurisdiction requires that City release such information.
3.A.3.e
Packet Pg. 145 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -15- Professional Services Agreement
3.6.4 Cooperation; Further Acts. The Parties shall fully cooperate with one
another, and shall take any additional acts or sign any additional documents as may be
necessary, appropriate or convenient to attain the purposes of this Agreement.
3.6.5 Indemnification.
3.6.5.1 To the fullest extent permitted by law, Consultant shall defend
(with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees,
volunteers, and agents free and harmless from any and all claims, demands, causes of action,
costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or
persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any
acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees,
subcontractors, consultants or agents in connection with the performance of the Consultant’s
Services, the Project or this Agreement, including without limitation the payment of all damages,
expert witness fees and attorney’s fees and other related costs and expenses except such loss
or damage caused by the sole negligence or willful misconduct of the City. Consultant's
obligation to indemnify shall survive expiration or termination of this Agreement and shall not be
restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers,
employees, agents, or volunteers.
3.6.5.2 If Consultant’s obligation to defend, indemnify, and/or hold
harmless arises out of Consultant’s performance as a “design professional” (as that term is
defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code
section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall
be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or
willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a
court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend,
shall not exceed the Consultant’s proportionate percentage of fault.
3.6.6 Entire Agreement. This Agreement contains the entire Agreement of the
parties with respect to the subject matter hereof, and supersedes all prior negotiations,
understandings or agreements. This Agreement may only be modified by a writing signed by
both parties.
3.6.7 Governing Law; Government Code Claim Compliance. This Agreement
shall be governed by the laws of the State of California. Venue shall be in Riverside County. In
addition to any and all contract requirements pertaining to notices of and requests for
compensation or payment for extra work, disputed work, claims and/or changed conditions,
Consultant must comply with the claim procedures set forth in Government Code sections 900
et seq. prior to filing any lawsuit against the City. Such Government Code claims and any
subsequent lawsuit based upon the Government Code claims shall be limited to those matters
that remain unresolved after all procedures pertaining to extra work, disputed work, claims,
and/or changed conditions have been followed by Consultant. If no such Government Code
claim is submitted, or if any prerequisite contractual requirements are not otherwise satisfied as
specified herein, Consultant shall be barred from bringing and maintaining a valid lawsuit
against the City.
3.6.8 Time of Essence. Time is of the essence for each and every provision of
this Agreement.
3.A.3.e
Packet Pg. 146 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -16- Professional Services Agreement
3.6.9 City's Right to Employ Other Consultants. City reserves right to employ
other consultants in connection with this Project.
3.6.10 Successors and Assigns. This Agreement shall be binding on the
successors and assigns of the parties.
3.6.11 Assignment or Transfer. Consultant shall not assign, hypothecate, or
transfer, either directly or by operation of law, this Agreement or any interest herein without the
prior written consent of the City. Any attempt to do so shall be null and void, and any
assignees, hypothecates or transferees shall acquire no right or interest by reason of such
attempted assignment, hypothecation or transfer.
3.6.12 Construction; References; Captions. Since the Parties or their agents
have participated fully in the preparation of this Agreement, the language of this Agreement
shall be construed simply, according to its fair meaning, and not strictly for or against any Party.
Any term referencing time, days or period for performance shall be deemed calendar days and
not work days. All references to Consultant include all personnel, employees, agents, and
subconsultants of Consultant, except as otherwise specified in this Agreement. All references
to City include its elected officials, officers, employees, agents, and volunteers except as
otherwise specified in this Agreement. The captions of the various articles and paragraphs are
for convenience and ease of reference only, and do not define, limit, augment, or describe the
scope, content, or intent of this Agreement.
3.6.13 Amendment; Modification. No supplement, modification, or amendment
of this Agreement shall be binding unless executed in writing and signed by both Parties.
3.6.14 Waiver. No waiver of any default shall constitute a waiver of any other
default or breach, whether of the same or other covenant or condition. No waiver, benefit,
privilege, or service voluntarily given or performed by a Party shall give the other Party any
contractual rights by custom, estoppel, or otherwise.
3.6.15 No Third-Party Beneficiaries. There are no intended third party
beneficiaries of any right or obligation assumed by the Parties.
3.6.16 Invalidity; Severability. If any portion of this Agreement is declared
invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions shall continue in full force and effect.
3.6.17 Prohibited Interests. Consultant maintains and warrants that it has not
employed nor retained any company or person, other than a bona fide employee working solely
for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not
paid nor has it agreed to pay any company or person, other than a bona fide employee working
solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other
consideration contingent upon or resulting from the award or making of this Agreement. For
breach or violation of this warranty, City shall have the right to rescind this Agreement without
liability. For the term of this Agreement, no member, officer or employee of City, during the term
of his or her service with City, shall have any direct interest in this Agreement, or obtain any
present or anticipated material benefit arising therefrom.
3.6.18 Authority to Enter Agreement. Consultant has all requisite power and
3.A.3.e
Packet Pg. 147 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -17- Professional Services Agreement
authority to conduct its business and to execute, deliver, and perform the Agreement. Each
Party warrants that the individuals who have signed this Agreement have the legal power, right,
and authority to make this Agreement and bind each respective Party.
3.6.19 Counterparts. This Agreement may be signed in counterparts, each of
which shall constitute an original.
3.6.20 Survival. All rights and obligations hereunder that by their nature are to
continue after any expiration or termination of this Agreement, including, but not limited to, the
indemnification obligations, shall survive any such expiration or termination.
3.7 Subcontracting.
3.7.1 Prior Approval Required. Consultant shall not subcontract any portion of
the work required by this Agreement, except as expressly stated herein, without prior written
approval of City. Subcontracts, if any, shall contain a provision making them subject to all
provisions stipulated in this Agreement.
[SIGNATURES ON NEXT PAGE]
3.A.3.e
Packet Pg. 148 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) -18- Professional Services Agreement
SIGNATURE PAGE TO PROFESSIONAL SERVICES AGREEMENT
BY AND BETWEEN THE CITY OF SAN JACINTO AND KYLE GROUNDWATER, INC
IN WITNESS WHEREOF, each of the Parties has caused this Agreement to be
executed on the day and year first above written.
CITY OF SAN JACINTO KYLE GROUNDWATER, INC
By: ____________________________ By: ____________________________
Robert A. Johnson Russell Kyle
City Manager President
Attest:
City Clerk
Approved as to Form:
______________________________
Best Best & Krieger LLP
City Attorney
3.A.3.e
Packet Pg. 149 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) Exhibit “A”-1 Professional Services Agreement
EXHIBIT "A"
SCOPE OF SERVICES
This project involves comprehensive Construction Management (CM) and Technical
Oversight for well rehabilitation. The scope is divided into three primary phases:
1. Administrative & Construction Management
• Meeting Oversight: Lead project management efforts, including progress meetings and
the initial Pre-Construction kickoff.
• Documentation Review: Manage technical and financial logistics through submittal
reviews, RFI responses, and Change Order Request (COR) evaluations.
• Project Controls: Monitor project timelines via schedule reviews and verify billings
through progress payment reviews.
2. Field Observation & Technical Inspections
• Rehabilitation Monitoring: Provide onsite observation during mechanical brushing and
the installation of casing patches.
• Video Surveys: Supervise multiple diagnostic phases, including pre-repair, post-repair,
and dynamic video surveys to ensure quality control.
• Sanitation: Oversee the final well disinfection process to ensure compliance with health
and safety standards.
3. Reporting & Recommendations
• Technical Memorandum (TM): Synthesize all field data and observations into a final
Summary TM.
• Strategic Guidance: Provide formal recommendations for long-term well maintenance or
required next steps.
3.A.3.e
Packet Pg. 150 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
24438.00000\30452526.3
(BB&K 2021) Exhibit “B”-1 Professional Services Agreement
EXHIBIT "B"
COMPENSATION & SCHEDULE OF SERVICES
Total consulting hours: 130. Breakdown by position description and hourly rates as follows:
1 Project Management and Progress Meetings 2 4 1,190.00$ 1,190.00$
2
Provide Construction Management and Support, including Pre-
Construction Meeting, Submittal Review, Response to RFIs,
COR Review, Schedule Review, Progress Payment Review,
and Construction Updates
2 8 4 2,590.00$ 129.00$ 2,719.00$
3 Field Observation during Mechanical Brushing 1 3 6 1,530.00$ 129.00$ 1,659.00$
4 Field Observation during Pre-Repair Video Survey 1 3 6 1,530.00$ 129.00$ 1,659.00$
5 Field Observation During Installation of Casing Patches 1 1 6 16 3,650.00$ 257.00$ 3,907.00$
6 Field Observation during Post-Repair Video Survey 1 3 6 1,530.00$ 129.00$ 1,659.00$
7 Field Observation during Dynamic Video Survey 2 4 8 2,430.00$ 129.00$ 2,559.00$
8 Field Observation during Well Disinfection 1 3 8 1,820.00$ 129.00$ 1,949.00$
9 Prepare Summary TM with Recommendations for Next Steps 2 4 8 12 4 4,650.00$ 4,650.00$
9 25 38 54 4 20,920.00$ 1,031.00$ 21,951.00$
Item Labor Direct Costs Total
Consulting Hours Costs
Total Hours and Cost:
GSI TechnicianStaff
Hydrogeologist
Project
Hydrogeologis
Senior
Hydrogeologist
Principal
HydrogeologistDescription
3.A.3.e
Packet Pg. 151 Attachment: Professional Services Agreement - KYLE Groundwater (Lake Park Well Rehabilitation - Patch Casing)
March 3, 2026
TO: City Council
REQUESTED BY: Julia Espinoza, City Clerk
APPROVED BY: Robert A. Johnson, City Manager
SUBJECT: AB1632 (Johnson) Support Letter
RECOMMENDATION:
Staff recommends that the City Council approve the support letter for AB 1632 (Johnson).
ATTACHMENTS:
AB1632 Letter of Support
3.A.4
Packet Pg. 152
595 S. San Jacinto Ave. | San Jacinto, CA 92583 | Ph 951-487-7330 | Fax 951-654-3728 | www.sanjacintoca.gov
Crystal Ruiz
Mayor
Clarisa Sanchez
Mayor Pro Tem
Phil Ayala
Councilmember
Alonso Ledezma
Councilmember
Valerie Vandever
Councilmember
Robert Johnson
City Manager
March 3, 2026
The Honorable Nick Schultz
Chair, Assembly Public Safety Committee
1020 N Street, Room 111
Sacramento, CA 95814
RE: AB 1632(Johnson) Trespass.
Notice of SUPPORT (1/26/2026)
Dear Assemblymember Schultz:
The City of San Jacinto is pleased to support AB 1632 (Johnson), which would remove the notary
requirement for a Trespass Letter of Authority and extend the applicability of the request from 12
months to 3 years for properties with fire hazard risk, absent owners, or those closed to the public.
Under existing law, property owners are allowed to submit a Trespass Letter of Authority (602
Letter) that authorizes law enforcement to enforce trespassing statutes when the owner is not
present. Currently, these letters must be notarized and only remain in effect for a 12-month period,
requiring frequent and costly renewals.
602 letters allow law enforcement officials to utilize their training and expertise to address nuisance
problems in a timely manner, while limiting the liability and asset impacts that businesses and
private citizens can experience during trespassing incidents. Requiring authorization forms to be
notarized requires property owners to appear in person and often pay for these services every time
the letter needs to be resubmitted. This process is burdensome, requiring substantial administrative
maintenance on individuals seeking only to protect their property.
For the City of San Jacinto, the current 12-month authorization limit and notarization requirement
can create enforcement gaps when requests for peace officer assistance expire. Property owners
must renew these requests annually, even when properties remain vacant, fire-prone, or closed to
the public for extended periods. When authorizations lapse, officers must obtain new requests
before taking enforcement action, which can delay response to ongoing trespassing, vandalism, and
nuisance activity. Addressing these procedural barriers will help maintain consistent enforcement
and better protect our community.
Removing the notarization requirement and extending the authorization period to three years will
strengthen local enforcement capabilities and create a more accessible process for property owners
seeking protection from trespassing.
For these reasons, the City of San Jacinto respectfully supports AB 1632 (Johnson).
Sincerely,
Crystal Ruiz
Mayor
City of San Jacinto
3.A.4.a
Packet Pg. 153 Attachment: AB1632 Letter of Support (AB1632 (Johnson) Support Letter)
March 3, 2026
TO: City Council
REQUESTED BY: Stuart McKibbin, City Engineer
APPROVED BY: Robert A. Johnson, City Manager
SUBJECT: Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue
(CIP# 06-145)
RECOMMENDATION:
Staff recommends the City Council take the following actions:
1. Approve the plans and specifications for the Esplanade Avenue Widening Phase 1
Warren Road to Sanderson Avenue (CIP# 06-145);
2. Award the construction contract to the lowest responsible bidder submitting a
responsive bid, Granite Construction Company, for the sum of $8,083,808;
3. Allocate 10% ($808,381) of total bid for construction contingencies;
4. Allocate 8.66% ($700,000) of total bid for construction administration,
inspection, and testing; and
5. Authorize the City Manager to execute the construction contract.
BACKGROUND:
The Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145)
Project (hereafter referred to as “the Project”) has been in the planning and design phase since
2018. The Project’s overall scope includes widening Esplanade Avenue from two lanes to four
lanes (two lanes in each direction), installation of traffic signals at the intersection of Esplanade
Avenue and Cawston Avenue, and the intersection of Esplanade Avenue and Warren Road, with
sidewalk and drainage facility along the north side of Esplanade Avenue.
As the Project is within the jurisdiction of Riverside County, the City of Hemet, and the City of
San Jacinto, and impacts major facilities operated by Eastern Municipal Water District
(“EMWD”), and Municipal Water District (“MWD”), detailed coordination between all 5
agencies was required. For example, EMWD regional water plan for the underlying aquifer
required the installation of a 5-foot diameter raw water conveyance pipe in Esplanade. The City
and EMWD worked together to eliminate design conflicts and agree on interim improvements,
coordinate right of way acquisition and construction schedules, minimize public inconvenience,
4.1
Packet Pg. 154
relocate of minor facilities, and execute a cost share agreement. For another example, the LGI
Homes development on the north side of Esplanade Ave is under construction now. LGI
cooperated with the City for acquisition of drainage easements, providing monitoring well
relocation sites, and coordinating on future Anza Trail intersection improvements, including
traffic signals, streetlights, and sidewalks.
The City of San Jacinto initiated an environmental study for the Project in 2018 , which was
completed by Environmental Science Associates (“ESA”) in December 2019, and the City
Council adopted and approved it on March 17, 2020. Permits from the Santa Ana Regional
Water Quality Control Board and California Department of Fish and Wildlife have been
obtained, and a mitigation credit agreement executed.
The Project required multiple easement and right-of-way purchases, which were completed and
recorded through the County of Riverside from 2019 to 2022.
The City of San Jacinto entered into three separate funding reimbursement agreements with
Western Riverside Council of Governments (“WRCOG”). September 10, 2018, in which
WRCOG agreed to reimburse the City of San Jacinto $1,170,025 for the planning and
engineering. On October 10, 2018, WRCOG agreed to reimburse the City of San Jacinto
$1,000,000 for the right-of-way. On February 21, 2023, WRCOG agreed to reimburse the City of
San Jacinto $5,630,000 for the construction. The balance of TUMF funds between the three
agreements mentioned is $6,249,367.
The City of San Jacinto also entered into a funding reimbursement agreement with Riverside
County Transportation Commission (“RCTC”) on October 9, 2023, in which RCTC agreed to
reimburse the City of San Jacinto for $3,960,000 in MARA funds for the construction of the
Project.
The Project scope includes relocations of certain EMWD facilities to which EMWD will be
responsible for reimbursing the City of San Jacinto a total of $271,650. The City Council
approved a funding reimbursement agreement with EMWD on May 17, 2022. The funding
reimbursement agreement will be revised to reflect the bid results.
As some of the Project’s improvements will be in the City of Hemet’s jurisdiction, the City of
Hemet will be responsible for reimbursing the City of San Jacinto a total of $4 88.921. A cost
share agreement with the City of Hemet is being revised to reflect the bid results.
The City of Hemet is planning to construct sidewalks and drainage improvements in the future
that will connect to the improvements constructed for the scope of the Project.
DISCUSSION:
4.1
Packet Pg. 155
A Notice Inviting Bids for the Project was advertised online at Planet Bids on December 16,
2025, and in the Press-Enterprise on December 22, 2025. On February 19, 2025, six (6) bids
were received, ranging from $8,083,808.00 to $9,070,045.65. Granite Construction Company
submitted the lowest responsible and responsive bid for the sum of $8,083,808.
Granite Construction Company has provided construction services in 2019 for the City of San
Jacinto’s project titled “San Jacinto Valley Connect Active Transportation Program (ATP) Cycle
2 Project (SJ-394).” Engineering is satisfied with the Granite Construction Company’s work
performed on this project.
Granite Construction Company will have 165 working days to complete the work requirements
of this project once construction begins.
City staff recommends the City Council award the construction contract for the sum of
$8,083,808 to Granite Construction Company as the lowest responsible bidder submitting a
responsive bid.
The Project may potentially require periodic full street closure to allow an efficient construction
schedule and to ensure the safety of the public during construction. All street closures will be
brought back to City Council for approval.
FISCAL IMPACT:
Considering the funding that will be reimbursed by RCTC, WRCOG, EMWD, and the City of
Hemet, it is anticipated that approval of the Project will not impact the General Fund.
Project Funding
TUMF $ 6,249,367
MARA $ 3,960,000
Measure “A” $ 200,000
City of Hemet $ 488,921
EMWD Reimbursement $ 271,650
Grand Total: $ 11,169.938
Project Expenditures
Construction Contract $ 8,083,808
Design Cost to Date $ 450,000
Contingencies $ 808,381
Admin, Inspection, Testing $ 700,000
Grand Total: $ 10,042,189
4.1
Packet Pg. 156
ATTACHMENTS:
Bid Plan Set - Esplanade - Addendum 5
Bid Result List
Contract Docs and Specifications - SJ-222
4.1
Packet Pg. 157
ESPLANADE AVENUE WIDENING PHASE 1LOCATION MAPLYON AVESANDERSON AVE.DE ANZA DR.RAMONA BLVD.SAN JACINTO AVE.IDYLLWILD DR.COTTONWOOD AVE.ESPLANADE AVE.PALM AVE.
LYON AVE.
EAGLE RD.
SANTA FE
KIRBY ST.SEVENTH ST.YOUNG ST.MISTLETOE AVE.MAIN ST.AVENUEESPLANADEALESSANDRO AVE.RAMONA EXPY.FIRST ST.SOBOBA RD.JORDAN AVE.
CAMINO
LOS BANOS ARTESIAN ST.TIGER LN.TA
H
Q
U
I
T
ZAVE.5TH ST.6TH ST.SEVENTH ST.RAMONAMENLO AVE.COMMONWEALTH AVE.EATON AVE.FRUITVALE AVE.OAKLAND AVE.DEVONSHIRE AVE.FLORIDA AVE.SAN JACINTO AVE.
HEWITT ST.COMMONWEALTH AVE.PARK AVE.PARK AVE.COLUMBIA ST.HIGHWAY 74HIGHWAY 79
LYON AVE.
KIRBY ST.
STATE ST.DEVONSHIRE AVE.MIDWAY ST.OAKWOOD ST.SANTA FE
EXPY.SHAVER ST.EVANS ST.GIRARD ST.
YALE ST.
CORNELL ST.
DARTMOUTH ST.CITY OF SAN JACINTOPROJECT SITEMAIN ST.W
A
T
E
K
A
S
T
.
CAWSTON AVE.
WARREN ROAD
RAMONA EXPY.CHASE ST.SANDERSON
STATE ST.
AV
E
N
U
E
CITY OF HEMETPERRIS74RIVERSIDEVICINITY MAPBEAUMONTVALLEYMORENOJACINTOSANHEMET15101521521560797960747474NTSNTS SITE PROJECT BASIS OF BEARING:BENCHMARK:1TITLE SHEETSTREET IMPROVEMENTSEARTHWORK QUANTITIES:CITY OF SAN JACINTO, CALIFORNIAWARREN ROAD TO SANDERSON AVENUECIP #06-145 (SJ-222)SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETDESCRIPTIONSHEET #SHEET INDEXTITLE SHEET1TRAFFIC SIGNALSTREET PROFILE & GRADINGCROSS SECTIONSTYPICAL SECTIONS23-1011-2223-27STORM DRAIN1-3SIGNING & STRIPING4-8APPROVED BY:APPROVED BY:4.1.aPacket Pg. 158Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
CITY OF SAN JACINTOCITY OF HEMETCITY OF HEMETCITY OF SAN JACINTOCITY OF HEMETCITY OF SAN JACINTOCITY OF SAN JACINTOCITY OF HEMETCITY OF SAN JACINTOCITY OF HEMETCITY OF HEMETCITY OF SAN JACINTO750'CAWSTON AVE.ESPLANADE AVE.SHEET #7SHEET #9SHEET #5SHEET #6SHEET #8SHEET #10BBAACCDD2SHEET INDEX & TYPICAL SECTIONSFFPROPOSED TRAFFIC SIGNALSTREET SHEET INDEXSTORM DRAIN SHEET INDEXSHEET #11SHEET #13SHEET #14SHEET #15SHEET #16SHEET #17EEWARREN ROADSHEET #4SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVII
NROFILACLIVI
I
NROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETANZA TRAIL(FUTURE STREET)ALABASTER AVENUESANDERSON AVENUESHEET #3PROPOSED TRAFFIC SIGNALESPLANADE AVE.CAWSTON AVE.WARREN ROADANZA TRAIL(FUTURE STREET)ALABASTER AVENUESHEET #12SANDERSON AVENUESHEET #18APPROVED BY:APPROVED BY:4.1.aPacket Pg. 159Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W12'' W 12'' W 12'' W 12'' W 12'' W
39'' W 39'' W 39'' W
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W8'' G 8'' G 8'' G
8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W8'' G39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRRSTREETSTT
TTTTTTTTTTTTTTTTTTTTT T T T T
CLW W W W
N 00°14'58" WS 89°30'18" EDWYGATEN 00°14'50" W N 89°30'18" WN 88°23'35" W 184.74'100+00101+00102+009+00 11+0099+0098+0097+0096+0095+00X
12'' W 12'' W 12'' W 12'' W 12'' W 12'' W8'' G8'' GT T TTTT T T T TWWWWWWW39'' W39'' W39'' W39'' W39'' W39'' W39'' WSTA. 95+83 TO STA. 102+00STREET IMPROVEMENTS3120801"=40'40040SCALESCALESJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETCASE "A"SCALE: 1" = 10'ACCESS RAMP DETAILCASE "B"SCALE: 1" = 10'ACCESS RAMP DETAILAPPROVED BY:APPROVED BY:4.1.aPacket Pg. 160Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
8'' G8'' G8'' G16'' W16'' W16'' W12'' W12'' W12'' W12'' W12'' W12'' W12'' W39'' W39'' W39'' W39'' W39'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W8'' G39'' W39'' WTTTTTTTTTTTTTTCLWWWWN 00°14'58" WN 00°14'50" WN 88°23'35" W 184.74'100+00101+009+0011+0099+00N 00°14'58" WXXXXX12+0013+0014+0012'' W 12'' W
6'' W16'' W16'' W16'' W16'' W16'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G16'' W16'' W16'' W8'' G8'' G8'' G8'' GSTA. 2+00 TO STA. 15+00120804004041"=40'SCALESCALEWARREN RD. STREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETSHEET #3WARREN RDCASE "B" MODIFIEDSCALE: 1" = 10'ACCESS RAMP DETAILCASE "A"SCALE: 1" = 10'ACCESS RAMP DETAILAPPROVED BY:APPROVED BY:4.1.aPacket Pg. 161Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' WTTTTTTTTTTTTTTT39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' SS6'' SS6'' SS6'' SS6'' SS 6'' SS
6'' SS6'' SS6'' SS6'' SSCLEEM-25 FLOWCONTROLFACILITYN 88°44'53" W 5293.57'60" CMLC WL60" CMLC WL102+00103+00104+00105+00106+00107+00108+00109+00110+00111+00112+0012'16'-2.78%-3.12%-2.92%15
0
4
.
0
0
15
0
4
.
5
0
STA. 102+00 TO STA. 112+005120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.aPacket Pg. 162Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G4'' G 4'' G 4'' G
4'' G 4'' G 16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' WTTTTTTTIRR39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SSCLCLS 01°15'07" W
S 01°15'07" W
N 88°44'53" W 5293.57'60" CMLC WL60" CMLC WL60" CMLC WL112+00113+00114+00115+00116+00117+00118+00119+00120+00121+00122+00123+00124+00125+00STA. 112+00 TO STA. 125+006120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.aPacket Pg. 163Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' WTTTTTTTTTTTTTTTTTTTTTT39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SSCLEDIRT ROADDIRT ROADN 88°44'53" W 5293.57'60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL125+00126+00127+00128+00129+00130+00131+00132+00133+00134+00135+00136+00137+00138+007120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETSTA. 125+00 TO STA. 138+40APPROVED BY:4.1.aPacket Pg. 164Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' WTTTTTTTTTTTTTTTTTTTTTTTTTTTT39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SSCLCLCLN 88°44'53" W 5293.57'60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL139+00140+00141+00142+00143+00144+00145+00146+00147+00148+00149+00150+00151+00ESPLANADE AVENUESTA. 138+40 TO STA. 151+80STREET IMPROVEMENTS8120801"=40'40040SCALESCALESJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.aPacket Pg. 165Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
24'' SS
20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W20'' ABAND IRR20'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR18'' W18'' W18'' W18'' W18'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W24'' SS 24'' SS 24'' SS 24'' SS24'' REC WT T T T T TIRRIRRIRRIRRIRRIRR IRR75'' W 75'' W 75'' W
72'' W 72'' W8'' SS8'' SS24'' REC W 24'' REC W 20'' SS 20'' SS 20'' SSTTTTT
TTTTTTTTTTTTTTT
T4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W18'' SD12'' SD12'' SD20'' SS 39'' W39'' W39'' W39'' W39'' W39'' W2'' W 2'' W 20'' SS24'' SS6'' SS6'' SS6'' SS6'' SSCLCLCLEEDWYS 00°06'27" W
S 89°53'30" E 2641.03'60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL152+00153+00154+00155+00156+00157+00158+00159+00160+00161+00162+00163+00164+00165+009+00 10+00 11+00 12+0011+00MW
MWS 00°06'27" WN 88°44'53" W 5293.57'24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS2'' W2'' W2'' W2'' W2'' W2'' W2'' W20'' SS20'' SS20'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SSTTTTTTSTA. 151+80 TO STA. 165+209120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.aPacket Pg. 166Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND WTTTTTTTTTTTTTTTTTTTTTTT4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W18'' SDCATVCATVCATVCATVCATVCATVCATVCATVCATV(SD)(SD)(SD)(SD)(SD)EEDWYDWYDWYDIRTDIRTLSADDCS 89°53'30" E 2641.03'60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL166+00167+00168+00169+00170+00171+00172+00173+00174+00175+00176+00177+00178+00MWMW60" CMLC WL167+07.031514.54'STA. 165+20 TO STA. 177+1210120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.aPacket Pg. 167Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
16'' W16'' W8'' G8'' G16'' W16'' W12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W
39'' W 39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G 8'' G 8'' G
8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W8'' G8'' G8'' G8'' G39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRRTTTT TT T T T T T
CLW W W W W W W
100+00101+0011+00
100+60.94101+00TTTT TT T T T T T
SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET11WARREN AVENUESTORM DRAIN IMPROVEMENTSESPLANADE AVENUEWARREN ROADAPPROVED BY:APPROVED BY:4.1.aPacket Pg. 168Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' WTTTTTTTTTTTTTTT39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' SS6'' SS6'' SS6'' SS6'' SS 6'' SS
6'' SS6'' SS6'' SSCLEEM-25 FLOWCONTROLFACILITY106+00107+00108+00109+00110+00111+0060" CMLC WL60" CMLC WL105+00106+00107+00108+00109+00110+00111+00105+00 104+00103+0012'16'104+00105+00106+00107+00108+00109+00110+00111+00104+00103+00102+0012'16'17'17.99'101+00101+07.25
SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET12STA. 100 +00 TO STA. 111+80STORM DRAIN IMPROVEMENTSAPPROVED BY:4.1.aPacket Pg. 169Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
STORM DRAIN14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G
4'' G4'' G4'' G4'' G4'' G16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W
T T T T T T T
IRR39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS
CL
CL
112+00 113+00
60" CMLC WL
60" CMLC WL
60" CMLC WL
112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00
114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00
112+00 113+
0
0
114+00
115+00
116+00
117+0
0
118+00 119+
0
0
120+00
121+00
122+0
0 123+00
124+00
125+00
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
STA. 111 +80 TO STA. 125+20
13
STORM DRAIN IMPROVEMENTS
4.1.a
Packet Pg. 170 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G
16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W TTT T T T T T T T T T T T T T T T T T T T T
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR
6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS
CL
E
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00
126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00
126+00
127+0
0 128+00
129+
0
0
130+00
131+00 132+00 133+00 134+00
135+00
136+00
137+00
138+00STORM DRAIN
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
STA. 125+20 TO STA. 138+60
14
STORM DRAIN IMPROVEMENTS
4.1.a
Packet Pg. 171 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
T T T T T T
T
T
T
T
T
T
T
T
T
T
T T T T T T T T T T T
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS
CL
CL CL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00
139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00
139+00 140+00 141+00
142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00STORM DRAIN 24.5' from CLSTORM DRAIN
15
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
STA. 138+60 TO STA. 152+00
15
STORM DRAIN IMPROVEMENTS
4.1.a
Packet Pg. 172 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
20'' ABAND IRR
20'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
18'' W 18'' W 18'' W 18'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W
24'' SS24'' SS24'' SS24'' SS24'' REC WTTTTTTIRRIRRIRRIRRIRRIRR75'' W75'' W75'' W72'' W72'' W8'' SS
8'' SS
24'' REC W24'' REC W20'' SS20'' SS20'' SST T T T T T T T T T T T T T T T T TTT
4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W
18'' SD
12'' SD 12'' SD
20'' SS39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 2'' W2'' W20'' SS24'' SS6'' SS 6'' SS 6'' SS
CL CL CL
EE
60" CMLC WL 60" CMLC WL 60" CMLC WL 60" CMLC WL60" CMLC WL
60" CMLC WL
60" CMLC WL
152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00
9+0010+0011+0011+00MW
MW
152+00 153+00
153+00 154+00 154+46.60
12'' SD 12'' SD
154+60.84155+00
156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
STA. 152+00 TO STA. 165+00
16
STORM DRAIN IMPROVEMENTS
APPROVED BY:
4.1.a
Packet Pg. 173 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W
T T T T T T T T T T T T T T T T T T T T TT
4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W
18'' SD
CATV CATV CATV CATV CATV CATV CATV(SD)(SD)
(SD)(SD)
DDC
60" CMLC WL 60" CMLC WL 60" CMLC WL 60" CMLC WL 60" CMLC WL60" CMLC WL
165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00
MW
MW 60" CMLC WL
166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
17
STORM DRAIN IMPROVEMENTS
STA. 165+00 TO STA. 178+00
4.1.a
Packet Pg. 174 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
26'' ABAND IRR26'' ABAND IRR39'' W39'' W39'' W20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
16'' W 16'' W 16'' W 16'' W
4'' W 4'' W 4'' W 4'' W8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W18'' IRR 18'' IRR18'' IRR12'' W12'' W12'' W12'' SS12'' SS12'' SS12'' SS12'' SS8'' SS 8'' SS 8'' SS 8'' SS
6'' G 6'' G 6'' G 6'' G 6'' G 6'' G 6'' G
T T T T T T
T
T T T
TTTT24'' SD 24'' S
D
24'' SD
2
4
'
'
S
D
24'' SD24'' SD24'' SD 24'' S
D
24'' SD
2
4
'
'
S
D
24'' SD24'' SD4'' W 4'' W 4'' W 4'' W 24'' W24'' W24'' W24'' W4'' ABAND W4'' ABAND W4'' ABAND W4'' ABAND W4'' ABAND W4'' ABAND WCATV CATV CATV CATV CATV CATV CATV CATV
CATV CATV CATV
CATVCATVCATVCATVCATVCATV(SD)(SD)(SD)(SD)(SD)(SD)(SD)(SD)(SD)E E E E E E EEEEEEEEE E ECLCLCLCL
CATVCATVCATVCATVCATVCATVCATV
E IP
TP
E
T
E
178+00 179+00 180+00 181+00 182+00
179+00 180+00
180+76.1216'' W16'' W8'' G8'' G16'' W16'' W12'' W12'' W12'' W12'' W12'' W12'' W12'' W12'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W8'' G 8'' G 8'' G 8'' G39'' W39'' W 39'' W 39'' W
14'' ABAND IRR14'' ABAND IRRTTTTTTTTTTTTCLWWWWWWWW100+00101+0011+00TTTTTTTTTTTTSJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
18
STORM DRAIN IMPROVEMENTS
STA. 178+00 TO STA 180+34APPROVED BY:
APPROVED BY:
4.1.a
Packet Pg. 175 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
CROSS-SECTIONS
19
STORM DRAIN IMPROVEMENTS
4.1.a
Packet Pg. 176 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
CROSS-SECTIONS
20
STORM DRAIN IMPROVEMENTS
4.1.a
Packet Pg. 177 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
CROSS-SECTIONS
21
STORM DRAIN IMPROVEMENTS
APPROVED BY:
4.1.a
Packet Pg. 178 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
CROSS-SECTIONS
22
STORM DRAIN IMPROVEMENTS
4.1.a
Packet Pg. 179 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20CROSS SECTIONSSTA. 101+00 TO STA. 120+00SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET234.1.aPacket Pg. 180Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
STA. 101+00 TO STA. 120+00CROSS SECTIONSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET244.1.aPacket Pg. 181Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
22STA. 121+00 TO STA. 140+00CROSS SECTIONSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET254.1.aPacket Pg. 182Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
STA. 141+00 TO STA. 160+00CROSS SECTIONSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET264.1.aPacket Pg. 183Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
STA. 161+00 TO STA. 180+00CROSS SECTIONSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET274.1.aPacket Pg. 184Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
ESPLANADE AVENUE WIDENING PROJECTCITY OF SAN JACINTOSHEET1INDEX OF SHEETSTITLE SHEET AND SPECIAL PROVISIONSDESCRIPTION2TRAFFIC SIGNAL PLANWARREN ROAD AT ESPLANADE AVENUEESPLANADE AVENUE WIDENING PROJECT3TRAFFIC SIGNAL PLANCAWSTON AVENUE AT ESPLANADE AVENUE FILE NO.VICINITY MAP81FILE NO.FOR:W.O.CITY-REVISION DESCRIPTIONDATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTOSCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#WORK CONTAINED WITHIN THESE PLANSSHALL NOT COMMENCE UNTIL ANENCROACHMENT PERMIT AND/OR AGRADING PERMIT HAS BEEN ISSUED.NOTE:FFCALI
O
RTEO R SEALSS
ETIREG
ERNNo. 20285I
LExp. 9/30/27TAVICN
AI
ESOFESPRD
E
OINLAEINGTREB
OR
KAHNSPECIAL PROVISIONS TO STANDARD SPECIFICATIONS FOR TRAFFIC SIGNAL PROJECTSDATESIGNED(800) 227-2600 AT LEAST TWO (2) WORKING DAYS PRIOR TO COMMENCEMENT OF EXCAVATION.2.THE UNDERSIGNED AGREES TO CONTACT AND OBTAIN AN INQUIRY I.D.# FROM UNDERGROUND SERVICE ALERT1.UNDERGROUND SERVICE ALERT HAS BEEN CONTACTED AND HAS PROVIDED INQUIRY I.D.#NOTICE TO CONTRACTORSPURSUANT TO ASSEMBLY BILL 3019, NO EXCAVATION PERMIT IS VALID UNLESS THE FOLLOWING IS PERFORMED:R.MODEL 2070E CONTROLLER ASSEMBLIES:O. BATTERY BACK-UP SYSTEM:Q.EMERGENCY VEHICLE PRE-EMPTION:H.L.E.D. DRIVER:G.LUMINARIES:N.DETECTION:M.PEDESTRIAN SIGNALS:VEHICLE SIGNAL FACES AND SIGNAL HEADS:L.K.SERVICE:F.PULL BOXES:E.CONDUIT:D.STANDARDS, STEEL PEDESTALS AND POSTS:C.FOUNDATIONS:EQUIPMENT LIST AND DRAWINGS:B.DESCRIPTION:A.6A 1220 BaudInternal ModemESPLANADE AVENUE WIDENING PROJECTTITLE SHEET AND SPECIAL PROVISIONSCITY OF SAN JACINTOCONDUCTORS AND WIRING:I.BONDING AND GROUTING:J.P.INTERNALLY ILLUMINATED STREET NAME SIGNS:GENERAL TRAFFIC SIGNAL NOTES:TRAFFIC SIGNAL PLANSSIGNING AND STRIPING PLANS7TH STREETESPLANADE AVENUEWARREN ROAD
CAWSTON AVENUE
SANDERSON AVENUE
KIRBY STREETPROJECTLOCATIONCITY OF HEMETCOUNTY OF RIVERSIDEENGINEERINGGROUP INC.4SIGNING AND STRIPING PLANESPLANADE AVE - WARREN RD TO STA. 108+005SIGNING AND STRIPING PLANESPLANADE AVE - STA. 108+00 TO STA. 139+006SIGNING AND STRIPING PLANESPLANADE AVE - STA. 139+00 TO STA. 160+007SIGNING AND STRIPING PLANCAWSTON AVE - SOUTH OF ESPLANADE AVE AT CAWSTON AVEGENERAL SIGNING & STRIPING NOTES:8SIGNING AND STRIPING PLANESPLANADE AVE - STA. 160+00 TO SANDERSON AVE4.1.aPacket Pg. 185Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
8'' G8'' GTTT96+008'' G8'' G8'' G8'' G8'' G8'' G12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W
8'' G8'' G 8'' G 8'' G 8'' G
8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' WTTTTTTTTT TT T T T T T T
W W W W W W W W W
100+00101+0011+0099+006'' W6'' W6'' W6'' W6'' W6'' W16'' W8'' G8'' G16'' W16'' W39'' W39'' W104+006'' W6'' WPOLE AND EQUIPMENT SCHEDULEESPLANADE AVENUE (50 MPH)GENERAL TRAFFIC SIGNAL NOTES:CONSTRUCTION NOTES (THIS SHEET):DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO28CITY OF SAN JACINTOWARREN ROAD AT ESPLANADE AVENUETRAFFIC SIGNAL PLANCONDUCTOR SCHEDULEFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
WARREN ROAD (55 MPH)SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETCOUNTY OF RIVERSIDEENGINEERINGGROUP INC.PROPOSED PHASE DIAGRAM4.1.aPacket Pg. 186Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR20'' ABAND IRR18'' W18'' WTTT39'' W39'' W39'' W6'' SS6'' SS151+0016'' IRR16'' IRR16'' IRR16'' IRR16'' IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR18'' W18'' W18'' W18'' W18'' W18'' W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS
24'' REC W 24'' REC W 24'' REC W
T T T T T T T T T T T T T T T
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
75'' W 75'' W 75'' W 75'' W 75'' W 75'' W8'' SS8'' SS8'' SS8'' SS24'' REC W 24'' REC W 24'' REC W 24'' REC W20'' SS
20'' SS
20'' SS
20'' SS
20'' SS
20'' SS
20'' SS
W24'' REC W TTTTTTTTTTTTTT4'' W4'' W4'' W4'' W4'' W4'' W18'' SD18'' SD18'' SD12'' SD12'' SD12'' SD12'' SD20'' SS 20'' SS 20'' SS 39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W2'' W 2'' W 2'' W 2'' W 2'' W 2'' W 2'' W 2'' W6'' SS6'' SS6'' SS60" CMLC WL60" CMLC WL154+00155+00156+0010+00
11+0011+00
MW16'' IRR16'' IRR20'' ABAND IRR20'' ABAND IRR8'' ABAND W8'' ABAND WTT4'' W4'' W4'' W39'' W39'' W39'' W24'' SS 24'' SS24'' SS 24'' SS
T T
2'' W 2'' W
20'' SS 20'' SS
24'' SS 24'' SSESPLANADE AVENUE (50 MPH)GENERAL TRAFFIC SIGNAL NOTES:CONSTRUCTION NOTES (THIS SHEET):PROPOSED PHASE DIAGRAMCONDUCTOR SCHEDULECAWSTON AVENUE (45 MPH)DETAIL 'A'POLE AND EQUIPMENT SCHEDULEDATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO38CITY OF SAN JACINTOWARREN ROAD AT ESPLANADE AVENUETRAFFIC SIGNAL PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.4.1.aPacket Pg. 187Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
100+00101+00102+00103+00104+00105+00106+00107+00108+009+00
11+0099+0098+0097+0096+00101+0012+00 13+00 14+0094+0096+0095+00ESPLANADE AVENUE (50 MPH)SIGN LEGEND:DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO48CITY OF SAN JACINTOESPLANADE AVE - WARREN RD TO STA. 108+00SIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETCOUNTY OF RIVERSIDEENGINEERINGGROUP INC.MATCHLINE SEE UPPER RIGHTMATCHLINE SEE LOWER LEFTWARREN ROAD (55 MPH)DRIVEWAYDRIVEWAYMATCHLINE SEE SHEET 5MATCHLINE SEE LOWER LEFTESPLANADE AVENUE (50 MPH)MATCHLINE SEE UPPER RIGHTSIGNING AND STRIPING NOTES:CONSTRUCTION NOTES (THIS SHEET):DETAIL "A"4.1.aPacket Pg. 188Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
4'' G 4'' G 108+00109+00110+00111+00112+00113+00114+00115+00116+00117+00118+00119+00120+00121+0014'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR
4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 121+00122+00123+00124+00125+00126+00127+00128+00129+00130+00131+00132+00133+00134+00134+00135+00136+00137+00138+00139+00SIGN LEGEND:DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO58CITY OF SAN JACINTOESPLANADE AVE - STA. 108+00 TO STA. 139+00SIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.MATCHLINE SEE SHEET 4MATCHLINE SEE MIDDLE LEFTMATCHLINE SEE UPPER RIGHTMATCHLINE SEE LOWER LEFTMATCHLINE SEE MIDDLE RIGHTMATCHLINE SEE SHEET 6ESPLANADE AVENUE (50 MPH)ESPLANADE AVENUE (50 MPH)ESPLANADE AVENUE (50 MPH)ALABASTER DRIVE (25 MPH)CINNABAR AVENUE (25 MPH)ANZA TRAIL (FUTURE)SIGNING AND STRIPING NOTES:4.1.aPacket Pg. 189Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
139+00140+00141+00142+00143+00144+00145+00146+00147+00148+00149+00150+00150+00151+00152+00153+00154+00155+00156+00157+00158+00159+00160+009+00 10+00
11+00 12+0011+00DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO68CITY OF SAN JACINTOESPLANADE AVE - STA. 139+00 TO STA. 160+00SIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.MATCHLINE SEE SHEET 5MATCHLINE SEE MIDDLE LEFTMATCHLINE SEE UPPER RIGHTMATCHLINE SEE LOWER LEFTMATCHLINE SEE SHEET 8MATCHLINE SEE MIDDLE RIGHTMATCHLINE SEE LOWER RIGHTMATCHLINE SEE SHEET 7MATCHLINE SEE UPPER LEFTESPLANADE AVENUE (50 MPH)CAWSTON AVENUE (45 MPH)ESPLANADE AVENUE (50 MPH)ESPLANADE AVENUE (50 MPH)CAWSTON AVENUE (45 MPH)SIGNING AND STRIPING NOTES:SIGN LEGEND:4.1.aPacket Pg. 190Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO78CITY OF SAN JACINTOSOUTH OF CAWSTON AVE AT ESPLANADE AVESIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.MATCHLINE SEE SHEET 6SIGNING AND STRIPING NOTES:SIGN LEGEND:CAWSTON AVENUE (45 MPH)4.1.aPacket Pg. 191Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD160+00161+00162+00163+00164+00165+00166+00167+00168+00169+00170+00171+00172+00173+00173+00174+00175+00176+00177+00178+00179+00180+00181+00182+00SIGN LEGEND:DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO88CITY OF SAN JACINTOESPLANADE AVE - STA. 160+00 TO SANDERSON AVESIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.MATCHLINE SEE SHEET 6MATCHLINE SEE LOWER LEFTMATCHLINE SEE UPPER RIGHTESPLANADE AVENUE (50 MPH)SANDERSON AVENUE (50 MPH)ESPLANADE AVENUE (50 MPH)SANDERSON AVENUE (45 MPH)DRIVEWAYSIGNING AND STRIPING NOTES:4.1.aPacket Pg. 192Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
Solid Casing - 4"
Sch 80 PVC with
Flush Threaded
Connections
10" Borehole
Screened Casing
4" Sch 80 PVC with
Flush Threaded
Connections
0 bgs
Ground Surface
4' x 4' x 4" Concrete Pad
Traffic Rated Flush Lid
Cap
Bottom Cap
Traffic Rated Vault
Sanitary Seal
Transition Seal
Pellet Seal
Filter Pack
Transition
Sand
bgs: Below Ground Surface
Not to Scale
Well Detail for HE-07
5 feet bgs
165 feet bgs
170 feet bgs
175 feet bgs
180 feet bgs
205 feet bgs
210 feet bgs
190 feet bgs (estimated)
W-1
4.1.a
Packet Pg. 193 Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road
W-24.1.aPacket Pg. 194Attachment: Bid Plan Set - Esplanade - Addendum 5 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
City of San JacintoBid Results for Project ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUEIssued on 12/22/2025Bid Due on February 19, 2026 2:00 PM (PST)Exported on 02/19/2026Line Totals (Unit Price * Quantity)Granite Construction Company Granite Construction Company Universal Construction and Engineering Universal Construction and Engineering Mamco Inc Mamco Inc Riverside Construction Company, Inc.Riverside Construction Company, Inc.Vance Corporation Vance Corporation All American Asphalt All American AsphaltItem Num Section Item Code Description Unit of Measure Quantity Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total Unit Price Line Total1BASE BID SCHEDULE 1 Mobilization LS 1 $375,000.00 $375,000.00 $516,800.00 $516,800.00 $380,977.90 $380,977.90 $420,000.00 $420,000.00 $682,000.00 $682,000.00 $425,000.00 $425,000.002BASE BID SCHEDULE 2 Traffic Control LS 1 $69,735.00 $69,735.00 $184,955.80 $184,955.80 $110,000.00 $110,000.00 $300,000.00 $300,000.00 $218,501.00 $218,501.00 $430,000.00 $430,000.003BASE BID SCHEDULE 3 Water Pollution Control LS 1 $15,000.00 $15,000.00 $27,040.00 $27,040.00 $50,000.00 $50,000.00 $80,000.00 $80,000.00 $39,555.00 $39,555.00 $10,000.00 $10,000.004BASE BID SCHEDULE 4 Clearing & Grubbing LS 1 $190,000.00 $190,000.00 $58,978.85 $58,978.85 $35,000.00 $35,000.00 $200,000.00 $200,000.00 $14,049.00 $14,049.00 $10,000.00 $10,000.005BASE BID SCHEDULE 5 Saw Cut LF 11781 $4.00 $47,124.00 $2.00 $23,562.00 $2.50 $29,452.50 $4.00 $47,124.00 $3.50 $41,233.50 $3.15 $37,110.156BASE BID SCHEDULE 6 Remove & Dispose Existing Pavement and Base CY 13338 $27.00 $360,126.00 $34.25 $456,826.50 $31.50 $420,147.00 $35.00 $466,830.00 $14.00 $186,732.00 $45.00 $600,210.007BASE BID SCHEDULE 7 Remove & Dispose Existing AC Berm LF 1074 $6.50 $6,981.00 $12.80 $13,747.20 $10.00 $10,740.00 $9.00 $9,666.00 $10.00 $10,740.00 $2.00 $2,148.008BASE BID SCHEDULE 8 Remove & Dispose Existing 18" CMP LF 170 $45.00 $7,650.00 $40.00 $6,800.00 $37.00 $6,290.00 $40.00 $6,800.00 $32.00 $5,440.00 $30.00 $5,100.009BASE BID SCHEDULE 9 Remove & Dispose Existing 12" CMP LF 40 $45.00 $1,800.00 $40.00 $1,600.00 $37.00 $1,480.00 $60.00 $2,400.00 $68.00 $2,720.00 $60.00 $2,400.0010BASE BID SCHEDULE 10 Remove & Dispose Existing Headwalls per Construction Note #4 EA 4 $2,000.00 $8,000.00 $1,500.00 $6,000.00 $2,500.00 $10,000.00 $2,500.00 $10,000.00 $1,252.00 $5,008.00 $2,700.00 $10,800.0011BASE BID SCHEDULE 11 Remove & Dispose Existing Reflector Delineators LS 1 $600.00 $600.00 $4,500.00 $4,500.00 $1,000.00 $1,000.00 $500.00 $500.00 $999.00 $999.00 $500.00 $500.0012BASE BID SCHEDULE 12 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.00 $0.00 $0.00 $0.00 $0.00 $0.0013BASE BID SCHEDULE 13 Remove & Dispose Existing Guard Rail LF 40 $96.00 $3,840.00 $129.25 $5,170.00 $100.00 $4,000.00 $96.00 $3,840.00 $117.00 $4,680.00 $100.00 $4,000.0014BASE BID SCHEDULE 14 Relocate Existing Fencing and Gates LF 468 $96.00 $44,928.00 $84.50 $39,546.00 $82.00 $38,376.00 $96.00 $44,928.00 $59.00 $27,612.00 $100.00 $46,800.0015BASE BID SCHEDULE 15 Relocate Existing Mailbox EA 1 $1,500.00 $1,500.00 $500.00 $500.00 $500.00 $500.00 $965.00 $965.00 $377.00 $377.00 $500.00 $500.0016BASE BID SCHEDULE 16 Remove & Dispose Existing Frontier Pole EA 1 $2,100.00 $2,100.00 $1,590.45 $1,590.45 $4,500.00 $4,500.00 $2,500.00 $2,500.00 $5,260.00 $5,260.00 $2,500.00 $2,500.0017BASE BID SCHEDULE 17 Cold Mill 0.12' Asphalt Concrete SF 78358 $1.00 $78,358.00 $0.39 $30,559.62 $0.45 $35,261.10 $0.40 $31,343.20 $0.44 $34,477.52 $0.30 $23,507.4018BASE BID SCHEDULE 18 Asphalt Concrete TON 10504 $125.00 $1,313,000.00 $117.52 $1,234,430.08 $120.00 $1,260,480.00 $99.50 $1,045,148.00 $123.00 $1,291,992.00 $108.00 $1,134,432.0019BASE BID SCHEDULE 19 Class 2 Aggregate Base TON 24619 $26.00 $640,094.00 $26.25 $646,248.75 $42.00 $1,033,998.00 $40.00 $984,760.00 $21.00 $516,999.00 $20.00 $492,380.0020BASE BID SCHEDULE 20 Remove and Salvage Signage EA 9 $50.00 $450.00 $330.50 $2,974.50 $400.00 $3,600.00 $150.00 $1,350.00 $111.00 $999.00 $150.00 $1,350.0021BASE BID SCHEDULE 21 Construct Sidewalk per County of Riverside Std 401 SF 40078 $12.00 $480,936.00 $9.25 $370,721.50 $7.25 $290,565.50 $9.00 $360,702.00 $7.95 $318,620.10 $6.25 $250,487.5022BASE BID SCHEDULE 22 Construct Type "A-8" Curb & Gutter per County of Riverside Std 201 LF 7237 $47.00 $340,139.00 $39.50 $285,861.50 $31.00 $224,347.00 $30.00 $217,110.00 $40.00 $289,480.00 $33.00 $238,821.0023BASE BID SCHEDULE 23 Construct Residential Driveway per County of Riverside Std 207 EA 5 $2,500.00 $12,500.00 $2,754.95 $13,774.75 $4,000.00 $20,000.00 $6,200.00 $31,000.00 $7,601.00 $38,005.00 $6,600.00 $33,000.0024BASE BID SCHEDULE 24 Construct Access Ramp per ADA & County of Riverside Std 403 EA 5 $7,700.00 $38,500.00 $7,046.95 $35,234.75 $8,000.00 $40,000.00 $10,500.00 $52,500.00 $7,601.00 $38,005.00 $10,500.00 $52,500.0025BASE BID SCHEDULE 25 Potholing (Exploratory Excavations)LS 1 $38,000.00 $38,000.00 $55,500.00 $55,500.00 $20,000.00 $20,000.00 $85,000.00 $85,000.00 $16,038.00 $16,038.00 $18,000.00 $18,000.0026BASE BID SCHEDULE 26 Construct Commercial Driveway per County of Riverside Std 207A EA 2 $25,000.00 $50,000.00 $23,290.00 $46,580.00 $16,000.00 $32,000.00 $16,000.00 $32,000.00 $20,479.00 $40,958.00 $23,000.00 $46,000.0027BASE BID SCHEDULE 27 Over Excavation and Subgrade Preparation CY 15566 $5.50 $85,613.00 $8.40 $130,754.40 $30.00 $466,980.00 $9.32 $145,075.12 $7.08 $110,207.28 $14.50 $225,707.0028BASE BID SCHEDULE 28 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.00 $0.00 $0.00 $0.00 $0.00 $0.0029BASE BID SCHEDULE 29 Construct Monitoring Well per Sheet No. W-1 LS 1 $30,000.00 $30,000.00 $48,339.50 $48,339.50 $74,800.00 $74,800.00 $85,000.00 $85,000.00 $94,511.00 $94,511.00 $95,000.00 $95,000.0030BASE BID SCHEDULE 30 Construct Single Headwalls per Caltrans Std D89A EA 7 $7,800.00 $54,600.00 $8,125.00 $56,875.00 $8,000.00 $56,000.00 $15,000.00 $105,000.00 $12,951.00 $90,657.00 $11,500.00 $80,500.0031BASE BID SCHEDULE 31 Construct Concrete Collar per RCFC & WD Std M803 EA 1 $2,500.00 $2,500.00 $2,065.00 $2,065.00 $2,000.00 $2,000.00 $1,600.00 $1,600.00 $2,472.00 $2,472.00 $2,200.00 $2,200.0032BASE BID SCHEDULE 32 Channel Excavation CY 9125 $27.00 $246,375.00 $27.80 $253,675.00 $32.00 $292,000.00 $14.00 $127,750.00 $26.00 $237,250.00 $78.00 $711,750.0033BASE BID SCHEDULE 33 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0034BASE BID SCHEDULE 34 Construct Junction Structure No. 8 Per RCFC Std JS233 EA 8 $15,000.00 $120,000.00 $5,740.00 $45,920.00 $6,000.00 $48,000.00 $15,000.00 $120,000.00 $11,930.00 $95,440.00 $14,000.00 $112,000.0035BASE BID SCHEDULE 35 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0036BASE BID SCHEDULE 36 NOT USED $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0037BASE BID SCHEDULE 37 Construct Manhole No. 1 per RCFC & WCD STD MH251 EA 9 $9,200.00 $82,800.00 $10,730.00 $96,570.00 $10,500.00 $94,500.00 $10,500.00 $94,500.00 $16,813.00 $151,317.00 $15,000.00 $135,000.0038BASE BID SCHEDULE 38 Construct 42" OD Steel Pipe Casing EMWD STD. B-575 LF 60 $550.00 $33,000.00 $1,376.00 $82,560.00 $740.00 $44,400.00 $550.00 $33,000.00 $2,178.00 $130,680.00 $1,940.00 $116,400.0039BASE BID SCHEDULE 39 Construct 4' Wide Curb Inlet Catch Basin per County of Riverside Std 300 EA 11 $6,500.00 $71,500.00 $6,508.00 $71,588.00 $4,800.00 $52,800.00 $10,000.00 $110,000.00 $11,397.00 $125,367.00 $10,000.00 $110,000.0040BASE BID SCHEDULE 40 Construct Depression for Curb Opening Catch Basin, Case C, per County of Riverside Std 311 SF 1584 $25.00 $39,600.00 $18.00 $28,512.00 $9.00 $14,256.00 $20.00 $31,680.00 $20.00 $31,680.00 $18.00 $28,512.0041BASE BID SCHEDULE 41 Construct 12" RCP LF 396 $210.00 $83,160.00 $305.00 $120,780.00 $240.00 $95,040.00 $250.00 $99,000.00 $644.00 $255,024.00 $500.00 $198,000.0042BASE BID SCHEDULE 42 Construct 18" RCP LF 745 $310.00 $230,950.00 $180.00 $134,100.00 $203.00 $151,235.00 $320.00 $238,400.00 $413.00 $307,685.00 $300.00 $223,500.0043BASE BID SCHEDULE 43 Construct 30" RCP LF 2123 $400.00 $849,200.00 $380.00 $806,740.00 $335.00 $711,205.00 $335.00 $711,205.00 $527.00 $1,118,821.00 $425.00 $902,275.0044BASE BID SCHEDULE 44 Install Rip-Rap TON 10726 $65.00 $697,190.00 $63.25 $678,419.50 $82.00 $879,532.00 $80.00 $858,080.00 $80.00 $858,080.00 $90.00 $965,340.0045BASE BID SCHEDULE 45 Type 1 Slurry Seal SY 5697 $4.00 $22,788.00 $3.30 $18,800.10 $5.00 $28,485.00 $3.00 $17,091.00 $4.68 $26,661.96 $4.80 $27,345.6046BASE BID SCHEDULE 46 Crack Seal LS 1 $12,500.00 $12,500.00 $10,450.00 $10,450.00 $9,300.00 $9,300.00 $9,500.00 $9,500.00 $7,444.00 $7,444.00 $8,500.00 $8,500.0047BASE BID SCHEDULE 47 Construct Modified Dual-Pipe Junction Structure Per RCFC STD JS233 LS 1 $11,000.00 $11,000.00 $6,128.00 $6,128.00 $8,000.00 $8,000.00 $25,000.00 $25,000.00 $28,256.00 $28,256.00 $25,000.00 $25,000.0048BASE BID SCHEDULE 48 Install TUMF Sign per Specifications LS 1 $2,000.00 $2,000.00 $1,400.00 $1,400.00 $3,500.00 $3,500.00 $2,500.00 $2,500.00 $1,756.00 $1,756.00 $3,500.00 $3,500.0049BASE BID SCHEDULE 49 Install Traffic Signal at Warren & Esplanade Ave LS 1 $488,921.00 $488,921.00 $499,935.00 $499,935.00 $544,000.00 $544,000.00 $450,000.00 $450,000.00 $561,741.00 $561,741.00 $470,000.00 $470,000.0050BASE BID SCHEDULE 50 Install Traffic Signal at Cawston & Esplanade Ave LS 1 $447,100.00 $447,100.00 $473,685.00 $473,685.00 $497,000.00 $497,000.00 $430,000.00 $430,000.00 $504,397.00 $504,397.00 $450,000.00 $450,000.0051BASE BID SCHEDULE 51 Signing, Striping, and Pavement Markings LS 1 $75,000.00 $75,000.00 $71,497.80 $71,497.80 $75,000.00 $75,000.00 $65,000.00 $65,000.00 $66,471.00 $66,471.00 $70,000.00 $70,000.00Subtotal$7,812,158.00 $7,708,296.55 $8,210,748.00 $8,195,847.32 $8,636,398.36 $8,838,075.6552EMWD ADDITIVE ALT 1A Adjust to Grade Existing EMWD Manholes EA 7 $2,325.00 $16,275.00 $32,000.00 $224,000.00 $5,000.00 $35,000.00 $3,300.00 $23,100.00 $1,423.00 $9,961.00 $1,785.00 $12,495.0053EMWD ADDITIVE ALT 2A Adjust to Grade Existing EMWD Water Valve Covers EA 11 $1,325.00 $14,575.00 $2,400.00 $26,400.00 $1,000.00 $11,000.00 $2,500.00 $27,500.00 $467.00 $5,137.00 $1,150.00 $12,650.0054EMWD ADDITIVE ALT 3A Relocate Existing EMWD Marker Post EA 30 $220.00 $6,600.00 $225.00 $6,750.00 $500.00 $15,000.00 $230.00 $6,900.00 $118.00 $3,540.00 $50.00 $1,500.0055EMWD ADDITIVE ALT 4A Relocate Existing EMWD Pedestal EA 1 $5,000.00 $5,000.00 $10,250.00 $10,250.00 $9,000.00 $9,000.00 $925.00 $925.00 $17,294.00 $17,294.00 $15,000.00 $15,000.0056EMWD ADDITIVE ALT 5A Relocate Existing EMWD Air Vac EA 3 $8,000.00 $24,000.00 $8,790.00 $26,370.00 $4,500.00 $13,500.00 $10,000.00 $30,000.00 $8,713.00 $26,139.00 $7,750.00 $23,250.0057EMWD ADDITIVE ALT 6A Relocate Existing EMWD Test Station EA 24 $4,500.00 $108,000.00 $3,200.00 $76,800.00 $5,800.00 $139,200.00 $7,700.00 $184,800.00 $3,708.00 $88,992.00 $3,300.00 $79,200.0058EMWD ADDITIVE ALT 7A Relocate Existing EMWD Blow Off EA 1 $7,100.00 $7,100.00 $6,000.00 $6,000.00 $4,500.00 $4,500.00 $13,200.00 $13,200.00 $8,653.00 $8,653.00 $7,700.00 $7,700.0059EMWD ADDITIVE ALT 8A Relocate Existing EMWD Water Valve EA 1 $3,000.00 $3,000.00 $13,000.00 $13,000.00 $3,000.00 $3,000.00 $6,200.00 $6,200.00 $24,487.00 $24,487.00 $22,000.00 $22,000.0060EMWD ADDITIVE ALT 9A Relocate Existing EMWD Fire Hydrant EA 2 $5,500.00 $11,000.00 $9,417.00 $18,834.00 $4,500.00 $9,000.00 $14,100.00 $28,200.00 $9,844.00 $19,688.00 $8,750.00 $17,500.0061EMWD ADDITIVE ALT 10A Relocate Existing EMWD Water Meter EA 2 $7,200.00 $14,400.00 $3,762.00 $7,524.00 $7,700.00 $15,400.00 $4,000.00 $8,000.00 $10,908.00 $21,816.00 $9,700.00 $19,400.0062EMWD ADDITIVE ALT 11A Relocate Existing EMWD Backflow EA 1 $4,700.00 $4,700.00 $3,100.00 $3,100.00 $4,500.00 $4,500.00 $10,000.00 $10,000.00 $9,844.00 $9,844.00 $8,750.00 $8,750.0063EMWD ADDITIVE ALT 12A Adjust to Grade Existing EMWD Test Station EA 15 $3,800.00 $57,000.00 $700.00 $10,500.00 $1,000.00 $15,000.00 $850.00 $12,750.00 $1,756.00 $26,340.00 $835.00 $12,525.00Subtotal$271,650.00 $429,528.00 $274,100.00 $351,575.00 $261,891.00 $231,970.00Total$8,083,808.00 $8,137,824.55 $8,484,848.00 $8,547,422.32 $8,898,289.36 $9,070,045.65 4.1.bPacket Pg. 195 Attachment: Bid Result List (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
City of San Jacinto
Bid Results for Project ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE
Issued on 12/22/2025
Bid Due on February 19, 2026 2:00 PM (PST)
Exported on 02/19/2026
Section/Bidder Bid Amount Responsive
BASE BID SCHEDULE
Universal Construction and Engineering $7,708,296.55
Granite Construction Company $7,812,158.00
Riverside Construction Company, Inc.$8,195,847.32
Mamco Inc $8,210,748.00
Vance Corporation $8,636,398.36
All American Asphalt $8,838,075.65
EMWD ADDITIVE ALTERNATE BID SCHEDULE
All American Asphalt $231,970.00
Vance Corporation $261,891.00
Granite Construction Company $271,650.00
Mamco Inc $274,100.00
Riverside Construction Company, Inc.$351,575.00
Universal Construction and Engineering $429,528.00
4.1.b
Packet Pg. 196 Attachment: Bid Result List (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
CITY OF SAN JACINTO
ADDENDUM No. 5
CONTRACT DOCUMENTS
AND SPECIFICATIONS
FOR
ESPLANADE AVENUE WIDENING PHASE 1 WARREN
ROAD TO SANDERSON AVENUE
CONTRACT NO. CIP #06-145
FEBRUARY 2026
PREPARED BY:
OFFICE OF THE CITY ENGINEER
BID OPENING – FEBRUARY 19, 2026, 2:00 PM
PlanetBids Website
Expected Bid Award: MARCH 03, 2026
Anticipated Start of Construction: MARCH 21, 2026
Mandatory Pre-Bid Meeting: January 15, 2026
4.1.c
Packet Pg. 197 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
CITY OF SAN JACINTO
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD
TO SANDERSON AVENUE
REVIEWED: _________________________ DATE: ___________________
APPROVED: _________________________ DATE: ___________________
Stuart E. McKibbin, Contract City Engineer
4.1.c
Packet Pg. 198 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Project Information Sheet
Project: ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD
TO SANDERSON AVENUE
Bid Opening Date: FEBRUARY 19, 2026 @ 2:00 PM
Expected Bid Award Date: MARCH 03, 2026
Anticipated Start Date: MARCH 21, 2026
Construction Time: 165 Working Days
Liquidated Damages: **$1,000 per calendar day**
Project Description: Widen Esplanade Avenue from two lanes to
four lanes (two lanes in each direction), center
turn lane, installation of traffic signals at
Esplanade Avenue and at Cawston Avenue,
with sidewalk and drainage facility along the
north side of Esplanade Avenue.
Engineer’s Estimate is $10,000,000
For Technical Inquiries: Please post all questions on
PlanetBids website
Note: See specifications for details regarding the above information.
4.1.c
Packet Pg. 199 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
TABLE OF CONTENTS
-i-
00 11 16 – NOTICE INVITING BIDS ...................................................................................... A-1
00 21 13 – INSTRUCTIONS TO BIDDERS ............................................................................ B-1
00 41 43 – BID FORMS ......................................................................................................... C-1
00 52 13 – CONTRACT FOR CONSTRUCTION ................................................................... D-1
00 61 13 – BOND FORMS ..................................................................................................... E-1
00 72 00 – GENERAL CONDITIONS .................................................................................. GC-1
00 73 13 – SPECIAL CONDITIONS .................................................................................... SC-1
TECHNICAL SPECIFICATIONS .......................................................................................... TS-1
PLANS AND DRAWINGS .................................................................................... APPENDIX “A”
CONTRACT FORMS……………………………………………………………………APPENDIX "B"
PREVAILING WAGE RATES – FEDERAL GENERAL DECISION………………..APPENDIX "C"
GEOTECHNICAL REPORT…………………………………………..………………..APPENDIX "D"
SOUTHERN CALIFORNIA EDISON DRAWINGS..………………..………………..APPENDIX "E"
ADDENDUM 5
4.1.c
Packet Pg. 200 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE A-1 00 11 16 – NOTICE INVITING BIDS
00 11 16 – NOTICE INVITING BIDS
ENGINEER’S ESTIMATE BASE BID: $10,000,000
QUESTIONS REGARDING THE PROJECT MUST BE POSTED ON PLANETBIDS FOR
RESPONSE. QUESTIONS DEADLINE: JANUARY 30, 2026 @ 5:00pm
NOTICE IS HEREBY GIVEN that the City of San Jacinto (“City”), with its principal place of
business at 595 S. San Jacinto Ave, San Jacinto, CA 92583 invites and will receive sealed bids
(“Bids”) up to but not later than 2:00 PM on FEBRUARY 19, 2026 online on PlanetBids for the
furnishing to City of all labor, equipment, materials, tools, services, transportation, permits,
utilities, and all other items necessary for ESPLANADE AVENUE WIDENING PHASE 1 WARREN
ROAD TO SANDERSON AVENUE . At said time, Bids will be publicly opened. Bids received after
said time will not be accepted. Bids shall be valid for a period of 90 calendar days after the bid
opening date.
This project consists of widening Esplanade Avenue from two lanes to four lanes (two lanes in
each direction), center turn lane, installation of traffic signals at Esplanade Avenue and at
Cawston Avenue, with sidewalk and drainage facility along the north side of Esplanade Avenue
Bids must be submitted on the Bid Forms found in this document. Bidders may obtain a copy of
the Contract Documents and Plans from www.planetbids.com. To the extent required by section
20103.7 of the Public Contract Code, upon request from a contractor plan room service, City shall
provide an electronic copy of the Contract Documents at no charge to the contractor plan room.
It is the responsibility of each prospective Bidder to download and print all Contract Documents
and Plans for review and to verify the completeness of Contract Documents before submitting a
bid. Any addenda will be posted on www.planetbids.com. It is the responsibility of each
prospective Bidder to check www.planetbids.com on a daily basis through the close of receiving
bids for any applicable addenda or updates. City does not assume any liability or responsibility
based on any defective or incomplete copying, excerpting, scanning, faxing, downloading or
printing of the Contract Documents or Plans. Information on www.planetbids.com may change
without notice to prospective Bidders. The Contract Documents shall supersede any information
posted or transmitted by www.planetbids.com.
Each Bid shall be accompanied by cash, a certified check, cashier’s check, or bid bond secured
from a surety company satisfactory to the City, the amount of which shall not be less than ten
percent (10%) of the submitted Total Bid Price, made payable to the City as bid security. The bid
security shall be provided as a guarantee that within ten (10) days after City provides the
successful Bidder the Notice of Award, the successful Bidder will enter into a contract and provide
the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the
successful Bidder fails to comply within said time. No interest will be paid on funds deposited with
City.
A mandatory Pre-Bid Conference is scheduled for January 15, 2026, at 10:00AM to review the
Project's existing conditions at the Circle K gas station located at 1450 S Sanderson Ave, San
Jacinto, CA 92582. Representatives of City and consulting engineers, if any, will be present. Bids
will not be accepted from any bidder who did not attend the mandatory Pre-Bid Conference.
• Date: January 15, 2026
• Time: 10:00 AM
• Location: 1450 S Sanderson Ave, San Jacinto, CA 92582
ADDENDUM 4
4.1.c
Packet Pg. 201 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE A-2 00 11 16 – NOTICE INVITING BIDS
The successful Bidder will be required to furnish a faithful performance bond and a labor and
material payment bond each in an amount equal to one hundred percent (100%) of the Contract
Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company
that meets all State of California bonding requirements, as defined in California Code of Civil
Procedure Section 995.120, and that is a California admitted surety insurer.
Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful
Bidder may substitute certain securities for funds withheld by City to ensure its performance under
the Contract.
Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages
and the prevailing wage rate for holiday and overtime work applicable in Riverside County from
the Director of the Department of Industrial Relations for each craft, classification, or type of
worker needed to execute this contract. A copy of these prevailing wage rates may be obtained
via the internet at: www.dir.ca.gov/dlsr/
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish
to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be
registered with the Department of Industrial Relations. No Bid will be accepted nor any Contract
entered into without proof of the contractor’s and subcontractors’ current registration with the
Department of Industrial Relations to perform public work. If awarded a contract, the Bidder and
its subcontractors, of any tier, shall maintain active registration with the Department of Industrial
Relations for the duration of the Project. Notwithstanding the foregoing, the contractor registration
requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work
performed on a public works project that is exempt pursuant to the small project exemption
specified in Labor Code Sections 1725.5 and 1771.1.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial
Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and
include the cost of complying with all labor compliance requirements under this Contract and
applicable law in its Bid.
Unless otherwise provided in the Instructions to Bidders, each Bidder shall be a licensed
contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following
classification(s) throughout the time it submits its Bid and for the duration of the Contract:
CLASS A CONTRACTOR’S LICENSE
Substitution requests shall be made within 35 calendar days after the award of the Contract.
Pursuant to Public Contract Code Section 3400(b), City may make findings designating that
certain additional materials, methods or services by specific brand or trade name other than those
listed in the Contract Documents be used for the Project. Such findings, if any, as well as the
materials, methods or services and their specific brand or trade names that must be used for the
Project may be found in the Special Conditions.
City shall award the contract for the Project to the lowest responsive, responsible Bidder as
determined by City from the Base Bid Schedule plus the EMWD Additive Alternate Bid Schedule.
City reserves the right to reject any or all Bids or to waive any irregularities or informalities in any
Bids or in the bidding process.
For further information, contact Mohanad Alami, at malami@interwestgrp.com or (951) 723-5264.
END OF NOTICE INVITING BIDS
ADDENDUM 1
4.1.c
Packet Pg. 202 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-1 00 21 13 – INSTRUCTIONS TO BIDDERS
00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 1. SECURING DOCUMENTS
Bids must be submitted to City on the Bid Forms through PlanetBids Website which are a part of
the Contract Documents for the Project. Contract Documents may be obtained as specified in the
Notice Inviting Bids. Prospective Bidders are encouraged to telephone in advance to determine
the availability of Contract Documents. Any charge for the Contract Documents is stated in the
Notice Inviting Bids.
City may also make the Contract Documents available for review at one or more plan rooms, as
indicated in the Notice Inviting Bids. Please Note: Prospective Bidders who choose to review the
Contract Documents at a plan room must contact City to obtain the required Contract Documents
if they decide to submit a Bid for the Project.
ARTICLE 2. BIDS
Bids shall include a completed Bid Schedule and shall be submitted on the forms prepared for
this Project through PlanetBids by the time stipulated in the Notice Inviting Bids. It is the Bidder’s
sole responsibility to see that his Bid is received in proper time. Any Bid submitted after the
scheduled closing time will not be accepted. A Bid may be withdrawn by the Bidder by means of
a written request, signed by the Bidder, or his properly authorized representative.
The Bids will be opened as stipulated in the Notice Inviting Bids.
Unauthorized conditions, limitations, or provisions attached to a Bid may render it nonresponsive
and may cause its rejection. The completed Bid forms shall be without interlineations, alterations,
or erasures. Oral, telegraphic, or telephonic bids or modifications will not be considered.
The Bidder shall furnish a price for all bid items in the Bid and failure to do so may render the Bid
nonresponsive and may cause its rejection. In the event the total indicated for the schedule does
not agree with the sum of the prices for the individual items, the individual item prices shall govern
and the total for the schedule may be corrected accordingly.
ARTICLE 3. EXAMINATION OF PLANS, SPECIFICATIONS, PROVISIONS, & PROJECT SITE
At its own expense and prior to submitting its Bid, each Bidder shall visit the site of the proposed
work and fully acquaint itself with the conditions relating to the construction and labor required so
that the Bidder may fully understand the work, including but not limited to difficulties and
restrictions attending the execution of the work under the Contract. Each Bidder shall carefully
examine the Drawings, and shall read the Specifications, Contract, and all other documents
referenced herein and made part of the Contract Documents. Each Bidder shall also determine
the local conditions which may in any way affect the performance of the work, including local tax
structure, contractors’ licensing requirements, availability of required insurance, the prevailing
wages and other relevant cost factors, shall familiarize itself with all federal, state and local laws,
ordinances, rules, regulations and codes affecting the performance of the work, including the cost
of permits and licenses required for the work, and shall make such surveys and investigations,
including investigations of subsurface or latent physical conditions at the site or where work is to
be performed as may be required. Bidders are responsible for consulting the standards
referenced in the Contract Documents. The failure or omission of any Bidder to receive or examine
the Contract Documents, forms, instruments, addenda, or other documents, or to visit the site and
ADDENDUM 1
4.1.c
Packet Pg. 203 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-2 00 21 13 – INSTRUCTIONS TO BIDDERS
acquaint itself with conditions there existing shall in no way relieve any Bidder from any obligation
with respect to its Bid or to the Contract and no relief for error or omission will be given except as
required under state law. The submission of a Bid shall be taken as conclusive evidence of
compliance with this Article.
The bidder shall examine carefully the site of the project and the plans and specifications for the
work contemplated. It will be assumed that the bidder has investigated and is satisfied with the
conditions to be encountered as to the character, quality, and quantities of work to be performed
and materials to be furnished and as to the requirements of the specifications. The plans for the
work will show conditions as they are supposed or believed by the engineer to exist but is not
intended nor is to be inferred that the conditions as shown thereon constitute a representation by
the city or its officers that such conditions are actually existent.
ARTICLE 4. INTERPRETATION OF DRAWINGS AND DOCUMENTS
Prospective Bidders unclear as to the true meaning of any part of the Drawings, Specifications or
other Contract Documents may submit a written request for interpretation. The prospective Bidder
submitting the request is responsible for prompt delivery. Interpretation of the Drawings,
Specifications or other Contract Documents will be made only by a written addendum duly issued
and a copy of such addenda will be posted on PlanetBids. The City will not be responsible for
any other explanation or interpretations of the Contract Documents. If a prospective Bidders
becomes aware of any errors or omissions in any part of the Contract Documents, it is the
obligation of the prospective Bidder to promptly bring it to the attention of the City. Any omissions
from these Contract Documents not called to the attention of the City shall not affect the validity
of the bid process or the contract eventually awarded.
ARTICLE 5. PRE-BID MEETING
A mandatory Pre-Bid Conference is scheduled for January 15, 2026, at 10:00AM to review the
Project's existing conditions at the Circle K gas station located at 1450 S Sanderson Ave, San
Jacinto, CA 92582. Representatives of City and consulting engineers, if any, will be present. Bids
will not be accepted from any bidder who did not attend the mandatory Pre-Bid Conference.
• Date: January 15, 2026
• Time: 10:00 AM
• Location: 1450 S Sanderson Ave, San Jacinto, CA 92582
ARTICLE 6. ADDENDA
The City reserves the right to revise the Contract Documents prior to the bid opening date.
Revisions, if any, shall be made by written addenda. All addenda issued by the City shall be
accounted for by Bidder in its bid and made part of the Contract Documents. Pursuant to Public
Contract Code Section 4104.5, if the City issues an addendum which includes material changes
to the Project less than 72 hours prior to the deadline for submission of Bids, the City will extend
the deadline for submission of Bids. The City may determine, in its sole discretion, whether an
addendum warrants postponement of the Bid submission date. Addenda will be published on
PlanetBids. Please Note: Bidders are responsible for ensuring that they have received and
reviewed any and all addenda. To this end, each Bidder should check PlanetBids to verify that it
has received all addenda issued, if any, prior to the Bid opening. The Bidder shall indicate the
ADDENDUM 1
4.1.c
Packet Pg. 204 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-3 00 21 13 – INSTRUCTIONS TO BIDDERS
addenda received prior to bidding in the space provided in the Bid Forms. Failure to indicate all
Addenda may be sufficient cause for rejecting the Bid.
ARTICLE 7. ALTERNATE BIDS
If alternate bid items are called for in the Contract Documents, the time required for completion of
the alternate bid items has already been factored into the Contract duration and no additional
Contract time will be awarded for any of the alternate bid items. The City may elect to include
none, one, or more of the alternate bid items, or to otherwise remove certain work from the Project
scope of work. Accordingly, each Bidder must ensure that each bid item contains a proportionate
share of profit, overhead, and other costs or expenses which will be incurred by the Bidder.
ARTICLE 8. COMPLETION OF BID FORMS
Bids shall only be prepared using copies of the Bid Forms which are included in the Contract
Documents. The use of substitute Bid Forms other than clear and correct photocopies of those
provided by the City will not be permitted. Bids shall be executed by an authorized signatory as
described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces
(including inserting “N/A” where applicable), and initial all interlineations, alterations, or erasures
to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the
Bid Forms nor make substitutions thereon. Use of typed entries, black or blue ink, or indelible
pencil is required. Deviations in the Bid Forms may result in the Bid being deemed non-
responsive.
ARTICLE 9. MODIFICATIONS OF BIDS
Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract
Documents. Unauthorized additions, modifications, revisions, conditions, limitations, exclusions
or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders
shall not delete, modify, or supplement the printed matter on the Bid Forms, or make substitutions
thereon. Oral, telephonic and electronic modifications will not be considered.
ARTICLE 10. CITY’S RIGHTS RESERVED
The City reserves the right to reject any or all bids, to waive any informality in a bid, and to make
awards in the interest of the City. None of the 3 lowest bidders may withdraw their bid for a period
of ninety (90) days after the bid opening.
ARTICLE 11. SUBCONTRACTORS
Bidder shall set forth the name, address of the place of business, contractor license number, and
public works contractor registration number of each subcontractor who will perform work, labor,
furnish materials or render services to the bidder on said contract and each subcontractor licensed
by the State of California who, under subcontract to bidder, specially fabricates and installs a
portion of the work described in the Contract Documents in an amount in excess of one half of
one percent (0.5%) of the total bid price, and shall indicate the portion of the work to be done by
such subcontractor in accordance with Public Contract Code section 4104. Notwithstanding the
foregoing, if the work involves the construction of streets and highways, then the Bidder shall list
each subcontractor who will perform work or labor or render service to the Bidder in or about the
work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or
$10,000, whichever is greater. If a Bidder fails to specify a subcontractor or if a Bidder specifies
ADDENDUM 1
4.1.c
Packet Pg. 205 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-4 00 21 13 – INSTRUCTIONS TO BIDDERS
more than one subcontractor for the same portion of work, then the Bidder shall be deemed to
have agreed that it is fully qualified to perform that portion of work and that it shall perform that
portion itself. Substitution of listed subcontractors shall only be permitted in accordance with
Public Contract Code section 4107.
ARTICLE 12. LICENSING REQUIREMENTS
Pursuant to Business and Professions Code Section 7028.15 and Public Contract Code Section
3300, all Bidders must possess proper licenses for performance of this Contract. Subcontractors
must possess the appropriate licenses for each specialty subcontracted. Pursuant to Business
and Professions Code Section 7028.5, the City shall consider any Bid submitted by a Bidder not
currently licensed in accordance with state law and pursuant to the requirements found in the
Contract Documents to be nonresponsive, and the City shall reject the Bid. The City shall have
the right to request, and Bidders shall provide within ten (10) calendar days, evidence satisfactory
to the City of all valid license(s) currently held by that Bidder and each of the Bidder’s
subcontractors, before awarding the Contract.
Notwithstanding anything contained herein, if the Project involves federal funds, the Contractor
shall be properly licensed by the time the Contract is awarded, pursuant to the provisions of Public
Contract Code section 20103.5.
ARTICLE 13. BID SECURITY (BOND)
Each Bid shall be accompanied by: (a) cash; (b) a certified check made payable to the City of
San Jacinto; (c) a cashier’s check made payable to the City of San Jacinto; or (d) a bid bond
secured from a surety company satisfactory to the City, the amount of which shall not be less than
ten percent (10%) of the Total Bid Price, made payable to the City as bid security. Personal
sureties and unregistered surety companies are unacceptable. The surety insurer shall be
California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. The
bid security shall be provided as a guarantee that within ten (10) calendar days after the City
provides the successful Bidder the Notice of Award, the successful Bidder will enter into a
Contract and provide the necessary bonds and certificates of insurance. The bid security will be
declared forfeited if the successful Bidder fails to comply within said time, and the City may enter
into a Contract with the next lowest responsible bidder providing a responsive bid, or may call for
new bids. No interest shall be paid on funds deposited with the City. The City will return the
security accompanying the Bids of all unsuccessful Bidders no later than sixty (60) calendar days
after award of the Contract.
The Bid Security must be submitted directly to the City as follows:
CITY OF SAN JACINTO
ATTN: STUART MCKIBBIN, CONTRACT CITY ENGINEER
1221 S SAN JACINTO AVE
SAN JACINTO, CA 92583
THE BID SECURITY MUST BE RECEIVED PRIOR TO THE SPECIFIED DATE AND TIME FOR
BID OPENING.
If Bidder elects to provide the required Bid Security in the form of a Bid Bond, the original hard
copy Bid Bond must be submitted to the City at the address indicated above prior to the specified
date and time for bid opening.
ADDENDUM 1
4.1.c
Packet Pg. 206 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-5 00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 14. IRAN CONTRACTING ACT OF 2010
In accordance with Public Contract Code Section 2200 et seq., the City requires that any person
that submits a Bid with the City of one million dollars ($1,000,000) or more, certify at the time the
Bid is submitted that the person is not identified on a list created pursuant to subdivision (b) of
Public Contract Code Section 2203 as a person engaging in investment activities in Iran described
in subdivision (a) of Public Contract Code Section 2202.5, or as a person described in subdivision
(b) of Public Contract Code Section 2202.5, as applicable.
The form of such Iran Contracting Certificate is included with the Bid Forms and must be signed
and dated under penalty of perjury.
ARTICLE 15. NONCOLLUSION DECLARATION
Bidders on all public works contracts are required to submit a declaration of noncollusion with
their Bid. This form is included with the Bid Forms and must be signed and dated under penalty
of perjury.
ARTICLE 16. PUBLIC WORKS CONTRACTOR DIR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish
to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be
registered with the Department of Industrial Relations. No Bid will be accepted nor any Contract
entered into without proof of the contractor’s and subcontractors’ current registration with the
Department of Industrial Relations to perform public work. If awarded a contract, the successful
Bidder and its subcontractors, of any tier, shall maintain active registration with the Department
of Industrial Relations for the duration of the Project. To this end, Bidder shall sign and submit
with its Bid the Public Works Contractor DIR Registration Certification on the form provided,
attesting to the facts contained therein. Failure to submit this form may render the Bid non-
responsive. In addition, each Bidder shall provide the registration number for each listed
subcontractor in the space provided in the Designation of Subcontractors form.
ARTICLE 17. NON-LOBBYING CERTIFICATION
The prospective participant must certify, by signing and submitting a bid or proposal, to the best
of his or her knowledge and belief that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influencing or attempting to influence an officer or
employee of any Federal agency, a Member of Congress, an officer or employee of
Congress, or an employee of a Member of Congress in connection with the awarding of
any Federal contract, the making of any Federal grant, the making of any Federal loan,
the entering into of any cooperative agreement, and the extension, continuation, renewal,
amendment, or modification of any Federal contract, grant, loan, or cooperative
agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any
person for influencing or attempting to influence an officer or employee of any Federal
agency, a Member of Congress, an officer or employee of Congress, or an employee of
a Member of Congress in connection with this Federal contract, grant, loan, or
ADDENDUM 1
4.1.c
Packet Pg. 207 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-6 00 21 13 – INSTRUCTIONS TO BIDDERS
cooperative agreement, the undersigned shall complete and submit Standard Form-LLL,
“Disclosure of Lobbying Activities”, in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification is a prerequisite for making
or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who
fails to file the required certification shall be subject to a civil penalty of not less than $10,000 or
not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she
shall require that the language of this certification be included in all lower tier subcontracts, which
exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
ARTICLE 18. PUBLIC CONTRACT CODE (PCC) 10300-10334
Project is subject to Public Contract Code (PCC) 10300-10334 (procurement of goods), PCC
10335-10381 (non A&E services), and California Government Code 4525-4529.5 including
4527(a) and 4528(a), and other applicable State regulations.
ARTICLE 19. NON-DISCRIMATION
Prospective Participants are subject to the statutes and regulations prohibiting discrimination
applicable to this project include, without limitation to the following:
Title IV of the Civil Rights Act of 1964 (42 U.S.C. Section 2000d et seq.) and
Treasury’s implementing regulations at 31 CFR Part 22, which prohibits discrimination
on the basis of race, color, or national origin;
The Fair Housing Act, Title VIII of the Civil Rights Act of 1968 (42 U.S.C. Section 3601
et seq.), which prohibits discrimination in housing on the basis of race, color, religion,
national origin, sex, familial status, or disability;
Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. Section 794),
which prohibits discrimination on the basis of disability under any program or activity
receiving federal financial assistance;
The Age Discrimination Act of 1975, as amended (42 U.S.C. Section 6101 et seq.),
and Treasury’s implementing regulations at 31 C.F.R. Part 23, which prohibit
discrimination on the basis of age in programs or activities receiving federal financial
assistance; and
Title II of the American with Disabilities Act of 1990, as amended (42 U.S.C. Section
12101 et seq.), which prohibit discrimination on the basis of disability under program,
activities, and services provided or made available by state and local governments or
instrumentalities or agencies thereto.
ARTICLE 20. BIDDER INFORMATION AND EXPERIENCE FORM
Each Bidder shall complete the questionnaire provided herein and shall submit the questionnaire
along with its Bid. Failure to provide all information requested within the questionnaire along with
the Bid may cause the Bid to be rejected as non-responsive. The City reserves the right to reject
ADDENDUM 1
4.1.c
Packet Pg. 208 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-7 00 21 13 – INSTRUCTIONS TO BIDDERS
any Bid if an investigation of the information submitted does not satisfy the City that the Bidder is
qualified to properly carry out the terms of the Contract.
ARTICLE 21. WORKERS' COMPENSATION CERTIFICATION
In accordance with the provisions of Labor Code Section 3700, Contractor shall secure the
payment of compensation to its employees. Contractor shall sign and file with the City a Workers'
Compensation Certificate prior to performing the work under this Contract. The form of such
Workers' Compensation Certificate is included as part of the Bid Forms.
ARTICLE 22. SIGNING OF BIDS
All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders may
be asked to provide evidence in the form of an authenticated resolution of its Board of Directors
or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to
each Bid and to any Contract arising therefrom.
If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of
Attorney executed by each joint venturer or partner appointing and designating one of the joint
venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that
joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that
particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and
(2) provide that each venturer or partner shall be jointly and severally liable for any and all of the
duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom.
The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture
or partnership in its legal name.
ARTICLE 23. WITHDRAWAL OF BID
Any Bid may be withdrawn either personally or by written request, incurring no penalty, at any
time prior to the scheduled closing time for receipt of bids. Requests to withdraw Bids shall be
worded so as not to reveal the amount of the original Bid. Withdrawn Bids may be resubmitted
until the time and day set for the receipt of bids, provided that resubmitted Bids are in conformance
with the instructions herein.
Bids may be withdrawn after bid opening only by providing written notice to the City within five (5)
working days of the Bid opening and in compliance with Public Contract Code section 5100 et
seq., or as otherwise may be allowed with the consent of the City.
ARTICLE 24. BIDDERS INTERESTED IN MORE THAN ONE BID
No Bidder shall be allowed to make, file, or be interested in more than one Bid as a prime
contractor for the same work unless alternate Bids are specifically called for. A person, firm or
corporation that has submitted a sub-proposal to a Bidder, or that has quoted prices of materials
to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other
Bidders or from simultaneously submitting its own Bid as a prime contractor. More than one Bid
ADDENDUM 1
4.1.c
Packet Pg. 209 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-8 00 21 13 – INSTRUCTIONS TO BIDDERS
from an individual, firm, partnership, corporation, or association under the same or different
names will not be considered.
ARTICLE 25. SUBSTITUTION OF SECURITY
The Contract Documents call for monthly progress payments for the Work completed. The City
will retain a percentage of each progress payment as provided by the Contract Documents. At
the request and expense of the successful Bidder, the City will substitute securities for the amount
so retained in accordance with Public Contract Code Section 22300.
ARTICLE 26. PREVAILING WAGES
The City has obtained from the Director of the Department of Industrial Relations the general
prevailing rate of per diem wages in the locality in which this work is to be performed for each
craft or type of worker needed to execute the Contract. These rates are available at the City or
may be obtained online at http://www.dir.ca.gov. Bidders are advised that a copy of these rates
must be posted by the successful Bidder at the job site(s).
This project is subject to compliance monitoring and enforcement by the Department of Industrial
Relations. Contractor shall post job site notices, as prescribed by regulation. Contractor shall
comply with all requirements of Labor Code section 1771.4, except the requirements that are
exempted by the Labor Commissioner for the Project.
ARTICLE 27. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
In accordance with the provisions of the Labor Code, contractors or subcontractors may not
perform work on a public works project with a subcontractor who is ineligible to perform work on
a public project pursuant to Labor Code Sections 1777.1 or 1777.7. Any contract on a public
works project entered into between a contractor and a debarred subcontractor is void as a matter
of law. A debarred subcontractor may not receive any public money for performing work as a
subcontractor on a public works contract. Any public money that is paid to a debarred
subcontractor by the Contractor for the Project shall be returned to the City. The Contractor shall
be responsible for the payment of wages to workers of a debarred subcontractor who has been
allowed to work on the Project.
ARTICLE 28. INSURANCE REQUIREMENTS
Prior to commencing work, the successful Bidder shall purchase and maintain insurance as set
forth in the General Conditions.
ARTICLE 29. PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS
The successful Bidder will be required to furnish a labor and material payment bond and a faithful
performance bond each in an amount equal to one hundred percent (100%) of the Contract Price.
Each bond shall be secured from a surety company that meets all State of California bonding
requirements, as defined in California Code of Civil Procedure Section 995.120 and is admitted
by the State of California. Each bond shall be accompanied, upon the request of the City, with all
documents required by California Code of Civil Procedure Section 995.660 to the extent required
by law. All bonding and insurance requirements shall be completed and submitted to the City
within ten (10) calendar days from the date the City provides the successful bidder with the Notice
of Award.
ADDENDUM 1
4.1.c
Packet Pg. 210 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-9 00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 30. CALIFORNIA AIR RESOURCES BOARD REGULATIONS
The California Air Resources Board (“CARB”) implemented amendments to the In-Use Off-Road
Diesel-Fueled Fleets Regulations (“Regulation”) which are effective on January 1, 2024 and apply
broadly to all self-propelled off road diesel vehicles 25 horsepower or greater and other forms of
equipment used in California. A copy of the Regulation is available at
https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf. Bidders
are required to comply with all CARB and Regulation requirements, including, without limitation,
all applicable sections of the Regulation, as codified in Title 13 of the California Code of
Regulations section 2449 et seq. throughout the term of the Project.
City is a Public Works Awarding Body, as defined under Title 13 California Code of Regulations
section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, a valid Certificate of
Reported Compliance (“CRC”) for the Bidder’s and its listed subcontractors fleet (including any
applicable leased equipment or vehicles). Bidder must complete and submit the Fleet
Compliance Certification, included in the Bid Forms. Failure to provide a CRC for the Bidder, and
for all listed subcontractors, or failure to complete the Fleet Compliance Certification, may render
the Bid non-responsive.
ARTICLE 31. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES
Contractor and its subcontractors performing work under this Contract will be required to pay
California sales tax and other applicable taxes, and to pay for permits, licenses and fees required
by the agencies with authority in the jurisdiction in which the Work will be located, unless otherwise
expressly provided by the Contract Documents. Encroachment Permits and City Business
Licenses issued by the City of San Jacinto will come with no cost to Contractor.
ARTICLE 32. FILING OF BID PROTESTS
Bidders may file a protest of a Bid with the City Engineer. In order for a Bidder’s protest to be
considered valid, the protest must:
A. Be filed in writing within five (5) calendar days after the bid opening date or any City
determination or recommendation regarding the Bidder’s bid, as applicable;
B. Clearly identify the specific irregularity or accusation;
C. Clearly identify the specific City staff determination or recommendation being protested;
D. Specify in detail the grounds for protest and the facts supporting the protest; and
E. Include all relevant, supporting documentation with the protest at time of filing.
If the protest does not comply with each of these requirements, the City may reject the protest
without further review.
If the protest is timely and complies with the above requirements, the City Engineer, or other
designated City staff member, shall review the protest, any response from the challenged
Bidder(s), and all other relevant information. The City Engineer will provide a written decision to
the protestor.
The procedure and time limits set forth in this Article are mandatory and are the sole and exclusive
remedy in the event of a Bid protest. Failure to comply with these procedures shall constitute a
ADDENDUM 1
4.1.c
Packet Pg. 211 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-10 00 21 13 – INSTRUCTIONS TO BIDDERS
failure to exhaust administrative remedies and a waiver of any right to further pursue the bid
protest, including filing a Government Code Claim or legal proceedings.
ARTICLE 33. BASIS OF AWARD; BALANCED BID
The City shall award the Contract to the lowest responsible Bidder submitting a responsive Bid.
The lowest Bid will be determined on the basis of the total bid price of the Base Bid Schedule plus
the EMWD Additive Alternate Bid Schedule.
The City may reject any Bid which, in its opinion when compared to other Bids received or to the
City’s internal estimates, does not accurately reflect the cost to perform the work. The City may
reject as non-responsive any Bid which unevenly weights or allocates costs, including but not
limited to overhead and profit to one or more particular bid items.
Bidder understands that a Bid is required for the entire work and that the estimated quantities set
forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation
under the contract will be based upon the actual quantities of work satisfactorily completed. THE
CITY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY
QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT WITHOUT ANY
ADJUSTMENT IN THE CONTRACT UNIT PRICE. It is agreed that the unit and/or lump sum
prices bid include all appurtenant expenses, taxes, royalties and fees. In the case of discrepancies
in the amounts bid, unit prices shall govern over extended amounts and words shall govern over
figures.
ARTICLE 34. AWARD PROCESS
Once all Bids are opened and reviewed to determine the lowest responsible Bidder submitting a
responsive Bid, the City Council may award the Contract. The apparent successful Bidder should
begin to prepare the following documents: (1) the performance bond; (2) the payment bond; and
(3) the required insurance certificates and endorsements. Once the City notifies the Bidder of the
award, the Bidder will have ten (10) calendar days from the date of this notification to execute the
Contract and supply the City with all of the required documents and certifications. Once the City
receives all of the properly drafted and executed documents and certifications from the Bidder,
the City will issue a Notice to Proceed to that Bidder.
ARTICLE 35. CONFLICT OF INTEREST
No employee, officer or agent of the City and/or Consultant, shall participate in selection, or in
award of administration of a contract supported by federal funds, if a conflict of interest, real or
apparent, would be involved. Such a conflict arises when: (i) the employee, officer or agent (ii)
any member of his immediate family (iii) his or her partner (iv) an organization, which employs or
is about to employ, and of the above has a financial or other interest in the firm selected for award.
ARTICLE 36. EXECUTION OF CONTRACT
As required herein the Bidder to whom an award is made shall execute the Contract in the amount
determined by the Contract Documents. The City may require appropriate evidence that the
persons executing the Contract are duly empowered to do so. The Contract and bond forms to
be executed by the successful Bidder are included within these Contract Documents and shall
not be detached.
ADDENDUM 1
4.1.c
Packet Pg. 212 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE B-11 00 21 13 – INSTRUCTIONS TO BIDDERS
Failure or refusal to enter into a Contract as herein provided or to conform to any of the stipulated
requirements in connection therewith shall be just cause for forfeiture of the Bid Security. If the
successful Bidder refuses or fails to execute the Contract, the City may award the contract to the
second lowest responsive and responsible Bidder. If the second lowest responsive and
responsible Bidder refuses or fails to execute the Contract, the City may award the contract to the
third lowest responsive and responsible bidder. On the failure or refusal of such second or third
lowest Bidders to execute the Contract, such Bidders' Security likewise shall be forfeited to the
City.
ARTICLE 37. CALIFORNIA GOVERNMENT CODE SECTIONS 4525-4529.14
The City of San Jacinto and prospect contractors and sub-contractors shall undertake the
procedures described in California Government Code 4527(a) and 4528(a). The City of San
Jacinto and prospect contractor and sub-contractors shall also comply with 2 CFR Part 200
Uniform Administrative Requirements, Cost Principals and Audit Requirements for all Federal
Awards, excluding 2 CFR Part 200.318-200.326. Contractors and sub-contractors will be
obligated to agree that Contract Cost principals and Procedures, 48 CFR, Federal Acquisition
Regulations System Chapter 1, Part 31, et seq., shall be used to determine the allowability of
individual PROJECT cost items. Every recipient and sub-recipient receiving PROJECT funds shall
comply with Federal administrative procedures in accordance with 2 CFR, Part 200, Uniform
Administrative Requirements, Cost Principals and Audit Requirement for Federal Awards,
excluding 2 CFR Part 200.318-200.326 Governments.
ARTICLE 38. QUESTIONS
Questions regarding this Notice Inviting Bids and Instruction to Bidders should be posted online
to the PlanetBids website. No other members of the City’s staff or City Council should be
contacted about this procurement during the bidding process. Any and all inquiries and comments
regarding this Bid must be communicated through the PlanetBids website, unless otherwise
instructed by the City. The City may, in its sole discretion, disqualify any Bidder who engages in
any prohibited communications.
ARTICLE 39. RECORD RETENTION
Contractor must keep project records for a period of five (5) years after project completion.
END OF INSTRUCTIONS TO BIDDER
ADDENDUM 1
4.1.c
Packet Pg. 213 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-1 00 41 43 – BID FORMS
00 41 43 – BID FORMS
BID
Bids will be received on www.planetbids.com , until 2:00 PM on FEBRUARY 19, 2026.
ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE
NAME OF BIDDER: ______________________________________________
To the City of San Jacinto, with its principal place of business at: 595 S. San Jacinto Ave,
San Jacinto, CA 92583
A. In response to the Notice Inviting Bids and in accordance with the accompanying
Instructions to Bidders, the undersigned hereby proposes to the City to furnish all
labor, technical and professional services, supervision, materials and equipment,
other than materials and equipment specified as furnished by the City, and to perform
all operations necessary and required to construct the Project in accordance with the
provisions of the Contract Documents and any addenda thereto, and at the prices
stated opposite the respective items set forth in the Bid Schedule.
B. This Bid constitutes a firm offer to the City which cannot be withdrawn for 90 calendar
days after the date set for opening of bids, or until a Contract is executed by the City
and a third party, whichever is earlier.
C. The undersigned certifies that it has examined and is fully familiar with all of the
provisions of the Contract Documents and any addenda thereto; that it has carefully
checked all of the words and figures shown in its Bid Schedule; that it has carefully
reviewed the accuracy of all statements in this Bid and attachments hereto; and that
it understands and agrees that the City will not be responsible for any errors or
omissions on the part of the undersigned in preparing this Bid.
D. If awarded a Contract, the undersigned agrees to execute and deliver to the City
within ten (10) calendar days after date of receipt of Notice of Award, a signed
Contract and the necessary performance bond, payment bond, and certificates of
insurance and endorsements.
E. The following Bid Forms, which have been completed and executed by the
undersigned Bidder, are incorporated by this reference and made a part of this Bid:
1. Bid Schedule
2. Bid security in the amount of not less than 10% of the Total Bid Price.
3. Completed Designation of Subcontractors form.
4. Fully executed Noncollusion Declaration form.
5. Completed Iran Contracting Act Certification form.
6. Completed Public Works Contractor DIR Registration Certification form.
7. Completed Contractor’s Certificate Regarding Workers’ Compensation form.
8. Completed Bidder Information and Experience form.
9. Completed Executive Order N-22 Certification form.
10. Completed Fleet Compliance Certification form.
ADDENDUM 4
4.1.c
Packet Pg. 214 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-2 00 41 43 – BID FORMS
F. Bidder is an ◯ individual, or ◯ corporation, or ◯ partnership, organized under the
laws of the State of _______________________________.
G. The undersigned is hereby representing that it is and will be properly licensed both at
the time that it submits a Bid as well as at the time the Contract is awarded, if the
Contract is awarded to the undersigned.
1. Individual Contractor. Undersigned certifies that it is now licensed in accordance
with the provisions of the Contractor's License Law of the State of California.
License number
Expiration date
License classification
1. Joint Venture. Undersigned certifies that the individual members of the joint
venture are now licensed in accordance with the provisions of the Contractor's
License Law of the State of California.
Member No. 1
Name
License number
Expiration date
License classification
Member No. 2
Name
License number
Expiration date
License classification
(If there are more than two members of the joint venture, attach a page for the
additional member(s) with the above information.)
The undersigned acknowledges receipt, understanding, and full consideration of the following
addenda to the Contract Documents:
Addenda No. ________________________________________________
[SIGNATURE ON NEXT PAGE]
4.1.c
Packet Pg. 215 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-3 00 41 43 – BID FORMS
I hereby certify under penalty of perjury under the laws of the State of California that all of the
information submitted in connection with this Bid and all of the representations made herein are
true and correct.
BIDDER: Bidder's Business Address:
(Company Name)
By
(Signature)
___________________________________
(Type or print name) (Phone Number)
___________________________________
(Title) (Email Address)
(Where signed) (City, State)
(corporate seal)
Dated: , 20
State of Incorporation:
Names and addresses of all partners or joint venturers:
Statement of the authority of signatory to bind Bidder:
4.1.c
Packet Pg. 216 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-4 00 41 43 – BID FORMS
BASE BID SCHEDULE
No. ITEM DESCRIPTION UNIT OF
MEASURE
EST.
QTY. UNIT PRICE ITEM COST
1 Mobilization LS 1 $ $
2 Traffic Control LS 1 $ $
3 Water Pollution Control LS 1 $ $
4 Clearing & Grubbing LS 1 $ $
5 Saw Cut LF 11,781 $ $
6 Remove & Dispose Existing
Pavement and Base CY 13,338 $ $
7 Remove & Dispose Existing AC
Berm LF 1,074 $ $
8 Remove & Dispose Existing 18"
CMP LF 170 $ $
9 Remove & Dispose Existing 12"
CMP LF 40 $ $
10
Remove & Dispose Existing
Headwalls per Construction Note
#4
EA 4 $ $
11 Remove & Dispose Existing
Reflector Delineators LS 1 $ $
12 NOT USED
13 Remove & Dispose Existing
Guard Rail LF 40 $ $
14 Relocate Existing Fencing and
Gates LF 468 $ $
15 Relocate Existing Mailbox EA 1 $ $
16 Remove & Dispose Existing
Frontier Pole EA 1 $ $
17 Cold Mill 0.12' Asphalt Concrete SF 78,358 $ $
18 Asphalt Concrete TON 10,504 $ $
19 Class 2 Aggregate Base TON 24,619 $ $
20 Remove and Salvage Signage EA 9 $ $
21 Construct Sidewalk per County
of Riverside Std 401 SF 40,078 $ $
22
Construct Type "A-8" Curb &
Gutter per County of Riverside
Std 201
LF 7,237 $ $
23 Construct Residential Driveway
per County of Riverside Std 207 EA 5 $ $
24 Construct Access Ramp per ADA
& County of Riverside Std 403 EA 5 $ $
ADDENDUM 5
4.1.c
Packet Pg. 217 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-5 00 41 43 – BID FORMS
BASE BID SCHEDULE
No. ITEM DESCRIPTION UNIT OF
MEASURE
EST.
QTY. UNIT PRICE ITEM COST
25 Potholing (Exploratory
Excavations) LS 1 $ $
26 Construct Commercial Driveway
per County of Riverside Std 207A EA 2 $ $
27 Over Excavation and Subgrade
Preparation CY 15,566 $ $
28 NOT USED
29 Construct Monitoring Well per
Sheet No. W-1 LS 1 $ $
30 Construct Single Headwalls per
Caltrans Std D89A EA 7 $ $
31 Construct Concrete Collar per
RCFC & WD Std M803 EA 1 $ $
32 Channel Excavation CY 9,125 $ $
33 NOT USED
34 Construct Junction Structure No.
8 Per RCFC Std JS233 EA 8 $ $
35 NOT USED
36 NOT USED
37 Construct Manhole No. 1 per
RCFC & WCD STD MH251 EA 9 $ $
38 Construct 42" OD Steel Pipe
Casing EMWD STD. B-575 LF 60 $ $
39
Construct 4' Wide Curb Inlet
Catch Basin per County of
Riverside Std 300
EA 11 $ $
40
Construct Depression for Curb
Opening Catch Basin, Case C,
per County of Riverside Std 311
SF 1,584 $ $
41 Construct 12" RCP LF 396 $ $
42 Construct 18" RCP LF 745 $ $
43 Construct 30" RCP LF 2,123 $ $
44 Install Rip-Rap TON 10,726 $ $
45 Type 1 Slurry Seal SY 5,697 $ $
46 Crack Seal LS 1 $ $
47
Construct Modified Dual-Pipe
Junction Structure Per RCFC STD
JS233
LS 1 $ $
48 Install TUMF Sign per
Specifications LS 1 $ $
ADDENDUM 5
4.1.c
Packet Pg. 218 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-6 00 41 43 – BID FORMS
BASE BID SCHEDULE
No. ITEM DESCRIPTION UNIT OF
MEASURE
EST.
QTY. UNIT PRICE ITEM COST
49 Install Traffic Signal at Warren &
Esplanade Ave LS 1 $ $
50 Install Traffic Signal at Cawston
& Esplanade Ave LS 1 $ $
51 Signing, Striping, and Pavement
Markings LS 1 $ $
BASE BID (BID ITEMS # 1-51) TOTAL $
EMWD ADDITIVE ALTERNATE BID SCHEDULE
NO. ITEM DESCRIPTION UNIT OF
MEASURE
EST.
QTY. UNIT PRICE ITEM COST
1A Adjust to Grade Existing EMWD
Manholes EA 7 $ $
2A Adjust to Grade Existing EMWD
Water Valve Covers EA 11 $ $
3A Relocate Existing EMWD Marker
Post EA 30 $ $
4A Relocate Existing EMWD
Pedestal EA 1 $ $
5A Relocate Existing EMWD Air Vac EA 3 $ $
6A Relocate Existing EMWD Test
Station EA 24 $ $
7A Relocate Existing EMWD Blow
Off EA 1 $ $
8A Relocate Existing EMWD Water
Valve EA 1 $ $
9A Relocate Existing EMWD Fire
Hydrant EA 2 $ $
10A Relocate Existing EMWD Water
Meter EA 2 $ $
11A Relocate Existing EMWD
Backflow EA 1 $ $
12A Adjust to Grade Existing EMWD
Test Station EA 15 $ $
EMWD ADDITIVE ALTERNATE (BID ITEMS # 1A-12A) TOTAL $
BASE BID + EMWD ADDITIVE ALTERNATE TOTAL $
The basis for award of contract shall be the Contractor’s Base Bid plus all Additive Alternate(s).
C-6
ADDENDUM 2
4.1.c
Packet Pg. 219 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-7 00 41 43 – BID FORMS
TOTAL BID PRICE BASED ON TOTAL BASE BID + TOTAL EMWD ADDITIVE
ALTERNATE BID SCHEDULE
$
Total Base Bid + EMWD Additive Alternate in Numbers
The costs for any work shown or required in the Contract Documents, but not specifically identified
as a bid line item are to be included in the related bid line items and no additional compensation
shall be due to Contractor for the performance of the work.
All blank spaces appearing above must be filled in. Failure to fill in any blank spaces may render
the Bid non-responsive. In case of discrepancy between the Unit Price and Item Cost set forth
for a unit basis item, the Unit Price shall prevail and be utilized as the basis for determining the
lowest responsive, responsible Bidder. However, if the amount set forth as a Unit Price is
ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the
entry in the Item Cost column, then the amount set forth in the Item Cost column for the item shall
prevail and shall be divided by the estimated quantity for the item and the price thus obtained
shall be the Unit Price.
For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit
prices and any apparent errors in the addition of lump sum and extended prices.
The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City
makes no representation that the actual quantities of work performed will not vary from the
estimates. Final payment shall be determined by the City from measured quantities of work
performed based upon the Unit Price.
The undersigned agrees that this Bid Schedule constitutes a firm offer to the City which cannot
be withdrawn for the number of calendar days indicated in the Notice Inviting Bids from and after
the bid opening, or until a Contract for the work is fully executed by the City and a third party,
whichever is earlier.
If the Contract Documents specify alternate bid items, the City can choose to include any, all, or
none of the alternate bid items in the Work. If the City selects any of the alternate bid items, the
corresponding alternate bid prices shall be added to or deducted from Base Bid Price for the work.
The City can award/select alternate bid items at any time(s).
ADDENDUM 1
4.1.c
Packet Pg. 220 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-8 00 41 43 – BID FORMS
TOTAL BASE BID + EMWD ADDITIVE ALTERNATE IN WORDS:________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
List of Addenda Received: _______________________________________________________
Name of Bidder:
Signature:
Name and Title:
Dated:
ADDENDUM 1
4.1.c
Packet Pg. 221 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-9 00 41 43 – BID FORMS
BID SECURITY
BID BOND
[Note: Not required when other form of Bidder’s security, e.g. cash, certified check or cashier’s
check, accompanies Bid.]
The makers of this bond are, _____________________________________________, as
Principal, and ______________________________________________________, as Surety
and are held and firmly bound unto the City of San Jacinto, with its principal place of business at
595 S. San Jacinto Ave, San Jacinto, CA 92583, hereinafter called the City, in the penal sum of
TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to the City for the
work described below, for the payment of which sum in lawful money of the United States, well
and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and
assigns, jointly and severally, firmly by these presents.
ADDENDUM 1
4.1.c
Packet Pg. 222 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-10 00 41 43 – BID FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
Name(s) of Signer(s)
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
ADDENDUM 1
4.1.c
Packet Pg. 223 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-11 00 41 43 – BID FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local
representatives of the bonding company must also be attached.
END OF BID BOND
ADDENDUM 1
4.1.c
Packet Pg. 224 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-12 00 41 43 – BID FORMS
DESIGNATION OF SUBCONTRACTORS
The subcontractor listed below will perform work or labor or render service to the successful
Bidder in or about the construction of the work or improvement, or are subcontractors licensed by
the State of California who will, under subcontract to the successful Bidder, specially fabricate
and install a portion of the work or improvement according to detailed drawings contained in the
Contract Documents, in an amount in excess of one-half of one percent (1/2 of 1%) of the Bidder’s
total bid. Notwithstanding the foregoing, if the work involves the construction of streets and
highways, then the Bidder shall list each subcontractor who will perform work or labor or render
service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%)
of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be
granted to provide the below requested information.
In compliance with the Subletting and Subcontracting Fair Practices Act Chapter 4 (commencing
at Section 4100), Part 1, Division 2 of the California Public Contract Code, the Bidder shall set
forth below:
(a) The portion of the work to be done by the subcontractor;
(b) The name and the location of the place of business;
(c) The California contractor license number; and
(d) The DIR public works contractor registration number.
If a Bidder fails to specify a subcontractor or if a Bidder specifies more than one subcontractor for
the same portion of work, then the Bidder shall be deemed to have agreed that it is fully qualified
to perform that portion of work and that it shall perform that portion itself.
Portion of
Work to be
done by
Subcontractor
Name of
Subcontractor Location of
Business
CSLB
Contractor
License No.
DIR
Registration
Number
ADDENDUM 1
4.1.c
Packet Pg. 225 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-13 00 41 43 – BID FORMS
Portion of
Work to be
done by
Subcontractor
Name of
Subcontractor Location of
Business
CSLB
Contractor
License No.
DIR
Registration
Number
(Attach additional sheets if necessary)
Name of Bidder
Signature
Name and Title
Dated
ADDENDUM 1
4.1.c
Packet Pg. 226 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-14 00 41 43 – BID FORMS
BIDDER INFORMATION AND EXPERIENCE FORM
A. INFORMATION ABOUT BIDDER
(Indicate not applicable (“N/A”) where appropriate.)
NOTE: Where Bidder is a joint venture, pages shall be duplicated and information provided
for all parties to the joint venture.
1.0 Name of Bidder: ___________________________________________
2.0 Type, if Entity: ___________________________________________
3.0 Bidder Address: ___________________________________________
_____________________________________________________________
_____________________________________________________________
Telephone Number
_____________________________________________________________
Email Address
4.0 How many years has Bidder’s organization been in business as a Contractor?
______________________________
5.0 How many years has Bidder’s organization been in business under its present
name? ________________________
5.1 Under what other or former names has Bidder’s organization
operated?_______________________________________________
6.0 If Bidder’s organization is a corporation, answer the following:
6.1 Date of Incorporation: ________________________________
6.2 State of Incorporation: ________________________________
6.3 President’s Name: ________________________________
6.4 Vice-President’s Name(s): ________________________________
________________________________
6.5 Secretary’s Name: ________________________________
6.6 Treasurer’s Name: ________________________________
ADDENDUM 1
4.1.c
Packet Pg. 227 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-15 00 41 43 – BID FORMS
7.0 If an individual or a partnership, answer the following:
7.1 Date of Organization: ______________________________________
7.2 Name and address of all partners (state whether general or limited
partnership):
___________________________________________________________
___________________________________________________________
___________________________________________________________
8.0 If other than a corporation or partnership, describe organization and name
principals:
___________________________________________________________
___________________________________________________________
9.0 List other states in which Bidder’s organization is legally qualified to do business.
___________________________________________________________
___________________________________________________________
___________________________________________________________
10.0 What type of work does the Bidder normally perform with its own forces?
___________________________________________________________
___________________________________________________________
___________________________________________________________
11.0 Has Bidder ever failed to complete any work awarded to it? If so, note when, where,
and why:
___________________________________________________________
___________________________________________________________
12.0 Within the last five years, has any officer or partner of Bidder’s organization ever
been an officer or partner of another organization when it failed to complete a
contract? If so, attach a separate sheet of explanation:
___________________________________________________________
___________________________________________________________
ADDENDUM 1
4.1.c
Packet Pg. 228 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-16 00 41 43 – BID FORMS
13.0 List Trade References:
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
14.0 List Bank References (Bank and Branch Address):
___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________
15.0 Name of Bonding Company and Name and Address of Agent:
___________________________________________________________
___________________________________________________________
___________________________________________________________
[REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]
ADDENDUM 1
4.1.c
Packet Pg. 229 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-17 00 41 43 – BID FORMS
B. LIST OF CURRENT PROJECTS (BACKLOG)
[Duplicate page if needed for listing additional current projects.]
Project Client Reference
(agency
name/contact
info)
Description of
Bidder’s Work
Completion Date Cost of Bidder’s
Work
ADDENDUM 1
4.1.c
Packet Pg. 230 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-18 00 41 43 – BID FORMS
C. LIST OF COMPLETED PROJECTS – LAST THREE YEARS
[Duplicate page if needed for listing additional completed projects.]
Please include only those projects which are similar enough to demonstrate Bidder’s ability to
perform the required work on the Project.
Project Client Reference
(agency
name/contact
info)
Description of
Bidder’s Work
Completion Date Cost of Bidder’s
Work
ADDENDUM 1
4.1.c
Packet Pg. 231 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-19 00 41 43 – BID FORMS
D. EXPERIENCE AND TECHNICAL QUALIFICATIONS QUESTIONNAIRE
Personnel:
The Bidder shall identify the key personnel to be assigned to this project in a management,
construction supervision or engineering capacity.
1. List each person’s job title, name and percent of time to be allocated to this project:
2. Summarize each person’s specialized education:
3. List each person’s years of construction experience relevant to the project:
4. Summarize such experience:
Bidder agrees that personnel named in this Bid will remain on this Project until completion of all
relevant work, unless substituted by personnel of equivalent experience and qualifications
approved in advance by the City.
ADDENDUM 1
4.1.c
Packet Pg. 232 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-20 00 41 43 – BID FORMS
E. ADDITIONAL BIDDER’S STATEMENTS:
If the Bidder feels that there is additional information which has not been included in the
questionnaire above, and which would contribute to the qualification review, it may add that
information in a statement here or on an attached sheet, appropriately marked:
_______
Name of Bidder
Signature
Name and Title
Dated
ADDENDUM 1
4.1.c
Packet Pg. 233 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-21 00 41 43 – BID FORMS
NON-COLLUSION DECLARATION
The undersigned declares:
I am the ___________________ of ______________________________, the party making the
foregoing Bid.
The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation. The Bid is genuine and not collusive or sham.
The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or
sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with
any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in
any manner, directly or indirectly, sought by agreement, communication, or conference with
anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost
element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are
true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation,
partnership, company, association, organization, bid depository, or to any member or agent
thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or
entity for such purpose.
Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint
venture, limited liability company, limited liability partnership, or any other entity, hereby
represents that he or she has full power to execute, and does execute, this declaration on behalf
of the Bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is
true and correct and that this declaration is executed on __________ [date], at
___________________ [city], ___________________ [state].
Name of Bidder
Signature
Name and Title
Dated
ADDENDUM 1
4.1.c
Packet Pg. 234 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-22 00 41 43 – BID FORMS
IRAN CONTRACTING ACT CERTIFICATION.
(Public Contract Code section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to
penalty for perjury that the option checked below relating to the Contractor’s status in regard to
the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:
The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities
in Iran prepared by the California Department of General Services in accordance
with subdivision (b) of Public Contract Code Section 2203; or
(2) a financial instruction that extends, for 45 days or more, credit in the amount of
$20,000,000 or more to any other person or entity identified on the current list of
persons and entities engaging in investment activities in Iran prepared by the
California Department of General Services in accordance with subdivision (b) of
Public Contract Code Section 2203, if that person or entity uses or will use the
credit to provide goods or services in the energy sector in Iran.
The City has exempted the Contractor from the requirements of the Iran Contracting
Act of 2010 after making a public finding that, absent the exemption, the City will be
unable to obtain the goods and/or services to be provided pursuant to the Contract.
The amount of the Contract payable to the Contractor for the Project does not exceed
$1,000,000.
Signature:
Printed Name:
Title:
Firm Name:
Date:
Note: In accordance with Public Contract Code Section 2205, false certification of this form shall
be reported to the California Attorney General and may result in civil penalties equal to the greater
of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on
contracts for three years.
ADDENDUM 1
4.1.c
Packet Pg. 235 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-23 00 41 43 – BID FORMS
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that
wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be
registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public-
Works/PublicWorks.html for additional information.
No bid will be accepted nor any contract entered into without proof of the contractor’s and
subcontractors’ current registration with the Department of Industrial Relations to perform public
work.
Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code
sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of
Industrial Relations.1
Name of Bidder:
DIR Registration Number:
DIR Registration Expiration:_________________________
Small Project Exemption: _____ Yes or _____ No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:
1. Bidder shall maintain a current DIR registration for the duration of the project.
2. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1
in its contract with subcontractors and ensure that all subcontractors are registered
at the time of bid opening and maintain registration status for the duration of the
project.
3. Failure to submit this form or comply with any of the above requirements may result
in a finding that the bid is non-responsive.
Name of Bidder
Signature
Name and Title
Dated
1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code
Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”
ADDENDUM 1
4.1.c
Packet Pg. 236 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-24 00 41 43 – BID FORMS
CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION.
I am aware of the provisions of section 3700 of the Labor Code which require every employer to
be insured against liability for workers’ compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions before
commencing the performance of the work of this Contract.
Name of Bidder
Signature
Name and Title
Dated
ADDENDUM 1
4.1.c
Packet Pg. 237 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-25 00 41 43 – BID FORMS
EXECUTIVE ORDER N-6-22 CERTIFICATION.
Executive Order N-6-22 issued by Governor Gavin Newsom on March 4, 2022, directs all
agencies and departments that are subject to the Governor’s authority to (a) terminate any
contracts with any individuals or entities that are determined to be a target of economic sanctions
against Russia and Russian entities and individuals; and (b) refrain from entering into any new
contracts with such individuals or entities while the aforementioned sanctions are in effect.
Executive Order N-6-22 also requires that any contractor that: (1) currently has a contract with
District funded through grant funds provided by the State of California; and/or (2) submits a bid or
proposal or otherwise proposes to or enter into or renew a contract with the District funded by
State of California grant funds, certify that the person is not the target of any economic sanctions
against Russia and Russian entities and individuals.
The contractor hereby certifies, SUBJECT TO PENALTY FOR PERJURY, that a) the contractor
is not a target of any economic sanctions against Russian and Russian entities and individuals
as discussed in Executive Order N-6-22 and b) the person signing below is duly authorized to
legally bind the Contractor. This certification is made under the laws of the State of California.
Signature:
Printed Name:
Title:
Firm Name:
Date:
ADDENDUM 1
4.1.c
Packet Pg. 238 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-26 00 41 43 – BID FORMS
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s
policies, rules and regulations and are familiar with the requirements of Title 13, California Code
of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder
hereby certifies, subject to penalty for perjury, that the option checked below relating to the
Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate
Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed
description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel
as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed
records describing the normal refueling methods, their attempts to procure renewable
diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third
party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4)
because this Project has been deemed an Emergency, as defined under section
2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation
and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed
reasoning is attached hereto.
Signature:
Printed Name:
Title:
Firm Name:
Date:
ADDENDUM 1
4.1.c
Packet Pg. 239 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE C-27 00 41 43 – BID FORMS
ELECTRONIC DOCUMENTS RELEASE ACCEPTANCE
Electronic Documents Release Notice:
By accessing the link(s) or document(s) attached, Interwest Consulting Group and City of San
Jacinto require that you, the Bidder, read and accept this notice. Interwest Consulting Group &
City of San Jacinto are providing electronic AutoCAD files and Bidder recognizes that said
transmission is for convenience only. These AutoCAD files are not As Built drawings and are
provided with the understanding that all conditions should be field verified to confirm the degree
of accuracy required for Esplanade Avenue Widening Phase 1 Warren Road To Sanderson
Avenue . Also, these files do not replace or otherwise alter our original designs and drawings.
The Bidder recognizes that data, plans, specifications, reports, documents or other information
recorded on or transmitted as electronic media are subject to undetectable alteration, either
intentional or unintentional due to, among other causes, transmission, conversion, media
degradation, software error or human alteration. Interwest Consulting Group & City of San Jacinto
make no warranties, either expressed or implied, regarding the fitness or suitability of the
electronic documents. In the event of a discrepancy between these electronic files and the hard
copy drawings, designs and specifications, the hard copy drawings, designs and specifications
that bear Interwest Consulting Group’s stamp and seal are deemed superior and accurate. Use
of the electronic files is limited to Reference Only and cannot be used for any other purpose and
is not intended as an end-product. To the fullest extent permitted by law, the Bidder agrees to
release, indemnify and defend Interwest Consulting Group & City of San Jacinto from any claims,
damages or losses that might be incurred that result from any transfer of the electronic files or
any use, re-use or modification of the electronic files by the Bidder or others. The information set
forth on such electronic media is the result of a fee for service and under no circumstances, shall
transfer of electronic media be deemed a sale by Interwest Consulting Group and Interwest
Consulting Group makes no warranties, either expressed or implied, for any purpose. The Bidder
recognizes that the electronic files link above and other information is constantly being revised
and evolving under Interwest Consulting Group and City of San Jacinto’s direction and the
electronic files and information may be constantly changing due to Interwest Consulting Group
and City of San Jacinto’s need to do so.
Electronic Documents Release Note:
Information stored on electronic media including, but not limited to computer disk, may not be
100% compatible with other systems, therefore, Interwest Consulting Group shall not be liable for
the completeness or accuracy of any materials provided due to difference in computer and
software systems.
Signature:
Printed Name:
Title:
Firm Name:
Date:
END OF BID FORMS
ADDENDUM 1
4.1.c
Packet Pg. 240 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE D-1 00 52 13 – CONTRACT FOR CONSTRUCTION
00 52 13 – CONTRACT FOR CONSTRUCTION
This Contract for Construction (“Contract”), CIP #06-145 is made and entered into this ____ day
of _______, ______, by and between City of San Jacinto, with its principal place of business at
595 S. San Jacinto Ave, San Jacinto CA 92583, sometimes hereinafter called the “City” and
__________________________________, sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other as follows:
SCOPE OF WORK.
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide
all labor, materials, equipment, tools, utility services, and transportation to complete all of the
Work required in strict compliance with the General Conditions, Special Conditions, Technical
Specifications, Plans and Drawings, and other Contract Documents as specified in Article 5,
below, for the following Project:
ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE
Contractor is an independent contractor and not an agent of the City. The Contractor and its
surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to
comply with this obligation.
TIME FOR COMPLETION.
Time is of the essence in the performance of the Work. The Work shall be commenced on the
date stated in the City’s Notice to Proceed. The Contractor shall complete all Work required by
the Contract Documents within 165 Working Days from the commencement date stated in the
Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth
above is adequate and reasonable to complete the Work.
CONTRACT PRICE.
The City shall pay to the Contractor as full compensation for the performance of the Contract,
subject to any additions or deductions as provided in the Contract Documents, and including all
applicable taxes and costs, the sum of
______________________________________________________________________ Dollars
($_________________________________). Payment shall be made as set forth in the General
Conditions. The City will pay to Contractor compensation based upon the prices set forth in the
Bid Schedule.
LIQUIDATED DAMAGES.
4.1.c
Packet Pg. 241 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE D-2 00 52 13 – CONTRACT FOR CONSTRUCTION
liquidated damages and not as a penalty or forfeiture. This Article does not exclude recovery of
other damages specified in the Contract Documents. Liquidated damages may be deducted from
progress payments due Contractor, Project retention or may be collected directly from Contractor,
or from Contractor's surety. These provisions for liquidated damages shall not prevent the City,
in case of Contractor's default, from terminating the Contractor.
Consistent with Public Contract Code Section 7102, Contractor will be compensated for damages
incurred due to delays for which the City is responsible. The parties agree that determining
Contractor’s exact delay damages is and will continue to be impracticable and extremely difficult.
As such, for each calendar day in excess of the Contract Time, the City shall pay to the Contractor
$5,000 per day as reverse liquidated damages and not as ap penalty or forfeiture. Such amount
shall constitute the only payment allowed for any City caused delays and shall necessarily include
all overhead, all profits, all administrative costs, all bond costs, all labor, materials, equipment and
rental costs and any other costs, expenses and fees incurred or sustained as a result of such
delays. Notice of requests for delay damages and additional days shall be provided to the City
within five (5) Days from the discovery of the circumstances giving rise to any delay or three (3)
Days from the discovery of any latent or subsurface conditions giving rise to a delay.
COMPONENT PARTS OF THE CONTRACT.
The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Bidders
Bid Forms
Bid
Bid Schedule
Bid Security
Designation Of Subcontractors
Bidder Information and Experience Form
Non-Collusion Declaration Form
Iran Contracting Act Certification
Public Works Contractor DIR Registration Certification
Executive Order N-22 Certification
Fleet Compliance Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Specifications
Addenda
Construction Plans and Drawings
Standard Specifications for Public Works Construction “Greenbook”, latest edition
Applicable Local Agency Standards and Specifications, as last revised
Reference Specifications
Approved and fully executed Change Orders
Permits
Any other documents contained in or incorporated into the Contract
ADDENDUM 1
4.1.c
Packet Pg. 242 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE D-3 00 52 13 – CONTRACT FOR CONSTRUCTION
The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the
Contract Documents and not by others shall be done as if required by all. In the event of conflict,
the various Contract Documents will be given effect in the order set forth in the General
Conditions. This Contract shall supersede any prior agreement of the parties.
PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Contract Documents shall be
deemed to be included in these Contract Documents. The Contractor shall comply with all
requirements of applicable federal, state and local laws, rules and regulations, including, but not
limited to, the provisions of the California Labor Code and California Public Contract Code which
are applicable to this Work.
INDEMNIFICATION.
Contractor shall provide indemnification and defense as set forth in the General Conditions.
RECORD RETENTION
The Contractor shall maintain accounts and records as set forth in the General Conditions.
PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor
Code which such rates shall be made available at the City or may be obtained online at
http://www.dir.ca.gov and which must be posted at the job site.
EXAMINATION OF PLANS, SPECIFICATIONS, PROVISIONS, & PROJECT SITE
Contractor shall follow the provisions set forth in Article 3 of the Instructions to Bidders. No
information derived from inspection of records or investigations or compilations of same made by
the City will in any way relieve the Contractor from his or her obligations under the Contract
Documents nor entitle the Contractor to any additional compensation. The Contractor will not and
agrees not to make any claims against the City based upon ignorance or misunderstanding of
any condition of the work site or of the requirements set forth in the Contract Documents.
FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud
and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False
Claims Act, California Government Code sections 12650, et seq., provides for civil penalties
where a person knowingly submits a false claim to a public entity. These provisions include within
their scope false claims made with deliberate ignorance of the false information or in reckless
disregard of the truth or falsity of the information. In the event the City seeks to recover penalties
pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’
fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an
administrative debarment proceeding wherein Contractor may be prevented from further bidding
on public contracts for a period of up to five (5) years.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
[SIGNATURES ON FOLLOWING PAGE]
ADDENDUM 1
4.1.c
Packet Pg. 243 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE D-4 00 52 13 – CONTRACT FOR CONSTRUCTION
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on
the day and year above written.
CITY OF SAN JACINTO
By:
Robert A. Johnson
City Manager
ATTEST:
By:
Julia Espinoza
City Clerk
APPROVED AS TO FORM:
By:
Best Best & Krieger LLP
City Attorney
_____________________________________
Company Name
By:
Signature of President or Authorized Signee
Its:___________________________________
Title of Signee
Printed Name:
Phone Number: ________________________
Email: ________________________________
If Corporation, Two Signatures are Required
(1) President or Vice President
(1) Secretary or Treasurer
By:
Signature of Secretary or Treasurer
Its:
Title of Signee
Printed Name:
____________________________________
Contractor’s License Number & Classification
____________________________________
DIR Registration Number
CONTRACTOR’S SIGNATURE MUST BE NOTARIZED AND CORPORATE SEAL AFFIXED,
IF APPLICABLE.
Note: The Notary Acknowledgment must specify that the signer of the Contract is
authorized to execute the Contract.
END OF CONTRACT FOR CONSTRUCTION
ADDENDUM 1
4.1.c
Packet Pg. 244 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE D-5 00 52 13 – CONTRACT FOR CONSTRUCTION
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
ADDENDUM 1
4.1.c
Packet Pg. 245 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-1 00 61 13 – BOND FORMS
00 61 13 – BOND FORMS
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the City of San Jacinto, with its principal place of business at 595 San Jacinto
Ave, San Jacinto, CA 92583, (hereinafter referred to as the “City”) has awarded to
____________________________, (hereinafter referred to as the “Contractor”) an agreement for
ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE
(hereinafter referred to as the “Project”);
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the
Contract Documents for the Project dated ________________, (hereinafter referred to as
“Contract Documents”), the terms and conditions of which are expressly incorporated herein by
reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof
and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, ________________________________, the undersigned Contractor,
and ________________________________________________ as Surety, a corporation
organized and duly authorized to transact business under the laws of the State of California, are
held and firmly bound unto the City in the sum of ________________________________ Dollars,
($________________), said sum being not less than one hundred percent (100%) of the total
amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs,
executors and administrators, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and agreements in the Contract
Documents and any alteration thereof made as therein provided, on its part, to be kept and
performed at the time and in the manner therein specified, and in all respects according to their
intent and meaning; and shall faithfully fulfill all obligations including the one (1) year guarantee
of all materials and workmanship; and shall indemnify and save harmless the City, its officials,
officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then
this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefore,
there shall be included costs and reasonable expenses and fees including reasonable attorney’s
fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless
otherwise provided for in the Contract Documents, the above obligation shall hold good for a
period of one (1) year after the acceptance of the work by the City, during which time if Contractor
shall fail to make full, complete, and satisfactory repair and replacements and totally protect the
City from loss or damage resulting from or caused by defective materials or faulty workmanship.
4.1.c
Packet Pg. 246 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-2 00 61 13 – BOND FORMS
The obligations of Surety hereunder shall continue so long as any obligation of Contractor
remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under
the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section
337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract
Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall
promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in
the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and
conditions in the Contract Documents and upon determination by Surety of the
lowest responsive and responsible bidder, arrange for a Contract between such
bidder, the Surety and the City, and make available as work progresses sufficient
funds to pay the cost of completion of the Project, less the balance of the contract
price, including other costs and damages for which Surety may be liable. The term
“balance of the contract price” as used in this paragraph shall mean the total
amount payable to Contractor by the City under the Contract and any modification
thereto, less any amount previously paid by the City to the Contractor and any
other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California
law and make available as work progresses sufficient funds to pay the cost of
completion of the Project, less the balance of the contract price, including other
costs and damages for which Surety may be liable. The term “balance of the
contract price” as used in this paragraph shall mean the total amount payable to
Contractor by the City under the Contract and any modification thereto, less any
amount previously paid by the City to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be
proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from
Contractor for completion of the Project if the City, when declaring the Contractor in default,
notifies Surety of the City’s objection to Contractor’s further participation in the completion of the
Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract Documents or to the Project to be performed
thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of
any such change, extension of time, alteration or addition to the terms of the Contract Documents
or to the Project .
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
[SIGNATURES ON FOLLOWING PAGE]
4.1.c
Packet Pg. 247 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-3 00 61 13 – BOND FORMS
IN WITNESS WHEREOF, we have hereunto set our hands and seals this ___________ day of
______________, 20___.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of
corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title
The rate of premium on this bond is ______________ per thousand. The total amount of premium
charges is $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________
___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________
Representative for service of ___________________________________________
process in California, if different ___________________________________________
from above)
(Telephone number of Surety ___________________________________________
and Agent or Representative for
service of process in California)
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety
to do so must be attached hereto.
4.1.c
Packet Pg. 248 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-4 00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
4.1.c
Packet Pg. 249 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-5 00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of Attorney to
local representatives of the bonding company must also be attached.
END OF PERFORMANCE BOND
4.1.c
Packet Pg. 250 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-6 00 61 13 – BOND FORMS
PAYMENT BOND (LABOR AND MATERIALS).
KNOW ALL MEN BY THESE PRESENTS:
THAT WHEREAS, the City of San Jacinto, with its principal place of business at 595 San Jacinto
Ave, San Jacinto, CA 92583 (hereinafter designated as the “City”), has awarded to
________________________, (hereinafter designated as the “Principal”) an agreement for
ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE ,
(hereinafter referred to as the “Project”);
WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract
Documents for the Project dated ________________, (hereinafter referred to as “Contract
Documents”), the terms and conditions of which are expressly incorporated herein by reference;
and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing
that if said Principal or any of its subcontractors shall fail to pay for any materials, provisions,
provender, equipment, or other supplies used in, upon, for or about the performance of the work
contracted to be done, or for any work or labor done thereon of any kind, or for amounts due
under the Unemployment Insurance Code or for any amounts required to be deducted, withheld,
and paid over to the Employment Development Department from the wages of employees of said
Principal and its subcontractors with respect to such work or labor the Surety on this bond will pay
for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________, as Surety, are held
and firmly bound unto the City in the penal sum of ______________ Dollars ($___________)
lawful money of the United States of America, for the payment of which sum well and truly to be
made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors,
heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named
in Civil Code section 9100, fail to pay for any materials, provisions or other supplies, used in,
upon, for or about the performance of the work contracted to be done, or for any work or labor
thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to
work or labor performed under the contract, or for any amounts required to be deducted, withheld,
and paid over to the Employment Development Department or Franchise Tax Board from the
wages of employees of the contractor and his subcontractors pursuant to Revenue and Taxation
Code Section 18663, with respect to such work and labor the Surety or Sureties will pay for the
same, in an amount not exceeding the sum herein above specified, and also, in case suit is
brought upon this bond, all litigation expenses incurred by the City in such suit, including
reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as
to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released
from the obligation of this bond by any change, extension of time for performance, addition,
alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining
or relating to any scheme or work of improvement herein above described, or pertaining or relating
4.1.c
Packet Pg. 251 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-7 00 61 13 – BOND FORMS
to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of
any terms of payment or extension of the time for any payment pertaining or relating to any
scheme or work of improvement herein above described, nor by any rescission or attempted
rescission or attempted rescission of the contract, agreement or bond, nor by any conditions
precedent or subsequent in the bond attempting to limit the right of recovery of claimants
otherwise entitled to recover under any such contract or agreement or under the bond, nor by any
fraud practiced by any person other than the claimant seeking to recover on the bond and that
this bond be construed most strongly against the Surety and in favor of all persons for whose
benefit such bond is given, and under no circumstances shall Surety be released from liability to
those for whose benefit such bond has been given, by reason of any breach of contract between
the owner or the City and original contractor or on the part of any obligee named in such bond,
but the sole conditions of recovery shall be that claimant is a person described in Civil Code
Section 9100, and has not been paid the full amount of his claim.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the Contract to be performed thereunder, shall in any way
affect its obligations on this bond, and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of Contract, including but not limited to, the provisions
of Sections 2819 and 2845 of the California Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of
______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
Signatures of those signing for the Contractor and Surety must be notarized and evidence of
corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the
Surety to do so much be attached hereto.
4.1.c
Packet Pg. 252 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-8 00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
4.1.c
Packet Pg. 253 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE E-9 00 61 13 – BOND FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to
me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed
the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local
representatives of the bonding company must also be attached.
END OF PAYMENT BOND
4.1.c
Packet Pg. 254 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-1 00 72 00 – GENERAL CONDITIONS
00 72 00 – GENERAL CONDITIONS
ARTICLE 1 -TERMS; DEFINITIONS
1.1 Defined Terms.
A.Whenever used in the Contract Documents and printed with initial capital letters, the
terms listed below will have the meanings indicated which are applicable to both the
singular and plural thereof. In addition to terms specifically defined below, terms with
initial capital letters in the Contract Documents include references to identified articles
and paragraphs, and the titles of other documents or forms.
1.Act of God – An earthquake of magnitude of 3.5 or higher on the Richter scale or
a tidal wave.
2. Addenda -- Written or graphic instruments issued prior to the submission of Bids
which clarify, correct, or change the Contract Documents.
3.Additional Work -- New or unforeseen work will be classified as “Additional Work”
when the Engineer determines that it is not covered by the Contract.
4.Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations,
permits, and licenses of any kind, issued by local, state or federal governmental
authorities or private authorities with jurisdiction (including utilities), to the extent
they apply to the Work.
5.Bid -- The offer or proposal of a Bidder submitted on the prescribed form setting
forth the prices and other terms for the Work to be performed.
6.Bid Security -- The bid bond, cashier’s check, or certified check to be made by the
Bidder, which is to accompany the Bid as a guaranty of good faith to enter into a
written contract.
7. Bidder -- The individual or entity who submits a Bid directly to the City.
8.Change Order (“CO”) -- A document that authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Times,
issued on or after the Effective Date of the Contract, in accordance with the
Contract Documents and in the form contained in the Contract Documents.
9.Change Order Request (“COR”) -- A request made by the Contractor for an
adjustment in the Contract Price and/or Contract Times as the result of a
Contractor-claimed change to the Work.
10.Contract -- The entire integrated written agreement between the City and
Contractor concerning the Work. “Contract” may be used interchangeably with
“Agreement” in the Contract Documents. The Contract supersedes prior
negotiations, representations, or agreements, whether written or oral, and includes
all Contract Documents.
4.1.c
Packet Pg. 255 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-2 00 72 00 – GENERAL CONDITIONS
11. Contract Documents -- The documents listed in Section 00 52 13, Article 5 of the
Contract for Construction. Some documents provided by the City to the Bidders
and Contractor, including but not limited to reports and drawings of subsurface and
physical conditions are not Contract Documents.
12. Contract Price -- Amount to be paid by the City to the Contractor as full
compensation for the performance of the Contract and completion of the Work,
subject to any additions or deductions as provided in the Contract Documents, and
including all applicable taxes and costs.
13. Contract Time -- The number of days or the dates stated in the Contract
Documents to: achieve defined milestones, if any; and to fully complete the Work.
14. Contractor -- The individual or entity with which the City has contracted for
performance of the Work.
15. Critical Supply Shortage -- An unusual shortage in materials that is (a) supported
by documented proof that Contractor made every effort to obtain such materials
from all available sources; (b) such shortage is due to the fact that such materials
are not physically available from single or multiple sources or could have been
obtained only at exorbitant prices entirely inconsistent with current and standard
rates taking into account the quantities involved and the usual industry practices
in obtaining such quantities; and (c) such shortages and the difficulties in obtaining
alternate sources of materials could not have been known or anticipated by
Contractor at the time it submitted its bid or entered the Contract. Market
fluctuations in prices of materials, whether or not resulting from a Force Majeure
Event, does not constitute a Critical Supply Shortage.
16. Day -- A calendar day of 24 hours measured from midnight to the next midnight.
17. Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not
conform to the Contract Documents; or that does not meet the requirements of any
inspection, reference standard, test, or approval referenced in the Contract
Documents.
18. Drawings -- That part of the Contract Documents prepared by of the Engineer of
Record which graphically shows the scope, extent, and character of the Work to
be performed by Contractor. Shop Drawings and other Contractor Submittals are
not Drawings as so defined.
19. Effective Date of the Contract -- The date indicated in the Contract on which it
becomes effective, but if no such date is indicated, it means the date on which the
Contract is signed and delivered by the last of the two parties to sign and deliver.
20. Engineer -- Whenever not qualified, shall mean the City Engineer or the Engineer
authorized to act for and in behalf of the City, acting either directly or through
properly authorized agents, such agents acting severally within the scope of the
particular duties entrusted to them.
21. Engineer of Record -- The individual, partnership, corporation, joint venture, or
other legal entity that prepares the Drawings.
4.1.c
Packet Pg. 256 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-3 00 72 00 – GENERAL CONDITIONS
22. Force Majeure Event -- An event that materially affects a party’s performance and
is one or more of the following: (1) Acts of God or other natural disasters occurring
at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental
authorities (including, without limitation, unreasonable and unforeseeable delay in
the issuance of permits or approvals by governmental authorities that are required
for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and
other organized labor action occurring at the Site and the effects thereof on the
Work, only to the extent such strikes and other organized labor action are beyond
the control of Contractor and its Subcontractors, of every tier, and to the extent the
effects thereof cannot be avoided by use of replacement workers; and (6) a Critical
Supply Shortage. For purposes of this section, “orders of governmental
authorities,” includes ordinances, emergency proclamations and orders, rules to
protect the public health, welfare and safety, and other actions of the City in its
capacity as a municipal authority.
23. Hazardous Waste -- The term “Hazardous Waste” shall have the meaning provided
in Section 104 of the Solid Waste Disposal Act (42 U.S.C. § 6903) as amended
from time to time, or any substance or material identified as hazardous under any
state or federal statute governing handling, disposal and/or cleanup of any such
substance or material, whichever is more restrictive.
24. Holiday – Holidays occur on:
New Year’s Day - January 1
Martin Luther King Day – Third Monday in January
President’s Day – Third Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day - December 25
New Year’s Eve – December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday
are both Holidays. If the Holiday should fall on a Sunday, Sunday and the following
Monday are both Holidays.
25. Notice of Award -- The written notice by the City to the successful Bidder stating
that upon timely compliance by the successful Bidder with the conditions precedent
listed therein, the City will sign and deliver the Contract.
26. Notice of Completion -- The form which may be executed by the City constituting
final acceptance of the Project.
27. Notice to Proceed -- A written notice given by the City to Contractor fixing the date
on which the Contractor may proceed with the Work and when the Contract Time
will commence to run.
4.1.c
Packet Pg. 257 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-4 00 72 00 – GENERAL CONDITIONS
28. Project -- The total construction of which the Work to be performed under the
Contract Documents, may be the whole, or a part.
29. Record Drawings – The record set of as-builts prepared by the Contractor during
the Work in accordance with the requirements of the General Conditions.
30. Recyclable Waste Materials -- Materials removed from the Site which are required
to be diverted to a recycling center rather than an area landfill. Recyclable Waste
Materials include, but are not limited to, asphalt, concrete, brick, concrete block,
and rock.
31. Sample -- A physical example furnished by the Contractor to illustrate materials,
equipment or workmanship; to establish standards by which the Work will be
judged.
32. Schedule of Submittals -- A schedule, prepared and maintained by Contractor, of
required submittals and the time requirements to facilitate scheduled performance
of related construction activities.
33. Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data
or information which are specifically prepared or assembled by or for Contractor
and submitted by Contractor to illustrate some portion of the Work.
34. Site -- Lands or areas indicated in the Contract Documents as being furnished by
the City upon which the Work is to be performed, including rights-of-way and
easements for access thereto, and such other lands furnished by the City which
are designated for the use of Contractor.
35. Specifications -- That part of the Contract Documents consisting of written
requirements for materials, equipment, systems, standards and workmanship as
applied to the Work, and certain administrative requirements and procedural
matters applicable thereto.
36. Subcontractor -- An individual or entity other than a Contractor having a contract
with any other entity than the City for performance of any portion of the Work at
the Site.
37. Submittal -- Written and graphic information and physical samples prepared and
supplied by the Contractor demonstrating various portions of the Work.
38. Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor
having a direct contract with Contractor or with any Subcontractor to furnish
materials or equipment used in the performance of the Work or to be incorporated
in the Work.
39. Underground Facilities -- All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including those that convey electricity,
gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or
traffic or other control systems.
4.1.c
Packet Pg. 258 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-5 00 72 00 – GENERAL CONDITIONS
40. Unit Price Work -- Work to be paid for on the basis of unit prices as provided by
the Contractor in its Bid or as adjusted in accordance with the Contract Documents.
41. Warranty -- A guarantee provided to the City by the Contractor that the Work will
remain free of defects and suitable for its intended use for the period required by
the Contract Documents or the longest period permitted by the law of this state,
whichever is longer.
42. Work -- The entire construction or the various separately identifiable parts thereof
required to be provided under the Contract Documents. Work includes and is the
result of performing or providing all labor, services, and documentation necessary
to produce such construction, and furnishing, installing, and incorporating all
materials and equipment into such construction, all as required by the Contract
Documents.
1.2 Terminology.
A. The words and terms below are not defined but, when used in the Contract
Documents, have the indicated meaning.
1. The word “furnish,” when used in connection with services, materials, or
equipment, shall mean to supply and deliver said services, materials, or equipment
to the Site (or some other specified location) ready for use or installation and in
usable or operable condition.
2. The word “install,” when used in connection with services, materials, or equipment,
shall mean to put into use or place in final position said services, materials, or
equipment complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services,
materials, or equipment, shall mean to furnish and install said services, materials,
or equipment complete and ready for intended use.
4. Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in
connection with services, materials, or equipment, an obligation of Contractor is
implied.
B. Unless stated otherwise in the Contract Documents, words or phrases that have a
well-known technical or construction industry or trade meaning are used in the
Contract Documents in accordance with such recognized meaning.
ARTICLE 2 -PRELIMINARY MATTERS
2.1 Delivery of Contract Documents.
A. Within ten (10) Days after receipt of the Notice of Award and before the City will
execute the Contract, the Contractor shall furnish and file with the City a signed
Contract and the necessary performance bond, payment bond, and certificates of
insurance and endorsements, as well as any other documents specified in the
Contract Documents.
4.1.c
Packet Pg. 259 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-6 00 72 00 – GENERAL CONDITIONS
2.2 Bonds.
A. Contractor shall submit the bonds on the forms provided with the Contract
Documents, duly executed by a responsible corporate surety admitted to transact
surety business in the State of California, as defined in Code of Civil Procedure
section 995.120, and listed in the United States Department of the Treasury circular
entitled "Companies Holding Certificates of Authority as Acceptable Sureties on
Federal Bonds and as Acceptable Reinsuring Companies," authorized to do
business in the State of California and acceptable to the City conditioned upon the
faithful performance by the Contractor of all requirements of the Contract
Documents. Each of the bonds shall be in a sum no less than one hundred percent
(100%) of the Contract Price. Bonds shall be delivered to the City within ten (10)
Days after receipt of the Notice of Award and before execution of the Contract by
the City.
2.3 Evidence of Insurance.
A. Prior to commencing any Work but no later than ten (10) Days after receipt of the
Notice of Award, the Contractor shall submit or cause to be submitted any and all
certificates of insurance and endorsements, showing that the Contractor has the
required insurance, to the attention of the City. Such insurance is to be provided at
the sole cost and expense of the Contractor. No Work shall be performed until all of
the required insurance has been received and approved.
2.4 Execution of the Contract.
A. Upon receipt of the required documents, the City will execute the Contract,
establishing the Effective Date of the Contract.
2.5 Contractor’s Failure to Perform.
A. Should Contractor fail to comply with timelines provided above, the City shall retain
the right to enforce and collect on the Contractor’s Bid Security, rescind award to the
Contractor and award the Contract to the next lowest responsible Bidder providing
a responsive Bid as determined by the City. If the City elects to accept bonds and
insurance submitted late, the Contract Time will begin to run as of the date stated in
the Notice to Proceed. However, the number of Days beyond the original ten (10)
Days it took to receive the properly executed Contract and related items may be
deducted from the Contract Time.
2.6 Commencement of Contract Times; Notice to Proceed.
A. The City will not issue a Notice to Proceed until after the Effective Date of the
Contract. Work shall commence within ten (10) Days of the date stated in the Notice
to Proceed. The Contract Time begin to run on the date specified in the Notice to
Proceed. No Work shall be done at the Site prior to the issuance of the Notice to
Proceed.
4.1.c
Packet Pg. 260 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-7 00 72 00 – GENERAL CONDITIONS
2.7 Copies of Documents.
A. Contractor will be furnished, free of charge, copies of the Contract Documents.
Contractor shall maintain a clean, undamaged set of Contract Documents, including
Submittals, at the Project site.
2.8 Substitution Requests, Schedule of Submittals, and Schedule.
A. Substitution Requests. Within thirty-five (35) Days of Contract award (unless
otherwise specified in the Contract Documents), Contractor shall provide all
substitution requests as further described in the General Conditions.
B. Schedule of Submittals. Within ten (10) Days after the issuance of the Notice of
Proceed (unless otherwise specified in the Contract Documents), Contractor shall
submit to the City a Schedule of Submittals that conforms with the requirements of
the Contract Documents.
C. Schedule. Within ten (10) Days after the issuance of the Notice to Proceed (unless
otherwise specified in the Contract Documents), the Contractor shall submit a
construction schedule that conforms with the requirements of the Contract
Documents.
2.9 Preconstruction Meeting; Designation of Authorized Representatives.
A. Before any Work at the Site is started, a meeting attended by the City, Contractor,
Engineer, and others as appropriate will be held to establish a working
understanding among the parties as to the Work and to discuss the schedules
referred to herein, procedures for handling Submittals and Shop Drawings,
processing applications for payment, and maintaining required records. At this
meeting the City and Contractor each shall designate, in writing, a specific individual
to act as its authorized representative with respect to the services and
responsibilities under the Contract. Such individuals shall have the authority to
transmit instructions, receive information, render decisions relative to the Contract,
and otherwise act on behalf of each respective party.
2.10 Mobilization.
A. When a bid item is included in the Bid Schedule for mobilization, the costs of Work
in advance of construction operations and not directly attributable to any specific bid
item will be included in the progress estimate. When no bid item is provided for
mobilization payment for such costs will be deemed to be included in the other items
of the Work.
B. Payment for mobilization based on the lump sum provided in the Bid Schedule, shall
constitute full compensation for all such Work. The lump sum price provided for
mobilization shall not be more than 5% of the Total Bid Price. No payment for
mobilization will be made until all of the listed items have been completed to the
satisfaction of the Engineer. The scope of the Work included under mobilization shall
include, but shall not be limited to, the following principal items:
1. Obtaining and paying for all bonds, insurance, and permits.
4.1.c
Packet Pg. 261 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-8 00 72 00 – GENERAL CONDITIONS
2. Moving on to the Project Site of all Contractor’s plant and equipment required for
the first month’s operations.
3. Installing temporary construction power, wiring, and lighting facilities, as
applicable.
4. Establishing fire protection system, as applicable.
5. Developing and installing a construction water supply, as applicable.
6. Providing and maintaining the field office trailers for the Contractor, if necessary,
and the Engineer, if specified, complete, with all specified furnishings and utility
services.
7. Providing on-site sanitary facilities and potable water facilities as specified per Cal-
OSHA and these Contract Documents.
8. Furnishing, installing, and maintaining all storage buildings or sheds required for
temporary storage of products, equipment, or materials that have not yet been
installed in the Work. All such storage shall meet manufacturer’s specified storage
requirements, and the specific provisions of the specifications, including
temperature and humidity control, if recommended by the manufacturer, and for
all security.
9. Arranging for and erection of Contractor’s work and storage yard.
10. Posting all OSHA required notices and establishment of safety programs per Cal-
OSHA.
11. Full-time presence of Contractor’s superintendent at the job Site as required
herein.
12. Submittal of construction schedule, Submittals, and Shop Drawings as required by
the Contract Documents.
ARTICLE 3 -CONTRACT DOCUMENTS; INTENT
3.1 Examination of Drawings, Specifications, and Site of Work.
A. Examination of Contract Documents; Site. Before commencing any portion of the
Work, Contractor shall again carefully examine all applicable Contract Documents,
the Project Site, and other information given to Contractor as to materials and
methods of construction and other Project requirements. Contractor shall
immediately notify the Engineer of any potential error, inconsistency, ambiguity,
conflict, or lack of detail or explanation. If Contractor performs, permits, or causes
the performance of any Work which is in error, inconsistent or ambiguous, or not
sufficiently detailed or explained, Contractor shall bear any and all resulting costs,
including, without limitation, the cost of correction. In no case shall the Contractor or
any Subcontractor proceed with Work if uncertain as to the applicable requirements.
4.1.c
Packet Pg. 262 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-9 00 72 00 – GENERAL CONDITIONS
B. Additional Instructions. After notification of any error, inconsistency, ambiguity,
conflict, or lack of detail or explanation, the Engineer will provide any required
additional instructions, by means of drawings or other written direction, necessary
for proper execution of Work.
C. Quality of Parts, Construction and Finish. All parts of the Work shall be of the best
quality of their respective kinds and the Contractor must use all diligence to inform
itself fully as to the required construction and finish.
D. Contractor’s Variation from Contract Document Requirements. If it is found that the
Contractor has varied from the requirements of the Contract Documents including
the requirement to comply with all Applicable Laws, the Engineer may at any time,
before or after completion of the Work, order the improper Work removed, remade
or replaced by the Contractor at the Contractor’s expense.
3.2 Intent of Contract Documents.
A. The Contract Documents are complementary; what is required by any one will be
binding as if required by all. It is the intent of the Contract Documents to describe a
functionally complete Project (or part thereof) to be constructed in accordance with
the Contract Documents. Any labor, documentation, services, materials, or
equipment that reasonably may be inferred from the Contract Documents or from
prevailing custom or trade usage as being required to produce the indicated result
will be provided whether or not specifically called for, at no additional cost to the City.
B. The Contractor shall furnish, unless otherwise provided in the Contract Documents,
all materials, implements, machinery, equipment, tools, supplies and labor
necessary to the prosecution and completion of the Project. If utilities to
equipment/fixtures are not shown but are necessary to operate the
equipment/fixtures, the utilities service installation is considered to be part of the
Work. The implied Work will conform to the appropriate sections of the Contract
Documents.
C. Organization of the Contract Documents into divisions, sections, and articles, and
arrangement of drawings shall not control the Contractor in dividing Work among
Subcontractors or in establishing the extent of Work to be performed by any trade.
D. Clarifications and interpretations of the Contract Documents shall be issued by the
Engineer as provided in these General Conditions.
3.3 Reference Standards.
A. Standards, Specifications, Codes, Laws, and Regulations.
1. Reference to federal specifications, federal standards, other standards,
specifications, manuals, or codes of any technical society, organization, or
association, or to Applicable Laws, whether such reference be specific or by
implication, shall mean the standard, specification, manual, code, or Applicable
Laws in effect at the time of opening of Bids (or on the Effective Date of the
Contract if there were no Bids), except as may be otherwise specifically stated in
the Contract Documents.
4.1.c
Packet Pg. 263 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-10 00 72 00 – GENERAL CONDITIONS
2. No provision of any such standard, specification, manual, or code, or any
instruction of a Supplier, shall be effective to change the duties or responsibilities
of the City, Contractor, or any of their Subcontractors, consultants, agents, or
employees, from those set forth in the Contract Documents. No such provision or
instruction shall be effective to assign to the City, or any of their officers, directors,
members, partners, employees, agents, consultants, or subcontractors, any duty
or authority to supervise or direct the performance of the Work or any duty or
authority to undertake responsibility inconsistent with the provisions of the Contract
Documents.
3.4 Reporting and Resolving Discrepancies; Order of Precedence.
A. Reporting Discrepancies. The Contract Documents are intended to be fully
cooperative and complementary. Before undertaking each part of the Work,
Contractor shall carefully study and compare the Contract Documents and check
and verify pertinent figures therein and all applicable field measurements.
Contractor shall promptly report in writing to the City any conflict, error, ambiguity,
or discrepancy which Contractor discovers, should have discovered, or has actual
knowledge of, and shall obtain a written interpretation or clarification from the City
before proceeding with any Work affected thereby. If, during the performance of the
Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the
Contract Documents, or between the Contract Documents and (i) any Applicable
Law, (ii) any standard, specification, manual, or code, or (iii) any instruction of any
Supplier, then Contractor shall promptly submit a written Request for Information
(RFI) to the City. Contractor shall not proceed with the Work affected thereby (except
in an emergency) until an amendment or supplement to the Contract Documents has
been issued by one of the methods indicated in the Contract Documents, and any
Work performed by Contractor before receipt of an amendment or supplement shall
be at Contractor’s own risk.
B. Order of Precedence:
1. In case of conflicts between the Contract Documents, the order of precedence
shall be as follows:
a. Permits from other agencies as may be required by law
b. Change Orders, most recent first
c. Addenda, most recent first
d. Contract
e. Special Conditions
f. Technical Specifications
g. Construction Plans and Drawings(Drawings)
h. General Conditions
i. Instructions to Bidders
j. Notice Inviting Bids
k. Applicable Local Agency Standards and Specifications
l. Standard Specifications for Public Works Construction “Greenbook” latest
edition
m. Standard Drawings
n. Contractor’s Bid (Bid Forms)
o. Reference Documents
4.1.c
Packet Pg. 264 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-11 00 72 00 – GENERAL CONDITIONS
2. With reference to the drawings the order of precedence shall be as follows:
a. Figures govern over scaled dimensions
b. Detail drawings govern over general drawings
c. Addenda/Change Order drawings govern over Drawings
d. Drawings govern over Standard Drawings
e. Drawings govern over Shop Drawings
3. Notwithstanding the orders of precedence established above, in the event of
conflicts, the higher standard, higher quality and most expensive shall always
apply.
3.5 Amending and Supplementing Contract Documents.
A. The Contract Documents may be amended to provide for additions, deletions, and
revisions in the Work or to modify the terms and conditions thereof only by Change
Order or written amendment to the Contract duly executed by the parties.
B. The requirements of the Contract Documents may be supplemented, and minor
variations and deviations in the Work may be authorized at no cost to the City, by
one or more of the following ways:
1. The City’s review of a Submittal, Shop Drawing, Sample or substitution request
without exception (subject to the provisions of the Contract Documents); or
2. The City’s issuance of a response to an RFI.
C. However, no review or RFI response will reduce or modify the Contractor’s obligation
to fully satisfy and comply with the requirements of the Contract Documents.
3.6 Reuse of Documents.
A. Contractor and any Subcontractor or Supplier shall not:
1. Have or acquire any title to or ownership rights in any of the Drawings,
Specifications, or other documents (or copies of any thereof) prepared by or
bearing the seal of Engineer of Record or its consultants, including electronic
media editions; or
2. Reuse any such Drawings, Specifications, other documents, or copies thereof on
extensions of the Project or any other project without written consent of the City
and Engineer of Record and specific written verification or adaptation by Engineer
of Record.
B. The prohibitions of this Article will survive final payment or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the
Contract Documents for record purposes.
ADDENDUM 1
4.1.c
Packet Pg. 265 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-12 00 72 00 – GENERAL CONDITIONS
ARTICLE 4 -INDEMNIFICATION; INSURANCE
4.1 Indemnification.
A. To the fullest extent permitted by law, Contractor shall immediately defend (with
counsel of the City’s choosing), indemnify and hold harmless the City of San Jacinto,
City of Hemet, County of Riverside, their officials, officers, employees, agents, and
authorized volunteers, and each of them from and against:
1. Any and all claims, demands, causes of action, costs, expenses, injuries, losses
or liabilities, in law or in equity, of every kind or nature whatsoever, but not limited
to, injury to or death, including wrongful death, of any person, and damages to or
destruction of property of any person, arising out of, related to, or in any manner
directly or indirectly connected with the Work or this Contract, including claims
made by subcontractors for nonpayment, including without limitation the payment
of all consequential damages and attorney’s fees and other related costs and
expenses, however caused, regardless of whether the allegations are false,
fraudulent, or groundless, and regardless of any negligence of the City or its
officials, officers, employees, agents, or authorized volunteers (including passive
negligence), except such loss or damages caused by the sole negligence or willful
misconduct or active negligence of the City or its officials, officers, employees, or
authorized volunteers.
2. Contractor’s defense and indemnity obligation herein includes, but is not limited to
damages, fines, penalties, attorney’s fees and costs arising from claims under the
Americans with Disabilities Act (ADA) or other federal or state disability access or
discrimination laws arising from Contractor’s Work during the course of
construction of the improvements or after the Work is complete, as the result of
defects or negligence in Contractor’s construction of the improvements.
3. Any and all actions, proceedings, damages, costs, expenses, fines, penalties or
liabilities, in law or equity, of every kind or nature whatsoever, arising out of,
resulting from, or on account of the violation of any governmental law or regulation,
compliance with which is the responsibility of Contractor.
4. Any and all losses, expenses, damages (including damages to the Work itself),
attorney’s fees, and other costs, including all costs of defense which any of them
may incur with respect to the failure, neglect, or refusal of Contractor to faithfully
perform the Work and all of Contractor’s obligations under Contract. Such costs,
expenses, and damages shall include all costs, including attorney’s fees, incurred
by the indemnified parties in any lawsuit to which they are a party.
B. Contractor shall immediately defend, at Contractor’s own cost, expense and risk,
with the counsel of the City choosing, any and all such aforesaid suits, actions or
other legal proceedings of every kind that may be brought or instituted against the
City or its officials, officers, employees, agents, or authorized volunteers. Contractor
shall pay and satisfy any judgment, award or decree that may be rendered against
the City or its officials, officers, employees, agents, or authorized volunteers, in any
such suit, action or other legal proceeding. Contractor shall reimburse the City and
its officials, officers, employees, agents, and authorized volunteers for any and all
ADDENDUM 1
4.1.c
Packet Pg. 266 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-13 00 72 00 – GENERAL CONDITIONS
legal expenses and costs incurred by each of them in connection therewith or in
enforcing the indemnity herein provided. The only limitations on this provision shall
be those imposed by Civil Code section 2782.
C. The provisions of this Article shall survive the termination of this Contract howsoever
caused, and no payment, partial payment, or acceptance of occupancy in whole or
part of the Work shall waive or release any of the provisions of this Article.
Contractor’s obligation to indemnify the City shall not be restricted to insurance
proceeds, if any, received by the City and its officials, officers, employees, agents,
and authorized volunteers.
4.2 Insurance.
A. General Requirements. The Contractor shall obtain, and at all times during
performance of the Work of Contract, maintain all of the insurance described in this
Article. Contractor shall not commence Work under this Contract until it has provided
evidence satisfactory to the City that it has secured all insurance required hereunder.
Contractor shall not allow any Subcontractor to commence work on any subcontract
until it has provided evidence satisfactory to the City that the subcontractor has
secured all insurance required under this Article. Failure to provide and maintain all
required insurance shall be grounds for the City to terminate this Contract for cause.
Contractor shall furnish the City with original certificates of insurance and
endorsements effective coverage required by this Contract on forms satisfactory to
the City. The certificates and endorsements for each insurance policy shall be
signed by a person authorized by that insurer to bind coverage on its behalf, and
shall be on forms acceptable to the City. All certificates and endorsements must be
received and approved by the City before Work commences.
B. Additional Insureds; Waiver of Subrogation. The City of San Jacinto, City of Hemet,
County of Riverside, their officials, officers, employees, agents and authorized
volunteers shall be named as Additional Insureds on Contractor’s All Risk policy and
on Contractor’s and its Subcontractors’ policies of Commercial General Liability and
Automobile Liability insurance using, for Contractor’s policy/ies of Commercial
General Liability insurance, ISO CG forms 20 10 and 20 37 (or endorsements
providing the exact same coverage, including completed operations), and, for
Subcontractors’ policies of Commercial General Liability insurance, ISO CG form 20
38 (or endorsements providing the exact same coverage). Notwithstanding the
minimum limits set forth in this Contract for any type of insurance coverage, all
available insurance proceeds in excess of the specified minimum limits of coverage
shall be available to the parties required to be named as Additional Insureds
hereunder. All insurance coverage maintained or procured pursuant to this Contract
shall be endorsed to waive subrogation against the City, its officers, officials, agents,
employees or volunteers or shall specifically allow Contractor - or others providing
insurance evidence in compliance with these specifications - to waive their right of
recovery prior to a loss. Contractor hereby waives its own right of recovery against
the City, and shall require similar written express waivers and insurance clauses
from each of its subcontractors. Copies of these waivers shall be submitted to the
City prior to commencement of work.
ADDENDUM 1
4.1.c
Packet Pg. 267 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-13a 00 72 00 – GENERAL CONDITIONS
C. Workers’ Compensation Insurance. The Contractor shall provide workers’
compensation insurance for all of the employees engaged in Work under this
Contract, on or at the Site, and, in case of any sublet Work, the Contractor shall
require the subcontractor similarly to provide workers’ compensation insurance for
all the latter’s employees as prescribed by State law. Any class of employee or
employees not covered by a subcontractor’s insurance shall be covered by the
Contractor’s insurance. In case any class of employees engaged in work under this
Contract, on or at the Site, is not protected under the Workers’ Compensation
Statutes, the Contractor shall provide or shall cause a subcontractor to provide,
adequate insurance coverage for the protection of such employees not otherwise
protected. The Contractor is required to secure payment of compensation to his
employees in accordance with the provisions of section 3700 of the Labor Code.
The Contractor shall file with the City certificates of his insurance protecting workers.
Company or companies providing insurance coverage shall be acceptable to the
City, if in the form and coverage as set forth in the Contract Documents.
ADDENDUM 1
4.1.c
Packet Pg. 268 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-14 00 72 00 – GENERAL CONDITIONS
D. Employer’s Liability Insurance. Contractor shall provide Employer’s Liability
Insurance, including Occupational Disease, in the amount of at least one million
dollars ($1,000,000.00) per person per accident. Contractor shall provide the City
with a certificate of Employer’s Liability Insurance. Such insurance shall comply with
the provisions of the Contract Documents. The policy shall be endorsed, if
applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and
contain a Waiver of Subrogation in favor of the City.
E. Commercial General Liability Insurance. Contractor shall provide “occurrence” form
Commercial General Liability insurance coverage at least as broad as the most
current ISO CGL Form 00 01, including but not limited to, premises liability,
contractual liability, products/completed operations, personal and advertising injury
which may arise from or out of Contractor’s operations, use, and management of the
Site, or the performance of its obligations hereunder. The policy shall not contain
any exclusion contrary to this Contract including but not limited to endorsements or
provisions limiting coverage for (1) contractual liability (including but not limited to
ISO CG 24 26 or 21 39); or (2) cross-liability for claims or suits against one insured
against another. Policy limits shall not be less than $2,000,000 per occurrence for
bodily injury, personal injury and property damage. If Commercial General Liability
Insurance or other form with a general aggregate limit is used, either the general
aggregate limit shall apply separately to this project/location or the general
aggregate limit shall be twice the required occurrence limit. Defense costs shall be
paid in addition to the limits.
1. Such policy shall comply with all the requirements of this Article. The limits set forth
herein shall apply separately to each insured against whom claims are made or
suits are brought, except with respect to the limits of liability. Further the limits set
forth herein shall not be construed to relieve the Contractor from liability in excess
of such coverage, nor shall it limit Contractor’s indemnification obligations to the
City, and shall not preclude the City from taking such other actions available to the
City under other provisions of the Contract Documents or law.
2. All general liability policies provided pursuant to the provisions of this Article shall
comply with the provisions of the Contract Documents.
3. All general liability policies shall be written to apply to all bodily injury, including
death, property damage, personal injury, owned and non-owned equipment,
blanket contractual liability, completed operations liability, explosion, collapse,
under-ground excavation, removal of lateral support, and other covered loss,
however occasioned, occurring during the policy term, and shall specifically insure
the performance by Contractor of that part of the indemnification contained in these
General Conditions relating to liability for injury to or death of persons and damage
to property.
4. If the coverage contains one or more aggregate limits, a minimum of 50% of any
such aggregate limit must remain available at all times; if over 50% of any
aggregate limit has been paid or reserved, the City may require additional
coverage to be purchased by Contractor to restore the required limits. Contractor
may combine primary, umbrella, and as broad as possible excess liability coverage
to achieve the total limits indicated above. Any umbrella or excess liability policy
4.1.c
Packet Pg. 269 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-15 00 72 00 – GENERAL CONDITIONS
shall include the additional insured endorsement described in the Contract
Documents.
5. All policies of general liability insurance shall permit and Contractor does hereby
waive any right of subrogation which any insurer of Contractor may acquire from
Contractor by virtue of the payment of any loss.
F. Automobile Liability Insurance. Contractor shall provide Automobile Liability
Insurance at least as broad as ISO CA 00 01 (Any Auto) in the amount of, at least,
one million dollars ($1,000,000) per accident for bodily injury and property damage.
Such insurance shall provide coverage with respect to the ownership, operation,
maintenance, use, loading or unloading of any auto owned, leased, hired or
borrowed by Contractor or for which Contractor is responsible, in a form and with
insurance companies acceptable to the City. All policies of automobile insurance
shall permit and Contractor does hereby waive any right of subrogation which any
insurer of Contractor may acquire from Contractor by virtue of the payment of any
loss.
G. Builder’s Risk [“All Risk”].
1. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s
Risk [“All Risk”] extended coverage insurance on all work, material, equipment,
appliances, tools, and structures that are or will become part of the Work and
subject to loss or damage by fire, and vandalism and malicious mischief, in an
amount to cover 100% of the replacement cost. The City accepts no responsibility
for the Work until the Work is formally accepted by the City. The Contractor shall
provide a certificate evidencing this coverage before commencing performance of
the Work.
2. The named insureds shall be Contractor, all Subcontractors of any tier (excluding
those solely responsible for design work), Suppliers, and the City, its elected
officials, officers, employees, agents and authorized volunteers, as their interests
may appear. Contractor shall not be required to maintain property insurance for
any portion of the Work following acceptance by the City.
3. Policy shall be provided for replacement value on an “all risk” basis. There shall
be no coinsurance penalty provision in any such policy. Policy must include: (1)
coverage for any ensuing loss from faulty workmanship, nonconforming work,
omission or deficiency in design or specifications; (2) coverage against machinery
accidents and operational testing; (3) coverage for removal of debris, and insuring
the buildings, structures, machinery, equipment, materials, facilities, fixtures and
all other properties constituting a part of the Project; (4) transit coverage, including
ocean marine coverage (unless insured by the supplier), with sub-limits sufficient
to insure the full replacement value of any key equipment item; and (5) coverage
with sub-limits sufficient to insure the full replacement value of any property or
equipment stored either on or off the Site. Such insurance shall be on a form
acceptable to the City to ensure adequacy and sublimit.
4.1.c
Packet Pg. 270 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-16 00 72 00 – GENERAL CONDITIONS
4. In addition, the policy shall meet the following requirements:
a. Insurance policies shall be so conditioned as to cover the performance of any
extra work performed under the Contract.
b. Coverage shall include all materials stored on site and in transit.
c. Coverage shall include Contractor’s tools and equipment.
d. Insurance shall include boiler, machinery and material hoist coverage.
H. Professional Liability Insurance. All architects, engineers, consultants or design
professionals retained by Contractor shall also procure and maintain, for a period of
five (5) years following completion of the Contract, errors and omissions liability
insurance with a limit of not less than $1,000,000 per occurrence. This insurance
shall name the City, its directors, officials, officers, employees, agents and
volunteers as additional and insureds with respect to Work performed, and shall
otherwise comply with all requirements of this Section. Defense costs shall be paid
in addition to the limits.
I. Contractor’s Pollution Liability Coverage. Environmental Impairment Liability
Insurance shall be written on a Contractor’s Pollution Liability form or other form
acceptable to the City providing coverage for liability arising out of sudden,
accidental and gradual pollution and remediation. The policy limit shall be no less
than $1,000,000 dollars per claim and in the aggregate. All activities contemplated
in this Contract shall be specifically scheduled on the policy as “covered operations.”
The policy shall provide coverage for the hauling of waste from the Project site to
the final disposal location, including non-owned disposal sites.
J. Contractor shall require all tiers of Subcontractors working under this Contract to
provide the insurance required under this Article unless otherwise agreed to in
writing by the City. Contractor shall make certain that any and all Subcontractors
hired by Contractor are insured in accordance with this Contract. If any
Subcontractor’s coverage does not comply with the foregoing provisions, Contractor
shall indemnify and hold the City harmless from any damage, loss, cost, or expense,
including attorneys’ fees, incurred by the City as a result thereof.
K. Notwithstanding the minimum limits set forth in this Contract for any type of
insurance coverage, if Contractor maintains higher limits than the minimums shown
above, the City requires and shall be entitled to coverage for the higher limits
maintained by the Contractor. Any available insurance proceeds in excess of the
specified minimum limits of insurance and coverage shall be available to the City.
L. Form and Proof of Carriage of Insurance.
1. Any insurance carrier providing insurance coverage required by the Contract
Documents shall be admitted to and authorized to do business in the State of
California unless waived, in writing, by the City’s Risk Manager. Carrier(s) shall
have an A.M. Best rating of not less than an A:VII. Insurance deductibles or self-
insured retentions must be declared by the Contractor. At the election of the City
the Contractor shall either 1) reduce or eliminate such deductibles or self-insured
4.1.c
Packet Pg. 271 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-17 00 72 00 – GENERAL CONDITIONS
retentions, or 2) procure a bond which guarantees payment of losses and related
investigations, claims administration, and defense costs and expenses. If umbrella
or excess liability coverage is used to meet any required limit(s) specified herein,
the Contractor shall provide a “follow form” endorsement satisfactory to the City
indicating that such coverage is subject to the same terms and conditions as the
underlying liability policy.
2. Each insurance policy required by this Contract shall be endorsed to state that: (1)
coverage shall not be suspended, voided, reduced or cancelled except after thirty
(30) days prior written notice by certified mail, return receipt requested, has been
given to the City; and (2) any failure to comply with reporting or other provisions of
the policies, including breaches of warranties, shall not affect coverage provided
to the City, its officials, officers, agents, employees, and volunteers.
3. The Certificates(s) and policies of insurance shall contain or shall be endorsed to
contain the covenant of the insurance carrier(s) that it shall provide no less than
thirty (30) days written notice be given to the City prior to any material modification
or cancellation of such insurance. In the event of a material modification or
cancellation of coverage, the City may terminate the Contract or stop the Work in
accordance with the Contract Documents, unless the City receives, prior to such
effective date, another properly executed original Certificate of Insurance and
original copies of endorsements or certified original policies, including all
endorsements and attachments thereto evidencing coverage’s set forth herein and
the insurance required herein is in full force and effect. Contractor shall not take
possession, or use the Site, or commence operations under this Contract until the
City has been furnished original Certificate(s) of Insurance and certified original
copies of endorsements or policies of insurance including all endorsements and
any and all other attachments as required in this Article. The original
endorsements for each policy and the Certificate of Insurance shall be signed by
an individual authorized by the insurance carrier to do so on its behalf.
4. The Certificate(s) of Insurance, policies and endorsements shall so covenant and
shall be construed as primary, and the City’s insurance and/or deductibles and/or
self-insured retentions or self-insured programs shall not be construed as
contributory.
5. The City reserves the right to adjust the monetary limits and types of insurance
coverages during the term of this Contract including any extension thereof if, in the
City’s reasonable judgment, the amount or type of insurance carried by the
Contractor becomes inadequate.
6. Contractor shall report to the City, in addition to the Contractor’s insurer, any and
all insurance claims submitted by the Contractor in connection with the Work under
this Contract.
7. Products/completed operations coverage shall extend a minimum of three years
after the project completion. Coverage shall be included on behalf of the insured
for covered claims arising out of the actions of independent contractors. If the
insured is using subcontractors, the policy must include work performed “by or on
behalf” of the insured. Policy shall contain no language that would invalidate or
4.1.c
Packet Pg. 272 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-18 00 72 00 – GENERAL CONDITIONS
remove the insurer’s duty to defend or indemnify for claims or suits expressly
excluded from coverage. Policy shall specifically provide for a duty to defend on
the part of the insurer. The City, its officers, officials, agents employees, and
volunteers shall be included as insureds under the policy.
ARTICLE 5 -CONTRACTOR RESPONSIBILITIES; REGULATORY REQUIREMENTS
5.1 Applicable Laws.
A. Contractor shall give all notices required by and shall comply with all Applicable Laws
applicable to the performance of the Work. Except where otherwise expressly
required by Applicable Laws, neither the City nor the Engineer shall be responsible
for monitoring Contractor’s compliance with any Applicable Laws. If Contractor
performs any Work knowing or having reason to know that it is contrary to Applicable
Laws, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other dispute resolution costs) arising out
of or relating to such Work.
5.2 Permits and Licenses.
A. Contractor will apply for necessary encroachment permits for Work within the public
rights-of-way. City will waive San Jacinto encroachment permit fee(s) and issue San
Jacinto encroachment permit(s) upon approval. All other necessary permits and
licenses necessary for prosecution of the Work shall be secured and paid for by
Contractor, including, but not limited to, permits, licenses and fees required by
agencies with authority in the jurisdiction in which the Work will be located, unless
otherwise expressly provided by the Contract Documents. The Contractor shall
arrange and pay for all off-site inspection of the Work related to permits and licenses,
including certification, required by the Contract Documents or by governing
authorities, except for such off-site inspections delineated as the City’s responsibility
pursuant to the Contract Documents. Before acceptance of the Work, the Contractor
shall submit all licenses, permits, certificates of inspection and required approvals to
the City.
5.3 Taxes.
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be
paid in accordance with the Applicable Laws of the place of the Project which are
applicable during the performance of the Work. In accordance with Revenue and
Taxation Code section 107.6, the Contract Documents may create a possessory
interest subject to personal property taxation for which Contractor will be
responsible.
5.4 Traffic Control.
A. Traffic control plans, if required, shall be prepared at Contractor’s expense. Traffic
control shall be performed at Contractor’s expense in accordance with the
requirements of the City and/or the local agency with jurisdiction. Costs for traffic
4.1.c
Packet Pg. 273 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-19 00 72 00 – GENERAL CONDITIONS
control plans, implementation of traffic control, or traffic signal services required by
the City shall be included in the Contractor’s Bid.
B. All warning signs and safety devices used by the Contractor to perform the Work
shall conform to the requirements contained in the State of California, Department
of Transportation’s current edition of “CA Manual on Uniform Traffic Control Devices”
or to the requirements of the local agency. The Contractor shall also be responsible
for all traffic control required by the agency having jurisdiction over the Project on
the intersecting streets. Contractor must submit a traffic control plan to the agency
having jurisdiction over the Project for approval prior to starting Work.
C. The Contractor’s representative on the Site responsible for traffic control shall
produce evidence that he or she has completed training acceptable to the California
Department of Transportation for safety through construction zones. All of the streets
in which the Work will occur shall remain open to traffic and one lane of traffic
maintained at all times unless otherwise directed by the agency of jurisdiction.
Businesses and residences adjacent to the Work shall be notified forty-eight (48)
hours in advance of closing of driveways. The Contractor shall make every effort to
minimize the amount of public parking temporarily eliminated due to construction in
areas fronting businesses. No stockpiles of material will be allowed in traveled right-
of-ways after working hours unless otherwise approved by the Engineer.
5.5 Safety.
A. Contractor shall be solely responsible for all safety precautions and programs in
connection with the Work. Such responsibility does not relieve Subcontractors of
their responsibility for the safety of persons or property in the performance of their
work, nor for compliance with applicable safety laws. Contractor shall comply with
all Applicable Laws relating to the safety of persons or property, or to the protection
of persons or property from damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection. Contractor shall notify owners
of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the
protection, removal, relocation, and replacement of their property. Contractor shall
be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged
between or among employers at the Site in accordance with Applicable Laws.
B. The Contractor shall maintain emergency first aid treatment for his employees which
complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. §
651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division
1, Department of Industrial Relations, Chapter 4. The Contractor shall ensure the
availability of emergency medical services for its employees in accordance with
California Code of Regulations, Title 8, Section 1512. The Contractor shall submit
an Illness and Injury Prevention Program and a Project Site specific safety program
to the City prior to beginning Work. Contractor shall maintain a confined space
program that meets or exceeds the City’s standards. Contractor needs to make
themselves aware of the City’s safety policies and procedures, and shall meet or
exceed all City standards in areas where the City must enter to perform inspections.
4.1.c
Packet Pg. 274 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-20 00 72 00 – GENERAL CONDITIONS
5.6 Hazardous Waste.
A. The City shall not be responsible for any Hazardous Waste brought to the site by the
Contractor. If the Contractor: (i) introduces and/or discharges a Hazardous Waste
onto the site in a manner not specified by the Contract Documents; and/or (ii)
disturbs a Hazardous Material identified in the Contract Documents, the Contractor
shall hire a qualified remediation contractor at Contractor’s sole cost to eliminate the
condition as soon as possible. Under no circumstance shall the Contractor perform
Work for which it is not qualified. The City, in its sole discretion, may require the
Contractor to retain at Contractor’s cost an independent testing laboratory.
B. If the Contractor encounters Hazardous Waste which may cause foreseeable injury
or damage, Contractor shall immediately: (i) secure or otherwise isolate such
condition; (ii) stop all Work in connection with such material or substance (except in
an emergency situation); and (iii) notify the City (and promptly thereafter confirm
such notice in writing). The City shall contract for any services required to directly
remove and/or abate Hazardous Waste, if required, and shall not require the
Contractor to subcontract for such services. The Work in the affected area shall not
thereafter be resumed except by written agreement of the City and Contractor.
C. Contractor shall indemnify and hold harmless the City from and against claims,
damages, losses and expenses, arising from a Hazardous Waste on the Project Site,
if such Hazardous Waste exceeded OSHA Permissible Exposure Levels or levels
which would classify the material as a state of California or federal hazardous waste,
and was either i) shown on the Contract Documents or information available to
bidders; or (ii) brought to the site by Contractor. Nothing in this paragraph shall
obligate the Contractor to indemnify the City in the event of the sole or active
negligence or willful misconduct of the City, its officers, agents, or employees.
5.7 Sanitary Facilities.
A. Contractor shall provide sanitary temporary toilet buildings and hand washing
facilities for the use of all workers. All toilets and hand washing facilities shall comply
with Applicable Laws. Toilets shall be placed inside sealed secondary containment
devices installed on a flat, level surface. Accumulated liquids in the secondary
containment devices shall be properly removed and legally disposed without spillage
onto the ground. Toilets shall be kept supplied with toilet paper and shall have
workable door fasteners. Toilets and hand washing facilities shall be serviced no
less than once weekly and shall be present in a quantity of not less than 1 per 20
workers as required by Cal/OSHA regulations. The toilets and hand washing facilities
shall be maintained in a sanitary condition at all times. Use of toilet and hand washing
facilities in the Work under construction shall not be permitted. Any other sanitary
facilities required by Cal/OSHA shall be the responsibility of the Contractor.
5.8 Dust Control.
A. Contractor, at its expense, shall maintain all excavations, embankments, haul roads,
permanent access roads, plant sites, waste disposal areas, borrow areas, and all
other work areas free from dust. Industry accepted methods of dust control suitable
4.1.c
Packet Pg. 275 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-21 00 72 00 – GENERAL CONDITIONS
for the area involved, such as sprinkling, chemical treatment, light bituminous
treatment or similar methods, will be permitted.
5.9 Air Pollution Control.
A. Contractor shall comply with all air pollution control rules, regulations, ordinances
and statutes. All containers of paint, thinner, curing compound, solvent or liquid
asphalt shall be labeled to indicate that the contents fully comply with the applicable
material requirements.
B. Without limiting the foregoing, Contractor must fully comply with all applicable laws,
rules and regulations in furnishing or using equipment and/or providing services,
including, but not limited to, emissions limits and permitting requirements imposed
by the Air Quality Management District with jurisdiction over the Project and/or
California Air Resources Board (CARB). Contractor shall specifically be aware of
the application of these limits and requirements to "portable equipment", which
definition includes any item of equipment with a fuel-powered engine. Contractor
shall indemnify the City against any fines or penalties imposed by the air quality
management district, CARB, or any other governmental or regulatory agency for its
violations of Applicable Laws as well as those of its Subcontractors or others for
whom Contractor is responsible under its indemnity obligations provided for in the
Contract Documents.
5.10 Water Quality Management and Compliance.
A. Storm, surface, ground, nuisance, or other waters may be encountered at various
times during construction of the Work. The Contractor hereby acknowledges that it
has investigated the risk arising from such waters, has prepared its Bid accordingly,
and assumes any and all risks and liabilities arising therefrom.
B. Contractor shall keep itself and all Subcontractors, staff, and employees fully
informed of and in compliance with all local, state and federal laws, rules and
regulations that may impact, or be implicated by the performance of the Work
including, without limitation, all applicable provisions regulating discharges of storm
water; the Federal Water Pollution Control Act (33 U.S.C. § 13000 et seq.); the
California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-
14950); and any and all regulations, policies, or permits issued pursuant to any such
authority. These include, but are not limited to California State Water Resources
Control Board Order Number 2009-0009-DWQ (NPDES Permit No. CAS000002),
as amended by Order Numbers 2010-0014-DWQ, 2012-0006-DWQ, and any
subsequent amendment to or renewal thereof, State Water Resources Control
Board Order No. 2013-0001-DWQ (NPDES Order No. CAS000004), Santa Ana
Regional Water Quality Control Board No. R8-2010-0036 (NPDES No. CAS618036),
and any amendment or renewal thereof.
C. Contractor shall comply with all conditions of the State Water Resources Control
Board National Pollutant Discharge Elimination System General Permit for Waste
Discharge Requirements for Discharges of Storm Water Runoff Associated with
Construction Activity (“Construction General Permit”) for all construction activity
which results in the disturbance of in excess of one acre of total land area or which
4.1.c
Packet Pg. 276 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-22 00 72 00 – GENERAL CONDITIONS
is part of a larger common area of development or sale. Contractor shall comply with
the lawful requirements of the City, and any other applicable municipality, drainage
district, or other local agency with jurisdiction over the location where the Work is to
be conducted, regarding discharges of storm water to separate storm drain systems
or other watercourses under their jurisdiction, including applicable requirements in
municipal storm water management programs.
D. Failure to comply with the Construction General Permit, laws, regulations, and
ordinances listed in this Article is a violation of federal and state law.
Notwithstanding any other indemnity contained in these Contract Documents,
Contractor agrees to indemnify and hold harmless the City, its officials, officers,
agents, employees and authorized volunteers from and against any and all claims,
demands, fees, costs, expenses, or losses or liabilities of any kind or nature which
the City, its officials, officers, agents, employees and authorized volunteers may
sustain or incur for noncompliance with the Construction General Permit, laws,
regulations, and ordinances listed above, arising out of or in connection with the
Work, except for liability resulting from the sole established negligence, willful
misconduct or active negligence of the City, its officials, officers, agents, employees
or authorized volunteers. The City reserves the right to defend any enforcement
action or civil action brought against the City for Contractor’s failure to comply with
any applicable water quality law, regulation, or policy. Contractor hereby agrees to
be bound by, and to reimburse the City for the costs associated with, any settlement
reached between the City and any relevant enforcement entity.
5.11 Environmental Quality Protection.
A. The Contractor shall comply with all requirements of applicable federal, state, and
local environmental rules and regulations. Any infractions of said rules and
regulations by the Contractor during the term of the Contract, which result in
penalties, will be the responsibility of the Contractor. The City operates under a
number of environmental permits issued by various agencies. If due to an action,
inaction, or negligence by the Contractor, the City becomes subject to non-
compliance penalties, the cost of such penalties shall be borne by the Contractor.
B. The Contractor shall exercise care to preserve the natural landscape and
vegetation, and shall conduct operations so as to prevent unnecessary destruction,
scarring, or defacing of the natural surroundings in the vicinity of the Work.
Movement of crews and equipment within the rights-of-way and over routes provided
for access to the Work shall be performed in a manner to prevent damage to
property. When no longer required, construction roads shall be restored to original
contours. Upon completion of the Work, and following removal of construction
facilities and required cleanup, land used for construction purposes and not required
for the completed installation shall be scarified and regraded, as required, so that all
surfaces are left in a condition that will facilitate natural revegetation, provide for
proper drainage, and prevent erosion.
C. If, in the performance of the Work, evidence of the possible occurrence of any
Federally listed threatened or endangered plant or animal is discovered, the
Contractor shall notify the City immediately, giving the location and nature of the
findings. Written confirmation of the evidence, location and nature of the findings
4.1.c
Packet Pg. 277 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-23 00 72 00 – GENERAL CONDITIONS
shall be forwarded to City within two (2) Days. The Contractor shall immediately
cease all construction activities in the immediate area of the discovery to the extent
necessary to protect the endangered plant or animal. If directed by the City,
Contractor will refrain from working in the immediate area, suspend the Work in its
entirety, or alter its performance to ensure full compliance with all applicable permits,
laws and regulations. Any City directed changes to the Work as a result of a siting
will be pursuant to the Contract Documents. Any costs or delays incurred by City or
the Contractor due to unreasonable or false notification of an endangered plant or
animal will be borne by the Contractor.
D. If, in the performance of the Work, Contractor should unearth cultural resources (for
example, human remains, animal bones, stone tools, artifacts and/or midden
deposits) through excavation, grading, watering or other means, the Contractor shall
notify the construction/archeological monitor and/or the City immediately, giving the
location and nature of the findings. Written confirmation of the evidence, location and
nature of the findings shall be forwarded to the construction/archeological monitor
and/or City within two (2) Days. Contractor shall immediately cease all construction
activities in the immediate area of the discovery to the extent necessary to protect
the cultural resource. If directed by the City, Contractor will refrain from working in
the immediate area, suspend the Work in its entirety, or re-sequence and/or alter its
performance to ensure full compliance with all applicable permits, laws and
regulations. Should the presence of cultural resources be confirmed, the Contractor
will assist the City and the construction/archeological monitor in the preparation and
implementation of a data recovery plan. The Contractor shall provide such
cooperation and assistance as may be necessary to preserve the cultural resources
for removal or other disposition. Any City directed changes to the Work as a result
of the cultural resource will be pursuant to the Contract Documents. Should
Contractor, without permission, injure, destroy, excavate, appropriate, or remove
any cultural resource on or adjacent to the Site, it will be subject to disciplinary action,
arrest and penalty under applicable law. Contractor shall be principally responsible
for all costs of mitigation and/or restoration of cultural resources related to the
unauthorized actions identified above. Contractor shall be required to pay for
unauthorized damage and mitigation costs to cultural resources (historical and
archeological resources) as a result of unauthorized activities that damage cultural
resources and shall indemnify City pursuant to the Contract Documents.
5.12 Noise Restrictions.
A. Contractor shall use only such equipment on the Work and in such state of repair so
that the emission of sound therefrom is within the noise tolerance level of that
equipment as established by Cal/OSHA. Contractor shall comply with the most
restrictive of the following: (1) local sound control and noise level rules, regulations
and ordinances and (2) the requirements contained in these Contract Documents,
including hours of operation requirements. No internal combustion engine shall be
operated on the Project without a muffler of the type recommended by the
manufacturer. Should any muffler or other control device sustain damage or be
determined to be ineffective or defective, the Contractor shall promptly remove the
equipment and shall not return said equipment to the job until the device is repaired
or replaced. Said noise and vibration level requirements shall apply to all equipment
4.1.c
Packet Pg. 278 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-24 00 72 00 – GENERAL CONDITIONS
on the job or related to the job, including but not limited to, trucks, transit mixers or
transit equipment that may or may not be owned by the Contractor.
5.13 Diversion of Recyclable Waste Material.
A. In compliance with the applicable City’s waste reduction and recycling efforts,
Contractor shall divert all Recyclable Waste Materials to appropriate recycling
centers as required for compliance with the local jurisdiction’s waste diversion
ordinances. Contractor will be required to submit weight tickets and written proof of
diversion with its monthly progress payment requests. Contractor shall complete and
execute any certification forms required by the City or other applicable agencies to
document Contractor’s compliance with these diversion requirements. All costs
incurred for these waste diversion efforts shall be the responsibility of the Contractor.
5.14 Workers; Contractor’s Supervision.
A. Contractor shall be an independent contractor for the City and not an employee.
Contractor understands and agrees that it and all of its employees shall not be
considered officers, employees, or agents of the City and are not entitled to benefits
of any kind normally provided employees of the City, including but not limited to,
state unemployment compensation or workers’ compensation. Contractor assumes
full responsibility for the acts and omissions of its employees or agents related to the
Work.
B. By executing the Contract, Contractor verifies that it fully complies with all
requirements and restrictions of state and federal law respecting the employment of
undocumented aliens, including, but not limited to, the Immigration Reform and
Control Act of 1986, as may be amended from time to time, and shall require all
Subcontractors, sub-subcontractors and consultants to comply with the same. Each
person executing this Contract on behalf of Contractor verifies that he or she is a
duly authorized officer of Contractor and that any of the following shall be grounds
for the City to terminate the Contract for cause: (1) failure of the Contractor or its
Subcontractors, sub-subcontractors or consultants to meet any of the requirements
provided for in this Article; (2) any misrepresentation or material omission concerning
compliance with such requirements; or (3) failure to immediately remove from the
Work any person found not to be in compliance with such requirements.
C. Contractor shall at all times enforce strict discipline and good order among its
employees. Contractor shall not employ on the Project any unfit person or any one
not skilled in the Work assigned to him or her. Any person in the employ of the
Contractor whom the City may deem incompetent or unfit shall be dismissed from
the Work and shall not be employed on this Project.
D. Contractor shall continuously keep at the Project site, a competent and experienced
full-time Project superintendent acceptable to the City. Superintendent must be able
to proficiently speak, read and write in English and shall have the authority to make
decisions on behalf of the Contractor. Contractor shall continuously provide efficient
supervision of the Project.
4.1.c
Packet Pg. 279 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-25 00 72 00 – GENERAL CONDITIONS
5.15 Labor.
A. Hours of Work.
1. As provided in Article 3 (commencing at section 1810), Chapter 1, Part 7, Division
2 of the Labor Code, Contractor stipulates that eight (8) hours of labor shall
constitute a legal day’s work. The time of service of any worker employed at any
time by the Contractor or by any subcontractor on any subcontract under this
Contract upon the Work or upon any part of the Work contemplated by this
Contract is limited and restricted to eight (8) hours during any one calendar day
and 40 hours during any one calendar week, except as hereinafter provided.
Notwithstanding the provisions herein above set forth, work performed by
employees of Contractor in excess of eight (8) hours per day, and 40 hours during
any one week, shall be permitted upon this public work upon compensation for all
hours worked in excess of eight (8) hours per day at not less than one and one-
half times the basic rate of pay.
2. The Contractor and every Subcontractor shall keep an accurate record showing
the name of and actual hours worked each calendar day and each calendar week
by each worker employed in connection with the Work or any part of the Work
contemplated by this Contract. The record shall be kept open at all reasonable
hours to the inspection of the City and to the Division of Labor Law Enforcement,
Department of Industrial Relations of the State of California.
3. The Contractor shall pay to the City a penalty of twenty-five dollars ($25.00) for
each worker employed in the execution of this Contract by the Contractor or by
any subcontractor for each calendar day during which such worker is required or
permitted to work more than eight (8) hours in any calendar day and 40 hours in
any one calendar week in violation of the provisions of Article 3 (commencing at
section 1810), Chapter 1, Part 7, Division 2 of the Labor Code.
4. Any work necessary to be performed after regular working hours, or on Saturdays
and Sundays or other holidays, shall be performed without additional expense to
the City.
5. It shall be unlawful for any person to operate, permit, use, or cause to operate any
of the following at the Project Site, other than between the hours of 7:00 a.m. to
5:00 p.m., Monday through Friday, with no Work allowed on Holidays, unless
otherwise approved by the City:
a. Powered Vehicles
b. Construction Equipment
c. Loading and Unloading Vehicles
d. Domestic Power Tools
B. Payroll Records; Labor Compliance.
4.1.c
Packet Pg. 280 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-26 00 72 00 – GENERAL CONDITIONS
1. Pursuant to Labor Code section 1776, Contractor and all Subcontractors shall
maintain weekly certified payroll records, showing the names, addresses, Social
Security numbers, work classifications, straight time and overtime hours worked
each day and week, and the actual per diem wages paid to each journeyman,
apprentice, worker, or other employee employed by them in connection with the
Work under this Contract. Contractor shall certify under penalty of perjury that
records maintained and submitted by Contractor are true and accurate. Contractor
shall also require Subcontractor(s) to certify weekly payroll records under penalty
of perjury.
2. In accordance with Labor Code section 1771.4, the Contractor and each
Subcontractor shall furnish the certified payroll records directly to the Department
of Industrial Relations (“DIR”) on the specified interval and format prescribed by
the DIR, which may include electronic submission. Contractor shall comply with
all requirements and regulations from the DIR relating to labor compliance
monitoring and enforcement. The requirement to submit certified payroll records
directly to the Labor Commissioner under Labor Code section 1771.4 shall not
apply to work performed on a public works project that is exempt pursuant to the
small project exemption specified in Labor Code Section 1771.4.
3. Any stop orders issued by the DIR against Contractor or any Subcontractor that
affect Contractor’s performance of Work, including any delay, shall be Contractor’s
sole responsibility. Any delay arising out of or resulting from such stop orders shall
be considered Contractor caused delay subject to any applicable liquidated
damages and shall not be compensable by the City. Contractor shall defend,
indemnify and hold the City, its officials, officers, employees and agents free and
harmless from any claim or liability arising out of stop orders issued by the DIR
against Contractor or any Subcontractor.
4. The payroll records described herein shall be certified and submitted by the
Contractor at a time designated by the City. The Contractor shall also provide the
following:
a. A certified copy of the employee’s payroll records shall be made available
for inspection or furnished to such employee or his or her authorized
representative on request.
b. A certified copy of all payroll records described herein shall be made
available for inspection or furnished upon request of the DIR.
5. Unless submitted electronically, the certified payroll records shall be on forms
provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or
shall contain the same information as the forms provided by the DLSE.
6. Any copy of records made available for inspection as copies and furnished upon
request to the public or any public agency, the City, the Division of Apprenticeship
Standards or the Division of Labor Standards Enforcement shall be marked or
obliterated in such a manner as to prevent disclosure of an individual's name,
address and social security number. The name and address of the Contractor
4.1.c
Packet Pg. 281 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-27 00 72 00 – GENERAL CONDITIONS
awarded the Contract or performing the Contract shall not be marked or
obliterated.
7. In the event of noncompliance with the requirements of this Article, the Contractor
shall have ten (10) Days in which to comply subsequent to receipt of written notice
specifying in what respects the Contractor must comply with this Article. Should
noncompliance still be evident after such 10-day period, the Contractor shall pay
a penalty of one hundred dollars ($100.00) to the City for each calendar day, or
portion thereof, for each worker, until strict compliance is effectuated. Upon the
request of the Division of Apprenticeship Standards or the Division of Labor
Standards Enforcement, such penalties shall be withheld from progress payment
then due.
8. The responsibility for compliance with this Article shall rest upon the Contractor.
C. Prevailing Rates of Wages.
1. The Contractor is aware of the requirements of Labor Code sections 1720 et seq.
and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000
et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage
rates and the performance of other requirements on certain “public works” and
“maintenance” projects. Since this Project involves an applicable “public works” or
“maintenance” project, as defined by the Prevailing Wage Laws, and since the total
compensation is $1,000 or more, Contractor agrees to fully comply with such
Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates
of per diem wages at the commencement of this Contract from the website of the
Division of Labor Statistics and Research of the Department of Industrial Relations
located at www.dir.ca.gov. In the alternative, the Contractor may view a copy of
the prevailing rate of per diem wages which are on file at the City and shall be
made available to interested parties upon request. Contractor shall make copies
of the prevailing rates of per diem wages for each craft, classification, or type of
worker needed to perform work on the Project available to interested parties upon
request, and shall post copies at the Contractor’s principal place of business and
at the Project site. Contractor shall defend, indemnify and hold the City, its officials,
officers, employees and authorized volunteers free and harmless from any claims,
liabilities, costs, penalties or interest arising out of any failure or allege failure to
comply with the Prevailing Wage Laws.
2. The Contractor shall forfeit as a penalty to the City not more than Two Hundred
Dollars ($200.00), pursuant to Labor Code section 1775, for each calendar day, or
portion thereof, for each worker paid less than the prevailing wage rate as
determined by the Director of the DIR for such work or craft in which such worker
is employed for any public work done under the Contract by it or by any
Subcontractor under it. The difference between such prevailing wage rate and the
amount paid to each worker for each calendar day or portion thereof, for which
each worker was paid less than the prevailing wage rate, shall be paid to each
worker by the Contractor.
4.1.c
Packet Pg. 282 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-28 00 72 00 – GENERAL CONDITIONS
3. Contractor shall post, at appropriate conspicuous points on the Project Site, a
schedule showing all determined general prevailing wage rates and all authorized
deductions, if any, from unpaid wages actually earned.
D. Public Works Contractor Registration. Pursuant to Labor Code sections 1725.5 and
1771.1, the Contractor and its Subcontractors must be registered with the DIR prior
to the execution of a contract to perform public works. By entering into this Contract,
Contractor represents that it is aware of the registration requirement and is currently
registered with the DIR. Contractor shall maintain a current registration for the
duration of the Project. Contractor shall further include the requirements of Labor
Code sections 1725.5 and 1771.1 in any subcontract and ensure that all
Subcontractors are registered at the time this Contract is entered into and maintain
registration for the duration of the Project. Notwithstanding the foregoing, the
contractor registration requirements mandated by Labor Code Sections 1725.5 and
1771.1 shall not apply to work performed on a public works project that is exempt
pursuant to the small project exemption specified in Labor Code Sections 1725.5
and 1771.1.
E. Employment of Apprentices. Contractor and all Subcontractors shall comply with
the requirements of Labor Code sections 1777.5 and 1777.6 in the employment of
apprentices. Information relative to apprenticeship standards, wage schedules, and
other requirements may be obtained from the Director of Industrial Relations, ex
officio the Administrator of Apprenticeship, San Francisco, California, or from the
Division of Apprenticeship Standards and its branch offices. Knowing violations of
Labor Code section 1777.5 will result in forfeiture not to exceed one hundred dollars
($100.00) for each calendar day of non-compliance pursuant to Labor Code section
1777.7.
F. Nondiscrimination/Equal Employment Opportunity. Pursuant to Labor Code section
1735 and other applicable provisions of law, the Contractor and its Subcontractors
shall not discriminate against any employee or applicant for employment because of
race, religious creed, color, national origin, ancestry, physical disability, mental
disability, medical condition, marital status, sex, age, sexual orientation, or any other
classifications protected by law on this Project. The Contractor will take affirmative
action to insure that employees are treated during employment or training without
regard to their race, religious creed, color, national origin, ancestry, physical
disability, mental disability, medical condition, marital status, sex, age, sexual
orientation, or any other classifications protected by law.
G. Debarment of Contractors and Subcontractors. Contractors or Subcontractors may
not perform work on a public works project with a subcontractor who is ineligible to
perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7.
Any contract on a public works project entered into between a contractor and a
debarred subcontractor is void as a matter of law. A debarred subcontractor may not
receive any public money for performing work as a subcontractor on a public works
contract. Any public money that is paid, or may have been paid to a debarred
subcontractor by a contractor on the project shall be returned to the City. The
Contractor shall be responsible for the payment of wages to workers of a debarred
subcontractor who has been allowed to work on the Project.
4.1.c
Packet Pg. 283 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-29 00 72 00 – GENERAL CONDITIONS
5.16 Subcontracts.
A. Contractor agrees to bind every Subcontractor to the terms of the Contract
Documents as far as such terms are applicable to Subcontractor’s portion of the
Work. Contractor shall be as fully responsible to the City for the acts and omissions
of its Subcontractors and of persons either directly or indirectly employed by its
Subcontractors, as Contractor is for acts and omissions of persons directly employed
by Contractor. Nothing contained in these Contract Documents shall create any
contractual relationship between any Subcontractor and the City. The City reserves
the right to accept all Subcontractors. The City’s acceptance of any Subcontractor
under this Contract shall not in any way relieve Contractor of its obligations in the
Contract Documents. Prior to substituting any Subcontractor listed in the Bid Forms,
Contractor must comply with the requirements of the Subletting and Subcontracting
Fair Practices Act pursuant to California Public Contract Code section 4100 et seq.
5.17 Progress Meetings.
A. The Contractor shall schedule and hold regular progress meetings at least weekly
and at other times as requested by Engineer or as required by progress of the Work.
The Contractor and City shall attend each meeting. Contractor may at its discretion
request attendance by representatives of its Suppliers, manufacturers, and other
Subcontractors. The purpose of the meetings is to review the progress of the Work,
maintain coordination of efforts, discuss changes in scheduling, and resolve other
problems which may develop. During each meeting, the Contractor shall present any
issues which may impact its progress with a view to resolve these issues
expeditiously.
5.18 Submittals
A. Schedule of Submittals. Within five (5) Days after the Notice to Proceed (unless
otherwise specified in the Contract Documents), Contractor will prepare and deliver
a Schedule of Submittals to the City that has been fully integrated with the progress
schedule and identifies each Submittal required by the Contract Documents as well
as the date on which Contractor will deliver each Submittal to the City. Each
Submittal must be delivered to the City at least thirty (30) Days prior to the date the
material or equipment is scheduled to be incorporated into the Work. The Contractor
is responsible for any schedule delays resulting from the Submittal process.
B. Submittal Procedures.
1. Contractor will follow the following procedures for each Submittal, Shop Drawing
and Sample required by the Contract Documents:
a. Submittals must be transmitted electronically.
b. Transmittals will be sequentially numbered. Contractor to mark revised
Submittals with original number and sequential alphabetic suffix.
c. Each Submittal will identify the Project, Contractor, Subcontractor and
Supplier, pertinent Drawing and detail number, and Specification Section
number appropriate to Submittal.
4.1.c
Packet Pg. 284 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-30 00 72 00 – GENERAL CONDITIONS
d. By transmitting a Submittal, Contractor certifies it has reviewed and
approved each Submittal, verified products required, field dimensions,
adjacent construction Work, and that coordination of information is
according to requirements of the Work and Contract Documents.
e. Identify variations in Contract Documents and product or system limitations
that may differ and/or be detrimental to successful performance of
completed Work.
f. When Submittal is revised for resubmission, Contractor shall promptly
address the City’s comments and resubmit. Contractor shall identify
changes made since previous submission.
g. The City’s review of Shop Drawings shall not relieve Contractor from
responsibility for deviations from the Contract Documents unless Contractor
has, in writing, called the City’s attention to such deviations at time of
submission and the City has taken no exception to the deviation. The City’s
review of Shop Drawings shall not relieve Contractor from responsibility for
errors in Shop Drawings.
h. Submittals not required by the Contract Documents or requested by the City
will not be acknowledged or processed.
i. Incomplete Submittals will not be reviewed by the City. Delays resulting from
incomplete Submittals are not the responsibility of the City.
j. Contractor shall not be entitled to any extension of the Contract Times as a
result of the Submittal process.
k. Contractor shall allow a minimum of 20 working days for review of
Submittals unless otherwise specified in the Contract Documents.
2. Where a Submittal, Shop Drawing or Sample is required by the Contract
Documents or the Schedule of Submittals, any related Work performed prior to
the City review and approval of the pertinent submittal will be performed at the
risk and sole expense and responsibility of Contractor.
C. Schedule Milestone for Submittals. Contractor must submit all Submittals required
by the Contract Documents in accordance with the Schedule of Submittals. If
Contractor fails to submit the Submittals in accordance with the Schedule of
Submittals, Contractor will be solely liable for any delays or impacts caused by the
delayed Submittal, whether direct or indirect. Contractor will be liable for the time
calculated from the date the Submittal is due until the date a compliant Submittal is
made. A compliant Submittal will be one that is complete and satisfies the
requirements of the Contract Documents.
4.1.c
Packet Pg. 285 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-31 00 72 00 – GENERAL CONDITIONS
5.19 Shop Drawings and Sample Submittal Procedures.
A. Before submitting each Shop Drawing or Sample, Contractor shall have:
1. Reviewed and coordinated each Shop Drawing or Sample with other Shop
Drawings and Samples and with the requirements of the Work and the Contract
Documents;
2. Determined and verified all field measurements, quantities, dimensions,
specified performance and design criteria, installation requirements, materials,
catalog numbers, and similar information with respect thereto;
3. Determined and verified the suitability of all materials offered with respect to the
indicated application, fabrication, shipping, handling, storage, assembly, and
installation pertaining to the performance of the Work; and
4. Determined and verified all information relative to Contractor’s responsibilities
for means, methods, techniques, sequences, and procedures of construction,
and safety precautions and programs incident thereto.
B. With each Submittal, Contractor shall give the City specific written notice of any
variations that the Shop Drawing or Sample may have from the requirements of the
Contract Documents. This notice shall be both a written communication separate
from the Shop Drawings or Sample Submittal and, in addition, a specific notation
made on each Shop Drawing or Sample submitted to the City for review and
approval of each such variation.
C. Shop Drawings.
1. Data shown on the Shop Drawings will be complete with respect to quantities,
dimensions, specified performance and design criteria, materials, and similar
data to show the City the services, materials, and equipment Contractor
proposes to provide and to enable the City to review the information for
assessing conformance with information given and design concept expressed in
Contract Documents.
2. When required by individual Specification sections, provide Shop Drawings
signed and sealed by a professional engineer responsible for designing
components shown on Shop Drawings. Shop Drawings must include signed and
sealed calculations to support design in a form suitable for submission to and
approval by authorities having jurisdiction.
3. Shop Drawings for steel structures shall consist of shop details, erection and
other working Drawings showing details, dimensions, sizes of members and
other information necessary for the complete fabrication and erection of the
metal work.
4. Shop Drawings of concrete structures shall consist of such detailed drawings as
may reasonably be required for the successful prosecution of the Work and
which are not included in the Drawings furnished by the Engineer. These may
4.1.c
Packet Pg. 286 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-32 00 72 00 – GENERAL CONDITIONS
include drawings for false work, bracing, centering and form work, masonry
layout diagrams, and diagrams for bent reinforcement.
5. Contractor shall make revisions and provide additional information when
required by authorities having jurisdiction.
D. Samples. Clearly identify each Sample as to material, Supplier, pertinent data such
as catalog numbers, the use for which intended and other data as required to enable
the City to review the submittal for assessing conformance with information given
and design concept expressed in Contract Documents. Samples should be of
appropriate size and detail to assess functional, aesthetic, color, texture, patterns
and finish selection.
E. City’s Review.
1. The City will review Shop Drawings and Samples in accordance with the
Schedule of Submittals. The City’s review and acceptance will be only to
determine if the items covered by the Submittals will, after installation or
incorporation in the Work, conform to the information given in the Contract
Documents and be compatible with the design concept of the completed Project
as a functioning whole as indicated by the Contract Documents.
2. The City review and approval will not extend to means, methods, techniques,
sequences, or procedures of construction (except where a particular means,
method, technique, sequence, or procedure of construction is specifically and
expressly called for by the Contract Documents) or to safety precautions or
programs incident thereto. The review and approval of a separate item as such
will not indicate approval of the assembly in which the item functions.
3. The City’s review and acceptance shall not relieve Contractor from responsibility
for any variation from the requirements of the Contract Documents unless the
City has given written approval of each such variation by specific written notation
thereof incorporated in or accompanying the Shop Drawing or Sample.
F. Resubmittal Procedures. Contractor shall make corrections required by the City and
shall return corrected Shop Drawings and submit, as required, new Samples for
review and approval. Contractor shall direct specific attention in writing to revisions
other than the corrections called for by the City on previous Submittals.
5.20 Record (“As-Built”) Drawings.
A. The Contractor shall maintain one record set of Contract Documents at the Site or
digitally in an acceptable format. On these, it shall mark all Project conditions,
locations, configurations, and any other changes or deviations which may vary from
the information represented in the original Contract Documents, including buried or
concealed construction and utility features which are revealed during the course of
construction. Special attention shall be given to recording the horizontal and vertical
location of all buried utilities that differ from the locations indicated, or which were
not indicated on the Drawings. For all Projects involving the installation of any
pipeline, Contractor shall survey and record the top of the pipe at a minimum of every
100 linear feet, and at each bend, recording both the horizontal and vertical
4.1.c
Packet Pg. 287 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-33 00 72 00 – GENERAL CONDITIONS
locations. Drawings shall be supplemented by any detailed sketches as necessary
or directed to fully indicate the Work as actually constructed. Any required as-built
drawings of civil engineering elements of the Work shall be prepared by a registered
civil engineer.
B. These master Record Drawings of the as-built conditions, including all revisions
made necessary by Addenda and Change Orders, shall be maintained up-to-date
during the progress of the Project. Red ink shall be used for alterations and notes.
Notes shall identify relevant Change Orders by number and date. Record Drawings
shall be accessible to the Engineer at all times during the construction period.
Failure on the Contractor’s part to keep Record Drawings current could result in
withholding partial payment.
C. Upon completion of the Project and as a condition of final acceptance, the Contractor
shall finalize and deliver a complete set of Record Drawings to the Engineer. The
information submitted by the Contractor will be assumed to be correct, and the
Contractor shall be responsible for, and liable to the City, for the accuracy of such
information, and for any errors or omissions which may or may not appear on the
Record Drawings.
5.21 Layout and Field Engineering.
A. The Contractor shall utilize a properly licensed surveyor to perform all layout surveys
required for the control and completion of the Work and all necessary surveys to
compute quantities of Work performed.
5.22 Separate Contracts and Cooperation.
A. Separate Contracts. The City reserves the right to let other contracts in connection
with this Work or on the Project site. Contractor shall permit other contractors
reasonable access and storage of their materials and execution of their work and
shall properly connect and coordinate its Work with theirs. To ensure proper
execution of its subsequent Work, Contractor shall immediately inspect work already
in place and shall at once report to the Engineer any problems with the Work in place
or discrepancies with the Contract Documents.
B. Cooperation. Contractor shall ascertain to its own satisfaction the scope of the
Project and nature of any other contracts that have been or may be awarded by the
City in prosecution of the Project to the end that Contractor may perform this
Contract in the light of such other contracts, if any. Nothing herein contained shall
be interpreted as granting to Contractor exclusive occupancy at site of the Project.
Contractor shall not cause any unnecessary hindrance or delay to any other
contractor working on the Project. If simultaneous execution of any contract for the
Project is likely to cause interference with performance of some other contract or
contracts, the Engineer shall decide which Contractor shall cease Work temporarily
and which contractor shall continue or whether work can be coordinated so that
contractors may proceed simultaneously. The City shall not be responsible for any
damages suffered or for extra costs incurred by Contractor resulting directly or
indirectly from award, performance, or attempted performance of any other contract
or contracts on the Project Site.
4.1.c
Packet Pg. 288 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-34 00 72 00 – GENERAL CONDITIONS
5.23 Work Site.
A. Limitation of Use of Site and Other Areas. Rights-of-way, easements, or rights-of-
entry for the Work will be provided by the City. Unless otherwise specified in the
Special Provisions, the Contractor shall make arrangements, pay for, and assume
all responsibility for acquiring, using, and disposing of additional work areas and
facilities temporarily required. The Contractor shall indemnify and hold the City
harmless from all claims for damages caused by such actions. Contractor shall
confine construction equipment, the storage of materials and equipment, and the
operations of workers to the Site and other areas permitted by Applicable Laws, and
shall not unreasonably encumber the Site and other areas with construction
equipment or other materials or equipment. Contractor shall assume full
responsibility for any damage to any such land or area, or to City or occupant thereof,
or of any adjacent land or areas resulting from the performance of the Work.
B. Site Maintenance. During the progress of the Work, Contractor shall keep the Site
and other areas free from accumulations of waste materials, rubbish, and other
debris. Removal and disposal of such waste materials, rubbish, and other debris
shall conform to Applicable Laws. The Contractor shall furnish trash bins for all
debris from construction. All debris shall be placed in trash bins daily. Forms and
false-work that are to be re-used shall be stacked neatly concurrently with their
removal. Forms and false-work that are not to be re-used shall be disposed of
concurrently with their removal.
C. Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and make
it ready for utilization by the City. At the completion of the Work Contractor shall
remove from the Site all tools, appliances, construction equipment and machinery,
and surplus materials and shall restore to original condition all property not
designated for alteration by the Contract Documents.
5.24 Utility Usage.
A. All temporary utilities, including but not limited to electricity, water, gas, and
telephone, used on the Work shall be furnished and paid for by Contractor.
Contractor shall provide necessary temporary distribution systems, including meters,
if necessary, from distribution points to points on the Work where the utility is
needed. Upon completion of the Work, Contractor shall remove all temporary
distribution systems. Contractor shall provide necessary and adequate utilities and
pay all costs for water, electricity, gas, oil, and sewer charges required for completion
of the Work, including but not limited to startup and testing required in the Contract
Documents. All permanent meters installed shall be listed in the Contractor’s name
until the Work is accepted. For Work to be performed in existing City facilities,
Contractor may use the City’s existing utilities, provided such use is reasonable
under the circumstances. If Contractor uses the City utilities, it will not need to
compensate the City for reasonably consumption of utilities, but Contractor will be
responsible for any excessive, unreasonable or wasteful utility usage. Amounts due
the City under this section may be deducted from progress payments.
4.1.c
Packet Pg. 289 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-35 00 72 00 – GENERAL CONDITIONS
5.25 Protection of Work and Property.
A. The Contractor shall digitally record video and take photographs of the Project site
and adjacent improvements in a manner and quality that clearly depicts the existing
condition of the Project Site and adjacent improvements immediately prior to the
start of Work (minimum 1080p video and 4MP photo). All videos and photographs
shall be date and time stamped. The Contractor shall submit the video and photos
in digital format on a memory stick before the commencement of Work, along with a
map outlining the route and locations of the videos and/or photographs. The
Contractor shall be responsible for all damages to persons or property that occur as
a result of the Work. Contractor shall be responsible for the proper care and
protection of all materials delivered and Work performed until completion and final
acceptance by the City. All Work shall be solely at the Contractor’s risk.
B. Contractor shall adequately protect adjacent property from settlement or loss of
lateral support as necessary. Contractor shall comply with all applicable safety laws
and building codes to prevent accidents or injury to persons on, about, or adjacent
to the Project site where Work is being performed. Contractor shall erect and
properly maintain at all times, as required by field conditions and progress of work,
all necessary safeguards, signs, barriers, lights, and watchmen for protection of
workers and the public, and shall post danger signs warning against hazards created
in the course of construction. Contractor shall provide such heat, covering, and
enclosures as are necessary to protect all Work, materials, equipment, appliances,
and tools against damage by weather conditions.
C. Contractor shall take adequate precautions to protect existing sidewalks, curbs,
pavements, utilities, and other adjoining property and structures, and to avoid
damage thereto, and Contractor shall repair any damage thereto caused by the Work
operations. Contractor shall:
1. Enclose the working area with a substantial barricade, and arrange work to
cause minimum amount of inconvenience and danger to the public.
2. Provide substantial barricades around any shrubs or trees indicated to be
preserved.
3. Deliver materials to the Site over a route designated by the City.
4. Confine Contractor’s apparatus, the storage of materials, and the operations of
its workers to limits required by law, ordinances, permits, or directions of the
City. Contractor shall not unreasonably encumber the Site with its materials.
5. Take care to prevent disturbing or covering any survey markers, monuments, or
other devices marking property boundaries or corners. If such markers are
disturbed by accident, they shall be replaced by a civil engineer or land surveyor
acceptable to the City, at no cost to the City.
6. Ensure that existing facilities, fences and other structures are all adequately
protected and that, upon completion of all Work, all facilities that may have been
damaged are restored to a condition acceptable to the City.
4.1.c
Packet Pg. 290 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-36 00 72 00 – GENERAL CONDITIONS
7. Preserve and protect from injury all buildings, pole lines and all directional,
warning and mileage signs that have been placed within the right-of-way.
8. At the completion of work each day, leave the Work and the Site in a clean, safe
condition.
9. Comply with any stage construction and/or traffic handling plans. Access to
residences and businesses shall be maintained at all times, except with the
City’s written approval. Any request for approval to reduce or restrict access to
residences and business must be submitted to the City at least seven (7) Days
in advance, and the City may issue or withhold approval in its sole discretion.
D. These precautionary measures will apply continuously and not be limited to normal
working hours. Full compensation for the work involved in the protection and
preservation of life, safety and property as above specified shall be considered as
included in the prices paid for the various contract items of Work, and no additional
allowance will be made therefor.
E. Should damage to persons or property occur as a result of the Work, Contractor shall
promptly notify the City, in writing. Contractor shall be responsible for proper
investigation, documentation, including video or photography, to adequately
memorialize and make a record of what transpired. The City shall be entitled to
inspect and copy any such documentation, video, or photographs. Contractor shall
maintain all investigation documentation including video and/or photographs for a
minimum of four (4) years following completion of the Project.
5.26 Emergencies.
A. In emergencies affecting the safety or protection of persons or the Work or Property
at the Site or adjacent thereto, the Contractor, without special instruction or
authorization from the City or the Engineer, is obligated to act to prevent threatened
damage, injury or loss. The Contractor shall give the Engineer prompt written notice
if the Contractor believes that any significant changes in the Work or variations from
the Contract Documents have been caused thereby.
5.27 California Air Resources Board Regulations.
A. To the extent applicable, Contractor, shall comply, and shall ensure all
Subcontractors comply, with all requirements of the most current version of the
California Air Resources Board (“CARB”) including, without limitation, all applicable
terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all
pending amendments (“Regulation”).
B. Throughout Project, and for five (5) years thereafter, Contractor shall make available
for inspection and copying any and all documents or information associated with
Contractor’s and subcontractors’ fleet including, without limitation, the CRCs,
fuel/refueling records, maintenance records, emissions records, and any other
information the Contractor is required to produce, keep or maintain pursuant to the
Regulation upon two (2) calendar days’ notice from City.
4.1.c
Packet Pg. 291 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-37 00 72 00 – GENERAL CONDITIONS
C. Contractor shall be solely liable for any and all costs associated with complying with
the Regulation as well as for any and all penalties, fines, damages, or costs
associated with any and all violations, or failures to comply with the Regulation.
Contractor shall defend, indemnify and hold harmless the City, its officials, officers,
employees and authorized volunteers free and harmless from any claims, liabilities,
costs, penalties or interest arising out of any failure or alleged failure to comply with
the Regulation.
ARTICLE 6 -MATERIALS; INSPECTION
6.1 Access to Work.
A. The City, Engineer, their consultants and other representatives and personnel,
independent testing laboratories, and governmental agencies with jurisdictional
interests will have access to the Site and the Work at reasonable times for their
observation, inspection, and testing. Contractor shall provide them proper and safe
conditions for such access and advise them of Contractor’s safety procedures and
programs.
6.2 Materials.
A. Except as otherwise specifically stated in the Contract Documents, Contractor shall
provide and pay for all materials, labor, tools, equipment, water, lights, power,
transportation, superintendence, temporary constructions of every nature, and all
other services and facilities whatsoever necessary to execute and complete this
Contract within the Contract Time. Unless otherwise specified, all materials, parts,
and equipment furnished by the Contractor in the Work shall be new, the best of their
respective kinds and grades as noted and/or specified, and workmanship shall be of
good quality.
B. No materials, supplies, or equipment for Work under this Contract shall be
purchased subject to any chattel mortgage or under a conditional sale or other
agreement by which an interest therein or in any part thereof is retained by the seller
or Supplier. Contractor warrants good title to all material, supplies, and equipment
installed or incorporated in the Work and agrees upon completion of all work to
deliver the Project, to the City free from any claims, liens, or charges.
C. Materials shall be furnished in ample quantities and at such times as to ensure
uninterrupted progress of the Work and shall be stored properly and protected as
required by the Contract Documents. Contractor shall be entirely responsible for
damage or loss by weather or other causes to materials or Work. Materials shall be
stored on the Project Site in such manner so as not to interfere with any operations
of the City or any independent contractor.
D. Contractor shall verify all measurements, dimensions, elevations, and quantities
before ordering any materials or performing any Work, and the City shall not be liable
for Contractor’s failure to so. No additional compensation, over and above payment
for the actual quantities at the prices set out in the Bid Schedule, will be allowed
because of differences between actual measurements, dimension, elevations and
quantities and those indicated on the Plans and in the Specifications. Any difference
4.1.c
Packet Pg. 292 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-38 00 72 00 – GENERAL CONDITIONS
therein shall be submitted to the Engineer for consideration before proceeding with
the Work.
6.3 Test and Inspections.
A. Inspection of Work.
1. If the Contract Documents, the Engineer, or any instructions, laws, ordinances,
or public authority requires any part of the Work to be tested or approved,
Contractor shall provide the Engineer at least two (2) Days’ notice of its
readiness for observation or inspection. If inspection is by a public authority other
than the City, Contractor shall promptly inform the City of the date fixed for such
inspection. Required certificates of inspection (or similar) shall be secured by
Contractor. Costs for City testing and inspection shall be paid by the City. Costs
of tests for Work found not to be in compliance shall be paid by the Contractor.
2. If Contractor gives notice of an inspection pursuant to the Contract Documents,
the City will provide inspection during normal working hours from 7:00 a.m. to
3:30 p.m. Monday through Friday. Requested inspections before or after this
time will be charged to the Contractor as reimbursable inspection time.
Inspections on weekends requires two (2) Days’ notice for review and approval.
Upon written request and approval the 8.5 hour working day may be changed to
other limits.
3. The Contractor shall pay for the cost of any minimum “show up” costs of a
materials testing technician that was called for by the Contractor but ultimately
the Contractor work was not ready for the inspection. Any such costs shall be
deducted from any amounts due to the Contractor.
4. If any Work is done or covered up without the required testing or approval, the
Contractor shall uncover or deconstruct the Work, and the Work shall be redone
after completion of the testing at the Contractor’s cost in compliance with the
Contract Documents.
5. Where inspection and testing are to be conducted by an independent laboratory
or agency, materials or samples of materials to be inspected or tested shall be
selected by such laboratory or agency, or by the City, and not by Contractor.
Unless otherwise stated and as provided by the Contract Documents, the City
shall employ and pay for the services of an independent testing laboratory to
perform all inspections, tests, or approvals required by the Contract Documents.
All tests or inspections of materials shall be made in accordance with the
commonly recognized standards of national organizations.
6. Reexamination of Work may be ordered by the City. If so ordered, Work must
be uncovered or deconstructed by Contractor. If Work is found to be in
accordance with the Contract Documents, the City shall pay the costs of
reexamination and reconstruction. If such work is found not to be in accordance
with the Contract Documents, Contractor shall pay all costs.
4.1.c
Packet Pg. 293 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-39 00 72 00 – GENERAL CONDITIONS
B. Testing of Materials.
1. In advance of manufacture of materials to be supplied by Contractor which must
be tested or inspected, Contractor shall notify the City so that the City may
arrange for testing at the source of supply. Any materials which have not
satisfactorily passed such testing and inspection shall not be incorporated into
the Work.
2. If the manufacture of materials to be inspected or tested will occur in a plant or
location greater than sixty (60) miles from the City, the Contractor shall pay for
any excessive or unusual costs associated with such testing or inspection,
including but not limited to excessive travel time, standby time and required
lodging.
3. Unless otherwise specified in the Special Provisions, all initial testing and a
reasonable amount of retesting will be performed under the direction of the
Engineer, and at no expense to the Contractor. The Contractor shall notify the
Engineer in writing, at least 15 days in advance, of its intention to use materials
for which tests are specified, to allow sufficient time to perform the tests. The
notice shall name the proposed Supplier and source of material. If the notice of
intent to use is sent before the materials are available for testing or inspection,
or is sent so far in advance that the materials on hand at the time will not last but
will be replaced by a new lot prior to use on the Work, it will be the Contractor's
responsibility to re-notify the Engineer when samples which are representative
may be obtained.
4. A Certificate of Compliance shall be furnished to the Engineer prior to the use of
any material or assembled material for which these Specifications so require or
if so required by the Engineer. The Engineer may waive the materials testing
requirements and accept a Certificate of Compliance. Material test data may be
required by the Engineer to be included with the Submittal. Materials used on
the basis of a Certificate of Compliance may be sampled and tested at any time.
The submission of a Certificate of Compliance shall not relieve the Contractor of
responsibility for incorporating material into the Work which conforms to the
requirements of the Contract Documents, and any material not conforming to
the requirements will be subject to rejection by the Engineer whether in place or
not.
5. Copies of mill certificates of composition and quality of all component materials
(reinforcing steel, structural steel, lumber, etc.) incorporated in the construction
of the Work shall be provided to the City at the time of delivery. City shall retain
the right to reject any raw material not provided with a mill certificate at the time
of delivery.
6. If, after incorporating such materials into the Work, it is found that sources of
supply that have been approved do not furnish a uniform product, or if the
product from any source proves unacceptable at any time, the Contractor shall
furnish approved material from other approved sources. If any product proves
unacceptable after improper storage, handling or for any other reason it shall be
rejected, not incorporated into the Work, and shall be removed from the Project
Site all at the Contractor’s expense.
4.1.c
Packet Pg. 294 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-40 00 72 00 – GENERAL CONDITIONS
6.4 Requests for Substitutions.
A. For the purposes of this provision, the term “substitution” shall mean the substitution
of any material, method or service substantially equal to or better in every respect to
that indicated in the Contract Documents or otherwise referenced herein.
B. Pursuant to Public Contract Code section 3400(b), the City may make a finding that
is described in the Notice Inviting Bids that designates certain products, things, or
services by specific brand or trade name.
C. Unless specifically designated in the Special Conditions, whenever any material,
process, or article is indicated or specified by grade, patent, or proprietary name or
by name of manufacturer, such specifications shall be deemed to be used for the
purpose of facilitating the description of the material, process, or article desired and
shall be deemed to be followed by the words “or equal.” Contractor may, unless
otherwise stated, offer for substitution any material, process, or article which may be
substantially equal to or better in every respect to that so indicated or specified in
the Contract Documents. However, the City has adopted uniform standards for
certain materials, processes, and articles.
D. The Contractor shall submit substitution requests, together with substantiating data,
for substitution of any “or equal” material, process, or article no later than thirty-five
(35) Days after award of Contract. Provisions regarding submission of substitution
requests shall not in any way authorize an extension of time for the performance of
this Contract. If a substitution request is rejected by the City, the Contractor shall
provide the material, method or service specified herein. The City shall not be
responsible for any costs incurred by the Contractor associated with substitution
requests. The burden of proof as to the equality of any material, process, or article
shall rest with the Contractor. The Engineer has the complete and sole discretion to
determine if a material, process, or article is substantially equal to or better than that
specified and to approve or reject all substitution requests.
E. Substantiating data as described above shall include, at a minimum, the following
information:
1. A signed affidavit from the Contractor stating that the material, process, or article
proposed as a substitution is substantially equal to or better than that specified
in every way except as may be listed on the affidavit.
2. Illustrations, specifications, catalog cut sheets, and any other relevant data
required to prove that the material, process, or article is substantially equal to or
better than that specified.
3. A statement of the cost implications of the substitution being requested,
indicating whether and why the proposed substitution will reduce or increase the
amount of the contract.
4. Information detailing the durability and lifecycle costs of the proposed
substitution.
4.1.c
Packet Pg. 295 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-41 00 72 00 – GENERAL CONDITIONS
F. Failure to submit all the required substantiating data detailed above in a timely
manner so that the substitution request can be adequately reviewed may result in
rejection of the substitution request. The Engineer is not obligated to review multiple
submittals related the same substitution request resulting from the Contractor’s
failure to initially submit a complete package.
G. Time limitations within this Article shall be strictly complied with and in no case will
an extension of time for completion of the contract be granted because of
Contractor’s failure to provide substitution requests at the time and in the manner
described herein.
H. If substitution requests approved by the Engineer require that Contractor furnish
materials, methods or services more expensive than that specified, the increased
costs shall be borne by Contractor.
ARTICLE 7 -SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES
7.1 Soils Investigations.
A. Reports and Drawings. The Special Conditions identify: those reports known to the
City of explorations and tests of subsurface conditions at or contiguous to the site;
and those drawings known to the City of physical conditions relating to existing
surface or subsurface structures at the site (except Underground Facilities).
B. Limited Reliance by Contractor on Technical Data Authorized. Contractor may rely
upon the accuracy of the “technical data” contained in such reports and drawings,
which were expressly not created or obtained to evaluate or assist in the evaluation
of constructability, and are not Contract Documents. Contractor shall make its own
interpretation of the “technical data” and shall be solely responsible for any such
interpretations. Except for reliance on the accuracy of such “technical data,”
Contractor may not rely upon or make any claim against the City, City’s
Representative, or Engineer of Record, or any of their officers, directors, members,
partners, employees, agents, consultants, or subcontractors, with respect to:
1. the completeness of such reports and drawings for Contractor’s purposes,
including without limitation any aspects of the means, methods, techniques,
sequences, and procedures of construction to be employed by Contractor, and
safety precautions and programs incident thereto;
2. other data, interpretations, opinions, conclusions and information contained in
such reports or shown or indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any “technical data” or
any such other data, interpretations, opinions, or information.
7.2 Ownership of Site Materials Found.
A. The title to water, soil, rock, gravel, sand, minerals, timber and any other materials
developed or obtained in the excavation or other operations of Contractor or any of
its Subcontractors in the performance of the Contract, and the right to use said items
in carrying out the Contract, or to dispose of same, is hereby expressly reserved by
4.1.c
Packet Pg. 296 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-42 00 72 00 – GENERAL CONDITIONS
the City. Neither Contractor nor any of its Subcontractors nor any of their
representatives or employees shall have any right, title, or interest in said materials,
nor shall they assert or make any claim thereto. Contractor will, as determined by
the City, be permitted to use in the Work without charge, any such materials which
meet the requirements of the Contract Documents, provided the City shall have the
right to use or consume these materials without payment to a third party.
7.3 Existence of Utilities at the Work Site.
A. Existing Utilities. The location of known existing utilities and pipelines are shown on
the Drawings in their approximate locations. However, nothing herein shall be
deemed to require the City to indicate the presence of existing service laterals or
appurtenances whenever the presence of such utilities on the site of the project can
be inferred from the presence of other visible facilities, such as buildings, cleanouts,
meter and junction boxes, on or adjacent to the Site of the Project. The City will
assume the responsibility for the timely removal, relocation, or protection of existing
main or trunk line utility facilities located on the Project site if such utilities are not
identified by the City in the Contract Documents or which cannot reasonably be
inferred from the presence of other visible facilities.
B. Utility Location.
1. It shall be the Contractor’s responsibility to determine the exact location and
depth of all utilities, including service connections, which the Contractor believes
may affect or be affected by the Contractor’s operations, by taking all reasonable
steps necessary including, but not limited to, calling Underground Service Alert
to locate utilities in accordance with the procedures described in Government
Code 4216 et seq. The Contractor shall not be entitled to additional
compensation nor time extensions for work necessary to avoid interferences nor
for repair to damaged utilities if the Contractor does not expose all such existing
utilities as required by this Article. The locating of utilities shall be in conformance
with Government Code section 4216 et seq. except for the City’s utilities located
on the City’s property and not on public right-of-way.
2. A “High Priority Subsurface Installation” is defined in Government Code section
4216 (j) as “high-pressure natural gas pipelines with normal operating pressures
greater than 415kPA gauge (60psig) or greater than six inches nominal pipe
diameter, petroleum pipelines, pressurized sewage pipelines, high-voltage
electric supply lines, conductors, or cables that have a potential to ground of
greater than or equal to 60kv, or hazardous materials pipelines that are
potentially hazardous to workers or the public if damaged.”
3. A “Subsurface Installation” is defined in Government Code section 4216 (s) as
“any underground pipeline, conduit, duct, wire, or other structure, except
nonpressurized sewer lines, nonpressurized storm drains, or other
nonpressurized drain lines.”
4. Pursuant to Government Code section 4216.2 the Contractor shall contact the
appropriate regional notification center at least two (2) working days but not
more than 14 Days before performing any excavation. The date of the
4.1.c
Packet Pg. 297 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-43 00 72 00 – GENERAL CONDITIONS
notification shall not count as part of the two-working-day notice. Before notifying
the appropriate regional notification center, the Contractor shall delineate the
area to be excavated. The Contractor shall request that the utility owners
conduct a utility survey and mark or otherwise indicate the location of their
service. The Contractor shall furnish to the Engineer written documentation of
its contact(s) with the regional notification center prior to commencing
excavation at such locations.
5. After the utility survey is completed, the Contractor shall commence “potholing”
or hand digging to determine the actual location of the pipe, duct, or conduit and
in accordance with Government Code section 4216.4 if the excavation within the
“tolerance zone” of a subsurface installation. The Engineer shall be given notice
prior to commencing potholing operations. The Contractor shall uncover all
piping and conduits, to a point one (1) foot below the pipe, where crossings,
interferences, or connections are shown on the Drawings, prior to trenching or
excavating for any pipe or structures, to determine actual elevations. New
pipelines shall be laid to such grade as to clear all existing facilities, which are
to remain in service for any period subsequent to the construction of the run of
pipe involved.
6. The Contractor's attention is directed to the requirements of Government Code
section 4216.2 (c) which provides: “When the excavation is proposed within 10
feet of a high priority subsurface installation, the operator of the high priority
subsurface installation shall notify the excavator of the existence of the high
priority subsurface installation to set up an onsite meeting prior to the legal
excavation start date and time or at a mutually agreed upon time to determine
actions or activities required to verify the location and prevent damage to the
high priority subsurface installation. As part of the meeting, the excavator shall
discuss with the operator the method and tools that will be used during the
excavation and the information the operator will provide to assist in verifying the
location of the subsurface installation. The excavator shall not begin excavating
until after the completion of the onsite meeting.” The Contractor shall notify the
Engineer in advance of this meeting.
C. Utility Relocation and Repair. If interferences occur at locations other than those
indicated in the Contract Documents with reasonable accuracy, the Contractor shall
notify the Engineer in writing. The Engineer will supply a method for correcting said
interferences in accordance with the responsibilities of this Article and Government
Code section 4215. Care shall be exercised by the Contractor to prevent damage to
adjacent existing facilities and public or private works; where equipment will pass
over these obstructions, suitable planking shall be placed. If high priority subsurface
installations are damaged and the operator cannot be contacted, the Contractor shall
call 911 emergency services. Temporary or permanent relocation or alteration of
utilities desired by the Contractor for its own convenience shall be the Contractor’s
responsibility and it shall make arrangements and bear all costs for such work
D. Construction at Existing Utilities. Where the Work to be performed crosses or
otherwise interferes with water, sewer, gas, or oil pipelines; buried cable; or other
public or private utilities, the Contractor shall perform construction in such a manner
so that no damage will result to either public or private utilities. It shall be the
4.1.c
Packet Pg. 298 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-44 00 72 00 – GENERAL CONDITIONS
responsibility of the Contractor to determine the actual locations of, and make
accommodates to maintain, all utilities. Before any utility is taken out of service,
permission shall be obtained by the Contractor from the owner. The owner, any
impacted resident or business owner and the City will be advised of the nature and
duration of the utility outage as well as the Contractor’s plan for providing temporary
utilities if required by the owner. The Contractor shall be liable for all damage which
may result from its failure to maintain utilities during the progress of the Work, and
the Contractor shall indemnify City as required by the Contract Documents from all
claims arising out of or connected with damage to utilities encountered during
construction; damages resulting from disruption of service; and injury to persons or
damage to property resulting from the negligent, accidental, or intentional breaching
of utilities.
7.4 Trenches.
A. Trenches Five Feet or More in Depth. Contractor shall submit to the City at the
preconstruction meeting, a detailed plan showing the design of shoring, bracing,
sloping or other provisions to be made for worker protection from hazards of caving
ground during the excavation of any trench or trenches five feet or more in depth. If
such plan varies from shoring system standards established by the Construction
Safety Orders of the California Code of Regulations, Department of Industrial
Relations, the plan shall be prepared by a California registered civil or structural
engineer. The plan shall not be less effective than the shoring, bracing, sloping, or
other provisions of the Construction Safety Orders, as defined in the California Code
of Regulations. The Contractor shall designate in writing the “competent person” as
defined in Title 8, California Code of Regulations, who shall be present at the Work
Site each day that trenching/excavation is in progress. The “competent person” shall
prepare and provide daily trenching/excavation inspection reports to the Engineer.
Contractor shall also submit a copy of its annual California Occupational Safety and
Health Administration (Cal/OSHA) trench/excavation permit.
B. Excavations Deeper than Four Feet.
1. If the Work involves excavating trenches or other excavations that extend
deeper than four (4) feet below the surface, Contractor shall promptly within
three (3) Days, and before the excavation is further disturbed, notify the City in
writing of any of the following conditions:
a. Material that the Contractor believes may be material that is hazardous
waste, as defined in section 25117 of the Health and Safety Code, that is
required to be removed to a Class I, Class II, or Class III disposal site in
accordance with provisions of existing law.
b. Subsurface or latent physical conditions at the site differing from those
indicated by information made available to bidders prior to the deadline for
submitting bids.
c. Unknown physical conditions at the site of any unusual nature, different
materially from those ordinarily encountered and generally recognized as
inherent in work of the character provided for in the Contract
4.1.c
Packet Pg. 299 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-45 00 72 00 – GENERAL CONDITIONS
2. The City shall promptly investigate the conditions, and if it finds that the
conditions do so materially differ, or do involve hazardous waste, and cause a
decrease or increase in Contractor’s cost of, or the time required for,
performance of any part of the Work, shall issue a Change Order under the
procedures described in Article 9.1 Change Orders and Time Extensions.
3. In the event that a dispute arises between the City and the Contractor as to
whether the conditions materially differ, or involve hazardous waste, or cause a
decrease or increase in the Contractor’s cost of, or time required for,
performance of any part of the Work, the Contractor shall not be excused from
any scheduled completion date provided for by the Contract, but shall proceed
with all Work to be performed under the Contract. Contractor shall retain any
and all rights provided either by contract or by law which pertain to the resolution
of disputes and protests between the parties.
ARTICLE 8 -PROSECUTION OF THE WORK
8.1 Contractor’s Means and Methods.
A. Contractor is solely responsible for the means and methods utilized to perform the
Work. Contractor shall perform all Work in a skillful and workmanlike manner, and
consistent with the standards generally recognized as being employed by
professionals in the same discipline in the State of California. Contractor warrants
that all employees and Subcontractors shall have sufficient skill and experience to
perform the Work assigned to them. Contractor represents that it, its employees and
Subcontractors have all licenses, permits, qualifications and approvals of whatever
nature that are legally required to perform the Work, and that such licenses and
approvals shall be maintained throughout the term of this Contract. Contractor shall
perform the Work in full compliance with all applicable state, federal and local laws
and to the all jurisdictions having authority over the Project.
8.2 Construction Schedule.
A. General Requirements. The schedule shall be prepared in a critical path method
format and in an electronic scheduling program acceptable to the City and as
specified in the Contract Documents. Contractor shall deliver the schedule and all
updates to the City in both paper and electronic form. The electronic versions shall
be in the format and include all data used to prepare the schedule.
B. Schedule. The receipt or approval of any schedules by the City shall not in any way
relieve the Contractor of its obligations under the Contract Documents. The
Contractor is fully responsible to determine and provide for any and all staffing and
resources at levels which allow for good quality and timely completion of the Project.
Contractor’s failure to incorporate all elements of Work required for the performance
of the Contract or any inaccuracy in the schedule shall not excuse the Contractor
from performing all Work required for a completed Project within the specified
Contract Time. If the required schedule is not received by the time the first payment
under the Contract is due, Contractor shall not be paid until the schedule is received,
reviewed and accepted by the City.
4.1.c
Packet Pg. 300 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-46 00 72 00 – GENERAL CONDITIONS
C. Schedule Contents. The schedule shall indicate the beginning and completion dates
of all phases of construction; critical path for all critical, sequential time related
activities; and “float time” for all “slack” or “gaps” in the non-critical activities. The
schedule shall include appropriate time allowances and constraints for Submittals,
items of interface with Work performed by others, and specified construction, start-
up and performance tests. All float shall be owned by the Project. Schedules
indicating early or late completion shall not modify or have any effect on the Contract
Time, regardless of whether the schedules are reviewed and/or accepted by the City.
D. Material Lead Times. Contractor shall include anticipated material delivery lead
times in the submitted construction schedule and identify long lead time items that
could become critical path items and affect the overall construction schedule.
E. Schedule Updates. Contractor shall continuously update its construction schedule.
Contractor shall submit an updated and accurate construction schedule to the City:
(1) prior to the start of construction, if there are any changes to the initial schedule;
(2) with each progress payment request; and (3) whenever requested to do so by
the City. The City may withhold progress payments or other amounts due under the
Contract Documents if Contractor fails to submit an updated and accurate
construction schedule. Upon the City’s request, Contractor shall submit any
schedules or updates to the City in the native electronic format of the software used
to create the schedule. Contractor shall also submit schedules showing a two-week
detailed look-ahead at weekly meetings conducted with the City. The two-week look-
ahead schedule shall clearly identify all staffing and other resources which in the
Contractor’s judgment are needed to complete the Work within the Contract Time,
and it shall clearly state the number of staff to be used on each daily segment of the
Work.
F. Acceptance. Acceptance of the schedules by the City will not impose on
responsibility for accuracy, for sequencing, scheduling, or progress of the Work, or
compliance with the Contract Documents. Acceptance will not interfere with or
relieve Contractor from Contractor’s full responsibility therefor.
8.3 Time for Completion and Liquidated Damages.
A. Time for Completion. The time for completion set forth in the Contract for
Construction shall commence: (1) on the date stated in the Notice to Proceed, or (2)
if the Notice to Proceed does not specify a commencement date, then on the date
of the Notice to Proceed and shall be completed by Contractor in the time specified
in the Contract Documents. The City is under no obligation to consider early
completion of the Project; and the Contract completion date shall not be amended
by the City’s receipt or acceptance of the Contractor’s proposed earlier completion
date. Any difference in time between the Contractor’s early completion and the
Contract Time shall be considered a part of the Project float. Contractor shall not be
entitled to compensation, and the City will not compensate Contractor, for delays
which impact early completion. Contractor shall not, under any circumstances,
receive additional compensation from the City (including but not limited to indirect,
general, administrative or other forms of overhead costs) for the period between the
time of earlier completion proposed by the Contractor and the Contract completion
date.
ADDENDUM 1
4.1.c
Packet Pg. 301 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-47 00 72 00 – GENERAL CONDITIONS
B. Liquidated Damages. If the Work is not completed within the Contract Time(s), it is
understood that the City will suffer damage. In accordance with Government Code
section 53069.85 and Public Contract Code section 7102, being impractical and
infeasible to determine the amount of actual damage, it is agreed that Contractor
shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum
stipulated in the Contract for each calendar day of delay until the Work is fully
completed. Contractor and its surety shall be liable for any liquidated damages. Any
money due or to become due the Contractor may be retained to cover liquidated
damages.
C. Inclement Weather. Contractor shall abide by the City’s determination of what
constitutes inclement weather. Time extensions for inclement weather shall only be
granted when the Work stopped during inclement weather is on the critical path of
the Project schedule. Contractor shall not be entitled to reverse liquidated damages
for time extensions resulting from inclement weather.
D. Extension of Time. Contractor’s entitlement to an extension of the Contract Times
is limited to a City-caused extension of the critical path, reduced by the Contractor’s
concurrent delays, and established by a proper time impact analysis. No time
extension shall be allowed unless, and then only to the extent that, the City-caused
delay extends the critical path beyond the previously approved Contract Time. The
City shall ascertain the facts and extent of delay and grant extension of time for
completing the Work when, in its judgment, the facts justify such an extension.
Contractor shall not be entitled to an adjustment in the Contract Times for delays
within the control of Contractor. Delays attributable to and within the control of a
Subcontractor or Supplier shall be deemed to be delays within the control of
Contractor. If approved, the increase in time required to complete the Work shall be
added to the Contract Time.
E. Reverse Liquidated Damages. Consistent with Public Contract Code section 7102,
Contractor will be compensated for damages incurred due to unreasonable delays
to the critical path for which the City is responsible. The parties agree that
determining Contractor’s exact delay damages are and will continue to be
impracticable and extremely difficult. As such, for each calendar day in excess of the
time for completion set forth in the Contract, the City shall pay to the Contractor the
amount stipulated in the Contract. Such amount shall constitute the only payment
allowed for any City-caused delays and shall necessarily include all overhead, all
profits, all administrative costs, all bond costs, all labor, materials, equipment and
rental costs and any other costs, expenses and fees incurred or sustained as a result
of such delays. Contractor shall not be entitled to reverse liquidated damages for
any change in the Work in which Contractor is compensated for overhead and profit
through a change in Unit Price Work or a Change Order resulting in a lump sum or
allowed mark-up for the additional Work. The amount of reverse liquidated damages
shall be reduced by Contractor’s concurrent delays.
ADDENDUM 1
4.1.c
Packet Pg. 302 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-48 00 72 00 – GENERAL CONDITIONS
F. Force Majeure. If a delay to the critical path results from a Force Majeure Event,
the Contractor will be entitled to a time extension but will not receive an adjustment
to the Contract Price or any other compensation. Such a non-compensable
adjustment shall be Contractor’s sole and exclusive remedy for such delays.
G. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for
which the City is responsible shall be limited to only an extension of time unless such
delays were unreasonable under the circumstances. In no case shall the City be
liable for any costs which are borne by the Contractor in the regular course of
business, including, but not limited to, home office overhead and other ongoing
costs. Damages caused by unreasonable City delay shall be based on actual costs
only, no proportions or formulas shall be used to calculate any delay damages.
H. Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled
to any extension of time or any reverse liquidated damages unless Contractor
properly notices the delay and adjustment to compensation and requests a Change
Order in accordance with Article 9.1 Change Orders and Time Extensions.
Contractor’s failure to timely and fully comply with the Change Order procedures in
the Contract Documents shall constitute a waiver of Contractor’s right to a time
extension or reverse liquidated damages.
I. No extension of time will be granted for a delay caused by the Contractor’s inability
to obtain materials unless the Contractor furnishes to the Engineer documentary
proof. The proof must be provided in a timely manner in accordance with the
sequence of the Contractor’s operations and the approved construction schedule.
8.4 Contractor’s Responsibility for Work.
A. Responsibility for, and security of, all Work and materials related to Contractor’s
Work is the responsibility of Contractor until final acceptance of the Contractor’s
Work by the City. The City shall not be held responsible for the care or protection of
any material or parts of the Work prior to final acceptance. Contractor shall take
every necessary precaution against injury or damage to any part thereof by the
action of the elements or from any cause whether arising from the execution or non-
execution of the Work and all loss or damage shall be borne by Contractor. The
Contractor shall rebuild, repair, restore and make good at its own expense all injuries
or damages to any portion of the Work before its completion and acceptance. In the
event of damage proximately caused by an Act of God, as defined by Section 7105
of the Public Contract Code, the City will pay for repair or restoration to damaged
Work in excess of 5% of the total Bid.
8.5 Occupancy.
A. The City reserves the right to occupy or utilize any portion of the Work at any time
before completion, and such occupancy or use shall not constitute acceptance of
any part of Work covered by this Contract. This use shall not relieve the Contractor
of its responsibilities under the Contract.
4.1.c
Packet Pg. 303 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-49 00 72 00 – GENERAL CONDITIONS
8.6 Securities for Money Withheld.
A. Pursuant to section 22300 of the Public Contract Code of the State of California,
Contractor may request the City to make retention payments directly to an escrow
agent or may substitute securities for any money withheld by the City to ensure
performance under the contract. At the request and expense of Contractor, securities
equivalent to the amount withheld shall be deposited with the City or with a state or
federally chartered bank as the escrow agent who shall return such securities to
Contractor upon satisfactory completion of the contract. Deposit of securities with an
escrow agent shall be subject to a written agreement substantially in the form
provided in section 22300 of the Public Contract Code.
8.7 The City’s Right to Suspend/Terminate the Contract.
A. Suspension of Work by the City.
1. The City in its sole and absolute discretion for any reason or no reason
whatsoever may at any time, with or without cause, suspend performance of all
or any part of the Work by giving not less than five (5) Days written notice to the
Contractor. Such notice of suspension of Work will designate the amount and
type of plant, labor, and equipment to be committed to the Project during the
period of suspension. Contractor shall use its best efforts to utilize its plant, labor,
and equipment in such a manner as to minimize costs associated with
suspension.
2. Upon receipt of any such notice, Contractor shall, unless the notice requires
otherwise: (1) immediately discontinue Work on the date and to the extent
specified in the notice; (2) place no further orders or subcontracts for material,
services, or facilities with respect to suspended Work other than to the extent
required in the notice; (3) promptly make every reasonable effort to obtain
suspension upon terms satisfactory to the City of all orders, subcontracts, and
rental agreements to the extent they relate to performance of Work suspended;
and (4) continue to protect and maintain the Work including those portions on
which Work has been suspended.
3. The City shall not be liable for any additional costs, damages or anticipated
profits incurred by Contractor or its Subcontractors and the Contract Price shall
not be increased during the period of suspension, except the actual costs
incurred by Contractor, excluding overhead and profit for (a) the purpose of
safeguarding the Work and material and equipment in transit or at the Site during
the period of suspension, (b) Contractor’s or its Subcontractor’s rented
equipment which are maintained at the Site, or (c) other reasonable and
unavoidable costs of shutting down the Work, or reassembling personnel and
equipment resulting directly from such suspension. Contractor shall be granted
an extension of the Contract Time equal to the number of days performance of
Work is suspended; provided, however, that no actual costs or extension of
Contract Time shall be granted if the suspension results from Contractor's non-
compliance with the requirements of the Contract.
4.1.c
Packet Pg. 304 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-50 00 72 00 – GENERAL CONDITIONS
B. Termination for Cause by the City.
1. In the sole estimation of the City, if the Contractor refuses or fails to prosecute
the Work or any separable part thereof with such diligence as will insure its
completion within the time specified by the Contract Documents, or any
extension thereof, or fails to complete such Work within such time, or if the
Contractor should be adjudged a bankrupt, or if it should make a general
assignment for the benefit of its creditors, or if a receiver should be appointed
on account of its insolvency, or the Contractor or any of its subcontractors should
violate any of the provisions of this Contract, the City may serve written notice
upon the Contractor and its surety of the City's intention to terminate this
Contract. This notice of intent to terminate shall contain the reasons for such
intention to terminate this Contract, and a statement to the effect that the
Contractor's right to perform this Contract shall cease and terminate upon the
expiration of ten (10) Days unless such violations have ceased and
arrangements satisfactory to the City have been made for correction of said
violations.
2. After expiration of the ten (10) Day period, the City may terminate the Contract
by providing a Notice of Termination to the Contractor. The City may take over
and complete the Work by any method it may deem appropriate, including
enforcement of the Project performance bond. If the City takes over the Work,
the City may, without liability for so doing, take possession of and utilize in
completing the Work such materials, appliances, plant, and other property
belonging to the Contractor as may be on the Site.
3. Contractor shall not be entitled to receive any further payment hereunder as a
result of such termination. Contractor and its surety shall be liable to the City for
any excess costs or other damages incurred by the City to complete the Work,
including professional services and expenses, reasonable overhead, profit, and
attorneys' fees. This payment obligation shall survive completion of the Project
and termination or expiration of this Contract.
C. Termination for Convenience by the City:
1. The City may terminate performance of the Work called for by the Contract
Documents in whole or, from time to time, in part, upon ten (10) Days written
notice if the City determines that a termination is in the City's interest. The
Contractor shall terminate all or any part of the Work upon delivery to the
Contractor of a Notice of Termination specifying that the termination is for the
convenience of the City, the extent of termination, and the effective date of such
termination.
2. After receipt of Notice of Termination, and except as directed by the City, the
Contractor shall, regardless of any delay in determining or adjusting any
amounts due under this termination for convenience clause, immediately
proceed with the following obligations: (1) stop Work as specified in the Notice;
(2) complete any Work specified in the Notice of Termination in a least
cost/shortest time manner while still maintaining the quality called for under the
Contract Documents; (3) leave the property upon which the Contractor was
4.1.c
Packet Pg. 305 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-51 00 72 00 – GENERAL CONDITIONS
working and upon which the facility (or facilities) forming the basis of the Contract
Document is situated in a safe and sanitary manner such that it does not pose
any threat to the public health or safety; (4) terminate all subcontracts to the
extent that they relate to the portions of the Work terminated; and (5) place no
further subcontracts or orders, except as necessary to complete the continued
portion of the Contract.
3. In case of such termination for the City’s convenience, the Contractor shall be
entitled to receive payment for Work actually completed by Contractor in
conformity with this Contract prior to Contractor’s receipt of City’s Notice and
costs incurred by reason of such termination. Any documentation substantiating
costs incurred by the Contractor solely as a result of the City's exercise of its
right to terminate this Contract pursuant to this clause, which costs the
Contractor is authorized under the Contract documents to incur, shall: (1) be
submitted to and received by the City no later than 30 Days after the effective
date of the Notice of Termination; (2) describe the costs incurred with
particularity; and (3) be conspicuously identified as “Termination Costs
occasioned by the City's Termination for Convenience.” If the City rejects any
costs, Contractor shall be deemed to waive the rejected costs unless Contractor
files a Claim within thirty (30) Days of the rejection pursuant to Article 9.2.
4. Contractor shall be entitled to receive only the amounts payable under this
Article, and Contractor specifically waives any claim for any other amounts or
damages, including, but not limited to, any claim for consequential damages or
lost profits. The provisions in this Article are in addition to and not in limitation of
any other rights or remedies available to the City.
5. Termination of the Contract shall not relieve surety of its obligation for any just
claims arising out of or relating to the Work performed.
6. Notwithstanding any other provision of this Article, when immediate action is
necessary to protect life and safety or to reduce significant exposure or liability,
the City may immediately order Contractor to cease Work on the Project until
such safety or liability issues are addressed to the satisfaction of the City or the
Contract is terminated.
7. If the City terminates Contractor for cause, and if it is later determined that the
termination was wrongful, such default termination shall automatically be
converted to and treated as a termination for convenience. In such event,
Contractor shall be entitled to receive only the amounts payable under this
Article, and Contractor specifically waives any claim for any other amounts or
damages, including, but not limited to, any claim for consequential damages or
lost profits.
8.8 Defective Work.
A. The City May Correct Defective Work.
1. If Contractor fails to correct Defective Work, or to remove and replace rejected
Work as required by the City, or if Contractor fails to perform the Work in
4.1.c
Packet Pg. 306 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-52 00 72 00 – GENERAL CONDITIONS
accordance with the Contract Documents, or if Contractor fails to comply with
any other provision of the Contract Documents, the City may, after seven (7)
Days written notice to Contractor, correct, or remedy any such deficiency.
2. In connection with such corrective or remedial action, the City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work
and suspend Contractor’s services related thereto, take possession of
Contractor’s tools, appliances, construction equipment and machinery at the
Site, and incorporate in the Work all materials and equipment stored at the Site
or for which the City has paid Contractor but which are stored elsewhere.
Contractor shall allow the City, and the agents, employees, other contractors,
and consultants of each of them, access to the Site to enable the City to exercise
the rights and remedies to correct the Defective Work.
3. All claims, costs, losses, and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) incurred or sustained by the City
correcting the Defective Work will be charged against Contractor, and a Change
Order will be issued incorporating the necessary revisions in the Contract
Documents with respect to the Work; and the City shall be entitled to an
appropriate decrease in the Contract Price. Such claims, costs, losses and
damages will include but not be limited to all costs of repair, or replacement of
work of others destroyed or damaged by correction, removal, or replacement of
defective Work.
4. If the Change Order is executed after all payments under the Contract have been
paid by the City and the Project retention is held in an escrow account as
permitted by the Contract Documents, Contractor will promptly alert the escrow
holder, in writing, of the amount of retention to be paid to the City. If the Change
Order is executed after release of the Project retention, an appropriate amount
will be paid by Contractor to the City. Contractor shall not be allowed an
extension of the Contract Time because of any delay in the performance of the
Work attributable to the City correcting Defective Work.
B. Acceptance of Defective Work.
1. If, instead of requiring correction or removal and replacement of defective Work,
the City prefers to accept it, the City may do so. Contractor shall pay all claims,
costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or
arbitration or other dispute resolution costs) attributable to the City’s evaluation
of and determination to accept such defective Work and for the diminished value
of the Work. If any acceptance of Defective Work occurs prior to release of the
Project retention, a Change Order will be issued incorporating the necessary
revisions in the Contract Documents with respect to the Work, and the City shall
be entitled to an appropriate decrease in the Contract Price, reflecting the
diminished value of Work and all costs incurred by the City. If the acceptance of
defective work occurs after release of the Project retention, an appropriate
amount will be paid by Contractor to the City.
4.1.c
Packet Pg. 307 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-53 00 72 00 – GENERAL CONDITIONS
8.9 Completion and Acceptance of Work.
A. Final Inspection. Upon written notice from Contractor that the entire Work is
complete, the Engineer will promptly make a final inspection with the City and
Contractor and will notify Contractor in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective. Contractor shall
immediately take such measures as are necessary to complete such Work or
remedy such deficiencies.
B. Final Acceptance. The acceptance of the Work on behalf of the City will be made
by the Engineer. Such acceptance by the City shall not constitute a waiver of defects.
After Contractor has, in the opinion of the Engineer, satisfactorily completed all
corrections identified during the final inspection and has delivered, in accordance
with the Contract Documents, all maintenance and operating instructions,
schedules, guarantees, bonds, certificates or other evidence of insurance,
certificates of inspection, Record Documents, and other documents required by the
Contract Documents, the City shall execute a Notice of Completion, constituting final
acceptance and completion of the Project, except as may be expressly noted.
8.10 Guarantee of Work.
A. Neither the final payment nor any provision in the Contract Documents shall relieve
Contractor of responsibility for faulty materials or workmanship. Contractor hereby
guarantees that materials and Work shall be completed in conformance with the
Contract Documents and that the materials and Work provided will fulfill the
requirements of this guarantee. Contractor hereby agrees to repair or replace, at the
discretion of the City, any or all Work that may prove to be defective in its
workmanship, materials furnished, methods of installation or fail to conform to the
Contract Document requirements together with any other Work which may be
damaged or displaced by such defect(s) within a period of one (1) year (or as
otherwise indicated in the Contract Documents or in any guarantee or warranty
provided by any manufacturer or supplier of equipment or materials incorporated into
the Work, whichever is later) from the date of the Notice of Completion of the Project
without any expense whatever to the City, ordinary wear and tear and unusual abuse
and neglect excepted. Contractor shall be required to promptly repair or replace
defective equipment or materials, at Contractor’s option. The Contractor shall
remedy at its expense any damage to City-owned or controlled real or personal
property. All costs associated with such corrective actions and testing, including the
removal, replacement, and reinstitution of equipment and materials necessary to
gain access, shall be the sole responsibility of the Contractor.
B. For any Work so corrected, Contractor’s obligation hereunder to correct defective
Work shall be reinstated for an additional one (1) year period, commencing with the
date of acceptance of such corrected Work. The reinstatement of the one (1) year
warranty shall apply only to that portion of Work that was corrected. Contractor shall
perform such tests as the City may require to verify that any corrective actions,
including, without limitation, redesign, repairs, and replacements comply with the
requirements of the Contract Documents. In the event of Contractor’s failure to
comply with the above-mentioned conditions within ten (10) Days after being notified
in writing of required repairs, to the reasonable satisfaction of the City, the City shall
4.1.c
Packet Pg. 308 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-54 00 72 00 – GENERAL CONDITIONS
have the right to correct and replace any defective or non-conforming Work and any
work damaged by such work or the replacement or correction thereof at Contractor’s
sole expense. Contractor shall be obligated to fully reimburse the City for any
expenses incurred hereunder immediately upon demand.
C. In addition to the warranty set forth in this Article, Contractor shall obtain for the City
all warranties that would be given in normal commercial practice and assign to the
City any and all manufacturer’s or installer’s warranties for equipment or materials
not manufactured by Contractor and provided as part of the Work, to the extent that
such third-party warranties are assignable and extend beyond the warranty period
set forth in this Article. Contractor shall furnish the City with all warranty and
guarantee documents prior to final acceptance of the Project by the City as required.
D. When specifically indicated in the Contract Documents or when directed by the
Engineer, the City may furnish materials or products to the Contractor for installation.
In the event any act or failure to act by Contractor shall cause a warranty applicable
to any materials or products purchased by the City for installation by the Contractor
to be voided or reduced, Contractor shall indemnify the City from and against any
cost, expense, or other liability arising therefrom, and shall be responsible to the City
for the cost of any repairs, replacement or other costs that would have been covered
by the warranty but for such act or failure to act by Contractor.
E. The City shall notify the Contractor, in writing, within a reasonable time after the
discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days
after being notified commence and perform with due diligence all necessary work to
remedy the failure, defect, or damage. If the Contractor fails to promptly remedy any
defect or damage, the City shall have the right to replace, repair or otherwise remedy
the defect, or damage at the Contractor’s expense.
F. In the event of any emergency constituting an immediate hazard to health, safety,
property, or licensees, when caused by Work of the Contractor not in accordance
with the Contract requirements, the City may undertake at Contractor’s expense,
and without prior notice, all Work necessary to correct such condition.
G. This Article shall not limit City’s rights under this Contract or with respect to latent
defects, gross mistakes, or fraud. Nothing in the warranty or in the Contract
Documents shall be construed to limit the rights and remedies available to the City
at law or in equity, including, but not limited to, Code of Civil Procedure section
337.15.
ARTICLE 9 -CHANGE ORDERS; DISPUTE RESOLUTION
9.1 Change Orders and Time Extensions.
A. Change Orders. All changes to the Contract, including compensation increases and
time extensions, shall be through a written Change Order in accordance with this
Article. The City, without invalidating the Contract, may order changes in the Work
consisting of additions, deletions or other revisions, and Contractor’s compensation
and the time for completion shall be adjusted accordingly. Whenever any change is
made as provided for herein, such change shall be considered and treated as though
4.1.c
Packet Pg. 309 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-55 00 72 00 – GENERAL CONDITIONS
originally included in the Contract, and shall be subject to all terms, conditions, and
provisions of the original Contract. Contractor shall not be entitled to claim or bring suit
for damages, whether for loss of profits or otherwise, on account of any decrease or
omission of any item or portion of Work to be done. No dispute, disagreement, or
failure of the parties to reach agreement on the terms of the Change Order shall relieve
the Contractor from the obligation to proceed with performance of the Work, including
Additional Work, promptly and expeditiously. Any alterations, extensions of time,
Additional Work, or any other changes may be made without securing consent of the
Contractor’s surety or sureties.
B. City Directive. The City may direct changes in the Work by delivering a written
directive. To the extent the work directive results in a change to compensation or time,
Contractor must timely request a Change Order and comply with all Change Order
procedures in accordance with this Article. Notwithstanding issuance of a work
directive, Contractor’s failure to timely request a Change Order shall constitute a
waiver by Contractor of any adjustment to compensation or time extension for Work
performed under the directive. The City shall not be liable to Contractor for Work
performed or omitted by Contractor in reliance on verbal orders.
C. Contractor’s Notice of Change/Delay. If Contractor intends to initiate a Change Order
Request, then Contractor shall provide the City with written notice of the underlying
facts and circumstances that gave rise to the proposed change within the following
times:
1. If due to unknown subsurface or latent physical conditions, within three (3) days
from the discovery date or prior to the alterations of the conditions, whichever is
earlier.
2. If due to a Force Majeure Event, as soon as reasonably practicable under the
conditions, which shall be no longer than three (3) days from the date the
Contractor discovers that the Force Majeure Event gives rise to a change, unless
that the conditions are such that notice within three (3) days is not possible or
practicable.
3. If due to any other matter that may involve an adjustment to the Contract Time or
the Contract Price, within seven (7) Days from the discovery date.
To be considered valid and complete, the notice of change/delay shall include a
general statement of the circumstances giving rise to the notice of change/delay
and a reasonable order of magnitude estimate of the additional costs and/or time.
If the circumstances give rise to both a cost adjustment and time extension,
Contractor shall submit the notice of change and notice of delay concurrently.
D. Request for Change in Compensation and/or Extension of Time. Contractor shall
submit a Change Order Request for any adjustment to Contractor’s compensation
and/or any extension of time. The Change Order Request shall be made prior to
incurring any expense and within fourteen (14) Days from either Contractor’s notice of
change/delay or the City’s directive ordering the change. For any costs or information
that cannot be determined at the time Contractor submits the Change Order Request,
Contractor shall submit to the City notice of the costs or information and all supporting
4.1.c
Packet Pg. 310 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-56 00 72 00 – GENERAL CONDITIONS
documentation within five (5) Days of when the costs or other information become
subject to determination. The Change Order Request shall include all of the following
information (unless inapplicable to the change):
1. A detailed description of the circumstances giving rise to the request;
2. A complete itemized cost proposal, including itemized pricing for first tier
Subcontractors;
3. Supporting documentation for all costs;
4. A time impact analysis showing the impact of the delay to the critical path to
completion;
5. If any added costs or information cannot be determined at the time of the Change
Order Request, the reason the costs or information cannot be determined at the
time; and
6. Certification to the accuracy of the Change Order Request under penalty of perjury.
The time impact analysis shall be in the critical path method format and shall show
the sequencing of all critical and non-critical new activities and/or activity revisions
affected by the delay, with logic ties to all affected existing activities noted on the
schedule. The City may demand, and Contractor shall provide, any additional
information supporting the Change Order Request, including but not limited to
native electronic format version of schedules and time impact analyses. Contractor
shall provide the requested additional information within five (5) Days of the
request.
E. City’s Final Decision on Change Order; Ordered Changes. If the City denies the
Change Order Request or disagrees with the proposal submitted by Contractor, it will
notify the Contractor, and the City will provide its opinion of the appropriate price and/or
time extension. If no agreement can be reached, the City shall have the right to order
the Work performed on a time and materials basis or to issue a unilateral Change
Order setting forth the City’s determination of the reasonable additions or savings in
costs and time attributable to the extra or deleted work. The City shall also have the
right to order changes in the Work to be performed promptly by the Contractor on a
time and materials basis or to issue a unilateral Change Order setting forth the City’s
determination of the reasonable additions or savings in costs and time attributable to
the extra or deleted work. The City’s determination shall become final and binding if
the Contractor fails to submit a claim in writing in accordance with Article 9.2 to the
City within fourteen (14) Days of the issuance of the unilateral Change Order, disputing
the terms of the unilateral Change Order and providing such supporting documentation
for its position as the City may reasonably require.
F. Contractor’s Waiver of Further Relief.
1. Contractor recognizes and acknowledges that timely submission of a formal written
notice of change/delay and Change Order Request, whether or not the
circumstances of the change may be known to the City or available to the City
through other means, is not a mere formality but is of crucial importance to the
4.1.c
Packet Pg. 311 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-57 00 72 00 – GENERAL CONDITIONS
ability of the City to promptly identify, prioritize, evaluate and mitigate the potential
effects of changes. Any form of informal notice, whether verbal or written
(including, without limitation, statements in requests for information, statements in
Submittals, statements at any job meeting or entries on monthly reports, daily logs
or job meeting minutes), that does not strictly comply with the formal requirements
of this Article, shall accordingly be insufficient.
2. CONTRACTOR’S FAILURE TO PROVIDE A COMPLETE AND TIMELY NOTICE
OF CHANGE/DELAY AND/OR CHANGE ORDER REQUEST, OR TO COMPLY
WITH ANY OTHER REQUIREMENT OF THIS ARTICLE, SHALL CONSTITUTE
A WAIVER BY CONTRACTOR OF THE RIGHT TO A CONTRACT
ADJUSTMENT ON ACCOUNT OF SUCH CIRCUMSTANCES AND A WAIVER
OF ANY RIGHT TO FURTHER RECOURSE OR RECOVERY BY REASON OF
OR RELATED TO SUCH CHANGE BY MEANS OF THE CLAIMS DISPUTE
RESOLUTION PROCESS OR BY ANY OTHER LEGAL PROCESS OTHERWISE
PROVIDED FOR UNDER APPLICABLE LAWS.
G. Change Order Format. A Change Order signed by the Contractor indicates the
Contractor's agreement therewith, including any adjustment in compensation or
extension of time, and the full and final settlement of all costs (direct, indirect and
overhead) related to the Work authorized by the Change Order. The City may
designate the forms to be used for notices, requests, and Change Orders. If so
designated, Contractor may only use such forms. Contractor shall not reserve a right
to assert impact costs, extended job site costs, extended overhead, constructive
acceleration and/or actual acceleration beyond what is stated in the Change Order.
No Claims shall be allowed for impact, extended overhead costs, constructive
acceleration and/or actual acceleration due to a multiplicity of changes and/or
clarifications. The Contractor may not change or modify the City’s Change Order form
in an attempt to reserve additional rights.
H. Determining Adjustments to Compensation.
1. Limitation on Costs. Contractor shall not be entitled to any compensation for Work
subject to a Change Order except as expressly set forth in this Article. The mark-
up added in instances of Additional Work shall constitute the entire amount of
profit, any mark-ups, any field or home office overhead costs, including personnel,
equipment or office space, any materials, or any costs of equipment idle time for
such Work.
2. Unit Price Change Orders.
a. When the actual quantity of a Unit Price Work item varies from the Bid
Schedule, compensation for the change in quantity will be calculated by
multiplying the actual quantity by the unit price. This calculation may result in
either an additive or deductive Change Order. Bid items included on the Bid
Schedule may be deducted from the Work in their entirety without any
negotiated extra costs. Because Unit Price Work includes overhead and profit
as determined by Contractor at the time of its Bid submission, no mark up or
deduction for overhead and profit will be allowed.
4.1.c
Packet Pg. 312 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-58 00 72 00 – GENERAL CONDITIONS
b. The City or Contractor may initiate a Change Order or Change Order Request
to adjust the Contract Price in accordance with Contractor Documents based
on actual quantities of Unit Price Work. The City or Contractor may make a
claim for an adjustment in the Unit Price in accordance with the Contract
Documents if: (1) the quantity of any item of Unit Price Work performed by
Contractor differs by twenty-five percent (25%) or more from the estimated
quantity of such item indicated in the Contract; (2) there is no corresponding
adjustment with respect to any other item of Work; and (3) Contractor believes
that Contractor is entitled to an increase in unit price as a result of having
incurred additional expense or the City believes that the City is entitled to a
decrease in unit price and the parties are unable to agree as to the amount of
any such increase or decrease.
3. Lump Sum Change Orders. Whenever possible, any changes affecting
compensation shall be in a lump sum mutually agreed by the Contractor and the
City.
4. Time and Materials Change Orders. The City may direct the Contractor to proceed
with the Additional Work with payment to be made on the basis of actual cost of
the labor and materials required to complete the Additional Work. If the Project is
federally funded, a time and materials Change Order shall only be issued after a
determination that no other Change Order is suitable and the Change Order shall
include a ceiling price that the Contractor exceeds at its own risk.
5. Federally Funded Projects. For any change in price to the Contract, general and
administrative expenses shall be negotiated and must conform to the cost
principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be
negotiated as a separate element of the cost. To establish a fair and reasonable
profit, consideration must be given to the complexity of the Additional Work to be
performed, the risk borne by the Contractor, the Contractor's investment, the
amount of subcontracting, the quality of its record of past performance, and
industry profit rates in the surrounding geographical area for similar work.
6. Allowed Costs. Estimates for lump sum quotations and accounting for time-and-
material work shall be limited to direct expenditures necessitated specifically by
the change and shall be segregated as follows:
a. Labor. The costs of labor will be the actual cost for wages prevailing locally for
each craft or type of worker at the time the work is done, plus employer
payments of payroll taxes and insurance, health and welfare, pension,
vacation, apprenticeship funds, and other direct costs resulting from federal,
state or local laws, as well as assessment or benefits required by lawful
collective bargaining agreements. The use of a labor classification which would
increase the cost will not be permitted unless the Contractor establishes the
necessity for such additional costs. Labor costs for equipment operators and
helpers shall be reported only when such costs are not included in the invoice
for equipment rental. Estimated labor hours must only include hours for those
workmen and working foremen directly involved in performing the change order
work. Supervision above the level of working foremen (such as general
foremen, superintendent, project manager, etc.) is considered to be included
4.1.c
Packet Pg. 313 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-59 00 72 00 – GENERAL CONDITIONS
in the markup percentages as outlined below. Note that no separate
allowances for warranty expense will be allowed as a direct cost of a change
order. Costs attributed to warranty expenses will be considered to be covered
by the markup. Labor burden allowable in Change Orders shall be defined as
employer's net actual cost of payroll taxes (FICA, Medicare, SUTA, FUTA), net
actual cost for employer's cost of union benefits (or other usual and customary
fringe benefits if the employees are not union employees), and net actual cost
to employer for worker's compensation insurance taking into consideration
adjustments for experience modifiers, premium discounts, dividends, rebates,
expense constants, assigned risk pool costs, net cost reductions due to
policies with deductibles for self-insured losses, assigned risk rebates, etc.
Contractor shall reduce their standard payroll tax percentages to properly
reflect the effective cost reduction due to the estimated impact of the annual
maximum wages subject to payroll taxes. An estimated percentage for labor
burden may be used for pricing change orders. However, the percentage used
for labor burden to price Change Orders will be examined at the conclusion of
the Project and an adjustment to the approved Change Orders will be
processed if it is determined that the actual labor burden percentage should
have been more or less than the estimated percentage used.
b. Materials. The cost of materials reported shall be at the lowest current price at
which such materials are locally available in the quantities involved, plus sales
tax, freight and delivery. Materials costs shall be based upon Supplier or
manufacturer’s invoice.
c. Tool and Equipment Use. Regardless of ownership, the rates to be used in
determining equipment use shall not exceed listed rates prevailing locally at
equipment rental agencies, or distributors, at the time the work is performed.
The Contractor shall furnish cost data supporting the establishment of the
rental rate. The rental rate to be applied for use of each items of equipment
shall be the rate resulting in the least total cost to the City for the total period
of use. The City shall make the final determination as to an equitable rental
rate for the equipment. No payment will be made for the use of small tools,
which have a replacement value of $1,000 or less. The rental time to be paid
for equipment shall be the time the equipment is in productive operation on the
Additional Work being performed. Rental time will not be allowed while
equipment is inoperative due to breakdowns. All equipment shall, in the opinion
of the City, be in good working condition and suitable for the purpose for which
the equipment is to be used. Equipment with no direct power unit shall be
powered by a unit of at least the minimum rating recommended by the
manufacturer. Before construction equipment is used on any Additional Work,
the Contractor shall plainly stencil or stamp an identifying number thereon at a
conspicuous location, and shall furnish to the City, in duplicate, a description
of the equipment and its identifying number. When hourly rates are listed, any
part of an hour less than 30 minutes of operation shall be considered to be 1/2-
hour of operation, and any part of an hour greater than 30 minutes will be
considered one hour of operation. When daily rates are listed, any part of a day
less than 4 hours operation shall be considered to be 1/2-day of operation.
4.1.c
Packet Pg. 314 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-60 00 72 00 – GENERAL CONDITIONS
7. Allowed Mark-up. The allowed mark-up for any and all overhead (including
supervision and home and field office costs) and profit on work added to the
Contract shall be determined in accordance with the following provisions:
a. “Net Cost” is defined as the actual costs of labor, materials and tools and
equipment only, excluding overhead and profit. The costs of applicable
insurance and bond premium will be reimbursed to the Contractor and
Subcontractors at cost only, without mark-up. Contractor shall provide the City
with documentation of the costs, including but not limited to payroll records,
invoices, and such other information as the City may reasonably request.
b. For Work performed by the Contractor’s forces the allowed mark-up shall not
exceed fifteen (15%) percent of labor costs, ten percent (10%) of material
costs, and ten percent (10%) of the cost of tools and equipment use.
c. For Work performed by a Subcontractor, the added cost for overhead and profit
shall not exceed fifteen percent (15%) of the Subcontractor’s Net Cost of the
Work to which the Contractor may add up to five percent (5%) of the
Subcontractor’s Net Cost.
d. For Work performed by a sub-subcontractor, the added cost for overhead and
profit shall not exceed fifteen percent (15%) of the sub-subcontractor’s Net
Cost for Work to which the Subcontractor and Contractor may each add up to
an additional five percent (5%) of the Net Cost of the lower tier subcontractor.
e. No additional mark-up will be allowed for lower tier subcontractors, and in no
case shall the added cost for overhead and profit payable by the City exceed
twenty-five percent (25%) of the Net Cost as defined herein, of the party that
performs the Work.
8. Documentation of Time-and-Material Costs.
a. T&M Daily Sheets. Contractor must submit timesheets, materials invoices,
records of equipment hours, and records of rental equipment hours to the City’s
for an approval signature each day that Work is performed on a time-and-
material basis. The Engineer’s signature on time sheets only serves as
verification that the Work was performed and is not indicative of the City’s
agreement to Contractor’s entitlement to the cost.
b. T&M Summary Sheet. Contractor shall submit a T&M Summary Sheet, which
shall include total actual costs, within five (5) Days following completion of
Additional Work on a time-and-material basis. Contractor’s total actual cost
shall be presented in a summary table in an electronic spreadsheet file by
labor, material, equipment, and any other costs, along with documentation
supporting the costs. Contractor’s failure to submit the T&M Summary Sheet
within five (5) Days of completion of the Additional Work will result in
Contractor’s waiver for any reimbursement of any costs associated with the
Additional Work.
4.1.c
Packet Pg. 315 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-61 00 72 00 – GENERAL CONDITIONS
9. Excluded Costs. The following costs or any other home or field office overhead
costs, all of which are to be considered administrative costs covered by the
Contractor’s mark-up, shall not be allowed costs and shall not be included in any
lump sum proposals or time-and-materials invoices:
a. Overhead Cost. Payroll costs and other compensation of Contractor’s officers,
executives, principals, general managers, engineers, architects, estimators,
attorneys, auditors, accountants, purchasing and contracting agents,
timekeepers, clerks, and other personnel employed by Contractor whether at
the Site or in Contractor’s principal office or any branch office, material yard,
or shop for general administration of the Work;
b. Office Expenses. Expenses of Contractor’s principal and branch offices;
c. Capital Expenses. Any part of Contractor’s capital expenses, including interest
on Contractor’s capital employed for the Additional Work and charges against
Contractor for delinquent payments;
d. Negligence. Costs due to the negligence of Contractor or any Subcontractor
or Supplier, or anyone directly or indirectly employed by any of them or for
whose acts any of them may be liable, including without limitation the correction
of Defective Work, disposal of materials or equipment wrongly supplied, and
making good any damage to property;
e. Small Tools. Cost of small tools valued at less than $1,000 and that remain
the property of Contractor;
f. Administrative Costs. Costs associated with the preparation of Change Orders
(whether or not ultimately authorized), cost estimates, or the preparation or
filing of Claims;
g. Anticipated Lost Profits. Expenses of Contractor associated with anticipated
lost profits or lost revenues, lost income or earnings, lost interest on earnings,
or unpaid retention;
h. Home Office Overhead. Costs derived from the computation of a “home office
overhead” rate by application of the Eichleay, Allegheny, burden fluctuation, or
other similar methods;
i. Special Consultants and Attorneys. Costs of special consultants or attorneys,
whether or not in the direct employ of Contractor, employed for services
specifically related to the resolution of a Claim, dispute, or other matter arising
out of or relating to the performance of the Additional Work.
j. Other. Other overhead or general expense costs of any kind and the cost of
any item not specifically and expressly included in the Contract Documents;
including but not limited to: submittals, drawings, field drawings, shop
drawings, including submissions of drawings; field inspection; general
superintendence; computer services; reproduction services; salaries of project
engineer, superintendent, timekeeper, storekeeper, and secretaries; janitorial
services; small tools, incidentals and consumables; temporary on-site facilities
4.1.c
Packet Pg. 316 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-62 00 72 00 – GENERAL CONDITIONS
(offices, telephones, high speed internet access, plumbing, electrical power,
lighting; platforms, fencing, water); surveying; estimating; protection of work;
handling and disposal fees; final cleanup; other incidental work; related
warranties; insurance and bond premiums.
9.2 Procedure for Resolving Claims.
A. Prerequisites. Contractor shall timely comply with any and all requirement of the
Contract Documents pertaining to notices and requests for changes to the Contract
Time or Contract Price, including but not limited to all requirements of Article 9.1, as
a prerequisite to filing any claim governed by this Article. The failure to timely submit
a notice of delay or notice of change, or to timely request a change to the time for
completion or Contractor’s compensation, or to timely provide any other notice or
request required herein shall constitute a waiver of the right to further pursue the
claim under the Contract or at law.
B. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public
Contract Code prescribes a process utilizing informal conferences, non-binding
judicial supervised mediation, and judicial arbitration to resolve disputes on
construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of
the Public Contract Code prescribes a process for negotiation and mediation to
resolve disputes on construction claims. The intent of this Article is to implement
Sections 20104 et seq. and Section 9204 of the California Public Contract Code.
This Article shall be construed to be consistent with all applicable law, including but
not limited to these statutes.
C. Claims. For purposes of this Article, “Claim” means a separate demand by the
Contractor for:
1. An adjustment to the time for completion including, without limitation, for relief from
damages or penalties for delay assessed by the City;
2. Payment by the City of money or damages arising from Work done by or on behalf
of the Contractor pursuant to the Contract, payment for which is not otherwise
expressly provided or to which the Contractor is not otherwise entitled; or
3. An amount the payment of which is disputed by the City.
A “Claim” does not include any demand for payment for which the Contractor has
failed to provide notice, request a Change Order, or otherwise failed to follow any
procedures contained in the Contract Documents.
D. Filing Claims. Claims governed by this Article may not be filed unless and until the
Contractor completes any and all requirements of the Contract Documents
pertaining to notices and requests for changes to the Contract Time or Contract
Price, and Contractor’s request for a change has been denied in whole or in part.
Claims governed by this Article must be filed no later than thirty (30) Days after a
request for change has been denied in whole or in part or after any other event giving
rise to the Claim. The Claim shall be submitted in writing to the City and shall include
on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The
4.1.c
Packet Pg. 317 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-63 00 72 00 – GENERAL CONDITIONS
Claim shall include all information and documents necessary to substantiate the
Claim, including but not limited to those identified below. Nothing in this Article is
intended to extend the time limit or supersede notice requirements otherwise
provided by Contract Documents. Failure to follow such contractual requirements
shall bar any Claims or subsequent proceedings for compensation or payment
thereon.
E. Documentation. The Contractor shall submit all Claims in the following format:
1. Summary description of Claim including basis of entitlement, merit and amount of
time or money requested, with specific reference to the Contract Document
provisions pursuant to which the Claim is made
2. List of documents relating to Claim:
a. Specifications
b. Drawings
c. Clarifications (Requests for Information)
d. Schedules
e. Other
3. Chronology of events and correspondence
4. Narrative analysis of Claim merit
5. Analysis of Claim cost, including calculations and supporting documents
6. Time impact analysis in the form required by the Contract Documents or, if the
Contract Documents do not require a particular format, CPM format, if an
adjustment of the Contract Time is requested
F. City’s Response. Upon receipt of a Claim pursuant to this Article, the City shall
conduct a reasonable review of the Claim and, within a period not to exceed 45 Days,
shall provide the Contractor a written statement identifying what portion of the Claim
is disputed and what portion is undisputed. Any payment due on an undisputed
portion of the Claim will be processed and made within 60 Days after the City issues
its written statement.
1. If the City needs approval from its governing body to provide the Contractor a
written statement identifying the disputed portion and the undisputed portion of the
Claim, and the City’s governing body does not meet within the 45 Days or within
the mutually agreed to extension of time following receipt of a Claim sent by
registered mail or certified mail, return receipt requested, the City shall have up to
three (3) Days following the next duly publicly noticed meeting of the City’s
governing body after the 45-Day period, or extension, expires to provide the
Contractor a written statement identifying the disputed portion and the undisputed
portion.
4.1.c
Packet Pg. 318 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-64 00 72 00 – GENERAL CONDITIONS
2. Within 30 Days of receipt of a Claim, the City may request in writing additional
documentation supporting the Claim or relating to defenses or Claims the City may
have against the Contractor. If additional information is thereafter required, it shall
be requested and provided pursuant to this subdivision, upon mutual agreement
of the City and the Contractor. The City’s written response to the Claim, as further
documented, shall be submitted to the Contractor within 30 Days (if the Claim is
less than $50,000, within 15 Days) after receipt of the further documentation, or
within a period of time no greater than that taken by the Contractor in producing
the additional information or requested documentation, whichever is greater.
G. Meet and Confer. If the Contractor disputes the City’s written response, or the City
fails to respond within the time prescribed, the Contractor may so notify the City, in
writing, either within 15 Days of receipt of the City’s response or within 15 Days of
the City’s failure to respond within the time prescribed, respectively, and demand in
writing an informal conference to meet and confer for settlement of the issues in
dispute. Upon receipt of a demand, the City shall schedule a meet and confer
conference within 30 Days for settlement of the dispute.
H. Mediation. Within 10 business days following the conclusion of the meet and confer
conference, if the Claim or any portion of the Claim remains in dispute, the City shall
provide the Contractor a written statement identifying the portion of the Claim that
remains in dispute and the portion that is undisputed. Any payment due on an
undisputed portion of the Claim shall be processed and made within 60 Days after
the City issues its written statement. Any disputed portion of the Claim, as identified
by the Contractor in writing, shall be submitted to nonbinding mediation, with the City
and the Contractor sharing the associated costs equally. The public entity and
Contractor shall mutually agree to a mediator within 10 business days after the
disputed portion of the Claim has been identified in writing, unless the parties agree
to select a mediator at a later time.
1. If the parties cannot agree upon a mediator, each party shall select a mediator and
those mediators shall select a qualified neutral third party to mediate with regard
to the disputed portion of the Claim. Each party shall bear the fees and costs
charged by its respective mediator in connection with the selection of the neutral
mediator.
2. For purposes of this Article, mediation includes any nonbinding process, including,
but not limited to, neutral evaluation or a dispute review board, in which an
independent third party or board assists the parties in dispute resolution through
negotiation or by issuance of an evaluation. Any mediation utilized shall conform
to the timeframes in this Article.
3. Unless otherwise agreed to by the City and the Contractor in writing, the mediation
conducted pursuant to this section shall excuse any further obligation under
Section 20104.4 to mediate after litigation has been commenced.
4. The mediation shall be held no earlier than the date the Contractor completes the
Work or the date that the Contractor last performs Work, whichever is earlier. All
unresolved Claims shall be considered jointly in a single mediation, unless a new
unrelated Claim arises after mediation is completed.
4.1.c
Packet Pg. 319 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-65 00 72 00 – GENERAL CONDITIONS
I. Procedures After Mediation. If following the mediation, the Claim or any portion
remains in dispute, the Contractor must file a Claim pursuant to Chapter 1
(commencing with Section 900) and Chapter 2 (commencing with Section 910) of
Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation.
For purposes of those provisions, the running of the period of time within which a
Claim must be filed shall be tolled from the time the Contractor submits his or her
written Claim pursuant to subdivision (a) until the time the Claim is denied, including
any period of time utilized by the meet and confer conference.
J. Civil Actions. The following procedures are established for all civil actions filed to
resolve Claims of $375,000 or less:
1. Within 60 Days, but no earlier than 30 Days, following the filing or responsive
pleadings, the court shall submit the matter to non-binding mediation unless
waived by mutual stipulation of both parties or unless mediation was held prior to
commencement of the action in accordance with Public Contract Code section
9204 and the terms of this Contract. The mediation process shall provide for the
selection within 15 Days by both parties of a disinterested third person as mediator,
shall be commenced within 30 Days of the submittal, and shall be concluded within
15 Days from the commencement of the mediation unless a time requirement is
extended upon a good cause showing to the court.
2. If the matter remains in dispute, the case shall be submitted to judicial arbitration
pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of
the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The
Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter
3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding
brought under this subdivision consistent with the rules pertaining to judicial
arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title
3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be
experienced in construction law, and (B) any party appealing an arbitration award
who does not obtain a more favorable judgment shall, in addition to payment of
costs and fees under that chapter, also pay the attorney’s fees on appeal of the
other party.
K. Government Code Claim Procedures.
1. This Article does not apply to tort claims and nothing in this Article is intended nor
shall be construed to change the time periods for filing tort claims or actions
specified by Chapter 1 (commending with Section 900) and Chapter 2
(commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the
Government Code.
2. In addition to any and all requirements of the Contract Documents pertaining to
notices of and requests for adjustment to the Contract Time, Contract Price, or
compensation or payment for Additional Work, disputed Work, construction claims
and/or changed conditions, the Contractor must comply with the claim procedures
set forth in Government Code Section 900, et seq. prior to filing any lawsuit against
the City.
4.1.c
Packet Pg. 320 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-66 00 72 00 – GENERAL CONDITIONS
3. Such Government Code claims and any subsequent lawsuit based upon the
Government Code claims shall be limited to those matters that remain unresolved
after all procedures pertaining to adjustment of the Contract Time or Contract Price
for Additional Work, disputed Work, construction claims, and/or changed
conditions have been followed by Contractor. If Contractor does not comply with
the Government Code claim procedure or the prerequisite contractual
requirements, Contractor may not file any action against the City.
4. A Government Code claim must be filed no earlier than the date the Work is
completed or the date the Contractor last performs Work on the Project,
whichever occurs first. A Government Code claim shall be inclusive of all
unresolved Claims known to Contractor or that should reasonably by known
to Contractor excepting only new unrelated Claims that arise after the
Government Code claim is submitted.
L. Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the
time periods described in this Article or to otherwise meet the time requirements of
this Article shall result in the Claim being deemed rejected in its entirety, and shall
not constitute a waiver of any rights under this Article.
ARTICLE 10 - MEASUREMENT; PAYMENT
10.1 Cost Breakdown.
A. Lump Sum Work. Contractor shall furnish on forms approved by the City within ten
(10) Days of the Notice to Proceed, a schedule of values allocating the entire
Contract Price to the various portions of the Work and prepared in such a form and
supported by such data to substantiate its accuracy as the Engineer may require.
This schedule of values, unless objected to by the Engineer, shall be used as a basis
for reviewing the Contractor’s applications for payment. Contractor shall submit the
schedule of values prior to submitting its first application for payment, and the City
will not issue any payment until it receives and approves the schedule of values.
B. Unit Price Work. Where the Contract Documents provide that all or part of the Work
is to be Unit Price Work, initially the Contract Price will be deemed to include for all
Unit Price Work an amount equal to the sum of the unit price for each separately
identified item of Unit Price Work multiplied by the estimated quantity of each item
as indicated in the Contract. The estimated quantities of items of Unit Price Work are
not guaranteed and are solely for the purpose of comparison of Bids and determining
an initial Contract Price. Each unit price will be deemed to include an amount
considered by Contractor to be adequate to cover Contractor’s overhead and or
profit for each separately identified item. Unless otherwise specified, payment will be
based on the actual quantities of Work as verified and approved by the Engineer,
based on the price per unit as set forth in the Bid Schedule.
10.2 Progress Estimates and Payment.
A. By the tenth (10th) Day of the following calendar month, Contractor shall submit to
Engineer a payment request which shall set forth in detail the value of the Work done
for the period beginning with the date Work was first commenced and ending on the
4.1.c
Packet Pg. 321 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-67 00 72 00 – GENERAL CONDITIONS
end of the calendar month for which the payment request is prepared. Contractor
shall include an adjusted list of actual quantities, verified by the Engineer, for unit
price items listed, if any, in the Bid. Contractor shall include any amount earned for
authorized Change Orders. Contractor shall certify under penalty of perjury, that all
cost breakdowns and periodic estimates accurately reflect the Work on the Project.
B. From the total thus computed, a deduction shall be made in the amount of five
percent (5%) for retention, except where the City has adopted a finding that the Work
done under the Contract is substantially complex, and then the amount withheld as
retention shall be the percentage specified in the Notice Inviting Bids. The amount
computed, less the amount withheld for retention and any amounts withheld as set
forth below, shall be the amount of the Contractor’s payment request.
C. The City may withhold a sufficient amount or amounts of any payment or payments
otherwise due to Contractor, as in its judgment may be necessary to cover:
1. Payments which may be past due and payable for just claims against Contractor
or any Subcontractors for labor or materials furnished in and about the
performance of work on the Project under this Contract.
2. Defective Work not remedied.
3. Failure of Contractor to make proper payments to his Subcontractor or for material
or labor.
4. Completion of the Contract if there is a reasonable doubt that the Work can be
completed for balance then unpaid.
5. Damage to another contractor or a third party.
6. Amounts which may be due the City for claims against Contractor.
7. Failure of Contractor to keep the Record Drawings up to date.
8. Failure to provide update on construction schedule as required herein.
9. Site cleanup.
10. Failure to comply with Contract Documents.
11. Liquidated damages.
12. Legally permitted penalties.
D. The City may apply such withheld amount or amounts to payment of such claims or
obligations at its discretion with the exception of subsections (C)(1), (3), and (5) of
this Article, which must be retained or applied in accordance with applicable law. In
so doing, the City shall be deemed the agent of Contractor and any payment so
made by the City shall be considered as a payment made under contract by the City
to Contractor and the City shall not be liable to Contractor for such payments made
in good faith. Such payments may be made without prior judicial determination of
4.1.c
Packet Pg. 322 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-68 00 72 00 – GENERAL CONDITIONS
claim or obligations. The City will render Contractor a proper accounting of such
funds disbursed on behalf of Contractor.
E. Upon receipt, the Engineer shall review the payment request to determine whether
it is undisputed and suitable for payment. If the payment request is determined to be
unsuitable for payment, it shall be returned to Contractor as soon as practicable but
not later than seven (7) Days after receipt, accompanied by a document setting forth
in writing the reasons why the payment request is not proper. The City shall make
the progress payment within 30 Days after the receipt of an undisputed and properly
submitted payment request from Contractor, provided that a release of liens and
claims has been received from the Contractor pursuant to Civil Code section 8132.
The number of days available to the City to make a payment without incurring
interest pursuant to this paragraph shall be reduced by the number of Days by which
the Engineer exceeds the seven (7) Day requirement.
F. A payment request shall be considered properly executed if funds are available for
payment of the payment request and payment is not delayed due to an audit inquiry
by the financial officer of the City.
G. The City shall have the right to adjust any estimate of quantity and to subsequently
correct any error made in any estimate for payment.
10.3 Final Acceptance and Payment
A. Following the City’s acceptance of the Work, the Contractor shall submit to the City
a written statement of the final quantities of unit price items for inclusion in the final
payment request. The City shall have the right to adjust any estimate of quantity and
to correct any error made in any estimate for payment.
B. When the Work has been accepted there shall be paid to Contractor a sum equal to
the Contract Price less any amounts previously paid Contractor and less any
amounts withheld by the City from Contractor under the terms of the Contract. The
final five percent (5%), or the percentage specified in the Notice Inviting Bids where
the City has adopted a finding of substantially complete, shall not become due and
payable until as required by Public Contract Code section 7107. If the Contractor
has placed securities with the City as described herein, the Contractor shall be paid
a sum equal to one hundred percent (100%) of the Contract Price less any amounts
due the City under the terms of the Contract.
C. Unless Contractor advises the City in writing prior to acceptance of the final five
percent (5%) or the percentage specified in the Notice Inviting Bids where the City
has adopted a finding of completion, or the return of securities held as described
herein, said acceptance shall operate as a release to the City of all claims and all
liability to Contractor for all things done or furnished in connection with this Work and
for every act of negligence of the City and for all other claims relating to or arising
out of this Work. If Contractor advises the City in writing prior to acceptance of final
payment or return of the securities that there is a dispute regarding the amount due
the Contractor, the City may pay the undisputed amount contingent upon the
Contractor furnishing a release of all undisputed claims against the City with the
disputed claims in stated amounts being specifically excluded by Contractor from the
4.1.c
Packet Pg. 323 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-69 00 72 00 – GENERAL CONDITIONS
operation of the release. No payments, however, final or otherwise, shall operate to
release Contractor or its sureties from the faithful performance bond, labor and
material payment bond, or from any other obligation under this Contract.
D. In case of termination of the Contract any unpaid balance shall be and become the
sole and absolute property of the City to the extent necessary to repay the City any
excess in the cost of the Work above the Contract Price.
E. Final payment shall be made no later than 60 Days after the date of acceptance of
the Work by the City or the date of occupation, beneficial use and enjoyment of the
Work by the City including any operation only for testing, start-up or commissioning
accompanied by cessation of labor on the Work, provided that a release of liens and
claims has been received from the Contractor pursuant to Civil Code section 8136.
In the event of a dispute between the City and the Contractor, the City may withhold
from the final payment an amount not to exceed 150% of the disputed amount.
F. Within ten (10) Days from the time that all or any portion of the retention proceeds
are received by Contractor, Contractor shall pay each of its Subcontractors from
whom retention has been withheld each Subcontractor’s share of the retention
received. However, if a retention payment received by Contractor is specifically
designated for a particular Subcontractor, payment of the retention shall be made to
the designated Subcontractor if the payment is consistent with the terms of the
subcontract.
ARTICLE 11 -MISCELLANEOUS
11.1 Patents.
A. Contractor shall hold and save the City, officials, officers, employees, and authorized
volunteers harmless from liability of any nature or kind of claim therefrom including
costs and expenses for or on account of any patented or unpatented invention,
article or appliance manufactured, furnished or used by Contractor in the
performance of this Contract.
11.2 Document Retention & Examination
A. In accordance with Government Code section 8546.7, records of both the City and
the Contractor shall be subject to examination and audit by the State Auditor General
for a period of three (3) years after final payment. Contractor shall make available to
the City any of the Contractor’s other documents related to the Project immediately
upon request of the City. In addition to the State Auditor rights above, the City shall
have the right to examine and audit all books, estimates, records, contracts,
documents, bid documents, subcontracts, and other data of the Contractor (including
computations and projections) related to negotiating, pricing, or performing the
modification in order to evaluate the accuracy and completeness of the cost or
pricing data at no additional cost to the City, for a period of five (5) years after final
payment.
4.1.c
Packet Pg. 324 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-70 00 72 00 – GENERAL CONDITIONS
11.3 Notice.
A. All notices shall be in writing and either served by personal delivery or mailed to the
other party. Written notice to the Contractor shall be addressed to Contractor’s
principal place of business unless Contractor designates another address in writing
for service of notice. Notice to the City shall be addressed to the City as designated
in the Notice Inviting Bids unless the City designates another address in writing for
service of notice. Notice shall be effective upon receipt or five (5) Days after being
sent by first class mail, whichever is earlier. Notice given by facsimile shall not be
effective unless acknowledged in writing by the receiving party.
11.4 Notice of Third Party Claims
A. Pursuant to Public Contract Code section 9201, the City shall provide the Contractor
with timely notification of the receipt of any third-party claims relating to the Contract.
The City is entitled to recover reasonable costs incurred in providing such
notification.
11.5 State License Board Notice
A. Contractors are required by law to be licensed and regulated by the Contractors’
State License Board which has jurisdiction to investigate complaints against
contractors if a complaint regarding a patent act or omission is filed within four (4)
years of the date of the alleged violation. A complaint regarding a latent act or
omission pertaining to structural defects must be filed within ten (10) years of the
date of the alleged violation. Any questions concerning a contractor may be referred
to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento,
California 95826.
11.6 Assignment of Contract
A. Contractor shall not assign, transfer, convey, sublet or otherwise dispose of the
rights or title of interest of any or all of this contract without the prior written consent
of the City. Any assignment or change of Contractor’s name of legal entity without
the written consent of the City shall be void. Any assignment of money due or to
become due under this Contract shall be subject to a prior lien for services rendered
or material supplied for performance of Work called for under the Contract
Documents in favor of all persons, firms, or corporations rendering such services or
supplying such materials to the extent that claims are filed pursuant to the Civil Code,
the Code of Civil Procedure or the Government Code.
11.7 Change In Name And Nature Of Contractor’s Legal Entity.
A. Should a change be contemplated in the name or nature of the Contractor’s legal
entity, the Contractor shall first notify the City in order that proper steps may be taken
to have the change reflected on the Contract and all related documents. No change
of Contractor’s name or nature will affect the City’s rights under the Contract,
including but not limited to the bonds.
4.1.c
Packet Pg. 325 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-71 00 72 00 – GENERAL CONDITIONS
11.8 Prohibited Interests
A. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting or approving any engineering, inspection,
construction, or material supply contract or any subcontract in connection with
construction of the project, shall be or become directly or indirectly interested
financially in the Contract.
11.9 Controlling Law
A. Notwithstanding any subcontract or other contract with any Subcontractor, Supplier,
or other person or organization performing any part of the Work, this Contract shall
be governed by the law of the State of California excluding any choice of law
provisions.
11.10 Jurisdiction; Venue
A. Contractor and any Subcontractor, Supplier, or other person or organization
performing any part of the Work agrees that any action or suits at law or in equity
arising out of or related to the bidding, award, or performance of the Work shall be
maintained in the Superior Court of Riverside County, California, and expressly
consent to the jurisdiction of said court, regardless of residence or domicile, and
agree that said court shall be a proper venue for any such action.
11.11 Cumulative Remedies.
A. The duties and obligations imposed by these General Conditions and the rights and
remedies available hereunder to the parties hereto are in addition to, and are not to
be construed in any way as a limitation of, any rights and remedies available to any
or all of them which are otherwise imposed or available by Applicable Laws, by
special warranty or guarantee, or by other provisions of the Contract Documents.
The provisions of this Article will be as effective as if repeated specifically in the
Contract Documents in connection with each particular duty, obligation, right, and
remedy to which they apply.
11.12 Survival of Obligations.
A. All representations, indemnifications, warranties, and guarantees made in, required
by, or given in accordance with the Contract Documents, as well as all continuing
obligations indicated in the Contract Documents, will survive final payment,
completion, and acceptance of the Work or termination or completion of the Contract
or termination of the services of Contractor.
11.13 Headings.
A. Article and paragraph headings are inserted for convenience only and do not
constitute parts of these General Conditions.
4.1.c
Packet Pg. 326 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-72 00 72 00 – GENERAL CONDITIONS
11.14 Assignment of Antitrust Actions
A. In accordance with §7103.5(b) of the California Public Contract Code, Contractor
and Subcontractors must conform to the following requirements:
1. In entering into a public works contract or a subcontract to supply goods, services,
or materials pursuant to a public works contract, Contractor or Subcontractor offer
and agree to assign to the awarding body all rights, title, and interest in and to all
causes of action it may have under §4 of the Clayton Act (15 U.S.C. Sec. 15) or
under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of
Division 7 of the Business and Professions Code) arising from purchases of goods,
services, or materials pursuant to the public works contract or the subcontract.
2. This assignment must be made and become effective at the time the awarding
body tenders to Contractor, without further acknowledgment by the parties.
11.15 Other Legal Provisions.
A. Contractor shall give all notices and comply with all federal, state and local laws,
ordinances, rules and regulations bearing on conduct of work as indicated and
specified by their terms. References to specific laws, rules, or regulations in this
Contract are for reference purposes only, and shall not limit or affect the applicability
of provisions not specifically mentioned. If Contractor observes that drawings and
specifications are at variance therewith, he shall promptly notify City in writing and
any necessary changes shall be adjusted as provided for in this Contract for changes
in Work. If Contractor performs any Work knowing it to be contrary to such laws,
ordinances, rules and regulations, and without such notice to City, he shall bear all
costs arising therefrom.
B. Contractor shall be responsible for familiarity with the Americans with Disabilities Act
(“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with
ADA laws, rules and regulations. Contractor shall comply with the Historic Building
Code, including, but not limited to, as it relates to the ADA, whenever applicable.
C. Contractor acknowledges and understands that, pursuant to Public Contract Code
section 20676, sellers of "mined material" must be on an approved list of sellers
published pursuant to Public Resources Code section 2717(b) in order to supply
mined material for this Contract.
D. No City official or representative who is authorized in such capacity and on behalf of
City to negotiate, supervise, make, accept, or approve, or to take part in negotiating,
supervising, making, accepting, or approving any engineering, inspection,
construction or material supply contract or any subcontract in connection with
construction of the Work, shall be or become directly or indirectly interested
financially in the Contract.
E. All provisions of law required to be inserted in the Contract or Contract Documents
pursuant to any Applicable Laws shall be and are inserted herein. If through mistake,
neglect, oversight, or otherwise, any such provision is not herein inserted or inserted
in improper form, upon the application of either party, the Contract or Contract
4.1.c
Packet Pg. 327 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GC-73 00 72 00 – GENERAL CONDITIONS
Documents shall be changed by City, at no increase in Contract Price or extension
in Contract Times, so as to strictly comply with the Applicable Laws and without
prejudice to the rights of either party hereunder.
END OF GENERAL CONDITIONS
4.1.c
Packet Pg. 328 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE SC-1 00 73 13 - SPECIAL CONDITIONS
00 73 13 – SPECIAL CONDITIONS
ARTICLE 1 -SCOPE OF WORK
1.1 Location of the Project.
A. Along Esplanade Avenue from Warren Road to Sanderson Avenue.
1.2 Scope of Work.
The Scope of Work consists of Widening Esplanade Avenue from two lanes to four lanes
(two lanes in each direction), center turn lane, installation of traffic signals at Esplanade
Avenue and at Cawston Avenue, with sidewalk and drainage facility along the north side
of Esplanade Avenue
MODIFICATIONS TO THE GENERAL CONDITIONS
1.3 Article 5.10 Water Quality Management and Compliance
Article 5.10 of the General Conditions is supplemented by the following:
A. Contractor shall prepare and implement a Storm Water Pollution Prevention Plan
(SWPPP) for the Project site based on the appropriate Risk Level requirements, and
draft and coordinate submittal of all Construction General Permit related documents
with City’s Legally Responsible Person and/or Authorized Signatory as those terms
are defined in the Permit. The Contractor shall submit the SWPPP to the City for
review not less than fifteen (15) Days prior to the start of on- site construction work.
City will file the Notice of Intent and pay the filing fee.
B. The SWPPP shall be developed by a Qualified SWPPP Developer and implemented
by a Qualified SWPPP Practitioner as those terms are defined in the Construction
General Permit and shall include industry standard requirements for water quality
control including but not be limited to the following:
1. Sediment and erosion control measures to manage sediment and erosion
including vegetative practices, structural control, silt fences, straw dikes, sediment
controls or operator controls as appropriate. Storm water management measures
shall be instituted as required, including velocity dissipaters, and solid waste
controls shall address controls for building materials and offsite tracking of
sediment.
2. Wastewater and storm water management controls to divert offsite surface flows
around the Project site and to divert surface flows within the Project area away from
areas of open earth or stockpiles of building and other materials. Wastewater from
general construction activities, such as drain water collection, aggregate
processing, concrete batching, drilling, grouting, or other construction operations,
shall not enter flowing or dry watercourses without having met the authorized non-
storm water discharge requirements listed in State Board Water Quality Order No.
2009-0009-DWQ, Section III.C., including proper notification to the Regional Water
Board.
4.1.c
Packet Pg. 329 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE SC-2 00 73 13 - SPECIAL CONDITIONS
3. Pollution prevention measures including methods of dewatering, unwatering,
excavating, or stockpiling earth and rock materials which include prevention
measures to control silting and erosion, and which will intercept and settle any
runoff of sediment-laden waters.
4. Turbidity prevention measures for prevention of excess turbidity including, but are
not restricted to, intercepting ditches, settling ponds, gravel filter entrapment dikes,
flocculating processes, recirculation, combinations thereof, or other approved
methods that are not harmful to aquatic life. All such wastewaters discharged into
surface waters, shall contain the least concentration of settleable material
possible, and shall meet all conditions of section 402, the National Pollutant
Discharge Elimination System (NPDES) permit.
5. Overall construction site management measures to address changes at the
Project site as the Project moves through different phases and changes that
account for rainy and dry season management practices.
6. Pollution control measures and construction activity methods that will prevent
entrance, or accidental spillage, of solid matter, contaminants, debris, or other
pollutants or wastes, into streams, flowing or dry watercourses, lakes, wetlands,
reservoirs, or underground water sources. Such pollutants and wastes include,
but are not restricted to: refuse, garbage, cement, sanitary waste, industrial
waste, hazardous materials, radioactive substances, oil and other petroleum
products, aggregate processing, tailings, mineral salts, and thermal pollution.
7. Control measures for stockpiled or deposited materials prohibiting the stockpile or
deposit of excavated materials, or other construction materials, near or on stream
banks, lake shorelines, or other watercourse perimeters where they can be washed
away by high water or storm runoff, or can, in any way, encroach upon the
watercourse.
8. Develop and implement a Rain Event Action Plan (REAP), if required, that must be
designed and implemented to protect all exposed portions of the site 48 hours
prior to any likely precipitation event.
9. Monitoring, reporting and record keeping, as necessary to achieve compliance with
applicable Permit requirements, including but not limited to annual reports and rain
event reports.
C. Before any Construction General Permit related documents, including the SWPPP,
rain event reports, or annual reports may be submitted to the State Board or
implemented on the Project site, they must first be reviewed and approved by City.
D. City retains the right to procure and maintain coverage under the Construction
General Permit for the Project site if the Contractor fails to draft a SWPPP or other
Construction General Permit related document, or fails to proceed in a manner that
is satisfactory to City. City reserves the right to implement its own SWPPP at the
Project site, and hire additional contractors to maintain compliance. Whether
Contractor has adequately maintained compliance with the Construction General
Permit shall be City’s sole determination. In the event that Contractor has failed or
is unable to maintain compliance with the Construction General Permit, any costs
or fines incurred by City in implementing a SWPPP, or otherwise maintaining
compliance with the Construction General Permit shall be paid by the Contractor.
4.1.c
Packet Pg. 330 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE SC-3 00 73 13 - SPECIAL CONDITIONS
1.4 Article 5.2 Permits and Licenses.
Article 5.2 of the General Conditions is supplemented by the following:
Contractor will apply and pay for necessary encroachment permits for Work within MWD, EMWD,
and County of Riverside rights-of-way. All other necessary permits and licenses necessary for
prosecution of the Work shall be secured and paid for by Contractor, including, but not limited to,
permits, licenses and fees required by agencies with authority in the jurisdiction in which the Work
will be located, unless otherwise expressly provided by the Contract Documents.
Contractor will also apply for City of San Jacinto and City of Hemet encroachment permits and
business licenses which will be provided to the contractor at no cost upon approval.
1.5 Article 2.9 Preconstruction Meeting; Designation of Authorized Representatives.
Article 2.9 of the General Conditions is supplemented by the following:
The City will hold a mandatory pre-bid meeting for this project on January 15, 2026 at 10:00AM.
The on-site mandatory pre-bid meeting will be located at the Circle K gas station on the northwest
corner of Sanderson Ave & Esplanade Ave.
• Date: January 15, 2026
• Time: 10:00 AM
• Location: 1450 S Sanderson Ave, San Jacinto, CA 92582
Failure to attend the mandatory pre-bid meeting on January 15, 2026 would disqualify any Bidder
from the consideration of the bid award.
END OF SPECIAL CONDITIONS
ADDENDUM 1
4.1.c
Packet Pg. 331 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-1 TECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS
THE FOLLOWING SPECIFICATIONS ARE INCORPORATED HEREIN BY REFERENCE AS IF
SET FORTH IN THEIR ENTIRETY:
Section # Specification Section Title
01 55 26 Traffic Control
01 57 23 Water Pollution Control
01 58 13 Temporary Project Signage (TUMF)
01 71 13 Mobilization
02 32 19 Potholing (Exploratory Excavations)
02 41 13.13 Roadway Excavation & Saw Cutting
02 41 13.55 Over Excavation & Subgrade Preparation
02 43 13 Remove or Relocate Existing Facilities
03 00 00 Minor Concrete
22 14 00 Storm Drain Structures
31 11 00 Clearing & Grubbing
31 11 53 Monitoring Well
31 37 00 Rip-Rap
32 01 13.61 Type 1 Slurry
32 01 16.71 Cold Mill
32 01 17.61 Crack Seal
32 11 23 Class 2 Aggregate Base
32 12 16 Asphalt Concrete
32 17 23 Signing, Striping, and Pavement Markings
33 01 30.86 Adjust to Grade Existing Utilities
33 05 24.5 Steel Pipe Casing
34 41 13 Traffic Signal Work
35 01 50.71 Channel Excavation
ADDENDUM 5
4.1.c
Packet Pg. 332 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-2 TECHNICAL SPECIFICATIONS
Bid Item # Construction Note # Specification Section
BASE BID SCHEDULE
1 N/A 01 71 13
2 N/A 01 55 26
3 N/A 01 57 23
4 N/A 31 11 00
5 2 02 41 13.13
6 3 02 41 13.13
7 4 02 43 13
8 4 02 43 13
9 4 02 43 13
10 4 02 43 13
11 4 02 43 13
12 N/A N/A
13 4 02 43 13
14 5 02 43 13
15 5 02 43 13
16 4 02 43 13
17 6 32 01 16.71
18 6, 9, 13, 18 32 12 16
19 9, 13 32 11 23
20 7 02 43 13
21 10 03 00 00
22 11 03 00 00
23 12 03 00 00
24 16 03 00 00
25 N/A 02 32 19
26 19 03 00 00
27 N/A 02 41 13.55
28 N/A N/A
29 Sheet No. W-1 31 11 53
30 24 22 14 00
31 22 22 14 00
32 N/A N/A
33 N/A N/A
34 26 22 14 00
35 N/A N/A
36 N/A N/A
37 31 22 14 00
38 32 33 05 24.5
39 33 22 14 00
ADDENDUM 5
4.1.c
Packet Pg. 333 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-3 TECHNICAL SPECIFICATIONS
Bid Item # Construction Note # Specification Section
40 34 22 14 00
41 35 22 14 00
42 23 22 14 00
43 37 22 14 00
44 36 31 37 00
45 38 32 01 13.61
46 38 32 01 17.61
47 41 22 14 00
48 42 01 58 13
49 Traffic Signal Plans 34 41 13
50 Traffic Signal Plans 34 41 13
51 Signing and Striping Plans 32 17 23
EMWD ADDITIVE ALTERNATE BID SCHEDULE
1A 14 33 01 30.86
2A 14 33 01 30.86
3A 15 02 43 13
4A 15 02 43 13
5A 15 02 43 13
6A 15 02 43 13
7A 15 02 43 13
8A 15 02 43 13
9A 15 02 43 13
10A 15 02 43 13
11A 15 02 43 13
12A 14 33 01 30.86
ADDENDUM 5
4.1.c
Packet Pg. 334 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-4 TECHNICAL SPECIFICATIONS
01 55 26 – TRAFFIC CONTROL SYSTEM
(BID ITEM No. 2)
This section covers the requirements for Bid Item No. 2 “Traffic Control.” Traffic control shall
conform to the provisions in Section 5-137B “Load Limits”, Section 7, “Legal Relations and
Responsibility to the Public”, Section 12, “Temporary Traffic Control” of the Caltrans
Specifications, the Manual on Uniform Traffic Control Devices (MUTCD), the Section of these
contract documents entitled “Insurance – Hold Harmless”, and these special provisions. Nothing
in these Special Provisions shall be construed as relieving the Contractor from the responsibilities
specified in Section 7-1.05.
A minimum of two (2) weeks prior to start of work, the Contractor shall submit traffic control and
detour plans signed and stamped by a Licensed Traffic Engineer to the City Engineer for review
for compliance with MUTCD. The Notice to Proceed will not be issued until a satisfactory
Traffic Control Plan is approved by the City Engineer. Any revisions to the traffic control
plans or requirements shall be approved by the City Engineer.
The access to each property shall not be restricted during normal business hours (8:00 AM to
5:00 PM, Monday through Friday). If access to a property needs to be restricted during normal
business hours, access shall not be restricted for any longer than one hour and contractor must
provide a minimum five day written notice. Vehicular and pedestrian access to adjacent properties
shall be provided at all times. Closed sidewalks shall be posted with “SIDEWALK CLOSED” signs
at each approach to the closure and an approved alternate route provided. All travel lanes,
sidewalks, and crosswalks shall be open between 5:00 am and 8:30 am and between 3:30 pm
and 9:00 pm. One travel lane in each direction shall be open at all times between 8:30 am and
3:30 pm. Flaggers may be used if one lane in each direction cannot be kept open with the
approval of the Traffic engineer. All traffic lanes shall be open before and after work hours. A
minimum of 11-foot lane, in each direction, with an even driving surface shall be available at all
times.
The City would consider road closures to through traffic if requested by the Contractor. If the
Contractor anticipates the need for a full road closure, Contractor would be responsible for
submitting traffic control plans that clearly depict the details of the road closure and detour routes.
If the Engineer deems a full road closure is necessary or beneficial, the Engineer’s office would
present the Contractor’s proposed road closure to the City Council for approval.
All existing traffic control signs and street name signs shall be maintained in visible locations
except as directed by the Engineer and where they conflict with the project.
Flashing message boards shall be installed to advise the public of work site. Flashing arrow
boards are mandatory for lane closures on major streets. They shall operate until traffic control
is removed. All warning lights, signs, flares, barricades (including concrete barriers), trench
4.1.c
Packet Pg. 335 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-5 TECHNICAL SPECIFICATIONS
plates, and other facilities for the sole convenience and direction of the public traffic or any other
reason shall be furnished and maintained by the Contractor. All signs shall conform to and be
placed in accordance with the current MUTCD, issued by the California Department of
Transportation for construction and maintenance of work zones. Any flares, flagman, pilot cars,
and any and all other traffic related items, shall be furnished by the Contractor at his expense.
All barricades shall be equipped with flashing/steady burn warning lamps at night. All cones,
delineators, barricades, and “k” rail shall be reflectorized. All traffic control shall be kept in their
proper position at all times, and shall be repaired, replaced, or cleaned as necessary to preserve
their appearance and continuity. Any devices not part of the required traffic control or detours
shall be removed from the view of the traveling public immediately.
Sufficient lighting will be required for all work performed when sufficient sunlight is not present.
No payment for extra work will be allowed for work performed as specified in Section 12-1.03
(Flagging costs) of the Caltrans Specifications. Flagging costs shall be borne entirely by the
Contractor.
It is the Contractor’s responsibility to provide for the safe passage for vehicles traveling to
residences and business locations within the limits of the project.
The Contractor shall provide public notification in the form of an information letter pertaining to
the planned work. The letter shall be written in English and Spanish and distributed to all affected
residents and businesses at least seven (7) days prior to scheduled work. The letter shall include
the City’s logo and be reviewed and approved by the City Engineer prior to distribution. Minimum
of 48 hours in advance of all work, Contractor shall notify all emergency services, trash pickup
company, school district(s), and post office.
Temporary “No Parking” signs with effective dates shall be posted three (3) days prior to the
scheduled work for a particular street. Signs shall be printed in English and Spanish. The
contractor shall notify the local Police Department immediately upon posting signs.
All open trenches shall be covered with non-skid steel plates or temporary asphalt pavement
before and after work hours. All open trenches shall be backfilled within 72 hours. All traffic
control signs shall be either covered or removed when not required by the nature of work or if
no present hazard to the motorist exists.
There shall be no asphalt grinding or excavation creating a “Lip” greater than 1.0 inch left open
to traffic. When lips greater than 1.0 inch exist, the lip shall be ramped with cold patch or other
approved materials. This applies to all locations, including along gutter lips, manholes, etc.
Contractor shall not work any holiday (unless approved 48 hours prior to the holiday by the City
Engineer).
4.1.c
Packet Pg. 336 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-6 TECHNICAL SPECIFICATIONS
Traffic control signs and materials shall be maintained at all times including after hours,
weekends, and holidays.
Contractor shall also coordinate to allow and not disrupt trash pickup and mail delivery at no
additional cost. The completed roadway shall not be opened to traffic until all permanent signing
and striping is in place or temporary striping and signing approved by the Engineer.
Adequate notice of any lane closures shall be given to all affected parties including school,
emergency services, CR&R, RTA, post office, and School District as required by other sections of
these specifications.
Payment for Bid Item No. 2 “Traffic Control” shall be by Lump Sum, and shall include all costs
for design, installation, modifications, and removal of traffic control over the course of the project.
Additional traffic control signs or adjustments to the signs, as determined by City, shall be done
at no additional cost to the City and minimum of 2 flashing message boards shall be installed to
advise the public at various work sites. The Lump Sum cost shall include cost of the traffic control
and detour plans prepared by a Licensed Engineer.
END OF SECTION 01 55 26
4.1.c
Packet Pg. 337 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-7 TECHNICAL SPECIFICATIONS
01 57 23 – WATER POLLUTION CONTROL (SWPPP)
(BID ITEM No. 3)
This section covers the requirements for Bid Item No. 3 “Water Pollution Control.” The Contractor
shall be responsible for preparing and adhering to a Storm Water Pollution Prevention Plan
(SWPPP) and Water Pollution Control Plan (WPCP) for the project. Water pollution control shall
be carried out in accordance with this document, as well as the Caltrans specifications, these
special provisions, and as directed by the Engineer.
Water pollution control work shall conform to the provisions in Section 13, “Water Pollution
Control” of the Caltrans Specifications and these Special Provisions.
Water pollution control work shall conform to the requirements in the “Storm Water Pollution
Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual” and
the “Construction Site Best Management Practices (BMPs) Manual,” and addenda thereto issued
up to and including the date of advertisement of the project, hereafter referred to respectively as
the “Preparation Manual” and the “Construction Site BMP Manual,” and collectively as the
“Manuals. Copies of the Manuals may be obtained from the Department of Transportation,
Material Operations Branch, Publication Distribution Unit, 1900 Royal Oaks Drive, Sacramento,
California 95815, Telephone: (916) 445-3520. Copies of the Manuals may also be obtained from
the Department’s Internet Web Site at: http://www.dot.ca.gov/hq/construct/stormwater.html.
Copies of the Permits are available for review at the Department of Transportation, District 8,
Environmental / Technical Branch, 464 West 4th Street, San Bernardino, California.
The Contractor shall know and fully comply with the applicable provisions of the Manuals, Permits,
and Federal, State, and local regulations that govern the Contractor’s operations and storm water
discharges from both the project site and areas of disturbance outside the project limits during
construction. The Contractor shall maintain copies of the Permits at the project site and shall
make the Permits available during construction.
Unless arrangements for disturbance or use of areas outside the project limits are made by the
City and made part of the contract, it is expressly agreed that the City assumes no responsibility
for the Contractor or property owner with respect to any arrangements made between the
Contractor and property owner. The Contractor shall implement, inspect and maintain all
necessary water pollution control practices to satisfy all applicable Federal, State, and Local laws
and regulations that govern water quality for areas used outside of the highway right-of-way or
areas arranged for the specific use of the Contractor for this project. Installing, inspecting, and
maintaining water pollution control practices on areas outside the road right-of- way not
specifically arranged for and provided for by the City for the execution of this contract will not be
paid for.
4.1.c
Packet Pg. 338 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-8 TECHNICAL SPECIFICATIONS
The Contractor shall be responsible for the costs and for liabilities imposed by law as a result of
the Contractor’s failure to comply with the provisions set forth in this section “Water Pollution
Control (Storm Water Pollution Prevention Plan)”, including but not limited to, compliance with
the applicable provisions of the Manuals, Permits and Federal, State and local regulations. Costs
and liabilities include , but are not limited to, fines, penalties, and damages whether assessed
against the State or the Contractor, including those levied under the Federal Clean Water Act and
the State Porter Cologne Water Quality Act.
In addition to the remedies authorized by law, money due to Contractor under the contract, in
an amount determined by the City, may be retained by the City until disposition has been made
of the costs and liabilities.
When a regulatory agency or other third party identifies a failure to comply with the permit or
any other local, State, or Federal requirement, the City may retain money due to Contractor,
subject to the following:
A. The City will give the Contractor 30 day notice of the City’s intention to retain
funds from partial payments which may become due to the Contractor prior to
acceptance of the contract. Retention of funds from payments made after
acceptance of the contract may be made without prior notice to the Contractor.
B. No retention of additional amounts out of partial payments will be made if the
amount to be retained does not exceed the amount being withheld from partial
payments pursuant to Section 73.2, “Partial and Final Payment” of the
Greenbook Specifications
C. If the City has retained funds and it is subsequently determined that the City
is not subject to the costs and liabilities in connection with the matter for which
the retention was made, the City shall pay for interest on the amount retained
for the period of the retention, and the rate of interest payable shall be 6
percent per annum.
Conformance with the provisions of this section “Water Pollution Control (Storm Water Pollution
Prevention Plan)” shall not relieve the Contractor from the Contractor’s responsibilities, as
provided in Section 7, “Legal Relations and Responsibility to the Public”, of the Caltrans
Specifications.
The Contractor shall notify the Engineer immediately upon request from the regulatory agencies
to enter, inspect, sample, monitor or otherwise access the project site or the Contractor’s records
pertaining to water pollution control work.
4.1.c
Packet Pg. 339 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-9 TECHNICAL SPECIFICATIONS
The full cost for Bid Item No. 3 “Water Pollution Control” for the entire project will be paid by
Lump Sum and shall include the preparation, implementation, and maintenance of a Storm
Water Pollution Prevention Plan. No additional payment for water pollution control will be
provided. The Contractor will be responsible for the payment of any fines without reimbursement
from the City.
END OF SECTION 01 57 23
4.1.c
Packet Pg. 340 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-10 TECHNICAL SPECIFICATIONS
01 58 13 – TEMPORARY PROJECT SIGNAGE (TUMF)
(BID ITEM No. 48)
This section covers the requirements for Bid Item No. 48 “Install TUMF Sign per Specifications.”
The contractor shall include the WRCOG TUMF logo on all outreach materials related to the
project, including but not limited to flyers and brochures. All materials must acknowledge WRCOG
TUMF Program’s contribution and be submitted to WRCOG for approval prior to public distribution.
The contractor shall also install a large project sign, in public view, at the project site for the
duration of the project. The sign will provide public acknowledgement of the funding entities,
including San Jacinto and WRCOG TUMF Program. The sign shall inform the public of the project’s
purpose, funding sources, and anticipated completion date.
1. Specifications for the Sign
The sign shall meet the following specifications:
• Dimensions – Minimum standard of 8 feet wide by 4 feet tall.
• Material – Weatherproof and durable materials, resistant to outdoor
elements for the duration of the project.
• Content – The sign shall include the following:
o The title of the Project.
o A statement recognizing the funding provided by City of San Jacinto
and WRCOG, including their logos.
o The total project cost.
o The start date and anticipated completion date of the Project.
o A brief project description or purpose statement.
• Design Approval – All content, logos, and layouts must be pre-approved by
City of San Jacinto and WRCOG before production and installation. If
desired, WRCOG can provide a template sign.
2. Installation and Placement
• The sign shall be installed at a visible and safe location near the Project
site, ensuring maximum visibility to the public.
• Installation shall be completed within 7 days of the Project start date and
maintained for the duration of the Project.
• Upon completion of the Project, the Contractor shall remove the sign unless
otherwise instructed by City of San Jacinto.
4.1.c
Packet Pg. 341 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-11 TECHNICAL SPECIFICATIONS
3. Funding for the Signage
• The cost of the sign, including design, production, installation, and
removal, shall be funded by the WRCOG TUMF Program. These costs must
be included in the line item cost for Bid Item No. 48 in the Base Bid
Schedule.
4. Noncompliance
• Failure to comply with the signage requirements outlined in these
specifications may result in withholding of funds until the signage is
produced, installed, and approved by City of San Jacinto and WRCOG.
The Lump Sum contract price paid for Bid Item No. 48 “Install TUMF Sign per Specifications”
shall include full compensation for design, production, installation, maintenance, and removal of
the sign over the course of the project and shall include full compensation for furnishing all labor,
materials, tools, equipment, and incidentals and no additional compensation will be allowed
therefor.
END OF SECTION 01 58 13
4.1.c
Packet Pg. 342 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-12 TECHNICAL SPECIFICATIONS
01 71 13 – MOBILIZATION
(BID ITEM No. 1)
This section covers the requirements for Bid Item No. 1 “Mobilization.” Mobilization shall conform
to the provisions in Section 7-3.4, “Mobilization”, of the Greenbook Specifications and these
Special Specifications.
As part of mobilization, the Contractor shall also provide a single place (job board, etc.) to place
all required federal forms, Cal/OSHA and EEO labor compliance posters, all permits, all safety
items, and any and all paperwork that must be posted in public view.
The City will not provide the contractor with a storage area to store their equipment, machinery,
tools, materials, etc. in the City right-of-way. Storage in City right-of-way will not be permitted.
Contractor will be responsible for arranging and paying for their own storage area.
Contractor shall provide a complete working schedule for the compete duration of the project.
The complete working schedule is required for the issuance of the Notice to Proceed.
If City requests a revised and updated schedule during any point of the project, Contractor shall
provide within 5 working days. The Contractor shall submit progress reports to the Engineer by
the 10th day of each month. The report shall include an updated Construction Schedule.
The Lump Sum contract price paid for Bid Item No. 1 “Mobilization” shall include full
compensation for furnishing all labor, materials, tools, equipment, and incidentals for mobilization
and no additional compensation will be allowed therefor, including any remobilization due to
phasing of work.
END OF SECTION 01 71 13
ADDENDUM 1
4.1.c
Packet Pg. 343 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-13 TECHNICAL SPECIFICATIONS
02 32 19 – POTHOLING (EXPLORATORY EXCAVATIONS)
(Bid Item No. 25)
Work under this section shall conform to the provisions in Section 15, “Existing Facilities” and
Section 19, “Earthwork” of the Caltrans Specifications, these special provisions, and applicable
utility standards.
This section shall include all exploratory excavation or potholing performed by the Contractor.
It is critical to not damage the existing utilities during construction. To this end, the City has
reviewed record drawings and have included existing available utility information on the civil
plans. It should be emphasized that even though this information is being provided, it is the
Contractor’s responsibility to protect the utilities during construction and to ensure that the
existing utilities do not conflict with the proposed improvements. It is possible that all existing
utilities may not be shown on the civil plans.
As used in this section, “non-street facilities” means any above or below ground facilities which
are not a part of the roadway structural section, curb and gutter, and sidewalk. Utility shall
include, but not be limited to, sewer, water, recycled water, storm drain, and irrigation pipelines,
and above and below ground electrical and gas facilities, cable, telephone, or other utilities and
communications facilities.
It is anticipated that some or all of the utility and other non-street facilities, both above ground
and below ground, that are required to be rearranged (as used herein, rearrangement includes
installation, relocation, alteration or removal) as a part of the street improvement will be
rearranged in advance of construction operations.
The Contractor shall be aware of the possible existence of underground main or trunk line facilities
not indicated on the Plans or in the Contract Specifications and to the possibility that underground
main or trunk lines may be in a location different from that which is indicated on the Plans or in
the Contract Specifications. Prior to commencing any trenching, excavation, or boring operations,
or any work that may damage any of the facilities or interfere with their service, the Contractor
shall, by potholing or other means approved by the Engineer, ascertain the exact location of
underground main or trunk line facilities whose presence is indicated on the Plans or in the
Contract Specifications or identified by their use or by USA, the location of their service laterals
or other appurtenances, and of existing service lateral or appurtenances of any other underground
facilities which can be inferred from the presence of visible facilities such as buildings, meters and
junction boxes, vents, lids or manholes. Prior to construction the Contractor will be responsible
for verifying that no conflicts exist between existing and proposed street and utility infrastructure
improvements.
Utility company service laterals are not shown on project plans. Contractor should allow for gas,
water, sewer, telephone, and cable TV services for each lot shown. Utility companies will locate
services and Contractor shall protect all services and facilities from injury. In case of damage to
existing utilities, they shall be restored by the Contractor or by utility company personnel to the
ADDENDUM 1
4.1.c
Packet Pg. 344 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-14 TECHNICAL SPECIFICATIONS
same type and quality of improvement at the Contractor’s cost and expense without additional
compensation.
If the Contractor discovers underground main or trunk lines not indicated on the plans or in the
Contract Specifications, the Contractor shall immediately give the Engineer and the Utility Owner
if not the City, written notification of the existence of those facilities. The main or trunk lines shall
be located and protected from damage as directed by the Engineer.
The Contractor shall immediately notify the Engineer of any delays to the Contractor's operations
as a direct result of underground main or trunk line facilities which were not indicated on the
Plans or in the Contract Specifications or were located in a position substantially different from
that indicated on the Plans or in the Contract Specifications.
Potholes or other excavations performed to determine the location of Utility and Non-Street
Facilities, and which potholes or excavations will remain outside the area to be excavated for
improvements shown on the Plans or specified in the Contract Specifications, shall be backfilled,
compacted, and the surface thereof restored in accordance with these Plans and Specifications.
Exception: Potholes or other excavations in the street area of diameter (or equivalent dimension
if non-circular), of 9 inches or less shall be backfilled in the following manner:
• the bottom 1 foot of the pothole or other excavation shall be backfilled with clean sand
• the remainder of the pothole or other excavation shall be backfilled with slurry cement or
with Class 2 aggregate base (AB) compacted in accordance with Section 32 11 23.
In asphalt pavement street areas the pothole shall be resurfaced with a 7 inch thick hot mix
asphalt plug with the surface level with or slightly higher than the surrounding existing pavement.
The type of surface restoration for potholes outside of the street area shall be directed by the
Engineer.
Any additional expenses incurred because of the failure of the Contractor to comply with these
requirements shall be borne by the Contractor.
The contract Lump Sum price for Bid Item No. 25 “Potholing (Exploratory Excavations)” shall
include full compensation for furnishing all labor, materials, tools, equipment, and for doing all
work conforming to the requirements of this section. No additional compensation will be allowed
thereof.
END OF SECTION 02 32 19
ADDENDUM 1
4.1.c
Packet Pg. 345 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
02 41 13.13 – ROADWAY EXCAVATION AND SAW CUTTING
(BID ITEMS No. 5 & 6)
Work under this section shall conform to the provisions in Section 15, “Existing Facilities” and
Section 19, “Earthwork” of the Caltrans Specifications, Section 401, “Removal” of the Greenbook
Specifications, these special provisions, and applicable utility standards.
This section shall include all roadway excavation, saw cutting, earthwork, asphalt concrete
removal, base removal, excavation, exporting, placement of fill material, including any import fill,
backfill, compaction, grading, shoulder grading, and all other earthwork if not addressed
somewhere else in the bid schedule. This section also includes saw cutting.
If any export of material is required, Contractor shall export to external sources. If areas are
encountered that the Contractor believes should be determined to be “unsuitable material”, the
Contractor shall notify the Engineer. If the Engineer determines that the material is “unsuitable”
it shall then be removed and disposed of and paid for as extra work.
It is critical to not damage the existing utilities during construction. To this end, the City has
reviewed record drawings and have included existing available utility information on the civil
plans. It should be emphasized that even though this information is being provided, it is the
Contractor’s responsibility to protect the utilities during construction and to ensure that the
existing utilities do not conflict with the proposed improvements. It is possible that all existing
utilities may not be shown on the civil plans.
The contract Lineal Foot price for Bid Item No. 5 “Saw Cut” shall include full compensation for
furnishing all labor, materials, tools, equipment, and for doing all work conforming to the
requirements of this section. No additional compensation will be allowed thereof.
The contract Cubic Yard price for Bid Item No. 6 “Remove & Dispose Existing Pavement and
Base” shall include full compensation for furnishing all labor, materials, tools, equipment, and for
doing all roadway excavation, saw cutting, earthwork, asphalt concrete removal, base removal,
excavation, exporting, placement of fill material, including any import fill, backfill, compaction,
grading, shoulder grading, and all other earthwork if not addressed somewhere else in the bid
schedule conforming to the requirements of this section. Cold milled asphalt concrete is not
considered to be included in the Cubic Yardage or the compensation for Bid Item No.
6 “Remove & Dispose Existing Pavement and Base”. No additional compensation will be
allowed thereof.
END OF SECTION 02 41 13.13
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-15 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 346 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
02 41 13.55 – OVER EXCAVATION & SUBGRADE PREPARATION
(BID ITEM No. 27)
Work under this section shall conform to the recommendations in the Geotechnical Report and
the Geotechnical Investigation Report Addendum found in Appendix “D” of this document, Section
301 of the Greenbook Specifications, these technical specifications, and applicable utility
standards.
The recommendations of the Geotechnical Report and the Geotechnical Investigation Report
Addendum found in Appendix “D” of this document shall take precedence over any conflicting
information found in the Greenbook.
For bidding purposes, Contractor shall assume 15,566 CY for 2 feet of over excavation for
subgrade preparation as shown on Typical Overex Section found on sheet W-2 of the plans. The
over excavated material will be replaced back into the over excavated trench after the Engineer’s
approval of the condition of the excavation bottom. Over excavation will not be required for the
6 foot wide existing EMWD pipe backfill as shown on Typical Overex Section found on sheet W-
2. Contractor shall take extra caution while excavating near the existing EMWD pipe and all other
utilities. If field conditions warrant deviation from the recommendations provided in the
Geotechnical Report, a change order will be issued in accordance with Section 9.1, “Change
Orders and Time Extensions” of the General Conditions.
The excavation bottom will be observed by the Engineer to verify the exposed conditions.
Contractor shall proof-roll the excavation bottom to observe any deflection. If the exposed
conditions are as anticipated, the excavation bottom should then be brought to near optimum
moisture content and compacted to a minimum 90% relative compaction per ASTM D1557. The
finished subgrade shall be compacted to a minimum 90% relative compaction. All fill placement
and compaction will be observed by the Engineer or a representative of the Engineer to verify
that soils are properly moisturized, processed, and compacted.
All soils and grading work shall be under the supervision of the geotechnical engineer.
The contract Cubic Yard price for Bid Item No. 27 “Over Excavation and Subgrade Preparation”
shall include full compensation for furnishing all labor, materials, tools, equipment, and for doing
all excavation, placement of fill material, backfill, compaction, grading, grading, proof rolling, and
all other earthwork if not addressed somewhere else in the bid schedule conforming to the
requirements of this section. No additional compensation will be allowed thereof.
END OF SECTION 02 41 13.55
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-15A TECHNICAL SPECIFICATIONS
ADDENDUM 5
4.1.c
Packet Pg. 347 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-16 TECHNICAL SPECIFICATIONS
02 43 13 – REMOVE OR RELOCATE EXISTING FACILITIES
(BID ITEMS No. 7, 8, 9, 10, 11, 13, 14, 15, 16, 20, 3A, 4A, 5A, 6A, 7A, 8A, 9A, 10A, & 11A)
Removal or relocation of facilities shall conform to the provisions of Section 400 “Protection and
Restoration”, Section 401 “Removal”, and Section 402 “Utilities” of the Greenbook Specifications.
All items covered in this section shall conform to Section 15, “Existing Facilities” and applicable
utility standards.
Signs to be removed shall be returned to the City’s Public Utilities Yard at 270 Bissell Place, San
Jacinto, CA 92582. Contact the City's Public Works Department at (951) 487-7330 giving 3 days
advanced notice prior to delivery.
Existing items and utilities shall be removed and disposed of as shown on the construction plans.
Items designated for relocation shall be reinstalled as directed by the City Engineer. Existing
EMWD facilities noted for relocation shall be determined by an EMWD inspector. The contractor
shall notify EMWD to make arrangements for an inspector to be present prior to any relocation
of an EMWD facility.
For bid purposes, bidder shall assume that extending service lines and using salvaged materials
is acceptable for the relocation bid items in the EMWD Additive Alternate Bid Schedule. If EMWD
decides that new materials are required, a change order will be issued.
Contractor will apply and pay for necessary encroachment permits for Work within MWD an EMWD
rights-of-way. All other necessary permits and licenses necessary for prosecution of the Work
shall be secured and paid for by Contractor, including, but not limited to, permits, licenses and
fees required by agencies with authority in the jurisdiction in which the Work will be located,
unless otherwise expressly provided by the Contract Documents.
If any item that is called-out to be relocated is deemed unfit to be used again then the contractor
shall notify the engineer. The engineer shall direct the contractor to replace or repair that item.
If the contractor damages an item called out to be relocated then the contractor shall at the
direction of the engineer, replace or repair that item or items at the contractor’s own expense.
Payment for the removal of existing facilities shall include all necessary excavation, backfill,
incidentals, and work involved to remove the items called out on the plans and no additional
compensation will be allowed.
Payment for Bid Item No. 7 “Remove & Dispose Existing AC Berm” shall be per Lineal Foot as
defined in the bid schedule. Payment shall include full compensation for furnishing all labor,
materials, tools, equipment, incidentals, and for doing all work involved to provide these items
complete in place, and no additional compensation will be allowed therefor.
ADDENDUM 2
4.1.c
Packet Pg. 348 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-17 TECHNICAL SPECIFICATIONS
Payment for Bid Item No. 8 “Remove & Dispose Existing 18" CMP” shall be per Lineal Foot as
defined in the bid schedule. Payment shall include full compensation for furnishing all labor,
materials, tools, equipment, incidentals, and for doing all work involved to provide these items
complete in place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 9 “Remove & Dispose Existing 12" CMP” shall be per Lineal Foot as
defined in the bid schedule. Payment shall include full compensation for furnishing all labor,
materials, tools, equipment, incidentals, and for doing all work involved to provide these items
complete in place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 10 “Remove & Dispose Existing Headwalls per Construction Note #4”
shall be per Each as defined in the bid schedule. Payment shall include full compensation for
furnishing all labor, materials, tools, equipment, incidentals, and for doing all work involved to
provide these items complete in place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 11 “Remove & Dispose Existing Reflector Delineators” shall be per
Lump Sum as defined in the bid schedule. Payment shall include full compensation for furnishing
all labor, materials, tools, equipment, incidentals, and for doing all work involved to provide these
items complete in place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 13 “Remove & Dispose Existing Guard Rail” shall be per Lineal Foot
as defined in the bid schedule. Payment shall include full compensation for furnishing all labor,
materials, tools, equipment, incidentals, and for doing all work involved to provide these items
complete in place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 14 “Relocate Existing Fencing and Gates” shall be per Lineal Foot as
defined in the bid schedule. Payment shall include full compensation for furnishing all labor,
materials, tools, equipment, incidentals, and for doing all work involved to provide these items
complete in place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 15 “Relocate Existing Mailbox” shall be per Each as defined in the bid
schedule. Payment shall include full compensation for furnishing all labor, materials, tools,
equipment, incidentals, and for doing all work involved to provide these items complete in place,
and no additional compensation will be allowed therefor.
ADDENDUM 5
4.1.c
Packet Pg. 349 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-18 TECHNICAL SPECIFICATIONS
Payment for Bid Item No. 16 “Remove & Dispose Existing Frontier Pole” shall be per Each as
defined in the bid schedule. Payment shall include full compensation for furnishing all labor,
materials, tools, equipment, incidentals, and for doing all work involved to provide these items
complete in place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 20 “Remove and Salvage Signage” shall be per Each as defined in the
bid schedule. Payment shall include full compensation for furnishing all labor, materials, tools,
equipment, incidentals, and for doing all work involved to provide these items complete in place,
and no additional compensation will be allowed therefor.
Payment for Bid Item No. 3A “Relocate Existing EMWD Marker Post” shall be per Each as defined
in the bid schedule. Payment shall include full compensation for furnishing all labor, materials,
tools, equipment, incidentals, and for doing all work involved to provide these items complete in
place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 4A “Relocate Existing EMWD Pedestal” shall be per Each as defined in
the bid schedule. Payment shall include full compensation for furnishing all labor, materials, tools,
equipment, incidentals, and for doing all work involved to provide these items complete in place,
and no additional compensation will be allowed therefor.
Payment for Bid Item No. 5A “Relocate Existing EMWD Air Vac” shall be per Each as defined in
the bid schedule. Payment shall include full compensation for furnishing all labor, materials, tools,
equipment, incidentals, and for doing all work involved to provide these items complete in place,
and no additional compensation will be allowed therefor.
Payment for Bid Item No. 6A “Relocate Existing EMWD Test Station” shall be per Each as defined
in the bid schedule. Payment shall include full compensation for furnishing all labor, materials,
tools, equipment, incidentals, and for doing all work involved to provide these items complete in
place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 7A “Relocate Existing EMWD Blow Off” shall be per Each as defined in
the bid schedule. Payment shall include full compensation for furnishing all labor, materials, tools,
equipment, incidentals, and for doing all work involved to provide these items complete in place,
and no additional compensation will be allowed therefor.
Payment for Bid Item No. 8A “Relocate Existing EMWD Water Valve” shall be per Each as defined
in the bid schedule. Payment shall include full compensation for furnishing all labor, materials,
tools, equipment, incidentals, and for doing all work involved to provide these items complete in
place, and no additional compensation will be allowed therefor.
ADDENDUM 2
4.1.c
Packet Pg. 350 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-19 TECHNICAL SPECIFICATIONS
Payment for Bid Item No. 9A “Relocate Existing EMWD Fire Hydrant” shall be per Each as defined
in the bid schedule. Payment shall include full compensation for furnishing all labor, materials,
tools, equipment, incidentals, and for doing all work involved to provide these items complete in
place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 10A “Relocate Existing EMWD Water Meter” shall be per Each as
defined in the bid schedule. Payment shall include full compensation for furnishing all labor,
materials, tools, equipment, incidentals, and for doing all work involved to provide these items
complete in place, and no additional compensation will be allowed therefor.
Payment for Bid Item No. 11A “Relocate Existing EMWD Backflow” shall be per Each as defined
in the bid schedule. Payment shall include full compensation for furnishing all labor, materials,
tools, equipment, incidentals, and for doing all work involved to provide these items complete in
place, and no additional compensation will be allowed therefor.
END OF SECTION 02 43 13
ADDENDUM 2
4.1.c
Packet Pg. 351 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-20 TECHNICAL SPECIFICATIONS
03 00 00 – MINOR CONCRETE
(Bid Item No. 21, 22, 23, 24, & 26)
Minor concrete work shall comply with Section 90, "Concrete" of the Caltrans Specifications and
these Special Provisions. Any concrete accelerators used to speed construction shall be at the
Contractor's expense and no additional payment will be made by the City. All concrete used for
driveways and cross gutters shall be sufficiently strong to allow them to be opened to traffic
within 72-hours of placement. Minor concrete items shall be constructed using a minimum of
3250 psi concrete mix unless otherwise specified.
All minor concrete items (including but not limited to, sidewalks, curb & gutter, driveways,
pedestrian ramps, cross gutters/spandrels, and PCC parking lot paving) shall be built per Riverside
County Improvement Standards and Specifications except as otherwise noted or modified in these
plans and specifications. The Contractor shall refer specifically to the following standard plans of
the Riverside County Transportation Department (latest edition) for further information:
• Riverside County Standard 201, "Type A-8 Curb and Gutter"
• Riverside County Standard 207, "Residential Drive Approach"
• Riverside County Standard 207A, "Commercial Drive Approach"
• Riverside County Standard 401, "Sidewalk and Curb"
• Riverside County Standard 403, "Curb Ramp"
All minor concrete must meet the latest ADA requirements. Minimum sidewalk thickness is a true
4.0 inches, and minimum drive approach and driveway thickness is 8.0 inches, both per Riverside
County Standards.
Handicap access ramps shall be bid per each and shall include all work from the BCR to the ECR
including, but not limited to, all concrete curb and gutter, the landing behind ramps, sidewalk,
scoring, grading to conform to existing area, and any and all work to make the ramp meet ADA
requirements. If applicable, all commercial driveways shall be paid per each and shall include
truncated domes. Truncated Domes Detectable Warning Surfaces shall meet all ADA
requirements, and all requirements of the County of Riverside. The color shall be yellow # 33538.
The subgrade shall be prepared conforming to the provisions in Section 301 “Subgrade
Preparation, Treated Materials, and Placement of Base Materials” of the Greenbook Specifications,
and these provisions. The top one (1) foot of subgrade shall be moisture-conditioned, processed,
and compacted to a minimum relative compaction of 95%. Minimum relative compaction shall
be 90% for sidewalk. Full compensation for preparing the subgrade for minor concrete items shall
be considered as included in the contract price paid for the minor concrete item.
Where expansive soils are found, place a minimum of 6” of class 2 aggregate base under and
around all sides of concrete improvements as directed by the Engineer. Per the soils report, there
ADDENDUM 1
4.1.c
Packet Pg. 352 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-21 TECHNICAL SPECIFICATIONS
is a potential for expansive soils in the vicinity of the job. Therefore, prior to the installation of
minor concrete items, the Engineer will conduct additional geotechnical investigations to identify
expansive soils. If class 2 aggregate base is determined to be necessary for concrete
improvements, the City will issue a change order to compensate the Contractor for the extra work
of installing the class 2 aggregate base intended for minor concrete improvements.
Payment for minor concrete shall be per unit as defined in the bid schedule for each minor
concrete item. Payment shall also include the removal of any concrete items if this is not
addressed elsewhere in the bid schedule. The price shall also include any required saw-cutting,
removal and replacement of any items needed to provide room for the form boards, and shall
include full compensation for all labor, materials, tools, equipment and incidentals for minor
concrete improvements complete-in-place.
"Slot paving" shall be installed along all new curb & gutter, in accordance with the details provided
in the project plans so as to develop a smooth connection between the existing roadway and the
new lip of gutter. The cost for removal and compaction for subgrade and construction of the slot
paving (minimum 2' wide) shall be included in the price per foot for curb and gutter.
Compensation for Bid Item No. 21 “Construct Sidewalk per County of Riverside Std 401” shall be
paid per Square Foot as shown on the bid schedules and shall include full compensation for all
work described in this section including furnishing all labor, materials, tools, equipment, signage,
and incidentals; additional compensation is not allowed.
Compensation for Bid Item No. 22 “Construct Type "A-8" Curb & Gutter per County of Riverside
Std 201” shall be paid per Lineal Foot as shown on the bid schedules and shall include full
compensation for all work described in this section including furnishing all labor, materials, tools,
equipment, signage, and incidentals; additional compensation is not allowed.
Compensation for Bid Item No. 23 “Construct Residential Driveway per County of Riverside Std
207” shall be paid per Each as shown on the bid schedules and shall include full compensation
for all work described in this section including furnishing all labor, materials, tools, equipment,
signage, and incidentals; additional compensation is not allowed.
Compensation for Bid Item No. 24 “Construct Access Ramp per ADA & County of Riverside Std
403” shall be paid per Each as shown on the bid schedules and shall include full compensation
for all work described in this section including furnishing all labor, materials, tools, equipment,
signage, and incidentals; additional compensation is not allowed.
Compensation for Bid Item No. 26 “Construct Commercial Driveway per County of Riverside Std
207A” shall be paid per Each as shown on the bid schedules and shall include full compensation
for all work described in this section including furnishing all labor, materials, tools, equipment,
signage, and incidentals; additional compensation is not allowed.
END OF SECTION 03 00 00
C-6
ADDENDUM 2
4.1.c
Packet Pg. 353 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-22 TECHNICAL SPECIFICATIONS
22 14 00 – STORM DRAIN STRUCTURES
(Bid Items No. 30, 31, 34, 37, 39, 40, 41, 42, 43, & 47)
GENERAL
Storm drain work shall comply with Section 207 "Gravity Pipe" of the Greenbook Specifications,
Division VII “Drainage Facilities” of the Caltrans Standard Specifications, and Section 03 00 00
“Minor Concrete” of these Technical Specifications.
MATERIALS AND CONSTRUCTION
Pipe materials and installation procedures shall be in conformance with plans and Section 65-2
“Reinforced Concrete Pipe” of the Caltrans Standard Specifications and in conformance with
manufacturer’s recommendations. All storm drain pipe to be installed shall be fabricated with any
of the following materials unless specified otherwise on the plans:
A. Reinforced Concrete Pipe, 12” diameter
B. Reinforced Concrete Pipe, 18” diameter
C. Reinforced Concrete Pipe, 30" diameter
Storm drain manholes, headwalls, transition structures, junction structures, concrete depressions,
concrete collars, drain inlets, and catch basins shall be constructed in conformance with Section
90, "Concrete" of the Caltrans Specifications, manufacturer’s recommendations, these technical
specifications, and the following standard plans unless specified otherwise on the plans:
A. Caltrans Standard Plan D89A: Pipe Culvert Headwalls Straight and “L”
B. RCFCD Standard Drawing M803: Concrete Collar for Pipes 12” through 66”
C. RCFCD Standard Drawing MH251: Manhole No. 1
D. RCFCD Standard Drawing JS233: Junction Structure No. 8
E. County of Riverside Standard No. 300: Curb Inlet Catch Basin
F. County of Riverside Standard No. 311: Gutter Depression for Curb Opening Catch Basins
TRENCH EXCAVATION AND BACKFILL
Trench excavation and backfill shall be performed in accordance with Section 300 “Earthwork” of
the Greenbook Standard Specifications and Section 19 “Earthwork” of the Caltrans Standard
Specifications. Work under this section shall be included in the storm drain bid items, and no
additional payment will be made therefore.
Trench shoring and bracing drawings for trenches deeper than five (5) feet shall be submitted for
the Engineer’s approval. In lieu of said drawings, the Contractor may state in writing that sloping,
ADDENDUM 1
4.1.c
Packet Pg. 354 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-23 TECHNICAL SPECIFICATIONS
shoring or benching systems shall be provided and used that conform with Section 1541 of the
Cal OSHA Construction Safety Orders, as amended.
PIPELAYING
The pipe shall be laid without break upgrade from structure to structure, true to line and grade,
centered to make a smooth and regular interior surface with a bell-collar end upgrade, unless
otherwise permitted by the Engineer.
When a connection is to be made to any existing pipeline or structure where the elevation or
position of which cannot be determined without excavation, the Contractor shall excavate for and
expose the existing work before laying any pipe.
Prior to installation, all pipe shall be checked for soundness, unevenness or any obvious defect.
Any pipe found broken, cracked or defective prior to or during laying shall be removed from the
trench. All pipes and structures must be clean of debris before final acceptance. Walking on top
of the pipe after it has been laid to grade will not be permitted. Suitable excavation shall be made
to receive the bell collar of the pipe, and the joint shall not bear upon the bottom of the trench.
Pipe shall be held true to line and grade so that a light will be visible from manhole to manhole.
The pipe shall be protected during handling against impact, shock and free fall. All adjustments
to line and grade shall be made by scraping away or filling in with sand, gravel or granular material
under the body of the pipe and not by wedging or blocking.
The interior of the pipe and spigot end must be clean before jointing and the pipe
interior kept in a clean condition after jointing. Before leaving work for the night,
during a rain or when work is ceased for any reason, the unfinished end of the pipeline
shall be securely closed and not opened until work is resumed.
TESTING
Upon completion of backfill and compacting trenches, the Contractor, at his expense, shall record
video inspection through the installed main line to demonstrate pipes meet the required line &
grade and maximum pipe deflection does not exceed allowable limit. If pipes don’t match line
and grade per plan and/or excessive pipe deflection is found, the Contractor shall perform all
work necessary to repair section of storm drain pipe and retest to ensure that pipe deflection is
within the allowable limit. All storm drain main lines and laterals shall be flushed with water and
"balled" or cleaned by acceptable method prior to testing to ensure that all dirt, debris, and
obstructions are removed. This work must be performed in the presence of and to the satisfaction
of the City Engineer, and the Contractor shall notify the City Engineer at least one (1) working
day in advance of starting the cleaning work. The Contractor shall, following backfill compaction
and line cleaning, perform video inspection and furnish video to City Engineer for review.
ADDENDUM 1
4.1.c
Packet Pg. 355 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-24 TECHNICAL SPECIFICATIONS
CONNECTION TO EXISTING STORM DRAIN
Connection to existing storm drain facilities shall be made in such a manner that the finish work
conforms to the applicable requirements specified for new manholes and catch basins including
all necessary concrete work, cutting and shaping.
Method of connection shall be determined by the Contractor, subject to approval of the Engineer.
Non-shrink grout for concrete pipes shall be used to ensure a water-tight connection.
ABANDONMENT OF EXISTING STORM DRAIN PIPE
When explicitly shown on plans, the Contractor shall abandon storm drain pipe and structures.
The Contractor shall plug both ends of pipe with a minimum 6” thick wall of concrete. Structures
shall be demolished to an elevation three feet below finished grade, their bottom, if any remains,
shall be broken to prevent entrapment of water and the resultant void backfilled and compacted
with native soil.
RESTORATION OF SURFACING
Existing paving shall be saw cut to neat lines and edges cleaned and primed before repaving
commences. After compaction of the asphalt, the final surface shall be one-quarter (1/4) inch
higher than the undisturbed adjoining surface. The entire cost of pavement replacement and
repair, regardless of the trench width incurred during pipe installation, will be borne by the
Contractor. The Contractor shall guarantee and maintain the resurfacing and the backfilled
trenches for a period of one (1) year from the date of final acceptance. Asphalt concrete shall
conform to the provisions in Section 39, “Asphalt Concrete” of the Caltrans Specifications except
as modified in Section V, Subsection 1, “Asphalt Concrete” of City of Hanford Standard
Specifications.
MEASUREMENT AND PAYMENT
Payment for all of the bid items listed below shall include all necessary excavation, backfill,
incidentals, and work involved to remove the items called out on the plans and no additional
compensation will be allowed.
Compensation for Bid Item No. 30 “Construct Single Headwalls per Caltrans Std D89A” shall be
paid per Each as shown on the bid schedules and shall include full compensation for all work
described in this section including furnishing all labor, materials, tools, equipment, signage, and
incidentals; additional compensation is not allowed.
ADDENDUM 1
4.1.c
Packet Pg. 356 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-25 TECHNICAL SPECIFICATIONS
Compensation for Bid Item No. 31 “Construct Concrete Collar per RCFC & WD Std M803” shall be
paid per Each as shown on the bid schedules and shall include full compensation for all work
described in this section including furnishing all labor, materials, tools, equipment, signage, and
incidentals; additional compensation is not allowed.
Compensation for Bid Item No. 34 “Construct Junction Structure No. 8 Per RCFC Std JS233” shall
be paid per Each as shown on the bid schedules and shall include full compensation for all work
described in this section including furnishing all labor, materials, tools, equipment, signage, and
incidentals; additional compensation is not allowed.
Compensation for Bid Item No. 37 “Construct Manhole No. 1 per RCFC & WCD STD MH251” shall
be paid per Each as shown on the bid schedules and shall include full compensation for all work
described in this section including furnishing all labor, materials, tools, equipment, signage, and
incidentals; additional compensation is not allowed.
Compensation for Bid Item No. 39 “Construct 4' Wide Curb Inlet Catch Basin per County of
Riverside Std 300” shall be paid per Each as shown on the bid schedules and shall include full
compensation for all work described in this section including furnishing all labor, materials, tools,
equipment, signage, and incidentals; additional compensation is not allowed.
Compensation for Bid Item No. 40 “Construct Depression for Curb Opening Catch Basin, Case C,
per County of Riverside Std 311” shall be paid per Square Foot as shown on the bid schedules
and shall include full compensation for all work described in this section including furnishing all
labor, materials, tools, equipment, signage, and incidentals; additional compensation is not
allowed.
Compensation for Bid Item No. 41 “Construct 12" RCP” shall be paid per Lineal Foot as shown
on the bid schedules and shall include full compensation for all work described in this section
including furnishing all labor, materials, tools, equipment, signage, and incidentals; additional
compensation is not allowed.
Compensation for Bid Item No. 42 “Construct 18" RCP” shall be paid per Lineal Foot as shown
on the bid schedules and shall include full compensation for all work described in this section
including furnishing all labor, materials, tools, equipment, signage, and incidentals; additional
compensation is not allowed.
Compensation for Bid Item No. 43 “Construct 30" RCP” shall be paid per Lineal Foot as shown
on the bid schedules and shall include full compensation for all work described in this section
including furnishing all labor, materials, tools, equipment, signage, and incidentals; additional
compensation is not allowed.
ADDENDUM 1
4.1.c
Packet Pg. 357 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-26 TECHNICAL SPECIFICATIONS
Compensation for Bid Item No. 47 “Construct Modified Dual-Pipe Junction Structure Per RCFC
STD JS233” shall be paid per Lump Sum as shown on the bid schedules and shall include full
compensation for all work described in this section including furnishing all labor, materials, tools,
equipment, signage, and incidentals; additional compensation is not allowed.
END OF SECTION 22 14 00
ADDENDUM 1
4.1.c
Packet Pg. 358 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-27 TECHNICAL SPECIFICATIONS
31 11 00 – CLEARING AND GRUBBING
(Bid Item No. 4)
This section covers the requirements for Bid Item No. 4 “Clearing and Grubbing” and all work
indicated on the plans by construction note 3. Work under this item shall conform to the
provisions in Section 17-2, “Clearing and Grubbing” of the Caltrans Specifications and these
special provisions.
This item shall include all clearing and grubbing within the project limits. Included in this item the
Contractor shall chemically kill and remove any and all weeds that are growing within the project
area and shall also chemically treat the top of sub-grade or native soil to prevent the future
growth of weeds.
All weeds shall be sprayed with an herbicide mixture of either Hyvar mixed with Roundup or
Pratatol mixed with Roundup, or approved equal, between seven (7) to twenty-one (21) days
prior to removing the weeds. The herbicide mixture shall contain Blazon, or approved equal, a
purple dye to easily confirm the herbicide has been applied. Full compensation for furnishing and
applying weed kill shall be considered as included in the contract price paid for clearing and
grubbing.
This work shall also consist of pruning trees and disposal offsite of trees as required. Pruning
shall be performed only by a certified arborist and with prior City approval. No pruning of new
or existing trees shall be done without prior City Engineer approval. No hooks or any other
climbing devices that might damage or puncture tree bark shall be used. The Contractor shall be
responsible to report to the City Engineer in writing, any hazardous trees, dead structural limbs,
or cavities so corrective action may be taken.
(a) Trees shall be pruned to meet the following criteria:
a. All branches overhanging roadways beyond curb face shall have 13’-6” minimum
vertical clearance.
(b) Trees covered by a landscape maintenance agreement or district shall be maintained or
removed as necessary per the agreement or by the maintenance district.
(c) Tree branches entangled in, or interfering with, overhead utility wires will be referred to
the appropriate utility for maintenance requests.
Should any direct or indirect damage or injury result in any public or private property by or on
account of any act, omission, neglect, or misconduct in the execution of work, or as a
consequence of the nonexecution thereof on the part of the Contractor or any of his employees
or agents, such property shall be restored at the expense of the Contractor to a condition
equivalent to that existing before the damage or injury occurred by repairing or rebuilding the
same, or by otherwise making restitution in an acceptable manner for such damage or injury, the
Contractor shall be required to provide and maintain barriers, guards, and lights when and where
it may be necessary in order to effectively guard the public from the work being done. The
ADDENDUM 1
4.1.c
Packet Pg. 359 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-28 TECHNICAL SPECIFICATIONS
Contractor shall also be required to post proper signage and traffic control for the public regarding
detours and the condition of the work under construction, all in accordance with applicable
provisions in Part 6 of the California MUTCD.
All removed tree material, including debris, shall become the property of the Contractor who shall
be responsible for its proper disposal. The Contractor shall not leave debris, at the site overnight.
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for
doing all the work involved in tree pruning, conforming to the requirements of this section shall
be considered as included in the Lump Sum price paid for Bid Item No. 4 “Clearing and Grubbing”
and no additional compensation will be allowed therefor.
END OF SECTION 31 11 00
ADDENDUM 1
4.1.c
Packet Pg. 360 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-29 TECHNICAL SPECIFICATIONS
31 11 53 – MONITORING WELL
(Bid Item No. 29)
ADDENDUM 1
4.1.c
Packet Pg. 361 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-30 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 362 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-31 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 363 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-32 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 364 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-33 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 365 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-34 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 366 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-35 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 367 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-36 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 368 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-37 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 369 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-38 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 370 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-39 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 371 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-40 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 372 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-41 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 373 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-42 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 374 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-43 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 375 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-44 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 376 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-45 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 377 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-46 TECHNICAL SPECIFICATIONS
31 37 00 – RIP-RAP
(Bid Item No. 44)
This section covers the requirements for Bid Item No. 44 “Install Rip-Rap”. Riprap shall conform
to the provisions in Section 72 “Slope Protection” of the Caltrans Standard Specifications.
Contractor shall install a 2.5-foot thick layer of Light Rip-Rap, Class III RSP per Caltrans Standard
Specifications Section 72, at locations shown on plans over a layer of filter fabric. The installation
of the rip-rap shall be placed per Method B as described in Section 72 of the Caltrans Standard
Specifications.
Placement Method B is described as follows:
• Rocks may be placed by dumping and may be spread in layers by bulldozers or other
suitable equipment.
• Place rocks such that:
o There is a minimum of voids
o Larger rocks are in the toe course and on the outside surface of the slope
protection.
Due to the side slopes being close together, the footing trenches on either side will meet and the
contractor will fill the trenches with rip-rap. The Contractor will not be required to excavate to
the scour depth.
The Contractor shall notify the Engineer in writing of the intended source of rock at least 30 Days
prior to use.
The materials for the filter fabric shall meet the requirements for a Class 8 RSP filter fabric as
defined in Section 96-1.02I “Rock Slope Protection Fabric” of the Caltrans Standard Specifications.
The filter material shall be consolidated and the surface trimmed to final grade as directed by the
Engineer. Filter fabric shall be overlapped a minimum of 12 inches at roll edges with upstream
fabric being placed on top of downstream fabric at the lap.
Compensation for Bid Item No. 44 “Install Rip-Rap” shall be paid per Ton as shown on the bid
schedules and shall include full compensation for all work described in this section including
furnishing all labor, materials, tools, equipment, signage, and incidentals; additional
compensation is not allowed. Compensation for furnishing and installing filter fabric is considered
to be included in the rip-rap tonnage unit cost.
END OF SECTION 31 37 00
C-6
ADDENDUM 2
4.1.c
Packet Pg. 378 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-47 TECHNICAL SPECIFICATIONS
32 01 13.61 – TYPE 1 SLURRY
(Bid Item No. 45)
This section covers the requirements for Bid Item 45 “Type 1 Slurry.” Slurry seal shall conform to
the provisions in Section 302-4 “Slurry Seal Surfacing” of the Greenbook Specifications. Pavement
surfaces shall be thoroughly cleaned, have herbicide applied and all weeds removed, and have
the cracks sealed as defined in the Special Provisions.
Prior to applying slurry seal, the Contractor shall clean, to the satisfaction of the Engineer, the
street surface with a power sweeper, remove all R.P.M.'s, abrasive grind or sandblast completely
all lane lines, street legends, crosswalks, or other painted or thermoplastic surfaces. All shall be
treated.
Before commencing the sealing operations, all surface utility covers, survey monuments, and
survey markers which were uncovered shall be covered by thoroughly covering the surface with
an appropriate adhesive or plastic paper. No adhesive material shall be permitted to cover, seal
or fill the joint between the frame and cover of the structure. Covers are to be uncovered and
cleaned by the end of the same work day. Ridges or bumps in the finished surface will not be
permitted.
Emulsified asphalt shall be quick-set. Slurry shall not be applied at more than 100 ft. per minute.
NO MORE THAN 150 TONS OF SLURRY SHALL BE SCHEDULED PER DAY.
The slurry course shall not be placed if either the pavement or the air temperature is below 55
degrees F and falling and shall not be placed if either the pavement or the air temperature is
above 95 degrees F and rising.
The application of slurry shall not commence until after 8:00 am, and shall conclude at 1:30 pm
unless other authorized by the Engineer. The slurry shall be sufficiently cured to be open to traffic
by 4:00 pm. The portions of streets to be slurry sealed shall be closed from the time the
application begins until the mixture as sufficient set to be opened to traffic.
The slurry shall be applied in such a manner that no ripples, bumps, or ridges exist. If ripples or
waves occur in the slurry during the application, the work shall cease and the Contractor shall
correct the situation. The Contractor may use a drag to knock down ridges. If ripples or waves
are not corrected to the Engineer's satisfaction, the street shall be slurry sealed again at the
Contractor's expense.
The Contractor shall, at the direction of the Engineer, repair the reseal to the entire street, or
complete section thereof, as determined by the Engineer, which have not been sealed properly
(includes areas that have failed to meet yield and mix designs specifications) and completely. No
compensation will be provided for slurry seal used in repair and reseal work.
TS-47
ADDENDUM 1
4.1.c
Packet Pg. 379 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-48 TECHNICAL SPECIFICATIONS
After slurry is placed, Contractor shall be required to use a power blower the following day (and
weekly as determined by City Engineer) on the street to remove loose particles from sidewalks,
driveways, and private properties. Contractor shall also sweep street a minimum of 2 days per
week or as directed by Engineer for a month after slurry is placed.
Adequate means shall be provided to protect the slurry course from damage by traffic until such
time that the mixture has cured sufficiently so that the slurry course will not adhere to and be
picked up by the tires of the vehicle. The Contractor shall repair any damage to the seal treatment
at no cost to the City. The contract unit price paid per square yard for Slurry Seal shall include
full compensation for furnishing the mix design, all labor, materials, tools, equipment and
incidentals, and for doing all work involved and no additional compensation will be allowed
therefore.
The placement of slurry seal may be suspended with the concurrence of the Engineer due to
unsuitable weather, temperature conditions, or other conditions that are considered unfavorable
for the prosecution of the work. The Contractor shall immediately comply with the order of
suspension by the Engineer, and work shall not be resumed until authorized by the Engineer.
If work cannot resume on the same day to completion as scheduled, then this work shall be
rescheduled in one to two weeks and the residents notified that the work will not be done as
scheduled and re- notified of new work day promptly. All "NO PARKING" and "NO DRIVING" signs
must be promptly removed.
In the event of a suspension of work, the Contractor shall remove all barricades, equipment, and
"No Parking" and "No Driving" signs (if appropriate) upon the during of the completed portion of
slurry.
No adjustment of unit prices of any items shall be allowed due to a suspension of work as
described above.
The days during which the suspension of work is in effect due to unsuitable weather shall not be
considered working days and the date of completion shall be extended to allow for work and
notification.
Compensation for Bid Item 45 “Type 1 Slurry” shall be paid by Square Yard as shown on the
bid schedules and shall include full compensation for all work described in this section including
furnishing all labor, materials, tools, equipment, signage, striping, and incidentals; additional
compensation is not allowed.
END OF SECTION 32 01 13.61
ADDENDUM 1
4.1.c
Packet Pg. 380 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-49 TECHNICAL SPECIFICATIONS
32 01 16.71 – COLD MILL
(Bid Item No. 17)
Cold milling asphalt pavement shall conform to Section 404 “Cold Milling” of the Greenbook
Specifications and these Technical Specifications.
Cold milling machines shall be equipped with a cutter head not less than 6.5’ in width and shall
be operated so that no fumes or smoke will be produced. The cold milling machine shall mill the
pavement without requiring the use of a heating device to soften the pavement during or prior
to the milling operation.
The depth, width, and shape of the cut shall be as shown on the plans or as designated by the
Engineer. The final cut shall result in a uniform surface conforming to the plans. The outside lines
of the milled area shall be neat and uniform. Milling asphalt concrete pavement operations shall
be performed without damage to the surfacing to remain in place.
The material milled from the roadway surface, shall be removed and disposed of by the
Contractor. The Contractor shall provide equipment (including a water truck) for this work.
Contractor is responsible for protecting all existing utilities.
The contract Square Foot price paid for Bid Item No. 17 “Cold Mill 0.12' Asphalt Concrete” shall
include full compensation for furnishing all labor, materials, tools, equipment, and incidentals,
and for doing all the work involved in cold milling the asphalt concrete and disposing of milled
material. Included in this bid item is constructing, maintaining, removing, and disposing of
temporary asphalt concrete tapers, as specified in the Standard Specifications and these Special
Provisions and as directed by the Engineer. The disposal of cold milled asphalt will be
considered to be included in the compensation for Bid Item No. 17 “Cold Mill 0.12'
Asphalt Concrete” and no additional compensation will be allowed therefor.
END OF SECTION 32 01 16.71
ADDENDUM 1
4.1.c
Packet Pg. 381 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-50 TECHNICAL SPECIFICATIONS
32 01 17.61 – CRACK SEAL
(Bid Item No. 46)
This section covers the requirements for Bid Item No. 46 “Crack Seal.” Crack sealing shall conform
to the provisions in Section 37-6, “Crack Treatments” of the Caltrans Specifications and applicable
utility standards.
All areas that call out for AC Overlay, or as directed by the engineer, shall be crack
sealed. The crack sealing operation shall be completed a minimum of twenty-four (24) hours
prior to the placement of the AC overlay. Tack coat shall not be considered a replacement for
crack seal/filler.
Pavement cracks 1/8" and wider, including lane joints, traverse and longitudinal, and all random
cracks shall be sealed. Areas of severe alligator cracking (cracks producing 18" diameter blocks
or less) shall not be crack sealed. Pavement cracks ¼" to l" wide shall be cleared of all loose
particles of dust, dirt, and laitance with oil-free compressed air immediately proceeding the
sealing operation. Prior to sealing cracks, the Contractor shall remove all existing temporary
asphalt concrete patching material, vegetation and organic material from all cracks by rounting
out as necessary to provide a reservoir for the sealer that will have a depth of ½" to 1½".
All cracks shall be filled with a rubberized asphalt material that has a minimum softening point
temperature of 200 degrees Fahrenheit and a safe heating temperature of 380 degrees
Fahrenheit, or as otherwise directed by the Engineer.
For cracks in size of 1/8" to ½" in width, the crack shall be widened using a router or heat lance
method to form a sealant reservoir which is a minimum of ½" wide and ¾" to 1" deep. The
routed crack shall then be cleared with hot compressed air to remove all dust and free moisture,
and then sealed to service level.
Cracks wider than ½" width shall be cleaned for the entire crack depth using sandblasting,
brushing and hot air blowing techniques, as required to provide a crack free from all debris, dust,
loose material, and moisture. Gauging or plowing may be required to remove incompressible deep
in the crack. The clean crack shall be filled with sealant, from the bottom up to surface level, in
a manner which does not result in sealant bridging or entrapped air pockets. Settlement of sealant
will occur, thus requiring application of a second layer of sealant material for all cracks ¼" in
width or wider. For cracks with depressed surfaces on each side of the crack shall be over filled
beyond level with pavement surface and then squeezed to fill in depressed area. No more than a
2" wide and 1/16" thick strip of material may be applied to the pavement surface.
Cracks wider than 1" width shall be filled with hot mix asphalt concrete as directed by the
Engineer.
ADDENDUM 1
4.1.c
Packet Pg. 382 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-51 TECHNICAL SPECIFICATIONS
All streets in exhibits that call out for slurry seal or AC Overlay shall be crack sealed.
No slurry seal material may be placed until after the crack seal material has been in place for a
minimum of seven (7) calendar days. The crack sealing operation shall be completed a minimum
of 24 hours prior to the placement of AC overlay.
Payment of the Lump Sum for Bid Item No. 46 “Crack Seal” will be paid proportionally with
progress made on Bid Items and shall include furnishing all labor, materials, tools, equipment,
incidentals and for doing all work include
END OF SECTION 32 01 17.61
ADDENDUM 1
4.1.c
Packet Pg. 383 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-52 TECHNICAL SPECIFICATIONS
32 11 23 – CLASS II AGGREGATE BASE
(Bid Item No. 19)
This section covers the requirements for Bid Item No. 19 “Class 2 Aggregate Base.” Aggregate
base shall be Class II and shall conform to the provisions in Section 26, “Aggregate Bases” of the
Caltrans Specifications and these special provisions. The Class II Aggregate Base shall be the
grading requirement for ¾” maximum.
The subgrade shall be prepared conforming to the provisions in Section 02 41 13.55, “Over
Excavation & Subgrade Preparation” of these Technical Specifications.
The Contractor shall have the proposed base certified by an independent testing laboratory to
meet Caltrans standards. This certification, along with the data, shall be submitted to the
Engineer for review at the preconstruction meeting. This certification will not release the
Contractor from having the base tested by the Engineer to meet specifications during
construction.
The maximum lift of aggregate base shall be 8.0 inches.
For expansive soil, place a minimum of 6” of class 2 aggregate base under and around all sides
of concrete improvements as directed by the Engineer. If class 2 aggregate base is determined
to be necessary for concrete improvements, the City will issue a change order to compensate the
Contractor for the extra work of installing the class 2 aggregate base intended for minor concrete
improvements.
The contract Tonnage price paid for Bid Item No. 19 “Class 2 Aggregate Base” shall include full
compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing
all work involved in constructing aggregate base complete in place and no additional
compensation will be allowed therefore. Payment will be in accordance with Section 26-1.04 of
the Caltrans Specifications. Certified weight tickets must be submitted with each truck of base
material.
END OF SECTION 32 11 23
ADDENDUM 5
4.1.c
Packet Pg. 384 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-53 TECHNICAL SPECIFICATIONS
32 12 16 – ASPHALT CONCRETE
(Bid Items No. 18)
This section covers the requirements for Bid Item No. 18 “Asphalt Concrete.” Asphalt concrete
shall conform to the requirements of Sections 203-1 “Paving Asphalt”, 203-6 “Asphalt Concrete”
and 302-5 “Asphalt Concrete Pavement” of the Greenbook Specifications. Table 302-5.5 in the
Greenbook is revised as follows:
Notes:
1) If only one course is required then the asphalt shall be of a C2 Class mixture as
defined by Table 203-6.4.4 in the Greenbook.
2) If two or more courses is required than the top/cap/final course shall be of a C2
class mixture and base courses shall be of a B class mixture as defined by Table
203-6.4.4 in the Greenbook.
3) When ¾-inch material is used, the minimum thickness for any lift shall be 0.15’.
4) The final cap shall be placed such that the longitudinal joint is on the lane line.
The paving asphalt shall have no RAP and shall be one of the following: C2-PG 70-10-R0, B-PG
70-10-R0, as indicated on the plans, these special provisions, or as determined by the Engineer.
All asphalt concrete for this project shall be supplied from one source unless requested in writing
and approved by the Engineer. Said source shall be listed on the Caltrans Material Plant Quality
Program and have current qualifications. The Contractor shall submit to the Engineer a test
results from said source for verification that the PG asphalt binder meets all requirements provided
in Table 203-1.2 of the Greenbook, prior to its use on the project.
Aggregate of the ¾-inch or ½-inch maximum size and aggregate for asphalt concrete base shall
be separated into 3 or more sizes and each size shall be stored in separate bins. If 3 sizes are
used, one bin shall contain that portion of the material which· will pass the maximum size specified
and be retaining on a 10 mm sieve; one bin shall contain that portion of the material which will
pass a 10 mm sieve and be retaining on a 2.36 mm sieve; and one bin shall contain that portion
of the material which will pass a 2.36 mm sieve.
Curb and gutter, cross gutters, driveways and other adjacent asphalt to concrete items to be
removed and replaced may require slot paving or removing and replacing the full depth of the
structural section adjacent to the item being removed with asphalt. The width and depth of the
ADDENDUM 1
4.1.c
Packet Pg. 385 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-54 TECHNICAL SPECIFICATIONS
slot paving and/or full depth removal and replacement is as shown on the plans or determined
by the Engineer. The asphalt used for slot paving and/or full depth removal and replacement
shall be included in the measurement and payment of asphalt.
The subgrade shall be prepared conforming to the provisions in Section 02 41 13.55, “Over
Excavation & Subgrade Preparation” of these Technical Specifications
Tack coat shall be furnished and applied as provided in Section 302-5.4 of the Greenbook. Full
compensation for furnishing and applying tack coat shall be considered as included in the contract
price paid for asphalt concrete.
All areas that call out for AC Overlay, or as directed by the engineer, shall be crack
sealed. The crack sealing operation shall be completed a minimum of twenty-four (24) hours
prior to the placement of the AC overlay.
Manholes, valves, and valve covers shall be adjusted to finish grade by the Contractor. The cost
shall be considered included in the asphalt concrete item of work unless there is a specific line
item for adjusting the valves and/or manholes.
If in the opinion of the Engineer the road does not drive smoothly, he shall direct the Contractor
to have the road “profilographed” and the Contractor will be responsible for any “bump” grinding
or other remedies required to provide a smooth and aesthetically pleasing road. The cost for
both the “profilgraphy” of the roadway and the “bump” grinding of pavement, if needed, shall be
borne by the Contractor.
Full compensation for furnishing and applying asphaltic emulsion (paint binder) shall be
considered as included in the contract price paid for asphalt concrete.
The contract Tonnage price paid for Bid Item No. 18 “Asphalt Concrete” shall include full
compensation for furnishing all labor, materials, tools, equipment, and incidentals, for furnishing
and installing all asphalt concrete on the project, unless specifically call-out somewhere else, and
for conforming to the requirements of this section and no additional compensation will be allowed
therefor. Certified weight tickets must be submitted with each truck of asphalt concrete material.
END OF SECTION 32 12 16
ADDENDUM 5
4.1.c
Packet Pg. 386 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-55 TECHNICAL SPECIFICATIONS
32 17 23 – SIGNING, STRIPING, AND PAVEMENT MARKING
(Bid Item No. 51)
This section covers the requirements for Bid Item No. 51 “Signing, Striping, and Pavement
Markings” and all striping and signage work indicated on the plans by the striping notes. All work
shall be performed in accordance with the provisions in Section 81, “Miscellaneous Traffic Control
Devices”, Section 82, “Signs and Markers”, and Section 84, “Markings” of the Caltrans
Specifications, MUTCD, including California Supplement, and these Special Provisions.
Prior to any work, the Contractor shall make a record of the existing striping and other pavement
markings throughout the project limits. This striping and pavement marking shall be restored at
the end of the project to existing condition, and include any additional project signage, striping,
and pavement marking, at the direction of the City Engineer. Any deviation in the striping or
pavement marking must be approved by the Engineer in advance.
The Contractor shall be responsible for removing and replacing and/or relocating “in-kind” all
signing, striping, and other pavement markings which are destroyed, damaged, obscured, or
otherwise affected due to the construction of the project. All signing, striping and other pavement
markings damaged by the project shall be replaced and/or relocated by the Contractor whether
shown on the project plans or not.
Removal of Existing Striping and Pavement Markings
Removal of existing traffic striping and pavement markings shall comply with the requirements of
Section 84-9.03B of the Caltrans Standard Specifications.
All existing striping and pavement markings within the areas to be resurfaced shall be removed
by sandblasting or grinding, prior to any resurfacing. This does not apply to areas proposed for
base repair, leveling course, overlay, reconstruction and within milling limits.
Striping and pavement marking removal shall occur no sooner than two (2) calendar days prior
to the pavement resurfacing. If the striping or pavement marking removal is performed on a day
other than the day of pavement resurfacing, the Contractor shall supply and install temporary
striping and pavement markings as detailed in these specifications. The Contractor shall be
responsible for the removal of the temporary striping and pavement markings prior to placement
of the resurfacing.
Removal of Existing Roadside Signs and Markers
Removal of existing roadside signs and markers shall comply with the requirements of Section
82-9 of the Caltrans Standard Specifications.
Contractor shall remove roadside signs and/or markers only when replacement signs and/or
markers are installed or when the existing signs and/or markers are no longer required for traffic.
Reset or relocate each roadside sign and/or marker the same day it is removed, using existing
posts when possible. If an existing post is deteriorated or broken, notify the Engineer.
ADDENDUM 1
4.1.c
Packet Pg. 387 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-56 TECHNICAL SPECIFICATIONS
All removed signs shall be salvaged to the City of San Jacinto yard located at 270 Bissel Pl, San
Jacinto, CA 92582.
Placement of Traffic Stripes and Pavement Markings
Contractor shall furnish and replace traffic stripes and pavement markings in the original pattern
on all roadways, unless otherwise shown on the Plans. Traffic striping shall be paint and pavement
markings shall be thermoplastic and conform to the provisions in Section 84, “Markings,” of the
Caltrans Standard Specifications and these special provisions.
The existing striping and pavement markings shall be replaced with thermoplastic for markings
and paint for striping, as specified in these specifications and as directed by the Engineer. Unless
noted elsewhere in these specifications and plans, traffic striping and pavement markings shall
be replaced at all locations where existing traffic stripes and pavement markings are damaged,
obliterated or covered as a result of construction operations.
Where striping joins existing striping, as shown on the plans, the Contractor shall begin and end
the transition from the existing striping pattern into or from the new striping pattern a sufficient
distance to ensure continuity of the striping pattern. All conflicting striping and pavement
markings shall be removed by sand blasting, grinding, or as directed by the Engineer. If a portion
of a pavement making or legend is damaged, obliterated or covered due to construction
operations the entire pavement marking or legend shall be replaced.
For striping and pavement markings to be replaced in kind, the Contractor shall physically tie
down the location of the beginning and ending of each existing stripe and pavement marking
adjacent to the work area. Within one working day following the completion of pavement
resurfacing or as directed by the Engineer, the Contractor shall accurately mark, by cat tracking
with painted marks, the location of all striping and pavement markings to be installed.
Upon notification by the Contractor, the Engineer shall review and approve the cat tracking prior
to applying the permanent stripes and marking. The Contractor shall allow a minimum of three
(3) working days for City review and the cat tracking, and permanent stripes and markings shall
not be applied prior to City approval. The City may make changes to the layout after cat tracking.
Where painting is allowed in these specifications, paint shall be applied in two applications, with
each coat being the thickness of a 1-coat treatment per Caltrans Standard Specifications Section
84-2.03 “Construction” (1 gallon per 107 square feet). The first coat shall be applied within two
working days following approval of the cat tracking and the second coat shall be applied a
minimum of two days later, but no later than fourteen calendar days following the pavement
resurfacing. The Contractor shall pay liquidated damages for each day the final striping and
pavement markings are not completed after the 14th calendar day. Scheduling of raised
pavement marker installation shall comply with Caltrans Standard Specifications Section 81-3.03A.
To prevent motorists from driving through and tracking wet paint, traffic control shall be installed
and maintained until the paint is completely dry.
The thermoplastic material shall be applied by extrusion method in a single uniform layer. Unless
otherwise noted on the plans or in these specifications, the Contractor shall replace all pavement
delineation on the same alignment and location.
ADDENDUM 1
4.1.c
Packet Pg. 388 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-57 TECHNICAL SPECIFICATIONS
Thermoplastic material shall be free of lead and chromium, and shall conform to the requirements
in California Department of Transportation, Specification PTH-02ALKYD. Retroreflectivity of the
thermoplastic traffic stripes and pavement markings shall conform to the requirements in ASTM
Designation: D 6359-99.
White thermoplastic pavement markings shall have a minimum initial retro reflectivity of 250 mcd m-2 lx-1.
Yellow thermoplastic pavement markings shall have a minimum initial retro reflectivity of 150 mcd m-2 lx-1.
The thermoplastic material for pavement markings shall be applied by extrusion methods only.
Thermoplastic material for traffic stripes shall be applied at a minimum thickness of 0.060‑inch.
Thermoplastic material for pavement markings shall be applied at a minimum thickness of 0.100‑
to 0.150-inch.
Thermoplastic pavement markings shall be free of runs, bubbles, craters, drag marks, stretch
marks, and debris.
Reflective Pavement Markers shall conform to Section 81-3, “Pavement Markers”, of the Caltrans
Standard Construction Specifications and these Special Provisions. All pavement markers shall be
removed prior to pavement resurfacing. Pavement markers shall be applied at all locations where
existing pavement markers are damaged, obliterated or removed as a result of asphalt resurfacing
operations, where required by Section 81 of the Standard Construction Specifications and these
specifications, whether a pavement marker was existing or not, and as shown on the plans.
Unless otherwise noted on the plans or in these Special Provisions, the Contractor shall replace
all pavement markers on the same alignment and locations.
Fire Hydrant Markers (blue reflective pavement markers) shall be placed in compliance to
Riverside County Fire Department’s Technical Policy # TP 06-011 – Code Reference: 2019 CFC §
507, Riverside County Ordinance 787.9 or as directed by the Engineer, and perpendicular to all
fire hydrants. Markers shall be blue with two reflective faces. Contractor shall be responsible for
locating all fire hydrants and layout work required for installation of blue reflective pavement
markers. Blue markers shall be referenced and installed at all fire hydrant locations within the
project limits whether a reflective pavement marker was existing or not.
Placement of Roadside Signs and Markers
The Contractor shall be responsible for furnishing and installing roadside signs and markers as
specified in the project plans. Placement of roadside signs and markers shall conform to the
provisions in Section 82 of the Caltrans Standard Specifications.
All signs must be standard size.
When an existing sign is to be replaced, the new sign shall be installed onto the existing frame
or post, unless the existing frame or post is damaged. When new signs are to be installed with a
new post, signs shall be installed on perforated GI Pipe (1 3"4 ) with anchor blocks.
ADDENDUM 1
4.1.c
Packet Pg. 389 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-58 TECHNICAL SPECIFICATIONS
Temporary Lane Delineation
The Contractor shall, upon completing pavement work, which covers or obliterates existing
pavement striping, immediately place temporary striping or other delineation as approved by the
Engineer along the lines of the existing striping to direct traffic until permanent striping or markers
can be placed.
Temporary tab markers shall not be placed more than twelve feet apart on curves nor more than
twenty-four feet apart on straight segments. Temporary tab markers shall be the same color as
the stripe they are replacing, shall measure two inches tall by 3-1/2 inches wide, and have a
reflective lens across the marker width.
Temporary striping such as “tabs” and “tape” can be used when the temporary striping and
pavement markings will be in use for less than seven calendar days. All temporary striping to be
in place greater than or equal to seven calendar days shall be paint unless approved otherwise
by the Engineer. Temporary stop limit lines shall be paint or eight-inch wide white traffic tape.
“Black-out” of existing striping shall be kept to a minimum. Existing striping shall be removed
when in conflict and in no case shall existing striping that is “blacked-out” be allowed to stay in
the field without being removed for more than 24 hours.
Temporary/removable “No Parking” signs shall be installed along the route of construction a
minimum of 72 hours prior to start of work in particular streets. The sign shall advise of the date
of actual construction. Parking available to residents is very limited, the contractor shall be diligent
with his schedule and delivery of work and not prohibit parking to any one block more than 24
continuous hours in any given phase of construction.
Measurement and Payment
The contract lump sum price for Bid Item No. 51 “Signing, Striping, and Pavement Markings” shall
include full compensation for all temporary and permanent striping, signage, and pavement
markings for furnishing all labor materials, tools, equipment and incidentals in place and no
additional compensation will be allowed therefor. This price shall include all signing, delineators,
and RPMS unless specifically called out to be paid for in a different item. This price shall also
include removal of all signage, striping, legends, and markings. This price shall include
preservation of existing fire hydrant reflectors and installation of new ones in case the preserved
ones are damaged or in the event none existed.
END OF SECTION 32 17 23
ADDENDUM 1
4.1.c
Packet Pg. 390 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-59 TECHNICAL SPECIFICATIONS
33 01 30.86 – ADJUST TO GRADE EXISTING UTILITIES
(Bid Items No. 1A, 2A, & 12A)
Adjusting to grade existing utilities shall conform to the provisions in Section 15, “Existing
Facilities” of the Caltrans Specifications and applicable utility standards.
Adjustment of existing utilities shall be done per applicable Standards and these Special Provisions
by the Contractor. The valve covers, manholes, and other utilities in new roadway widening areas
shall be lowered to subgrade, raised to base grade, and raised to final pavement grade, per the
utility’s applicable standards. The valve covers and manholes in overlay or slurry seal areas shall
be adjusted to final surface grade.
The contract price per Each for Bid Item No. 1A “Adjust to Grade Existing EMWD Manholes” shall
include compensation for furnishing all labor, materials, tools, equipment and incidentals, and no
additional compensation will be allowed therefor.
The contract price per Each for Bid Item No. 2A “Adjust to Grade Existing EMWD Water Valve
Covers” shall include compensation for furnishing all labor, materials, tools, equipment and
incidentals, and no additional compensation will be allowed therefor.
The contract price per Each for Bid Item No. 12A “Adjust to Grade Existing EMWD Test Station”
shall include compensation for furnishing all labor, materials, tools, equipment and incidentals,
and no additional compensation will be allowed therefor.
END OF SECTION 33 01 30.86
C-6
ADDENDUM 2
4.1.c
Packet Pg. 391 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-60 TECHNICAL SPECIFICATIONS
33 05 24.5 - STEEL PIPE CASING
(Bid Item No. 38)
Steel pipe encasement shall conform to the provisions listed in this section of the Technical
Specifications and EMWD’s Section 03604, “Casing Grouting – Annular Space” provided below.
The steel casing shall be installed by means of jacking or dry boring, except where specifically
noted on the plans to be installed by open trench construction.
Casing diameter shall be a minimum of 4 inches greater than the outside bell diameter, and sewer
pipe casing shall not be less than 42 inches in diameter unless specifically noted.
Minimum casing thickness specified in "Table A" is required for steel casing in place, and does
not account for construction loads. The contractor shall be solely responsible for the structural
sufficiency of the casing during construction, and also the method of installation.
Gravity pipelines and pressure pipelines shall be supported on pipe skids subject to the approval
of the engineer.
All skids are to be square in cross section and may be made from redwood, or better Douglas fir,
sound material, to be wolmanized or creosoted (redwood need not be treated).
ADDENDUM 1
4.1.c
Packet Pg. 392 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-61 TECHNICAL SPECIFICATIONS
Skids shall be attached to pipe by strapping with a standard strapping machine to hold skids in
place during pulling operations. Use stainless steel bands, or method of "cleating" skids together,
as approved.
Flexible pipe (PVC, ABS, etc) shall have spacer guide along on the top to prevent pipe from
floating. Pipe within casing to be bonded together at the joints for an integral unit per
manufacturer's recommendations, two (2) approved flexible couplings shall be used at each end
of casing per SB-63.
Notice as required by the City shall be given prior to construction, for the City inspection of casing
pipe and carrier pipe installation. The as-built location and grade of casing pipe shall be approved
by the City prior to installation of the carrier pipe. Departures from planned location or grade of
the casing pipe shall require a field survey for carrier pipe redesign if feasible, or abandonment
in favor of a new installation.
The total annular space shall be grouted per EMWD Specification Section 03604 (provided on the
following 3 pages), unless otherwise specified on the construction drawings.
Wooden skids can be replaced with Advance Products & Systems, Inc. (APS) casing spacers, SSI
8 model for carrier pipe 4” to 36”, and SSI 12 model for pipe greater than 36” or approved equal.
These spacers shall be installed 6 feet on center.
In lieu of mortar grouted bricks (to seal steel casing ends), Advance Products & Systems, Inc.
(APS) molded end seals can be used, model AM or approved equal.
The contract Lineal Footage price paid for Bid Item No. 38 “Construct 42" OD Steel Pipe Casing
EMWD STD. B-575” shall include full compensation for furnishing all labor, materials, tools,
equipment, and incidentals, for furnishing and installing steel pipe casing on the project,
conforming to the requirements of this section, and no additional compensation will be allowed
therefor.
ADDENDUM 1
4.1.c
Packet Pg. 393 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-62 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 394 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-63 TECHNICAL SPECIFICATIONS
ADDENDUM 1
4.1.c
Packet Pg. 395 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-64 TECHNICAL SPECIFICATIONS
END OF SECTION 33 05 24.5
ADDENDUM 1
4.1.c
Packet Pg. 396 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-65 TECHNICAL SPECIFICATIONS
34 41 13 – TRAFFIC SIGNAL WORK
(Bid Item No. 49 & 50)
This section covers the requirements for Bid Item No. 49 “Install Traffic Signal at Warren &
Esplanade Ave”, Bid Item No. 50 “Install Traffic Signal at Cawston & Esplanade Ave”, and all work
indicated on Traffic Signal Plan sheets. Traffic signal work shall conform to the provisions listed
on the Traffic Signal Plan sheet titled “Title Sheet and Special Provisions” and all the provisions
listed in Division X “Electrical Work” of the Caltrans Specification.
EQUIPMENT LIST AND DRAWINGS
The Electrical Contractor must submit a "Notice of Materials to be Used". The Contractor shall
furnish to the City Engineer a copy of all purchase orders for equipment and materials used in
reference to traffic signals within five days of when such orders are placed. The Contractor shall
also provide copies of all correspondence with equipment and materials suppliers concerning
availability, delivery dates, anticipated delays, and shipment notices within five days of each letter.
References to cost may be omitted. Consideration for recommending time extensions for
materials and equipment delivery delays will not be made unless these provisions are met. The
Contractor shall furnish two maintenance and operation manuals for cabinet, controller unit,
auxiliary equipment, vehicle detector sensor units, control units, amplifiers, and any other
auxiliary equipment furnished. The maintenance manual and operation manual may be combined
into one manual. The maintenance manual or combined maintenance and operation manual shall
be submitted at the time the controllers are delivered for testing.
The maintenance manual shall include, but need not be limited to, the following items:
(a) Specifications
(b) Design Characteristics
(c) General Operation Theory
(d) Function of all controls
(e) Trouble shooting procedure (diagnostic routine)
(f) Block circuit diagram
(g) Geographical layout of components
(h) Schematic diagrams
(i) List of replaceable component parts with stock numbers
MAINTAINING EXISTING AND TEMPORARY ELECTRICAL SYSTEMS
Unless otherwise permitted in writing by the City Engineer, existing traffic signal system
shutdowns shall be limited to periods between the hours of 9:00 am and 4:00 pm.
MATERIALS AND CONSTRUCTION
Construction methods and materials shall be in conformance with the provisions provided in the
“Special Provisions to Standard Specifications for Traffic Signal Projects” which are listed on the
Traffic Signal Plan sheet titled “Title Sheet and Special Provisions.”
ADDENDUM 1
4.1.c
Packet Pg. 397 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-66 TECHNICAL SPECIFICATIONS
MEASUREMENT AND PAYMENT
The contract unit price paid for Lump Sum for Bid Item No. 49 “Install Traffic Signal at Warren
& Esplanade Ave” shall include full compensation for furnishing all the labor, materials, tools,
equipment and incidentals, and for doing all work involved in the electrical work as shown on the
plans, as specified in these Technical Specification, the Caltrans Standard Plans and
Specifications, and as directed by the Engineer, including, dewatering (if needed), excavation,
removal of excavated material and off-site disposal, all appurtenances and equipment specified,
potholing, conduits, conductors, connection to new or existing pull boxes, replacement of
disturbed surface material and all flatwork coordination with vendors/suppliers, testing of all
electrical systems to ensure a complete and functioning traffic signal system, complete in place,
and no additional payment will be allowed therefore. All trench restoration for traffic signal
electrical conduit, including backfill materials and hot mix asphalt with T-cut, is included in the
Traffic Signal Installation bid item per each location.
The contract unit price paid for Lump Sum for Bid Item No. 50 “Install Traffic Signal at Cawston
& Esplanade Ave” shall include full compensation for furnishing all the labor, materials, tools,
equipment and incidentals, and for doing all work involved in the electrical work as shown on the
plans, as specified in these Technical Specification, the Caltrans Standard Plans and
Specifications, and as directed by the Engineer, including, dewatering (if needed), excavation,
removal of excavated material and off-site disposal, all appurtenances and equipment specified,
potholing, conduits, conductors, connection to new or existing pull boxes, replacement of
disturbed surface material and all flatwork coordination with vendors/suppliers, testing of all
electrical systems to ensure a complete and functioning traffic signal system, complete in place,
and no additional payment will be allowed therefore. All trench restoration for traffic signal
electrical conduit, including backfill materials and hot mix asphalt with T-cut, is included in the
Traffic Signal Installation bid item per each location.
Full compensation for salvaging, hauling, stockpiling, and disposing of existing electrical systems
removed shall be considered as included in the contract price paid for Bid Item No. 49 “Install
Traffic Signal at Warren & Esplanade Ave” and Bid Item No. 50 “Install Traffic Signal at Cawston
& Esplanade Ave” and no additional compensation will be allowed, therefore.
END OF SECTION 34 41 13
ADDENDUM 1
4.1.c
Packet Pg. 398 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE TS-67 TECHNICAL SPECIFICATIONS
35 01 50.71 – CHANNEL EXCAVATION
(Bid Item No. 32)
This section covers the requirements for Bid Item No. 32 “Channel Excavation”. Channel
Excavation work shall conform to the provisions listed in the Section 300-7 “Earthwork for
Channels” of the Greenbook Specifications.
Channel Excavation shall cover the complete construction of the channel inclusive of all earthwork,
excavation, ditch excavation, exporting, placement of fill material, including any import fill,
backfill, compaction, grading, subgrade preparation, and slope grading.
If any export of material is required, Contractor shall export to external sources. If areas are
encountered that the Contractor believes should be determined to be “unsuitable material”, the
Contractor shall notify the Engineer.
Compaction of the channel subgrade will not be required.
Compensation for the installation of rip-rap and filter fabric will not be considered to be a part of
the compensation for Bid Item No. 32.
Full compensation for Channel Excavation shall include furnishing all labor, materials, tools,
equipment, incidentals, and for doing all work included in excavating the channel, and conforming
to the requirements of this section shall be considered as included in the Cubic Yardage unit
price paid for Bid Item No. 32 “Channel Excavation” and no additional compensation will be
allowed therefor.
END OF SECTION 35 01 50.71
ADDENDUM 1
4.1.c
Packet Pg. 399 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “A”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE PLANS AND DRAWINGS
PLANS AND DRAWINGS
"THE FOLLOWING PLANS AND DRAWINGS ARE INCORPORATED HEREIN BY
REFERENCE AS IF SET FORTH IN THEIR ENTIRETY:
1. (27 Sheets) “City of San Jacinto Esplanade Widening Phase 1 Warren Road to
Sanderson Avenue CIP #06-145 (SJ-222)
2. (8 Sheets) “City of San Jacinto Esplanade Widening Project Traffic Signal Plans
Signing & Striping Plans"
3. (1 Sheet) “SJ-222 Esplanade Ave. at Warren Rd. Monitoring Well Location”
4. (1 Sheet) “Typical Overex Section”
4.1.c
Packet Pg. 400 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
ESPLANADE AVENUE WIDENING PHASE 1LOCATION MAPLYON AVESANDERSON AVE.DE ANZA DR.RAMONA BLVD.SAN JACINTO AVE.IDYLLWILD DR.COTTONWOOD AVE.ESPLANADE AVE.PALM AVE.
LYON AVE.
EAGLE RD.
SANTA FE
KIRBY ST.SEVENTH ST.YOUNG ST.MISTLETOE AVE.MAIN ST.AVENUEESPLANADEALESSANDRO AVE.RAMONA EXPY.FIRST ST.SOBOBA RD.JORDAN AVE.
CAMINO
LOS BANOS ARTESIAN ST.TIGER LN.TA
H
Q
U
I
T
ZAVE.5TH ST.6TH ST.SEVENTH ST.RAMONAMENLO AVE.COMMONWEALTH AVE.EATON AVE.FRUITVALE AVE.OAKLAND AVE.DEVONSHIRE AVE.FLORIDA AVE.SAN JACINTO AVE.
HEWITT ST.COMMONWEALTH AVE.PARK AVE.PARK AVE.COLUMBIA ST.HIGHWAY 74HIGHWAY 79
LYON AVE.
KIRBY ST.
STATE ST.DEVONSHIRE AVE.MIDWAY ST.OAKWOOD ST.SANTA FE
EXPY.SHAVER ST.EVANS ST.GIRARD ST.
YALE ST.
CORNELL ST.
DARTMOUTH ST.CITY OF SAN JACINTOPROJECT SITEMAIN ST.W
A
T
E
K
A
S
T
.
CAWSTON AVE.
WARREN ROAD
RAMONA EXPY.CHASE ST.SANDERSON
STATE ST.
AV
E
N
U
E
CITY OF HEMETPERRIS74RIVERSIDEVICINITY MAPBEAUMONTVALLEYMORENOJACINTOSANHEMET15101521521560797960747474NTSNTS SITE PROJECT BASIS OF BEARING:BENCHMARK:1TITLE SHEETSTREET IMPROVEMENTSEARTHWORK QUANTITIES:CITY OF SAN JACINTO, CALIFORNIAWARREN ROAD TO SANDERSON AVENUECIP #06-145 (SJ-222)SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETDESCRIPTIONSHEET #SHEET INDEXTITLE SHEET1TRAFFIC SIGNALSTREET PROFILE & GRADINGCROSS SECTIONSTYPICAL SECTIONS23-1011-2223-27STORM DRAIN1-3SIGNING & STRIPING4-8APPROVED BY:APPROVED BY:4.1.cPacket Pg. 401Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
CITY OF SAN JACINTOCITY OF HEMETCITY OF HEMETCITY OF SAN JACINTOCITY OF HEMETCITY OF SAN JACINTOCITY OF SAN JACINTOCITY OF HEMETCITY OF SAN JACINTOCITY OF HEMETCITY OF HEMETCITY OF SAN JACINTO750'CAWSTON AVE.ESPLANADE AVE.SHEET #7SHEET #9SHEET #5SHEET #6SHEET #8SHEET #10BBAACCDD2SHEET INDEX & TYPICAL SECTIONSFFPROPOSED TRAFFIC SIGNALSTREET SHEET INDEXSTORM DRAIN SHEET INDEXSHEET #11SHEET #13SHEET #14SHEET #15SHEET #16SHEET #17EEWARREN ROADSHEET #4SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVII
NROFILACLIVI
I
NROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETANZA TRAIL(FUTURE STREET)ALABASTER AVENUESANDERSON AVENUESHEET #3PROPOSED TRAFFIC SIGNALESPLANADE AVE.CAWSTON AVE.WARREN ROADANZA TRAIL(FUTURE STREET)ALABASTER AVENUESHEET #12SANDERSON AVENUESHEET #18APPROVED BY:APPROVED BY:4.1.cPacket Pg. 402Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W12'' W 12'' W 12'' W 12'' W 12'' W
39'' W 39'' W 39'' W
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W8'' G 8'' G 8'' G
8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W8'' G39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRRSTREETSTT
TTTTTTTTTTTTTTTTTTTTT T T T T
CLW W W W
N 00°14'58" WS 89°30'18" EDWYGATEN 00°14'50" W N 89°30'18" WN 88°23'35" W 184.74'100+00101+00102+009+00 11+0099+0098+0097+0096+0095+00X
12'' W 12'' W 12'' W 12'' W 12'' W 12'' W8'' G8'' GT T TTTT T T T TWWWWWWW39'' W39'' W39'' W39'' W39'' W39'' W39'' WSTA. 95+83 TO STA. 102+00STREET IMPROVEMENTS3120801"=40'40040SCALESCALESJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETCASE "A"SCALE: 1" = 10'ACCESS RAMP DETAILCASE "B"SCALE: 1" = 10'ACCESS RAMP DETAILAPPROVED BY:APPROVED BY:4.1.cPacket Pg. 403Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
8'' G8'' G8'' G16'' W16'' W16'' W12'' W12'' W12'' W12'' W12'' W12'' W12'' W39'' W39'' W39'' W39'' W39'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W8'' G39'' W39'' WTTTTTTTTTTTTTTCLWWWWN 00°14'58" WN 00°14'50" WN 88°23'35" W 184.74'100+00101+009+0011+0099+00N 00°14'58" WXXXXX12+0013+0014+0012'' W 12'' W
6'' W16'' W16'' W16'' W16'' W16'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G16'' W16'' W16'' W8'' G8'' G8'' G8'' GSTA. 2+00 TO STA. 15+00120804004041"=40'SCALESCALEWARREN RD. STREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETSHEET #3WARREN RDCASE "B" MODIFIEDSCALE: 1" = 10'ACCESS RAMP DETAILCASE "A"SCALE: 1" = 10'ACCESS RAMP DETAILAPPROVED BY:APPROVED BY:4.1.cPacket Pg. 404Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' WTTTTTTTTTTTTTTT39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' SS6'' SS6'' SS6'' SS6'' SS 6'' SS
6'' SS6'' SS6'' SS6'' SSCLEEM-25 FLOWCONTROLFACILITYN 88°44'53" W 5293.57'60" CMLC WL60" CMLC WL102+00103+00104+00105+00106+00107+00108+00109+00110+00111+00112+0012'16'-2.78%-3.12%-2.92%15
0
4
.
0
0
15
0
4
.
5
0
STA. 102+00 TO STA. 112+005120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.cPacket Pg. 405Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G4'' G 4'' G 4'' G
4'' G 4'' G 16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' WTTTTTTTIRR39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SSCLCLS 01°15'07" W
S 01°15'07" W
N 88°44'53" W 5293.57'60" CMLC WL60" CMLC WL60" CMLC WL112+00113+00114+00115+00116+00117+00118+00119+00120+00121+00122+00123+00124+00125+00STA. 112+00 TO STA. 125+006120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.cPacket Pg. 406Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' WTTTTTTTTTTTTTTTTTTTTTT39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SSCLEDIRT ROADDIRT ROADN 88°44'53" W 5293.57'60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL125+00126+00127+00128+00129+00130+00131+00132+00133+00134+00135+00136+00137+00138+007120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETSTA. 125+00 TO STA. 138+40APPROVED BY:4.1.cPacket Pg. 407Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W18'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' WTTTTTTTTTTTTTTTTTTTTTTTTTTTT39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SS6'' SSCLCLCLN 88°44'53" W 5293.57'60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL139+00140+00141+00142+00143+00144+00145+00146+00147+00148+00149+00150+00151+00ESPLANADE AVENUESTA. 138+40 TO STA. 151+80STREET IMPROVEMENTS8120801"=40'40040SCALESCALESJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.cPacket Pg. 408Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
24'' SS
20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W20'' ABAND IRR20'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR18'' W18'' W18'' W18'' W18'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W24'' SS 24'' SS 24'' SS 24'' SS24'' REC WT T T T T TIRRIRRIRRIRRIRRIRR IRR75'' W 75'' W 75'' W
72'' W 72'' W8'' SS8'' SS24'' REC W 24'' REC W 20'' SS 20'' SS 20'' SSTTTTT
TTTTTTTTTTTTTTT
T4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W18'' SD12'' SD12'' SD20'' SS 39'' W39'' W39'' W39'' W39'' W39'' W2'' W 2'' W 20'' SS24'' SS6'' SS6'' SS6'' SS6'' SSCLCLCLEEDWYS 00°06'27" W
S 89°53'30" E 2641.03'60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL152+00153+00154+00155+00156+00157+00158+00159+00160+00161+00162+00163+00164+00165+009+00 10+00 11+00 12+0011+00MW
MWS 00°06'27" WN 88°44'53" W 5293.57'24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS2'' W2'' W2'' W2'' W2'' W2'' W2'' W20'' SS20'' SS20'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SS24'' SSTTTTTTSTA. 151+80 TO STA. 165+209120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.cPacket Pg. 409Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR16'' IRR39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND WTTTTTTTTTTTTTTTTTTTTTTT4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W4'' W18'' SDCATVCATVCATVCATVCATVCATVCATVCATVCATV(SD)(SD)(SD)(SD)(SD)EEDWYDWYDWYDIRTDIRTLSADDCS 89°53'30" E 2641.03'60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL60" CMLC WL166+00167+00168+00169+00170+00171+00172+00173+00174+00175+00176+00177+00178+00MWMW60" CMLC WL167+07.031514.54'STA. 165+20 TO STA. 177+1210120801"=40'40040SCALESCALESTREET IMPROVEMENTSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SETAPPROVED BY:4.1.cPacket Pg. 410Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
16'' W16'' W8'' G8'' G16'' W16'' W12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W
39'' W 39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G 8'' G 8'' G
8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W8'' G8'' G8'' G8'' G39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRRTTTT TT T T T T T
CLW W W W W W W
100+00101+0011+00
100+60.94101+00TTTT TT T T T T T
SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET11WARREN AVENUESTORM DRAIN IMPROVEMENTSESPLANADE AVENUEWARREN ROADAPPROVED BY:APPROVED BY:4.1.cPacket Pg. 411Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' WTTTTTTTTTTTTTTT39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' SS6'' SS6'' SS6'' SS6'' SS 6'' SS
6'' SS6'' SS6'' SSCLEEM-25 FLOWCONTROLFACILITY106+00107+00108+00109+00110+00111+0060" CMLC WL60" CMLC WL105+00106+00107+00108+00109+00110+00111+00105+00 104+00103+0012'16'104+00105+00106+00107+00108+00109+00110+00111+00104+00103+00102+0012'16'17'17.99'101+00101+07.25
SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET12STA. 100 +00 TO STA. 111+80STORM DRAIN IMPROVEMENTSAPPROVED BY:4.1.cPacket Pg. 412Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
STORM DRAIN14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G
4'' G4'' G4'' G4'' G4'' G16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W
T T T T T T T
IRR39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS
CL
CL
112+00 113+00
60" CMLC WL
60" CMLC WL
60" CMLC WL
112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00
114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00
112+00 113+
0
0
114+00
115+00
116+00
117+0
0
118+00 119+
0
0
120+00
121+00
122+0
0 123+00
124+00
125+00
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
STA. 111 +80 TO STA. 125+20
13
STORM DRAIN IMPROVEMENTS
4.1.c
Packet Pg. 413 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
8'' G 8'' G 8'' G 8'' G 8'' G 8'' G 8'' G
16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W TTT T T T T T T T T T T T T T T T T T T T T
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
14'' ABAND IRR 14'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR
6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS
CL
E
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00
126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00
126+00
127+0
0 128+00
129+
0
0
130+00
131+00 132+00 133+00 134+00
135+00
136+00
137+00
138+00STORM DRAIN
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
STA. 125+20 TO STA. 138+60
14
STORM DRAIN IMPROVEMENTS
4.1.c
Packet Pg. 414 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W 18'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 6'' W
T T T T T T
T
T
T
T
T
T
T
T
T
T
T T T T T T T T T T T
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS
CL
CL CL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
60" CMLC WL
139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00
139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00
139+00 140+00 141+00
142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00STORM DRAIN 24.5' from CLSTORM DRAIN
15
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
STA. 138+60 TO STA. 152+00
15
STORM DRAIN IMPROVEMENTS
4.1.c
Packet Pg. 415 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
20'' ABAND IRR
20'' ABAND IRR
14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR 14'' ABAND IRR
18'' W 18'' W 18'' W 18'' W
6'' W 6'' W 6'' W 6'' W 6'' W 6'' W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W
24'' SS24'' SS24'' SS24'' SS24'' REC WTTTTTTIRRIRRIRRIRRIRRIRR75'' W75'' W75'' W72'' W72'' W8'' SS
8'' SS
24'' REC W24'' REC W20'' SS20'' SS20'' SST T T T T T T T T T T T T T T T T TTT
4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W
18'' SD
12'' SD 12'' SD
20'' SS39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 2'' W2'' W20'' SS24'' SS6'' SS 6'' SS 6'' SS
CL CL CL
EE
60" CMLC WL 60" CMLC WL 60" CMLC WL 60" CMLC WL60" CMLC WL
60" CMLC WL
60" CMLC WL
152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00
9+0010+0011+0011+00MW
MW
152+00 153+00
153+00 154+00 154+46.60
12'' SD 12'' SD
154+60.84155+00
156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
STA. 152+00 TO STA. 165+00
16
STORM DRAIN IMPROVEMENTS
APPROVED BY:
4.1.c
Packet Pg. 416 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W
T T T T T T T T T T T T T T T T T T T T TT
4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W
18'' SD
CATV CATV CATV CATV CATV CATV CATV(SD)(SD)
(SD)(SD)
DDC
60" CMLC WL 60" CMLC WL 60" CMLC WL 60" CMLC WL 60" CMLC WL60" CMLC WL
165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00
MW
MW 60" CMLC WL
166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
17
STORM DRAIN IMPROVEMENTS
STA. 165+00 TO STA. 178+00
4.1.c
Packet Pg. 417 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
26'' ABAND IRR26'' ABAND IRR39'' W39'' W39'' W20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
16'' IRR 16'' IRR 16'' IRR 16'' IRR 16'' IRR
39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W 39'' W
20'' ABAND IRR 20'' ABAND IRR 20'' ABAND IRR
16'' W 16'' W 16'' W 16'' W
4'' W 4'' W 4'' W 4'' W8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W 8'' ABAND W18'' IRR 18'' IRR18'' IRR12'' W12'' W12'' W12'' SS12'' SS12'' SS12'' SS12'' SS8'' SS 8'' SS 8'' SS 8'' SS
6'' G 6'' G 6'' G 6'' G 6'' G 6'' G 6'' G
T T T T T T
T
T T T
TTTT24'' SD 24'' S
D
24'' SD
2
4
'
'
S
D
24'' SD24'' SD24'' SD 24'' S
D
24'' SD
2
4
'
'
S
D
24'' SD24'' SD4'' W 4'' W 4'' W 4'' W 24'' W24'' W24'' W24'' W4'' ABAND W4'' ABAND W4'' ABAND W4'' ABAND W4'' ABAND W4'' ABAND WCATV CATV CATV CATV CATV CATV CATV CATV
CATV CATV CATV
CATVCATVCATVCATVCATVCATV(SD)(SD)(SD)(SD)(SD)(SD)(SD)(SD)(SD)E E E E E E EEEEEEEEE E ECLCLCLCL
CATVCATVCATVCATVCATVCATVCATV
E IP
TP
E
T
E
178+00 179+00 180+00 181+00 182+00
179+00 180+00
180+76.1216'' W16'' W8'' G8'' G16'' W16'' W12'' W12'' W12'' W12'' W12'' W12'' W12'' W12'' W39'' W39'' W39'' W14'' ABAND IRR14'' ABAND IRR14'' ABAND IRR6'' W6'' W6'' W6'' W6'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G8'' G16'' W16'' W16'' W8'' G 8'' G 8'' G 8'' G39'' W39'' W 39'' W 39'' W
14'' ABAND IRR14'' ABAND IRRTTTTTTTTTTTTCLWWWWWWWW100+00101+0011+00TTTTTTTTTTTTSJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
18
STORM DRAIN IMPROVEMENTS
STA. 178+00 TO STA 180+34APPROVED BY:
APPROVED BY:
4.1.c
Packet Pg. 418 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
CROSS-SECTIONS
19
STORM DRAIN IMPROVEMENTS
4.1.c
Packet Pg. 419 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
CROSS-SECTIONS
20
STORM DRAIN IMPROVEMENTS
4.1.c
Packet Pg. 420 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
CROSS-SECTIONS
21
STORM DRAIN IMPROVEMENTS
APPROVED BY:
4.1.c
Packet Pg. 421 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
SJ-222CITY OF SAN JACINTO
DIG ALERT
SEAL CITY OF SAN JACINTO
PREPARED BY:
APPROVED BY:
ESPLANADE AVENUE
BENCHMARK:AS SHOWN
B
KC L
ANOISSEF
M L
ANOISSEF
T
RDERP
SRDERP O
E.
O
LIVI INROFILAC
LIVI INROFILACRT
SSIGE
ETART
SSIGE
ETA
FF
NO. 44553
OO
CC NETAETURTRAENIGNERAENIGNEEEB
C I
I
February 13, 2026
BID SET
CROSS-SECTIONS
22
STORM DRAIN IMPROVEMENTS
4.1.c
Packet Pg. 422 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20CROSS SECTIONSSTA. 101+00 TO STA. 120+00SJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET234.1.cPacket Pg. 423Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
STA. 101+00 TO STA. 120+00CROSS SECTIONSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET244.1.cPacket Pg. 424Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
22STA. 121+00 TO STA. 140+00CROSS SECTIONSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET254.1.cPacket Pg. 425Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
STA. 141+00 TO STA. 160+00CROSS SECTIONSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET264.1.cPacket Pg. 426Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
STA. 161+00 TO STA. 180+00CROSS SECTIONSSJ-222CITY OF SAN JACINTODIG ALERTSEALCITY OF SAN JACINTOPREPARED BY:APPROVED BY:ESPLANADE AVENUEBENCHMARK:AS SHOWNBKCLANOISSEFMLANOISSEFTRD
E
R
PS
RD
E
R
POE.OLIVIIN
ROFILACLIVI
IN
ROFILAC R
TSSIGE
ETAR
TSSIGE
ETAFFNO. 44553 OOCCNET
A
ET
U
R
T
RA
ENIGNERA
ENIGNEEEBCII February 13, 2026BID SET274.1.cPacket Pg. 427Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
ESPLANADE AVENUE WIDENING PROJECTCITY OF SAN JACINTOSHEET1INDEX OF SHEETSTITLE SHEET AND SPECIAL PROVISIONSDESCRIPTION2TRAFFIC SIGNAL PLANWARREN ROAD AT ESPLANADE AVENUEESPLANADE AVENUE WIDENING PROJECT3TRAFFIC SIGNAL PLANCAWSTON AVENUE AT ESPLANADE AVENUE FILE NO.VICINITY MAP81FILE NO.FOR:W.O.CITY-REVISION DESCRIPTIONDATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTOSCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#WORK CONTAINED WITHIN THESE PLANSSHALL NOT COMMENCE UNTIL ANENCROACHMENT PERMIT AND/OR AGRADING PERMIT HAS BEEN ISSUED.NOTE:FFCALI
O
RTEO R SEALSS
ETIREG
ERNNo. 20285I
LExp. 9/30/27TAVICN
AI
ESOFESPRD
E
OINLAEINGTREB
OR
KAHNSPECIAL PROVISIONS TO STANDARD SPECIFICATIONS FOR TRAFFIC SIGNAL PROJECTSDATESIGNED(800) 227-2600 AT LEAST TWO (2) WORKING DAYS PRIOR TO COMMENCEMENT OF EXCAVATION.2.THE UNDERSIGNED AGREES TO CONTACT AND OBTAIN AN INQUIRY I.D.# FROM UNDERGROUND SERVICE ALERT1.UNDERGROUND SERVICE ALERT HAS BEEN CONTACTED AND HAS PROVIDED INQUIRY I.D.#NOTICE TO CONTRACTORSPURSUANT TO ASSEMBLY BILL 3019, NO EXCAVATION PERMIT IS VALID UNLESS THE FOLLOWING IS PERFORMED:R.MODEL 2070E CONTROLLER ASSEMBLIES:O. BATTERY BACK-UP SYSTEM:Q.EMERGENCY VEHICLE PRE-EMPTION:H.L.E.D. DRIVER:G.LUMINARIES:N.DETECTION:M.PEDESTRIAN SIGNALS:VEHICLE SIGNAL FACES AND SIGNAL HEADS:L.K.SERVICE:F.PULL BOXES:E.CONDUIT:D.STANDARDS, STEEL PEDESTALS AND POSTS:C.FOUNDATIONS:EQUIPMENT LIST AND DRAWINGS:B.DESCRIPTION:A.6A 1220 BaudInternal ModemESPLANADE AVENUE WIDENING PROJECTTITLE SHEET AND SPECIAL PROVISIONSCITY OF SAN JACINTOCONDUCTORS AND WIRING:I.BONDING AND GROUTING:J.P.INTERNALLY ILLUMINATED STREET NAME SIGNS:GENERAL TRAFFIC SIGNAL NOTES:TRAFFIC SIGNAL PLANSSIGNING AND STRIPING PLANS7TH STREETESPLANADE AVENUEWARREN ROAD
CAWSTON AVENUE
SANDERSON AVENUE
KIRBY STREETPROJECTLOCATIONCITY OF HEMETCOUNTY OF RIVERSIDEENGINEERINGGROUP INC.4SIGNING AND STRIPING PLANESPLANADE AVE - WARREN RD TO STA. 108+005SIGNING AND STRIPING PLANESPLANADE AVE - STA. 108+00 TO STA. 139+006SIGNING AND STRIPING PLANESPLANADE AVE - STA. 139+00 TO STA. 160+007SIGNING AND STRIPING PLANCAWSTON AVE - SOUTH OF ESPLANADE AVE AT CAWSTON AVEGENERAL SIGNING & STRIPING NOTES:8SIGNING AND STRIPING PLANESPLANADE AVE - STA. 160+00 TO SANDERSON AVE4.1.cPacket Pg. 428Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
8'' G8'' GTTT96+008'' G8'' G8'' G8'' G8'' G8'' G12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W
8'' G8'' G 8'' G 8'' G 8'' G
8'' G8'' G8'' G8'' G16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W16'' W8'' G8'' G8'' G8'' G8'' G8'' G8'' G39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' WTTTTTTTTT TT T T T T T T
W W W W W W W W W
100+00101+0011+0099+006'' W6'' W6'' W6'' W6'' W6'' W16'' W8'' G8'' G16'' W16'' W39'' W39'' W104+006'' W6'' WPOLE AND EQUIPMENT SCHEDULEESPLANADE AVENUE (50 MPH)GENERAL TRAFFIC SIGNAL NOTES:CONSTRUCTION NOTES (THIS SHEET):DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO28CITY OF SAN JACINTOWARREN ROAD AT ESPLANADE AVENUETRAFFIC SIGNAL PLANCONDUCTOR SCHEDULEFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
WARREN ROAD (55 MPH)SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETCOUNTY OF RIVERSIDEENGINEERINGGROUP INC.PROPOSED PHASE DIAGRAM4.1.cPacket Pg. 429Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
20'' ABAND IRR20'' ABAND IRR18'' W18'' WTTT39'' W39'' W39'' W6'' SS6'' SS151+0016'' IRR16'' IRR16'' IRR16'' IRR16'' IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR20'' ABAND IRR18'' W18'' W18'' W18'' W18'' W18'' W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W8'' ABAND W24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS 24'' SS
24'' REC W 24'' REC W 24'' REC W
T T T T T T T T T T T T T T T
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
75'' W 75'' W 75'' W 75'' W 75'' W 75'' W8'' SS8'' SS8'' SS8'' SS24'' REC W 24'' REC W 24'' REC W 24'' REC W20'' SS
20'' SS
20'' SS
20'' SS
20'' SS
20'' SS
20'' SS
W24'' REC W TTTTTTTTTTTTTT4'' W4'' W4'' W4'' W4'' W4'' W18'' SD18'' SD18'' SD12'' SD12'' SD12'' SD12'' SD20'' SS 20'' SS 20'' SS 39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W39'' W2'' W 2'' W 2'' W 2'' W 2'' W 2'' W 2'' W 2'' W6'' SS6'' SS6'' SS60" CMLC WL60" CMLC WL154+00155+00156+0010+00
11+0011+00
MW16'' IRR16'' IRR20'' ABAND IRR20'' ABAND IRR8'' ABAND W8'' ABAND WTT4'' W4'' W4'' W39'' W39'' W39'' W24'' SS 24'' SS24'' SS 24'' SS
T T
2'' W 2'' W
20'' SS 20'' SS
24'' SS 24'' SSESPLANADE AVENUE (50 MPH)GENERAL TRAFFIC SIGNAL NOTES:CONSTRUCTION NOTES (THIS SHEET):PROPOSED PHASE DIAGRAMCONDUCTOR SCHEDULECAWSTON AVENUE (45 MPH)DETAIL 'A'POLE AND EQUIPMENT SCHEDULEDATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO38CITY OF SAN JACINTOWARREN ROAD AT ESPLANADE AVENUETRAFFIC SIGNAL PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.4.1.cPacket Pg. 430Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
100+00101+00102+00103+00104+00105+00106+00107+00108+009+00
11+0099+0098+0097+0096+00101+0012+00 13+00 14+0094+0096+0095+00ESPLANADE AVENUE (50 MPH)SIGN LEGEND:DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO48CITY OF SAN JACINTOESPLANADE AVE - WARREN RD TO STA. 108+00SIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETCOUNTY OF RIVERSIDEENGINEERINGGROUP INC.MATCHLINE SEE UPPER RIGHTMATCHLINE SEE LOWER LEFTWARREN ROAD (55 MPH)DRIVEWAYDRIVEWAYMATCHLINE SEE SHEET 5MATCHLINE SEE LOWER LEFTESPLANADE AVENUE (50 MPH)MATCHLINE SEE UPPER RIGHTSIGNING AND STRIPING NOTES:CONSTRUCTION NOTES (THIS SHEET):DETAIL "A"4.1.cPacket Pg. 431Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
4'' G 4'' G 108+00109+00110+00111+00112+00113+00114+00115+00116+00117+00118+00119+00120+00121+0014'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR 14'' IRR
4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 4'' G 121+00122+00123+00124+00125+00126+00127+00128+00129+00130+00131+00132+00133+00134+00134+00135+00136+00137+00138+00139+00SIGN LEGEND:DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO58CITY OF SAN JACINTOESPLANADE AVE - STA. 108+00 TO STA. 139+00SIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.MATCHLINE SEE SHEET 4MATCHLINE SEE MIDDLE LEFTMATCHLINE SEE UPPER RIGHTMATCHLINE SEE LOWER LEFTMATCHLINE SEE MIDDLE RIGHTMATCHLINE SEE SHEET 6ESPLANADE AVENUE (50 MPH)ESPLANADE AVENUE (50 MPH)ESPLANADE AVENUE (50 MPH)ALABASTER DRIVE (25 MPH)CINNABAR AVENUE (25 MPH)ANZA TRAIL (FUTURE)SIGNING AND STRIPING NOTES:4.1.cPacket Pg. 432Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
139+00140+00141+00142+00143+00144+00145+00146+00147+00148+00149+00150+00150+00151+00152+00153+00154+00155+00156+00157+00158+00159+00160+009+00 10+00
11+00 12+0011+00DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO68CITY OF SAN JACINTOESPLANADE AVE - STA. 139+00 TO STA. 160+00SIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.MATCHLINE SEE SHEET 5MATCHLINE SEE MIDDLE LEFTMATCHLINE SEE UPPER RIGHTMATCHLINE SEE LOWER LEFTMATCHLINE SEE SHEET 8MATCHLINE SEE MIDDLE RIGHTMATCHLINE SEE LOWER RIGHTMATCHLINE SEE SHEET 7MATCHLINE SEE UPPER LEFTESPLANADE AVENUE (50 MPH)CAWSTON AVENUE (45 MPH)ESPLANADE AVENUE (50 MPH)ESPLANADE AVENUE (50 MPH)CAWSTON AVENUE (45 MPH)SIGNING AND STRIPING NOTES:SIGN LEGEND:4.1.cPacket Pg. 433Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO78CITY OF SAN JACINTOSOUTH OF CAWSTON AVE AT ESPLANADE AVESIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.MATCHLINE SEE SHEET 6SIGNING AND STRIPING NOTES:SIGN LEGEND:CAWSTON AVENUE (45 MPH)4.1.cPacket Pg. 434Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD12'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' S
D
18'' SD
18'' SD
18'' SD
18'' S
D
18'' SD
18'' SD
18'' SD160+00161+00162+00163+00164+00165+00166+00167+00168+00169+00170+00171+00172+00173+00173+00174+00175+00176+00177+00178+00179+00180+00181+00182+00SIGN LEGEND:DATENO.DATE:DATE:RECOMMENDED BY:DATEAPPR.DATE:DRAWN BY:DATE:DESIGNED BY:CHECKED BY:CITY OF SAN JACINTO88CITY OF SAN JACINTOESPLANADE AVE - STA. 160+00 TO SANDERSON AVESIGNING AND STRIPING PLANFFCALIORTEO R SEALSS ETIREGERNNo. 20285IL Exp. 9/30/27TAVICNAI ESOFESPRDE OINLAEINGTREBORKAHN
SCALE:H:V:SERVICE ADDRESS:SIGNAL ENERGIZED:SG#CITY OF HEMETENGINEERINGGROUP INC.MATCHLINE SEE SHEET 6MATCHLINE SEE LOWER LEFTMATCHLINE SEE UPPER RIGHTESPLANADE AVENUE (50 MPH)SANDERSON AVENUE (50 MPH)ESPLANADE AVENUE (50 MPH)SANDERSON AVENUE (45 MPH)DRIVEWAYSIGNING AND STRIPING NOTES:4.1.cPacket Pg. 435Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
Solid Casing - 4"
Sch 80 PVC with
Flush Threaded
Connections
10" Borehole
Screened Casing
4" Sch 80 PVC with
Flush Threaded
Connections
0 bgs
Ground Surface
4' x 4' x 4" Concrete Pad
Traffic Rated Flush Lid
Cap
Bottom Cap
Traffic Rated Vault
Sanitary Seal
Transition Seal
Pellet Seal
Filter Pack
Transition
Sand
bgs: Below Ground Surface
Not to Scale
Well Detail for HE-07
5 feet bgs
165 feet bgs
170 feet bgs
175 feet bgs
180 feet bgs
205 feet bgs
210 feet bgs
190 feet bgs (estimated)
W-1
4.1.c
Packet Pg. 436 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren
W-24.1.cPacket Pg. 437Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “B”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE CONTRACT FORMS
CONTRACT FORMS
NOTICE OF AWARD
Date: ____________
To:
(Bidder)
Address:
You are hereby notified that your Bid dated _________________ for the above Contract has been
considered. You are the apparent successful bidder and have been awarded a contract for the above-
named project.
The Bid Price of your contract is $
You must comply with the following conditions precedent within 10 calendar days of the date of this Notice
of Award; that is, by ___________________.
1. You must deliver to the City, the fully executed counterpart of the Contract.
2. You must deliver, with the executed Contract, the Payment and Performance Bonds, and all required
insurance documents as specified in the Instructions to Bidders and the Special Provisions.
3. You must prepare and submit to the City, a construction schedule and a schedule of values allocating
the entire Contract Price to the various portions of the Work in accordance with Section 6 of the
Special Provisions.
All of the above items shall be submitted to ________________ (name of project manager), City of San
Jacinto Public Works Department.
Failure to comply with these conditions within the time specified will entitle the City to consider your Bid
abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited.
After you comply with the foregoing conditions, the City will return to you one fully signed counterpart of
the Contract with the Contract Documents attached.
A mandatory pre-construction meeting for the contractor and all of his subs will be required prior to start
of work and will be scheduled upon receipt of all contract documents.
You are required to return an acknowledged copy of this Notice of Award to the Agency.
CITY OF SAN JACINTO
_____________________________________________
By:
Title:
4.1.c
Packet Pg. 438 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “B”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE CONTRACT FORMS
ACCEPTANCE OF NOTICE OF AWARD
Receipt of the above Notice of Award is hereby acknowledged by
_________________________________ this _____ day of __________________________ , 20__
Contractor_______________________________________
By_____________________________
Title____________________________
__________________________
Contractor’s California License No.
__________________________
Expiration Date
4.1.c
Packet Pg. 439 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “B”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE CONTRACT FORMS
NOTICE TO PROCEED
Date: __________________
Contractor:
Address:
Contract No.:
Project: ESPLANADE AVENUE WIDENING PHASE 1 WARREN ROAD TO SANDERSON AVENUE
Subject: NOTICE TO PROCEED
Dear __________________:
You are hereby notified to that the Contract Time under the above Contract will commence to run on
[INSERT START DATE], and the work must be complete within 165 Working Days thereafter.
The date of completion of the work is therefore [INSERT COMPLETION DATE]. The Contract provides for
an assessment of liquidated damages for each and every calendar day after the above established contract
completion date that the Work remains incomplete.
You are required to return an acknowledged copy of this Notice to Proceed to the City.
Please contact me at [INSERT CONTACT INFO] if you have questions. We are looking forward to a mutually
successful project.
CITY OF SAN JACINTO
BY: __________________________
Title: _________________________
4.1.c
Packet Pg. 440 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “B”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE CONTRACT FORMS
ACCEPTANCE OF NOTICE TO PROCEED
Receipt of the above Notice to Proceed is hereby acknowledged by
_________________________________ this _____ day of __________________________ , 20__
Contractor_______________________________________
By_____________________________
Title___________________________
__________________________
Contractor’s California License No.
__________________________
Expiration Date
4.1.c
Packet Pg. 441 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “B”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE CONTRACT FORMS
CHANGE ORDER
Project:
CI Number:
Contract #:
Change Order Number:
Change Order Date:
Contract Date:
To: [INSERT CONTRACTOR NAME, CONTACT INFORMATION AND REPRESENTATIVE]
THIS CHANGE ORDER FORM SHALL BE USED FOR ALL CHANGE ORDERS ASSOCIATED WITH THE WORK.
NO ADDITIONS OR DELETIONS TO THIS FORM SHALL BE ALLOWED, EXCEPT WITH PERMISSION OF THE
CITY OF SAN JACINTO.
The Contract is changed as follows:
[INSERT DESCRIPTION OF CHANGE]
Contractor agrees to furnish all labor, materials, equipment and services to perform the work, modified as
described herein, in accordance with the Contract Documents as revised by this Change Order.
NOT VALID UNTIL SIGNED BY OWNER
In consideration of the change(s) described above, the Contract Price is adjusted as follows:
The original Contract Price was $_____________________
Net change by previously authorized Change Orders $_____________________
The Contract Price prior to this Change Order was $_____________________
The Contract Price will be changed by this Change Order in the amount of $_____________________
The new Contract Price including this Change Order will be $_____________________
In consideration of the change(s) described above, the Contract Time is adjusted as follows:
The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days
The date of Completion as of the date of this Change Order therefore is ____/____/____
Attachments: [e.g., revised plans or specifications or itemized contractor proposal – if none, delete this
line]
Contractor accepts the terms and conditions stated herein as full and final settlement of any and all claims
arising from this Change Order. The adjustments to the Contract Price and Contract Time in this Change
Order constitute the entire compensation and/or adjustment thereto due to Contractor, including but not
limited to all direct, indirect, consequential, profit, labor, equipment, tools, idle time, incidentals, and
overhead (field and home office) costs, due to Contractor arising out of or related to the change in the
Work covered by this Change Order.
4.1.c
Packet Pg. 442 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “B”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE CONTRACT FORMS
REQUESTED BY: ____________________________________________
Contractor
Date:_____________
ACCEPTED BY: ____________________________________________
City (Project Manager)
Date:_____________
APPROVED BY: ____________________________________________
City (Contract City Engineer)
Date:_____________
4.1.c
Packet Pg. 443 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “C”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GEOTECHNICAL REPORT
PREVAILING WAGE RATES
4.1.c
Packet Pg. 444 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
"General Decision Number: CA20250025 11/28/2025
Superseded General Decision Number: CA20240025
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and
Highway
County: Riverside County in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not
include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does
not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally
required to pay at least the applicable minimum wage rate
required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered
contracts entered into by the federal government that are
subject to the Davis-Bacon Act itself, but do not apply to
contracts subject only to the Davis-Bacon Related Acts,
including those set forth at 29 CFR 5.1(a)(1).
______________________________________________________________
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.75 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2025. |
|______________________________|_____________________________|
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $13.30 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2025. |
|______________________________|_____________________________|
The applicable Executive Order minimum wage rate will be
adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for
performance of work on the contract does not appear on this
wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
4.1.c
Packet Pg. 445 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Modification Number Publication Date
0 01/03/2025
1 01/10/2025
2 01/24/2025
3 02/07/2025
4 02/21/2025
5 02/28/2025
6 03/28/2025
7 06/06/2025
8 08/01/2025
9 08/08/2025
10 08/15/2025
11 08/22/2025
12 09/05/2025
13 09/19/2025
14 09/26/2025
15 10/03/2025
16 11/28/2025
ASBE0005-002 09/01/2024
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
protective coverings,
coatings, and finishes to all
types of mechanical systems).....$ 56.32 26.52
Fire Stop Technician
(Application of Firestopping
Materials for wall openings
and penetrations in walls,
floors, ceilings and curtain
walls)...........................$ 39.94 20.65
----------------------------------------------------------------
ASBE0005-004 07/04/2022
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)....$ 23.52 13.37
----------------------------------------------------------------
BOIL0092-003 01/01/2024
Rates Fringes
BOILERMAKER......................$ 51.98 42.11
----------------------------------------------------------------
* BRCA0004-011 05/01/2024
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 45.53 20.29
*The wage scale for prevailing wage projects performed in
Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine
4.1.c
Packet Pg. 446 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Palms, Needles and 1-15 corridor (Barstow to the Nevada
State Line) will be Three Dollars ($3.00) above the
standard San Bernardino/Riverside County hourly wage rate
----------------------------------------------------------------
BRCA0018-004 06/01/2024
Rates Fringes
MARBLE FINISHER..................$ 43.38 15.36
TILE FINISHER....................$ 37.96 13.77
TILE LAYER.......................$ 51.82 19.32
----------------------------------------------------------------
BRCA0018-010 09/01/2024
Rates Fringes
TERRAZZO FINISHER................$ 42.11 14.67
TERRAZZO WORKER/SETTER...........$ 49.62 15.26
----------------------------------------------------------------
CARP0213-001 07/01/2025
Rates Fringes
CARPENTER
(1) Carpenter, Cabinet
Installer, Insulation
Installer, Hardwood Floor
Worker and acoustical
installer...................$ 52.24 26.18
(2) Millwright..............$ 52.24 26.68
(3) Piledrivermen/Derrick
Bargeman, Bridge or Dock
Carpenter, Heavy Framer,
Rock Bargeman or Scowman,
Rockslinger, Shingler
(Commercial)................$ 52.37 26.18
(4) Pneumatic Nailer,
Power Stapler...............$ 52.37 26.18
(5) Sawfiler...............$ 52.34 26.18
(6) Scaffold Builder.......$ 45.37 25.43
(7) Table Power Saw
Operator....................$ 52.34 26.18
FOOTNOTE: Work of forming in the construction of open cut
sewers or storm drains, on operations in which horizontal
lagging is used in conjunction with steel H-Beams driven or
placed in pre- drilled holes, for that portion of a lagged
trench against which concrete is poured, namely, as a
substitute for back forms (which work is performed by
piledrivers): $0.13 per hour additional.
----------------------------------------------------------------
CARP0213-002 07/01/2025
Rates Fringes
Diver
(1) Wet.....................$ 901.92 26.18
(2) Standby.................$ 450.96 26.18
(3) Tender..................$ 442.96 26.18
(4) Assistant Tender........$ 418.96 26.18
Amounts in ""Rates' column are per day
----------------------------------------------------------------
4.1.c
Packet Pg. 447 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
CARP0213-004 07/01/2025
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 52.24 26.18
STOCKER/SCRAPPER............$ 21.45 11.27
----------------------------------------------------------------
CARP0721-001 07/01/2025
Rates Fringes
Modular Furniture Installer......$ 25.00 13.06
----------------------------------------------------------------
ELEC0440-001 12/30/2024
Rates Fringes
ELECTRICIAN
INSIDE ELECTRICIAN..........$ 56.26 3%+28.48
INTELLIGENT TRANSPORTATION
SYSTEMS
Electrician................$ 36.99 3%+23.18
Technician.................$ 27.75 3%+23.18
ZONE PAY: Zone A: Free travel zone for all contractors
performing work in Zone A.
Zone B:Any work performed in Zone (B) shall add $12.00 per
hour to the current wage scale. Zone (B) shall be the area
from the eastern perimeter of Zone (A) to a line which runs
north and south begininng at Little Morongo Canyon (San
Bernardino/Riverside County Line), Southeast along the
Coachella Tunnels, Colorado River Aqueduct and Mecca
Tunnels to Pinkham Wash then South to Box Canyon Road, then
southwest along Box Canyon Road to Highway 195 west onto
195 south to Highway 86 to Riverside/Imperial County Line.
----------------------------------------------------------------
ELEC1245-001 01/01/2025
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 70.16 24.71
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 53.30 22.26
(3) Groundman...............$ 40.76 21.76
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day
and day after Thanksgiving, Christmas Day
----------------------------------------------------------------
ELEV0018-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC................$ 69.43 38.435+a+b
4.1.c
Packet Pg. 448 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly
rate as vacation pay credit for employees with more than 5
years of service, and 6% for 6 months to 5 years of service.
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday
after Thanksgiving, and Christmas Day.
----------------------------------------------------------------
* ENGI0012-004 08/01/2025
Rates Fringes
OPERATOR: Power Equipment
(DREDGING)
(1) Leverman................$ 67.90 40.95
(2) Dredge dozer............$ 61.93 40.95
(3) Deckmate................$ 61.82 40.95
(4) Winch operator (stern
winch on dredge)............$ 61.27 40.95
(5) Fireman-Oiler,
Deckhand, Bargeman,
Leveehand...................$ 60.73 40.95
(6) Barge Mate..............$ 61.34 40.95
----------------------------------------------------------------
ENGI0012-024 07/01/2023
Rates Fringes
OPERATOR: Power Equipment
(All Other Work)
GROUP 1....................$ 53.90 32.80
GROUP 2....................$ 54.68 32.80
GROUP 3....................$ 54.97 32.80
GROUP 4....................$ 56.46 32.80
GROUP 6....................$ 56.68 32.80
GROUP 8....................$ 56.79 32.80
GROUP 10....................$ 56.91 32.80
GROUP 12....................$ 57.08 32.80
GROUP 13....................$ 57.18 32.80
GROUP 14....................$ 57.21 32.80
GROUP 15....................$ 57.29 32.80
GROUP 16....................$ 57.41 32.80
GROUP 17....................$ 57.58 32.80
GROUP 18....................$ 57.68 32.80
GROUP 19....................$ 57.79 32.80
GROUP 20....................$ 57.91 32.80
GROUP 21....................$ 58.08 32.80
GROUP 22....................$ 58.18 32.80
GROUP 23....................$ 58.29 32.80
GROUP 24....................$ 58.41 32.80
GROUP 25....................$ 58.58 32.80
OPERATOR: Power Equipment
(Cranes, Piledriving &
Hoisting)
GROUP 1....................$ 55.25 32.80
GROUP 2....................$ 56.03 32.80
GROUP 3....................$ 56.32 32.80
GROUP 4....................$ 56.46 32.80
GROUP 5....................$ 56.68 32.80
GROUP 6....................$ 56.79 32.80
GROUP 7....................$ 56.91 32.80
GROUP 8....................$ 57.08 32.80
4.1.c
Packet Pg. 449 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
GROUP 9....................$ 57.25 32.80
GROUP 10....................$ 58.25 32.80
GROUP 11....................$ 59.25 32.80
GROUP 12....................$ 60.25 32.80
GROUP 13....................$ 61.25 32.80
OPERATOR: Power Equipment
(Tunnel Work)
GROUP 1....................$ 55.75 32.80
GROUP 2....................$ 56.53 32.80
GROUP 3....................$ 56.82 32.80
GROUP 4....................$ 56.96 32.80
GROUP 5....................$ 57.18 32.80
GROUP 6....................$ 57.29 32.80
GROUP 7....................$ 57.41 32.80
PREMIUM PAY:
$10.00 per hour shall be paid on all Power Equipment Operator
work on the followng Military Bases: China Lake Naval
Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base,
Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics
Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp
Pendleton
Workers required to suit up and work in a hazardous material
environment: $2.00 per hour additional. Combination mixer
and compressor operator on gunite work shall be classified
as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch
Witch, with seat or similar type equipment; Elevator
operator-inside; Engineer Oiler; Forklift operator
(includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant
operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank
operator);Coil Tubing Rig Operator, Concrete mixer
operator-skip type; Conveyor operator; Fireman; Forklift
operator (includes loed, lull or similar types over 5 tons;
Hydrostatic pump operator; oiler crusher (asphalt or
concrete plant); Petromat laydown machine; PJU side dum
jack; Screening and conveyor machine operator (or similar
types); Skiploader (wheel type up to 3/4 yd. without
attachment); Tar pot fireman; Temporary heating plant
operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar
type (Skid steer); Equipment greaser (rack); Ford Ferguson
(with dragtype attachments); Helicopter radioman (ground);
Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or
similar type); Boring machine operator; Boxman or mixerman
(asphalt or concrete); Chip spreading machine operator;
Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable);Direct Push
Operator (Geoprobe or similar types) Drilling machine
operator, small auger types (Texoma super economatic or
similar types - Hughes 100 or 200 or similar types -
drilling depth of 30' maximum); Equipment greaser (grease
truck); Guard rail post driver operator; Highline cableway
4.1.c
Packet Pg. 450 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
signalman; Hydra-hammer-aero stomper; Micro Tunneling
(above ground tunnel); Power concrete curing machine
operator; Power concrete saw operator; Power-driven jumbo
form setter operator; Power sweeper operator; Rock Wheel
Saw/Trencher; Roller operator (compacting); Screed operator
(asphalt or concrete); Trenching machine operator (up to 6
ft.); Vacuum or much truck
GROUP 6: Articulating material hauler; Asphalt plant
engineer; Batch plant operator; Bit sharpener; Concrete
joint machine operator (canal and similar type); Concrete
planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator,
bucket or auger types (Calweld 100 bucket or similar types
- Watson 1000 auger or similar types - Texoma 330, 500 or
600 auger or similar types - drilling depth of 45'
maximum); Drilling machine operator; Hydrographic seeder
machine operator (straw, pulp or seed), Jackson track
maintainer, or similar type; Kalamazoo Switch tamper, or
similar type; Machine tool operator; Maginnis internal full
slab vibrator, Mechanical berm, curb or gutter(concrete or
asphalt); Mechanical finisher operator (concrete,
Clary-Johnson-Bidwell or similar); Micro tunnel system
(below ground); Pavement breaker operator (truck mounted);
Road oil mixing machine operator; Roller operator (asphalt
or finish), rubber-tired earth moving equipment (single
engine, up to and including 25 yds. struck); Self-propelled
tar pipelining machine operator; Skiploader operator
(crawler and wheel type, over 3/4 yd. and up to and
including 1-1/2 yds.); Slip form pump operator (power
driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine,
up to 100 h.p. flywheel and similar types, up to and
including D-5 and similar types); Tugger hoist operator (1
drum); Ultra high pressure waterjet cutting tool system
operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or
finishing); Asphalt paving machine operator (Barber Greene
or similar type); Asphalt-rubber distribution operator;
Backhoe operator (up to and including 3/4 yd.), small ford,
Case or similar types; Cable Bundling Machine Operator
(excluding handheld); Cable Trenching Machine Operator
(Spider Plow or similar types) Cast-in-place pipe laying
machine operator; Combination mixer and compressor operator
(gunite work); Compactor operator (self-propelled);
Concrete mixer operator (paving); Crushing plant operator;
Drill Doctor; Drilling machine operator, Bucket or auger
types (Calweld 150 bucket or similar types - Watson 1500,
2000 2500 auger or similar types - Texoma 700, 800 auger or
similar types - drilling depth of 60' maximum); Elevating
grader operator; Grade checker; Gradall operator; Grouting
machine operator; Heavy-duty repairman; Heavy equipment
robotics operator; Kalamazoo balliste regulator or similar
type; Kolman belt loader and similar type; Le Tourneau blob
compactor or similar type; Loader operator (Athey, Euclid,
Sierra and similar types); Mobark Chipper or similar; Ozzie
padder or similar types; P.C. slot saw; Pneumatic concrete
placing machine operator (Hackley-Presswell or similar
type); Pumpcrete gun operator; RCM Cementing Unit Operator,
Rail/Switch Grinder Operator (Harsco or similar types)
Rock Drill or similar types; Rotary drill operator
(excluding caisson type); Rubber-tired earth-moving
equipment operator (single engine, caterpillar, Euclid,
4.1.c
Packet Pg. 451 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Athey Wagon and similar types with any and all attachments
over 25 yds. up to and including 50 cu. yds. struck);
Rubber-tired earth-moving equipment operator (multiple
engine up to and including 25 yds. struck); Rubber-tired
scraper operator (self-loading paddle wheel type-John
Deere, 1040 and similar single unit); Self- propelled curb
and gutter machine operator; Shuttle buggy; Skiploader
operator (crawler and wheel type over 1-1/2 yds. up to and
including 6-1/2 yds.); Soil remediation plant operator;
Surface heaters and planer operator; Tractor compressor
drill combination operator; Tractor operator (any type
larger than D-5 - 100 flywheel h.p. and over, or
similar-bulldozer, tamper, scraper and push tractor single
engine); Tractor operator (boom attachments), Traveling
pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity,
manufacturer's rating); trenching Machine with Road Miner
attachment (over 6 ft depth capacity): Ultra high pressure
waterjet cutting tool system mechanic; Water pull
(compaction) operator
GROUP 10: Drilling machine operator, Bucket or auger types
(Calweld 200 B bucket or similar types-Watson 3000 or 5000
auger or similar types-Texoma 900 auger or similar
types-drilling depth of 105' maximum); Dual drum mixer,
dynamic compactor LDC350 (or similar types); Monorail
locomotive operator (diesel, gas or electric); Motor
patrol-blade operator (single engine); Multiple engine
tractor operator (Euclid and similar type-except Quad 9
cat.); Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Pneumatic pipe ramming tool
and similar types; Prestressed wrapping machine operator;
Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Rubber tired earth moving
equipment operator (multiple engine, Euclid, caterpillar
and similar over 25 yds. and up to 50 yds. struck), Tower
crane repairman; Tractor loader operator (crawler and wheel
type over 6-1/2 yds.); Woods mixer operator (and similar
Pugmill equipment)
GROUP 12: Auto grader operator; Automatic slip form operator;
Drilling machine operator, bucket or auger types (Calweld,
auger 200 CA or similar types - Watson, auger 6000 or
similar types - Hughes Super Duty, auger 200 or similar
types - drilling depth of 175' maximum); Hoe ram or similar
with compressor; Mass excavator operator less tha 750 cu.
yards; Mechanical finishing machine operator; Mobile form
traveler operator; Motor patrol operator (multi-engine);
Pipe mobile machine operator; Rubber-tired earth- moving
equipment operator (multiple engine, Euclid, Caterpillar
and similar type, over 50 cu. yds. struck); Rubber-tired
self- loading scraper operator (paddle-wheel-auger type
self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment operator
operating equipment with push-pull system (single engine,
up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer operator;
Remote- control earth-moving equipment operator (operating
a second piece of equipment: $1.00 per hour additional);
Wheel excavator operator (over 750 cu. yds.)
GROUP 15: Rubber-tired earth-moving equipment operator,
operating equipment with push-pull system (single engine,
4.1.c
Packet Pg. 452 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Caterpillar, Euclid, Athey Wagon and similar types with any
and all attachments over 25 yds. and up to and including 50
yds. struck); Rubber-tired earth-moving equipment operator,
operating equipment with push-pull system (multiple
engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment operator,
operating equipment with push-pull system (single engine,
over 50 yds. struck); Rubber-tired earth-moving equipment
operator, operating equipment with push-pull system
(multiple engine, Euclid, Caterpillar and similar, over 25
yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment operator,
operating equipment with push-pull system (multiple engine,
Euclid, Caterpillar and similar, over 50 cu. yds. struck);
Tandem tractor operator (operating crawler type tractors in
tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment operator,
operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, up to and including 25 yds. struck)
GROUP 19: Rotex concrete belt operator (or similar types);
Rubber-tired earth-moving equipment operator, operating in
tandem (scrapers, belly dumps and similar types in any
combination, excluding compaction units - single engine,
Caterpillar, Euclid, Athey Wagon and similar types with any
and all attachments over 25 yds.and up to and including 50
cu. yds. struck); Rubber-tired earth-moving equipment
operator, operating in tandem (scrapers, belly dumps and
similar types in any combination, excluding compaction
units - multiple engine, up to and including 25 yds. struck)
GROUP 20: Rubber-tired earth-moving equipment operator,
operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating in tandem
(scrapers, belly dumps, and similar types in any
combination, excluding compaction units - multiple engine,
Euclid, Caterpillar and similar, over 25 yds. and up to 50
yds. struck)
GROUP 21: Rubber-tired earth-moving equipment operator,
operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
multiple engine, Euclid, Caterpillar and similar type, over
50 cu. yds. struck)
GROUP 22: Rubber-tired earth-moving equipment operator,
operating equipment with the tandem push-pull system
(single engine, up to and including 25 yds. struck)
GROUP 23: Rubber-tired earth-moving equipment operator,
operating equipment with the tandem push-pull system
(single engine, Caterpillar, Euclid, Athey Wagon and
similar types with any and all attachments over 25 yds. and
up to and including 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating with the tandem
push-pull system (multiple engine, up to and including 25
yds. struck)
GROUP 24: Rubber-tired earth-moving equipment operator,
4.1.c
Packet Pg. 453 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
operating equipment with the tandem push-pull system
(single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating equipment with
the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar, over 25 yds. and up to 50 yds.
struck)
GROUP 25: Concrete pump operator-truck mounted; Rubber-tired
earth-moving equipment operator, operating equipment with
the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar type, over 50 cu. yds. struck);
Spyder Excavator Operator, with all attachments
CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS
GROUP 1: Engineer oiler; Fork lift operator (includes loed,
lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross carrier
operator (jobsite)
GROUP 4: Bridge-type unloader and turntable operator;
Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western
or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane operator; Hoist
operator (Chicago boom and similar type); Lift mobile
operator; Lift slab machine operator (Vagtborg and similar
types); Material hoist and/or manlift operator; Polar
gantry crane operator; Self Climbing scaffold (or similar
type); Shovel, backhoe, dragline, clamshell operator (over
3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator
GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline,
clamshell operator (over 5 cu. yds. mrc); Tower crane
repair; Tugger hoist operator (3 drum)
GROUP 8: Crane operator (up to and including 25 ton
capacity); Crawler transporter operator; Derrick barge
operator (up to and including 25 ton capacity); Hoist
operator, stiff legs, Guy derrick or similar type (up to
and including 25 ton capacity); Shovel, backhoe, dragline,
clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to and including
50 tons mrc); Derrick barge operator (over 25 tons up to
and including 50 tons mrc); Highline cableway operator;
Hoist operator, stiff legs, Guy derrick or similar type
(over 25 tons up to and including 50 tons mrc); K-crane
operator; Polar crane operator; Self erecting tower crane
operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to and
including 100 tons mrc); Derrick barge operator (over 50
tons up to and including 100 tons mrc); Hoist operator,
stiff legs, Guy derrick or similar type (over 50 tons up to
and including 100 tons mrc), Mobile tower crane operator
(over 50 tons, up to and including 100 tons M.R.C.);
GROUP 11: Crane operator (over 100 tons and up to and
including 200 tons mrc); Derrick barge operator (over 100
4.1.c
Packet Pg. 454 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
tons up to and including 200 tons mrc); Hoist operator,
stiff legs, Guy derrick or similar type (over 100 tons up
to and including 200 tons mrc); Mobile tower crane operator
(over 100 tons up to and including 200 tons mrc) ; Tower
crane operator and tower gantry
GROUP 12: Crane operator (over 200 tons up to and including
300 tons mrc); Derrick barge operator (over 200 tons up to
and including 300 tons mrc); Hoist operator, stiff legs,
Guy derrick or similar type (over 200 tons, up to and
including 300 tons mrc); Mobile tower crane operator (over
200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derrick barge
operator (over 300 tons); Helicopter pilot; Hoist operator,
stiff legs, Guy derrick or similar type (over 300 tons);
Mobile tower crane operator (over 300 tons)
TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. without
attachment)
GROUP 2: Power-driven jumbo form setter operator
GROUP 3: Dinkey locomotive or motorperson (up to and
including 10 tons)
GROUP 4: Bit sharpener; Equipment greaser (grease truck);
Slip form pump operator (power-driven hydraulic lifting
device for concrete forms); Tugger hoist operator (1 drum);
Tunnel locomotive operator (over 10 and up to and including
30 tons)
GROUP 5: Backhoe operator (up to and including 3/4 yd.);
Small Ford, Case or similar; Drill doctor; Grouting machine
operator; Heading shield operator; Heavy-duty repairperson;
Loader operator (Athey, Euclid, Sierra and similar types);
Mucking machine operator (1/4 yd., rubber-tired, rail or
track type); Pneumatic concrete placing machine operator
(Hackley-Presswell or similar type); Pneumatic heading
shield (tunnel); Pumpcrete gun operator; Tractor compressor
drill combination operator; Tugger hoist operator (2 drum);
Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator
ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL County and the
portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as
defined below:
That area within the following Boundary: Begin in San
Bernardino County, approximately 3 miles NE of the intersection
of I-15 and the California State line at that point which is
the NW corner of Section 1, T17N,m R14E, San Bernardino
Meridian. Continue W in a straight line to that point which is
the SW corner of the northwest quarter of Section 6, T27S,
R42E, Mt. Diablo Meridian. Continue North to the intersection
with the Inyo County Boundary at that point which is the NE
corner of the western half of the northern quarter of Section
6, T25S, R42E, MDM. Continue W along the Inyo and San
4.1.c
Packet Pg. 455 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Bernardino County boundary until the intersection with Kern
County, as that point which is the SE corner of Section 34,
T24S, R40E, MDM. Continue W along the Inyo and Kern County
boundary until the intersection with Tulare County, at that
point which is the SW corner of the SE quarter of Section 32,
T24S, R37E, MDM. Continue W along the Kern and Tulare County
boundary, until that point which is the NW corner of T25S,
R32E, MDM. Continue S following R32E lines to the NW corner of
T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E,
MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue
W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.
Continue S to SW corner of T11N, R17W, SBM. Continue E along
south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.
Continue S to SW corner of T9N, R7W, SBM. Continue E along
south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.
Continue S along west boundary of R1E, SMB to Riverside County
line at the SW corner of T1S, R1E, SBM. Continue E along south
boundary of T1s, SBM (Riverside County Line) to SW corner of
T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to
Imperial County line at the SW corner of T8S, R10E, SBM.
Continue W along Imperial and Riverside county line to NW
corner of T9S, R9E, SBM. Continue S along the boundary between
Imperial and San Diego Counties, along the west edge of R9E,
SBM to the south boundary of Imperial County/California state
line. Follow the California state line west to Arizona state
line, then north to Nevada state line, then continuing NW back
to start at the point which is the NW corner of Section 1,
T17N, R14E, SBM
$1.00 additional per hour for portions of SAN LUIS OBISPO,
KERN, SANTA BARBARA & VENTURA as defined below:
That area within the following Boundary: Begin approximately 5
miles north of the community of Cholame, on the Monterey County
and San Luis Obispo County boundary at the NW corner of T25S,
R16E, Mt. Diablo Meridian. Continue south along the west side
of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW
corner of T30S, R17E, MDM. Continue S to SW corner of T31S,
R17E, MDM. Continue E to SW corner of T31S, R18E, MDM.
Continue S along West side of R18E, MDM as it crosses into San
Bernardino Meridian numbering area and becomes R30W. Follow
the west side of R30W, SBM to the SW corner of T9N, R30W, SBM.
Continue E along the south edge of T9N, SBM to the Santa
Barbara County and Ventura County boundary at that point whch
is the SW corner of Section 34.T9N, R24W, SBM, continue S along
the Ventura County line to that point which is the SW corner of
the SE quarter of Section 32, T7N, R24W, SBM. Continue E
along the south edge of T7N, SBM to the SE corner to T7N, R21W,
SBM. Continue N along East side of R21W, SBM to Ventura County
and Kern County boundary at the NE corner of T8N, R21W.
Continue W along the Ventura County and Kern County boundary to
the SE corner of T9N, R21W. Continue North along the East edge
of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue
West along the north edge of T12N, SBM to the SE corner of
T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM
and T32S MDM]. Continue North along the East side of R21E, MDM
to the Kings County and Kern County border at the NE corner of
T25S, R21E, MDM, continue West along the Kings County and Kern
County Boundary until the intersection of San Luis Obispo
County. Continue west along the Kings County and San Luis
Obispo County boundary until the intersection with Monterey
County. Continue West along the Monterey County and San Luis
Obispo County boundary to the beginning point at the NW corner
of T25S, R16E, MDM.
4.1.c
Packet Pg. 456 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
$2.00 additional per hour for INYO and MONO Counties and the
Northern portion of SAN BERNARDINO County as defined below:
That area within the following Boundary: Begin at the
intersection of the northern boundary of Mono County and the
California state line at the point which is the center of
Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then
SE along the entire western boundary of Mono County, until it
reaches Inyo County at the point which is the NE corner of the
Western half of the NW quarter of Section 2, T8S, R29E, MDM.
Continue SSE along the entire western boundary of Inyo County,
until the intersection with Kern County at the point which is
the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM.
Continue E along the Inyo and Kern County boundary until the
intersection with San Bernardino County at that point which is
the SE corner of section 34, T24S, R40E, MDM. Continue E along
the Inyo and San Bernardino County boundary until the point
which is the NE corner of the Western half of the NW quarter of
Section 6, T25S, R42E, MDM. Continue S to that point which is
the SW corner of the NW quarter of Section 6, T27S, R42E, MDM.
Continue E in a straight line to the California and Nevada
state border at the point which is the NW corner of Section 1,
T17N, R14E, San Bernardino Meridian. Then continue NW along
the state line to the starting point, which is the center of
Section 18, T10N, R22E, MDM.
REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE
----------------------------------------------------------------
IRON0433-006 01/01/2025
Rates Fringes
IRONWORKER
Fence Erector...............$ 45.78 26.51
Ornamental, Reinforcing
and Structural..............$ 50.70 35.15
PREMIUM PAY:
$9.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval
Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas Island,
Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine
Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB
Army Defense Language Institute - Monterey, Fallon Air Base,
Naval Post Graduate School - Monterey, Yermo Marine Corps
Logistics Center
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock
----------------------------------------------------------------
LABO0300-005 07/01/2025
Rates Fringes
Asbestos Removal Laborer.........$ 46.48 25.93
SCOPE OF WORK: Includes site mobilization, initial site
cleanup, site preparation, removal of asbestos-containing
4.1.c
Packet Pg. 457 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
material and toxic waste, encapsulation, enclosure and
disposal of asbestos- containing materials and toxic waste
by hand or with equipment or machinery; scaffolding,
fabrication of temporary wooden barriers and assembly of
decontamination stations.
----------------------------------------------------------------
LABO0345-001 07/01/2025
Rates Fringes
LABORER (GUNITE)
GROUP 1.....................$ 55.88 23.77
GROUP 2.....................$ 54.93 23.77
GROUP 3.....................$ 51.39 23.77
FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a
Bosn'n's Chair or suspended from a rope or cable shall
receive 40 cents per hour above the foregoing applicable
classification rates. Workers doing gunite and/or
shotcrete work in a tunnel shall receive 35 cents per hour
above the foregoing applicable classification rates, paid
on a portal-to-portal basis. Any work performed on, in or
above any smoke stack, silo, storage elevator or similar
type of structure, when such structure is in excess of
75'-0"" above base level and which work must be performed in
whole or in part more than 75'-0"" above base level, that
work performed above the 75'-0"" level shall be compensated
for at 35 cents per hour above the applicable
classification wage rate.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Rodmen, Nozzlemen
GROUP 2: Gunmen
GROUP 3: Reboundmen
----------------------------------------------------------------
LABO1184-001 07/01/2025
Rates Fringes
Laborers: (HORIZONTAL
DIRECTIONAL DRILLING)
(1) Drilling Crew Laborer...$ 47.94 20.86
(2) Vehicle Operator/Hauler.$ 48.11 20.86
(3) Horizontal Directional
Drill Operator..............$ 49.96 20.86
(4) Electronic Tracking
Locator.....................$ 51.96 20.86
Laborers: (STRIPING/SLURRY
SEAL)
GROUP 1.....................$ 49.30 23.97
GROUP 2.....................$ 50.60 23.97
GROUP 3.....................$ 52.61 23.97
GROUP 4.....................$ 54.35 23.97
LABORERS - STRIPING CLASSIFICATIONS
GROUP 1: Protective coating, pavement sealing, including
repair and filling of cracks by any method on any surface
in parking lots, game courts and playgrounds; carstops;
operation of all related machinery and equipment; equipment
4.1.c
Packet Pg. 458 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
repair technician
GROUP 2: Traffic surface abrasive blaster; pot tender -
removal of all traffic lines and markings by any method
(sandblasting, waterblasting, grinding, etc.) and
preparation of surface for coatings. Traffic control
person: controlling and directing traffic through both
conventional and moving lane closures; operation of all
related machinery and equipment
GROUP 3: Traffic delineating device applicator: Layout and
application of pavement markers, delineating signs, rumble
and traffic bars, adhesives, guide markers, other traffic
delineating devices including traffic control. This
category includes all traffic related surface preparation
(sandblasting, waterblasting, grinding) as part of the
application process. Traffic protective delineating system
installer: removes, relocates, installs, permanently
affixed roadside and parking delineation barricades,
fencing, cable anchor, guard rail, reference signs,
monument markers; operation of all related machinery and
equipment; power broom sweeper
GROUP 4: Striper: layout and application of traffic stripes
and markings; hot thermo plastic; tape traffic stripes and
markings, including traffic control; operation of all
related machinery and equipment
----------------------------------------------------------------
LABO1184-002 07/01/2025
Rates Fringes
LABORER (TUNNEL)
GROUP 1.....................$ 53.60 25.74
GROUP 2.....................$ 53.92 25.74
GROUP 3.....................$ 54.38 25.74
GROUP 4.....................$ 55.07 25.74
LABORER
GROUP 1.....................$ 46.48 25.95
GROUP 2.....................$ 47.03 25.95
GROUP 3.....................$ 47.58 25.95
GROUP 4.....................$ 49.13 25.95
GROUP 5.....................$ 49.48 25.95
LABORER CLASSIFICATIONS
GROUP 1: Cleaning and handling of panel forms; Concrete
screeding for rough strike-off; Concrete, water curing;
Demolition laborer, the cleaning of brick if performed by a
worker performing any other phase of demolition work, and
the cleaning of lumber; Fire watcher, limber, brush loader,
piler and debris handler; Flag person; Gas, oil and/or
water pipeline laborer; Laborer, asphalt-rubber material
loader; Laborer, general or construction; Laborer, general
clean-up; Laborer, landscaping; Laborer, jetting; Laborer,
temporary water and air lines; Material hose operator
(walls, slabs, floors and decks); Plugging, filling of shee
bolt holes; Dry packing of concrete; Railroad maintenance,
repair track person and road beds; Streetcar and railroad
construction track laborers; Rigging and signaling; Scaler;
Slip form raiser; Tar and mortar; Tool crib or tool house
laborer; Traffic control by any method; Window cleaner;
Wire mesh pulling - all concrete pouring operations
4.1.c
Packet Pg. 459 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger
mixer and handling bulk cement); Cesspool digger and
installer; Chucktender; Chute handler, pouring concrete,
the handling of the chute from readymix trucks, such as
walls, slabs, decks, floors, foundation, footings, curbs,
gutters and sidewalks; Concrete curer, impervious membrane
and form oiler; Cutting torch operator (demolition); Fine
grader, highways and street paving, airport, runways and
similar type heavy construction; Gas, oil and/or water
pipeline wrapper - pot tender and form person; Guinea
chaser; Headerboard person - asphalt; Laborer, packing rod
steel and pans; Membrane vapor barrier installer; Power
broom sweeper (small); Riprap stonepaver, placing stone or
wet sacked concrete; Roto scraper and tiller; Sandblaster
(pot tender); Septic tank digger and installer(lead); Tank
scaler and cleaner; Tree climber, faller, chain saw
operator, Pittsburgh chipper and similar type brush
shredder; Underground laborer, including caisson bellower
GROUP 3: Buggymobile person; Concrete cutting torch; Concrete
pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or
longer; Dri-pak-it machine; Gas, oil and/or water pipeline
wrapper, 6-in. pipe and over, by any method, inside and
out; High scaler (including drilling of same); Hydro seeder
and similar type; Impact wrench multi-plate; Kettle person,
pot person and workers applying asphalt, lay-kold,
creosote, lime caustic and similar type materials
(""applying"" means applying, dipping, brushing or handling
of such materials for pipe wrapping and waterproofing);
Operator of pneumatic, gas, electric tools, vibrating
machine, pavement breaker, air blasting, come-alongs, and
similar mechanical tools not separately classified herein;
Pipelayer's backup person, coating, grouting, making of
joints, sealing, caulking, diapering and including rubber
gasket joints, pointing and any and all other services;
Rock slinger; Rotary scarifier or multiple head concrete
chipping scarifier; Steel headerboard and guideline setter;
Tamper, Barko, Wacker and similar type; Trenching machine,
hand-propelled
GROUP 4: Asphalt raker, lute person, ironer, asphalt dump
person, and asphalt spreader boxes (all types); Concrete
core cutter (walls, floors or ceilings), grinder or sander;
Concrete saw person, cutting walls or flat work, scoring
old or new concrete; Cribber, shorer, lagging, sheeting and
trench bracing, hand-guided lagging hammer; Head rock
slinger; Laborer, asphalt- rubber distributor boot person;
Laser beam in connection with laborers' work; Oversize
concrete vibrator operator, 70 lbs. and over; Pipelayer
performing all services in the laying and installation of
pipe from the point of receiving pipe in the ditch until
completion of operation, including any and all forms of
tubular material, whether pipe, metallic or non-metallic,
conduit and any other stationary type of tubular device
used for the conveying of any substance or element, whether
water, sewage, solid gas, air, or other product whatsoever
and without regard to the nature of material from which the
tubular material is fabricated; No-joint pipe and stripping
of same; Prefabricated manhole installer; Sandblaster
(nozzle person), water blasting, Porta Shot-Blast
GROUP 5: Blaster powder, all work of loading holes, placing
and blasting of all powder and explosives of whatever type,
regardless of method used for such loading and placing;
Driller: All power drills, excluding jackhammer, whether
4.1.c
Packet Pg. 460 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
core, diamond, wagon, track, multiple unit, and any and all
other types of mechanical drills without regard to the form
of motive power; Toxic waste removal
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person; Dump
person; Dump person (outside); Swamper (brake person and
switch person on tunnel work); Tunnel materials handling
person; Nipper; Pot tender, using mastic or other materials
(for example, but not by way of limitation, shotcrete, etc.)
GROUP 2: Chucktender, cabletender; Loading and unloading
agitator cars; Vibrator person, jack hammer, pneumatic
tools (except driller); Bull gang mucker, track person;
Concrete crew, including rodder and spreader
GROUP 3: Blaster, driller, powder person; Chemical grout jet
person; Cherry picker person; Grout gun person; Grout mixer
person; Grout pump person; Jackleg miner; Jumbo person;
Kemper and other pneumatic concrete placer operator; Miner,
tunnel (hand or machine); Nozzle person; Operating of
troweling and/or grouting machines; Powder person (primer
house); Primer person; Sandblaster; Shotcrete person; Steel
form raiser and setter; Timber person, retimber person,
wood or steel; Tunnel Concrete finisher
GROUP 4: Diamond driller; Sandblaster; Shaft and raise work
----------------------------------------------------------------
* LABO1184-004 11/01/2025
Rates Fringes
Brick Tender.....................$ 42.60 22.13
----------------------------------------------------------------
LABO1414-001 08/06/2025
Rates Fringes
LABORER
PLASTER CLEAN-UP LABORER....$ 46.17 25.97
PLASTER TENDER..............$ 48.72 25.97
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
PAIN0036-001 07/01/2023
Rates Fringes
Painters: (Including Lead
Abatement)
(1) Repaint (excludes San
Diego County)...............$ 29.59 17.12
(2) All Other Work..........$ 38.52 18.64
REPAINT of any previously painted structure. Exceptions:
work involving the aerospace industry, breweries,
commercial recreational facilities, hotels which operate
commercial establishments as part of hotel service, and
sports facilities.
----------------------------------------------------------------
PAIN0036-008 09/01/2024
4.1.c
Packet Pg. 461 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 49.33 26.82
----------------------------------------------------------------
PAIN0036-015 01/01/2025
Rates Fringes
GLAZIER..........................$ 53.05 30.64
FOOTNOTE: Additional $1.25 per hour for work in a condor,
from the third (3rd) floor and up Additional $1.25 per
hour for work on the outside of the building from a swing
stage or any suspended contrivance, from the ground up
----------------------------------------------------------------
PLAS0200-009 08/03/2022
Rates Fringes
PLASTERER........................$ 47.37 19.64
----------------------------------------------------------------
PLAS0500-002 07/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 47.70 27.07
----------------------------------------------------------------
PLUM0016-001 09/01/2025
Rates Fringes
PLUMBER/PIPEFITTER
Work ONLY on new additions
and remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space.................$ 59.85 25.83
Work ONLY on strip malls,
light commercial, tenant
improvement and remodel
work........................$ 44.29 24.16
All other work except work
on new additions and
remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space and work on
strip malls, light
commercial, tenant
improvement and remodel
work........................$ 61.73 26.81
----------------------------------------------------------------
PLUM0345-001 09/01/2025
Rates Fringes
PLUMBER
Landscape/Irrigation Fitter.$ 44.75 26.20
Sewer & Storm Drain Work....$ 48.84 23.58
----------------------------------------------------------------
ROOF0036-002 08/01/2025
4.1.c
Packet Pg. 462 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Rates Fringes
ROOFER...........................$ 52.63 20.73
FOOTNOTE: Pitch premium: Work on which employees are exposed
to pitch fumes or required to handle pitch, pitch base or
pitch impregnated products, or any material containing coal
tar pitch, the entire roofing crew shall receive $1.75 per
hour ""pitch premium"" pay.
----------------------------------------------------------------
SFCA0669-002 01/01/2025
Rates Fringes
SPRINKLER FITTER.................$ 47.45 28.50
----------------------------------------------------------------
SHEE0105-003 01/01/2025
LOS ANGELES (South of a straight line drawn between Gorman and
Big Pines)and Catalina Island, INYO, KERN (Northeast part, East
of Hwy 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES
Rates Fringes
SHEET METAL WORKER
(1) Commercial - New
Construction and Remodel
work........................$ 59.31 30.43
(2) Industrial work
including air pollution
control systems, noise
abatement, hand rails,
guard rails, excluding
aritechtural sheet metal
work, excluding A-C,
heating, ventilating
systems for human comfort...$ 56.95 30.04
----------------------------------------------------------------
TEAM0011-002 07/01/2025
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 41.59 35.69
GROUP 2....................$ 41.74 35.69
GROUP 3....................$ 41.87 35.69
GROUP 4....................$ 42.06 35.69
GROUP 5....................$ 42.09 35.69
GROUP 6....................$ 42.12 35.69
GROUP 7....................$ 42.37 35.69
GROUP 8....................$ 42.62 35.69
GROUP 9....................$ 42.82 35.69
GROUP 10....................$ 43.12 35.69
GROUP 11....................$ 43.62 35.69
GROUP 12....................$ 44.05 35.69
WORK ON ALL MILITARY BASES:
PREMIUM PAY: $3.00 per hour additional.
[29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB,
El Centro Naval Facility, Fort Irwin, Marine Corps
Logistics Base at Nebo & Yermo, Mountain Warfare Training
Center, Bridgeport, Point Arguello, Point Conception,
Vandenberg AFB]
4.1.c
Packet Pg. 463 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Truck driver
GROUP 2: Driver of vehicle or combination of vehicles - 2
axles; Traffic control pilot car excluding moving heavy
equipment permit load; Truck mounted broom
GROUP 3: Driver of vehicle or combination of vehicles - 3
axles; Boot person; Cement mason distribution truck; Fuel
truck driver; Water truck - 2 axle; Dump truck, less than
16 yds. water level; Erosion control driver
GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete
truck, less than 6-1/2 yds. water level
GROUP 5: Water truck, 3 or more axles; Truck greaser and tire
person ($0.50 additional for tire person); Pipeline and
utility working truck driver, including winch truck and
plastic fusion, limited to pipeline and utility work;
Slurry truck driver
GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck,
6-1/2 yds. water level and over; Vehicle or combination of
vehicles - 4 or more axles; Oil spreader truck; Dump truck,
16 yds. to 25 yds. water level
GROUP 7: A Frame, Swedish crane or similar; Forklift driver;
Ross carrier driver
GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck
repair person; Water pull - single engine; Welder
GROUP 9: Truck repair person/welder; Low bed driver, 9 axles
or over
GROUP 10: Dump truck - 50 yds. or more water level; Water
pull - single engine with attachment
GROUP 11: Water pull - twin engine; Water pull - twin engine
with attachments; Winch truck driver - $1.25 additional
when operating winch or similar special attachments
GROUP 12: Boom Truck 17K and above
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
4.1.c
Packet Pg. 464 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
----------------------------------------------------------------
The body of each wage determination lists the classifications
and wage rates that have been found to be prevailing for the
type(s) of construction and geographic area covered by the wage
determination. The classifications are listed in alphabetical
order under rate identifiers indicating whether the particular
rate is a union rate (current union negotiated rate), a survey
rate, a weighted union average rate, a state adopted rate, or a
supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union
whose collectively bargained rate prevailed in the survey for
this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council
number where applicable, i.e., Plumbers Local 0198. The next
number, 005 in the example, is an internal number used in
processing the wage determination. The date, 07/01/2024 in the
example, is the effective date of the most current negotiated
rate.
Union prevailing wage rates are updated to reflect all changes
over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the
classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for
those classifications, but that 100% of the data reported for
the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a
weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number
used in producing the wage determination. The date, 01/01/2024
in the example, indicates the date the wage determination was
updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to
reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union
4.1.c
Packet Pg. 465 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by
computing a weighted average rate based on all the rates
reported in the survey for that classification. As a weighted
average rate includes all rates reported in the survey, it may
include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that
classification. FL indicates the State of Florida. 2022 is the
year of the survey on which these classifications and rates are
based. The next number, 007 in the example, is an internal
number used in producing the wage determination. The date,
6/27/2024 in the example, indicates the survey completion date
for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey
is conducted. However, the Wage and Hour Division (WHD) has the
discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and
prevailing wage rates set by a state (or local) government were
adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME
refers to the State of Maine. 2023 is the year during which the
state completed the survey on which the listed classifications
and rates are based. The next number, 007 in the example, is an
internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which
the classifications and rates under the ?SA? identifier took
effect under state law in the state from which the rates were
adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can
be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests
for summaries of surveys, should be directed to the WHD Branch
of Wage Surveys. Requests can be submitted via email to
davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be
directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or
by mail to:
4.1.c
Packet Pg. 466 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested
party (those affected by the action) that disagrees with the
decision can request review and reconsideration from the Wage
and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via
email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and any information (wage payment
data, project description, area practice material, etc.) that
the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================
END OF GENERAL DECISION"
4.1.c
Packet Pg. 467 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “D”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE GEOTECHNICAL REPORT
GEOTECHNICAL REPORT
ADDENDUM 1
4.1.c
Packet Pg. 468 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
GEOTECHNICAL INVESTIGATION
CITY OF SAN JACINTO
ESPLANADE AVENUE WIDENING PROJECT
PREPARED FOR:
CITY OF SAN JACINTO
Attention: Habib Motlagh, P.E.
166 E. Main Street, Suite 2
San Jacinto, California 92583
PREPARED BY:
INLAND FOUNDATION ENGINEERING, INC.
P. O. Box 937
San Jacinto, California 92583
May 30, 2019
Project No. S026-180
4.1.c
Packet Pg. 469 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
__________________________________
Geotechnical Invest. – Esplanade Avenue
Project No. S026-180 – May 2019 1 of 5 Inland Foundation Engineering, Inc.
INTRODUCTION
This report presents the results of our subsurface exploration and testing conducted for
the design of the proposed Esplanade Avenue Widening project, located between
Warren Road and Sanderson Avenue in the City of San Jacinto, California.
U.S.G.S. Topographic Map, Lakeview Quadrangle, and Aerial Photograph (2016)
The following plans were provided for our use during this study:
• Preliminary Plans, Esplanade Avenue, City of San Jacinto, prepared by Tri Lake
Consultants, Inc., undated.
SCOPE OF SERVICES
The scope of service for this project was discussed with representatives of the City of
San Jacinto. The purpose of the geotechnical exploration and testing was to provide
geotechnical parameters for design and construction of the proposed project. The
scope of the geotechnical study included:
➢ A review of the general geologic conditions and specific subsurface conditions of the
project site.
➢ An evaluation of the engineering and geologic data collected for the project.
Project Alignment
4.1.c
Packet Pg. 470 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
__________________________________
Geotechnical Invest. – Esplanade Avenue
Project No. S026-180 – May 2019 2 of 5 Inland Foundation Engineering, Inc.
➢ Preparation of a formal report providing geotechnical conclusions and
recommendations for design and construction.
➢ The tasks performed in order to achieve these objectives included:
▪ Subsurface exploration to evaluate the nature and stratigraphy of the subsurface
soils and to obtain representative samples for laboratory testing.
• Review of relevant previous subsurface exploration along the project alignment
conducted by our firm.
▪ Laboratory testing of representative samples in order to establish the
classification and engineering properties of the soils.
▪ Analysis of the data collected and the preparation of this report with our
geotechnical conclusions and recommendations.
PROJECT DESCRIPTION
The proposed construction considered during this study is for the widening of
Esplanade Avenue between Warren Road and Sanderson Avenue in the
City of San Jacinto, California. The existing pavement will be widened to the north by
30 feet with asphalt concrete.
This portion of Esplanade Avenue is generally a two lane asphalt concrete paved
roadway. The north shoulder of Esplanade Avenue is unpaved. An existing drainage
swale is present along the northerly side of the roadway, ranging in depth from
approximately one to four feet below the adjacent ground level. Existing underground
utilities are present within the swale. The adjacent grades to the north of the existing
paved street are typically several feet lower than the existing pavement. Several feet of
fill will be necessary to establish the desired final grade s along most of the alignment.
The adjacent property to the north is generally undeveloped and consists of agricultural
fields. An existing commercial development is located on the northwest corner of
Esplanade Avenue and Sanderson Avenue. A large Metropolitan Water District line
(San Diego Aqueduct) crosses the alignment near the intersection of Cawston Avenue.
SUBSURFACE CONDITIONS
Our evaluation of the subsurface conditions along the alignment included excavating
shallow test pits along the north side of the existing pavement where the roadway
4.1.c
Packet Pg. 471 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
__________________________________
Geotechnical Invest. – Esplanade Avenue
Project No. S026-180 – May 2019 3 of 5 Inland Foundation Engineering, Inc.
widening is proposed. W e also reviewed logs of recent soil borings (2017) drilled along
the project alignment for a pipeline project. Eight (8) soil borings were advanced along
Esplanade Avenue between Warren Road and Sanderson Avenue during the 2017
study.
The soil along the alignment generally consists of fine to medium clayey sand (SC), silty
sand (SM), clay and sandy clay (CL). Erosion, deposition, filling and backfilling along
the shoulder and swale areas adjacent to the existing pavement have resulted in loose
fill and alluvium to depths exceeding two feet. L ogs of the materials encountered during
the current investigation and the previous pipeline investigation conducted by our firm
are appended.
The locations of the exploratory trenches and previous exploratory borings are shown
on Figure No. A-12.
Conditions will vary seasonally. Periods of high precipitation will likely result in over -
optimum soil moisture contents along the alignment.
RECOMMENDATIONS
In general, the proposed widening is feasible from a geotechnical engineering
standpoint. The primary issues are related to loose existing near-surface soil along the
alignment, and the necessity for importing soil to achieve final des ign grades. Fill
depths of five or more feet above existing grades will be required along much of the
alignment.
Tentative Pavement Section Design: The following recommended pavement sections
are based on the results of laboratory R-value testing (26) performed on a
representative near-surface soil sample and traffic index information provided by the
City of San Jacinto.
T.I.
(Traffic Index)
Asphalt Concrete
Thickness (ft.)
Aggregate Base Course
Thickness (ft.)
8.5 0.40 1.15
9.0 0.45 1.20
These recommendations are provided for estimating purposes only. Upon completion
of rough grading, the actual subgrade soil should be evaluated and, if necessary,
additional R-value testing performed. All pavement construction should be in
4.1.c
Packet Pg. 472 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
__________________________________
Geotechnical Invest. – Esplanade Avenue
Project No. S026-180 – May 2019 4 of 5 Inland Foundation Engineering, Inc.
accordance with the minimum requirements of the City of San Jacinto and the Standard
Specifications for Public Works Construction (Greenbook).
Site Grading: All grading should be performed per the minimum requirements of the
City of San Jacinto and the Standard Specifications for Public Works Construction
(Greenbook).
1. Clearing and Grubbing: All surfaces to receive compacted fill should be
cleared of existing vegetation, loose fill, debris, and other unsuitable materials.
All undocumented fill should be removed. Buried underground utilities that are to
remain should be protected in-place throughout construction.
2. Subgrade Preparation. Existing soil within the limits of the proposed
construction should be removed to a depth of at least 36 inches below existin g
grades, or to a depth of at least 24 inches below proposed pavement subgrade,
whichever is deeper. The excavation bottom should be observed by a
representative of this firm to verify that the exposed conditions are as anticipated.
The bottom should then be scarified, brought to near optimum moisture content,
and compacted to a minimum of 90 percent relative compaction , based on ASTM
D1557.
Conditions will vary seasonally. Periods of high precipitation will likely result in
over-optimum soil moisture contents along the alignment. If over-optimum soil
moisture contents are present, the soils may need to be dried or replaced with
suitable fill materials.
3. Placement of Compacted Fill: Fill materials consisting of on-site soil or
approved imported granular soil should be spread in shallow lifts not exceeding
eight (8) inches in loose thickness. Fill should be compacted at near optimum
moisture content to a minimum of 90 percent relative compaction based on
ASTM D1557, 95 percent relative compaction within 12 inches of finish subgrade
elevation. Aggregate base should be compacted to at least 95 percent relative
compaction.
4. Import Soil: All import soil should be non-expansive and free of particles
larger than 3 inches. It should have no more than 30 percent passing the No.
200 sieve, and an R-value of at least 40. Class 3 aggregate subbase in
conformance with the Caltrans Standard Specifications meets these
requirements.
4.1.c
Packet Pg. 473 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
4.1.cPacket Pg. 474Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX A
4.1.c
Packet Pg. 475 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
__________________________________
Geotechnical Invest. – Esplanade Avenue
Project No. S026-180 – May 2019 A-1 Inland Foundation Engineering, Inc.
APPENDIX A
FIELD EXPLORATION
For our field exploration, one test pit was excavated by means of a backhoe. Backhoe
test pits along the remainder of the alignment were not feasible due to the presence of
near-surface buried utilities. Instead, we manually excavated three additional shallow
test pits. The material sampled was logged on-site by a staff engineer. Representative
bulk samples were obtained from the test pits and transported to our laboratory.
Approximate test pit locations are shown on Figure No. A -12. Laboratory test results
are discussed and presented in Appendix B.
4.1.c
Packet Pg. 476 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D2487)
PRIMARY DIVISIONS GROUP SYMBOLS SECONDARY DIVISIONS COARSE GRAINED SOILS MORE THAN HALF OF MATERIALS IS LARGER THAN #200 SIEVE SIZE GRAVELS MORE THAN HALF OF COARSE FRACTION IS LARGER THAN #4 SIEVE CLEAN
GRAVELS
(LESS
THAN) 5%
FINES
GW
WELL GRADED GRAVELS, GRAVEL-SAND MIXTURES, LITTLE OR NO FINES
GP
POORLY GRADED GRAVELS OR GRAVEL-SAND MIXTURES, LITTLE OR NO
FINES
GRAVEL
WITH
FINES
GM
SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES
GC
CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES SANDS MORE THAN HALF OF COARSE FRACTION IS SMALLER THAN #4 SIEVE CLEAN
SANDS
(LESS
THAN) 5%
FINES
SW WELL GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES
SP
POORLY GRADED SANDS OR GRAVELLY SANDS, LITTLE OR NO FINES
SANDS
WITH
FINES
SM
SILTY SANDS, SAND-SILT MIXTURES
SC
CLAYEY SANDS, SAND-CLAY MIXTURES FINE GRAINED SOILS MORE THAN HALF OF MATERIALS IS SMALLER THAN #200 SIEVE SIZE SILTS AND CLAYS LIQUID LIMIT IS LESS THAN 50 ML
INORGANIC SILTS, VERY FINE SANDS, ROCK FLOUR, SILTY OR CLAYEY
FINE SANDS
CL
INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS,
SANDY CLAYS, SILTY CLAYS, LEAN CLAYS
OL
ORGANIC SILTS AND ORGANIC SILT-CLAYS OF LOW PLASTICITY SILTS AND CLAYS LIQUID LIMIT IS GREATER THAN 50 MH
INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE SANDS OR
SILTS, ELASTIC SILTS
CH
INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS
OH
ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, ORGANIC SILTS
HIGHLY ORGANIC SOILS PT PEAT, MUCK AND OTHER HIGHLY ORGANIC SOILS TYPICAL FORMATIONAL MATERIALS SANDSTONES SS
SILTSTONES SH
CLAYSTONES CS
LIMESTONES LS
SHALE SL
CONSISTENCY CRITERIA BASES ON FIELD TESTS
RELATIVE DENSITY – COARSE – GRAIN SOIL
CONSISTENCY –
FINE-GRAIN SOIL
TORVANE
POCKET **
PENETROMETER
RELATIVE
DENSITY
SPT *
(# BLOWS/FT)
RELATIVE
DENSITY
(%)
CONSISTENCY SPT*
(# BLOWS/FT)
UNDRAINED
SHEAR
STRENGTH
(tsf)
UNCONFINED
COMPRESSIVE
STRENGTH (tsf)
VERY LOOSE <4 0-15 Very Soft <2 <0.13 <0.25
LOOSE 4-10 15-35 Soft 2-4 0.13-0.25 0.25-0.5
MEDIUM
DENSE 10-30 35-65 Medium Stiff 4-8 0.25-0.5 0.5-1.0
DENSE 30-50 65-85 Stiff 8-15 0.5-1.0 1.0-2.0
VERY DENSE >50 85-100 Very Stiff 15-30 1.0-2.0 2.0-4.0
Hard >30 >2.0 >4.0
MOISTURE CONTENT CEMENTATION
DESCRIPTION FIELD TEST DESCRIPTION FIELD TEST
DRY Absence of moisture, dusty, dry to the touch Weakly Crumbled or breaks with handling or slight finger pressure
MOIST Damp but no visible water Moderately Crumbles or breaks with considerable finger pressure
WET Visible free water, usually soil is below water table Strongly Will not crumble or break with finger pressure
EXPLANATION OF LOGS A-2
* NUMBER OF BLOWS
OF 140 POUND
HAMMER FALLING
30 INCHES TO DRIVE A
2 INCH O.D.
(1 3/8 INCH I.D.) SPLIT
BARREL SAMPLER
(ASTM -1586 STANDARD
PENETRATION TEST)
** UNCONFINED
COMPRESSIVE
STRENGTH IN
TONS/SQ.FT. READ
FROM POCKET
PENETROMETER
4.1.c
Packet Pg. 477 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
CLAYEY SAND, fine- to medium-grained with trace coarse,
gray-brown, slightly moist, loose to medium dense.
CLAYEY SAND, fine- to coarse-grained, olive-brown, slightly moist,
loose to medium dense.
End of trench at 4 feet.
95
99
99
10
12
14
GB
SC
SC
LOGGED BY HM
DATE EXCAVATED 4/30/19EXCAVATION METHOD Backhoe
GROUND ELEVATION N/A
BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEDEPTH(ft)0
SUMMARY OF SUBSURFACE CONDITIONS
DRY UNIT WT.(pcf)MOISTURE (%)SAMPLE TYPEBLOWCOUNTS /6"GRAPHICLOGU.S.C.S.LOG OF TRENCH TR-01
Inland FoundationEngineering, Inc.
PROJECT NUMBER S026-180
.San Jacinto
PROJECT LOCATION Esplanade Avenue Widening
PROJECT NAME Geotechnical Investigation
CLIENT City of San Jacinto FIGURE NO.
A-3
OLD IFE TRENCH - GINT STD US LAB.GDT - 5/20/19 17:32 - P:\S026\S026-180 ESPLANADE ROAD WIDENING\CITY OF SAN JACINTO ESPLANADE, WARREN TO SANDERSON\GINT.GPJ4.1.c
Packet Pg. 478 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
SC
CL
ML
SC
SP-
SM
SC
SM
8
13
14
16
25
35
10
8
11
12
GB
GB
SS
SS
GB
SS
GB
SPT
SPT
19
19
7
12
9
107
111
130
CLAYEY SAND, very fine- to fine-grained, olive, moist, medium
dense.
CLAY with SAND, very fine- to fine-grained, olive, moist, stiff.
SANDY SILT, with trace clay, very fine-grained, olive-brown, moist,
stiff.
CLAYEY SAND, fine- to medium-grained, olive-brown, moist, dense,
moderately cemented.
SAND with SILT, with trace clay, fine- to coarse-grained, olive,
moist, dense.
CLAYEY SAND, fine- to coarse-grained, olive-brown, moist, medium
dense.
SILTY SAND, with trace clay, fine- to coarse-grained, olive, moist,
medium dense.
End of boring at 25.5 feet. No groundwater encountered. Backfilled
with native soils.BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEU.S.C.S.GRAPHICLOGLOG OF BORING B-01
BLOWCOUNTS /6"SAMPLE TYPEMOISTURE (%)DRY UNIT WT.(pcf)SUMMARY OF SUBSURFACE CONDITIONS
DEPTH(ft)0
5
10
15
20
25
Inland FoundationEngineering, Inc.
PROJECT NUMBER H432-001
.San Jacinto/Hemet, Riverside County, CA
PROJECT LOCATION Various Locations
PROJECT NAME EMWD Raw Water Conveyance Facility
CLIENT HDR Engineering, Inc.FIGURE NO.
A-4
DRILLING RIG CME-75
DRILLING METHOD Rotary Auger
LOGGED BY FWC
GROUND ELEVATION +/- 1504 ft
HAMMER TYPE Auto-Trip
HAMMER WEIGHT 140-lb.
HAMMER DROP 30-inches
BORING DIAMETER 8-inches
DATE DRILLED 12/15/17
IFE BORING - GINT STD US LAB.GDT - 1/22/18 16:57 - P:\H432\H432-001\GINT.GPJ4.1.c
Packet Pg. 479 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
SC
CL
SC-
SM
CL
SC
SM
SC-
SM
7
10
10
13
4
8
24
32
6
5
GB
SS
GB
GB
SS
GB
SS
SPT
SPT
18
27
30
15
11
108
99
98
118
CLAYEY SAND, very fine- to fine-grained, olive-brown, moist, loose
to medium dense.
SANDY CLAY, very fine- to fine-grained, olive-brown, moist, stiff.
SILTY, CLAYEY SAND, fine- to medium-grained, olive-brown, moist,
medium dense.
CLAY with SAND, very fine- to fine- grained, olive-brown, very moist,
stiff.
CLAYEY SAND, very fine- to fine-grained, olive-brown, moist,
dense.
SILTY SAND, fine- to medium-grained, olive-brown, moist, dense.
SILTY, CLAYEY SAND, very fine- to fine-grained, brown, very moist,
medium dense.
End of boring at 25.5 feet. No groundwater encountered. Backfilled
with native soils.BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEU.S.C.S.GRAPHICLOGLOG OF BORING B-02
BLOWCOUNTS /6"SAMPLE TYPEMOISTURE (%)DRY UNIT WT.(pcf)SUMMARY OF SUBSURFACE CONDITIONS
DEPTH(ft)0
5
10
15
20
25
Inland FoundationEngineering, Inc.
PROJECT NUMBER H432-001
.San Jacinto/Hemet, Riverside County, CA
PROJECT LOCATION Various Locations
PROJECT NAME EMWD Raw Water Conveyance Facility
CLIENT HDR Engineering, Inc.FIGURE NO.
A-5
DRILLING RIG CME-75
DRILLING METHOD Rotary Auger
LOGGED BY FWC
GROUND ELEVATION +/- 1507 ft
HAMMER TYPE Auto-Trip
HAMMER WEIGHT 140-lb.
HAMMER DROP 30-inches
BORING DIAMETER 8-inches
DATE DRILLED 12/8/17
IFE BORING - GINT STD US LAB.GDT - 1/22/18 16:57 - P:\H432\H432-001\GINT.GPJ4.1.c
Packet Pg. 480 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
CL
SM
CL
SC
10
10
5
12
3
4
7
11
5
8
GB
SS
GB
SS
GB
SPT
SS
SPT
21
17
32
15
21
101
107
117
ASPHALT CONCRETE over LIME TREATED BASE over
AGGREGATE BASE, (4 inches over 12 inches over 24 inches)
CLAY with SAND, very fine-grained, dark olive-brown, moist, stiff.
SILTY SAND, with trace clay, fine- to medium-grained, brown, moist,
medium dense.
CLAY with SAND, very fine-grained, dark olive-brown, very moist,
firm to stiff, with thin interbedded sand and silty sand.
CLAYEY SAND, very fine- to fine-grained, olive-brown, very moist,
medium dense, trace caliche.
End of boring at 24.5 feet. No groundwater encountered. Backfilled
with native soils.BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEU.S.C.S.GRAPHICLOGLOG OF BORING B-03
BLOWCOUNTS /6"SAMPLE TYPEMOISTURE (%)DRY UNIT WT.(pcf)SUMMARY OF SUBSURFACE CONDITIONS
DEPTH(ft)0
5
10
15
20
Inland FoundationEngineering, Inc.
PROJECT NUMBER H432-001
.San Jacinto/Hemet, Riverside County, CA
PROJECT LOCATION Various Locations
PROJECT NAME EMWD Raw Water Conveyance Facility
CLIENT HDR Engineering, Inc.FIGURE NO.
A-6
DRILLING RIG CME-75
DRILLING METHOD Rotary Auger
LOGGED BY FWC
GROUND ELEVATION +/- 1508 ft
HAMMER TYPE Auto-Trip
HAMMER WEIGHT 140-lb.
HAMMER DROP 30-inches
BORING DIAMETER 8-inches
DATE DRILLED 12/8/17
IFE BORING - GINT STD US LAB.GDT - 1/22/18 16:57 - P:\H432\H432-001\GINT.GPJ4.1.c
Packet Pg. 481 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
CL
SC-
SM
CL
SC
SM
6
7
9
11
5
7
3
6
5
7
GB
SS
GB
SS
GB
SS
SPT
SPT
18
13
32
19
19
103
99
92
ASPHALT CONCRETE over AGGREGATE BASE, (6 inches 13
inches)
SANDY CLAY, very fine- to fine-grained, olive, very moist, stiff.
SILTY, CLAYEY SAND, very fine- to fine-grained, olive, moist,
medium dense.
CLAY with SAND, very fine- to fine-grained, olive, very moist, stiff,
with thin layers of silty sand.
CLAYEY SAND, very fine- to fine-grained, olive, moist, medium
dense.
SILTY SAND, fine- to medium-grained, olive, moist, medium dense.
End of boring at 26.5 feet. No groundwater encountered. Backfilled
with native soils.BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEU.S.C.S.GRAPHICLOGLOG OF BORING B-04
BLOWCOUNTS /6"SAMPLE TYPEMOISTURE (%)DRY UNIT WT.(pcf)SUMMARY OF SUBSURFACE CONDITIONS
DEPTH(ft)0
5
10
15
20
25
Inland FoundationEngineering, Inc.
PROJECT NUMBER H432-001
.San Jacinto/Hemet, Riverside County, CA
PROJECT LOCATION Various Locations
PROJECT NAME EMWD Raw Water Conveyance Facility
CLIENT HDR Engineering, Inc.FIGURE NO.
A-7
DRILLING RIG CME-75
DRILLING METHOD Rotary Auger
LOGGED BY FWC
GROUND ELEVATION +/- 1510.2 ft
HAMMER TYPE Auto-Trip
HAMMER WEIGHT 140-lb.
HAMMER DROP 30-inches
BORING DIAMETER 8-inches
DATE DRILLED 12/8/17
IFE BORING - GINT STD US LAB.GDT - 1/22/18 16:57 - P:\H432\H432-001\GINT.GPJ4.1.c
Packet Pg. 482 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
CL
ML
CL
CL
CL
6
7
7
9
3
4
5
5
6
7
GB
SS
GB
SS
GB
SPT
SS
SPT
18
15
20
29
17
94
99
95
ASPHALT CONCRETE over AGGREGATE BASE, (6 inches over 12
inches)
SANDY CLAY, very fine- to fine-grained, olive, moist, stiff.
SANDY SILT, fine- to medium-grained, olive, moist, stiff, with thin
layers of sandy clay.
SANDY CLAY, very fine- to fine-grained, olive, moist, stiff.
CLAY, fine- to medium-grained, olive, moist, firm.
SANDY CLAY, very fine- to fine-grained, olive, very moist, firm to
stiff, with thin layers of silty sand.
End of boring at 25.5 feet. No groundwater encountered. Backfilled
with native soils.BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEU.S.C.S.GRAPHICLOGLOG OF BORING B-05
BLOWCOUNTS /6"SAMPLE TYPEMOISTURE (%)DRY UNIT WT.(pcf)SUMMARY OF SUBSURFACE CONDITIONS
DEPTH(ft)0
5
10
15
20
25
Inland FoundationEngineering, Inc.
PROJECT NUMBER H432-001
.San Jacinto/Hemet, Riverside County, CA
PROJECT LOCATION Various Locations
PROJECT NAME EMWD Raw Water Conveyance Facility
CLIENT HDR Engineering, Inc.FIGURE NO.
A-8
DRILLING RIG CME-75
DRILLING METHOD Rotary Auger
LOGGED BY FWC
GROUND ELEVATION +/- 1511.8 ft
HAMMER TYPE Auto-Trip
HAMMER WEIGHT 140-lb.
HAMMER DROP 30-inches
BORING DIAMETER 8-inches
DATE DRILLED 12/9/17
IFE BORING - GINT STD US LAB.GDT - 1/22/18 16:57 - P:\H432\H432-001\GINT.GPJ4.1.c
Packet Pg. 483 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
SC-
SM
SC
SM
CL
SC
SM
CL
5
7
4
7
5
5
3
4
2
5
SS
GB
GB
SS
GB
SS
SPT
SPT
13
23
30
27
20
106
101
95
ASPHALT CONCRETE over AGGREGATE BASE, (6-1/2 inches
over 17 inches)
SILTY, CLAYEY SAND, very fine- to fine-grained, olive, moist,
medium dense.
CLAYEY SAND, very fine- to fine-grained, olive-brown, moist,
medium dense.
SILTY SAND, fine- to medium-grained, olive brown, moist, medium
dense.
SANDY CLAY, very fine- to fine-grained, olive brown, very moist,
firm.
CLAYEY SAND, very fine- to fine-grained, olive-brown, very moist,
loose to medium dense, with layers of sandy silt.
SILTY SAND, fine- to medium-grained, olive brown, moist, loose.
SANDY CLAY, very fine- to fine-grained, olive-brown, very moist,
firm.
End of boring at 25.5 feet. No groundwater encountered. Backfilled
with native soils.BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEU.S.C.S.GRAPHICLOGLOG OF BORING B-06
BLOWCOUNTS /6"SAMPLE TYPEMOISTURE (%)DRY UNIT WT.(pcf)SUMMARY OF SUBSURFACE CONDITIONS
DEPTH(ft)0
5
10
15
20
25
Inland FoundationEngineering, Inc.
PROJECT NUMBER H432-001
.San Jacinto/Hemet, Riverside County, CA
PROJECT LOCATION Various Locations
PROJECT NAME EMWD Raw Water Conveyance Facility
CLIENT HDR Engineering, Inc.FIGURE NO.
A-9
DRILLING RIG CME-75
DRILLING METHOD Rotary Auger
LOGGED BY FWC
GROUND ELEVATION +/- 1512.2 ft
HAMMER TYPE Auto-Trip
HAMMER WEIGHT 140-lb.
HAMMER DROP 30-inches
BORING DIAMETER 8-inches
DATE DRILLED 12/15/17
IFE BORING - GINT STD US LAB.GDT - 1/22/18 16:57 - P:\H432\H432-001\GINT.GPJ4.1.c
Packet Pg. 484 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
SC-
SM
SM
CL
CL
SP
CL
4
5
4
6
3
4
16
21
2
4
GB
SS
GB
SS
GB
SPT
GB
SS
SPT
10
12
33
9
32
114
94
99
ASPHALT CONCRETE over AGGREGATE BASE, (5 inches over 8
inches)
SILTY, CLAYEY SAND, very fine- to fine-grained, olive-brown,
moist, loose.
SILTY SAND, with trace clay, fine- to medium-grained, olive-brown,
moist, loose.
SANDY CLAY, very fine- to fine-grained, olive-brown, very moist,
firm, interbedded with clayey sand.
SANDY CLAY, very fine- to fine-grained, dark olive-brown, very
moist, stiff.
SAND, fine- to medium-grained, gray, moist, dense.
CLAY with SAND, very fine- to fine-grained, dark olive, very moist,
firm.
End of boring at 24.5 feet. No groundwater encountered. Backfilled
with native soils.BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEU.S.C.S.GRAPHICLOGLOG OF BORING B-07
BLOWCOUNTS /6"SAMPLE TYPEMOISTURE (%)DRY UNIT WT.(pcf)SUMMARY OF SUBSURFACE CONDITIONS
DEPTH(ft)0
5
10
15
20
Inland FoundationEngineering, Inc.
PROJECT NUMBER H432-001
.San Jacinto/Hemet, Riverside County, CA
PROJECT LOCATION Various Locations
PROJECT NAME EMWD Raw Water Conveyance Facility
CLIENT HDR Engineering, Inc.FIGURE NO.
A-10
DRILLING RIG CME-75
DRILLING METHOD Rotary Auger
LOGGED BY FWC
GROUND ELEVATION +/- 1515.8 ft
HAMMER TYPE Auto-Trip
HAMMER WEIGHT 140-lb.
HAMMER DROP 30-inches
BORING DIAMETER 8-inches
DATE DRILLED 12/15/17
IFE BORING - GINT STD US LAB.GDT - 1/22/18 16:57 - P:\H432\H432-001\GINT.GPJ4.1.c
Packet Pg. 485 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
SC
SC-
SM
CL
SP
CL
3
5
2
3
4
5
2
3
2
2
GB
SS
GB
SS
GB
SS
SPT
SPT
18
25
33
11
31
102
100
89
ASPHALT CONCRETE over AGGREGATE BASE, (9 inches over 3
inches)
CLAYEY SAND, very fine- to fine-grained, olive, moist, medium
dense.
SILTY, CLAYEY SAND, fine- to medium-grained, olive brown, moist,
soft to firm.
SANDY CLAY, very fie- to fine-grained, olive, very moist, soft to
firm.
SAND, fine- to medium-grained, grey, slightly moist, medium dense.
SANDY CLAY, very fine- to fine-grained, dark olive-brown, very
moist, soft.
End of boring at 25.5 feet. No groundwater encountered. Backfilled
with native soils.BULK SAMPLEThis summary applies only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location
with the passage of time. The data presented is a simplification of actual conditions
encountered and is representative of interpretations made during drilling. Contrasting
data derived from laboratory analysis may not be reflected in these representations.DRIVE SAMPLEU.S.C.S.GRAPHICLOGLOG OF BORING B-08
BLOWCOUNTS /6"SAMPLE TYPEMOISTURE (%)DRY UNIT WT.(pcf)SUMMARY OF SUBSURFACE CONDITIONS
DEPTH(ft)0
5
10
15
20
25
Inland FoundationEngineering, Inc.
PROJECT NUMBER H432-001
.San Jacinto/Hemet, Riverside County, CA
PROJECT LOCATION Various Locations
PROJECT NAME EMWD Raw Water Conveyance Facility
CLIENT HDR Engineering, Inc.FIGURE NO.
A-11
DRILLING RIG CME-75
DRILLING METHOD Rotary Auger
LOGGED BY FWC
GROUND ELEVATION +/- 1517.8 ft
HAMMER TYPE Auto-Trip
HAMMER WEIGHT 140-lb.
HAMMER DROP 30-inches
BORING DIAMETER 8-inches
DATE DRILLED 12/15/17
IFE BORING - GINT STD US LAB.GDT - 1/22/18 16:57 - P:\H432\H432-001\GINT.GPJ4.1.c
Packet Pg. 486 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
4.1.cPacket Pg. 487Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX B
4.1.c
Packet Pg. 488 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
__________________________________
Geotechnical Invest. – Esplanade Avenue
Project No. S026-180 – May 2019 B-1 Inland Foundation Engineering, Inc.
APPENDIX B
LABORATORY TESTING
Unit Weight and Moisture Content: Unit weight and moisture content testing were
performed in accordance with ASTM D2937 and D2216, respectively. The results of
this testing are shown on the test pit and boring logs (Figure Nos. A-3 through A-11).
Maximum Density-Optimum Moisture Content: Maximum density – optimum
moisture content testing was performed in accordance with ASTM D1557. The results
of this testing are presented graphically on Figure No. B-3.
Classification: Four soil samples were selected for classification testing. This testing
consists of sieve analysis and Atterberg limits testing in accordance with ASTM D6913
and D4318. These tests provide information for developing classifications for the soil in
accordance with the Unified Classification System. This classification system
categorizes the soil into groups having similar engineering characteristics. The results
of this testing are very useful in detecting variations in the soils and in selecting samples
for further testing. The results of this testing are presented on Figure Nos. B -4.
Sand Equivalent: Four samples were selected for sand equivalent testing in
accordance with ASTM D2419. This test is useful in detecting variations in grain size
distribution, backfill suitability and pavement subgrade support. The results of this
testing are shown below.
Location Depth (ft) Sand Equivalent
TR-01 0 – 4 3
S-1 0 – 1 11
S-2 0 – 1 13
S-3 0 – 1 12
R-value: One sample was selected for R-value testing. This test measures the ability
of soil to resist lateral deformation under applied vertical loads, and is used in
developing parameters for pavement structural section design. Testing was performed
in accordance with ASTM D2844.
Location Depth (ft) R-value
S-1 0 – 1 26
4.1.c
Packet Pg. 489 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
__________________________________
Geotechnical Invest. – Esplanade Avenue
Project No. S026-180 – May 2019 B-2 Inland Foundation Engineering, Inc.
GENERAL
All laboratory testing has been conducted in conformance with the applica ble ASTM test
methods by personnel trained and supervised in conformance with our QA/QC policy.
Our test data only relates to the specific soils tested. Soil conditions typically vary and
any significant variations should be reported to our laboratory fo r review and possible
testing. The data presented in this report are for the use of the City of San Jacinto only
and may not be reproduced or used by others without written approval of Inland
Foundation Engineering, Inc.
4.1.c
Packet Pg. 490 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
100
105
110
115
120
125
130
135
140
145
150
0 10 20 30 40 50
BOREHOLE DEPTH
120.1 PCF 11.9 %
Max DD Optimum WC
TR-01
Description of Materials
SANDY CLAY (CL) 0.0DRY DENSITY, pcfWATER CONTENT, %
MOISTURE-DENSITY CURVES (ASTM D1557)
FIGURE NO.B-3
PROJECT NUMBER S026-180
PROJECT NAME Geotechnical InvestigationCLIENTCity of San Jacinto
PROJECT LOCATION Esplanade Avenue Widening
.San Jacinto
IFE COMPACTION - GINT STD US LAB.GDT - 5/20/19 17:28 - P:\S026\S026-180 ESPLANADE ROAD WIDENING\CITY OF SAN JACINTO ESPLANADE, WARREN TO SANDERSON\GINT.GPJInland Foundation Engineering, Inc.
Curves of 100% Saturation
for Specific Gravity Equal to:
2.80
2.70
2.60
4.1.c
Packet Pg. 491 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
0.0010.010.1110100
PI Cc CuLL PL
COBBLES GRAVEL
40.2
35.8
37.8
64.0
12.5
19
12.5
25
SAND
GRAIN SIZE IN MILLIMETERS
coarse fine
CLAYEY SAND (SC)
SILTY, CLAYEY SAND (SC-SM)
SILTY, CLAYEY SAND (SC-SM)
SANDY CLAY (CL)
Classification
501/2
HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS
1403420 406 601.5 8 143/4 3/8
0.0
0.0
0.0
0.0PERCENT FINER BY WEIGHTGRADATION CURVES (ASTM D422, ASTM D4318)
FIGURE NO.B-4
D100 D60 D30 D10 %Gravel
0.145
0.152
0.136
1
2
3
TR-01
coarse SILT OR CLAYfinemedium
0.0
0.0
0.0
0.0
%Sand %Silt %Clay
3.6
5.1
1.6
4.7
56.2
59.1
60.6
31.3
BOREHOLE DEPTH
BOREHOLE DEPTH
3 100
1
2
3
TR-01
24 16 30
1 2006 10
PROJECT NUMBER S026-180
PROJECT NAME Geotechnical InvestigationCLIENTCity of San Jacinto
PROJECT LOCATION Esplanade Avenue Widening
.San Jacinto
IFE SIEVE ANALYSIS - GINT STD US LAB.GDT - 5/20/19 17:29 - P:\S026\S026-180 ESPLANADE ROAD WIDENING\CITY OF SAN JACINTO ESPLANADE, WARREN TO SANDERSON\GINT.GPJInland Foundation Engineering, Inc.
4.1.c
Packet Pg. 492 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
IFE Inland Foundation Engineering, Inc.
inlandfoundation.com 1310 South Santa Fe Ave. PO Box 937 San Jacinto, CA 92581 ꓲ (951) 654-1555 77622 Country Club Dr. Suite Q, Palm Desert, CA 92211 ꓲ (760) 200-2400
February 12, 2026
Project No. S026-180
City of San Jacinto
c/o Interwest
1221 S. San Jacinto Avenue
San Jacinto, CA 92583
Attention: Stuart E. McKibbin, PE
Contract City Engineer
Subject: Geotechnical Investigation Report Addendum
Revised Subgrade Preparation Recommendations
Esplanade Avenue Widening – Warren Road to Sanderson Avenue
San Jacinto, California
References: Geotechnical Investigation, City of San Jacinto, Esplanade Avenue
Widening Project, Warren Road to Sanderson Avenue, North Side,
prepared by Inland Foundation Engineering, Inc., dated May 30, 2019,
revised August 15, 2019, Project No. S026-180
Plans for City of San Jacinto, California, Esplanade Avenue Widening
Phase 1, Warren Road to Sanderson Avenue, CIP #06-145 (SJ-222),
Sheets 27 of 27, prepared by Interwest Consulting Group, dated January
21, 2026 (Addendum 1), File No. SJ-222_Design
Dear Mr. McKibben:
This report addendum has been prepared to provide supplemental subgrade
preparation recommendations for the subject project. Since preparation of the
referenced geotechnical investigation report, Eastern Municipal Water District (EMWD)
has completed construction of their San Jacinto Valley Raw Water Conveyance
Facilities Project, which included placement of a 60-inch CML&C pipeline north of the
existing Esplanade Avenue pavement from Warren Road to Sanderson Avenue. The
pipeline is within the limits of the proposed widening project. The pipeline was
constructed in an approximately 7-ft wide shored trench that provided 1 foot of
clearance on each side of the pipe. The trench backfill was compacted to 90 percent
relative compaction to ground surface.
4.1.c
Packet Pg. 493 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
____________________________________________________ Report Addendum – Esplanade Avenue Widening
Project No. S026-180, February 2026 2 of 2 Inland Foundation Engineering, Inc.
The referenced geotechnical investigation report includes the recommendation that
existing soil within the limits of the proposed construction be removed to a depth of at
least 36 inches below existing grades, or to a depth of at least 24 inches below
proposed pavement subgrade, whichever is deeper. Information provided by the City
shows that the depth to top of pipe is as close as 5.5 feet to finish grade elevation,
which is less than 4 feet to the design subgrade elevation. Considering the backfill
placement and grading performed by EMWD along the north side of Esplanade Avenue,
the subgrade preparation recommendations should be revised as follows.
Subgrade Preparation. Soil in the area to be widened along the north side of the
existing pavement should be removed to a depth of at least 24 inches below pavement
subgrade, or as otherwise directed by the Engineer. Within 3 feet of centerline of the
EMWD pipe, the existing soil is considered suitable for pavement support and need not
be removed. In areas where the existing pavement is to be replaced, the existing
asphalt concrete and aggregate base should be removed to the design subgrade
elevation below the new aggregate base. Sheet W-2, attached, shows the
recommended removal limits and depth.
The excavation bottom should be observed by a representative of this firm to verify the
exposed conditions are as anticipated. The bottom should then be proof-rolled with a
pneumatic-tired roller or other loaded construction equipment and observed for
deflection (pumping). Areas of soil with high moisture content may be present along the
alignment that become unstable with excessive deflection during proof-rolling. If such
soil is encountered, it should be allowed to dry until it is stable and does not deflect
when loaded, unless otherwise directed by the Engineer
We appreciate the opportunity to work with you on this project. Please call if you have
any questions or need any other information.
Sincerely,
Inland Foundation Engineering, Inc.
Allen D. Evans, PE, GE
Principal
ADE:sd
Distribution: Addressee
4.1.c
Packet Pg. 494 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
W-24.1.cPacket Pg. 495Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
APPENDIX “E”
ESPLANADE AVENUE WIDENING PHASE 1
WARREN ROAD TO SANDERSON AVENUE SOUTHERN CALIFORNIA
EDISON DRAWINGS
ADDENDUM 5
SOUTHERN CALIFORNIA EDISON DRAWINGS
4.1.c
Packet Pg. 496 Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-
RAR0250PS7105600A / 120A - FCLOAD BREAK2335285E2335286E4523709E4523708ELOAD BREAK2335279E1/0 A1/0 A1/0 A ESPLANADE AVCAWSTON AVRAR0250PS7105600A / 120A - FCLOAD BREAK2335285E2335286E4523709E4523708ELOAD BREAK2335279E1/0 A1/0 A1/0 A
ESPLANADE AVCAWSTON AVEXISTING SINGLE LINEEASTER 12KV% NELSON SUBPROPOSED SINGLE LINEEASTER 12KV% NELSON SUBEX: 4792411NEW: 25KVA 120/240 1PContact USADial 811 or 800-422-4133UNDERGROUND SERVICE ALERTwww.digalert.org/contact“”––“”4.1.cPacket Pg. 497Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))
Contact USADial 811 or 800-422-4133UNDERGROUND SERVICE ALERTwww.digalert.org/contact4.1.cPacket Pg. 498Attachment: Contract Docs and Specifications - SJ-222 (Esplanade Avenue Widening Phase 1 Warren Road to Sanderson Avenue (CIP# 06-145))