Loading...
HomeMy WebLinkAboutAgenda - Agenda Packets - Regular Meeting 10/1/2019 AGENDA CITY COUNCIL - REGULAR MEETING TUESDAY, OCTOBER 1, 2019 6:30 PM OPEN SESSION COMMUNITY CENTER 625 S. PICO AVENUE SAN JACINTO, CA 92583 951-487-7339 City of San Jacinto Page 1 Updated 9/26/2019 3:48 PM RUSS UTZ, MAYOR ANDREW KOTYUK, MAYOR PRO TEM ALONSO LEDEZMA, COUNCILMEMBER JOEL LOPEZ, COUNCILMEMBER CRYSTAL RUIZ, COUNCILMEMBER 1. ORGANIZATION 1.1. Roll Call 1.2. Invocation - Pastor Gwen Lute, Community of Christ Church 1.3. Pledge of Allegiance - Scouts BSA Pack 46 1.4. Special Presentations 1.4.1. San Jacinto Unified School District Proclamation - October is Heritage Month 1.4.2. Code Enforcement Officer Appreciation Week Proclamation 1.4.3. Fire Prevention Week Proclamation - Cal Fire 1.4.4. San Jacinto Police Department 3rd Annual Trunk or Treat 1.5. Mayor / Council Member Reports / Discussions 1.6. Late Items 2. PUBLIC COMMENTS 3. JOINT CONSENT CALENDARS 3.A. Consent Calendar - City Council 3.A.1. Waiver of Full Reading of Ordinance(s), and Reading by Title Only 3.A.2. Minutes of the September 17, 2019 Regular City Council Meeting RECOMMENDATION: Staff recommends that City Council approve the minutes of the September 17, City of San Jacinto Page 2 Updated 9/26/2019 3:48 PM 2019 Regular City Council meeting. Department: City Clerk 3.A.3. Treasurer's Report at August 31, 2019 RECOMMENDATION: Receive and File Treasurer’s Report for the month ending August 31, 2019. Department: Finance 3.A.4. On-Call Environmental Consultant List through FY 2024-2025 RECOMMENDATION: That the City Council Approve the On-Call Environmental Consultant List through Fiscal Year 2024-2025 thereby authorizing Staff to use informal bidding for Environmental Work associated with a CEQA or NEPA Review. Department: Community Development 3.A.5. Lease Agreement with Family Services Association of Western Riverside County RECOMMENDATION: Staff recommends that the City Council approve the Lease Agreement with Family Services Association (FSA) of Western Riverside County for the use of the Community Center. Department: City Manager 3.B. Consent Calendar - Successor Agency to the Redevelopment Agency of the City of San Jacinto 4. PUBLIC HEARING 4.1. A proposal of Soboba Band of Luiseno Indians, for the Luiseno Village project located on Ramona Expressway extending between Main Street and Donna Way. To facilitate the Project, the applicant is requesting: 1) Change of Zone (CZ-17-05) to change the Zone from CN – Commercial Neighborhood to CG – Commercial General. 2) Site Plan and Design Review (SPDR17-17) for the review of the overall site design of a commercial retail center, which includes a 14,583 square foot retail building, a 9,360 square foot retail building, a service station with a 3,048 square foot convenience store with off-sale general alcohol sales and a 1,105 square foot car wash, a 3,200 square foot fast food restaurant, a 2,800 square foot fast food restaurant, and the design review for the construction of the 14,583 square foot retail building. 3) Conditional Use Permit (CUP-17-09) to permit a service station with a 3,048 square foot convenience store with off-sale general alcohol sales and a 1,105 square foot car wash. 4) Variance (VAR-17-05) to allow 24 fuel pumps at a single station where a maximum of 15 are permitted by the Development Code. 5) Minor Use Permit (MUP-17-09) to permit a fast food restaurant with a drive-through. 6) Minor Use Permit (MUP-17-10) to permit a fast food restaurant with a drive-through. 7) Minor Use Permit (MUP-17-11) to exceed the City’s parking requirement by more than five percent. RECOMMENDATION: City of San Jacinto Page 3 Updated 9/26/2019 3:48 PM That the City Council continue this item to October 15, 2019. Department: Community Development 5. CITY MANAGER UPDATE 6. FUTURE REQUESTS FROM CITY COUNCIL TO STAFF 7. ADJOURNMENT DOCUMENTS RELATED TO OPEN SESSION AGENDAS (SB343) - Any public record, relating to an open session agenda item, that is distributed within 72 hours prior to the meeting is available for public inspection at the public counter located in the Administration Building of City Hall, 595 S. San Jacinto Avenue, San Jacinto, CA 92583. I, Angela Walton, City Clerk of the City of San Jacinto, do hereby certify that I caused to be posted the foregoing agenda this 26th day of September 2019 as requested by law. Angela Walton, City Clerk October 1, 2019 TO: City Council REQUESTED BY: Angela Walton, City Clerk APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Minutes RECOMMENDATION: Staff recommends that City Council approve the minutes of the September 17, 2019 Regular City Council meeting. ATTACHMENTS: 9-17-19 Regular Meeting Minutes Draft 3.A.2 Packet Pg. 4 ACTION MINUTES CITY COUNCIL – REGULAR MEETING TUESDAY, SEPTEMBER 17, 2019 6:30 PM OPEN SESSION SAN JACINTO COMMUNITY CENTER 625 S. PICO AVE SAN JACINTO, CA 92583 951-487-7339 1. ORGANIZATION Mayor Utz called the Regular City Council meeting to order at 6:33 pm. 1.1. Roll Call City Clerk Angela Walton conducted the roll call: Present: Kotyuk, Ledezma, Lopez, Ruiz, Utz Absent: None 1.2. Invocation Councilmember Crystal Ruiz gave the invocation. 1.3. Pledge of Allegiance The Pledge of Allegiance was led by San Jacinto Leadership Academy. 1.4. Mayor/Council Member Reports / Discussions Councilmembers provided their reports. 1.5. Late Items There were no late items. 2. PUBLIC COMMENTS Public Speakers:  Alfredo Fregozo  Joel Hinojosa RUSS UTZ, MAYOR ANDREW KOTYUK, MAYOR PRO TEM ALONSO LEDEZMA, COUNCILMEMBER JOEL LOPEZ, COUNCILMEMBER CRYSTAL RUIZ, COUNCILMEMBER 3.A.2.a Packet Pg. 5 Attachment: 9-17-19 Regular Meeting Minutes Draft (Minutes) 3. JOINT CONSENT CALENDARS City Council Consent Calendar Item 3.A. and Successor Agency Item 3.B. Consent Calendars were heard concurrently. 3.A. Consent Calendar – City Council 3.A.1. Waiver of Full Reading of Ordinance(s), and Reading by Title Only 3.A.2. Minutes of the Regular City Council Meeting of September 3, 2019 / City Clerk / Approve 3.A.3. Warrants and Disbursements – August 2019 / Finance / Approve 3.A.4. Agreement for Law Enforcement Services / City Manager / Approve 3.A.5. Approve Resolution to amend agreement for Professional Assistance: A resolution of the City Council of the City of San Jacinto amending agreement appointing Robert Brady to perform extra help services and approving employment contract / City Manager / Approve 3.B. Consent Calendar – Successor Agency to the Redevelopment Agency of the City of San Jacinto Mayor Pro Tem Kotyuk recused himself from Agenda Item 3.A.2., Warrants and Disbursements, line items 126404 and 126521. M/S/C (Ruiz/Ledezma) moved to approve the Consent Calendar. Motion carried 5/0. Ayes: Kotyuk, Ledezma, Lopez, Ruiz, Utz Nays: None Absent: None Abstain: None 4. PUBLIC HEARING 4.1. A Proposal of Soboba Band of Luiseno Indians for the Luiseno Village Project: An ordinance of the city council of the City of San Jacinto, California approving change of zone 17-05, a zone change from commercial neighborhood to commercial general located on the west side of Ramona Expressway extending between Main Street and Donna Way (APN #s 433-160-024, 027, 028, 029, 032, 033, and 034). City Manager Robert A. Johnson presented the staff report. Mayor Utz opened the Public Hearing at 7:08 pm. Public Speaker:  Alfredo Javier 3.A.2.a Packet Pg. 6 Attachment: 9-17-19 Regular Meeting Minutes Draft (Minutes) Written correspondence was received by the City Clerk on September 17, 2019 from Alfredo Javier, Director of Environmental and Regulatory Compliance, Eastern Municipal Water District. The Public Hearing will remain open until October 1, 2019. 5. DISSCUSSION ITEM 5.1. Bath Well Rehabilitation Water/Wastewater Superintendent Arthur Mullen presented the staff report. M/S/C (Ruiz/Ledezma) moved to approve the Bath Well Rehabilitation. Motion carried 5/0. Ayes: Kotyuk, Ledezma, Lopez, Ruiz, Utz Nays: None Absent: None Abstain: None 6. CITY MANAGER UPDATE - City Manager Robert A. Johnson  State of the City event reminder, September 26, 2019, Soboba Casino Resort Events Center 7. FUTURE REQUESTS TO STAFF  Councilmember Ledezma requests consideration of a Mexican independence celebration on September 15  Mayor Utz requests a Purple Heart Veteran’s parking space at the San Jacinto Community Center  Mayor Pro Tem Kotyuk requests the removal of goat’s head weeds from sidewalks and streets in San Jacinto 8. ADJOURNMENT With no further business before the City Council, Mayor Utz adjourned the Regular Meeting of the City Council at 7:35 pm in honor of the victims and first responders of the recent Horseshoe Fire. CITY OF SAN JACINTO: _________________________ Russ Utz, Mayor ATTEST: ________________________ Angela Walton, City Clerk Approved as read: Approved as amended: 3.A.2.a Packet Pg. 7 Attachment: 9-17-19 Regular Meeting Minutes Draft (Minutes) October 1, 2019 TO: City Council REQUESTED BY: Tom Prill, Deputy City Manager APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Treasurer's Report at August 31, 2019 RECOMMENDATION: Receive and File Treasurer’s Report for the month ending August 31, 2019. BACKGROUND: The Treasurer’s Report is required to be presented to the governing body at least quarterly in accordance with California Government Code Section 53600 et. seq. DISCUSSION: Total Cash and City Investments decreased 3.32% during the month. This includes cash, cash in bank and cash with trustee. The attached Treasurer’s report is a “snapshot” report of our cash position on the last day of the month in all of our accounts. A section demonstrating compliance with the adopted Investment Policy and a chart depicting historical interest rates for certain positions is also included. Detailed statements of investments from Chandler Asset Management and Public Trust Advisors have also been included. FISCAL IMPACT: None. ATTACHMENTS: August 2019 Treasurers Report 3.A.3 Packet Pg. 8 TREASURER'S REPORT FOR THE MONTH ENDING AUGUST 31, 2019 7/31/2019 8/31/2019 % change 8/31/2019 COMPUTED INVESTMENT INSTITUTION INTEREST AUGUST PURCHASE MATURITY PREV. MONTH CURRENT from prior MARKET ACCR. INT.AVERAGE TYPE SERIAL #RATE YIELD INTEREST DATE DATE BALANCE BALANCE month VALUE & MKT. VALUE DURATION STATE POOL L.A.I.F.2.383%2.409%$40,501 Various Open $20,014,141 N $20,014,141 0.00%$20,095,626 $81,485 MONEY MARKET Bank of Hemet 0.150%0.150%$434 Various Open $3,637,841 Q $2,108,275 -42.05%$2,108,275 $0 DEMAND Acct - old Bank of Hemet 0.000%0.000%N/A Various Open $622,520 Q $409,050 -34.29%$409,050 $0 DEMAND Acct - new Bank of Hemet 0.000%0.000%N/A Various Open $246,715 Q $69,799 -71.71%$69,799 $0 PAYROLL Account Bank of Hemet 0.000%0.000%N/A Various Open $140,994 Q $15,932 -88.70%$15,932 $0 MONEY MARKET Rabobank 0.050%0.050%$1 Various Open $27,606 Q $52,159 88.94%$52,159 $0 MONEY MARKET Rabobank 0.200%0.200%$97 Various Open $596,487 Q $572,033 -4.10%$572,033 $0 CCA Lockbox River City Bank 0.000%0.000%$0 Various Open $942,158 Q $788,585 -16.30%$788,585 $0 MANAGED Acct - CAM Chandler / U.S. Bank - Gov't Ob Fund 1.710%1.723%$460 Various Various $27,789 L $203,933 633.86%$203,933 $0 0.00 MANAGED Acct - CAM Chandler / U.S. Bank - Agency 1.980%1.998%$5,944 Various Various $4,542,235 C $4,373,284 -3.72%$4,461,043 $87,759 1.81 MANAGED Acct - CAM Chandler / U.S. Bank - Commercial 2.260%2.284%$0 Various Various $396,427 E $396,427 0.00%$397,835 $1,408 0.24 MANAGED Acct - CAM Chandler / U.S. Bank - US Corporate 2.460%2.488%$5,344 Various Various $2,454,047 F $2,406,597 -1.93%$2,444,483 $37,886 1.85 MANAGED Acct - CAM Chandler / U.S. Bank - US Treasury 2.070%2.090%$2,781 Various Various $2,796,728 A $2,796,728 0.00%$2,867,134 $70,406 2.01 MANAGED Acct - CAM Chandler / U.S. Bank - Asset-Backed Sec.2.510%2.539%$0 Various Various $446,338 J $498,139 11.61%$502,533 $4,394 0.89 MANAGED Acct - PTA PTA / U.S. Bank - Gov't Ob Fund 1.720%1.734%$37 Various Various $28,655 L $17,703 -38.22%$17,703 $0 0.00 MANAGED Acct - PTA PTA / U.S. Bank - Agency 2.609%2.640%$6,920 Various Various $653,158 C $651,714 -0.22%$665,143 $13,429 1.60 MANAGED Acct - PTA PTA / U.S. Bank - Agency CMBS 2.563%2.593%$0 Various Various $319,671 C $319,688 0.01%$327,476 $7,788 2.84 MANAGED Acct - PTA PTA / U.S. Bank - US Corporate 2.103%2.123%$1,800 Various Various $1,994,493 F $1,668,036 -16.37%$1,685,203 $17,167 0.76 MANAGED Acct - PTA PTA / U.S. Bank - US Treasury 2.333%2.358%$6,863 Various Various $7,399,421 A $7,750,415 4.74%$7,924,053 $173,638 2.10 MANAGED Acct - PTA PTA / U.S. Bank - Municipal Bonds 0.000%0.000%$0 Various Various $0 D $0 0.00%$0 $0 0.00 MANAGED Acct - PTA PTA / U.S. Bank - Asset-Backed Sec.2.868%2.906%$0 Various Various $199,328 J $197,430 -0.95%$200,811 $3,381 0.22 CASH Cash in EOC Lockbox 0.000%0.000%N/A Various n/a $5,000 Q $5,000 0.00%$5,000 $0 CASH Cash on Hand 0.000%0.000%N/A Various n/a $850 Q $850 0.00%$850 $0 TOTAL CITY INVESTMENTS & FUNDS 2.112%2.132%$71,182 $47,492,602 $45,315,918 -4.58%$45,814,658 $498,740 Annual Return Based on Previous Month Balance 1.424% RESTRICTED CASH WITH FISCAL AGENT (BOND FUNDS) Trustee STREETLIGHT ACQUISITION Mutual Fund Wilmington Blackrock Liquidity FundsXXXXX3-00X 2.050%2.069%Various Open $469,869 K $464,548 -1.13%$464,548 $0 CFD NO. 2002-1 Mutual Fund Union Bank Blackrock Prov. T-Fund XXXX16090X 2.000%2.018%Various Open $1,820,964 K $2,768,856 52.05%$2,768,856 $0 2005 RDA SAN JACINTO TAX ALLOCATION BONDS Mutual Fund Union Bank Blackrock Prov. T-Fund XXXX75750X 1.993%2.012%Various Open $433,663 K $241 -99.94%$241 $0 TOTAL CASH WITH FISCAL AGENT $2,724,496 $3,233,645 18.69%$3,233,645 $0 TOTAL ALL FUNDS $50,217,098 $48,549,563 -3.32%$49,048,303 $498,740 Page 1 3.A.3.a Packet Pg. 9 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) TREASURER'S REPORT FOR THE MONTH ENDING AUGUST 31, 2019 7/31/2019 8/31/2019 % change 8/31/2019 COMPUTED INVESTMENT INSTITUTION INTEREST AUGUST PURCHASE MATURITY PREV. MONTH CURRENT from prior MARKET ACCR. INT.AVERAGE TYPE SERIAL #RATE YIELD INTEREST DATE DATE BALANCE BALANCE month VALUE & MKT. VALUE DURATION PER INVESTMENT POLICY:Maximum %Current %In Compliance? Level 1 - Investments U.S. Treasury Bills, Notes and Bonds 100%22%Yes A $10,547,143 Negotiable CDs 30%0%Yes B $0 Obligations issued by U.S. Government Agencies 100%11%Yes C $5,344,686 Municipal Bonds 100%0%Yes D $0 Commercial Paper 25%1%Yes E $396,427 Medium Term Notes 30%8%Yes F $4,074,633 Repurchase Agreements 100%0%Yes G $0 Banker's Acceptances 40%0%Yes H $0 Time Deposits & CDARS 30%0%Yes I $0 Mortgage pass-through / asset-backed securities 20%1%Yes J $695,569 Mutual Funds (Limited to U.S. Treasuries)18%7%Yes K $3,233,645 Mutual Funds (Limited to U.S. Govt. Sec.)18%0%Yes L $221,636 Level 2 - Investments Money Market Funds (non-brokered)20%0%Yes M $0 LAIF 70%41%Yes N $20,014,141 RCIF 70%0%Yes O $0 Other JPA Pool 50%0%Yes P $0 Cash & Demand Accounts n/a n/a n/a Q $4,021,683 $48,549,563 I CERTIFY THAT THESE INVESTMENTS COMPLY WITH ALL STATE LAWS PERTAINING TO THE INVESTMENT OF LOCAL AGENCY FUNDS AND THE CITY OF SAN JACINTO'S INVESTMENT POLICIES. CITY OF SAN JACINTO MEETS OR EXCEEDS THE SIX MONTH CASH FLOW REQUIREMENTS AS PER GOVERNMENT CODE 53646(b)(3). KALEENA RICHARDS, TREASURER City of San Jacinto Reviewed By: Deputy City Manager - 09/25/19 Page 2 3.A.3.a Packet Pg. 10 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) - 0.500 1.000 1.500 2.000 2.500 3.0009/1610/1611/1612/161/172/173/174/175/176/177/178/179/1710/1711/1712/171/182/183/184/185/186/187/188/189/1810/1811/1812/181/192/193/194/195/196/197/198/19Interest Rates - 9/16 to 8/19LAIFLAMMA-BoHMMA-RaboPIMMA-RaboChandlerBLX / PTA3.A.3.aPacket Pg. 11Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) MONTHLY ACCOUNT STATEMENT City of San Jacinto - Account #10167 AUGUST 1, 2019 THROUGH AUGUST 31, 2019 Information contained herein is confidential. We urge you to compare this statement to the one you receive from your qualified custodian. Please see Important Disclosures. CHANDLER ASSET MANAGEMENT chandlerasset.com Chandler Team: For questions about your account, please call (800) 317-4747, or contact operations@chandlerasset.com Custodian US Bank Christopher Isles (503) 464-3685 3.A.3.a Packet Pg. 12 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) ACCOUNT SUMMARY Beg. Values as of 7/31/19 End Values as of 8/31/19 Market Value 10,745,959 10,828,669 Accrued Interest 44,157 48,291 Total Market Value 10,790,116 10,876,960 Income Earned 18,699 19,100 Cont/WD -1,003 Par 10,692,378 10,700,196 Book Value 10,675,023 10,688,985 Cost Value 10,663,564 10,675,108 TOP ISSUERS Government of United States 26.4% Federal Home Loan Bank 19.0% Federal Home Loan Mortgage Corp 12.2% Federal National Mortgage Assoc 9.8% Toyota Motor Corp 3.0% Wal-Mart Stores 1.9% Apple Inc 1.9% First American Govt Oblig Fund 1.9% Total 76.1% PORTFOLIO CHARACTERISTICS Average Modified Duration 1.73 Average Coupon 2.04% Average Purchase YTM 2.14% Average Market YTM 1.75% Average S&P/Moody Rating AA/Aa1 Average Final Maturity 1.91 yrs Average Life 1.80 yrs CREDIT QUALITY (S&P)MATURITY DISTRIBUTIONSECTOR ALLOCATION Portfolio Summary As of August 31, 2019 City of San Jacinto Account #10167 PERFORMANCE REVIEW Annualized TOTAL RATE OF RETURN 1M 3M YTD 1YR 2YRS 3YRS 5YRS 10YRS 6/30/2012 City of San Jacinto 0.81%1.35%3.41%4.56%2.41%1.88%1.57%N/A 1.29% ICE BAML 1-3 Yr US Treasury Index 0.81%1.21%3.14%4.35%2.15%1.60%1.33%N/A 1.09% ICE BAML 1-3 Yr US Corp/Govt Rated AAA-A Index 0.81%1.28%3.33%4.52%2.31%1.78%1.50%N/A 1.29% Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 1 3.A.3.a Packet Pg. 13 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Category StandardCommentMunicipal Securities "A" rating category or better by a NRSRO;  30% maximum;  5% max per issuerCompliesTreasury Issues No LimitationCompliesAgency Issues No LimitationCompliesSupranationals"AA" rated or better by a NRSRO; 30% maximum;  10% max per issuer;  U.S. dollar denominated senior unsecured unsubordinated obligations issued or unconditionally guaranteed by the International Bank for Reconstruction and Development ("IBRD"), the International Finance Corporation ("IFC") or the Inter‐American Development Bank ("IADB")  CompliesBanker’s Acceptances"A‐1" short term debt rated or higher by at least two NRSROs;  and "A" long‐term debt rated or higher by at least two NRSROs;  40% maximum;  5% max per issuer;  180 days max maturity Complies Commercial Paper"A‐1" short term debt rated or higher by at least two NRSROs;  and "A" long‐term debt rated or higher by at least two NRSROs; 25% maximum;  5% max per issuer;  270 days max maturity;  Issuer is a corporation organized and operating in the U.S. with assets > $500 million  CompliesNegotiable Certificates of Deposit"A" long‐term issuer rated category or higher by at least two NRSROs;  and/or "A‐1" short term rated or higher by at least two NRSROs;  30% maximum;  5% max per issuerComplies  Federally Insured Certificates of Deposit (CDs)/ Time Deposit (TDs)20% maximum (combined FDIC insured and collateralized TD/ CD);  Amount per institution is limited to maximum covered under federal insuranceComplies  Collateralized Certificates of Deposit (CDs)/Time Deposit (TDs)/ "A" long‐term debt rated category or higher by at least two NRSROs;  and/or  "A‐1" short term debt rated or higher by at least two NRSROs;  20% maximum (combined FDIC and collateralized TD/ CD)Complies  Corporate Medium Term Notes"A" rated category or better by at least two NRSROs;  30% maximum; 5% max per issuer;   Issued by corporations organized and operating within the U.S. or by depository institutions licensed by the U.S. or any state  and operating within the U.S. Complies  Mutual Fund & Money Market Mutual FundHighest rating or "AAA" rated  by two NRSROs; SEC registered adviser with AUM >$500 million and experience > 5 years; 20% maximum in Mutual Funds and Money Market Mutual Funds;  10% max per one Mutual Fund;  20% max in Money Market Mutual Fund    CompliesAsset‐Backed (ABS), Mortgage‐Backed Securities; Mortgage Pass‐Throughs; Collateralized Mortgage Obligations (CMOs)"AA" rated category or better by at least two NRSROs;  "A" issuer debt rated category or higher by at least two NRSROs; 20% maximum;  5% max per issuerComplies Local Agency Investment Fund  (LAIF) 70% of the portfolio may be invested in LAIF, up to the maximum permitted balance;  Not used by investment adviserCompliesLocal Government Investment Pools and Joint Powers Authority PoolsRiverside County Investment Fund‐ 70% max of the total portfolioJPA Pools‐ 50% max of the total portfolioRepurchase Agreements 102% collateralized;  1 year max maturityCompliesProhibited SecuritiesInverse floaters; Ranges notes, Interest‐only strips from mortgaged backed securities; Zero interest accrual securities;  Margin purchasing or selling;  Reverse repurchase agreements;  Foreign currency denominated securities CompliesMax Callables 20% maximum callable securities (does not include "make whole call" securities)CompliesMax Per Issuer5% of portfolio  per issuer (except U.S. Government, its Agencies and enterprises, Money Market Mutual Funds, Mutual Funds, LAIF, LGIP, Supranationals, or unless otherwise specified in the investment policy)CompliesMaximum maturity 5 yearsComplies City of San JacintoAs of August 31, 2019 Assets managed by Chandler Asset Management are in full compliance with state law and with the City's investment policy.Statement of Compliance3.A.3.aPacket Pg. 14Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) BOOK VALUE RECONCILIATION BEGINNING BOOK VALUE $10,675,023.31 Acquisition + Security Purchases $234,524.84 + Money Market Fund Purchases $413,539.66 + Money Market Contributions $0.00 + Security Contributions $0.00 + Security Transfers $0.00 Total Acquisitions $648,064.50 Dispositions - Security Sales $0.00 - Money Market Fund Sales $236,392.55 - MMF Withdrawals $1,003.43 - Security Withdrawals $0.00 - Security Transfers $0.00 - Other Dispositions $0.00 - Maturites $370,000.00 - Calls $0.00 - Principal Paydowns $28,325.46 Total Dispositions $635,721.44 Amortization/Accretion +/- Net Accretion $1,619.00 $1,619.00 Gain/Loss on Dispositions +/- Realized Gain/Loss $0.00 $0.00 ENDING BOOK VALUE $10,688,985.37 CASH TRANSACTION SUMMARY BEGINNING BALANCE $27,789.10 Acquisition Contributions $0.00 Security Sale Proceeds $0.00 Accrued Interest Received $0.00 Interest Received $14,753.82 Dividend Received $460.38 Principal on Maturities $370,000.00 Interest on Maturities $0.00 Calls/Redemption (Principal)$0.00 Interest from Calls/Redemption $0.00 Principal Paydown $28,325.46 Total Acquisitions $413,539.66 Dispositions Withdrawals $1,003.43 Security Purchase $234,524.84 Accrued Interest Paid $1,867.71 Total Dispositions $237,395.98 ENDING BOOK VALUE $203,932.78 Reconciliation Summary As of August 31, 2019 City of San Jacinto California Account #10167 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 3 3.A.3.a Packet Pg. 15 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Holdings Report As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration ABS 89238BAB8 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 49,417.78 01/23/2018 2.12% 49,412.73 49,415.68 99.99 2.20% 49,412.92 46.12 0.45% (2.76) Aaa / AAA NR 1.13 0.10 65478VAD9 NAROT 2016-B A3 1.32% Due 1/15/2021 16,528.15 02/12/2018 1.87% 16,395.80 16,465.82 99.86 2.20% 16,505.57 2.42 0.15% 39.75 Aaa / NR AAA 1.38 0.16 47788BAD6 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 70,317.64 07/26/2018 3.16% 69,271.12 69,626.21 99.83 2.18% 70,194.84 56.88 0.65% 568.63 Aaa / NR AAA 2.13 0.49 47789JAB2 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 45,000.00 03/05/2019 2.87% 44,997.95 44,998.30 100.52 2.00% 45,232.16 57.00 0.42% 233.86 Aaa / NR AAA 2.29 0.60 43815HAC1 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 70,000.00 08/21/2018 2.98% 69,990.40 69,992.83 101.47 1.81% 71,027.74 57.36 0.65% 1,034.91 Aaa / NR AAA 2.98 1.27 65478WAE5 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 130,000.00 04/16/2019 2.56% 128,080.47 128,367.03 99.45 2.11% 129,289.16 79.73 1.19% 922.13 Aaa / NR AAA 3.38 0.75 43815NAC8 HAROT 2019-3 A3 1.78% Due 8/15/2023 80,000.00 08/20/2019 1.79% 79,999.34 79,999.34 100.09 1.71% 80,071.20 15.82 0.74% 71.86 Aaa / AAA NR 3.96 1.23 477870AC3 JDOT 2019-B A3 2.21% Due 12/15/2023 40,000.00 07/16/2019 2.23% 39,991.51 39,991.72 100.98 1.79% 40,393.88 90.86 0.37% 402.16 Aaa / NR AAA 4.29 2.28 Total ABS 501,263.57 2.51% 498,139.32 498,856.93 1.99% 502,127.47 406.19 4.62% 3,270.54 Aaa / AAA AAA 2.93 0.89 AGENCY 313380FB8 FHLB Note 1.375% Due 9/13/2019 190,000.00 10/25/2017 1.63% 189,110.80 189,984.47 99.98 2.08% 189,954.40 1,219.17 1.76% (30.07) Aaa / AA+ NR 0.04 0.03 3137EADM8 FHLMC Note 1.25% Due 10/2/2019 155,000.00 09/24/2015 1.34% 154,443.55 154,988.25 99.93 2.03% 154,894.60 801.91 1.43% (93.65) Aaa / AA+ AAA 0.09 0.09 3137EAEE5 FHLMC Note 1.5% Due 1/17/2020 260,000.00 03/08/2017 1.72% 258,408.80 259,789.67 99.83 1.94% 259,568.14 476.67 2.39% (221.53) Aaa / AA+ AAA 0.38 0.38 3135G0A78 FNMA Note 1.625% Due 1/21/2020 245,000.00 12/10/2015 1.61% 245,149.45 245,014.13 99.88 1.94% 244,698.41 442.36 2.25% (315.72) Aaa / AA+ AAA 0.39 0.39 3135G0T29 FNMA Note 1.5% Due 2/28/2020 205,000.00 08/28/2017 1.48% 205,102.50 205,020.21 99.79 1.93% 204,567.04 25.63 1.88% (453.17) Aaa / AA+ AAA 0.50 0.49 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 4 3.A.3.a Packet Pg. 16 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Holdings Report As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration AGENCY 3137EAEF2 FHLMC Note 1.375% Due 4/20/2020 250,000.00 07/27/2017 1.54% 248,900.00 249,744.03 99.70 1.86% 249,238.75 1,250.87 2.30% (505.28) Aaa / AA+ AAA 0.64 0.63 3137EADR7 FHLMC Note 1.375% Due 5/1/2020 225,000.00 08/24/2016 1.05% 227,637.00 225,476.42 99.67 1.87% 224,268.30 1,031.25 2.07% (1,208.12) Aaa / AA+ AAA 0.67 0.66 313383HU8 FHLB Note 1.75% Due 6/12/2020 130,000.00 10/14/2015 1.38% 132,181.40 130,365.28 99.94 1.82% 129,927.98 499.24 1.20% (437.30) Aaa / AA+ NR 0.78 0.77 3130A5Z77 FHLB Note 1.83% Due 7/29/2020 125,000.00 10/27/2015 1.46% 127,132.50 125,407.83 100.07 1.76% 125,083.63 203.33 1.15% (324.20) Aaa / AA+ AAA 0.91 0.90 3137EAEK1 FHLMC Note 1.875% Due 11/17/2020 225,000.00 01/18/2018 2.19% 223,042.50 224,160.53 100.23 1.68% 225,519.30 1,218.75 2.08% 1,358.77 Aaa / AA+ AAA 1.22 1.19 3130A3UQ5 FHLB Note 1.875% Due 12/11/2020 225,000.00 01/28/2016 1.53% 228,642.75 225,956.79 100.33 1.62% 225,734.40 937.50 2.08% (222.39) Aaa / AA+ NR 1.28 1.25 3130A7CV5 FHLB Note 1.375% Due 2/18/2021 200,000.00 03/10/2016 1.61% 197,812.00 199,350.27 99.74 1.56% 199,475.20 99.31 1.83% 124.93 Aaa / AA+ AAA 1.47 1.44 3135G0N82 FNMA Note 1.25% Due 8/17/2021 315,000.00 01/26/2017 2.02% 304,579.80 310,502.79 99.41 1.55% 313,156.31 153.13 2.88% 2,653.52 Aaa / AA+ AAA 1.96 1.93 313378WG2 FHLB Note 2.5% Due 3/11/2022 300,000.00 03/13/2018 2.65% 298,323.00 298,939.51 102.49 1.49% 307,473.30 3,541.67 2.86% 8,533.79 Aaa / AA+ NR 2.53 2.42 313379Q69 FHLB Note 2.125% Due 6/10/2022 200,000.00 06/20/2017 1.87% 202,370.00 201,322.76 101.67 1.51% 203,343.60 956.25 1.88% 2,020.84 Aaa / AA+ AAA 2.78 2.68 3135G0T94 FNMA Note 2.375% Due 1/19/2023 290,000.00 10/17/2018 3.07% 281,993.10 283,627.48 102.92 1.49% 298,470.61 803.54 2.75% 14,843.13 Aaa / AA+ AAA 3.39 3.24 3137EAEN5 FHLMC Note 2.75% Due 6/19/2023 200,000.00 11/13/2018 3.08% 197,176.00 197,665.74 104.62 1.49% 209,249.20 1,100.00 1.93% 11,583.46 Aaa / AA+ AAA 3.80 3.59 313383YJ4 FHLB Note 3.375% Due 9/8/2023 200,000.00 12/27/2018 2.73% 205,630.00 204,819.15 107.38 1.48% 214,763.00 3,243.75 2.00% 9,943.85 Aaa / AA+ NR 4.02 3.72 3130A0F70 FHLB Note 3.375% Due 12/8/2023 220,000.00 01/30/2019 2.71% 226,593.40 225,800.85 107.85 1.47% 237,274.18 1,711.88 2.20% 11,473.33 Aaa / AA+ AAA 4.27 3.97 3130A1XJ2 FHLB Note 2.875% Due 6/14/2024 210,000.00 Various 1.96% 219,055.20 218,682.67 106.37 1.49% 223,374.70 1,291.36 2.07% 4,692.03 Aaa / AA+ NR 4.79 4.46 Total Agency 4,370,000.00 1.98% 4,373,283.75 4,376,618.83 1.68% 4,440,035.05 21,007.57 41.01% 63,416.22 Aaa / AA+ AAA 1.90 1.81 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 5 3.A.3.a Packet Pg. 17 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Holdings Report As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration COMMERCIAL PAPER 62479MXN8 MUFG Bank Ltd/NY Discount CP 2.27% Due 10/22/2019 200,000.00 06/20/2019 2.32% 198,436.22 199,356.83 99.68 2.32% 199,356.83 0.00 1.83% 0.00 P-1 / A-1 NR 0.14 0.14 89233GA71 Toyota Motor Credit Discount CP 2.14% Due 1/7/2020 200,000.00 07/22/2019 2.19% 197,990.78 198,478.22 99.24 2.19% 198,478.22 0.00 1.82% 0.00 P-1 / A-1+ NR 0.35 0.35 Total Commercial Paper 400,000.00 2.26% 396,427.00 397,835.05 2.26% 397,835.05 0.00 3.66% 0.00 P-1 / A-1 NR 0.25 0.24 MONEY MARKET FUND FI 31846V203 First American Govt Obligation Fund Class Y 203,932.78 Various 1.71% 203,932.78 203,932.78 1.00 1.71% 203,932.78 0.00 1.87% 0.00 Aaa / AAA AAA 0.00 0.00 Total Money Market Fund FI 203,932.78 1.71% 203,932.78 203,932.78 1.71% 203,932.78 0.00 1.87% 0.00 Aaa / AAA AAA 0.00 0.00 US CORPORATE 06406HCW7 Bank of New York Callable Note Cont 8/11/2019 2.3% Due 9/11/2019 150,000.00 10/26/2016 2.30% 153,034.50 150,000.00 100.00 2.33% 149,997.75 1,629.17 1.39% (2.25) A1 / A AA- 0.03 0.03 166764AN0 Chevron Corp Callable Note Cont 10/15/2019 2.193% Due 11/15/2019 130,000.00 01/05/2016 2.12% 130,341.90 130,010.93 100.02 1.98% 130,025.48 839.43 1.20% 14.55 Aa2 / AA NR 0.21 0.12 46625HKA7 JP Morgan Chase Callable Note Cont 12/23/2019 2.25% Due 1/23/2020 125,000.00 08/11/2017 1.91% 125,970.00 125,127.60 100.03 2.12% 125,042.50 296.88 1.15% (85.10) A2 / A- AA- 0.40 0.31 857477AS2 State Street Bank Note 2.55% Due 8/18/2020 125,000.00 11/29/2016 2.18% 126,620.00 125,420.84 100.58 1.94% 125,720.38 115.10 1.16% 299.54 A1 / A AA- 0.97 0.95 02665WAZ4 American Honda Finance Note 2.45% Due 9/24/2020 150,000.00 10/07/2016 1.72% 154,161.00 151,122.49 100.49 1.98% 150,735.45 1,602.71 1.40% (387.04) A2 / A NR 1.07 1.04 91159HHL7 US Bancorp Callable Note 1X 12/29/2020 2.35% Due 1/29/2021 125,000.00 05/02/2017 2.12% 126,012.50 125,368.11 100.53 1.94% 125,663.13 261.11 1.16% 295.02 A1 / A+ AA- 1.42 1.30 17275RBD3 Cisco Systems Note 2.2% Due 2/28/2021 150,000.00 09/20/2017 1.98% 151,108.50 150,482.26 100.66 1.75% 150,985.80 27.50 1.39% 503.54 A1 / AA- NR 1.50 1.47 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 6 3.A.3.a Packet Pg. 18 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Holdings Report As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration US CORPORATE 369550BE7 General Dynamics Corp Note 3% Due 5/11/2021 125,000.00 05/15/2018 3.25% 124,128.75 124,505.57 101.92 1.84% 127,396.13 1,145.83 1.18% 2,890.56 A2 / A+ NR 1.70 1.64 808513AW5 Charles Schwab Corp Callable Note Cont 4/21/2021 3.25% Due 5/21/2021 150,000.00 05/30/2018 3.01% 151,011.00 150,573.06 102.22 1.86% 153,332.70 1,354.17 1.42% 2,759.64 A2 / A A 1.72 1.58 931142EJ8 Wal-Mart Stores Note 3.125% Due 6/23/2021 200,000.00 Various 2.96% 200,929.00 200,568.49 102.44 1.75% 204,884.20 1,180.56 1.89% 4,315.71 Aa2 / AA AA 1.81 1.75 68389XBK0 Oracle Corp Callable Note Cont 8/15/2021 1.9% Due 9/15/2021 200,000.00 10/12/2017 2.11% 198,458.00 199,196.65 99.99 1.90% 199,985.40 1,752.22 1.85% 788.75 A1 / A+ A 2.04 1.90 89236TDP7 Toyota Motor Credit Corp Note 2.6% Due 1/11/2022 130,000.00 01/28/2019 2.98% 128,629.80 128,902.06 101.61 1.90% 132,099.11 469.44 1.22% 3,197.05 Aa3 / AA- A+ 2.37 2.28 06051GEU9 Bank of America Corp Note 3.3% Due 1/11/2023 130,000.00 01/28/2019 3.29% 130,059.80 130,050.93 103.95 2.08% 135,136.04 595.83 1.25% 5,085.11 A2 / A- A+ 3.37 3.17 084670BR8 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 3/15/2023 150,000.00 08/26/2019 1.83% 154,525.50 154,510.85 103.19 1.77% 154,780.95 1,902.08 1.44% 270.10 Aa2 / AA A+ 3.54 3.18 037833AK6 Apple Inc Note 2.4% Due 5/3/2023 200,000.00 05/20/2019 2.63% 198,284.00 198,405.38 102.11 1.80% 204,212.80 1,573.33 1.89% 5,807.42 Aa1 / AA+ NR 3.67 3.48 24422EUR8 John Deere Capital Corp Note 3.45% Due 1/10/2024 150,000.00 03/14/2019 2.95% 153,322.50 153,007.06 106.00 2.00% 159,006.15 733.13 1.47% 5,999.09 A2 / A A 4.36 4.04 Total US Corporate 2,390,000.00 2.46% 2,406,596.75 2,397,252.28 1.92% 2,429,003.97 15,478.49 22.47% 31,751.69 A1 / A+ A+ 1.97 1.85 US TREASURY 912828UB4 US Treasury Note 1% Due 11/30/2019 125,000.00 10/26/2016 1.05% 124,819.76 124,985.58 99.75 1.99% 124,692.38 317.62 1.15% (293.20) Aaa / AA+ AAA 0.25 0.25 912828UV0 US Treasury Note 1.125% Due 3/31/2020 195,000.00 11/17/2015 1.61% 191,054.95 194,475.64 99.56 1.88% 194,146.88 923.05 1.79% (328.76) Aaa / AA+ AAA 0.58 0.57 912828L32 US Treasury Note 1.375% Due 8/31/2020 200,000.00 11/03/2015 1.56% 198,289.73 199,645.72 99.59 1.79% 199,187.60 7.55 1.83% (458.12) Aaa / AA+ AAA 1.00 0.99 912828M98 US Treasury Note 1.625% Due 11/30/2020 205,000.00 Various 1.71% 204,350.30 204,793.50 99.90 1.70% 204,799.72 846.46 1.89% 6.22 Aaa / AA+ AAA 1.25 1.23 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 7 3.A.3.a Packet Pg. 19 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Holdings Report As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration US TREASURY 912828N89 US Treasury Note 1.375% Due 1/31/2021 160,000.00 04/04/2018 2.41% 155,500.00 157,741.28 99.59 1.67% 159,343.68 191.30 1.47% 1,602.40 Aaa / AA+ AAA 1.42 1.39 912828Q78 US Treasury Note 1.375% Due 4/30/2021 210,000.00 05/25/2017 1.66% 207,753.05 209,046.22 99.63 1.60% 209,220.69 972.96 1.93% 174.47 Aaa / AA+ AAA 1.67 1.63 912828WN6 US Treasury Note 2% Due 5/31/2021 200,000.00 04/29/2019 2.29% 198,820.31 199,012.28 100.72 1.58% 201,437.60 1,016.39 1.86% 2,425.32 Aaa / AA+ AAA 1.75 1.71 912828S76 US Treasury Note 1.125% Due 7/31/2021 260,000.00 11/29/2017 1.98% 252,169.53 255,912.25 99.19 1.55% 257,897.64 254.35 2.37% 1,985.39 Aaa / AA+ AAA 1.92 1.88 912828T34 US Treasury Note 1.125% Due 9/30/2021 125,000.00 05/30/2018 2.59% 119,194.34 121,377.42 99.19 1.52% 123,989.25 591.70 1.15% 2,611.83 Aaa / AA+ AAA 2.08 2.04 912828G53 US Treasury Note 1.875% Due 11/30/2021 220,000.00 04/26/2017 1.81% 220,653.86 220,319.92 100.84 1.49% 221,847.56 1,048.16 2.05% 1,527.64 Aaa / AA+ AAA 2.25 2.19 912828W89 US Treasury Note 1.875% Due 3/31/2022 200,000.00 04/26/2018 2.75% 193,531.25 195,750.65 101.04 1.46% 202,078.20 1,577.87 1.87% 6,327.55 Aaa / AA+ AAA 2.58 2.50 912828L24 US Treasury Note 1.875% Due 8/31/2022 150,000.00 07/22/2019 1.77% 150,462.89 150,446.58 101.28 1.44% 151,921.80 7.73 1.40% 1,475.22 Aaa / AA+ AAA 3.00 2.91 912828M80 US Treasury Note 2% Due 11/30/2022 200,000.00 04/11/2019 2.31% 197,851.56 198,076.94 101.79 1.43% 203,578.20 1,016.39 1.88% 5,501.26 Aaa / AA+ AAA 3.25 3.13 9128284D9 US Treasury Note 2.5% Due 3/31/2023 210,000.00 Various 2.95% 206,053.12 206,862.22 103.74 1.43% 217,850.43 2,209.02 2.02% 10,988.21 Aaa / AA+ AAA 3.58 3.39 912828Y61 US Treasury Note 2.75% Due 7/31/2023 175,000.00 12/27/2018 2.59% 176,223.63 176,043.30 105.00 1.43% 183,743.18 418.48 1.69% 7,699.88 Aaa / AA+ AAA 3.92 3.71 Total US Treasury 2,835,000.00 2.07% 2,796,728.28 2,814,489.50 1.59% 2,855,734.81 11,399.03 26.36% 41,245.31 Aaa / AA+ AAA 2.07 2.01 TOTAL PORTFOLIO 10,700,196.35 2.14% 10,675,107.88 10,688,985.37 1.75% 10,828,669.13 48,291.28 100.00% 139,683.76 Aa1 / AA AAA 1.91 1.73 TOTAL MARKET VALUE PLUS ACCRUED 10,876,960.41 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 8 3.A.3.a Packet Pg. 20 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Transaction Ledger As of August 31, 2019 City of San Jacinto Account #10167 Transaction Type Settlement Date CUSIP Quantity Security Description Price Acq/Disp Yield Amount Interest Pur/Sold Total Amount Gain/Loss ACQUISITIONS Purchase 08/01/2019 31846V203 1,062.50 First American Govt Obligation Fund Class Y 1.000 1.93%1,062.50 0.00 1,062.50 0.00 Purchase 08/01/2019 31846V203 170,000.00 First American Govt Obligation Fund Class Y 1.000 1.93%170,000.00 0.00 170,000.00 0.00 Purchase 08/01/2019 31846V203 460.38 First American Govt Obligation Fund Class Y 1.000 1.93%460.38 0.00 460.38 0.00 Purchase 08/14/2019 31846V203 2,100.00 First American Govt Obligation Fund Class Y 1.000 1.93%2,100.00 0.00 2,100.00 0.00 Purchase 08/14/2019 31846V203 200,000.00 First American Govt Obligation Fund Class Y 1.000 1.93%200,000.00 0.00 200,000.00 0.00 Purchase 08/15/2019 31846V203 6,195.81 First American Govt Obligation Fund Class Y 1.000 1.93%6,195.81 0.00 6,195.81 0.00 Purchase 08/15/2019 31846V203 106.88 First American Govt Obligation Fund Class Y 1.000 1.93%106.88 0.00 106.88 0.00 Purchase 08/15/2019 31846V203 4,418.12 First American Govt Obligation Fund Class Y 1.000 1.93%4,418.12 0.00 4,418.12 0.00 Purchase 08/15/2019 31846V203 149.50 First American Govt Obligation Fund Class Y 1.000 1.93%149.50 0.00 149.50 0.00 Purchase 08/15/2019 31846V203 17,968.14 First American Govt Obligation Fund Class Y 1.000 1.93%17,968.14 0.00 17,968.14 0.00 Purchase 08/17/2019 31846V203 1,968.75 First American Govt Obligation Fund Class Y 1.000 1.93%1,968.75 0.00 1,968.75 0.00 Purchase 08/18/2019 31846V203 2,968.75 First American Govt Obligation Fund Class Y 1.000 1.93%2,968.75 0.00 2,968.75 0.00 Purchase 08/21/2019 31846V203 172.08 First American Govt Obligation Fund Class Y 1.000 1.93%172.08 0.00 172.08 0.00 Purchase 08/27/2019 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 99.999 1.79%79,999.34 0.00 79,999.34 0.00 Purchase 08/28/2019 084670BR8 150,000.00 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 3/15/2023 103.017 1.83%154,525.50 1,867.71 156,393.21 0.00 Purchase 08/28/2019 31846V203 3,187.50 First American Govt Obligation Fund Class Y 1.000 1.93%3,187.50 0.00 3,187.50 0.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 9 3.A.3.a Packet Pg. 21 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Transaction Ledger As of August 31, 2019 City of San Jacinto Account #10167 Transaction Type Settlement Date CUSIP Quantity Security Description Price Acq/Disp Yield Amount Interest Pur/Sold Total Amount Gain/Loss ACQUISITIONS Purchase 08/31/2019 31846V203 2,781.25 First American Govt Obligation Fund Class Y 1.000 1.71%2,781.25 0.00 2,781.25 0.00 Subtotal 643,539.66 648,064.50 1,867.71 649,932.21 0.00 TOTAL ACQUISITIONS 643,539.66 648,064.50 1,867.71 649,932.21 0.00 DISPOSITIONS Sale 08/27/2019 31846V203 79,999.34 First American Govt Obligation Fund Class Y 1.000 1.93%79,999.34 0.00 79,999.34 0.00 Sale 08/28/2019 31846V203 156,393.21 First American Govt Obligation Fund Class Y 1.000 1.93%156,393.21 0.00 156,393.21 0.00 Subtotal 236,392.55 236,392.55 0.00 236,392.55 0.00 Paydown 08/15/2019 47788BAD6 6,079.94 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 100.000 6,079.94 115.87 6,195.81 0.00 Paydown 08/15/2019 47789JAB2 0.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 100.000 0.00 106.88 106.88 0.00 Paydown 08/15/2019 65478VAD9 4,395.10 NAROT 2016-B A3 1.32% Due 1/15/2021 100.000 4,395.10 23.02 4,418.12 0.00 Paydown 08/15/2019 65478WAE5 0.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 100.000 0.00 149.50 149.50 0.00 Paydown 08/15/2019 89238BAB8 17,850.42 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 100.000 17,850.42 117.72 17,968.14 0.00 Paydown 08/21/2019 43815HAC1 0.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 100.000 0.00 172.08 172.08 0.00 Subtotal 28,325.46 28,325.46 685.07 29,010.53 0.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 10 3.A.3.a Packet Pg. 22 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Transaction Ledger As of August 31, 2019 City of San Jacinto Account #10167 Transaction Type Settlement Date CUSIP Quantity Security Description Price Acq/Disp Yield Amount Interest Pur/Sold Total Amount Gain/Loss DISPOSITIONS Maturity 08/01/2019 3137EADK2 170,000.00 FHLMC Note 1.25% Due 8/1/2019 100.000 170,000.00 0.00 170,000.00 0.00 Maturity 08/14/2019 084670BL1 200,000.00 Berkshire Hathaway Note 2.1% Due 8/14/2019 100.000 200,000.00 0.00 200,000.00 0.00 Subtotal 370,000.00 370,000.00 0.00 370,000.00 0.00 Security Withdrawal 08/06/2019 31846V203 899.26 First American Govt Obligation Fund Class Y 1.000 899.26 0.00 899.26 0.00 Security Withdrawal 08/26/2019 31846V203 104.17 First American Govt Obligation Fund Class Y 1.000 104.17 0.00 104.17 0.00 Subtotal 1,003.43 1,003.43 0.00 1,003.43 0.00 TOTAL DISPOSITIONS 635,721.44 635,721.44 685.07 636,406.51 0.00 OTHER TRANSACTIONS Interest 08/01/2019 3137EADK2 170,000.00 FHLMC Note 1.25% Due 8/1/2019 0.000 1,062.50 0.00 1,062.50 0.00 Interest 08/14/2019 084670BL1 200,000.00 Berkshire Hathaway Note 2.1% Due 8/14/2019 0.000 2,100.00 0.00 2,100.00 0.00 Interest 08/17/2019 3135G0N82 315,000.00 FNMA Note 1.25% Due 8/17/2021 0.000 1,968.75 0.00 1,968.75 0.00 Interest 08/18/2019 3130A7CV5 200,000.00 FHLB Note 1.375% Due 2/18/2021 0.000 1,375.00 0.00 1,375.00 0.00 Interest 08/18/2019 857477AS2 125,000.00 State Street Bank Note 2.55% Due 8/18/2020 0.000 1,593.75 0.00 1,593.75 0.00 Interest 08/28/2019 17275RBD3 150,000.00 Cisco Systems Note 2.2% Due 2/28/2021 0.000 1,650.00 0.00 1,650.00 0.00 Interest 08/28/2019 3135G0T29 205,000.00 FNMA Note 1.5% Due 2/28/2020 0.000 1,537.50 0.00 1,537.50 0.00 Interest 08/31/2019 912828L24 150,000.00 US Treasury Note 1.875% Due 8/31/2022 0.000 1,406.25 0.00 1,406.25 0.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 11 3.A.3.a Packet Pg. 23 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Transaction Ledger As of August 31, 2019 City of San Jacinto Account #10167 Transaction Type Settlement Date CUSIP Quantity Security Description Price Acq/Disp Yield Amount Interest Pur/Sold Total Amount Gain/Loss OTHER TRANSACTIONS Interest 08/31/2019 912828L32 200,000.00 US Treasury Note 1.375% Due 8/31/2020 0.000 1,375.00 0.00 1,375.00 0.00 Subtotal 1,715,000.00 14,068.75 0.00 14,068.75 0.00 Dividend 08/01/2019 31846V203 198,851.60 First American Govt Obligation Fund Class Y 0.000 460.38 0.00 460.38 0.00 Subtotal 198,851.60 460.38 0.00 460.38 0.00 TOTAL OTHER TRANSACTIONS 1,913,851.60 14,529.13 0.00 14,529.13 0.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 12 3.A.3.a Packet Pg. 24 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Income Earned As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income FIXED INCOME 02665WAZ4 American Honda Finance Note 2.45% Due 09/24/2020 10/07/2016 10/13/2016 150,000.00 151,211.94 0.00 0.00 151,122.49 1,296.46 0.00 1,602.71 306.25 0.00 89.45 (89.45) 216.80 216.80 037833AK6 Apple Inc Note 2.4% Due 05/03/2023 05/20/2019 05/22/2019 200,000.00 198,368.49 0.00 0.00 198,405.38 1,173.33 0.00 1,573.33 400.00 36.89 0.00 36.89 436.89 436.89 06051GEU9 Bank of America Corp Note 3.3% Due 01/11/2023 01/28/2019 01/30/2019 130,000.00 130,052.21 0.00 0.00 130,050.93 238.33 0.00 595.83 357.50 0.00 1.28 (1.28) 356.22 356.22 06406HCW7 Bank of New York Callable Note Cont 8/11/2019 2.3% Due 09/11/2019 10/26/2016 10/31/2016 150,000.00 150,029.93 0.00 0.00 150,000.00 1,341.67 0.00 1,629.17 287.50 0.00 29.93 (29.93) 257.57 257.57 084670BL1 Berkshire Hathaway Note Due 08/14/2019 01/26/2017 01/31/2017 0.00 200,027.77 0.00 200,000.00 0.00 1,948.33 2,100.00 0.00 151.67 0.00 27.77 (27.77) 123.90 123.90 084670BR8 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 03/15/2023 08/26/2019 08/28/2019 150,000.00 0.00 154,525.50 0.00 154,510.85 0.00 (1,867.71) 1,902.08 34.37 0.00 14.65 (14.65) 19.72 19.72 166764AN0 Chevron Corp Callable Note Cont 10/15/2019 2.193% Due 11/15/2019 01/05/2016 01/08/2016 130,000.00 130,018.64 0.00 0.00 130,010.93 601.86 0.00 839.43 237.57 0.00 7.71 (7.71) 229.86 229.86 17275RBD3 Cisco Systems Note 2.2% Due 02/28/2021 09/20/2017 09/22/2017 150,000.00 150,509.65 0.00 0.00 150,482.26 1,402.50 1,650.00 27.50 275.00 0.00 27.39 (27.39) 247.61 247.61 24422EUR8 John Deere Capital Corp Note 3.45% Due 01/10/2024 03/14/2019 03/18/2019 150,000.00 153,065.62 0.00 0.00 153,007.06 301.88 0.00 733.13 431.25 0.00 58.56 (58.56) 372.69 372.69 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 13 3.A.3.a Packet Pg. 25 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Income Earned As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 3130A0F70 FHLB Note 3.375% Due 12/08/2023 01/30/2019 01/31/2019 220,000.00 225,916.20 0.00 0.00 225,800.85 1,093.13 0.00 1,711.88 618.75 0.00 115.35 (115.35) 503.40 503.40 3130A1XJ2 FHLB Note 2.875% Due 06/14/2024 Various Various 210,000.00 218,836.65 0.00 0.00 218,682.67 788.22 0.00 1,291.36 503.14 0.00 153.98 (153.98) 349.16 349.16 3130A3UQ5 FHLB Note 1.875% Due 12/11/2020 01/28/2016 01/29/2016 225,000.00 226,020.30 0.00 0.00 225,956.79 585.94 0.00 937.50 351.56 0.00 63.51 (63.51) 288.05 288.05 3130A5Z77 FHLB Note 1.83% Due 07/29/2020 10/27/2015 10/28/2015 125,000.00 125,445.91 0.00 0.00 125,407.83 12.71 0.00 203.33 190.62 0.00 38.08 (38.08) 152.54 152.54 3130A7CV5 FHLB Note 1.375% Due 02/18/2021 03/10/2016 03/11/2016 200,000.00 199,312.69 0.00 0.00 199,350.27 1,245.14 1,375.00 99.31 229.17 37.58 0.00 37.58 266.75 266.75 313378WG2 FHLB Note 2.5% Due 03/11/2022 03/13/2018 03/14/2018 300,000.00 298,903.85 0.00 0.00 298,939.51 2,916.67 0.00 3,541.67 625.00 35.66 0.00 35.66 660.66 660.66 313379Q69 FHLB Note 2.125% Due 06/10/2022 06/20/2017 06/21/2017 200,000.00 201,363.24 0.00 0.00 201,322.76 602.08 0.00 956.25 354.17 0.00 40.48 (40.48) 313.69 313.69 313380FB8 FHLB Note 1.375% Due 09/13/2019 10/25/2017 10/26/2017 190,000.00 189,944.34 0.00 0.00 189,984.47 1,001.46 0.00 1,219.17 217.71 40.13 0.00 40.13 257.84 257.84 313383HU8 FHLB Note 1.75% Due 06/12/2020 10/14/2015 10/15/2015 130,000.00 130,405.01 0.00 0.00 130,365.28 309.65 0.00 499.24 189.59 0.00 39.73 (39.73) 149.86 149.86 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 14 3.A.3.a Packet Pg. 26 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Income Earned As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 313383YJ4 FHLB Note 3.375% Due 09/08/2023 12/27/2018 12/28/2018 200,000.00 204,920.92 0.00 0.00 204,819.15 2,681.25 0.00 3,243.75 562.50 0.00 101.77 (101.77) 460.73 460.73 3135G0A78 FNMA Note 1.625% Due 01/21/2020 12/10/2015 12/11/2015 245,000.00 245,017.21 0.00 0.00 245,014.13 110.59 0.00 442.36 331.77 0.00 3.08 (3.08) 328.69 328.69 3135G0N82 FNMA Note 1.25% Due 08/17/2021 01/26/2017 01/31/2017 315,000.00 310,308.08 0.00 0.00 310,502.79 1,793.75 1,968.75 153.13 328.13 194.71 0.00 194.71 522.84 522.84 3135G0T29 FNMA Note 1.5% Due 02/28/2020 08/28/2017 08/29/2017 205,000.00 205,023.69 0.00 0.00 205,020.21 1,306.88 1,537.50 25.63 256.25 0.00 3.48 (3.48) 252.77 252.77 3135G0T94 FNMA Note 2.375% Due 01/19/2023 10/17/2018 10/19/2018 290,000.00 283,467.65 0.00 0.00 283,627.48 229.58 0.00 803.54 573.96 159.83 0.00 159.83 733.79 733.79 3137EADK2 FHLMC Note Due 08/01/2019 08/28/2015 08/31/2015 0.00 170,000.00 0.00 170,000.00 0.00 1,062.50 1,062.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3137EADM8 FHLMC Note 1.25% Due 10/02/2019 09/24/2015 09/25/2015 155,000.00 154,976.50 0.00 0.00 154,988.25 640.45 0.00 801.91 161.46 11.75 0.00 11.75 173.21 173.21 3137EADR7 FHLMC Note 1.375% Due 05/01/2020 08/24/2016 08/25/2016 225,000.00 225,537.20 0.00 0.00 225,476.42 773.44 0.00 1,031.25 257.81 0.00 60.78 (60.78) 197.03 197.03 3137EAEE5 FHLMC Note 1.5% Due 01/17/2020 03/08/2017 03/09/2017 260,000.00 259,742.42 0.00 0.00 259,789.67 151.67 0.00 476.67 325.00 47.25 0.00 47.25 372.25 372.25 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 15 3.A.3.a Packet Pg. 27 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Income Earned As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 3137EAEF2 FHLMC Note 1.375% Due 04/20/2020 07/27/2017 07/28/2017 250,000.00 249,709.83 0.00 0.00 249,744.03 964.41 0.00 1,250.87 286.46 34.20 0.00 34.20 320.66 320.66 3137EAEK1 FHLMC Note 1.875% Due 11/17/2020 01/18/2018 01/19/2018 225,000.00 224,101.79 0.00 0.00 224,160.53 867.19 0.00 1,218.75 351.56 58.74 0.00 58.74 410.30 410.30 3137EAEN5 FHLMC Note 2.75% Due 06/19/2023 11/13/2018 11/14/2018 200,000.00 197,613.57 0.00 0.00 197,665.74 641.67 0.00 1,100.00 458.33 52.17 0.00 52.17 510.50 510.50 369550BE7 General Dynamics Corp Note 3% Due 05/11/2021 05/15/2018 05/18/2018 125,000.00 124,480.77 0.00 0.00 124,505.57 833.33 0.00 1,145.83 312.50 24.80 0.00 24.80 337.30 337.30 43815HAC1 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 08/22/2022 08/21/2018 08/28/2018 70,000.00 69,992.63 0.00 0.00 69,992.83 57.36 172.08 57.36 172.08 0.20 0.00 0.20 172.28 172.28 43815NAC8 HAROT 2019-3 A3 1.78% Due 08/15/2023 08/20/2019 08/27/2019 80,000.00 0.00 79,999.34 0.00 79,999.34 0.00 0.00 15.82 15.82 0.00 0.00 0.00 15.82 15.82 46625HKA7 JP Morgan Chase Callable Note Cont 12/23/2019 2.25% Due 01/23/2020 08/11/2017 08/16/2017 125,000.00 125,162.61 0.00 0.00 125,127.60 62.50 0.00 296.88 234.38 0.00 35.01 (35.01) 199.37 199.37 477870AC3 JDOT 2019-B A3 2.21% Due 12/15/2023 07/16/2019 07/24/2019 40,000.00 39,991.55 0.00 0.00 39,991.72 17.19 0.00 90.86 73.67 0.17 0.00 0.17 73.84 73.84 47788BAD6 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 07/26/2018 07/30/2018 70,317.64 75,616.31 0.00 6,079.94 69,626.21 61.80 115.87 56.88 110.95 89.84 0.00 89.84 200.79 200.79 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 16 3.A.3.a Packet Pg. 28 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Income Earned As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 47789JAB2 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 03/05/2019 03/13/2019 45,000.00 44,998.24 0.00 0.00 44,998.30 57.00 106.88 57.00 106.88 0.06 0.00 0.06 106.94 106.94 65478VAD9 NAROT 2016-B A3 1.32% Due 01/15/2021 02/12/2018 02/14/2018 16,528.15 20,839.48 0.00 4,395.10 16,465.82 3.07 23.02 2.42 22.37 21.44 0.00 21.44 43.81 43.81 65478WAE5 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 01/17/2023 04/16/2019 04/18/2019 130,000.00 128,301.71 0.00 0.00 128,367.03 79.73 149.50 79.73 149.50 65.32 0.00 65.32 214.82 214.82 68389XBK0 Oracle Corp Callable Note Cont 8/15/2021 1.9% Due 09/15/2021 10/12/2017 10/16/2017 200,000.00 199,163.22 0.00 0.00 199,196.65 1,435.56 0.00 1,752.22 316.66 33.43 0.00 33.43 350.09 350.09 808513AW5 Charles Schwab Corp Callable Note Cont 4/21/2021 3.25% Due 05/21/2021 05/30/2018 06/01/2018 150,000.00 150,602.77 0.00 0.00 150,573.06 947.92 0.00 1,354.17 406.25 0.00 29.71 (29.71) 376.54 376.54 857477AS2 State Street Bank Note 2.55% Due 08/18/2020 11/29/2016 12/02/2016 125,000.00 125,457.90 0.00 0.00 125,420.84 1,443.23 1,593.75 115.10 265.62 0.00 37.06 (37.06) 228.56 228.56 89236TDP7 Toyota Motor Credit Corp Note 2.6% Due 01/11/2022 01/28/2019 01/30/2019 130,000.00 128,862.62 0.00 0.00 128,902.06 187.78 0.00 469.44 281.66 39.44 0.00 39.44 321.10 321.10 89238BAB8 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 01/23/2018 01/31/2018 49,417.78 67,265.13 0.00 17,850.42 49,415.68 62.78 117.72 46.12 101.06 0.97 0.00 0.97 102.03 102.03 91159HHL7 US Bancorp Callable Note 1X 12/29/2020 2.35% Due 01/29/2021 05/02/2017 05/05/2017 125,000.00 125,391.64 0.00 0.00 125,368.11 16.32 0.00 261.11 244.79 0.00 23.53 (23.53) 221.26 221.26 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 17 3.A.3.a Packet Pg. 29 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Income Earned As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 9128284D9 US Treasury Note 2.5% Due 03/31/2023 Various Various 210,000.00 206,787.79 0.00 0.00 206,862.22 1,764.35 0.00 2,209.02 444.67 74.43 0.00 74.43 519.10 519.10 912828G53 US Treasury Note 1.875% Due 11/30/2021 04/26/2017 04/27/2017 220,000.00 220,332.00 0.00 0.00 220,319.92 698.77 0.00 1,048.16 349.39 0.00 12.08 (12.08) 337.31 337.31 912828L24 US Treasury Note 1.875% Due 08/31/2022 07/22/2019 07/23/2019 150,000.00 150,459.22 0.00 0.00 150,446.58 1,176.97 1,406.25 7.73 237.01 0.00 12.64 (12.64) 224.37 224.37 912828L32 US Treasury Note 1.375% Due 08/31/2020 11/03/2015 11/04/2015 200,000.00 199,615.63 0.00 0.00 199,645.72 1,150.82 1,375.00 7.55 231.73 30.09 0.00 30.09 261.82 261.82 912828M80 US Treasury Note 2% Due 11/30/2022 04/11/2019 04/15/2019 200,000.00 198,026.68 0.00 0.00 198,076.94 677.60 0.00 1,016.39 338.79 50.26 0.00 50.26 389.05 389.05 912828M98 US Treasury Note 1.625% Due 11/30/2020 Various Various 205,000.00 204,779.45 0.00 0.00 204,793.50 564.31 0.00 846.46 282.15 14.05 0.00 14.05 296.20 296.20 912828N89 US Treasury Note 1.375% Due 01/31/2021 04/04/2018 04/05/2018 160,000.00 157,606.10 0.00 0.00 157,741.28 5.98 0.00 191.30 185.32 135.18 0.00 135.18 320.50 320.50 912828Q78 US Treasury Note 1.375% Due 04/30/2021 05/25/2017 05/31/2017 210,000.00 208,997.51 0.00 0.00 209,046.22 729.72 0.00 972.96 243.24 48.71 0.00 48.71 291.95 291.95 912828S76 US Treasury Note 1.125% Due 07/31/2021 11/29/2017 11/30/2017 260,000.00 255,730.96 0.00 0.00 255,912.25 7.95 0.00 254.35 246.40 181.29 0.00 181.29 427.69 427.69 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 18 3.A.3.a Packet Pg. 30 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Income Earned As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 912828T34 US Treasury Note 1.125% Due 09/30/2021 05/30/2018 05/31/2018 125,000.00 121,229.66 0.00 0.00 121,377.42 472.59 0.00 591.70 119.11 147.76 0.00 147.76 266.87 266.87 912828UB4 US Treasury Note 1% Due 11/30/2019 10/26/2016 10/31/2016 125,000.00 124,980.61 0.00 0.00 124,985.58 211.75 0.00 317.62 105.87 4.97 0.00 4.97 110.84 110.84 912828UV0 US Treasury Note 1.125% Due 03/31/2020 11/17/2015 11/18/2015 195,000.00 194,398.97 0.00 0.00 194,475.64 737.24 0.00 923.05 185.81 76.67 0.00 76.67 262.48 262.48 912828W89 US Treasury Note 1.875% Due 03/31/2022 04/26/2018 04/27/2018 200,000.00 195,610.81 0.00 0.00 195,750.65 1,260.25 0.00 1,577.87 317.62 139.84 0.00 139.84 457.46 457.46 912828WN6 US Treasury Note 2% Due 05/31/2021 04/29/2019 04/30/2019 200,000.00 198,964.29 0.00 0.00 199,012.28 677.60 0.00 1,016.39 338.79 47.99 0.00 47.99 386.78 386.78 912828Y61 US Treasury Note 2.75% Due 07/31/2023 12/27/2018 12/28/2018 175,000.00 176,065.93 0.00 0.00 176,043.30 13.08 0.00 418.48 405.40 0.00 22.63 (22.63) 382.77 382.77 931142EJ8 Wal-Mart Stores Note 3.125% Due 06/23/2021 Various Various 200,000.00 200,595.16 0.00 0.00 200,568.49 659.72 0.00 1,180.56 520.84 0.00 26.67 (26.67) 494.17 494.17 Total Fixed Income 10,096,263.57 10,250,158.65 234,524.84 398,325.46 10,087,217.54 44,157.01 12,886.11 48,291.28 17,020.38 1,935.82 1,076.31 859.51 17,879.89 17,879.89 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 19 3.A.3.a Packet Pg. 31 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Income Earned As of August 31, 2019 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income CASH & EQUIVALENT 31846V203 First American Govt Obligation Fund Class Y 08/01/2019 08/01/2019 203,932.78 27,789.10 413,539.66 237,395.98 203,932.78 0.00 460.38 0.00 460.38 0.00 0.00 0.00 460.38 460.38 62479MXN8 MUFG Bank Ltd/NY Discount CP 2.27% Due 10/22/2019 06/20/2019 06/20/2019 200,000.00 198,965.89 0.00 0.00 199,356.83 0.00 0.00 0.00 0.00 390.94 0.00 390.94 390.94 390.94 89233GA71 Toyota Motor Credit Discount CP 2.14% Due 01/07/2020 07/22/2019 07/22/2019 200,000.00 198,109.67 0.00 0.00 198,478.22 0.00 0.00 0.00 0.00 368.55 0.00 368.55 368.55 368.55 Total Cash & Equivalent 603,932.78 424,864.66 413,539.66 237,395.98 601,767.83 0.00 460.38 0.00 460.38 759.49 0.00 759.49 1,219.87 1,219.87 TOTAL PORTFOLIO 10,700,196.35 10,675,023.31 648,064.50 635,721.44 10,688,985.37 44,157.01 13,346.49 48,291.28 17,480.76 2,695.31 1,076.31 1,619.00 19,099.76 19,099.76 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 20 3.A.3.a Packet Pg. 32 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 09/08/2019 Interest 313383YJ4 200,000.00 FHLB Note 3.375% Due 9/8/2023 0.00 3,375.00 3,375.00 09/11/2019 Interest 313378WG2 300,000.00 FHLB Note 2.5% Due 3/11/2022 0.00 3,750.00 3,750.00 09/11/2019 Maturity 06406HCW7 150,000.00 Bank of New York Callable Note Cont 8/11/2019 2.3% Due 9/11/2019 150,000.00 1,725.00 151,725.00 09/13/2019 Maturity 313380FB8 190,000.00 FHLB Note 1.375% Due 9/13/2019 190,000.00 1,306.25 191,306.25 09/15/2019 Interest 084670BR8 150,000.00 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 3/15/2023 0.00 2,062.50 2,062.50 09/15/2019 Interest 68389XBK0 200,000.00 Oracle Corp Callable Note Cont 8/15/2021 1.9% Due 9/15/2021 0.00 1,900.00 1,900.00 09/15/2019 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 4,811.93 86.48 4,898.41 09/15/2019 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 729.12 125.23 854.35 09/15/2019 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,556.38 106.88 1,663.26 09/15/2019 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 4,776.59 106.65 4,883.24 09/15/2019 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,917.89 149.50 5,067.39 09/15/2019 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 3,287.00 71.20 3,358.20 09/21/2019 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 4,923.44 172.08 5,095.52 09/24/2019 Interest 02665WAZ4 150,000.00 American Honda Finance Note 2.45% Due 9/24/2020 0.00 1,837.50 1,837.50 09/27/2019 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 958.65 18.18 976.83 09/30/2019 Interest 912828UV0 195,000.00 US Treasury Note 1.125% Due 3/31/2020 0.00 1,096.88 1,096.88 09/30/2019 Interest 9128284D9 210,000.00 US Treasury Note 2.5% Due 3/31/2023 0.00 2,625.00 2,625.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 21 3.A.3.a Packet Pg. 33 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 09/30/2019 Interest 912828T34 125,000.00 US Treasury Note 1.125% Due 9/30/2021 0.00 703.13 703.13 09/30/2019 Interest 912828W89 200,000.00 US Treasury Note 1.875% Due 3/31/2022 0.00 1,875.00 1,875.00 SEP 2019 365,961.00 23,092.46 389,053.46 10/02/2019 Maturity 3137EADM8 155,000.00 FHLMC Note 1.25% Due 10/2/2019 155,000.00 968.75 155,968.75 10/15/2019 Call 166764AN0 130,000.00 Chevron Corp Callable Note Cont 10/15/2019 2.193% Due 11/15/2019 130,000.00 1,187.88 131,187.88 10/15/2019 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 4,613.55 99.40 4,712.95 10/15/2019 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 730.64 72.32 802.96 10/15/2019 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,560.06 103.18 1,663.24 10/15/2019 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 4,617.02 78.06 4,695.08 10/15/2019 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 3,226.27 113.79 3,340.06 10/15/2019 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,924.39 143.84 5,068.23 10/20/2019 Interest 3137EAEF2 250,000.00 FHLMC Note 1.375% Due 4/20/2020 0.00 1,718.75 1,718.75 10/21/2019 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 4,762.22 159.98 4,922.20 10/22/2019 Maturity 62479MXN8 200,000.00 MUFG Bank Ltd/NY Discount CP 2.27% Due 10/22/2019 200,000.00 0.00 200,000.00 10/27/2019 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 960.33 17.13 977.46 10/31/2019 Interest 912828Q78 210,000.00 US Treasury Note 1.375% Due 4/30/2021 0.00 1,443.75 1,443.75 OCT 2019 510,394.48 6,106.83 516,501.31 11/01/2019 Interest 3137EADR7 225,000.00 FHLMC Note 1.375% Due 5/1/2020 0.00 1,546.88 1,546.88 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 22 3.A.3.a Packet Pg. 34 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 11/03/2019 Interest 037833AK6 200,000.00 Apple Inc Note 2.4% Due 5/3/2023 0.00 2,400.00 2,400.00 11/11/2019 Interest 369550BE7 125,000.00 General Dynamics Corp Note 3% Due 5/11/2021 0.00 1,875.00 1,875.00 11/15/2019 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 732.16 70.98 803.14 11/15/2019 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,563.76 99.47 1,663.23 11/15/2019 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 3,165.38 109.01 3,274.39 11/15/2019 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 4,450.16 92.41 4,542.57 11/15/2019 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,930.90 138.18 5,069.08 11/15/2019 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 4,421.53 69.98 4,491.51 11/17/2019 Interest 3137EAEK1 225,000.00 FHLMC Note 1.875% Due 11/17/2020 0.00 2,109.38 2,109.38 11/21/2019 Interest 808513AW5 150,000.00 Charles Schwab Corp Callable Note Cont 4/21/2021 3.25% Due 5/21/2021 0.00 2,437.50 2,437.50 11/21/2019 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 4,600.40 148.27 4,748.67 11/27/2019 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 962.02 16.07 978.09 11/30/2019 Interest 912828WN6 200,000.00 US Treasury Note 2% Due 5/31/2021 0.00 2,000.00 2,000.00 11/30/2019 Interest 912828M98 205,000.00 US Treasury Note 1.625% Due 11/30/2020 0.00 1,665.63 1,665.63 11/30/2019 Interest 912828G53 220,000.00 US Treasury Note 1.875% Due 11/30/2021 0.00 2,062.50 2,062.50 11/30/2019 Interest 912828M80 200,000.00 US Treasury Note 2% Due 11/30/2022 0.00 2,000.00 2,000.00 11/30/2019 Maturity 912828UB4 125,000.00 US Treasury Note 1% Due 11/30/2019 125,000.00 625.00 125,625.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 23 3.A.3.a Packet Pg. 35 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount NOV 2019 149,826.31 19,466.26 169,292.57 12/08/2019 Interest 3130A0F70 220,000.00 FHLB Note 3.375% Due 12/8/2023 0.00 3,712.50 3,712.50 12/10/2019 Interest 313379Q69 200,000.00 FHLB Note 2.125% Due 6/10/2022 0.00 2,125.00 2,125.00 12/11/2019 Interest 3130A3UQ5 225,000.00 FHLB Note 1.875% Due 12/11/2020 0.00 2,109.38 2,109.38 12/12/2019 Interest 313383HU8 130,000.00 FHLB Note 1.75% Due 6/12/2020 0.00 1,137.50 1,137.50 12/14/2019 Interest 3130A1XJ2 210,000.00 FHLB Note 2.875% Due 6/14/2024 0.00 3,018.76 3,018.76 12/15/2019 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 3,104.35 104.31 3,208.66 12/15/2019 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 4,286.45 85.66 4,372.11 12/15/2019 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 4,225.46 62.24 4,287.70 12/15/2019 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 733.68 69.63 803.31 12/15/2019 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,567.46 95.76 1,663.22 12/15/2019 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,937.41 132.51 5,069.92 12/19/2019 Interest 3137EAEN5 200,000.00 FHLMC Note 2.75% Due 6/19/2023 0.00 2,750.00 2,750.00 12/21/2019 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 4,437.98 136.96 4,574.94 12/23/2019 Call 46625HKA7 125,000.00 JP Morgan Chase Callable Note Cont 12/23/2019 2.25% Due 1/23/2020 125,000.00 1,171.88 126,171.88 12/23/2019 Interest 931142EJ8 200,000.00 Wal-Mart Stores Note 3.125% Due 6/23/2021 0.00 3,125.00 3,125.00 12/27/2019 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 963.71 15.01 978.72 DEC 2019 149,256.50 19,852.10 169,108.60 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 24 3.A.3.a Packet Pg. 36 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 01/07/2020 Maturity 89233GA71 200,000.00 Toyota Motor Credit Discount CP 2.14% Due 1/7/2020 200,000.00 0.00 200,000.00 01/10/2020 Interest 24422EUR8 150,000.00 John Deere Capital Corp Note 3.45% Due 1/10/2024 0.00 2,587.50 2,587.50 01/11/2020 Interest 89236TDP7 130,000.00 Toyota Motor Credit Corp Note 2.6% Due 1/11/2022 0.00 1,690.00 1,690.00 01/11/2020 Interest 06051GEU9 130,000.00 Bank of America Corp Note 3.3% Due 1/11/2023 0.00 2,145.00 2,145.00 01/15/2020 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 4,122.39 79.16 4,201.55 01/15/2020 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 735.21 68.28 803.49 01/15/2020 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 3,043.17 99.71 3,142.88 01/15/2020 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,943.94 126.83 5,070.77 01/15/2020 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 4,028.80 54.85 4,083.65 01/15/2020 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,571.16 92.04 1,663.20 01/17/2020 Maturity 3137EAEE5 260,000.00 FHLMC Note 1.5% Due 1/17/2020 260,000.00 1,950.00 261,950.00 01/19/2020 Interest 3135G0T94 290,000.00 FNMA Note 2.375% Due 1/19/2023 0.00 3,443.75 3,443.75 01/21/2020 Maturity 3135G0A78 245,000.00 FNMA Note 1.625% Due 1/21/2020 245,000.00 1,990.63 246,990.63 01/21/2020 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 4,274.96 126.05 4,401.01 01/27/2020 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 965.41 13.95 979.36 01/29/2020 Interest 91159HHL7 125,000.00 US Bancorp Callable Note 1X 12/29/2020 2.35% Due 1/29/2021 0.00 1,468.75 1,468.75 01/29/2020 Interest 3130A5Z77 125,000.00 FHLB Note 1.83% Due 7/29/2020 0.00 1,143.75 1,143.75 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 25 3.A.3.a Packet Pg. 37 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 01/31/2020 Interest 912828Y61 175,000.00 US Treasury Note 2.75% Due 7/31/2023 0.00 2,406.25 2,406.25 01/31/2020 Interest 912828N89 160,000.00 US Treasury Note 1.375% Due 1/31/2021 0.00 1,100.00 1,100.00 01/31/2020 Interest 912828S76 260,000.00 US Treasury Note 1.125% Due 7/31/2021 0.00 1,462.50 1,462.50 JAN 2020 728,685.04 22,049.00 750,734.04 02/15/2020 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 736.75 66.92 803.67 02/15/2020 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,574.88 88.31 1,663.19 02/15/2020 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 3,958.00 72.90 4,030.90 02/15/2020 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,950.47 121.15 5,071.62 02/15/2020 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 3,831.57 47.80 3,879.37 02/15/2020 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 2,981.85 95.19 3,077.04 02/17/2020 Interest 3135G0N82 315,000.00 FNMA Note 1.25% Due 8/17/2021 0.00 1,968.75 1,968.75 02/18/2020 Interest 3130A7CV5 200,000.00 FHLB Note 1.375% Due 2/18/2021 0.00 1,375.00 1,375.00 02/18/2020 Interest 857477AS2 125,000.00 State Street Bank Note 2.55% Due 8/18/2020 0.00 1,593.75 1,593.75 02/21/2020 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 4,111.33 115.54 4,226.87 02/27/2020 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 967.10 12.89 979.99 02/28/2020 Interest 17275RBD3 150,000.00 Cisco Systems Note 2.2% Due 2/28/2021 0.00 1,650.00 1,650.00 02/28/2020 Maturity 3135G0T29 205,000.00 FNMA Note 1.5% Due 2/28/2020 205,000.00 1,537.50 206,537.50 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 26 3.A.3.a Packet Pg. 38 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 02/29/2020 Interest 912828L24 150,000.00 US Treasury Note 1.875% Due 8/31/2022 0.00 1,406.25 1,406.25 02/29/2020 Interest 912828L32 200,000.00 US Treasury Note 1.375% Due 8/31/2020 0.00 1,375.00 1,375.00 FEB 2020 228,111.95 11,526.95 239,638.90 03/08/2020 Interest 313383YJ4 200,000.00 FHLB Note 3.375% Due 9/8/2023 0.00 3,375.00 3,375.00 03/11/2020 Interest 313378WG2 300,000.00 FHLB Note 2.5% Due 3/11/2022 0.00 3,750.00 3,750.00 03/15/2020 Interest 084670BR8 150,000.00 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 3/15/2023 0.00 2,062.50 2,062.50 03/15/2020 Interest 68389XBK0 200,000.00 Oracle Corp Callable Note Cont 8/15/2021 1.9% Due 9/15/2021 0.00 1,900.00 1,900.00 03/15/2020 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 3,633.75 41.09 3,674.84 03/15/2020 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 2,920.37 90.77 3,011.14 03/15/2020 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 738.28 65.57 803.85 03/15/2020 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,957.02 115.45 5,072.47 03/15/2020 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 3,793.27 66.90 3,860.17 03/15/2020 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,578.62 84.56 1,663.18 03/21/2020 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 3,947.08 105.44 4,052.52 03/24/2020 Interest 02665WAZ4 150,000.00 American Honda Finance Note 2.45% Due 9/24/2020 0.00 1,837.50 1,837.50 03/27/2020 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 968.80 11.83 980.63 03/31/2020 Interest 912828W89 200,000.00 US Treasury Note 1.875% Due 3/31/2022 0.00 1,875.00 1,875.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 27 3.A.3.a Packet Pg. 39 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 03/31/2020 Interest 9128284D9 210,000.00 US Treasury Note 2.5% Due 3/31/2023 0.00 2,625.00 2,625.00 03/31/2020 Interest 912828T34 125,000.00 US Treasury Note 1.125% Due 9/30/2021 0.00 703.13 703.13 03/31/2020 Maturity 912828UV0 195,000.00 US Treasury Note 1.125% Due 3/31/2020 195,000.00 1,096.88 196,096.88 MAR 2020 217,537.19 19,806.62 237,343.81 04/15/2020 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 2,858.75 86.44 2,945.19 04/15/2020 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 3,435.34 34.73 3,470.07 04/15/2020 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 3,628.19 61.15 3,689.34 04/15/2020 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,963.57 109.75 5,073.32 04/15/2020 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 739.81 64.21 804.02 04/15/2020 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,582.34 80.82 1,663.16 04/20/2020 Maturity 3137EAEF2 250,000.00 FHLMC Note 1.375% Due 4/20/2020 250,000.00 1,718.75 251,718.75 04/21/2020 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 3,782.24 95.73 3,877.97 04/27/2020 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 970.50 10.76 981.26 04/30/2020 Interest 912828Q78 210,000.00 US Treasury Note 1.375% Due 4/30/2021 0.00 1,443.75 1,443.75 APR 2020 271,960.74 3,706.09 275,666.83 05/01/2020 Maturity 3137EADR7 225,000.00 FHLMC Note 1.375% Due 5/1/2020 225,000.00 1,546.88 226,546.88 05/03/2020 Interest 037833AK6 200,000.00 Apple Inc Note 2.4% Due 5/3/2023 0.00 2,400.00 2,400.00 05/11/2020 Interest 369550BE7 125,000.00 General Dynamics Corp Note 3% Due 5/11/2021 0.00 1,875.00 1,875.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 28 3.A.3.a Packet Pg. 40 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 05/15/2020 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 741.35 62.85 804.20 05/15/2020 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 3,462.78 55.65 3,518.43 05/15/2020 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 2,796.97 82.20 2,879.17 05/15/2020 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,970.12 104.05 5,074.17 05/15/2020 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 3,236.34 28.72 3,265.06 05/15/2020 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,586.09 77.06 1,663.15 05/17/2020 Interest 3137EAEK1 225,000.00 FHLMC Note 1.875% Due 11/17/2020 0.00 2,109.38 2,109.38 05/21/2020 Interest 808513AW5 150,000.00 Charles Schwab Corp Callable Note Cont 4/21/2021 3.25% Due 5/21/2021 0.00 2,437.50 2,437.50 05/21/2020 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 3,616.77 86.44 3,703.21 05/27/2020 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 972.21 9.69 981.90 05/31/2020 Interest 912828WN6 200,000.00 US Treasury Note 2% Due 5/31/2021 0.00 2,000.00 2,000.00 05/31/2020 Interest 912828G53 220,000.00 US Treasury Note 1.875% Due 11/30/2021 0.00 2,062.50 2,062.50 05/31/2020 Interest 912828M98 205,000.00 US Treasury Note 1.625% Due 11/30/2020 0.00 1,665.63 1,665.63 05/31/2020 Interest 912828M80 200,000.00 US Treasury Note 2% Due 11/30/2022 0.00 2,000.00 2,000.00 MAY 2020 246,382.63 18,603.55 264,986.18 06/08/2020 Interest 3130A0F70 220,000.00 FHLB Note 3.375% Due 12/8/2023 0.00 3,712.50 3,712.50 06/10/2020 Interest 313379Q69 200,000.00 FHLB Note 2.125% Due 6/10/2022 0.00 2,125.00 2,125.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 29 3.A.3.a Packet Pg. 41 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 06/11/2020 Interest 3130A3UQ5 225,000.00 FHLB Note 1.875% Due 12/11/2020 0.00 2,109.38 2,109.38 06/12/2020 Maturity 313383HU8 130,000.00 FHLB Note 1.75% Due 6/12/2020 130,000.00 1,137.50 131,137.50 06/14/2020 Interest 3130A1XJ2 210,000.00 FHLB Note 2.875% Due 6/14/2024 0.00 3,018.76 3,018.76 06/15/2020 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 2,735.05 78.05 2,813.10 06/15/2020 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 742.90 61.48 804.38 06/15/2020 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,589.85 73.29 1,663.14 06/15/2020 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 3,297.03 50.39 3,347.42 06/15/2020 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,976.70 98.33 5,075.03 06/15/2020 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 3,036.75 23.06 3,059.81 06/19/2020 Interest 3137EAEN5 200,000.00 FHLMC Note 2.75% Due 6/19/2023 0.00 2,750.00 2,750.00 06/21/2020 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 3,450.70 77.54 3,528.24 06/23/2020 Interest 931142EJ8 200,000.00 Wal-Mart Stores Note 3.125% Due 6/23/2021 0.00 3,125.00 3,125.00 06/27/2020 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 973.92 8.62 982.54 JUN 2020 150,802.90 18,448.90 169,251.80 07/10/2020 Interest 24422EUR8 150,000.00 John Deere Capital Corp Note 3.45% Due 1/10/2024 0.00 2,587.50 2,587.50 07/11/2020 Interest 06051GEU9 130,000.00 Bank of America Corp Note 3.3% Due 1/11/2023 0.00 2,145.00 2,145.00 07/11/2020 Interest 89236TDP7 130,000.00 Toyota Motor Credit Corp Note 2.6% Due 1/11/2022 0.00 1,690.00 1,690.00 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 30 3.A.3.a Packet Pg. 42 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 07/15/2020 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 744.45 60.11 804.56 07/15/2020 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,983.27 92.61 5,075.88 07/15/2020 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 3,130.94 45.39 3,176.33 07/15/2020 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,593.62 69.51 1,663.13 07/15/2020 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 2,672.97 73.99 2,746.96 07/15/2020 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 2,836.58 17.74 2,854.32 07/19/2020 Interest 3135G0T94 290,000.00 FNMA Note 2.375% Due 1/19/2023 0.00 3,443.75 3,443.75 07/21/2020 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 3,284.01 69.06 3,353.07 07/27/2020 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 975.63 7.55 983.18 07/29/2020 Interest 91159HHL7 125,000.00 US Bancorp Callable Note 1X 12/29/2020 2.35% Due 1/29/2021 0.00 1,468.75 1,468.75 07/29/2020 Maturity 3130A5Z77 125,000.00 FHLB Note 1.83% Due 7/29/2020 125,000.00 1,143.75 126,143.75 07/31/2020 Interest 912828N89 160,000.00 US Treasury Note 1.375% Due 1/31/2021 0.00 1,100.00 1,100.00 07/31/2020 Interest 912828S76 260,000.00 US Treasury Note 1.125% Due 7/31/2021 0.00 1,462.50 1,462.50 07/31/2020 Interest 912828Y61 175,000.00 US Treasury Note 2.75% Due 7/31/2023 0.00 2,406.25 2,406.25 JUL 2020 145,221.47 17,883.46 163,104.93 08/15/2020 Paydown 43815NAC8 80,000.00 HAROT 2019-3 A3 1.78% Due 8/15/2023 2,610.75 70.02 2,680.77 08/15/2020 Paydown 89238BAB8 49,417.78 Toyota Auto Receivables Owner 2018-A A2A 2.1% Due 10/15/2020 2,635.80 12.78 2,648.58 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 31 3.A.3.a Packet Pg. 43 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Cash Flow Report As of August 31, 2019 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 08/15/2020 Paydown 47788BAD6 70,317.64 John Deere Owner Trust 2017-B A3 1.82% Due 10/15/2021 2,964.50 40.64 3,005.14 08/15/2020 Paydown 65478WAE5 130,000.00 Nissan Auto Receivables Owner 2016-C A4 1.38% Due 1/17/2023 4,989.86 86.88 5,076.74 08/15/2020 Paydown 477870AC3 40,000.00 JDOT 2019-B A3 2.21% Due 12/15/2023 746.00 58.74 804.74 08/15/2020 Paydown 47789JAB2 45,000.00 John Deere Owner Trust 2019-A A2 2.85% Due 12/15/2021 1,597.38 65.73 1,663.11 08/17/2020 Interest 3135G0N82 315,000.00 FNMA Note 1.25% Due 8/17/2021 0.00 1,968.75 1,968.75 08/18/2020 Interest 3130A7CV5 200,000.00 FHLB Note 1.375% Due 2/18/2021 0.00 1,375.00 1,375.00 08/18/2020 Maturity 857477AS2 125,000.00 State Street Bank Note 2.55% Due 8/18/2020 125,000.00 1,593.75 126,593.75 08/21/2020 Paydown 43815HAC1 70,000.00 Honda Auto Receivables Owner 2018-3 A3 2.95% Due 8/22/2022 3,116.70 60.99 3,177.69 08/27/2020 Paydown 65478VAD9 16,528.15 NAROT 2016-B A3 1.32% Due 1/15/2021 977.34 6.48 983.82 08/28/2020 Interest 17275RBD3 150,000.00 Cisco Systems Note 2.2% Due 2/28/2021 0.00 1,650.00 1,650.00 AUG 2020 144,638.33 6,989.76 151,628.09 TOTAL 3,308,778.54 187,531.98 3,496,310.52 Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 32 3.A.3.a Packet Pg. 44 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Important DisclosuresCity of San Jacinto Account #10167 Chandler Asset Management, Inc. ;͞Chandler͟Ϳis an SEC registered investment adviser. For additional information about our firm, please see our current disclosures (Form ADV). To obtain a copy of our current disclosures, you may contact your client service representative by calling the number on the front of this statement or you may visit our website at www.chandlerasset.com. Information contained in this monthly statement is confidential and is provided for informational purposes only and should not be construed as specific investment or legal advice. The information contained herein was obtained from sources believed to be reliable as of the date of this statement, but may become outdated or superseded at any time without notice. Custody: Your qualified custodian bank maintains control of all assets reflected in this statement and we urge you to compare this statement to the one you receive from your qualified custodian. Chandler does not have any authority to withdraw or deposit funds from/to the custodian account. Valuation: Prices are provided by IDC, an independent pricing source. In the event IDC does not provide a price or if the price provided is not reflective of fair market value, Chandler will obtain pricing from an alternative approved third party pricing source in accordance with our written valuation policy and procedures. Our valuation procedures are also disclosed in Item 5 of our Form ADV Part 2A. Performance: Performance results are presented gross-of-advisory fees and represent the client ͛s Total Return. The deduction of advisory fees lowers performance results. These results include the reinvestment of dividends and other earnings. Past performance may not be indicative of future results. Therefore, clients should not assume that future performance of any specific investment or investment strategy will be profitable or equal to past performance levels. All investment strategies have the potential for profit or loss. Economic factors, market conditions or changes in investment strategies, contributions or withdrawals may materially alter the performance and results of your portfolio. Source ice Data Indices, LLC ("ICE"), used with permission. ICE PERMITS USE OF THE ICE INDICES AND RELATED DATA ON AN "AS IS" BASIS; ICE, ITS AFFILIATES AND THEIR RESPECTIVE THIRD PARTY SUPPLIERS DISCLAIM ANY AND ALL WARRANTIES AND REPRESENTATIONS, EXPRESS AND/OR IMPLIED, INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR USE, INCLUDING THE INDICES, INDEX DATA AND ANY DATA INCLUDED IN, RELATED TO, OR DERIVED THEREFROM. NEITHER ICE DATA, ITS AFFILIATES OR THEIR RESPECTIVE THIRD PARTY PROVIDERS GUARANTEE THE QUALITY, ADEQUACY, ACCURACY, TIMELINESS OR COMPLETENESS OF THE INDICES OR THE INDEX DATA OR ANY COMPONENT THEREOF, AND THE INDICES AND INDEX DATA AND ALL COMPONENTS THEREOF ARE PROVIDED ON AN "AS IS" BASIS AND LICENSEE'S USE IS AT LICENSEE'S OWN RISK. ICE DATA, ITS AFFILIATES AND THEIR RESPECTIVE THIRD PARTY DO NOT SPONSOR, ENDORSE, OR RECOMMEND CHANDLER, OR ANY OF ITS PRODUCTS OR SERVICES. Index returns assume reinvestment of all distributions. Historical performance results for investment indexes generally do not reflect the deduction of transaction and/or custodial charges or the deduction of an investment management fee, the incurrence of which would have the effect of decreasing historical performance results. It is not possible to invest directly in an index. Ratings: Ratings information have been provided by Moody͛s, S&P and Fitch through data feeds we believe to be reliable as of the date of this statement, however we cannot guarantee its accuracy. Security level ratings for U.S. Agency issued mortgage-backed securities ;͞MBS͟Ϳreflect the issuer rating because the securities themselves are not rated. The issuing U.S. Agency guarantees the full and timely payment of both principal and interest and carries a AA+/Aaa/AAA by S&P, Moody ͛s and Fitch respectively. Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 33 3.A.3.a Packet Pg. 45 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Benchmark Index & DisclosuresCity of San Jacinto California Account #10167 Benchmark Index Disclosure ICE BAML 1-3 Yr US Treasury Index The ICE BAML 1-3 Year US Treasury Index tracks the performance of US dollar denominated sovereign debt publicly issued by the US government in its domestic market. Qualifying securities must have at least one year remaining term to final maturity and less than three years remaining term to final maturity, a fixed coupon schedule and a minimum amount outstanding of $1 billion. Qualifying securities must have at least 18 months to final maturity at the time of issuance. (Index: G1O2. Please visit www.mlindex.ml.com for more information) ICE BAML 1-3 Yr US Corp/Govt Rated AAA-A Index The ICE BAML 1-3 AAA-A Year US Corporate & Government Index tracks the performance of US dollar denominated investment grade debt publicly issued in the US domestic market, including US Treasury, US agency, foreign government, supranational and corporate securities. Qualifying securities must be rated AAA through A3 (based on an average of Moody͛s, S&P and Fitch). In addition, qualifying securities must have at least one year remaining term to final maturity and less than three years remaining term to final maturity, at least 18 months to final maturity at point of issuance, a fixed coupon schedule and a minimum amount outstanding of $1 billion for US Treasuries and $250 million for all other securities. (Index: GVPB. Please visit www.mlindex.ml.com for more information) Execution Time: 9/3/2019 9:45:31 PMChandler Asset Management - CONFIDENTIAL Page 34 3.A.3.a Packet Pg. 46 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) City of San Jacinto Public Trust Advisors LLC 595 S. San Jacinto Ave.550 South Hope Street San Jacinto, CA 92583 Suite 560 Los Angeles, CA 90071 Monthly Investment Report for Period Ended August 31, 2019 3.A.3.a Packet Pg. 47 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Investment Management Portfolio Review Page Investment Portfolio Summary Comparison 3 Total Return Performance Summary 4 Investment Portfolio Maturity Distribution 5 Investment Portfolio Maturity Distribution By Security Type 6 Investment Portfolio Rating Distribution 7 Investment Portfolio Security Distribution - Market Value 8 Investment Portfolio Security Distribution - Historical Cost 9 Investment Portfolio Compliance 10 Additional Disclosure 11 Portfolio Holdings Detail 12 City of San Jacinto Summary 3.A.3.a Packet Pg. 48 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) City of San Jacinto August 1, 2019 Beginning Balance August 31, 2019 Ending Balance Portfolio Characteristic August 1, 2019 Beginning Balance August 31, 2019 Ending Balance Historical Cost 10,583,342.80$ 10,604,985.75$ Book Yield Gross 2.39%2.33% Book Value 10,594,725.41$ 10,616,853.21$ Market Yield Gross 1.99%1.62% Accrued Interest 57,632.33 53,964.97 Weighted Average Coupon 2.25%2.22% Book Value Plus Accrued 10,652,357.74$ 10,670,818.18$ Duration 1.79 Years 1.85 Years Net Unrealized Gain/Loss 88,737.68 149,570.20 Weighted Effective Maturity 1.85 Years 1.90 Years Market Value Plus Accrued(2)10,741,095.42$ 10,820,388.38$ Weighted Final Maturity 1.85 Years 1.91 Years Net Pending Transactions 37.37 7,558.47 Market Value Plus Accrued Net(2)10,741,132.79$ 10,827,946.85$ City of San Jacinto August 2019 Net Income Portfolio Compliance Compliant Interest Income 20,131.30$ Security Distribution YES Net Amortization/Accretion 1,126.97 Maturity Distribution YES Net Realized Gain/Loss(3)4,827.44 Rating Distribution YES Miscellaneous Income - Net Income 26,085.71$ City of San Jacinto Summary Comparison for the period August 1, 2019 to August 31, 2019 (1) Payables represent amounts due to settle security transactions that have been executed but have not settled as of period end. The funds used to settle these trades may come from a variety of sources including cash within the portfolio, proceeds from future security transactions including maturities and sales, or other sources including money market funds. For reporting purposes, a payable is created for over-period settlements which are reflected in the detailed holdings. (2) Market Value Plus Accrued Net represents the market value of the portfolio net payables and recievables from transactions that settle in the following reporting period. (3) MBS paydowns may result in negative realized losses rather than amortization in as a result of accounting method. Page 3 3.A.3.a Packet Pg. 49 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Trailing Month Trailing 3 Months Trailing 12 Months Year to Date Total Return Performance Periodic Periodic Periodic Periodic City of San Jacinto 0.81%1.23%4.35%3.26% BofA ML 1-3 Year U.S. Treasuries 0.81%1.21%4.35%3.14% Trailing 3 Years Trailing 5 Years Since Inception* Total Return Performance Annualized Annualized Annualized City of San Jacinto 1.72%1.41%1.21% BofA ML 1-3 Year U.S. Treasuries 1.60%1.33%1.12% *Total return since inception date: December 1, 2012 Annualized total return performance presented for investment periods longer than one year. Return information obtained from Bloomberg. City of San Jacinto Total Return August 1, 2019 to August 31, 2019 0.81% 1.23% 4.35% 3.26% 1.72% 1.21% 0.81% 1.21% 4.35% 3.14% 1.60% 1.12% 0.00% 0.50% 1.00% 1.50% 2.00% 2.50% 3.00% 3.50% 4.00% 4.50% 5.00% Trailing Month Trailing 3 Months Trailing 12 Months Year to Date Trailing 3 Years Trailing 5 Years Since Inception*YieldTotal Return Performance vs. Benchmark City of San Jacinto BofA ML 1-3 Year U.S. Treasuries Page 4 3.A.3.a Packet Pg. 50 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Maturity Distribution August 1, 2019 Beginning Balance August 31, 2019 Ending Balance Portfolio Allocation Distribution Change 0-3 Months 325,153.14$ 440,088.41$ 4.07%1.04% 3-6 Months 499,814.51 450,348.96 4.16%-0.49% 6-9 Months 452,850.12 679,773.10 6.28%2.07% 9-12 Months 779,121.68 76,008.03 0.70%-6.55% 1-2 Years 3,583,600.21 3,856,250.80 35.64%2.28% 2-3 Years 4,400,315.50 4,395,028.13 40.62%-0.35% 3-4 Years 700,240.26 922,890.95 8.53%2.01% 4-5 Years - - 0.00%0.00% 5-6 Years - - 0.00%0.00% 6 Years +- - 0.00%0.00% Total Portfolio 10,741,095.42$ 10,820,388.38$ 100.00% City of San Jacinto Maturity Distribution Market Value Basis August 1, 2019 to August 31, 2019 $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 $4,500,000 $5,000,000 0-3 M 3-6 M 6-9 M 9-12 M 1-2 Yr 2-3 Yr 3-4 Yr 4-5 Yr 5-6 Yr 6 Yr + Maturity Distribution Comparison August 1, 2019 August 31, 2019 0-3 M 4.07% 3-6 M 4.16% 6-9 M 6.28% 9-12 M 0.70% 1-2 Yr 35.64% 2-3 Yr 40.62% 3-4 Yr 8.53% Maturity Distribution Page 5 3.A.3.a Packet Pg. 51 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Security Distribution 0-3 Months 3-6 Months 6-9 Months 9-12 Months 1-2 Years 2-3 Years 3-4 Years 4-5 Years Total Portfolio Cash -$ -$ -$ -$ -$ -$ -$ -$ -$ Money Market Funds 17,703 - - - - - - - 17,703 Certificates of Deposit - - - - - - - - - Commercial Paper - - - - - - - - - U.S. Treasury Notes - - - - 3,324,883 3,676,279 922,891 - 7,924,053 U.S. Agency Notes - - - - - - - - - Federal Inst. (GSE)*- - - - 531,368 461,251 - - 992,619 Corporate Notes 221,575 450,349 679,773 76,008 - 257,499 - - 1,685,204 Asset Backed (ABS)200,811 - - - - - - - 200,811 Municipal Bonds - - - - - - - - - Total 440,088$ 450,349$ 679,773$ 76,008$ 3,856,251$ 4,395,028$ 922,891$ -$ 10,820,388$ *Mortgage backed securities shown to effective maturity. City of San Jacinto Maturity Distribution Market Value Basis as of August 31, 2019 $- $5,000,000 0-3 Months 3-6 Months 6-9 Months 9-12 Months 1-2 Years 2-3 Years 3-4 Years 4-5 Years Maturity Distribution By Type Municipal Bonds Asset Backed (ABS) Corporate Notes Federal Inst. (GSE)* U.S. Agency Notes U.S. Treasury Notes Commercial Paper Certificates of Deposit Money Market Funds Cash Page 6 3.A.3.a Packet Pg. 52 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) S&P Rating Distribution August 31, 2019 Ending Balance Portfolio Allocation Short Term Rating Distribution A-1+-$ 0.00% A-1 - 0.00% A-2 - 0.00% Total Short Term Ratings -$ 0.00% Long Term Rating Distribution AAA Rating 368,597.50$ 3.41% AA Rating 9,283,879.18 85.80% A Rating 1,167,911.70 10.79% Below A - 0.00% Not Rated - 0.00% Total Long Term Rating 10,820,388.38$ 100.00% Total Portfolio 10,820,388.38$ 100.00% Moody's Rating Distribution August 31, 2019 Ending Balance Portfolio Allocation Short Term Rating Distribution P-1 -$ 0.00% P-2 - 0.00% Total Short Term Ratings -$ 0.00% Long Term Rating Distribution Aaa Rating 9,360,805.25$ 86.51% Aa Rating 291,671.43 2.70% A Rating 1,167,911.70 10.79% Below A - 0.00% Not Rated - 0.00% Total Long Term Rating 10,820,388.38$ 100.00% Total Portfolio 10,820,388.38$ 100.00% City of San Jacinto Rating Distribution Market Value Basis as of August 31, 2019 AAA Rating 3.41% AA Rating 85.80% A Rating 10.79% Portfolio Allocation By Standard and Poors' Rating Aaa Rating 86.51% Aa Rating 2.70% A Rating 10.79% Portfolio Allocation By Moody's Rating Page 7 3.A.3.a Packet Pg. 53 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Security Distribution August 1, 2019 Beginning Balance Portfolio Allocation August 31, 2019 Ending Balance Book Yield Portfolio Allocation Change in Allocation Permitted by Policy*Compliant Cash -$ 0.00%-$ 0.00%0.00%0.00%YES LGIP - 0.00%- 0.00%0.00%0.00%YES U.S. Treasury Notes 7,513,898.18 69.95%7,924,052.86 2.34%73.23%3.28%NO U.S. Agency Notes - 0.00%- 0.00%0.00%0.00%YES FNMA 132,246.27 1.23%133,775.39 2.65%1.24%0.01%NO FHLMC 857,913.19 7.99%858,843.13 2.59%7.94%-0.05%NO FFCB - 0.00%- 0.00%0.00%0.00%YES FHLB - 0.00%- 0.00%0.00%0.00%YES Fed Instrumentality Subtotal 990,159.46$ 9.22%992,618.52$ 2.59%9.17%-0.04%NO Asset Backed Securities 200,377.60 1.87%200,810.55 2.87%1.86%-0.01%NO Commercial Paper - 0.00%- 0.00%0.00%0.00%YES Corporate Notes 2,008,005.06 18.69%1,685,203.78 2.11%15.57%-3.12%NO Bankers Acceptances - 0.00%- 0.00%0.00%0.00%YES Money Market Funds 28,655.12 0.27%17,702.68 1.72%0.16%-0.10%YES Municipal Bonds - 0.00%- 0.00%0.00%0.00%YES Intergovernmental Funds - 0.00%- 0.00%0.00%0.00%YES Certificates of Deposit - 0.00%- 0.00%0.00%0.00%YES Total Portfolio Market Value 10,741,095.42$ 100.00%10,820,388.38$ 2.33%100.00% *Permitted allocation based on aggregate assets as defined within the investment policy. City of San Jacinto Market Value Basis Security Distribution August 1, 2019 to August 31, 2019 $- $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 CashLGIPUSTAgencyFNMAFHLMCFFCBFHLBABSCPCorpBAMMFMuniInter GovCDAsset Balance By Security Type (in millions) August 1, 2019 August 31, 2019 UST 73.23% FNMA 1.24% FHLMC 7.94% ABS 1.86% Corp 15.57% MMF 0.16% Ending Portfolio Allocation Page 8 3.A.3.a Packet Pg. 54 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Security Distribution August 1, 2019 Beginning Balance Portfolio Allocation August 31, 2019 Ending Balance Book Yield Portfolio Allocation Change in Allocation Permitted by Policy*Compliant Cash -$ 0.00%-$ 0.00%0.00%0.00%YES U.S. Treasury Notes 7,392,997.69 69.86%7,750,415.08 2.34%73.08%3.23%NO U.S. Agency Notes - 0.00%- 0.00%0.00%0.00%YES FNMA 129,906.40 1.23%129,906.40 2.65%1.22%0.00%NO FHLMC 841,495.50 7.95%841,495.50 2.59%7.93%-0.02%NO FFCB - 0.00%- 0.00%0.00%0.00%YES FHLB - 0.00%- 0.00%0.00%0.00%YES Fed Instrumentality Subtotal 971,401.90$ 9.18%971,401.90$ 2.59%9.16%-0.02%NO Asset Backed Securities 197,429.69 1.87%197,429.69 2.87%1.86%0.00%NO Commercial Paper - 0.00%- 0.00%0.00%0.00%YES Corporate Notes 1,992,858.40 18.83%1,668,036.40 2.11%15.73%-3.10%NO Bankers Acceptances - 0.00%- 0.00%0.00%0.00%YES Money Market Funds 28,655.12 0.27%17,702.68 1.72%0.17%-0.10%YES Municipal Bonds - 0.00%- 0.00%0.00%0.00%YES Intergovernmental Funds - 0.00%- 0.00%0.00%0.00%YES Certificates of Deposit - 0.00%- 0.00%0.00%0.00%YES Total Portfolio Historical Cost 10,583,342.80$ 100.00%10,604,985.75$ 2.33%100.00% *Permitted allocation based on aggregate assets as defined within the investment policy. City of San Jacinto Historical Cost Basis Security Distribution August 1, 2019 to August 31, 2019 $- $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 CashUSTAgencyFNMAFHLMCFFCBFHLBABSCPCorpBAMMFMuniInter GovCDAsset Balance By Security Type (in millions) August 1, 2019 August 31, 2019 UST 73.08% FNMA 1.22% FHLMC 7.93%ABS 1.86% Corp 15.73% MMF 0.17% Ending Portfolio Allocation Page 9 3.A.3.a Packet Pg. 55 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Policy Section Description Compliance Requirement Compliant Policy Section Description Compliance Requirement Compliant IX. 1 Municipal Bonds Rated in 4 highest general classifications by nationally recognized rating service; 5% issuer limitation Compliant IX. 14 Pass-Through Securities Issuer debt rated at least A by 2 NRSRO; Must be rated in the AA category by 2 NRSRO's; 20% total portfolio limit, 5-year maturity limit Compliant IX. 2 U.S. Treasury No limitations Compliant IX. 15 Money Market Funds Registerd with SEC under 1940 Act, have highest ranking by 2 NRSRO's; Retained advisor registered (or exempt from registration) with 5-years experience investing in securities authorized by CA 53601 and at least $500 million of assets; 20% total portfolio limit, 10% per fund limit Compliant IX. 3 Federal Agency No limitations Compliant IX. 16 Mutual Funds Authorize by CA Government Code Section 53601 Compliant IX. 4 Bankers Acceptances Rated A1 or better and have long term debt rated A or better by 2 NRSRO's; Maturity ≤ to 180 days, 40% total portfolio limit, 5% issuer limit Compliant X.A.1 Futures and Opions Prohibited Compliant IX. 5 Federally Insured Time Deposits Limited to amounts covered under federal insurance; 5-year maturity limit Compliant X.A.2 Inverse Floaters, Range Notes, and Mortgage Derived IO Strips Prohibited Compliant IX. 6 Time Deposits Fully collateralized per CA law, 20% limit when combined with IX. 5; Issuer must have long-term debt rated A or higher or short-term debt rated A1 or higher by 2 NRSRO's, 5-year maturity limit Compliant X.A.3 Potentail Zero Accrual Securities Prohibited Compliant IX.7 CDARS 30% limit in combination of CD's (including CDARS); 5-year maturity limit Compliant X.A.5 Purchasing Securities on Margin Prohibited Compliant IX. 8 Negotiable CD's Issuer must have long-term debt rated A or higher and/or short- term debt rated A1 or higher by 2 NRSRO's; Maturity ≤ to 5 years, 30% total portfolio limit, 5% issuer limit Compliant X.A.6 Reverse Repos or other leverage Prohibited Compliant IX. 9 Repurchase Agreements Collateralized at 102% in accordance with policy;1-year maturity limit, no % portfolio limit, collateral held by custodian bank;Subject to master repurchase agreement substantially in SIFMA's form Compliant X.A.7 Foreign Currency Securities Prohibited Compliant IX. 10 Commercial Paper Issuer is organized and operating in the U.S. with assets of at least $500 million; Issuer short-term ratings of A1 or higher and long- term ratings of A or higher ny 2 NRSRO; Maturity ≤ 270 days; 25% total portfolio limit; 5% issuer limit Compliant X.B.2 Single Issuer Limitation 5% issuer limitation, except U.S. Government and its agencies & enterprises Compliant IX. 11 Local Agency Investment Fund 70% total portfolio limit, up to the maximum permitted balance Compliant X.C.2 Callable Security Limitation 20% of total portfolio (excluding Make Whole Call securities)Compliant IX. 12 Local Government Investment Pools Riveride County Investment Fund limited to 70% of the portfolio; JPA Pools limited to 50% of the portfolio Compliant X.C.3 Maximum Security Maturity Individual security maturities limited to 5-years or less Compliant IX. 13 Corporate Bonds Corporations organized and operating in the U.S. or depository institutions licensed by the U.S. or any state and operating in the U.S.; Rated in the A category or better by 2 NRSRO's, 5-year maturity limit; 30% total portfolio limit, 5% issuer limit Compliant X.C.4 Portfolio Duration Limitation Average portfolio duration will be managed to be approximatly equal to the Market Benchmark selected by the City (typically +/- 20 of benchmark duration) Compliant City of San Jacinto Portfolio Compliance August 1, 2019 to August 31, 2019 Page 10 3.A.3.a Packet Pg. 56 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Additional Disclosure This statement is for general information purposes only and is not intended to provide specific advice or recommendations. P lease review the contents of this statement carefully. Should you have any questions regarding the information presented, calculation methodology, investment portfolio or security detail, or any other facet of your statement, please feel free to contact us. Public Trust Advisor’s monthly statement is intended to detail our investment advisory activity as well as the activity of an y accounts held by clients in pools that are managed by Public Trust Advisors. The custodian bank maintains the control of assets and executes and settles all investm ents transactions. The custodian statement is the official record of security and cash holdings transactions. Public Trust Advisors recognizes that clients ma y use these reports to facilitate record keeping; therefore the custodian bank statement and the Public Trust Advisors statement should be reconciled and differences resolved. Many custodians use a settlement date basis which may result in the need to reconcile due to a timing difference. Please contact your relationshi p manager or our toll free number 855- 395-3954 with questions regarding your account. Public Trust Advisors does not have the authority to withdraw funds from or deposit funds to the custodian. Our clients retai n responsibility for their internal accounting policies; implementing and enforcing internal controls and generating ledger entries or otherwise recording transa ctions. Pricing sources from our reporting platform are provided by Clearwater reporting platform and are established by Clearwater’s internal pricing procedures. Clearwater utilizes a hierarchical pricing model which starts with one of the industry’s pricing sources, S&P Capital IQ. Se curities with short maturities and infrequent secondary market trades are typically priced via mathematical calculations. The Securities in this investment por tfolio, including shares of mutual funds, are not guaranteed or otherwise protected by Public trust Advisors, the FDIC (except for certain non -negotiable certificates of deposit) or any government agency, unless otherwise specifically stated. Investment in fixed income securities involves risks, including the possible lo ss of the amount invested. Past performance is not an indication of future performance. Beginning and Ending Balances based on Market Value plus Accrued Interest on a Trade Date basis. Public Trust Advisors is an investment advisor registered with the Securities and Exchange Commission, and is required to mai ntain a written disclosure statement of our background and business experience. If you would like to receive a copy of our current disclosure statement, privacy p olicy, or code of ethics please contact Service Operations at the address below. Public Trust Advisors 717 17th Street, Suite 1850 Denver, CO 80202 Page 11 3.A.3.a Packet Pg. 57 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Portfolio Holdings Portfolio Income Portfolio Transactions Issuer Concentration Security Concentration Portfolio Activity Summary City of San Jacinto Detail Page 12 3.A.3.a Packet Pg. 58 Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Month End Report Trade Date copySan Jacinto, City of (66779)Month End (M8 Y2019)08/01/2019 - 08/31/2019Dated: 09/09/2019Locked Down3.A.3.aPacket Pg. 59Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Holdings Report Trade Date (San Jacinto, City of (66779))1Income Detail Report Trade Date (San Jacinto, City of (66779))4Transactions Realized Gain Loss Report (San Jacinto, City of (66779))6Issuer Concentration with Yield GASB 40 Trade Date (San Jacinto, City of(66779))7Security Type GASB 40 Trade Date (San Jacinto, City of (66779))12Portfolio Activity Summary (San Jacinto, City of (66779))16Table of ContentsDated: 09/09/20193.A.3.aPacket Pg. 60Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Description,Identifier,Security Type,CouponEffective Maturity,Final Maturity,Callable,Next Call DateOriginal Cost,Current Units,Market PriceTrade Date,Settle DateMoodysRating,S&P Rating,Fitch RatingBook Value,Book Value + AccruedAccrued Balance,Net Unrealized Gain/LossMarket Value,Market Value + AccruedCCCIT 16A1 A117305EFW0ABS1.75011/19/201911/19/2019Y---197,429.69200,000.0099.909409/20/201809/24/2018AaaAAA---199,517.38200,509.05991.67301.50199,818.88200,810.55FEDERAL HOME LOAN MORTGAGE CORP3137EAEL9AGCY BOND2.37502/16/202102/16/2021N---521,808.00525,000.00101.114004/17/201804/19/2018AaaAA+---523,330.29523,849.82519.537,518.15530,848.44531,367.97FEDERAL NATIONAL MORTGAGE ASSOCIATION3135G0U92AGCY BOND2.62501/11/202201/11/2022N---129,906.40130,000.00102.539601/09/201901/11/2019AaaAA+---129,925.81130,399.77473.963,375.62133,301.43133,775.39INTERNATIONAL BUSINESS MACHINES CORP459200JN2CORP1.90001/27/202001/27/2020N---299,712.00300,000.0099.908801/24/201701/27/2017A2A---299,960.46300,498.79538.33-234.10299,726.36300,264.69MICROSOFT CORP594918BV5CORP1.85002/06/202002/06/2020N---149,899.50150,000.0099.927701/30/201702/06/2017AaaAAA---149,985.28150,177.99192.71-93.72149,891.56150,084.27WALT DISNEY CO25468PDP8CORP1.95003/04/202003/04/2020N---298,956.00300,000.00100.004803/15/201703/20/2017A2A---299,816.12302,692.372,876.25198.18300,014.31302,890.56APPLE INC037833CS7CORP1.80005/11/202005/11/2020N---124,872.50125,000.0099.891105/04/201705/11/2017Aa1AA+---124,969.95125,657.45687.50-106.09124,863.86125,551.36INTEL CORP458140AZ3CORP1.85005/11/202005/11/2020N---249,905.00250,000.0099.967205/08/201705/11/2017A1A+---249,977.60251,390.801,413.19-59.61249,917.99251,331.19APPLE INC037833CZ1CORP1.50009/12/201909/12/2019N---119,896.80120,000.0099.983909/05/201709/12/2017Aa1AA+---119,998.44120,843.44845.00-17.79119,980.65120,825.65GILEAD SCIENCES INC375558BR3CORP1.85009/20/201909/20/2019N---54,980.7555,000.00100.000109/14/201709/21/2017A3A---54,999.5055,454.54455.050.5655,000.0655,455.10WAL-MART STORES INC931142DY6CORP1.75010/09/201910/09/2019N---44,999.1045,000.0099.964010/11/201710/20/2017Aa2AA---44,999.9545,310.57310.63-16.1544,983.8045,294.43AMERICAN HONDA FINANCE CORP02665WCH2CORP3.00006/16/202006/16/2020N---74,898.7575,000.00100.719007/11/201807/16/2018A2A---74,957.1375,425.88468.75582.1575,539.2876,008.03AMERICAN HONDA FINANCE CORP02665WCP4CORP3.37512/10/202112/10/2021N---174,916.00175,000.00103.219010/03/201810/10/2018A2A---174,934.84176,263.741,328.915,698.38180,633.22181,962.12EXXON MOBIL CORP30231GBB7CORP1.90208/16/202208/16/2022N---75,000.0075,000.00100.635908/13/201908/16/2019AaaAA+---75,000.0075,059.4459.44476.9475,476.9475,536.38FHMS K024 A23137AXHP1FHLMC CMO2.57308/20/202209/25/2022Y---319,687.50320,000.00102.121605/02/201905/07/2019AaaAA+---319,664.91320,351.04686.137,124.11326,789.02327,475.16FIRST AMER:GVT OBLG Y31846V203MMFUND1.74008/31/201908/31/2019N---17,702.6817,702.681.0000------AaaAAAm---17,702.6817,702.680.000.0017,702.6817,702.68Holdings Report Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/201913.A.3.aPacket Pg. 61Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Description,Identifier,Security Type,CouponEffective Maturity,Final Maturity,Callable,Next Call DateOriginal Cost,Current Units,Market PriceTrade Date,Settle DateMoodysRating,S&P Rating,Fitch RatingBook Value,Book Value + AccruedAccrued Balance,Net Unrealized Gain/LossMarket Value,Market Value + AccruedUNITED STATES TREASURY9128284B3US GOV2.37503/15/202103/15/2021N---339,455.47340,000.00101.132803/26/201803/28/2018AaaAA+---339,713.52343,443.823,730.304,138.00343,851.52347,581.82UNITED STATES TREASURY9128283X6US GOV2.25002/15/202102/15/2021N---325,952.35330,000.00100.871107/26/201807/30/2018AaaAA+---327,654.33327,997.33343.005,220.30332,874.63333,217.63UNITED STATES TREASURY9128284P2US GOV2.62505/15/202105/15/2021N---328,723.83330,000.00101.730507/26/201807/30/2018AaaAA+---329,214.85331,780.642,565.796,495.80335,710.65338,276.44UNITED STATES TREASURY9128285A4US GOV2.75009/15/202109/15/2021N---298,722.65300,000.00102.468809/24/201809/26/2018AaaAA+---299,112.95302,924.093,811.148,293.45307,406.40311,217.54UNITED STATES TREASURY912828Y20US GOV2.62507/15/202107/15/2021N---436,803.13440,000.00101.949209/24/201809/26/2018AaaAA+---437,845.73439,352.251,506.5210,730.75448,576.48450,083.00UNITED STATES TREASURY912828F21US GOV2.12509/30/202109/30/2021N---428,491.99435,000.00101.234412/17/201812/20/2018AaaAA+---430,089.72433,979.163,889.4510,279.92440,369.64444,259.09UNITED STATES TREASURY9128285L0US GOV2.87511/15/202111/15/2021N---437,090.04435,000.00102.945312/17/201812/20/2018AaaAA+---436,605.70440,309.993,704.3011,206.36447,812.05451,516.35UNITED STATES TREASURY9128285R7US GOV2.62512/15/202112/15/2021N---250,664.06250,000.00102.566401/10/201901/15/2019AaaAA+---250,527.21251,925.781,398.575,888.79256,416.00257,814.57UNITED STATES TREASURY9128284T4US GOV2.62506/15/202106/15/2021N---440,928.13440,000.00101.843801/10/201901/15/2019AaaAA+---440,695.72443,157.192,461.487,417.00448,112.72450,574.20UNITED STATES TREASURY912828WY2US GOV2.25007/31/202107/31/2021N---436,940.63440,000.00101.316401/10/201901/15/2019AaaAA+---437,683.19438,544.06860.878,108.97445,792.16446,653.03UNITED STATES TREASURY912828D72US GOV2.00008/31/202108/31/2021N---246,748.05250,000.00100.921902/13/201902/15/2019AaaAA+---247,422.41247,436.1413.744,882.34252,304.75252,318.49UNITED STATES TREASURY912828W55US GOV1.87502/28/202202/28/2022N---98,101.56100,000.00100.976602/13/201902/15/2019AaaAA+---98,428.2598,433.415.152,548.35100,976.60100,981.75UNITED STATES TREASURY912828XG0US GOV2.12506/30/202206/30/2022N---148,089.85150,000.00101.929702/13/201902/15/2019AaaAA+---148,389.16148,934.85545.694,505.39152,894.55153,440.24UNITED STATES TREASURY912828G87US GOV2.12512/31/202112/31/2021N---284,242.97285,000.00101.453103/26/201903/28/2019AaaAA+---284,361.85285,398.661,036.804,779.48289,141.34290,178.14UNITED STATES TREASURY9128286H8US GOV2.37503/15/202203/15/2022N---286,425.00285,000.00102.293003/26/201903/28/2019AaaAA+---286,226.45289,353.313,126.875,308.60291,535.05294,661.92UNITED STATES TREASURY912828SF8US GOV2.00002/15/202202/15/2022N---314,778.52315,000.00101.300805/29/201905/31/2019AaaAA+---314,802.47315,093.50291.034,295.05319,097.52319,388.55Holdings Report Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/201923.A.3.aPacket Pg. 62Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) * Filtered By: Description ¹ "Payable" and Description ¹ "Receivable". * Weighted by: Market Value + Accrued.Description,Identifier,Security Type,CouponEffective Maturity,Final Maturity,Callable,Next Call DateOriginal Cost,Current Units,Market PriceTrade Date,Settle DateMoodysRating,S&P Rating,Fitch RatingBook Value,Book Value + AccruedAccrued Balance,Net Unrealized Gain/LossMarket Value,Market Value + AccruedUNITED STATES TREASURY912828V72US GOV1.87501/31/202201/31/2022N---313,621.88315,000.00100.918005/29/201905/31/2019AaaAA+---313,753.83314,267.41513.594,137.87317,891.70318,405.29UNITED STATES TREASURY912828B90US GOV2.00002/28/202102/28/2021N---314,310.94315,000.00100.546905/29/201905/31/2019AaaAA+---314,412.47314,429.7817.312,310.27316,722.73316,740.04UNITED STATES TREASURY912828WG1US GOV2.25004/30/202104/30/2021N---315,922.85315,000.00101.054705/29/201905/31/2019AaaAA+---315,804.24318,192.422,388.182,518.07318,322.30320,710.48UNITED STATES TREASURY912828C57US GOV2.25003/31/202103/31/2021N---315,762.89315,000.00100.972705/29/201905/31/2019AaaAA+---315,661.40318,643.582,982.172,402.60318,064.01321,046.18UNITED STATES TREASURY912828L57US GOV1.75009/30/202209/30/2022N---374,765.63375,000.00100.949206/26/201906/27/2019AaaAA+---374,780.57377,541.842,761.273,778.93378,559.50381,320.77UNITED STATES TREASURY912828J76US GOV1.75003/31/202203/31/2022N---473,348.63475,000.00100.757807/09/201907/11/2019AaaAA+---473,435.68476,933.293,497.615,163.87478,599.55482,097.16UNITED STATES TREASURY912828L24US GOV1.87508/31/202208/31/2022N---100,953.13100,000.00101.281208/08/201908/09/2019AaaAA+---100,934.47100,939.625.15346.73101,281.20101,286.35UNITED STATES TREASURY912828P38US GOV1.75001/31/202301/31/2023N---439,570.90435,000.00101.062508/26/201908/28/2019AaaAA+---439,556.74440,218.69661.9665.14439,621.88440,283.83------------07/26/202107/27/2021------10,604,985.7510,632,702.68---------Aa1AA---10,616,853.2110,670,818.1853,964.97149,570.2010,766,423.4110,820,388.38Holdings Report Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/201933.A.3.aPacket Pg. 63Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Identifier,DescriptionFinal MaturityEnding Current UnitsEarned InterestIncomeRealized Gain,Realized LossAccretion IncomeAmortization ExpenseMisc IncomeNet Earned IncomeInterest PaymentReceived,Ending Interest Due912828P38UNITED STATES TREASURY01/31/2023435,000.0082.750.000.000.00-14.160.0068.580.000.00912828L57UNITED STATES TREASURY09/30/2022375,000.00555.840.000.007.020.000.00562.860.000.003137AXHP1FHMS K024 A209/25/2022320,000.00686.130.000.00-5.750.000.00680.38686.130.00912828L24UNITED STATES TREASURY08/31/2022100,000.00117.240.000.000.00-18.660.0098.580.00937.5030231GBB7EXXON MOBIL CORP08/16/202275,000.0059.440.000.000.000.000.0059.440.000.00912828XG0UNITED STATES TREASURY06/30/2022150,000.00268.510.000.0046.390.000.00314.900.000.00912828J76UNITED STATES TREASURY03/31/2022475,000.00704.060.000.0051.900.000.00755.960.000.009128286H8UNITED STATES TREASURY03/15/2022285,000.00570.190.000.000.00-39.200.00530.990.000.00912828W55UNITED STATES TREASURY02/28/2022100,000.00158.000.000.0051.090.000.00209.090.00937.50912828SF8UNITED STATES TREASURY02/15/2022315,000.00534.680.000.007.380.000.00542.063,150.000.00912828V72UNITED STATES TREASURY01/31/2022315,000.00497.540.000.0042.590.000.00540.130.000.003135G0U92FEDERAL NATIONAL MORTGAGE ASSOCIATION01/11/2022130,000.00284.380.000.002.580.000.00286.950.000.00912828G87UNITED STATES TREASURY12/31/2021285,000.00510.170.000.0022.540.000.00532.710.000.009128285R7UNITED STATES TREASURY12/15/2021250,000.00555.840.000.000.00-18.990.00536.850.000.0002665WCP4AMERICAN HONDA FINANCE CORP12/10/2021175,000.00492.190.000.002.340.000.00494.530.000.009128285L0UNITED STATES TREASURY11/15/2021435,000.001,053.520.000.000.00-59.530.00993.990.000.00912828F21UNITED STATES TREASURY09/30/2021435,000.00782.940.000.00193.680.000.00976.620.000.009128285A4UNITED STATES TREASURY09/15/2021300,000.00694.970.000.0035.390.000.00730.360.000.00912828D72UNITED STATES TREASURY08/31/2021250,000.00421.350.000.00105.420.000.00526.760.002,500.00912828WY2UNITED STATES TREASURY07/31/2021440,000.00833.970.000.00100.010.000.00933.980.000.00912828Y20UNITED STATES TREASURY07/15/2021440,000.00972.960.000.0094.840.000.001,067.800.000.009128284T4UNITED STATES TREASURY06/15/2021440,000.00978.280.000.000.00-32.280.00945.990.000.009128284P2UNITED STATES TREASURY05/15/2021330,000.00729.720.000.0037.890.000.00767.610.000.00912828WG1UNITED STATES TREASURY04/30/2021315,000.00597.040.000.000.00-39.540.00557.510.000.00912828C57UNITED STATES TREASURY03/31/2021315,000.00600.310.000.000.00-33.830.00566.480.000.009128284B3UNITED STATES TREASURY03/15/2021340,000.00680.230.000.0015.320.000.00695.560.000.00912828B90UNITED STATES TREASURY02/28/2021315,000.00530.890.000.0033.830.000.00564.720.003,150.003137EAEL9FEDERAL HOME LOAN MORTGAGE CORP02/16/2021525,000.001,039.070.000.0095.450.000.001,134.526,234.380.009128283X6UNITED STATES TREASURY02/15/2021330,000.00630.160.000.00134.170.000.00764.333,712.500.009128283Q1UNITED STATES TREASURY01/15/20210.00218.482,282.470.0057.910.000.002,558.860.000.00Income Detail Report Trade DateSan Jacinto, City of (66779)08/01/2019 - 08/31/2019Return to Table of ContentsDated: 09/09/201943.A.3.aPacket Pg. 64Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) * Filtered By: Description ¹ "Payable" and Description ¹ "Receivable". * Weighted by: Ending Market Value + Accrued.Identifier,DescriptionFinal MaturityEnding Current UnitsEarned InterestIncomeRealized Gain,Realized LossAccretion IncomeAmortization ExpenseMisc IncomeNet Earned IncomeInterest PaymentReceived,Ending Interest Due931142EG4WALMART INC06/23/20200.00694.692,544.970.003.790.000.003,243.450.000.0002665WCH2AMERICAN HONDA FINANCE CORP06/16/202075,000.00187.500.000.004.550.000.00192.050.000.00037833CS7APPLE INC05/11/2020125,000.00187.500.000.003.630.000.00191.130.000.00458140AZ3INTEL CORP05/11/2020250,000.00385.420.000.002.700.000.00388.120.000.0025468PDP8WALT DISNEY CO03/04/2020300,000.00487.500.000.0030.170.000.00517.670.000.00594918BV5MICROSOFT CORP02/06/2020150,000.00231.250.000.002.890.000.00234.141,387.500.00459200JN2INTERNATIONAL BUSINESS MACHINES CORP01/27/2020300,000.00475.000.000.008.280.000.00483.280.000.0017305EFW0CCCIT 16A1 A111/19/2019200,000.00291.670.000.00189.380.000.00481.050.000.00931142DY6WAL-MART STORES INC10/09/201945,000.0065.630.000.000.040.000.0065.670.000.00375558BR3GILEAD SCIENCES INC09/20/201955,000.0084.790.000.000.820.000.0085.620.000.00037833CZ1APPLE INC09/12/2019120,000.00150.000.000.004.400.000.00154.400.000.0031846V203FIRST AMER:GVT OBLG Y08/31/201917,702.6833.470.000.000.000.000.0033.4737.3733.47594918BN3MICROSOFT CORP08/08/20190.0016.040.000.000.510.000.0016.55412.500.00------07/27/202110,632,702.6820,131.304,827.440.001,383.17-256.200.0026,085.7115,620.387,558.47Income Detail Report Trade DateSan Jacinto, City of (66779)08/01/2019 - 08/31/2019Return to Table of ContentsDated: 09/09/201953.A.3.aPacket Pg. 65Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) * Does not Lock Down. * Filtered By: Type = Buy or Type = Sell or Type = Call Redemption or Type = Put Redemption or Type = Corporate Action Sell or Type = Cash Transfer or Type = Maturity or Type = Coupon or Type = Principal Paydown or Type = Money Market Funds. * Weighted by: AbsoluteValue of Principal. * MMF transactions are expanded. * The Transaction Detail/Trading Activity reports provide our most up-to-date transactional details. As such, these reports are subject to change even after the other reports on the website have been locked down. While these reports can be useful tools in understanding recent activity,due to their dynamic nature we do not recommend using them for booking journal entries or reconciliation.IdentifierDescriptionCurrent UnitsTypeSettle DatePricePrincipalRealized Gain/LossAmount31846V203FIRST AMER:GVT OBLG Y0.00Money Market Funds07/31/2019---0.000.0037.373137AXHP1FHMS K024 A20.00Coupon08/01/2019---0.000.00686.1331846V203FIRST AMER:GVT OBLG Y37.37Buy08/02/20191.00037.370.00-37.3731846V203FIRST AMER:GVT OBLG Y1,387.50Buy08/06/20191.0001,387.500.00-1,387.50594918BV5MICROSOFT CORP0.00Coupon08/06/2019---0.000.001,387.5031846V203FIRST AMER:GVT OBLG Y75,412.50Buy08/08/20191.00075,412.500.00-75,412.50594918BN3MICROSOFT CORP0.00Coupon08/08/2019---0.000.00412.50594918BN3MICROSOFT CORP-75,000.00Maturity08/08/2019100.000-75,000.000.0075,000.0031846V203FIRST AMER:GVT OBLG Y-101,778.54Sell08/09/20191.000-101,778.540.00101,778.54912828L24UNITED STATES TREASURY100,000.00Buy08/09/2019100.953100,953.130.00-101,778.5431846V203FIRST AMER:GVT OBLG Y6,862.50Buy08/15/20191.0006,862.500.00-6,862.5031846V203FIRST AMER:GVT OBLG Y75,472.06Buy08/15/20191.00075,472.060.00-75,472.06912828SF8UNITED STATES TREASURY0.00Coupon08/15/2019---0.000.003,150.009128283Q1UNITED STATES TREASURY-75,000.00Sell08/15/2019100.461-75,345.70916.2575,472.069128283X6UNITED STATES TREASURY0.00Coupon08/15/2019---0.000.003,712.5031846V203FIRST AMER:GVT OBLG Y-68,765.62Sell08/16/20191.000-68,765.620.0068,765.623137EAEL9FEDERAL HOME LOAN MORTGAGE CORP0.00Coupon08/16/2019---0.000.006,234.3830231GBB7EXXON MOBIL CORP75,000.00Buy08/16/2019100.00075,000.000.00-75,000.00CCYUSDUS DOLLAR0.00Cash Transfer08/26/2019---0.000.00-104.1731846V203FIRST AMER:GVT OBLG Y-104.17Sell08/26/20191.000-104.170.00104.1731846V203FIRST AMER:GVT OBLG Y686.13Buy08/26/20191.000686.130.00-686.1331846V203FIRST AMER:GVT OBLG Y-162.17Sell08/28/20191.000-162.170.00162.179128283Q1UNITED STATES TREASURY-110,000.00Sell08/28/2019100.500-110,550.001,366.21110,813.04931142EG4WALMART INC-325,000.00Sell08/28/2019100.770-327,502.502,544.97329,174.90912828P38UNITED STATES TREASURY435,000.00Buy08/28/2019101.051439,570.900.00-440,150.1131846V203FIRST AMER:GVT OBLG Y0.00Money Market Funds08/31/2019---0.000.0033.47912828B90UNITED STATES TREASURY0.00Coupon08/31/2019---0.000.003,150.00912828D72UNITED STATES TREASURY0.00Coupon08/31/2019---0.000.002,500.00912828W55UNITED STATES TREASURY0.00Coupon08/31/2019---0.000.00937.50912828L24UNITED STATES TREASURY0.00Coupon08/31/2019---0.000.00937.50------14,047.56---------16,173.394,827.447,558.47Transactions Realized Gain Loss ReportSan Jacinto, City of (66779)08/01/2019 - 08/31/2019Return to Table of ContentsDated: 09/09/201963.A.3.aPacket Pg. 66Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Apple Inc.Citigroup Inc.Exxon Mobil CorporationIdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue037833CS7CORPAPPLE INCApple Inc.125,000.00FixedN0.6861.8351.95705/11/202005/11/2020687.50124,969.95125,657.45124,863.86125,551.361.160%037833CZ1CORPAPPLE INCApple Inc.120,000.00FixedN0.0331.5441.97009/12/201909/12/2019845.00119,998.44120,843.44119,980.65120,825.651.114%---CORPAPPLE INCApple Inc.245,000.00FixedN0.3661.6921.96301/13/202001/13/20201,532.50244,968.39246,500.89244,844.51246,377.012.274%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue17305EFW0ABSCCCIT 16A1 A1Citigroup Inc.200,000.00FixedY0.2172.8682.16111/19/201911/19/2019991.67199,517.38200,509.05199,818.88200,810.551.856%17305EFW0ABSCCCIT 16A1 A1Citigroup Inc.200,000.00FixedY0.2172.8682.16111/19/201911/19/2019991.67199,517.38200,509.05199,818.88200,810.551.856%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/201973.A.3.aPacket Pg. 67Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Federal National Mortgage AssociationFreddie MacGilead Sciences, Inc.Honda Motor Co., Ltd.IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue30231GBB7CORPEXXON MOBIL CORPExxon Mobil Corporation75,000.00FixedN2.8681.9021.68108/16/202208/16/202259.4475,000.0075,059.4475,476.9475,536.380.701%30231GBB7CORPEXXON MOBIL CORPExxon Mobil Corporation75,000.00FixedN2.8681.9021.68108/16/202208/16/202259.4475,000.0075,059.4475,476.9475,536.380.701%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue3135G0U92AGCY BONDFEDERAL NATIONAL MORTGAGEASSOCIATIONFederal National Mortgage Association130,000.00FixedN2.2842.6501.52701/11/202201/11/2022473.96129,925.81130,399.77133,301.43133,775.391.238%3135G0U92AGCY BONDFEDERAL NATIONAL MORTGAGEASSOCIATIONFederal National Mortgage Association130,000.00FixedN2.2842.6501.52701/11/202201/11/2022473.96129,925.81130,399.77133,301.43133,775.391.238%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue3137AXHP1FHLMC CMOFHMS K024 A2Freddie Mac320,000.00FixedY2.8382.5631.78608/20/202209/25/2022686.13319,664.91320,351.04326,789.02327,475.163.035%3137EAEL9AGCY BONDFEDERAL HOME LOAN MORTGAGECORPFreddie Mac525,000.00FixedN1.4322.5991.60002/16/202102/16/2021519.53523,330.29523,849.82530,848.44531,367.974.931%---------Freddie Mac845,000.00Fixed---1.9682.5851.67109/14/202109/27/20211,205.66842,995.20844,200.86857,637.46858,843.137.966%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue375558BR3CORPGILEAD SCIENCES INCGilead Sciences, Inc.55,000.00FixedN0.0551.8681.83309/20/201909/20/2019455.0554,999.5055,454.5455,000.0655,455.100.511%375558BR3CORPGILEAD SCIENCES INCGilead Sciences, Inc.55,000.00FixedN0.0551.8681.83309/20/201909/20/2019455.0554,999.5055,454.5455,000.0655,455.100.511%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue02665WCH2CORPAMERICAN HONDA FINANCE CORPHonda Motor Co., Ltd.75,000.00FixedN0.7793.0742.08006/16/202006/16/2020468.7574,957.1375,425.8875,539.2876,008.030.702%02665WCP4CORPAMERICAN HONDA FINANCE CORPHonda Motor Co., Ltd.175,000.00FixedN2.1773.3921.92312/10/202112/10/20211,328.91174,934.84176,263.74180,633.22181,962.121.678%---CORPAMERICAN HONDA FINANCE CORPHonda Motor Co., Ltd.250,000.00FixedN1.7653.2971.96907/03/202107/03/20211,797.66249,891.96251,689.62256,172.50257,970.152.379%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/201983.A.3.aPacket Pg. 68Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Intel CorporationInternational Business Machines CorporationMicrosoft CorporationThe Walt Disney CompanyU.S. BancorpUnited StatesIdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue458140AZ3CORPINTEL CORPIntel Corporation250,000.00FixedN0.6861.8631.89605/11/202005/11/20201,413.19249,977.60251,390.80249,917.99251,331.192.321%458140AZ3CORPINTEL CORPIntel Corporation250,000.00FixedN0.6861.8631.89605/11/202005/11/20201,413.19249,977.60251,390.80249,917.99251,331.192.321%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue459200JN2CORPINTERNATIONAL BUSINESS MACHINESCORPInternational Business Machines Corporation300,000.00FixedN0.4051.9332.12201/27/202001/27/2020538.33299,960.46300,498.79299,726.36300,264.692.784%459200JN2CORPINTERNATIONAL BUSINESS MACHINESCORPInternational Business MachinesCorporation300,000.00FixedN0.4051.9332.12201/27/202001/27/2020538.33299,960.46300,498.79299,726.36300,264.692.784%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue594918BV5CORPMICROSOFT CORPMicrosoft Corporation150,000.00FixedN0.4301.8732.01602/06/202002/06/2020192.71149,985.28150,177.99149,891.56150,084.271.392%594918BV5CORPMICROSOFT CORPMicrosoft Corporation150,000.00FixedN0.4301.8732.01602/06/202002/06/2020192.71149,985.28150,177.99149,891.56150,084.271.392%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue25468PDP8CORPWALT DISNEY COThe Walt Disney Company300,000.00FixedN0.5012.0721.94003/04/202003/04/20202,876.25299,816.12302,692.37300,014.31302,890.562.787%25468PDP8CORPWALT DISNEY COThe Walt Disney Company300,000.00FixedN0.5012.0721.94003/04/202003/04/20202,876.25299,816.12302,692.37300,014.31302,890.562.787%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue31846V203MMFUNDFIRST AMER:GVT OBLG YU.S. Bancorp17,702.68FixedN0.0001.7201.72008/31/201908/31/20190.0017,702.6817,702.6817,702.6817,702.680.164%31846V203MMFUNDFIRST AMER:GVT OBLG YU.S. Bancorp17,702.68FixedN0.0001.7201.72008/31/201908/31/20190.0017,702.6817,702.6817,702.6817,702.680.164%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/201993.A.3.aPacket Pg. 69Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Walmart Inc.IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue9128284B3US GOVUNITED STATES TREASURYUnited States340,000.00FixedN1.4972.4311.62903/15/202103/15/20213,730.30339,713.52343,443.82343,851.52347,581.823.194%9128283X6US GOVUNITED STATES TREASURYUnited States330,000.00FixedN1.4312.7521.64302/15/202102/15/2021343.00327,654.33327,997.33332,874.63333,217.633.092%9128284P2US GOVUNITED STATES TREASURYUnited States330,000.00FixedN1.6582.7691.59405/15/202105/15/20212,565.79329,214.85331,780.64335,710.65338,276.443.118%9128285A4US GOVUNITED STATES TREASURYUnited States300,000.00FixedN1.9632.9001.51809/15/202109/15/20213,811.14299,112.95302,924.09307,406.40311,217.542.855%912828Y20US GOVUNITED STATES TREASURYUnited States440,000.00FixedN1.8232.8961.56607/15/202107/15/20211,506.52437,845.73439,352.25448,576.48450,083.004.166%912828F21US GOVUNITED STATES TREASURYUnited States435,000.00FixedN2.0182.6871.52109/30/202109/30/20213,889.45430,089.72433,979.16440,369.64444,259.094.090%9128285L0US GOVUNITED STATES TREASURYUnited States435,000.00FixedN2.1252.7011.51411/15/202111/15/20213,704.30436,605.70440,309.99447,812.05451,516.354.159%9128285R7US GOVUNITED STATES TREASURYUnited States250,000.00FixedN2.2132.5291.48212/15/202112/15/20211,398.57250,527.21251,925.78256,416.00257,814.572.382%9128284T4US GOVUNITED STATES TREASURYUnited States440,000.00FixedN1.7412.5341.57706/15/202106/15/20212,461.48440,695.72443,157.19448,112.72450,574.204.162%912828WY2US GOVUNITED STATES TREASURYUnited States440,000.00FixedN1.8712.5341.55107/31/202107/31/2021860.87437,683.19438,544.06445,792.16446,653.034.141%912828D72US GOVUNITED STATES TREASURYUnited States250,000.00FixedN1.9392.5331.53108/31/202108/31/202113.74247,422.41247,436.14252,304.75252,318.492.343%912828W55US GOVUNITED STATES TREASURYUnited States100,000.00FixedN2.4172.5281.47602/28/202202/28/20225.1598,428.2598,433.41100,976.60100,981.750.938%912828XG0US GOVUNITED STATES TREASURYUnited States150,000.00FixedN2.7382.5211.42806/30/202206/30/2022545.69148,389.16148,934.85152,894.55153,440.241.420%912828G87US GOVUNITED STATES TREASURYUnited States285,000.00FixedN2.2662.2241.48912/31/202112/31/20211,036.80284,361.85285,398.66289,141.34290,178.142.686%9128286H8US GOVUNITED STATES TREASURYUnited States285,000.00FixedN2.4402.2001.45303/15/202203/15/20223,126.87286,226.45289,353.31291,535.05294,661.922.708%912828SF8US GOVUNITED STATES TREASURYUnited States315,000.00FixedN2.3932.0261.45902/15/202202/15/2022291.03314,802.47315,093.50319,097.52319,388.552.964%912828V72US GOVUNITED STATES TREASURYUnited States315,000.00FixedN2.3552.0441.48701/31/202201/31/2022513.59313,753.83314,267.41317,891.70318,405.292.953%912828B90US GOVUNITED STATES TREASURYUnited States315,000.00FixedN1.4612.1271.63002/28/202102/28/202117.31314,412.47314,429.78316,722.73316,740.042.942%912828WG1US GOVUNITED STATES TREASURYUnited States315,000.00FixedN1.6232.0931.60604/30/202104/30/20212,388.18315,804.24318,192.42318,322.30320,710.482.957%912828C57US GOVUNITED STATES TREASURYUnited States315,000.00FixedN1.5392.1141.62503/31/202103/31/20212,982.17315,661.40318,643.58318,064.01321,046.182.954%912828L57US GOVUNITED STATES TREASURYUnited States375,000.00FixedN2.9741.7701.43409/30/202209/30/20222,761.27374,780.57377,541.84378,559.50381,320.773.516%912828J76US GOVUNITED STATES TREASURYUnited States475,000.00FixedN2.5031.8811.45003/31/202203/31/20223,497.61473,435.68476,933.29478,599.55482,097.164.445%912828L24US GOVUNITED STATES TREASURYUnited States100,000.00FixedN2.8871.5551.43808/31/202208/31/20225.15100,934.47100,939.62101,281.20101,286.350.941%912828P38US GOVUNITED STATES TREASURYUnited States435,000.00FixedN3.3061.4341.43001/31/202301/31/2023661.96439,556.74440,218.69439,621.88440,283.834.083%---US GOVUNITED STATES TREASURYUnited States7,770,000.00FixedN2.1012.3331.52710/31/202110/31/202142,117.937,757,112.887,799,230.817,881,934.937,924,052.8673.208%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue931142DY6CORPWAL-MART STORES INCWalmart Inc.45,000.00FixedN0.1081.7512.06910/09/201910/09/2019310.6344,999.9545,310.5744,983.8045,294.430.418%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/2019103.A.3.aPacket Pg. 70Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Summary * Grouped by: Issuer Concentration. * Groups Sorted by: Issuer Concentration. * Filtered By: Description ¹ "Payable" and Description ¹ "Receivable". * Weighted by: Ending Market Value + Accrued, except Book Yield by Base Book Value + Accrued.IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue931142DY6CORPWAL-MART STORES INCWalmart Inc.45,000.00FixedN0.1081.7512.06910/09/201910/09/2019310.6344,999.9545,310.5744,983.8045,294.430.418%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue------------10,632,702.68Fixed---1.8452.3301.62007/26/202107/27/202153,964.9710,616,853.2110,670,818.1810,766,423.4110,820,388.38100.000%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/2019113.A.3.aPacket Pg. 71Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) ABSAGCY BONDIdentifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued17305EFW0CCCIT 16A1 A1ABS1.856%FixedY0.217AAAAaa200,000.0011/19/201911/19/20192.8682.161991.67197,429.69199,517.38200,509.05199,818.88200,810.5517305EFW0CCCIT 16A1 A1ABS1.856%FixedY0.217AAAAaa200,000.0011/19/201911/19/20192.8682.161991.67197,429.69199,517.38200,509.05199,818.88200,810.55Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued3137EAEL9FEDERAL HOME LOAN MORTGAGE CORPAGCY BOND4.911%FixedN1.432AA+Aaa525,000.0002/16/202102/16/20212.5991.600519.53521,808.00523,330.29523,849.82530,848.44531,367.973135G0U92FEDERAL NATIONAL MORTGAGEASSOCIATIONAGCY BOND1.236%FixedN2.284AA+Aaa130,000.0001/11/202201/11/20222.6501.527473.96129,906.40129,925.81130,399.77133,301.43133,775.39------AGCY BOND6.147%FixedN1.603AA+Aaa655,000.0004/23/202104/23/20212.6091.586993.49651,714.40653,256.10654,249.59664,149.87665,143.36Security Type GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/2019123.A.3.aPacket Pg. 72Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) CORPFHLMC CMOMMFUNDIdentifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued037833CZ1APPLE INCCORP1.117%FixedN0.033AA+Aa1120,000.0009/12/201909/12/20191.5441.970845.00119,896.80119,998.44120,843.44119,980.65120,825.65375558BR3GILEAD SCIENCES INCCORP0.513%FixedN0.055AA355,000.0009/20/201909/20/20191.8681.833455.0554,980.7554,999.5055,454.5455,000.0655,455.10931142DY6WAL-MART STORES INCCORP0.419%FixedN0.108AAAa245,000.0010/09/201910/09/20191.7512.069310.6344,999.1044,999.9545,310.5744,983.8045,294.43459200JN2INTERNATIONAL BUSINESS MACHINESCORPCORP2.775%FixedN0.405AA2300,000.0001/27/202001/27/20201.9332.122538.33299,712.00299,960.46300,498.79299,726.36300,264.69594918BV5MICROSOFT CORPCORP1.387%FixedN0.430AAAAaa150,000.0002/06/202002/06/20201.8732.016192.71149,899.50149,985.28150,177.99149,891.56150,084.2725468PDP8WALT DISNEY COCORP2.799%FixedN0.501AA2300,000.0003/04/202003/04/20202.0721.9402,876.25298,956.00299,816.12302,692.37300,014.31302,890.56037833CS7APPLE INCCORP1.160%FixedN0.686AA+Aa1125,000.0005/11/202005/11/20201.8351.957687.50124,872.50124,969.95125,657.45124,863.86125,551.36458140AZ3INTEL CORPCORP2.323%FixedN0.686A+A1250,000.0005/11/202005/11/20201.8631.8961,413.19249,905.00249,977.60251,390.80249,917.99251,331.1902665WCH2AMERICAN HONDA FINANCE CORPCORP0.702%FixedN0.779AA275,000.0006/16/202006/16/20203.0742.080468.7574,898.7574,957.1375,425.8875,539.2876,008.0302665WCP4AMERICAN HONDA FINANCE CORPCORP1.682%FixedN2.177AA2175,000.0012/10/202112/10/20213.3921.9231,328.91174,916.00174,934.84176,263.74180,633.22181,962.1230231GBB7EXXON MOBIL CORPCORP0.698%FixedN2.868AA+Aaa75,000.0008/16/202208/16/20221.9021.68159.4475,000.0075,000.0075,059.4475,476.9475,536.38------CORP15.574%FixedN0.760A+A11,670,000.0006/11/202006/11/20202.1031.9699,175.751,668,036.401,669,599.251,678,775.011,676,028.031,685,203.78Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued3137AXHP1FHMS K024 A2FHLMC CMO3.026%FixedY2.838AA+Aaa320,000.0008/20/202209/25/20222.5631.786686.13319,687.50319,664.91320,351.04326,789.02327,475.163137AXHP1FHMS K024 A2FHLMC CMO3.026%FixedY2.838AA+Aaa320,000.0008/20/202209/25/20222.5631.786686.13319,687.50319,664.91320,351.04326,789.02327,475.16Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued31846V203FIRST AMER:GVT OBLG YMMFUND0.164%FixedN0.000AAAmAaa17,702.6808/31/201908/31/20191.7201.7200.0017,702.6817,702.6817,702.6817,702.6817,702.68Security Type GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/2019133.A.3.aPacket Pg. 73Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) US GOVIdentifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued31846V203FIRST AMER:GVT OBLG YMMFUND0.164%FixedN0.000AAAmAaa17,702.6808/31/201908/31/20191.7201.7200.0017,702.6817,702.6817,702.6817,702.6817,702.68Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued9128283X6UNITED STATES TREASURYUS GOV3.080%FixedN1.431AA+Aaa330,000.0002/15/202102/15/20212.7521.643343.00325,952.35327,654.33327,997.33332,874.63333,217.63912828B90UNITED STATES TREASURYUS GOV2.927%FixedN1.461AA+Aaa315,000.0002/28/202102/28/20212.1271.63017.31314,310.94314,412.47314,429.78316,722.73316,740.049128284B3UNITED STATES TREASURYUS GOV3.212%FixedN1.497AA+Aaa340,000.0003/15/202103/15/20212.4311.6293,730.30339,455.47339,713.52343,443.82343,851.52347,581.82912828C57UNITED STATES TREASURYUS GOV2.967%FixedN1.539AA+Aaa315,000.0003/31/202103/31/20212.1141.6252,982.17315,762.89315,661.40318,643.58318,064.01321,046.18912828WG1UNITED STATES TREASURYUS GOV2.964%FixedN1.623AA+Aaa315,000.0004/30/202104/30/20212.0931.6062,388.18315,922.85315,804.24318,192.42318,322.30320,710.489128284P2UNITED STATES TREASURYUS GOV3.126%FixedN1.658AA+Aaa330,000.0005/15/202105/15/20212.7691.5942,565.79328,723.83329,214.85331,780.64335,710.65338,276.449128284T4UNITED STATES TREASURYUS GOV4.164%FixedN1.741AA+Aaa440,000.0006/15/202106/15/20212.5341.5772,461.48440,928.13440,695.72443,157.19448,112.72450,574.20912828Y20UNITED STATES TREASURYUS GOV4.160%FixedN1.823AA+Aaa440,000.0007/15/202107/15/20212.8961.5661,506.52436,803.13437,845.73439,352.25448,576.48450,083.00912828WY2UNITED STATES TREASURYUS GOV4.128%FixedN1.871AA+Aaa440,000.0007/31/202107/31/20212.5341.551860.87436,940.63437,683.19438,544.06445,792.16446,653.03912828D72UNITED STATES TREASURYUS GOV2.332%FixedN1.939AA+Aaa250,000.0008/31/202108/31/20212.5331.53113.74246,748.05247,422.41247,436.14252,304.75252,318.499128285A4UNITED STATES TREASURYUS GOV2.876%FixedN1.963AA+Aaa300,000.0009/15/202109/15/20212.9001.5183,811.14298,722.65299,112.95302,924.09307,406.40311,217.54912828F21UNITED STATES TREASURYUS GOV4.106%FixedN2.018AA+Aaa435,000.0009/30/202109/30/20212.6871.5213,889.45428,491.99430,089.72433,979.16440,369.64444,259.099128285L0UNITED STATES TREASURYUS GOV4.173%FixedN2.125AA+Aaa435,000.0011/15/202111/15/20212.7011.5143,704.30437,090.04436,605.70440,309.99447,812.05451,516.359128285R7UNITED STATES TREASURYUS GOV2.383%FixedN2.213AA+Aaa250,000.0012/15/202112/15/20212.5291.4821,398.57250,664.06250,527.21251,925.78256,416.00257,814.57912828G87UNITED STATES TREASURYUS GOV2.682%FixedN2.266AA+Aaa285,000.0012/31/202112/31/20212.2241.4891,036.80284,242.97284,361.85285,398.66289,141.34290,178.14912828V72UNITED STATES TREASURYUS GOV2.943%FixedN2.355AA+Aaa315,000.0001/31/202201/31/20222.0441.487513.59313,621.88313,753.83314,267.41317,891.70318,405.29912828SF8UNITED STATES TREASURYUS GOV2.952%FixedN2.393AA+Aaa315,000.0002/15/202202/15/20222.0261.459291.03314,778.52314,802.47315,093.50319,097.52319,388.55Security Type GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/2019143.A.3.aPacket Pg. 74Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Summary * Grouped by: Security Type. * Groups Sorted by: Security Type. * Filtered By: Description ¹ "Payable" and Description ¹ "Receivable". * Weighted by: Ending Market Value + Accrued, except Book Yield by Base Book Value + Accrued.Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued912828W55UNITED STATES TREASURYUS GOV0.933%FixedN2.417AA+Aaa100,000.0002/28/202202/28/20222.5281.4765.1598,101.5698,428.2598,433.41100,976.60100,981.759128286H8UNITED STATES TREASURYUS GOV2.723%FixedN2.440AA+Aaa285,000.0003/15/202203/15/20222.2001.4533,126.87286,425.00286,226.45289,353.31291,535.05294,661.92912828J76UNITED STATES TREASURYUS GOV4.455%FixedN2.503AA+Aaa475,000.0003/31/202203/31/20221.8811.4503,497.61473,348.63473,435.68476,933.29478,599.55482,097.16912828XG0UNITED STATES TREASURYUS GOV1.418%FixedN2.738AA+Aaa150,000.0006/30/202206/30/20222.5211.428545.69148,089.85148,389.16148,934.85152,894.55153,440.24912828L24UNITED STATES TREASURYUS GOV0.936%FixedN2.887AA+Aaa100,000.0008/31/202208/31/20221.5551.4385.15100,953.13100,934.47100,939.62101,281.20101,286.35912828L57UNITED STATES TREASURYUS GOV3.524%FixedN2.974AA+Aaa375,000.0009/30/202209/30/20221.7701.4342,761.27374,765.63374,780.57377,541.84378,559.50381,320.77912828P38UNITED STATES TREASURYUS GOV4.069%FixedN3.306AA+Aaa435,000.0001/31/202301/31/20231.4341.430661.96439,570.90439,556.74440,218.69439,621.88440,283.83---UNITED STATES TREASURYUS GOV73.233%FixedN2.101AA+Aaa7,770,000.0010/31/202110/31/20212.3331.52742,117.937,750,415.087,757,112.887,799,230.817,881,934.937,924,052.86Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued---------100.000%Fixed---1.845AAAa110,632,702.6807/26/202107/27/20212.3301.62053,964.9710,604,985.7510,616,853.2110,670,818.1810,766,423.4110,820,388.38Security Type GASB 40 Trade DateSan Jacinto, City of (66779)As of 08/31/2019Return to Table of ContentsDated: 09/09/2019153.A.3.aPacket Pg. 75Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Identifier,Description,Security TypeInterest/DividendReceivedTransfers In/OutPurchasesPurchasedAccruedIncomeSalesDisposed AccruedMaturities andRedemptionsPaydownsNet RealizedGain/LossBeginning OriginalCost,Ending Original CostBeginning MarketValue,Ending Market Value31846V203FIRST AMER:GVT OBLG YMMFUND37.370.00159,858.060.00-170,810.500.000.000.000.0028,655.1217,702.6828,655.1217,702.68CCYUSDCashCASH0.00-104.170.000.000.000.000.000.000.000.000.000.000.00CCYUSDReceivableCASH0.000.000.000.000.000.000.000.000.0037.377,558.4737.377,558.47594918BN3MICROSOFT CORPCORP412.500.000.000.000.000.00-75,000.000.000.0074,922.750.0074,982.110.00459200JN2INTERNATIONAL BUSINESSMACHINES CORPCORP0.000.000.000.000.000.000.000.000.00299,712.00299,712.00299,373.58299,726.36594918BV5MICROSOFT CORPCORP1,387.500.000.000.000.000.000.000.000.00149,899.50149,899.50149,698.61149,891.5625468PDP8WALT DISNEY COCORP0.000.000.000.000.000.000.000.000.00298,956.00298,956.00299,413.80300,014.31037833CS7APPLE INCCORP0.000.000.000.000.000.000.000.000.00124,872.50124,872.50124,677.56124,863.86458140AZ3INTEL CORPCORP0.000.000.000.000.000.000.000.000.00249,905.00249,905.00249,269.09249,917.99037833CZ1APPLE INCCORP0.000.000.000.000.000.000.000.000.00119,896.80119,896.80119,897.29119,980.65375558BR3GILEAD SCIENCES INCCORP0.000.000.000.000.000.000.000.000.0054,980.7554,980.7554,964.1255,000.06931142DY6WAL-MART STORES INCCORP0.000.000.000.000.000.000.000.000.0044,999.1044,999.1044,947.7844,983.809128284B3UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00339,455.47339,455.47342,297.72343,851.523137EAEL9FEDERAL HOME LOAN MORTGAGECORPAGCY BOND6,234.380.000.000.000.000.000.000.000.00521,808.00521,808.00527,962.39530,848.44931142EG4WALMART INCCORP0.000.000.000.00-327,502.50-1,672.400.000.002,544.97324,899.250.00326,909.610.0002665WCH2AMERICAN HONDA FINANCE CORPCORP0.000.000.000.000.000.000.000.000.0074,898.7574,898.7575,478.6875,539.289128283X6UNITED STATES TREASURYUS GOV3,712.500.000.000.000.000.000.000.000.00325,952.35325,952.35331,353.66332,874.639128284P2UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00328,723.83328,723.83333,931.62335,710.6517305EFW0CCCIT 16A1 A1ABS0.000.000.000.000.000.000.000.000.00197,429.69197,429.69199,677.60199,818.889128285A4UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00298,722.65298,722.65305,425.80307,406.40912828Y20UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00436,803.13436,803.13445,929.88448,576.48Portfolio Activity SummarySan Jacinto, City of (66779)08/01/2019 - 08/31/2019Return to Table of ContentsDated: 09/09/2019163.A.3.aPacket Pg. 76Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Identifier,Description,Security TypeInterest/DividendReceivedTransfers In/OutPurchasesPurchasedAccruedIncomeSalesDisposed AccruedMaturities andRedemptionsPaydownsNet RealizedGain/LossBeginning OriginalCost,Ending Original CostBeginning MarketValue,Ending Market Value02665WCP4AMERICAN HONDA FINANCE CORPCORP0.000.000.000.000.000.000.000.000.00174,916.00174,916.00179,261.62180,633.22912828F21UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00428,491.99428,491.99437,107.14440,369.649128285L0UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00437,090.04437,090.04444,634.38447,812.053135G0U92FEDERAL NATIONAL MORTGAGEASSOCIATIONAGCY BOND0.000.000.000.000.000.000.000.000.00129,906.40129,906.40132,056.69133,301.439128285R7UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00250,664.06250,664.06254,423.75256,416.009128284T4UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00440,928.13440,928.13445,672.04448,112.72912828WY2UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00436,940.63436,940.63442,870.12445,792.16912828D72UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00246,748.05246,748.05250,488.25252,304.759128283Q1UNITED STATES TREASURYUS GOV0.000.000.000.00-185,895.70-389.400.000.002,282.47183,106.640.00185,057.720.00912828W55UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.0098,101.5698,101.56100,007.80100,976.60912828XG0UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00148,089.85148,089.85151,148.40152,894.55912828G87UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00284,242.97284,242.97286,647.59289,141.349128286H8UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00286,425.00286,425.00288,885.41291,535.053137AXHP1FHMS K024 A2FHLMC CMO686.130.000.000.000.000.000.000.000.00319,687.50319,687.50323,549.82326,789.02912828SF8UNITED STATES TREASURYUS GOV3,150.000.000.000.000.000.000.000.000.00314,778.52314,778.52316,045.80319,097.52912828V72UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00313,621.88313,621.88314,963.15317,891.70912828B90UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00314,310.94314,310.94315,135.45316,722.73912828WG1UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00315,922.85315,922.85316,698.16318,322.30912828C57UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00315,762.89315,762.89316,538.15318,064.01912828L57UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00374,765.63374,765.63373,798.88378,559.50912828J76UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00473,348.63473,348.63473,626.78478,599.55Portfolio Activity SummarySan Jacinto, City of (66779)08/01/2019 - 08/31/2019Return to Table of ContentsDated: 09/09/2019173.A.3.aPacket Pg. 77Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) * Weighted by: Ending Market Value + Accrued. * Holdings Displayed by: Lot.Identifier,Description,Security TypeInterest/DividendReceivedTransfers In/OutPurchasesPurchasedAccruedIncomeSalesDisposed AccruedMaturities andRedemptionsPaydownsNet RealizedGain/LossBeginning OriginalCost,Ending Original CostBeginning MarketValue,Ending Market Value912828L24UNITED STATES TREASURYUS GOV0.000.00100,953.13-825.410.000.000.000.000.000.00100,953.130.00101,281.2030231GBB7EXXON MOBIL CORPCORP0.000.0075,000.000.000.000.000.000.000.000.0075,000.000.0075,476.94912828P38UNITED STATES TREASURYUS GOV0.000.00439,570.90-579.210.000.000.000.000.000.00439,570.900.00439,621.88---------15,620.38-104.17775,382.09-1,404.62-684,208.70-2,061.80-75,000.000.004,827.4410,583,380.1710,612,544.2210,683,500.4610,773,981.88Portfolio Activity SummarySan Jacinto, City of (66779)08/01/2019 - 08/31/2019Return to Table of ContentsDated: 09/09/2019183.A.3.aPacket Pg. 78Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) Additional Disclosure:This information is for the sole purposes of the client and is not intended to provide specific advice or recommendations. Please review the contents of this information carefully. Should you have any questions regarding theinformation presented, calculation methodology, investment portfolio, security detail, or any other facet of this information, please feel free to contact us.Public Trust Advisors, LLC (Public Trust) statements and reports are intended to detail our investment advisory activity as well as the activity of certain client accounts managed by Public Trust. The custodian bank maintainsthe control of assets and executes and settles all investment transactions. The custodian statement is the official record of security and cash holdings transactions. Public Trust recognizes that clients may use these reports tofacilitate record keeping; therefore, it is recommended that the client reconcile this information with their custodian bank statement. Many custodians use a settlement date basis that may result in the need to reconcile due to atiming difference. The underlying market value, amortized cost, and accrued interest may differ between the custodian and this statement or report. This can be attributed to differences in calculation methodologies and pricingsources used.Public Trust does not have the authority to withdraw funds from or deposit funds to the custodian. Our clients retain responsibility for their internal accounting policies, implementing and enforcing internal controls, andgenerating ledger entries or otherwise recording transactions. The total market value represents prices obtained from various sources; it may be impacted by the frequency at which prices are reported, and such prices are notguaranteed. Prices received from pricing vendors are generally based on current market quotes but when such quotes are not available, the pricing vendors use a variety of techniques to estimate value. These estimates,particularly for fixed-income securities, may be based on certain minimum principal amounts (e.g. $1 million) and may not reflect all the factors that affect the value of the security including liquidity risk. The prices provided arenot firm bids or offers. Certain securities may reflect N/A or unavailable where the price for such security is generally not available from a pricing source. The market value of a security, including those priced at par value, maydiffer from its purchase price and may not closely reflect the value at which the security may be sold or purchased based on various market factors. The securities in this investment portfolio, including shares of mutual funds,are not guaranteed or otherwise protected by Public Trust, the FDIC (except for certain non-negotiable certificates of deposit), or any government agency unless specifically stated otherwise.Clients may be permitted to establish one or more unmanaged accounts for the purposes of client reporting. Clients may also be permitted to provide externally managed assets for the purposes of client reporting. Public Trustdefines unmanaged accounts or assets as one where the investment direction remains the sole responsibility of the client rather than the Investment Manager. Unmanaged accounts or external assets do not receive ongoingsupervision and monitoring services. The Investment Manager does not make any investment recommendations and may not charge a fee for reporting on these accounts or assets. The primary purpose for this service is toinclude unmanaged accounts or assets owned by the client in the performance reports provided by the Investment Manager. The Investment Manager assumes no liability for the underlying performance of any unmanagedaccounts or assets, and it is the client’s sole responsibility for the accuracy or correctness of any such performance.Beginning and ending balances are based on market value plus accrued interest on a trade date basis. Statements and reports made available to the end user either from Public Trust or through the online reporting platformmay present information and portfolio analytics using various optional methods including, but not limited to, historical cost, amortized cost, and market value. All information is assumed to be correct, but the accuracy has notbeen confirmed and therefore is not guaranteed to be correct. Information is obtained from third party sources that may or may not be verified. The data in this report is unaudited and is only applicable for the date denoted onthe report. Market values may change day-to-day based on numerous circumstances such as trading volume, news released about the underlying issuer, issuer performance, etc. Underlying market values may be priced vianumerous aspects as certain securities are short term in nature and not readily traded. Performance results are shown net of all fees and expenses and reflect the reinvestment of dividends and other earnings.Many factors affect performance including changes in market conditions and interest rates and in response to other economic, political, or financial developments. Investment involves risk including the possible loss ofprincipal. No assurance can be given that the performance objectives of a given strategy will be achieved. Past performance is no guarantee of future results. Any financial and/or investment decision may incur losses.The investment advisor providing these services is Public Trust Advisors, LLC, an investment adviser registered with the U.S. Securities and Exchange Commission (SEC) under the Investment Advisers Act of 1940, asamended. Registration with the SEC does not imply a certain level of skill or training. Public Trust is required to maintain a written disclosure brochure of our background and business experience. If you would like to receive acopy of our current disclosure brochure, Privacy Policy, or Code of Ethics, or have any questions regarding your account please contact us.Public Trust Advisors717 17th St. Suite 1850Denver, CO 802023.A.3.aPacket Pg. 79Attachment: August 2019 Treasurers Report (Treasurer's Report at August 31, 2019) October 1, 2019 TO: City Council REQUESTED BY: Travis Randel, Community Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: On-Call Environmental Consultant List RECOMMENDATION: That the City Council Approve the On-Call Environmental Consultant List through Fiscal Year 2024-2025 thereby authorizing Staff to use informal bidding for Environmental Work associated with a CEQA or NEPA Review. BACKGROUND: The California Environmental Quality Act (CEQA) was enacted in 1970 following the enactment of the National Environmental Policy Act (NEPA) the previous year. CEQA is California’s broadest environmental law and is codified in the Public Resources Code Section 21000-21189. The purpose of CEQA is to:  Disclose to the public the significant environmental effects of a proposed discretionary project, through the preparation of an Initial Study (IS), Negative Declaration (ND), or Environmental Impact Report (EIR).  Minimize damage to the environment through development of project alternatives, mitigation measures, and mitigation monitoring.  Disclose to the public the agency decision making process utilized to approve discretionary projects through findings and statements of overriding consideration.  Enhance public participation in the environmental review process through scoping meetings, public notice, public review, hearings, and the judicial process.  Improve interagency coordination through early consultations, scoping meetings, notices of preparation, and State Clearinghouse review. CEQA applies to certain activities of state and local public agencies. A public agency must comply with CEQA when it undertakes an activity defined by CEQA as a "project." A project is an activity undertaken by a public agency or a private activity, which must receive some discretionary approval (meaning that the agency has the authority to deny the requested permit or approval) from a government agency, which may cause either a direct physical change in the environment or a reasonably foreseeable indirect change in the environment. Most proposals for physical development in California are subject to the provisions of CEQA, as are many governmental decisions, which do not immediately result in physical development (such as adoption of a general or community plan ). Every development project, which requires a discretionary governmental approval will require at least some environmental review pursuant to CEQA, unless an exemption applies. In addition to the Public Resources Code, the Governor’s Office of Planning a nd Research 3.A.4 Packet Pg. 80 prepares Guidelines for the implementation and administration of CEQA in Section 15000- 15387 of the Code of Regulations. The Guidelines are the regulations that explain and interpret the law for both the public agencies required to administer CEQA and for the public generally. The Guidelines provide objectives, criteria and procedures for the orderly evaluation of projects and the preparation of Environmental Impact Reports, Negative Declarations, and Mitigated Negative Declarations by public agencies. The fundamental purpose of the Guidelines is to make the CEQA process comprehensible to those who administer it, to those subject to it, and to those for whose benefit it exists. To that end, the Guidelines are more than mere regulations, which implement CEQA as they incorporate and interpret both the statutory mandates of CEQA and the principles advanced by judicial decisions. While all Development Projects are subject to the provisions of CEQA, some projects may require only minimal review while others are quite extensive. For instance, construction of a new 4,000 square foot multi-tenant building within an existing shopping center may be found to be Categorically Exempt from CEQA, while a new shopping center may require a Negative Declaration, Mitigated Negative Declaration, or Environmental Impact Report. The level of review is based on a number of environmental factors including the presence of Archeological, Cultural or Biological Resources; Air or Water Quality; and Noise or Traffic Impacts. CEQA is a self-executing statute. Public agencies are entrusted with compliance with CEQA and its provisions are enforced, as necessary, by the public through litigation, and the threat thereof. While the Resources Agency is charged with the adoption of CEQA Guidelines, and may often assist public agencies in the interpretation of CEQA, it is each public agency's duty to determine what is and is not subject to CEQA. DISCUSSION: Starting with the Aldi and Starbucks projects constructed last year and continuing with new development proposals such as the Luiseno Village and KPC Promenade, the City has experienced an exponential growth in commercial development proposals over the past several years. As previously presented to the City Council, as part of the Envision San Jacinto Program, City Staff is exploring options on streamlining the development process by providing greater certainty and transparency to the development community while maintaining our commitment to keeping the residents informed and engaged in the development review process. One of the greatest challenges for Cities is the lack of specialized experience required under CEQA. For instance, the City does not have a Biologist or Archeologist on staff; nor would it be financially prudent to do so. As a result, the City often contracts with qualified consultants to help in the preparation of highly technical studies and surveys. In addition, staff relies on consultants to help convert the highly technical information to readily understandable reports, which are then provided to the general public. The City’s procurement process outlined in Chapter 3.080.070, Bidding, Contracting and Purchases of Supplies, Services and Equipment, of the Municipal Code allows for the Department Director to award Professional Service Contracts of less than $100,000 by “any 3.A.4 Packet Pg. 81 alternative procedure (i.e. non-formal bid process)”, but requires City Council approval for contacts over $75,000. Contracts over $100,000, or multiple contracts that collectively exceed $100,000 to a single vendor within any fiscal year, require a formal competitive bid to be approved by the City Council. In August 2019, the City posted a Request for Qualifications (“RFQ”) to create a “Short List” of qualified Environmental Consultants (“Consultants”). The short list would allow City staff to obtain informal bids from specific Consultants for individual projects without going through a formal bid process. The short list will save development applicants time and money by simplifying the process for identifying and selecting Consultants. The City received responses from 18 firms. Consultants selected from the list will be limited to a maximum of One Million Dollars ($1,000,000) during the term of the Short List, which is proposed to extend through Fiscal Year 2024-2025 (5 years). A consultant hired directly by the developer is not subject to the procurement requirements, nor are they limited on compensation since payments are provided directly from the developer to the consultant. For Development Projects, the Consultant fees will be paid by the applicant through their project deposit. For Capital Improvement, Public Works and Engineering Projects, the consultants will be paid out of the project funds. It is important to note that while the approval of the Short List creates a list for City staff to select from without a formal bid, it does not introduce, expand, or change any fee/cost associated with the project development. Instead, the Short list provides a streamline process to select qualified Consultants that have demonstrated exceptional knowledge and experience in one or more specialized areas. In reviewing the RFQ responses, 11 of the firms have demonstrated extensive knowledge and experience in the City, County or Southern California and provide a wide range of comprehensive and specialized reports and services. Those firms are:  Albert A. Webb & Associates  Aspen Environmental Group  Chambers Group, Inc.  Dudek  ECORP Consulting, Inc.  EPD Solutions, Inc.  FirstCarbon Solutions  ICF Jones & Stokes  Kimley-Horn and Associates  Placeworks  The Altum Group Staff broke the Consultants into two lists, one for Development Projects (private development) and the other for Capital Improvement, Public Works and Engineering Projects (public projects). While staff is recommending limiting the list to the 11 firms listed above, staff did determine that all 18 firms demonstrated sufficient knowledge and experience and therefore provided a “Qualified Consultants” list, which will be made available to the general public. This allows for 3.A.4 Packet Pg. 82 a developer to select a consultant prior to submitting to the City with a reasonable degree of certainty that the consultant is qualified to complete the work. The list does not provide an endorsement of any Consultant. A developer may select from the Qualified Consultant list or use any other qualified consultants for their project. However, staff reserves the right to hire a Consultant from the Short List to complete a 3rd Party /Quality Control Review to verify findings and mitigation depending on the scope of the project. FISCAL IMPACT: There is no fiscal impact. All costs associated with hiring a Consultant or 3rd Party Reviewer will be paid for by the Project Applicant or the Capital Improvement, Public Works or Engin eering Project budget. ATTACHMENTS: On-Call CEQA/NEPA Consultant List for Public Projects - Short List On-Call CEQA/NEPA Consultant List for Planning Projects - Short List Qualified Consultant List 3.A.4 Packet Pg. 83 On-Call CEQA/NEQA Environmental Consultant Short List Engineering/Public Works/CIP Projects Dudek ECorp ICF Webb & Associates 3.A.4.a Packet Pg. 84 Attachment: On-Call CEQA/NEPA Consultant List for Public Projects - Short List (On-Call Environmental Consultant List) On-Call CEQA/NEQA Environmental Consultant Short List Planning Projects – Comprehensive Review Altum Group Aspen Chambers Dukek ECorp EPD Solutions First Carbon ICF Kimley Horn Placeworks Webb & Associates 3.A.4.b Packet Pg. 85 Attachment: On-Call CEQA/NEPA Consultant List for Planning Projects - Short List (On-Call Environmental Consultant List) Qualified Consultant List – Areas of Qualification Comprehensive Plan Air Quality and GHG Emissions Biological Resources Archeological Resources Cultural Resources Geo / Soils Hazards and HazMat Hydrology and Water Quality Noise Traffic Impact Tribal Cultural Aspen Environment 909.949.3686 X X X X X X Chambers Group 949.261.5414 X X X X X X X X X X X Dudek 951.300.2100 X X X X X X X X X X X ECORP Consulting 909.307-0046 X X X X X X X EcoTierra Consulting 951.462.2070 X X X X X EPD Solutions 949.794.1182 X X X X X X X X X X X First Carbon Solution 888.826.5814 X X X X X X X X X ICF Jones & Stokes 951.493.0660 X X X X X X X X X X X Impact Science 213.935.1901 X X X Kimley-Horn 951.543.9868 X X X X X Matthew Fagan 951.265.5428 X Placeworks 714.966.9220 X X X X X X X X X X Sagecrest Planning 714.783.1863 X X X X X X X TetraTech 949.809.5042 X X X X X X X The Altum Group 760.346.4750 X X X X X X X X X X X Tidewater 614.792.2896 X X X UltraSystem 949.788.4900 X X X X X X Webb & Associates 951.686.1070 X X X X 3.A.4.c Packet Pg. 86 Attachment: Qualified Consultant List (On-Call Environmental Consultant List) October 1, 2019 TO: City Council REQUESTED BY: Robert Johnson, City Manager APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Lease Agreement with Family Services Association of Western Riverside County RECOMMENDATION: Staff recommends that the City Council approve the Lease Agreement with Family Services Association (FSA) of Western Riverside County for the use of the Community Center. RECOMMENDATION: Staff recommends that the City Council approve the Lease Agreement with Family Services Association (FSA) of Western Riverside County for the use of the Community Center. BACKGROUND: Since June 2002, FSA has been using the kitchen and dining area at the community center to operate the senior nutrition program. The senior nutrition program offers a vital service to our senior population and enhances the programs and services offered at the Community Center. In order for the program to be preserved, FSA will lease the entire Community Center from the City. The significant terms of lease are as follows:  No cost to the FSA in monthly or annual lease payments.  Exclusive use of entire Community Center and parking lot.  FSA to be responsible for maintaining the building, all equipment, and for payment of all utilities associated with the Center.  Lessee shall be responsible for repairs at the facility up to $5,000.00 total per calendar year  Term of Lease is through June 30, 2022.  FSA fully indemnifies the City of San Jacinto. ATTACHMENTS:  Lease Agreement ATTACHMENTS: Family Services Association Lease _2019 Draft 3.A.5 Packet Pg. 87 Page 1 of 11 OFFICE OF AGING NUTRITION PROGRAM LEASE REAL PROPERTY LEASE between CITY OF SAN JACINTO a California municipal corporation AND FAMILY SERVICES ASSOCIATION OF WESTERN RIVERSIDE COUNTY a private-non-profit organization in California 3.A.5.a Packet Pg. 88 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 2 of 11 1. Parties and Date. This Lease Agreement (“Agreement”) is made and entered into this 1st day of October 1st, 2019, by and between The City of San Jacinto (“Lessor”), a California municipal corporation, with its principal place of business at 595 S. San Jacinto Avenue, San Jacinto, California 92583, and Family Services Association of Western Riverside County (“Lessee”), a California Corporation, with its principal place of business at 21250 Box Springs Road, Suite 212, Moreno Valley, California 92557. The Lessor and Lessee are sometimes referred to individually as a “Party” and referred to collectively as the “Parties.” 2. Recitals. 2.1 Lessor Property. Lessor is the owner of that real property located at 625 S. Pico Street, San Jacinto, California 92383, (“Lessor Property”), legally described in Exhibit “A” and incorporated by this reference. 2.2 Purpose of Agreement. Lessor desires to lease to Lessee, and Lessee desires to lease from Lessor, a portion of the Lessor Property for due and adequate consideration, the receipt and sufficiency of which are acknowledged by the Parties and further described and set forth in this Agreement, for the purpose of operating a nutrition program for the elderly at a portion of the Lessor Property. 3. Terms. 3.1 Description of Leased Premises. Lessor hereby leases to Lessee, and Lessee leases from Lessor, on the terms and conditions set forth in this Agreement, a portion of the Lessor Property consisting of a kitchen and dining facility and are approximately one thousand seven hundred (1,700) square feet, as more specifically shown on the diagram attached as Exhibit “B” and incorporated by this reference. (“Leased Premises”). 3.2 Term. The term of this Agreement shall be for three (3) years beginning July 1, 2019 (“Lease Commencement Date”) and ending June 30, 2022. 3.3 Lease Payment. The Leased Premises are leased to the Lessee for the sum of one dollar ($1) per year (“Annual Lease Payment”), payable on or before the first (1st) day of the month during the term of this Agreement. Payment shall be made in legal U.S. tender and shall be sent to Lessor at the address provided in Section 3.25 of this Agreement and shall be made payable to the City of San Jacinto. 3.4 Use. 3.A.5.a Packet Pg. 89 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 3 of 11 3.4.1 Nutrition Program. The Leased Premises are leased to Lessee solely for the purpose of operating a nutrition program for the elderly which shall consist of preparing and serving nutritionally sound meals to the elderly and providing social and rehabilitative services on a daily basis during the term of this Agreement (“Nutrition Program”). The Nutrition Program may be operated directly by Lessee, by any agent or designee of Lessee or any combination of these. Any agent or designee of Lessee shall be chosen by Lessee in Lessee’s sole and absolute discretion. 3.4.2 Lawful Operation. Lessee shall operate the Nutrition Program in accordance with the Older Americans Act of 1965, as amended (42 United States Code, section 3030(e) et seq.) and all applicable federal, state, and City laws and regulations, and this Agreement. Lessee shall be responsible for ensuring that all necessary approvals, licenses, and permits have been obtained in order to operate the Nutrition Program in a lawful manner. 3.4.2.1 Reasonable Access to Leased Premises. Lessor and its agents shall have the right at all reasonable times to enter the Leased Premises to: (a) inspect the Leased Premises to determine whether Lessee is carrying on any activity that violates this Agreement; (b) show the Leased Premises to prospective purchasers, mort gagees, or tenants or to ground lessors or underlying lessors; (c) serve, post, and keep posted notices required by law or that Lessor considers necessary for the protection of the Lessor or the Lessor Property; or (d) make repairs, replacements, alterations, or improvements to the Leased Premises or Lessor Property that Lessor considers necessary or desirable. 3.4.3 Hours of Operation. Lessee shall have exclusive use of the Leased Premises between the hours of 7:00 a.m. and 2:00 p.m. on Monday through Friday, inclusive for the duration of this Agreement. During such period, Lessee shall have the use in common with others of the restrooms, hallways, entrances, parking spaces, and other similar facilities of and surrounding the Leased Premises. 3.A.5.a Packet Pg. 90 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 4 of 11 3.5 No Joint Venture or Partnership. Lessor and Lessee shall not, by virtue of this Agreement, in any way or for any reason, be deemed to be or have become a partner of the other in the conduct of its business or otherwise, or a joint venturer. 3.6 Reserved. 3.7 Payment of Taxes. Lessee shall pay any possessory interest tax imposed against the Lessee and the Leased Premises. Lessor shall pay any remaining real and personal property taxes assessed against the Lessor Property. 3.8 Utilities and Janitorial Services. Except as otherwise specifically provided in this Agreement, Lessor shall pay for the utility costs associated with the Lessor Property. Lessee shall pay all charges for telephone service associated with the Leased Premises, including any and all improvements, alterations, fixtures and furnishings made part of or associated with the Leased Premises. 3.9 Maintenance and Repair. Lessee shall maintain in good repair the furniture, kitchen facilities, heating, ventilation, and cooling system, plumbing and electrical systems, doors, windows, roof, common areas, and other like portions of the Leased Premises. Lessee shall be responsible for repairs at the facility up to $5,000.00 total per calendar year. Lessee shall keep the Leased Premises in a neat and sanitary condition, and shall comply with the California Uniform Retail Food Facilities Law (Health and Safety Code section 113700 et seq.) This includes, but is not limited to picking up trash and food droppings, wiping surfaces, and removing soil marks from floors and tables. Lessor shall maintain in good repair the heating, ventilation and cooling system, plumbing and electrical systems, exterior walls, windows, roof, sidewalks, yards, driveways, common areas, and other like portions of the Leased Premises and Lessor Property. Lessee shall not go onto, and shall not authorize or permit any person to go onto, the roof of the Lessor Property without the prior written consent of Lessor. Lessor shall not be required to repair or replace any of the above items unless and until Lessee has notified Lessor in writing of the need for such repairs or replacement. Once notified, Lessor shall complete any and all needed repairs and replacements within a reasonable period of time at no cost or expense to the Lessee, except to the extent that such repairs or replacements are attributable in whole or in part to the negligence or misconduct of the Lessee, its employees, agents, contractors, licensees and invitees. 3.9.1 Lessee shall keep the Leased Premises in a neat and sanitary condition, and shall comply with the California Uniform Retail Food Facilities Law (Health and Safety Code section 113700 et seq.). This includes, but is not limited to picking up trash and food droppings; wiping surfaces; and removing soil marks from floors and tables. 3.10 Independent Contractor. 3.A.5.a Packet Pg. 91 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 5 of 11 Neither Lessee, nor any of its agents, employees, invitees, licensees, or guests shall constitute employees of the Lessor. 3.A.5.a Packet Pg. 92 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 6 of 11 3.11 Improvements. Except as expressly provided by this Agreement, no improvements shall be constructed and/or maintained on the Leased Premises without Lessor’s prior written approval, which approval shall not unreasonably be withheld. Lessee shall, at Lessee’s sole cost, expense, and liability, obtain all permits and entitlements required for improvements. All fixtures, improvements, or additions made to the Leased Premises by Lessee shall become the real property of the Lessee at the expiration or termination of the Agreement and shall be removed by Lessee upon termination of this Agreement. 3.12 Insurance. Lessor shall procure and maintain during the term of this lease, fire insurance and extended coverage on the building in which the Leased Premises are located. Lessor shall provide Lessee with satisfactory proof of such coverage in the form prescribed by Lessee. 3.13 Acceptance; Surrender. The Lessee shall be deemed to have accepted the Leased Premises as being in good condition for the above-stated uses. The Lessee shall, upon the termination or expiration of any Agreement term, surrender the Leased Premises in as good condition, reasonable use and wear excepted. 3.14 Waste and Covenant of Quiet Enjoyment. Lessee shall not commit, or allow to be committed, any waste upon the Leased Premises, or any nuisance or other act which may disturb the quiet enjoyment of the Lessor or any other tenant of the Lessor Property. Lessee shall not engage in, or permit or authorize any of Lessee’s employees, agents, licensees, invitees, or guests to engage in, any activity, which constitutes a violation of any applicable federal, state, or City laws, ordinances, or regulations. 3.15 Repair of Damage. Lessee agrees to notify Lessor in writing within three (3) days of any damage to the Leased Premises resulting from fire, earthquake, or any other identifiable event of a sudden, unexpected, or unusual nature (“Casualty”). If the Leased Premises are damaged by a Casualty or areas provided access to the Leased Premises are damaged to the extent that Lessee does not have rea sonable access to the Leased Premises and if neither Lessor nor Lessee has elected to terminate this Agreement, Lessor shall, at Lessor’s sole cost and expense, promptly and diligently restore such areas and the Leased Premises to substantially the same co ndition as existed before the Casualty, except for modifications required by building codes and other laws. Lessor shall, within thirty (30) days after Lessor has determined the extent of the damage caused by the Casualty provide written notice to Lessee indicating the anticipated period for repairing the damage caused by the Casualty (“Repair Period Notice”). In making the repairs and modifications required by this Section 3.15, Lessor shall not materially impair Lessee’s access to the Leased Premises. 3.16 Indemnity. To the fullest extent permitted by law, Lessee shall, at Lessee’s sole expense, indemnify, defend, and hold harmless Lessor, its officials, officers, employees, agents, and volunteers from and 3.A.5.a Packet Pg. 93 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 7 of 11 against all actions, claims, proceedings, damages, costs, expenses (collectively, “Liabilities”) arising out of or relating to any act, error, or omission, or negligence of Lessee, its officials, officers, agents, employees, independent contractors, licensees, invitees, and guests, to the extent that such Liabilities are not the proximate result of Lessor’s or its officials’, officers’, employees’, agents’, or volunteers’ active or passive negligence or willful misconduct. Lessor shall, with counsel reasonably acceptable to Lessee, indemnify, defend, and hold harmless Lessee, its officials, officers, employees, agents, and volunteers from and against all Liabilities arising out of or relating to any act, error, or omission, or negligence of Lessor, its officers, directors, members, agents, employees, and independent contractors, to the extent that such Liabilities are not the proximate result of Lessee’s or its officials’, officers’, employees’, agents’, or volunteers’ active or passive negligence or willful misconduct. 3.17 Assignment/Sublease. Lessee may, with the written consent of Lessor, which consent shall be in the sole and absolute discretion of Lessor, withhold, sell, assign, mortgage, assign, sublease, or transfer Lessee’s interest in this Agreement. Any attempted transfer without Lessor’s written consent shall be void and shall constitute a non-curable breach of this Agreement. 3.18 Option to Terminate. 3.18.1 Either party may terminate this Agreement upon giving thirty (30) days written notice to the address listed in Section 3.25 of this Agreement. 3.18.2 If the Repair Period Notice required by Section 3.15 indicates that the anticipated period for repairing the Leased Premises or areas exceeds ninety (90) days, Lessee may elect to terminate this Agreement without any liability of any kind by providing written notice (“Lessee’s Termination Notice”) to Lessor within ten (10) days after receipt of the Lessor’s Repair Period Notice. If Lessee does not elect to terminate within this ten (10) day period, Lessee shall be deemed to have waived the option to terminate. 3.19 Rent Abatement. If Lessee is prevented from using, and does not use, all or part of the Leased Premises (“Affected Area”) as a result of a Casualty, as defined in Section 3.15 and if this loss of use continues for five (5) consecutive business days after Lessor’s receipt of written notice from Lessee of the Casualty, the Monthly Lease Payment payable under this Agreement shall be abated or reduced after the expiration of the Eligibility Period for such time that Lessee continues to be prevented from using, and does not use, the Affected Area in the proportion that the square footage of the Affected Area bears to the square footage of the Leased Premises. 3.A.5.a Packet Pg. 94 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 8 of 11 3.20 Severability. If any term, covenant, condition, or provision of this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remainder of the provisions hereof shall remain in full force and shall not be affected, impaired, or invalidated thereby. 3.21 Attorneys’ Fees. In case either Party brings an action to enforce any term or condition of this Agreement, the prevailing Party shall be entitled to its reasonable attorneys’ fees as determined by the court, and all other costs and expenses related to such action. 3.22 Waiver. The waiver by either Party of the breach of any provision of this Agreement shall not be deemed to be a waiver of any subsequent breach of that or any other provision. 3.23 Binding on Successors. This Agreement shall apply to and be binding upon the heirs, successors in interest, executors, administrators, and assigns of the respective Parties hereto. The terms Lessee, Lessor, Party, and Parties shall include the heirs, successors in interest, executors, administrators, assigns, agents, employees, officers, or officials of such Party or Parties. 3.24 Captions. The various headings contained herein and the grouping of the provisions of this Agreement into separate paragraphs are for the purpose of convenience only, and shall not be considered in interpreting the provisions of this Agreement. 3.25 Notices. Any and all notices which are required under the terms and conditions of this Agreement or which either Lessor or Lessee desire to serve upon the other, shall be in writing and shall be deemed served when delivered personally or faxed, or when deposited in the United States mail, postage prepaid, return receipt requested, and addressed as follows: 3.A.5.a Packet Pg. 95 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 9 of 11 LESSOR: City of San Jacinto P.O. Box 488 San Jacinto, CA 92583 Fax: 951-654-3728 Attn: City Manager LESSEE: Family Service Association 21250 Box Springs Road Suite 207 Moreno Valley, CA. 92557 Attn: CEO Any notice so given shall be considered served on the other Party three (3) days after deposit in the U.S. mail, first class postage prepaid, return receipt requested, and addressed to the Party at its applicable address. Actual notice, including by fax, shall be deemed adequate notice on the date actual notice occurred regardless of the method of service. 3.26 Entire Agreement. This Agreement, along with any exhibits and attachments attached hereto and incorporated herein by reference, constitutes the entire agreement between the Lessor and the Lessee relative to the Lessor Property, and may only be modified by mutual consent of the Parties in writing. IN WITNESS WHEREOF, the Parties hereby execute this Agreement effective upon the day and year first above written. LESSOR: THE CITY OF SAN JACINTO a municipal corporation By: __________________________________ _ Robert A. Johnson City Manager ATTEST: ______________________________________ Angela Walton City Clerk 3.A.5.a Packet Pg. 96 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 10 of 11 APPROVED AS TO LEGAL FORM: City Attorney _______________________________________ Mike Maurer City Attorney LESSEE: Family Services Association of Western Riverside County A California corporation ______________________________________ ATTEST: _____________________________________ APPROVED AS TO LEGAL FORM: By: ________________________________ County Counsel 3.A.5.a Packet Pg. 97 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 11 of 11 EXHIBIT “A” LEGAL DESCRIPTION OF PROPERTY 2.02 Acres M/L in Lot 1 Blk 24 MB 007/329 SD Map of Town of San Jacinto 3.A.5.a Packet Pg. 98 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) Page 12 of 11 EXHIBIT “B” DIAGRAM OF LEASED PREMISES [See attached] 3.A.5.a Packet Pg. 99 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services Association of Western Riverside County) 1:4•171two":”' Adult Day Care Parking Lot Entrance Meeting Room = Lease Area Reception Area Main Entrance 3.A.5.a Packet Pg. 100 Attachment: Family Services Association Lease _2019 Draft (Lease Agreement with Family Services October 1, 2019 TO: City Council REQUESTED BY: Travis Randel, Community Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05) RECOMMENDATION: That the City Council continue this item to October 15, 2019. DISCUSSION: On September 17, 2019, the City Council held a public hearing for the Luiseno Village Project and introduced Ordinance No. 19-18 for Change of Zone 17-05. The item was continued to October 1, 2019, for the 2nd reading of the ordinance and conditional approval of the project. However, staff has been informed that the Joint Project Review being managed by the Western Riverside County Regional Conservation Authority has not yet been completed, which means that the environmental review has not officially concluded. Therefore, staff recommends continuance of this item until October 15, 2019. FISCAL IMPACT: There are no fiscal impacts associated with this item. ATTACHMENTS: September 17, 2019 City Council Staff Report 4.1 Packet Pg. 101 September 17, 2019 TO: City Council REQUESTED BY: Travis Randel, Community Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05) RECOMMENDATION: That the City Council: 1. INTRODUCE Ordinance No. 19-18 for first reading approving Change of Zone 17-05 to change the Zone from CN - Commercial Neighborhood to CG - Commercial General; AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA APPROVING CHANGE OF ZONE 17-05, A ZONE CHANGE FROM COMMERCIAL NEIGHBORHOOD TO COMMERCIAL GENERAL LOCATED ON THE WEST SIDE OF RAMONA EXPRESSWAY EXTENDING BETWEEN MAIN STREET AND DONNA WAY (APNs 433-160-024,027,028,029,032,033, and 034) 2. Open the Public Hearing for the Luiseno Village Project and take public testimony; and 3. CONTINUE the Public Hearing to October 1, 2019. BACKGROUND: On August 27, 2019, the Planning Commission held a Public Hearing and unanimously recommended that the City Council approve the Luiseno Village Project. The Project, consisting of 9.4 acres, is located on the west side of Ramona Expressway, extending between Main Street and Donna Way and includes:  Two retail buildings totaling 23,943 square feet;  A service station with a 3,048 square foot convenience store with an off-sale general alcohol license, 24 fuel pumps, and a 1,105 square foot car wash;  A 3,200 square-foot fast food restaurant with drive-through service; and  A 2,800 square-foot fast food restaurant with drive-through service. To facilitate the project, the applicant is requesting approval of the following entitlements:  Site Plan and Design Review (SPDR-17-17);  Conditional Use Permit (CUP-17-09) to permit a service station with a convenience store and an off-sale general alcohol license and an automated car wash;  Minor Use Permits (MUP-17-09 & MUP-17-10) to permit two fast food restaurants with drive-through service; 4.1 Packet Pg. 78 4.1.a Packet Pg. 102 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))  Minor Use Permit (MUP-17-11) to exceed the City’s parking requirement by more than five percent;  Variance (VAR-17-05) to allow 24 fuel pumps at a single station where a maximum of 15 are permitted by the Development Code; and  Change of Zone (CZ-17-05) to change the Zone from Commercial Neighborhood to Commercial General. While the Planning Commission unanimously recommended approval of the project, they also recommended striking condition 59. Staff supports the proposed change as Condition 59 was redundant and partially conflicted with other, more specific, Conditions of Approval. DISCUSSION: The Luiseno Village Project will be a welcome addition to the Ramona Expressway Corridor providing additional food, gas, and retail venues for area residents. Details of the Project can be found in the attached Planning Commission staff report (Attachment 3). The project is located within Criteria Cells 3098 and 3099 of the Western Riverside County Multiple Species Habitat Conservation Plan. A Criteria Refinement has been proposed as part of the project and a Joint Project Review (“JPR”) is in process with t he Riverside Conservation Authority. Staff anticipates the JPR to be completed in the next several days, and as such, recommend that the City Council continue the public hearing to October 1, 2019, before adopting the attached Mitigated Negative Declaration and approval resolution. The continued Public Hearing would coincide with the second reading of the Rezoning Ordinance and ensure compliance with any requirements from the JPR. ENVIRONMENTAL ANALYSIS: Based upon the information contained in the Initial Study and pursuant to the requirements of CEQA, it has been determined that this Project, with the incorporation of mitigation measures, will not have a significant impact on the environment. The mitigation measures required to reduce or mitigate the impacts of this Project on the environment are included in the Project design and/or the Mitigation Monitoring Program and will be included as part of the Mitigated Negative Declaration for this Project. CONCLUSION: As designed and conditioned, the Project will be a welcome addition along Ramona Expressway and in the City. The Project offers area residents and the traveling public another choice for gasoline and food, car wash, and retail sales, promoting job opportunities, and strengthening the local buying power. FISCAL IMPACT: There is no impact to the General Fund since all project costs are borne by the applicant. ATTACHMENTS: 1 - Ordinance 19-18 2 - Resolution 3781 4.1 Packet Pg. 79 4.1.a Packet Pg. 103 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) 3 - PC Staff Report 4 - Planning Commission Recommended Conditions of Approval 4.1 Packet Pg. 80 4.1.a Packet Pg. 104 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Page 1 of 6 STATE OF CALIFORNIA ) ORDINANCE NO: 19-18 COUNTY OF RIVERSIDE )ss CITY OF SAN JACINTO ) AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA APPROVING CHANGE OF ZONE 17-05, A ZONE CHANGE FROM COMMERCIAL NEIGHBORHOOD TO COMMERCIAL GENERAL LOCATED ON THE WEST SIDE OF RAMONA EXPRESSWAY EXTENDING BETWEEN MAIN STREET AND DONNA WAY WHEREAS, the Saboba Band of Luiseno Indians filed a Change of Zone 17-05 application on November 21, 2017 for Luiseno Village (“Applications), located on the west side of Ramona Expressway extending between Main Street and Donna Way (“Subject Site”); WHEREAS, the Application Change of Zone 17-05 proposes to change the Zone from CN – Commercial Neighborhood to CG – Commercial (“Project”) ; WHEREAS, the Application was reviewed, studied, and found to comply with the California Environmental Quality Act (“CEQA”) as more fully described below: WHEREAS, on August 27, 2019, the Planning Commission of the City of San Jacinto (“Commission”) conducted a duly noticed public hearing on the Project at which time all persons wishing to testify in connection with the Project were heard, and the Project was comprehensively reviewed, and the Project was recommended for approval by the City Council; and WHEREAS, on September 17th and October 1st, 2019, the City Council of the City of San Jacinto conducted duly noticed public hearings on the Application at which time all persons wishing to testify in connection with the Application were heard and the Application was comprehensively reviewed by the City Council. NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN JACINTO DOES HEREBY ORDAIN AS FOLLOWS: Section 1. Incorporation of Recitals. The Recitals set forth above are incorporated herein and made an operative part of this Ordinance as though fully set forth herein. Section 2. Based on the entire record before the City Council, all written and oral evidence presented, the recommendation and the findings made in this Ordinance, the City Council hereby approves Change of Zone 17-05, subject to the Findings of Fact and Conditions of Approval. 4.1.a Packet Pg. 81 Attachment: 1 - Ordinance 19-18 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 105 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Page 2 of 6 Section 3. Findings of Fact. The City Council of the City of San Jacinto hereby finds and determines: A. The proposed Change of Zone is consistent with the General Plan, in that the Community Commercial Land Use Designation includes both the current Commercial Neighborhood Zone and proposed Commercial General Zone. There is not a specific plan for this location. B. The proposed Change of Zone promotes the growth of the City consistent with the City’s General Plan. The Change of Zone will facilitate commercial development along Ramona Expressway and Main Street, as envisioned by the General Plan. As the project is conditioned, it will not adversely affect the public convenience, health, interest, safety or general welfare. C. The site is physically suitable for development, as it is of adequately sized property with an adequate width to depth ratio for commercial development. The property is able to utilize, Main Street, Ramona Expressway and Donna Way for ingress and egress. Adequate infrastructure exists to support the project site and the proposed land uses will be conditioned to ensure that their design accommodates and provides for public and emergency vehicles including solid waste haulers, City crews, and other service and utility providers, as not to constitute a hazard. Section 4. That the official Zoning Map of the City Council is hereby amended by adding thereto Zone Change 17-05 rezoning, the certain properties as described in Attachment “A” attached hereto from CN – Commercial Neighborhood to – CG – Commercial General. Section 5. That this Ordinance shall become effective on the 31st day following its adoption. Section 6. That an environmental analysis has been conducted wh ich evaluated information and impacts based on the specifics of this proposed project. This analysis determined that, although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent and other effects will be mitigated to a level of less than significant impact. Therefore, a Mitigated Negative Declaration and its associated Mitigation Monitoring Plan is recommended. Section 7. The City Clerk shall certify the adoption of this ordinance and cause the same to be published in a newspaper of general circulation printed and published in the County of Riverside, State of California. 4.1.a Packet Pg. 82 Attachment: 1 - Ordinance 19-18 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 106 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Page 3 of 6 Introduced at a regular meeting of the City Council on the 17th day of September 2019. PASSED APPROVED, AND ADOPTED at a regular meeting of the City Council on the 1st Day of October 2019 by the following vote. AYES: NAYS: ABSENT: ABSTAIN: CITY OF SAN JACINTO: ___________________________ by Russell Utz, Mayor ATTEST: _________________________ Angela Walton, City Clerk APPROVED AS TO FORM: BEST BEST & KRIEGER LLP __________________________ Michael J. Maurer, City Attorney 4.1.a Packet Pg. 83 Attachment: 1 - Ordinance 19-18 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 107 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Page 4 of 6 CERTIFICATION State of California ) County of Riverside) ss City of San Jacinto) I, Angela Walton, duly appointed City Clerk of the City of San Jacinto, do hereby certify that the foregoing Ordinance No. 19-18 was introduced at a regular meeting of the City Council of the City of San Jacinto on the 17th day of September 2019. Ordinance No. 19-18 was passed, approved, and adopted by the City Council of the City of San Jacinto, California, at a regular meeting of the City Council held on the 1st day of October 2019: AYES: NAYS: ABSENT: ABSTAIN: Witness my hand and seal the 1st day of October 2019. _____________________________ Angela Walton, City Clerk City of San Jacinto 4.1.a Packet Pg. 84 Attachment: 1 - Ordinance 19-18 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 108 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Page 5 of 6 ATTACHMENT “A” PROPERTY DESCRIPTION The land referred to is situated in the County of Riverside, City of San Jacinto, State of California, and is described as follows: Parcels 1, 2, 8 and 9, in the City of San Jacinto, County of Riverside, State of California, as shown by Parcel Map 20795 on file in Book 131, Pages 60 to 63 inclusive of Parcel Maps, Records of Riverside County, California. EXCEPT THEREFROM those portions conveyed to the City of San Jacinto, by document Recorded March 19, 1987, as Instrument No. 74702 of Official Records of Riverside County, California. APN(S): 433-160-024-1; 433-160-027-4; 433-160-028-5; 433-160-029-6; 433-160-034-0; 433160-032-8; 433-160-033-9 4.1.a Packet Pg. 85 Attachment: 1 - Ordinance 19-18 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 109 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Page 6 of 6 ZONING MAP 4.1.a Packet Pg. 86 Attachment: 1 - Ordinance 19-18 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 110 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) STATE OF CALIFORNIA) RESOLUTION NO: 3781 COUNTY OF RIVERSIDE)ss CITY OF SAN JACINTO) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, CALIFORNIA APPROVING SITE PLAN AND DESIGN REVIEW 17-17 FOR A COMMERCIAL CENTER, CONDITIONAL USE PERMIT CUP-17-09 TO PERMIT A SERVICE STATION WITH AN AUTOMATED CAR WASH AND A CONVENIENCE STORE WITH OFF- SALE GENERAL ALCOHOL LICENSE; MINOR USE PERMIT 17-09 TO PERMIT A FAST FOOD RESTAURANT WITH DRIVE-THROUGH, MINOR USE PERMIT 17-10 TO PERMIT A FAST FOOD RESTAURANT WITH DRIVE-THROUGH, MINOR USE PERMIT 17-11 TO EXCEED THE PARKING REQUIREMENTS BY 5%, VARIANCE 17-05 TO ALLOW 24 FUEL PUMPS; LOCATED ON THE WEST SIDE OF RAMONA EXPRESSWAY EXTENDING BETWEEN MAIN STREET AND DONNA WAY. WHEREAS, the Saboba Band of Luiseno Indians filed applications on November 21, 2017 and June 24, 2019: 1) Site Plan and Design Review (SPDR) 17-17; 2) Change of Zone (CZ) 17-05; 3) Conditional Use Permit (CUP) 17-09; 4) Variance (VAR) 17-05; 5) Minor Use Permit (MUP) 17-09; 6) Minor Use Permit (MUP) 17-10; 7) Minor Use Permit (MUP) 17-11; for Luiseno Village (“Applications”), located on the west side of Ramona Expressway extending between Main Street and Donna Way (“Subject Site”); WHEREAS, the Applications are proposed to develop the Luiseno Village Project as a commercial development with SPDR 17-17 for the review of the commercial center and overall site and building design of a 14,583 square foot retail building, CUP 17-09 to permit a service station with an automated car wash and a convenience store with an off-sale general alcohol license, MUP 17-09 to permit a fast food restaurant with a drive- through, MUP 17-10 to permit a fast food restaurant with a drive-through, MUP 17-11 to exceed the parking requirements by more than 5% and VAR 17 -05 to allow 24 fuel pumps where a maximum of 15 are permitted by the Development Code (“Project”); and WHEREAS, the Application was reviewed, studied, and found to comply with the California Environmental Quality Act (“CEQA”) as more fully described below; and WHEREAS, on August 27, 2019, the Planning Commission of the City of San Jacinto (“Commission”) conducted a duly noticed public hearing on the Project at which time all persons wishing to testify in connection with the Project were heard , and the Project was comprehensively reviewed, and the project was recommended for approval by the City Council; and WHEREAS, on September 17th and October 1st, 2019, the City Council of the City of San Jacinto conducted duly noticed public hearings on the Application at which time all persons wishing to testify in connection with the Application were heard and the Application was comprehensively reviewed by the City Council; and 4.1.b Packet Pg. 87 Attachment: 2 - Resolution 3781 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 111 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred. NOW, THEREFORE, BE IT RESOLVED, ordered and determined by the City Council of the City of San Jacinto: SECTION 1. Based on the entire record before the City Council, all written and oral evidence presented, the recommendation of the Planning Commission and the findings made in this Resolution, the City Council hereby approves SPDR 17-17, CUP 17-09, MUP 17-09, MUP 17-10, MUP 17-11, and VAR 17-05, subject to the Findings of Fact and Conditions of Approval in the staff report. SECTION 2. Based on the entire record before the City Council and all written and oral evidence presented, the City Council finds:  The proposed use will not be detrimental to surrounding properties and neighborhoods including ensuring that the use does not contribute to loitering, public drunkenness, noise, obstructing pedestrian and vehicular traffic, parking, crime, interference with pedestrian corridors used by children, defacement, and damage to structures;  The proposed use will not adversely impact the suitability of adjacent commercially zoned properties for commercial uses;  The proposed use will not adversely affect the welfare of residents in the area or result in an undue concentration in the neighborhood of establishments dispensing alcoholic beverages, including beer and wine. For purposes of this subparagraph, “undue concentration” shall be as defined in the Business and Professions Code Section 23958.4;  The proposed use is consistent with the General Plan and any applicable specific plan;  The proposed use is allowed within the applicable zone and complies with all other applicable provisions of this Development Code and the Municipal Code;  The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future la nd uses in the vicinity;  The site is physically suitable in terms of:  Its design, location, shape, size, and operating characteristics of the proposed use;  The provision of public and emergency vehicle (e.g., fire and medical) access; 4.1.b Packet Pg. 88 Attachment: 2 - Resolution 3781 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 112 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))  Public protection services (e.g., fire protection, police protection, etc.); and  The measure of site suitability shall be required to ensure that the type, density, and intensity of use being proposed will not adversely affect the public convenience, health, interest, safety, or general welfare, constitute a nuisance, or be materially injurious to the improvements, persons, property, or uses in the vicinity and zone in which the property is located;  The applicant agrees in writing to comply with any and all of the conditions imposed by the Approving Authority in the approval of the Conditional Use Permit.  The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity.  There are special circumstances applicable to the subject property (e.g., location, shape, size, surroundings, topography, or other physical features) that do not apply generally to other properties in the vicinity under an identical zoning classification;  Strict compliance with Development Code requirements would deprive the subject property of privileges enjoyed by other property in the vicinity and under an identical zoning classification;  Approving the Variance would not constitute a grant of special privileges inconsistent with the limitations on other properties in the same vicinity and zone in which the subject property is situated; and  The requested Variance would not allow a use or activity that is not otherwise expressly authorized by the regulations go verning the subject parcel. SECTION 3. Based on the entire record before the City Council and all written and oral evidence presented, the City Council finds the A pplication complies with CEQA for the following reasons: An environmental analysis has been conducted which evaluated information and impacts based on the specifics of this proposed project. This analysis determined that, although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent and other effects will be mitigated to a level of less than significant impact. Therefore, a Mitigated Negative Declaration and its associated Mitigation Monitoring Plan is recommended. 4.1.b Packet Pg. 89 Attachment: 2 - Resolution 3781 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 113 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) SECTION 4. The location and custodian of the documents and any other material which constitute the record of proceedings upon which the City Council based its decision is as follows: Planning Director, City of San Jacinto Plann ing Department, 595 S. San Jacinto Ave, San Jacinto, CA 92583. (909) 487-7330. SECTION 7. Effective Date. This Resolution shall become effective upon its adoption. PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council on the 1st Day of October 2019 by the following vote. AYES: NAYS: ABSENT: ABSTAIN: CITY OF SAN J ACINTO: _______________________ Russell Utz, Mayor ATTEST: _____________________ Angela Walton, City Clerk APPROVED AS TO FORM: BEST BEST & KRIEGER LLP __________________________ Michael J. Maurer, City Attorney 4.1.b Packet Pg. 90 Attachment: 2 - Resolution 3781 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 114 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) CERTIFICATION State of California ) County of Riverside) ss City of San Jacinto) I, Angela Walton, duly appointed City Clerk of the City of San Jacinto, do hereby certify that the foregoing Resolution No. 3781was duly passed, and adopted at a regular meeting of the City Council of the City of San Jacinto on the 1st day of October 2019 by the following vote: AYES: NAYS: ABSENT: ABSTAIN: Witness my hand and seal the 1st day of October 2019. _____________________________ Angela Walton, City Clerk City of San Jacinto 4.1.b Packet Pg. 91 Attachment: 2 - Resolution 3781 (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 115 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) August 27, 2019 TO: Planning Commission REQUESTED BY: Travis Randel, Community Development Director APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11. RECOMMENDATION: Staff recommends that the Planning Commission: 1. DETERMINE that this proposed Project will not have a significant effect on the environment based on the findings set forth in the case record and RECOMMEND that the City Council: a. ADOPT A Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) pursuant to the California Environmental Quality Act (CEQA); and 2. RECOMMEND that the City Council: a. APPROVE Change of Zone 17-05 (CZ-17-05), to change the Zone from CN - Commercial Neighborhood to CG - Commercial General; and ADOPT the necessary Zone Change Ordinance; and b. APPROVE Site Plan Design Review 17-17 (SPDR-17-17) for the overall site design of a commercial retail center, which includes a 14,583 square foot retail building, a 9,360 square foot retail building, a service station with a 3,048 square foot convenience store with off-sale beer and wine and a 1,105 square foot car wash, a 3,200 square foot fast food restaurant, a 2,800 square foot fast food restaurant, and the design review for the construction of a 14,583 square foot retail building, subject to conditions of approval; and c. APPROVE Conditional Use Permit 17-09 (CUP-17-09) for a service station and convenience store with off-sale alcohol sales, subject to the conditions of approval and Variance 17-05 (VAR-17-05) to allow 24 fuel pumps at a single station where a maximum of 15 are permitted by the Development Code; and d. APPROVE Minor Use Permit 17-09 (MUP-17-09) to permit a 3,200 square foot fast food restaurant with drive-through service, subject to the conditions of approval; and e. APPROVE Minor Use Permit 17-10 (MUP-17-10) to permit a 2,800 square foot fast food restaurant with drive-through service, subject to the conditions of approval, and 4.1 Packet Pg. 9 4.1.c Packet Pg. 92 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 116 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) f. APPROVE Minor Use Permit 17-11 (MUP-17-11) to exceed the City’s parking requirement by more than five percent. 3. ADOPT Planning Commission Resolution 19-09 recommending City Council approval of, ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, MUP-17-09, MUP-17-10 and MUP-17-11, subject to Findings of Fact and Conditions of Approval set forth in the case record. PROJECT DESCRIPTION: The Luiseno Village Project is located on Ramona Expressway, extending between Main Street and Donna Way. The property is 9.4 acres of Vacant Land. The Project includes the following discretionary approvals:  CZ-17-05 to change the Zone from CN Commercial Neighborhood to CG – Commercial General.  SPDR-17-17 for the review of the overall site plan and the design of a 14,583 square foot building.  CUP-17-09 to permit a service station with a convenience store to have an off-sale beer and wine license.  VAR-17-05 to allow 24 fuel pumps at a single station where a maximum of 15 are permitted by the Development Code.  MUP-17-09 to permit a fast food restaurant with a drive-through service.  MUP-17-10 to permit a fast food restaurant with a drive-through service.  MUP-17-11 to exceed the City’s parking requirement by more than five percent. LOCATION/SURROUNDING LAND USES: Land Use General Plan Zoning North Vacant (north of East Main Street) CC – Community Commercial and LDR – Low Density Residential CG – General Commercial and RL – Residential, Low Density South Soboba Indian Health Clinic, EMWD property, and vacant parcels CC – Community Commercial CN – Commercial Neighborhood East EMWD recharge facilities (east of Ramona Expressway) CC – Community Commercial CN – Commercial Neighborhood West Single-family residential LDR – Low Density Residential RL – Residential, Low Density The Location, General Plan, and Zoning Maps are included as Attachments 4, 5, and 6 respectively. 4.1 Packet Pg. 10 4.1.c Packet Pg. 93 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 117 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) BACKGROUND: The site is vacant and covered with weedy grassland. The project site was historically used for agriculture but has been fallow and vacant for over 20 years. It has been mowed and possibly disked occasionally for weed control. The topography is generally flat with a slight slope down to the northwest. Site elevation ranges from 1,592 to 1,600 feet above mean sea level (MSL). Ramona Expressway and Main Street are elevated above the site near the intersection of these two streets. The site consists of four parcels and seven assessor parcel numbers. To facilitate the project, the has been conditioned for a Lot Line Adjustment to reconfigure the existing parcel lines to be consistent with the proposed development project. DISCUSSION/ANALYSIS: Change of Zone ZC-17-05 The General Plan Land Use Designation for the site is Community Commercial. The Community Commercial land use designation provides for a variety of retail and service-oriented business activities at various intensities to serve the local community and population, as well as the broader market area. The project does not include a proposed change to the General Plan. The project includes the request for a zone change from Commercial Neighborhood (CN) to Commercial General (CG). The CN zone is applied to areas appropriate for providing small- scale retail and personal service uses for the local population living in adjacent residential neighborhoods. However, the Project includes a service station, which is not allowed in the CN zone. Therefore, a zone change is required the proposed Project. The CG zone is applied to areas appropriate for general commercial and daily shopping needs of a broad market area. The CG zone may allow a wide range of retail sales and business, professional, and personal services that are accessible to transit corridors. The project site is adjacent to Ramona Expressway, a major transit corridor which make which makes the site appropriate for general commercial and daily shopping uses. In addition, the General Plan denotes that the CG zone is clearly compatible with the Community Commercial land use designation of the General Plan. In April 2019, the City Council approved the KPC Promenade Development (“KPC”) located north of the subject site. The KPC project included a General Plan Amendment from Low Density Residential to Community Commercial and associated Rezone from Low Density Residential to Commercial General to facilitate the construction of a new 120-room hotel, 114- unit senior housing project, and 155,200 square feet of commercial development for retail, restaurant and medical office uses. The proposed Change of Zone would apply the same zoning designation as the KPC project. 4.1 Packet Pg. 11 4.1.c Packet Pg. 94 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 118 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Site Plan Design Review (SPDR-17-17) Under SPDR-17-17, the City will ensure that the Project respects the physical environmental characteristics of the property, provides safe and convenient access and circulation for pedestrians and vehicles, provides high quality design practices, minimizes, or eliminates negative or undesirable visual impacts, provides for adequate dedication of land for public purposes and provides needed public infrastructure. Site Plan Parcel 1 The 14,583 square foot multi-tenant retail building is located on approximately 3 acres in the northwest corner of the project site. The building will include up to 10 individual tenant spaces ranging from 1,200 to 2,261 square feet each. Specialty retail and restaurants are envisioned for this proposed building. The Development Code requires 81 parking spaces in this portion of the project and the Project proposes 95 spaces, which includes 5 bus parking spaces. The trash enclosure is proposed in the parking area east of the proposed building and the residential development, a design feature that will reduce noise impacts to the existing homes to the west. The proposed retail building has a contemporary design. Cement plaster walls with three varying earth tone shades make up the upper portions of the building. The lower portion of the building will consist of stone veneer (El Dorado Stone). The design of the building provides varying heights with column features and awnings to create visual interest. The building also in cludes decorative wood brackets and wood trellis features. The primary focal point of the building is at the center of the building where the parapet extends higher than the majority of the building with siding below. The building also features an enhanced north elevation with an extended pyramid roof, with flat tile. All roof mounted equipment is proposed below the parapet and is completely screened. Parcel 2 The 9,360 square foot multi-tenant retail building and 2,800 square foot restaurant with drive through service are located on 3 acres in the southwest portion of the project. The multi-tenant building is also expected to be utilized for specialty retail and quick-serve restaurants. This portion of the project requires 100 parking spaces and 101 spaces are proposed. The trash enclosure is also proposed in the parking area east of the proposed building and the residential development. Building elevations have not been submitted for the building at this time. As conditioned, a Site Plan and Design Review application will be required to ensure the building is architecturally compatible with the rest of the center prior to issuance of building permits. Both retail buildings proposed on parcel 1 and 2 have been setback from the residential development west of the site by 50 feet, which includes a 15 foot landscaped area, and drive aisle 4.1 Packet Pg. 12 4.1.c Packet Pg. 95 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 119 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) with a loading zone. This project design help reduce noise and lighting impacts on the adjacent residences. Parcel 8 The service station with a 3,048 square foot convenience store, a 1,105 square foot car wash, and 24 fuel pumps is located on 2 acres on the northeast portion of the project site. The carwash location is proposed to be adjacent to the convenience store on the easternmost portion of the site, which is a project design feature to reduce noise impact on the residential neighborhood west of the project site. The fuel pumps are located west of the proposed convenience store, adjacent to the primary access driveways. The Development Code requires the service station to include 16 parking spaces and 18 spaces are proposed. Parcel 9 The 3,200-square-foot-restaurant with drive-through service is proposed on the 1.4 acres on the southeast portion of the project site. This Development Code requires 50 parking spaces and 55 spaces are proposed. Access Site access would be provided by one right-in/out-only driveway on Main Street, one right- in/out-only driveway on Ramona Expressway, and one full access driveway on Donna Way. A north-south aligned access driveway would be developed that would connect Main Street to Donna Way. This driveway bifurcates the site, separating the retail building and the 2,800 square foot restaurant with drive through service, from the service station and the 3,200 square foot restaurant with drive through service. This access also connects with the driveway off of Ramona Expressway near the central portion of the site. Street Improvements The Project would make improvements to Ramona Expressway and Main Street consistent with the General Plan and Landscape Design Guidelines. Ramona Expressway will be widened to the planned roadway width along the property frontage. Improvements include southbound right- turn lanes at the project driveway and Donna Way, and re-striping and signage to provide an additional southbound through lane. A traffic signal will be installed at the intersection of Ramona Expressway and Donna Way. Other improvements at this intersection include removing a portion of the Ramona Expressway median to allow full access to Donna Way and to provide a northbound left-turn lane. The Project will modify existing street signage and striping on the property frontage of Main Street. Other roadway work would include curb cuts for the driveways, and connections to underground utility lines in the roadways. 4.1 Packet Pg. 13 4.1.c Packet Pg. 96 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 120 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Project Standards The design of the Project has been compared against City standards as noted below. DEVELOPMENT STANDARDS FOR THE CG ZONE Required/ Permitted Parcel 1 Parcel 2 Parcel 8 Parcel 9 Parcel Area (Net) Minimum 5,000 sq. ft. (12,000 sq. ft. for a Drive-Through) 132,637 sq. ft. 132,018 sq. ft. 86,281 sq. ft. 61,122 sq. ft. Parcel Width 50 ft. (100 sq. ft. for a Drive-Through & Service Station) 330 ft. 575 ft. 240 ft. 250 ft. Parcel Depth 100 ft. 330 ft. 250 ft. 255 ft. 250 ft. FAR (Maximum) .40 .11 .09 .05 .05 Building Size Varies 14,583 sq. ft. 12,160 sq. ft. 4,153 sq. ft. 3,200 sq. ft. Building Height 45 ft. 32.5 ft. Specific plans have not been submitted. Building height will not exceed 45 ft. Impervious Surface (Max) 85% 80% 69% 69% 83% Structure/Lot Coverage (Max) 50% 12% 10% 13% 6% Setbacks Street Setback Ramona Expressway 12-foot parkway 8-foot walk 25-foot scenic 25 ft. Scenic n/a n/a 25 ft. 34 ft. Main Street 6-foot parkway 6-foot walk 12-foot landscape 12 ft. Landscape 15 ft. n/a 15 ft. n/a Side Building Interior Setback Abutting Non- Residential 0 ft. 21 ft. 16 ft. 23 ft. 36 ft. Abutting Residential 10 ft. n/a n/a n/a n/a Side Building Street Setback 10 ft. 62 ft. 72 ft. 34 ft. 28 ft. Rear Building Setback Abutting Non- Residential 0 ft. n/a n/a 65 ft. 99 ft. Abutting Residential 15 ft. 15-20 ft. 15-20 ft. n/a n/a 4.1 Packet Pg. 14 4.1.c Packet Pg. 97 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 121 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Parking A total of 269 parking stalls are envisioned for the entire four parcels. This would include an estimated 13 disabled parking stalls. PARKING ANALYSIS Ratio (Gross Floor Area) Calculation Required Provided Parcel 1 Retail – 1:250 of GFA & 1:300 for Outdoor Display Areas 12,396/250 50 95 Restaurant – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. and 1/50 for patio areas over 15% of GFA and 1/50 for patio areas over 15% of GFA 2,000/200 + 187/60 + 900/50 13 Total Parcel 1 81 Parcel 2 Retail – 1:250 of GFA & 1:300 for Outdoor Display Areas 7,956/250 32 101 Restaurant – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. and 1/50 for patio areas over 15% of GFA 1,404/200 + 900/50 25 Fast Food w/Drive-Through – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. and 1/50 for patio areas over 15% of GFA 2,000/200 + 800/60 + 1,000/50 43 Total Parcel 2 100 Parcel 8 Convenience Store – 1:225 – plus 1 space for each employee on duty during heaviest traffic 8-hour shift 3,048/225 + 4 employees 18 18 Total Parcel 8 18 Parcel 9 Fast Food Drive-Through – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. 2000/200 + 1,200/60 + 1,000/50 50 55 Total Parcel 9 50 The above spaces need to include the following: ADA Stalls 1 – 25 = 1 26 – 50 = 2 51 – 75 = 3 76 – 100 = 4 Parcel 1 = 4 Parcel 2 = 4 Parcel 8 = 1 Parcel 9 = 2 Parcel 1 = 4 Parcel 2 = 5 Parcel 8 = 2 Parcel 9 = 2 4.1 Packet Pg. 15 4.1.c Packet Pg. 98 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 122 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) PARKING ANALYSIS Ratio (Gross Floor Area) Calculation Required Provided Bicycle Parking – 10% of required parking spaces – 17.330.110 10% Parcel 1 = 8 Parcel 2 = 10 Parcel 8 = 2 Parcel 9 = 5 Parcel 1 = 11 Parcel 2 = 11 Parcel 8 = 2 Parcel 9 = 6 Cal Green 5.106.4.1.1 – Short term bicycle parking – 5% of new visitor parking spaces being added 5% Parcel 1 = 4 Parcel 2 = 5 Parcel 8 = 1 Parcel 9 = 3 Parcel 1 = 6 Parcel 2 = 6 Parcel 8 = 2 Parcel 9 = 4 Cal Green 5.106.4.1.2 – Long Term bicycle parking – when 10 or more occupants 5% of employee parking spaces Parcel 1 = 5 Parcel 2 = 5 Parcel 8 = 0 Parcel 9 = 2 Parcel 1 = 5 Parcel 2 = 5 Parcel 8 = 0 Parcel 9 = 2 Low-Emitting, Fuel Efficient and Carpool/Vanpool Vehicles – Cal Green 5.106.5.2 – when 10 or more stalls added 0 – 9 = 0 10 – 25 = 1 26 – 50 = 3 51 – 75 = 6 76 – 100 = 8 Parcel 1 = 8 Parcel 2 = 8 Parcel 8 = 1 Parcel 9 = 3 Parcel 1 = 8 Parcel 2 = 11 Parcel 8 = 1 Parcel 9 = 6 Conditional Use Permit (CUP-17-09) – Convenience Store with Off-Sale Beer and Wine Sales Conditional Use Permit, CUP-17-09, is required to permit a service station with a convenience market with off-sale alcohol sales under a Type 20 Alcoholic Beverage Control (ABC) license. The service station also includes 24 fuel pumps and a 1,105 square foot car wash. The store will operate between 24-hours a day, seven days a week. Variance (VAR-17-05) As previously discussed, this Project requires one variance to allow 24 pump where a maximum 15 are permitted by the Development Code. As previously mentioned, the site is adjacent to Ramona Expressway a major transit corridor that provides access to the Soboba Casino and Resort. The proposed service station is expected to receive considerable amounts of traffic from the resort and casino, as it is a major entertainment attraction in the San Jacinto Valley. In addition, the site is twice the minimum size required for service stations, and is expected to include dedicated diesel fuel pumps for buses, trucks, and recreational vehicles. Minor Use Permit (MUP-17-09) – Fast Food Restaurant with a Drive Through This MUP is for the fast food restaurant with the Drive-Through lane on Parcel 2. As designed, the site meets all requirements for the use. Once a tenant has been secured, architectural renderings and a site plan in compliance with the conceptual design shown under this Project will be required for review and approval. 4.1 Packet Pg. 16 4.1.c Packet Pg. 99 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 123 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Minor Use Permit (MUP-17-10) – Fast Food Restaurant with a Drive Through This MUP is for a Retail building with two tenants where one of the tenants will have a Drive- Through lane on Parcel 3. As designed, the site meets all requirements for the use. Once tenants have been secured, architectural renderings and a site plan in compliance with the conceptual design shown under this Project will be required for staff review and approval. Minor Use Permit (MUP-17-11) –Excess Parking The project includes a Minor Use Permit to allow the development to exceed the required parking spaces by more than 5 percent. The applicant is requesting to exceed the required parking spaces in order to allow flexibility of future tenants of the retail buildings. Parking requirements for retail uses are required at a ratio of 1 space per 250 square feet, while restaurants parking requirements are required at a ratio of 1 space per 200 square feet and 1 space per 50 square feet of outdoor seating. The site plan estimates that 15% of the space would be utilized by restaurants, which could include outdoor seating. The additional spaces would allow the development to include additional restaurants and still meet the parking demands. Further, the additional parking spaces will reduce parking limitations for the applicant, which could potentially help secure quick serve restaurant chains that have stringent parking requirements. PUBLIC NOTICE AND COMMENTS: The environmental review (Initial Study) and public hearing for this Project were advertised on August 16, 2019, opening the public comment period with comments due by September 16, 2019. While the comment period extends beyond the Planning Commission Public Hearing, the project includes a rezone which requires City Council approval. As such, the Planning Commission will be making a recommendation on the project, but will not be the approval authority. No comments have been received at the time this report was written. ENVIRONMENTAL ANALYSIS: The City of San Jacinto is the lead agency on the proposed Project and has reviewed all submitted drafts, technical studies, and reports. An Initial Study was prepared for the proposed project to evaluate potential impacts on the environment as required by the California Environmental Quality Act. The initial study reflects the City’s independent judgment, including reliance on applicable technical personnel and consultants with other departments and review of all technical sub consultant reports. The following are details regarding a few of the key topics evaluated in the Initial Study. 4.1 Packet Pg. 17 4.1.c Packet Pg. 100 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 124 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Biological Resources The subject property is located within a Criteria Area of the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP). As such, the Project must comply with the requirements of the MSHCP, which includes payment of the MSHCP Development Mitigation Fee. The Criteria Area for the project includes Criteria Cell 3098 and 3099. The MSHCP determined that conservation of grassland habitat is required within these cells, which includes 5% to 15% southeastern portion of the Cell. The acreage that needs to be conserved in this area will therefore range from 8 to 24 acres. The project site is located within the southeast portion of Criteria Cell 3098 which is the area described for Conservation. Because the Project would develop the entire project site, the Criteria of the MSHCP must be modified via a Criteria Refinement. To meet the Reserve Assembly goals of the MSHCP, the applicant has identified an 11.6-acre Replacement Site. The Replacement Site proposed to be conserved as part of the Criteria Refinement is located northwest of the Soboba Springs Country Club, south of Soboba Road, and adjacent to existing conserved lands. The Replacement Site is located within portions of a different Criteria Cells that were not identified for conservation within the MSHCP. Therefore, conservation of the Replacement Site would contribute lands not already called out for conservation. The proposed Criteria Refinement will result in approximately 11.6 acres of higher quality habitat. In addition, the total acreage being conserved is greater than the total area being removed for development (approximately 11.6 acres to be conserved versus approximately 9.5 acres proposed for development). The Western Riverside County Regional Conservation Authority (RCA) determined, and the CDFW and USFWS have agreed, that the proposed Criteria Refinement would result in equivalent or superior biological value and that the Criteria Refinement is consistent with the MSHCP. Burrowing Owl The entire project site is within the MSHCP designated survey area for the burrowing owl. Habitat for burrowing owl was assessed over the entire project site. Surveys conducted in accordance with MSHCP’s Burrowing Owl Survey Instructions were conducted in 2017 and 2019. No potential burrows and no sign of burrowing owls were observed on the project site. However, burrowing owls were observed north of Main Street in 2017 indicating that the project site could be used for foraging by burrowing owl or could get colonized in the future. Because the site has the potential to support burrowing owls in the future, the MSHCP requires that pre- construction surveys be conducted prior to disturbance of the site. Therefore, a mitigation measure is recommended for compliance with the MSHCP burrowing owl requirements. 4.1 Packet Pg. 18 4.1.c Packet Pg. 101 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 125 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Noise Noise from construction and operational activities would add to the existing noise environment of the project site and immediate vicinity. Sensitive receptors located near the project site could be exposed to project related noise. The closest sensitive receptors are residents located w est of the project site. A six-foot high masonry wall currently separates the residential development from the project site, and the project design includes a 50 foot building setback from the western project boundary. A noise study was prepared for the project which assessed all potential noise impacts from the project, including the proposed car wash, drive-through restaurants, deliveries and trash trucks, and the HVAC systems. The project design was instrumental in reducing potential impacts, by placing the car wash adjacent to Ramona which is more than 500 feet from the existing residential. Mitigation measure have been identified to reduce impacts from the project to a less than significant level. The measures include HVAC shielding, idling restrictions, and construction limitations. Traffic A Traffic Impact Analysis was prepared for the project, which analyzed the forecast traffic conditions associated with the Project. The study evaluated seven intersections that with the project would operate at an acceptable level of service (LOS D or better) during the peak hours under Cumulative and Cumulative with Project conditions with the following exceptions: 1. East Main Street / Hewitt Street – PM peak hour, LOS F. 2. Ramona Expressway / East Main Street-Lake Park Drive – PM peak hour, LOS F. Because these intersections do not operate at an acceptable level of service, the addition of Project-related traffic would result in a significant impact and requires mitigation. Therefore, mitigation measures which include a fair share contribution to a new traffic signal at Main Street and Hewitt Street and restriping eastbound lanes on Ramona Expressway are required. Mitigated Negative Declaration Based upon the information contained in the Initial Study and pursuant to the requirements of CEQA; it has been determined that this Project, with the incorporation of mitigation measures, will not have a significant impact on the environment. The mitigation measures required to reduce or mitigate the impacts of this Project on the environment are included in the Project design and/or the Mitigation Monitoring Program and will be included as part of the Mitigated Negative Declaration for this Project. As a result, it is recommended that the Planning Commission recommend that the City Council adopt a Mitigated Negative Declaration for this Project. 4.1 Packet Pg. 19 4.1.c Packet Pg. 102 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 126 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) FISCAL IMPACT: There is no impact to the General Fund since all project costs are borne by the applicant. CONCLUSION: As designed and conditioned, the Project will be a welcome addition along the Ramona Expressway corridor and the City. The Project offers the constituents of the City another choice for gasoline and food and retail sales, promoting job opportunities and local buying power. ATTACHMENTS: 01 - Findings of Fact 02 - Conditions of Approval 03 - PC Resolution 19-09 04 - Location Map 05 - General Plan Land Use Map 06 - Zoning Map 07 - Project Plans 08 - Conceptual Grading Plan 09 - Signing and Striping Plans 10 - Initial Study 11 - Mitigation, Monitoring and Reporting Program 4.1 Packet Pg. 20 4.1.c Packet Pg. 103 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 127 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) CZ 17-05, SPDR-17-17, CUP- 17-09, MUP 17-09, MUP 17-10, MUP 17-11 & VAR 17-05 CHANGE OF ZONE FINDINGS OF FACT (CZ-17-05): 1. The proposed Zoning Map amendment is consistent with the General Plan and applicable specific plan; The General Plan Land Use Designation is Community Commercial. The project proposes to change the zoning on the project site to Commercial General. Table LU-1 of the General Plan (General Plan and Zoning Consistency Matrix) shows the Commercial General zone is clearly compatible with the Community Commercial General Plan Designation. The project is not located within a Specific Plan. 2. The proposed amendment will not be detrimental to the public interest, health, safety, convenience, or welfare of the City; The proposed Change of Zone promotes the growth of the City consistent with the City’s General Plan. The Change of Zone will facilitate commercial development along Ramona Expressway and Main Street, as envisioned by the General Plan. As the project is conditioned, it will not adversely affect the public convenience, health, interest, safety or general welfare. 3. The affected site is physically suitable in terms of design, location, shape, size, operation characteristics, and the provision of public services and utilities (e.g., fire protection, police protection, potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.), to ensure that the requested zoning designation and the proposed or anticipated uses and/or development will not endanger, jeopardize, or otherwise constitute a hazard to the property or improvements in the vicinity in which the property is located; The site is physically suitable for development, as it is of adequately sized property with an adequate width to depth ratio for commercia l development. The property is able to utilize, Main Street, Ramona Expressway and Donna Way for ingress and egress. Adequate infrastructure exists to support the project site and the proposed land uses will be conditioned to ensure that their design accommodates and provides for public and emergency vehicles including solid waste haulers, City crews, and other service and utility providers, as not to constitute a hazard. 4.1.a Packet Pg. 21 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 104 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 128 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) SITE PLAN DESIGN REVIEW PERMIT FINDINGS OF FACT (SPDR-17-17): The proposed Project will: 1. Be allowed within the subject zone; The proposed commercial center will be consistent with the proposed CG – Commercial General Zone and the CC – Community Commercial General Plan Land Use designation, with the adoption of the proposed Change of Zone. 2. Be in compliance with all the applicable criteria below: a. Compliance with 17.630 – Site Plan and Design Review of the Development Code, and all other applicable City regulations and policies; As noted in the staff report and as conditioned, the Project will comply with Chapter 17.630 of the Development Code. (See Table 2 of the staff report) b. Efficient site layout and design; As designed the Project provides an efficient site layout and desig n with three points of access and an internal circulation system that serves all proposed uses in the project. c. Compatibility with neighboring properties and developments; The Project provides compatibility with neighboring properties as the proposed project complies with all required setbacks and provides landscape buffers along all borders of the project site. In addition, the proposed site plan includes a 50 foot building setback from the residential uses located west of the project site to reduce potential impacts. d. Efficiency and safety of public access and parking; The Project provides an efficient site layout and design with three points of access and an internal circulation system that provides access to Ramona Expressway, Main Street, and Donna Way. Therefore, the Project provides efficient and safe public access and parking. In addition, the proposed commercial uses have dedicated pedestrian access, separate from the vehicular drive aisles. 4.1.a Packet Pg. 22 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 105 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 129 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) e. The arrangement and relationship of proposed structures and signs to one another and to other developments in the vicinity and whether the relationship is harmonious and based on good standards of design; Overall, the Project design provides a good relationship and arrangement of the proposed structures to one another and developments in the vicinity. The design features and colors are compatible with existing surrounding residential developments. f. The compatibility in scale and aesthetic treatment of proposed structures with public areas; The site and building design provide a compatible scale and aesthetic treatment for the public areas as 23% of the project site will include landscaping, the majority of which is adjacent to the Ramona Expressway, Main Street, and Donna Way. In addition, the design of the building provides varying heights with column features and awnings to create visual interest. The building also includes decorative wood brackets and wood trellis features. Cement plaster finish painted with three varying earth tones, which will complement the adjacent residential structures. g. The adequacy of proposed driveways, landscaping, parking spaces, potential on-site and off-site parking and traffic impacts and other potential impacts on the environment; The City Engineer and Traffic Engineer have reviewed the site design and Traffic Impact Analysis and have determined that as conditioned the Project will provide for safe vehicular and pedestrian movements to and from the site. Further, as noted in the staff report the Project meets the required landscaping and parking requirements. All other potential environmental impacts have been thoroughly analyzed in the Initial Study and as mitigated/conditioned the Project will have less than significant environmental impacts. h. Appropriate open space and use of water-efficient landscaping; The Project design provides adequate open space in the form of on -site landscaping. As conditioned, the Project will provide landscaping in conformance with Chapter 17.325 – Water Efficient Landscaping and Irrigation in conformance with State law. 4.1.a Packet Pg. 23 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 106 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 130 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) i. Consistency with the General Plan and any applicable specific plan; The CC –General Plan land use designation provides for a variety of retail and service-oriented business activities, including office uses, at various intensities to serve the local community and population, as well as the broader market area. The Project would allow the development of a commercial retail center, which is consistent with the General Plan land use designation. The project is not located within a Specific Plan. j. Consistency with any adopted design guidelines/standards. As conditioned, the Project will be consistent with the City’s Landscape Design Guidelines, including, but not limited to, the special landscaping setback requirements along Ramona Expressway. 3. Be in keeping with the character of the neighborhood, in terms of the structure(s) general appearance; As conditioned, the Project will be compatible with the residential neighborhood west of the site and the institutional land use along the Ramona Expressway as the proposed building will utilize walls with cement plaster painted with varying earth tones. In addition, the site complies with the building setback requirements of the development code, which include landscaping to soften the development. 4. Not be detrimental to the harmonious and orderly growth of the City. The Project promotes the growth of the City consistent with the City’s Development Code and General Plan. CONDITIONAL USE PERMIT AND ALCOHOL SALES FINDINGS OF FACT (CUP-17- 09): 1. The proposed use will not be detrimental to surrounding properties and neighborhoods including ensuring that the use does not contribute to loitering, public drunkenness, noise, obstructing pedestrian and vehicular traffic, parking, crime, interference with pedestrian corridors used by children, defacement, and damage to structures; As designed and conditioned, the Project will not be detrimental to surrounding properties and the neighborhood. The convenience store is located at the southwest corner of Ramona Expressway and Main Street, which is the furthest portion on the site from existing residential uses. Conditions of Approval include requirements to address loitering, noise, and property maintenance. 4.1.a Packet Pg. 24 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 107 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 131 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) 2. The proposed use will not adversely impact the suitability of adjacent commercially zoned properties for commercial uses; The proposed use will not adversely impact the suitability of adjacent commercially zoned properties for commercial uses as the proposed service station with convenience store is compatible with the planned commercial land uses on Ramona Expressway 3. The proposed use will not adversely affec t the welfare of residents in the area or result in an undue concentration in the neighborhood of establishments dispensing alcoholic beverages, including beer and wine. For purposes of this subparagraph, “undue concentration” shall be as defined in the Business and Professions Code Section 23958.4; and Excerpt of Business and Professions Code Section 23958.4 – For purposes of Section 23958, “undue concentration” means the case in which the applicant premises for an original or premises-to-premises transfer of any retail license are located in an area where any of the following conditions exist: (1) The applicant premises are located in a crime reporting district that has a 20 percent greater number of reported crimes, as defined in subdivision (c), than the average number of reported crimes as determined from all crime reporting districts within the jurisdiction of the local law enforcement agency. (2) As to on-sale retail license applications, the ratio of on -sale retail licenses to population in the census tract or census division in which the applicant premises are located exceeds the ratio of on-sale retail licenses to population in the county in which the applicant premises are located. – Not Applicable to this Project (3) As to off-sale retail license applications, the ratio of off-sale retail licenses to population in the census tract or census division in which the applicant premises are located exceeds the ratio of off-sale retail licenses to population in the county in which the applicant premises are located. The proposed use will not adversely affect the welfare of residents in the area or result in an undue concentration in the neighborhood of establishments dispensing alcoholic beverages, including beer and wine. The City’s Police Department does not keep crime statistics by Census Tracts, so the City is unable to determine if crime in this Census Tract is any greater than crime in other Census Tracts within the City. The Census Tract is not over concentrated with off-site sales licenses, having zero existing licenses where one license is permitted. 4.1.a Packet Pg. 25 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 108 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 132 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) 4. The proposed use is consistent with the General Plan and any applicable specific plan; The General Plan Land Use Designation is Community Commercial, which provides for a variety of retail and service-oriented business activities, including office uses, at various intensities to serve the local community and population, as well as the broader market area. The service station with convenience store is consistent with the General Plan land use designation. The project is not located within a Specific Plan. 5. The proposed use is allowed within the applicable zone and complies with all other applicable provisions of this Development Code and the Municipal Code; The proposed use is allowed within the applicable zone and complies with all other applicable provisions of this Development Code and the Municipal Code except that the service station exceeds the maximum number of fuel dispensers allowed by the Development Code (See Variance Findings below). The proposed service station with convenience store is consistent with the proposed CG Zone and CC General Plan land use designations. 6. The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity; The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The Project is physically suitable for the proposed Project as the site is 2 acres, with adequate width and depth, and the design of the commercial center under the SPDR utilizes driveways of the proposed Project on Ramona Expressway, Main Street and Donna Way. The proposed service station is planned to be adjacent to retail spaces and a fast food restaurant with drive through service, which are complimentary uses. 7. The site is physically suitable in terms of: a. Its design, location, shape, size, and operating characteristics of the proposed use; The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The Project is physically suitable for the proposed Project as the site is 2 acres with adequate width and depth to accommodate the proposed use and traffic circulation. 4.1.a Packet Pg. 26 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 109 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 133 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) b. The provision of public and emergency vehicle (e.g., fire and medical) access; The site is designed to provide adequate access for emergency vehicles as the site plan has been reviewed by the Police and Fire Departments, and as conditioned, meets their requirements. c. Public protection services (e.g., fire protection, police protection, etc.); and The Project is consistent with the General Plan which helps to ensure that public protection services are available. In addition, the site plan has been reviewed by the Police and Fire Departments, and as conditioned, meets their requirements. d. The provision of utilities (e.g., potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.). The Project will be required to connect to all required utilities and as conditioned will be providing the required trash enclosures for solid waste disposal. 8. The measure of site suitability shall be required to ensure that the type, density, and intensity of use being proposed will not adversely affect the public convenience, health, interest, safety, or general welfare, constitute a nuisance, or be materially injurious to the improvements, persons, property, or uses in the vicinity and zone in which the property is located; and The Project site is physically suitable for the proposed Project as the development has adhere to the required setbacks and have adequate parking. The project will have Floor Area Ratio (0.06) that is well below the maximum ratio allowed by the Development Code (0.40). Access to the proposed project is provided by Ramona Expressway, Main Street, and Donna Way. The Project will be a welcome addition providing needed services to the neighborhood and the City. As conditioned, the Project will not adversely affect the public convenience, health, interest, safety or general welfare. 9. The applicant agrees in writing to comply with any and all of the conditions imposed by the Approving Authority in the approval of the Conditional Use Permit. The applicant is required to sign the conditions of approval reflecting their agreement with the conditions. 4.1.a Packet Pg. 27 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 110 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 134 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) MINOR USE PERMITS (MUP-17-09 and MUP-17-10) FINDINGS OF FACT: 1. The proposed use is consistent with the General Plan and any applicable specific plan. The proposed uses are consistent with the General Plan. The CC General Plan land use designation provides for a variety of retail and service-oriented business activities, including office uses, at various intensities to serve the local community and population, as well as the broader market area. Therefore, a fast food restaurant with a drive-through service is consistent with the General Plan land use designation. The site is not located within a Specific Plan. 2. The proposed use is allowed within the applicable zone and complies with all other applicable provisions of this Development Code and the Municipal Code. The proposed uses are allowed within the proposed zone, with the adoption of Change of Zone 17-05 and complies with all other applicable provisions of this Development Code and the Municipal Code, as demonstrated in Table 2 of the staff report. The proposed fast-food restaurants with drive-through service are consistent with the CG Zone, as they are listed as an allowed use, subject to a MUP. 3. The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The Project is physically suitable for the proposed Project as the site is generally flat, and the design of the commercial center under the SPDR planned for the proposed uses. 4. The site is physically suitable in terms of: a. Its design, location, shape, size, and operating characteristics of the proposed use; The Project site is physically suitable for the proposed Project as the site is 9.4 acres that is generally flat, with adequate width and depth. In addition, the site has access from three driveways, served by Ramona Expressway, Main Street, and Donna Way. The Project will be a welcome addition to the eastern portion of the city, providing needed services to the neighborhood and the City. As conditioned, the Project will not adversely affect the public convenience, health, interest, safety or general welfare. 4.1.a Packet Pg. 28 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 111 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 135 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) b. The provision of public and emergency vehicle (e.g., fire and medical) access; The site is designed to provide adequate access for emergency vehicles. Furthermore, the site plan has been reviewed by the Police and Fire Departments, and as conditioned, meets their requirements. c. Public protection services (e.g., fire protection, police protection, etc.); and The Project is consistent with the General Plan which helps to ensure that public protection services are available. The site plan has been reviewed by the Police and Fire Departments, and as conditioned, meets their requirements. d. The provision of utilities (e.g., potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.). The Project will be connecting to all required utilities and as conditioned will be providing the required trash enclosures for solid waste disposal. 5. The measure of site suitability shall be required to ensure that the type, density, and intensity of use being proposed will not adversely affect the public convenience, health, interest, safety, or general welfare, constitute a nuisance, or be materially injurious to the improvements, persons, property, or uses in the vicinity and zone in which the property is located. The Project site is physically suitable for the proposed Project as the site is generally flat, and the design under SPDR accommodates this use as designed. As conditioned, the Project will not adversely affect the public convenience, health, interest, safety or general welfare. 6. The applicant agrees in writing to comply with any and all of the conditions imposed by the review authority in the approval of the Minor Use Permit. The applicant is required to sign the conditions of approval reflecting their agreement with the conditions. 4.1.a Packet Pg. 29 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 112 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 136 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) MINOR USE PERMITS (MUP-17-11) (EXCESS PARKING) FINDINGS OF FACT: 1. The proposed use is consistent with the General Plan and any applicable specific plan. The proposed uses are consistent with the General Plan. The CC General Plan land use designation provides for a variety of retail and service -oriented business activities, including office uses, at various intensities to serve the local community and population, as well as the broader market area. Parking requirements for retail uses are required at a ratio of 1 space per 250 square feet, while restaurants parking requirements are required at a ratio of 1 space per 200 squ are feet and 1 space per 50 square feet of outdoor seating. The site plan estimates that 15% of the retail buildings would be utilized by restaurants, which could include outdoor seating. The additional spaces would allow the development to include addit ional restaurants and still meet the parking demands. 2. The proposed use is allowed within the applicable zone and complies with all other applicable provisions of this Development Code and the Municipal Code. Parking spaces as an ancillary use to an appro ved land use are allowed in CG zone. 3. The design, location, size, and operating characteristics of the proposed activity will be compatible with the existing and future land uses in the vicinity. The design, location, size, and operating characteristics of the proposed parking areas are physically suitable for the proposed Project as the site is generally flat, and structure coverage is less than 10 percent of the site. Furthermore, the design of the commercial center under the SPDR, planned for the proposed uses. 4. The site is physically suitable in terms of: a. Its design, location, shape, size, and operating characteristics of the proposed use; The parking area for the proposed Project has been adequately analyzed under the SPDR 17-17, and the project is suitable in size, location, shape and size. b. The provision of public and emergency vehicle (e.g., fire and medical) access; This Finding is not applicable. 4.1.a Packet Pg. 30 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 113 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 137 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) c. Public protection services (e.g., fire protection, police protection, etc.); and This Finding is not applicable. d. The provision of utilities (e.g., potable water, schools, solid waste collection and disposal, storm drainage, wastewater collection, treatment, and disposal, etc.). This Finding is not applicable. 5. The measure of site suitability shall be required to ensure that the type, density, and intensity of use being proposed will not adversely affect the public convenience, health, interest, safety, or general welfare, constitute a nuisance, or be materially injurious to the improvements, persons, property, or uses in the vicinity and zone in which the property is located. The Project site is physically suitable for the proposed Project as the site is generally flat, and the design under the SPDR accommodates this use as designed. As conditioned, the Project will not adversely affect the public convenience, health, interest, safety or general welfare. 6. The applicant agrees in writing to comply with any and all of the conditions imposed by the review authority in the approval of the Minor Use Permit. The applicant is required to sign the conditions of approval reflecting thei r agreement with the conditions. 4.1.a Packet Pg. 31 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 114 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 138 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) VARIANCE (VAR-17-05) (INCREASED PUMPS) FINDINGS OF FACT: To allow the service station to exceed 15 pumps. 1. There are special circumstances applicable to the subject property (e.g., location, shape, size, surroundings, topography, or other physical features) that do not apply generally to other properties in the vicinity under an identical zoning classification; The project site is adjacent to Ramona Expressway, a major corridor in the City and is less than a mile from the Soboba Resort and Casino, a large entertainment venue which includes a hotel, restaurants, gaming and conference center. The greater majority of traffic trips entering and leaving the Resort are expected to pass by the proposed fuel station which means that the service station is likely to have a greater demand than other stations in the vicinity at peak hours, especially following live concerts, and similar events. 2. Strict compliance with Development Code requirements would deprive the subject property of privileges enjoyed by other property in the vicinity and under an identical zoning classification; The project site well exceeds the minimum lot size for a fueling station which typically limits the amount of pumps that can be reasonably accommodated. Unlike more restricted sites, the project site has excellent access to public roads and internal circulation. The increase in pumps will not result in internal conflict which the code limit of 15 pumps is attempting to prevent. In addition city has previously approved projects that included a variance to allow more than 15 fuel pumps for a single service station, when the service stations are located on larger sites that can accommodate the additional vehicle trips. Therefore, strict compliance of the Development Code requirements would deprive the subject property of privi leges enjoyed by other properties. 3. Approving the Variance would not constitute a grant of special privileges inconsistent with the limitations on other properties in the same vicinity and zone in which the subject property is situated; and Approving the Variance would not constitute a grant of special privileges inconsistent with the limitations on other properties in the same vicinity and zone as the project site is twice the minimum size required for fuel stations, and the area set aside for the proposed fuel stations is sufficient to accommodate the additional traffic. 4.1.a Packet Pg. 32 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 115 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 139 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) 4. The requested Variance would not allow a use or activity that is not otherwise expressly authorized by the regulations governing the subject parcel. The requested Variances would not allow a use or activity that is not otherwise expressly authorized by the regulations governing the subject parce l as a service station is listed as a permitted use in the Development Code under the CG Zone, subject to a use permit. 4.1.a Packet Pg. 33 Attachment: 01 - Findings of Fact (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 116 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 140 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Conditions of Approval Page 1 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Approval Date: TBD Effective Date: TBD Expiration Date: TBD PROJECT LOCATION: Southwest corner of Main Street and Ramona Expressway in the City of San Jacinto. (APNs): 433-160-024, 027, 028, 029, 032, 033, and 034) APPLICANT: Soboba Band of Luiseno Village 23906 Soboba Road San Jacinto, CA 92583 ACCEPTED AND AGREED TO BY: _____________________________________________________________ Applicant Date PROJECT DESCRIPTION: A proposal of the Soboba Band of Luiseño Indians to construct and operate a commercial shopping center that includes a service station with 24 fuel pumps, a 3,048 square foot convenience store with alcohol sales, and a 1,105 square foot car wash; a 14,583 square foot multi-tenant retail building; a 9,360-square-foot multi-tenant retail building; a fast-food restaurant with drive-through service totaling 2,800 square feet; a fast-food restaurant with drive-through service totaling 3,200 square feet. General Requirements & Information – SPDR 17-17, CUP 17-09, MUP 17-09, MUP 17-10 A) The developer/applicant or successor in interest agrees to indemnify, hold harmless, and defend the City, its officials, offi cers, agents, and employees, from any and all liability, claims, actions or proceedings that may be brought arising out of its approval of this permit, and any approvals associated with the Project, including, without limitation, any CEQA review or approval, except to the extent caused by the negligence of the City. B) The approval of this Project, a commercial center, shall comply with all required standards of the Development Code. 4.1.b Packet Pg. 34 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 117 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 141 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 2 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - C) The developer/applicant or successor in interest is advised that the businesses or uses which this Project is granted cannot be legally conducted on the subject property until all conditions of approval of this case (SPDR 17-17) have been met to the satisfaction of the Planning Department. D) The effective date of issuance of this Project is TBD. The approval will lapse if improvements have not commenced within two (2) years from the date upon which the approval was granted. Unless a time extension is approved by the City’s applicable review authority. Applications for time extensions must be received prior to the expiration date. E) All cases associated with the Project, SPDR-17-17, CUP-17-09, MUP-17-09, MUP-17-10, MUP-17-10, and VAR-17-05, and shall have the same effective date and expiration date. Therefore, these cases will become null and void, if the project has not been vested, on or before TBD (two calendar years from the effective date), unless a time extension is approved by the City’s applicable review authority. Applications for time extensions must be received prior to the expiration date. F) All storage and display of merchandise and supplies must be conducted within a building. G) The Project shall fully and continually comply with all applicable conditions of approval, State, Federal and local laws in effect at the time the permit is approved and exercised, and which may become effective and applicable thereafter. Failure to do so will be grounds for Code Enforcement actions, revocation, or further legal action. H) All plans submitted to the City shall be in substantial conformance with the plans in this approval as conditioned. This condition applies to site plans, grading plans, landscape plans, building plans, elevations, and all other illustrations, text, or plan s submitted to the City in connection with the Project. I) A copy of all pages of these conditions shall be included in the construction drawing packages for grading plans, building plans, and landscape and irrigation plans. J) This approval may be revoked if the Project is operated or maintained in violation of any law or in a manner that constitutes a nuisance or adversely affects the public health, safety, or welfare. K) The City shall have the right to annually inspect the site and facilities to ensure compliance with the conditions of approva l and 4.1.b Packet Pg. 35 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 118 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 142 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 3 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - to recover its actual costs related to such inspections from the property owner or tenant. L) The required parking and loading features (e.g., landscaping, parking surfaces, striping, signs, etc.) shall be continuously maintained in good condition by the person having control of the premises (e.g., lessee, owner, tenant, etc.) as follows: • Landscaping shall be kept alive and continually maintained in compliance with Section 17.330.090 (Landscaping Standards for Parking Areas) and Chapter 17.325 (Water Efficient Landscape and Irrigation). • Parking surfaces shall be kept free of holes and substantial deterioration. • Striping shall be visible. • Signs shall be kept in place, legible, and continually maintained. • Parked vehicles shall not extend over a property line or into a public right-of-way. • All parking and drive aisles shall be screened from the public right-of-way with a landscape hedge or decorative wall, as reviewed and approved by the Planning and Community Development Director. M) Fire Department apparatus access shall be provided to within 150 feet to of all portions of all buildings. Fire apparatus roads shall have an unobstructed width of not less than 24 feet. Driveway loops, fire apparatus access lanes and entrance curb radius should be designed to adequately allow access of emergency fire vehicles. Ref. CFC Sections 503.1.1 and 503.2.1 as amended by the City of San Jacinto. N) All required Fire Department vehicle access roads shall be maintained in a passable condition at all times for emergency Fire Department use. Gates or other obstructions shall be approved by the Fire Department prior to construction. O) For CFD Annexation - Developer will ensure that funds are available for maintenance of public improvements, in the event that improvements are completed, and ready for City takeover, PRIOR to levy collection. P) For CFD Annexation - The first installment of collected assessments is paid to the City in January of each year. In the event that takeover is requested before the first installment is paid to the City, the Developer will either: 4.1.b Packet Pg. 36 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 119 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 143 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 4 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village -  Pay an advancement of funds for the months included from takeover to collection (amount to be set by cost estimate at annexation) OR  Continue to maintain improvements until City has acquired enough funds to sustain maintenance or until first assessment installment is received, whichever is first. Q) For CFD Annexation - Upon acceptance and City take-over, developer will ensure that a minimum of one -year warranty is in place for landscape, irrigation, basin integrity, inclusive pumps and mechanical equipment used for the maintenance of the improvements taken over. R) If not already completed, the developer/applicant or successor in interest shall submit a single check to the City, made payable to the Riverside County Clerk, in the amount of $2,330.75, for the payment of State Fish and Game Fees ($2,280.75) and the County Recorder handling fee ($50.00) for filing of the Notice of Determination (NOD). In accordance with Section 711.4 of the State Fish and Game Code, no project shall be operative, vested, or fina l until the filing fees have been paid. The City will record the NOD and provide a copy of the NOD and receipt to the applicant. S) Grading shall not be commenced, and no structures shall be altered, enlarged, erected, moved, demolished, or rebuilt subject to the provisions of Chapter 17.630 – Site Plan and Design Review of the Development Code, except in compliance with the approved Project and the conditions imposed on the review. T) Grading and public improvements shall be installed in accordance with City standards and specifications. The tops of all graded slopes shall be at the property line U) The project’s grading shall be in a manner to perpetuate existing natural drainage patterns. Any deviation from this, concentration or increase in runoff, must have approval from adjacent property owners, and the City Engineer. Drainage easements shall be obtained from affected property owners. The applicant shall accept the offsite runoff and convey to an acceptable outlet. Emergency escape paths shall be provided for all sump conditions. V) Prior to issuance of any permit, the developer/property owner shall secure City’s and appropriate agency’s approval of the improvement plans. 4.1.b Packet Pg. 37 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 120 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 144 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 5 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - W) Prior to commencement of any construction or installation of fencing in public ri ght-of-way, encroachment permit shall be obtained from the City Engineer’s office. 4.1.b Packet Pg. 38 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 121 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 145 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 6 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Conditions of Approval Timing Responsible Department Condition of Approval – Luiseno Village MET? SPDR 17-17 - Project Description: A multi-tenant retail building totaling 14,583 square feet of specialty retail, with up to 10 individual tenant spaces ranging from 1,200 to 2,261 square feet each. Prior to Any Earthmoving Activity For SPDR 17-17 Prior to any Earthmoving Activity/ Grading Planning 1) Prior to grading permit issuance the developer shall enter into a Treatment and Disposition Agreement (TDA) with the Soboba Band of Luiseño Indians to address treatment and disposition of archaeological / cultural resources and human remains associated with Soboba Band of Luiseño Indians that may be uncovered or otherwise discovered during ground disturbing activities related to the project. The TDA may establish provisions for tribal monitors, and needs to be submitted to the Planning Division upon after it has been executed. Prior to any Earthmoving Activity/ Grading Planning 2) MM BIO 1 - If construction occurs during the breeding season (February 1 to August 31), a burrowing owl breeding bird survey following the recommended guidelines of the MSHCP will be required within 30 days prior to construction to determine if nesting is occurring on site.  If burrowing owl have colonized the project site, the Applicant will prepare a Burrowing Owl Protection and Relocation Plan for approval by RCA and CDFW.  Occupied nests will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation; or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival.  If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance 4.1.b Packet Pg. 39 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 122 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 146 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 7 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? determined by the qualified biologist for each nest or nesting site. For the burrowing owl, the recommended distance is a minimum of 160 feet.  Relocation of burrowing owl is subject to the above conditions and prior coordination with RCA, CDFW and the United States Fish and Wildlife Service (USFWS). Prior to any Earthmoving Activity/ Grading Planning 3) MM Bio 2 - A breeding bird survey will be required to determine if nesting is occurring no more than five days prior to ground disturbing activities. Occupied nests will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation; or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival. If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. Prior to any Earthmoving Activity/ Grading Planning 4) MM Bio 3 - A condition shall be placed on grading permits requiring a qualified biologist to conduct a training session for project personnel prior to grading. The training shall include a description of the species of concern and its habitats, the general provisions of the Endangered Species Act (Act) and the MSHCP, the need to adhere to the provisions of the Act and the MSHCP, the penalties associated with violating the provisions of the Act, the general measures that are being implemented to conserve the species of concern as they relate to the project, and the access routes to and project site boundaries within which the project activities must be accomplished.  Water pollution and erosion control plans shall be developed and implemented in accordance with RWQCB requirements. 4.1.b Packet Pg. 40 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 123 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 147 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 8 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET?  The footprint of disturbance shall be minimized to the maximum extent feasible. Access to sites shall be via pre-existing access routes to the greatest extent possible.  Equipment storage, fueling, and staging areas shall be located on upland sites with minimal risks of direct drainage into riparian areas or other sensitive habitats. These designated areas shall be located in such a manner as to prevent any runoff from entering sensitive habitat. Necessary precautions shall be taken to prevent the release of cement or other toxic substances into surface waters. Project related spills of hazardous materials shall be reported to appropriate entities including but not limited to applicable jurisdictional city, FWS, and CDFG, RWQCB and shall be cleaned up immediately and contaminated soils removed to approved disposal areas.  The removal of native vegetation shall be avoided and minimized to the maximum extent practicable. Temporary impacts shall be returned to pre - existing contours and revegetated with appropriate native species.  Exotic species that prey upon or displace target species of concern should be permanently removed from the site to the extent feasible.  To avoid attracting predators of the species of concern, the project site shall be kept as clean of debris as possible. All food related trash items shall be enclosed in sealed containers and regularly removed from the site(s).  Construction employees shall strictly limit their activities, vehicles, equipment, and construction materials to the proposed project footprint and designated staging areas and routes of travel. The construction area(s) shall be the minimal area necessary to complete the project and shall be specified in the construction plans. Construction limits will be fenced with orange snow screen. Exclusion fencing should be maintained until the completion of all construction activities. Employees shall be instructed that their activities are restricted to the construction areas. 4.1.b Packet Pg. 41 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 124 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 148 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 9 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET?  The Permittee (City of San Jacinto) shall have the right to access and inspect any sites of approved projects including any restoration/enhancement area for compliance with project approval conditions including these BMPs. Prior to any Earthmoving Activity/ Grading Planning 5) MM BIO 4 - The following measures apply to the construction of roadway improvements with the rights-of-way of Ramona Expressway and East Main Street that are completed as part of the Project.  Plans for water pollution and erosion control will be prepared for work involving the movement of earth in excess of 50 cubic yards. The plans will describe sediment and hazardous materials control, dewatering or diversion structures, fueling and equipment management practices, use of plant material for erosion control. Plans will be reviewed and approved by the City prior to construction.  Timing of construction activities will consider seasonal requirements for breeding birds and migratory non-resident species. Habitat clearing will be avoided during species active breeding season defined as March 1 to June 30.  Sediment and erosion control measures will be implemented until such time soils are determined to be successfully stabilized.  Silt fencing or other sediment trapping materials will be installed at the downstream end of construction activities to minimize the transport of sediments off-site.  The footprint of disturbance will be minimized to the maximum extent Feasible. Access to sites will occur on pre-existing access routes to the greatest extent possible.  Equipment storage, fueling and staging areas will be sited on non-sensitive upland wildlife habitat types with minimal risk of direct discharge into riparia n areas or other sensitive wildlife habitat types.  Exotic species removed during construction will be properly handled to prevent sprouting or regrowth. 4.1.b Packet Pg. 42 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 125 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 149 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 10 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET?  Training of construction personnel will be provided.  Ongoing monitoring and reporting will occur for th e duration of the construction activity to ensure implementation of best management practices.  Active construction areas shall be watered regularly to control dust and minimize impacts to adjacent vegetation.  All equipment maintenance, staging, and dispensing of fuel, oil, coolant, or any other toxic substances shall occur only in designated areas within the proposed grading limits of the project site. These designated areas shall be clearly marked and located in such a manner as to contain run-off.  Waste, dirt, rubble, or trash shall not be deposited in the Conservation Area or on native habitat. Prior to any Earthmoving Activity/ Grading Planning 6) MM CR 1 - Should cultural/archaeological resources be encountered during ground disturbing activities for the project, work must be halted in the area within 50 feet of the find and a qualified archaeologist notified immediately to assess the significance of the find. Construction activities could continue in other areas. If the discovery proves to be significant, additional work, such as data recovery excavation, may be warranted and would be discussed in consultation with the property owner, the City of San Jacinto, or any other relevant regulatory agency, as appropriate. Prior to any Earthmoving Activity/ Grading Planning 7) MM CR 2 - In the event of the discovery of human remains, the Riverside County coroner shall be immediately notified. If human remains of Native American origin are discovered during ground disturbing activities, the applicant shall comply with the State law relating to the disposition of Native American burials that fall within the jurisdiction of the NAHC (PRC Section 5097). According to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 8100), and disturbance of Native American cemeteries is a felony (Section 7052). Section 7050.5 requires that excavation be stopped near discovered human 4.1.b Packet Pg. 43 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 126 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 150 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 11 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? remains until the coroner can determine whether the remains are those of a Native American. If the remains are determined to be Native American, the California Native American Heritage Commission and the Soboba Band of Luiseño Indians shall be notified, and appropriate measures provided by State law shall be implemented to determine the most likely living descendant(s). Disposition of the remains shall be overseen by the most likely living descendants to determine the most appropriate means of treating the human remains and any associated grave artifacts. Prior to any Earthmoving Activity/ Grading Engineering Department 8) The developer/applicant or successor in interest shall submit three (3) copies of a comprehensive grading plan at 40-scale for review and approval to the Engineering Department with any required fee and one (1) copy to the Project Planner. The plan shall comply with the Uniform Building Code, Chapter 70, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. The plan shall be drawn on 24" X 36" Mylar by a registered civil engineer. A copy of all pages of these conditions shall be included in the plans. Prior to any Earthmoving Activity/ Grading Planning 9) Grading and public improvements shall be installed in accordance with City standards and specifications. The tops of all graded slopes shall be at the property line. Any graded area that remains undeveloped between phases shall be maintained with a decomposed granite concrete mix, to prevent wind and water erosion. 4.1.b Packet Pg. 44 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 127 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 151 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 12 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to any Earthmoving Activity/ Grading Planning 10) The grading plan shall include the following, for Planning approval: A. An ADA path of travel enhanced with decorative paving, stamped concrete, pavers, or another material differentiating the walk from the asphalt parking area as approved by Planning and Community Development Director. B. A public sidewalk with special decorative paving accents where crossed by driveway entrances to parking lots. C. Parking areas surfaced with Portland-Cement Concrete paving to a minimum 4-inch thickness over native soil compacted to 95% compaction or asphalt concrete with 2½ inch thickness over 4 inches of Class II aggregate base compacted to 95% relative compaction, or as approved by the City Engineer. Prior to any Earthmoving Activity/ Grading Planning 11) A final Water Quality Management Plan (WQMP) shall be submitted and approved, including a project description, and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The Water Quality Management Plan shall identify the structural and non-structural measures consistent with the City’s adopted requirements. Prior to any Earthmoving Activity/ Grading Planning 12) The proposed site design BMPs selected for this project have been approved in concept as a Master WQMP. The individual parcels shall submit Final WQMP Addendums including plans and details providing the elevations and slopes of the three bio-retention basins, the detention basin and other details for the proposed structural BMPs. The Public Works Department shall review and approve the Final WQMP document, plans and details. The property owners will also provide signed agreements presenting shared responsibilities for the BMP maintenance. 4.1.b Packet Pg. 45 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 128 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 152 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 13 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to any Earthmoving Activity/ Grading Planning 13) MM GEO 2 - All earthmoving during project implementation at or below 4 feet requires full-time paleontological monitoring, as follows:  A qualified paleontologist (graduate degree and more than one year of professional experience as a principal investigator) will be retained to provide paleontological services. The principal paleontologist will be responsible to implement and oversee monitoring and to maintain professional standards of work. The principal paleontologist will report all mitigation and monitoring activities, or related actions of the paleontological resources team to the City, as appropriate, including discussing a reduction in monitoring from full- to part- time after monitoring is initiated and no fossils have been identified.  A qualified paleontological monitor will perform monitoring of construction grading and excavations that take place in the older Pleistocene sediments at depths of 4 feet or more. The monitor will have authority to divert grading away from exposed fossils temporarily in order to recover the fossil specimens. Cooperation and assistance from on-site personnel will greatly assist timely resumption of work in the area of the fossil discovery.  Discovery of fossil producing localities requires documentation including measured stratigraphic columns and geologic samples for analysis. Any fossils recovered that meet significance criteria will be prepared, identified, and cataloged before donation to an appropriate repository. The Western Science Center in Hemet, California is recommended as an appropriate repository.  The principal paleontologist retained will prepare a final report. The report will include a list of specimens recovered, documentation of each locality, interpretation of fossils recovered, and will include any specialists’ reports as appendices. 4.1.b Packet Pg. 46 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 129 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 153 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 14 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to any Earthmoving Activity/ Grading Engineering Department 14) A geotechnical engineering report shall be submitted to the City Engineer prior to issuance of a grading permit, and all requirements identified in the report shall be met. The report must be prepared by a California licensed geotechnical engineer or civil engineer skilled in soils/foundation investigations and shall be submitted for review by the Building & Safety Department prior to the issuance of grading or building permits. All requirements identified in the report shall be met. Prior to any Earthmoving Activity/ Grading Engineering Department 15) Onsite and offsite fire hydrants shall be installed as determined by the Fire Department. Prior to any Earthmoving Activity/ Grading Engineering Department 16) The developer/property owner shall submit the following to the City Engineer for review and approval:  Onsite Grading Plan and Erosion Control Plan – All pads shall be graded to be a minimum of 1’ above 100-year calculated water surface elevation or adjacent finished grade. Plans shall show the approved WDID No.  Drainage Plan, Hydrology and Hydraulic Report  Final WQMP (for reference)  Water & Sewer Plan – Fire Department and EMWD approval required prior to City Engineer approval.  Street Improvement Plan  Traffic Signal Plans prepared by Traffic Engineer  Signing and Striping plan prepared by Traffic Engineer  Streetlight Plan prepared by a Registered Electrical Engineer per City of San Jacinto standards. Street lights shall be LS3 – LED type. 4.1.b Packet Pg. 47 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 130 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 154 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 15 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET?  The project’s design shall be in compliance with EMWD, Riverside County Flood Control and Water Conservation District, Riverside County, Caltrans, City of San Jacinto and ADA most recent standards, criteria and requirements and in effect at the time of construction and coordinated with approved plans for adjacent developments. Prior to any Earthmoving Activity/ Grading Engineering Department 17) The developer/property owner shall provide water and sewer service to this project in accordance with the requirements of the appropriate utility purveyors. This project is within City of San Jacinto sewer service area and Eastern Municipal Water District’s water service area. Water and sewer improvements shall be installed per EMWD Standards and Fire Department requirements. Prior to any Earthmoving Activity/ Grading Engineering Department 18) The incremental increase in runoff volume between developed and undeveloped state for the 85th percentile storm, shall be retained within onsite private detention facilities. The applicant larger storms proposes to collect into the detention system and discharge them into Main Street through a curb outlet. Prior to any Earthmoving Activity/ Grading Engineering Department 19) This project is located within the limits of the San Jacinto Valley Area Drainage Plan for which drainage fees have been adopted by the City. Drainage fees shall be paid as set forth under the provisions of the “Rules and Regulations for Administration of Area Drainage Plan”. During Construction Planning 20) MM NOI 4 - Idling equipment shall be turned off when not in use. During Construction Planning 21) MM NOI 1 - Construction shall occur during the permissible hours as defined in Section 8.40.090. 4.1.b Packet Pg. 48 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 131 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 155 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 16 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? During Construction Planning 22) MM NOI 2 - During construction, the contactor shall ensure all construction equipment is equipped with appropriate noise attenuating devices. During Construction Planning 23) MM NOI 3 - The contractor shall locate equipment staging areas that will create the greatest distance between construction -related noise/vibration sources and sensitive receptors nearest the project site during all project construction. Prior to the Issuance of Building Permits –SPDR 17-17 Prior to Issuance of Building Permits Planning 24) All buildings except for the retail building located on Parcel 1 for which Design Review of Elevations were included for SPDR 17-17 shall submit for and obtain Site Plan and Design Review approval. Prior to Issuance of Building Permits Planning 25) The developer shall enter into an agreement with the City franchised trash hauler for the removal of construction waste and debris from the construction site. Prior to Issuance of Building Permits Planning 26) Submit a detailed landscape and irrigation plan for review and approval. The landscape plans shall be prepared by a licensed landscape architect in conformance with Chapter 17.325 – Water Efficient Landscape and Irrigation and Section 17.325.060 — Landscape and Irrigation Submittal Package Requirements of the Development Code and the City Landscape Design Guidelines for review and approval by the City Landscape Architect. Plans should be submitted at least 30 days prior to the expected date of permit issuance. 4.1.b Packet Pg. 49 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 132 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 156 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 17 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Planning 27) Submit, for Planning approval, an outdoor lighting plan in compliance with the following: A. A site plan showing all parking lot light standards, building mounted light fixtures, and any up-lighting in landscaping, low-level walk lights, and lighting diffused off of wall surfaces. B. Cut sheets for all proposed lighting fixtures. C. The lighting shall be indirect, hooded, and arranged to reflect lighting away from adjoining properties and streets in compliance with Section 17.300.080 (Outdoor Light and Glare). D. Parking lot light standards shall be a maximum of 25 feet in height overall, as measured from the usable parking or driving surface. E. Outdoor lighting shall maintain a minimum of one-foot candle illumination for all parking and pedestrian areas and shall not exceed one-half foot candle along property lines of the subject site. F. Include a photometric plan that includes details such as beam spreads and/or photometric calculations, location and type of fixtures, and arrangement of exterior lighting that does not create glare or hazardous interference to adjacent streets or properties. Prior to Issuance of Building Permits Planning 28) Submit for Planning approval, the plans for trash enclosures. Pursuant to City standards, trash receptacles shall be enclosed by a six (6) foot high solid decorative masonry wall with solid view-obstructing gates, a solid roof with trellis feature, an ADA accessible pedestrian entrance and a drain to the sewer system. The enclosures shall be designed so they cannot be entered into in any way when door and gates are closed and locked. Approved Trash Enclosure plans shall be shown on the plans submitted for Plan Check. 4.1.b Packet Pg. 50 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 133 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 157 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 18 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits I Planning 29) The developer/applicant or successor in interest shall record a “Water Quality Management Plan and Urban Runoff BMP Transfer Access and Maintenance Agreement,” to provide public notice of the re quirement to implement the approved Final project-specific WQMP and the maintenance requirements associated with the WQMP. Prior to Issuance of Building Permits Planning 30) The developer/applicant or successor in interest may have to secure coverage under the State’s General Industrial Activities Storm Water Permit as issued by the State Water Resources Control Board. Prior to Issuance of Building Permits Planning 31) The developer/applicant or successor in interest shall ensure the following pursuant to Section XII. I of the 2010 NPDES Permit. Field verification that structural Site Design, Source Control, and Treatment Control BMPs are designed, constructed and functional in accordance with the approved Final Water Quality Management Plan (WQMP). City WQMP Inspector will be notified for required inspections during construction. 4.1.b Packet Pg. 51 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 134 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 158 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 19 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Planning 32) MM GEO 1 - The Soil and Foundation Report (Soils Southwest, 2017) provides foundation recommendations to minimize seismic-induced settlement hazards. These include using conventional checkered/waffle type rigid footings for exterior load bearing walls along with interior grade beams, or using a rigid mat foundation. Additional recommendations address concrete slab construction and cu ring, excavation and fill, pavement and utility trenches. The recommendations identified in the Soil and Foundation Report, or similar measures approved by a registered civil engineer, shall be incorporated into the construction plans. Project plans will be reviewed during the plan check process to confirm geotechnical design measures are incorporated to address the potential for seismic-induced settlement. These measures shall be incorporated into final construction plans prior to issuance of building permits. Prior to Issuance of Building Permits Engineering 33) MM TRAF 2 - Ramona Expressway/Main Street-Lake Park Drive: The project applicant shall restripe the eastbound approach to include one left turn lane, one through lane, and one shared through/right turn lane. Prior to Issuance of Building Permits Planning 34) MM NOI 7 - All HVAC units on the roofs of the retail buildings on Parcels 1 and 2 shall be shielded to maintain the nighttime standard of 45 dBA at the adjacent residential property line. A parapet or acoustic screen shall be provided that extends two feet in height above the top of the HVAC units. A noise control analysis of the HVAC plans and specifications shall be provided prior to issuance of building permits to ensure that the HVAC units would not exceed the 45 dBA standard at the adjacent residential property line. 4.1.b Packet Pg. 52 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 135 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 159 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 20 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Building & Safety 35) Any building, sign, or structure to be constructed or located on site, will require professionally prepared plans based on the most current City and California Building Codes, submitted for review and approval and comply with the following:  The proposed roof-mounted equipment shall be completely screened so as not to be visible from any street or private property adjacent to the Project. The screening shall be an integral part of the building; details shall be provided to the Planning Department for review and approval prior to issuance of building permits. Any proposed change shall be reviewed and approved by the Planning Department.  Any ground mounted equipment or equipment attached to the building, including gas and electrical meters, and electrical or mechanic cabinets shall be completely screened so as not to be visible from any street or private property adjacent to the Project. Chain link fencing is not an approved screening material. Prior to Issuance of Building Permits Building & Safety 36) The developer/applicant or successor in interest shall pay school fees as required by State law. The developer/applicant or successor in interest shall receive written clearance from the San Jacinto Unified School District. Prior to Issuance of Building Permits Building & Safety 37) All lumber scraps, combustible materials, and other debris shall be picked up daily, or more often as required by the Building and Safety Division. Prior to Issuance of Building Permits Cal Fire – Riverside County Fire Department 38) The required water system, including all fire hydrant(s), shall be installed and accepted by the appropriate water agency and the Riverside County Fire Department prior to any combustible building material placed on an individual lot. Approved water plans must be at the job site. 4.1.b Packet Pg. 53 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 136 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 160 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 21 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Cal Fire – Riverside County Fire Department 39) Fire Sprinkler System: All structures 3,600 square feet or larger will be required to install a fire sprinkler system in accordance with the CFC and NFPA 13. Ref. CFC 903.2 as amended by the City of San Jacinto. Prior to Issuance of Building Permits Cal Fire – Riverside County Fire Department 40) Fire hydrants shall be located within 400’ of all exterior portions of the structures, along required fire apparatus access roads, and adjacent to public streets in the quantities and up to the maximum distance as required by California Fire Code and Riverside County Fire Department. Prior to Issuance of Building Permits Cal Fire – Riverside County Fire Department 41) The address shall be posted per Riverside County Fire Department standards and will be clearly visible from public roadway. Prior to Issuance of Building Permits Engineering Department 42) The developer shall provide water and sewer services to this project in accordance with the requirements of the appropriate utility purveyor. This project is within the Eastern Municipal Water District’s sewer and water service area. Water and sewer improvements shall be installed per EMWD standards. Prior to Issuance of Building Permits Engineering Department 43) All rights-of-way dedication shall be offered to the public and shall continue in force until the City accepts or abandons such offers. Dedications shall be free from all encumbrances as approved by the City Engineer. Prior to Issuance of Building Permits Engineering Department 44) Paved access shall be provided to the proposed buildings per precise grading plan. 4.1.b Packet Pg. 54 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 137 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 161 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 22 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Engineering Department 45) The developer/property owner shall submit a compaction certification from the Soils Engineer in compliance with the approved geotechnical/soils report. Prior to Occupancy – SPDR 17-17 Prior to Occupancy Planning 46) All required on-site improvements shall be installed per approved plans. Prior to Occupancy Planning 47) Lighting shall be provided throughout the parking area at all hours of customer and employee use. Prior to Occupancy Planning 48) All landscaping, dust control measures, all walls/fences, pedestrian walkways, irrigation systems, etc. as delineated on the approved landscape plan shall be installed. Prior to Occupancy Planning 49) The developer/applicant or successor in interest shall submit the following items for the landscape and irrigation development and maintenance: a. The signed Landscape Certificate of Completion pursuant to Section 17.325.070 – Certificate of Completion of the Development Code; b. The irrigation scheduling pursuant to Section 17.325.080 – Irrigation Scheduling of the Development Code; c. The Landscape and Irrigation Maintenance Schedule pursuant to Section 17.325.090 – Landscape and Irrigation maintenance Schedule of the Development Code; and d. The Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis pursuant to Section 17.325.100 — Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis of the Development Code. 4.1.b Packet Pg. 55 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 138 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 162 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 23 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Planning 50) The developer/applicant or successor in interest shall pay any outstanding planning application or processing fees. Prior to Occupancy Building & Safety 51) The City has adopted Traffic Signal Mitigation fees and the Transportation Uniform Mitigation Fee (TUMF) program; this Project shall be subject to the payment of these fees prior to the issuance of building permits unless exempted by the ordinance establishing the TUMF program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of fee payment. Prior to Occupancy Building & Safety 52) The City of San Jacinto has adopted the area-wide Multi-Species Habitat Conservation Plan (MSHCP). This Project is subject to the payment of fees prior to the occupancy. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of payment. Prior to Occupancy Building & Safety 53) Specific addresses for each building shall be provided to make such number plainly visible from the public street, avenue, court, or alley upon which property fronts, and shall be contrasting color and background. Prior to Occupancy Building & Safety 54) Prior to occupancy all Department/Division requirements and signoffs shall be complete. 4.1.b Packet Pg. 56 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 139 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 163 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 24 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Engineering Department 55) Improve Ramona Expressway Urban Arterial Highway Standard (modified – 146’/114’ including an 18’ wide raised landscaped median and 16-foot parking) to include installation of half-width street improvements along the property frontage; curb and gutter located 57’ west of centerline and a 12’ wide Class 1 multi-purpose trail within the 16’ wide parkway. If the existing pavement is in good condition the developer/property owner may use grind and overlay technique as determined by the City Engineer. The design shall provide the lane assignments as depicted on the conceptual signing and striping plan prepared by Michael Baker International as included in the staff report. Prior to Occupancy Engineering Department 56) Improve Main Street - Secondary Highway Standard (100’/64’) to include installation of 6’ wide sidewalk within the 18’ wide parkway. If the existing pavement if in good condition the developer/property owner may use grind and overlay technique as determined by the City Engineer. Prior to Occupancy Engineering Department 57) Upgrade the existing traffic signal at the southwest corner of the intersection of Main Street and Ramona Expressway to ultimate design per City of San Jacinto and Riverside County Standards. Prior to Occupancy Engineering Department 58) Install traffic signals at the intersection of Ramona Expressway and Donna Way to ultimate design per City of San Jacinto and Riverside County Standards. This will require removal of a portion of the existing median to accommodate turning movement for northbound Ramona Expressway traffic, and the removal of the existing porkchop at the existing pavement if in good condition may be grind and overlayed as determined by the City Engineer 4.1.b Packet Pg. 57 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 140 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 164 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 25 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Engineering Department 59) The developer’s traffic study indicates that Main and Hewitt would not operate at an acceptable level of service after development of the site. Therefore, the developer shall install the signal at Hewitt and Main Street. Alternatively, the Developer shall execute the Soboba Mitigation Agreement, and provide the City with funds as detailed in the terms to that agreement. The City, subject to Council approval, would allocate funds toward the installation of the signal by a City administered public works contract. Prior to Occupancy Engineering Department 60) The driveways on Main Street and Ramona Expressway shall be limited to right - in/right-out only. Prior to Occupancy Engineering Department 61) Existing cables (under 66kv) shall be undergrounded and poles removed. All other poles if in conflict with proposed improvements shall be relocated, this may impact a signal pole at Ramona Expressway and Donna Way. Prior to Occupancy Engineering Department 62) Streetlights shall be installed on Ramona Expressway, Main Street and Donna Way adjacent to the site, as approved by the City Engineer. Prior to Occupancy Engineering Department 63) The property owner(s) shall support the continuous maintenance of the street lighting by annexing to the appropriate district prior to Certificate of Occupancy. All onsite lighting, drainage facilities, WQMP improvements and parking/median landscaping shall be the responsibility of the property owner. The property owner shall be responsible to pay its share of the maintenance of the traffic signals at the intersections of: Ramona Expressway and Main Street Ramona Expressway and Donna Way Main Street and Hewitt Street 4.1.b Packet Pg. 58 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 141 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 165 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 26 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Engineering Department 64) Any appurtenances damaged or broken during the development of this project shall be repaired or removed and replaced by the developer/property owner to the satisfaction of the City Engineer. Any survey monuments damaged or destroyed shall be reset by a qualified professional pursuant to the California Business and Professional Code 8771. Prior to Occupancy Engineering Department 65) MM TRAF 1 - Main Street/Hewitt Street: The project applicant shall make a fair share contribution to the construction of a signal at this location. Prior to Occupancy Riverside County Environmental Health 66) A Hazardous Materials Business Plan permit must be obtained prior to operation. California Environmental Reporting System (CERS) submittal necessary (http://cers.calepa.ca.gov/) Prior to Occupancy Special Districts 67) Establish a funding mechanism for the maintenance of public improvements and public safety services. Annexation into the Community Facilities District (CFD) for Public Facilities Maintenance (MC 15.08.015) is an option to fulfill the funding requirement for maintenance of public improvements.  $21,800.00 + $25 per parcel Funding of services under the City’s CFDs will consist of an annual assessment based on the costs of such services, as determined by a City’s Engineer’s Estimate, established at the time of annexation. Prior to Occupancy Special Districts 68) Development must comply with Storm Water Basin & Pump Specifications and Standards. 4.1.b Packet Pg. 59 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 142 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 166 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 27 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Special Districts 69) Development must comply with Landscape and Irrigation Design Guidelines. Prior to Occupancy Special Districts 70) Landscape improvements shall have irrigation water meters, exclusive for right - of-way landscaping. Prior to Occupancy Special Districts 71) Landscape areas in the right-of-way shall have an independent irrigation control system, exclusive for right-of-way landscaping.  Cal-Sense 3000 or newer is required for all irrigation areas Overall Project Operational Conditions Prior to Issuance of Building Permits Planning 72) MM NOI 5 - Solid Waste and recycling collection shall only occur during daytime hours (7:00 a.m. and 7:00 p.m.). Prior to Issuance of Building Permits Planning 73) MM NOI 6 - Truck deliveries shall only occur during daytime hours (7:00 a.m. and 7:00 p.m.). 4.1.b Packet Pg. 60 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 143 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 167 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 28 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Conditions For CUP 17-09 Description: Service Station with 24 fuel stations, a 3,048 square foot Convenience Store , with a type 20 license for beer and wine sales, and 1,105 square foot car wash. Prior to the Issuance of Grading Permits –CUP Prior to Grading Planning 74) The developer shall submit a Site Plan & Design Review for review and approval. Prior to Grading Planning 75) The developer/applicant or successor in interest shall submit three (3) copies of a comprehensive grading plan at 40-scale for review and approval to the Engineering Department with any required fee and one (1) copy to the Project Planner. The plan shall comply with the Uniform Building Code, Chapter 70, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. The plan shall be drawn on 24" X 36" Mylar by a registered civil engineer. A copy of all pages of these conditions shall be included in the plans. Prior to the Issuance of Building Permits Prior to Issuance of Building Permits Planning 76) Submit a detailed landscape and irrigation plan for review and approval. The landscape plans shall be prepared by a licensed landscape architect in conformance with Chapter 17.325 – Water Efficient Landscape and Irrigation and Section 17.325.060 — Landscape and Irrigation Submittal Package Requirements of the Development Code and the City Landscape Design Guidelines for review and approval by the City Landscape Architect. Plans should be submitted at least 30 days prior to the expected date of permit issuance. Prior to Issuance of Building Permits Building & Safety 77) Any building, sign, or structure to be constructed or located on site, will require professionally prepared plans based on the most current City and California Building Codes, submitted for review and approval. Prior to Issuance of Planning 78) Prior to building permit issuance, the applicant shall demonstrate compliance with SCAQMD rules, Rule 201 – Permit to Construct, Rule 203 – Permit to Operate, 4.1.b Packet Pg. 61 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 144 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 168 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 29 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Building Permits and Rule 461 – Gasoline Transfer and Dispensing by obtaining the proper permits from SCAQMD. Prior to Issuance of Building Permits Building & Safety 79) The developer/applicant or successor in interest shall pay school fees as required by State law. The developer/applicant or successor in interest shall receive written clearance from the San Jacinto Unified School District Prior to Issuance of Building Permits Riverside County Environmental Health 80) For the Convenience Store and Gas Station, the construction plan and permit shall be submitted to County of Riverside Department of Environmental Health and be approved prior to starting construction. Prior to Occupancy Prior to Occupancy Planning 81) The developer/applicant or successor in interest shall pay any outstanding planning application or processing fees. Prior to Occupancy Planning 82) The developer/applicant or successor in interest shall record a “Water Quality Management Plan and Urban Runoff BMP Transfer Access and Maintenance Agreement,” to provide public notice of the requirement to implement the approved Final project-specific WQMP and the maintenance requirements associated with the WQMP. Prior to Occupancy Planning 83) The developer/applicant or successor in interest may have to secure coverage under the State’s General Industrial Activities Storm Water Permit as issued by the State Water Resources Control Board. Prior to Occupancy Planning 84) The developer/applicant or successor in interest shall ensure the following, pursuant to Section XII. I. of the 2010 NPDES Permit:  Field verification that structural Site Design, Source Control, and Treatment Control BMPs are designed, constructed and functional in accordance with the approved Final Water Quality Management Plan (WQMP). City WQMP Inspector will be notified for required inspections during construction. 4.1.b Packet Pg. 62 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 145 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 169 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 30 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village -  The irrigation scheduling pursuant to Section 17.325.080 – Irrigation Scheduling of the Development Code;  The Landscape and Irrigation Maintenance Schedule pursuant to Sec-tion 17.325.090 – Landscape and Irrigation maintenance Schedule of the Development Code; and  The Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis pursuant to Section 17.325.100 — Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis of the Development Code. Prior to Occupancy Building & Safety 85) Prior to final inspection by Building and Safety Division and/or issuance of a Certificate of Occupancy the applicant shall pay in full all fees. Prior to Occupancy Building & Safety 86) Specific addresses for each building shall be provided to make such number plainly visible from the public street, avenue, court, or alley upon which property fronts, and shall be contrasting color and background. Prior to Occupancy Building & Safety 87) Prior to occupancy all Department/Division requirements and signoffs shall be complete. Prior to Occupancy Building & Safety 88) The City has adopted Traffic Signal Mitigation fees and the Transportation Uniform Mitigation Fee (TUMF) program; this Project shall be subject to the payment of these fees prior to the issuance of building permits unless exempted by the ordinance establishing the TUMF program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of building permit issuance. Prior to Occupancy Building & Safety 89) The City of San Jacinto has adopted the area-wide Multi-Species Habitat Conservation Plan (MSHCP). This Project is subject to the payment of fees prior to the issuance of building permits unless exempted by the ordinance establishing the MSHCP program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of building permit issuance. 4.1.b Packet Pg. 63 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 146 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 170 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 31 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Prior to Occupancy Riverside County Environmental Health 90) A Hazardous Waste Generator Permit must be obtained prior to operation. Prior to Occupancy Riverside County Environmental Health 91) A Hazardous Materials Business Plan permit must be obtained prior to operation. California Environmental Reporting System (CERS) submittal necessary (http://cers.calepa.ca.gov/) Prior to Occupancy Riverside County Environmental Health 92) An Underground Storage Tank operating permit must be obtained prior to operation. DEH Hax Mat Plan Check process required. OPERATONAL CONDITIONS Operation Conditions Planning 93) A Hazardous Waste Generator Permit must be obtained prior to operation. Operation Conditions Planning 94) The service station with a convenience store with off-sale beer and wine license shall be operated as described in the submitted application for this Project and as described in the body of the staff report; unless superseded by these conditions of approval. Operation Conditions Planning 95) The service station with a convenience store with off-sale beer and wine license shall be developed and operated per the required standards of the Development Code Operation Conditions Planning 96) A copy of the Conditional Use Permit and Final Conditions of Approval shall be available at the site and presented to City staff, including the Police Department and Code Enforcement, upon request. Failure to have the latest approved conditions available upon request will be grounds for revocation of the Conditional Use Permit. Operation Conditions Planning 97) A copy of the California Department of Alcohol and Beverage Control license for the premises shall be available at the site and presented to City staff, including 4.1.b Packet Pg. 64 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 147 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 171 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 32 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - the Police Department and Code Enforcement, upon request. Failure to have the license available upon request will be grounds for revocation of the Conditional Use Permit. Operation Conditions Planning 98) The off-sale alcohol premises shall be posted to indicate that it is unlawful for an y person to drink or consume any alcoholic beverage in any public place or posted premises. Operation Conditions Planning 99) A sign shall be posted in front of the convenience store indicating that no loitering is permitted. Operation Conditions Planning 100) No sale of alcoholic beverages shall be made from a drive-through lane or window. Operation Conditions Planning 101) The display area of the alcoholic beverages shall be limited to 2% of the total floor area of the store, as depicted on the conceptual floor plan Operation Conditions Planning 102) No displays of beer and wine shall be located within five-feet of the store’s entrances, windows or checkout counter. Operation Conditions Planning 103) Cold beer and wine shall be sold from, or displayed in, the main, permanently affixed electrical coolers only. Operation Conditions Planning 104) No beer or wine advertising shall be located on service station islands; no advertising for beer or wine shall be located on buildings or windows visible to the exterior. Operation Conditions Planning 105) All security cameras, both interior and exterior, around the facility covering the inside and outside of the building as well as surrounding areas, shall be maintained in good operational service and used 24 hours a day Operation Conditions Planning 106) At least 240 hours of video data will be recorded and saved for future playback or review. Operation Conditions Planning 107) The business windows of the convenience store shall not be tinted or obscured in any way, including by temporary or painted window signs, and the interior lighting of the building shall remain at adequate levels to clearly see into the business from the exterior. 4.1.b Packet Pg. 65 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 148 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 172 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 33 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Operation Conditions Planning 108) The subject alcoholic beverage license shall not be exchanged for a public premises type license or operated as a public premise. All alcoholic beverages sold shall be for consumption off the premises. Operation Conditions Planning 109) All storage and display of merchandise and supplies must be conducted within the building. Operation Conditions Planning 110) Lighting shall be provided throughout the parking area at all hours of customer and employee use. Operation Conditions Planning 111) All parking and drive aisles shall be screened from the public right -of-way with a landscape hedge or decorative wall, as reviewed and approved by the Planning and Community Development Director. 4.1.b Packet Pg. 66 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 149 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 173 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 34 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Conditions For MUP 17-09 Project Description: A Minor Use Permit for a fast-food restaurant with drive-through service totaling 2,800 square feet. Prior to Grading Prior to Issuance of Building Permits Planning 112) The developer shall submit a Site Plan & Design Review for review and approval. Prior to Issuance of Building Permits Planning 113) The developer/applicant or successor in interest shall submit three (3) copies of a comprehensive grading plan at 40-scale for review and approval to the Engineering Department with any required fee and one (1) copy to the Project Planner. The plan shall comply with the Uniform Building Code, Chapter 70, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. The plan shall be drawn on 24" X 36" Mylar by a registered civil engineer. A copy of all pages of these conditions shall be included in the plans. Prior to Building Permits Prior to Occupancy Building & Safety 114) The developer/applicant or successor in interest shall pay school fees as required by State law. The developer/applicant or successor in interest shall receive written clearance from the San Jacinto Unified School District. Prior to Occupancy Building & Safety 115) Any building, sign, or structure to be constructed or located on site, will require professionally prepared plans based on the most current County and California Building Codes, submitted for review and approval. Prior to Occupancy 116) The developer/applicant or successor in interest shall pay any outstanding planning application or processing fees. Prior to Occupancy Building & Safety 117) Specific addresses for each building shall be provided to make such number plainly visible from the public street, avenue, court, or alley upon which property fronts, and shall be contrasting color and background. 4.1.b Packet Pg. 67 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 150 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 174 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 35 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Prior to Occupancy Building & Safety 118) Prior to occupancy all Department/Division requirements and signoffs shall be complete. 119) Prior to final inspection by Building and Safety Division and/or issuance of a Certificate of Occupancy the applicant shall pay in full all fees. Prior to Occupancy Building & Safety 120) The City has adopted Traffic Signal Mitigation fees and the Transportation Uniform Mitigation Fee (TUMF) program; this Project shall be subject to the payment of these fees prior to the issuance of building permits unless exempted by the ordinance establishing the TUMF program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of building permit issuance. Prior to Occupancy Building & Safety 121) The City of San Jacinto has adopted the area-wide Multi-Species Habitat Conservation Plan (MSHCP). This Project is subject to the payment of fees prior to the occupancy. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of payment. Operational Conditions Operational Conditions Planning 122) The fast-food restaurant with a drive-through, automated car wash and tire store shall be operated as described in the submitted application for this Project and as described in the body of the staff report; unless superseded by these conditions of approval. Operational Conditions Planning 123) The permit a fast food restaurant with a drive -through, automated car wash, and tire store shall be developed and operated per the required standards of the Development Code. 4.1.b Packet Pg. 68 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 151 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 175 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 36 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Conditions of Approval – MUP 17-10 Project Description: A Minor Use Permit for a fast-food restaurant with drive-through service totaling 3,200 square feet. Prior to Grading Prior to Precise Grading Planning 124) The developer shall submit a Site Plan & Design Review for review and approval. Prior to Precise Grading Planning 125) The developer/applicant or successor in interest shall submit three (3) copies of a comprehensive grading plan at 40-scale for review and approval to the Engineering Department with any required fee and one (1) copy to the Project Planner. The plan shall comply with the Uniform Building Code, Chapter 70, Cit y Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. The plan shall be drawn on 24" X 36" Mylar by a registered civil engineer. A copy of all pages of these conditions shall be included in the plans. Prior to Building Permits Prior to Building Permits Building and Safety 126) The developer/applicant or successor in interest shall pay school fees as required by State law. The developer/applicant or successor in interest shall receive written clearance from the San Jacinto Unified School District. Prior to Building Permits Building and Safety 127) Any building, sign, or structure to be constructed or located on site, will require professionally prepared plans based on the most current County and California Building Codes, submitted for review and approval. Prior to Occupancy Prior to Occupancy Planning 128) The developer/applicant or successor in interest shall pay any outstanding planning application or processing fees. Prior to Occupancy Building & Safety 129) Prior to final inspection by Building and Safety Division and/or issuance of a Certificate of Occupancy the applicant shall pay in full all fees. Prior to Occupancy Building & Safety 130) Specific addresses for each building shall be provided to make such number plainly visible from the public street, avenue, court, or alley upon which property fronts, and shall be contrasting color and background. 4.1.b Packet Pg. 69 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 152 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 176 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 37 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Prior to Occupancy Building & Safety 131) Prior to occupancy all Department/Division requirements and signoffs shall be complete. Prior to Occupancy Building & Safety 132) The City has adopted Traffic Signal Mitigation fees and the Transportation Uniform Mitigation Fee (TUMF) program; this Project shall be subject to the payment of these fees prior to the issuance of building permits unless exempted by the ordinance establishing the TUMF program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of building permit issuance. Prior to Occupancy Building & Safety 133) The City of San Jacinto has adopted the area-wide Multi-Species Habitat Conservation Plan (MSHCP). This Project is subject to the payment of fees prior to the occupancy. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of payment. Prior to Occupancy Public Works 134) All exterior lighting shall be LED, including both wall packs and parking lights. Interior lighting shall be LED as well Operational Conditions Operational Conditions Planning 135) The fast-food restaurant with a drive-through, automated car wash and tire store shall be operated as described in the submitted application for this Project and as described in the body of the staff report; unless superseded by these conditions of approval. Operational Conditions Planning 136) The permit a fast food restaurant with a drive-through, automated car wash, and tire store shall be developed and operated per the required standards of the Development Code. 4.1.b Packet Pg. 70 Attachment: 02 - Conditions of Approval (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05,Planning Conditions (August 27, 2019) - Superceded4.1.c Packet Pg. 153 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 177 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- STATE OF CALIFORNIA ) RESOLUTION PC 19-09 COUNTY OF RIVERSIDE ) ss CITY OF SAN JACINTO ) A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN JACINTO, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL ADOPT CHANGE OF ZONE 17-05 TO CHANGE THE ZONE FROM COMMERCIAL NEIGHBORHOOD TO COMMERCIAL GENERAL; APPROVE SITE PLAN AND DESIGN REVIEW 17-17 FOR A COMMERCIAL CENTER; CONDITIONAL USE PERMIT 17-09 FOR A SERVICE STATION AND CONVENIENCE STORE WITH OFF-SALE ALCOHOL SALES, AN AUTOMATED CAR WASH, AND VARIANCE 17- 05 TO ALLOW A SERVICE STATION WITH 24-PUMP DISPENSERS WHERE A MAXIMUM OF 15 ARE PERMITTED; MINOR USE PERMITS 17-09 AND 17-10 TO PERMIT TWO FAST FOOD RESTAURANTS WITH A DRIVE-THROUGH; AND MINOR USE PERMIT 17-11 TO EXCEED THE REQUIRED PARKING SPACES BY MORE THAN 5 PERCENT, ON THE WEST SIDE OF RAMONA EXPRESSWAY, EXTENDING BETWEEN MAIN STREET AND DONNA WAY. WHEREAS, All–Specks, Inc, on behalf of Soboba Band of Luiseno Indians filed applications on November 21, 2017, and June 24, 2019 for a Change of Zone 17-05 (17- 05) Site Plan and Design Review 17-17 (SPDR 17-17); Conditional Use Permit 17-09 (CUP-17-09); Variance 17-05 (VAR-17-05); Minor Use Permit 17-09, 17-10, and 17-11 (MUP 17-09), (MUP 17-10), and MUP 17-11); (“applications”), located west of Ramona Expressway, extending between Main Street and Donna Way. (“Subject Site”); WHEREAS, the Applications are proposed to develop the Luiseno Village Project as a commercial development with SPDR 17-17 for the review of the overall site and building designs, a CUP 17-09 to permit a service station with a convenience store to have an off-sale beer and wine license, and a carwash, VAR 17-05 to allow 24 fuel pumps where a maximum of 15 are permitted, MUP 17-09 and MUP 17-10 to permit two fast food restaurants with a drive-through, MUP 17-11 to exceed the required parking spaces by more than 5 percent, and CZ 17-05 to change the Zone from CN – Commercial Neighborhood to CG – Commercial General (“Project”) ; WHEREAS, the Applications were reviewed, studied, and found to not have a significant effect on the environment under the California Environmental Quality Act (“CEQA”) as more fully described below; WHEREAS, on August 27, 2019, the Planning Commission of the City of San Jacinto (“Commission”) conducted a duly noticed public hearing on the Project at which time all persons wishing to testify in connection with the Applications were heard and the Applications were comprehensively reviewed; and 4.1.c Packet Pg. 71 Attachment: 03 - PC Resolution 19-09 (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 154 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 178 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF SAN JACINTO RESOLVES AS FOLLOWS: SECTION 1. Based on the entire record before the Commission, all written and oral evidence presented to the Commission, and the findings set forth in Attachment 1 of the staff report, the Commission recommends that the City Council approve the following: 1) SPDR 17-17 for Luiseno Village; 2) CUP 17-09 to permit a service station and car wash, with off-sale beer and wine license; 3) VAR 17-05 to allow 24 fuel pumps where a maximum of 15 pumps are permitted; 4) MUP 17-09 and MUP 17-10 to permit two fast food restaurants with a drive through; 6) MUP 17-11 to exceed the allowed parking spaces by more than 5 percent, and 8) CZ 17-05 to change the Zone from CN – Commercial Neighborhood to CG – Commercial General on the Subject Site (“the Project”), and subject to the Conditions of Approval. SECTION 2. Based on the entire record before the Commission, including the Findings of Fact found in Attachment 1 of the staff report, and all written and oral evidence presented to the Commission, including the staff report, Mitigated Negative Declaration (MND), and the Mitigation Monitoring and Reporting Program (MMRP) the Commission finds as follows: A. The proposed zoning designation of the Subject Site provides for land uses that are compatible with the Community Commercial General Plan designation for the Subject Site. B. The Project is permitted in the requested CG – Commercial General Zone and as conditioned will be consistent with the General Plan and the City’s Landscape Design Guidelines. C. The Project, as conditioned, will comply with City’s – Commercial General Zone and Standards of the Development Code. D. The Project, as conditioned, provides for land uses compatible with the surrounding area, as the surrounding area is developed with similar commercial development. E. The Project is consistent with City standards, ordinances, and policies. F. The Subject Site is physically suitable for the type and density of development proposed under because the Project is proposed to be developed at a density that is consistent with the General Plan Land Use designations and Zoning. 4.1.c Packet Pg. 72 Attachment: 03 - PC Resolution 19-09 (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 155 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 179 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) G. The Project, as conditioned, will provide adequate access, design, water efficient landscaping, and has mitigated traffic and other environmental impacts. SECTION 3. Based on the entire record before the Planning Commission and all written and oral evidence presented, the Planning Commission recommends that the City Council find that the Project will comply with CEQA for the following reasons: A. Based upon the information contained in the Initial Study and pursuant to the requirements of CEQA; it has been determined that this Project, with the incorporation of mitigation measures, will not have a significant impact on the environment. The mitigation measures required to reduce or mitigate the impacts of this Project on the environment are included in the Project design and/or the Mitigation Monitoring Program and are included as part of the Mitigated Negative Declaration for this Project. PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning Commission on the 27th day of August 2019. Planning Commission Chairperson ATTEST: Planning Commission Secretary 4.1.c Packet Pg. 73 Attachment: 03 - PC Resolution 19-09 (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 156 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 180 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) O SPDR 17-17, GPA 7-05 and C Z 17-15Locational Map ! ! Indian Health Clinic North Mountain Mid Sch 7TH MAIN LAKE PARKRAMONADONNAMIRACLEOFFERINGC O U R T L A N D PRAISEDOGWOOD REWARD MOU N T A I N POPPY O A K K N O LLBOXELDERFORSITHIASEDUM TRUTH S T. A L B A N Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS UserCommunity SUBJECTSITE 4.1.d Packet Pg. 74 Attachment: 04 - Location Map (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 157 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 181 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) O SPDR 17-17, GPA 7-05 and C Z 17-15General Plan Map 7TH MAIN RAMONALAKE PARKDONNAMIRACLEOFFERINGPRAISE REWARDDOGWOOD MOU N T A I N POPPY O A K K N O LLBOXELDERCORNFLOWER FORSITHIASEDUM TRUTH Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS UserCommunity SUBJECTSITE Landuse GPLU Low Density Residential Community Commercial Park 4.1.e Packet Pg. 75 Attachment: 05 - General Plan Land Use Map (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 158 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 182 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) O SPDR 17-17, GPA 7-05 and C Z 17-15Zoning Map ! ! Indian Health Clinic North Mountain Mid Sch 7TH MAIN RAMONALAKE PARKDONNAMIRACLEOFFERINGPRAISE REWARDDOGWOOD MOU N T A I N POPPY O A K K N O LLBOXELDERCORNFLOWER FORSITHIASEDUM TRUTH CN RL OSG PI RM SP Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS UserCommunity SUBJECTSITE Change of Zone request fromCommercial Neighborhood (CN) toCommercial General (CG) 4.1.f Packet Pg. 76 Attachment: 06 - Zoning Map (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 159 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 183 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) SSSSS S S SSSSSSS SSSSSSNOPARKINGNO PA R K I N G NO PARKING NOPARKING 60'243'60'156'40'70'79'40'33'-6"91'CLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EV CLEAN A IR /VANPOOL / EVCLE A N A IR / VA N P OO L / E V CLEAN A IR /VANPOOL / EV CLEAN AIR /VANPOOL / EV NOPARKINGCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EV CLEAN AIR /VANPOOL / EV CLEAN A IR /VAN P OO L / EV CLEAN A I R /VANPOOL / E V CLEAN A IR / VANPOOL / EVCLEAN AI R /VANPOOL / E V EVEVEVEVEVEVEVEVEVEVEVEVEV50'32'18'10' DRAINAGEEASEMENT20' SEWEREASEMENT4' WIDE DRAINAGECHANNEL6' BLOCK WALL10' DRAINAGEEASEMENT20' SEWEREASEMENT4' WIDEDRAINAGECHANNELUNDERSIDEWALKDRAIN4' WIDEDRAINAGECHANNEL10'DRAINAGEEASEMENTNOPARKINGNOPARKINGCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVEVEVEVEVCLEAN AIR /VANPOOL / EVEVEVVVVVVVVVVVVLOADING ZONELOADING ZONELLLLLLLYY YYNOPARKINGNO PAR K I N G NOPARKING NOPARKING 60'243'60'156'40'70'79'40'33'-6"91'CLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EV CL EAN A IR /VAN POOL / EV CLEAN AIR / VANP OO L / EV CLEAN AI R /VAN POO L / EV CLEAN AIR /VANPOOL / EV NOPARKINGCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EV CLEAN AIR /VANPOOL / EV CLEAN AIR / VANPOOL / EV CLEAN A IR /VANPO O L / EV CLEAN AIR / VANP OOL / EV CLEAN A IR /VANP OOL / EV EVEVEVEVEVEVEVEVEVEVEVEVEV50'32'18'10' DRAINAGEEASEMENT20' SEWEREASEMENT4' WIDE DRAINAGECHANNEL6' BLOCK WALL10' DRAINAGEEASEMENT20' SEWEREASEMENT4' WIDEDRAINAGECHANNELUNDERSIDEWALKDRAIN4' WIDEDRAINAGECHANNEL0'RAINAGEASEMENTNOPARKINGNOPARKINGCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVEVEVEVEVCLEAN AIR /VANPOOL / EVEVEVVVVVLOADING ZONELOADING ZONELLLYY YYOVERALL SITE PLANA1"=40'-0"FUTURECONVENIENCE STORE3,048 S.F.(NOT A PAT)BILL SPECK10073 VALLEY VIEW ST.CYPRESS, CA 90630PHONE: 714-606-9141e-mail: allspeckslnc@yahoo.comCopyright 2016, MPA Architects, Inc.. All rights reserved.cDESCRIPTIONREVISIONSNO.DATEPROJECTCLIENTA PROPOSED COMMERCIAL DEVELOPMENT LOCATED AT:F. 619.236.0557AMERICAN INSTITUTE OF ARCHITECTSwww.mpa-architects.comMEMBERSan Diego, CA 92104V. 619.236.05953578 30th StreetM P A A R C H I T E C T S I N C .DATABASE:SHEET NUMBER:SCALE:SHEET TITLECHECKED BY:PROJECT NO:17069-L. DALEPLOT DATE:DRAWN BY:AS NOTED-1706906-30-19LUISENO VILLAGES.E.C. HWY 79 AND MAIN ST.SAN JACINTO, CA 92583LICENSEDARCHITEC T S TATEOOFCALIFRNIANHOJRUMSE Y C26819Exp. 3-31-2019SP1.0OVERALL SITE PLAN(FOR REFERENCE ONLY)NOTE:ALL SITE PLAN DESIGN FEATURES AND INFRASTRUCTURE BEYONDPARCEL 1 (INCLUDING BUT LIMITED TO: CONCRETE CURBS, PARKINGLOT, SITE LIGHTING, TRASH ENCLOSURE, STORM WATER SYSTEM,AND LANDSCAPE) ARE PART OF A SITE DEVELOPMENT PLAN, UNDERA SEPARATE PERMIT AND SHOWN FOR REFERENCE ONLY.FUTURE DRIVE-THRURESTAURANT (PAD IV)3,200 S.F.(NOT A PAT)FUTURERETAIL (PAD II)9,360 S.F.(NOT A PAT)PROPOSEDRETAIL (PAD I)14,583 S.F.FUTURE DRIVE-THRURESTAURANT (PAD III)2,800 S.F.(NOT A PAT)3TYP.7TYP.26'26'26'30'30'30'36'30'20'30'19'16'-9"38'19'19'10'-3"6' PARKWAY 6' SIDEWALK 12' LS SETBACK 9'TYP.26'26'19'16'-9"38'19'9'TYP.30'38'30'19'12'8'10'-6"43'-6"36'36' 30'30'30'30'30'10'12' 12'10'19'30'30'60'30' 30' 20' 20'10'10'15'-6"73'30'12'30'10'-6"30'10'-4"35'-9"12'5'TYP.5'TYP.5'TYP.6'TYP.6'TYP.26' 26'12'12'12'9'TYP.38'1227TYP.7TYP.7TYP.7TYP.7TYP.5555553TYP.3TYP.3TYP.1221221222213TYP.3TYP.3TYP.3TYP.3TYP.182725TYP.253TYP.25TYP.24242420202520252017TYP.17TYP.1616161615TYP.15TYP.2520TYP.TYP.15TYP.151525201111118TYP.8TYP.8TYP.8TYP.8TYP.8TYP.8TYP.8TYP.8TYP.8TYP.1566666156866TYP.8TYP.62520TYP.66TYP.2TYP.2TYP.2TYP.2TYP.4TYP.4TYP.4TYP.32'-6"12'TYP.4TYP.3TYP.3TYP.8TYP.3TYP.8TYP.5'TYP.19TYP.19TYP.6TYP.8412631161251055352061064121272041216918810182619TYP.232314332928282929282829294'6'-4"30303036'15'141415'15'BUS CIRCULATION TEMPLATEB1"=80'-0"Lock to Lock TimeWidthTrack:::inchesCITY-BUS6.0102.0102.0Steering Angle 41.4:300.084.0480.041'15'20'41'20'15'41'3131PARKING ANALYSIS 8'188'BSP1.1SITE AREA:IMPERVIOUS SURFACE COVERAGE (structures + paved area + hardscape): STRUCTURES COVERAGE (bldg., canopy, trash enclosure, etc): PAVED AREA COVERAGE (parking area + drive isles + hardscape):LANDSCAPE AREA COVERAGE:LANDSCAPE AREA REQUIRED (MIN. 5% OF PAVED AREA):PROPOSED TOTAL BLDG. AREA:FAR:EXISTING ZONING:PROPOSED ZONING:BUILDING SETBACKS:FRONT: 10' STREET SIDE: 10'REAR: 10' INTERIOR SIDE: NOT REQ'DLANDSCAPE SETBACKS:MAIN STREET: 6' PARKWAY + 6' WALK + 12' LANDSCAPE SETBACKRAMONA EXPRESS WAY: 12' PARKWAY + 8' WALK + 25' SCENIC SETBACKADJACENT TO RESIDENTIAL (WEST SIDE): 15'412,058 (9.46 A)316,462 S.F. (7.26 A) - 76.8%36,847 S.F. (0.85 A) - 8.9%279,615 S.F. (6.58 A) - 67.9%95,596 S.F. (2.19 A) - 23.2%12,558 S.F. (MIN.)28,496 SQ.FT. - 6.91%0.069CN (COMMERCIAL NEIGHBORHOOD)CG (COMMERCIAL GENERAL)SITE ANALYSISPARCEL 1SITE AREAPROPOSED BLDG. AREA:COVERAGE:NUMBER OF STORIES (CBC TABLE 504.4):PROPOSED BLDG. HEIGHT (CBC TABLE 504.3):CONSTRUCTION TYPE:OCCUPANCY GROUP:PROPOSED USE:AREA SEPARATION WALL:BLDG. SPRINKLER:132,637 S.F. (3 A)14,583 S.F.11%01± 31'-0" A.F.F.V-BB-MRETAIL & FAST FOOT REST.NOTBDPARCEL 2SITE AREAPROPOSED BLDG. AREA (PAD2 - RETAIL):PROPOSED BLDG. AREA (PAD3 - RESTAURANT):COVERAGE:NUMBER OF STORIES (CBC TABLE 504.4):PROPOSED BLDG. HEIGHT (CBC TABLE 504.3):CONSTRUCTION TYPE:OCCUPANCY GROUP:PROPOSED USE:AREA SEPARATION WALL:BLDG. SPRINKLER:132,018 S.F. (3 A)9,360 S.F.2,800 S.F.9%01TBDV-BB-MRETAIL & FAST FOOT REST.NOTBDPARCEL 9SITE AREAPROPOSED BLDG. AREA:COVERAGE:NUMBER OF STORIES (CBC TABLE 504.4):PROPOSED BLDG. HEIGHT (CBC TABLE 504.3):CONSTRUCTION TYPE:OCCUPANCY GROUP:PROPOSED USE:AREA SEPARATION WALL:BLDG. SPRINKLER:61,122 S.F. (1.4 A)3,200 S.F.5%01TBDV-BB-MDRIVE-THRU FAST FOOT REST.NOTBDPARCEL 8SITE AREAPROPOSED BLDG. AREA (CONVENIENCE STORE):PROPOSED BLDG. AREA (CAR WASH):COVERAGE:NUMBER OF STORIES (CBC TABLE 504.4):PROPOSED BLDG. HEIGHT (CBC TABLE 504.3):CONSTRUCTION TYPE:OCCUPANCY GROUP:PROPOSED USE:AREA SEPARATION WALL:BLDG. SPRINKLER:86,281 S.F. (2 A)3,048 S.F.1,105 S.F.5%01TBDV-BBRETAIL & CAR WASHTBDTBD6'TYP.TYP.19TYP.16VICINITY MAPNOT TO SCALE13R.O.W. IMPROVEMENT NOTESAT DONNA WAY:a. ANY EXISTING IMPROVEMENT THAT ARE DEEMED SUBSTANDARD PER FIELD INSPECTION SHALLBE REPLACED IN KIND. THIS INCLUDES AC PAVING, CURB/GUTTER AND SIDEWALK.b. STREET LIGHTS WILL BE REQUIRED.c. PARKWAY LANDSCAPE WILL BE REQUIRED.AT RAMONA EXPRESSWAY:a. ANY EXISTING IMPROVEMENT THAT ARE DEEMED SUBSTANDARD PER FIELD INSPECTION SHALLBE REPLACED IN KIND. THIS INCLUDES AC PAVING, CURB/GUTTER AND SIDEWALK.b. STREET LIGHTS WILL BE REQUIRED.c. PARKWAY LANDSCAPE WILL BE REQUIRED.d. RAISED MEDIAN WILL BE REQUIRED.AT RAMONA EXPRESSWAY:a. ANY EXISTING IMPROVEMENT THAT ARE DEEMED SUBSTANDARD PER FIELD INSPECTION SHALLBE REPLACED IN KIND. THIS INCLUDES AC PAVING, CURB/GUTTER AND SIDEWALK.b. ADDITIONAL STREET LIGHTS MAY BE REQUIRED, DEPENDING ON PLACEMENT.c. PARKWAY LANDSCAPE WILL BE REQUIRED.FUTURECAR WASH1,105 S.F.(NOT A PAT)USERETAILRESTAURANT * (15%)RESTAURANT PATIOAREA12,396 SQ.FT.2,000 SQ.FT.187 SQ.FT.900 SQ.FT.REQUIRED1:2501:2001:601:50TOTAL50 STALLS10 STALLS3 STALLS18 STALLSPARCEL 1SHOPS BLDG AREA 14,583 SQ.FT.TOTAL PARKING REQUIREDTOTAL PARKING PROVIDEDSTANDARD SPACESHC SPACESCLEAN AIR/VAN POOL/EP PROVIDEDFUTURE EV SPACES PROVIDEDBUS PARKINGBICYCLE PARKING PROVIDED (SHORT-TERM)BICYCLE PARKING PROVIDED (LONG-TERM)81 STALLS95 STALLS83 STALLS04 STALLS08 STALLS05 STALLS05 STALLS0605* RESTAURANT/DRIVE THRU:UP TO 2,000 SQ. FT. = 1 SPACE FOR EACH 200-SQ. FT. GFA OVER 2,000 SQ. FT. = 1 SPACE FOR EACHADDITIONAL 60 SQ. FT. GFA; AND STACKING FOR 7 VEHICLES AT EACH BAY, WINDOW, LANE, ORORDERING STATION FOR EACH NO ADDITIONAL PARKING REQUIRED IF OUTDOOR DINING AREACOMPRISES NO MORE THAN 15 PERCENT OF THE INTERIOR GROSS FLOOR AREA OF THE PRIMARYFOOD SERVICE USE; IF OUTDOOR DINING AREA IS OVER 15%, 1 SPACE FOR EVERY 50-SQ. FT. OR 1SPACE FOR EVERY 3 SEATS, WHICHEVER IS GREATER.** CAR WASH:1 PARKING SPACE PER EACH EMPLOYEE OF THE LARGEST SHIFT; STACKING FOR 4 VEHICLES FOREACH AUTOMATIC CAR WASH LANE, AND 3 SPACES PER LANE FOR MANUAL DRYINGUSERETAILRESTAURANT * (15%)RESTAURANT PATIODRIVE-THRU RESTAURANT *RESTAURANT PATIOAREA7,956 SQ.FT.1,404 SQ.FT.900 SQ.FT.2,000 SQ.FT.800 SQ.FT.1,000 SQ.FT.REQUIRED1:2501:2001:501:2001:601:50TOTAL32 STALLS7 STALLS18 STALLS10 STALLS13 STALLS20 STALLSPARCEL 2SHOPS BLDG AREA 9,360 SQ.FT.TOTAL PARKING REQUIREDTOTAL PARKING PROVIDEDSTANDARD SPACESHC SPACESCLEAN AIR/VAN POOL/EP PROVIDEDFUTURE EV SPACES PROVIDEDBICYCLE PARKING PROVIDED (SHORT-TERM)BICYCLE PARKING PROVIDED (LONG-TERM)100 STALLS101 STALLS85 STALLS05 STALLS11 STALLS07 STALLS0605USEDRIVE-THRU RESTAURANT *RESTAURANT PATIOAREA2,000 SQ.FT.1,200 SQ.FT.1,000 SQ.FT.REQUIRED1:2001:601:50TOTAL10 STALLS20 STALLS20 STALLSPARCEL 9RESTAURANT BLDG AREA3,200 SQ.FT.TOTAL PARKING REQUIREDTOTAL PARKING PROVIDEDSTANDARD SPACESHC SPACESCLEAN AIR/VAN POOL/EP PROVIDEDFUTURE EV SPACES PROVIDEDBICYCLE PARKING PROVIDED (SHORT-TERM)BICYCLE PARKING PROVIDED (LONG-TERM)50 STALLS55 STALLS47 STALLS02 STALLS06 STALLS04 STALLS42USECONVENIENCE STORECAR WASH **AREA3,048 SQ.FT.1,105 SQ.FT.REQUIRED1:2501:EACH EMPLOYEETOTAL12 STALLS4 STALLSPARCEL 8CONVENIENCE STORE BLDG. AREA 3,048 SQ.FT.TOTAL PARKING REQUIREDTOTAL PARKING PROVIDEDSTANDARD SPACESHC SPACESCLEAN AIR/VAN POOL/EP PROVIDEDFUTURE EV SPACES PROVIDEDBICYCLE PARKING PROVIDED (SHORT-TERM)16 STALLS18 STALLS15 STALLS02 STALLS01 STALLS01 STALLS2CAR WASH BLDG. AREA 1,105 SQ.FT.TOTAL BICYCLE PARKING REQUIRED (MIN. 10% OF 272 PROVIDED PARKING)27TOTAL BICYCLE PARKING PROVIDED305'TYP.169'TYP.9'TYP.9'TYP.9'TYP.9'TYP.9'TYP.TYP.32323210'SB10'SB12'PARKWAY8'(SIDEWALK WIDTH)313TOTAL PARKING REQUIRED 247 STALLSTOTAL PARKING PROVIDEDPERCENTAGE OF PARKING SPACES IN EXCESS OF MIN. REQUIRED269 STALLS9%34TYP.3434TYP.34TYP.3636RESTAURANT BLDG AREA2,800 SQ.FT.262618TYP.18TYP.2627TYP.27TYP.2627TYP.272726TYP.SITE PLAN SHEET INDEX1. MASONRY TRASH ENCLOSURE w/ DECORATIVE BLOCK, SOLID TRELLIS FEATURE AND INTERNAL DRAIN.TRASH ENCLOSURE TO COMPLY w/ ALL NEW STATE OF CALIFORNIA & CITY REQUIREMENTS. REFER TODETAIL A/SPD2.02. 6" LANDSCAPE CURB TYPICAL. REFER TO DETAIL F/SPD1.03. LANDSCAPED AREA. REFER TO LANDSCAPE PLANS4. 9'-0" W x 19'-0" D PARKING STALLS PAINTED PER CITY'S REQUIREMENTS.5. PROPOSED ACCESSIBLE PARKING STALLS, RAMP (WHERE OCCURS) TO COMPLY WITH STATE ANDFEDERAL STANDARDS. REFER TO DETAIL A/SPD1.0.6. PROPOSED PEDESTRIAN ACCESSIBLE PATH OF TRAVEL (DASHED LINE). 5% MAX. SLOPE IN DIRECTIONOF TRAVEL & 2% MAX. CROSS-SLOPE.7. ASPHALT PARKING LOT AND DRIVE AISLES PER CITY OF SAN JACINTO STANDARDS. REFER TO CIVILPLANS.8. CONCRETE SIDEWALK. G.C. TO ENSURE 5% MAX. SLOPE & 2% MAX. CROSS-SLOPE REFER TO DETAILSH/SPD1.0 & I/SPD1.0.9.PROPOSED LOCATION OF POSSIBLE FUTURE ATM DRIVE-THRU MACHINE LOCATION. SHOWN FORREFERENCE ONLY. NOT A PART OF THIS PERMIT.10.PROPOSED LOCATION OF POSSIBLE FUTURE ATM DRIVE-THRU DIRECTIONAL SIGN. SHOWN FORREFERENCE ONLY. NOT A PART OF THIS PERMIT.11. APPROXIMATE MONUMENT SIGN LOCATION PER CITY OF SAN JACINTO STANDARDS . SHOWN FORREFERENCE ONLY. NOT A PART OF THIS PERMIT. REFER TO "SEPARATE PERMIT NOTE" ON SHEET T1.0.12. PARKING LOT LIGHTING. SHOWN FOR REFERENCE ONLY. UNDER A SEPARATE PERMIT.13. 6' HIGH CMU WALL ADJACENT TO RESIDENTIAL ZONE.14. PROPOSED RAISED MEDIAN.15. DECORATIVE PAVING AT ACCESSIBLE ROUTES (PATTERN TBD).16. BICYCLE PARKING SPACES REQ'D PER CALGREEN CODE (REFER TO PARKING ANALYSIS). BICYCLEPARKING SHALL COMPLY WITH CGC SEC. 5.106.4. REFER TO DETAIL J/SPD1.0.17. PROPOSED 10' LONG x 48" WIDE PLANTER AREA ADJACENT TO PARKING SPACES. CENTER BETWEENSPACES AS SHOWN. REFER TO LANDSCAPE PLANS.18. DESIGNATED PARKING FOR ANY COMBINATION OF LOW-EMITTING, FUEL-EFFICIENT AND CARPOOL/VANPOOL VEHICLES (REFER TO PARKING ANALYSIS). PARKING STALL MARKING: PAINT, IN THE PAINT USEDFOR THE STALL STRIPPING, THE FOLLOWING CHARACTERS SUCH THAT THE LOWER EDGE OF THE LASTWORD ALIGNS WITH THE END OF THE STALL STRIPING AND IS VISIBLE BENEATH A PARKED VEHICLE :CLEAN AIR/ VANPOOL/EV.19. 5' SQ. LANDSCAPE DIAMOND w/ 6" CONCRETE CURB.20. PROPOSED ACCESSIBLE CURB RAMP, RAMP TO COMPLY WITH STATE AND FEDERAL STANDARDS.REFER TO CIVIL PLANS AND DETAIL L/SPD1.0.21.PROPOSED TRANSFORMER LOCATION, LOCATION TO BE COORDINATED w/ UTILITY CO. REFER TO CIVILPLANS.22. CONCRETE TO ASPHALT TRANSITION.23. DECORATIVE TRELLIS.24. INSTALL HANDICAP ACCESSIBILITY SIGN AT SITE ENTRANCE. REFER TO DETAIL G/SPD1.0.25. INSTALL DETECTABLE WARNING SURFACE AT "ZERO CURB" AREAS. REFER TO DETAIL K/SPD1.0 ANDCIVIL PLANS.26. FUTURE LOCATION OF ELECTRICAL VEHICLE SUPPLY EQUIPMENT (EVSE). REFER TO POWER PLAN FOREVSE REQUIREMENTS. FUTURE CHARGING SPACES QUALIFY AS DESIGNATED PARKING FOR CLEAN AIRVEHICLES (CGC 5.106.5.3.5).27. FUTURE LOCATION OF POTENTIAL ELECTRICAL VEHICLE CHARGING STATION (EVCS). FUTURECHARGING SPACES QUALIFY AS DESIGNATED PARKING FOR CLEAN AIR VEHICLES (CGC 5.106.5.3.5).28. PROPOSED WATER METER LOCATION.29. PROPOSED GAS METER LOCATION.30. 10'x25' LOADING ZONE.31. PROPOSED 22' LONG x 48" WIDE PLANTER AREA ADJACENT TO DRIVE ISLE. REFER TO LANDSCAPEPLANS.32. DECORATIVE PAVING AT DRIVEWAY ENTRANCES (PATTERN TBD).33. APPROXIMATE LOCATION OF EXITING RAISED MEDIAN.34. UNDERGROUND RETENTION SYSTEM PER CIVIL PLANS.35. BUILDING COLUMNS/ARCHITECTURAL PROJECTIONS. REFER TO FLOOR PLANS & EXTERIOR ELEVATIONS36. GAS STATION CANOPY, BY OTHERS. SHOWN FOR REFERENCE ONLY.37. LONG-TERM BICYCLE PARKING TO COMPLY w/ CGC SEC. 5.106.4.1.2. BICYCLE PARKING BY CYCLE SAFE,MODEL #PRO-PARK BIKE, DBL TIER - OR APPROVED EQUAL.38. -39. APPROX. LOCATION OF BUS STOP w/ 8'x20' SIDEWALK PAD CONNECTED TO BUS SHELTER. BY RIVERSIDETRANSIT AGENCY - 17' NON-AD CUSTOM DOME RTA BUS SHELTER, OR APPROVED EQUAL.40. (E) PORK-CHOP TO BE REMOVED.41. (E) MEDIAN TO BE MODIFIED.#35TYP.35TYP.37373737371637SHORT-TERM BICYCLE PARKING PROVIDED18LONG-TERM BICYCLE PARKING PROVIDED12DESCRIPTIONPLAN SUBMITTAL LOGPLAN DATEPLANNING DEPT. SUBMITTAL - 1st REVIEW08-28-18PLANNING DEPT. SUBMITTAL - 2nd REVIEW10-22-183915'L.S.57'-6"32' 50' 18' 6'55'43'45'8'8'8'25'SCENIC S.B.73'2'PROPOSED 2' R.O.W.DEDICATION12'PARKWAY8'(SIDEWALK WIDTH)25'SCENIC S.B.45'27'27'30'52'4010'25'15'25'30'8'10'25'15'25'48'12'12'12'12'48'12'12'12'12'57'-6"20'41PLANNING DEPT. SUBMITTAL - 3rd REVIEW06-06-19304.1.g Packet Pg. 77 Attachment: 07 - Project Plans (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 160 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 184 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) PARKING 60'243'60'CLEAN A IR /VANPOOL / EV CL VAN CL VANEV 50'32'18'10' DRAINAGEEASEMENT20' SEWEREASEMENT4' WIDEDRAINAGECHANNELUNDERSIDEWALKDRAINNOPARKINGNOPARKINGCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVEVEVEVEVCLEAN AIR /VANPOOL / EVEVEVVVVVVVVVVVVVVVVVVVVVVVVVLOADING ZONELLLLLLLLLLLLLL1.62.1 2 . 5 2.3 2 . 7 3 . 0 2.9 3 . 3 2.8 3 . 3 3 . 5 3.1 3 . 4 3 . 5 3 . 3 3.5 3 . 8 3 . 6 3 . 1 3.0 3 . 4 4 . 5 3 . 8 3 . 1 2 . 5 2 . 1 1 . 7 1 . 4 1 . 1 3.0 3 . 3 3 . 8 4 . 0 3 . 2 2 . 7 2 . 2 1 . 7 1 . 4 1 . 1 0 . 8 3.1 3 . 5 3 . 6 3 . 7 0 . 6 2.2 2 . 8 3 . 4 3 . 6 2.0 2 . 6 3 . 0 3 . 3 1.7 2.3 2.8 3.11.8 2.0 2.5 2.72.0 2.2 2.42.0 2.1 2.22.1 2.2 2.22.2 2.2 2.22.3 2.3 2.3 2.22.5 2.4 2.32.6 2.6 2.52.8 2.7 2.53.0 2.93.2 3.2 3.0 3.4 3 . 5 3.6 3 . 6 3 . 6 3.9 3 . 9 3 . 7 4.0 4 . 0 4.0 4 . 2 3 . 9 4.3 4 . 2 3 . 7 4.6 4 . 2 4.8 4 . 0 4.3 4 . 3 3 . 7 4.3 4 . 1 3 . 7 4.2 4 . 1 3 . 6 4.2 4 . 1 4.0 3 . 8 3.9 3 . 4 3.7 3 . 2 3.6 3 . 5 2 . 9 3.5 3.2 2.63.3 3.0 2.53.2 3.0 2.53.2 3.03.2 2.93.2 3.03.2 3.03.3 3.13.6 3.4 3.23.7 3.6 3.34.0 3.9 3.54.3 4.1 3.6 4.6 4 . 3 4.8 4 . 4 5.1 4 . 6 5.3 5 . 2 4 . 8 5.3 5 . 2 4 . 9 5.3 5 . 4 4 . 9 5.6 5 . 7 5.2 6 . 0 5 . 7 5.5 5 . 7 5 . 4 5.6 5 . 6 5.5 5 . 7 5 . 5 5.6 5 . 7 4.9 5 . 5 5 . 4 5.0 5 . 3 4.6 5 . 0 5 . 2 4.2 4 . 5 4 . 9 4.3 4.5 4.74.2 4.4 4.54.2 4.3 4.44.3 4.3 4.24.4 4.3 4.24.6 4.24.9 4.6 4.15.1 5.0 4.55.2 4.9 4.45.3 5.4 4.95.4 5.3 4.75.5 5.3 5.1 5.6 5 . 1 5.4 5 . 7 4 . 7 5.4 5 . 1 4 . 4 4.9 4 . 6 4.6 4 . 6 4 . 4 4.4 4 . 6 4 . 3 4.3 4 . 5 4 . 0 4.2 4 . 2 4.3 4 . 0 4.3 4 . 0 4.3 3 . 8 3.6 3 . 6 3 . 5 3 . 5 3 . 4 3 . 4 3 . 6 3 . 7 4 . 0 4.2 3 . 7 3.8 3 . 8 3 . 8 3 . 9 4 . 3 4 . 6 4 . 2 4 . 2 4 . 1 4 . 2 4 . 1 4 . 1 3 . 7 3 . 7 4 . 1 4 . 0 4 . 2 3 . 9 3.6 3 . 7 3 . 9 4 . 0 4 . 2 4 . 2 4 . 2 4 . 2 4 . 0 4 . 0 3 . 9 3 . 3 3 . 4 4 . 0 4 . 0 3 . 8 3 . 9 4 . 0 4 . 1 4 . 2 4 . 1 3.7 3 . 9 3 . 7 3 . 7 3 . 9 4 . 1 4 . 3 4 . 2 4.2 4 . 4 4 . 1 4.1 4 . 3 4 . 0 4.2 4.3 3.94.2 4.2 3.84.0 4.03.9 4.13.2 4.1 4.03.8 4.7 3.94.0 4.43.8 4.0 4.04.5 4.3 3.94.74.14.04.3 4.24.14.5 4.4 4.9 4 . 84.55.2 5 . 0 5.2 5.4 5.0 5.7 5 . 5 5.5 5.8 5 . 6 5.6 5.7 5.2 5.5 5.8 5.0 5.7 5.9 5.0 6 . 3 4.6 5.1 5.8 4.7 5 . 1 5.2 4.8 4 . 9 4.7 4.6 4.1 4 . 4 4.3 4.0 4 . 0 3 . 9 3.7 3 . 7 3.4 3.43.2 3.23.0 3.02.8 2.9 2.92.7 2.8 2.82.7 2.7 2.72.7 2.7 2.62.7 2.7 2.62.7 2.72.7 2.82.8 2.93.0 3.1 3.1 3 . 2 3 . 1 3.3 3 . 4 3 . 1 3.5 3 . 6 3.6 3 . 4 3.7 3 . 5 3 . 1 4.0 3 . 3 2 . 9 3.8 4.1 3.0 3.2 3 . 7 3 . 4 2.8 3 . 4 3 . 6 3 . 2 3.0 3 . 3 3 . 3 2.0 2 . 5 2 . 9 3 . 2 1.6 2 . 0 2 . 4 2 . 7 1.3 1 . 6 2 . 0 2 . 3 0.2 0.3 0.5 1.0 1.9 2.6 3.2 3.94.44.3 3.6 3.0 2.9 2.8 2.3 2.0 1.9 2.4 2.3 2.3 2.3 2.0 2.2 2.5 2.7 2.6 2.4 2.1 2.1 2.4 2.1 2.4 2.1 1.8 1.9 1.8 1.3 0.8 0.40.4 0.6 0.8 1.3 2.2 2.7 3.1 3.8 4.64.53.7 3.3 3.4 3.3 2.9 2.5 2.4 2.8 2.9 2.9 2.9 2.6 2.7 3.1 3.3 3.2 2.9 2.6 2.6 3.0 2.7 2.9 2.6 2.4 2.3 2.2 1.6 0.9 0.50.7 1.0 1.1 1.7 2.6 3.0 3.3 4.0 4.94.73.9 3.6 3.8 3.7 3.2 2.9 3.1 3.4 3.5 3.6 3.5 3.2 3.1 3.5 3.8 3.7 3.4 3.1 3.3 3.6 3.5 3.6 3.3 2.9 2.7 2.6 1.8 1.0 0.61.2 1.5 1.6 1.6 1.63.2 3.3 4.04.55.3 5.14.54.1 3.6 3.8 4.0 4.0 3.7 3.8 4.3 4.8 5.3 4.8 4.2 3.6 3.0 2.8 2.0 1.1 0.61.6 1.9 1.9 1.7 1.03.44.4 4.53.7 3.8 4.04.7 4.74.0 3.1 2.91.9 2.3 2.2 1.8 1.02.4 3.0 3.1 3.7 4.2 4.6 4.6 4.3 3.9 3.5 3.8 3.9 3.6 3.6 4.0 4.6 4.0 3.5 3.02.5 2.6 2.5 2.0 1.02.1 2.6 2.6 2.9 3.2 3.3 3.4 3.3 3.1 3.0 3.4 3.6 3.3 3.0 3.1 3.2 3.4 3.0 2.8 2.63.4 3.3 3.0 2.2 1.01.9 2.2 2.3 2.3 2.7 2.7 2.8 2.8 2.4 2.6 3.0 3.2 2.8 2.5 2.5 2.9 2.6 2.9 2.5 2.2 2.33.84.43.7 2.4 1.21.5 1.8 1.8 1.8 2.2 2.0 2.1 2.3 1.9 2.1 2.4 2.6 2.3 2.0 2.1 2.2 1.9 2.2 2.1 1.8 1.84.8 4.8 4.1 2.7 1.31.2 1.3 1.2 1.2 1.4 1.4 1.8 1.6 1.3 1.4 1.4 1.0 1.3 1.4 1.2 1.24.2 4.6 3.9 2.6 1.21.2 1.3 1.1 1.2 1.4 1.1 1.2 1.5 1.4 1.4 1.8 2.0 1.6 1.3 1.4 1.4 1.0 1.3 1.4 1.2 1.23.5 3.6 3.3 2.3 1.11.6 1.8 1.8 1.8 2.2 2.0 2.1 2.2 2.0 2.1 2.4 2.6 2.2 2.0 2.1 2.3 1.9 2.2 2.0 1.8 1.92.8 2.8 2.6 2.1 1.01.9 2.2 2.3 2.3 2.8 2.7 2.8 2.7 2.4 2.7 3.0 3.2 2.8 2.5 2.5 2.9 2.6 2.8 2.5 2.3 2.42.1 2.4 2.3 1.9 1.02.2 2.6 2.7 2.9 3.3 3.3 3.4 3.2 3.0 3.1 3.5 3.6 3.2 3.0 3.1 3.4 3.2 3.4 3.0 2.8 2.82.0 1.7 0.92.5 3.0 3.2 3.8 4.24.7 4.54.2 3.8 3.5 3.8 4.0 3.6 3.7 4.04.54.64.43.9 3.4 3.21.7 1.6 0.92.5 3.0 3.44.45.0 6.2 6.0 5.04.53.7 3.9 4.1 3.8 4.1 4.85.5 4.74.0 3.41.3 1.2 0.82.5 3.0 3.3 4.04.55.2 5.24.54.1 3.6 3.9 4.0 3.7 3.84.44.85.45.0 4.3 3.80.2 0.7 1.0 0.9 0.62.3 2.8 2.8 3.2 3.5 3.6 3.7 3.5 3.3 3.2 3.6 3.8 3.4 3.2 3.4 3.7 3.6 3.7 3.40.5 0.8 1.0 0.9 0.72.1 2.4 2.4 2.5 2.9 2.9 3.0 2.9 2.7 2.8 3.2 3.4 3.0 2.7 2.7 3.1 2.8 3.1 2.91.0 1.3 1.4 1.3 0.81.9 2.1 2.1 2.2 2.6 2.4 2.6 2.6 2.3 2.5 2.8 3.0 2.5 2.2 2.3 2.6 2.3 2.61.4 1.8 1.8 1.6 0.91.8 2.0 1.9 2.0 2.3 1.8 2.0 2.4 2.1 2.2 2.5 2.5 1.8 1.5 1.6 1.8 1.51.7 2.1 2.0 1.8 1.01.9 2.1 1.9 2.1 2.5 2.1 2.3 2.4 2.1 2.2 2.3 2.1 1.4 1.3 1.5 2.02.1 2.4 2.4 1.9 1.02.0 2.2 2.2 2.3 2.3 2.3 2.3 2.0 2.6 2.8 3.13.0 2.9 2.7 2.1 1.12.3 2.6 2.6 2.8 3.2 3.1 3.2 3.0 2.8 2.6 2.6 2.2 2.5 3.2 3.5 3.53.6 3.9 3.4 2.3 1.12.5 2.9 3.1 3.7 4.14.44.3 3.9 3.4 3.0 3.0 2.6 2.4 2.7 3.1 3.9 4.64.44.6 4.0 2.6 1.32.6 3.1 3.54.45.0 6.15.7 4.74.1 3.3 3.3 3.0 2.7 2.7 3.1 3.94.54.6 5.14.8 4.8 4.1 2.7 1.32.6 3.1 3.4 4.2 4.85.55.34.54.0 3.3 3.4 3.2 2.9 2.8 3.0 3.7 4.1 4.14.43.7 4.2 3.6 2.4 1.22.8 2.9 3.3 3.7 3.7 3.8 3.5 3.2 3.0 3.2 3.0 2.8 2.9 3.1 3.2 3.4 3.9 3.63.2 3.1 2.9 2.2 1.12.6 2.6 2.7 2.6 2.7 2.8 2.5 2.1 2.4 2.82.4 2.5 2.5 2.0 1.22.8 2.7 2.7 2.4 2.3 2.3 1.5 1.6 2.01.8 2.2 2.1 1.8 1.2 0.6 0.6 1.0 1.3 1.5 1.7 2.0 2.5 3.1 3.3 3.1 3.0 3.1 2.7 2.7 2.6 2.0 1.7 1.6 1.4 1.1 0.9 1.01.5 1.8 1.8 1.6 1.1 0.6 0.7 1.1 1.6 1.9 2.3 2.6 3.2 3.8 3.9 3.5 3.1 2.8 2.4 2.2 2.0 1.4 1.0 0.8 0.7 0.6 0.5 0.61.4 1.4 1.3 0.9 0.7 0.8 1.2 1.7 2.1 2.5 2.9 4.6 4.2 3.2 2.7 2.3 2.0 1.6 1.00.8 0.8 0.7 0.6 0.7 1.1 1.6 1.9 5.1 4.2 3.4 2.6 2.2 1.8 1.4 10'40'60'30' 30' 20' 20' 10'71''22'9'NOPARKINGNO PARKING NOPARKING NOPARKING 60'243'60'156'40'70'79'40'33'-6"91'CLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EV CLEAN AIR / VANPOOL / EV CLEAN AIR / VANP OO L / EV CLE AN AIR / VANP OO L / EV CLEAN AIR /VANPOOL / EV NOPARKINGN89°40'37"E475.77'N20°18'3 0 " W 327.78'415.62'295.24'N89°46'00"E154.20'N89°46'00"ES28°4 3' 0 0" E 321.01'N61°17'00"E227.37'N64°27'13"E228.55'N61°17'00"E321.37'S28°4 3' 0 0" E 155.00'N89°40'37"E309.43'N87°10'11"E137.25'N00°19'23"W 296.69'591.94'L=398.96'R=950.00'L=482.47'R=900.00'L =3 6 4 .2 1 'R =2 0 7 1 .0 0 'L =2 8 9 .0 9 'C2C6C1C32L=4896'.L=15000'.2L=1324'.L=18572'.L =3 0 0 .4 5 '88.58'S10°20'56"E N 89°40'37" E456.21'N61°17'00"E263.02'252.84'334.55'257.39'PARCEL 8PARCEL 9PARCEL 2(OLD PARCEL 1)PMB 131/60-63(OLD PARCEL 2)PMB 131/60-63(OLD PARCEL 8)PMB 131/60-63(OLD PARCEL 9)PMB 131/60-63174.71'S20°09'0 2 " E N28°4 3' 0 0" W 243.75' 71.26'N28°43' 0 0" W N02°49'49"W 280.88' 242.99'L1L3L4L2417.28'PARCEL 1CLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EV CLEAN AIR /VANPOOL / EV CLEA N AIR /VANPOOL / E V CLEAN AI R / VANP OOL / EV CLEAN A IR / VANPOOL / EV CLE AN AIR / VANPO OL / EV EVEVEVEVEVEVEVEVEVEVEVEVEV50'32'18'10' DRAINAGEEASEMENT20' SEWEREASEMENT4' WIDE DRAINAGECHANNEL6' BLOCK WALL10' DRAINAGEEASEMENT20' SEWEREASEMENT4' WIDEDRAINAGECHANNELUNDERSIDEWALKDRAIN4' WIDEDRAINAGECHANNEL10'DRAINAGEEASEMENTNOPARKINGNOPARKINGCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVEVEVEVEVCLEAN AIR /VANPOOL / EVEVEVVVVVLOADING ZONELOADING ZONELLLYY YY60'243'N89°40'37"E475.77'N20°18'3 0 " W 327.78'415.62'N89°46'00"E154.20'N89°46'00"EN00°19'23"W 296.69'L=398.96'R=950.00'L=482.47'2L=4896'.L=15000'.2L=1324'.L=18572'.88.58'S10°20'56"E N 89°40'37" E456 21' 334.55'(OLD PARCEL 1)PMB 131/60-63174.71'S20°09'0 2 " E 71.26'N28°43' 0 0" W 417.28'PARCEL 150'32'18'10' DRAINAGEEASEMENT20' SEWEREASEMENT4' WIDEDRAINAGECHANNELUNDERSIDEWALKDRAINNOPARKINGNOPARKINGCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVCLEAN AIR /VANPOOL / EVEVEVEVEVCLEAN AIR /VANPOOL / EVEVEVVVVVLOADING ZONELLLSITE PLAN (PARCEL 1)B1"=20'-0"BILL SPECK10073 VALLEY VIEW ST.CYPRESS, CA 90630PHONE: 714-606-9141e-mail: allspeckslnc@yahoo.comCopyright 2016, MPA Architects, Inc.. All rights reserved.cDESCRIPTIONREVISIONSNO.DATEPROJECTCLIENTA PROPOSED COMMERCIAL DEVELOPMENT LOCATED AT:F. 619.236.0557AMERICAN INSTITUTE OF ARCHITECTSwww.mpa-architects.comMEMBERSan Diego, CA 92104V. 619.236.05953578 30th StreetM P A A R C H I T E C T S I N C .DATABASE:SHEET NUMBER:SCALE:SHEET TITLECHECKED BY:PROJECT NO:17069-L. DALEPLOT DATE:DRAWN BY:AS NOTED-1706906-30-19LUISENO VILLAGES.E.C. HWY 79 AND MAIN ST.SAN JACINTO, CA 92583LICENSEDARCHITEC T S TATEOOFCALIFRNIANHOJRUMSE Y C26819Exp. 3-31-2019SP1.1SITE PLAN -PARCEL 1PRELIM. WOOD TRELLIS CONCEPTCN.T.S.OVERALL SITE PLANA1"=80'-0"FUTURECONVENIENCE STORE3,048 S.F.(NOT A PAT)1111242424615615615615NOTE:ALL SITE PLAN DESIGN FEATURES AND INFRASTRUCTURE BEYONDPARCEL 1 (INCLUDING BUT LIMITED TO: CONCRETE CURBS, PARKINGLOT, SITE LIGHTING, TRASH ENCLOSURE, STORM WATER SYSTEM,AND LANDSCAPE) ARE PART OF A SITE DEVELOPMENT PLAN, UNDERA SEPARATE PERMIT AND SHOWN FOR REFERENCE ONLY.FUTURECAR WASH1,105 S.F.(NOT A PAT)FUTURE DRIVE-THRURESTAURANT (PAD IV)3,200 S.F.(NOT A PAT)FUTURERETAIL (PAD II)9,360 S.F.(NOT A PAT)BSP1.0615PROPOSEDRETAIL (PAD I)14,583 S.F.FUTURE DRIVE-THRURESTAURANT (PAD III)2,800 S.F.(NOT A PAT)SITE PLAN KEY NOTES1. MASONRY TRASH ENCLOSURE w/ DECORATIVE BLOCK, SOLID TRELLIS FEATURE AND INTERNAL DRAIN. TRASHENCLOSURE TO COMPLY w/ ALL NEW STATE OF CALIFORNIA & CITY REQUIREMENTS2. 6" LANDSCAPE CURB TYPICAL.3. LANDSCAPED AREA. REFER TO LANDSCAPE PLANS4. 9'-0" W x 19'-0" D PARKING STALLS PAINTED PER CITY'S REQUIREMENTS.5. PROPOSED ACCESSIBLE PARKING STALLS, RAMP (WHERE OCCURS) TO COMPLY WITH STATE AND FEDERALSTANDARDS.6. PROPOSED PEDESTRIAN ACCESSIBLE PATH OF TRAVEL (DASHED LINE). 5% MAX. SLOPE IN DIRECTION OFTRAVEL & 2% MAX. CROSS-SLOPE.7. ASPHALT PARKING LOT AND DRIVE AISLES PER CITY OF SAN JACINTO STANDARDS. REFER TO CIVIL PLANS.8. CONCRETE SIDEWALK. G.C. TO ENSURE 5% MAX. SLOPE & 2% MAX. CROSS-SLOPE9. -10. -11. APPROXIMATE MONUMENT SIGN LOCATION PER CITY OF SAN JACINTO STANDARDS . SHOWN FOR REFERENCEONLY. NOT A PART OF THIS PERMIT. REFER TO "SEPARATE PERMIT NOTE" ON SHEET T1.0.12. PARKING LOT LIGHTING. REFER TO SITE PHOTOMETRIC PLAN13. 6' HIGH CMU WALL ADJACENT TO RESIDENTIAL ZONE.14. PROPOSED RAISED MEDIAN.15. DECORATIVE PAVING AT ACCESSIBLE ROUTES (PATTERN TBD).16. BICYCLE PARKING SPACES REQ'D PER CALGREEN CODE (REFER TO PARKING ANALYSIS). BICYCLE PARKINGSHALL COMPLY WITH CGC SEC. 5.106.4.17. PROPOSED 10' LONG x 48" WIDE PLANTER AREA ADJACENT TO PARKING SPACES. CENTER BETWEEN SPACESAS SHOWN. REFER TO LANDSCAPE PLANS.18. DESIGNATED PARKING FOR ANY COMBINATION OF LOW-EMITTING, FUEL-EFFICIENT AND CARPOOL/VAN POOLVEHICLES (REFER TO PARKING ANALYSIS). PARKING STALL MARKING: PAINT, IN THE PAINT USED FOR THESTALL STRIPPING, THE FOLLOWING CHARACTERS SUCH THAT THE LOWER EDGE OF THE LAST WORD ALIGNSWITH THE END OF THE STALL STRIPING AND IS VISIBLE BENEATH A PARKED VEHICLE : CLEAN AIR/ VANPOOL/EV.19. 5' SQ. LANDSCAPE DIAMOND w/ 6" CONCRETE CURB.20. PROPOSED ACCESSIBLE CURB RAMP, RAMP TO COMPLY WITH STATE AND FEDERAL STANDARDS. REFER TOCIVIL PLANS21.PROPOSED TRANSFORMER LOCATION, LOCATION TO BE COORDINATED w/ UTILITY CO. REFER TO CIVIL PLANS.22. CONCRETE TO ASPHALT TRANSITION.23. DECORATIVE TRELLIS, REFER TO DETAIL C ON THIS SHEET24. INSTALL HANDICAP ACCESSIBILITY SIGN AT SITE ENTRANCE.25. INSTALL DETECTABLE WARNING SURFACE AT "ZERO CURB" AREAS.26. FUTURE LOCATION OF POTENTIAL ELECTRICAL VEHICLE SUPPLY EQUIPMENT (EVSE). REFER TO POWER PLANFOR EVSE REQUIREMENTS.27. FUTURE LOCATION OF POTENTIAL ELECTRICAL VEHICLE CHARGING STATION (EVCS). POTENTIAL FUTURECHARGING SPACES QUALIFY AS DESIGNATED PARKING FOR CLEAN AIR VEHICLES (CGC 5.106.5.3.5).28. PROPOSED WATER METER LOCATION. REFER TO PLUMBING PLANS.29. PROPOSED GAS METER LOCATION. REFER TO PLUMBING PLANS.30. 10'x25' LOADING ZONE.31. PROPOSED 22' LONG x 48" WIDE PLANTER AREA ADJACENT TO DRIVE ISLE. REFER TO LANDSCAPE PLANS.32. DECORATIVE PAVING AT DRIVEWAY ENTRANCES (PATTERN TBD).33. -34. UNDERGROUND RETENTION SYSTEM PER CIVIL PLANS.35. BUILDING COLUMNS/ARCHITECTURAL PROJECTIONS. REFER TO FLOOR PLANS & EXTERIOR ELEVATIONS36. -37. LONG-TERM BICYCLE PARKING TO COMPLY w/ CGC SEC. 5.106.4.1.2. BICYCLE PARKING BY CYCLE SAFE, MODEL#PRO-PARK BIKE, DBL TIER - OR APPROVED EQUAL.38. -39. APPROX. LOCATION OF BUS STOP w/ 8'x20' SIDEWALK PAD CONNECTED TO BUS SHELTER. BY RIVERSIDETRANSIT AGENCY - 17' NON-AD CUSTOM DOME RTA BUS SHELTER, OR APPROVED EQUAL.PAD 'I'14,583 S.F.2TYP.2TYP.2TYP.2TYP.3TYP.3TYP.615667TYP.7TYP.7TYP.7TYP.7TYP.7TYP.8TYP.8TYP.3TYP.1618182020TYP.26272425TYP.5'-0"1758TYP.43'-6"4'-0"10'-6"20'-0"30'-0"8'-0"10'-0"S.B.26'-0"19'-0"13'-6"54'-0"6'-0"5'-0"6'-0"54'-0"6'-0"54'-0"6'-0"45'-0"14'-6 1/2"13'-6"12'-0"TYP.8TYP.61515TYP.30'-0"11'-0"151130'-0"15'-0"15'-0"30'-0"19'-0"26'-0"38'-0"26'-0"19'-0"16'-9"19'-0"TYP.19'-0"TYP.32'-6"30'-0"30'-0"30'-0"5'-0"TYP.5'-0"TYP.194TYP.4TYP.3TYP.2TYP.3TYP.615TYP.6'-0" PARKWAY 6'-0" SIDEWALK 12'-0" LS SETBACK 231430'-0"5'-0"4'-0"295'-0"30'-0"8'-0"20'-0"3015'-0"15'-0"20'-0"41'-0"15'-0"4'-0"TYP.10'-0"TYP.22'-0"3122'-0"318'-0"5'-0"6131618186'-0"3235TYP.35TYP.35TYP.35TYP.35TYP.3434TYP.1827526'-0"3737373911203TYP.19194TYP.9'-0"TYP.9'-0"TYP.9'-0"TYP.31717172TYP.2TYP.2TYP.12TYP.12TYP.12TYP.12TYP.12TYP.18272625'-0"10'-0"25'-0"15'-0"16'-0"20'-0"7'-0"224.1.g Packet Pg. 78 Attachment: 07 - Project Plans (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 161 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 185 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) 2121KJIHGFEDCBAKJIHGFEDCBALOADING ZONEFLOOR PLANA1/8"=1'-0"   101SPACE "101"(FUTURE TENANT)2,141 S.F. 103SPACE "103"(FUTURE TENANT)1,430 S.F. 105SPACE "105"(FUTURE TENANT)1,200 S.F. 107SPACE "107"(FUTURE TENANT)1,200 S.F. 109SPACE "109"(FUTURE TENANT)1,200 S.F. 111SPACE "111"(FUTURE TENANT)1,200 S.F. 113SPACE "113"(FUTURE TENANT)1,200 S.F. 115SPACE "115"(FUTURE TENANT)1,200 S.F. 117SPACE "117"(FUTURE TENANT)1,430 S.F. 119SPACE "119"(FUTURE TENANT)2,261 S.F.AA2.0DA2.0CA2.0BA2.0PROPOSED PAD BUILDING14,582.50 SQ. FT.BILL SPECK10073 VALLEY VIEW ST.CYPRESS, CA 90630PHONE: 714-606-9141e-mail: allspeckslnc@yahoo.comCopyright 2016, MPA Architects, Inc.. All rights reserved.cDESCRIPTIONREVISIONSNO.DATEPROJECTCLIENTA PROPOSED COMMERCIAL DEVELOPMENT LOCATED AT:F. 619.236.0557AMERICAN INSTITUTE OF ARCHITECTSwww.mpa-architects.comMEMBERSan Diego, CA 92104V. 619.236.05953578 30th StreetM P A A R C H I T E C T S I N C .DATABASE:SHEET NUMBER:SCALE:SHEET TITLECHECKED BY:PROJECT NO:17069-L. DALEPLOT DATE:DRAWN BY:AS NOTED-1706906-30-19LUISENO VILLAGES.E.C. HWY 79 AND MAIN ST.SAN JACINTO, CA 92583LICENSEDARCHITEC T S TATEOOFCALIFRNIANHOJRUMSE Y C26819Exp. 3-31-2019A1.1FLOOR PLANCA3.0EFBDCDEFFAA3.0 A3.0 A3.0A3.0A3.0A3.0 A3.0 A3.0A3.0A3.03'-11"3'-7"12'-0"22'-9 1/4"9'-0"4'-8"9'-0"11'-0"9'-0"8'-7"9'-0"8'-9"12'-0"4'-4"12'-0"8'-9"9'-0"8'-7"9'-0"11'-0"9'-0"4'-8"9'-0"22'-9 1/4"12'-0"3'-7"19'-1"3'-11"11'-6 1/4"3'-0"12'-6 1/2"3'-0"12'-8"3'-0"3'-7"13'-1"3'-7"13'-1"2'-7"3'-11"30'-1 1/2"3'-5 1/2"2'-7"13'-1"3'-7"13'-1"3'-7"3'-0"12'-8"3'-0"12'-6 1/2"3'-0"11'-6 1/4"3'-11"19'-1"3'-11"3'-7"3'-7"37'-8 1/4"23'-10"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"23'-10"37'-8 1/4"243'-0 1/2"243'-0 1/2"60'-0"14'-9"2'-8"16'-8"2'-8"6'-3 1/2"3'-11"20'-8 1/2"3'-11"11'-7"5'-9 1/2"4'-0"4'-0"2'-0"3'-11"20'-8 1/2"3'-11"6'-3 1/2"2'-8"16'-8"2'-8"14'-9"26'-9"5'-9 1/2"4'-0"1'-6"4'-0"1'-6"4'-0"11'-7"60'-0"12'-0"4'-0"7'-5"TYP.7'-0"TYP. 201ELECT. ROOM89 S.F. 203FIRE RISER ROOM89 S.F.7'-5"TYP.7'-0"TYP.EXTERIOR STUD WALLS - NON RATED2x6 STUDS @ 16" O/C, w/ R-19 BATT INSULATIONEXTERIOR STUD WALL - POP-OUT ELEMENTS2x4 STUDS @ 16" O/CFLOOR PLAN WALL LEGENDFLOOR PLAN SHEET INDEX57318642PROPOSED TELEPHONE EQUIPMENT LOCATION. REFER TO ELECTRICAL PLANSPROPOSED FIRE RISER LOCATION13ELECTRICAL PANELS. REFER TO ELECTRICAL PLANSELECTRICAL SUB-PANEL PER ELECTRICAL PLANS. VERIFY PANEL LOCATION w/ FUTURE TENANTPRIOR TO INSTALLATIONROOF ACCESS LADDER AND HATCH. REFER TO DETAIL D/AD1.0STOREFRONT SYSTEM. REFER TO SHEET A4.0NOT USED.910APPROXIMATE LOCATION OF RECESSED KNOX BOX (3200 SERIES). VERIFY REQUIREMENTSw/ FIRE DEPT.PERIMETER OF AWNING. REFER TO REFLECTED CEILING PLAN & EXTERIOR ELEVATIONS1112-14--15-MAIN AND U.G. PULL SECTION, SW. BRD. METERS. REFER TO SINGLE LINE DIAGRAMINTERIOR STUD WALLS - NON RATEDINTERIOR DEMISING STUD WALLS - NON-RATED6" METAL STUDS @ 16" O/C, w/ 5/8" GYP. BOARD BOTH SIDES6" METAL STUDS @ 16" O/C, w/ 5/8" GYP. BOARD BOTH SIDES5TYP.431710-1069TYP.10TYP.INTERIOR STUD WALLS - NON RATED3 5/8" METAL STUDS @ 16" O/C, w/ 5/8" GYP. BOARD BOTH SIDES28'-3 1/4"3'-0"21'-2 1/2"3'-0"3'-7"12'-7"3'-7"12'-7"3'-7"60'-3"3'-7"12'-7"3'-7"12'-7"3'-7"3'-0"21'-2 1/2"3'-0"28'-3 1/4"2'-0"2'-0"1'-0"4.1.g Packet Pg. 79 Attachment: 07 - Project Plans (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 162 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 186 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) KJIHGFEDCBA2112ABCDEFGHIJKEAST ELEVATIONA1/8"=1'-0"WEST ELEVATIOND1/8"=1'-0"SOUTH ELEVATIONB1/8"=1'-0"NORTH ELEVATIONC1/8"=1'-0"0'-0"T.O. FINISH FLOOR0'-0"T.O. FINISH FLOOR0'-0"T.O. FINISH FLOOR0'-0"T.O. FINISH FLOOR123.5123.5CAEFBDCDEAA3.0FFA3.0 A3.0 A3.0 A3.0A3.0A3.0A3.0 A3.0 A3.0A3.0A3.0BILL SPECK10073 VALLEY VIEW ST.CYPRESS, CA 90630PHONE: 714-606-9141e-mail: allspeckslnc@yahoo.comCopyright 2016, MPA Architects, Inc.. All rights reserved.cDESCRIPTIONREVISIONSNO.DATEPROJECTCLIENTA PROPOSED COMMERCIAL DEVELOPMENT LOCATED AT:F. 619.236.0557AMERICAN INSTITUTE OF ARCHITECTSwww.mpa-architects.comMEMBERSan Diego, CA 92104V. 619.236.05953578 30th StreetM P A A R C H I T E C T S I N C .DATABASE:SHEET NUMBER:SCALE:SHEET TITLECHECKED BY:PROJECT NO:17069-L. DALEPLOT DATE:DRAWN BY:AS NOTED-1706906-30-19LUISENO VILLAGES.E.C. HWY 79 AND MAIN ST.SAN JACINTO, CA 92583LICENSEDARCHITEC T S TATEOOFCALIFRNIANHOJRUMSE Y C26819Exp. 3-31-2019A2.0EXTERIOR ELEVATIONSTRASH ENCLOSURE ELVATIONSE1/4"=1'-0"8E4FPRECAST CONC. CAP,COLOR TO MATCHWALL BELOW8x8x16 PRECISION CONCRETEBLOCKS w/ FLUSH JOINTS, w/SKIM COAT STUCCO FINISH,PAINT TO MATCH COLOR-B4x6 @ 24" O/Cw/ H2.5 EA. SIDE, TYP.4x14 BEAM-H-HMETAL GATE-HMETAL RIB ROOFU-PANEL 22 GA. w/ #6SCREWS @ 8" O/C3'-2"6'-0"9'-0"3'-2"6'-0"9'-0"SLOPE ENCLOSURE COVER1/2-INCH PER FOOT MIN.NOTE:BUILDING PARAPETS SHALL SCREEN ALL ROOF TOPMECHANICAL EQUIPMENT.EXTERIOR MATERIALSEXTERIOR CEMENT PLASTER WITH SMOOTH FINISHEPS CORNICE / TRIM WITH SMOOTH PLASTER FINISHMETAL AWNINGMANUFACTURED STONE VENEERDECORATIVE WOOD BRACKETS1-2.1-3-4-5-6-7.1-8-9-10-11-12-HOLLOW METAL DOOR AND FRAME, PAINTED TO MATCH ADJACENTSURFACESTOREFRONT SYSTEM WITH ALUMINUM FRAME AND CLEAR GLAZING13-EXTERIOR COLORS-A-B-C-D-E-F-G-HELDORADO STONE: MOUNTAIN LEDGE "SHASTA"-J-KINTEGRAL COLOR PLASTER, WITH ELASTOMERIC PAINT TO MATCHSHERWIN-WILLIAMS, DOWNING SLATE #SW2819INTEGRAL COLOR PLASTER, COLOR TO MATCH SHERWIN-WILLIAMS,MINUTE MAUVE #SW7078INTEGRAL COLOR PLASTER, COLOR TO MATCH SHERWIN-WILLIAMS,RENWICK ROSE BEIGE #SW2804INTEGRAL COLOR PLASTER, WITH ELASTOMERIC PAINT TO MATCHSHERWIN-WILLIAMS, ROOKWOOD SASH GREEN #SW2810INTEGRAL COLOR PLASTER, COLOR TO MATCH SHERWIN-WILLIAMS,LEATHER BOUND #SW6118PRECAST COLUMN TRIM CAPPRIMED FOR PAINT SELECT CEDARMILL HARDIE PLANK LAP SIDING w/ SMOOTHFINISH BY JAMES HARDIEDOUBLE EAGLE PONDEROSA FLAT TILE BY EAGLE ROOFING. (ICC-ES REPORT #ESR-1900)987 BROWN GRAY RANGE1ESTAINED WOODMEDIUM OAK COLOR9J4F7.1H2E5--8E2.1E3D5-8E4F1B1B1A1B1C1B5-8E4F2.2E1A7.1H9J11H5-1B8E4F1C2.2E1B5-4F3D1A8E4F1B2.1E8E4F10G1B9J1E1B2.1E2.2E8E5-4F1B16E11H9J7.1H8E10G11H9J7.1H16E1B8E8E5-4F1B2.1E2.2E4F4F6B1B2.1E2.1E1B1C2.2E1A1BINTEGRAL COLOR PLASTER, COLOR TO MATCH SHERWIN-WILLIAMS,INTELLECTUAL GRAY #SW70451A1A1A1C1B6B6B6B6B6B7.2H8E8E8E1/4" STUCCO REVEAL13-13-14-EXPOSED WOOD TRELLIS14H15-72"x96" WALL MOUNTED TRELLIS15D15D15D8E4F2E13-13-2.1E1B1B4F8E2.2ET.O. STOREFRONT@ 9'-6" A.F.F., TYP.B.O. SOFFIT @ 13'-0" A.F.F.T.O. PARAPET @ 23'-6" A.F.F.T.O. PARAPET @ 27'-6" A.F.F.T.O. RIDGE @ ± 32'-1 1/4" A.F.F.T.O. PARAPET @ 23'-6" A.F.F.B.O. SOFFIT @ 13'-0" A.F.F.B.O. SOFFIT @ 14'-6"T.O. PARAPET @ 15'-0" A.F.F.T.O. PARAPET @ 21'-6" A.F.F.T.O. PARAPET @ 27'-6" A.F.F.T.O. PARAPET @ 21'-6" A.F.F.T.O. TRIM @4'-6" A.F.F.T.O. TRIM @3'-2" A.F.F.B.O. SOFFIT @ 10'-6" A.F.F.T.O. PARAPET @ 21'-6" A.F.F.B.O. TRELLIS @9'-0" A.F.F.B.O. SOFFIT @ 12'-0" A.F.F.B.O. SOFFIT @ 14'-0" A.F.F.B.O. SOFFIT @ 14'-0" A.F.F.B.O. SOFFIT @ 12'-0" A.F.F.T.O. PARAPET @ 23'-6" A.F.F.T.O. PARAPET @ 28'-6" A.F.F.T.O. TRIM @ 17'-0" A.F.F.T.O. STOREFRONT@ 9'-6" A.F.F., TYP.T.O. TRIM @3'-2" A.F.F.T.O. STOREFRONT@ 9'-6" A.F.F., TYP.T.O. TRIM @4'-6" A.F.F.T.O. TRIM @3'-2" A.F.F.B.O. SOFFIT @ 14'-0" A.F.F.B.O. SOFFIT @ 12'-0" A.F.F.T.O. PARAPET @ 23'-6" A.F.F. T.O. WINDOW @9'-6" A.F.F.T.O. TRIM @3'-2" A.F.F.EQ.EQ.4'-6"T.O. PARAPET @ 23'-6" A.F.F.T.O. PARAPET @ 15'-0" A.F.F.T.O. PARAPET @ 21'-6" A.F.F.B.O. SOFFIT @ 10'-6" A.F.F. T.O. WINDOW @9'-6" A.F.F.T.O. TRIM @3'-2" A.F.F.EQ.EQ.4'-6"T.O. PARAPET @ 23'-6" A.F.F.EQ.EQ.T.O. PARAPET @ 23'-6" A.F.F.T.O. TRIM @4'-6" A.F.F.T.O. TRIM @3'-2" A.F.F.T.O. PARAPET @ 21'-6" A.F.F.T.O. PARAPET @ 21'-6" A.F.F.B.O. SOFFIT @ 12'-0" A.F.F.B.O. SOFFIT @ 14'-0" A.F.F.T.O. PARAPET @ 23'-6" A.F.F.T.O. TRIM @4'-6" A.F.F.T.O. TRIM @3'-2" A.F.F.4F4F2.1ET.O. RIDGE @ ± 32'-1 1/4" A.F.F.1'-0"19'-6"1'-0"EPS CORNICE / TRIM WITH SMOOTH PLASTER FINISH2.2-16-4"4"4"4"4"4"16E4"4"16EEPS TRIM WITH SMOOTH PLASTER FINISH. 2"D x 5"H(SECURED TO STUCCO WITH ADHESIVE PER MANUFACTURERS SPECS)DECORATIVE WOOD BRACKETS7.2-7.1H1'-6"TYP.1'-0"TYP.1'-6"TYP.1'-0"TYP.EQ.1'-0"TYP.EQ.1'-6"TYP.1'-0"TYP.1'-6"TYP.1'-0"TYP.4.1.g Packet Pg. 80 Attachment: 07 - Project Plans (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 163 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 187 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) 13SLOPE12"1/2"3SLOPE12"1/2"3SLOPE12"1/2"3SLOPE12"1/2"3SLOPEKSLOPE3SLOPE2121KJIHGFEDCBAKJIHGFEDCBA1BUILDING CROSS SECTIONA1/4"=1'-0"BUILDING CROSS SECTIONC1/4"=1'-0"BUILDING CROSS SECTIOND1/4"=1'-0"BUILDING CROSS SECTIONE1/4"=1'-0"BUILDING CROSS SECTIONF1/4"=1'-0"BUILDING CROSS SECTIONG1/4"=1'-0"BUILDING CROSS SECTIONB1/4"=1'-0"BILL SPECK10073 VALLEY VIEW ST.CYPRESS, CA 90630PHONE: 714-606-9141e-mail: allspeckslnc@yahoo.comCopyright 2016, MPA Architects, Inc.. All rights reserved.cDESCRIPTIONREVISIONSNO.DATEPROJECTCLIENTA PROPOSED COMMERCIAL DEVELOPMENT LOCATED AT:F. 619.236.0557AMERICAN INSTITUTE OF ARCHITECTSwww.mpa-architects.comMEMBERSan Diego, CA 92104V. 619.236.05953578 30th StreetM P A A R C H I T E C T S I N C .DATABASE:SHEET NUMBER:SCALE:SHEET TITLECHECKED BY:PROJECT NO:17069-L. DALEPLOT DATE:DRAWN BY:AS NOTED-1706906-30-19LUISENO VILLAGES.E.C. HWY 79 AND MAIN ST.SAN JACINTO, CA 92583LICENSEDARCHITEC T S TATEOOFCALIFRNIANHOJRUMSE Y C26819Exp. 3-31-2019A3.0CROSS-SECTIONSSTOREFRONT @ 9'-6" A.F.F.TOP PLATE @ 14'-0" A.F.F.TOP OF PARAPET @ 21'-6" A..F.F.TOP PLATE @ 14'-0" A.F.F.TOP OF PARAPET @ 21'-6" A..F.F.STOREFRONT @ 9'-6" A.F.F.TOP PLATE @ 14'-0" A.F.F.TOP OF PARAPET @ 23'-6" A..F.F.BOT OF SOFFIT @ 12'-0" A.F.F.TOP OF PARAPET @ 28'-6" A..F.F.TOP PLATE @ 14'-0" A.F.F.STOREFRONT @ 9'-6" A.F.F.TOP OF SILL@ 3'-11" A.F.F.TOP OF WINDOW @ 9'-5" A.F.F.BOT OF SOFFIT @ 10'-5" A.F.F.TOP OF POP-OUT @ 15'-0" A..F.F.TOP OF PARAPET @ 20'-0" A..F.F.TOP OF PARAPET @ 27'-6" A..F.F.TOP PLATE @ 14'-0" A.F.F.STOREFRONT @ 9'-6" A.F.F.BOT OF SOFFIT @ 13'-0" A.F.F.TOP OF PARAPET @ 27'-6" A..F.F.TOP PLATE @ 14'-0" A.F.F.STOREFRONT @ 9'-6" A.F.F.BOT OF SOFFIT @ 13'-0" A.F.F.TOP OF RIDGE 32'-6"BOT. OF SOFFIT @ 14'-6" A.F.F.BOT. OF TRUSS @ 15'-6" A.F.F.1'-0"1'-0"1'-0"CA3.0EFBDCDEFFAA3.0 A3.0 A3.0 A3.0 A3.0 A3.0 A3.0 A3.0A3.0A3.0243'-0 1/2"60'-0"11'-7"ROOF PLANH1/16"=1'-0"  1/2:12SLOPEAPPROX. 5,260 SQ.FT.APPROX. 5,060 SQ.FT.APPROX. 5,060 SQ.FT.58'-0"8'-0"8' HIGH CMU WALL5'-6"LINE OF SIGHT78'-0"100'-0"20'-0"LINE OF SIGHT @ WEST P.L.I1/8"=1'-0"TOP PLATE @ 14'-0" A.F.F.TOP OF PARAPET @ 21'-6" A.F.F.4.1.g Packet Pg. 81 Attachment: 07 - Project Plans (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 164 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 188 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) 4.1.h Packet Pg. 82 Attachment: 08 - Conceptual Grading Plan (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 165 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 189 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) SSS60'40'70'33'-6"91'VVVPROPOSED IMPROVEMENTS ONRAMONA EXPRESSWAY NORTH OF MAINSTREET BE COMPLETED BY OTHERS.PROPOSED IMPROVEMENTS ON LAKE PARKDRIVE EAST OF RAMONA EXPRESSWAY TOBE COMPLETED BY OTHERS.SSSSSS79'40'5050 Avenida Encinas, Ste 260Carlsbad, CA 92008Phone: (760) 476-9193 · MBAKERINTL.COMEAST MAIN ST. / LAKE PARK DR.CONCEPTUAL SIGNING &STRIPING PLANSLIMITSPEEDNORIGHTTURNONLYONLYNO4.1.iPacket Pg. 83Attachment: 09 - Signing and Striping Plans (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-4.1.cPacket Pg. 166Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.aPacket Pg. 190Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Initial Study – Luiseño Village Retail Center Page 1 City of San Jacinto ENVIRONMENTAL ASSESSMENT FORM INITIAL STUDY (IS) 1. Project Title: Luiseño Village Retail Center – SPDR 17-17 2. Lead Agency: City of San Jacinto, Planning Department 595 S. San Jacinto Avenue San Jacinto, CA 92583 (951) 487-7330 – Phone (951) 654-3728 – Fax Prepared By: Josh Ferris Origin Environmental Planning, LLC. (916) 265-2608 josh@originenvr.com 3. Contact Person Kevin White, Senior Planner City of San Jacinto, Planning Department 595 S. San Jacinto Avenue San Jacinto, CA 92583 (951) 487-7330 – Phone (951) 654-3728 – Fax kwhite@sanjacintoca.gov 4. Project Location: Southwest corner of Main Street and Ramona Ex- pressway in the City of San Jacinto as shown in Figure 1. The Project Site is located within an unsectioned area of the Rancho San Jacinto Viejo land grant, Town- ship 4 South, Range 1 West (San Bernardino base line and meridian) as shown on the San Jacinto, California 7.5-minute U.S. Geological Survey (USGS) quadran- gle. The project site is comprised of 4 parcels with 7 Tax Assessor Parcel Numbers (APNs): 433-160-024, 027, 028, 029, 032, 033, and 034. 5. Project Developer & Applicant Project Developer Property Owner/Applicant Bill Speck Ruben De Los Santos All-Specks, Inc. Soboba Band of Luiseño Indians 10073 Valley View St. #101 P.O. Box 487 Cypress, CA 90630 San Jacinto, CA 92581 (714) 606-9141 (951) 654-5544 allspecksinc@yahoo.com RDELOSSANTOS@soboba-nsn.gov 4.1.j Packet Pg. 84 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 167 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 191 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 2 City of San Jacinto 6. General Plan Designation: CC – Community Commercial The Community Commercial land use designation provides for a variety of retail and service-oriented business activities at various intensities to serve the local community and population, as well as the broader market area. The maximum intensity of devel- opment is a FAR of 0.40, with an average intensity of a FAR of 0.25. (Figure 2) a. General Plan Neighborhood Designation: Spice Ranch Neighborhood Planning Concept The neighborhood planning concept allows the City to ensure that adequate levels of public services and facilities are available throughout the commu- nity and not concentrated in only a few areas. b. Specific Plan Name and Designation: Not located within a Specific Plan 7. Existing Zoning: CN – Commercial Neighborhood. The CN Zone is a “Clearly Compatible” Zone with the CC General Plan designation. The CN zone is applied to areas appropriate for providing small-scale retail and per- sonal service uses for the local population living in adjacent residential neighborhoods. This zone allows a maximum floor area ratio (FAR) of 0.40. (Figure 3) 8. Description of the Project: Environmental Setting The site is vacant and covered with weedy grassland. The project site was histori- cally used for agriculture but has been fallow and vacant for over 20 years. It has been mowed and possibly disked occasionally for weed control. The topography is generally flat with a slight slope down to the northwest. Site elevation ranges from 1,592 to 1,600 feet above mean sea level (MSL). Ramona Expressway and Main Street are elevated above the site near the intersection of these two streets. No ponding water or surface seepage was observed at or near the site during field investigations. Site drainage appears to be controlled via infiltration on the site. A concrete swale is located along the southern and western boundary of the site which accepts stormwater flows from Donna Way and drains north to Main Street via a drain under the sidewalk into the street gutter on the south side of Main Street. Project Description The Project is a retail center including a service station with convenience market and carwash, two drive-through restaurants, and two retail buildings. 4.1.j Packet Pg. 85 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 168 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 192 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 3 City of San Jacinto Construction of the Project would occur in two or more phases. The first phase would include a retail building with associated parking and landscaping, a driveway connect- ing Main Street to Donna Way, and utility and stormwater management improvements. Construction of the first phase is estimated to start in Fall 2019 and end approximately in Summer 2020. The remaining land uses would be developed in one or more sub- sequent phases. Construction activities would include: 1) grading, 2) building, 3) pav- ing, and 4) architectural coating. It is estimated that the Project has the potential to import approximately 13,831 cubic yards of material during grading or approximately 864 truckloads. The Project includes a number of discretionary actions as follows:  Lot Line Adjustment to align the lot lines with the proposed onsite driveways.  Change of Zone from Commercial Neighborhood to Commercial General to allow for the proposed service station and car wash.  Site Plan and Design Review for retail building on Parcel 1.  Conditional Use Permit CUP to permit a service station with an automated car wash and a convenience market with off-sale alcohol sales under a Type 21 Alcoholic Beverage Control (ABC) license.  Minor Use Permit to allow for the provision of parking that exceeds City require- ments by more than five percent.  Minor Use Permits to allow for two fast food restaurants with the drive-through lanes.  A Variance to allow 24 pumps where a maximum 15 are permitted by the De- velopment Code. Lot Line Adjustment Currently, the project site consists of four parcels. The proposed Lot Line Adjustment maintain four parcels but will align the lot lines with the proposed onsite driveways (Figure 4). Along with a reciprocal access, parking and maintenance agreement, this will facilitate the orderly provision of access within the commercial development. The driveways/lot lines will be realigned to provide safer access points on Donna Way (move the driveway/lot line away from the bend on Donna Way) and Main Street (pro- vide a 90-degree intersection). The Lot Line Adjustment will result in four legal parcels: Parcel 1 (3.04 acres), Parcel 2 (3.03 acres), Parcel 8 (1.98 acres), and Parcel 9 (1.40 acres). Change of Zone The requested change of zone would rezone the four parcels from Commercial Neigh- borhood to Commercial General. The current Commercial Neighborhood zone allows for all proposed uses except for the service station and car wash. Rezoning the site to Commercial General will allow the development of these uses. The Commercial General zone provides for general commercial and daily shopping needs of a broad market area. The Commercial General zone allows for a wide range of retail sales 4.1.j Packet Pg. 86 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 169 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 193 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 4 City of San Jacinto and business, professional, and personal services that are accessible to transit corri- dors. This zone allows a maximum floor area ratio (FAR) of 0.40. The Commercial General zone is consistent with the Community Commercial land use designation of the General Plan. Site Plan Design Review The applicant is currently seeking to develop the first phase of the project and has developed site plans for retail building on Parcel 1 (Figures 5 and 6). Development of the building on Parcel 1 requires Site Plan Design Review (SPDR-17-17). Site Plan Design Review for development on the remaining parcels (Parcels 2, 8 and 9) will occur when specific development plans are prepared, and the applicant seeks building permits. While the current Site Plan Design Review is focused on Parcel 1, information is provided below for Parcels 2, 8 and 9 as a basis for the environmental review of the entire project. Under the current Site Plan Design Review case, the City will ensure that the Project respects the physical environmental characteristics of the property, provides safe and convenient access and circulation for pedestrians and vehicles, provides high quality design practices, minimizes or eliminates negative or undesirable visual impacts, pro- vides for adequate dedication of land for public purposes and provides needed public infrastructure. Conditional Use Permit A Conditional Use Permit is required to permit a service station with an automated car wash and a convenience market with off-sale alcohol sales under a Type 21 Alcoholic Beverage Control (ABC) license. The store will operate 24-hours a day, seven days a week. (hours subject to change). Minor Use Permit – Excess parking over five percent A Minor Use Permit is needed to allow for the provision of parking that exceeds City requirements by more than five percent. Total proposed parking on the site is 272 spaces, where as the City Development Code requires 249. Minor Use Permits – Fast Food Restaurants with a Drive-Through Two MUPs are for the two fast food restaurants with the drive-through lanes on Par- cels 2 and 9. As designed the site meets all requirements for the use. 4.1.j Packet Pg. 87 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 170 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 194 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 5 City of San Jacinto Project Summary Parcel 1 is proposed for a multi-tenant retail building totaling 14,583 square feet of specialty retail, with up to 10 individual tenant spaces ranging from 1,200 to 2,261 square feet each. Parcel 2 is proposed for a 9,360-square-foot multi-tenant retail building and a 2,800- square-foot-restaurant with drive-through service. Parcel 8 is proposed for a service station with convenience store (approximately 3,048 square feet) and car wash (approximately 1,105 square feet). Parcel 9 is proposed for 3,200-square-foot-restaurant with drive-through service. The Project Standards are as follows: DEVELOPMENT STANDARDS FOR THE CG ZONE Required/ Permitted Parcel 1 Parcel 2 Parcel 8 Parcel 9 Parcel Area (Net) Minimum 5,000 sq. ft. (12,000 sq. ft. for a Drive-Through) 132,637 sq. ft. 132,018 sq. ft. 86,281 sq. ft. 61,122 sq. ft. Parcel Width 50 ft. (100 sq. ft. for a Drive-Through & Service Station) 330 ft. 575 ft. 240 ft. 250 ft. Parcel Depth 100 ft. 330 ft. 250 ft. 255 ft. 250 ft. FAR (Maxi- mum) .40 .11 .09 .05 .05 Building Size Varies 14,583 sq. ft. 12,160 sq. ft. 4,153 sq. ft. 3,200 sq. ft. Building Height 45 ft. 32.5 ft. Specific plans have not been submitted. Building height will not exceed 45 ft. Impervious Sur- face (Max) 85% 80% 69% 69% 83% Structure/Lot Coverage (Max) 50% 12% 10% 13% 6% Setbacks Street Setback Ramona Ex- pressway 12-foot parkway 8-foot walk 25-foot scenic 25 ft. Scenic n/a n/a 25 ft. 34 ft. Main Street 6-foot parkway 6-foot walk 12-foot land- scape 12 ft. Landscape 15 ft. n/a 15 ft. n/a 4.1.j Packet Pg. 88 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 171 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 195 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 6 City of San Jacinto DEVELOPMENT STANDARDS FOR THE CG ZONE Required/ Permitted Parcel 1 Parcel 2 Parcel 8 Parcel 9 Side Building Interior Setback Abutting Non- Residential 0 ft. 21 ft. 16 ft. 23 ft. 36 ft. Abutting Resi- dential 10 ft. n/a n/a n/a n/a Side Building Street Setback 10 ft. 62 ft. 72 ft. 34 ft. 28 ft. Rear Building Setback Abutting Non- Residential 0 ft. n/a n/a 65 ft. 99 ft. Abutting Resi- dential 15 ft. 15-20 ft. 15-20 ft. n/a n/a Access Site access would be provided by one right-in/out-only driveway on East Main Street, one right-in/out-only driveway on Ramona Expressway, and one full access driveway on Donna Way. A north-south aligned access driveway would be developed during the first phase that would connect East Main Street to Donna Way. An east-west aligned access lane would also be constructed during the first phase along the bound- ary of Parcels 1 and 2. The access driveway connecting to Ramona Expressway would be constructed at a later phase when Parcels 8 and/or 9 are developed. Street Improvements The Project would make improvements to Ramona Expressway and East Main Street consistent with the General Plan and Landscape Design Guidelines. Ramona Ex- pressway will be widened to the planned roadway width along the property frontage. Improvements include southbound right-turn lanes at the project driveway and Donna Way, and re-striping and signage to provide an additional southbound through lane. An 8-foot wide Class 1 bike lane multi-use path will be provided within the landscaped setback along the property frontage of Ramona Expressway in compliance with the City’s Landscape Design Guidelines. A traffic signal will be installed at the intersection of Ramona Expressway and Donna Way. Other improvements at this intersection in- clude removing a portion of the Ramona Expressway median to allow full access to Donna Way and to provide a northbound left-turn lane. The Project will modify existing street signage and striping on the property frontage of East Main Street. Other road- way work would include curb cuts for the driveways, and connections to underground utility lines in the roadways. Parking A total of 269 parking stalls are envisioned for the entire four parcels. This would in- clude an estimated 13 disabled parking stalls. The first phase of development on Parcel 1 would provide 95 stalls, including 4 disabled stalls, 8 clean air vanpool/EV stalls, 5 future EV stalls, and 5 bus stalls. A total of 6 short-term and 5 long-term bicycle parking spaces would be provided around the perimeter of the retail building. 4.1.j Packet Pg. 89 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 172 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 196 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 7 City of San Jacinto PARKING ANALYSIS Ratio (Gross Floor Area) Calculation Required Provided Parcel 1 Retail – 1:250 of GFA & 1:300 for Outdoor Display Areas 12,396/250 50 95 Restaurant – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. and 1/50 for patio areas over 15% of GFA and 1/50 for patio areas over 15% of GFA 2,000/200 + 187/60 + 900/50 13 Total Parcel 1 81 Parcel 2 Retail – 1:250 of GFA & 1:300 for Outdoor Display Areas 7,956/250 32 101 Restaurant – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. and 1/50 for patio areas over 15% of GFA 1,404/200 + 900/50 25 Fast Food w/Drive-Through – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. and 1/50 for patio areas over 15% of GFA 2,000/200 + 800/60 + 1,000/50 43 Total Parcel 2 100 Parcel 8 Convenience Store – 1:225 – plus 1 space for each employee on duty during heaviest traffic 8-hour shift 3,048/225 + 4 employees 18 18 Total Parcel 8 18 Parcel 9 Fast Food Drive-Through – 1:200 for first 2,000 sq. ft. then 1:60 for anything over 2,000 sq. ft. 2000/200 + 1,200/60 + 1,000/50 50 55 Total Parcel 9 50 The above spaces need to include the following: ADA Stalls 1 – 25 = 1 26 – 50 = 2 51 – 75 = 3 76 – 100 = 4 Parcel 1 = 4 Parcel 2 = 4 Parcel 8 = 1 Parcel 9 = 2 Parcel 1 = 4 Parcel 2 = 5 Parcel 8 = 2 Parcel 9 = 2 Bicycle Parking – 10% of required parking spaces – 17.330.110 10% Parcel 1 = 8 Parcel 2 = 10 Parcel 8 = 2 Parcel 9 = 5 Parcel 1 = 11 Parcel 2 = 11 Parcel 8 = 2 Parcel 9 = 6 Cal Green 5.106.4.1.1 – Short term bicycle parking – 5% of new visitor parking spaces being added 5% Parcel 1 = 4 Parcel 2 = 5 Parcel 8 = 1 Parcel 9 = 3 Parcel 1 = 6 Parcel 2 = 6 Parcel 8 = 2 Parcel 9 = 4 Cal Green 5.106.4.1.2 – Long Term bicycle park- ing – when 10 or more occupants 5% of employee parking spaces Parcel 1 = 5 Parcel 2 = 5 Parcel 8 = 0 Parcel 9 = 2 Parcel 1 = 5 Parcel 2 = 5 Parcel 8 = 0 Parcel 9 = 2 Low-Emitting, Fuel Efficient and Carpool/Vanpool Vehicles – Cal Green 5.106.5.2 – when 10 or more stalls added 0 – 9 = 0 10 – 25 = 1 26 – 50 = 3 51 – 75 = 6 76 – 100 = 8 Parcel 1 = 8 Parcel 2 = 8 Parcel 8 = 1 Parcel 9 = 3 Parcel 1 = 8 Parcel 2 = 11 Parcel 8 = 1 Parcel 9 = 6 4.1.j Packet Pg. 90 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 173 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 197 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 8 City of San Jacinto PARKING ANALYSIS Ratio (Gross Floor Area) Calculation Required Provided Electric Vehicle Charging Stations – Cal Green 5.106.5.3 0 – 9 = 0 10 – 25 = 1 26 – 50 = 2 51 – 75 = 4 76 – 100 = 5 Parcel 1 = 5 Parcel 2 = 5 Parcel 8 = 1 Parcel 9 = 2 Parcel 1 = 5 Parcel 2 = 7 Parcel 8 = 1 Parcel 9 = 4 Electric Vehicle Charging Stations – 17.430.361 3 – 50 = 1 51 – 100 = 2 Parcel 1 = 2 Parcel 2 = 2 Parcel 8 = 1 Parcel 9 = 1 Parcel 1 = 5 Parcel 2 = 7 Parcel 8 = 1 Parcel 9 = 4 10’ by 25’ Loading Space 10,000 to 20,000 sq. ft.=1 Parcel 1 = 1 Parcel 2 = 1 Parcel 8 = 0 Parcel 9 = 0 Parcel 1 = 1 Parcel 2 = 1 Parcel 8 = 0 Parcel 9 = 0 Landscaping & Drainage Approximately 2.2 acres of landscaping is proposed along the Project boundaries and throughout the parking lots. The landscaped areas will include pedestrian paths to connect East Main Street to Donna Way and Ramona Expressway. A decorative wood trellis will be provided at the main intersection of these paths. A preliminary Water Quality Management Plan (WQMP) has been prepared for the entire site. The site is divided into four drainage management areas (DMAs) which roughly correspond to the four parcels. Infiltration chambers will be installed below the parking areas on each parcel to allow for percolation of stormwater on site. Runoff from the car wash pro- posed on Parcel 8 will drain to the sanitary sewer. Other Amenities Five, approximately 240-square-foot, trash enclosures are proposed. The enclosures would be constructed of concrete blocks with stone and stucco finish. The enclosure would have metal roofing and gates. Two trash enclosures would be located along the southern property boundary and the remaining three would be located in the interior of the project site. 4.1.j Packet Pg. 91 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 174 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 198 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 9 City of San Jacinto 9. Surrounding Land Uses and Setting (Figures 1 - 3): Land Use General Plan Zoning North Vacant (north of East Main Street) CC – Community Commer- cial and LDR – Low Density Residential CG – General Commercial and RL – Residential, Low Density South Soboba Indian Health Clinic, EMWD property, and vacant parcels CC – Community Commercial CN – Commercial Neighborhood East EMWD facilities and Valley Trap Club trap shooting range (east of Ramona Expressway) CC – Community Commercial CN – Commercial Neighborhood West The Durango residential development LDR – Low Density Residential RL – Residential, Low Density 10. Other Public Agencies Whose Approval is Required (e.g., permits, financing ap- proval, or participation agreement): a. California Department of Alcohol Beverage Control (ABC) License b. Eastern Municipal Water District c. County of Riverside Department of Environmental Health d. Riverside County Flood Control and Water Conservation District e. Southern California Edison f. South Coast Air Quality Management District g. Western Riverside County Regional Conservation Authority h. California Department of Fish and Wildlife i. United States Fish and Wildlife Service j. Regional Water Quality Control Board 11. Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1? If so, is there a plan for consultation that includes, for ex- ample, the determination of significance of impacts to tribal cultural resources, procedures regarding confidentiality, etc.? Note: Conducting consultation early in the CEQA process allows tribal governments, lead agencies, and project proponents to discuss the level of environmental review, identify and ad- dress potential adverse impacts to tribal cultural resources, and reduce the potential for delay and conflict in the environmental review process. (See Public Resources Code section 21080.3.2.) Information may also be available from the California Native American Heritage Commission’s Sacred Lands File per Public Resources Code section 5097.96 and the California Historical Resources Information System administered by the California Office of Historic Preservation. Please also note that Public Re- sources Code section 21082.3(c) contains provisions specific to confidentiality. Consultation under AB 52 commenced on January 18, 2019. The 30-day response period ended on February 19, 2018. Information on the consultation process can be found in Appendix A of this Initial Study. 4.1.j Packet Pg. 92 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 175 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 199 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 10 City of San Jacinto 12. Public Comment Period: August 16, 2019 to September 16, 2019 13. Other Environmental Reviews Incorporated by Reference in this Review: a. General Plan as amended through October 19, 2012 b. General Plan EIR April 2006 c. General Plan EIR Addendum August 2012, GPA-1-12 d. Riverside County DEIR No. 521 14. Technical Studies Referenced in this Initial Study: a. Air Quality and Greenhouse Gas Report, prepared by EDS and OB-1 Air Analysis, July 2019. b. General Biological Assessment, prepared by ENVIRA, April 23, 2019. c. San Bernardino Kangaroo Rat and Los Angeles pocket mouse Presence/Absence Trapping and Burrowing Owl Re-Surveys, prepared by ENVIRA, June 25, 2019. d. Cultural and Paleontological Resources Inventory, prepared by Natural Investiga- tions Company, October 19, 2017. e. Report of Soils and Foundation Evaluations, prepared by Soils Southwest, Novem- ber 8, 2017 f. Hydrology Study, prepared by Tuttle Engineering, March 6, 2018. g. Preliminary Water Quality Management Plan, prepared by CWE, July 2, 2019. h. Noise Assessment, prepared by Ldn Consulting, Inc., July 15, 2019. i. Traffic Impact Analysis, prepared by Michael Baker International, June 25, 2019 j. Signing and Striping Plan, prepared by Michael Baker International, May 2019 k. Sewer Study, prepared by Dexter Wilson Engineering, February 6, 2019 15. Acronyms: ABC - Alcohol Beverage Control ALUC - Airport Land Use Commission ALUCP - Airport Land Use Compatibility Plan AMSL - Above Mean Sea Level AQMP - Air Quality Management Plan CalEEMod - California Emissions Estimator Model CBC - California Building Code CDFW - California Department of Fish and Wildlife CDWR - California Department of Water Resources CERCLIS - Comprehensive Environmental Response, Compensation, & Liability Information System CEQA - California Environmental Quality Act CESA - California Endangered Species Act CIWMD - California Integrated Waste Management District CMP - Congestion Management Plan CNPS - California Native Plant Society CO - Carbon Monoxide DEIR - Draft Environmental Impact Report DTSC - Department of Toxic Substance Control EIR - Environmental Impact Report EMWD - Eastern Municipal Water District 4.1.j Packet Pg. 93 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 176 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 200 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 11 City of San Jacinto EOP - Emergency Operations Plan FEMA - Federal Emergency Management Agency FEIR - Final Environmental Impact Report FESA - Federal Endangered Species Act GIS - Geographic Information System GHG - Green House Gas GP - General Plan as Amended October 19, 2012, San Jacinto HCOC - Hydraulic Conditions of Concern HUSD - Hemet Unified School District IBC - International Building Code IS - Initial Study LHMP - Local Hazard Mitigation Plan LHMWD - Lake Hemet Municipal Water District LID - Low Impact Design LST - Localized Significance Threshold MBTA - Migratory Bird Treaty Act MSHCP - Multiple Species Habitat Conservation Plan MWD - Metropolitan Water District NAHC - Native American Heritage Commission NCCP - Natural Communities Conservation Plan NO2 - Nitrogen Dioxide NOX - Nitrogen Oxides NPDES - National Pollutant Discharge Elimination System OEM - Office of Emergency Services OPR - Office of Planning & Research, State PEIR - Program Environmental Impact Report PM-2.5 - Particulate Matter at 2.5 Micrometers PM-10 - Particulate Matter at 10 Micrometers PW - Public Works, Hemet RCA - Western Riverside County Regional Conservation Authority RCEH - Riverside County Environmental Health RCFCWCD - Riverside County Flood Control & Water Conservation District RCIP - Riverside County Integrated Plan RCP - Regional Comprehensive Plan RCTC - Riverside County Transportation Commission RTA - Riverside Transit Agency RTIP - Regional Transportation Improvement Plan RTP - Regional Transportation Plan RWQCB - Regional Water Quality Control Board SCAG - Southern California Association of Governments SCAQMD - South Coast Air Quality Management District SCE - Southern California Edison SCH - State Clearinghouse SJMC - San Jacinto Municipal Code SJUSD - San Jacinto Unified School District SKRHCP - Stephens’ Kangaroo Rat Habitat Conservation Plan SO2 - Sulphur Dioxide SOX - Sulphur Oxides SWPPP - Storm Water Pollution Prevention Plan TDA - Treatment and Disposition Agreement TRI - Toxic Release Inventory UBC - Uniform Building Code 4.1.j Packet Pg. 94 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 177 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 201 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 12 City of San Jacinto USACOE - United States Army Corps of Engineers USFWS - United States Fish and Wildlife Service USGS - United States Geologic Survey VOC - Volatile Organic Compounds VWRPD - Valley Wide Recreation & Parks District WQMP - Water Quality Management Plan WRCOG - Western Riverside Council of Governments 4.1.j Packet Pg. 95 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 178 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 202 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Figure 1 Aerial Photo Feet0400200 E Main St Ramo n a E xp y Donna WayE 7th StW Ramona ExpyLake Par k Dri v e Aerial date: February 2018 Project Site Soboba Indian Health Center Donna W a y Luiseño Village Retail Center 4.1.j Packet Pg. 96 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 179 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 203 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Figure 2 General Plan Map °0 250 500 Feet East Main Street E 7th Street Figure 2 - General Plan D o n n a W a y Donna WayRa mona Ex pr e s s wa y Project Site LDR PI MDR Water Source CC Luiseño Village Retail Center Feet0500250 4.1.j Packet Pg. 97 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 180 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 204 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Figure 3 Zoning Map °0 250 500 Feet East Main Street E 7th Street Figure 2 - General Plan D o n n a W a y Donna WayRa mona Ex pr e s s wa y Project Site LDR PI MDR Water Source CG CN Luiseño Village Retail Center Feet0500250 4.1.j Packet Pg. 98 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 181 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 205 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Figure 4 Lot Line Adjustment Luiseño Village Retail Center 4.1.j Packet Pg. 99 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 182 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 206 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Figure 5 Site Plan SERVICE STATION / CONVENIENCE STORECAR WASH DRIVE-THRU RESTAURANT DRIVE-THRU RESTAURANT RETAIL BUILDING PARCEL 1 PARCEL 2 PARCEL 9 PARCEL 8 Luiseño Village Retail Center RETAIL BUILDING E a s t M a in St r e e t Ramona E xp re s swa y Donna Way 0 100 200 FeetDonna Way4.1.j Packet Pg. 100 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-4.1.c Packet Pg. 183 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 207 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Figure 6 Parcel 1 Retail Building Eleva�ons K J I H G F E D C B A 2 112 A B C D E F G H I J K EAST ELEVATION A1/8"=1'-0" WEST ELEVATION D1/8"=1'-0" SOUTH ELEVATION B1/8"=1'-0" NORTH ELEVATION C1/8"=1'-0" 0'-0" T.O. FINISH FLOOR 0'-0" T.O. FINISH FLOOR 0'-0" T.O. FINISH FLOOR 0'-0" T.O. FINISH FLOORT.O. STOREFRONT @ 9'-6"TYP.B.O. SOFFIT @ 13'-0"T.O. LOWR PARAPET @ 23'-6"T.O. PARAPET @ 27'-6"T.O. PARAPET @ 28'-6"T.O. RIDGE @ 32'-6"T.O. PARAPET @ 23'-6"B.O. SOFFIT @ 13'-0"B.O. SOFFIT @ 14'-0"B.O. SOFFIT @ 14'-0"T.O. PARAPET @ 23'-6"T.O. WINDOW @ 9'-5"T.O. PARAPET @ 15'-0"T.O. PARAPET @ 21'-6"T.O. PARAPET @ 27'-6"T.O. RIDGE @ 32'-6"T.O. PARAPET @ 21'-6"T.O. TRIM @ 4'-6"T.O. LOWER TRIM @ 3'-2"T.O. TRIM @ 17'-0"B.O. SOFFIT @ 10'-5"T.O. POP OUT REVEAL @ 8'-3"T.O. LOWER PARAPET @ 15'-0"T.O. PARAPET @ 21'-6"T.O. TRIM @ 3'-2"T.O. TRIM @ 3'-2"T.O. PARAPET @ 21'-6"B.O. WINDOW TRIM @ 3'-6"T.O. POP OUT TRIM @ 4'-6"CA E F BDCDE A A3.0 FF A3.0 A3.0 A3.0 A3.0 A3.0 A3.0 A3.0 A3.0 A3.0 A3.0A3.0 T.O. PARAPET @ 23'-6"B.O. TRELLIS @ 9'-0"B.O. SOFFIT @ 12'-0"B.O. SOFFIT @ 14'-0"NOTE: BUILDING PARAPETS SHALL SCREEN ALL ROOF TOP MECHANICAL EQUIPMENT. H AD1.0 EXTERIOR MATERIALS EXTERIOR CEMENT PLASTER WITH SMOOTH FINISH EPS CORNICE / TRIM WITH SMOOTH PLASTER FINISH METAL AWNING MANUFACTURED STONE VENEER DECORATIVE WOOD BRACKETS 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - HOLLOW METAL DOOR AND FRAME, PAINTED TO MATCH ADJACENT SURFACE STOREFRONT SYSTEM WITH ALUMINUM FRAME AND CLEAR GLAZING 13 - EXTERIOR COLORS - A - B - C - D - E - F - G - H ELDORADO STONE: MOUNTAIN LEDGE "SHASTA" - J - K - L - M INTEGRAL COLOR PLASTER, WITH ELASTOMERIC PAINT TO MATCHSHERWIN-WILLIAMS, DOWNING SLATE #SW2819 INTEGRAL COLOR PLASTER, COLOR TO MATCH SHERWIN-WILLIAMS,MINUTE MAUVE #SW7078 INTEGRAL COLOR PLASTER, COLOR TO MATCH SHERWIN-WILLIAMS,RENWICK ROSE BEIGE #SW2804 INTEGRAL COLOR PLASTER, WITH ELASTOMERIC PAINT TO MATCHSHERWIN-WILLIAMS, ROOKWOOD SASH GREEN #SW2810 INTEGRAL COLOR PLASTER, COLOR TO MATCH SHERWIN-WILLIAMS,LEATHER BOUND #SW6118 PAINTED WOOD WATER TABLE PRIMED FOR PAINT SELECT CEDARMILL HARDIE PLANK LAP SIDING WITH SMOOTH FINISH BY JAMES HARDIE DOUBLE EAGLE PONDEROSA FLAT TILE BY EAGLE ROOFING. 987 BROWN GRAY RANGE 11 H STAINED WOOD MEDIUM OAK COLOR 9 J 4 F 7 H 2 E 5 - PAINTED STOREFRONT TRIM 12 E 8 E 2 E 3 D 5 - 8 E 4 F 1 B 1 B 1 A 1 B 1 C 1 B 5 - 8 E 4 F 2 E 1 A 7 H 9 J 11 H 5 - 12 E 1 B 8 E 4 F 1 C 2 E 1 B 5 - 4 F 3 D 1 A 8 E 4 F 1 B 2 E 8 E 4 F 10 G 1 B 9 J 11 H 1 B 2 E 2 E 8 E 5 - 12 E 4 F 1 B 2 E 11 H 9 J 7 H 8 E 10 G 11 H 9 J 7 H 2 E 1 B 8 E 8 E 5 - 12 E 4 F 1 B 2 E 2 E 4 F 4 F 6 B 1 B 2 E 2 E BILL SPECK 10073 VALLEY VIEW ST. CYPRESS, CA 90630 PHONE: 714-606-9141e-mail: allspeckslnc@yahoo.com Copyright 2016, MPA Architects, Inc.. All rights reserved.cDESCRIPTION REVISIONS NO.DATE PROJECT CLIENT A PROPOSED COMMERCIAL DEVELOPMENT LOCATED AT:F. 619.236.0557 AMERICAN INSTITUTE OF ARCHITECTS www.mpa-architects.com MEMBER San Diego, CA 92104V. 619.236.0595 3578 30th StreetM P A A R C H I T E C T S I N C .DATABASE: SHEET NUMBER: SCALE: SHEET TITLE CHECKED BY: PROJECT NO:17069 - L. DALE PLOT DATE: DRAWN BY: AS NOTED - 17069 10-22-18 LUISENO VILLAGES.E.C. HWY 79 AND MAIN ST.SAN JACINTO, CA 92583LICENS E D ARCHIT E C TST ATEO OF CA L IF RNIANHOJ R UMS E YC26819Exp. 3-31-2019 A2.0 EXTERIOR ELEVATIONS L AD1.0 - AD1.0 1 B 1 C 2 E 1 A 1 B INTEGRAL COLOR PLASTER, COLOR TO MATCH SHERWIN-WILLIAMS,INTELLECTUAL GRAY #SW7045 1 A 1 A 1 A 1 C 1 B 6 B 6 B 6 B 6 B 6 B 7 H 8 E 8 E 8 E 1/4" STUCCO REVEAL 13 - 13 - 14 -EXPOSED WOOD TRELLIS 14 H 15 -72"x96" MC NICHOLS PANEL 15 D 15 D 15 D 8 E 4 F 2 E 13 - 13 - 2 E 1 B 1 B 4 F 8 E 2 E 15 D 15 D TRASH ENCLOSURE ELVATIONS E1/4"=1'-0" 8 E 4 F PRECAST CONC. CAP,COLOR TO MATCHWALL BELOW 8x8x16 PRECISION CONCRETEBLOCKS w/ FLUSH JOINTS, w/SKIM COAT STUCCO FINISH,PAINT TO MATCH COLOR - B 4x6 @ 24" O/Cw/ H2.5 EA. SIDE, TYP. 4x14 BEAM - H - H METAL GATE - H METAL RIB ROOFU-PANEL 22 GA. w/ #6SCREWS @ 8" O/C 3'-2"6'-0"9'-0"3'-2"6'-0"9'-0"SLOPE ENCLOSURE COVER1/2-INCH PER FOOT MIN. 4.1.j Packet Pg. 101 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-4.1.c Packet Pg. 184 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 208 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Initial Study – Luiseño Village Retail Center Page 19 City of San Jacinto ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Aesthetics Agriculture & Forestry Resources Air Quality Biological Resources Cultural Resources Energy Geology & Soils Greenhouse Gas Emissions Hazards & Hazardous Materials Hydrology/Water Quality Land Use & Planning Mineral Resources Noise Population/Housing Public Services Recreation Transportation Tribal Cultural Resources Utilities/Service Systems Wildfire Mandatory Findings of Significance DETERMINATION (To be completed by the Lead Agency): On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environ- ment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environ- ment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a "potentially significant" or "potentially signifi- cant unless mitigated" impact on the environment, but at least one effect 1) has been ad- equately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environ- ment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARA- TION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. Signature Date Travis Randel, Planning and Community Development Director City of San Jacinto Printed Name For 4.1.j Packet Pg. 102 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 185 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 209 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 20 City of San Jacinto EVALUATION OF ENVIRONMENTAL IMPACTS: 1) A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a Lead Agency cites in the pa- rentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g. the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project-specific factors as well as general standards (e.g. the project will not expose sensitive re- ceptors to pollutants, based on a project-specific screening analysis). 2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts. 3) Once the Lead Agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially signifi- cant, less than significant with mitigation, or less than significant. "Potentially Sig- nificant Impact" is appropriate if there is substantial evidence that an effect is sig- nificant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Po- tentially Significant Impact" to a "Less than Significant Impact." The Lead Agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Ear- lier Analyses," may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or neg- ative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a) Earlier Analyses Used. Identify and state where they are available for re- view. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analy- sis. c) Mitigation Measures. For effects that are "Less than Significant with Mitiga- tion Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 6) Lead agencies are encouraged to incorporate into the checklist references to in- formation sources for potential impacts (e.g. general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropri- ate, include a reference to the page or pages where the statement is substantiated. 4.1.j Packet Pg. 103 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 186 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 210 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 21 City of San Jacinto 7) Supporting Information Sources. A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify: a) the significance criteria or threshold, if any, used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance. 4.1.j Packet Pg. 104 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 187 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 211 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 22 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact I. AESTHETICS – Except as provided in Public Resources Code §21099 – Modernization of Transportation Analysis for Transit-Oriented Infill Projects – Would the project: a) Have a substantial adverse effect on a scenic vista? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, General Plan EIR Addendum August 2012, GPA-1-12, & General Plan EIR Figure 5.1-1 – Major Scenic Resources) The project site is located at the eastern fringe of development within the City of San Jacinto. The project site is an undeveloped lot on southwest corner of East Main Street and Ramona Express- way. Plant cover of the site is ruderal (weedy) grassland composed of non-native weeds with some native shrubs (California buckwheat, California brittlebush, and sweet bush occur as isolated plants. The site is flat with a gentle slope down to the northwest. The grades of Ramona Expressway and East Main Street are elevated (by approximately seven feet) respective to the project site at the intersection of the two streets. Further from the intersection, the roads return to the same grade as the project site. The surrounding area is a mix of residential, commercial and undeveloped areas. To the north are vacant commercial zoned parcels north of East Main Street. To the east, Eastern Municipal Water District Facilities and the Valley Trap Club trap shooting range is located east of Ramona Express- way. To the south, the Soboba Indian Health Clinic and vacant commercial zoned land are located south of Donna Way. To the west, the project site is bordered by the Durango residential develop- ment, which includes one- and two-story single-family homes. A six-foot high masonry block wall surrounds the residential development. The overall visual character of the area is defined by the sparse plain of the San Jacinto Valley that provides distant views of the surrounding mountains. The most scenic views are of the San Jacinto Mountains to the north and east. Since these are the closest mountains, they appear larger and higher. These views are for the most part unobstructed by trees and buildings in the immediate vicinity. The primary public viewpoints are from East Main Street and Ramona Expressway. Donna Way also provides public viewpoints. The Project would result in the development of the project site, introducing buildings and trees that would decrease the visibility of the horizon and distant mountains. This change would be most no- ticeable to homes along the eastern edge of the Durango residential development. The views from these homes are currently obstructed by the 6-foot high masonry wall that surrounds the develop- ment, by neighboring homes, and associated landscape trees and shrubs. Nevertheless, some homes along the eastern edge have views of the mountains. The Project would introduce buildings and trees that would further obscure views from homes. The landscaping plan includes a row of trees (golden rain tree and holly oak) along the western boundary of the project site that would border the residential area. These would screen views of the proposed commercial development but would also reduce views of the horizon and mountains. While the Project would reduce views from the homes along the eastern edge of the Durango resi- dential development, this change is consistent with the development of the site provided in the General Plan. The project site has a General Plan land use designation of Community Commer- cial. The proposed rezone from Commercial Neighborhood to Commercial General would not sub- stantially change the visual impacts from site development. The allowable building height would change from 35 feet to 45 feet. However, all proposed uses are expected to have building heights of less than 35 feet. The Phase I retail center currently under Site Plan Design Review has a max- imum height of 32.5 feet; however, most of the building has heights ranging from 20 to 28 feet above grade. The future (Phase II) retail center would also be located near the western boundary and is expected to have a similar design. The future envisioned uses of a gas station/mini mart and drive-through restaurants are also expected to have maximum heights under 35 feet. The change in zoning from Commercial Neighborhood to Commercial General would increase the al- lowed structure coverage from 40% to 50%, and the impervious surface coverage from 80% to 85%. The proposed site plan for the entire site has a structure coverage of less than 9% and an 4.1.j Packet Pg. 105 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 188 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 212 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 23 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact impervious surface coverage of approximately 77%. Other development standards for the Com- mercial General zone are the same or similar to the development standards for Commercial Neighborhood. When viewed from the public view corridors of East Main Street and Ramona Expressway, the Project would have less of an effect on scenic vistas. From viewpoints on East Main Street directly north of the project site, the Project would diminish views of distant mountains to the southeast; however, the primary scenic vista is of the mountains to the north and east, which would be unob- structed. From viewpoints on Ramona Expressway, the primary scenic vista of the mountains to the north and east would not be obstructed. From Donna Way, views of the mountains would be partially obstructed by the proposed developments. While the development of the Project would reduce scenic views from some residences located west of the project site, scenic views along the primary public view corridors of East Main Street and Ramona Expressway would not be significantly obstructed. Site Plan Design Review will be required of all proposed developments, which will ensure proposed buildings and landscaping meet the City’s design requirements. Therefore, the Project would have a less-than-significant impact directly, indirectly and cumulatively on scenic vistas. b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element – Figure RM-4 – Cultural Resources, Arts & Culture Element – Figure AC-1, General Plan EIR, General Plan EIR Addendum August 2012, GPA-1-12, General Plan EIR Figure 5.1-1 – Major Scenic Resources, City of San Jacinto Landscape Design Guidelines – Appendix One – Parkway & Median Master Plan, & Municipal Code Chapter 12.20 – Street Trees and Shrubs) No state scenic highways are located near the project site. The project site does not contain trees, rock outcroppings or historic buildings. No impacts would occur directly, indirectly or cumulatively to scenic resources within a state scenic highway. c) In non-urbanized areas, substantially de- grade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly acces- sible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?) Response: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012, GPA-1-12) The Project would change the visual character of the project site from undeveloped open space to an urban commercial center. The visual character of the project site is defined by its flatness and weedy vegetation. As such, the project site does not possess visual characteristics that contribute significantly to the area. The visual character of the site and surroundings is defined by views of the surrounding mountains. As described under question a) above, the Project would diminish some views of distant mountains, but would not obstruct the primary scenic vistas of the mountains from East Main Street and Ramona Expressway. The project would be consistent with the proposed zoning of Commercial General, and would com- ply with all design standards. No variances are being requested. Development of the site as pro- posed, in compliance with the City’s design standards, would not result in the loss of distinct or valuable visual characteristics of the site and surroundings. The Project would result in a less-than- significant impact directly, indirectly and cumulatively on the visual character of the site and surround- ings. 4.1.j Packet Pg. 106 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 189 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 213 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 24 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Response: (General Plan as amended October 19, 2012, General Plan EIR, General Plan EIR Addendum August 2012, GPA-1-12, Development Code Section 17.300.080 – Outdoor Light & Glare, Riverside County Ordinance 655 – Regulating Light Pollution & San Jacinto Valley Area Plan of the Riverside County General Plan) The City of San Jacinto is in Zone B of the Mount Palomar Observatory, located in San Diego County. Zone B is the area defined as a circular ring forty-five (45) miles in radius centered on Palomar Obser- vatory. The Project site is 29.65 miles from Mount Palomar Observatory. As well, the City enjoys limited night sky impacts due to its rural nature. To preserve the night sky, lighting must be designed to limit leak spillage that may obstruct or hinder the view of the nighttime sky. To reduce impacts related to light pollution, the City requires that all developments introducing new light sources, or modifications to exist- ing light sources, to shield all such devices. An exterior lighting plan shall be submitted to Design Review staff for review and approval. A photometric study and manufacturer’s cut sheets of all exterior lighting on the building, in the landscaped areas and in the parking lot shall be submitted with the exterior lighting plan. All on-site lighting shall provide a minimum intensity of one foot-candle and a maximum intensity of ten foot-candles at ground level throughout the areas serving the public and used for parking, with a ratio of average light to minimum light of four to one (4:1). The light sources shall be shielded to minimize off-site glare, shall not direct light skyward and shall be directed away from adjacent properties and public rights-of-ways. If lights are proposed to be mounted on buildings, down-lights shall be utilized. Light poles shall not exceed twenty (20) feet in height, including the height of any concrete or other base material. In addition, the design of the buildings reduces the number of reflective surfaces used in the construction to minimize new sources of glare. Exterior building materials will use earth tone light colors with a low- reflectance. Any bare metallic surfaces found on infrastructure such as pipes and poles shall be painted to minimize reflectance and glare. As designed the impacts to the nighttime sky and the potential for glare will be less than significant, directly, indirectly and cumulatively. II. AGRICULTURE AND FOREST RESOURCES – In determining whether im- pacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the Califor- nia Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Depart- ment of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest car- bon measurement methodology provided in Forest protocols adopted by the California Air Re- sources Board. – Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricul- tural use? Or pursuant to the City of San Jacinto’s General Plan (page RM-28), convert Farmland of Local Importance as shown on the maps prepared pursuant to the Farmland Map- ping and Monitoring Program of the California Resources Agency, to non-agricultural use? Response: (General Plan as amended October 19, 2012, Figure RM-5 – Agricultural Resources, RM-6 – Important Farmland, RM-3 – Vegetation Communities, General Plan EIR, Figure 5.2-1 – Agricultural Resources, Figure 5.2-1 – Important Farmland, General Plan EIR Addendum August 2012, GPA-1-12, Development Code Section 17.305.040 – Agriculture (Right to Farm), & 2014 Farmland Mapping and Monitoring Program map) The project site is designated as Farmland of Local Importance by the Farmland Mapping and Monitoring Program of the California Resources Agency. This designation is applied to sites that would be classified 4.1.j Packet Pg. 107 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 190 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 214 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 25 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact as Prime and Statewide but lack available irrigation water. The project site was historically used for ag- riculture but has been fallow and vacant for over 20 years. The Project would not convert Prime Farm- land, Unique Farmland or Farmland of Statewide Importance. The project site is also identified as Farmland of Local Importance within the San Jacinto General Plan (Figure RM-6 Important Farmland). The General Plan designates the site as Community Commercial and the General Plan EIR addressed the conversion of farmland to urban development. In approving the General Plan, the City adopted a Statement of Overriding Considerations to address the loss of farmland associated with buildout of the General Plan. Because the loss of Farmland was adequately addressed in the General Plan EIR, the loss of Farmland of Local Importance that will occur with development of the Project is not treated as significant here. Accordingly, impacts to Farmland will be less than signifi- cant, directly, indirectly and cumulatively. b) Conflict with existing zoning for agricul- tural use, or a Williamson Act contract? Response: (General Plan as amended October 19, 2012, Figure RM-5 – Agricultural Resources, RM-6 – Important Farmland, RM-3 – Vegetation Communities, General Plan EIR, Figure 5.2-1 – Agricultural Resources, Figure 5.2-1 – Important Farmland, General Plan EIR Addendum August 2012, GPA-1-12, Development Code Section 17.305.040 – Agriculture (Right to Farm), & 2014 Farmland Mapping and Monitoring Program Map) The project site is designated and zoned for commercial development. The surrounding areas are not zoned for agriculture or enrolled in a Williamson Act contract. The closest active agricultural fields are located 1/4 mile north of the project site. The closest parcel zoned for agriculture is located 1/3 mile southeast of the project site. The closest lands enrolled in a Williamson Act contract are over 3 miles away. No impacts would occur directly, indirectly and cumulatively to existing agricultural use or a Wil- liamson Act contract. c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))? Response: (Riverside County DEIR No. 521 – Section 04-05 – Agricultural and Forestry Resources) In Southern California, including Riverside County and the City of San Jacinto, climate and topography limit the types and locations of forest lands and their potential for commercial or industrial timber utiliza- tion. Accordingly, there are no existing or currently proposed zoning of forest land, timberland or Tim- berland Production Zones within the City of San Jacinto. In addition, figures released by the State of California indicate that no “California forest land” ownership, either public or private, is mapped for Riv- erside County including the City of San Jacinto. Therefore, the Project would not conflict with the existing zoning for, or cause rezoning of, forest land, timberland, or timberland zoned Timberland Production and the Project will have no impact, directly, indirectly or cumulatively to forest land. d) Result in the loss of forest land or con- version of forest land to non-forest use? Response: (Source: Riverside County DEIR No. 521 – Section 04-05 – Agricultural and Forestry Resources) There is no commercial forestry or timber production industry within the City of San Jacinto other than Christmas tree farms or nursery stock production (that is, cultivated, rather than wild-harvested); there- fore, the Project would not result in the loss of forest land or the conversion of forest land to non-forest use and the Project will have no impact, directly, indirectly or cumulatively to the loss of forest land or conversion of forest land to non-forest use. e) Involve other changes in the existing en- vironment which, due to their location or nature, could result in conversion of 4.1.j Packet Pg. 108 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 191 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 215 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 26 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Farmland, to non-agricultural use or con- version of forest land to non-forest use? Response: (General Plan as amended October 19, 2012, Figure RM-5 – Agricultural Resources, RM-6 – Important Farmland, RM-3 – Vegetation Communities, General Plan EIR, Figure 5.2-1 – Agricultural Resources, Figure 5.2-1 – Important Farmland, General Plan EIR Addendum August 2012, GPA-1-12, Development Code Section 17.305.040 – Agriculture (Right to Farm), & 2014 Farmland Mapping and Monitoring Program map, & Riverside County DEIR No. 521 – Section 04-05 – Agricultural and Forestry Resources) As noted above, the closest agricultural fields are 1/4 mile away. Development of the proposed commer- cial center would not significantly impact agriculture in the area or result in the conversion of Farmland to non-agricultural use. No forestry resources exist within the City of San Jacinto. Impacts to conversion of Farmland and forest land would be less than significant, directly, indirectly and cumulatively. As noted above, there is no commercial forestry or timber production industry within the City of San Jacinto other than Christmas tree farms or nursery stock production (that is, cultivated, rather than wild- harvested); therefore, the Project would not result in the loss of forest land or the conversion of forest land to non-forest use and the Project will have no impact, directly, indirectly or cumulatively. III. AIR QUALITY – Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? Response: (Source: South Coast Air Quality Management District’s 2012 Air Quality Management Plan & Air Quality and Greenhouse Gas Report, prepared by EDS, Inc. and OB-1 Air Analyses, November 2018) The SCAQMD CEQA Handbook states that "New or amended General Plan Elements (including land use zoning and density amendments), Specific Plans, and significant projects must be analyzed for consistency with the AQMP." Strict consistency with all aspects of the plan is usually not required. A proposed project is considered consistent with the AQMP if it furthers one or more policies and does not obstruct other policies. The SCAQMD CEQA Handbook identifies two key indicators of consistency: (1) Whether the project will result in an increase in the frequency or severity of existing air quality vio- lations or cause or contribute to new violations, or delay timely attainment of air quality standards or the interim emission reductions specified in the AQMP. (2) Whether the project will exceed the assumptions in the AQMP in 2012 or increments based on the year of project buildout and phase. Both criteria are evaluated in the following sections. Criterion 1 - Increase in the Frequency or Severity of Violations Based on the air quality modeling analysis performed for the Project as part of the Air Quality and Greenhouse Gas Report neither short-term construction impacts, nor long-term operations will not re- sult in significant impacts based on the SCAQMD regional and local thresholds of significance. There- fore, the Project is not projected to contribute to the exceedance of any air pollutant concentration standards and is found to be consistent with the AQMP for the first criterion. Criterion 2 - Exceed Assumptions in the AQMP? Consistency with the AQMP assumptions is determined by performing an analysis of the proposed Pro- ject with the assumptions in the AQMP. The emphasis of this criterion is to ensure that the analyses conducted for the Project are based on the same forecasts as the AQMP. The 2016- 2040 Regional Transportation/Sustainable Communities Strategy, prepared by SCAG, 2016, includes chapters on the challenges in a changing region, creating a plan for our future, and the road to greater mobility and sustainable growth. These chapters currently respond directly to federal and state requirements placed on SCAG. Local governments are required to use these as the basis of their plans for purposes of consistency with applicable regional plans under CEQA. For this Project, the City of San Jacinto Land Use Plan defines the assumptions that are represented in the AQMP. The existing General Plan land use designation for the project site is Community Commercial. The Project would be consistent with this General Plan land use designation. Therefore, the Project would 4.1.j Packet Pg. 109 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 192 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 216 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 27 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact not exceed the AQMP assumptions for the project site and is found to be consistent with the AQMP for the second criterion. Based on the above, the Project will have no impact on the SCAQMD AQMP. b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attain- ment under an applicable federal or state ambient air quality standard? Response: (Source: Municipal Code 10.28 – Vehicle Trip Reduction Program, Chapter 15.30 – Dust Control, Development Code Section 17.300.030 Air Quality, Chapter 17.350 – Transportation Demand Management, South Coast Air Quality Manage- ment District’s 2012 Air Quality Management Plan & Air Quality and Greenhouse Gas Report, prepared by EDS, Inc. and OB-1 Air Analyses, November 2018) The Air Quality and Greenhouse Gas Report prepared for the Project found the following related to Construction Emissions Impacts: Regional Construction Emissions The construction emissions for the Project would not exceed the SCAQMD’s daily emission thresholds at the regional level as demonstrated in the table below, and therefore would be considered less than significant. Regional Significance – Construction Emission (pounds/day) Pollutant Maximum Day Emissions (lbs/day) Significance Thresholds (lbs/day) Nitrogen Oxides (NOx) 58.3 100 Volatile Organic Compounds (VOC) 20.0 75 Particulate Matter < 10 microns (PM10) 10.9 150 Particulate Matter < 2.5 microns (PM2.5) 6.9 55 Sulfur Oxides (SOx) 0.1 150 Carbon Monoxide (CO) 26.3 550 Source: Air Quality and Greenhouse Gas Report. Localized Construction Emissions In addition to addressing emissions on a regional basis, SCAQMD has developed methodology to ad- dress the potential for project emissions to result in elevated concentrations of pollutants that exceed ambient air quality standards. The SCAQMD Localized Significance Threshold (LST) Methodology (SCAQMD, 2008a) uses tables of emission thresholds based on the project’s location and site acreage to determine the significance of emissions for CEQA purposes. The data provided in the table below shows that none of the analyzed criteria pollutants would exceed the local emissions thresholds. There- fore, a less-than-significant local air quality impact would occur from the construction of the Project. 4.1.j Packet Pg. 110 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 193 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 217 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 28 City of San Jacinto Localized Significance -- Construction Phase Pollutant Emissions (lbs/day) NOx CO PM10 PM2.5 Site Preparation 48.2 22.5 10.7 6.8 Grading 30.7 16.6 4.5 2.9 Building Construction 23.4 17.6 1.5 1.4 Paving 15.2 14.7 0.8 0.8 Architectural Coating 1.8 1.8 0.1 0.1 SCAQMD LST Threshold 371 1,965 13 8 Source: Air Quality and Greenhouse Gas Report. Construction-Related Toxic Air Contaminant Impact Construction activities would result in short-term emissions of diesel particulate matter (diesel PM) from off-road heavy-duty diesel equipment exhaust and diesel-fueled haul trucks. Diesel PM was identified as a toxic air contaminant (TAC) by the California Air Resources Board (CARB) in 1998. Health risks associated with exposure of sensitive receptors to TAC emissions are typically based on the concen- tration of a substance or substances in the environment (dose) and the duration of exposure to the substance(s). Dose is positively correlated with time, meaning that a longer exposure period would result in a higher exposure level for the maximally exposed individual. Thus, the risks estimated for a maximally exposed individual are higher if a fixed exposure occurs over a long period of time. According to the California Office of Environmental Health Hazard Assessment, health risk assessments, which determine the exposure of sensitive receptors to TAC emissions, should be based on a 70-year expo- sure period. Project construction, however, would occur over a much shorter period of time. The site preparation and grading phases, which would generate most of the diesel PM on the site, would be limited to about six weeks. Use of off-road heavy-duty diesel equipment would be temporary, and diesel PM emissions would disperse rapidly with distance from the source. Thus, construction-related TAC emissions would not expose sensitive off-site receptors to substantial concentrations of TACs. The Project would result in a less-than-significant impact for short-term toxic air containments during construction of the Project. Regional Operational Emissions The operations-related criteria air quality impacts created by the Project have been analyzed through the use of CalEEMod model. The operating emissions were based on the year 2020, which is the anticipated opening year for the first phase of the Project. The summer and winter emissions created by the Project’s long-term operations were calculated and the highest emissions from either summer or winter are summarized in the table below. 4.1.j Packet Pg. 111 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 194 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 218 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 29 City of San Jacinto Regional Significance – Operational Emissions (lbs/day) Pollutant Maximum Day Emissions (lbs/day) Significance Thresholds (lbs/day) Nitrogen Oxides (NOx) 48.8 55 Volatile Organic Compounds (VOC) 13.7 55 Particulate Matter < 10 microns (PM10) 14.4 150 Particulate Matter < 2.5 microns (PM2.5) 4.0 55 Sulfur Oxides (SOx) 0.22 150 Carbon Monoxide (CO) 87.7 550 Source: Air Quality and Greenhouse Gas Report. Localized Operational Emissions The table below shows the calculated emissions for the proposed operational activities compared with appropriate LSTs. The LST analysis only includes on-site sources; however, the CalEEMod software outputs do not separate on-site and off-site emissions for mobile sources. For a worst-case scenario as- sessment, the emissions shown in the table below include all on-site Project-related stationary sources and 10% of the Project-related new mobile sources. This percentage is an estimate of the amount of pro- ject-related new vehicle traffic that will occur on-site. Therefore, the Project will have a less-than-signif- icant impact on Localized Operational emissions. Localized Significance – Operation Emissions Emission Sources Pollutant Emissions (pounds/day) NOx CO PM10 PM2.5 Area 0.00 0.06 0.00 0.00 Energy 0.46 0.38 0.03 0.03 Mobile 4.83 8.73 1.43 0.40 Total On-site Emissions 5.29 9.11 1.46 0.43 SCAQMD LST Threshold 371 1,965 4 2 Source: Air Quality and Greenhouse Gas Report. CO Hot Spot Emissions SCAQMD recommends that a local CO hot spot analysis be conducted if an intersection meets one of the following criteria: 1) the intersection is at level of service (LOS) D or worse and where the project increases the volume to capacity ratio by 2 percent, or 2) the project decreases an intersection from C to D. One intersection, Ramona Expressway and East Main Street/Lake Park Drive, would operate at LOS D with or without the Project. Based on traffic volumes estimated in the traffic study (Michael Baker International, 2019), with the project Ramona Expressway would have an average traffic volume of approximately 22,240 vehicles per day and East Main Street has approximately 6,540 vehicles per day. The 1992 Federal Attainment Plan for Carbon Monoxide (1992 CO Plan) showed that an intersection which has a daily traffic volume of approximately 100,000 vehicles per day would not violate the CO standard. The volume of traffic at this intersection would be well below 100,000 vehicles and below the necessary volume to cause a violation of the CO standard. Therefore, no CO “hot spot” modeling was performed, and project impacts on CO concentrations are considered to be less than significant. 4.1.j Packet Pg. 112 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 195 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 219 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 30 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Operational Toxic Air Contaminant Impact Operation of the proposed service station would release TACs including benzene, ethylbenzene, tolu- ene, xylenes, and naphthalene from gasoline vapors. These vapors are emitted during the transfer of gasoline from tanker trucks to underground storage tanks, venting of underground storage tanks, and refueling vehicles (including spillage). The service station would be required to have an enhanced vapor recovery system that is effective at removing 98 percent of Phase I emissions and 95 percent of Phase II emissions. A health risk assessment (HRA) was completed for the proposed service station using SCAQMD’s Rule 1401 Calculator that was developed to assist in determining the cancer and non- cancer health effects of facilities emitting TACs. The calculation indicates a Maximum Individual Cancer Risk (MICR) of 1.373 for a residential receptor and 1.152 for a commercial receptor, these values are below the SCAQMD’s significance threshold of 10 in a million. The calculation also indicates that chronic and acute hazard risks are negligible. Because TAC emissions associated with operation of the proposed service station would not exceed significance thresholds and screening criteria, the Project would result in a less-than-significant impact. c) Expose sensitive receptors to substantial pollutant concentrations? Response: (Source: Municipal Code 10.28 – Vehicle Trip Reduction Program, Chapter 15.30 – Dust Control, Development Code Section 17.300.030 Air Quality, Chapter 17.350 – Transportation Demand Management, South Coast Air Quality Manage- ment District’s 2012 Air Quality Management Plan & Air Quality and Greenhouse Gas Report, prepared by EDS, Inc. and OB-1 Air Analyses, November 2018) As noted in Response III a) and b) above, the construction-related and operational emissions of the Project would not exceed significance thresholds. Therefore, the Project will have a less-than-signifi- cant impact on sensitive receptors. d) Result in other emissions (such as those leading to odors adversely affecting a substantial number of people? Response: (Source: Municipal Code 10.28 – Vehicle Trip Reduction Program, Chapter 15.30 – Dust Control, Development Code Section 17.300.030 Air Quality, Chapter 17.350 – Transportation Demand Management, South Coast Air Quality Manage- ment District’s 2012 Air Quality Management Plan & Air Quality and Greenhouse Gas Report, prepared by EDS, Inc. and OB-1 Air Analyses, November 2018) Potential sources that may emit odors during construction activities include the application of materials such as paint and asphalt pavement. The objectionable odors that may be produced during the construc- tion process would be short-term in nature and the odor emissions are expected cease upon the drying or hardening of the odor producing materials. In addition, SCAQMD Rule 1113 limits the amount of vol- atile organic compounds from architectural coatings. Due to the short-term nature and limited amounts of odor producing materials being utilized, no significant impact related to odors would occur during con- struction. Operation of the Project would include two drive-through restaurants and other retail establishments. Odors generated on the site would be primarily associated with exhaust fumes from cooking food, with charbroilers being the most significant source. SCAQMD Rule 1138 requires restaurants with chain- driven charbroilers to install odor-reducing equipment. Garbage collection would also have the potential to generate foul odors. Good housekeeping practices would be sufficient to prevent nuisance odors. In addition, SCAQMD Rule 402 (Nuisance) would limit potential objectionable odor impacts. With compli- ance with SCAQMD rules, construction and operation of the Project would result in a less-than-signifi- cant impact. 4.1.j Packet Pg. 113 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 196 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 220 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 31 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact IV. BIOLOGICAL RESOURCES ̶ Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candi- date, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Depart- ment of Fish and Game or U.S. Fish and Wildlife Service? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element – Figure RM-1 – Open Space Resources, RM-3 – Vegetation Communities, General Plan EIR, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.4-1 – Vegetation Communities, Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria, Riverside County Multiple Species Habitat Conservation Plan (MSHCP), Development Code Chapter 17.520 – Natural Resource Conservation, General Biological Assessment, prepared by ENVIRA, April 23, 2019 & San Bernardino Kangaroo Rat and Los Angeles pocket mouse Presence/Absence Trapping and Burrowing Owl Re-Surveys, prepared by ENVIRA, June 25, 2019) A General Biological Assessment was prepared for the Project by ENVIRA (April 2019). The General Biological Assessment includes habitat assessments and focused surveys for resources covered under the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) survey require- ments, including the burrowing owl (Athene cunicularia), San Bernardino kangaroo rat (Dipodomys mer- riami parvus), and Los Angeles pocket mouse (Perognathus longimembris brevinasus). The project site was re-surveyed for burrowing owl, San Bernardino kangaroo rate, and Los Angeles pocket mouse in June 2019 (ENVIRA, July 2019). Plant Communities The project site was historically used for agriculture but has been fallow and vacant for over 20 years. It has been mowed and possibly disked occasionally for weed control. Currently, the plant community found on site is a ruderal (weedy) grassland composed of a mix of non-native weeds such as Mediterranean grass (Schismus barbatus), short-pod mustard (Hirschfeldia incana), red-stemmed filaree (Erodium cicu- tarium). Native shrub species such as California buckwheat (Eriogonum fasciculatum), California brittle- bush (Encelia farinosa) and sweet bush (Bebbia juncea) occur as isolated plants. Herbaceous cover is estimated at 85 percent, and shrub cover at less than 1 percent. The MSHCP does not identify the project area as having habitat for Criteria Area or Narrow Endemic Plant species. Wildlife Only a few day-time wildlife species were observed during field surveys, mostly due to the lack of plant cover, water and native food resources. Bird species observed included common species such as mourn- ing dove (Zenaida macroura), house sparrow (Passer domesticus), California towhee (Pipilo crissalis), and lark sparrow (Chondestes grammacus). The side-blotched lizard (Uta stansburiana) was the only reptile observed. No amphibian species were observed. Mammal species observed included Audubon’s cottontail (Syvilagus audubonii), and Botta’s pocket gopher (Thomomys bottae). The habitat assessment identified potential habitat for sensitive biological resources, in particular the San Bernardino kangaroo rat, Los Angeles pocket mouse, and burrowing owl as identified in the MSHCP. San Bernardino Kangaroo Rat The habitat assessment conducted by ENVIRA in 2017 identified potential kangaroo rat burrows. To determine whether SBKR were present on the project site, protocol trapping survey were conducted by ENVIRA in September 2017 and June 2019. The trapping surveys were conducted according to USFWS protocols established for SBKR, which require five nights of live-trapping. The SBKR was not captured, and the species is therefore considered absent from the project site. Los Angeles Pocket Mouse 4.1.j Packet Pg. 114 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 197 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 221 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 32 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The habitat assessment conducted by ENVIRA in 2017 identified potential pocket mouse burrows. How- ever, during the subsequent protocol trapping surveys in 2017 and 2019, the LAPM was not captured. The species is therefore considered absent from the project site. Burrowing Owl The entire project site is within the MSHCP designated survey area for the burrowing owl. Habitat for burrowing owl was assessed over the entire project site by ENVIRA biologist Philippe Vergne in 2017. Surveys conducted in accordance with MSHCP’s Burrowing Owl Survey Instructions were conducted in 2017 and 2019. The surveys included looking for burrowing owl burrows, whitewash, pellets, animal remains and other burrowing owl indicators. No potential burrows and no sign of burrowing owls were observed on the project site. However, bur- rowing owls were observed north of East Main Street in 2017 indicating that the project site could be used for foraging by burrowing owl or could get colonized in the future. Because the site has the potential to support burrowing owls in the future, the MSHCP requires that pre-construction surveys be conducted prior to disturbance of the site. Therefore, MM BIO 1 is recommended for compliance with the MSHCP burrowing owl requirements. The Project will have a less-than-significant impact with mitigation on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service. MM BIO 1 – Burrowing Owl  If construction occurs during the breeding season (February 1 to August 31), a burrowing owl breeding bird survey following the recommended guidelines of the MSHCP will be required within 30 days prior to construction to determine if nesting is occurring on site.  If burrowing owl have colonized the project site, the Applicant will prepare a Burrowing Owl Protection and Relocation Plan for approval by RCA and CDFW.  Occupied nests will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation; or (b) the juveniles from the occupied nests are for- aging independently and are capable of independent survival.  If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. For the burrowing owl, the recommended distance is a minimum of 160 feet.  Relocation of burrowing owl is subject to the above conditions and prior coordination with RCA, CDFW and the United States Fish and Wildlife Service (USFWS). b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the Cali- fornia Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element – Figure RM-1 – Open Space Resources, RM-3 – Vegetation Communities, General Plan EIR, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.4-1 – Vegetation Communities, Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria, Riverside County Multiple Species Habitat Conservation Plan (MSHCP), Development Code Chapter 17.520 – Natural Resource Conservation, General Biological Assessment, prepared by ENVIRA, April 23, 2019 & San Bernardino Kangaroo Rat and Los Angeles pocket mouse Presence/Absence Trapping and Burrowing Owl Re-Surveys, prepared by ENVIRA, June 25, 2019) 4.1.j Packet Pg. 115 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 198 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 222 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 33 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Riparian/Riverine Areas Riparian/Riverine Areas are defined by the MSHCP as “lands which contain Habitat dominated by tress [sic], shrubs, persistent emergents, or emergent mosses and lichens, which occur close to or which depend upon soil moisture from a nearby fresh water source; or areas with fresh water flow during all or a portion of the year”. The California Department of Fish and Wildlife (CDFW), through provisions of the State of California Administrative Code, is empowered to issue agreements for any alteration of a river, stream or lake where fish or wildlife resources may adversely be affected. Streams (and rivers) are defined by the presence of a channel bed and banks, and at least an intermittent flow of water. Lateral limits of jurisdiction are not clearly defined, but generally include any riparian resources associated with a stream or lake, CDFW regulates wetland areas only to the extent that those wetlands are part of a river, stream or lake as defined by CDFW. Water may have historically flowed across the project site, but the natural flow was altered years ago by the channeling of the San Jacinto River, the development of agriculture and the construction of adjacent roadways and development. The site is almost flat and has sandy soils. There are no riparian habitats, drainages, culverts, streams, or other waters that would come under the jurisdiction of the CDFW. Therefore, the Project will have no impact to riparian or riverine areas. c) Have a substantial adverse effect on state or federally protected wetlands (in- cluding, but not limited to, marsh, vernal pool, coastal, etc.) through direct re- moval, filling, hydrological interruption, or other means? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element – Figure RM-1 – Open Space Resources, RM-3 – Vegetation Communities, General Plan EIR, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.4-1 – Vegetation Communities, Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria, Riverside County Multiple Species Habitat Conservation Plan (MSHCP), Development Code Chapter 17.520 – Natural Resource Conservation, General Biological Assessment, prepared by ENVIRA, April 23, 2019 & San Bernardino Kangaroo Rat and Los Angeles pocket mouse Presence/Absence Trapping and Burrowing Owl Re-Surveys, prepared by ENVIRA, June 25, 2019) Vernal Pool Vernal pools are defined by the MSHCP as “seasonal wetlands that occur in depression areas that have wetlands indicators of all three parameters (soils, vegetation and hydrology) during the wetter portion of the growing season but normally lack wetlands indicators of hydrology and/or vegetation during the drier portion of the growing season . . .. Evidence concerning the persistence of an area's wetness can be obtained from its history, vegetation, soils, and drainage characteristics, uses to which it has been subjected, and weather and hydrologic records” (Riverside County Transportation and Land Management Agency). Prior to 1990s, the site appears to have been in active agricultural use. Since then, it appears to have been occasionally disked for weed control. The soils mapped on the site are all described by the National Resource Conservation Service as loamy sands or sandy loams. The soils are described as somewhat poorly drained to excessively well-drained. Flooding in all the soils is rare, and ponding never occurs (NRCS, 2019). Based on the survey results, soils type and history of the site, vernal pools are not present. Army Corps of Engineers The Corps regulates discharges of dredged or fill material into waters of the United States. These watersheds include wetlands and non-wetland bodies of water that meet specific criteria. The lateral limit of Corps jurisdiction extends to the Ordinary High Water Mark (OHWM) and to any wetland areas extending beyond the OHWM; thus, the maximum jurisdictional area is represented by the OHWM or wetland limit, whichever is greater. 4.1.j Packet Pg. 116 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 199 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 223 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 34 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Corps regulatory jurisdiction pursuant to Section 404 of the Clean Water Act is founded on a connection or nexus between the water body in question and interstate (waterway) commerce. This connection may be direct, through a tributary system linking a stream channel with traditional navigable waters used in interstate or foreign commerce, or may be indirect, through a nexus identified in the Corps regulations. Water may have historically flowed across the Project site, but the natural flow was altered years ago by the channeling of the San Jacinto River, and the development of the surrounding area. There are no waters or wetland habitats that would be subject to Corps jurisdiction pursuant Section 404 of the Clean Water Act. Regional Water Quality Control Board The Corps has delegated the authority for use of 404 permits to each individual state. The use of a 404 permit in California is regulated by the State Water Resources Control Board (SWRCB) under Section 401 of the Clean Water Act regulations. The Board has authority to issue a 401 permit that allows the use of a 404 permit in the state, with the authority in the state being vested in regional offices known as Regional Water Quality Control Boards (RWQCB). Under the Porter-Cologne Act of 2003, the SWRCB has extended its responsibilities to include impacts to water quality from non-point source pollution. In addition, the SWRCB has the responsibility to require that projects address ground water and water quality issues, which would be evaluated as part of the geotechnical and hydrology studies. Their authority extends to all waters of the State (of California). Water may have flowed across the project site in the past, but historic natural flow in the region was altered years ago, by channelization, the development of agriculture and development of the surrounding area. There are no waters or wetland habitats that would come under the jurisdiction of the Santa Ana RWQCB or provide any Beneficial Uses (BUs) that might come under the RWQCB protection. Therefore, the Project will have no impact on protected wetlands. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element – Figure RM-1 – Open Space Resources, RM-3 – Vegetation Communities, General Plan EIR, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.4-1 – Vegetation Communities, Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria, Riverside County Multiple Species Habitat Conservation Plan (MSHCP), Development Code Chapter 17.520 – Natural Resource Conservation, General Biological Assessment, prepared by ENVIRA, April 23, 2019 & San Bernardino Kangaroo Rat and Los Angeles pocket mouse Presence/Absence Trapping and Burrowing Owl Re-Surveys, prepared by ENVIRA, June 25, 2019) Habitat Fragmentation and Wildlife Movement Wildlife movement and the fragmentation of wildlife habitat are recognized as critical issues that must be considered in assessing impacts to wildlife. In summary, habitat fragmentation is the division or breaking up of larger habitat areas into smaller areas that may or may not be capable of independently sustaining wildlife and plant populations. Wildlife movement (more properly recognized as species movement) is the temporal movement of species along diverse types of corridors. Wildlife corridors are especially im- portant for connecting fragmented wildlife habitat areas. The surrounding area includes residential and commercial development and some vacant lots. None of the adjacent lands provide habitat that supports significant wildlife populations. The closest area of im- portant habitat is the San Jacinto River floodplain. This habitat is separated from the project site by Ramona Expressway, the river levee, and Eastern Municipal Water District (EMWD) property used for percolation that is maintained free of vegetation. Habitat on the project site is ruderal grassland and is 4.1.j Packet Pg. 117 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 200 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 224 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 35 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact isolated from the surrounding area. As such, the project site does not provide for wildlife movement in the area. Raptors, Migratory Birds, and Habitat Most of the raptor species (eagles, hawks, falcons and owls) are experiencing population declines be- cause of habitat loss. Some, such as the peregrine falcon, have also experienced population losses as a result of environmental toxins affecting reproductive success, animals destroyed as pests or collected for falconry, and other direct impacts on individuals. Only a few species, such as the red-tailed hawk and barn owl, have expanded their range despite or a result of human modifications to the environment. As a group, raptors are of concern to state and federal agencies. Raptors and all migratory bird species, whether listed or not, also receive protection under the Migratory Bird Treaty Act (MBTA) of 1918. The MBTA prohibits individuals to kill, take, possess or sell any migratory bird, bird parts (including nests and eggs) except per regulations prescribed by the Secretary of the Interior Department (16 U. S. Code 703). Additional protection is provided to all bald and golden eagles under the Bald and Golden Eagle Protection Act of 1940, as amended. State protection is extended to all birds of prey by the CDFW Code, Section 2503.5. No take is allowed under these provisions except through the approval of the agencies or their designated representatives. Because the project site has no trees, there is no nesting habitat for raptors or migratory birds on site other than for ground nesting species (burrowing owl, Killdeer, Larks). While unlikely, the project site may provide habitat for ground-nesting migratory birds. Therefore, MM BIO 2 is recommended for to avoid impacts to nesting birds. MM BIO 2 – Nesting Birds  A breeding bird survey will be required to determine if nesting is occurring no more than five days prior to ground disturbing activities. Occupied nests will not be disturbed during the nesting sea- son (February 1 through August 31) unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation; or (b) the juve- niles from the occupied nests are foraging independently and are capable of independent sur- vival.  If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. The Project will have a less-than-significant impact with mitigation on habitat fragmentation and nest- ing birds. e) Conflict with any local policies or ordi- nances protecting biological resources, such as a tree preservation policy or or- dinance? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element – Figure RM-1 – Open Space Resources, RM-3 – Vegetation Communities, General Plan EIR, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.4-1 – Vegetation Communities, Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria, Riverside County Multiple Species Habitat Conservation Plan (MSHCP), Development Code Chapter 17.520 – Natural Resource Conservation, General Biological Assessment, prepared by ENVIRA, April 23, 2019 & San Bernardino Kangaroo Rat and Los Angeles pocket mouse Presence/Absence Trapping and Burrowing Owl Re-Surveys, prepared by ENVIRA, June 25, 2019) Habitat on the project site is limited to ruderal grasslands. The site does not contain any trees or other significant biological resources protected by policies or ordinances. Therefore, no impact, directly, indi- rectly and cumulatively, will occur. 4.1.j Packet Pg. 118 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 201 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 225 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 36 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Com- munity Conservation Plan, or other ap- proved local, regional, or state habitat conservation plan? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element – Figure RM-1 – Open Space Resources, RM-3 – Vegetation Communities, General Plan EIR, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.4-1 – Vegetation Communities, Figure 5.4-2 – San Jacinto Valley Area Plan with Vegetation, Cells and Cell Groups Keyed to MSHCP Criteria, Riverside County Multiple Species Habitat Conservation Plan (MSHCP), Development Code Chapter 17.520 – Natural Resource Conservation, Noise Assessment, prepared by Ldn Consulting, Inc., July 15, 2019, General Biological Assessment, prepared by ENVIRA, April 23, 2019, San Bernardino Kangaroo Rat and Los Angeles pocket mouse Presence/Ab- sence Trapping and Burrowing Owl Re-Surveys, prepared by ENVIRA, June 25, 2019 & Air Quality and Greenhouse Gas Report, prepared by EDS, Inc. and OB-1 Air Analyses, July 2019) The subject property is located within the Criteria Area of the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) San Jacinto Valley Area Plan. As such, the Project must comply with the requirements of the MSHCP. The applicant is required to pay the MSHCP Development Mitiga- tion Fee and the Project must be consistent with MSHCP Reserve Assembly criteria and “Other Plan Requirements.” Reserve Assembly The approximately 9.5-acre project site is within the MSHCP Criteria Area of Subunit 3, Upper San Jacinto River/Bautista Creek for the San Jacinto Valley Area Plan. Specifically, approximately 8.7 acres of the project site is within Criteria Cell 3098 and approximately 0.8 acre of the project site is located within Criteria Cell 3099. The MSHCP identifies that conservation of grassland habitat within Criteria Cells 3098 and 3099 is intended to contribute to the assembly of Proposed Core 5, which is comprised of the portion of the upper San Jacinto River extending from the San Jacinto Mountains to just west of State Street. The MSHCP identifies that conservation within Criteria Cell 3098 will range from 5% to 15% of the Cell focusing in the southeastern portion of the Cell. The acreage that needs to be conserved in this cell will therefore range from 8 to 24 acres. The project site is located within the southeast portion of Criteria Cell 3098 which is the area described for Conservation. Criteria Cell 3099 is part of Cell Group Z; there are four Cells in this Cell Group and Cell 3099 is the southernmost Cell in the Cell Group. Conservation within Cell Group Z will be approximately 5% (approximately 32 acres) of the Cell Group focusing in the southwestern portion of the Cell Group. The project site is located within the southwestern portion of Cell Group Z which is the area described for Conservation. Because the Project would develop the entire project site, the Criteria of the MSHCP must be modified via a Criteria Refinement. To meet the Reserve Assembly goals of the MSHCP, the applicant has iden- tified an 11.6-acre Replacement Site. The Replacement Site proposed to be conserved as part of the Criteria Refinement is located northwest of the Soboba Springs Country Club, south of Soboba Road, and adjacent to existing conserved lands (Figure 7). The APNs associated with the Replacement Site include a portion of APN 433-080-005, 433-080-011, and 433-080-012. Approximately 11.2 acres of the Replacement Site is located within Criteria Cell 2787, approximately 0.16 acre of the Replacement Site is located within Criteria Cell 2893, approximately 0.001 acre of the Replacement Site is located within Criteria Cell 2895, and approximately 0.249 acre of the Replacement Site is located outside of a Criteria Cell. The Replacement Site is located within portions of these Criteria Cells that were not identified for conservation within the MSHCP. Therefore, conservation of the Re- placement Site would contribute lands not already called out for conservation, which means the MSHCP would get additional lands within Criteria Cells 2787, 2893 and 2895. The proposed Criteria Refinement will result in approximately 11.6 acres of higher quality habitat being added to the MSHCP Conservation Area that were not originally intended to be Conserved. Approxi- mately 8.7 acres of the 11.6-acre Replacement Site would compensate for the development of Criteria Cell 3098 by the Project (1:1 replacement ratio), while the remaining approximately 2.9 acres is identified to compensate for the removal of 0.8 acre in Criteria Cell 3099 (3.6:1 replacement ratio). The total acre- age being conserved is greater than the total area being removed for development (approximately 11.6 4.1.j Packet Pg. 119 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 202 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 226 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Figure 7 Replacement Site Loca�on Map 0 1,250 2,500625 Feet Luiseño Village Retail Center Project Site Replacement Site Ramona Exp re s sway Lake Park DriveSoboba Ro a dEast Main Street 3098 3099 3100 2996 2893 2895 2787 Project Site Replacement Site MSHCP Conservation Public/Quasi-Public Conserved Lands Other Conservation 3099 Criteria Cells 0 1,250 2,500 Feet San J ac i nt o Ri ver 4.1.j Packet Pg. 120 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 203 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 227 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 38 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact acres to be conserved versus approximately 9.5 acres proposed for development). This translates into an overall conservation ratio of roughly 1.2:1. The Western Riverside County Regional Conservation Authority (RCA) determined, and the CDFW and USFWS have agreed, that the proposed Criteria Refinement would result in equivalent or superior bio- logical value and that the Criteria Refinement is consistent with the MSHCP (Beck, 2019). Other Plan Requirements Riparian/Riverine, Vernal Pool, and Fairy Shrimp Requirements:  The only habitat found on the project site is ruderal grasslands. No riparian/riverine, vernal pools or other wetland habitat exists on the site. No habitat exists on the site that can support fairy shrimp. Accordingly, MSHCP requirements to protect these habitats and the fairy shrimp do not apply to the site. Species Survey Requirements:  The project site is located within the Burrowing Owl Survey Area, and the eastern margin of the site is within the SBKR and LAPM Survey Area. The MSHCP does not identify the project area as having habitat for Criteria Area or Narrow Endemic Plant Species or being in a mapped area for Amphibians. Habitat assessments for burrowing owl, SBKR and LAPM were conducted as part of a General Biological As- sessment completed by ENVIRA in 2017. The project site was re-surveyed in 2019. These surveys were conducted in accordance with MSHCP’s Burrowing Owl Survey Instructions. The surveys included look- ing for burrowing owl burrows, whitewash, pellets, animal remains and other burrowing owl indicators. No sign of burrowing owls was observed on site. However, burrowing owls were observed across Ra- mona Expressway in 2017 indicating that the project site could be used for foraging by burrowing owl or could get colonized in the future. Implementation of MM BIO 1 would ensure project consistency with MSHCP survey requirements and that impacts to burrowing owl are reduced to a less-than-significant level. The habitat assessment identified potential kangaroo rat and pocket mouse burrows. To determine whether SBKR and LAPM were present on the project site, a protocol trapping survey was conducted by ENVIRA in September 2017. Trapping surveys were conducted again in June 2019. SBKR and LAPM were not captured, and these species are therefore considered absent from the project site. The Project has met the Species Survey Requirements for SBKR and LAPM. Information on Other Species  The project site is not within an area with Delhi soils mapped within the MSHCP baseline data. A list of species identified during the habitat assessment and trapping studies was compiled (ENVIRA, April 2019). None of the MSHCP Table 9-3 species occur on the project site. Urban/Wildlands Interface Guidelines:  MSHCP includes guidelines intended to reduce the indirect effects of development on areas described for conservation. The guidelines address site drainage, use of chemicals and toxics, lighting, noise, in- vasive species, access barriers and grading. The project site is separated from the nearest conservation area (San Jacinto River) by Ramona Expressway, the river levee, and EMWD percolation pond. As such, development of the project site would not directly or indirectly impact the MSHCP conserved lands along the San Jacinto River. In addition, design features incorporated into the Project would further reduce the potential for indirect effects. The Preliminary Water Quality Management Plan (WQMP) for the Project incorporates infiltration cham- bers that will be installed below the parking areas to allow for percolation of stormwater on site. Storm- water will be filtered through the underground chambers, removing contaminants and reducing discharge to a level equal to or below the pre-development discharge. Stormwater that is not infiltrated on site would discharge to an existing concrete swale on the west side of the Project site that drains to East Main Street and the City of San Jacinto’s storm sewer system and not to the nearby San Jacinto River and Conserved lands. Runoff from the proposed car wash will drain to the sanitary sewer. 4.1.j Packet Pg. 121 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 204 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 228 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 39 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The proposed land uses on the project site would include typical retail businesses. No significant amounts of toxics will be generated or used on the project site. Based on the analysis presented in the Air Quality and Greenhouse Gas Report, emissions of potential toxic air contaminants would be below applicable significance criteria (EDS/OB-1, 2019). All exterior lighting would be required to comply with the City of San Jacinto Municipal Code Section 17.300.080 – Outdoor Light and Glare. Section 17.300.080 requires that exterior lights “be located so as to eliminate spillover illumination or glare onto adjoining properties and to prohibit any interference with the normal operation or enjoyment of adjacent property.” The code also requires that exterior lights be shielded or otherwise controlled and not directed upward into the sky. These code requirements, which are enforced through the City’s Design Review process, will ensure that lighting on the project site will not increase the ambient nighttime light levels in the nearby MSHCP Conservation Area. The Project will increase noise levels in the vicinity of the project site due to the operation of vehicles, exhaust and air conditioning fans, and the carwash air dryer and vacuums. Based on the analysis pre- sented in the Noise Assessment, because these noise sources are at least 650 feet from the nearest MSHCP conservation area, noise levels will attenuate to levels that fall below the nighttime residential noise standard of 45 dBA (Ldn Consulting, 2019). Accordingly, traffic noise levels along Ramona Ex- pressway and Lake Park Drive are expected to continue to be the dominate noise in the vicinity. Existing noise levels along Ramona Expressway are estimated to be approximately 72 to 74 dBA (CNEL) and existing noise levels along Lake Park Drive are estimated to be approximately 67 dBA (CNEL). Noise levels along these roadways are expected to increase by 0.2 to 0.3 dBA (CNEL) with the Project – a level that is well below the ability of humans to detect and is not expected to measurably increase noise levels in the nearby MSHCP conserved lands (Ldn Consulting, 2019). The levee along the western side of the San Jacinto River will also continue to function as a noise berm and reduce sound levels in the river bed that are generated by Ramona Expressway. No additional noise reduction measures are required to maintain existing noise levels in the nearby MSHCP Conserved Lands. Consistent with City of San Jacinto Municipal Code Section 17.325.060 – Landscape and Irrigation Sub- mittal Package Requirements, a landscape plan must be approved by the City before a grading permit is issued. The City incorporates the list of invasive plant species provided in Table 6-2 of the MSHCP in its review. Through the City’s review of the landscaping plans submitted for the project site, the City will ensure that none of the plant species listed in Table 6-2 will be included in plans. Because a public roadway (Ramona Expressway) is located between the project site and the nearest conservation area, the incorporation of wildlife barriers would not be appropriate. Grading and develop- ment of the project site will not change slope or drainage patterns in a manner that could affect the MSHCP conservation area. Best Management Practices The Project will comply with MSHCP Volume 1, Appendix C, Standard BMPs. In addition, construction of the roadway improvements are subject to the guidelines provided in MSHCP Section 7.5.3. The ap- plicable conditions shall be applied to the Project so that impacts are reduced to species as construction occurs. Compliance with these conditions is required by the City as a Permittee per the Implementing Agreement Sections 6 (I) and 13.2 (A). The applicable BMPs included in MM BIO 3 and MM BIO 4 are recommended to comply with the MSHCP. MM BIO 3 – MSHCP BMPs  A condition shall be placed on grading permits requiring a qualified biologist to conduct a train- ing session for project personnel prior to grading. The training shall include a description of the species of concern and its habitats, the general provisions of the Endangered Species Act (Act) and the MSHCP, the need to adhere to the provisions of the Act and the MSHCP, the penalties associated with violating the provisions of the Act, the general measures that are being implemented to conserve the species of concern as they relate to the project, and the access routes to and project site boundaries within which the project activities must be accom- plished. 4.1.j Packet Pg. 122 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 205 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 229 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 40 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact  Water pollution and erosion control plans shall be developed and implemented in accordance with RWQCB requirements.  The footprint of disturbance shall be minimized to the maximum extent feasible. Access to sites shall be via pre-existing access routes to the greatest extent possible.  Equipment storage, fueling, and staging areas shall be located on upland sites with minimal risks of direct drainage into riparian areas or other sensitive habitats. These designated areas shall be located in such a manner as to prevent any runoff from entering sensitive habitat. Necessary precautions shall be taken to prevent the release of cement or other toxic sub- stances into surface waters. Project related spills of hazardous materials shall be reported to appropriate entities including but not limited to applicable jurisdictional city, FWS, and CDFG, RWQCB and shall be cleaned up immediately and contaminated soils removed to approved disposal areas.  The removal of native vegetation shall be avoided and minimized to the maximum extent prac- ticable. Temporary impacts shall be returned to pre-existing contours and revegetated with appropriate native species.  Exotic species that prey upon or displace target species of concern should be permanently removed from the site to the extent feasible.  To avoid attracting predators of the species of concern, the project site shall be kept as clean of debris as possible. All food related trash items shall be enclosed in sealed containers and regularly removed from the site(s).  Construction employees shall strictly limit their activities, vehicles, equipment, and construction materials to the proposed project footprint and designated staging areas and routes of travel. The construction area(s) shall be the minimal area necessary to complete the project and shall be specified in the construction plans. Construction limits will be fenced with orange snow screen. Exclusion fencing should be maintained until the completion of all construction activi- ties. Employees shall be instructed that their activities are restricted to the construction areas.  The Permittee shall have the right to access and inspect any sites of approved projects includ- ing any restoration/enhancement area for compliance with project approval conditions includ- ing these BMPs. MM BIO 4 – Roadway Construction BMPs The following measures apply to the construction of roadway improvements with the rights-of-way of Ramona Expressway and East Main Street that are completed as part of the Project.  Plans for water pollution and erosion control will be prepared for work involving the movement of earth in excess of 50 cubic yards. The plans will describe sediment and hazardous materials control, dewatering or diversion structures, fueling and equipment management practices, use of plant material for erosion control. Plans will be reviewed and approved by the City prior to construction.  Timing of construction activities will consider seasonal requirements for breeding birds and migratory non-resident species. Habitat clearing will be avoided during species active breeding season defined as March 1 to June 30.  Sediment and erosion control measures will be implemented until such time soils are deter- mined to be successfully stabilized.  Silt fencing or other sediment trapping materials will be installed at the downstream end of construction activities to minimize the transport of sediments off-site.  The footprint of disturbance will be minimized to the maximum extent Feasible. Access to sites will occur on pre-existing access routes to the greatest extent possible.  Equipment storage, fueling and staging areas will be sited on non-sensitive upland wildlife habitat types with minimal risk of direct discharge into riparian areas or other sensitive wildlife habitat types. 4.1.j Packet Pg. 123 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 206 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 230 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 41 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact  Exotic species removed during construction will be properly handled to prevent sprouting or regrowth.  Training of construction personnel will be provided.  Ongoing monitoring and reporting will occur for the duration of the construction activity to en- sure implementation of best management practices.  Active construction areas shall be watered regularly to control dust and minimize impacts to adjacent vegetation.  All equipment maintenance, staging, and dispensing of fuel, oil, coolant, or any other toxic substances shall occur only in designated areas within the proposed grading limits of the pro- ject site. These designated areas shall be clearly marked and located in such a manner as to contain run-off.  Waste, dirt, rubble, or trash shall not be deposited in the Conservation Area or on native hab- itat. Summary With implementation of MM BIO 1, MM BIO 2, MM BIO 3, and MM BIO 4 the Project would not conflict with the MSHCP or any other habitat conservation plans. The Project would result in less-than-signifi- cant impacts with mitigation on an adopted Habitat Conservation Plan, Natural Community Conserva- tion Plan, or other approved local, regional, or state habitat conservation plan. V. CULTURAL RESOURCES ̶ Would the project: a) Cause a substantial adverse change in the significance of a historical resource as defined in § 15064.5? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element Figure RM-4 – Cultural Resources, General Plan FEIR, Figure 5.5-1 – Existing Cultural Resources, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.1-1 – Existing Cultural Resources, Development Code Chapter 17.500 – Archaeological and Paleontological Protection & Chapter 17.510 – Historic Preservation, Cultural and Paleontological Resources Inventory, Prepared by Natural In- vestigations Company, October 19, 2017) The Cultural Resource Inventory prepared for this site found that the project site has been disturbed by former use for agriculture, by grading and construction of the former route of Mountain Avenue and its intersection with Main Street through the northeast portion of the project site and of the series of existing surrounding roadways (Main Street, Ramona Expressway, Donna Way), and by disking for weed control and fire prevention. No features, objects, buildings or other historical resources were identified on the project site during the survey. Thus, the Project does not have the potential to cause an adverse change in the significance of a historical resource under CEQA. Therefore, no impact would occur directly, indi- rectly and cumulatively. b) Cause a substantial adverse change in the significance of an archaeological re- source pursuant to § 15064.5? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element Figure RM-4 – Cultural Resources, General Plan FEIR, Figure 5.5-1 – Existing Cultural Resources, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.1-1 – Existing Cultural Resources, Development Code Chapter 17.500 – Archaeological and Paleontological Protection & Chapter 17.510 – Historic Preservation, Report of Findings From a Record Search, prepared by Scientific Resource Surveys, Inc., February 7, 2017 & Cultural and Paleontological Resources Inventory, Prepared by Natural Investigations Company, October 19, 2017) No archaeological resources were identified or recorded during the Cultural Resource Inventory, and previous disturbance of the project site noted in the discussion under question a) reduces the likelihood of intact archaeological resources. However, in the event that archaeological resources are encountered during construction, implementation of MM CR 1 would ensure that archaeological resources are con- served. The Project would result in less-than-significant impacts with mitigation, directly, indirectly and cumulatively. 4.1.j Packet Pg. 124 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 207 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 231 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 42 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact MM CR 1 – Archaeological Resources Should cultural/archaeological resources be encountered during ground disturbing activities for the project, work must be halted in the area within 50 feet of the find and a qualified archaeologist notified immediately to assess the significance of the find. Construction activities could continue in other areas. If the discovery proves to be significant, additional work, such as data recovery excavation, may be warranted and would be discussed in consultation with the property owner, the City of San Jacinto, or any other relevant regulatory agency, as appropriate. c) Disturb any human remains, including those interred outside of formally dedi- cated cemeteries? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element Figure RM-4 – Cultural Resources, General Plan FEIR, Figure 5.5-1 – Existing Cultural Resources, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.1-1 – Existing Cultural Resources, Development Code Chapter 17.500 – Archaeological and Paleontological Protection & Chapter 17.510 – Historic Preservation, Report of Findings From a Record Search, prepared by Scientific Resource Surveys, Inc., February 7, 2017 & Cultural and Paleontological Resources Inventory, Prepared by Natural Investigations Company, October 19, 2017) No cemeteries or human remains are known to occur onsite and it is unlikely that human remains will be uncovered during Project development. Implementation of mitigation measures will assure that impacts will be less-than-significant impact with mitigation, directly, indirectly or cumulatively. MM CR 2 – Human Remains In the event of the discovery of human remains, the Riverside County coroner shall be immediately notified. If human remains of Native American origin are discovered during ground disturbing activi- ties, the applicant shall comply with the State law relating to the disposition of Native American burials that fall within the jurisdiction of the NAHC (PRC Section 5097). According to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 8100), and disturbance of Native American cemeteries is a felony (Section 7052). Section 7050.5 requires that excavation be stopped near discovered human remains until the coroner can determine whether the remains are those of a Native American. If the remains are determined to be Native American, the California Native American Heritage Commission and the Soboba Band of Luiseño Indians shall be notified, and appropriate measures provided by State law shall be implemented to determine the most likely living descendant(s). Disposition of the remains shall be overseen by the most likely living descendants to determine the most appropriate means of treating the human remains and any as- sociated grave artifacts. VI. ENERGY – Would the project: a) Result in potentially significant environmental im- pact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR Addendum August 2012; City of San Jacinto Municipal Code) Construction of the proposed commercial center would require typical use of energy resources. Energy would be consumed during site clearing, excavation, grading, and construction. A substantial portion of energy used during construction would be associated with the transport of earth fill to grade the site. The initial grading plan identified 44,462 cubic yards of fill imported onto the site. The grading plan has been revised to reduce the amount of fill to 13,831 cubic yards; this would save truck trips and greatly reduce energy required during construction. Other aspects of the construction process would be typical. No site conditions or project features would require an inefficient or unnecessary consumption of energy. The project has been designed in compli- ance with California’s Energy Efficiency Standards and 2016 CALGreen Standards. These measures include the use of water conserving plumbing, installation of bicycle racks, and designated parking for Clean Air/Carpool/Van Pool Vehicles. 4.1.j Packet Pg. 125 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 208 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 232 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 43 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Operation of the proposed commercial center would involve the use of energy for heating, cooling and equipment operation. These facilities would comply with all applicable California Energy Efficiency Stand- ards and 2016 CALGreen Standards. The largest source of operational energy use would be vehicle operation of customers. The site’s location at the intersection of an urban arterial and secondary street, would reduce vehicle miles traveled by capturing existing traffic on the surrounding roadways. The traffic study has identified pass-by trip reduc- tions ranging from 25 percent for the commercial center to 50 percent for the service station/car wash. In addition, due to the multiple land uses on the site (i.e., retail center, fast food restaurants, service station) the internal capture of trips would reduce trips by an additional 5 percent. Taken together, the location and incorporation of multiple land uses provide a 47 percent reduction of trips. The site is located close to existing transit service, with Riverside Transit Agency Bus Route 42 providing direct access and connections to other lines. Neither construction or operation of the project would result in wasteful, inefficient, or unnecessary con- sumption of energy, or wasteful use of energy resources. Therefore, impacts related to wasteful energy use would be less than significant. b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR Addendum August 2012; City of San Jacinto Municipal Code) The project has been designed in compliance with California’s Energy Efficiency Standards and 2016 CALGreen Standards. These include the use of water conserving plumbing, installation of bicycle racks, and designated parking for Clean Air/Carpool/Van Pool Vehicles. The project would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency; therefore, impacts would be less than significant. VII. GEOLOGY AND SOILS ̶ Would the project: a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury or death involving: i) Rupture of a known earthquake fault, as deline- ated on the most recent Alquist-Priolo Earth- quake Fault Zoning Map issued by the State Ge- ologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. Response: (Source: General Plan as amended October 19, 2012, Public Safety Element, Figure PS-1 – Geologic & Seismic Hazards, General Plan FEIR, Figure 5.6-1 – Seismic Hazards, General Plan EIR Addendum August 2012, SJMC Chapter 15.24 – Earthquake Hazard Reduction Code, SJMC Chapter 16.28 – Soils Report & Report of Soils and Foundation Evaluations, prepared by Soils Southwest, November 8, 2017) Unlike damage from ground shaking, which can occur at great distances from the fault, impacts from fault rupture are limited to the immediate area of the fault zone where the fault breaks along the surface. The Project is not located in an Alquist-Priolo Earthquake Fault Zone and the closest known fault is located approximately 0.9 miles from the site. Therefore, the potential hazards associated with fault rup- ture are considered less than significant, directly, indirectly, and cumulatively. ii) Strong seismic ground shaking? Response: (Source: General Plan as amended October 19, 2012, Public Safety Element, Figure PS-1 – Geologic & Seismic Hazards, General Plan FEIR, Figure 5.6-1 – Seismic Hazards, General Plan EIR Addendum August 2012, SJMC Chapter 15.24 – Earthquake Hazard Reduction Code, SJMC Chapter 16.28 – Soils Report & Report of Soils and Foundation Evaluations, prepared by Soils Southwest, November 8, 2017) 4.1.j Packet Pg. 126 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 209 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 233 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 44 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The project site is subject to ground shaking due to the proximity of the Claremont Fault and other re- gional fault systems. The California Building Code addresses seismic hazards and provides safeguards against typical ground shaking. However, the Soil and Foundation Report prepared for the Project deter- mined that the site may be susceptible to earthquake-induced liquefaction that could result in ground settlement. The Soil and Foundation Report also found that implementation of identified mitigation measures could minimize the potential for seismically induced adverse effects to structures. Implemen- tation of mitigation measures will assure that impacts will be less than significant with mitigation, directly, indirectly or cumulatively. MM GEO 1 – Geotechnical Design The Soil and Foundation Report (Soils Southwest, 2017) provides foundation recommendations to minimize seismic-induced settlement hazards. These include using conventional checkered/waffle type rigid footings for exterior load bearing walls along with interior grade beams, or using a rigid mat foundation. Additional recommendations address concrete slab construction and curing, exca- vation and fill, pavement and utility trenches. The recommendations identified in the Soil and Foun- dation Report, or similar measures approved by a registered civil engineer, shall be incorporated into the construction plans. Project plans will be reviewed during the plan check process to confirm geotechnical design measures are incorporated to address the potential for seismic-induced settle- ment. These measures shall be incorporated into final construction plans prior to issuance of build- ing permits. iii) Seismic-related ground failure, including lique- faction? Response: (Source: General Plan as amended October 19, 2012, Public Safety Element, Figure PS-1 – Geologic & Seismic Hazards, General Plan FEIR, Figure 5.6-1 – Seismic Hazards, General Plan EIR Addendum August 2012, SJMC Chapter 15.24 – Earthquake Hazard Reduction Code, SJMC Chapter 16.28 – Soils Report & Report of Soils and Foundation Evaluations, prepared by Soils Southwest, November 8, 2017) Liquefaction is the process in which loose, saturated granular soil loses strength because of cyclic load- ing. The strength loss is a result of a decrease in granular sand volume and a positive increase in pore pressures. The Soil and Foundation Report prepared for the Project determined that the site may be susceptible to earthquake-induced liquefaction that could result in ground settlement. The Soil and Foun- dation Report also found that implementation of identified mitigation measures could minimize the po- tential for seismically induced adverse effects to structures. Implementation of MM GEO 1 will ensure that impacts will be less than significant with mitigation, directly, indirectly or cumulatively. iv) Landslides? Response: (Source: General Plan as amended October 19, 2012, Public Safety Element, Figure PS-1 – Geologic & Seismic Hazards, General Plan FEIR, Figure 5.6-1 – Seismic Hazards, General Plan EIR Addendum August 2012, SJMC Chapter 15.24 – Earthquake Hazard Reduction Code, SJMC Chapter 16.28 – Soils Report & Report of Soils and Foundation Evaluations, prepared by Soils Southwest, November 8, 2017) The site is located on relatively level ground and is not immediately adjacent to any slopes or hillsides that could be potentially susceptible to landslides. As such, risks associated with slope instability should be considered "negligible." Therefore, impacts related to landslides would be less than significant, directly, indirectly and cumulatively. b) Result in substantial soil erosion or the loss of topsoil? Response: (Source: General Plan as amended October 19, 2012, Public Safety Element, Figure PS-1 – Geologic & Seismic Hazards, General Plan FEIR, Figure 5.6-1 – Seismic Hazards, General Plan EIR Addendum August 2012, SJMC Chapter 15.24 – Earthquake Hazard Reduction Code, SJMC Chapter 16.28 – Soils Report & Report of Soils and Foundation Evaluations, pre- pared by Soils Southwest, November 8, 2017) Erosion is a large-scale impact caused by human activity and disturbance of surface soil, wind, and water. No signs of flooding or erosion were observed during field visits. During construction, grading of the site would expose soil to wind and water erosion. The developer would be required to comply with the General Construction Activity Storm Water Permit issued by the State Water Resources Control 4.1.j Packet Pg. 127 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 210 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 234 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 45 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Board (SWRCB) under the National Pollution Discharge Elimination System (NPDES). Construction ac- tivity subject to this permit includes clearing, grading and disturbances to the ground such as stockpiling, or excavation. To obtain coverage under this permit, the developer would need to submit a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP would identify potential pollution sources and best management practices (BMPs) to reduce pollutants. Permanent BMPs would required as part of the Water Quality Management Plan (WQMP) required for the Project as part of Riverside County Municipal NPDES Storm Water Permit, which covers the stormwater drainage system of the City of San Jacinto. These BMPs would ensure that soil erosion would be minimized after construction is completed. Com- pliance with the General Permit and Municipal Permit requirements would reduce impacts related to erosion to less than significant, directly, indirectly and cumulatively. c) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code, creating substantial risks to life or property? Response: (Source: General Plan as amended October 19, 2012, Public Safety Element, Figure PS-1 – Geologic & Seismic Hazards, General Plan FEIR, Figure 5.6-1 – Seismic Hazards, General Plan EIR Addendum August 2012, SJMC Chapter 15.24 – Earthquake Hazard Reduction Code, SJMC Chapter 16.28 – Soils Report & Report of Soils and Foundation Evaluations, prepared by Soils Southwest, November 8, 2017) Expansive soils contain certain types of clay minerals that shrink or swell as the moisture content changes; the shrinking or swelling can shift, crack, or break structures built on such soils. Arid or semiarid areas with seasonal changes of soil moisture experience a much higher frequency of problems from expansive soils than areas with higher rainfall and more constant soil moisture. The Soil and Foundation Report determined that the near surface soils are silty sandy in nature and are considered "very low" in expansion, requiring no special construction requirements. Potential impacts associated with expansive soils are considered to be less than significant, directly, indirectly and cu- mulatively. d) Have soils incapable of adequately supporting the use of septic tanks or alternative waste wa- ter disposal systems where sewers are not available for the disposal of waste water? Response: (Source: General Plan as amended October 19, 2012, Public Safety Element, Figure PS-1 – Geologic & Seismic Hazards, General Plan FEIR, Figure 5.6-1 – Seismic Hazards, General Plan EIR Addendum August 2012, SJMC Chapter 15.24 – Earthquake Hazard Reduction Code, SJMC Chapter 16.28 – Soils Report & Report of Soils and Foundation Evaluations, prepared by Soils Southwest, November 8, 2017) The Project will be served by San Jacinto sewer infrastructure. An 8-inch clay pipe sewer line exists in San Jacinto Avenue. The Project will be required to connect to the sewer line. Therefore, the Project will have no impact, directly, indirectly or cumulatively on the disposal of wastewater and it will not be using a septic tank. Waste water from the project site would be directed to the City’s sewer system and treated at the Eastern Municipal Water District’s treatment plant. No on-site waste water system is proposed. The Project would have no impact directly, indirectly or cumulatively regarding the disposal of waste water. e) Directly or indirectly destroy a unique paleonto- logical resource or site or unique geologic fea- ture? Response: (Source: General Plan as amended October 19, 2012, Resource Management Element Figure RM-4 – Cultural Resources, General Plan FEIR, Figure 5.5-1 – Existing Cultural Resources, General Plan EIR Addendum August 2012, General Plan EIR Figure 5.1-1 – Existing Cultural Resources, Development Code Chapter 17.500 – Archaeological and Paleontological Protection & Chapter 17.510 – Historic Preservation, Report of Findings From a Record Search, prepared by Scientific Resource Surveys, Inc., February 7, 2017 & Cultural and Paleontological Resources Inventory, Prepared by Natural Investigations Company, October 19, 2017) The Paleontological Resource Survey prepared for this site found that no unique geologic features exist on the project site. However, the project site is located in an area mapped by Riverside County as having high sensitivity for paleontological resources. The older Pleistocene sediments underlying the project site 4.1.j Packet Pg. 128 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 211 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 235 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 46 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact are considered to have a high paleontological sensitivity at depths at or below 4 feet, with a low sensitivity in Holocene alluvial deposits at shallower depths. Excavation and grading on the site has the potential to impact paleontological resources. Implementation of mitigation measures will assure that impacts will be less than significant with mitigation, directly, indirectly or cumulatively. MM GEO 2 – Paleontological Resources All earthmoving during project implementation at or below 4 feet requires full-time paleontological monitoring, as follows:  A qualified paleontologist (graduate degree and more than one year of professional experience as a principal investigator) will be retained to provide paleontological services. The principal paleontologist will be responsible to implement and oversee monitoring and to maintain profes- sional standards of work. The principal paleontologist will report all mitigation and monitoring activities, or related actions of the paleontological resources team to the City, as appropriate, including discussing a reduction in monitoring from full- to part-time after monitoring is initiated and no fossils have been identified.  A qualified paleontological monitor will perform monitoring of construction grading and excava- tions that take place in the older Pleistocene sediments at depths of 4 feet or more. The moni- tor will have authority to divert grading away from exposed fossils temporarily in order to re- cover the fossil specimens. Cooperation and assistance from on-site personnel will greatly as- sist timely resumption of work in the area of the fossil discovery.  Discovery of fossil producing localities requires documentation including measured strati- graphic columns and geologic samples for analysis. Any fossils recovered that meet signifi- cance criteria will be prepared, identified, and cataloged before donation to an appropriate re- pository. The Western Science Center in Hemet, California is recommended as an appropriate repository.  The principal paleontologist retained will prepare a final report. The report will include a list of specimens recovered, documentation of each locality, interpretation of fossils recovered, and will include any specialists’ reports as appendices. VIII. GREENHOUSE GAS EMISSIONS ̶ Would the project: a) Generate greenhouse gas emissions, either di- rectly or indirectly, that may have a significant impact on the environment? Response: (Source: Air Quality and Greenhouse Gas Report, prepared by EDS, Inc. and OB-1 Air Analyses, July 2019) Greenhouse gas (GHG) emissions refer to a group of emissions that have the potential to trap heat in the atmosphere and consequently affect global climate conditions. Scientific studies have concluded that there is a direct link between increased emission of GHGs and long-term global temperature. The prin- cipal GHGs are carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), sulfur hexafluoride (SF6), perfluorocarbons (PFCs), hydrofluorocarbons (HFCs), and water vapor (H2O). CO2 is the reference gas for climate change because it is the predominant greenhouse gas emitted. To account for the varying warming potential of different GHGs, GHG emissions are often quantified and reported as CO2 equiva- lents (CO2e) and measured in metric tons per year (MT/year). Construction of the Project would emit GHG emissions through the combustion of fossil fuels by heavy- duty construction equipment and through vehicle trips generated by construction workers traveling to and from the site. Emissions of GHGs were calculated using CalEEMod (Version 2016.3.2) for each year of construction of the Project. As shown in the table below, total construction emissions over the entire construction period would be 638 MT CO2e. Consistent with SCAQMD guidance, the construction emis- sions are amortized over 30 years. Using this approach, the Project’s construction emissions would be 21 MT CO2e per year. 4.1.j Packet Pg. 129 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 212 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 236 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 47 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The proposed development would also result in operational GHG emissions. A variety of sources are considered in estimating CO2e emissions. The largest source is ‘mobile’ which consists of vehicle trips of business patrons and employees, followed by ‘energy’ which includes emissions associated with elec- tricity and natural gas use. Other sources include ‘area,’ which accounts for landscape equipment, and consumer products; ‘waste,’ which accounts for emissions associated with disposal of solid waste in landfills, and ‘water,’ which accounts for energy associated with the delivery of potable water and the treatment of wastewater. The estimated operational-related emissions of CO2e for source are summa- rized in the table below. With amortized construction-period GHG emissions and annual operational emissions, the Project would be responsible for the generation of 2,622 MT CO2e. Project CO2e emis- sions would be less than the SCAQMD screening threshold; the Project would have a less-than-signif- icant impact. Estimated Greenhouse Gas Emissions Source CO2e Emissions (MT/Year) Construction 2019 558 2020 80 Total 638 Total amortized over 30 years 21 Operation Area 0.01 Energy 252 Mobile 2,318 Waste 13 Water 18 Total Operational Emissions 2,601 Total Project Emissions 2,622 SCAQMD Screening Threshold 3,000 Exceeds Screening Threshold No Notes: CO2e = carbon dioxide equivalents (includes carbon dioxide, methane and nitrous oxide) MT = metric tons Source: EDS-OB-1, 2019 b) Conflict with an applicable plan, policy or regula- tion adopted for the purpose of reducing the emission of greenhouse gases? Response: (Source: Air Quality and Greenhouse Gas Report, prepared by EDS, Inc. and OB-1 Air Analyses, November 2018) The Project would not exceed SCAQMD’s threshold of 3,000 MT CO2e for GHG and, as such, would not have a significant impact on GHG emissions. The Project would comply with all federal, state, and local regulations. The Project would not conflict with any applicable plan, policy, or regulation of an agency adopted for the purpose of reducing the emissions of GHGs, including AB 32 and the Climate Change Scoping Plan. Therefore, the Project’s impact related to GHG emission reduction plans, policies, and regulations would be less than significant. 4.1.j Packet Pg. 130 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 213 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 237 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 48 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact IX. HAZARDS AND HAZARDOUS MATERIALS ̶ Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) Construction of the Project would involve the use of potentially hazardous materials, including vehicle fuels, oils, and transmission fluids. During the operation of the retail and restaurant businesses, typical hazardous materials transported to and used at the site would include cleaning solvents, pesticides for landscaping, painting supplies, and petroleum products. However, all potentially hazardous materials used during construction or operation would be contained, stored, and used in accordance with manu- facturers’ instructions and handled in compliance with applicable federal, state, and local standards and regulations, which include requirements for disposal of hazardous materials at a facility licensed to ac- cept such waste based on its waste classification and the waste acceptance criteria of the permitted disposal facilities. The Project includes a service station that would use underground storage tanks (USTs). Operation and maintenance of the gasoline USTs are regulated by the California Water Resources Control Board Un- derground Storage Tank Program. Installation and maintenance of the proposed USTs would be subject to CCR Title 23, Chapter 16 (Underground Tank Regulations). These regulations stipulate construction requirements for new USTs; monitoring requirements; requirements for unauthorized release report and for repair, upgrade, and closure of USTs; and specify variance request procedures. Additional State and Federal regulations pertaining to the under-ground storage and dispensation of flammable materials in- clude but are not limited to the following: • 2013 California Fire Code Title 24, Part 9 (CFC 8003.1.3.2) Spill Control Requirements; • California Code of Regulations Title 13, Motor Vehicles Division 1, 2 and 3; • California Code of Regulations Title 27, Environmental Protection, as applicable; • California Mechanical Code (CMC); • California Code of Regulations, Title 8, Industrial Relations, Chapter 4, Industrial Safety; • Health and Safety Code, Section 13240 – 1343.6 (California Propane Storage and Handling Safety Act); and • National Fire Protection Association (NFPA) Code Section 30a. Air quality emissions from USTs are regulated by CARB and SCAQMD. The intent of these rules is to minimize the release of volatile organic compounds and other hazardous vapors. This is accomplished by vapor recovery and leak detection systems that are required to be CARB-certified and verified through testing and reporting. SCAQMD Rule 461 applies to the transfer of gasoline from tank trucks to USTs and the transfer of gasoline from USTs to motor vehicles. Additional regulations include CARB’s Benzene Airborne Toxic Control Measure for Retail Service Stations (17 CCR 93101) and the Environmental Pro- tection Agency’s National Emission Standards for Hazardous Air Pollutants for Source Category: Gaso- line Dispensing Facilities (CFR, Title 40, Part 63, Subpart CCCCCC). The gas station operation would result in the regular transportation of gasoline to the project site. These deliveries would occur on designated truck routes in compliance with the California Department of Motor Vehicle standards. Collectively, the routine inspection of the gas station, the USTs, and all associated fuel delivery infrastructure, along with the continued mandated compliance with all federal, state, and local regulations, would ensure that the Project is operated in a non-hazardous manner. Therefore, long- term impacts associated with handling, storing, and dispensing of hazardous materials would be less than significant, directly, indirectly or cumulatively with compliance with all regulations concerning the use and storage of such hazardous materials. b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the re- lease of hazardous materials into the environ- ment? 4.1.j Packet Pg. 131 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 214 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 238 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 49 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) As described under question a), construction and operation of the Project would involve the use of po- tentially hazardous materials. However, the transport, use, and storage of these materials is strictly reg- ulated by federal, state and local standards. The installation and use of USTs must comply with regula- tions that have been adopted to prevent spills and leaks. Mandatory compliance with these regulations would ensure that the potential for impacts associated with the release of hazardous material into the environment is less than significant directly, indirectly or cumulatively. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) The closest school is the North Mountain Middle School, approximately 0.25 mile from the proposed service station. As described under question a), compliance with federal, state and local standards per- taining to the transport, use, storage, and disposal of hazardous materials would ensure that potential emissions would be negligible. Accordingly, impacts associated with hazardous emissions and handling hazardous materials would be less than significant, directly, indirectly or cumulatively. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code section 65962.5 and, as a re- sult, would it create a significant hazard to the public or the environment? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, General Plan EIR Addendum August 2012, EDR Radius Map Report, Environmental Data Resources, Inc, November 15, 2017) A search of available environmental records was completed in 2017 for the project site (EDR, 2017). A search was conducted by Environmental Data Resources, Inc (EDR). The search was designed to assist parties seeking to meet the search requirements of EPA’s Standards and Practices for All Appropriate Inquiries (40 CFR Part 312), the ASTM Standard Practice for Environmental Site Assessments (E 1527- 13) or custom requirements developed for the evaluation of environmental risk associated with a parcel of real estate. No mapped hazardous material sites were identified on the project site or in the surround- ing area. Therefore, this Project would have no impact directly, indirectly, or cumulatively in terms of creating a significant hazard to the public or the environment. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? Response: (Source: Riverside County Land Use Commission – Hemet-Ryan Airport Plan Final 2017) The City of San Jacinto is outside the Airport Influence Area for the Hemet-Ryan Airport and therefore, the Project would have no impact on this public airport and there are no other private airports within two miles of the City. f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR & General Plan EIR Addendum August 2012) 4.1.j Packet Pg. 132 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 215 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 239 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 50 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The City’s Emergency Operation Plan describes the City’s process for responding to emergencies or disasters. In addition, the City, along with most other jurisdictions in Riverside County, joined with the County of Riverside to submit a Multi-Jurisdictional LHMP providing a framework for emergency re- sponse. Access for the Project would be provided on East Main Street, Ramona Expressway and Donna Way. These are existing streets within the City’s established street system. The Project would not alter the existing circulation pattern in the project area. Emergency access and evacuation routes would be unaf- fected by the Project. The Project provides adequate access for emergency vehicles, including adequate street widths and vertical clearance. Implementation of federal, state, and local laws and regulations in the construction of this Project would result in less-than-significant impacts, directly, indirectly and cumulatively to an adopted emergency response or evacuation plan. g) Expose people or structures, either directly or in- directly, to a significant risk of loss, injury or death involving wildland fires? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Figure 5.7-1 – Fire Hazards & General Plan EIR Addendum August 2012) The project site is not within a High Fire Hazards Area. The Project will not expose people or structures to significant risks associated with wildfires and therefore, no impact, directly, indirectly or cumulatively will occur. X. HYDROLOGY AND WATER QUALITY – Would the project: a) Violate any water quality standards or waste dis- charge requirements or otherwise substantially degrade surface or ground water quality? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018 & Project Specific Water Quality Management Plan, pre- pared by CWE, July 2, 2019) The City of San Jacinto is a Co-Permittee in, and is required to comply with, the Riverside County mu- nicipal separate storm sewer system (MS4) permit adopted by the Regional Board on January 29, 2010. Incompliance with the MSF permit, a preliminary WQMP has been prepared for the Project. The WQMP incorporates subsurface chambers where stormwater would be filtered, and a portion infiltrated to sub- surface soils. The stormwater discharge volume would be limited to the estimated pre-development vol- ume. Compliance with all WQMP requirements would be confirmed during the plan check process. In addition, construction would be required to comply with the General Construction NPDES permit through implementation of a SWPPP. And pursuant to Section 17.300.120 – Water Quality of the Devel- opment Code, the Project will not be permitted to discharge any liquids into the public or private drainage system, or into the ground. Compliance with all existing federal, state, and local water quality laws and regulations related to water quality standards would ensure a less-than-significant impact directly, indirectly and cumulatively to water quality and discharge. b) Substantially decrease groundwater supplies or interfere substantially with groundwater re- charge such that the project may impede sus- tainable groundwater management of the basin? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 4.1.j Packet Pg. 133 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 216 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 240 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 51 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018 & Project Specific Water Quality Management Plan, pre- pared by CWE, July 2, 2019) San Jacinto is located within the San Jacinto Groundwater Basin (Basin). The Basin underlies the cities of San Jacinto, Perris, Moreno, and Menifee Valleys in western Riverside County. The Project would use subsurface chambers to filter stormwater and infiltrate a portion to subsurface soils. The post-develop- ment runoff rates would match the pre-development rates. This would ensure that groundwater recharge on the project site is not impeded. Water supply would be provided by EMWD’s municipal system, no on-site groundwater wells would be used. Compliance with existing federal, state, and local water quality laws and regulations related to groundwater and would ensure Project impacts would be less than sig- nificant, directly, indirectly and cumulatively. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would: i) Result in substantial erosion or siltation on- or off- site? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018 & Project Specific Water Quality Management Plan, pre- pared by CWE, July 2, 2019) As described under questions a) and b) above, the Project would utilize subsurface chambers to filter stormwater and infiltrate a portion to subsurface soils. The post-development runoff rates would match the pre-development rates. The site currently drains to an existing concrete swale bordering the western and southern edges of the project site. The same concrete swale would be used to drain the proposed development, and flows in the swale would not increase with project development. As such, there would be no substantial alteration of the existing drainage pattern on the site. Potential impacts associated with erosion or siltation would be less than significant, directly, indirectly and cumulatively. ii) Substantially increase the rate or amount of sur- face runoff in a manner which would result in flooding on- or offsite? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018 & Project Specific Water Quality Management Plan, pre- pared by CWE, July 2, 2019) See Response IX c) i) above. Implementation of these and other applicable requirements will assure that drainage and stormwater will not exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff. Therefore, the Project will have less-than-significant impact, directly, indirectly or cumulatively to the rate or amount of surface runoff in a manner which would result in flooding on- or off-site. iii) Create or contribute runoff water which would exceed the capacity of existing or planned storm water drainage systems or provide substantial additional sources of polluted runoff? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018 & Project Specific Water Quality Management Plan, pre- pared by CWE, July 2, 2019) 4.1.j Packet Pg. 134 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 217 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 241 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 52 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact As described throughout this section, IX, the Project will be required to comply with all applicable water quality standards. To further minimize potential water quality degradation, runoff from the car wash pro- posed on Parcel 8 will drain to the sanitary sewer. Project-related water quality degradation impacts will be less than significant, directly, indirectly and cumulatively. iv) Impede or redirect flood flows? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018 & Project Specific Water Quality Management Plan, pre- pared by CWE, July 2, 2019) The project site is not located in the 100-year floodplain and will not place housing or other structures in an area that would impede or redirect flows. The Federal Emergency Management Agency (FEMA) des- ignates the project area as Zone X – area with reduced flood risk due to levee. This zone designates areas that are located between the limits of the base flood and the 0.2-percent-annual-chance (or 500- year) flood (FIRM Map No. 06065C1490H, April 19, 2017 and FIRM Map No. 06065C1495H, April 19, 2017). This zone designation is not a Special Flood Hazard Area on the Flood Insurance Rate Map. The City has adopted emergency procedures for the evacuation and control of populated areas in its Emer- gency Operations Plan and in the Riverside County LHMP. Compliance with existing federal, state, and local flood hazard laws and regulations as they pertain to the design of the Project will result in a less- than-significant impact, directly, indirectly and cumulatively. d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018, Project Specific Water Quality Management Plan, pre- pared by CWE, July 2, 2019 & FEMA FIRM Maps 06065C1490H and 06065C1495H) Seiche is a temporary disturbance or oscillation in the water level of a lake or partially enclosed body of water, especially one caused by changes in atmospheric pressure. Tsunami is a long high sea wave caused by an earthquake, submarine landslide, or other disturbance. Mudflows (or debris flows) are rivers of rock, earth, and other debris saturated with water. They develop when water rapidly accumulates in the ground, such as during heavy rainfall or rapid snowmelt, changing the earth into a flowing river of mud. Compliance with existing Federal, State, and local flood hazard laws and regulations as they pertain to the design of the Project will result in a less than significant flood hazard impact, directly, indirectly, and cumulatively. e) Place within a 100-year flood hazard area struc- tures which would impede or redirect flood flows? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018, Project Specific Water Quality Management Plan, prepared by CWE, July 2, 2019 & FEMA FIRM Maps 06065C1490H and 06065C1495H) The project site is not located in the 100-year floodplain and will not place housing or other structures in an area that would impede or redirect flows. Compliance with existing federal, state, and local flood hazard laws and regulations as they pertain to the design of the Project will result in a less-than-signif- icant impact, directly, indirectly and cumulatively. 4.1.j Packet Pg. 135 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 218 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 242 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 53 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact f) Conflict with or obstruct implementation of a wa- ter quality control plan or sustainable groundwa- ter management plan? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, Municipal Code Chapter 13.44 – Storm Water Management, Chapter 16.24 – Improvements, Chapter 13.04 – Water Service, Chapter 15.40 – Floodplain Management, Development Code Section 17.300.120 – Water Quality, Section 17.305.050 – Floodplain Management, Section 17.520.050 – Water Quality, Section 17.600.100 – Water Quality Management Plan (WQMP) Required, General Plan EIR Addendum August 2012, Hydrology Study, prepared by Tuttle Engineering, March 6, 2018 & Project Specific Water Quality Management Plan, pre- pared by CWE, July 2, 2019 & FEMA FIRM Maps 06065C1490H and 06065C1495H) The Project is required to comply with the City’s Municipal Code, the Riverside County Drainage Area Management Plan, and Riverside County MS4 permit all of which contain regulations to meet Federal and State water quality requirements related to water quality and groundwater. Therefore, the Project will be designed for compliance with existing federal, state, and local water quality laws and regulations related to water quality standards which will ensure a less than significant impact, directly, indirectly, or cumulatively, to the water quality control plan and groundwater management plan. XI. LAND USE AND PLANNING ̶ Would the project: a) Physically divide an established community? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) The project site is an undeveloped site designated and zoned for commercial land uses. An existing residential neighborhood is located directly west of the project site. This community would not be physi- cally divided by the Project. The Project would not alter traffic patterns or otherwise limit access to and from the community. The Project would result in no impact directly, indirectly or cumulatively with re- gards to dividing an established community. b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regu- lation adopted for the purpose of avoiding or mitigating an environmental effect? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) Most of the proposed uses would be allowed under the existing zoning restrictions. This includes the proposed retail buildings and fast food restaurants. However, the proposed rezone would allow uses that are currently prohibited by the current Commercial Neighborhood zone. Specifically, rezoning the site from Commercial Neighborhood to Commercial General would allow the development of the proposed service station and car wash. The Commercial General zone is appropriate to the site due to its location on Ramona Expressway, designated by the City as an Urban Arterial, and East Main Street, designated by the City as a Secondary Roadway. All of the proposed land uses are consistent with the underlying General Plan designation and are com- patible with surrounding land uses. The proposed rezone of the project site from Commercial Neighbor- hood to Commercial General would be consistent with the existing General Plan land use designation of Community Commercial as identified in Table LU-1 General Plan and Zoning Consistency Matrix of the San Jacinto General Plan and Section 17.220.010 of the San Jacinto Development Code. No amend- ments of the General Plan are required. No land uses are proposed that have the potential to adversely impact the general welfare of persons residing in the community. The proposed retail buildings on the west side of the project site would be located approximately 90 feet from existing homes to the west. These proposed retail uses would be consistent with existing zoning and development standards, and are considered compatible uses within the General Plan. The Project would provide commercial uses consistent with the requested zone change. Therefore, no impact directly, indirectly or cumulatively to any land use plans would occur. 4.1.j Packet Pg. 136 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 219 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 243 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 54 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact XII. MINERAL RESOURCES ̶ Would the project: a) Result in the loss of availability of a known min- eral resource that would be of value to the region and the residents of the state? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) According to the California Geological Survey Surface Mining and Reclamation Act (SMARA) Mineral Land Classification system, the City of San Jacinto has been classified as MRZ-1. MRZ-1 are areas where geologic information indicates no significant mineral deposits are present. Therefore, imple- mentation of the Project will have no impact directly, indirectly or cumulatively on mineral re- sources. b) Result in the loss of availability of a locally-im- portant mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) The project site is not delineated for mineral resources in a local general plan, specific plan or other land use plan and will therefore, have no impact, directly, indirectly or cumulatively to the availability of an important mineral resources. XIII. NOISE ̶ Would the project result in: a) Generation of a substantial temporary or per- manent increase in ambient noise levels in the vicinity of the project in excess of standards es- tablished in the local general plan or noise ordi- nance, or applicable standards of other agen- cies? Response: (Source: General Plan as amended October 19, 2012, Noise Element Figure N-1 – Future Noise Contours, General Plan EIR, Figure 5.10.1 – Future Noise Contours, General Plan EIR Addendum August 2012, Municipal Code Chapter 8.40 – Noise Control & Noise Assessment, prepared by Ldn Consulting, Inc., July 15, 2019) dBA = A-weighted sound level in decibels as measured on a sound level meter using the A-weighted filter network. The A-weighting filter de-emphasizes the very low and very high frequency components of the sound in a manner similar to the response of the human ear. A numerical method of rating human judgement of loudness. Leq = Equivalent Sound Level – the sound level corresponding to a steady noise level over a given sample period with the same amount of acoustic energy as the actual time varying noise level. The energy average noise level during the sample period. CNEL = Community Noise Equivalent Level. – the average equivalent A-weighted sound level during a 24-hour day, obtained after addition of five (5) decibels to sound levels in the evening from 7:00 to 10:00 p.m. and after addition of ten (10) decibels to sound levels in the night before 7:00 a.m. and after 10:00 p.m. The City of San Jacinto Noise Control Ordinance (Municipal Code Section 8.40) limits exterior noise levels for single-family residential areas to 65 dBA Leq from 7:00 a.m. to 10:00 p.m. and 45 dBA Leq from 10:00 p.m. to 7:00 a.m. The Noise Control Ordinance allows for interior noise levels of 45 dBA from 7:00 a.m. to 10:00 p.m. and 40 dBA from 10:00 p.m. to 7:00 a.m. (Section 8.40.040). Construction noise that exceeds these noise levels is exempted from this standard if it occurs between 7:00 a.m. and 7:00 p.m. on weekdays and Saturdays. Construction (and associated noise) is prohibited on Sundays and federal holidays. Emergency construction work is exempted when authorized by the city manager or his or her designee (Municipal Code Section 8.40.090). Noise generated by real property maintenance is 4.1.j Packet Pg. 137 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 220 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 244 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 55 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact limited by Section 8.40.080. Operation of equipment to maintain real property in a manner that produces loud noise that disturbs a person on normal sensitivity who works or resides in the vicinity is prohibited, except between 7:00 a.m. and 7:00 p.m. The Noise Assessment prepared for the Project analyzed the existing noise environment as follows: Short-Term Noise Measurement Results To determine the existing noise environment and to assess potential noise impacts, a 24-hour measure- ment was taken at the project site along the western property line. This was done to determine the ex- isting conditions at the nearest residences. The noise measurements were recorded on September 12- 13, 2018 by Ldn Consulting between approximately 4:00 p.m. and 3:00 p.m., the following day. Two noise measurements were taken. Location M1 is 140 feet south of Main Street and location M2 is 440 feet south of Main Street. The results of the noise level measurement are presented in the table below. The existing noise levels in the project area consisted primarily of traffic along Main Street, and back- ground noise from the Ramona Expressway in the distance. Short-Term Noise Measurement Data (dBA) Location Date Leq CNEL M1 9/12-13/2018 49.3 54.7 M2 9/12-13/2018 45.4 50.5 Construction Noise Noise from construction activities would add to the existing noise environment of the project site and immediate vicinity. Sensitive receptors located near the project site could be exposed to construction- related noise. The closest sensitive receptors are residents located west of the project site where homes are located within 40 feet of the project site. A six-foot high masonry wall separates the residential de- velopment from the project site. Construction noise is considered a short-term impact and would be considered significant if construction activities are taken outside the allowable times as described in the City’s Municipal Code (Section 8.40.090). Construction is anticipated to occur during the permissible hours according the City’s Munici- pal Code. Construction noise will have a temporary or periodic increase in the ambient noise level above the existing within the project vicinity. Construction noise levels are rarely steady in nature, but instead fluctuate depending on the number and type of equipment in use at any given time. Individual construction activities would generate maximum noise level ranges of 76 to 90 dBA at a distance of 50 feet. Where multiple noise sources are operating, the combined noise level could reach a maximum of 93 dBA at a distance of 50 feet. Noise levels would vary depending on the location of equipment on the project site. The center of the project site is approx- imately 400 feet from the nearest homes; at this distance, assuming a typical attenuation rate of 6 dBA per doubling of distance, noise levels from equipment are expected to reach a maximum of 75 dBA. Construction operations must follow the City’s General Plan and the Noise Ordinance, which states that construction, repair or excavation work performed must occur within the permissible hours. To further ensure that construction activities do not disrupt the adjacent land uses, the following mitigation measures are proposed. The impact is considered less than significant with mitigation. MM NOI 1 – Permissible Hours Construction shall occur during the permissible hours as defined in Section 8.40.090. MM NOI 2 – Noise Attenuating Devices 4.1.j Packet Pg. 138 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 221 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 245 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 56 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact During construction, the contactor shall ensure all construction equipment is equipped with appro- priate noise attenuating devices. MM NOI 3 – Staging Area Location The contractor shall locate equipment staging areas that will create the greatest distance between construction-related noise/vibration sources and sensitive receptors nearest the project site during all project construction. MM NOI 4 – Idling Restriction Idling equipment shall be turned off when not in use. Operational Noise from Car Wash The car wash proposed on Parcel 8 would have two dominate noise sources – an air dryer provided at the end of the automated service and vacuum units that may be provided independently. Based noise measurements on typical equipment, these noise sources have a potential to generate maximum noise levels of 80 dBA and 73.6 dBA respectively, near the units. Because these units would not operate continuously, when adjusted for estimated run time during a peak operational hour, the adjusted noise levels would be approximately 74.8 dBA and 71.4 dBA respectively, near the units. The residential property line is located over 540 feet to the west and the proposed convenience store would also block direct line of site, shielding the equipment noise from the residences. Utilizing the adjusted operational times and distance, the anticipated unshielded noise level was determined to be 40 dBA. Therefore, the proposed operations of the carwash and service station would not exceed the City’s daytime residential threshold of 65 dBA and the most restrictive nighttime residential threshold of 45 dBA. Therefore, no additional noise reductions would be required. Operational Noise from Drive-through Restaurants In order to examine the potential stationary noise source impacts associated with the operation of the proposed fast food restaurants, reference noise levels were used for the menu board and speaker post. The reference noise level of the speaker board is 54 dBA CNEL at 32 feet. The future drive-through speakers are located 415 feet and 615 feet from the nearest residential property line to the west and resulting in an anticipated noise level of approximately 33 dBA. Therefore, the proposed operations of the fast food restaurant and drive-through would not exceed the City’s daytime threshold of 65 dBA and the most restrictive nighttime threshold of 45 dBA. Therefore, no additional noise reductions would be required. Operational Noise from Deliveries and Trash Trucks Noise from trucks making deliveries and collecting recycling and solid waste would occur on an infre- quent but regular basis. This noise would be most noticeable at the retail buildings on the western side of the project site, as these areas are closest to the adjacent residential area. In order to evaluate the truck delivery noise impacts, the analysis utilized reference noise level meas- urements taken at a shopping center. The measurements include truck drive-by noise, truck load- ing/unloading and truck engine noise. The unmitigated exterior noise levels for truck drive-by noise and truck engine noise were measured at 66.5 dBA Leq at a distance of 25-feet from the loading dock. A truck will take approximately 2 minutes to drive in the site and position itself, less than 30 minutes to be unloaded and another 2 minutes to exit the site. During the loading/unloading of the truck the engine can only idle for five (5) minutes in compliance with State air quality requirements. To be conservative, it was assumed the truck engine could be operating for 15 minutes of the total time required during the delivery process (5 minutes at arrival, 5 minutes of idle and 5 minutes at departure). The delivery trucks for the proposed retail uses on the western portion of the site will travel along the western property line and the nearest sensitive receptors to the project site include the single-family property line to the west approximately 50 feet from the trucks that will also be shielded by the existing 6-foot CMU wall. The distance would result in a reduction of 6 decibels, resulting in an overall noise 4.1.j Packet Pg. 139 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 222 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 246 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 57 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact level of 60.5 dBA at the property line. The existing 6-foot wall would provide a small amount of addi- tional noise reduction that has not been accounted for to be conservative. The proposed operations of the delivery trucks would not exceed the City’s daytime threshold of 65 dBA. However, if deliveries oc- cur during the nighttime or early hours (10 pm to 7 am) potential noise impacts could occur at the resi- dential structures to the west. Two trash and recycling enclosures would be located along the southern boundary, while three other trash and recycling enclosures would be located within the internal parking areas. The nearest trash and recycling enclosure would be 160 feet from the western property line. Noise associated with rolling the dumpsters and noise from the waste collection vehicle would be partly screened by the existing 6- foot masonry wall surrounding the adjacent residential development. As provided in Section 8.40.080 of the City of San Jacinto Noise Control Ordinance, loud noise associated with property maintenance is prohibited unless it occurs between 7:00 a.m. and 7:00 p.m. To further ensure that noise from deliveries and waste collection do not disrupt the adjacent land uses during nighttime and early morning hours, the following mitigation measures are proposed. The impact is considered less than significant with mitigation. MM NOI 5 – Solid Waste and Recycling Collection Solid Waste and recycling collection shall only occur during daytime hours (7:00 a.m. and 7:00 p.m.). MM NOI 6 – Truck Deliveries Truck deliveries shall only occur during daytime hours (7:00 a.m. and 7:00 p.m.). Operational Noise from Parking Lots Traffic associated with parking lots is typically not of sufficient volume to exceed community noise standards, which are based on a time-averaged scale. However, the instantaneous sound levels gen- erated by a car door slamming and engine starting up may be an annoyance to adjacent sensitive re- ceptors. The estimated maximum noise levels associated with parking lot activities typically range from 60-65 dBA and are short term. It should be noted that parking lot noise are instantaneous noise levels compared to noise standards, which are averaged over time. As a result, actual noise levels over time resulting from parking lot activities would be far lower. Therefore, based on the limited operational time of vehicles on-site, distance separation, intervening buildings and the existing 6-foot CMU wall on the western property line, parking lot noise is not expected to exceed daytime or nighttime noise standards. Operational Noise from Mechanical Ventilation Heating, ventilation and air conditioning (HVAC) units would be installed on the roof of the proposed buildings. Typically, mechanical equipment noise is 70-80 dBA at a distance of 3 feet from 3-ton to 10- ton units. HVAC units would be included on the roof of the proposed buildings and would be shielded by a mechanical screen and/or the roof parapet, which would further reduce the noise. The HVAC units on most of the site would be located over 400 feet from the residential property line to the west, with the exception of the two retail buildings on the western portion of the site. The two retail buildings would be roughly 70 feet from the property line and 100 feet from the residential structures. The HVAC units will be set-back from the edge of the buildings at least 5 feet, resulting in a separation of 75 feet from the property line. To determine the noise levels associated with the HVAC units on those two buildings, the higher noise level of 80 dBA at 3 feet for each anticipated HVAC unit was utilized and as many as four HVAC units would be in close proximity to each other and would operate at the same time. To predict the worst- case future noise environment, continuous reference noise levels were used to represent the mechani- cal ventilation system. Even though the mechanical ventilation system will cycle on and off throughout the day, this approach presents the worst-case noise condition. Utilizing a 6 dBA decrease per doubling of distance, noise levels at the edge of the nearest property line to the west at the distances shown above were calculated for all the mechanical units. The worst 4.1.j Packet Pg. 140 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 223 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 247 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 58 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact case combined noise from the HVAC would occur from a handful of units located on the roofs of the proposed retail buildings once fully constructed. As can be seen in the table below, the proposed HVAC noise levels would not exceed the City’s daytime threshold of 65 dBA but would be in exceed- ance of the nighttime standard of 45 dBA without mitigation. Details on the mitigation are provided be- low. Unshielded HVAC Noise Levels (Nearest Property Line) Receptor Distance Separation (Feet) Reference Noise Level (dBA) Quantity Cumulative Noise Level (dBA) Noise Reduc- tion Due to Distance (dBA) Receptor Noise Level Western Property Line 75 80 4 86 -28.0 58 Residence Ground Level 100 -30.4 56 Residence Second Level 100 -30.4 56 To further ensure that noise from HVAC equipment on the roofs of the retail buildings on the west side of Parcels 1 and 2 do not disrupt the adjacent land uses during nighttime hours, the following mitigation measure is proposed. The Noise Assessment prepared for the Project determined that incorporation of a parapet or acoustical screening two feet in height above the top of the HVAC units would reduce noise levels at the adjacent residential property line to 45 dBA or less. The impact is considered less than significant with mitigation. MM NOI 7 – HVAC Shielding on Retail Buildings All HVAC units on the roofs of the retail buildings on Parcels 1 and 2 shall be shielded to maintain the nighttime standard of 45 dBA at the adjacent residential property line. A parapet or acoustic screen shall be provided that extends two feet in height above the top of the HVAC units. A noise control analysis of the HVAC plans and specifications shall be provided prior to issuance of building permits to ensure that the HVAC units would not exceed the 45 dBA standard at the adjacent resi- dential property line. Noise Impacts to Off-Site Receptors Due to Project Generated Traffic A significant off-site traffic noise impact would occur if the Project resulted in or created a significant increase in the existing ambient noise levels. Studies have shown that the average human ear can barely perceive a change in sound level of 3 dBA. A change of at least 5 dBA is considered a readily perceivable change in a normal environment. A 10-dBA increase is subjectively heard as a doubling in loudness and would cause a community response. Based on these concepts of noise level increase and perception, if an area is already exposed to noise levels in excess of the land use compatibility guidelines and noise levels were to result in greater than a 3 dBA increase, then the impact would be considered significant. The off-site Project-related roadway segment noise levels projected in the Noise Assessment were cal- culated using the methods in the Highway Noise Model published by the Federal Highway Administration (FHWA Highway Traffic Noise Prediction Model, FHWA-RD-77-108, December, 1978). The FHWA Model uses the traffic volume, vehicle mix, speed, and roadway geometry to compute the equivalent noise level. A spreadsheet calculation was used which computes equivalent noise levels for each of the time periods used in the calculation of CNEL. Weighting these equivalent noise levels and summing them gives the CNEL for the traffic projections. To determine if direct off-site noise level increases as- sociated with the development of the Project. The noise levels for the existing conditions were compared with the noise level increase of existing plus the Project, utilizing the traffic volumes provided for the Project by Michael Baker International (MBI), 2018. The table below presents the comparison of noise levels on nearby roadways with and without the Pro- ject. The roadway segment noise levels will increase from 0.1 dBA CNEL to 0.8 dBA CNEL with the 4.1.j Packet Pg. 141 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 224 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 248 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 59 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact development of the Project. The Project does not create a noise level increase on any roadway segment that will cause a significant impact to any existing or future noise sensitive land uses. Project Related Change in Traffic Noise Levels Roadway Segment Existing Noise Level @ 50-Feet (dBA CNEL) Existing + Project Noise Level @ 50- Feet (dBA CNEL) Project Related Direct Noise Level Increase (dBA CNEL) Ramona Expressway North of East Main Street 72.2 72.4 0.2 East Main Street to Project Driveway #2 73.9 74.2 0.3 Project Driveway #2 to Donna Way 74.0 74.1 0.1 Donna Way to East 7th Street 73.9 74.1 0.2 South of East 7th Street 73.8 74.0 0.2 East Main Street West of Hewitt Street 66.5 66.9 0.4 Hewitt Street to Project Driveway #1 66.0 66.7 0.7 Project Driveway #1 to Ramona Expressway 64.6 65.4 0.8 Lake Park Drive Ramona Expressway to Soboba Road 67.3 67.5 0.2 East 7th Street Hewitt Street to Las Rosas Drive 65.8 66.3 0.5 Las Rosas Drive to Donna Way 65.7 66.4 0.7 Donna Way to Ramona Expressway 63.3 63.7 0.4 Note: Sound Levels provided are worst-case and do not take into account topography or shielding from barriers. Short-term and long-term noise impacts associated with the Project are considered less than significant with mitigation, directly, indirectly and cumulatively. b) Generation of excessive groundborne vi- bration or groundborne noise levels? Response: (Source: General Plan as amended October 19, 2012, Noise Element Figure N-1 – Future Noise Contours, General Plan EIR, Figure 5.10.1 – Future Noise Contours, General Plan EIR Addendum August 2012 & Municipal Code Chapter 8.40 – Noise Control) Construction activities can produce vibration that may be felt by adjacent land uses. The construction of the Project would not require the use of equipment such as pile drivers, which are known to generate substantial construction vibration levels. The primary vibration source during construction may be from a bulldozer. A large bulldozer has a vibration impact of 0.089 inches per second peak particle velocity (PPV) at 25 feet which is perceptible but below any risk to architectural damage. The distance of the construction equipment will be at least 40 feet or more from any existing structure. The City requires all construction activities to comply with the limits (maximum noise levels, hours and days of allowed activity) established in the City noise regulations Municipal Code Chapter 8.40 – Noise Control to reduce impacts associated with temporary construction noise and vibration to the extent feasible. The Project will have a less-than-significant impact on the generation of excessive ground- borne vibration. c) For a project located within the vicinity of a pri- vate airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? 4.1.j Packet Pg. 142 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 225 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 249 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 60 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Response: (Source: General Plan as amended October 19, 2012, Noise Element Figure N-1 – Future Noise Contours, General Plan EIR, Figure 5.10.1 – Future Noise Contours, General Plan EIR Addendum August 2012, Municipal Code Chapter 8.40 – Noise Control & Riverside County Land Use Commission – Hemet-Ryan Airport Plan Final 2017) There are no private airports within two miles of the City, and this project site is outside the Hemet Ryan Airport Plan; therefore, this Project will have no impact, directly, indirectly, or cumulatively to exposing people residing or working in the project area to excessive noise. XIV. POPULATION AND HOUSING ̶ Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for exam- ple, through extension of road or other infrastruc- ture)? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) The Project will not induce growth as it is consistent with the City’s General Plan land use designation of CC – Community Commercial. The City’s General Plan establishes the development potential of the City to accommodate the City’s growth to 2020. The Project, as proposed, will help to accommodate that growth, but will not induce it. The project site is located on existing streets, and utilities and public facilities are all available in the immediate area. No new road or utility infrastructure is required. Project-related impacts are expected to be less than significant directly, indirectly and cumulatively. b) Displace substantial numbers of existing people or housing, necessitating the construction of re- placement housing elsewhere? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) The project site is vacant and will not displace any persons, or require the construction of replacement housing. Therefore, there is no impact to housing. XV. PUBLIC SERVICES ̶ Would the project: a) Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant en- vironmental impacts, in order to maintain ac- ceptable service ratios, response times or other performance objectives for any of the public ser- vices: Fire protection? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) The Project is located approximately 1.4 miles from Fire Station #25 located at 132 S. San Jacinto Ave- nue. As a result, fire personnel will be able to reach the site within the recommended response time. The Fire Department will approve the Project site plan to ensure it meets applicable fire standards and regu- lations. As referenced in Section VIII – Hazards and Hazardous Materials, the Project will be designed consistent with the California Building Code and the National Fire Protection Association (NFPA) Code require- ments for fueling stations and onsite storage of flammable material such as gasoline and diesel and 4.1.j Packet Pg. 143 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 226 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 250 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 61 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact related state regulations governing the design and operation of fueling facilities. Like any development project, the Project may increase demand for fire service; however, the Project is consistent with the General Plan land use designation for the site and would not increase the population beyond what was anticipated in the General Plan. Further, the Project would be designed and constructed consistent with applicable codes and standards for access and fire suppression infrastructure. The Project will not re- quire the construction of a new fire station to maintain service ratios. Through the implementation of all regulations and City policies for development projects, the Project will have a less than significant impact on fire services, directly, indirectly, and cumulatively. Police protection? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, & General Plan EIR Addendum August 2012) Development of the site would result in additional facilities that would need to be provided with police protection. The Project incorporates features that would limit the demand for police protection. These features include adequate site and security lighting, and security cameras. In addition, the Police De- partment will review site plans to ensure all applicable fire and public safety codes are met. Through project design and code enforcement, the potential increase for police protection services would be min- imized. The existing police facilities would be sufficient to maintain acceptable service ratios and re- sponse times. The Project would have a less than significant impact directly, indirectly, and cumula- tively on public services and would not result in substantial adverse physical impacts associated with providing additional government facilities. Schools? Response: (Source: General Plan as amended October 19, 2012, Community Services & Facilities Element Figure CSF-1 – School Districts, General Plan EIR, General Plan EIR Addendum August 2012, San Jacinto Unified School District 2015 Facilities Master Plan) The Project is located within the service area boundary of the San Jacinto Unified School District. The Project is required to pay the state-mandated school fees in place at the time that development occurs. These fees are designed to mitigate impacts to schools by providing funds for the construction of new facilities. The Project would result in the development of a retail center, fast food restaurants and service station with a car wash. These proposed land uses would increase employment and economic activity within the city of San Jacinto. The retail and restaurant employees are expected to be existing residents of San Jacinto, Hemet and other nearby communities. The businesses are not expected to attract a substantial number of new employees that would relocate to the area. Accordingly, the proposed development is not expected to result in an increase in service demand or the need to provide additional school facilities to serve new residents. Through the implementation of all regulations and City and School District policies for development pro- jects, the Project will have a less than significant impact on schools, directly, indirectly and cumula- tively. Parks? Response: (Source: General Plan as amended October 19, 2012, Community Services and Facilities Element Figure CSF-3 – Parks & Public Facilities, General Plan EIR, General Plan EIR Addendum August 2012, Parks Master Plan, November 2005, Municipal Code Chapter 16.40 – Park Dedications and Fees & Chapter 15.36 – Park and Open Space Development Fees) The City has a broad range of available recreation facilities, programs, and parks. As noted above, the retail and restaurant employees are expected to be existing residents of San Jacinto, Hemet and other nearby communities. The businesses are not expected to attract a substantial number of new employees that would relocate to the area. Accordingly, the proposed development is not expected to result in an 4.1.j Packet Pg. 144 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 227 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 251 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 62 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact increase in service demand or the need to provide additional parks to serve new residents. The Project will have a less than significant impact on parks, directly, indirectly and cumulatively. Other public facilities? Response: (Source: General Plan as amended October 19, 2012, Community Services and Facilities Element Figure CSF-3 – Parks & Public Facilities, CSF-4 – Trails Opportunities Map, General Plan EIR, General Plan EIR Addendum August 2012, Parks Master Plan, November 2005, Municipal Code Chapter 16.40 – Park Dedications and Fees & Chapter 15.36 – Park and Open Space Development Fees) As noted above, the Project will not result in an increase in demand for other City services and facilities, including recreational trails and library services. Therefore, no impacts to other public facilities will occur directly, indirectly and cumulatively. XVI. RECREATION ̶ Would the project: a) Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facil- ity would occur or be accelerated? Response: (Source: General Plan as amended October 19, 2012, Community Services and Facilities Element Figure CSF-3 – Parks & Public Facilities, CSF-4 – Trails Opportunities Map, General Plan EIR, General Plan EIR Addendum August 2012, Parks Master Plan, November 2005, Municipal Code Chapter 16.40 – Park Dedications and Fees & Chapter 15.36 – Park and Open Space Development Fees) The City and Valley-Wide Recreation provide a broad range of recreation facilities, programs, and parks. The City established a park ratio of 5.0 acres of developed parkland for every 1,000 residents. The City’s Parks Master Plan details recommendations and standards to meet park facility demand. There are 83.5 acres of parks and recreational facilities (General Plan Table CSF-1 – Existing Parks and Recreational Facilities) with another 50 acres planned (General Plan Table CSF-2 – Planned Parks and Recrea- tional Facilities). As described under Response XIV a) above, the proposed land uses would increase employment and economic activity within the city of San Jacinto. However, the retail and restaurant employees are ex- pected to be existing residents of San Jacinto, Hemet and other nearby communities. The businesses are not expected to attract a substantial number of new employees that would relocate to the area. Accordingly, the proposed development is not expected to result in an increase in demand for recrea- tional facilities. The Project will have a less than significant impact on recreational facilities, directly, indirectly and cumulatively. b) Does the project include recreational facilities or require the construction or expansion of recrea- tional facilities which have an adverse physical effect on the environment? Response: (Source: General Plan as amended October 19, 2012, Community Services and Facilities Element Figure CSF-3 – Parks & Public Facilities, CSF-4 – Trails Opportunities Map, General Plan EIR, General Plan EIR Addendum August 2012, Parks Master Plan, November 2005, Municipal Code Chapter 16.40 – Park Dedications and Fees & Chapter 15.36 – Park and Open Space Development Fees) The Project does not include the construction of recreational facilities or require the need to construct recreational facilities. The Project will have no impact, directly, indirectly or cumulatively on recreational facilities. 4.1.j Packet Pg. 145 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 228 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 252 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 63 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact XVII. TRANSPORTATION ̶ Would the project: a) Conflict with program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? Response: (Source: General Plan as amended October 19, 2012, Circulation Element Table C-1 – Overview of Street Classi- fications, Figure C-1 – Roadway Cross Sections, Figure C-2 – Roadway System, Figure C-4 – Bikeways, Figure C-5 – Standard Bikeway Cross Sections, General Plan EIR, General Plan EIR Addendum August 2012, Figure 5.13-5 – Proposed City of San Jacinto General Plan Network, Figure 5.13-6 – General Plan Roadway Cross-Sections, Traffic Impact Analysis, prepared by Mi- chael Baker International, June 25, 2019 & Striping and Striping Plans, prepared by Michael Baker International, May, 2019) A traffic impact analysis was completed for the Project by Michael Baker International. The study ana- lyzes the forecast traffic conditions associated with the Project. The study evaluates the following seven intersections in the vicinity of the project site: 1. East Main Street / Hewitt Street 2. Ramona Expressway / East Main Street-Lake Park Drive 3. Lake Park Drive / Soboba Road 4. Ramona Expressway / Donna Way 5. East 7th Street / Las Rosas Drive 6. East 7th Street / Donna Way 7. Ramona Expressway / East 7th Street It should be noted that the intersection of Ramona Expressway and Donna Way (Intersection 4) operates as a right-in/right-out minor street stop-controlled intersection. In addition, the Project would have a total of three points of vehicular access. The following Project access driveways have been included as study intersection locations: 8. East Main Street / Project Driveway #1 9. Ramona Expressway / Project Driveway #2 10. Donna Way / Project Driveway #3 The driveways located on Main Street and Ramona Expressway would operate as a right-in/right-out only access. The driveways located on Donna Way would operate as full access unsignalized intersec- tions. These study locations have been analyzed in the following study scenarios: • Existing Conditions; • Existing With Project Conditions; • Existing Plus Cumulative Conditions; • Existing Plus Cumulative With Project Conditions Level of Service Level of Service (LOS) is commonly used as a qualitative description of intersection operation and is based on the capacity of the intersection and the volume of traffic using the intersection. The Highway Capacity Manual (HCM) 2010 analysis methodology is utilized to determine the operation LOS of the study intersections. The HCM analysis methodology describes the operation of an intersection using a range of level of service from LOS A (free-flow conditions) to LOS F (Severely congested conditions), based on the corresponding stopped delay experienced per vehicle for study intersections. The City of San Jacinto has adopted level of service “D“ or better as acceptable operating conditions for intersections during the peak hour. Trip Generation To calculate the number of vehicle trips generated by the Project, the trip rates provided in the Institute of Transportation Engineers (ITE) 9th Edition Trip Generation Manual were used. These rates were ad- justed to account for “pass-by trips” which are existing trips deviated from the surrounding roadway net- work to access the project site, and “internal trips” in which a person visits more than one destination 4.1.j Packet Pg. 146 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 229 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 253 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 64 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact onsite during the same visit. Based on this methodology, the Project is forecast to generate approxi- mately 4,144 trips per day, with approximately 307 trips occurring during the AM peak hour and approx- imately 314 trips occurring during the PM peak hour. Existing Plus Project Conditions The table below summarizes Existing Conditions and Existing with Project Conditions AM and PM peak hour level of service for all study intersections. Existing Conditions and Existing Plus Project Level of Service Study Intersection Traffic Control Existing Conditions Existing with Project Conditions AM Delay / LOS PM Delay / LOS AM Delay / LOS PM Delay / LOS 1 - E. Main St. / Hewitt St. AWSC 10.6 - B 10.0 - A 11.2 - B 10.5 - B 2 - Ramona Expwy. / Main St.-Lake Park Dr. Signal 22.3 - C 41.0 - D 24.4 - C 48.7 - D 3 - Lake Park Dr. / Soboba Rd. Signal 18.7 - B 24.2 - C 18.9 - B 24.9 - C 4 - Ramona Expwy. / Donna Way Signal1 10.0 - B 12.5 - B 12.4 - B 8.0 - A 5 - E. 7th St. / Las Rosas Dr. AWSC 10.9 - B 8.5 - A 11.6 - B 8.8 - A 6 - E. 7th St. / Donna Way OWSC 9.5 - A 9.0 - A 11.2 - B 10.8 - B 7 - Ramona Expwy. / E. 7th St. Signal 15.4 - B 12.4 - B 15.5 - B 13.2 - B 8 - E. Main St. / Project Driveway #1 OWSC DNE DNE 9.3 - A 9.2 - A 9 - Ramona Expwy. / Project Drive- way #2 OWSC DNE DNE 10.5 - B 14.0 - B 10 - Donna Way / Project Driveway #3 OWSC DNE DNE 10.7 - B 10.4 - B Notes: Deficient intersection operation indicated in bold. Delay = average seconds of delay per vehicle. LOS = level of service DNE = does not exist AWSC = all way stop control OWSC = one way stop control 1 - Project proposes to construct traffic signal at Ramona Expressway/Donna Way. Therefore, analyzed as a signal with the project. All study intersections are forecast to operate at an acceptable level of service (LOS D or better) during the peak hours with the addition of Project-related traffic to existing traffic volumes. Therefore, no signif- icant impacts were identified under Existing with Project Conditions and no mitigations measures are required. The table below summarizes Cumulative Conditions and Cumulative with Project Conditions AM and PM peak hour level of service for all study intersections. 4.1.j Packet Pg. 147 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 230 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 254 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 65 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Cumulative and Cumulative Plus Project Level of Service Study Intersection Traffic Control Cumulative Con- ditions Cumulative With Project AM Delay / LOS PM Delay/ LOS AM Delay/ LOS PM Delay / LOS 1 - E. Main St. / Hewitt St. AWSC 97.2 - F 159.3 - F 116.8 - F 182.0 - F 2 - Ramona Expwy. / Main St.-Lake Park Dr. Signal 66.5 - E 176.3 - F 66.5 - E 176.7 - F 3 - Lake Park Dr. / Soboba Rd. 1 Signal 17.2 - B 25.6 - C 19.8 - B 26.6 - C 4 - Ramona Expwy. / Donna Way Signal2 12.0 - B 15.9 - C 7.4 - A 7.1 - A 5 - E. 7th St. / Las Rosas Dr. AWSC 11.4 - B 8.6 - A 12.1 - B 9.0 - A 6 - E. 7th St. / Donna Way OWSC 9.6 - A 9.1 - A 11.4 - B 10.6 - B 7 - Ramona Expwy. / E. 7th St. Signal 21.1 - C 16.6 - B 22.8 - C 17.8 - B 8 - E. Main St. / Project Driveway #1 OWSC DNE DNE 11.3 - B 11.7 - B 9 - Ramona Expwy. / Project Drive- way #2 OWSC DNE DNE 11.9 - B 17.8 - C 10 - Donna Way / Project Driveway #3 OWSC DNE DNE 10.8 - B 10.4 - B Notes: Deficient intersection operation indicated in bold. Delay = average seconds of delay per vehicle. LOS = level of service DNE = does not exist AWSC = all way stop control OWSC = one way stop control 1 - Includes intersections improvements due to construction of Soboba Casino Project 2 - Project proposes to construct traffic signal at Ramona Expressway/Donna Way. Therefore, analyzed as a signal with the project. All study intersections are forecast to operate at an acceptable level of service (LOS D or better) during the peak hours under Cumulative and Cumulative with Project conditions with the following exceptions: 1. East Main Street / Hewitt Street – PM peak hour, LOS F 2. Ramona Expressway / East Main Street-Lake Park Drive – PM peak hour, LOS F Because these intersections do not operate at an acceptable level of service, the addition of Project- related traffic would result in a significant impact and requires mitigation. With implementation of the following mitigation measures, the intersections would operate at acceptable levels of service (as shown in the table below) and the Project would have a less than significant impact with mitigation directly, indirectly or cumulatively. MM TRAF 1 – Main Street/Hewitt Street Intersection Improvements The project applicant shall make a fair share contribution to the construction of a signal at this loca- tion. MM TRAF 2 – Ramona Expressway/Main Street-Lake Park Drive Intersection Improvements The project applicant shall restripe the eastbound approach to include one left turn lane, one through lane, and one shared through/right turn lane. 4.1.j Packet Pg. 148 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 231 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 255 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 66 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Mitigated Cumulative and Cumulative Plus Project Level of Service Study Intersection Traffic Control Existing Plus Cumulative With Project Conditions - Mitigated AM PM Delay - LOS Delay - LOS 1 - E. Main St. / Hewitt St. Signal 22.5 - C 24.7 - C 2 - Ramona Expwy. / E. Main St.-Lake Park Dr. Signal Not Impacted 54.6 - D Notes: Deficient intersection operation indicated in bold. Delay = average seconds of delay per vehicle. Public Transit Services The site is located close to existing transit service, with Riverside Transit Agency Bus Route 42 providing direct access and connections to other lines. Existing bus stops are located on East Main Street at Mir- acle Drive, approximately 600 feet from the project site. Development of the Project would not interfere with these bus stops. In addition, site plan includes the development of a bus stop and shelter in coop- eration with RTA. Impacts to public transit would be less than significant directly, indirectly or cumula- tively. Bicycles The site plan includes bicycle racks consistent with CALGreen requirements. These include both short- and long-term storage facilities. The site plan also includes the development of a Class I bike lane/multi- use lane along Ramona Expressway. Impacts to public transit would be less than significant directly, indirectly or cumulatively. Pedestrian The site plan includes sidewalks, crosswalks, ADA ramps, and decorative trellis as pedestrian facilities that tie into existing sidewalks along East Main Street and Ramona Expressway. The Project would not conflict with or obstruct a state or local plan for alternative transportation; therefore, impacts would be less than significant directly, indirectly or cumulatively. b) Conflict or be inconsistent with CEQA Guidelines section 15064.31 or will conflict with an applica- ble congestion management program, including, but not limited to, level of service standards and travel demand measures, or other standards es- tablished by the county congestion management agency for designated roads or highways? Response: (Source: General Plan as amended October 19, 2012, Circulation Element Table C-1 – Overview of Street Classi- fications, Figure C-1 – Roadway Cross Sections, Figure C-2 – Roadway System, Figure C-4 – Bikeways, Figure C-5 – Standard Bikeway Cross Sections, General Plan EIR, General Plan EIR Addendum August 2012, Figure 5.13-5 – Proposed City of San Jacinto General Plan Network, Figure 5.13-6 – General Plan Roadway Cross-Sections, Traffic Impact Analysis, prepared by Mi- chael Baker International, June 25, 2019 & Striping and Striping Plans, prepared by Michael Baker International, May, 2019) The 2011 Riverside County Transportation Commission (RCTC) Congestion Management Program (CMP) designates certain roadways as CMP facilities. The CMP designates a minimum acceptable LOS of E on CMP facilities. The nearest designated CMP routes are State Route 74 and State Route 79. Ramona Expressway intersects with State Route 74 approximately three miles south of the project site. East Main Street intersects with State Route 79 approximately one mile west of the project site. The 1CEQA Guidelines section 15064.3(c) provides that a lead agency “may elect to be governed by the provisions” of the section imme- diately; otherwise, the section’s provisions apply July 1, 2020. Here, the City has not elected to be governed by Section 15064.3. Accordingly, an analysis of vehicles miles traveled (VMT) is not necessary to determine whether a proposed project will have a sig- nificant transportation impact. 4.1.j Packet Pg. 149 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 232 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 256 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 67 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Project is not expected to result in a significant contribution of traffic to these facilities. Project-related traffic becomes more diffuse farther from the project site as it spreads through the transportation network. The traffic impact analysis estimates that 22 percent of Project traffic would use East Main Street west of Hewitt Street, 15 percent of the Project traffic would use Ramona Expressway to the northwest, and 20 percent of Project traffic would use Ramona Expressway south of East 7th Street. Due to the “local serving” nature of this commercial center, most of the primary (new) trips will have origins and destina- tions near the Project. Trips arriving on regional facilities like State Route 74 and State Route 79 would be primarily pass-by trips destined to a nearby regional trip attractor (such as the Soboba Casino). Ac- cordingly, only a minor amount Project-related “new” traffic would use State Route 74 and State Route 79. Due to the minor amount of new trips the Project would contribute to these roadways, Project impacts are considered to be less than significant directly, indirectly or cumulatively. c) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous inter- sections) or incompatible uses (e.g., farm equip- ment)? Response: (Source: General Plan as amended October 19, 2012, Circulation Element Table C-1 – Overview of Street Classi- fications, Figure C-1 – Roadway Cross Sections, Figure C-2 – Roadway System, Figure C-4 – Bikeways, Figure C-5 – Standard Bikeway Cross Sections, General Plan EIR, General Plan EIR Addendum August 2012, Figure 5.13-5 – Proposed City of San Jacinto General Plan Network, Figure 5.13-6 – General Plan Roadway Cross-Sections, Traffic Impact Analysis, prepared by Mi- chael Baker International, June 25, 2019 & Striping and Striping Plans, prepared by Michael Baker International, May, 2019) The project driveways are located along East Main Street, Ramona Expressway and Donna Way which do not have sharp curves in the vicinity of the access points. The sight distance appears adequate to observe oncoming vehicles and do not appear to pose a hazardous condition. The proposed traffic signal at Ramona Expressway and Donna Way will adhere to all applicable design guidelines and will provide safer access to and from the site. No incompatible uses are proposed that would conflict with existing traffic. The Project would have a less-than-significant impact directly, indirectly and cumulatively on traffic hazards. d) Result in inadequate emergency access? Response: (Source: General Plan as amended October 19, 2012, Circulation Element Table C-1 – Overview of Street Classi- fications, Figure C-1 – Roadway Cross Sections, Figure C-2 – Roadway System, Figure C-4 – Bikeways, Figure C-5 – Standard Bikeway Cross Sections, General Plan EIR, General Plan EIR Addendum August 2012, Figure 5.13-5 – Proposed City of San Jacinto General Plan Network, Figure 5.13-6 – General Plan Roadway Cross-Sections, Traffic Impact Analysis, prepared by Mi- chael Baker International, June 25, 2019 & Striping and Striping Plans, prepared by Michael Baker International, May, 2019) The proposed development has three points of access, one on East Main Street, one on Ramona Ex- pressway, and one on Donna Way. In the event that one driveway is blocked, another driveway can be accessed for emergency vehicles. These access points have been reviewed by the City’s traffic engi- neer and the City’s police and fire departments to ensure the design complies with all applicable public safety codes. Through project design and code enforcement, adequate emergency access would be provided, and the Project would result in a less-than-significant impact, directly, indirectly and cumu- latively on emergency access. XVIII. TRIBAL CULTURAL RESOURCES – Would the project: a) Cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: i) Listed or eligible for listing in the California Regis- ter of Historical Resources, or in a local register of historical resources as defined in Public Re- sources Code section 5020.1(k), or Response: (Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Resources; General Plan FEIR; Figure 5.5-1 – Existing Cultural Resources; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.1-1 – Existing Cultural Resources; Development Code Chapter 17.500 – Archaeological and Paleontological Protection; Chapter 17.510 – Historic Preservation; & Cultural and Paleontological Resources Inventory, Prepared by Natural Investigations Company, October 19, 2017) 4.1.j Packet Pg. 150 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 233 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 257 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 68 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact See responses V a - c above. Natural Investigations contacted the Native American Heritage Commission (NAHC), requesting a search of their Sacred Lands File for traditional cultural resources within or near the Project area. The reply from the NAHC, dated September 25, 2017, states that the search failed to indicate the presence of sacred lands in the immediate vicinity of the Project area, but that the area is considered sensitive for cultural resources. In addition, the City conducted AB 52 Consultations with the tribes noted in Appendix A of this Initial Study. No cultural resources have been previously recorded on the project site, and no resources were identified during the survey of the project site. However, as there is always a chance that unanticipated cultural resources, archaeological resources, or even human remains could be encountered during ground-disturbing activities mitigation measures MM CR 1 through MM CR 3 have been applied to this Project. Therefore, the Project will have a less than significant impact with mitigation, directly, indi- rectly, or cumulatively, on any cultural resource as defined by Public Resources Code Section 5020.1(k). ii) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code section 5024.1. In applying the criteria set forth in subdi- vision (c) of Public Resources Code section 5024.1, the lead agency shall consider the signifi- cance of the resource to a California Native Amer- ican tribe. Response: (Source: General Plan as amended October 19, 2012; Resource Management Element Figure RM-4 – Cultural Resources; General Plan FEIR; Figure 5.5-1 – Existing Cultural Resources; General Plan EIR Addendum August 2012; General Plan EIR Figure 5.1-1 – Existing Cultural Resources; Development Code Chapter 17.500 – Archaeological and Paleontological Protection; Chapter 17.510 – Historic Preservation; & Cultural and Paleontological Resources Inventory, Prepared by Natural Investigations Company, October 19, 2017) See response XVIII a) above, no significant resources have been identified on the Project site pursuant to criteria set forth in subdivision (c) of Public Resource Code Section 5024.1. However, implementation of MM CR 1 to MM CR 3 will address significant resources that may be present on the site. Therefore, the Project will have less than significant impact with mitigation, directly, indirectly, and cumulatively on a Tribal Historical Resource. XIX. UTILITIES AND SERVICE SYSTEMS ̶ Would the project: a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the con- struction or relocation of which could cause sig- nificant environmental effects? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, General Plan EIR Addendum August 2012 & Sewer Study, prepared by Dexter Wilson Engineering, February 6, 2019) Water Water will be provided by EMWD. EMWD has indicated the ability to serve the Project. No new or ex- panded water supply facilities are needed. EMWD has found that its water supplies will be sufficient to meet the District’s water demand during normal, single dry, and multiple dry years through 2040. The Project is consistent with the City of San Jacinto General Plan designation of the project site. Because the General Plan was used to forecast future water demand, the proposed development has already been factored into the EMWD’s overall water demand. Wastewater Sewer service to the Project would be provided by the City of San Jacinto. The City operates and main- tains local collector sewers in the area that convey flow to EMWD truck sewers and interceptors. EMWD 4.1.j Packet Pg. 151 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 234 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 258 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 69 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact is responsible for treatment and disposal of sewage conveyed to their system from the City of San Jacinto. The Project would connect to an 8-inch sewer line along the western boundary of the project site. This 8-inch sewer line conveys flow to an 8-inch sewer line in Main Street that conveys flow westerly. This line leaves Main Street and increases to 12-inch and then to 15-inch prior to connecting to an EMWD 36-inch line in Palm Avenue. Based on sewer flow metering that was performed in the existing system downstream of the Project, the existing sewer system is flowing within its design capacity at peak flows. With the addition of flows from the Luiseno Village Project, the existing sewer lines are still anticipated to be operating within their design capacity at peak flows. Wastewater from the Project would be conveyed to EMWD’s San Jacinto Valley Regional Water Recla- mation Facility for treatment. As of 2016, the reclamation facility has a capacity of 14 MGD with typical daily flows of 7 MGD. The reclamation facility has an ultimate design capacity of 27 MGD. The Project would not exceed current capacity of the collection or treatment system. The Project would have a less than significant impact on wastewater infrastructure. Storm water Pursuant to NPDES regulations, the City will require that the Project comply with existing Santa Ana WQCB and City stormwater controls, including compliance with NPDES construction and operation measures to prevent erosion, siltation, and transport of urban pollutants. In addition, the City of San Jacinto is a Co-Permittee in, and is required to comply with, the Riverside County municipal separate storm sewer system (MS4) permit (Waste Discharge Requirements for Riv- erside County - Order No. 2010-0033, NPDES No. CAS618033) adopted by the Regional Board on January 29, 2010. In conformance with this MS4 permit the Project is required to implement structural and non-structural Best Management Practices (BMPs) to retain and treat pollutants of concern (in dry- weather runoff and first-flush stormwater runoff, during and post-construction. Consistent with the MS4 permit, the Preliminary WQMP for the Project incorporates infiltration chambers that will be installed below the parking areas to allow for percolation of stormwater on site. Stormwater will be filtered through the underground chambers, removing contaminants and reducing discharge to a level equal to or below the pre-development discharge. Stormwater that is not infiltrated on site would discharge to an existing concrete swale on the west side of the project site that drains to East Main Street and the City of San Jacinto’s storm sewer system and not to the nearby San Jacinto River and Conserved lands. Runoff from the proposed car wash will drain to the sanitary sewer. The Project will not impact the existing stormwater management systems significantly. The Project will not result in an increase in the volume of stormwater discharged to the City’s drainage system. Electric Power The proposed development would connect to existing utility lines along East Main Street, Ramona Ex- pressway and Donna Way. Electric power is provided to the site by Southern California Edison (SCE). SCE has committed to providing service to the planned uses of the General Plan, and this Project is consistent with the City’s General Plan. The Project will connect to an existing distribution line along East Main Street. The Project will not require or result in the construction of expanded electric power which could cause significant environmental effects. Natural Gas Natural gas is provided to the site by Southern California Gas Company (SCG). The Project will connect to an existing distribution line in either East Main Street or Ramona Expressway. SCG has committed to providing service to the planned uses of the General Plan 2035, and this Project is consistent with the City’s General Plan 2035. The Project will not require or result in the relocation or construction of new or expanded natural gas facilities power which could cause significant environmental effects. 4.1.j Packet Pg. 152 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 235 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 259 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 70 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact Telecommunication Facilities No cellular utilities are present on the site. No expanded telecommunication facilities would be needed to serve the project. Summary The Project will have a less-than-significant impact, directly, indirectly, or cumulatively, on the relocation or construction of new or expanded water, wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects. b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, General Plan EIR Addendum August 2012) Senate Bill (SB) 610 (Chapter 643, Statutes of 2001; Water Code Sections 10910–10915) made changes to the Urban Water Management Planning Act to require additional information in UWMPs if groundwater is identified as a source available to the supplier. The information required includes a copy of any ground- water management plan adopted by the supplier, a copy of the adjudication order or decree for adjudi- cated basins, and if non-adjudicated, whether the basin has been identified as being over drafted or projected to be over drafted in the most current DWR publication on that basin. If the basin is in overdraft, that plan must include current efforts to eliminate any long-term overdraft. A key provision in SB 610 requires that large development projects supplied with water from a public water system and subject to CEQA be provided a specified water supply assessment, except as specified in the law. Large develop- ment projects include those with 500 or more residential units, 500,000 square feet of retail commercial space, or 250,000 square feet of office commercial space. These assessments, prepared by “public water systems” responsible for service, address whether there are adequate existing or projected water supplies available to serve proposed projects, in addition to urban and agricultural demands and other anticipated development in the service area in which the project is located. SB 221 (Chapter 642, Statutes of 2001; Government Code Section 66473.7) prohibits approval of sub- divisions consisting of more than 500 dwelling units unless there is verification of sufficient water supplies for the project from the applicable water supplier(s). This requirement also applies to approvals that would increase the number of service connections by 10% or more for public water systems with less than 500 service connections. The law defines criteria for determining “sufficient water supply” such as using normal, single-dry, and multiple-dry year hydrology and identifying the amount of water that the supplier can reasonably rely on to meet existing and future planned uses. Rights to extract additional groundwater, if used for the project, must be substantiated. The Project proposes retail commercial buildings totaling 34,096-square-feet and as such is not required to get a water supply assessment from EMWD, the water purveyor. EMWD has found that its water supplies will be sufficient to meet the District’s water demand during normal, single dry, and multiple dry years through 2040. The Project is consistent with the City of San Jacinto General Plan designation of the project site. Because the General Plan was used to forecast future water demand, the proposed development has already been factored into the EMWD’s overall water demand. EMWD has sufficient water supply to serve the Project, and Project-related impacts on water supply would be less than significant directly, indirectly and cumulatively. 4.1.j Packet Pg. 153 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 236 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 260 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 71 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, General Plan EIR Addendum August 2012) As noted in XIX a) above, the Project will not generate enough wastewater to exceed current capacity of the wastewater system. San Jacinto Municipal Utilities and EMWD implement all requirements of the Regional Water Quality Control Board pertaining to water quality and wastewater discharge requirement. The Project will have a less-than-significant impact, directly, indirectly and cumulatively on wastewater treatment. d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, General Plan EIR Addendum August 2012 & Municipal Code Chapter 8.34 – Construction and Demolition Waste Management) CR&R Waste and Recycling Services transports solid waste to the Lamb Canyon landfill. The Lamb Canyon landfill is expected to meet capacity in 2021 at which time waste can be taken to the El Sobrante or Badlands landfills. With the implementation of the City’s and CR&R’s recycling programs the City continues to divert waste from the landfill. The California Integrated Waste Management Act (CIWMA) of 1989 mandates that all cities and counties in California reduce solid waste disposed at landfills gen- erated within their jurisdictions by 50% and has a long-term compliance goal of 70%. Construction waste associated with the proposed Project will be recycled to the extent practicable with the remainder sent to a landfill. Pursuant to Municipal Code Chapter 8.34 – Construction Demolition Waste Management, 50% of the construction debris must be diverted. Therefore, landfill capacity is available to accommodate this Project and the Project will have a less-than-significant impact, directly, indirectly and cumulatively to landfills. e) Comply with federal, state, and local statutes and regulations related to solid waste? Response: (Source: General Plan as amended October 19, 2012, General Plan EIR, General Plan EIR Addendum August 2012 & Municipal Code Chapter 8.34 – Construction and Demolition Waste Management) Federal, State, and local statutes and regulations regarding solid waste generation, transport, and dis- posal are intended to assure adequate landfill capacity through mandatory reductions in solid waste quantities (for example, through recycling and composting of green waste) and the safe and efficient transportation of solid waste. The Project will comply with all regulatory requirements regarding solid waste including AB 939 and AB 341. AB 939, which is administered by the California Department of Resources Recycling and Recovery required local governments to achieve a landfill diversion rate of at least 50 percent by January 1, 2000, through source reduction, recycling, and composting activities. Moreover, AB 341 increases the minimum solid waste diversion rate to 75 percent by 2020. Such regu- lations will be applicable to this Project and compliance is mandatory. Further, mandates set forth by the CALGreen Code aim to reduce solid waste generation and promote recycling and diversion design and activities, to which this Project is required to comply. There will be a less-than-significant impact, di- rectly, indirectly or cumulatively regarding compliance with Federal, State, and local statutes and regu- lations related to solid waste. 4.1.j Packet Pg. 154 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 237 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 261 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 72 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact XX. WILDFIRE – If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project: a) Substantially impair an adopted emergency re- sponse plan or emergency evacuation plan? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) The project site is not within or near a Very High Fire Hazards Zone. The nearest Very High Fire Hazards Area is located approximately 1/3 mile east across the San Jacinto River. The site is separated from this area by the San Jacinto River and its associated levees, a EMWD property that is maintained free of vegetation, and by Ramona Expressway. This separation and the accessibility of the area (mostly level terrain and roadways) assists in reducing fire risk while facilitating access for firefighting efforts. As stated in response Section IX f) above, the City’s Emergency Operation Plan describes the City’s process for responding to emergencies or disasters. In addition, the City, along with most other jurisdic- tions in Riverside County, joined with the County of Riverside to submit a Multi-Jurisdictional LHMP providing a framework for emergency response. The Project provides adequate access for emergency vehicles, including adequate street widths and vertical clearance. Implementation of federal, state, and local laws and regulations in the construction of this Project would result in less than significant im- pacts, directly, indirectly, or cumulatively, to adopted emergency response or evacuation plans. b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose pro- ject occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) In addition to response Section IX g) above, the Project site is not located within a Very High Fire Hazard Classification area with the County of Riverside or a High Fire Hazard Zone Area in the City’s General Plan (Figure 5.7-1 – Fire Hazard). As well, the site is relatively flat. Therefore, the Project will not exacerbate wildfire risks and will have no impact, directly, indirectly, or cumulatively, to the exposure of pollutant concentration from a wildfire or the uncontrolled spread of a wildfire. c) Require the installation or maintenance of associ- ated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk, or that may result in temporary or ongoing impacts to the en- vironment? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) The Project will not require the installation or maintenance of associated infrastructure that would exac- erbate fire risk, or that may result in temporary or ongoing impacts to the environment and as such will have a no impact, directly, indirectly, or cumulatively. d) Expose people or structures to significant risks, in- cluding downslope or downstream flooding or landslides, as a result of runoff, post-fire slope in- stability, or drainage changes? Response: (Source: General Plan as amended October 19, 2012; General Plan EIR; & General Plan EIR Addendum August 2012) 4.1.j Packet Pg. 155 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 238 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 262 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 73 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact The site is relatively flat and is not located near any slopes that could subject to instability after a fire. Therefore, the Project will have a less no impact, directly, indirectly or cumulatively, as it is will not expose people or structures to significant risk from flooding or landslides as a result of a wildfire. II. MANDATORY FINDINGS OF SIGNIFICANCE a) Does the project have the potential to degrade the quality of the environment, substantially re- duce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or en- dangered plant or animal or eliminate important examples of the major periods of California his- tory or prehistory? As described in Section IV. Biological Resources, no sensitive natural community exists on the site. The only habitat found on the project site is ruderal grasslands isolated by surrounding development. No special-status species or special-status habitats occur on the project site. Implementation of identified mitigation measures (pre-construction surveys, MSHCP BMPs) would ensure that any impacts to spe- cial-status species would be less than significant. As described in Section V. Cultural Resources, no built environment resources were identified or rec- orded during the survey. Thus, the Project does not have the potential to cause a significant impact on any resource that qualifies as a historical resource. In addition, no archaeological resources were iden- tified or recorded during the field survey. The potential for the discovery of buried archaeological materi- als within the alluvial sediments underlying the project area is low. Implementation of identified mitigation measures (unanticipated discovery measures) would ensure that any impacts to archaeological re- sources would be less than significant. As described in Section VII. Geology and Soils, the project site is in an area mapped as having high sensitivity for paleontological resources. Excavation and grading on the site at depths at or below 4 feet has the potential to impact paleontological resources. Implementation of identified mitigation measures (paleontological monitoring) would ensure that any impacts to archaeological resources would be less than significant. The Project would not result in significant impacts to other environmental resource categories. Based on the lack of known resources on the site and the inclusion of mitigation measures to reduce impact, the Project would result in a less-than-significant impact with mitigation. b) Does the project have impacts that are individu- ally limited, but cumulatively considerable? ("Cu- mulatively considerable" means that the incre- mental effects of a project are considerable when viewed in connection with the effects of past pro- jects, the effects of other current project, and the effects of probable future projects.) The evaluation of Project impacts in this document has been made in the context of cumulative impacts and resource trends. Air quality and GHG emissions have been evaluated according to SCAQMD thresh- olds intended to protect air quality and climate from the cumulative impact of development in the region. Impacts to biological resources have been addressed in the context of the MSHCP, which addresses the conservation needs of listed species while providing for regional development. Water quality impacts have been evaluated for consistency with the regional MS4 and statewide NPDES permits, which ad- dress cumulative effects on water quality. Traffic impacts have been assessed in accordance with the City’s LOS standards to ensure that cumulative impacts to the local roadway network are addressed. Likewise, Project impacts in all other environmental resource categories have been made in the context 4.1.j Packet Pg. 156 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 239 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 263 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 74 City of San Jacinto ISSUES (AND SUPPORTING INFORMATION SOURCES): Potentially Significant Impact Less Than Significant with Mitiga- tion Incorpo- rated Less Than Significant Impact No Impact of how the Project would contribute to resource trends that are shaped by existing and future develop- ment patterns. With mitigation, these potential impacts do not have the potential to be cumulatively con- siderable. The Project would result in a less-than-significant cumulative impact with mitigation. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? A significant impact to humans may occur if the Project has the potential to result in significant environ- mental impacts. Based on the preceding environmental analysis, the Project would not have significant environmental effects on human beings, either directly or indirectly. Any potentially significant impacts would be reduced to less-than-significant levels through the implementation of the applicable mitiga- tion measures identified within this document. Note: Authority cited: Public Resources Code sections 21083, 21083.05, 21083.09. Reference: Gov. Code section 65088.4; Public Resources Code sections 21073, 21074, 21080(c), 21080.1, 21080.3, 21080.3.1, 21080.3.2, 21082.3, 21083, 21083.3, 21083.5, 21084.2, 21084.3, 21093, 21094, 21095 and 21151; Sundstrom v. County of Mendo- cino (1988) 202 Cal.App.3d 296; Leonoff v. Monterey Board of Supervisors (1990) 222 Cal.App.3d 1337; Eureka Citizens for Respon- sible Govt. v. City of Eureka (2007) 147 Cal.App.4th 357; Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116 Cal.App.4th 1099, 1109; San Franciscans Upholding the Downtown Plan v. City and County of San Francisco (2002) 102 Cal.App.4th 656. 4.1.j Packet Pg. 157 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 240 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 264 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center Page 75 City of San Jacinto Supporting Information Sources Beck, Carly, 2019. Email from Carly Beck, Environmental Scientist, California Department of Fish and Wildlife to Travis Randel, Planning and Community Development Director, City of San Jacinto, July 18, 2019. Natural Resources Conservation Service (NRCS), 2019. Custom Soil Resource Report for West- ern Riverside Area, California. April 24, 2019. 4.1.j Packet Pg. 158 Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-09, 10, 11.)4.1.c Packet Pg. 241 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05))4.1.a Packet Pg. 265 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11, VAR-17-05)) Initial Study – Luiseño Village Retail Center / Page 1 City of San Jacinto APPENDIX A – AB 52 CONSULTATION LOG 4.1.jPacket Pg. 159Attachment: 10 - Initial Study (Luiseno Village ZC-17-05, SPDR-17-17, CUP-17-09, VAR-17-05, and MUP-17-4.1.cPacket Pg. 242Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.aPacket Pg. 266Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- MITIGATION MONITORING or REPORTING PROGRAM (MMRP) FOR LUISEÑO VILLAGE RETAIL CENTER (DRAFT) 1. Project Case Number(s): SPDR-17-17 – Site Plan & Design Review Case 2. Project Title: Luiseño Village Retail Center (Project) 3. Lead Agency: Kevin White, Senior Planner City of San Jacinto Planning Department 595 S. San Jacinto Avenue San Jacinto, CA 92583 kwhite@sanjacintoca.gov 4. Project Sponsor: Applicant/Developer/Property Owner Ruben De Los Santos Soboba Band of Luiseño Indians P.O. Box 487 San Jacinto, CA 92581 (951) 654-5544 RDELOSSANTOS@soboba-nsn.gov 5. Project Location: Southwest corner of Main Street and Ramona Expressway in the City of San Jacinto. The Project Site is located within an unsectioned area of the Rancho San Jacinto Viejo land grant, Township 4 South, Range 1 West (San Bernardino base line and meridian) as shown on the San Jacinto, California 7.5-minute U.S. Geological Survey (USGS) quadrangle. The project site is comprised of 4 parcels with 7 Tax Assessor Parcel Numbers (APNs): 433-160-024, 027, 028, 029, 032, 033, and 034. 4.1.k Packet Pg. 160 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 243 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 267 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 2 City of San Jacinto THE FOLLOWING REPRESENTS THE CITY’S MITIGATION MONITORING OR REPORTING PROGRAM FOR THE MITIGATED NEGATIVE DECLARATION FOR THE ABOVE PROJECT) LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date IV. BIOLOGICAL RESOURCES MM BIO 1  If construction occurs during the breeding season (February 1 to August 31), a burrowing owl breeding bird survey following the recommended guidelines of the MSHCP will be required within 30 days prior to construction to determine if nesting is occurring on site.  If burrowing owl have colonized the project site, the Applicant will prepare a Burrowing Owl Protection and Relocation Plan for approval by RCA and CDFW.  Occupied nests will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation; or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival.  If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. For the burrowing owl, the recommended distance is a minimum of 160 feet.  Relocation of burrowing owl is subject to the above conditions and prior coordination with RCA, CDFW and the United States Fish and Wildlife Service (USFWS). Developer Prior To All Demolition, Earthmoving, and/or Grading Planning shall ensure that survey has been received before approving grading plan REMARKS: 4.1.k Packet Pg. 161 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 244 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 268 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 3 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date MM BIO 2  A breeding bird survey will be required to determine if nesting is occurring no more than five days prior to ground disturbing activities. Occupied nests will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non- invasive methods that either (a) the adult birds have not begun egg-laying and incubation; or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival.  If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. Developer Prior To All Demolition, Earthmoving, and/or Grading Planning shall ensure that survey has been received before approving grading plan REMARKS: MM BIO 3  A condition shall be placed on grading permits requiring a qualified biologist to conduct a training session for project personnel prior to grading. The training shall include a description of the species of concern and its habitats, the general provisions of the Endangered Species Act (Act) and the MSHCP, the need to adhere to the provisions of the Act and the MSHCP, the penalties associated with violating the provisions of the Act, the general measures that are being implemented to conserve the species of concern as they relate to the project, and the access routes to and project site boundaries within which the project activities must be accomplished.  Water pollution and erosion control plans shall be developed and implemented in accordance with RWQCB requirements. Developer Prior To All Demolition, Earthmoving, and/or Grading Planning shall verify on Plan Check set of plans City Engineer during inspections 4.1.k Packet Pg. 162 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 245 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 269 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 4 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date  The footprint of disturbance shall be minimized to the maximum extent feasible. Access to sites shall be via pre-existing access routes to the greatest extent possible.  Equipment storage, fueling, and staging areas shall be located on upland sites with minimal risks of direct drainage into riparian areas or other sensitive habitats. These designated areas shall be located in such a manner as to prevent any runoff from entering sensitive habitat. Necessary precautions shall be taken to prevent the release of cement or other toxic substances into surface waters. Project related spills of hazardous materials shall be reported to appropriate entities including but not limited to applicable jurisdictional city, FWS, and CDFG, RWQCB and shall be cleaned up immediately and contaminated soils removed to approved disposal areas.  The removal of native vegetation shall be avoided and minimized to the maximum extent practicable. Temporary impacts shall be returned to pre-existing contours and revegetated with appropriate native species.  Exotic species that prey upon or displace target species of concern should be permanently removed from the site to the extent feasible.  To avoid attracting predators of the species of concern, the project site shall be kept as clean of debris as possible. All food related trash items shall be enclosed in sealed containers and regularly removed from the site(s). 4.1.k Packet Pg. 163 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 246 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 270 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 5 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date  Construction employees shall strictly limit their activities, vehicles, equipment, and construction materials to the proposed project footprint and designated staging areas and routes of travel. The construction area(s) shall be the minimal area necessary to complete the project and shall be specified in the construction plans. Construction limits will be fenced with orange snow screen. Exclusion fencing should be maintained until the completion of all construction activities. Employees shall be instructed that their activities are restricted to the construction areas.  The Permittee (City of San Jacinto) shall have the right to access and inspect any sites of approved projects including any restoration/enhancement area for compliance with project approval conditions including these BMPs. REMARKS: MM BIO 4 The following measures apply to the construction of roadway improvements with the rights-of-way of Ramona Expressway and East Main Street that are completed as part of the Project.  Plans for water pollution and erosion control will be prepared for work involving the movement of earth in excess of 50 cubic yards. The plans will describe sediment and hazardous materials control, dewatering or diversion structures, fueling and equipment management practices, use of plant material for erosion control. Plans will be reviewed and approved by the City prior to construction. Developer Prior To All Demolition, Earthmoving, and/or Grading Planning shall verify on Plan Check set of plans City Engineer during inspections 4.1.k Packet Pg. 164 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 247 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 271 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 6 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date  Timing of construction activities will consider seasonal requirements for breeding birds and migratory non-resident species. Habitat clearing will be avoided during species active breeding season defined as March 1 to June 30.  Sediment and erosion control measures will be implemented until such time soils are determined to be successfully stabilized.  Silt fencing or other sediment trapping materials will be installed at the downstream end of construction activities to minimize the transport of sediments off-site.  The footprint of disturbance will be minimized to the maximum extent Feasible. Access to sites will occur on pre-existing access routes to the greatest extent possible.  Equipment storage, fueling and staging areas will be sited on non-sensitive upland wildlife habitat types with minimal risk of direct discharge into riparian areas or other sensitive wildlife habitat types.  Exotic species removed during construction will be properly handled to prevent sprouting or regrowth.  Training of construction personnel will be provided.  Ongoing monitoring and reporting will occur for the duration of the construction activity to ensure implementation of best management practices.  Active construction areas shall be watered regularly to control dust and minimize impacts to adjacent vegetation. 4.1.k Packet Pg. 165 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 248 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 272 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 7 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date  All equipment maintenance, staging, and dispensing of fuel, oil, coolant, or any other toxic substances shall occur only in designated areas within the proposed grading limits of the project site. These designated areas shall be clearly marked and located in such a manner as to contain run-off.  Waste, dirt, rubble, or trash shal l not be deposited in the Conservation Area or on native habitat. REMARKS: V. CULTURAL RESOURCES MM CR 1 Should cultural/archaeological resources be encountered during ground disturbing activities for the project, work must be halted in the area within 50 feet of the find and a qualified archaeologist notified immediately to assess the significance of the find. Construction activities could continue in other areas. If the discovery proves to be significant, additional work, such as data recovery excavation, may be warranted and would be discussed in consultation with the property owner, the City of San Jacinto, or any other relevant regulatory agency, as appropriate. Developer Monitor during all earthmoving activity Advise the City immediately if work stops for a find REMARKS: MM CR 2 In the event of the discovery of human remains, the Riverside County coroner shall be immediately notified. If human remains of Native American origin are discovered during ground disturbing activities, the applicant shall comply with the State law relating to the disposition of Native American burials that fall within the jurisdiction of the NAHC (PRC Section 5097). According to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 8100), and disturbance of Native American Developer, Archaeologist and Tribal Monitors Monitor During All Earthmoving Activity Once City is notified Planning shall follow the process 4.1.k Packet Pg. 166 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 249 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 273 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 8 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date cemeteries is a felony (Section 7052). Section 7050.5 requires that excavation be stopped near discovered human remains until the coroner can determine whether the remains are those of a Native American. If the remains are determined to be Native American, the California Native American Heritage Commission and the Soboba Band of Luiseño Indians shall be notified, and appropriate measures provided by State law shall be implemented to determine the most likely living descendant(s). Disposition of the remains shall be overseen by the most likely living descendants to determine the most appropriate means of treating the human remains and any associated grave artifacts. REMARKS: VII. GEOLOGY AND SOILS MM GEO 1 The Soil and Foundation Report (Soils Southwest, 2017) provides foundation recommendations to minimize seismic- induced settlement hazards. These include using conventional checkered/waffle type rigid footings for exterior load bearing walls along with interior grade beams, or using a rigid mat foundation. Additional recommendations address concrete slab construction and curing, excavation and fill, pavement and utility trenches. The recommendations identified in the Soil and Foundation Report, or similar measures approved by a registered civil engineer, shall be incorporated into the construction plans. Project plans will be reviewed during the plan check process to confirm geotechnical design measures are incorporated to address the potential for seismic-induced settlement. These measures shall be incorporated into final construction plans prior to issuance of building permits. Developer and Geotechnical Engineer Prior to Building Permit Issuance Engineering shall verify on Plan Check set of plans REMARKS: 4.1.k Packet Pg. 167 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 250 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 274 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 9 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date MM GEO 2 All earthmoving during project implementation at or below 4 feet requires full-time paleontological monitoring, as follows:  A qualified paleontologist (graduate degree and more than one year of professional experience as a principal investigator) will be retained to provide paleontological services. The principal paleontologist will be responsible to implement and oversee monitoring and to maintain professional standards of work. The principal paleontologist will report all mitigation and monitoring activities, or related actions of the paleontological resources team to the City, as appropriate, including discussing a reduction in monitoring from full- to part-time after monitoring is initiated and no fossils have been identified.  A qualified paleontological monitor will perform monitoring of construction grading and excavations that take place in the older Pleistocene sediments at depths of 4 feet or more. The monitor will have authority to divert grading away from exposed fossils temporarily in order to recover the fossil specimens. Cooperation and assistance from on-site personnel will greatly assist timely resumption of work in the area of the fossil discovery.  Discovery of fossil producing localities requires documentation including measured stratigraphic columns and geologic samples for analysis. Any fossils recovered that meet significance criteria will be prepar ed, identified, and cataloged before donation to an appropriate repository. The Western Science Center in Hemet, California is recommended as an appropriate repository. Developer and Paleontologist Monitor During All Earthmoving Activity Once City is notified Planning shall follow the process 4.1.k Packet Pg. 168 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 251 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 275 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 10 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date The principal paleontologist retained will prepare a final report. The report will include a list of specimens recovered, documentation of each locality, interpretation of fossils recovered, and will include any specialists’ reports as appendices. REMARKS: XIII. NOISE MM NOI 1 Construction shall occur during the permissible hours as defined in Section 8.40.090. Developer Maintain time frames during Construction The City will verify during Inspections & through Code Enforcement Complaints REMARKS: MM NOI 2 During construction, the contactor shall ensure all construction equipment is equipped with appropriate noise attenuating devices. Developer During Construction Should complaints arise the City will ask for verification of equipment REMARKS: MM NOI 3 The contractor shall locate equipment staging areas that will create the greatest distance between construction-related noise/vibration sources and sensitive receptors nearest the project site during all project construction. Developer During Construction The City will verify during Inspections REMARKS: MM NOI 4 Idling equipment shall be turned off when not in use. Developer During Construction Should complaints arise the City will ask for verification REMARKS: MM NOI 5 Solid Waste and recycling collection shall only occur during daytime hours (7:00 a.m. and 7:00 p.m.). Property owner and Retail Operators Throughout the Life of the Project Upon a complaint Code Enforcement REMARKS: MM NOI 6 Truck deliveries shall only occur during daytime hours (7:00 a.m. and 7:00 p.m.). Property owner and Retail Operators Throughout the Life of the Project Upon a complaint Code Enforcement REMARKS: MM NOI 7 All HVAC units on the roofs of the retail buildings on Parcels 1 and 2 shall be shielded to maintain the nighttime standard of 45 dBA at Developer Prior to Building Permit Issuance Planning shall verify on Plan Check set of plans 4.1.k Packet Pg. 169 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 252 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 276 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Luiseño Village Retail Center Page 11 City of San Jacinto LUISENO VILAGE RETAIL CENTER Mitigation Measures Responsible Party Monitoring Timing or Frequency Type of Verification Verification of Compliance Initials Date the adjacent residential property line. A parapet or acoustic screen shall be provided that extends two feet in height above the top of the HVAC units. A noise control analysis of the HVAC plans and specifications shall be provided prior to issuance of building permits to ensure that the HVAC units would not exceed the 45 dBA standard at the adjacent residential property line. REMARKS: TRANSPORTATION MM TRAF 1 Main Street/Hewitt Street: The project applicant shall make a fair share contribution to the construction of a signal at this location. Developer Prior to the First Building Occupancy Engineering & Planning shall verify that payment has been made prior to release of building permits REMARKS: MM TRAF 2 Ramona Expressway/Main Street-Lake Park Drive: The project applicant shall restripe the eastbound approach to include one left turn lane, one through lane, and one shared through/right turn lane. Developer Prior to Building Permit Issuance Engineering shall verify on Street Improvement plans REMARKS: 4.1.k Packet Pg. 170 Attachment: 11 - Mitigation, Monitoring and Reporting Program (Luiseno Village ZC-17-05, SPDR-17-17,4.1.c Packet Pg. 253 Attachment: 3 - PC Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-17-09, MUP-17-09,10,11,4.1.a Packet Pg. 277 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 1 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Approval Date: October 1, 2019 Effective Date: October 15, 2019 Expiration Date: October 15, 2019 PROJECT LOCATION: Southwest corner of Main Street and Ramona Expressway in the City of San Jacinto. (APNs): 433-160-024, 027, 028, 029, 032, 033, and 034) APPLICANT: Soboba Band of Luiseno Village 23906 Soboba Road San Jacinto, CA 92583 ACCEPTED AND AGREED TO BY: _____________________________________________________________ Applicant Date PROJECT DESCRIPTION: A proposal of the Soboba Band of Luiseño Indians to construct and operate a commercial shopping center that includes a service station with 24 fuel pumps, a 3,048 square foot convenience store with alcohol sales, and a 1,105 square foot car wash; a 14,583 square foot multi-tenant retail building; a 9,360-square-foot multi-tenant retail building; a fast-food restaurant with drive-through service totaling 2,800 square feet; a fast-food restaurant with drive-through service totaling 3,200 square feet. General Requirements & Information – SPDR 17-17, CUP 17-09, MUP 17-09, MUP 17-10 A) The developer/applicant or successor in interest agrees to indemnify, hold harmless, and defend the City, its officials, offi cers, agents, and employees, from any and all liability, claims, actions or proceedings that may be brought arising out of its approval of this permit, and any approvals associated with the Project, including, without limitation, any CEQA review or approval, except to the extent caused by the negligence of the City. B) The approval of this Project, a commercial center, shall comply with all required standards of the Development Code. 4.1.d Packet Pg. 254 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 278 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 2 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - C) The developer/applicant or successor in interest is advised that the businesses or uses which this Project is granted cannot be legally conducted on the subject property until all conditions of approval of this case (SPDR 17-17) have been met to the satisfaction of the Planning Department. D) The effective date of issuance of this Project is October 15, 2019. The approval will lapse if improvements have not commenced within two (2) years from the date upon which the approval was granted. Unless a time extension is approved by the City’s applicable review authority. Applications for time extensions must be received prior to the expiration date. E) All cases associated with the Project, SPDR-17-17, CUP-17-09, MUP-17-09, MUP-17-10, MUP-17-10, and VAR-17-05, and shall have the same effective date and expiration date. Therefore, these cases will become null and void, if the project has not been vested, on or before October 15, 2021 (two calendar years from the effective date), unless a time extension is approved by the City’s applicable review authority. Applications for time extensions must be received prior to the expiration date. F) All storage and display of merchandise and supplies must be conducted within a building. G) The Project shall fully and continually comply with all applicable conditions of approval, State, Federal and local laws in effect at the time the permit is approved and exercised, and which may become effective and applicable thereafter. Failure to do so will be grounds for Code Enforcement actions, revocation, or further legal action. H) All plans submitted to the City shall be in substantial conformance with the plans in this approval as conditioned. This condition applies to site plans, grading plans, landscape plans, building plans, elevations, and all other illustrations, text, or plan s submitted to the City in connection with the Project. I) A copy of all pages of these conditions shall be included in the construction drawing packages for grading plans, building plans, and landscape and irrigation plans. J) This approval may be revoked if the Project is operated or maintained in violation of any law or in a manner that constitutes a nuisance or adversely affects the public health, safety, or welfare. K) The City shall have the right to annually inspect the site and facilities to ensure compliance with the conditions of approval and 4.1.d Packet Pg. 255 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 279 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 3 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - to recover its actual costs related to such inspections from the property owner or tenant. L) The required parking and loading features (e.g., landscaping, parking surfaces, striping, signs, etc.) shall be continuously maintained in good condition by the person having control of the premises (e.g., lessee, owner, tenant, etc.) as follows: • Landscaping shall be kept alive and continually maintained in compliance with Section 17.330.090 (Landscaping Standards for Parking Areas) and Chapter 17.325 (Water Efficient Landscape and Irrigation). • Parking surfaces shall be kept free of holes and substantial deterioration. • Striping shall be visible. • Signs shall be kept in place, legible, and continually maintained. • Parked vehicles shall not extend over a property line or into a public right-of-way. • All parking and drive aisles shall be screened from the public right-of-way with a landscape hedge or decorative wall, as reviewed and approved by the Planning and Community Development Director. M) Fire Department apparatus access shall be provided to within 150 feet to of all portions of all buildings. Fire apparatus roads shall have an unobstructed width of not less than 24 feet. Driveway loops, fire apparatus access lanes and entrance curb radius should be designed to adequately allow access of emergency fire vehicles. Ref. CFC Sections 503.1.1 and 503.2.1 as amended by the City of San Jacinto. N) All required Fire Department vehicle access roads shall be maintained in a passable condition at all times for emergency Fire Department use. Gates or other obstructions shall be approved by the Fire Department prior to construction. O) For CFD Annexation - Developer will ensure that funds are available for maintenance of public improvements, in the event that improvements are completed, and ready for City takeover, PRIOR to levy collection. P) For CFD Annexation - The first installment of collected assessments is paid to the City in January of each year. In the event that takeover is requested before the first installment is paid to the City, the Developer will either: 4.1.d Packet Pg. 256 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 280 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 4 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village -  Pay an advancement of funds for the months included from takeover to collection (amount to be set by cost estimate at annexation) OR  Continue to maintain improvements until City has acquired enough funds to sustain maintenance or until first assessment installment is received, whichever is first. Q) For CFD Annexation - Upon acceptance and City take-over, developer will ensure that a minimum of one -year warranty is in place for landscape, irrigation, basin integrity, inclusive pumps and mechanical equipment used for the maintenance of the improvements taken over. R) If not already completed, the developer/applicant or successor in interest shall submit a single check to the City, made payable to the Riverside County Clerk, in the amount of $2,330.75, for the payment of State Fish and Game Fees ($2,280.75) and the County Recorder handling fee ($50.00) for filing of the Notice of Determination (NOD). In accordance with Section 711.4 of the State Fish and Game Code, no project shall be operative, vested, or final until the filing fees have been paid. The City will record the NOD and provide a copy of the NOD and receipt to the applicant. S) Grading shall not be commenced, and no structures shall be altered, enlarged, erected, moved, demolished, or rebuilt subject to the provisions of Chapter 17.630 – Site Plan and Design Review of the Development Code, except in compliance with the approved Project and the conditions imposed on the review. T) Grading and public improvements shall be installed in accordance with City standards and specifications. The tops of all graded slopes shall be at the property line U) The project’s grading shall be in a manner to perpetuate existing natural drainage patterns. Any deviation from this, concentration or increase in runoff, must have approval from adjacent property owners, and the City Engineer. Drainage easements shall be obtained from affected property owners. The applicant shall accept the offsite runoff and convey to an acceptable outlet. Emergency escape paths shall be provided for all sump conditions. V) Prior to issuance of any permit, the developer/property owner shall secure City’s and appropriate agency’s approval of the improvement plans. 4.1.d Packet Pg. 257 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 281 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 5 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - W) Prior to commencement of any construction or installation of fencing in public ri ght-of-way, encroachment permit shall be obtained from the City Engineer’s office. 4.1.d Packet Pg. 258 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 282 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 6 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Conditions of Approval Timing Responsible Department Condition of Approval – Luiseno Village MET? SPDR 17-17 - Project Description: A multi-tenant retail building totaling 14,583 square feet of specialty retail, with up to 10 individual tenant spaces ranging from 1,200 to 2,261 square feet each. Prior to Any Earthmoving Activity For SPDR 17-17 Prior to any Earthmoving Activity/ Grading Planning 1) Prior to grading permit issuance the developer shall enter into a Treatment and Disposition Agreement (TDA) with the Soboba Band of Luiseño Indians to address treatment and disposition of archaeological / cultural resources and human remains associated with Soboba Band of Luiseño Indians that may be uncovered or otherwise discovered during ground disturbing activities related to the project. The TDA may establish provisions for tribal monitors, and needs to be submitted to the Planning Division upon after it has been executed. Prior to any Earthmoving Activity/ Grading Planning 2) MM BIO 1 - If construction occurs during the breeding season (February 1 to August 31), a burrowing owl breeding bird survey following the recommended guidelines of the MSHCP will be required within 30 days prior to construction to determine if nesting is occurring on site.  If burrowing owl have colonized the project site, the Applicant will prepare a Burrowing Owl Protection and Relocation Plan for approval by RCA and CDFW.  Occupied nests will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation; or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival.  If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance 4.1.d Packet Pg. 259 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 283 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 7 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? determined by the qualified biologist for each nest or nesting site. For the burrowing owl, the recommended distance is a minimum of 160 feet.  Relocation of burrowing owl is subject to the above conditions and prior coordination with RCA, CDFW and the United States Fish and Wildlife Service (USFWS). Prior to any Earthmoving Activity/ Grading Planning 3) MM Bio 2 - A breeding bird survey will be required to determine if nesting is occurring no more than five days prior to ground disturbing activities. Occupied nests will not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist verifies through non-invasive methods that either (a) the adult birds have not begun egg-laying and incubation; or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival. If the biologist is not able to verify one of the above conditions, then no disturbance shall occur during the breeding season within a distance determined by the qualified biologist for each nest or nesting site. Prior to any Earthmoving Activity/ Grading Planning 4) MM Bio 3 - A condition shall be placed on grading permits requiring a qualified biologist to conduct a training session for project personnel prior to grading. The training shall include a description of the species of concern and its habitats, the general provisions of the Endangered Species Act (Act) and the MSHCP, the need to adhere to the provisions of the Act and the MSHCP, the penalties associated with violating the provisions of the Act, the general measures that are being implemented to conserve the species of concern as they relate to the project, and the access routes to and project site boundaries within which the project activities must be accomplished.  Water pollution and erosion control plans shall be developed and implemented in accordance with RWQCB requirements. 4.1.d Packet Pg. 260 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 284 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 8 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET?  The footprint of disturbance shall be minimized to the maximum extent feasible. Access to sites shall be via pre-existing access routes to the greatest extent possible.  Equipment storage, fueling, and staging areas shall be located on upland sites with minimal risks of direct drainage into riparian areas or other sensitive habitats. These designated areas shall be located in such a manner as to prevent any runoff from entering sensitive habitat. Necessary precautions shall be taken to prevent the release of cement or other toxic substances into surface waters. Project related spills of hazardous materials shall be reported to appropriate entities including but not limited to applicable jurisdictional city, FWS, and CDFG, RWQCB and shall be cleaned up immediately and contaminated soils removed to approved disposal areas.  The removal of native vegetation shall be avoided and minimized to the maximum extent practicable. Temporary impacts shall be returned to pre - existing contours and revegetated with appropriate native species.  Exotic species that prey upon or displace target species of concern should be permanently removed from the site to the extent feasible.  To avoid attracting predators of the species of concern, the project site shall be kept as clean of debris as possible. All food related trash items shall be enclosed in sealed containers and regularly removed from the site(s).  Construction employees shall strictly limit their activities, vehicles, equipment, and construction materials to the proposed project footprint and designated staging areas and routes of travel. The construction area(s) shall be the minimal area necessary to complete the project and shall be specified in the construction plans. Construction limits will be fenced with orange snow screen. Exclusion fencing should be maintained until the completion of all construction activities. Employees shall be instructed that their activities are restricted to the construction areas. 4.1.d Packet Pg. 261 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 285 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 9 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET?  The Permittee (City of San Jacinto) shall have the right to access and inspect any sites of approved projects including any restoration/enhancement area for compliance with project approval conditions including these BMPs. Prior to any Earthmoving Activity/ Grading Planning 5) MM BIO 4 - The following measures apply to the construction of roadway improvements with the rights-of-way of Ramona Expressway and East Main Street that are completed as part of the Project.  Plans for water pollution and erosion control will be prepared for work involving the movement of earth in excess of 50 cubic yards. The plans will describe sediment and hazardous materials control, dewatering or diversion structures, fueling and equipment management practices, use of plant material for erosion control. Plans will be reviewed and approved by the City prior to construction.  Timing of construction activities will consider seasonal requirements for breeding birds and migratory non-resident species. Habitat clearing will be avoided during species active breeding season defined as March 1 to June 30.  Sediment and erosion control measures will be implemented until such time soils are determined to be successfully stabilized.  Silt fencing or other sediment trapping materials will be installed at the downstream end of construction activities to minimize the transport of sediments off-site.  The footprint of disturbance will be minimized to the maximum extent Feasible. Access to sites will occur on pre-existing access routes to the greatest extent possible.  Equipment storage, fueling and staging areas will be sited on non-sensitive upland wildlife habitat types with minimal risk of direct discharge into riparia n areas or other sensitive wildlife habitat types.  Exotic species removed during construction will be properly handled to prevent sprouting or regrowth. 4.1.d Packet Pg. 262 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 286 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 10 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET?  Training of construction personnel will be provided.  Ongoing monitoring and reporting will occur for th e duration of the construction activity to ensure implementation of best management practices.  Active construction areas shall be watered regularly to control dust and minimize impacts to adjacent vegetation.  All equipment maintenance, staging, and dispensing of fuel, oil, coolant, or any other toxic substances shall occur only in designated areas within the proposed grading limits of the project site. These designated areas shall be clearly marked and located in such a manner as to contain run-off.  Waste, dirt, rubble, or trash shall not be deposited in the Conservation Area or on native habitat. Prior to any Earthmoving Activity/ Grading Planning 6) MM CR 1 - Should cultural/archaeological resources be encountered during ground disturbing activities for the project, work must be halted in the area within 50 feet of the find and a qualified archaeologist notified immediately to assess the significance of the find. Construction activities could continue in other areas. If the discovery proves to be significant, additional work, such as data recovery excavation, may be warranted and would be discussed in consultation with the property owner, the City of San Jacinto, or any other relevant regulatory agency, as appropriate. Prior to any Earthmoving Activity/ Grading Planning 7) MM CR 2 - In the event of the discovery of human remains, the Riverside County coroner shall be immediately notified. If human remains of Native American origin are discovered during ground disturbing activities, the applicant shall comply with the State law relating to the disposition of Native American burials that fall within the jurisdiction of the NAHC (PRC Section 5097). According to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 8100), and disturbance of Native American cemeteries is a felony (Section 7052). Section 7050.5 requires that excavation be stopped near discovered human 4.1.d Packet Pg. 263 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 287 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 11 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? remains until the coroner can determine whether the remains are those of a Native American. If the remains are determined to be Native American, the California Native American Heritage Commission and the Soboba Band of Luiseño Indians shall be notified, and appropriate measures provided by State law shall be implemented to determine the most likely living descendant(s). Disposition of the remains shall be overseen by the most likely living descendants to determine the most appropriate means of treating the human remains and any associated grave artifacts. Prior to any Earthmoving Activity/ Grading Engineering Department 8) The developer/applicant or successor in interest shall submit three (3) copies of a comprehensive grading plan at 40-scale for review and approval to the Engineering Department with any required fee and one (1) copy to the Project Planner. The plan shall comply with the Uniform Building Code, Chapter 70, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. The plan shall be drawn on 24" X 36" Mylar by a registered civil engineer. A copy of all pages of these conditions shall be included in the plans. Prior to any Earthmoving Activity/ Grading Planning 9) Grading and public improvements shall be installed in accordance with City standards and specifications. The tops of all graded slopes shall be at the property line. Any graded area that remains undeveloped between phases shall be maintained with a decomposed granite concrete mix, to prevent wind and water erosion. 4.1.d Packet Pg. 264 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 288 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 12 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to any Earthmoving Activity/ Grading Planning 10) The grading plan shall include the following, for Planning approval: A. An ADA path of travel enhanced with decorative paving, stamped concrete, pavers, or another material differentiating the walk from the asphalt parking area as approved by Planning and Community Development Director. B. A public sidewalk with special decorative paving accents where crossed by driveway entrances to parking lots. C. Parking areas surfaced with Portland-Cement Concrete paving to a minimum 4-inch thickness over native soil compacted to 95% compaction or asphalt concrete with 2½ inch thickness over 4 inches of Class II aggregate base compacted to 95% relative compaction, or as approved by the City Engineer. Prior to any Earthmoving Activity/ Grading Planning 11) A final Water Quality Management Plan (WQMP) shall be submitted and approved, including a project description, and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The Water Quality Management Plan shall identify the structural and non-structural measures consistent with the City’s adopted requirements. Prior to any Earthmoving Activity/ Grading Planning 12) The proposed site design BMPs selected for this project have been approved in concept as a Master WQMP. The individual parcels shall submit Final WQMP Addendums including plans and details providing the elevations and slopes of the three bio-retention basins, the detention basin and other details for the proposed structural BMPs. The Public Works Department shall review and approve the Final WQMP document, plans and details. The property owners will also provide signed agreements presenting shared responsibilities for the BMP maintenance. 4.1.d Packet Pg. 265 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 289 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 13 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to any Earthmoving Activity/ Grading Planning 13) MM GEO 2 - All earthmoving during project implementation at or below 4 feet requires full-time paleontological monitoring, as follows:  A qualified paleontologist (graduate degree and more than one year of professional experience as a principal investigator) will be retained to provide paleontological services. The principal paleontologist will be responsible to implement and oversee monitoring and to maintain professional standards of work. The principal paleontologist will report all mitigation and monitoring activities, or related actions of the paleontological resources team to the City, as appropriate, including discussing a reduction in monitoring from full- to part- time after monitoring is initiated and no fossils have been identified.  A qualified paleontological monitor will perform monitoring of construction grading and excavations that take place in the older Pleistocene sediments at depths of 4 feet or more. The monitor will have authority to divert grading away from exposed fossils temporarily in order to recover the fossil specimens. Cooperation and assistance from on-site personnel will greatly assist timely resumption of work in the area of the fossil discovery.  Discovery of fossil producing localities requires documentation including measured stratigraphic columns and geologic samples for analysis. Any fossils recovered that meet significance criteria will be prepared, identified, and cataloged before donation to an appropriate repository. The Western Science Center in Hemet, California is recommended as an appropriate repository.  The principal paleontologist retained will prepare a final report. The report will include a list of specimens recovered, documentation of each locality, interpretation of fossils recovered, and will include any specialists’ reports as appendices. 4.1.d Packet Pg. 266 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 290 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 14 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to any Earthmoving Activity/ Grading Engineering Department 14) A geotechnical engineering report shall be submitted to the City Engineer prior to issuance of a grading permit, and all requirements identified in the report shall be met. The report must be prepared by a California licensed geotechnical engineer or civil engineer skilled in soils/foundation investigations and shall be submitted for review by the Building & Safety Department prior to the issuance of grading or building permits. All requirements identified in the report shall be met. Prior to any Earthmoving Activity/ Grading Engineering Department 15) Onsite and offsite fire hydrants shall be installed as determined by the Fire Department. Prior to any Earthmoving Activity/ Grading Engineering Department 16) The developer/property owner shall submit the following to the City Engineer for review and approval:  Onsite Grading Plan and Erosion Control Plan – All pads shall be graded to be a minimum of 1’ above 100-year calculated water surface elevation or adjacent finished grade. Plans shall show the approved WDID No.  Drainage Plan, Hydrology and Hydraulic Report  Final WQMP (for reference)  Water & Sewer Plan – Fire Department and EMWD approval required prior to City Engineer approval.  Street Improvement Plan  Traffic Signal Plans prepared by Traffic Engineer  Signing and Striping plan prepared by Traffic Engineer  Streetlight Plan prepared by a Registered Electrical Engineer per City of San Jacinto standards. Street lights shall be LS3 – LED type. 4.1.d Packet Pg. 267 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 291 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 15 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET?  The project’s design shall be in compliance with EMWD, Riverside County Flood Control and Water Conservation District, Riverside County, Caltrans, City of San Jacinto and ADA most recent standards, criteria and requirements and in effect at the time of construction and coordinated with approved plans for adjacent developments. Prior to any Earthmoving Activity/ Grading Engineering Department 17) The developer/property owner shall provide water and sewer service to this project in accordance with the requirements of the appropriate utility purveyors. This project is within City of San Jacinto sewer service area and Eastern Municipal Water District’s water service area. Water and sewer improvements shall be installed per EMWD Standards and Fire Department requirements. Prior to any Earthmoving Activity/ Grading Engineering Department 18) The incremental increase in runoff volume between developed and undeveloped state for the 85th percentile storm, shall be retained within onsite private detention facilities. The applicant larger storms proposes to collect into the detention system and discharge them into Main Street through a curb outlet. Prior to any Earthmoving Activity/ Grading Engineering Department 19) This project is located within the limits of the San Jacinto Valley Area Drainage Plan for which drainage fees have been adopted by the City. Drainage fees shall be paid as set forth under the provisions of the “Rules and Regulations for Administration of Area Drainage Plan”. During Construction Planning 20) MM NOI 4 - Idling equipment shall be turned off when not in use. During Construction Planning 21) MM NOI 1 - Construction shall occur during the permissible hours as defined in Section 8.40.090. 4.1.d Packet Pg. 268 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 292 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 16 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? During Construction Planning 22) MM NOI 2 - During construction, the contactor shall ensure all construction equipment is equipped with appropriate noise attenuating devices. During Construction Planning 23) MM NOI 3 - The contractor shall locate equipment staging areas that will create the greatest distance between construction -related noise/vibration sources and sensitive receptors nearest the project site during all project construction. Prior to the Issuance of Building Permits –SPDR 17-17 Prior to Issuance of Building Permits Planning 24) All buildings except for the retail building located on Parcel 1 for which Design Review of Elevations were included for SPDR 17-17 shall submit for and obtain Site Plan and Design Review approval. Prior to Issuance of Building Permits Planning 25) The developer shall enter into an agreement with the City franchised trash hauler for the removal of construction waste and debris from the construction site. Prior to Issuance of Building Permits Planning 26) Submit a detailed landscape and irrigation plan for review and approval. The landscape plans shall be prepared by a licensed landscape architect in conformance with Chapter 17.325 – Water Efficient Landscape and Irrigation and Section 17.325.060 — Landscape and Irrigation Submittal Package Requirements of the Development Code and the City Landscape Design Guidelines for review and approval by the City Landscape Architect. Plans should be submitted at least 30 days prior to the expected date of permit issuance. 4.1.d Packet Pg. 269 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 293 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 17 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Planning 27) Submit, for Planning approval, an outdoor lighting plan in compliance with the following: A. A site plan showing all parking lot light standards, building mounted light fixtures, and any up-lighting in landscaping, low-level walk lights, and lighting diffused off of wall surfaces. B. Cut sheets for all proposed lighting fixtures. C. The lighting shall be indirect, hooded, and arranged to reflect lighting away from adjoining properties and streets in compliance with Section 17.300.080 (Outdoor Light and Glare). D. Parking lot light standards shall be a maximum of 25 feet in height overall, as measured from the usable parking or driving surface. E. Outdoor lighting shall maintain a minimum of one-foot candle illumination for all parking and pedestrian areas and shall not exceed one-half foot candle along property lines of the subject site. F. Include a photometric plan that includes details such as beam spreads and/or photometric calculations, location and type of fixtures, and arrangement of exterior lighting that does not create glare or hazardous interference to adjacent streets or properties. Prior to Issuance of Building Permits Planning 28) Submit for Planning approval, the plans for trash enclosures. Pursuant to City standards, trash receptacles shall be enclosed by a six (6) foot high solid decorative masonry wall with solid view-obstructing gates, a solid roof with trellis feature, an ADA accessible pedestrian entrance and a drain to the sewer system. The enclosures shall be designed so they cannot be entered into in any way when door and gates are closed and locked. Approved Trash Enclosure plans shall be shown on the plans submitted for Plan Check. 4.1.d Packet Pg. 270 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 294 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 18 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits I Planning 29) The developer/applicant or successor in interest shall record a “Water Quality Management Plan and Urban Runoff BMP Transfer Access and Maintenance Agreement,” to provide public notice of the re quirement to implement the approved Final project-specific WQMP and the maintenance requirements associated with the WQMP. Prior to Issuance of Building Permits Planning 30) The developer/applicant or successor in interest may have to secure coverage under the State’s General Industrial Activities Storm Water Permit as issued by the State Water Resources Control Board. Prior to Issuance of Building Permits Planning 31) The developer/applicant or successor in interest shall ensure the following pursuant to Section XII. I of the 2010 NPDES Permit. Field verification that structural Site Design, Source Control, and Treatment Control BMPs are designed, constructed and functional in accordance with the approved Final Water Quality Management Plan (WQMP). City WQMP Inspector will be notified for required inspections during construction. 4.1.d Packet Pg. 271 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 295 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 19 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Planning 32) MM GEO 1 - The Soil and Foundation Report (Soils Southwest, 2017) provides foundation recommendations to minimize seismic-induced settlement hazards. These include using conventional checkered/waffle type rigid footings for exterior load bearing walls along with interior grade beams, or using a rigid mat foundation. Additional recommendations address concrete slab construction and cu ring, excavation and fill, pavement and utility trenches. The recommendations identified in the Soil and Foundation Report, or similar measures approved by a registered civil engineer, shall be incorporated into the construction plans. Project plans will be reviewed during the plan check process to confirm geotechnical design measures are incorporated to address the potential for seismic-induced settlement. These measures shall be incorporated into final construction plans prior to issuance of building permits. Prior to Issuance of Building Permits Engineering 33) MM TRAF 2 - Ramona Expressway/Main Street-Lake Park Drive: The project applicant shall restripe the eastbound approach to include one left turn lane, one through lane, and one shared through/right turn lane. Prior to Issuance of Building Permits Planning 34) MM NOI 7 - All HVAC units on the roofs of the retail buildings on Parcels 1 and 2 shall be shielded to maintain the nighttime standard of 45 dBA at the adjacent residential property line. A parapet or acoustic screen shall be provided that extends two feet in height above the top of the HVAC units. A noise control analysis of the HVAC plans and specifications shall be provided prior to issuance of building permits to ensure that the HVAC units would not exceed the 45 dBA standard at the adjacent residential property line. 4.1.d Packet Pg. 272 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 296 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 20 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Building & Safety 35) Any building, sign, or structure to be constructed or located on site, will require professionally prepared plans based on the most current City and California Building Codes, submitted for review and approval and comply with the following:  The proposed roof-mounted equipment shall be completely screened so as not to be visible from any street or private property adjacent to the Project. The screening shall be an integral part of the building; details shall be provided to the Planning Department for review and approval prior to issuance of building permits. Any proposed change shall be reviewed and approved by the Planning Department.  Any ground mounted equipment or equipment attached to the building, including gas and electrical meters, and electrical or mechanic cabinets shall be completely screened so as not to be visible from any street or private property adjacent to the Project. Chain link fencing is not an approved screening material. Prior to Issuance of Building Permits Building & Safety 36) The developer/applicant or successor in interest shall pay school fees as required by State law. The developer/applicant or successor in interest shall receive written clearance from the San Jacinto Unified School District. Prior to Issuance of Building Permits Building & Safety 37) All lumber scraps, combustible materials, and other debris shall be picked up daily, or more often as required by the Building and Safety Division. Prior to Issuance of Building Permits Cal Fire – Riverside County Fire Department 38) The required water system, including all fire hydrant(s), shall be installed and accepted by the appropriate water agency and the Riverside County Fire Department prior to any combustible building material placed on an individual lot. Approved water plans must be at the job site. 4.1.d Packet Pg. 273 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 297 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 21 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Cal Fire – Riverside County Fire Department 39) Fire Sprinkler System: All structures 3,600 square feet or larger will be required to install a fire sprinkler system in accordance with the CFC and NFPA 13. Ref. CFC 903.2 as amended by the City of San Jacinto. Prior to Issuance of Building Permits Cal Fire – Riverside County Fire Department 40) Fire hydrants shall be located within 400’ of all exterior portions of the structures, along required fire apparatus access roads, and adjacent to public streets in the quantities and up to the maximum distance as required by California Fire Code and Riverside County Fire Department. Prior to Issuance of Building Permits Cal Fire – Riverside County Fire Department 41) The address shall be posted per Riverside County Fire Department standards and will be clearly visible from public roadway. Prior to Issuance of Building Permits Engineering Department 42) The developer shall provide water and sewer services to this project in accordance with the requirements of the appropriate utility purveyor. This project is within the Eastern Municipal Water District’s sewer and water service area. Water and sewer improvements shall be installed per EMWD standards. Prior to Issuance of Building Permits Engineering Department 43) All rights-of-way dedication shall be offered to the public and shall continue in force until the City accepts or abandons such offers. Dedications shall be free from all encumbrances as approved by the City Engineer. Prior to Issuance of Building Permits Engineering Department 44) Paved access shall be provided to the proposed buildings per precise grading plan. 4.1.d Packet Pg. 274 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 298 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 22 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Issuance of Building Permits Engineering Department 45) The developer/property owner shall submit a compaction certification from the Soils Engineer in compliance with the approved geotechnical/soils report. Prior to Occupancy – SPDR 17-17 Prior to Occupancy Planning 46) All required on-site improvements shall be installed per approved plans. Prior to Occupancy Planning 47) Lighting shall be provided throughout the parking area at all hours of customer and employee use. Prior to Occupancy Planning 48) All landscaping, dust control measures, all walls/fences, pedestrian walkways, irrigation systems, etc. as delineated on the approved landscape plan shall be installed. Prior to Occupancy Planning 49) The developer/applicant or successor in interest shall submit the following items for the landscape and irrigation development and maintenance: a. The signed Landscape Certificate of Completion pursuant to Section 17.325.070 – Certificate of Completion of the Development Code; b. The irrigation scheduling pursuant to Section 17.325.080 – Irrigation Scheduling of the Development Code; c. The Landscape and Irrigation Maintenance Schedule pursuant to Section 17.325.090 – Landscape and Irrigation maintenance Schedule of the Development Code; and d. The Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis pursuant to Section 17.325.100 — Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis of the Development Code. 4.1.d Packet Pg. 275 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 299 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 23 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Planning 50) The developer/applicant or successor in interest shall pay any outstanding planning application or processing fees. Prior to Occupancy Building & Safety 51) The City has adopted Traffic Signal Mitigation fees and the Transportation Uniform Mitigation Fee (TUMF) program; this Project shall be subject to the payment of these fees prior to the issuance of building permits unless exempted by the ordinance establishing the TUMF program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of fee payment. Prior to Occupancy Building & Safety 52) The City of San Jacinto has adopted the area-wide Multi-Species Habitat Conservation Plan (MSHCP). This Project is subject to the payment of fees prior to the occupancy. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of payment. Prior to Occupancy Building & Safety 53) Specific addresses for each building shall be provided to make such number plainly visible from the public street, avenue, court, or alley upon which property fronts, and shall be contrasting color and background. Prior to Occupancy Building & Safety 54) Prior to occupancy all Department/Division requirements and signoffs shall be complete. 4.1.d Packet Pg. 276 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 300 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 24 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Engineering Department 55) Improve Ramona Expressway Urban Arterial Highway Standard (modified – 146’/114’ including an 18’ wide raised landscaped median and 16-foot parking) to include installation of half-width street improvements along the property frontage; curb and gutter located 57’ west of centerline and a 12’ wide Class 1 multi-purpose trail within the 16’ wide parkway. If the existing pavement is in good condition the developer/property owner may use grind and overlay technique as determined by the City Engineer. The design shall provide the lane assignments as depicted on the conceptual signing and striping plan prepared by Michael Baker International as included in the staff report. Prior to Occupancy Engineering Department 56) Improve Main Street - Secondary Highway Standard (100’/64’) to include installation of 6’ wide sidewalk within the 18’ wide parkway. If the existing pavement if in good condition the developer/property owner may use grind and overlay technique as determined by the City Engineer. Prior to Occupancy Engineering Department 57) Upgrade the existing traffic signal at the southwest corner of the intersection of Main Street and Ramona Expressway to ultimate design per City of San Jacinto and Riverside County Standards. Prior to Occupancy Engineering Department 58) Install traffic signals at the intersection of Ramona Expressway and Donna Way to ultimate design per City of San Jacinto and Riverside County Standards. This will require removal of a portion of the existing median to accommodate turning movement for northbound Ramona Expressway traffic, and the removal of the existing porkchop at the existing pavement if in good condition may be grind and overlayed as determined by the City Engineer 4.1.d Packet Pg. 277 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 301 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 25 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Engineering Department 59) The developer’s traffic study indicates that Main and Hewitt would not operate at an acceptable level of service after development of the site. Therefore, the developer shall install the signal at Hewitt and Main Street. Alternatively, the Developer shall execute the Soboba Mitigation Agreement, and provide the City with funds as detailed in the terms to that agreement. The City, subject to Council approval, would allocate funds toward the installation of the signal by a City administered public works contract. Removed By the Planning Commission (August 27, 2019). Prior to Occupancy Engineering Department 60) The driveways on Main Street and Ramona Expressway shall be limited to right - in/right-out only. Prior to Occupancy Engineering Department 61) Existing cables (under 66kv) shall be undergrounded and poles removed. All other poles if in conflict with proposed improvements shall be relocated, this may impact a signal pole at Ramona Expressway and Donna Way. Prior to Occupancy Engineering Department 62) Streetlights shall be installed on Ramona Expressway, Main Street and Donna Way adjacent to the site, as approved by the City Engineer. Prior to Occupancy Engineering Department 63) The property owner(s) shall support the continuous maintenance of the street lighting by annexing to the appropriate district prior to Certificate of Occupancy. All onsite lighting, drainage facilities, WQMP improvements and parking/median landscaping shall be the responsibility of the property owner. The property owner shall be responsible to pay its share of the maintenance of the traffic signals at the intersections of: Ramona Expressway and Main Street Ramona Expressway and Donna Way 4.1.d Packet Pg. 278 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 302 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 26 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Main Street and Hewitt Street Prior to Occupancy Engineering Department 64) Any appurtenances damaged or broken during the development of this project shall be repaired or removed and replaced by the developer/property owner to the satisfaction of the City Engineer. Any survey monuments damaged or destroyed shall be reset by a qualified professional pursuant to the California Business and Professional Code 8771. Prior to Occupancy Engineering Department 65) MM TRAF 1 - Main Street/Hewitt Street: The project applicant shall make a fair share contribution to the construction of a signal at this location. Prior to Occupancy Riverside County Environmental Health 66) A Hazardous Materials Business Plan permit must be obtained prior to operation. California Environmental Reporting System (CERS) submittal necessary (http://cers.calepa.ca.gov/) Prior to Occupancy Special Districts 67) Establish a funding mechanism for the maintenance of public improvements and public safety services. Annexation into the Community Facilities District (CFD) for Public Facilities Maintenance (MC 15.08.015) is an option to fulfill the funding requirement for maintenance of public improvements.  $21,800.00 + $25 per parcel Funding of services under the City’s CFDs will consist of an annual assessment based on the costs of such services, as determined by a City’s Engineer’s Estimate, established at the time of annexation. 4.1.d Packet Pg. 279 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 303 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 27 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Timing Responsible Department Condition of Approval – Luiseno Village MET? Prior to Occupancy Special Districts 68) Development must comply with Storm Water Basin & Pump Specifications and Standards. Prior to Occupancy Special Districts 69) Development must comply with Landscape and Irrigation Design Guidelines. Prior to Occupancy Special Districts 70) Landscape improvements shall have irrigation water meters, exclusive for right - of-way landscaping. Prior to Occupancy Special Districts 71) Landscape areas in the right-of-way shall have an independent irrigation control system, exclusive for right-of-way landscaping.  Cal-Sense 3000 or newer is required for all irrigation areas Overall Project Operational Conditions Prior to Issuance of Building Permits Planning 72) MM NOI 5 - Solid Waste and recycling collection shall only occur during daytime hours (7:00 a.m. and 7:00 p.m.). Prior to Issuance of Building Permits Planning 73) MM NOI 6 - Truck deliveries shall only occur during daytime hours (7:00 a.m. and 7:00 p.m.). 4.1.d Packet Pg. 280 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 304 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 28 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Conditions For CUP 17-09 Description: Service Station with 24 fuel stations, a 3,048 square foot Convenience Store , with a type 20 license for beer and wine sales, and 1,105 square foot car wash. Prior to the Issuance of Grading Permits –CUP Prior to Grading Planning 74) The developer shall submit a Site Plan & Design Review for review and approval. Prior to Grading Planning 75) The developer/applicant or successor in interest shall submit three (3) copies of a comprehensive grading plan at 40-scale for review and approval to the Engineering Department with any required fee and one (1) copy to the Project Planner. The plan shall comply with the Uniform Building Code, Chapter 70, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. The plan shall be drawn on 24" X 36" Mylar by a registered civil engineer. A copy of all pages of these conditions shall be included in the plans. Prior to the Issuance of Building Permits Prior to Issuance of Building Permits Planning 76) Submit a detailed landscape and irrigation plan for review and approval. The landscape plans shall be prepared by a licensed landscape architect in conformance with Chapter 17.325 – Water Efficient Landscape and Irrigation and Section 17.325.060 — Landscape and Irrigation Submittal Package Requirements of the Development Code and the City Landscape Design Guidelines for review and approval by the City Landscape Architect. Plans should be submitted at least 30 days prior to the expected date of permit issuance. Prior to Issuance of Building Permits Building & Safety 77) Any building, sign, or structure to be constructed or located on site, will require professionally prepared plans based on the most current City and California Building Codes, submitted for review and approval. Prior to Issuance of Planning 78) Prior to building permit issuance, the applicant shall demonstrate compliance with SCAQMD rules, Rule 201 – Permit to Construct, Rule 203 – Permit to Operate, 4.1.d Packet Pg. 281 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 305 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 29 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Building Permits and Rule 461 – Gasoline Transfer and Dispensing by obtaining the proper permits from SCAQMD. Prior to Issuance of Building Permits Building & Safety 79) The developer/applicant or successor in interest shall pay school fees as required by State law. The developer/applicant or successor in interest shall receive written clearance from the San Jacinto Unified School District Prior to Issuance of Building Permits Riverside County Environmental Health 80) For the Convenience Store and Gas Station, the construction plan and permit shall be submitted to County of Riverside Department of Environmental Health and be approved prior to starting construction. Prior to Occupancy Prior to Occupancy Planning 81) The developer/applicant or successor in interest shall pay any outstanding planning application or processing fees. Prior to Occupancy Planning 82) The developer/applicant or successor in interest shall record a “Water Quality Management Plan and Urban Runoff BMP Transfer Access and Maintenance Agreement,” to provide public notice of the requirement to implement the approved Final project-specific WQMP and the maintenance requirements associated with the WQMP. Prior to Occupancy Planning 83) The developer/applicant or successor in interest may have to secure coverage under the State’s General Industrial Activities Storm Water Permit as issued by the State Water Resources Control Board. Prior to Occupancy Planning 84) The developer/applicant or successor in interest shall ensure the following, pursuant to Section XII. I. of the 2010 NPDES Permit:  Field verification that structural Site Design, Source Control, and Treatment Control BMPs are designed, constructed and functional in accordance with the approved Final Water Quality Management Plan (WQMP). City WQMP Inspector will be notified for required inspections during construction. 4.1.d Packet Pg. 282 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 306 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 30 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village -  The irrigation scheduling pursuant to Section 17.325.080 – Irrigation Scheduling of the Development Code;  The Landscape and Irrigation Maintenance Schedule pursuant to Sec-tion 17.325.090 – Landscape and Irrigation maintenance Schedule of the Development Code; and  The Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis pursuant to Section 17.325.100 — Irrigation Audit, Irrigation Survey, and Irrigation Water Use Analysis of the Development Code. Prior to Occupancy Building & Safety 85) Prior to final inspection by Building and Safety Division and/or issuance of a Certificate of Occupancy the applicant shall pay in full all fees. Prior to Occupancy Building & Safety 86) Specific addresses for each building shall be provided to make such number plainly visible from the public street, avenue, court, or alley upon which property fronts, and shall be contrasting color and background. Prior to Occupancy Building & Safety 87) Prior to occupancy all Department/Division requirements and signoffs shall be complete. Prior to Occupancy Building & Safety 88) The City has adopted Traffic Signal Mitigation fees and the Transportation Uniform Mitigation Fee (TUMF) program; this Project shall be subject to the payment of these fees prior to the issuance of building permits unless exempted by the ordinance establishing the TUMF program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of building permit issuance. Prior to Occupancy Building & Safety 89) The City of San Jacinto has adopted the area-wide Multi-Species Habitat Conservation Plan (MSHCP). This Project is subject to the payment of fees prior to the issuance of building permits unless exempted by the ordinance establishing the MSHCP program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of building permit issuance. 4.1.d Packet Pg. 283 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 307 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 31 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Prior to Occupancy Riverside County Environmental Health 90) A Hazardous Waste Generator Permit must be obtained prior to operation. Prior to Occupancy Riverside County Environmental Health 91) A Hazardous Materials Business Plan permit must be obtained prior to operation. California Environmental Reporting System (CERS) submittal necessary (http://cers.calepa.ca.gov/) Prior to Occupancy Riverside County Environmental Health 92) An Underground Storage Tank operating permit must be obtained prior to operation. DEH Hax Mat Plan Check process required. OPERATONAL CONDITIONS Operation Conditions Planning 93) A Hazardous Waste Generator Permit must be obtained prior to operation. Operation Conditions Planning 94) The service station with a convenience store with off-sale beer and wine license shall be operated as described in the submitted application for this Project and as described in the body of the staff report; unless superseded by these conditions of approval. Operation Conditions Planning 95) The service station with a convenience store with off-sale beer and wine license shall be developed and operated per the required standards of the Development Code Operation Conditions Planning 96) A copy of the Conditional Use Permit and Final Conditions of Approval shall be available at the site and presented to City staff, including the Police Department and Code Enforcement, upon request. Failure to have the latest approved conditions available upon request will be grounds for revocation of the Conditional Use Permit. Operation Conditions Planning 97) A copy of the California Department of Alcohol and Beverage Control license for the premises shall be available at the site and presented to City staff, including 4.1.d Packet Pg. 284 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 308 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 32 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - the Police Department and Code Enforcement, upon request. Failure to have the license available upon request will be grounds for revocation of the Conditional Use Permit. Operation Conditions Planning 98) The off-sale alcohol premises shall be posted to indicate that it is unlawful for an y person to drink or consume any alcoholic beverage in any public place or posted premises. Operation Conditions Planning 99) A sign shall be posted in front of the convenience store indicating that no loitering is permitted. Operation Conditions Planning 100) No sale of alcoholic beverages shall be made from a drive-through lane or window. Operation Conditions Planning 101) The display area of the alcoholic beverages shall be limited to 2% of the total floor area of the store, as depicted on the conceptual floor plan Operation Conditions Planning 102) No displays of beer and wine shall be located within five-feet of the store’s entrances, windows or checkout counter. Operation Conditions Planning 103) Cold beer and wine shall be sold from, or displayed in, the main, permanently affixed electrical coolers only. Operation Conditions Planning 104) No beer or wine advertising shall be located on service station islands; no advertising for beer or wine shall be located on buildings or windows visible to the exterior. Operation Conditions Planning 105) All security cameras, both interior and exterior, around the facility covering the inside and outside of the building as well as surrounding areas, shall be maintained in good operational service and used 24 hours a day Operation Conditions Planning 106) At least 240 hours of video data will be recorded and saved for future playback or review. Operation Conditions Planning 107) The business windows of the convenience store shall not be tinted or obscured in any way, including by temporary or painted window signs, and the interior lighting of the building shall remain at adequate levels to clearly see into the business from the exterior. 4.1.d Packet Pg. 285 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 309 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 33 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Operation Conditions Planning 108) The subject alcoholic beverage license shall not be exchanged for a public premises type license or operated as a public premise. All alcoholic beverages sold shall be for consumption off the premises. Operation Conditions Planning 109) All storage and display of merchandise and supplies must be conducted within the building. Operation Conditions Planning 110) Lighting shall be provided throughout the parking area at all hours of customer and employee use. Operation Conditions Planning 111) All parking and drive aisles shall be screened from the public right -of-way with a landscape hedge or decorative wall, as reviewed and approved by the Planning and Community Development Director. 4.1.d Packet Pg. 286 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 310 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 34 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Conditions For MUP 17-09 Project Description: A Minor Use Permit for a fast-food restaurant with drive-through service totaling 2,800 square feet. Prior to Grading Prior to Issuance of Building Permits Planning 112) The developer shall submit a Site Plan & Design Review for review and approval. Prior to Issuance of Building Permits Planning 113) The developer/applicant or successor in interest shall submit three (3) copies of a comprehensive grading plan at 40-scale for review and approval to the Engineering Department with any required fee and one (1) copy to the Project Planner. The plan shall comply with the Uniform Building Code, Chapter 70, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. The plan shall be drawn on 24" X 36" Mylar by a registered civil engineer. A copy of all pages of these conditions shall be included in the plans. Prior to Building Permits Prior to Occupancy Building & Safety 114) The developer/applicant or successor in interest shall pay school fees as required by State law. The developer/applicant or successor in interest shall receive written clearance from the San Jacinto Unified School District. Prior to Occupancy Building & Safety 115) Any building, sign, or structure to be constructed or located on site, will require professionally prepared plans based on the most current County and California Building Codes, submitted for review and approval. Prior to Occupancy 116) The developer/applicant or successor in interest shall pay any outstanding planning application or processing fees. Prior to Occupancy Building & Safety 117) Specific addresses for each building shall be provided to make such number plainly visible from the public street, avenue, court, or alley upon which property fronts, and shall be contrasting color and background. 4.1.d Packet Pg. 287 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 311 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 35 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Prior to Occupancy Building & Safety 118) Prior to occupancy all Department/Division requirements and signoffs shall be complete. 119) Prior to final inspection by Building and Safety Division and/or issuance of a Certificate of Occupancy the applicant shall pay in full all fees. Prior to Occupancy Building & Safety 120) The City has adopted Traffic Signal Mitigation fees and the Transportation Uniform Mitigation Fee (TUMF) program; this Project shall be subject to the payment of these fees prior to the issuance of building permits unless exempted by the ordinance establishing the TUMF program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of building permit issuance. Prior to Occupancy Building & Safety 121) The City of San Jacinto has adopted the area-wide Multi-Species Habitat Conservation Plan (MSHCP). This Project is subject to the payment of fees prior to the occupancy. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of payment. Operational Conditions Operational Conditions Planning 122) The fast-food restaurant with a drive-through, automated car wash and tire store shall be operated as described in the submitted application for this Project and as described in the body of the staff report; unless superseded by these conditions of approval. Operational Conditions Planning 123) The permit a fast food restaurant with a drive -through, automated car wash, and tire store shall be developed and operated per the required standards of the Development Code. 4.1.d Packet Pg. 288 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 312 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 36 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Conditions of Approval – MUP 17-10 Project Description: A Minor Use Permit for a fast-food restaurant with drive-through service totaling 3,200 square feet. Prior to Grading Prior to Precise Grading Planning 124) The developer shall submit a Site Plan & Design Review for review and approval. Prior to Precise Grading Planning 125) The developer/applicant or successor in interest shall submit three (3) copies of a comprehensive grading plan at 40-scale for review and approval to the Engineering Department with any required fee and one (1) copy to the Project Planner. The plan shall comply with the Uniform Building Code, Chapter 70, Cit y Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. The plan shall be drawn on 24" X 36" Mylar by a registered civil engineer. A copy of all pages of these conditions shall be included in the plans. Prior to Building Permits Prior to Building Permits Building and Safety 126) The developer/applicant or successor in interest shall pay school fees as required by State law. The developer/applicant or successor in interest shall receive written clearance from the San Jacinto Unified School District. Prior to Building Permits Building and Safety 127) Any building, sign, or structure to be constructed or located on site, will require professionally prepared plans based on the most current County and California Building Codes, submitted for review and approval. Prior to Occupancy Prior to Occupancy Planning 128) The developer/applicant or successor in interest shall pay any outstanding planning application or processing fees. Prior to Occupancy Building & Safety 129) Prior to final inspection by Building and Safety Division and/or issuance of a Certificate of Occupancy the applicant shall pay in full all fees. Prior to Occupancy Building & Safety 130) Specific addresses for each building shall be provided to make such number plainly visible from the public street, avenue, court, or alley upon which property fronts, and shall be contrasting color and background. 4.1.d Packet Pg. 289 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 313 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP- Conditions of Approval Page 37 of 37 General Notes, Requirements, and Conditions of Approval Luiseno Village - Prior to Occupancy Building & Safety 131) Prior to occupancy all Department/Division requirements and signoffs shall be complete. Prior to Occupancy Building & Safety 132) The City has adopted Traffic Signal Mitigation fees and the Transportation Uniform Mitigation Fee (TUMF) program; this Project shall be subject to the payment of these fees prior to the issuance of building permits unless exempted by the ordinance establishing the TUMF program. The fees shall be subject to the provisions of the enabling ordinance and based upon the fee schedule in effect at the time of building permit issuance. Prior to Occupancy Building & Safety 133) The City of San Jacinto has adopted the area-wide Multi-Species Habitat Conservation Plan (MSHCP). This Project is subject to the payment of fees prior to the occupancy. The fees shall be subject to the provisions of th e enabling ordinance and based upon the fee schedule in effect at the time of payment. Prior to Occupancy Public Works 134) All exterior lighting shall be LED, including both wall packs and parking lights. Interior lighting shall be LED as well Operational Conditions Operational Conditions Planning 135) The fast-food restaurant with a drive-through, automated car wash and tire store shall be operated as described in the submitted application for this Project and as described in the body of the staff report; unless superseded by these conditions of approval. Operational Conditions Planning 136) The permit a fast food restaurant with a drive-through, automated car wash, and tire store shall be developed and operated per the required standards of the Development Code. 4.1.d Packet Pg. 290 Attachment: 4 - Planning Commission Recommended Conditions of Approval (Luiseno Village (SPDR-17-4.1.a Packet Pg. 314 Attachment: September 17, 2019 City Council Staff Report (Luiseno Village (SPDR-17-17, CZ-17-05; CUP-