HomeMy WebLinkAboutResolution - 99-42 RESOLUTION NO. 99-42
RESOLUTION OF THE CITY COUNCIL OF TIIE CITY OF SAN JACINTO
ESTABLISBING A SCHEDULE OF FEES AND CHARGES FOR CERTAIN SERVICES
PERFORMED FOR AND OR BY THE CITY OF SAN JACINTO BUILDING AND
SAFETY DEPARTMENT IN ACCORDANCE WITH CITY OF SAT JACINTO
ORDINANCE NO. 1074
WHEREAS, the City Council of San Jacinto has adopted Ordinance No. 1074, adopting
the Uniform Building Code, 1997 Edition, including all appendices and with certain
amendments; the Uniform Administrative Code, 1997 Edition, including all appendices and
certain other Codes known as: The Uniiorin Housing Code, 1997 Edition, including all
appendices; the Uniform Building Code Standards, 1997 Edition, including all appendices;
Uniform Mechanical Code 1997 Edition, including all appendices; the Uniform Plumbing Code
1997 Edition, including all appendices;the National Electrical Code, 1996 Edition, including all
appendices: the Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition,
including all appendices; and the Uniform Swimming Pool, Spa and Hot Tub Code 1997
Edition; including all appendices; and
WHEREAS, the declared intent of the City Council requires the San Jacinto Building and
Safety Department to associate the costs of a specified service with the limited number of
persons who most benefit from that service; and
WHEREAS, the cost of rendering such services should be borne by the beneficiaries of
such service; and
WHEREAS, a public hearing was held on July 1, 1999 and on July 15, 1999, concerning
the schedule of fees and charges.
NOW THEREFORE.., BE IT RESOLVED BY THE CITY COUNCIL OF THF. CITY OF
SAN JACINI'O (fiat it hereby approves the fees and charges for the San Jacinto Building and
Safety Department as set forth in Exhibits A, Band C attached hereto and made a part hereof,
and that said fees and charges shall be in full force and effect upon the effective date of
Ordinance No. 1074.
Moved, passed and adopted this 5`h day of August, )999.
AYES: Council Members Conner, Good, Smedley, Williams and Mayor Cornett
NOES: None
ABliF,NT: None
CITY OF SAN JACINTO, CALIFORNIA
.Mayor
ATTEST:
By:LZ 1
City C;crk
CERTIFICATION
STA'11E OF CALIFORNIA)
COUNTY OF RIVERSIDE)
CITY OF SAN JACINTO)
1, Pamela L. Lee, City Clerk of the City of San Jacinto, do hereby testify that the
foregoing is a true copy of Resolution No, 99-42 , duly adopted by the City Council of the City
of San Jacinto at a regular meeting thereof held the 5th day of August , 1999.
WITNESS, my hand and official seal of the City of San Jacinto this day of
1999.
City Clerk
FXIIIBIT "A"
All Plan Check Fees required by Ordinance No. 1074 are non-refundable.
SECTION J. BUILDING PERMIT FEES
Total Valuation Fee
$1.00 to $500.00 $23.50
$501.00 - $2,000.00 $23.50 far the first $500.00 plus
$3.05 for each additional $100.00, or
fraction thereof, to and including
$2,000.00
$2.001.00 to $25,000.00 $69,25 for the first $2,000.00 plus
$14.00 for each additional $1,000.00,
or fraction thereat, to and including
$25,000.00
$257001.00 to $50,000.00 $391.75 for the first $25,000.00 plus
$10.10 for each additional $1,000.00,
or fraction thereof, to and including
` w $50,000.00
$50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus
$7.00 for each additional $1,000,00,
or fraction thereof, to and including
$100,000.00
$i00.001.00 to $500,000.00 $993.75 for the first $100,000.00
plus $5.60 for each additional
$1,000.00, or fraction thereof, to and
including $500,000.00
$500,001,00 to $100,000.00 $3,233.75 for the first $500,000.00
plus $4.75 for each additional
$1,000.00, or fraction thereof, to and
including; $1,000,000.00
$1,000,001.00 and up $5,608.75 for the first $1,00U00.00
plus $3.65 for each additional
$1,000.00, or fraction thereof.
Other inspections and Fees:
1. Inspections outside of normal business hours...................................$47.00 per hour
(minimum charge - two hours)
2. Reinspection fees assessed wider :provisions of Section 305.8..........$47.00 per hour
3. Inspections for which no fee is specifically indicated........................$47,00 per hour
4. Additional plan review required by changes, additions or revisions to plans $47.00 per
hour *
5. Por use of outside consultants for plan checking and inspections, or both....Actual
Costs**
* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision, overlicad, equipment, hourly wages and the fringe benefits of the employees
involved.
** Actual costs include administrative and overhead costs.
SECTION B. ELECTRICAL PERMIT FEES
Permit Issuance
l. For the issuance of each electrical permit.........................................$2 3.50
2. For the issuing of each supplemental permit for which the original permit has not expired,
been canceled, or finaled....................................................................$ 7.25
System Fee Schedule
(Note: The following do not include permit-issuing fee.)
1, New Residential Buildings
The following fees shall include all wiring and electrical equipment in or on each
building, or other electrical equipment on the same promises constructed at the same
time.
Multifamily. 1'or new multifamily buildings (apartments and condominiums) having
three or more dwelling units constructed at the same time, not including the area of
garages, carports and accessory buildings, per square foot (0.09 M2)........................$.05
Page No. 2
Single-and two-family. For new sing,lc-and two-family residential buildings constructed
�- at the same time and not including the area of garages, carports and accessory buildings,
per square foot (0.09 M2).......................................................................$.056
For other types of residential occupancies and for alterations, additions and modifications
to existing residential buildings, use the Unit Fee Schedule.
2. Private Swimming Pools
For new private, in-ground swimming pools for single-family and multifamily
occupancies, including a complete system of necessary branch circuit wiring, bonding,
grounding, underwater lighting, water pumping and other similar electrical equipment
directly related to the operation of a swimming pool, each pool.
3. Carnivals and Circuses
Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable-type
rides, booths. displays and attractions.
For electrical generators and electrically driven rides, each.........................$23.50
For mechanically driven rides and walk-through attractions or displays having electric
lighting, each................................................................._..............................$ 7.25
For a system of area and booth lighting, each...............................................$ 7.25
For permanently installed rides, booths, displays and attractions, use the Unit Fee
Schedule.
4, Temporary Power Service
For a temporary service pole or pedestal, including all pole or pedestal-mounted
receptacles outlets and appurtenances, each.....................................................$23.50
For a temporary distribution system and temporary lighting and receptacle outlets for
construction sites, decorative lights, Christmas tree sales lots, fireworks stands, etc.,
each.........................................._.................,.............. ........ ..... ...$12.30
Unit Fee Schedule
(Note: The following do not include permit-issuing fee.)
1. Receptacle, Switch and Light Outlets
For receptacle, switch, light or other outlets at which current is used or controlled, except
services, feeders and meters:
First 20 fixtures. each.........................................................................................S1.10
'`r Page No. 3
Additional fixtures, each.....................................................................................$.73
Note; For multi outlet assemblies, each 5 feet (1524 mm) or fraction thereof may be
considered as one outlet.
�. Lighting Fixtures
For lighting fixtures, sockets or other lam-holding devices:
First 20 fixtures_ each.........................._..................................................$1.10
Additional fixtures. each..........................................................................$ .73
For pole or platform-mounted lighting fixtures, each..............................$1.10
For theatrical-type lighting fixtures or assemblies, each............... $1.10
3. Residential Appliances
For fixed residential appliances or receptacle outlets for same; including wall-mounted
electric ovens; counter-mounted cooking tops; electric ranges; self-contained room,
console or through-wall air conditioners; space heaters; food waste grinders; dishwashers;
washing machines; water heaters; clothes dryers; or other motor-operated appliances not
exceeding 1 horsepower (HP) ('146 W) in rating, cacti...................................$4,75
Vote: For other types of air conditioners and other motor-driven appliances having larger
electrical ratings, see Power Apparatus.
4, Nonresidential Appliances
For nonresidential appliances and self-contained factory-wired, nonresidential appliances
not exceeding 1 horsepower (HP), kilowatt (kW) or kilovolt-ampere (kVA), in rating,
including medical and dental devises; food; beverage and ice cream cabinets; illuminated
show cases; drinking fountains; vending machines; laundry machines; or other similar
types of equipment, each...................................................................................$4.75
Note: For other types of air conditioners and other motor-driven appliances having larger
electrical ratings, see Power Apparatus.
5. Power Apparatus
for motors, generators, transformers, rectifiers, synchronous converters, capacitors,
industrial heating, air conditioners and heat pumps, cooking or baking equipment and
other apparatus, as follows:
Page No. 4
bating in horsepower (HP), kilowatts (kW), kilovolt-amperes (kVA) or
kilovolt-amperes-reactive (kVAR):
Up to and including 1, each.............................................................$4.75
Over 1 and not over 10, each...........................................................$12.30
Over 10 and not over 50, each.........................................................$24.60
Over 50 and not over 100, each.......................................................$49.50
Over100, each.................................................................................$74,50
Notes:
l. For equipment or appliances having more than one motor, transformer, heater,
etc., the sum of the combined ratings may be use.
2. These fees include all switches, cisc.uit breakers, contactors,thermostats, relays
and other directly related control equipment.
6. B11sways
For trolley and plug;-in-type busways, each 100 feet (30 480 mm) or fraction
thereof............................... ....... .................................. ..........$7.25
Note: An additional fee is required for lighting fixtures, motors and other appliances that
r..
are connected to trolley and plug-in-type busways. A fee is not required for potable tools.
7. Signs, Outline Lighting and Marquees
For signs, outline lighting systems or marquees supplied from one branch circuit,
each................................................................................................................$24.60
For additional branch circuits within the same sign, outline lighting system or marquee,
each.......................................................................................................---------S4.75
8. Services
For services of 600 volts or less and not over 200 amperes in rating, each...........$30.50
For services of 600 volts or less and over 200 amperes to 1,000 amperes, each..-.$62.15
For services over 600 volts or over 1,000 amperes in rating, each........................$124.30
9. Miscellaneous Apparatus, Conduits and Conductors
For electrical apparatus, conduits and conductors for which a permit is required but for
which no The is herein set forth.............................................................................$18.20
`� Page No. 5
Note: This fee is not applicable when a fee is paid for one or more services, outlets.
fixtures, appliances, power apparatus, husways, signs or other equipment.
Other Inspections and Fees:
1. Inspections outside of normal business hours, per hour (minimum charge — two
hours)......................................................................... .$49.50*.......................... ..
2. Reinspection fee assessed under provisions of Section 305.8, per
inspection.................................................................................................$49.50*
3. Inspections for which no fee is specifically indicated, per hour (minimum charge -
-one-half hour)..........................................................................................$49.50
4. Additional plan review required by changes, additions or revisions to plans or to
plans for which an initial review has been completed (minimum charge one-
halfhour).................._......................... ........................_ .....$49.50*
* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall
include supervision, overhead, equipment, hourly wages and fringe benefits of the
employees involved.
SECTION C - MECHANICAL PERMIT FEES
Permit Issuance and Heaters
1. For the issuance of each mechanical permit----------------$23.50
2. For issuance each supplemental permit for which the original permit has not expired,
been canceled or finaled-------$ 7,25
Unit Fee Schedule
(Note: The following do not include permit-issuing fee.)
1. Furnaces
For the installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance. up to and including 100,000 Rtu/h
(29.3 kW)----------------------------------------$14.80
For the installation or relocation of each forced-air or gravity-type furnace or burner,
including ducts and vents attached to such appliance over 100,000 btulh (29.3kW)
----------------------------------------------------$18.20
For the installation or relocation of each floor furnace, including vent------------$14.80
For the installation or relocation of each suspended heater, recessed wall heater or floor
mounted unit heater----------------- --------$14.80
2. Appliance Vents
Page No. 6
�- ],or the installation, relocation or replacement of each appliance vent installed and not
included in an appliance permit--------------------$ 7.25
3. Repairs or Additions
For the repair of, alteration of, or addition to each heating appliance, refrigeration unit,
cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling,
system, including installation of controls regulated by the Mechanical Code-------$13.70
4. Boilers, Compressors and absorption Systems
For the installation or relocation of each boiler or compressor to and including 3
horsepower (10.6 M), or each absorption system to and including 100,000 Btu/h (29.3
kW)--------------------------------------------------$ 14.70
For the installation or relocation of each boiler or compressor over three horsepower
(10.6 kW) to and including 15 horsepower(52.7 M), of each absorption system over
I W000 13tu/h (29.3kW)to and including 500,000 Btu/h (146.6 kW)-----------$2T 15
For the installation or relocation of each boiler or compressor over 15 horsepower (52.7
kW)to and including 30 horsepower(105.5 M), or each absorption system over 500,000
`" Btulh (146.6 kW) to and including 1,000,000 13tu/h (293.1 kW)-----------------$37.25
For the installation or relocation of each boiler or compressor over 30 horsepower
(I05.5kW)to and including 50 horsepower (176 M), or each absorption system over
1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9kW)-----$55.45
For the installation or relocation of each boiler or compressor over 50 horsepower (176
M), or each absorption system over 1,750,000 Btu/11 (512.9 kW)------------$92.65
S. Air Handlers
For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4719 Us),
including ducts attached thereto-----------------------------------------------------$10.65
Note: This fee does not apply to an air-handling unit which is a portion of a factory-
assembled appliance, cooling unit, evaporative cooler or absorption unit for which a
permit is required elsewhere in the Mechanical Code.
For each air-handling unit over 10,000 cfm (4719 Lis)--------------------------$18,10
6. Evaporative Coolers
For each evaporative cooler other than portable type-----------------------------$10.65
Page No. 7
?. Ventilation and Exhaust
For each ventilation fan connected to a single duct--------------------------------$ 7.25
For each ventilation system which is not a portion of any heating or air-conditioning
system authorised by a permit--------------------------------------------------------$10.65
For the installation of each hood which is served by mechanical exhaust, including the
ducts for such hood--------------------------------------------------------------------$10.65
8. Incinerators
],'or the installation or relocation of each domestic type incinerator------------$18.20
For the installation or relocation of each commercial or industrial-type incinerator-$14.50
9. Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not
classed in other appliance categories, or for which no other fee is listed in the table -
$10.65
Other Inspections and Fees:
I. Inspections outside of normal business hours, per hots (minimum charge--two hours)-----
$49.50* '~
7. Reinspection fee assessed tinder provisions ol-Section 1 16.6, per inspection------$49.50*
3. Inspections for which no fee is specifically indicated, per hour (minimum charge— one-
halfhour)-------------------------------------------------------------------------------------$49.50*
4. Additional plan review required by changes, additions or revisions to plans or to plans for
which an initial review has been completed (minimum charge-one-half hour)-----$49.50*
*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
SECTION D - PLUMBING PERMIT FEES
Permit Issuance
I. For the issuance of each plumbing permit..........................................................$21.50
2. For issuing each supplemental permit where the original permit has not expired, been
canceled or finaled ........................................................................................... ..$7.25
Page No. 8
Unit Fee Schedule
(Note: The following do not include permit-issuing fee.)
t. Fixtures and Vents
For each plumbing fixture or trap or set of fixtures on one trap (including water; drainage
piping and backflow protection thereof)...............................................................$9.90
For repair or alteration of drainage or vent piping,. each fixture...........................$4.75
2. Sewers, Disposal Systems and interceptors
For each building sewer and each, trailer park sewer............................................524.65
Foreach cesspool............................................................. ....................................$37.25
For each private sewage disposal system....,............. .................................... ......$74.50
For each industrial waster pretreatment interceptor, including its trap and vent, excepting
kitchen-type grease interceptors functioning as fixture traps.................................$19.90
Rainwater systems --per drain (inside building).......................................................$9.80
3. Water Piping and Water Heaters
For installation, alteration, or repair of water piping or water-treating equipment, or both.
each............................................................................................................ ................$4.75
For each water heater including vent.................................. .......................................S I 2_1.0
for vents only, see table 3-C.
4. Gas Piping Systems
For each gas piping system of one to five outlets......................................................$6.15
For each additional outlet over five, each...................................................................$1.10
5. Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices
For each lawn sprinkler system on any one meter, including backflow protection devices
thereof.........__......._._................................................................ .......$14.80
For atmospheric-type vacuum breakers or backflow protection devices not included in
Item 1:
1 to 5 devices.................................................................................................$12.30
Over 5 devices, each...................................................................................... $2.25
For each backflow-protection device other than atmospheric-type vacuum breakers:
2 inches (50.8 mm) and smaller....................................................................$12.10
Over 2 inches (50.8 mm)................................................... ..................._....524.65
�` Page No. 9
6. Swimming Pools
For each swimming pool or spa:
Publicpool ..................................................................................................$91.25
Publicspa ....................................................................................................$60.75
Private pool .......................................................... .......$60.75
Privatespa ....................................................................................................$3025
7. Miscellaneous
For each appliance or piece of equipment regulated by the plumbing, code but not classed
in other appliance categories or for which no other fce is listed in this code............$9,80
Other Inspections and Fees:
1. Inspections outside of normal business hours, per hour (minimum charge--two hours)-----
$49.50*
2. Reinspection fee assessed under provisions of Section l 16.6, per inspection------$49.50*
3. Inspections for which no fee is specifically indicated.. per hour(minimum charge -- one-
halfhour)-------------------------------------------------------------------------------------$49.50*
4. Additional plan review required by changes. additions or revisions to plans or to plans for
which an initial review has been completed (minimum charge-one-half hour)-----$49.50*
*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved
SECTION F --ELEVATOR PERMIT FEES
New Installations:
Passenger or freight elevator, escalator, moving walk:
Up to and including $40,000.00 of valuation— $89.00
Over $40,000.00 of valuation--$89.90 plus $l.65 for each $1,000.00 or fraction
thereof over $40,000.00
Dumbwaiter or private residence elevator:
Page No. 10
Up to and including $10,000 of valuation--$25.00
saw Over 510.000.00 of-valuation-425.00 plus $1.65 for each $1,000.00 or fraction
thereof over $10,000.00
Major Alterations:
Fees for major alterations shall be as set forth in Table 3-A. Installation fees
include charges for the first year's annual inspection fee and charges for electrical equipment on
the conveyance side of the disconnect switch.
SECTION F--ELEVATOR ANNUAL CERTIFICATES OF INSPECTION FEES
Foreach elevator ....................................................................................................$4l.50
For each escalator or moving walk..........................................................................$24 65
For each commercial dumbwaiter ...........................................................................$16.75
(Each escalator or moving walk unit powered by one motor shall be considered as a
separate escalator or moving walk.)
SECTION G--GRADING PLAN REVIEW FEES
50 cubic yards (38.2 M3) or less ...................... .No Fee
51 to 100 cubic yards (40 to 76.5 me)......................................................................$23.50
101 to 1,000 cubic yards (77.2 to 764.6 M3)............................................................$37.00
L.001 to 100,000 cubic yards (7646.3 to 76 455 M3)-449,25 for the first 10,000 cubic
yards (7645.5 M3), plus $24.50 for each additional 10,000 cubic yards (7645.5 M3) or
fraction thereof.
100,001 to 200,000 cubic yards (76 456 to 152 911 M3)--$269.75 for the first 100,000
cubic yards (76 455 M3), plus $13.25 for each additional 10,000 cubic yards 97645.5 M3)
or fraction thereof.
200,00L cubic yards (.52 912 M3) or rnore— $402.25 for the first 200,000 cubic yards
(152 911 M3), plus $7.25 for each additional 10,000 cubic yards (7545.5 M3) or fraction
thereof.
Other Fees:
Additional plan review required by changes, additions or revisions to plans or to plans for which
an initial review has been completed.............................................................................$50.50*
*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
`" Page No. 1 1
SECTION II--GRADING PERMIT FEES l
50 cubic yards (38.2 M3) or less ............................................................................$23,50
51 to 100 cubic yards (40 to 76.5 M3).....................................................................S37.00
101 to 1,000 cubic yards (77.2 to 764.6 M3)-437.00 for the first 100 cubic yards (76.5
M3) plus $17.50 for each additional 100 cubic yards (76.5 M 3) or fraction thereof.
1.001 to 10.000 cubic yards (765.3 to 7645.5 M3)--S194.50 for the first 1,000 cubic yards
(764.6 M3). plus $14.50 for each additional 1.000 cubic yards (764.6 N13) or fraction
thereof.
10,001 to 1WOW cubic yards (7646.1 to 76 455 M3)--$325.00 fir the first 10,000 cubic
yards (7645.5 M3), plus $66.00 for each additional 10,000 cubic yards (7645.5 W) or
fraction thereof.
100,001 cubic yards (76 456 M3) or more--$919.00 for the first 100,000 cubic yards (76
455 M3), plus $36.50 for each additional 10.000 cubic yards (7645.5 M3) or fraction
thereof.
Other Inspections and Fees:
1. Inspection outside of normal business horns, per hour (minimum charge--two
hours).....................................................................................................................$50.50 2
2. Reinspeclion fees assessed under provisions of Section 305.8. per inspection....150.50 2
3. Inspections for which no fee is specifically indicated. per hour(minimum charge--one-
halfhour).................................... .......................................................... ............$.50.50 2
1 The fee for a grading permit authorizing additional work to that under a valid permit shall
be the difference between the fee paid for the original permit and the fee shown for the
entire project.
2. Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall
include supervision, overhead, equipment, hourly wages and fringe benefits of the
employees involved.
SECTION I - OTHER PERMIT FEES
1. Mobilehome Installation - Pier set-up only........................................................$]80.00
Mobilehome lot preparation ......... ..... ............................................................... $54.00
3. Mobileho ne Awnings.................................................... .....................................$ 30,00
4. Mobilehome patio room....................................................................................... $95.00
Page No. 12
5. Mobilehome porch deck................. ................................................................... $30,00
S"M 6. Mobilehorne issuance fee..................................................................................... $20.00
7. Mobilehome State of California MCD fee................................................__....... $30.00
8. Mobilehome on Permanent Foundation............ ........................ .... ......... ..........$150.00
SIECTION d. - MISCELLANEOUS FEES
PermitTransfer................................................................................................................. a15.00
Storage
0.02% of valuation for all projects plus S5.00 per sheet for all plans required to be retained
indefinitely by state law.
Fire and Life Safety Service Fee
0.10% of valuation for Fire and Life Safety equipment, contractor license verification. and
computer permit tracking program.
Energy Conservation Review Fee
15%of the building permit fee.
NOW
Certificate of Occupancy
$40.00 for each commercial/industrial occupancy inspection.
Fence Permits
$15.00 per lot up to 300 lineal feet of lengtli. Otherwise $25.00 per lot.
Wall Permits
$15,00 minimum, permit based on valuation in accordance with Section A above. Value
calculated at$5.00 per square foot of wall.
Pools and Spas
Fee based on value in accordance with Section A above. Valuation rate is $1.00 per gallon. Plan
check equals 50% of permit fee. Separate electrical, mechanical and plumbing permits are
required.
�- Page No. 13
Landscape and Irrigation Plan/Plan Checking Fee
Before accepting a set of plans and specifications for checking, the Fire and Life Safety
Department shall collect a plan checking fee. PLAN CHECK FEES ......$15.00 per lot
Landscaping Permit Fees
A fee for each landscaping permit shall be paid to the Fire and Life Safety Department,
LANDSCAPING PERMIT FEF.S.............................................................$15.00 per lot
Paac No. 14
`+r EXHIBIT "B"
FEES REQUIRED BY CITY OF SAN JACINTO ORDINANCE NO. SECTIONS 4
AND 7
A. WATER CAPITAL IMPROVEMENT FEE:
$250.00 per residential unit or 15 plumbing fixture units for commercial and industrial
development.
B. SEWER CONNECTION FEE: $200.00 per unit
C. PUBLIC SAFETY CAPITAL IMPROVEMENT FUND:
1. Capital Structures. $50.00 per residential Unit or$0.01 per square foot of lot area
lot being developed for industrial or commercial uses.
2. Capital Equipment. $10.00 per residential unit or $0.01 per square foot of lot
being developed for commercial and industrial purposes.
D. STORM DRAIN IMPROVEMENTS
Area 1: $5,990.00 per acre.
Area 2: $4,975.00 per acre.
E. SIGNALIZATION FEE:
For the purpose of mitigating the impacts of new growth on City intersections. The funds
so collected shall be set aside to install, upgrade and/or maintain traffic signals
throughout the City.
1. Single family attached or detached........$150.001unit
2. Multiple Family.....................................$100.00,'unit
3, All other-.............................................-$2.700.00/acre
F. LIGHTING, LANDSCAPE,MAINTENANCE DISTRICT (light districts only):
S 1.00 per lineal feet of public streets frontage in existence prior to development.
Page No. 15
EXHIBIT "C"
PUBLIC WORKS FEES AND WHEN IMPROVEMENTS ARE NEEDED
Inspection Fees Permit Fees Inspection Fee
1. Residential Driveway $15.00 $25.00
2. Commercial Driveway $15.00 525.00
3. Excavation Permit within $15.00 $25.00/250 ft.
unpaved section oi'City R-O-W
4. Excavation Pcmiit within $15.00 $30.00/100 ft.
paved section of City R-O-W
5. Encroachment on or over $15.00 $25.00/encroachment
a Citv R-O-W without
excavation
b. Curb and Gutters $15.00 2 1/2% ofestimate $50,00
minimum
7. Sidewalks $15.00 2112% ofestimate $50.00
minimum
8. Utility Service Connections $15.00 550.00 each crossing
involving open cuts across streets
9. Utility Service Connections $15.00 $50.00 each crossing
with no open cuts
10. Pot hole permit $15.00 $50.00 each
11. Paving $15.00 2 112% of estimate 550.00
minimum
12. Miscellaneous $15.00 2 '/2 % of estimate $50.00
minimum
13. Core Drill of Curb $15.00 $25.00 per lot
Page No. 16
I%W Other Fees
I. Subdivisions. Conditional 13,w Permits. Sit;: Plans and all new construction.
Plan Check 3 % of preliminary engineers estimate for on & offsite
improvements
Inspections 2 '/2 % of final engineers estimate for on & offsite
improvements
?. Fire Hvdrant & Blue Dot Total hourly cost to the jurisdiction. This cost shall include
material, supervision, overhead, equipment, hourly wages
and fringe benefits of the employees involved.
3. Water services/sewer lateral Total hourly cost to the jurisdiction. This cost shall include
material, supervision, overhead, equipment, hourly wages
and fringe benefits of the employees involved.
w
N" Page No. 17