HomeMy WebLinkAboutResolution - RDA 93 - 27 RESOLUTION NO. RDA 9 3-2 7
A RESOLUTION OF THE SAN JACINTO REDEVELOPMENT AGENCY
CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT ON
THE SAN JACINTO REDEVELOPMENT PROJECT AMENDMENT NO. I
WHEREAS, the San Jacinto Redevelopment Agency (the "Agency") has prepared a
Redevelopment Plan for the proposed San Jacinto Redevelopment Project Amendment No. I (the
"Amendment") and has filed its Report on the Amendment with the City Council of the City of
San Jacinto; and
WHEREAS, the Planning Commission of the City of San Jacinto has approved and
forwarded to the Agency its report and recommendation, pursuant to Health and Safety Code
Section 33346, that the proposed Amendment is in conformity with the General Plan of the City
of San Jacinto and has recommended approval of said Amendment; and
WHEREAS, the proposed Amendment involves the addition of territory to the Project
Area (the "Project Amendment Area") and various language changes (hereinafter, the "Project");
such amendments to a redevelopment plan are a "project" as defined by the California
Environmental Quality Act (Public Resources Code Sections 21000, et seq.: "CEQA"); and
WHEREAS, the Agency has prepared an Environmental Impact Report (the "EIR") on
the Amendment pursuant to CEQA, the Guidelines for Implementation of the California
Environmental Quality Act (Title 14, California Code of Regulations, Sections 15000, et seq.: the
"State CEQA Guidelines"), and procedures adopted by the Agency relating to environmental
evaluation of public and private projects; and
WHEREAS, all action required to be taken by applicable law related to the preparation,
circulation, and review of the Draft EIR have been taken; and
WHEREAS, following notice duly and regularly given as required by law, a joint public
hearing has been held by the Agency and the City Council concerning the adoption of the
Amendment and review of the Draft EIR relating thereto and all interested persons expressing a
desire to comment thereon or object thereto have been heard; and
WHEREAS, the Final EIR consists of the Draft EIR, as revised and supplemented to
incorporate all comments received during the public review period and the response of the
Agency and the City thereto; and
WHEREAS, the Agency has reviewed and considered the Final EIR and the Mitigation
Monitoring Plan with respect to the Amendment and all comments and responses thereto.
NOW, THEREFORE, it is resolved by the San Jacinto Redevelopment Agency as
follows:
SECTION 1. A full and fair public hearing has been held on the Final EIR prepared on
the proposed Project, the Agency has considered all comments received thereon, which comments
and responses thereto are contained in the Final EIR, and the Agency finds, pursuant to Section
21082.1 of CEQA, that the Final EIR reflects the independent judgment of the Agency. These
actions having been taken, the Final EIR is hereby approved, certified, and adopted as the Final
EIR for the San Jacinto Redevelopment Project Amendment No. 1.
SECTION 2. The Agency hereby certifies that the Final EIR for the proposed Project is
adequate and has been completed in compliance with CEQA, the State CEQA Guidelines and
local procedures adopted by the Agency pursuant thereto, and that the Agency has reviewed and
considered the Final EIR and the information contained therein prior to deciding whether to
approve the proposed Project.
SECTION 3. The Agency hereby makes the written findings set forth in Exhibit A,
attached hereto and incorporated herein by reference, for each of the potentially significant
environmental effects identified in Exhibit A, and further approves the Findings of Fact set forth
in Exhibit A. Based on such Findings of Fact, the Agency hereby finds that mitigation measures
have been required in, or incorporated into, the Project which will eliminate or reduce to a level
of insignificance the potentially significant environmental effects of the Project identified in
Exhibit A.
SECTION 4. The Agency further finds that the project alternatives identified in Sections
6.1, 6.2, 6.3, 6.4, and 6.5 of the Final EIR either would not achieve the objectives of the Project
or would do so only with unacceptable adverse impacts. Accordingly, and for the reasons set
forth herein and in Chapter 6.0 of the Final EIR, those alternatives are infeasible, and none of
the alternatives are environmentally superior. With the exception of increasing the size of the
Project Amendment Area (6.3), each alternative analyzed, including the "no-project" alternative,
reduces development activities and limits the Agency's ability to correct current environmental
problems. Furthermore, these alternatives lessen the Agency's ability to accelerate the
achievement of the General Plan's land use goals. Enlarging the Project Amendment Area would
lead to unanticipated environmental impacts, and may not be eligible under the law. An
alternative site was not considered feasible because the redevelopment of an alternative site would
not address the conditions of blight present in the Project Amendment Area and thus would not
achieve program goals.
SECTION 5. The mitigation measures for traffic/circulation, air quality, schools, solid
waste, and conversion of agricultural land impacts as identified in Exhibit A substantially lessen
the potentially significant traffic/circulation, air quality, schools, solid waste, and conversion of
agricultural land impacts of the Amendment identified in the Final EIR. Further, the social,
economic and other benefits of the Project outweigh any unavoidable adverse traffic/circulation,
air quality, schools, solid waste, and conversion of agricultural land impacts that may occur.
Due to such overriding benefits and considerations, the Agency finds that these unavoidable
adverse environmental impacts of the Project are acceptable. The Project will revitalize and
upgrade the Project Amendment Area by increasing sales tax revenues, providing adequate
roadways, providing improved housing opportunities, correcting deficiencies in the public
PUBL:9219_1113361B2763.1 2 12/01/93
infrastructure, and promoting aesthetic improvements. This Project will also promote
employment opportunities, promote economic development and alleviate conditions of blight in
the Project Amendment Area. Implementation of the Project will also help accelerate
achievement of General Plan goals for land uses within the Project Amendment Area. This
paragraph constitutes a "Statement of Overriding Considerations" pursuant to Section 15093 of
the State CEQA Guidelines.
SECTION 6. The Agency hereby finds and determines that the mitigation measures
incorporated into the Final EIR, the Findings of Fact, and the Mitigation Monitoring Plan set
forth in the Final EIR, will mitigate or avoid all significant environmental effects that can
feasibly be mitigated or avoided. The Agency hereby adopts the Mitigation Monitoring Plan as
set forth in the Final EIR.
SECTION 7. The Agency Secretary, in cooperation with the Executive Director of the
Agency, is hereby authorized and directed to file with the County Clerk of the County of
Riverside, a Notice of Determination, pursuant to Section 15094 of the State CEQA Guidelines,
along with any and all fees required pursuant to Title 14, California Code of Regulations,
Section 753.5.
ADOPTED this 21 day of December, 1993.,.
r
1
, z r
C4airman,; 1 an Jacinto�Redevel4pment Agency
ATTEST:
Agency Secretary
San Jacinto Redevelopment Agency
APPROVED AS TO FOILM:
Stradling, Yocca, Carlson & Rauth
Agency Special Counsel
vusL:9219_113361B2763.1 3 12/01/93
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF SAN JACINTO )
I, , Agency Secretary of the San Jacinto Redevelopment
Agency, hereby certify that the above and foregoing Resolution No. _ was duly and regularly
passed and adopted by the San Jacinto Redevelopment Agency at a publicly noticed regular
meeting thereof, held on the day of December, 1993, by the following vote:
AYES: Agencymembers Ford, Solorio, Williams , Chairman Hafliger
NOES: None
ABSTAIN: Agencymember Leahy
ABSENT: None
Agency Secretary,
San Jacinto Redevelopment Agency
PUBL:9219_1 13361 B27631 4 12/01/93
EXHIBIT "A"
FINDINGS OF FACT CONCERNING THE SIGNIFICANCE OF SPECIFIC POTENTIAL
ENVIRONMENTAL IMPACTS IDENTIFIED IN THE FINAL ENVIRONMENTAL
IMPACT REPORT" FOR THE SAN JACINTO REDEVELOPMENT PROJECT
AMENDMENT NO. I
1. LAND USE
A. Potential Environmental Impacts
Blight
The proposed Redevelopment Plan Amendment is intended to alleviate existing
conditions of blight that were found to exist within the Project Amendment Area, as
described in the Report to City Council and the Final EIR. In turn, the elimination of
blighting conditions will result in further implementation of the goals and policies of the
San Jacinto General Plan, with the resultant overall beneficial impact on area land uses.
Implementation of the proposed Redevelopment Plan Amendment will provide the
fiscal resources to improve flood control and other public facilities throughout the Project
Amendment Area. This will help reduce, if not eliminate, existing blighting conditions
that result from a lack of adequate public facilities. New development will be induced to
the extent that improved public facilities increase the availability of presently vacant land
for new development.
Consistency with the General Plan Land Use Element
Implementation of the General Plan is expected to result from the encouragement
of new industrial, commercial, and residential development through a variety of financial
incentives, the upgrading of the existing public service infrastructure in the Project
Amendment Area, and the provision of new facilities where required. Rehabilitation or
reconstruction of existing land uses also will occur throughout the Project Amendment
Area, but the precise extent or rate at which either reconstruction, new development, or
rehabilitation will take place is not known at this time due to the lack of specific land use
proposals and the unpredictability of future economic conditions.
Notwithstanding the uncertainty as to the character and extent of future
development, the Final EIR (Section 3.5: Project Description) contains an expected
development scenario for the purposes of estimating reasonably expected redevelopment
activities based on the General Plan. Based on the estimates contained in the Final EIR,
there will be a total of 12,367 dwelling units, 10,087,755 square feet of industrial
development, 3,997.000 square feet of commercial development, and 3,079,000 square
feet of public facilities within the Project Amendment Area upon full buildout.
Future buildout of the Project Amendment Area in accordance with this
development scenario would yield an increase of 11,999 dwelling units, 7,613,547 square
feet of industrial development, 2,544,338 square feet of commercial development, and
1,605,839 square feet of public facilities.
The proposed Redevelopment Plan Amendment does not contain a phasing
schedule, but it is expected that the land use changes described above would occur in
accordance with the build-out estimates contained in the San Jacinto General Plan.
Redevelopment plans are required by State Law to be consistent with the
community's general plan. The proposed Redevelopment Plan Amendment specifically
adopts the City of San Jacinto General Plan by reference. To this extent, then, the
proposed Redevelopment Plan Amendment is by definition consistent with the San Jacinto
General Plan, and no adverse impacts on the General Plan will result from continued
implementation of the Redevelopment Plan Amendment. As noted above, implementation
of the Redevelopment Plan Amendment could result in a beneficial impact on the
continued implementation of the General Plan by encouraging the continued development
of the Project Amendment Area, and the conversion of land uses that do not conform with
the General Plan to fully conforming land uses.
Displacement
Because one of the prime purposes of the Project is to encourage implementation
of the land uses designated for the Project Amendment Area by the San Jacinto General
Plan, some residences and businesses could be displaced by other development, either as
a direct result of Redevelopment Agency activity or as a result of private development
without direct agency participation. Exactly when and where such displacement will
occur cannot be determined at present, but is likely to occur as private property is
redeveloped or rehabilitated during the lifetime of the project.
Residents displaced as a result of Agency actions will be relocated in conformance
with a feasible relocation plan developed by the Redevelopment Agency in accordance
with the California Community Redevelopment Law. Such plans must provide that no
persons or families of low and moderate income can be displaced unless and until there is
a suitable housing unit available and ready for occupancy at rents comparable to those
paid at the time of their displacement. Such replacement dwellings must be suitable to the
needs of displaced persons and families, and must be decent, safe, sanitary, and otherwise
standard dwelling units.
A number of existing businesses could also be displaced as a result of
Redevelopment Agency activities pursuant to the proposed Redevelopment Plan
Amendment. Displaced businesses will be given the opportunity to relocate within the
Project Amendment Area, if feasible, and will be provided with relocation assistance and
benefits in accordance with State law. Such assistance and benefits may include fair
market value for the land and the business, relocation assistance, and loss of business due
to any move. Property owners also shall be offered the opportunity of participating in the
redevelopment activity.
ruBL:9126_113361B2763.1 2 12/01/93
In regards to impacts on low and moderate income housing or families, the
Redevelopment Agency is required to set aside up to 20 percent of all tax increment
revenues for the development of low and moderate income housing as described in the
Preliminary Report. This is an on-going program mandated by State law, and will be
implemented upon adoption of the proposed Redevelopment Plan Amendment. In
addition, State law requires that all low and moderate income units displaced as a direct
result of Agency actions shall be replaced by the Agency on a one-for-one basis.
Impacts on Surrounding Land Uses
Intensified or new land uses in the Project Amendment Area could adversely
affect surrounding or nearby land uses both inside and outside the Project Amendment
Area. Such conflicts could arise through the improper siting of commercial, office or
industrial development adjacent to sensitive uses such as schools or hospitals,
inappropriate access to such development, the construction of buildings with highly
reflective surfaces, or permitted noisy or otherwise noxious activities on the sites
immediately adjacent to sensitive uses. Because specific development projects are
unknown at this time, it is impossible to predict the exact nature of these potential impacts
at this point. The potential for land use conflicts is greatest, however, where different
land uses are immediately adjacent to each other, rather than being separated by a street
or other barrier.
Impacts on uses outside but close to the Project Amendment Area could occur as a
result of continued development. Besides those discussed in the Final EIR, including
traffic and circulation and air quality, adverse land use related impacts could occur, but
are not considered highly likely. This is because the nature of existing and proposed
development along the borders of the Project Amendment Area are consistent in character
to existing and proposed uses along the periphery of the Project Amendment Area. In
other words, like uses generally abut like uses.
B. Mitigation Measures
Blighting Conditions
Existing blighting conditions in the Project Amendment Area are proposed to be
alleviated by implementation of the proposed Redevelopment Plan Amendment
through a combination of public facility and utility infrastructure improvements
throughout the Project Amendment Area, and rehabilitation assistance and
assistance to private sector developers. No other mitigation is necessary in this
regard.
Displacement
Implementation of the displacement and housing mitigation programs described
above will reduce potential displacement and housing impacts to less than
significant levels. No further mitigation measures are necessary in this regard.
2ueL:9126_113361B2763.1 3 12/01/93
General Plan Land Use Element
Implementation of the Redevelopment Plan will have no adverse impact on the
General Plan's Land Use Element. Likewise, there will be no adverse impact on
the land use policies of adjacent jurisdictions. Therefore, no mitigation measures
are required in this regard.
Land Use
Implementation of the Project will help encourage new residential, industrial,
commercial and office land uses consistent with the San Jacinto General Plan and
no significant adverse land use impacts are expected. However, in order to assure
consistency with the General Plan and avoid adverse land use impacts upon
implementation, the following mitigation measures are conditions of Project
approval:
1. The City and the Redevelopment Agency shall process all future
development plans within the Project Amendment Area in the manner
provided for by the San Jacinto General Plan and all applicable City
regulations or policies.
2. Individual site plans and environmental reviews in the Project Amendment
Area shall ensure that adjacent: land uses are compatible in character,
design and operation, and that where significant environmental effects are
identified, subsequent or tiered environmental documents are prepared.
C. Finding of Significance
The City Council finds, based upon the evidence in the record, (1) that there are
no significant adverse impacts of the Project upon blight, the General Plan Land Use
Element and displacement, and (2) that implementation of the above mitigation measures
as conditions of Project approval will reduce land use impacts to less than significant
levels.
2. POPULATION, HOUSING AND EMPLOYMENT
A. Potential Environmental Impacts
Implementation of the Redevelopment Plan Amendment will result in an increase
in employment, housing and population in the Project Amendment Area. While the
Redevelopment Plan Amendment is consistent with the San Jacinto General Plan, and
therefore does not propose any changes in land use, its provisions will serve to encourage
development that would not likely take place otherwise, or will result in the faster pace of
future development. This will result primarily from the plan's proposed financing of
significant public infrastructure improvements. This will improve the economic
attractiveness of the area as a whole.
PURL:9126_11336I112763.1 4 12/01/93
Population and Housing
Assuming that all undeveloped parcels within the Project Amendment Area
designated for or otherwise permitting residential uses in the San Jacinto General Plan
were built to their maximum permitted densities, a total of 12,367 housing units would
result. This represents a net increase of 11,999 dwelling units over the existing 368 units
through 2010. At a projected average of 2.6 people per dwelling unit by 2010,
population would increase from the current estimate of I,141 to 32,141. Most new
housing construction would take place in Sub-Areas 1, 2, and 13 in conformance with the
General Plan.
San Jacinto as a whole is expected to grow from its 1993 population of 22,255 to
a 2010 population of 59,729, or by 168.4%. While at present the Project Amendment
Area's population represents 4.7% of the City's total population, its share will increase to
53.8% by 2010. These Project Amendment Area projections assume implementation of
the Redevelopment Plan Amendment, including the incentive for new residential
development that will accrue through the provision of public utility and services
improvements as described in Chapter 3 of the Final EIR.
Because the residential development anticipated in the Project Amendment Area is
consistent with that called for by the current Growth Management Plan, by the General
Plan, and by the City's most recent population projections, no significant adverse impacts
relative to population and housing growth rate issues are expected.
Employment
Implementation of the Redevelopment Plan Amendment will induce a significant
increase in commercial and industrial employment in the Project Amendment Area. Total
employment will increase by 17,717 jobs from a current estimate of 8,625 to 26,342.
This represents an average annual increase in employment in the Project Amendment
Area of 1,042 jobs per year over the 1993 to 2010 period, or an average rate of increase
of 12% per year.
The number of jobs expected in the Project Amendment Area given current
development standards is consistent with the San Jacinto General Plan, because the
amount of anticipated commercial, office, public and industrial development upon which
the employment projections shown on Table 7 of the Final EIR were based are identical
to those contained in the General Plan. Since the Redevelopment Plan Amendment is
intended to facilitate and increase the rate of development in the Project Amendment
Area, the creation of new jobs may be faster than presently being experienced by the City
as a whole, but likely not any faster than anticipated for the City pursuant to the General
Plan. The General Plan's projections appear to assume that existing infrastructure
deficiencies will be overcome in the near future. This in turn appears to assume the
existence of some means of funding infrastructure improvements such as the proposed
Redevelopment Plan Amendment.
The character of employment in the Project Amendment Area will be more
industrial in nature than at present, with industrial employment accounting for 49.8% of
pu13L:9126_113361132763.1 5 12/01/93
all employment. Commercial employment will increase by an estimated 275%, and will
ultimately account for 30.4% of all Project Amendment Area employment. Public
employment is projected to increase by 2,730. Note, though, that much of the projected
commercial development will be a mix of retail and office uses.
This increase in the number of employment opportunities in the Project
Amendment Area results from the development of currently vacant land, and the
significant rehabilitation of existing commercial and industrial uses. In cases where
existing commercial or industrial uses are either significantly rehabilitated or recycled to
other commercial or industrial uses, more intense development is anticipated. Similarly,
this scenario assumes that all vacant commercial land will be developed to floor area
ratios that reflect typical suburban development patterns.
JobsMousing Balance
Implementation of the proposed Redevelopment Plan Amendment will improve the
jobs/housing balance in San Jacinto, and by extension throughout the Central Riverside
County Sub-Region. Taken alone and not accounting for City-wide job growth, the
17,717 new jobs created in the Project Amendment Area by 2010 will increase the 2010
San Jacinto jobs/housing ratio from 0.92 to 1 to 1.22 to 1.
In regards to the jobs/housing balance in the Central Riverside County Sub-Region
as a whole, the continued implementation of the Redevelopment Plan Amendment will
result in a rise in San Jacinto's share of the Sub-Region's total employment. Given
current SCAG projections, the Project Amendment Area's share of the Sub-Region's total
employment will be 26,342 out of 179,500 in 2010, or 14.7%.
An analysis of the impacts on the Central Riverside County Sub-Region
jobs/housing balance shows that the proposed Project will have a positive impact on the
jobs/housing balance ratio in the sub-region. Analytical procedures outlined in the
Guidelines for Implementing the 1989 SIP for Conformity Procedures Related to General
Development indicates that the Project Amendment Area will generate a positive
jobs/housing balance of 13,706.
B. Mitigation Measures
Population and Housing
Because the number of new housing units and the resultant population increase
that could result from implementation of the Redevelopment Plan are consistent
with the San Jacinto General Plan, and with the City's and SCAG's population
projections, no significant adverse impacts are expected, and no mitigation
measures are necessary.
Employment
Potential increases in employment in the Project Amendment Area will have
beneficial impacts on the City's and the sub-region's job/housing balance by
PUBL:9126_11336IB2763.1 6 12/01/93
providing additional employment for San Jacinto and its surroundings. Therefore,
no mitigation measures are required.
Jobs/Housing Balance
Because the implementation of the Project could result in an improved
jobs/housing balance in San Jacinto and in the Central Riverside County Sub-
Region as a whole, no adverse jobs/housing impacts are expected and no
mitigation measures are necessary.
C. Finding of Significance
The City Council finds, based upon the evidence in the record, that there are no
significant adverse impacts of the Project upon population, housing and employment
because (1) implementation of the proposed Redevelopment Plan Amendment will create
more jobs than demanded by housing increases, (2) no new substantial impacts not
previously anticipated in the General Plan and the SCAG Growth Management Plan will
accrue as a result of implementation of the Redevelopment Plan Amendment, (3) because
the Redevelopment Plan Amendment is consistent with the General Plan and the SCAG
Growth Management Plan, no unavoidable adverse impacts are expected,and (4) the
implementation of the Project could result in an improved jobs/housing balance in San
Jacinto and in the Central Riverside County Sub-Region as a whole.
3. TRAFFIC AND CIRCULATION
A. Potential Environmental Impacts
The proposed Redevelopment Plan Amendment will not in and of itself result in
new construction of land uses that generate significant amounts of traffic. Rather, the
plan only proposes improvements to the local circulation system within the Project
Amendment Area that are intended to improve traffic flows. Future traffic volumes will
result primarily from development in the community, and are therefore a function of the
General Plan's land use and circulation policies. The primary effect of the proposed
Redevelopment Plan Amendment will be to encourage new development or significant
redevelopment projects that would not otherwise be undertaken by the private sector
acting alone. Therefore, the cumulative amount of commercial, industrial and residential
land uses in the Project Amendment Area is not affected by the Redevelopment Plan
Amendment. However, because the proposed Redevelopment Plan Amendment is
intended to overcome conditions of blight within the Project Amendment Area,
implementation of the Redevelopment Plan Amendment is expected to increase the rate of
development within the Project Amendment Area to an as yet undeterminable extent.
Traffic Volumes
As shown on Table 10 of the Final EIR, buildout within the Project Amendment
Area can increase average daily traffic by an estimated 346,362 vehicle trips per day (not
PUSL:9126_113361B2763.1 7 12/01/93
accounting for pass-by and/or double-counted trips which could decrease the total by as
much as twenty five percent). Over 53,000 new vehicle trips can be generated by
industrial development, nearly 181,000 additional trips by commercial development, and
just over 99,000 more trips will be due to new residential development. Commercial
development represents the largest increase in average daily trips.
According to the General Plan, there will be adequate traffic capacity on the
planned street system to serve future buildout of the General Plan's land uses. This
assumes that the recommended traffic improvements are implemented in a timely manner
that keeps pace with expected future development. Of critical importance are upgrades to
Ramona Expressway, State Street, Highway 79, Sanderson Avenue, and other arterial
streets in and around the Project Amendment Area. Over the short term it is unlikely that
circulation system improvements will keep pace with the demands placed on the road
system by new development. This is because without adequate capital funding sources,
off-site traffic improvements needed to accommodate new development will lag behind
due to a lack of capital funding, and the need to accumulate funds from numerous public
and private sources prior to actually undertaking improvements.
Additionally, while the overall circulation system will likely be able to carry
newly generated traffic at an acceptable level of service, localized areas of poor service
could arise. In some cases, individual intersections may not be able to carry expected
traffic volumes without upgrading and widening. In other cases, incomplete street
segments, numerous curb cuts, or other traffic impediments may contribute to
unacceptable localized congestion levels.
Circulation Improvements
Circulation improvements are an essential part of the Redevelopment Plan
Amendment. The Redevelopment Plan authorizes the San Jacinto Redevelopment Agency
to use various funding methods for public improvements and calls for the widening and
improvement of a number of arterial roadways and the reconstruction or continued
improvement to a number of other streets. Additionally, the City requires that new
development improve adjacent street frontages as part of any development proposal.
As funds become available, the Agency has the authority to provide or participate
in providing the following non-exclusive list of public improvements to the City's
circulation system, which will help to alleviate existing and future traffic problems:
A Widen Ramona Expressway to six lane divided highway in Sub-Area 1
• Widen Sanderson Avenue to six lane divided highway in Sub-area 1
® Extend Ramona Expressway from 7th Street and Cedar Street in Sub-areas
18, 20, and 21
• Construct curb and gutter in Sub-area 13
• Reconstruct Esplanade Avenue in Sub-area 6
• Reconstruct Palm Avenue in Sub-area 6
® Improve Grand Avenue in Sub-area 5
® Improve Palm Avenue in Sub-area 5
PUBL:9126_1 13361 B2763.1 8 12/01/93
The proposed Project improvements may result in alterations to the City's
circulation patterns and the movement of vehicular traffic and pedestrians, both for the
long-term and the short-term. For the short term, there may be temporary traffic
disruptions during the construction of necessary street and infrastructure improvements.
In the long-term, the required improvements to correct existing and future vehicular
circulation deficiencies may alter circulation patterns and movement of vehicular traffic
and pedestrians. However, these measures will reduce, but not completely eliminate all
the significant impacts.
Parking
Development at the intensity proposed may also impact existing and future parking
accommodations. Parking deficiencies within the Project Amendment Area are discussed
in detail in the Preliminary Report for the proposed Project. Project implementation may
create additional parking demands, which will be mitigated by requiring an adequate
number of on-site parking spaces through the design review process.
B. Mitigation Measures
The following mitigation measures are conditions of Project approval:
1. Individual traffic study reports prepared by a licensed civil or traffic
engineer shall be required for any large development project to ensure that
peak hour operations at specific intersections, appropriate County of
Riverside facilities, and impacts to the regional network are addressed
from a cumulative perspective. This determination shall be made at the
time of design review for each individual project submitted, and shall be
prepared in a manner consistent with the County Congestion Management
Plan. Major new developments must demonstrate the availability of
adequate circulation system capacity consistent with the General Plan prior
to the issuance of occupancy permits or other appropriate approvals.
2. Plans involving improvements to State Route 79 will require approval by
the Department of Transportation (CalTrans). All work within the State
right-of-way will be performed to State standards and specifications.
3. All new developments shall ensure the provision of an adequate number of
on-site parking spaces in conformance with the San Jacinto Municipal
Code.
4. All future circulation system improvements shall be in conformance with
the Congestion Management Plan.
5. All new developments or significantly rehabilitated developments with 50
or more employees shall conform to the City's Mobile Source Pollution
Reduction Ordinance.
PUBL:9126_113361B2763.1 9 12/01/93
6. All traffic and circulation-related mitigation measures contained in the
Annexation 66 and Sunrise Ranch EIRs are hereby incorporated into this
EIR as if they were set forth in full to the extent that the incorporated
mitigation measure applies in whole or in part to the Project Amendment
Area.
C. Finding of Significance
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures will reduce, but not eliminate, adverse
impacts from traffic increases in and around San Jacinto. However, the proposed project
will not result in unanticipated trips and, by contributing to the provision of traffic and
circulation system improvements, the Project will substantially lessen the significant
traffic and circulation impacts identified in the Final EIR. However, remaining traffic
and circulation impacts may be significant and adverse. Therefore, this impact will
require a Statement of Overriding Considerations to be adopted as a condition of Project
approval.
4. AIR QUALITY
A. Potential Environmental Impacts
The construction phases of Project implementation will produce on-site air
pollutant emissions from heavy equipment exhaust, worker travel, and from the
generation of dust as a result of grading activities. The use of heavy equipment may also
produce impacts from diesel fuel odors. Construction activities can also spill over into
the surrounding neighborhood. Even though small in and of themselves, off-site impacts
could be cumulatively significant when spread over many years and many projects.
Long-term air quality impacts associated with the implementation of the
Redevelopment Plan Amendment consist of emissions generated by mobile (motor
vehicle) and stationary sources subsequent to the completion and operation of individual
development projects. Stationary sources include the use of natural gas on-site for
cooking, space and water heating, and the generation of electricity off-site. Upon
buildout. of the Project Amendment Area, the total amount of pollutants that the proposed
Redevelopment Plan Amendment is anticipated to generate through additional motor
vehicle, natural gas, and electrical emissions far exceeds the South Coast Air Quality
Management District's daily threshold levels for significance.
Because the Project is consistent with the San Jacinto General Plan, it is by
extension consistent with the SCAG Growth Management Plan and the assumptions upon
which the SCAQMD's Air Quality Management Plan is based. In addition, the
Redevelopment Plan Amendment contains a number of traffic improvement measures that
could lead to reduced emissions through reduced trip lengths, improved congestion levels,
and an improved jobs/housing balance. Increased development in the Project Amendment
Area presents opportunities to contribute substantially to reductions in regional pollution
burdens by offering the opportunity to implement a transportation system management
ruBL:9126_113361 B2763.1 10 12/01/93
(TSM) and transportation demand management (TDM) program on a Project Amendment
Area-wide basis.
The Redevelopment Plan Amendment could, however, have a significant adverse
cumulative impact on air quality, in that the total rate of development in the Project
Amendment Area could be greater than rates of development that would occur without the
Project. This increase in the rate of development relates primarily to the new
development or significant rehabilitation of residential, commercial and industrial land
uses. While pollutants generated by motor vehicle trips and other activity associated with
these new land uses will increase, more local employment is anticipated to result in
shorter motor vehicle trip lengths as more local employment is provided. In general,
then, increases in locally generated pollutants will be offset to a yet undeterminable
amount by reductions in total motor vehicle trip lengths. This tradeoff will in turn
contribute to a reduction in the regional air pollution load, and an overall beneficial
impact.
B. Mitiyation Measures
The following mitigation measures are conditions of Project approval:
1. Development permits that involve ten or more acres shall limit on-site
construction activities to no more than ten acres per day, grading shall be
terminated when sustained wind speeds exceed 25 miles per hour, and
construction areas shall be appropriately stabilized if construction is halted
or delayed.
2. Prior to issuance of a building permit, developers or contractors shall
certify that all construction equipment used on the job is required to have a
90-day low-NOh tune up, and that idling time will be limited to no more
than ten minutes.
3. Construction site management shall include the following principles:
® Encourage car pooling for construction workers.
0 Limit lane closures to off-peak travel hours.
0 Park construction vehicles off the public right-of-way.
o Wet down or cover dirt hauled off-site.
® Receive materials only during off-peak traffic hours.
® Sandbag construction sites for erosion control.
® Wash or sweep access points daily.
4. Adherence to South Coast Air Quality Management District's rules that
require dust control measures during grading and construction activities,
shall be required during all construction operations.
5. Measures to reduce the interference of construction activities with existing
traffic, and to prevent truck queuing around local sensitive receptors such
as residences, shall be incorporated into any project construction permits.
PUBL:9126_113361B2763.1 11 12/01/93
The permits will limit operations to daytime periods with better pollutant
dispersion in order to minimize localized pollutant accumulation.
6. Various transportation control measures (TCMs) shall be evaluated to
determine how they shall be incorporated into individual project proposals.
Such measures will be aimed primarily at employees of commercial,
public/institutional, and office uses, but may be used in connection with
residential development. These measures include, but are not limited to:
• Ridesharing
• Vanpool incentives
® Alternate transportation methods
® Work scheduling for off-peak travel periods
0 Appointment of a TCM program coordinator for larger projects
• Traffic signal coordination
Y Roadway and signalization improvements to maintain peak traffic
hour level of service E or better
7. All new developments or significantly rehabilitated developments with 50
or more employees shall conform to the City's Mobile Source Pollution
Reduction Ordinance.
8. All new residential development shall contribute $90.00 per unit to the
City's Carpool Mitigation Fund to be used to build park and ride facilities.
C. Finding of Significance
The City Council finds, based upon the evidence in the record:
I. With regard to actions that can be taken at the local level, that imposition
of the above mitigation measures as conditions of Project approval will
avoid or substantially lessen the significant air quality impacts as identified
in the Final EIR. Because the Project is consistent with the San Jacinto
General Plan, it is by extension consistent with the South Coast Air
Quality Management District's Air Quality Management Plan, the Project's
impacts on attaining the goals of these plans will be largely beneficial.
2. With regard to regional and cumulative air quality effects which depend on
regional strategies and standards, that changes or alterations are within the
responsibility and jurisdiction of another public agency. Other mitigation
measures are within the responsibility and jurisdiction of the South Coast
Air Quality Management District and the U.S. Environmental Protection
Agency. These measures include; (1) SCAQMD Rule 403 requiring
control of construction-related emission; (2) SCAQMD Regulation XV
requiring all developments in the Project Area to prepare and implement
Transportation Demand Management (TDM) programs at their sites; and
(4) other measures and programs to reduce cumulative effects of growth
in the region on air quality that have been adopted by those agencies and
PuBi-:9126_113361B2763.1 12 12/01/93
include; (a) steadily improving vehicles emissions and (b) emission
controls on stationary sources.
3. That specific economic, social, or other considerations make infeasible the
mitigation measures or project alternatives identified in the Final EIR.
Implementation of the Project will result in emissions greater than South Coast Air
Quality Management District significance thresholds and adverse impacts upon regional
air quality will remain through increased air pollution emissions. Therefore, this finding
will require a Statement of Overriding Considerations to be adopted as a condition of
Project approval.
5. PUBLIC SERVICES
This section treats potential impacts and mitigation measures regarding fire, police,
schools, and parks serving the Project Amendment Area.
A. Potential Environmental Impacts
Fire Protection
Full development of the Project Amendment Area consistent with the General Plan
would generate a total demand for 59.7 firefighters by full buildout based on the current
standard of 1 firefighter per 1,000 population. This represents an increased need for
approximately 58.56 firefighters by full buildout. This increased number of firefighters
and fire protection equipment, including new stations, will be financed primarily by
increased sales taxes, property taxes, and other revenues from the Project Amendment
Area pursuant to City policy. The proposed Redevelopment Plan Amendment also
authorizes the use of Agency funds to underwrite the construction of new fire stations.
Increased intensity of development within the Project Amendment Area will create
additional emergency calls. Anticipated structural rehabilitation activities in the older
commercial portions of the City could alleviate impacts if the latest features in fire
resistive construction and the addition of automatic fire detection and protection systems
such as sprinklers are included. Rehabilitation that includes these improvements will help
to reduce both the current and future demand on fire protection services for the Project
Amendment Area.
The Redevelopment Agency may assist in the provision of any necessary water
system upgrades (line enlargement, additional hydrants, etc) thereby mitigating adverse
effects of intensified development. Any additional required fire protection systems would
be determined during plan review. Additionally, the proposed Redevelopment Plan
Amendment authorizes the use of Redevelopment Agency funds to construct two new fire
stations.
auaL:9126_1 13361 82763.t 13 12/01/93
Police Protection
Buildout of the Project Amendment Area may increase the opportunity for both
crimes against property and crimes against persons to occur. The character of
development in the Project Amendment Area will remain predominantly residential in
nature, with an expected proportional rise in residentially related crime. Continued
commercial and industrial development will result in a proportionate increase in crimes
related to commercial and office properties. These include robbery, burglary, auto theft,
and grand/petty theft. Also, incidents related to maintaining the public peace could rise.
As traffic levels increase, traffic collisions and violations will rise in proportion to
growth.
Park Services
Based upon population forecasts from the Southern California Association of
Governments (SLAG), the population for the City of San Jacinto can be expected to
increase from its current population of 22,255 to 59,729 by the year 2010. Further,
based on the City's standard of 5.0 acres per thousand, demand for park land in the City
will increase from 111.3 acres to 298.7 acres by full buildout. Without the provision of
additional parkland, deficits will rise from the present 57.3 acres to 238.7 acres in 2010.
Current deficits in park land result from inadequate park facilities to meet current demand
for park space. Because new development in the Project Amendment Area will dedicate
park land or pay fees in lieu of dedication, new development in the Project Amendment
Area will contribute park land and park impact fees and therefore will provide adequate
park land to meet its own demand. Thus, new development in the Project Amendment
Area will not exacerbate existing park land shortages.
The City of San Jacinto collects park impact fees, or Quimby Act fees, of
approximately $525.00 per dwelling unit at the time new residential construction is
approved. Raising funds to make up current park land deficits is a very difficult task,
because there are few easily implemented means of raising new funds from existing
development. Tools such as benefit assessment districts or landscape maintenance
districts can, however, be implemented with a majority vote.
Schools
Although the school district's generation figures for new students induced by new
non-residential development may overstate actual student generation, and using such
figures when the exact character of new non-residential development is unknown is highly
speculative (see Section .3.6 of the Final EIR), expected growth in students over the next
decades will require the construction of new elementary, junior high school and senior
high school facilities. Based on the State standard of 2,400 students per high school,
1,200 students per junior high school, and 650 students per elementary school, new
student generation from within the Project Amendment Area would result in demand for
10.5 new elementary schools, 2.0 new junior high schools, and 0.82 new high school.
PUBL:9126_1 13361 B2763.1 14 12/01/93
Throughout the whole of the City of San Jacinto, school impacts are primarily
mitigated through enforcement of a 1991 cooperation agreement between the San Jacinto
Unified School District and the City of San Jacinto. Under this agreement, the San
Jacinto Unified School District may collect up to $123.5 Million ($ 1991) in school
facilities funding by means of the City requiring all future residential development in the
City of San Jacinto to annex to one or more Mello-Roos community facilities districts
created by the School District. Annual fees will be collected according to a formula
established in the agreement that includes a one-time impact fee and a subsequent annual
tax based on the size of the dwelling unit. The District estimates that this combination of
taxes and fees will fund between 70% and 80% of all school construction costs, with the
remaining funding being through State and other sources. Additionally, the cooperation
agreement expressly states that it will be the sole means of mitigating school facilities
impacts, that the District will not oppose any residential projects or any redevelopment
projects or plans, and that the total tax increment "pass-through" to the District is pre-
negotiated at $0.137 per $1.00 of tax increment received by the San Jacinto
Redevelopment Agency.
Unlike the San Jacinto Unified School District, the County Office of Education
and the Community College District do not charge any development impact fees and
taxes. These two agencies are, therefore, reliant on property taxes and funding directly
from the State for much of their revenues. Increased property taxes from the Project
Amendment Area, including any pass through of tax increment from the Agency, will
increase revenues for these agencies to cover increased costs. The County Office of
Education and the Community College District may be eligible to receive a portion of the
tax increment from the Agency. Any allocation of tax increment dollars to these agencies
may be determined through negotiations, and would be intended to mitigate significant
financial burdens that demonstrably result from the implementation of the Project.
B. Mitigation Measures
The following mitigation measures are conditions of Project approval:
Fire Protection
1. Design standards for new and significantly rehabilitated construction shall
be consistent with accepted fire safety standards. Existing fire safety
regulations shall be enforced through established City of San Jacinto
project review and permitting procedures.
Police Protection
2. Input from the San Jacinto Police Department shall be solicited during the
project review process regarding measures for ensuring the safety and
security of construction sites.
3. Adequate security design measures shall be required for all new develop-
ment, based on Police Department recommendations during each site plan
review process.
PUBL:9126_1 13361 B2763.1 15 12/01/93
Park Services
4. All appropriate development in the Project Amendment Area will be
required to pay a parkland dedication fee as described above.
5. The Agency shall encourage implementation of additional mitigation
measures to provide capital financing for park facilities as proposed in the
San Jacinto General Plan. This includes the establishment of benefit
assessment districts, community facilities districts, and lighting and
landscape maintenance district as appropriate.
Schools
Relative to the San Jacinto Unified School District, none possible because the
1991 Cooperation Agreement between the City provides that it is the exclusive
method of mitigating impacts upon District schools. Potential mitigation measures
for the County Office of Education and the Community College District are
limited, because neither agency collects development impact fees. Participation in
community facilities districts may be feasible to help underwrite the construction
of new capital facilities, however.
C. Finding of Significance
Fire Protection
The City Council finds, based upon the evidence in the record, that following
implementation of the above mitigation measure as conditions of Project approval, no
significant unavoidable adverse impacts are expected relative to fire protection.
Police Protection
The City Council finds, based upon the evidence in the record, that following
implementation of the above mitigation measures as conditions of Project approval, no
significant unavoidable adverse impacts are expected relative to police protection.
Park Services
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval will
reduce park services impacts to less than significant levels..
Schools
The City Council finds, based upon the evidence in the record:
1. That there are no long-term adverse impacts of the Project upon K-12
school facilities. This is because the means of financing future K-12
school facilities are already in place. However, short-term overcrowding
PUBL:9126_1 1336 1 B2763.1 16 12/01/93
at school facilities may occasionally accrue as new capital facilities
development lags behind new residential development.
2. That changes or alterations are within the responsibility and jurisdiction of
the school districts and the State of California. These changes include the
districts electing to continue receiving their share of the property tax as
permitted, making regular and timely applications for State construction
funds, pursuing alternate means of financing schools as those are made
available through changes in state law, and using year-round schedules and
double sessions as necessary and appropriate. Also, these changes include
the State continuing to finance construction of new schools and classrooms
in response to enrollment increases.
3. That specific economic, social, or other considerations make infeasible the
mitigation measures or project alternatives identified in the Final EIR.
Therefore, this finding as to impacts to schools will require a Statement of
Overriding Considerations to be adopted as a condition of Project approval.
6. PUBLIC UTILITIES
This section treats potential impacts and mitigation measures regarding electricity, natural
gas, water, wastewater, and solid waste utilities serving the Project Amendment Area.
A. Potential Environmental Impacts
Electricity
As shown on Table 16 of the Final EIR, Project implementation at the level of
development projected in the Final EIR will result in a ten-fold increase in electric power
consumption. Southern California Edison does not anticipate any problems providing
electrical services upon buildout of the Project Amendment Area, based on currently
available electricity generation, transmission and distribution facilities.
Natural Gas
As shown on Table 16 of the Final EIR, rough estimates indicate natural gas
consumption is expected to increase by approximately 942% upon buildout of the Project.
According to the Southern California Gas Company, natural gas can be supplied by
existing mains. Availability of natural gas is assumed based on present conditions of gas
supply and regulatory policies.
Water
Buildout of the Project Amendment Area wilt increase water demands. Table 17
of the Final EIR estimates that future development will consume nearly 13 million gallons
per day, or over 11 million more gallons than at present. This constitutes an almost
PUBL:9126_113361132763.1 17 12/01/93
seven-fold increase over existing consumption levels. The exact extent of future impacts
will depend on consumer demands and consumer uses, and on the availability of local and
imported water supplies.
At present, it is unknown whether the overdraft condition will be alleviated by the
time full development is reached. If not, then development may have to be limited due to
lack of adequate water supplies. If the issue is resolved, then the additional demand that
the proposed Redevelopment Plan Amendment will have upon the water supply will not
be significant.
Water distribution is an intricate system which requires maintenance and
upgrading as growth occurs. An essential element of the Redevelopment Plan
Amendment is the provision of these public improvements. In order to alleviate impacts
upon the water distribution system, the proposed Redevelopment Plan Amendment
authorizes the Agency to use various funding mechanisms to upgrade the existing water
system serving the Project Amendment Area. The Agency is authorized to provide or
participate in providing the following non-exclusive list of water system improvements:
• Drill four wells in Sub-Area I
• Construct 18 million gallon storage tank in Sub-Area 1
® Install 12" to 30" water mains in Sub-Area 1
® Extend lines along Ramona Expressway extension in Sub-Areas 18, 19,
20, and 21
Constrict complete water service in Sub-Area 2
b Install and upgrade hydrants to adequate spacing and proper type in Sub-
Areas 1, 2, and 13
Install needed water lines in Sub-Area 13
Reposition 48" transmission main to adequate depth in Sub-Area 6
• Improve water main in Sub-Area 6
Wastewater
Sewage generation subsequent to buildout of the Project Amendment Area will be
increased by approximately 6 million gallons per day: from less than 1 million gallons
per day to well over 6 million gallons per day. This increase is due primarily to the
extent of new residential development expected in the Project Amendment Area, followed
by industrial development. While these increases exceed currently available capacity,
they will be phased over the lifetime of the Redevelopment Plan Amendment. New
sewerage transmission and treatment facilities will be required during the early decades of
the next century. The Redevelopment Plan Amendment includes provisions for upgrading
the sewer system in order to adequately serve the proposed development within the
Project Amendment Area. These improvements may be constructed with funding sources
provided through the Redevelopment Plan Amendment, on an as needed basis. The
extension of these improvements will result in the extension of sewer services to presently
unnerved areas, and upgrade services to other areas. These improvements include:
O Construct complete sewer service in Sub-Area 1 (trunk and local
transmission line)
Pu13L:9126_113361B2763.1 18 12/01/93
• Extend lines along Ramona Expressway extension in Sub-Areas 18, 19,
20, and 21
® Construct complete sewer service in Sub-Area 2
® Construct permanent sewer service in Sub-Area 3
0 Install needed sewer lines in Sub-Area 13
Solid Waste
As shown on Table 18 of the Final EIR, Project buildout can potentially increase
the overall amount of solid waste generated from within the Project Amendment Area by
427,500 pounds per day. In addition, more equipment such as trash containers and refuse
collection vehicles will be required. These generation rates do not include the effects of
recycling programs, and so represent the worst case. With implementation of recycling
and other waste reduction efforts, these volumes can be reduced significantly. If a full
50% reduction in the waste stream is achieved at some point in the future, then the total
increase in solid waste generated from within the Project Amendment Area would decline
to just over 300,000 pounds per day.
Implementation of mitigation measures will reduce refuse generation to acceptable
levels, but will not eliminate the generation of solid waste from within the Project
Amendment Area.
B. Mitigation Measures
The following mitigation measures are conditions of Project approval:
Electricity
1. Project design and operations will be required to implement energy
conservation measures to conform to Title 24 requirements and any other
applicable requirements of the City of San Jacinto.
2. The California Code of Regulations and local Building and Safety Codes
incorporate provisions and guidelines for construction of more energy
efficient structures. To reduce visual impacts, undergrounding of utility
lines should be required in design specifications for development projects
within the Project Amendment Area.
Natural Gas
3. Project design and operations will incorporate and implement those energy
conservation measures as appropriate to conform to Title 24 requirements.
Water
4. Precise water system requirements will be determined during specific
project design review. Water design requirements will be subject to the
provisions of the site plan review by the City of San Jacinto.
ausu9126_1 13361 B2763.1 19 12/01/93
5. Water distribution system improvements shall be constructed prior to or
concurrent with future development as required.
6. All City ordinances or other actions regulating the use of water approved
by the City Council shall be implemented by all new development within
the Project Amendment Area.
7. Water conservation measures recommended by the California Department
of Water Resources shall be incorporated in all new or substantially
rehabilitated projects, including:
a Low flush toilets of no greater than 1.6 gallons per flush.
o Low flow shower heads.
0 Insulation of hot water lines to provide hot water faster with less
water waste and to keep hot pipes from heating cold water pipes.
0 Water pressures greater than 50 pounds per square inch be reduced
to less than 50 pounds per square inch by means of a pressure
reducing valve.
® Landscape with low water consuming or drought tolerant plants in
all commercial and industrial projects, and in public areas in
residential projects. Landscaped areas should also be mulched to
the maximum extent to reduce evaporation and maintain soil
moisture.
® Install efficient irrigation systems that minimize runoff and
evaporation, and maximize the water that will reach the plant roots.
Drip irrigation, soil moisture sensors and automatic irrigation
systems are a few methods to consider in increasing irrigation
efficiency.
s Require projects of appropriate size to connect to the reclaimed
water system for irrigation purposes.
Wastewater
8. All new development within the Project Amendment Area must obtain
approval from the City of San Jacinto prior to occupancy. Evidence of the
Eastern Municipal Water District's ability to serve shall be submitted prior
to the issuance of building permits.
9. All industrial and commercial users must take on-site measures to reduce
the load strength of the sewage.
10. Implementation of the water conservation mitigation measures above also
will reduce per unit sewage flows.
euet:9126_113361B2763.1 20 12/01/93
Solid Waste
It. Where feasible, commercial and industrial buildings shall install refuse
compacting equipment to substantially reduce the number of refuse hauling
trips and allow for more effective and sanitary disposal.
12. Each building occupant shall, as a condition of use, participate in any
source reduction or recycling programs developed or adopted by the City
or the appropriate trash hauler to reduce waste generation.
13. Any hazardous waste that is generated on-site, or is found on-site during
demolition, rehabilitation, or new construction activities shall be
remediated, stored, handled, and transported to an appropriate disposal
facility by a licensed hauler in accordance with appropriate local, State and
Federal laws, as well as with the City's Source Reduction and Recycling
Element of the General Plan. All National Pollution Discharge
Elimination System (NPDES) requirements shall be complied with.
14. All future commercial, industrial and office buildings shall be provided
with enclosed trash bins. Additionally, all future residential, industrial,
commercial and office development shall be reviewed for and conditioned
for the construction of recycling facilities, including conveniently located
bins.
15. The City will cooperate with County efforts to establish a County-wide
integrated solid waste management system in implementation of the
California Integrated Solid Waste Management Act of 1991.
C. Finding of Significance
Electricity
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval will
reduce impacts from electricity demand to less than significant levels.
Natural Gas
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measure as a condition of Project approval will
reduce impacts from natural gas demand to less than significant levels.
Water
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval and
other measures contained throughout the Final EIR will reduce impacts from additional
water consumption to less than significant levels.
pu13L:9126_113361B2763.1 21 12/01/93
Wastewater
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval will
reduce impacts from wastewater generation to less than significant levels.
Solid Waste
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval will
reduce impacts from solid waste generation to acceptable levels but will not eliminate the
regional need for additional landfills and other disposal sites. Therefore, this finding as
to cumulative regional impacts from solid waste generation will require a Statement of
Overriding Considerations to be adopted as a condition of Project approval.
7. RISK OF UPSET
A. Potential Environmental Impacts
There are two potential sources of health hazards that could impact those in and
around the Project Amendment Area as a result of Project implementation. These include
undetected hazards associated with prior activities and hazards related to improper
handling and storing of hazardous materials by future site specific uses. Examples of
businesses which store hazardous materials consist of automobile service stations, body
and repair shops, nurseries, and printing shops. These uses typically contain underground
storage tanks and may utilize potentially hazardous materials. However, each of the uses
is considered to be compatible and the risks are considered normal for a mixed use
environment. Therefore no significant hazard is anticipated.
Furthermore, future industrial facilities developed within the proposed Project
Amendment Area must comply with all Federal and State policies and procedures that
pertain to the generation, transportation, treatment, storage and disposal of hazardous
substances.
B. Mitigation Measures
The following mitigation measures are conditions of Project approval:
1. All State and local laws and policies that govern the manufacturing and
handling of hazardous substances must be followed by all new industrial
uses constructed within the proposed Project Amendment Area.
2. Provisions for the use and storage of any potentially hazardous materials
within the proposed Project Amendment Area shall be reviewed by the
Fire Department and County Environmental Health Services, and strict
controls shall be placed upon their use and storage to ensure safety.
euau9126_11336162763.1 22 12/01/93
C. Finding of Significance
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval will
reduce risk of upset impacts to less than significant levels.
8. GEOLOGY AND SEISMICITY
A. Potential Environmental Impacts
Redevelopment and new development throughout the Project Amendment Area
will require some grading in order to provide for building pads, parking facilities, utilities
and drainage. The precise extent of required grading cannot be determined until specific
development proposals are prepared and submitted to the City for approval; however, the
gentle topography of most of the Project Amendment Area should minimize the overall
amount of earthwork needed to provide adequate building sites.
The proximity of an earthquake fault is a primary consideration when evaluating
the impact of ground shaking on an area. Other factors, including depth of focus,
epicenter location and magnitude, contribute to the intensity of ground shaking produced
by a seismic event. For instance, a 6.5 Richter magnitude earthquake on the San Jacinto
Fault in the immediate vicinity of San Jacinto will produce greater ground shaking and
damage than a much larger earthquake located some distance away. The alluvial soils
that underlie most of the Project Amendment Area have a tendency to amplify ground
motion from earthquakes because they are not as dense or consolidated as solid bedrock.
Given the proximity of the Project Amendment Area to the San Andreas and San Jacinto
Faults, future seismic events and the resulting ground shaking could cause major
structural damage to buildings, with the consequent personal injury and possible loss of
life. In addition, overhead and underground utility lines could be susceptible to damage
during periods of seismic activity, which in turn could leave all or portions of the Project
Amendment Area without essential water, power and sanitary services during the critical
period immediately following a major earthquake.
B. Mitigation Measures
The following mitigation measures are conditions of Project approval:
1. Future site-specific development proposals shall include comprehensive
geotechnical investigations to explore and evaluate soil, groundwater,
geological and seismic conditions, to provide soil engineering criteria, and
document the potential for seismically induced ground shaking on the
building site. An analysis of liquefaction, landsliding, and ground
subsidence induced by groundwater withdrawal shall be undertaken as
necessary and appropriate. Such investigations shall be conducted by a
licensed civil engineer specializing in the practice of soil mechanics, and
by a certified engineering geologist. Construction shall be in compliance
with the findings and recommendations of the required investigations.
PURL:9126_113361B2763.1 23 12/01/93
2. In portions of the Project Amendment Area that lie near suspected faults
which may be identified in future studies, geotechnical evaluations
acceptable to the City of San Jacinto shall be undertaken to establish the
presence and location of the suspected faults, and to establish whether or
not they are potentially active.
3. No structure intended for human occupancy or use shall be placed directly
on or within 50 feet of any active or potentially active fault. Nor shall any
structure intended for human occupancy be placed within 150 feet of an
inferred fault whose exact location is unknown. Additionally, no sensitive
structures including hospitals and schools should be placed within any
study zone, or within 200 feet of any inferred fault.
4. All construction of new buildings or rehabilitation of existing buildings
shall be in conformance with latest adopted edition of the Uniform
Building Code.
5. Structures of unreinforced masonry shall be brought up to existing State
and local building standards at the time of application for a change in use
or for major additions or alterations. The Redevelopment Agency shall
develop and continue to implement programs for assisting owners of
unreinforced concrete buildings in bringing their buildings up to current
State and Local earthquake standards.
6. All grading in the Project Amendment Area shall be in conformance with
the City of San Jacinto Municipal Code.
C. Finding of Significance
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval will
reduce geology and seismicity impacts to a less than significant level.
9. FLOODING AND DRAINAGE
A. Potential Environmental Impacts
Potential impacts from the implementation of the proposed Project could have
significant adverse impacts by exposing people and property to flooding, and by
increasing the amount of storm water runoff generated in the Project Amendment Area.
On the other hand, the implementation of the Project could have significant beneficial
impacts by financing the construction of flood control facilities in the Project Amendment
Area.
Construction within the 100-year flood plain could subject people and property to
inundation during a 100-year or greater storm. This affects portions of the Project
Amendment Area. Development of vacant land, and intensification of development on
ao13L:4126_113361B2763.1 24 12/01/93
presently underdeveloped parcels will increase the amount of ground surface impervious
to water. In turn, storm runoff into nearby streets and channels will be increased
incrementally, thus increasing the height and volume of flood waters during rainy periods.
This increase in impervious covering will also decrease percolation of surface water into
the groundwater basin, thereby reducing incrementally ground water levels.
Adoption of the Redevelopment Plan Amendment will assist in the alleviation of
existing and future drainage-related deficiencies, because the Agency would be authorized
to provide or participate in providing the following non-exclusive list of drainage
improvement projects:
• Construct levee along the south side of San Jacinto River in Sub-Area 1
• Construct various flood control channels and other improvements as
needed in Sub-Area I
® Construct necessary drainage improvements in Sub-Area 2 including storm
drain facility between Ramona Expressway and the San Jacinto River
• Construct storm drains to eliminate surface drainage at the intersection of
Ramona Expressway and State Street in Sub-Area 3
• Construct storm drain along State Street to the San Jacinto River in Sub-
Area 3
® Construct necessary drainage improvements in Sub-Areas 6 and 13
B. Mitigation Measures
The following mitigation measures are conditions of Project approval:
1. Development design shall include measures to ensure adequate drainage,
including construction of open or closed conveyance structures.
2. New development or significant rehabilitation shall be required to pay
impact fees in accordance with the City's drainage impact fee program.
3. No structures shall be placed within the 100-year flood plain, nor shall any
structure or grading be sited or constructed in such a way as to increase
the height or rate of downstream storm runoff.
4. If a future development project involves a Federal Emergency Management
Agency (FEMA) mapped flood plain, the City will condition the applicant
to provide all studies, calculations, plans and other information necessary
to meet FEMA requirements, and will further condition the applicant to
obtain a Conditional Letter of Map Revision (CLOMAR) prior to grading,
recordation or other final approval of the project, and a Letter of Map
Revision (LOMAR) prior to occupancy.
5. If a natural watercourse or mapped flood plain is impacted by a future
development project, the City shall require the applicant to obtain a
Section 1601/1603 Agreement from the California Department of Fish and
Game, and a Clean Water Act Section 404 permit from the U.S. Army
eua[.:9126 113361B2763.1 25 12/01/93
Corps of Engineers, or written correspondence from these agencies
indicating the project is exempt from these requirements. A Clean Water
Act Section 401 Water Quality Certification may be required from the
local California Regional Quality Control Board prior to issuance of the
Corps of Engineers Section 404 Permit.
C. Finding of Significance
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval will
reduce flooding and drainage impacts to less than significant levels.
10. LIGHT AND GLARE
A. Potential Environmental Impacts
Future illumination of new parking areas and ornamental lighting associated with
new commercial development could impact adjoining residential areas, if not properly
mitigated. In addition, glare impacts may occur if highly reflective exterior building
materials are used in the construction of new development in the Project Amendment
Area.
B. Mitigation Measures
The following mitigation measures as conditions of Project approval:
1. During the required site plan review of all proposed developments, the
City shall ensure that site improvements, including lighting and possible
glare producing building exteriors, do not adversely affect adjacent land
uses.
2. The City shall continue to implement its standard development regulations
that require low pressure sodium lighting on streets, in roadways and for
security. Such lighting should meet the requirements of Riverside County
Ordinance No. 655. Pedestrian circulation and walkway lighting shall be
fully shielded downwards, but may be Rill spectrum lighting because color
rendition in pedestrian areas is important.
C. Finding of Significance
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures as conditions of Project approval, will
reduce light and glare impacts to less than significant levels.
PUBL:9126_1 13361 B2763.1 26 12/01/93
11. NOISE
A. Potential Environmental Impacts
Noise impacts in the Project Amendment Area will come from three major
sources: increases in traffic volumes, increased number of possible point sources, and
construction activities. All these relate to the increased urban activity expected in the
Project Amendment Area as a result of implementation of the Redevelopment Plan
Amendment.
Future development and redevelopment in the Project Amendment Area will result
in long-term increases in existing traffic volumes within and around the City, and in turn,
increased noise levels along existing and proposed arterial corridors affected by traffic
increases. Construction activities will result in short-term increases in ambient noise
levels in the vicinity of construction sites. These activities may pose a temporary
annoyance to nearby businesses and residents during construction periods.
Enforcement of applicable regulations, such as California Code of Regulations,
Title 25, can reduce potential noise impacts by building sound insulation into all new
structures. However, Project-related traffic will result in a cumulative incremental
increase in ambient community noise levels throughout the Project Amendment Area and
its environs. Continued enforcement of the General Plan Noise Element will reduce these
adverse impacts to acceptable levels, and no significant adverse impact is expected.
Increased commercial and industrial activity within the Project Amendment Area could
result in a rise in potential point noise sources, such as manufacturing, automobile repair
shops, and other activities.
B. MitiQation Measures
The following mitigation measures are conditions of Project approval:
1. Prior to the issuance of a building permit, applicants for future
development within the Project Amendment Area shall submit evidence to
the satisfaction of the City that all applicable exterior and interior noise
standards established by the General Plan and implementing noise
ordinances will be met.
2. Site preparation and construction activities shall be limited to daytime
weekday hours.
3. All General Plan and other State and local standards for exterior and
interior noise exposure shall be met by all new constructions or significant
rehabilitation of existing structures.
ausL:9126_113361B2763.1 27 12/01/93
C. Finding of Significance
The City Council finds, based upon the evidence in the record, that
implementation of the above mitigation measures will reduce noise impacts to less than
significant levels.
12. BIOLOGICAL RESOURCES
A. Potential Environmental Impacts
As a general rule, the nature of expected biotic changes with urban development is
towards simplification of the structure and function of the natural biotic communities.
The loss of diversity will occur in biotic communities when they are disturbed, such as
those disturbances resulting from an increase in development. The cumulative
consequence of urban development causes the habitat tolerances of individual species to
be gradually exceeded, resulting in the elimination of sensitive species from the
community. Regionally, there will be a reduction in species diversity and abundance as a
result of the toss of undeveloped land.
Development pressures within San Jacinto as well as development pressures from
Hemet will continue with anticipated growth as proposed in the General Plan. The
transition of agricultural uses to more urbanized uses is expected and is consistent with
City objectives for the future. The hillside areas are expected to remain undisturbed. In
those portions of the Project Amendment Area that are presently developed for urban
purposes, or where the land has been heavily disturbed by past or present urban activity,
no significant impact on plant and animal life is expected. Other areas could adversely
affect existing natural plant and animal communities through either the reduction of range,
the direct loss of habitat, or the interruption of migration corridors. Loss of riparian
habitat could occur through inappropriate development along existing creek channels, or
through the channelization of existing creeks. In such cases, urban development without
appropriate mitigation measures could have significant adverse impacts either directly
through the loss of habitat or individual members of threatened or sensitive species, or
indirectly through the loss of range and migration corridors.
B. Mitigation Measures
The following mitigation measures are conditions of Project approval:
1. Existing agricultural uses, in particular row crops in the southeastern
portion of the City and dairies in the northwest portion of the Project
Amendment Area shall be permitted to remain at the owner's prerogative.
2. Areas within agricultural preserves shall be given a lower priority for
development than areas which are not in such preserves.
3. A biological survey and report shall be prepared by a qualified biologist
and submitted as part of any development application in an identified
PUBL:9126_1 13361 B2763.1 28 12/01/93
C. Finding of Significance
The City Council finds, based upon the evidence in the record, that upon
implementation of the above mitigation measures as conditions of Project approval, no
significant adverse impacts are expected relative to biological resources.
Conversion of Prime Agricultural Land
The conversion of land with prime agricultural soils to urban uses will result in a
significant adverse environmental impact over the long term. Note that the San Jacinto
General Plan calls for the conversion of this agricultural land to urban uses. The only
means of mitigating adverse impacts from the loss of agricultural land would be to amend
the General Plan to allow only agricultural production on prime agriculture soils in Sub-
Areas 1 and 2. This may not be feasible, however, because much of this land has been
committed to urban development through approved specific plans or other actions that
tend to assure urban development. Therefore, this impact will require a Statement of
Overriding Considerations to be adopted as a condition of Project approval.
PUPL:9126_113361B2763.1 30 12/01/93