Loading...
HomeMy WebLinkAboutResolution - 2123 RESOLUTION N0.-2.123 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO, APPROVING AN AMENDMENT TO THE CIRCULATION ELEMENT OF THE SAN JACINTO GENERAL PLAN FOR THE FIRST CYCLE OF 1993 AND INVOLVING A LARGER AREA, INCLUDING ANNEXATION 66 THE NORTHWEST PLAN AND SUNRISE RANCH THE CITY COUNCIL OF THE CITY OF SAN JACINTO DOES HEREBY RESOLVE AS FOLLOWS; WHEREAS, Section 65631 of the Government Code provides that no mandatory element of General Plan shall be amended more frequently than four times during any calendar year, and that the City Council of the City of San Jacinto is amending the Circulation Element of the San Jacinto General Plan for the First time during the 1993 calendar year; and WHEREAS, the City Council of San Jacinto held a public hearing regarding General Plan Amendment 19-93 on May 41 1993 and made a determination that the Circulation Element of the San Jacinto General Plan should be amended as follows: A. GPA 1-93 will enhance the logical development of the City and provide improved circulation in furtherance of the goals and policies of the General Plan by updating roadway designations. B. GPA 1-93 allows for reasonable and proper correlation of the circulation element with the land use element of the general plan. WHEREAS, advertisement for a public hearing on General Plan 1-93 was published in accordance with Article 6, Chapter 3, Title 7, of the Government Code; and WHEREAS, the City Council finds that there will not be a significant impact on the environment by right of this change and adopts a Negative Declaration for General Plan Amendment 1-93. THEREFORE, the land use element of the General plan is hereby amended in accordance with Exhibit "A®, attached hereto incorporated herein by reference. MOVED, PASSED AND ADOPTED on the 4th day of May, 1993. VOTE: AYES: Councilmembers Ford, Leahy, Solorio, Williams , Mayor Hafliger NOES: None ABSENT: None ABSTAIN: None ATTEST: MayoO Alv"VU De uty City Cfer�, CERTIFICATE The foregoing is certified to be a true copy of Resolution No.— duly passed by the said City Council of the City of San jacinto on the date set forth therein. Deputy City Clerk EXHIBIT A CaliforniaCITY OF SAN JACINTO GENERAL PLAN CIRCULATION ELEMENT TRAFFIC STUDY San Jacinto, [Revised July 14, 19921 �h I 1 L-- J I � i S P LI ' L ,— g I Y r J r 1 I ` .rases aaw I i rill rj a obert Kahn, John Kain & Associates, Inc. Robert Kahn , John Kain & Associates, Inc. Transportation Planning • Traffic/Acoustical Engineering July 14 , 1992 Mr. Les Evans CITY OF SAN JACINTO 201 East Main Street San Jacinto, CA 92583 Subject: Revised City of San Jacinto Circulation Element Traffic Study Dear Mr. Evans: ROBERT KAHN, JOHN KAIN & ASSOCIATES, INC. is pleased to submit this revised buildout traffic analysis prepared in support of the City of San Jacinto General Plan Circulation Element update. This report provides a summary of the findings, analysis procedures and evaluation of the proposed circulation network pursuant to land use plans currently under consideration within the City. The function of the Circulation Element of the General Plan is to serve as the blueprint for development of the circulation system much in the same way as the Land Use Element serves to guide development of land uses. Accordingly, the travel demand within the circulation system exhibited by traffic from the land uses at buildout must be estimated to determine the adequacy of the roadway classifications. The purpose of this report is to provide buildout traffic projections based upon a cumulative analysis procedure with manually distributed traffic patterns. A recommended buildout transportation network has been identified as part of this report. If you have any questions regarding this study, please do not hesitate to call at (714) 474-0809. Sincerely, ROBERT KAHN, JOHN KAIN TES, INC. IR iONq Q ����o g�CRT Kq Fyn o ti z J hn Kain, AICP w Q Robert Kahn, P.E. incipal NO. 0555 D Principal EXP. 12/31/93 RK:JK:CB:kgd/2336 * l G JN. 328-91-001 sr RAFF� Attachments 4jF OF C0.l`F��N`P 4101 Birch Street, Newport Beach, California 92660 (714) 474-0809 • FAX (714) 474-0902 CITY OF SAN JACINTO CIRCULATION ELEMENT TRAFFIC STUDY SAN JACINTO, CALIFORNIA (REVISED) Prepared for: CITY OF SAN JACINTO 201 East Main Street San Jacinto, CA 92583 Prepared by: ROBERT KAHN, JOHN KAIN & ASSOCIATES, INC. 4101 Birch Street, Suite 100 Newport Beach, CA 92660 July 14, ` 1992 JN: 328-91-001 TABLE OF CONTENTS SECTION PAGE I. INTRODUCTION AND SUMMARY 1 A. Purpose of Report and Study Objectives B. Executive Summary 1. Study Area 2 . Principal Findings II. EXISTING CONDITIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 A. Study Area Network 1. Roadway Inventory 2 . Traffic Volumes and Conditions B. Circulation Plans III. PROJECTED TRAFFIC . . . . . . . . . . . . . 26 A. Study Area Land Use B. Traffic Forecasting Methodology 1. Trip Generation 2 . Trip Distribution 3 . Modal Split C. Cumulative Future Development Traffic IV. STUDY AREA BUILDOUT TRAFFIC CONDITIONS . . . . . . . . . . . . . . . 42 A. Circulation System Requirements B. Phasing of Improvements APPENDICES LEVEL OF SERVICE DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A ZONE DISTRIBUTION PATTERNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B LIST OF EXHIBITS EXHIBIT PAGE A STUDY AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 B TRAFFIC ANALYSIS ZONES . . . . . . . . . . . . . . . . . . . . . . . . . . 5 C EXISTING NUMBER OF THROUGH LANES . . . . . . . . . . . . . . . . 12 D EXISTING INTERSECTION CONTROLS . . . . . . . . . . . . . . . . . . 16 E EXISTING AVERAGE DAILY TRAFFIC (ADT) . . . . . . . . . . . . 17 F EXISTING VOLUME TO CAPACITY RATIOS . . . . . . . . . . . . . . 19 G CITY OF SAN JACINTO CIRCULATION ELEMENT . . . . . . . . . 20 H CITY OF SAN JACINTO NORTHWEST AREA PLAN . . . . . . . . . 21 I RIVERSIDE COUNTY GENERAL PLAN CIRCULATION ELEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 i RIVERSIDE COUNTY GENERAL PLAN ROADWAY CROSS-SECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 K CITY OF HEMET DRAFT CIRCULATION ELEMENT . . . . . . . . . 25 L STUDY AREA BUILDOUT AVERAGE DAILY TRAFFIC (ADT) 41 M PROPOSED ROADWAY CROSS-SECTIONS . . . . . . . . . . . . . . . . . 48 N RECOMMENDED ROADWAY CLASSIFICATIONS . . . . . . . . . . . . . 50 0 STUDY AREA BUILDOUT VOLUME TO CAPACITY RATIOS . . . 51 P BUS TURNOUT DESIGN PARAMETERS . . . . . . . . . . . . . . . . . . . 52 LIST OF TABLES TABLE PAGE I BUILDOUT LAND USE DATA BASE . . . . . . . . . . . . . . . . . . . . . 27 2 TRIP GENERATION RATES . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 3 EXTERNAL TRIP GENERATION BY ZONE . . . . . . . . . . . . . . . . 36 CITY OF SAN JACINTO CIRCULATION ELEMENT TRAFFIC STUDY (REVISED) I. INTRODUCTION AND SUMMARY A. Purpose of Report and Study Objectives The purpose of this traffic analysis is to provide buildout traffic projections based upon a cumulative analysis procedure with manually distributed traffic patterns . A recommended buildout transportation network has been identified as part of this report. The cumulative analysis procedure provides the areawide data base needed to address citywide traffic issues in terms of the orientation of routes and link capacity requirements. The City of San Jacinto is currently analyzing long range roadway network requirements in support of an update to its Circulation Element. As one of the mandated elements of the General Plan, the Circulation Element sets forth the master plan for development of the circulation system, consistent with the Land Use Element. The primary function of the Circulation Element is provide a planned, efficient, and safe roadway system to meet the needs of the Land Use Element. To achieve this, estimates of travel demand within the roadway system at buildout of the city must be made. Study area buildout traffic projections have been prepared for specific land uses currently under consideration within the City of San Jacinto and its sphere of influence. With this knowledge, the adequacy of the various roadway classifications can be determined. 1 The study area includes two major land developments currently under review and subject to final approval by the City of San Jacinto: the Northwest Improvement Project (3 , 300 acres) and Annexation 66 (6, 400 acres) . The majority of the future traffic in the study area will be generated from the Northwest Improvement Project and Annexation 66. Study objectives include (1) documentation of existing traffic conditions in the study area; (2) evaluation of long range traffic conditions for the future development; and (3) determination of the ultimate circulation system needed to achieve City of San Jacinto level of service requirements. Existing conditions are based upon recent traffic counts and roadway conditions which exist in 1992 . Buildout conditions represent the full development within the study area including the Northwest Improvement Plan, Annexation 66, and the full buildout of the remainder of the study area as depicted in the City's General Plan and zoning. B. Executive Summary 1. Study Area Exhibit A illustrates the traffic analysis study area roughly bounded by Gilman Springs Road to the north, Florida Avenue (SR-74) and Menlo Avenue to the south, Soboba Road to the east and Warren Road to the west. The study area includes the land uses listed in Table 1 in Section 3 of this report. 2 C Y Is- � N is _a a, ui N T t 1 r r r/ r 'x i _ X x ° r — px t �` IX � x y x W LLl a— — �W O \ Z CC 0 1 \ 7 U Z J } � r UJ H V N w. F� A F'Frill Exhibit B shows the traffic analysis zones (TAZ) used in this study. Each TAZ represents the area where traffic , is generated by the land uses in that TAZ. The zone system is subdivided into areas which are small enough to accurately represent the distribution process and the; manner in which traffic loads to the roadway network. The study area of the model has been subdivided into 59 zones. 2 . Principal Findings Based on the -buildout traffic assignment illustrated on Exhibit L, recommendations are presented for roadway sizing and corridor requirements. These requirements are shown on Exhibit N which depicts the recommended circulation system classifications. Recommended changes to the existing general plan roadway designations are listed below: ROADWAY CLASSIFICATIONS EXISTING GENERAL RECOMMENDED ROADWAY SEGMENT PLAN PLAN • Warren Rd. south Arterial Urban Arterial of Ramona Expy:, • Warren Rd. north Not Classified Major of Ramona Expy. • Gilman Springs Rd. Secondary Major between Sanderson Ave. and Ramona Expy. • Lyon Ave. between Secondary Major Sanderson Ave. and Record Rd. 4 LU lCC r ® v - LL o (9 c) e me—esl� — � Q •. w z uj LU J f= uj z a d LL Q .. { ® u rr� O • Lyon Ave. between Urban Arterial Major Ramona Blvd. and De Anza Dr. • Ramona Expy. east Expressway Urban Arterial of Chase St. • Ramona Blvd. Urban Arterial Major between Sanderson Ave. and Lyon St. • De Anza Dr. Secondary Collector between Lyon St. and State St. • San Jacinto Ave. Secondary Collector between State St. and Ramona Expy. • San Jacinto Ave. Not Classified Collector between Ramona Expy. and Main St. • San Jacinto Ave. Urban Arterial Major south of Main St. • Alessandro Ave. Not Classified collector between Ramona Expy. and Main St. • Camino Los Banos Not classified Collector between Ramona Expy. and 7th St. • Shaver St. Not Classified Collector between Hewitt Ave. and Esplanade Ave. • Evans St. between Not Classified Collector Hewitt Ave. and Shaver St. • Sanderson Ave. Major Urban Arterial south of Cottonwood Ave. • Kirby St. south Collector Secondary of Cottonwood Ave. 6 • Esplanade Ave. Secondary Major between Sanderson Ave. and Palm Ave. • Esplanade Ave. Secondary Major between San Jacinto Ave. and Hewitt Ave.' • Esplanade Ave. Collector Major between Hewitt Ave. and Commonwealth Ave.' • Esplanade Ave. Secondary Major between Commonwealth Ave. and Ramona Expy.' With the recommended circulation system classifications shown on Exhibit N, the resulting volume to capacity ratios for the roadway network have been determined and are illustrated on Exhibit O. As shown on Exhibit O, most roadways in the study area will operate better than Level of Service "C10 (volume to capacity ratio = 0 . 80 or less) with the exception of portions of the Ramona Expressway, State Route 79 , Lyon Street, State Street and Sanderson Avenue. As illustrated on Exhibit M. the results of the buildout traffic assignment indicate that additional City roadway classifications are desirable. These are the inclusion of the Expressway and Urban Arterial cross-sections, as well as adjustments to the Arterial cross-section. ' Changes have been made with the Rancho San Jacinto project. 7 The use of the Expressway cross-section is recommended for Ramona Expressway west of Sanderson Avenue. The " utilization of this cross-section will provide enhanced capacity for roadway segments requiring roadway capacity in excess of that which can be provided by the standard County of Riverside Expressway cross-section. To mitigate overloads on the Ramona Expressway and other key roadways where physical improvements beyond those recommended are not feasible, this analysis suggests that it may be necessary to (1) selectively reduce development intensities of planned land uses throughout the study area, especially in the large commercial areas and/or (2) implement Travel Demand Management (TDM) and Urban design features which reduce peak hour trip activity, increase vehicle occupancy levels, and encourage alternative transportation modes. Urban design encompasses a range of activities and actions: the establishment of zoning and subdivision policies governing types and distribution of land uses and densities, the planning of neighborhoods and patterns of streets and blocks, the siting and massing of buildings, and the detailed design of streetscapes. It entails planning for all modes of , travel, public and private, alone and in groups, by machine and by foot. TDM measures include adopting strategies that influence travel ' behavior -- encouraging carpooling, sharing required parking, reducing rather than increasing parking requirements where public transit is an option, staggering work schedules, and providing employment opportunities near or, via telecommunication, within the homes of workers. 8 In the previous Sunrise Ranch Traffic Study by ROBERT KAHN, JOHN KAIN & ASSOCIATES, INC. (October, 1991) an additional north/south connection parallel to Sanderson Avenue to the Ramona =Expressway was evaluated. The purpose of this additional roadway connection was to specifically reduce traffic impacts at the intersection of Sanderson Avenue and the Ramona Expressway. This alternative was not evaluated in this analysis but is a viable option: The 'traffic signals required within the study area at buildout should specifically include an interconnect of the signals to function in a coordinated system. To accommodate future bus service on key roadways, transit stops should be anticipated at the far side of major intersections. Pedestrian access to the bus stops should be provided. Exhibit P shows the recommended bus turnout design features. New land use developments within the study area should participate in the phased construction of traffic signals as 'required within the study area through payment of established fees or installation of traffic signals when warranted based upon traffic analysis of development phases . To ensure that roadway improvements are provided in conjunction with each development phase, the following development monitoring requirements should be enforced throughout the study area: 9 a. Traffic impact study reports shall be required with submittal of each tentative tract map or plot plan for projects which may significantly impact the existing roadway network based upon City and County criteria. b. The required format for each traffic impact study report will be determined by the City of San Jacinto. The required format will include evaluation of peak hour conditions at intersections significantly impacted by each phase of development. C. If an impacted intersection is estimated to exceed City service level standards, then appropriate link and intersection improvements shall be required to be presented for City staff review. d. The improvements needed ; to maintain the City service level standards will be required to be in place prior to occupancy of the relevant development phase. Improvements which are included in an adopted fee program will be provided by the fee program mechanism if funds are currently available. If funds are not available to meet the circulation improvement needs at any particular development phase, then the project proponent will either provide the off-site improvements directly (with assurance of future reimbursement or credits if a relevant fee program is in place) , or the development must await other sources of implementation. 10 ZI. EXISTING CONDITIONS A. Study Area 1. Roadway Inventory Roadways in the study area are listed below and depicted on Exhibit C. In the study area, the following roadway conditions exist. Sanderson Avenue: This north/south roadway is classified as an Urban Arterial (134 foot right-of-way) on the City of San Jacinto Circulation Element. It is currently two lanes in the study area. Lyon Avenue: This north/south roadway is classified as a Major highway (ioo foot right-of-way) south of De Anza Drive and as an Urban Arterial (134 foot right-of-way) between De Anza Drive and the Ramona Expressway on the _ City of San Jacinto Circulation Element. It is currently two lanes south of De Anza Drive. Ramona Expressway: This generally east/west roadway is classified as a Specific Plan Roadway (142 foot right-of- way) on the City of San Jacinto Circulation Element. It is currently two lanes in the study area. Ramona Boulevard: This generally east/west roadway is classified as an Urban Arterial (134 foot right-of-way) west of 'Lyon Avenue and as a Secondary highway (88 foot right-of-way) east of Lyon Avenue on the City of San Jacinto Circulation Element. It is currently two lanes between Sanderson Avenue and San Jacinto Avenue. 11 e � W uj 9 � LU sat 6, co I C u� - 4--� 3 roceas ;J ' i 91! r _ 46 i tj Z 51 W uj O F.. � 0 e3 LL Q U ® w F' w W $ (� C9 CA AC = G3 _ t a ME LLI Ir s LLI z F i Sig i z�: i �i e � c i r� II i �v uj a. 1 uj ug 6 O Q .J C Q V Zp dl& p$pFppGY c LL LI OE G F Lj! �B®� 6 � 3 — >- z C I W w Q 0 (n is w: De Anza Drive: This generally east/west roadway is classified as a Secondary highway (88 foot right-of-way) west of State Street and as a Collector highway (66 foot right-of-way) east of State Street on the City of San Jacinto Circulation Element. It is currently two lanes in the study area. Cottonwood Avenue: This east/west roadway is classified as a Major highway (loo foot right-of-way) on the City of San Jacinto Circulation Element. It is currently two lanes in the study area. Warren Road: This north/south roadway is classified as an Urban Arterial (134 foot right-of-way) on the City of San Jacinto Circulation Element. It is currently two lanes in the study area. Kirby Street: This north/south roadway is classified as a Collector (66 foot right-of-way) on the City of San Jacinto Circulation Element and as a Secondary highway (88 foot right-of-way) on the County of Riverside General Plan Circulation Element. It is currently two lanes south of Cottonwood Avenue. Palm Avenue: This north/south roadway is classified as a Secondary highway (88 foot right-of-way) on the City of San Jacinto Circulation Element. It is currently two lanes south of Esplanade Avenue. State Street: This north/south roadway is classified as a ;Major _highway (loo foot right-of-way) south of the Ramona Expressway and as a Secondary highway north of the Ramona Expressway on the City of San Jacinto Circulation 13 Element. It is currently two to four lanes in the study area San Jacinto Avenue: This north/south roadway is classified as a Collector highway (66 foot right-of-way) north of Main Street and as a Secondary highway (88 foot right-of-way) between Main Street and Seventh Street and as an Urban Arterial highway south of Seventh Street on the City of San Jacinto Circulation Element. " It is currently two to four lanes in the study area. Hewitt Avenue: This north/south roadway is classified as a Secondary Highway (88 foot right-of-way) on the City of San Jacinto Circulation Element. It is currently two lanes in the study area. 7th Street: This east/west roadway is classified as a Secondary highway (88 foot right-of-way) on the City of San Jacinto Circulation Element. It is currently two to four lanes in the study area. Esplanade Avenue: This east/west roadway is classified as a Major highway (100 foot right-of-way) between Lyon Avenue and the Ramona Expressway and as a Secondary highway (88 foot right-of-way) west of Lyon Avenue on the City of San Jacinto Circulation Element. It is currently two to four lanes in the study area. Main Street: This east/west roadway is classified as a Secondary highway (88 foot right-of-way) east of San Jacinto Avenue and as a Collector highway west of San Jacinto Avenue on the City of San Jacinto Circulation 14 Element. It is currently two to four lanes in the study area. Gilman Springs Road: This generally east/west roadway is classified as a Secondary highway (88 foot right-of-way) west of State Street on the City of San Jacinto Circulation Element. It is currently two lanes in the study area. Soboba Road: This generally east/west roadway is classified as a Secondary highway (88 foot right-of-way) on the City of San Jacinto circulation Element. It is currently two lanes in the study area. To dimension the existing traffic conditions, roadway characteristics were documented in January, 1992 . Exhibit C identifies the existing number of through travel lanes. Existing intersection controls are as illustrated on Exhibit D. 2 . Traffic Volumes and Conditions Existing average daily traffic (ADT) on arterial highways throughout the study area are shown on Exhibit E. Average daily traffic (ADT) volumes are based upon the latest traffic data collected by the county of Riverside Transportation Department, Traffic Division, Traffic Count Book dated 1990, the 1990 Traffic Volumes on California State Highways by Caltrans, the City of San Jacinto Traffic Census Report (February, 1991) , counts made for the City of San Jacinto by Counts Unlimited (February, 1992) , City of Hemet 1990 Traffic Flow Map and 15 e� 0 s � f !YQ w d5 uj V/ '"'i •• �r W Qu ui i si k �, l '•� d 'xrf�K+�'p 14_ i 4� a?• , ram' s _ 1 7 3 r r' $ W } _ LIJ J Ell Z 0_ H Z p 4 ftS 4 40. mad§ tip U- 4 Ci F— W cc V CD U) li il.e u _0 G R _ L LLcc v a LLI ' i o d yc r_ s�rne srnm.me e LU - "�i .._hj Cl) me v3: — - - ,.p /// uj LLI ui 0 4� Z 0 ca G Z_:CC p a J' e O w W >" Z F' Lu sA s� o _ �cr - counts made for Robert Kahn, John Kain & Associates', Inc. . By dividing existing average daily traffic volumes by the daily roadway capacities listed below, existing daily volume to capacity ratios have been calculated. Existing volume to capacity ratios are shown on Exhibit F. volume to capacity ratios are based on the County of Riverside maximum capacities listed below: MAXIMUM CAPACITY FACILITY LANES (LOS = E) Expressway 8 80, 000 Urban Arterial 6 59 , 000 Arterial/Major 4 38, 000 Secondary 4 30, 000 Collector 2 18, 000 An explanation of Level of Service (LOS) is included in Appendix "A" . B. Circulation Plans Exhibit G shows the current City of San Jacinto Circulation Element (The Rancho San Jacinto project changes Esplanade Avenue and Commonwealth Avenue) . The Northwest Area Plan for the City of San Jacinto supercedes the City' s original circulation element for the affected area and is illustrated on Exhibit H. Exhibit I shows the Riverside County General Plan Circulation Element. This exhibit shows the nature and extent of arterial highways which are estimated to be needed to serve ultimatedevelopment, and serves to coordinate future 18 t9i x a . cc H , co r � a �x a 8 i x2 / yy 'tIR Ilf ui rz 711 Lys �A L fc I o a W c W W z Ld a 3 c a 4C w s' a 1 zLU -� uj tC o -c CIRCULATION ELEMENT LEGEND t RIGHT OF WAY `'� URBANfAL HIGHWAY a®®�+yu&5 MAJOR HIGHWAY 100` SECONDARY HIGHWAY I%. COLLECTOR HIGHWAY 66� RAMONA EXPRESSWAY •. w ............ .. 1 tiq• +. qq I i I Y 4' l \tip _ ! 1 I S MR N Vi.y.m CITY OF SAN JACINTO ort GENERAL PLAN CIRCULATION ELEMENT San Jacinto, ' EXHIBIT G z a ober# Kahn, John Kai n & Associates, Inc. of NORTHWEST AREA PLAN i C _ "� LEGEND M■OUOAWP 100NT11VH,T aYBHTFROJ I SYMBOL R.W.` DESIGNATION I � iI 1 1® 142'SPECIFIC PLAN ROAD r.7 0 t 134' ARTERIAL(URBAN) HIGHWAY (.ATM xe�HHn.at t i w..a......v...e.., 134'ARTERIAL(URBAN) ® Fy 5 \'{ y �••� r. _ HIGHWAY 100'MAJOR HIGHWAY ------- 88' SECONDARY HIGHWAY j --__-_ 66'MODIFIED SECONDARY HIGHWAY COo rnu ..f.,.cR ' a 2:u:Cp J -----_. 66 COLLECTOR STREET BIKE PATH go �=- F � Jr 2 „U014 U, CrYr H w SIT 0 i 11i2i U$ 1 S 7 .i'Y ,JVOIR iI o r y JVi�T r. 1 y W� i OTTCbV000 I _., ®aa �� .e,H,au4 ,,, � .;... Ej _�3 ®[$ _CIRCOWLATIVION San Jacinto, li I EXHIBIT H z 1 knob®rt Kahn, John Kai n do Associates, Inc. RIVERSIDE COUNTY GENERAL PLAN CIRCULATION ELEMENT LEGEND CLASSIFICATION RIGHT OF WAY SYMBOL LvE ::® ®. r .mmmmmm 1 t SECONDARY BB° n®a.m.m® of RD MAJOR 100 MARVIN m ® ® y`�9 mommemaft ARTERIAL 110 a cfy MOUNTAIN ARTERIAL I lo' 77 URBAN ARTERIAL 134' ®N st EXPRESSWAY VARIABLE t fs, FREEWAY VARIABLE i SPECIFIC PLAN ROAD VARIABLE ZJ v \ BRIDGE R! RR RECORC ®m .Tmm �.®m R R R 79� ,® RR 9rP.D' OUAND ST - -'�v ` NCH 90. 1_PL %oFi R l 1Ey W I `y4`Y R ♦ l�"' ! ° 1 ^e R co**oNwooD 1 1 T 1► R' ° ®� =R :I�y ' 1 ♦ 1 y R ♦ A 1 t ® #71-- gym 10 ® 1 j S� ESPLA. E C _ 79 ♦+o s�®+s +o+�-so w-wmroos SOBC o`E A-0[. a®E 1 ® ® ® m 1 I RE 31 ♦ m 1 ♦ a I aZE oEoo. ME 1 ♦ • wE 49cHrr F V p ®®�r r.®W. ® ems♦ 1 0 0 \ ccI � � 1 .. R:OA ♦ 1 AVE4VE r cc 1 + Ort Jacinto,San li i EXHIBIT I az Robert Kahn, John Kein & Associates, Inc. arterials between local jurisdictions. Exhibit J illustrates the Riverside County arterial street cross-sections. The City of Hemet Draft Circulation Element is illustrated on Exhibit K. 23 RIVERSIDE COUNTY GENERAL PLAN ROADWAY CROSSIBIISECTIONS Wk rt aL 6 i2'—Fz% 2�14 f412 12' 12'T.R.0"\ 6 6 CURB ( CURB NEOWI G 2%7i fCURB —� /,[ 'CURBED OR PAINTED MED60 URBAN ARTERIAL HIGHWAY R/W 110, R/W B6'WL INK 12 CURB URO�V MLANE i f 2% CURB fi CURB \CURBED OR PAINTED MEDIAN ARTERIAL HIGHWAY R/W 11W R/W —12' 17 - 12, i 2'—y-2X� 6 2:9 MAX I � > 2:1 WUC. MOUNTAIN ARTERIAL HIGHWAY A CONCRETE CURB GUTTER AND SIDEWALK NAY BE REQUIRED AS DETERMINED BY 4HE DIRECTOR OF TRANSPORTATION. R/YN 100, R/W YN. { MN SDEWNK CURB �72'�tI2'�f2'—p—i-2'_ CURB\ 40BWLK�b /1 MEDIAN I 1\ MAJOR HIGHWAY R/W 88, R/W 64' I15 x CUR %21—p-72 72'—y--7—y CURB x� SECONDARY HIGHWAY R/W 7B' R/W 56, 34'* AIL -tom 10 12'�11I2'�12'�-10--}-6�5' I�TtMKCURB 2% 1 2% CURB 5✓�WWI( PAINTEDIIIIMED. _.® 1 [INDUSTRIAL COLLECTOR RPART MOTH STREET SECTION FOR AN INTERIOR R/W COMMERCIAL OR INDUSTRIAL STREET RAN $6' 44' W. SUBVL /OM MK (SBEMI.R CURB f r. CURB--• x CIX LECTOR *PART MOTH STREET SECTION FOR ALL COLLECTOR STREET - 34' IMPROVEMENTS ON 48' R/W GENERAL PLAN ort CIRCULATION San Jacinto, California E2XHIBIT J 2 4 obert Kahn , John i n SCAssociates, Inc. DRAFT CIRCULATION ELEMENT \ i3$ .1. —a— ]Lee CITY OF HEMET 3 ' R d aaaam 1 FA rI q Ile 1 d rF° L Xb �p It ® O®mom + `14P LP_GHND: 1\ Lussinc,LnaW wcxrne.wws CITY OF SAN .� +nuW/Y WM«P 6T ROW. mm F1py W(Ava1 Im 0.0W Amin MV'..1 IIP(D W. Lpva.aR IN WX. 6NwG RD.W Im.IH'ROw. NTOY GENERAL PLAN CIRCULATION ELEMENT San ort Jacinto, California EXHIBIT K ly zs oart Kahn, John Kain & Associates, Inc. III PROJECTED TRAFFIC A. Study Area Land Use Table 1 shows the expected buildout land uses for each traffic analysis zone based on an analysis of existing General Plans and zoning within the study area. Land use data was obtained from NBS/Lowry and the City of San Jacinto. Table 1 also shows the percent of internal interaction assumed for commercial, recreational and residential uses within zones. B. Traffic Forecasting Methodology 1. Trip Generation Trip generation represents the amount of traffic which is attracted and produced by a development. Trip generation rates were determined for average weekday traffic. By multiplying the traffic generation rates by the land use quantities, the traffic volumes are determined. Table 2 exhibits the trip generation rates for peak hour and daily traffic. Traffic volumes shown in Table 3 consist of the external trips generated for new land uses. As a residential trip generated by a project will also be making trips to a commercial or other land use within the project, a double counting of those trips occurs. An assumed thirty percent of the Table 4 traffic generated by each project has been removed for interaction of commercial, business and residential uses within the study area. This has been done to eliminate the "double counting" of trips 26 TABLE 1 BUILDOUT LAND USE DATA BASE PERCENT INTERNAL ZONE LAND USE INTERACTION UNITS QUANTITY' 1 Industrial 5% TSF 120.0 2 Single-Family 5% DU 360.0 Junior High School ST 1,300.0 3 Commercial Retail 10% TSF 144.0 4 Single-Family 5% DU 429.0 5 Single-FamiLy 5% DU 465.0 Elementary School ST 730.0 6 Single-Family 5% DU 383.0 Multi-Family DU 67.0 7 Single-Family 5% DU 214.0 Elementary School ST 730.0 8 Commercial 10% TSF 48.0 9 Single-Family 5% DU 106.0 Junior High School ST 1,300.0 10 Single-Family 5% DU 101.0 11 Commercial Retail 10% TSF 72.0 Industrial TSF 96.0 Business Park TSF 108.0 12 Single-Family 10% DU 27.0 Commercial Retail TSF 91.2 13 MuLti-Family 10% DU 80.0 Commercial Retail TSF 28.8 TSF = thousand square feet DU = duelling units ST = students AC = acres z The quantity (TSF) of commercial retail, industrial and business park have been estimated by'taking gross acres of each land use and reducing them by 20% for'all' zones except zones 25, 26, 30,'32 and 33, which were reduced by 50%, and then applying the following factors: • Commercial Retail = 10 TSF per acre • Industrial = 15 TSF per acre • Business Park` = 15 TSF per acre ` 27 TABLE 1 (CONT'D) BUILDOUT LAND USE DATA BASE PERCENT INTERNAL ZONE LAND USE INTERACTION'' UNITS1 QUANTITyz 14 Multi-Family 10% DU 237.0 Commercial Retail TSF 87.2 15 Multi-Family 10% DU 40.0 Commercial Retail TSF 62.4 Elementary School ST 730.0 16 Multi-Family 10% DU 40.0 Commercial Retail TSF 25.6 17 Single-Family 20% DU 1,266.0 Multi-Family DU 496.0 Commercial Retail TSF 256.0 Industrial TSF 1,120.0 Business Park TSF 560.0 18 single-Family 20% DU 502.0 Multi-Family DU 3,904.0 Commercial Retail (NBHD) TSF : 40.8 Commercial Retail (REG) TSF 792.0 Industrial TSF 1,064.0 Business Park TSF 532.0 Elementary School ST 730.0 Junior High School ST 1,300.0 19 Single-family 20% DU 252.0 Multi-Family DSF 2,008.0 Commercial Retail (NBHD) Commercial Retail (COM) TSF 176.0 Industrial TSF 156.0 Elementary School ST 730.0 Junior High School ST 1,300.0 High School ST 2,174.0 Public Utilities AC 247.0 TSF = thousand square feet DU = dwelling units ST = students AC = acres 2 The quantity (TSF) of commercial retail, industrial and business park have been estimated by ;taking gross acres of each land use and reducing them by 20% for all zones except zones 25, 26, 30, 32 and 33, which were reduced by 50%, and then applying the following factors: • Commercial Retail = 10 TSF per acre • Industrial = 15 TSF per acre • Business Park = 15 TSF per acre 28 TABLE 1 (CONT'D) BUILDOUT LAND USE DATA BASE PERCENT INTERNAL ZONE LAND USE INTERACTION UNITS' DUANTITYZ 20 Single-Family 15% DU 1,262.0 Multi-Family DU 800.0 Commercial Retail TSF 224.0 Elementary School ST 730.0 Public Utilities AC 38.0 21 N/A3 N/A N/A N/A 22 Multi-Family 1D% DU 245.0 Industrial TSF 391.2 Business Park TSF 195.6 23 Multi-Family 15% DU 144.0 Commercial Retail TSF 72.0 Industrial TSF 1,D98.4 Business Park TSF '549.2 24 Single-Family 10% DU 683.0 Comnercial Retail TSF 246.4 25 Single-Family 10% DU 798.0 Commercial Retail TSF 174.5 26 Single-Family 1D% DU 794.0 Comercial Retail TSF 218.D 27 Single-Family 5% DU 143.0 Multi-Family DU 496.0 Junior High School ST 1,300.0 TSF = thousand square feet DU = dwelling units ST = students AC = acres ' The quantity (TSF) of comnerciat. retail, industrial and business park have been estimated by taking gross acres of each land use and reducing them by 2D% for all zones except zones 25, 26, 30, 32 and 33, which were reduced by 50%, and ,then applying the following factors: • Commercial Retail = 10 TSF per acre • Industrial = 15 TSF per acre • Business Park = 15 TSF per acre N/A = not applicable 29 TABLE 1 (CONT'D) BUILDOUT LAND USE DATA BASE PERCENT INTERNAL ZONE LAND USE INTERACTION. . UNITS QUANTITY' 28 Mutti-Family 15% DU 581.0 Commercial Retail TSF 48.8 Elementary School ST 730.0 Industrial TSF 357.6 29 Single-Famity 10% DU 481.0 Multi-Family DU 291.0 Commercial Retail TSF 183.2 Elementary School ST 730.0 30 Single-Family 10% DU 580.0 Multi-Family DU 111.0 Commercial Retail TSF 123.0 31 Single-Family 10% DU 774.0 Multi-Family DU 499.0 Commercial Retail TSF 126.4 32 Single-Family 10% DU 164.0 Multi-Family DU 442.0 industrial TSF 150.0 33 Single-Family 15% DU 429.0 Commercial Retail TSF 34.5 Industrial TSF 270.0 34 N/A N/A N/A N/A . 35 Single-Family 5% DU 410.0 36 Single-Family 5% DU 130.0 Autti-Family DU 205.0 37 Single-Family 10% DU 128.0 commercial Retail TSF 80.0 TSF = thousand square feet DU = dwelling units ST = students AC = acres ' The quantity (TSF) of commercial retail, industrial and business park have been estimated by 'taking gross acres of each land use and reducing them by 20% for all zones except zones 25, 26, 30, 32 and 33, which were reduced by 50%, and then applying the following factors: • Commercial Retail = 10 TSF per acre • Industrial = 15 TSF per acre • Business Park - 15 TSF per acre, 30 TABLE 1 (CONT'D) BUILDOUT' LAND USE DATA BASE PERCENT INTERNAL ZONE LAND USE INTERACTION UNITS' QUANTITY2 38 Single-Famity 5% DU 32.0 39 Multi-Famity 5% DU 48.0 40 Single-Family 10% DU 208.0 Multi-FamiLy DU 240.0 Commercial Retail TSF 40.0 41 Multi-Family 10% DU 782.0 Conmercial Retail TSF 80.0 42 Single-Family 10% DU 1,363.0 Commercial Retail TSF 132.0 43 Single-Family 5% DU 1,426.0 Multi-Family DU 160.0 44 Multi-Family 5% DU 64.0 45 Single-Family 10% DU 726.0 Multi-Family DU 624.0 Commercial Retail (COM) TSF 120.0 Commercial Retail (HWY) TSF 80.0 46 Single-Family 10% DU 942.0 Commercial Retail TSF 80.0 47 Single-Famity 5% DU 598.0 48 Multi-Family 5% DU 40.0 49 Single-Family 10% DU 152.0 Multi-Family DU 200.0 Commercial Retail TSF 420.8 50 Single-Family 5% DU 40.0 TSF = thousand square feet DU = dwelling units ST = students AC = acres Z The quantity (TSF) of commerciaL retail, industrial and business park have been estimated by taking gross acres of each land use and reducing them by 20% for all zones except zones 25, 26, 30,,32 and 33, which were reduced by 50%, and then applying the following factors: • Commercial Retail = 10 TSF per acre • Industrial = 15 TSF per acre • Business Park = 15 TSF per acre 31 TABLE 1 YCONTID) BUILDOUT LAND USE DATA BASE PERCENT INTERNAL': ZONE LAND USE INTERACTION UNITS QUANTITY' 51 Forest/Parks 5% AC 3,700.0 52 Single-Family 5% DU 128.0 53 Forest/Parks 5% AC 1,902.0 54 SingLe-Family 10% DU 6,762.0 55 Estate 5% DU 1,166.0 56 Single-Family 5% DU 64.0 57 Single-FamiLy 20% DU 4,000.0 Commercial Retail TSF 730.0 Light Industrial TSF 3,060.0 58 Single-Family 5% DU 480.0 59 Single-FamiLy 5% DU 320.0 TSF = thousand square feet DU = duelling units ST = students AC = acres 2 The quantity (TSF) of commercial retail, industrial and business park have been estimated by taking gross acres of each land use and reducing them by 20% for all zones except zones 25, 26, 30, 32 and 33, which were reduced by 50%, and then applying the following factors: • Commercial Retail = 10 TSF per acre • Industrial = 15 TSF per acre • Business Park' = 15 TSF per acre 32 TABLE 2 TRIP GENERATION RATES' PEAK-HOUR AM PM LAND USE UNITS2 IN OUT IN OUT DAILY Estate DU 0. 24 0. 66 0.76 0 . 44 12 . 00 Single-Family DU 0. 19 0.55 0. 66 0. 35 9. 55 Multi-Family DU 0.17 0. 50 0.47 0 . 36 8 . 00 Commercial Retail3 • (26 TSF) TSF 1.79 1. 05 5. 38 5. 38 117 . 80 • (29 TSF) TSF 1.71 1. 00 5. 16 5. 16 112 .71 • (35 TSF) TSF 1. 59 0. 93 4.83 4 . 83 105.33 • (40TSF) TSF 1.49 0. 88 4 . 58 4 . 58 - 99 . 65 • (41 TSF) TSF 1. 48 0. 87 4 . 54 4 . 54 98 . 91 • (48 TSF) TSF 1. 38 0. 81 4. 28 4 . 28 93 . 07 • (49 TSF) TSF 1. 37 0. 81 4 . 26 4 . 26 92 .49 . • (56 TSF) TSF 130 0. 76 4 . 05 4 . 05 '87 .84 • (62 TSF) TSF 1. 24 0.73 3. 89 3 . 89 84 .34 • (72 TSF) TSF 1. 17 0. 69 3 .70 3 . 70 79 .94 • (80 TSF) TSF 1. 12 0. 66 3 . 56 3 . 56 76. 84 Source: Institute of Transportation Engineers, Trip Generation, Fifth Edition, 1991, Land Use Categories 210, 231, 820, 110, 520 and 430. z DU = dwelling unit TSF = thousand square feet AC = acre ST = student Commercial retail trip generation rates are based upon the following ITE equations for Land Use Code 820: X $ X X Shopping Center Rates In Out Shopping Center Rates In Out Under 570 TSF Under 600 TSF Ln(T) = 0.625 Ln(X)'+ 5.985 50 50 Ln(PMT) = 0.637 Ln(X) + 3.553 50 50 570 TSF & Over 600 TSF 8 Over Ln(T) 0.756 Ln(X) + 5.154 50 50 "Ln(PNT) = 0.725 Ln(X) + 2.987 50 50 Ln(ANT) = 0.589 Ln(X) + 2.378 63 37 X = building net Leasable area in TSF (thousand square feet) ANT = AM peak hour trips PMT = PH peak hour trips 33 TABLE 2 (CONTID) TRIP GENERATION RATE PEAK-HOUR AM PM LAND USE UNITS' IN OUT IN OUT DAILY Commercial Retai13 • (87 TSF) TSF 1. 08 0. 64 3 . 45 3 . 45 74 .40 • (91 TSF) TSF 1. 06 0. 62 3 . 39 3 . 39 73 . 16 + ( 120 TSF) TSF 0. 95 0.56 3. 07 3 . 07 66. 00 • (123 TSF) TSF 0.94 0. 55 3 . 04 3 . 04 65.39 • (126 TSF) TSF 0 . 93 0.55 3 . 01 3 . 01 64 .73 ® (132 TSF) TSF 0 . 91 0. 54 2 .97 2 . 97 63 . 68 • (144 TSF) TSF 0. 88 0. 52 2 . 87 2 . 87 61. 64 a (175 TSF) TSF 0. 81 0. 48 2 . 68 2 . 68 57. 36 0 (176 TSF) TSF . . : 0. 81 0. 48 2 . 67 2 . 67 57. 17 • (183 TSF) TSF 0.80 0. 47 2 . 63 2 . 63 56.32 • (218 TSF) TSF 0.74 0.44 2 . 47 2 . 47 52 .76 • (224 TSF) TSF 0.73 0. 43 2 .45 2 . 45 52 .23 0 (246 TSF) TSF 0.71 0.41 2 .37 2 . 37 50. 39 • (256 TSF) TSF 0.70 0. 41 2 .33, 2 . 33 49. 68 0 (421 TSF) TSF .. 0. 57 0. 33 1. 95 1. 95 41. 23 • (730 TSF) TSF 0.45 0 .27 1. 62 1. 62 34. 65 • (792 TSF) TSF 0. 44 0. 26 1. 58 1. 58 33 . 97 Source: Institute of Transportation Engineers, Trip Generation, Fifth Edition, 1991, Land Use Categories 210, 231, 820, 110, 520 and 430. DU = dwelling unit TSF - thousand square feet AC = acre ST = student CortmerciaL retail trip generation rates are based upon the following ITE equations for Land Use Code 820: x x x x Shopping Center Rates 1n Out Shopping Center Rates In Out Under 570 TSF Under 600 TSF Ln(T) = 0.625 Ln(X) + 5.985 50 50 Ln(PMT) = 0.637 Ln(X) + 3.553 50 50 570 TSF & Over 600 TSF & Over Ln(T) - 0.756 Ln(X) + 5.154 50 50 Ln(PMT) = 0.725 Ln(X) + 2.987 50 50 Ln(AMT) - 0.589 Ln(X) + 2.378 63 37 X = building net Leasable area in TSF (thousand square feet) AMT = AM peak hour trips PMT - PM peak hour trips 34 TABLE 2 (CONTID) TRIP GENERATION RATESi PEAK-HOUR AM PM LAND USE UNITS' IN OUT IN OUT DAILY Industrial TSF 0.76 0. 16 0. 12 0. 86 6.97 Public Utilities AC 2 .24 0. 25 0. 16 1. 16 2 . 62 Elementary School ST 0. 18 0. 12 0. 01 0. 01 1. 09 Junior High School ST 0. 18 0. 12 0. 01 0. 01 1. 09 Forest/Parks AC 0. 01 0. 01 0. 02 0. 02 0. 50 Source: institute of Transportation Engineers, Trip Generation, Fifth Edition, 1991, Land Use Categories 210, 231, 820, 110, 520 and 430. DU = dwelling unit TSF = thousand square feet AC = acre ST = student 35 TABLE 3 EXTERNAL TRIP GENERATION BY ZONE PEAK-HOUR' AM '. PM ZONE IN OUT IN OUT DAILY 1 60 15 10 70 560 2 200 235 165 95 3,230 3 80 45 260 260 5,590 4 55 155 190 100 2,730 5 145 230 210 115 3,480 6 55 160 190 105 2,790 7 115 135 100 55 1,890 8 40 25 130 130 2,810 9 170 145 55 35 1,620 10 15 35 45 25 640 11 195 55 195 300 5,030 12 65 45 205 200 4,380 13 40 45 120 110 2,470 14 85 110 260 245 5,280 15 135 95 170 165 4,020 16 35 30 100 95 2,100 17 1,190 765 1,110 1,580 25,000 18 1,725 1,685 2,200 2,555 47,170 19 1,260 1,055 1,080 1,165 22,630 20 450 765 1,055 790 18,470 21 N/A3 N/A N/A N/A N/A 22 385 145 145 410 4,720 23 1,015 255 385 1,130 13,360 24 190 300 650 520 11,930 25 185 330 625 470 11,110 26 195 335 670 515 12,020 27 230 320 225 160 4,490 28 340 280 315 435 7,410 29 265 370 595 480 11,360 ALL peak hour trips rounded to the nearest 5. Z ALL daily trips rounded to the nearest 10. ' N/A = not appLicabte 36 TABLE 3 (CONT°D) EXTERNAL TRIP 'GENERATION BY ZONE PEAK-HOUR' AM PM ZONE IN OUT IN OUT DAILY 30 155 280 510 390 9,120 31 220 470 710 525 12,330 32 140 210 210 215 3,870 33 205 185 285 325 5,720 34 N/A N/A N/A N/A N/A 35 50 150 180 95 2,600 36 40 115 120 80 1,920 37 70 75 230 205 4,640 38 5 10 15 5 200 39 5 15 15 10 260 40 90 170 270 215 4,970 41 140 280 410 355 7,820 42 240 515 815 550 13,500 43 200 575 675 370 9,910 44 5 20 20 15 340 45 280 525 900 715 16,380 46 170 360 570 385 9,540 47 75 220 260 140 3,800 48 5 15 15 10 210 49 190 205 640 595 12,850 50 5 15 20 10 250 51 25 25 50 50 1,230 52 15 45 55 30 810 53 15 15 25 25 630 54 810 2,345 2,810 1,490 40,680 55 185 510 590 340 9,310 56 10 25 30 15 410 57 1,910 1,615 2,345 2,920 47,500 All peak hour trips rounded to the nearest 5. 2 All daily trips rounded to the nearest 10. 37 TABLE 3 (CONT`D) EXTERNAL TRIP GENERATION BY ZONE PEAK-HOUR' AM PM ZONE IH OUT IN OUT DAILY' 58 60 175 210 110 3,050 54 40 115 140 75 2,030 TOTAL 14,280 17,445 24,585 22,575 464,170 ALL peak hour trips rounded to the nearest 5. ' ALL daily trips rounded to the nearest 10. 38 that are produced in one area (i.e. , residential) and attracted (i.e. , commercial) to another area within the study area. This factor is appropriate for a study area of this size. At buildout, the land uses are estimated to generate approximately 464, 170 external vehicle trips per day, 31, 725 of which will occur during the AM peak hour and 47 , 160 of which will occur during the PM peak hour (see Table 3) . 2 . Trip Distribution Trip distribution represents the directional orientation of traffic to and from each project site. Trip distribution is heavily influenced by the geographical location of the site, the location of work, shopping and recreational opportunities and the proximity to the regional freeway system. The directional orientation of traffic was determined by evaluating existing and proposed land uses and highways within the community. Trip distribution for each project has been based upon long-term conditions, based upon those highway facilities which will be in place or will be contemplated over the next few years. The trip distribution patterns for the study area are listed in Appendix "B" . Each distribution pattern is based upon the node map shown in Appendix "B" . 3 . Modal Split The traffic reducing potential of public transit has not been considered in this report. Essentially the traffic 39 projections are "worse-case" in that any significant public transit might be able to reduce the projected traffic volumes. The assignment of traffic from each site to the adjoining roadway system has been based upon the site's trip generation, trip distribution, proposed arterial highway and local street systems, which would be in place for study area buildout. C. Cumulative Future Development Traffic To assess future traffic conditions for study area buildout traffic conditions, traffic generated by future land uses in each study area zone is added to existing traffic. Future land use is in addition to existing land use in each study area zone. Exhibit L illustrates the future average daily traffic volumes on roadway links throughout the study area. 40 O 'Y !0 10 = �� co cc ir C� o x W cc ui W r� ,e, i n P� e E4 - t — qui t Ltd T _ — W Z O Z V Z J � C G €4 LL Q �I? LEI to Ltd >- a c LLJ to r O f C' IV. STUDY AREA BUILDOUT TRAFFIC CONDITIONS This section of the report summarizes the results of the cumulative analysis procedure. Circulation plan upgrades and modifications, based on the forecast for the study area assignment, are also ,l recommended. A. circulation system Requirements The initial application of the model to forecast average daily traffic volumes at study area buildout has produced volume projections which appear to be appropriate for the circulation system and land use assumptions. - At buildout, the land uses are estimated to generate approximately 464 , 170 external vehicle trips per day, 31, 725 of which will occur during the AM peak hour and 47, 160 of which will occur during the PM peak hour. Based on this traffic analysis, planned land uses significantly impact the existing and planned roadway system. To mitigate overloads on the Ramona Expressway and other key roadways where physical improvements beyond those recommended are not feasible, this analysis suggests that it may be necessary to (1) selectively reduce development intensities of planned land uses throughout the study area, especially in the large commercial areas and/or (2) implement Travel Demand Management, (TDM) and Urban design features which reduce peak hour trip activity, increase vehicle occupancy levels, and encourage alternative transportation modes. 42 Urban design encompasses a range of activities and actions: the establishment of zoning and subdivision policies governing types and distribution of land uses and densities, the planning of neighborhoods and patterns of streets and blocks, the siting and massing of buildings, and the detailed design of streetscapes. It entails planning for all modes of travel, public and private, alone and in groups, by machine and by foot. TDM measures include adopting strategies that influence travel behavior -- encouraging carpooling, sharing required parking, reducing rather than increasing parking requirements where public transit is an option, staggering work schedules, and providing employment opportunities near or, via telecommunication, within the homes of workers. Based on the buildout traffic assignment illustrated on Exhibit L, recommendations are presented for roadway sizing and corridor requirements. These requirements are shown on Exhibit N which depicts the recommended circulation system classifications. Recommended changes to the existing general plan roadway designations are listed below: ROADWAY CLASSIFICATIONS EXISTING GENERAL RECOMMENDED ROADWAY SEGMENT PLAN PLAN • Warren Rd. south Arterial Urban Arterial of Ramona Expy. • Warren Rd. north Not Classified Major of Ramona Expy. • Gilman Springs Rd. Secondary Major between Sanderson Ave. and Ramona Expy. 43 • Lyon Ave. between Secondary , Major Sanderson Ave. and Record Rd. • Lyon Ave. between Urban Arterial Major Ramona Blvd. and De Anza Dr. • Ramona Expy. east Expressway Urban Arterial of Chase St. • Ramona Blvd. Urban Arterial Major between Sanderson Ave. and Lyon St. • De Anza Dr. Secondary Collector between Lyon St. and' State"St. • San Jacinto Ave. Secondary Collector between State St. and Ramona Expy. • San Jacinto Ave. Not Classified Collector between Ramona Expy. and Main St. • San Jacinto Ave. Urban Arterial Major south of Main St. • Alessandro Ave. Not Classified Collector between Ramona Expy. and Main St. • Camino Los Banos Not Classified Collector between Ramona Expy. and 7th St. • Shaver St. Not Classified Collector between Hewitt Ave. and Esplanade Ave. • Evans St. between Not Classified Collector Hewitt Ave. and Shaver St. • Sanderson Ave. Major Urban Arterial south of Cottonwood Ave. 44 ® Kirby St. south Collector Secondary of Cottonwood Ave. ® Esplanade Ave. Secondary Major between Sanderson Ave. and Palm Ave. ® Esplanade Ave. Secondary Major between San Jacinto Ave. and Hewitt Ave.' ® Esplanade Ave. Collector Major between Hewitt Ave. and Commonwealth Ave.' ® Esplanade Ave. Secondary Major between Commonwealth Ave. and Ramona Expy.' The traffic projections indicated that several roadways in the City and its Sphere of Influence will have traffic volumes which exceed Level of Service 01C11 on a daily basis or "D" during peak hours. The critical deficiencies in these segments are at key arterial intersections with major conflicting traffic flows. These include the following intersections (see Exhibit D) : Bridge Street (NS) at: ® Ramona Expressway (EW) Warren Road (NS) at: ® Ramona Expressway (EW) ® Warren Road Extension (EW) ® Cottonwood Avenue (EW) ' Changes have been made with the Rancho San Jacinto project. 45 Sanderson Avenue (NS) at • Gilman Springs Road (EW) • Ramona Expressway (EW) • Ramona Boulevard (EW) • Warren Road Extension (EW) • Cottonwood Avenue (EW) Lyon Street (NS) at: • Ramona Expressway (EW) • Ramona Boulevard (EW) State Street (NS) at: • Ramona Expressway (EW) • Ramona Boulevard (EW) • 7th Street (EW) • Esplanade Avenue (EW) San Jacinto Avenue (NS) at: • Main Street (EW) • 7th Street (EW) • Esplanade Avenue (EW) • Menlo Avenue (EW) Ramona Expressway (NS) at: • Main Street (EW) Provision of additional turn lanes, signal phasing for heavy turn movements, and other intersection capacity improvements are projected to provide the needed additional capacity at these locations. These intersections have been designated as critical intersections to indicate the need for intersection capacity improvements beyond what is standard within the typical arterial cross-sections. 46 In the previous Sunrise Ranch Traffic Study by ROBERT KAHN, JOHN KAIN & ASSOCIATES, INC. (October, 1991) an additional north/south connection parallel to Sanderson Avenue to the Ramona Expressway was evaluated. The purpose of this additional roadway connection was to specifically reduce traffic impacts at the intersection of Sanderson Avenue and the Ramona -Expressway. "' This alternative was not evaluated in. this analysis but is a viable option. As illustrated on Exhibit M, the results of the buildout traffic assignment indicate that additional City roadway classifications are desirable. These are the inclusion of the Expressway and Urban Arterial cross-sections, as well as adjustments to the Arterial cross-section. By dividing study area buildout average daily, traffic volumes by the daily roadway capacities listed below, study area buildout daily volume to capacity ratios have been calculated. Study area buildout volume to capacity ratios are shown on Exhibit 0. Volume to capacity ratios are based on the County of Riverside maximum capacities listed below: MAXIMUM CAPACITY FACILITY LANES (LOS = E) Expressway 8 80, 000 Urban Arterial 6 59, 000 Arterial/Major 4 38, 000 Secondary 4 30000' Collector 2 18, 000 An explanation of Level of , Service (LOS) is included in Appendix "A" . 47 CITY OF SAN JACINTO PROPOSED ROADWAY CROSSumSECTIONS 142'.:ROW 71' I 71' fi' 1In3I' 11122f• 1I2nI 13 12'�-72' 13.. i h 2' 12 1 S 9' }-10 10 srrr-i mommmommmmmum EXPRESSWAY R/W 134' R/W 110' W 6 -/1012' 12' II-14' 71 7'E 12�'- -12'TCUR 10 I48L 6 CURB n S LCURB � B R`CURBED OR PAINTED MEDIAN URBAN ARTERIAL HIGHWAY 110' R/W 86' NN. pN. 6 6 10• 12' 14' T 7• 14' 12' :tt.4'El. 2'CURB 2z LE1 CUR2S II _ r _— `_CURBED OR PAINTED MEDIAN ARTERIAL HIGHWAY R/W —1 DO' R/W: _7B. MIN. UK = �C11R6 SO i 712'�2'�12'—y-1 —}-9URBD 6 /1 �_ PhINiID NEDWI MAJOR HIGHWAY R/W 66' R/W 64' N!L � Mp. 2? 2' i2' 12 6 SOESWX i %EWNA CURB I F ............ � �2S CUftB` i SECONDARY HIGHWAY R/W R/W 79' 58' rL WL ._iCURB 2z�-1''2'—q-122� CUR10-.. '-q-5 ,lam r PAINTED MEDIAN INDUSTRIAL COLLECTOR R/W R/W 66' 44' BIL MIL 1 12'—y 12'—T�10 CURB ( 2X I� 2g i 5IDLYSU I CURB COLLECTOR CITY OF SAN JACINTO GENERAL PLAN ort CIRCULATION San Jacinto, California EXHIBIT M 48 Robert Kahn, Sohn Kain & Associates, Inc. With the recommended circulation system classifications shown on Exhibit N, the resulting volume to capacity ratios for the roadway network have been determined and are illustrated on Exhibit O. As shown on Exhibit O, most roadways in the study area will operate better than Level of Service "C" (volume to capacity ratio = 0. 80 or less) with the exception of portions of the Ramona Expressway, State Route 79 , Lyon Street, State Street and Sanderson Avenue. The use of the Expressway cross-section is recommended for Ramona Expressway west of Sanderson Avenue. The utilization of this cross-section will provide enhanced capacity for roadway segments requiring roadway capacity in excess of that which can be provided by the standard County of Riverside Expressway cross-section. The traffic signals required within the study area at buildout should specifically include an interconnect of the signals to function in a coordinated system. To accommodate future bus service on key roadways, transit stops should be anticipated at the far side of major intersections. Pedestrian access to the bus stops should be provided. Exhibit P shows the recommended bus turnout design features. New land use developments within the study area participate in the phased construction of traffic signals as required within the study area through payment of established fees or installation of traffic signals when warranted based upon traffic analysis of development phases. 49 N C 0 e N gcc ui In 1 —Ia S ------ LU LU LU n a �.a�' 3 i ➢r � "' ' -- .. i—Fan e i Z W @ � f.3 fn 9 w € e s LLCo V pl Z w to rs C? L7 to O ; w t � O LL w J - � ss3n Y. W e� ,ems---= W - i 4� W 17 j • a S - �� c ,tom Y B x t ■ ■ �v vnisnr� '. • v vy ■ - 6 ■ W • ■ ■ ® {l • J ui An ♦ i. ♦ F s ♦ ♦ ® = ice, (� CC O e Q Z V ® Li I a LU e w..cc e r, mot\ 2�5' - BUS TURNOUT DESIGN PARAMETERS 50•A r .- �. .: b w � t_ `50'A •��' ,.....::r..r /2' ' ` � .,.:�-;: 50A SO q SIDEWALK t'•17 BUS Stop S'qn . a"Shelter NO Wheelchair Ramp M kmKINa (per local code) aUs b aceaa star md*sm developrnem SCALE: 1'-20' 17-107 -.... (11 AppraprWe) •60'desirable for all streets with adjacerd bkelane CONCRETE PAD t YV SOURCE: ORANGE COUNTY TRANSIT DISTRICT (OCTD) CITY OF SAN JACINTO 1`7 F-, GENERAL PLAN®rt CIRCULATION San Jacinto, California EXHIBIT P 52 F�obert Kahn , John Kain & Associates, Inc. B. Phasing of Improvements To ensure that roadway improvements are ' provided in conjunction with each development ` phase, the following development monitoring requirements should be enforced throughout the study area: a. Traffic impact study reports shall be required with submittal of each tentative tract map or plot plan for projects which may significantly impact the existing roadway network based upon City and County criteria. b. The required format for each traffic impact study report will be determined by the City of San Jacinto. The required format will include evaluation of peak hour conditions at intersections significantly impacted by each phase of development. C. If an impacted intersection is estimated to exceed City service level standards, then appropriate link and intersection improvements shall be required to be presented for City staff review. d. The improvements needed to maintain the City service level standards will be required to be in place prior to occupancy of the relevant development phase. Improvements which are included in an adopted fee program will be provided by the fee program mechanism if funds are currently available. If funds are not available to meet the circulation improvement needs at any particular 53 development phase, then the project proponent will either provide the off-site improvements directly (with assurance of future reimbursement or credits if , a relevant fee program is in place) , or the development must await other sources of implementation. 54 APPENDIX A LEVEL OF SERVICE DESCRIPTION LEVEL OF SERVICE- DEFINITIONS" Service General Freeways Arterials Level Definition Criteria for measurement: Criteria for measurement: Density(cars per iane-mile) Average travel speed (mph) A Free flow. Individual users are Free flow operations. Average Primarily free flow-operations at virtually unaffected by the pres- travel speeds near 60 mph gen- average travel speeds usually ence of others in the traffic erally prevail on 70-mph freeway within 90 percent of the free flow stream. Freedom to select de- elements. Vehicles are almost speed. Vehicles are completely sired speeds and to maneuver completely unimpeded in their unimpeded In their ability to within the traffic stream is ex- ability to maneuver within the maneuver within the traffic tremely high. The general level traffic stream. The average stream. Stopped delay at sig- of comfort and convenience pro- spacing between vehicles is about nalized intersections is minimal. vided to the motorist, passenger, 440 ft, or 22 car-lengths, with a or pedestrian is excellent. maximum density of 12 cars/ mi/In. The effects of minor inci- dents or breakdowns are easily absorbed at this level. Although they may cause a deterioration In LOS In the vicinity of the Inci- dent, standing queues will not form, and traffic quickly returns to LOS A on passing the dis- ruption. 8 Stable flow, but the presence of Reasonably free-flow conditions, Unimpeded operations at average other users in the traffic stream and speeds of over 57 mph are travel speeds usually within 70 begins to be noticeable. Freedom maintained on 70-mph freeway percent of the free flow speed. to select desired speeds is rela- elements. The average spacing The ability to maneuver within tively unaffected, but there is a between vehicles is about 260 ft, the traffic stream is slightly slight decline in the freedom to or 13 car-lengths, with a restricted and stopped delays are maneuver within the traffic maximum density of 20 not bothersome. stream from LOS A. The level of can/mi/la. The ability to comfort and convenience provided maneuver within the traffic is somewhat less than at LOS A, stream Is only slightly restric- because the presence of others In ted. The effects of minor inei- the traffic stream begins to dents and breakdowns are still affect individual behavior. - easily absorbed, though local deterioration In service would be more severe than for LOS A. C Stable flow, but marks the Stable operations, but flows Stable operations. Ability to beginning of the range of flow in approach the range in which small maneuver end change lanes In which the operation of individual Increases In flow will cause midbloek locations may be more users becomes significantly substantial deterioration In restricted than in LOS B, and affected by Interactions with service. Average travel speeds longer queues and/or adverse others In the traffic stream. The are still over 54 mph. Freedom to signal coordination may selection of speed Is affected by maneuver within the traffle contribute to lower average travel the presence of others, and stream is noticeably restricted at speeds of about 50 percent of the maneuvering within the traffic LOB C, and lane changes require average free flow speed. stream requires substantial additional care and vigilance by vigilance on the part of the user. the driver. Average spacings are The general level of comfort and In the range of 175 ft, or 9 car- convenience declines noticeably lengths, with a maximum density at this level. of 30/cars/milln. Minor incidents may still be absorbed, but the local deterioration In service will be substantial. Queues may be expected to form behind any significant blockage. Additional vigilance by driver required for safe operation. D High-density, but stable, flow. Borders on unstable flow. In this Borders on a range on which small Speed and freedom to maneuver range, small Increases in flow Increases in flow may cause are severely restricted, and the cause substantial deterioration In substantial increases In approach driver or pedestrian experiences a service. Average travel speeds of delay and, hence, decreases in generally poor level of comfort 46 mph or more can still be arterial speed. This may be due and convenience. Small increases maintained on 70-mph freeway to adverse signal progression, in traffic flow will generally elements. Freedom to maneuver Inappropriate signal timing, high cause operational problems at this within the traffic stream is volumes, or some combination of level. severely limited. Even minor these. Average travel speeds are incidents can be expected to about 40 percent of free flow create substantial queuing, speed. because the traffic stream has little space to absorb disruptions. Average spacings are about 125 ft, or 6 car-lengths, with a maximum density of 42 cars/mi/In. E Operating conditions at or near The boundary between LOS D and Significant approach delays and the capacity level. All speeds are LOS E describes operation at average travel speeds of one-third reduced to a low but relatively capacity. Operations in this level the free flow speed or lower. uniform value. Freedom to man- are extremely unstable, because Such operations are caused by euver within the traffic stream is there are virtually no usable gaps some combination or adverse extremely difficult, and It Is in the traffic stream. Vehicles progression, high signal density, generally accomplished by forcing are spaced at approximately 80 ft, extensive queuing at critical a vehicle or pedestrian to "give or 4 car-Lengths, at relatively Intersections, and Inappropriate way" to accommodate such man- uniform headways. This, however, signal timing. euvers. Comfort and convenience represents the minimum spacing levels are extremely poor, and at which stable flow can be driver or pedestrian frustration is accommodated. Any disruption to generally high. Operations at this the traffic stream, such as a level are usually unstable, because vehicle entering from a ramp,or a smelt increases In flow or minor vehicle changing lanes, causes perturbations within the traffic following vehicles'to give'way to stream will cause breakdowns. admit the vehicle. At capacity, the traffic stream has no ability to dissipate even the most minor disruptions. Any incident can be expected to produce a serious breakdown with extensive queuing. The range of flows encompassed by LOS E is relatively small compared to other levels, but reflects a substantial deterioration in service. Maneuverability within the traffic stream is extremely limited. Average travel speeds at capacity are approximately 30 mph. F Level-of-service F. Forced or Level F describes forced or Arterial flow at extremely low breakdown flow. Tbds condition breakdown flow. Such conditions speeds below one-third to one- exists wherever the amount of generally exist within queues quarter of the free flow speed. traffic approaching a point forming behind breakdown Intersection congestion is likely at exceeds the amount which can points. Breakdown occurs when critical signalized locations, with traverse the point. Queues form the ratio of actual arrival flow high approach delays resulting. behind such locations. Arrival rate to actual capacity or the Adverse progression Is frequently flow exceeds discharge flow. forecasted flow rate to estimated a contributor to this condition. capacity exceeds 1.00. Operations at such a point will generally be at or near capacity, and downstream operations may be better as vehicles pass the bottleneck (assuming that there are no additional downstream problems). The LOS F operations observed within a queue are the result of a breakdown or bottle- neck at a downstream point. *Source: "Highway Capacity Manual, Special Report 209" Tr"nvnortatinn Rewrareh Hoard. Washinvton i1.C.. 1985 APPENDIX B ZONE DISTRIBUTION PATTERNS s a � s r a d d� 2 i� Z 3 ice' is S� R.y'1' - rrmie.n Y I 7 � n h G m, _-- s V< ui W _. uj �4 z ¢ o v C) Oct Z t2 of ,� J — LL v 0 uw z C �i W m a 0 0 (1) File name: ROUTESI.DAT In/Out % Bound Mirror Route path 10 0 y 29 28 83 15 14 13 12 131 5 o y 29 28 83 15 14 13 12 132 20 o y 29 28 83 15 82 124 120 115 114 5 0 y 29 28 83 15 82 124 120 119 118 117 10 0 y 29 30 89 17 18 19 94 4 127 129 130 5 0 y 29 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 29 28 84 44 58 64 85 72 73 74 75 138 76 139 140 141 10 o y 29 28 27 26 5 0 y 29 28 84 44 58 64 65 66 67 68 69 70 71 5 0 y 29 28 84 44 45 46 91 59 135 66 92 74 98 145 108 10 o y 29 28 84 44 45 46 47 48 49 50 51 52 53 54 5 o y 29 30 31 32 33 21 22 23 24 25 5 o y 29 30 31 32 33 21 22 103 102 6 7 Fite neme: ROUTES2.DAT In/out % Bound Mirror Route path 20` y 29 28 83 15 82 124 120 115 114 5 0 y 29 28 27 26 5 0 y 29 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 29 28 84 44 58 64 85 72 73 74 75 138 76 139 140 141 5 0 y 29 30 31 32 33 21 22 23 24 25 5 a y 29 30 31 32 33 34 35 36 37 38 39 40 41 10 0 y 89 17 18 19 94 4 127 129 130 5 0 y 89 30 90 46 91 59 135 66 92 74 98 145 108 10 0 y 89 30 90 46 47 48 49 50 51 52 53 54 5 0 y 89 17 16 15 14 13 12 132 10 0 y 89 17 16 15 14 13 12 131 5 0 y 89 17 88 87 2 122 5 0 y 89 17 18 19 21 22 23 24 25 5 a y 89 17 18 19 21 22 103 102 6 7 File name: ROl1TE53.DAT , In/Out % Bound Mirror Route path 5 o y 89 30 29 28 27 26 5 0 y 89 30 29 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 89 30 29 28 84 44 58 64 63 5 0 y 89 30 90 46 91 59 135 66 92 74 98 145 108 5 o y 89 30 90 46 47 48 49 50 51 52 53 54 5 o y 89 30 90 46 47 48 49 50 51 52 106 69 107 75 138 76 139 140 141 5 o y 89 17 88 87 2 122 5 0 y 89 17 16 15 14 13 12 132 10 o y 89 17 16 15 14 13 12 131 20 0 y 89 17 16 15 82 124 120 115 114 10 0 y 89 17 18 19 94 4 127 1Z9 130 5 o y 89 17 18 19 94 4 5 5 o y 89 30 31 32 33 34 35 36 37 38 39 40 41 10 o y 89 17 18 19 21 22 23 24 25 File name: ROUTE54.DAT In/Out % Onund Mirror Route path 5 u y 31 30 29 28 27 26 20 0 y 31 30 29 28 83 15 82 124 120 115 114 5 0 y 31 30 29 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 31 30 29 28 84 44 58 57 10 0 y 31 30 89 17 18 19 94 4 127 129 130 5 0 y 31 30 90 46 91 59 135 66 92 74 98 145 108 5 0 y 31 32 33 34 50 51 52 53 54 5 0 y 31 32 33 34 50 51 52 106 69 70 71 5 0 y 31 30 89 17 88 133 5 0 y 31 30 89 17 16 15 14 13 12 132 10 0 y 31 30 89 17 16 15 14 13 12 131 15 0 y 31 32 33 21 22 23 24 25 5 0 y 31 32 33 34 35 36 37 38 39 40 41 Fite name: ROUTES5.OAT In/Out % Sound Mirror Route path 5 0 y 29 28 27 26 20 o y 29 28 83 15 82 124 120 115 114 5 o y 29 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 29 28 84 44 58 64 85 72 73 74 75 138 76 139 140 141 5 o y 90 30 89 17 16 15 14 13 12 132 10 o y 90 30 89 17 16 15 14 13 12 131 5 o y 90 30 89 17 88 87 2 122 15 0 y 90 30 89 17 18 19 94 4 127 129 130 5 o y 90 30 89 17 18 19 21 22 23 24 25 5 o y 29 30 31 32 33 21 22 23 24 25 5 o y 90 46 91 59 135 66 92 74 98 145 108 5 o y 90 46 91 59 135 66 67 68 69 70 71 5 o y 90 46 47 48 49 50 51 52 53 54 5 o y 90 46 47 48 49 50 51 52 53 109 File name: ROUTES6.DAT In/Out % 0nund Mirror Route path 5 u y 90 30 29 28 27 26 20 0 y 90 30 29 28 83 15 82 124 120 115 114 5 o y 90 46 45 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 90 46 91 59 135 66 92 74 98 145 108 5 0 y 90 46 91 59 135 66 67 68 69 70 71 10 0 y 90 46 47 48 49 50 51 52 53 54 5 0 y 90 30 89 17 16 15 14 13 12 132 10 0 y 90 30 89 17 16 15 14 13 12 131 15 0 y 90 30 89 17 18 19 94 4 127 129 130 5 0 y 90 30 31 32 33 21 22 23 24 25 5 0 y 90 30 89 17 88 133 5 0 y 90 46 45 44 43 5 0 y 90 46 47 48 49 50 51 52 38 23 105 Fite name: RCJTE57.DAT In/Out X Bound Mirror Route path 5 o y 31 30 29 28 27 26 20 0 y 31 30 29 28 83 15 82 124 120 115 114 5 0 y 31 30 29 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 31 30 29 28 84 44 58 57 5 o y 31 30 90 46 91 59 135 66 92 74 75 138 76 139 140 141 5 0 y 31 30 89 17 88 87 2 122 5 0 y 31 30 89 17 16 15 14 13 12 132 10 0 y 31 30 89 17 16 15 14 13 12 131 10 0 y 31 30 89 17 18 19 94 4 127 129 130 5 0 y 31 32 33 34 50 51 52 53 54 5 0 y 31 32 33 34 50 51 52 53 109 5 o y 31 32 33 34 35 36 37 38 39 40 41 10 0 y 31 32 33 21 22 23 24 25 5 0 y 31 32 33 21 99 File name: ROUTES8.DAT In/Out % Bound Mirror Route path 5 y 90 46 45 44 43 56 20 0 y 90 46 45 44 84 28 83 15 82 124 120 115 114 5 0 y 90 46 45 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 90 46 45 44 58 64 85 72 86 98 5 0 y 90 46 91 59 135 66 92 74 98 145 108 5 o y 90 46 91 59 135 66 67 68 69 70 71 5 0 y 90 46 91 59 135 66 92 74 75 138 76 139 140 141 15 0 y 90 46 47 48 49 50 51 52 53 54 5 0 y 90 46 47 48 49 50 51 52 53 109 5 a y 90 46 47 48 49 50 51 36 22 103 102 6 127 129 130 10 o y 90 30 89 17 16 15 14 13 12 131 5 0 y 90 46 45 44 43 42 26 81 14 13 12 132 5 0 y 90 30 89 17 88 133 5:'' y 90 30 89 17 18 19 94 4 127 129 130 File name: ROUTES9.DhT In/Out % Bound Mirror Route path 5 o y 49 48 47 46 45 44 43 56 20 o y 49 48 47 46 45 44 84 28 83 15 82 124 120 115 114 5 o y 49 48 47 46 45 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 49 48 47 46 45 44 58 64 85 72 86 98 10 o y 49 48 47 46 90 30 89 17 16 15 14 13 12 131 5 0 y 49 48 47 46 45 44 43 42 26 81 14 13 12 132 5 0 y 49 48 47 46 90 30 89 17 88 87 2 122 5 o y 49 50 51 104 68 69 70 71 20 o y 49 50 51 52 53 54 10 o y 49 50 51 36 22 103 102 6 127 129 130 5 o y 49 50 34 33 21 22 23 24 25 5 0 y 49 50 34 33 21 99 File name: ROUTES10.OAT In/Out % and Mirror Route path 5 o y 47 46 45 44 43 56 20 0 y 47 46 45 44 84 28 83 15 82 124 120 115 114 10 0 y 47 46 45 44 84 28 83 15 14 13 12 131 5 0 y 47 46 45 44 43 42 26 81 14 13 12 132 5 o y 47 46 45 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 47 46 45 44 58 64 85 72 86 98 5 0 y 47 46 91 59 135 66 92 74 75 138 76 139 140 141 5 0 y 47 46 91 59 135 66 92 74 75 138 76 111 5 0 y 47 46 90 30 89 17 88 133 5 o y 47 48 95 60 96 136 67 68 69 70 71 20 0 y 47 48 49 50 51 52 53 54 10 o y 47 48 49 50 51 36 22 103 102 6 127 129 130 Fite name: ROUTES11.DAT " In/Out % Bound Mirror Route path 5 o y 16 15 14 13 12 132 10 0 y 16 15 14 13 12 131 5 0 y 16 15 14 81 20 o y 16 15 82 124 120 115 114 5 0 y 16 15 82 124 120 119 118 117 5 o y 16 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 16 15 83 28 84 44 58 64 85 72 86 152 159 160 165 166 162 158 5 0 y 16 15 83 28 84 44 58 64 85 72 73 74 75 138 76 139 140 141 10 o y 16 17 18 19 94 4 127 129 130 10 0 y 16 17 18 19 21 22 23 24 25 5 o y 16 17 18 19 21 22 23 105 5 o y 16 17 89 30 90 46 91 59 135 66 92 74 98 145 108 5 o y 16 17 89 30 90 46 91 59 135 66 67 68 69 70 71 5 0 y 16 17 89 30 90 46 47 48 49 50 51 52 53 54 Fite name: ROUTE512.DAT In/Out X .Round Mirror Route path 5 y 32 31 30 29 28 27 26 15 0 y 32 31 30 29 28 83 15 82 124 120 115 114 5 o y 32 31 30 29 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 32 31 30 29 28 84 44 58 64 63 5 0 y 32 31 30 89 17 16 15 14 13 12 132 5 0 y 32 31 30 89 17 88 133 10 0 y 32 33 21 19 18 17 16 15 14 13 12 131 5 0 y 32 33 21 19 94 93 3 125 122 121 120 119 118 117 10 0 y 32 33 21 22 23 24 25 5 0 y 32 33 21 22 23 24 40 53 109 10 0 y 32 33 21 22 103 102 6 127 129 130 10 0 y 32 33 34 35 36 37 38 39 40 41 5 a y 32 33 34 50 51 52 53 54 5; y 32 33 34 50 101 96 136 67 68 69 70 71 File name: ROUTESI3.DAT In/Out % Bound Mirror Route path 5 o y 32 31 30 29 28 27 26 15 0 y 32 31 30 29 28 83 15 82 124 120 115 114 5 o y 32 31 30 29 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 32 31 30 89 17 16 15 14 13 12 132 5 o y 32 31 30 89 17 88 133 10 0 y 32 33 21 19 18 17 16 15 14 13 12 131 15 0 y 32 33 21 22 23 24 25 10 0 y 32 33 21 22 103 102 6 127 129 130 10 0 y 32 33 34 35 36 37 38 39 40 41 5 0 y 32 33 34 35 36 37 38 39 40 53 109 5 0 y 32 33 34 50 51 52 53 54 5 o y 32 33 34 50 101 96 136 67 97 74 98 145 108 5 o y 32 33 21 19 94 93 3 125 122 121 120 119 118 117 Fite name; ROUTESI4.DAT In/Out % Bound Mirror Route path 5 y 45 44 43 56 5 0 y 45 44 43 42 26 81 14 13 12 132 20 0 y 45 44 84 28 83 15 82 124 120 115 114 5 o y 45 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 45 44 58 64 85 72 86 152 159 175 10 a y 45 46 90 30 89 17 16 15 14 13 12 131 5 0 y 45 46 90 30 89 17 88 87 2 122 5 0 y 45 46 91 59 135 66 92 74 98 145 108 5 0 y 45 46 91 59 135 66 92 74 75 138 76 139 140 141 5 0 y 45 46 91 59 135 66 67 68 69 70 71 20 0 y 45 46 47 48 49 50 51 52 53 54 10 0 y 45 46 47 48 49 50 51 36 22 103 102 6 127 129 130 Fite name: ROUTE515.DAT In/Out % Bound Mirror Route path 5 0 y 91 46 45 44 43 56 20 0 y 91 46 45 44 84 28 83 15 82 124 120 115 114 10 o y 91 46 90 30 89 17 16 15 14 13 12 131 5 0 y 91 46 90 30 89 17 88 87 2 122 121 120 119 118 117 5 0 y 91 59 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 91 59 135 66 92 74 75 138 76 139 140 141 5 0 y 91 59 135 66 92 74 75 138 76 139 142 5 o y 95 48 47 46 45 44 43 42 26 81 14 13 12 132 20 0 y 95 48 49 50 51 52 53 54 10 0 y 95 48 49 50 51 36 22 103 102 6 127 129 130 5 0 y 95 60 96 136 67 97 74 98 145 108 5 0 y 95 60 96 136 104 106 109 137 Fite name: ROUTESI6.DAT In/Out % ^ and Mirror Route path 5 y 45 44 43 56 5 o y 45 44 43 42 26 81 14 13 12 132 '.0 o y 45 44 84 28 83 15 82 124 120 115 114 5 o y 45 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 45 44 58 64 85 72 86 98 10 0 y 45 46 90 30 89 17 16 15 14 13 12 131 5 o y 45 46 90 30 89 17 88 87 2 122 121 120 119 118 117 5 o y 45 46 91 59 135 66 92 74 98 145 108 5 o y 45 46 91 59 135 66 92 74 75 138 76 139 140 141 5 0 y 45 46 91 59 135 66 67 68 69 70 71 20 0 y 45 46 47 48 49 50 51 52 53 54 10 0 y 45 46 47 48 49 50 51 36 22 103 102 6 127 129 130 File name: RDUTE517.DAT ' In/Out % Bound Mirror Route path 5 o y 80 1 123 5 o y 80 14 13 12 132 10 o y 80 14 13 12 131 5 o y 80 14 81 26 42 43 44 45 46 47 48 49 50 51 52 53 54 5 o y 80 14 81 26 42 43 56 5 o y 80 14 15 83 28 84 44 58 64 65 66 67 68 69 70 71 5 o y 80 14 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 10 o y 80 14 15 16 17 18 19 21 22 23 24 25 20 o y 80 1 124 120 115 114 10 o y 80 119 118 117 15 o y 80 1 124 2 3 4 127 129 130 5 o y 80 1 124 2 3 93 Fite name: ROUTES18.DAT In/Out % Bound Mirror Route path 5 y 133 20 18 17 16 15 14 13 12 132 5 o y 93 20 18 19 21 22 23 24 25 10 0 y 87 133 88 17 16 15 14 13 12 131 5 0 y 20 133 88 17 16 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 20 133 88 17 89 30 90 46 91 59 135 66 67 68 69 70 71 5 0 y 20 133 88 17 89 30 90 46 47 48 49 50 51 52 53 54 5 0 y 3 93 94 19 21 22 23 24 25 10 0 y 3 93 94 4 127 129 130 15 0 y 20 93 3 4 127 129 130 10 0 y 20 93 3 125 122 121 120 119 118 117 5 0 y 133 87 2 122 121 120 115 114 20 0 y 88 87 2 124 120 115 114 Fite name: ROUTESI9.DAT In/Out % Bound Mirror Route path 5 0 y 99 21 19 18 17 16 15 14 13 12 132 5 a y 99 21 19 18 17 16 15 14 13 12 131 5 0 y 99 21 33 34 50 49 48 47 46 45 44 43 5 o y 99 21 19 94 93 3 125 122 121 120 119 118 117 10 0 y 99 21 22 23 24 25 5 o y 99 103 22 23 24 25 5 o y 99 103 22 23 24 40 53 5 o y 99 102 103 22 36 51 104 68 67 66 65 64 85 5 o y 99 102 103 22 36 51 104 68 69 107 5 a y 99 102 6 127 126 121 120 119 118 117 5 a y 5 6 102 103 22 36 51 52 53 54 20 o y 5 6 127 129 130 20 o y 5 4 3 2 124 120 115 114 FiLe name: ROUTE520.DAT In/Out % ,:Qnund Mirror Route path 5 u y 105 103 22 36 51 104 68 67 66 65 64 63 10 0 y 105 103 102 6 127 126 121 120 119 118 117 5 0 y 10 105 23 22 21 19 18 17 16 15 14 13 12 132 5 o y 10 105 23 22 21 19 18 17 16 15 14 13 12 131 5 0 y 10 105 23 38 52 106 69 107 75 138 76 139 140 141 5 0 y 103 105 23 24 25 5 0 y 105 10 11 24 40 53 5 o y 105 10 11 24 40 41 10 0 y 8 10 11 134 25 0 y 7 8 9 129 130 20 o y 7 6 5 4 3 2 124 120 115 114 File name: ROUTES2I.DAT In/Out % Bound Mirror Route path ?0 o y 77 12 131 10 o y 77 61 62 63 64 65 66 67 68 69 70 71 5 o y 77 61 62 63 64 65 66 92 74 75 138 76 139 140 141 5 o y 77 61 62 63 64 85 72 86 152 159 160 165 169 172 173 15 o y 13 12 132 5 o y 13 12 131 10 o y 13 14 15 16 17 18 19 21 22 23 24 25 15 o y 13 14 15 16 17 18 19 94 4 127 129 130 15 o y 13 14 15 82 124 120 115 114 File name: RO0TES22.DAT In/Out % ._.Bound Mirror Route path 10 o y 81 14 13 12 132 10 0 y 81 14 13 12 131 5 a y 81 14 80 20 a y 81 14 15 82 124 120 115 114 5 o y 81 14 15 16 17 18 19 21 22 23 24 25 15 o y 81 14 15 16 17 18 19 94 4 127 129 130 5 0 y 81 26 42 43 56 5 a y 81 26 42 43 44 45 46 47 48 49 50 51 52 53 54 5 0 y 81 26 42 43 44 45 46 47 48 49 50 51 52 53 40 5 0 y 81 26 42 43 44 45 46 47 48 95 60 96 136 67 97 5 0 y 81 26 27 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 81 26 27 28 84 44 58 64 85 72 73 74 75 138 76 139 140 141 5 o y 81 26 27 28 84 44 58 64 65 66 67 68 69 70 71 File name: ROUTES23.DAT In/Out % Bound Mirror Route path 5 0 y 81 26 27 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 81 26 27 28 84 44 58 64 85 72 73 74 75 138 76 139 140 141 5 0 y 81 26 27 28 84 44 58 64 65 66 67 68 69 70 71 5 o y 81 26 27 28 29 30 31 32 33 21 22 23 24 25 5 D y 81 26 27 28 83 15 82 124 120 115 114 5 0 y 81 26 42 43 56 5 0 y 81 26 42 43 44 45 46 47 48 95 60 96 136 67 97 74 98 145 108 5 0 y 81 26 42 43 44 45 46 47 48 49 50 51 52 53 54 5 D y 81 14 15 16 17 18 19 21 22 23 38 15 0 y 81 14 15 16 17 18 19 94 4 127 129 130 15 o y 81 14 15 82 124 120 115 114 5 o y 81 14 80 10 0 y 81 14 13 12 132 10 0 y 81 14 13 12 131 file name: ROUTES24.DAT In/Out % Bound Mirror Route path 5 y 35 34 50 49 48 47 46 45 43 42 26 81 14 13 12 131 5 0 y 35 34 50 49 48 47 46 45 44 84 28 83 15 82 124 120 115 114 5 0 y 35 34 50 49 48 47 46 45 44 58 64 85 72 86 152 159 160 165 169 172 173 10 o y 35 34 33 21 19 18 17 16 15 14 13 12 132 10 o y 35 34 33 21 19 18 17 16 15 82 124 120 115 114 10 o y 35 34 33 21 19 94 93 3 125 122 121 120 119 118 117 5 0 y 35 36 51 104 68 69 70 71 5 0 y 35 36 51 52 53 54 5 0 y 35 36 37 38 52 106 69 107 15 0 y 35 36 37 38 39 40 41 10 0 y 35 36 22 23 24 25 10 0 y 35 36 22 103 102 6 127 129 130 5 o y 35 36 22 103 102 6 127 126 121 120 115 114 Fite name: ROUTE525.DAT - In/Out % Bound Mirror Route path 5 o y 37 36 51 104 68 67 66 65 64 63 5 o y 37 36 51 50 49 48 47 46 45 44 43 42 26 81 14 13 12 132 10 0 y 37 36 22 21 19 18 17 16 15 14 13 12 131 5 0 y 37 36 22 21 19 18 17 16 15 82 124 120 115 114 10 o y 37 36 22 103 102 6 127 129 130 5 o y 37 36 22 103 102 6 5 4 3 125 122 121 120 119 118 117 10 0 y 37 36 22 103 102 6 5 4 3 125 122 121 120 115 114 5 0 y 37 38 23 22 21 19 18 17 16 15 82 124 120 115 114 10 0 y 37 38 23 24 25 15 o y 37 38 39 40 41 5 0 y 37 38 52 53 54 5 0 y 37 38 52 106 69 70 71 5 a y 37 38 52 106 69 107 75 108 154 160 165 169 172 173 5 0 y 37 38 52 106 69 107 75 108 146 147 File name: ROUTES26.DAT In/Out % Round Mirror Route path 5 y 39 38 52 106 69 107 75 108 154 160 165 169 172 173 5 o y 39 38 52 106 104 136 5 0 y 39 38 52 51 50 49 48 47 46 90 5 0 y 39 38 52 53 54 5 0 y 39 38 37 36 22 103 102 6 5 4 3 2 124 120 115 114 5 0 y 39 38 37 36 22 103 102 6 5 4 3 125 122 121 120 119 118 117 5 0 y 39 38 23 22 21 19 18 17 16 15 14 13 12 132 5 0 y 39 38 23 22 21 19 18 17 16 15 14 13 12 131 5 0 y 39 38 23 22 21 19 18 17 16 15 82 124 120 115 114 5 0 y 39 40 24 11 9 129 127 126 121 120 115 114 15 0 y 39 40 24 11 9 129 130 10 0 y 39 40 24 25 15 0 y 39 40 41 5 y 39 40 53 109 70 71 5 0 y 39 40 53 109 137 Fite name: ROUTE527.DAT In/Out % Bound Mirror Route path --- ----- ------ ------------ t' 5 0 y 55 56 62 61 77 12 131 10 0 y 55 56 62 63 64 65 66 67 68 69 70 71 5 o y 55 56 62 72 73 74 75 138 76 139 140 141 5 o y 55 56 57 58 59 60 5 0 y 55 56 57 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 55 56 57 58 44 84 28 83 15 82 124 120 115 114 15 0 y 55 42 43 44 45 46 47 48 49 50 51 52 53 54 10 o y 55 42 43 44 84 28 83 15 82 124 120 115 114 10 0 y 55 42 26 27 28 29 30 89 17 18 19 94 4 127 129 130 5 0 y 55 42 26 27 28 83 15 82 124 120 115 114 5 0 y 55 42 26 81 14 80 10 o y 55 42 26 81 14 13 12 132 10 0 y 55 42 26 81 14 13 12 131 Fite name: ROUTES28.DAT In/Out % .9ound Mirror Route path 5 y 43 56 62 61 77 12 131 5 0 y 43 44 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 43 56 62 72 73 74 75 138 76 139 140 141 5 0 y 43 44 45 46 91 59 135 66 67 68 69 70 71 5 0 y 43 44 45 46 91 59 135 136 104 106 109 137 15 o y 43 44 45 46 47 48 49 50 51 52 53 54 5 0 y 43 44 45 46 47 48 49 50 51 36 22 103 102 6 127 129 130 10 0 y 27 26 81 14 13 12 132 10 0 y 27 26 81 14 13 12 131 5 0 y 27 26 81 14 80 10 a y 27 28 29 30 89 17 18 19 94 4 127 129 130 20 0 y 27 28 83 15 82 124 120 115 114 File name: ROUTES29.DAT In/out % Bound Mirror Route path 15 0 y 57 56 62 61 77 12 131 10 o y 57 56 43 42 26 81 14 13 12 132 5 o y 57 56 43 42 26 81 14 80 10 o y 57 56 43 44 45 46 47 48 49 50 51 52 53 54 10 o y 57 56 43 44 45 46 47 48 49 50 51 36 22 103 102 6 127 129 130 5 o y 57 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 57 58 64 85 72 86 152 159 160 165 166 162 158 15 0 y 57 58 64 65 66 67 68 69 70 71 5 o y 57 58 59 60 96 136 67 97 74 98 20 o y 57 58 44 84 28 83 15 82 124 120 115 114 File name: ROUTE530.DAT In/Cut % Round Mirror Route path 5 0 y 59 58 57 56 55 42 26 81 14 13 12 132 5 0 y 59 58 57 56 62 15 0 y 59 58 44 84 28 83 15 82 124 120 115 114 5 0 y 59 58 64 85 72 86 152 159 160 165 169 172 173 5 0 y 59 58 64 85 72 86 152 153 5 0 y 91 46 45 44 84 28 83 15 82 124 120 115 114 10 0 y 91 46 90 30 89 17 16 15 14 13 12 131 5 0 y 91 46 90 30 89 17 88 133 15 0 y 91 46 47 48 49 50 51 52 53 54 10 0 y 59 60 95 48 49 50 51 36 22 103 102 6 127 129 130 10 0 y 59 60 96 136 67 68 69 70 71 5 0 y 59 135 66 92 74 75 138 146 5 o y 59 135 136 104 106 109 137 file name: ROUTES3I.DAT In/Out % Bound Mirror Route path 5 0 y 104 136 96 60 95 48 47 46 45 44 84 28 83 15 82 124 120 115 114 5 o y 104 136 67 66 65 64 63 5 0 y 104 136 67 97 74 98 145 108 5 o y 104 136 67 68 69 70 71 10 0 y 101 50 49 48 47 46 45 44 43 42 26 81 14 13 12 132 10 o y 101 50 49 48 47 46 45 44 84 28 83 15 82 124 120 115 114 5 o y 101 50 34 33 21 19 18 17 16 15 14 13 12 131 10 0 y 101 50 51 52 53 54 5 o y 136 104 51 36 22 21 19 18 17 16 15 14 13 12 131 15 0 y 136 104 51 36 22 103 102 6 127 129 130 5 o y 136 104 51 36 22 23 24 25 10 o y 136 104 106 109 137 10 0 y 136 104 68 69 70 71 File name: ROUTE532.OAT In/Out % '-unr1 Mirror Route path 10 0 y 106 104 68 67 66 65 64 63 62 61 77 12 131 10 0 y 106 104 68 69 70 71 15 0 y 106 104 51 36 22 103 102 6 127 129 130 5 0 y 106 104 51 36 22 103 102 6 5 4 3 125 122 121 120 115 114 5 0 y 106 104 51 36 22 21 19 18 17 16 15 14 13 12 132 10 0 y 106 104 51 50 49 48 47 46 45 44 84 28 83 15 82 124 120 115 114 5 0 y 104 106 52 51 50 49 48 47 46 45 44 43 42 26 81 14 13 12 132 5 0 y 104 106 69 107 75 108 154 160 165 169 172 173 5 0 y 104 106 69 107 75 138 76 139 140 141 15 0 y 104 106 109 137 10 0 y 104 106 52 53 54 5 o y 104 106 52 38 23 24 25 Fite name: ROUTES33.DAT ' In/Out % Bound Mirror Route path 5 o y 109 106 69 68 67 66 65 64 63 62 61 77 12 131 5 o y 109 106 69 107 75 108 154 160 165 169 172 173 5 o y 109 106 69 107 75 108 145 5 0 y 109 106 69 70 71 5 0 y 109 106 52 51 50 49 48 47 46 45 44 43 42 26 81 14 13 12 132 5 0 y 109 106 52 51 50 49 48 47 46 45 44 84 28 83 15 82 124 5 o y 109 106 52 51 36 22 103 102 6 5 4 3 125 122 121 120 115 114 5 o y 109 1D6 52 38 23 22 21 19 18 17 16 15 14 13 12 132 5 0 y 109 106 52 38 23 24 25 5 o y 1D6 109 70 110 76 139 140 141 5 o y 106 109 70 71 15 o y 106 109 137 10 o y 106 109 53 54 20 o y 106 109 53 40 24 11 9 129 130 File name: ROUTES34.DAT In/Out % Bound Mirror Route path 15 y 78 61 77 12 131 15 0 y 78 61 77 12 132 5 0 y 78 79 175 176 177 172 173 5 o y 78 79 175 174 5 o y 78 61 62 56 43 20 o y 78 61 62 63 64 58 44 84 28 83 15 82 124 120 115 114 15 0 y 78 61 62 63 64 65 66 67 68 69 70 71 5 0 y 78 61 62 63 64 65 66 67 68 104 51 36 22 103 102 6 127 129 130 5 o y 78 61 62 63 64 65 66 135 136 5 0 y 78 61 62 63 64 85 72 86 152 159 160 165 166 162 158 5 o y 78 61 62 72 73 74 75 138 76 139 140 141 Fite name: ROUTE535.OAT In/Out % Bound Mirror Route path 15 0 y 62 61 77 12 131 5 0 y 62 61 77 12 132 10 o y 62 56 43 42 26 81 14 13 12 132 20 0 y 62 56 43 44 94 28 83 15 82 124 120 115 114 10 0 y 62 56 43 44 45 46 47 48 49 50 51 52 53 54 15 o y 62 63 64 65 66 67 68 69 70 71 5 0 y 62 63 64 65 66 67 68 69 70 109 53 10 0 y 62 63 64 65 66 67 68 104 51 36 22 103 102 6 127 129 130 5 0 y 62 72 86 152 159 160 165 169 172 173 5 0 y 62 72 73 74 75 138 76 139 140 141 Fite name: ROUTES36.DAT In/Out X Round Mirror Route path 15 u y 63 62 61 77 12 131 15 o y 63 62 61 77 12 132 25 0 y 63 64 58 44 84 28 83 15 82 124 120 115 114 20 0 y 63 64 65 66 67 68 69 70 71 5 0 y 63 64 65 66 67 68 104 51 52 53 54 10 0 y 63 64 65 66 67 68 104 51 36 22 103 102 6 127 129 130 5 0 y 62 72 86 152 159 160 165 169 172 173 5 0 y 62 72 73 74 75 138 76 139 140 141 Fite name: ROUTES37.DAT In/Out % Bound Mirror Route path 5 o y 73 72 86 152 159 160 165 169 172 173 5 o y 73 72 86 152 159 175 15 0 y 72 73 74 75 138 76 139 140 141 15 0 y 73 72 85 64 58 44 84 28 83 15 82 124 120 115 114 10 0 y 73 65 64 63 62 61 77 12 131 5 o y 73 65 64 58 44 84 28 83 15 14 13 12 132 5 0 y 73 65 64 58 44 84 28 83 15 82 124 120 115 114 10 0 y 73 65 66 67 68 69 70 71 5 0 y 92 74 98 145 5 0 y 92 74 75 138 76 139 140 141 5 o y 92 66 135 59 91 46 90 30 89 17 88 87 2 122 121 120 119 118 117 10 o y 92 66 67 68 69 70 71 5 0 y 92 66 67 68 104 51 36 22 103 102 6 127 129 130 File name: ROUTES38.DAT In/Out % Qound Mirror Route path 10 y 92 66 65 64 63 62 61 77 12 131 10 o y 92 66 65 64 58 44 84 28 83 15 82 124 120 115 114 10 0 y 97 67 136 96 60 59 58 44 84 28 83 15 82 124 120 115 114 5 0 y 92 66 135 59 91 46 90 30 89 17 16 15 14 13 12 132 5 o y 92 66 135 59 91 46 90 30 89 17 88 87 2 122 121 120 119 118 117 10 o y 92 74 75 138 76 139 140 141 5 o y 67 97 74 98 145 153 159 160 165 169 172 173 5 0 y 67 97 74 98 145 108 146 147 5 0 y 67 97 74 75 138 76 139 140 141 5 0 y 67 97 107 69 106 52 20 0 y 97 67 68 69 70 71 10 o y 97 67 68 104 51 36 22 103 102 6 127 129 130 Pile name: ROUTES39.DAT In/out % Bound Mirror Route path 5 0 y 107 97 67 66 65 64 63 62 61 77 12 131 5 o y 107 97 67 66 65 64 63 62 61 77 12 132 10 o y 107 97 67 66 65 64 58 44 84 28 83 15 82 124 120 115 114 5 o y 107 97 74 98 145 153 159 160 165 169 172 173 5 o y 107 97 74 98 86 10 0 y 107 97 74 75 138 76 139 140 141 5 0 y 68 104 51 36 22 103 102 6 5 4 3 125 122 121 120 115 114 15 o y 68 104 51 36 22 103 102 6 127 129 130 5 o y 97 107 75 108 146 147 111 10 o y 97 107 75 138 76 139 140 141 20 0 y 97 107 69 70 71 5 0 y 97 107 69 106 52 38 23 24 25 File name: ROUTE540.DAT In/Out % -Round Mirror Route path 5 y 107 69 68 67 66 65 64 63 62 61 77 12 131 5 0 y 107 69 68 67 66 65 64 63 62 61 77 12 132 10 0 y 107 69 68 67 66 65 64 58 44 84 28 83 15 82 124 120 115 114 5 0 y 107 75 108 154 160 165 169 172 173 5 0 y 107 75 108 145 5 0 y 107 75 108 146 147 111 5 0 y 107 69 106 52 38 23 22 103 102 6 5 4 3 2 124 120 115 114 5 0 y 107 69 106 52 38 23 105 20 0 y 110 76 139 140 141 20 o y 110 70 71 15 a y 110 70 109 53 40 24 11 9 129 130 File name: ROUTES4I.DAT In/Out % Bound Mirror Route path 5 0 y 110 70 69 68 67 66 65 64 63 62 61 77 12 131 5 0 y 110 70 69 68 67 66 65 64 63 62 61 77 12 132 5 0 y 110 70 69 68 67 66 65 64 58 44 84 28 83 15 82 124 120 115 114 10 0 y 110 70 71 15 0 y 110 70 109 53 40 24 11 9 129 130 5 0 y 110 76 138 75 74 73 72 85 64 58 44 84 28 83 15 82 124 120 115 114 5 0 y 110 76 111 157 158 162 166 165 169 172 173 5 0 y 110 76 111 147 5 0 y 139 76 138 75 108 5 0 y 139 142 148 158 162 166 167 170 5 o y 139 142 148 149 150 30 0 y 139 140 141 File name: ROIJTES42.DAT In/out % -°nund Mirror Route path 10 0 y 152 86 72 62 61 77 12 139 10 0 y 152 86 72 62 61 77 12 132 5 0 y 152 153 145 108 146 147 111 148 5 o y 152 153 145 108 146 147 111 76 110 70 109 53 54 5 0 y 152 159 160 165 169 172 173 5 0 y 86 152 159 160 165 166 162 158 10 0 y 86 98 74 75 138 76 139 140 141 10 0 y 86 72 73 74 75 138 76 139 140 141 15 o y 86 72 85 64 65 66 67 68 69 70 71 5 0 y 86 72 85 64 65 66 67 68 104 51 36 22 103 102 6 127 129 130 20 0 y 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 File name: ROUTES43.DAT ' In/Out % Bound Mirror Route path 5 0 y 153 152 159 160 165 169 172 173 10 0 y 153 152 86 72 85 64 63 62 61 77 12 131 5 0 y 153 152 86 72 85 64 58 44 84 28 83 15 14 13 12 132 5 o y 98 86 152 159 160 165 169 170 15 0 y 98 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 5 0 y 73 72 85 64 58 44 84 28 83 15 82 124 120 115 114 10 0 y 73 74 75 138 76 139 140 141 5 o y 152 153 159 175 5 0 y 152 153 145 98 74 97 10 0 y 152 153 145 98 74 75 138 76 139 140 141 5 o y 86 98 145 108 146 147 111 148 149 150 151 5 o y 86 98 145 108 146 147 111 157 158 5 0 y 86 98 145 108 146 147 111 76 110 70 109 53 40 24 11 9 129 130 5 0 y 86 98 74 75 138 76 110 70 109 53 40 24 11 9 129 130 5 o y 86 98 74 75 107 69 70 71 FiLe name: ROUTES44.0AT In/Out % Round Mirror Route path 5 y 154 153 159 175 5 0 y 154 153 159 152 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 10 0 y 154 153 152 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 5 o y 108 145 98 74 73 72 85 64 63 62 61 77 12 131 5 0 y 108 145 98 74 97 5 o y 153 154 160 165 169 172 173 5 o y 153 154 108 75 107 69 106 52 38 23 22 21 19 18 17 16 15 14 13 12 132 5 0 y 153 154 108 75 107 69 106 52 38 23 24 25 5 o y 153 154 108 75 107 69 106 52 51 36 22 103 102 99 5 0 y 153 154 108 75 138 76 139 140 141 10 0 y 145 108 146 147 111 148 149 150 151 10 0 y 145 108 146 147 111 76 110 70 109 53 40 24 11 9 129 130 5 0 y 145 108 146 147 111 76 110 70 109 53 54 20 y 145 108 75 138 76 139 140 141 FiLe name: ROUTES45.DAT In/Out % Bound Mirror Route path 5 0 y 146 108 145 153 159 175 79 78 61 77 12 131 5 0 y 146 108 154 160 159 152 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 5 0 y 146 108 75 107 69 106 52 38 23 105 5 0 y 146 108 75 107 69 106 52 38 23 22 21 19 18 17 16 15 14 13 12 132 5 0 y 146 108 75 107 69 68 67 66 65 64 63 62 61 77 12 131 5 o y 161 166 167 170 5 0 y 161 166 167 168 5 0 y 156 157 158 162 166 165 169 172 173 5 0 y 156 157 158 162 166 165 160 159 152 86 72 85 64 58 44 84 28 15 82 124 120 115 114 10 o y 156 157 111 76 110 70 109 53 40 24 11 9 129 130 10 0 y 156 157 111 76 110 70 71 10 0 y 147 111 148 149 150 151 10 0 y 147 111 148 142 139 140 141 5 0 y 147 111 76 138 75 74 73 72 85 64 58 44 84 28 83 15 82 124 120 115 114 10 0 y 146 138 76 139 140 141 file name: ROUTE546.DAT In/Out % O�und Mirror Route path 5 y 162 166 165 169 172 173 10 a y 162 166 165 160 159 152 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 5 0 y 149 163 168 10 0 y 149 163 164 5 0 y 149 148 111 147 146 108 145 5 o y 149 148 111 147 146 108 75 107 69 106 52 5 a y 149 148 142 139 76 138 75 74 73 72 85 64 63 62 61 77 12 131 5 0 y 149 148 142 139 76 110 70 109 53 40 24 11 9 129 130 10 0 y 149 148 142 139 140 141 10 0 y 149 150 151 Fite name: ROUTES47.DAT In/out % Bound Mirror Route path 10 o y 79 175 176 30 o y 79 175 159 153 145 98 74 75 138 76 139 140 5 0 y 79 175 159 153 145 98 74 75 138 76 110 70 109 53 40 24 11 9 129 130 25 0 y 79 175 159 152 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 15 a y 79 78 61 77 12 131 15 0 y 79 78 61 77 12 132 File name: ROUTES48.DAT In/Out % sound Mirror Route path 10 o y 175 176 30 0 y 175 159 153 145 98 74 75 138 76 139 140 5 0 y 175 159 153 145 98 74 75 138 76 110 70 109 53 40 24 11 9 129 130 25 o y 175 159 152 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 15 0 y 175 79 78 61 77 12 131 15 0 y 175 79 78 61 77 12 132 Fite name: ROUTE549.DAT In/out % Bound Mirror Route path 5 o y 166 165 169 172 173 15 0 y 166 167 168 30 o y 166 162 158 148 142 139 140 10 o y 166 162 158 157 111 76 110 70 109 53 40 24 11 9 129 130 5 o y 166 162 158 157 111 76 110 70 109 53 40 24 25 5 o y 166 162 158 157 111 76 110 70 109 53 54 5 o y 166 162 158 157 111 76 110 70 69 68 15 o y 166 165 160 159 152 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 5 o y 166 165 160 159 152 86 72 85 64 58 44 84 28 83 15 14 13 12 132 5 o y 166 165 160 159 152 86 72 85 64 63 62 61 77 12 131 File name: ROUTES50.DAT In/Out % �ound Mirror Route path 10 0 y 174 175 176 15 0 y 174 175 79 78 61 77 12 131 15 o y 174 175 79 78 61 77 12 132 30 o y 174 175 159 153 145 98 74 75 138 76 139 140 5 0 y 174 175 159 153 145 98 74 75 138 76 110 70 109 53 40 24 11 9 129 130 25 o y 174 175 159 152 86 72 85 64 58 44 84 28 83 15 82 124 120 115 114 File name: ROUTE551.OAT In/Out % Bound Mirror Route path 15 0 y 117 118 119 120 115 114 15 0 y 123 1 124 120 115 114 15 0 y 123 1 124 2 3 4 127 129 130 5 o y 123 1 124 82 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172.173 5 0 y 13 12 131 15 0 y 13 12 132 10 0 y 13 14 15 16 17 18 19 21 22 23 24 25 File name: ROUTE552.DAT In/Out % -�und Mirror Route path 40 0 y 123 1 124 120 115 114 10 0 y 123 1 119 118 117 25 0 y 123 1 124 2 3 4 127 129 130 10 o y 123 1 124 82 15 14 13 12 132 5 o y 123 1 124 82 15 16 17 18 19 21 22 23 24 25 5 0 y 123 1 124 82 15 83 28 84 44 58 64 65 66 67 68 69 70 71 5 0 y 123 1 124 82 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 Fite name: ROUTES53.DAT In/Out % Bound Mirror Route path 5 o y 118 113 112 5 o y 118 113 115 116 5 0 y 118 113 115 120 124 82 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 35 o y 118 113 115 114 20 o y 113 118 117 5 0 y 113 118 119 1 5 0 y 113 118 119 120 115 114 10 0 y 113 118 119 120 121 122 125 3 4 127 129 130 5 0 y 113 118 119 120 121 122 125 3 4 5 5 o y 113 118 119 120 124 82 15 83 28 84 44 58 64 65 66 67 68 69 70 71 File name: ROUTES54.OAT In/Out % Pound Mirror Route path 20 0 y 113 112 5 o y 117 118 119 120 115 114 10 o y 117 118 119 120 115 114 5 o y 118 119 120 124 2 3 4 127 129 130 5 o y 120 115 114 5 o y 120 124 82 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 File name: ROUTE555.DAT In/Out % Bound Mirror Route path 20 a y 117 118 119 120 115 114 5 0 y 131 12 13 14 15 16 17 18 19 21 22 23 24 25 5 0 y 131 12 77 61 62 63 64 65 66 67 68 69 70 71 5 o y 132 12 13 14 15 16 17 18 19 21 22 23 24 25 File name: ROUTES56.DAT In/Out % °nund Mirror Route path 55 d y 115 114 20 o y 115 120 119 118 117 10 0 y 115 120 121 126 127 129 130 5 0 y 115 120 124 82 15 14 13 12 132 5 0 y 115 120 124 82 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 115 120 124 82 15 83 28 84 44 58 64 65 66 67 68 69 70 71 Fite name: ROUTES57.OAT In/Out % Bound Mirror Route path x --- ----- ------ ----------- 20 o y 126 121 120 115 114 5 o y 121 120 115 114 5 o y 125 122 121 120 115 114 15 0 y 2 122 121 120 119 118 117 5 o y 122 2 87 88 5 o y 122 2 124 82 15 14 13 12 132 5 o y 122 125 3 2 124 82 15 83 28 84 44 58 64 85 72 86 152 159 160 165 169 172 173 5 o y 122 125 3 93 5 0 y 122 125 3 4 94 19 21 22 23 24 25 5 0 y 122 125 3 4 127 129 130 5 0 y 125 126 127 6 102 103 22 36 51 104 68 69 70 71 20 0 y 125 126 127 129 130 File name: ROUTE558.DAT In/Out % Bound Mirror Route path LO 0 y 126 121 120 115 114 10 0 y 126 121 120 119 118 117 5 o y 126 125 3 93 5 o y 126 127 129 130 5 o y 126 127 6 102 103 22 36 51 5 0 y 126 127 6 102 103 22 21 19 18 17 16 15 14 13 12 132 5 0 y 126 127 6 102 103 22 21 19 18 17 16 15 14 13 12 131 35 0 y 128 129 130 5 o y 128 129 9 11 24 40 53 109 70 110 76 139 140 141 5 0 y 128 129 9 11 24 25 Pile name: ROUTE559.DAT In/Out % Bound Mirror Route path ' --- ----- ----- ------------ 20 o y 78 61 77 12 131 15 o y 78 61 77 12 132 25 o y 78 61 62 63 64 58 44 84 28 83 15 82 124 120 115 114 20 o y 78 61 62 63 64 65 66 67 68 69 70 71 5 o y 78 61 62 63 64 65 66 67 68 69 70 109 53 40 24 11 9 129 130 10 a y 78 79 175 176 5 o y 78 79 175 159 153 145 98 74 75 138 76 139 140 141