Loading...
HomeMy WebLinkAboutResolution - 3949Resolution No. 3949 Page 1 of 8 STATE OF CALIFORNIA ) RESOLUTION NO. 3949 COUNTY OF RIVERSIDE ) CITY OF SAN JACINTO ) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JACINTO ADOPTING FINDINGS OF FACT AND A STATEMENT OF OVERRIDING CONSIDERATIONS PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, CERTIFYING THE GENERAL PLAN UPDATE FINAL ENVIRONMENTAL IMPACT REPORT (SCH #2020120312), AND APPROVING THE PROJECT WHEREAS, the City of San Jacinto (the “City”) proposes the Envision San Jacinto – General Plan 2040 Project (the “General Plan Update” or “Project”), a comprehensive update to the City’s existing General Plan; and WHEREAS, the Project sets the overarching policy document that guides land use, housing, transportation, open space, public safety, community services, and other policy decisions throughout the City and the Sphere of Influence; and WHEREAS, the City will implement the General Plan Update by requiring development, infrastructure improvements, and other projects to be consistent with its policies, and by implementing the actions included in the Project; and WHEREAS, prior to the development of the Project, the City conducted extensive public outreach including direct mailing to over 15,000 mailboxes within the City limits; hosted three (3) public workshops in February and March 2019, hosted two (2) popup workshops at the City sponsored Kool A ugust Nights Concert Series in August 2019, conducted a 10 month online survey, hosted two (2) stakeholder focus group sessions in August 2019, and held two public meetings for the Planning Commission and City Council in September and October 2020 respectively to receive feedback on a draft land use policy map; and WHEREAS, pursuant to section 21067 of the Public Resources Code, and section 15367 of the State CEQA Guidelines (Cal. Code Regs., tit. 14, § 15000 et seq.), the City of San Jacinto is the lead agency for the proposed Project; and WHEREAS, in accordance with CEQA and the State CEQA Guidelines, the City determined that a Programmatic Environmental Impact Report (“EIR”) should be prepared in order to analyze all potential adverse environmental impacts that could potentially result from the adoption and implementation of the proposed Project; and WHEREAS, in accordance with State CEQA Guidelines section 15082, on December 17, 2020, the City sent to the Office of Planning and Research and each responsible and trustee agency a Notice of Preparation (“NOP”) stating that an Environmental Impact Report (State Clearinghouse Number #2020120312 would be prepared; and DocuSign Envelope ID: BCC13C27-71BE-4BE6-B03E-9202B943AAD3 Resolution No. 3949 Page 2 of 8 WHEREAS, ten (10) comment letters were received in response to the NOP; and WHEREAS, pursuant to Public Resources Code section 21083.9 and State CEQA Guidelines sections 15082(c) and 15083, the City held a duly noticed Scoping Meeting on January 6, 2021, to solicit comments on the scope of the environmental review of the proposed Project, however, no comments were received during the Scoping Meeting; and WHEREAS, a Draft Programmatic EIR (“Draft EIR”) was prepared, incorporating comments received in response to the NOP; and WHEREAS, the Draft EIR concluded that the proposed Project would result in significant and unavoidable impacts relating to: agricultural resources, air quality, biological resources, greenhouse gas emissions, and noise; and WHEREAS, in accordance with State CEQA Guidelines section 15085, a Notice of Completion was prepared and filed with the Office of Planning and Research on July 28, 2022; and WHEREAS, as required by State CEQA Guidelines section 15087(a), the City provided Notice of Availability of the Draft EIR to the public at the same time that the City sent Notice of Completion to the Office of Planning and Research, on July 28, 2022; and WHEREAS, during the public comment period, copies of the Draft EIR and technical appendices were available for review and inspection at City Hall, on the City’s website, and published in the Press Enterprise; and WHEREAS, pursuant to State CEQA Guidelines section 15087(e), the Draft EIR was circulated for at least a 45-day public review and comment period from December 31, 2411 to September 12, 2022; and WHEREAS, during the public review and comment period, the City consulted with and requested comments from all responsible and trustee agencies, other regulatory agencies, and others pursuant to State CEQA Guidelines section 15086; and WHEREAS, the City received five (5) written comment letters on the Draft EIR; and WHEREAS, pursuant to Public Resources Code section 21092.5, the City provided copies of its responses to commenting public agencies at least ten (10) days prior to the City’s consideration of the Final EIR on October 14, 2022; and WHEREAS, on October 14, 2022, the City released the Final EIR (“Final EIR”), which consists of the Draft EIR, all technical appendices prepared in support of the Draft EIR, all written comment letters received on the Draft EIR, written responses to all written comment letters received on the Draft EIR, and errata to the Draft EIR and technical appendices; and DocuSign Envelope ID: BCC13C27-71BE-4BE6-B03E-9202B943AAD3 Resolution No. 3949 Page 3 of 8 WHEREAS, on October 25, 2022, the Planning Commission conducted the public hearing to consider the Draft EIR for the Project and solicited comments on the document. After hearing all relevant testimony from staff, the public, and the City’s consultant team, the Planning Commission adopted Planning Commission Resolution No. 22-02 by a unanimous (5-0) vote, recommending that the City Council certify the EIR for the Project; and WHEREAS, the “EIR” consists of the Final EIR and its attachments and appendices, as well as the Draft EIR and its attachments and appendices (as modified by the Final EIR); and WHEREAS , all potentially significant adverse environmental impacts were sufficiently analyzed in the EIR; and WHEREAS, as contained herein, the City has endeavored in good faith to set forth the basis for its decision on the Project; and WHEREAS, all of the requirements of the Public Resources Code and the State CEQA Guidelines have been satisfied by the City in connection with the preparation of the EIR which is sufficiently detailed so that all of the potentially significant environmental effects of the Project have been adequately evaluated; and WHEREAS, the EIR prepared in connection with the Project sufficiently analyzes the Project’s potentially significant environmental impacts and the EIR analyzes a range of feasible alternatives capable of reducing th ese effects to an even lesser level of significance; and WHEREAS, the City has made certain findings of fact, as set forth in Exhibit “A” to this Resolution, attached hereto and incorporated herein, based upon the oral and written evidence presented to it as a whole and the entirety of the administrative record for the Project, which are incorporated herein by this reference; and WHEREAS, the City finds that environmental impacts that are identified in the EIR as less than significant and do not require mitigation are described in Section II of Exhibit “A”; and WHEREAS, the City finds that there are no environmental impacts that are identified in the EIR that are less than significant with incorporation of mitigation measures as described in Section III of Exhibit “A”; and WHEREAS, the City finds that even with the incorporation of all feasible mitigation measures, the environmental impacts that are identified in the EIR that are significant and unavoidable are described in Section IV of Exhibit “A”; and WHEREAS, the cumulative impacts of the Project identified in the EIR and set forth herein, are described in Section V of Exhibit “A”; and DocuSign Envelope ID: BCC13C27-71BE-4BE6-B03E-9202B943AAD3 Resolution No. 3949 Page 4 of 8 WHEREAS, the potential significant irreversible environmental changes that would result from the proposed Project identified in the EIR and set forth herein, are described in Section VI of Exhibit “A”; and WHEREAS, the existence of any growth-inducing impacts resulting from the proposed Project identified in the EIR and set forth herein, are described in Section VII of Exhibit “A”; and WHEREAS, alternatives to the proposed Project that might further reduce the already less than significant environmental impacts are described in Section VIII of Exhibit “A”; and WHEREAS, because the EIR identified significant and unavoidable impacts, the City explains its reasoning for recommending the adoption of the Project despite those impacts in the Statement of Overriding Considerations, as set forth in Section IX of Exhibit “A”; and WHEREAS, prior to taking action, the City Council has heard, been presented with, reviewed and considered all of the information and data in the administrative record, including but not limited to the EIR, and all oral and written evidence presented to it during all meetings and hearings; and WHEREAS, the City Council finds the EIR reflects the independent judgment of the City and is deemed adequate for purposes of making decisions on the merits of the Project; and WHEREAS, no comments made in the public hearings conducted by the Planning Commission and City Council and no additional information submitted to the City have produced substantial new information requiring recirculation of the EIR or additional environmental review of the Project under Public Resources Code section 21092.1 and State CEQA Guidelines section 15088.5; and WHEREAS, on November 15, 2022, the City Council conducted a duly noticed public hearing on this Resolution, at which time all persons wishing to testify were heard and the Project was fully considered; and WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN JACINTO: SECTION 1. The above recitals are true and correct and incorporated herein by reference. SECTION 2. The City Council hereby finds that it has been presented with the EIR which it has reviewed and considered, and further finds that the EIR is an accurate and objective statement that has been completed in full compliance with CEQA and the State DocuSign Envelope ID: BCC13C27-71BE-4BE6-B03E-9202B943AAD3 Resolution No. 3949 Page 5 of 8 CEQA Guidelines. The City Council finds that the EIR reflects the independent judgment and analysis of the City. The City Council declares that no evidence of new significant impacts or any new information of “substantial importance” as defined by State CEQA Guidelines section 15088.5, has been received by the City after circulation of the Draft EIR that would require recirculation. Therefore, the City Council certifies the EIR based on the entirety of the record of proceedings. SECTION 3. The City Council adopts the “CEQA Findings of Fact” where were prepared in accordance with State CEQA Guidelines sections 15091 and which are attached hereto as Exhibit “A” and incorporated herein by this reference. SECTION 4. Based upon the entire record before it, including the EIR, Findings of Fact, and all written and oral evidence presented, the City Council approves the proposed Project. SECTION 5. The documents and materials that constitute the record of proceedings on which this Resolution has been based are located a t City Hall, 595 S. San Jacinto Avenue, San Jacinto, CA 92583. The custodian for these records is Travis Randel. This information is provided pursuant to Public Resources Code section 21081.6. SECTION 6. The City Council hereby directs staff to prepare and file a Notice of Determination with the County Clerk of the County of Riverside within five working days of the execution of this Resolution and approval of the Project and with the Office of Planning and Research. PASSED, APPROVED, AND ADOPTED this 15th day of November 2022, by the following vote: AYES: Heath, Ledezma, Ayala, Ruiz NAYS: None ABSENT: Hawkins ABSTAIN: None DocuSign Envelope ID: BCC13C27-71BE-4BE6-B03E-9202B943AAD3 Resolution No. 3949 Page 6 of 8 CITY OF SAN JACINTO: _____________________________ Crystal Ruiz, Mayor ATTEST: ______________________________ Julia Espinoza, City Clerk APPROVED AS TO FORM: BEST, BEST & KRIEGER LLP __________________________________ Craig Hayes, Deputy City Attorney DocuSign Envelope ID: BCC13C27-71BE-4BE6-B03E-9202B943AAD3 Resolution No. 3949 Page 7 of 8 STATE OF CALIFORNIA) COUNTY OF RIVERSIDE) ss CITY OF SAN JACINTO) CERTIFICATION I, Julia Espinoza, City Clerk of the City of San Jacinto, CA, do hereby certify that the foregoing Resolution No. 3949 was passed, approved, and adopted at the Regular Meeting of the San Jacinto City Council held on the 15 th day of November, 2022. AYES: Heath, Ledezma, Ayala, Ruiz NAYS: None ABSENT: Hawkins ABSTAIN: None WITNESS MY HAND AND THE SEAL on this 15th day of November 2022. ______________________________ Julia Espinoza, City Clerk City of San Jacinto DocuSign Envelope ID: BCC13C27-71BE-4BE6-B03E-9202B943AAD3 Resolution No. 3949 Page 8 of 8 EXHIBIT “A” CEQA FINDINGS OF FACT DocuSign Envelope ID: BCC13C27-71BE-4BE6-B03E-9202B943AAD3 -1- EXHIBIT A CEQA FINDINGS OF FACT The California Environmental Quality Act (Pub. Resources Code, § 21000 et seq.) (“CEQA”) requires that public agencies shall not approve or carry out a project for which an environmental impact report (“EIR”) has been certified that identifies one or more significant adverse environmental effects of a project unless the public agency makes one or more written Findings for each of those significant effects, accompanied by a brief explanation of the rationale for each Finding (State CEQA Guidelines [Cal. Code Regs., tit. 14, § 15000 et seq.], § 15091). This document presents the CEQA Findings of Fact made by the City of San Jacinto, in its capacity as the CEQA lead agency, regarding the Envision San Jacinto – General Plan 2040 (“General Plan”), evaluated in the Draft Environmental Impact Report (“Draft EIR”) and Final Environmental Impact Report (“Final EIR”) for the Project. SECTION I INTRODUCTION Public Resources Code section 21002 states that “public agencies should not approve projects as proposed if there are feasible alternatives or feasible mitigation measures available which would substantially lessen the significant environmental effects of such projects[.]” Section 21002 further states that the procedures required by CEQA “are intended to assist public agencies in systematically identifying both the significant effects of proposed projects and the feasible alternatives or feasible mitigation measures which will avoid or substantially lessen such significant effects.” Pursuant to section 21081 of the Public Resources Code, a public agency may only approve or carry out a project for which an EIR has been completed that identifies any significant environmental effects if the agency makes one or more of the following written finding(s) for each of those significant effects accompanied by a brief explanation of the rationale for each finding: 1. Changes or alterations have been required in, or incorporated into, the project which mitigate or avoid the significant effects on the environment. 2. Those changes or alterations are within the responsibility and jurisdiction of another public agency and have been, or can and should be, adopted by that other agency. 3. Specific economic, legal, social, technological, or other considerations, including considerations for the provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or alternatives identified in the environmental impact report. As indicated above, section 21002 requires an agency to “avoid or substantially lessen” significant adverse environmental impacts. Thus, mitigation measures that “substantially lessen” significant environmental impacts, even if not completely avoided, satisfy section 21002’s mandate. (Laurel Hills Homeowners Assn. v. City Council (1978) 83 Cal.App.3d 515, 521 [“CEQA does not mandate the choice of the environmentally best feasible project if through the imposition of feasible mitigation measures alone the appropriate public agency has reduced env ironmental Findings Page 2 of 266 damage from a project to an acceptable level”]; Las Virgenes Homeowners Fed., Inc. v. County of Los Angeles (1986) 177 Cal. App. 3d 300, 309 [“[t]here is no requirement that adverse impacts of a project be avoided completely or reduced to a level of insignificance . . . if such would render the project unfeasible”].) While CEQA requires that lead agencies adopt feasible mitigation measures or alternatives to substantially lessen or avoid significant environmental impacts, an agency need not adopt infeasible mitigation measures or alternatives. (Pub. Resources Code, § 21002.1(c) [if “economic, social, or other conditions make it infeasible to mitigate one or more significant effects on the environment of a project, the project may nonetheless be carried out or approved at the discretion of a public agency”]; see also State CEQA Guidelines, § 15126.6(a) [an “EIR is not required to consider alternatives which are infeasible”].) CEQA defines “feasible” to mean “capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors.” (Pub. Resources Code, § 21061.1.) The State CEQA Guidelines add “legal” considerations as another indicia of feasibility. (State CEQA Guidelines, § 15364.) Project objectives also inform the determination of “feasibility.” (Jones v. U.C. Regents (2010) 183 Cal. App. 4th 818, 828-829.) “‘[F]easibility’ under CEQA encompasses ‘desirability’ to the extent that desirability is based on a reasonable balancing of the relevant economic, environmental, social, and technological factors.” (City of Del Mar v. City of San Diego (1982) 133 Cal.App.3d 401, 417; see also Sequoyah Hills Homeowners Assn. v. City of Oakland (1993) 23 Cal.App.4th 704, 715.) “Broader considerations of policy thus come into play when the decision making body is considering actual feasibility[.]” (Cal. Native Plant Soc’y v. City of Santa Cruz (2009) 177 Cal.App.4th 957, 1000 (“Native Plant”); see also Pub. Resources Code, § 21081(a)(3) [“economic, legal, social, technological, or other considerations” may justify rejecting mitigation and alternatives as infeasible] (emphasis added).) Environmental impacts that are less than significant do not require the imposition of mitigation measures. (Leonoff v. Monterey County Board of Supervisors (1990) 222 Cal.App.3d 1337, 1347.) The California Supreme Court has stated, “[t]he wisdom of approving . . . any development project, a delicate task which requires a balancing of interests, is necessarily left to the sound discretion of the local officials and their constituents who are responsible for such decisions. The law as we interpret and apply it simply requires that those decisions be informed, and therefore balanced.” (Citizens of Goleta Valley v. Board of Supervisors (1990) 52 Cal.3d 553, 576.) In addition, perfection in a project or a project’s environmental alternatives is not required; rather, the requirement is that sufficient information be produced “to permit a reasonable choice of alternatives so far as environmental aspects are concerned.” Outside agencies (including courts) are not to “impose unreasonable extremes or to interject [themselves] within the area of discretion as to the choice of the action to be taken.” (Residents Ad Hoc Stadium Com. v. Board of Trustees (1979) 89 Cal.App.3d 274, 287.) Findings Page 3 of 266 SECTION II FINDINGS REGARDING ENVIRONMENTAL IMPACTS NOT REQUIRING MITIGATION The City Council hereby finds that the following potential environmental impacts of the General Plan are less than significant and therefore do not require the imposition of Mitigation Measures. A. AESTHETICS 1. Scenic Vistas Threshold: Would the project have a substantial adverse effect on a scenic vista? Finding: Less than significant. (Draft EIR, Impact AES-1, pages 5.1-8 through 5.1- 10) Explanation: The Study Area is surrounded by mountain and hillside terrain that offer scenic vistas, the view of which are available throughout the Study Area and major roadways. Implementation of the Project would result in new development and intensification of existing urban uses throughout the Study Area that may detract from the existing scenic vistas. However, the General Plan Update Land Use Map would maintain existing designated Open Space areas in the San Jacinto Mountain foothills to the northeast and Lakeview Mountains to the west. Further, the San Jacinto Development Code (SJDC) would regulate maximum building height, building setbacks, building type and intensity, and other development characteristics in place in each zoning district to protect scenic vistas within the Study Area. SJDC Chapter 17.630 provides for project-specific design review of future development proposals within City limits, which would ensure that development pursuant to the General Plan Update is attractive and cohesive without diminishing the quality of the natural beauty of the general vicinity. Design review would be required for the construction of any structure, or to relocate, rebuild, or significantly enlarge or modify any existing structure or site within the City. Criteria to be considered includes efficiency of site layout and design, compatibility in scale and aesthetic treatment of proposed structures with public areas, and consistency with design guidelines/standards, the General Plan, or any other applicable specific plan. Additionally, San Jacinto Municipal Code Chapter 15.28, Hillside Development, regulates development of hillside areas by relating the number and distribution of dwelling units and other buildings to the topography to prevent disfigurement of the terrain through extensive cut and fill. Accordingly, projects which may impact views of ridgelines would be given particular attention. Future development within the City’s SOI that is under the County’s land use control would be subject to the County’s entitlement requirements, regulations, and design review process. Findings Page 4 of 266 Furthermore, the General Plan Update goals, policies, and actions are intended to ensure that urbanization of the Study Area would not result in substantial adverse effects on a scenic vista. For example, Policy LU-3.1 ensures the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Policy LU-5.3 identifies and preserves the positive characteristics and features of a site, such as viewsheds, heritage trees, and rock outcroppings, during the design and development of new projects. Policy RM-1.1 supports a balanced and integrated system of open space that reflects aesthetics and community identity considerations. Policy RM-1.2 preserves scenic resources in San Jacinto, including mature trees, rock outcroppings, hillsides, ridgelines, and other prominent natural landforms. Policy RM-1.5 requires orderly development of hillside areas through compliance with the City’s Hillside Development Ordinance. Action RM-1e retains the significant hillsides and ridgelines on San Jacinto’s eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Action RM-1h directs the City to identify local scenic routes and vistas and explore developing guidelines for development visible from these scenic routes to minimize impacts to scenic vistas. Therefore, implementation of the General Plan Update impacts related to having a substantial adverse effect on a scenic vista would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-2.2: Infill Development. Encourage new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Policy LU-3.1: Surrounding Uses. Consider as part of the development review process the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Policy LU-3.7: Hillside Development. Conserve hillsides by limiting development on slopes greater than 25 percent and allowing unique planning techniques such as Specific Plans, Planned Unit Developments, and clustered development to reduce grading. Action LU-3b: Through the development review process, evaluate development proposals for land use and transportation network compatibility with existing surrounding or abutting development or neighborhoods. Action LU-3c: Analyze land use compatibility through the development review process to require adequate buffers and/or architectural enhancements that protect sensitive receptors from intrusion of development activities that may cause unwanted nuisances and health risks. Findings Page 5 of 266 Action LU-3e: During both redevelopment and the development of new projects, encourage the provision and maintenance of setbacks and buffers, such as roadways, topographic features, and open space, to prevent incompatibilities between agricultural and non-agricultural land uses. Policy LU-5.1: Design Features. Enhance the City's identity with attractive high-quality gateways, city entry signs and design features, cohesive street signs, and other design features at public gathering spaces and other areas, where appropriate. Policy LU-5.2: Standards and Guidelines. Develop and enforce development standards and objective design guidelines that provide clear direction for achieving quality community design in new development and redevelopment projects. Policy LU-5.3: Site Planning. Identify and preserve, as feasible, the positive characteristics and features of a site, such as viewsheds, heritage trees, and rock outcroppings, during the design and development of new projects. Policy LU-5.5: Sustainable Design. Support “green” and “sustainable” developments that respect and conserve the region’s important resources. Policy LU-5.7: Landscaping. Use landscaping for screening, solar control, parking lot shade, and other beautification purposes throughout the City. Policy LU-5.8: Streetscapes. Promote drought tolerant landscaping, tree planting, and tree preservation along City streets as a means of improving aesthetics, making neighborhoods more pedestrian-friendly, and providing environmental and economic benefits. RESOURCE MANAGEMENT ELEMENT Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.2: Scenic Resources. Encourage the preservation of San Jacinto’s scenic resources, including mature trees, rock outcroppings, hillsides, ridgelines, and other prominent natural landforms, to the extent practical. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.5: Hillside Development. Require the orderly development of hillside areas through compliance with the City’s Hillside Development Ordinance. Action RM-1e: For Hillside Development Projects, implement the City's Hillside Development Standards to retain the significant hillsides and ridgelines on San Jacinto’s Findings Page 6 of 266 eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Action RM-1h: Identify local scenic routes and vistas and explore developing guidelines for development visible from these scenic routes to minimize impacts to scenic vistas. Policy RM-3.5: Public Art. Promote the use of public art that celebrates the diverse and culturally rich history of San Jacinto at key gateways, major projects, and public gathering places. Policy RM-7.9: Open Space in Nonresidential Development. Encourage outdoor gathering spaces, such as mini-parks and plazas, be incorporated into nonresidential development to encourage social interaction, create experience-oriented centers, and enhance the visual character of the community. 2. Scenic Resources Threshold: Would the project substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? Finding: Less than significant. (Draft EIR, Impact AES-2, page 5.1-11 through 5.1- 14) Explanation: There are no officially designated State Scenic Highways that traverse San Jacinto. Although the General Plan Update does not propose any changes to the County’s designated scenic highways, future development could occur adjacent to County eligible scenic highways. Future development would be subject to conformance with applicable San Jacinto Municipal Code requirements and be guided by relevant General Plan Update policies, including Policy LU-3.1, which ensures the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Policy LU-5.3 identifies and preserves the significant features of a site, such as viewsheds, heritage trees, and rock outcroppings, during the design and development of new projects. Policy RM-1.1 supports a balanced and integrated system of open space that reflects aesthetics and community identity considerations. Policy RM-1.2 preserves scenic resources in San Jacinto, including mature trees, rock outcroppings, hillsides, ridgelines, and other prominent natural landforms. Policy RM-1.5 requires orderly development of hillside areas through compliance with the City’s Hillside Development Ordinance. Action RM- 1e retains the significant hillsides and ridgelines on San Jacinto’s eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Action RM-1h directs the City to identify local scenic routes and vistas and explore developing guidelines for development visible from these scenic routes to minimize impacts to scenic vistas. Findings Page 7 of 266 Special attention would be given to all development proposals that could affect views of, or otherwise alter, ridgelines. Pursuant to SJDC Chapter 17.630, all development located on hillsides having a natural slope gradient of 15 percent or greater is subject to Municipal Code Chapter 15.28, Hillside Development, which regulates development of hillside areas by relating the number and distribution of dwelling units and other buildings to the topography to prevent disfigurement of the terrain through extensive cut and fill. Historic buildings would be preserved as required by federal, State, and local policies, including SJDC Chapter 17.510, which provides guidelines to assist in the identification and preservation of historic and cultural resources within the City. General Plan Update policies provide additional protections for historic buildings, including Policy RM-3.1 which protects areas containing significant historic, archaeological, and paleontologic resources. Policy RM-3.6 identifies, designates, and protects buildings, districts, and sites of historic importance within San Jacinto. Action RM-3a ensures that the City would continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to CEQA. Action RM-3b requires that for structures that potentially have historic significance, a study be conducted by a professional archaeologist or historian to determine the actual significance of the structure and potential impacts of the proposed development in accordance with CEQA Guidelines Section 15064.5. Action RM-3o directs the City to conduct a historic properties inventory that takes into consideration buildings, neighborhoods, and other features of historic, architectural, or cultural significance. Future development within the City’s SOI that is under the County’s land use control would be subject to the County’s entitlement requirements, regulations, and design review process. The General Plan Update goals, policies, and actions described above and the SJDC are intended to ensure that development within the Study Area would not result in substantial damage to scenic resources. Therefore, implementation of the General Plan Update would not significantly impact scenic resources within a State scenic highway and impacts would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-2.2: Infill Development. Encourage new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Policy LU-3.1: Surrounding Uses. Consider as part of the development review process the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Findings Page 8 of 266 Policy LU-3.7: Hillside Development. Conserve hillsides by limiting development on slopes greater than 25 percent and allowing unique planning techniques such as Specific Plans, Planned Unit Developments, and clustered development to reduce grading. Action RM-3a: Continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to the California Environmental Quality Act (CEQA). Action LU-3b: Through the development review process, evaluate development proposals for land use and transportation network compatibility with existing surrounding or abutting development or neighborhoods. Action LU-3c: Analyze land use compatibility through the development review process to require adequate buffers and/or architectural enhancements that protect sensitive receptors from intrusion of development activities that may cause unwanted nuisances and health risks. Action LU-3e: During both redevelopment and the development of new projects, encourage the provision and maintenance of setbacks and buffers, such as roadways, topographic features, and open space, to prevent incompatibilities between agricultural and non-agricultural land uses. Policy LU-5.1: Design Features. Enhance the City's identity with attractive high-quality gateways, city entry signs and design features, cohesive street signs, and other design features at public gathering spaces and other areas, where appropriate. Policy LU-5.2: Standards and Guidelines. Develop and enforce development standards and objective design guidelines that provide clear direction for achieving quality community design in new development and redevelopment projects. Policy LU-5.3: Site Planning. Identify and preserve, as feasible, the significant features of a site, such as viewsheds, heritage trees, and rock outcroppings, during the design and development of new projects. Policy LU-5.5: Sustainable Design. Support “green” and “sustainable” developments that respect and conserve the region’s important resources. Policy LU-5.7: Landscaping. Use landscaping for screening, solar control, parking lot shade, and other beautification purposes throughout the City. Policy LU-5.8: Streetscapes. Promote drought tolerant landscaping, tree planting, and tree preservation along City streets as a means of improving aesthetics, making neighborhoods more pedestrian-friendly, and providing environmental and economic benefits. Findings Page 9 of 266 RESOURCE MANAGEMENT ELEMENT Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.2: Scenic Resources. Encourage the preservation of San Jacinto’s scenic resources, including mature trees, rock outcroppings, hillsides, ridgelines, and other prominent natural landforms, to the extent practical. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multip le Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.5: Hillside Development. Require the orderly development of hillside areas through compliance with the City’s Hillside Development Ordinance. Action RM-1e: For Hillside Development Projects, implement the City's Hillside Development Standards to retain the significant hillsides and ridgelines on San Jacinto’s eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Action RM-1h: Identify local scenic routes and vistas and explore developing guidelines for development visible from these scenic routes to minimize impacts to scenic vistas. Policy RM-3.1: Preservation. Protect areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Code. Policy RM-3.5: Public Art. Promote the use of public art that celebrates the diverse and culturally rich history of San Jacinto at key gateways, major projects, and public gathering places. Policy RM-3.6: Historic Preservation. Identify, designate, and protect buildings, districts, and sites of historic importance within San Jacinto. Action RM-3b: For structures that potentially have historic significance, the City shall require that a study be conducted by a professional archaeologist or historian to determine the actual significance of the structure and potential impacts of the proposed development in accordance with CEQA Guidelines Section 15064.5. The City may require modification of the project and/or mitigation measures to avoid any impact to a historic structure, when feasible, such as retaining or rehabilitating historic buildings pursuant to City of San Jacinto guidelines or relocating the historic building as feasible. Findings Page 10 of 266 Action RM-3o: Conduct a historic properties inventory that takes into consideration buildings, neighborhoods, and other features of historic, architectural, or cultural significance. Policy RM-7.9: Open Space in Nonresidential Development. Encourage outdoor gathering spaces, such as mini-parks and plazas, be incorporated into nonresidential development to encourage social interaction, create experience-oriented centers, and enhance the visual character of the community. 3. Visual Character Threshold: In non-urbanized areas, would the project substantially degrade the existing visual character or quality of public view of the site and its surroundings? If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Finding: Less than significant. (Draft EIR, Impact AES-3, pages 5.1-15 through 5.1- 18) Explanation: All construction activities related to the General Plan Update would be temporary in nature and all construction equipment would ultimately be removed from individual project sites following completion of construction activities. Therefore, changes to local visual character and quality associated with construction of future development would be temporary, and impacts would be less than significant. The General Plan Update would support additional development beyond existing conditions. In general, the General Plan Update Land Use Element proposes an increase in building density and intensity, in accordance with State and regional housing and climate change goals. The General Plan Update incorporates consistent and compatible development intensities that would maintain and enhance the overall visual character/quality of the Study Area. Specifically, the Land Use Element includes goals and policies, maps, and diagrams to control and direct the general distribution, location, and extent of land uses within the Study Area. For example, Policy LU-3.1 ensures the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Policy LU-5.3 identifies and preserves the significant features of a site, such as viewsheds, heritage trees, and rock outcroppings, during the design and development of new projects. Policy RM-1.2 preserves scenic resources in San Jacinto, including mature trees, rock outcroppings, hillsides, ridgelines, and other prominent natural landforms. Policy RM-1.5 requires orderly development of hillside areas through compliance with the City’s Hillside Development Ordinance. Action RM-1h directs the City to identify local scenic routes and vistas and explore developing guidelines for development visible from these scenic routes to minimize impacts to scenic vistas. Future growth would largely occur in areas that are already Findings Page 11 of 266 developed, as described above. Additionally, the General Plan Update would maintain existing designated Open Space areas in the San Jacinto Mountain foothills to the northeast and Lakeview Mountains to the west. Policy LU 2.2 would encourage new development to occur in infill locations in a pattern that preserves open space. Policy RM-1.1 supports a balanced and integrated system of open space that reflects aesthetics and community identity considerations. Action RM-1e retains the significant hillsides and ridgelines on San Jacinto’s eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Guiding future growth and development based on the General Plan Update would ensure future development complements and protects the quality of the existing environment. All future development would also be subject to conformance with applicable SJDC requirements. SJDC Article 2, Zones, Allowable Land Uses, and Zone-Specific Standards, would regulate maximum building height, building setbacks, parking and garage/carport placement, landscaping and screening requirements, and other development characteristics in place in each zoning district to protect the City’s long- term visual character. Pursuant to SJDC Chapter 17.630, future development projects would be subject to project-specific design review to ensure compatibility in scale and aesthetic treatment of proposed structures with public areas, and consistency with design guidelines/standards, the General Plan, or any other applicable specific plan (refer to Impact AES-2). Pursuant to SJDC Section 17.600.090, Environmental Review, future land use and development review applications would undergo environmental review on a project-by-project basis prior to consideration by the decision- making authority. If necessary, mitigation would be recommended to reduce potential impacts to a less than significant level. The implementation of policies and actions contained in the General Plan Update and compliance with the SJDC would ensure that new development in the Study Area would be designed to enhance the visual quality of the area and be visually compatible with existing development and open space resources. Therefore, implementation of the General Plan Update would not substantially degrade the existing visual character or quality of public views or conflict with applicable zoning and other regulations governing scenic quality. Impacts would be less than significant in this regard. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-2.2: Infill Development. Encourage new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Findings Page 12 of 266 Policy LU-3.1: Surrounding Uses. Consider as part of the development review process the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Policy LU-3.7: Hillside Development. Conserve hillsides by limiting development on slopes greater than 25 percent and allowing unique planning techniques such as Specific Plans, Planned Unit Developments, and clustered development to reduce grading. Action LU-3b: Through the development review process, evaluate development proposals for land use and transportation network compatibility with existing surrounding or abutting development or neighborhoods. Action LU-3c: Analyze land use compatibility through the development review process to require adequate buffers and/or architectural enhancements that protect sensitive receptors from intrusion of development activities that may cause unwanted nuisances and health risks. Action LU-3e: During both redevelopment and the development of new projects, encourage the provision and maintenance of setbacks and buffers, such as roadways, topographic features, and open space, to prevent incompatibilities between agricultural and non-agricultural land uses. Policy LU-5.1: Design Features. Enhance the City's identity with attractive high-quality gateways, city entry signs and design features, cohesive street signs, and other design features at public gathering spaces and other areas, where appropriate. Policy LU-5.2: Standards and Guidelines. Develop and enforce development standards and objective design guidelines that provide clear direction for achieving quality community design in new development and redevelopment projects. Policy LU-5.3: Site Planning. Identify and preserve, as feasible, the significant features of a site, such as viewsheds, heritage trees, and rock outcroppings, during the design and development of new projects. Policy LU-5.5: Sustainable Design. Support “green” and “sustainable” developments that respect and conserve the region’s important resources. Policy LU-5.7: Landscaping. Use landscaping for screening, solar control, parking lot shade, and other beautification purposes throughout the City. Policy LU-5.8: Streetscapes. Promote drought tolerant landscaping, tree planting, and tree preservation along City streets as a means of improving aesthetics, making neighborhoods more pedestrian-friendly, and providing environmental and economic benefits. RESOURCE MANAGEMENT ELEMENT Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, Findings Page 13 of 266 recreation, aesthetics, and community identity. Policy RM-1.2: Scenic Resources. Encourage the preservation of San Jacinto’s scenic resources, including mature trees, rock outcroppings, hillsides, ridgelines, and other prominent natural landforms, to the extent practical. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.5: Hillside Development. Require the orderly development of hillside areas through compliance with the City’s Hillside Development Ordinance. Action RM-1e: For Hillside Development Projects, implement the City's Hillside Development Standards to retain the significant hillsides and ridgelines on San Jacinto’s eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Action RM-1h: Identify local scenic routes and vistas and explore developing guidelines for development visible from these scenic routes to minimize impacts to scenic vistas. Policy RM-3.5: Public Art. Promote the use of public art that celebrates the diverse and culturally rich history of San Jacinto at key gateways, major projects, and public gathering places. Policy RM-7.9: Open Space in Nonresidential Development. Encourage outdoor gathering spaces, such as mini-parks and plazas, be incorporated into nonresidential development to encourage social interaction, create experience-oriented centers, and enhance the visual character of the community 4. Light and Glare Threshold: Would the project create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Finding: Less than significant. (Draft EIR, Impact AES-4, pages 5.1-19) Explanation: Future development accommodated through implementation of the General Plan Update could introduce new sources of light or glare with the potential to adversely affect day or nighttime views. Light and glare impacts could result from new light sources such as street lighting, interior and exterior building lighting (including for safety purposes), vehicle headlights, illuminated signage, traffic signals, and new glare sources such as reflective building materials, roofing materials, and windows. All lighting installed in future development projects as a result of the implementation of the General Plan Update would be subject to conformance with applicable SJDC Findings Page 14 of 266 requirements and guided by General Plan Update Land Use Element Action LU-3c, which would ensure sensitive receptors are protected from the intrusion of development activities that may cause unwanted nuisances through the development review process. Pursuant to SJDC Section 17.300.080, Outdoor Light and Glare, all exterior lighting would be shielded or modified, and located so as to eliminate spillover illumination or glare beyond the property line or upward into the sky. SJDC Section 17.300.080 would also ensure lighting fixtures used to illuminate an outdoor advertising display be directed downward. Further, SJDC Section 17.330.080, Parking Design and Development Standards, provides a maximum height limit of 25 feet tall for parking lot light standards and ensures illumination of parking lots does not exceed one-half foot-candle along lot lines of a project. Pursuant to SJDC Section 17.600.090, all future land use and development review applications would undergo environmental review on a project-by-project basis prior to consideration by the decision-making authority. If necessary, mitigation would be recommended to reduce potential impacts to a less than significant level. Therefore, implementation of the General Plan Update would not result in adverse light and glare impacts. Impacts would be less than significant in this regard GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Action LU-3c: Analyze land use compatibility through the development review process to require adequate buffers and/or architectural enhancements that protect sensitive receptors from intrusion of development activities that may cause unwanted nuisances and health risks. B. AGRICULTURAL RESOURCES 1. Forestland Zoning and Loss of Forest Land Threshold: Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g), or result in the loss of forest land or conversion of forest land to non-forest use? Finding: No Impact. (Draft EIR, page 5.2-7) Explanation: There are no forest lands or timber lands located within the Study Area. There are also no parcels that are currently zoned as forest land, timber, or timber production. Therefore, implementation of the proposed General Plan Update would have no impact on forest land, timber, or timber production. Findings Page 15 of 266 C. AIR QUALITY 1. Air Quality Plans Threshold: Would the project conflict with or obstruct implementation of the applicable air quality plan? Finding: Less than significant. (Draft EIR, Impact AQ-1, pages 5.3-27 through 5.3- 32) Explanation: The Southern California Air Quality Management District (SCAQMD) has adopted a series of Air Quality Management Plans (AQMPs) to lead the Air Basin into compliance with several criteria air pollutant standards and other federal requirements, while taking into account construction and operational emissions associated with population and economic growth projections provided by the Southern California Association of Government’s (SCAG’s) 2020 RTP/SCS. CEQA requires that general plans be evaluated for consistency with the AQMP. Indicators of consistency include control strategies and growth projections. Construction Emissions Future development of individual projects under the General Plan Update would be required to comply with CARB’s requirements to minimize short- term emissions from on-road and off-road diesel equipment, including the ATCM to limit heavy-duty diesel motor vehicle idling to no more than five minutes at any given time, and with SCAQMD’s regulations such as Rule 403 for controlling fugitive dust and Rule 1113 for controlling VOC emissions from architectural coatings. Furthermore, as applicable to the type of growth, individual projects under the proposed General Plan Update would comply with fleet rules to reduce on-road truck emissions (i.e., 13 CCR, Section 2025 (CARB Truck and Bus regulation)). Compliance with these measures and requirements would be consistent with and meet or exceed the AQMP requirements for control strategies intended to reduce emissions from construction equipment and activities. Implementation of the General Plan Update would result in an increase in short-term employment compared to existing conditions. However, these jobs would be temporary in nature. Therefore, the construction jobs generated by future development accommodated by the General Plan Update would not conflict with the long-term employment or population projections upon which the AQMPs are based. Operational Emissions Future development under the General Plan Update would be required to comply with CARB motor vehicle standards, SCAQMD regulations for stationary sources and architectural coatings, Title 24 energy efficiency standards, and, to the extent applicable, the 2020 RTP/SCS. Additionally, Findings Page 16 of 266 the location, design, and land uses of the growth anticipated by the General Plan Update would implement land use and transportation strategies related to reducing vehicle trips for residents and employees of the City by increasing commercial and residential density near public transit with the new land use designations such as Downtown Village and Mixed-Use. The availability of public transportation and the focus on increasing density relative to the existing public transportation, enables implementation of the General Plan Update to potentially reduce vehicle trips, VMT, and associated transportation-related emissions per capita, compared to the existing conditions. Future development in the City of San Jacinto that is consistent with the General Plan Update would increase vehicle trips and VMT that would result in emissions of ozone precursors and particulate matter. Individual projects under the General Plan Update would be required to undergo subsequent environmental review pursuant to CEQA, and would be required to demonstrate compliance with the AQMP. The City of San Jacinto continues to coordinate with SCAQMD and SCAG to ensure Citywide growth projections, land use planning efforts, and local development patterns are accounted for in the regional planning and air quality planning processes. Additionally, the General Plan Update includes policies and actions to further minimize potential impacts to air quality in support of the AQMP. Goal RM-4 of the General Plan Update Resources Management Element addresses potential air quality impacts by supporting projects, programs, policies and regulations that reduce impacts to air quality by private and public construction projects. Also, Policy LU-1.1 of the General Plan Update Land Use Element promotes a land use pattern that would reduce pollution and air quality impacts. Therefore, the operation of the proposed General Plan Update would not conflict with or obstruct the implementation of the applicable air quality plan and impacts would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). RESOURCE MANAGEMENT ELEMENT Goal RM-4: Air Quality and Greenhouse Gas Emissions. Improved air quality in San Jacinto and the region through reductions in air pollutants and greenhouse gas (GHG emissions). Findings Page 17 of 266 Policy RM-4.1: Regional Cooperation. Support regional efforts, including those organized through the South Coast Air Quality Management District, Southern California Association of Governments, the Western Riverside Council of Governments, and the California Air Resource Board (CARB) to implement the regional Air Quality Management Plan. Policy RM-4.2: Measurement and Enforcement. Coordinate with the California Air Resources Board and South Coast Air Quality Management District to properly measure air quality at emission sources and enforce the standards of the Clean Air Act. Policy RM-4.4: Transportation Options. Promote alternative modes of transportation to reduce vehicular emissions and improve air quality. (See Mobility Element) Policy RM-4.5: Walkability. Encourage pedestrian-scale development and pedestrian- friendly design features to reduce vehicle emissions. (See Mobility Element) Policy RM-4.6: Sustainable Development. Encourage and incentivize higher density and mixed-use development opportunities within designated areas of the City to lessen the impacts of traffic congestion on local air quality. (See Land Use Element) Policy RM-4.7: Sensitive Receptors. Insulate sensitive receptors from areas of heightened air quality pollution, by utilizing land use planning to buffer and protect residential areas. Policy RM-4.8: Mitigation. Require the implementation of relevant mitigation measures for all future development upon identification of potential air quality impacts. Policy RM-4.8: Public Engagement. Promote regional air quality programs in order to inform the public on regional air quality concerns and encourage the engagement of all San Jacinto residents in future planning decisions related to air quality. Action RM-4b: Review all new industrial and commercial development projects for potential air quality impacts to residences and other sensitive receptors. Ensure that mitigation measures and best management practices are implemented to reduce significant emissions of criteria pollutants. Action RM-4c: Review development, infrastructure, and planning projects for consistency with SCAQMD requirements during the CEQA review process. Require project applicants to prepare air quality analyses to address SCAQMD and General Plan requirements, which include analysis and identification of: 1. Air pollutant emissions associated with the project during construction, project operation, and cumulative conditions. 2. Potential exposure of sensitive receptors to toxic air contaminants. 3. Significant air quality impacts associated with the project for construction, project operation, and cumulative conditions. Findings Page 18 of 266 4. Mitigation measures to reduce significant impacts to less than significant or the maximum extent feasible where impacts cannot be mitigated to less than significant. Action RM-4d: Work with the South Coast Air Quality Management District, Southern California Association of Governments, the Western Riverside Council of Governments, and the California Air Resource Board (CARB) to implement programs aimed at improving regional air quality. Action RM-4n: Future development projects implemented under the General Plan will be required to demonstrate consistency with SCAQMD construction emission thresholds. Where emissions from individual projects exceed SCAQMD thresholds, the following actions shall be incorporated as necessary to minimize impacts. These measures do not exclude the use of other, equally effective mitigation measures.  Require all off-road diesel equipment greater than 50 horsepower (hp) used for this Project to meet USEPA Tier 4 final off-road emission standards or equivalent. Such equipment shall be outfitted with Best Available Control Technology (BACT) devices including a California Air Resources Board Certified Level 3 Diesel Particulate Filter (DPF) or equivalent. The DPF reduces diesel particulate matter and NOx emissions during construction activities.  Require a minimum of 50 percent of construction debris be diverted for recycling.  Require building materials to contain a minimum 10 percent recycled content.  Require materials such as paints, primers, sealants, coatings, and glues to have a low volatile organic compound concentration compared to conventional products. If low VOC materials are not available, architectural coating phasing should be extended sufficiently to reduce the daily emissions of VOCs. Action RM-4o: Future development projects implemented under the General Plan will be required to demonstrate consistency with SCAQMD’s operational emission thresholds. For projects where operational emissions exceed regulatory thresholds, the following measures may be used to reduce impacts. Note the following measures are not all inclusive and developers have the option to add or substitute measures that are equally or more appropriate for the scope of the project.  Develop a project specific TDM program for residents and/or employees that provides opportunities for carpool/vanpools.  Provide onsite solar/renewable energy in excess of regulatory requirements.  Require that owners/tenants of non-residential or multi-family residential developments use architectural coatings that are 10 grams per liter or less when repainting/repairing properties. Findings Page 19 of 266  Require dripless irrigation and irrigation sensor units that prevent watering during rain storms.  Ensure all parking areas are wired for capability of future EV charging and include EV charging stations that exceed regulatory requirements. 2. Other Adverse Emissions Threshold: Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people? Finding: Less than significant. (Draft EIR, Impact AQ-4, pages 5.3-41 through 5.3- 42) Explanation: According to the SCAQMD’s CEQA Air Quality Handbook, construction equipment is not a typical source of odors. Odors from the combustion of diesel fuel would be minimized by complying with the CARB ATCM that limits diesel-fueled commercial vehicle idling to five minutes at any given location, which was adopted in 2004. Future development accommodated by the General Plan Update would also comply with SCAQMD Rule 402 (Nuisance), which prohibits the emissions of nuisance air contaminants or odorous compounds. Through adherence with mandatory compliance with SCAQMD Rules and State measures, construction activities and materials would not create objectionable odors. Construction of future development would not be expected to generate nuisance odors at nearby air quality sensitive receptors. Therefore, impacts with respect to odors would be less than significant. According to the SCAQMD’s CEQA Air Quality Handbook, land uses associated with odor complaints typically include agricultural uses, wastewater treatment plants, food processing plants, chemical plants, composting, refineries, landfills, dairies, and fiberglass molding. Compliance with the City’s Municipal Code, including Section 6.24.040 which prohibits animal premises from being a source of offensive odors, and SCAQMD’s Rule 402 (Nuisance), which prohibits the emissions of nuisance air contaminants or odorous compounds would reduce potential impacts. The other potential source of odors would be new waste receptacles within the Study Area. The receptacles would be stored in areas and in containers, as required by the City (Municipal Code Chapter 8.32, Garbage Collection and Disposal), and be emptied on a regular basis, before potentially substantial odors have developed. Additionally, the policies included as part of the General Plan Update would reduce mobile and stationary source emissions and odors associated with diesel fuel by focusing on land use patterns that improve air quality, reduce air pollution from stationary sources, and encourage/enable increased transit behavior. Consequently, implementation of the General Plan Update would not create operational-related objectionable odors affecting a substantial number of Findings Page 20 of 266 people within the City. Impacts would be less than significant in this regard. D. BIOLOGICAL RESOURCES 1. Wetlands Threshold: Would the project have a substantial adverse effect on state or federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? Finding: Less than significant. (Draft EIR, Impact BIO-3, pages 5.4-32 through 5.4- 35) Explanation: The General Plan Update is a planning document that enables additional development but does not include any specific development proposals; therefore, adoption of the General Plan Update would not directly impact the environment. However, the Project could have an indirect change on the physical environment through subsequently approved projects that are consistent with the buildout under the General Plan Update. the General Plan Resource Management Element includes policies and actions intended to protect sensitive natural communities, including wetlands, from adverse effects associated with future development and improvement projects within the Study Area. Policy RM-1.1 supports a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3 preserves and enhances biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with State and federal resource agency requirements. Policy RM-1.4 addresses regional cooperation by recognizing areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinating the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6 would conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1c directs the City to work closely with the USACE, USFWS, and the CDFW during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d directs the City to cooperate with the County to develop and manage preserve areas within the urban landscape. During the review of development proposals, the City would use the MSHCP to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the Findings Page 21 of 266 applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Further, Action RM-1i addresses potential resources outside of the MSHCP area, including the requirement to identify the presence of state or federal regulated wetlands or waters and to ensure compliance with the applicable requirements of the regulatory agencies and application of any mitigation determined through the agency permitting process. Policy RM-2.4 encourages development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Action RM-2b directs the City to cooperate with the RWQCB to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. Compliance with federal, State, and local regulations, and implementation of General Plan Update policies and actions, and implementation would reduce potential impacts to wetlands to a less than significant level. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-1: Natural Resources. A community that conserves and protects its natural resources. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3: Biological Resource Protection. Preserve and enhance biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with state and federal resource agency requirements. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riversid e Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6: Native Vegetation. Conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1c: Work closely with the U.S. Army Corps of Engineers (ACOE), U.S. Fish Findings Page 22 of 266 and Wildlife Service (FWS), and the California Department of Fish and Wildlife (CDFW) during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d: Cooperate with the County of Riverside to develop and manage preserve areas within the urban landscape. During the review of development proposals, use the Western Riverside County MSHCP Habitat Conservation Plan (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Action RM-1i: During the development review process, require Applicants of developments with the potential to reduce or eliminate habitat for native plant and wildlife species or sensitive habitats not covered by the MSHCP, as determined by the City of San Jacinto’s Community Development Department, to prepare a site-specific general biological resources survey to identify the presence of any sensitive biological resources, including any sensitive plant or wildlife species. The report shall identify the need for focused presence/absence surveys and identify the presence of state or federal regulated wetlands or waters. Required surveys shall be conducted by qualified biologists and/or botanists in accordance with California Department of Fish and Wildlife (CDFW) and/or United States Fish and Wildlife Services (USFWS) survey protocols for target species. If no sensitive species are observed during the field survey then no further mitigation will be required. If sensitive species or habitats, including wetlands are documented on the project site, the project applicant shall comply with the applicable requirements of the regulatory agencies and shall apply mitigation determined through the agency permitting process. Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Action RM-2b: Cooperate with the Regional Water Quality Control Board to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. 2. Wildlife Movement Threshold: Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? Findings Page 23 of 266 Finding: Less than significant. (Draft EIR, Impact BIO-4, pages 5.4-35 through 5.4- 38) Explanation: Future development under the General Plan Update could result in creation of new barriers to animal movement in the urbanizing portions of the City; however, impacts to wildlife movement would be mitigated through the establishment of corridors and linkages established by compliance with the Western Riverside MSHCP. In accordance with SJDC Section 17.520.030, development projects would be required to comply with the applicable terms in the MSHCP, including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Additionally, applicants for a discretionary permit for property located in Criteria Area/Criteria Cell(s) as designated in Multiple Species Habitat Conservation Plan must submit a Habitat Evaluation and Acquisition Negotiation Strategy (HANS) application to the Riverside County Environmental Programs Department and subsequently to the Western Riverside Regional Conservation Authority (RCA) for Joint Project Review (JPR). Compliance with the SJDC would prevent substantial interference with wildlife movement and corridors. In compliance with the Natural Community Conservation Planning Act, the Western Riverside County MSHCP is required by federal and State permitting authorities to provide for the movement of species, protect wildlife corridors and facilitate genetic flow. The MSHCP protects native wildlife nursery sites by conserving large blocks of representative native habitats suitable for supporting species’ lifecycle requirements and the essential ecological processes of species which depend on such habitats. The EIR/EIS for the MSHCP concluded that the Plan provides for the movement of species through established wildlife corridors and protects the use of native wildlife nursery sites; therefore, compliance with the conservation requirements for the Cores, Linkages, and Habitat Blocks in the Study Area would ensure wildlife nursery sites are not adversely impacted. In addition, the General Plan Resource Management Element includes policies and actions intended to preserve ecological and biological resources. Policy RM-1.1 supports a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM- 1.3 preserves and enhances biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with State and federal resource agency requirements. Policy RM-1.4 addresses regional cooperation by recognizing areas of overlapping jurisdiction with respect to open space and biological resources, such as the MSHCP, and coordinating the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6 would conserve existing native vegetation where possible and integrate regionally Findings Page 24 of 266 native plant species into development and infrastructure projects where appropriate. Action RM-1c directs the City to work closely with the USACE, USFWS, and the CDFW during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d directs the City to cooperate with the County to develop and manage preserve areas within the urban landscape. During the review of development proposals, the City would use the MSHCP (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Further, Action RM-1j requires vegetation and tree removal that would occur during the bird nesting season would be required to conduct surveys to determine whether active bird nests are observed within the site or vicinity. If active nests are identified, buffers would be required to be implemented and compliance with the Migratory Bird Treaty Act (MBTA) would be required. Thus, through the protections afforded by the MSHCP, the MBTA, and General Plan Update goals, policies, and actions, future development under the General Plan Update would have a less than significant impact associated with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or the use of native wildlife nursery sites. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: Goal RM-1: Natural Resources. A community that conserves and protects its natural resources. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3: Biological Resource Protection. Preserve and enhance biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with state and federal resource agency requirements. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Findings Page 25 of 266 Policy RM-1.6: Native Vegetation. Conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1c: Work closely with the U.S. Army Corps of Engineers (ACOE), U.S. Fish and Wildlife Service (FWS), and the California Department of Fish and Wildlife (CDFW) during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d: Cooperate with the County of Riverside to develop and manage preserve areas within the urban landscape. During the review of development proposals, use the Western Riverside County MSHCP Habitat Conservation Plan (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Action RM-1j: Where feasible, vegetation and tree removal should occur outside of the bird nesting season (February 1 to August 31). If not feasible, the project applicant shall retain a qualified biologist to conduct a nesting bird survey no more than three days prior to the commencement of construction activities. The biologist conducting the clearance survey shall document the negative results if no active bird nests are observed on the project site or within the vicinity during the clearance survey with a brief letter report, submitted to the City of San Jacinto Community Development Department prior to construction, indicating that no impacts to active bird nests would occur before construction can proceed. If an active avian nest is discovered during the pre-construction clearance survey, construction activities shall stay outside a 300-foot buffer around the active nest. For listed and raptor species, this buffer shall be 500 feet. A biological monitor shall be present to delineate the boundaries of the buffer area and to monitor the active nest to ensure the nesting behavior is not adversely affected by construction activity, pursuant to the Migratory Bird Treaty Act (MBTA). Prior to the commencement of construction activities and the issuance of any permits, results of the pre-construction survey and any subsequent monitoring shall be provided to the City of San Jacinto Community Development Department, California Department of Fish and Wildlife (CDFW), and other appropriate agencies. 3. Local Policies and Ordinances Threshold: Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? Finding: Less than significant. (Draft EIR, Impact BIO-5, page 5.4-38 through 5.4- 40) Findings Page 26 of 266 Explanation: Future development under the General Plan Update would be subject to all applicable federal, State, regional, and local policies and regulations related to the protection of biological resources. The City does not have a tree preservation policy or ordinance; however, San Jacinto Municipal Code Chapter 12.20 addresses the City’s tree planting and street improvement plan and requires authorization for the removal of trees in public parks, public grounds, public streets or parking places in the City. In addition, the General Plan Resource Management Element includes policies and actions intended to protect biological resources. Policy RM-1.3 preserves and enhances biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with State and federal resource agency requirements. Policy RM-1.4 addresses regional cooperation by recognizing areas of overlapping jurisdiction with respect to open space and biological resources, such as the MSHCP, and coordinating the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Action RM-1c directs the City to work closely with the USACE, USFWS, and the CDFW during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. During the review of development proposals, the City would use the MSHCP (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Future development projects would be assessed for consistency with the San Jacinto Municipal Code and General Plan Update goals, policies, and actions. Thus, the General Plan Update would not conflict with any local policies or ordinances protecting biological resources and impacts would be less than significant tin this regard. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-1: Natural Resources. A community that conserves and protects its natural resources. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3: Biological Resource Protection. Preserve and enhance biological Findings Page 27 of 266 communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with state and federal resource agency requirements. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6: Native Vegetation. Conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1c: Work closely with the U.S. Army Corps of Engineers (ACOE), U.S. Fish and Wildlife Service (FWS), and the California Department of Fish and Wildlife (CDFW) during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d: Cooperate with the County of Riverside to develop and manage preserve areas within the urban landscape. During the review of development proposals, use the Western Riverside County MSHCP Habitat Conservation Plan (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. 4. Habitat Conservation Plans Threshold: Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? Finding: Less than significant. (Draft EIR, Impact BIO-6, pages 5.4-40 through 5.4- 42) Explanation: There are two Habitat Conservation Plans/Natural Community Conservation Plans within the Study Area: the Stephens’ Kangaroo Rat Habitat Conservation Plan and the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP). The northeastern portion of the Study Area, within the City of San Jacinto’s SOI, lies within the Stephens’ Kangaroo Rat Fee Area. The portion of the Findings Page 28 of 266 Study Area within the Stephens’ Kangaroo Rat Fee Area is located within unincorporated Riverside County. The General Plan Update designates the area within the Stephens’ Kangaroo Rat Fee Area as Open Space. The General Plan Update is in conformance with the Stephens’ Kangaroo Rat Habitat Conservation Plan, as evidenced by the area remaining as Open Space in the Potrero ACEC Reserve area, as designated by the Habitat Conservation Plan. The Study Area lies within the Western Riverside County MSHCP. The General Plan Update has been designed to direct future development and redevelopment to areas that are already developed or designated for development, and would maintain 6,189 acres of existing Open Space areas in the San Jacinto Mountain foothills in the northeast and Lakeview Mountains in the western portion of the Study Area. Focusing development and redevelopment within areas that consist primarily of developed and/or disturbed land would minimize conflicts with the MSHCP. However, future development and redevelopment may include future projects within MSHCP Conserved Lands, Criteria Cells, and Public/Quasi Public Lands. Such future development would be required to undergo project-specific environmental and design review to determine whether the project would be consistent with the MSHCP. Additionally, the General Plan Update includes goals, policies, and actions that would maintain, protect, and preserve biologically significant habitats where practical, which would serve to maintain consistency with the MSHCP. Policy RM-1.3 preserves and enhances biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with State and federal resource agency requirements. Policy RM-1.4 addresses regional cooperation by recognizing areas of overlapping jurisdiction with respect to open space and biological resources, such as the MSHCP, and coordinating the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Action RM-1c directs the City to work closely with the USACE, USFWS, and the CDFW during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d directs City to cooperate with the County to develop and manage preserve areas within the urban landscape. During the review of development proposals, the City would use the MSHCP (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. As such, implementation Findings Page 29 of 266 of the General Plan Update would not conflict with the provisions of the Western Riverside County MSHCP, Stephens’ Kangaroo Rat Habitat Conservation Plan, or other approved local, regional, or State habitat conservation plan and impacts would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-1: Natural Resources. A community that conserves and protects its natural resources. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3: Biological Resource Protection. Preserve and enhance biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with state and federal resource agency requirements. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6: Native Vegetation. Conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1c: Work closely with the U.S. Army Corps of Engineers (ACOE), U.S. Fish and Wildlife Service (FWS), and the California Department of Fish and Wildlife (CDFW) during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d: Cooperate with the County of Riverside to develop and manage preserve areas within the urban landscape. During the review of development proposals, use the Western Riverside County MSHCP Habitat Conservation Plan (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Findings Page 30 of 266 E. CULTURAL RESOURCES 1. Historical Resources Threshold: Would the project cause a substantial adverse change in the significance of a historical resource pursuant to State CEQA Guidelines, § 15064.5? Finding: Less than significant. (Draft EIR, Impact CUL-1, pages 5.5-24 through 5.5- 26) Explanation: There are 152 recorded historic built environment resources throughout the Study Area. These historic resources are scattered throughout the Study Area and vary in terms of type, architectural style, condition, and alteration history. While the General Plan Update does not directly propose any changes to any historic resources, future development allowed under the General Plan Update could cause a substantial adverse change in the significance of known historical resources or unknown historical resources which have not yet been identified. The General Plan Update Resource Management Element includes goals, policies, and actions addressing heritage resources, including historical resources. Policy RM-3.1 protects areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Code. Policy RM- 3.6 identifies, designates, and protects buildings, districts, and sites of historic importance within San Jacinto. Policy RM-3.7 identifies funding programs to assist private property owners in the preservation of historic resources. Action RM-3a ensures the City would continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to CEQA. Action RM-3b requires that, for structures that potentially have historic significance, a study be conducted by a professional archaeologist or historian to determine the actual significance of the structure and potential impacts of the proposed development in accordance with CEQA Guidelines Section 15064.5. The City may require modification of the project and/or mitigation measures to avoid any impact to a historic structure, when feasible, such as retaining or rehabilitating historic buildings pursuant to City guidelines or relocating the historic building as feasible. Action RM- 3m directs the City to develop and implement architectural standards and historical preservation guidelines for development and redevelopment in the Downtown Village area of the community. Action RM-3n directs the City to develop and implement programs and/or incentives to private property owners to help preserve, restore, or reuse historic structures while enhancing their historical significance and integrity. Action RM-3o directs the City to conduct a historic properties inventory that takes into consideration buildings, neighborhoods, and other features of historic, architectural, or cultural significance. Findings Page 31 of 266 As future development and infrastructure projects are considered by the City, each project would be evaluated for conformance with the City’s General Plan, Municipal Code, and other applicable State and local regulations relative to historic and potentially historic resources. Subsequent development and infrastructure projects would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA, pursuant to the City’s entitlement review process. Per SJDC Chapter 17.510, potential historic resources may be considered for a Historic Resource designation by the City, and would require a permit to restore, rehabilitate, alter, develop, construct, demolish, remove, or change the appearance of. Further, for structures that potentially have historical significance, the City would require preparation of a study by a qualified professional archaeologist or historian to determine the significance of the structure and potential impacts of the proposed development in compliance with CEQA. Therefore, compliance with the General Plan Update policies and actions and existing regulations, would not cause a substantial adverse change in the significance of a historical resource and impacts would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-3: Heritage Resources. A community that celebrates and preserves its rich culture and historic assets. Policy RM-3.1: Preservation. Protect areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Code. Policy RM-3.2: Cultural Reminders. Seek to incorporate reminders of San Jacinto’s culture in the built and natural environment through adaptive reuse, signage, markers, and other reminders of San Jacinto’s heritage. Policy RM-3.3: Public Education. Educate and actively involve the public in preserving cultural assets, including techniques, incentives, and legal requirements for preservation. Policy RM-3.6: Historic Preservation. Identify, designate, and protect buildings, districts, and sites of historic importance within San Jacinto. Policy RM-3.7: Funding. Identify funding programs to assist private property owners in the preservation of historic resources. Action RM-3a: Continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to the California Environmental Quality Act (CEQA). Findings Page 32 of 266 Action RM-3b: For structures that potentially have historic significance, the City shall require that a study be conducted by a professional archaeologist or historian to determine the actual significance of the structure and potential impacts of the proposed development in accordance with CEQA Guidelines Section 15064.5. The City may require modification of the project and/or mitigation measures to avoid any impact to a historic structure, when feasible, such as retaining or rehabilitating historic buildings pursuant to City of San Jacinto guidelines or relocating the historic building as feasible. Action RM-3k: Promote public awareness and encourage tourism in the City by actively identifying and enhancing the community’s historic resources through the location of historic landmark plaques and a Historic Tour Guide. Promote tours of these sites on the City’s and other organization’s websites. Action RM-3l: Continue to support the improvement and enhancement of the Estudillo Mansion and expand opportunities for public access and use of the historic treasure. Action RM-3m: Develop and implement architectural standards and historical preservation guidelines for development and redevelopment in the Downtown Village area of the community. Use housing and façade rehabilitation programs to support development and redevelopment activities that preserve and complement historic structures and resources in the downtown. Action RM-3n: Develop and implement programs and/or incentives to private property owners to help preserve, restore, or reuse historic structures while enhancing their historical significance and integrity. Action RM-3o: Conduct a historic properties inventory that takes into consideration buildings, neighborhoods, and other features of historic, architectural, or cultural significance. 2. Archeological Resources Threshold: Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5? Finding: Less than significant. (Draft EIR, Impact CUL-2, pages 5.5-26 through 5.5- 28) Explanation: The EIC record search identified a total of 80 archaeological resources within the Study Area, including 49 prehistoric archaeological sites, seven prehistoric isolates, three multicomponent sites, 20 historic archaeological sites, and one historic isolate. Effects on archaeological resources deemed to be significant could be considered adverse if they involve physical demolition, destruction, or alteration of the resource or its immediate surroundings such that the significance of a resource would be materially impaired. While the General Plan Update does not directly propose site- specific development with the potential to directly impact archaeological Findings Page 33 of 266 resources, future development allowed under the General Plan Update could cause a substantial adverse change in the significance of known or unknown archaeological resources. The General Plan Update Resource Management Element includes goals, policies, and actions addressing heritage resources, including archaeological resources. Policy RM-3.1 protects areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Code. Action RM-3a ensures the City would continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to CEQA. Action RM-3c requires, for all development proposals within areas with the potential to contain prehistoric/historic resources, a study to be conducted by a professional archaeologist. The objective of the study will be to determine if significant archaeological resources are potentially present and if the project will significantly impact these resources. If significant impacts are identified, the City may require the project to be modified to avoid the impacts, or require mitigation measures to mitigate the impacts. Mitigation may involve archaeological investigation and resources recovery. Action RM-3f directs the City to make provisions for archeological resources accidentally discovered during construction for projects where the City has approval authority over the project. These provisions shall include an immediate evaluation of the find and contingency funding and time allotment sufficient to allow for the recovery of the archeological resource or implement measures to avoid disturbing the resource if the archeological resource is determined to be unique. Action RM-3o directs the City to conduct a historic properties inventory that takes into consideration buildings, neighborhoods, and other features of historic, architectural, or cultural significance. Archaeological resources are protected under federal, State, and local regulations and implementation of General Plan Update policies and actions would reduce potential adverse impacts to archaeological resources associated with future development. Subsequent development and infrastructure projects would be analyzed for potential environmental impacts, consistent with the requirements of CEQA, pursuant to the City’s entitlement review process. SJDC Chapter 17.500 is intended to protect archaeological resources and requires a resource assessment be conducted with specific areas having been identified as having the potential for archaeological resources. SJDC Chapter 17.500 establishes the procedures for the resource assessment, including the potential for a resource to be impacted and requirements if significant impacts are identified. Compliance with the General Plan Update policies and actions and existing regulations would not cause a substantial adverse change in the significance of an archaeological resource and impacts would be less than significant. Findings Page 34 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-3: Heritage Resources. A community that celebrates and preserves its rich culture and historic assets. Policy RM-3.1: Preservation. Protect areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Code. Policy RM-3.3: Public Education. Educate and actively involve the public in preserving cultural assets, including techniques, incentives, and legal requirements for preservation. Action RM-3a: Continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to the California Environmental Quality Act (CEQA). Action RM-3c: For all development proposals within areas with the potential to contain prehistoric/historic resources, the City shall require a study to be conducted by a professional archaeologist. The objective of the study will be to determine if significant archaeological resources are potentially present and if the project will significantly impact these resources. If significant impacts are identified, the City may require the project to be modified to avoid the impacts, or require mitigation measures to mitigate the impacts. Mitigation may involve archaeological investigation and resources recovery. Action RM-3f: The City shall make provisions for archeological resources accidentally discovered during construction for projects where the City has approval authority over the project. These provisions shall include an immediate evaluation of the find and contingency funding and time allotment sufficient to allow for the recovery of the archeological resource or implement measures to avoid disturbing the resource if the archeological resource is determined to be unique. Action RM-3o: Conduct a historic properties inventory that takes into consideration buildings, neighborhoods, and other features of historic, architectural, or cultural significance. 3. Human Remains Threshold: Would the project disturb any human remains, including those interred outside of dedicated cemeteries? Finding: Less than significant. (Draft EIR, Impact CUL-3, pages 5.5-28 through 5.5- 30) Explanation: Future construction projects within the Study Area could have the potential to disturb or destroy buried Native American human remains as well as other human remains, including those interred outside of formal cemeteries. Findings Page 35 of 266 As future development and infrastructure projects are considered by the City, each project would be evaluated for conformance with the City’s General Plan, Municipal Code, and other applicable State and local regulations. Subsequent development and infrastructure projects would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA. The General Plan Update Resource Management Element includes actions addressing the potential discovery of human remains. Action RM-3a directs the City to continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to CEQA. Action RM-3d establishes that, in the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, the City shall halt excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the County Coroner has been informed and has determined that no investigation of the cause of death is required. If the remains are of Native American origin, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the descendants from the deceased Native Americans have made a recommendation to the landowner or the persons responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code section 5097.98, or the Native American Heritage Commission was unable to identify a descendant or the descendant failed to make a recommendation within 24 hours after being granted access to the site. Subsequent development and infrastructure projects would be analyzed for potential environmental impacts, consistent with the requirements of CEQA, pursuant to the City’s entitlement review process. SJDC Chapter 17.500 is intended to protect archaeological resources and addresses the potential for inadvertent discovery of human remains consistent with Public Resources Code 5097.98 Compliance with the General Plan Update policies and actions and existing regulations, including Health and Safety Code Section 7050.5, CEQA Guidelines Section 15064.5(e), and PRC Section 5097.98, would ensure that potential impacts associated with the inadvertent discovery of human remains would be reduced to less than significant GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-3: Heritage Resources. A community that celebrates and preserves its rich culture and historic assets. Policy RM-3.1: Preservation. Protect areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Code. Findings Page 36 of 266 Action RM-3a: Continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to the California Environmental Quality Act (CEQA). Action RM-3d: For projects that involve ground disturbing activities on native soil, prior to the issuance of a grading permit, the developer shall enter a Treatment and Disposition Agreement (TDA) with the Soboba Band of Luiseño Indians to address treatment and disposition of archaeological/cultural resources and human remains associated with Soboba Band of Luiseño Indians that may be uncovered or oth erwise discovered during construction of the project. The TDA may establish provisions for tribal monitors. Following execution of the TDA by the developer and Soboba Band of Luiseño Indians, the TDA will be incorporated by reference into the grading permit. Action RM-3g: In the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, the City shall halt excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the County Coroner has been informed and has determined that no investigation of the cause of death is required. If the remains are of Native American origin, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the descendants from the deceased Native Americans have made a recommendation to the landowner or the persons responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code section 5097.98, or the Native American Heritage Commission was unable to identify a descendant or the descendant failed to make a recommendation within 24 hours after being granted access to the site. F. ENERGY 1. Energy Threshold: Would the project result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation, or conflict with or obstruct a state or local plan for renewable energy or energy efficiency? Finding: Less than significant. (Draft EIR, Impact EN-1 pages 5.6-8 through 5.6-14) Explanation: Buildout of the General Plan Update would use energy resources for the operation of buildings (electricity and natural gas), for on-road vehicle trips (e.g., gasoline and diesel fuel), and from off-road construction activities (e.g. diesel fuel) associated with 2040 buildout of the General Plan Update. Each of these activities would require the use of energy resources. Developers of individual projects within the Study Area would be responsible for conserving energy, to the extent feasible, and would rely heavily on reducing per capita energy consumption to achieve this goal, including through Statewide and local measures. Buildout of the General Findings Page 37 of 266 Plan Update would be in compliance with all applicable federal, State, and local regulations regulating energy usage. The General Plan Update would not conflict with any applicable plan, policy, or regulation adopted for the purpose of reducing energy use or increasing the use of renewable energy. This is a less than significant impact in this regard. The General Plan Update includes policies and actions to support energy conservation and renewable energy, as well as reducing energy use. Policy MR-5.2 ensures compliance with all State requirements regarding generation of power and encourages energy providers to investigate the use or expansion of renewable sources of energy. Policy RM-5.3 promotes the development and use of renewable energy resources to reduce dependency on fossil fuels. Policy RM-5.4 promotes the use of energy-efficient materials, equipment, and design in public and private facilities and infrastructure. Policy RM-5.5 promotes energy conservation and recycling by the public and private sectors. Policy RM-5.8 promotes public education programs that advocate for reducing energy consumption, and promote renewable sources of energy. Action RM-5b implements energy conservation measures in public buildings by promoting energy efficient buildings and site design for all new public buildings during the site development permit process, as well as installing energy saving devices in new public buildings and retrofitting existing public buildings. Action RM- 5c uses the development review process to encourage innovative building design, layout, and orientation techniques to minimize energy use by taking advantage of sun/shade patterns, prevailing winds, landscaping and building materials that control energy usage, and solar design. Action RM-5e continues to review development projects to ensure that all new public and private development complies with the California Code of Regulations, Title 24 standards as well as the energy efficiency standards established by the General Plan and the Municipal Code. Action RM-5f promotes the CEC Building Energy Benchmarking Program on the City’s website to help benchmark and monitor energy use for participating businesses seeking to increase energy efficiency and realize cost savings. Action RM-5g encourages new development projects to install electrified space (HVAC) and water heating systems in lieu of natural gas systems, above and beyond the requirements of Title 24, before and during the building plan check process. Furthermore, connections exist between the Study Area and nearby pedestrian and bicycle pathways, and public transit access exists nearby, reducing the need for local motor vehicle travel. Although improvements to the City’s pedestrian, bicycle, and public transit systems would provide further opportunities for alternative transit, the Study Area would be linked closely with existing networks that, in large part, are sufficient for most residents of the Study Area and neighboring communities. As a result, the General Plan Update would not result in any significant adverse impacts related to Project energy requirements, energy use Findings Page 38 of 266 inefficiencies, and/or the energy intensiveness of materials by amount and fuel type for during General Plan Update buildout, including during construction, operations, maintenance, and/or removal. The City of San Jacinto would comply with all existing energy standards and would not result in significant adverse impacts on energy resources. Buildout of the General Plan Update would not be expected cause an inefficient, wasteful, or unnecessary use of energy resources nor conflict with or obstruct a State or local plan for renewable energy or energy efficiency. This is a less than significant impact. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-5: Energy and Mineral Resources. A community that safely manages its energy and mineral resources Policy RM-5.1: San Jacinto Power. Continue to make clean, modern, and cost-effective energy options available to individuals who live and work in San Jacinto. Policy RM-5.2: Compliance with State Legislation. Comply with all state requirements regarding the generation of power and encourage energy providers to investigate the use or expansion of renewable sources of energy. Policy RM-5.3: Renewable Energy. Promote the development and use of renewable energy resources to reduce dependency on fossil fuels. Policy RM-5.4: Energy-Efficient Materials. Promote the use of energy-efficient materials, equipment, and design in public and private facilities and infrastructure. Policy RM-5.5: Energy Conservation. Promote energy conservation and recycling by the public and private sectors. Policy RM-5.6: Energy Needs. Collaborate with local service providers in determining and meeting the needs of the community for energy in clean, modern, and cost-effective ways. Policy RM-5.7: Business Community. Support the decisions of the San Jacinto business community as they select and implement the most appropriate, financially feasible, and responsible energy source for their individual operations. Policy RM-5.8: Public Education. Promote public education programs that advocate for reducing energy consumption, and promote renewable sources of energy. Policy RM-5.9: Promote Energy Conservation in Existing Building Stock. Promote energy conservation by residents and businesses in existing structures, in close coordination with other agencies and local energy providers, including the SCAQMD and Southern California Edison. Findings Page 39 of 266 Action RM-5a: Continue to implement the City’s Community Choice Aggregation (CCA) program; evaluate the effectiveness of the program every five years to identify programmatic changes necessary to continue meeting the City’s objectives. Action RM-5b: Implement energy conservation measures in public buildings through the following actions:  Promote energy efficient buildings and site design for all new public buildings during the site development permit process; and  Install energy saving devices in new public buildings and retrofit existing public buildings. Action RM-5c: During the development review process, encourage innovative building design, layout, and orientation techniques to minimize energy use by taking advantage of sun/shade patterns, prevailing winds, landscaping and building materials that control energy usage, and solar design. Action RM-5d: Promote retrofit programs by the City to reduce energy usage and consequently reduce emissions from energy consumption. Encourage utility companies to provide informational literature about available retrofit programs at public facilities such as City Hall, the Community Center , and libraries. Action RM-5e: Continue to review development projects to ensure that all new public and private development complies with the California Code of Regulations, Title 24 standards as well as the energy efficiency standards established by the General Plan and the Municipal Code. Action RM-5f: Promote the CEC Building Energy Benchmarking Program (AB 802) on the City’s website to help benchmark and monitor energy use for participating businesses seeking to increase energy efficiency and realize cost savings. Action RM-5g: Encourage new development projects to install electrified space (HVAC) and water heating systems in lieu of natural gas systems, above and beyond the requirements of Title 24, before and during the building plan check process. Action RM-5h: During the development review process, require that all new developments adjacent to or near natural gas lines, coordinate with So Cal Gas to install and connect to the lines, as feasible. Action RM-5i: Advertise the San Jacinto Power PureGreen program and encourage San Jacinto Power customers to enroll in the program and opt-up to 100 percent renewable energy content. Findings Page 40 of 266 G. GEOLOGY AND SOILS 1. Seismic Hazards Threshold: Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, strong seismic ground shaking, seismic-related ground failure, including liquefaction, or landslides? Finding: Less than significant. (Draft EIR, Impact GS-1 pages 5.7-20 through 5.7- 23) Explanation: The Study Area is situated within a seismically active region, specifically within the San Jacinto fault zone. The Alquist-Priolo fault zone runs two parallel tracks through the City; one fault runs through the western portion of the City, and one fault runs through the Sphere of Influence in the eastern portion of the Study Area. Any development within an Alquist-Priolo fault zone would be required to comply with regulatory requirements of the State of California Alquist-Priolo Earthquake Fault Zoning Act, which requires any proposed development to prepare a geologic report to address the potential for surface fault displacement within the Project site. Future development projects would be required to comply with the provisions of the California Building Standards Code (CBSC), which requires development projects to: perform geotechnical investigations in accordance with State law, engineer improvements to address potential seismic and ground failure issues, and use earthquake-resistant construction techniques to address potential earthquake loads when constructing buildings and improvements. As future development and infrastructure projects are considered by the City, each project will be evaluated for conformance with the CBSC, General Plan, San Jacinto Municipal Code, and other regulations. Subsequent development and infrastructure would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA. In addition to the requirements associated with the CBSC and the Municipal Code, the General Plan includes policies and actions in both the Public Safety Element and Resource Management Element to address potential impacts associated with seismic activity. For example, Policy PS-1 requires the maintenance of the City’s geologic and seismic hazards map (Figure PS-1 in the Public Safety Element). Policy PS 1.2 requires the enforcement of the State’s seismic design guidelines and all relevant building codes in order to reduce the risk of damage associated with seismic activity. Policy PS-1.5 requires the assessment and mitigation of hazards related to liquefaction, landslides, and flooding for new development projects or City improvement projects that are identified by the City as susceptible to these hazards. The Resource Management Element includes Action RM-1g, to ensure proper geotechnical and soil management techniques are implemented during the development review process. Findings Page 41 of 266 Development projects are reviewed to address seismic safety issues and would be required to provide adequate mitigation for existing and potential hazards identified. With the implementation of the policies and actions in the General Plan, as well as applicable State and City codes, potential impacts associated with a seismic event, including rupture of an earthquake fault, seismic ground shaking, liquefaction, and landslides would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-1: Seismic and Geologic Hazards: A community that is adequately prepared for natural hazards related to landslides, geologic instability, and seismic activity. Policy PS-1.1: Geologic Hazard Identification. Maintain the City’s geologic and seismic hazards map (Figure PS-1) in concert with updates from the California Geologic Survey and local surveys, and update as appropriate. Policy PS-1.2: Earthquake Protection. Enforce State seismic design guidelines and all relevant building codes to reduce the risk of damage associated with seismic activity. Policy PS-1.3: Fault Zones. Encourage landscaped open space uses for areas within identified fault zones and limit the development of new sensitive uses in these areas. Policy PS-1.4: Liquefaction. Require site-specific studies in areas subject to liquefaction to determine the nature and extent of potential liquefaction and to identify engineering and development siting measures to permit development to occur safely. Policy PS-1.5: Development. Require assessment and mitigation of hazards related to liquefaction, landslides, and flooding for new development projects or City improvement projects that are identified by the City as susceptible to these hazards. Policy PS-1.6: Impact Reduction. Reduce the risk of impacts from geologic and seismic hazards by applying proper and up to date land use planning, development engineering, building construction, and retrofitting requirements. Policy PS-1.8: Critical Facilities. Require new critical infrastructure and facilities that may be built in the City to incorporate site specific seismic structural design as required by applicable building codes. Action PS-1a: Review development proposals to ensure compliance with California Health and Safety Code Section 19100 et seq. (Earthquake Protection Law), which requires that buildings be designed to resist stresses produced by natural forces such as earthquakes and wind. Action PS-1b: Update building, zoning, and grading codes as needed to ensure adopted standards mitigate potential seismic hazards and comply with the Alquist-Priolo Act and Findings Page 42 of 266 Unreinforced Masonry Law. Action PS-1d: Reduce the risk to the community from hazards related to geologic conditions, seismic activity, flooding, and wildfires by requiring feasible mitigation of such impacts on development projects. Assess development proposals for potential hazards pursuant to the California Environmental Quality Act. Require measures to mitigate all identified significant public safety hazards. Action PS-1e: Where the threat from natural hazards (such as fault rupture or flooding) cannot be mitigated, use open space easements and other regulatory techniques to prohibit development and avoid public safety hazards. Where feasible, permit the joint-use of preserve areas and easements such as seismic faults and drainage basins for open space and recreational uses. Action PS-1f: To minimize damage from earthquakes and other geologic activity, adopt and implement the most recent State seismic requirements for structural design of new development and redevelopment. Action PS-1g: During review of discretionary development and redevelopment proposals, require surveys of soil and geologic conditions by State licensed Engineering Geologists and Civil Engineers where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the geologic survey. RESOURCE MANAGEMENT ELEMENT Action RM-1g: Where feasible, incorporate open space and passive recreational uses into areas identified to have significant hazards related to flooding, geologic conditions, and seismic events. 2. Soil Erosion Threshold: Would the project result in substantial soil erosion or the loss of topsoil? Finding: Less than significant. (Draft EIR, Impact GS-2, pages 5.7-23 through 5.67- 24) Explanation: Implementation of the General Plan Update would provide for development and improvement projects that would involve some land clearing, mass grading, and other ground-disturbing activities that could temporarily increase soil erosion rates during and shortly after project construction. Construction-related erosion could result in the loss of a substantial amount of nonrenewable topsoil and could adversely affect water quality in nearby surface waters. As future development and infrastructure projects are considered by the City, each project would be evaluated for conformance with the CBSC, General Plan, San Jacinto Municipal Code, and other regulations. In compliance with NPDES Permit regulations, the State of Findings Page 43 of 266 California requires that any construction activity disturbing one acre or more of soil comply with the Construction General Permit. The permit requires development and implementation of a SWPPP and monitoring plan, which must include erosion-control and sediment-control BMPs that would meet or exceed measures required by the Construction General Permit to control stormwater quality degradation due to potential construction-related pollutants. The General Plan Update includes a range of policies and actions related to best management practices, NPDES requirements, and minimizing discharge of materials (including eroded soils) into the storm drain system in the proposed Public Safety Element and Resource Management Element. For example, Action PS-1g requires that during the review of discretionary development and redevelopment proposals, licensed soil and geologic conditions surveys are required by the State, and when potential geologic impacts are identified, mitigation efforts are required. Action RM-1f ensures proper geotechnical and soil management techniques are implemented. Action RM-2a requires new development and redevelopment projects to control stormwater runoff through implementation of BMPs. With the implementation of the policies and actions in the General Plan Update, as well as applicable State and City requirements, potential impacts associated with erosion and loss of topsoil would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Action PS-1g: During review of discretionary development and redevelopment proposals, require surveys of soil and geologic conditions by State licensed Engineering Geologists and Civil Engineers where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the geologic survey. RESOURCE MANAGEMENT ELEMENT Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the survey. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through Findings Page 44 of 266 implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). 3. Unstable Soils Threshold: Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? Finding: Less than significant (Draft EIR, Impact GS-3, pages 5.7-24 through 5.7- 28) Explanation: Future development anticipated by the General Plan Update could result in the exposure of people and structures to conditions that have the potential for adverse effects associated with ground instability or failure. Soils and geologic conditions in the Study Area have the potential for landslides, lateral spreading, subsidence, liquefaction, or collapse. The General Plan Update Land Use, Public Safety and Resource Management elements include policies and actions to address geologic conditions within the Study Area. For example, Policy LU-3.4 limits development in areas subject to severe natural hazards, such as landslides, ground subsidence, liquefaction, and flooding. Policy PS-1 requires the maintenance of the City’s geologic and seismic hazards map (Figure PS-1 in the Public Safety Element). Policy PS 1.2 requires the enforcement of the State’s seismic design guidelines and all relevant building codes in order to reduce the risk of damage associated with seismic activity. Policy PS-1.5 requires the assessment and mitigation of hazards related to liquefaction, landslides, and flooding for new development projects or City improvement projects that are identified by the City as susceptible to these hazards. The Resource Management Element includes Action RM-1g, to ensure proper geotechnical and soil management techniques are implemented during the development review process. As future development and infrastructure projects are considered by the City of San Jacinto, each project would be evaluated for conformance with the CBSC, the General Plan Update policies and actions, San Jacinto Municipal Code, and other regulations. Subsequent development and infrastructure projects would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA. Future development Findings Page 45 of 266 and improvement projects would be required to prepare site-specific geotechnical studies to identify geologic and soil conditions specific to the site and provide design recommendations consistent with the requirements of State and City codes. Implementation of CBSC and the Municipal Code requirements related to seismic and geologic conditions and the General Plan Update policies and actions would ensure that future development projects are evaluated for potential geologic and seismic risks and that potential risks are adequately addressed. With the implementation of the policies and actions in the General Plan Update, as well as applicable State and City codes, potential impacts associated with unstable geologic conditions with the potential to result in landslide, lateral spreading, subsidence, liquefaction or collapse would be reduced to less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Goal LU-3: Land Use Compatibility. A community that promotes high-quality development and compatibility with surrounding land uses and major transportation corridors. Policy LU-3.4: Environmental Compatibility. Limit development in areas subject to severe natural hazards, such as landslides, ground subsidence, liquefaction, and flooding. Action LU-3a: Ensure all projects are reviewed and processed per California Environmental Quality Act (CEQA) Guidelines. PUBLIC SAFETY ELEMENT Goal PS-1: Seismic and Geologic Hazards. A community that is adequately prepared for natural hazards related to landslides, geologic instability, and seismic activity. Policy PS-1.1: Geologic Hazard Identification. Maintain the City’s geologic and seismic hazards map (Figure PS-1) in concert with updates from the California Geologic Survey and local surveys, and update as appropriate. Policy PS-1.2: Earthquake Protection. Enforce State seismic design guidelines and all relevant building codes to reduce the risk of damage associated with seismic activity. Policy PS-1.3: Fault Zones. Encourage landscaped open space uses for areas within identified fault zones and limit the development of new sensitive uses in these areas. Policy PS-1.4: Liquefaction. Require site-specific studies in areas subject to liquefaction to determine the nature and extent of potential liquefaction and to identify engineering and development siting measures to permit development to occur safely. Policy PS-1.5: Development. Require assessment and mitigation of hazards related to Findings Page 46 of 266 liquefaction, landslides, and flooding for new development projects or City improvement projects that are identified by the City as susceptible to these hazards. Policy PS-1.6: Impact Reduction. Reduce the risk of impacts from geologic and seismic hazards by applying proper and up to date land use planning, development engineering, building construction, and retrofitting requirements. Policy PS-1.7: Risk Inventories. Maintain an updated inventory of public buildings and infrastructure within the City of San Jacinto at risk of seismic and geologic hazard impacts and regularly evaluate potential mitigation projects to address risks, as financially feasible. Policy PS-1.8: Critical Facilities. Require new critical infrastructure and facilities that may be built in the City to incorporate site specific seismic structural design as required by applicable building codes. Action PS-1a: Review development proposals to ensure compliance with California Health and Safety Code Section 19100 et seq. (Earthquake Protection Law), which requires that buildings be designed to resist stresses produced by natural forces such as earthquakes and wind. Action PS-1b: Update building, zoning, and grading codes as needed to ensure adopted standards mitigate potential seismic hazards and comply with the Alquist-Priolo Act and Unreinforced Masonry Law Action PS-1d: Reduce the risk to the community from hazards related to geologic conditions, seismic activity, flooding, and wildfires by requiring feasible mitigation of such impacts on development projects. Assess development proposals for potential hazards pursuant to the California Environmental Quality Act. Require measures to mitigate all identified significant public safety hazards. Action PS-1e: Where the threat from natural hazards (such as fault rupture or flooding) cannot be mitigated, use open space easements and other regulatory techniques to prohibit development and avoid public safety hazards. Where feasible, permit the joint-use of preserve areas and easements such as seismic faults and drainage basins for open space and recreational uses. Action PS-1f: To minimize damage from earthquakes and other geologic activity, adopt and implement the most recent State seismic requirements for structural design of new development and redevelopment. RESOURCE MANAGEMENT ELEMENT Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the Findings Page 47 of 266 recommendations contained within the survey. Action RM-1g: Where feasible, incorporate open space and passive recreational uses into areas identified to have significant hazards related to flooding, geologic conditions, and seismic events Goal RM-2: Water Resources: A community that protects and conserves limited water resources Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). 4. Expansive Soils Threshold: Would the project be located on expansive soil, as defined in Tables 18-1- D of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Finding: Less than significant. (Draft EIR, Impact GS-4, pages 5.7-28 through 5.7- 31) Explanation: The majority of the Study Area has low expansive soils, including most of the developed land. The areas with high expansive soils represent only a very small portion of the Study Area and would require special design considerations due to shrink-swell potentials. The Public Safety Element and Resource Management Element of the General Plan Update includes policies and actions that are designed to protect from geologic hazards, including expansive soils. Goal PS-1, Seismic and Geologic Hazards and Goal PS-3, Flood Hazards, contain policies and actions that limit potential hazards created by expansive soils. Further, the Resource Management Element goals, policies, and actions, pertaining to native vegetation and water resource conservation; healthy soil and vegetation and water sources help to prevent dangers originating from expansive soil situations. As future development and infrastructure projects are considered by the City, each project would be evaluated for conformance with the CBSC, General Plan policies and actions, San Jacinto Municipal Code, and other applicable Findings Page 48 of 266 regulations. Subsequent development and infrastructure projects would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA. As required by the CBSC, a site-specific geotechnical investigation would identify the potential for damage related to expansive soils and non- uniformly compacted fill and engineered fill. If a risk is identified, design criteria and specification options may include removal of the problematic soils, and replacement, as needed, with properly conditioned and compacted fill material that is designed to withstand the forces exerted during the expected shrink-swell cycles and settlements. Design criteria and specifications set forth in the design-level geotechnical investigation would ensure impacts from problematic soils are minimized. There are no additional significant adverse environmental impacts, apart from those disclosed in the relevant chapters of this Draft EIR, that are anticipated to occur associated with expansive soils. Therefore, this impact is considered less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-1: Seismic and Geologic Hazards: A community that is adequately prepared for natural hazards related to landslides, geologic instability, and seismic activity Policy PS-1.1: Geologic Hazard Identification. Maintain the City’s geologic and seismic hazards map (Figure PS-1) in concert with updates from the California Geologic Survey and local surveys, and update as appropriate Policy PS-1.3: Fault Zones. Encourage landscaped open space uses for areas within identified fault zones and limit the development of new sensitive uses in these areas Policy PS-1.4: Liquefaction. Require site-specific studies in areas subject to liquefaction to determine the nature and extent of potential liquefaction and to identify engineering and development siting measures to permit development to occur safely. Policy PS-1.5: Development. Require assessment and mitigation of hazards related to liquefaction, landslides, and flooding for new development projects or City improvement projects that are identified by the City as susceptible to these hazards Policy PS-1.6: Impact Reduction. Reduce the risk of impacts from geologic and seismic hazards by applying proper and up to date land use planning, development engineering, building construction, and retrofitting requirements. Policy PS-1.7: Risk Inventories. Maintain an updated inventory of public buildings and infrastructure within the City of San Jacinto at risk of seismic and geologic hazard impacts and regularly evaluate potential mitigation projects to address risks, as financially feasible Findings Page 49 of 266 Policy PS-1.8: Critical Facilities. Require new critical infrastructure and facilities that may be built in the City to incorporate site specific seismic structural design as required by applicable building codes Action PS-1a: Review development proposals to ensure compliance with California Health and Safety Code Section 19100 et seq. (Earthquake Protection Law), which requires that buildings be designed to resist stresses produced by natural forces such as earthquakes and wind. Action PS-1b: Update building, zoning, and grading codes as needed to ensure adopted standards mitigate potential seismic hazards and comply with the Alquist-Priolo Act and Unreinforced Masonry Law. Action PS-1d: Reduce the risk to the community from hazards related to geologic conditions, seismic activity, flooding, and wildfires by requiring feasible mitigation of such impacts on development projects. Assess development proposals for potential hazards pursuant to the California Environmental Quality Act. Require measures to mitigate all identified significant public safety hazards. Action PS-1e: Where the threat from natural hazards (such as fault rupture or flooding) cannot be mitigated, use open space easements and other regulatory techniques to prohibit development and avoid public safety hazards. Where feasible, permit the joint-use of preserve areas and easements such as seismic faults and drainage basins for open space and recreational uses. Action PS-1f: To minimize damage from earthquakes and other geologic activity, adopt and implement the most recent State seismic requirements for structural design of new development and redevelopment. Action PS-1a: Review development proposals to ensure compliance with California Health and Safety Code Section 19100 et seq. (Earthquake Protection Law), which requires that buildings be designed to resist stresses produced by natural forces such as earthquakes and wind. Goal PS-3: Flood Hazards. A community that is protected from flood hazards. Policy PS-3.6: Building Codes. Adhere to the latest building, site, and design codes in the California Building Code and FEMA flood control guidelines to avoid or minimize the risk of flooding hazards in the community. Policy PS-3.11: Mitigation. Require that all new development and redevelopment in areas susceptible to flooding incorporate mitigation measures designed to reduce flood hazards. Action PS-3b: Review projects for project-related flood control and stormwater management impacts to ensure that all proposed development comply with the City’s MS4 permit. Findings Page 50 of 266 RESOURCE MANAGEMENT ELEMENT Goal RM-1: Natural Resources. A community that conserves and protects its natural resources Policy RM-1.6: Native Vegetation. Conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the survey. Goal RM-2: Water Resources. A community that protects and conserves limited water resources Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Action RM-2f: Whenever feasible, incorporate improved open space and preservation areas and quasi-active recreation facilities in areas used for ground water recharge and/or drainage detention. 5. Septic Tanks Threshold: Would the project have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? Finding: Less than significant. (Draft EIR, Impact GS-5, pages 5.7-31 through 5.7- 33) Explanation: The City of San Jacinto sewer system service area covers the vast majority of area within the City’s municipal boundaries. The areas within the Study Area from which the City does not collect wastewater are served either by septic systems, provided by Eastern Municipal Water District (EMWD), or by the Lake Hemet Municipal Water District (LHMWD). Because of varying soil characteristics and depths to groundwater throughout the Study Area, some areas may have moderate to severe limitations on the use of septic tanks or alternative wastewater disposal systems. To the extent that Findings Page 51 of 266 future development under the General Plan Update would occur in such areas, there is the potential for effects to soils that cannot adequately support the use of septic tanks or alternative wastewater disposal systems. However, any individual project which would have a septic system would be required to comply with the CSBC, which requires development projects to perform geotechnical investigations in accordance with State law to determine that on-site soil conditions are suitable for a septic system. Additionally, future developments proposing a septic system must also comply with the RWQCB Basin Plan and the Riverside County Department of Health requirements. The Resource Management and Public Safety Elements of the General Plan Update include Action RM-1f, and Action PS-1g, which ensure that proper geotechnical and soil management surveys and techniques are implemented in order to reduce the likelihood of soils that are incapable of adequately supporting septic tanks be developed on. Further, Policy RM-2.6 discourages the use of septic systems to reduce potential negative impacts to groundwater. As future development and infrastructure projects are considered by the City of San Jacinto, each project would be evaluated for conformance with the CBSC, the General Plan policies and actions, San Jacinto Municipal Code, and other regulations. Subsequent development and infrastructure projects would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA. Future development and improvement projects would be required to prepare a site-specific geotechnical study to identify geologic and soil conditions specific to the site and provide design recommendations consistent with the requirements of State and City codes. Implementation of CBSC and the Municipal Code requirements related to seismic and geologic conditions and General Plan Update policies and actions would ensure that future development projects are evaluated for potential geologic and seismic risks and that potential risks are adequately addressed. With the implementation of the policies and actions in the General Plan Update, as well as applicable State and City codes, potential impacts associated with having soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems would be less than significant GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-1: Seismic and Geologic Hazards. A community that is adequately prepared for natural hazards related to landslides, geologic instability, and seismic activity. Action PS-1g: During review of discretionary development and redevelopment proposals, require surveys of soil and geologic conditions by State licensed Engineering Geologists and Civil Engineers where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained Findings Page 52 of 266 within the geologic survey. RESOURCE MANAGEMENT ELEMENT Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the survey. Policy RM-2.6: Septic Systems. Discourage the use of septic systems to reduce potential negative impacts to groundwater. Action RM-2e: Through the development review process, require that sufficient water supply and water infrastructure capacity is available to serve the development prior to approval of the project, pursuant to Water Code Section 10910 and Government Code Section 66473.7. Action RM-2h: Continue to encourage the conversion from existing septic systems to sewer by limiting the replacement or expansion/repair of existing septic systems as feasible. 6. Paleontological Resources Threshold: Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Finding: Less than significant. (Draft EIR, Impact GS-6, pages 5.7-33 through 5.7- 35) Explanation: Only qualified, trained paleontologists with specific expertise in the type of fossils being evaluated can determine the scientific significance of paleontological resources. No geologic units in the Study Area are assigned a very high sensitivity. However, the following geologic units within the Study Area are assigned a high sensitivity: Mount Eden Formation at surface, Bautista Formation at surface, Older Surficial Sediments at surface, and Surficial Sediments at depth. Further, paleontological resources have been discovered within the Study Area. Therefore, it is possible that undiscovered paleontological resources could be encountered during ground-disturbing activities. The General Plan Update Resource Management Element includes policies and actions to protect significant paleontological resources within the Study Area. Policy RM-3.1 protects areas containing significant historic, archaeological, and paleontological resources, as defined by the California Public Resources Code. Action RM- 3a ensures the City would continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological Findings Page 53 of 266 resources pursuant to CEQA. As future development occurs, project sites located within areas identified as having high paleontological sensitivity would be required to prepare a resource assessment. The objective of the report is to determine if significant paleontological resources are potentially present and if the project would significantly impact these resources for measures to be implemented to avoid the resource; monitor soil disturbance where there is high potential for resources; and implement mitigation measure to mitigate impacts. With implementation of the General Plan Update policies and actions and compliance with SJDC Section 17.500.020, potential impacts to paleontological resources associated with future development anticipated by the General Plan Update would be reduced to less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Policy RM-3.1: Preservation. Protect areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Code. Policy RM-3.3: Public Education. Educate and actively involve the public in preserving cultural assets, including techniques, incentives, and legal requirements for preservation. Policy RM-3.4: Tribal Consultation. Consult with Native American tribes that may be impacted by proposed development, as necessary, and in accordance with state, local, and tribal intergovernmental consultation requirements. Policy RM-3.6: Historic Preservation. Identify, designate, and protect buildings, districts, and sites of historic importance within San Jacinto. Policy RM-3.7: Funding. Identify funding programs to assist private property owners in the preservation of historic resources. Action RM-3a: Continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to the California Environmental Quality Act (CEQA). Action RM-3c: For all development proposals within areas with the potential to contain prehistoric/historic resources, the City shall require a study to be conducted by a professional archaeologist. The objective of the study will be to determine if significant archaeological resources are potentially present and if the project will significantly impact these resources. If significant impacts are identified, the City may require the project to be modified to avoid the impacts, or require mitigation measures to mitigate the impacts. Mitigation may involve archaeological investigation and resources recovery. Action RM-3d: For projects that involve ground disturbing activities on native soil, prior Findings Page 54 of 266 to the issuance of a grading permit, the developer shall enter a Treatment and Disposition Agreement (TDA) with the Soboba Band of Luiseño Indians to address treatment and disposition of archaeological/cultural resources and human remains associated with Soboba Band of Luiseño Indians that may be uncovered or otherwise discovered during construction of the project. The TDA may establish provisions for tribal monitors. Following execution of the TDA by the developer and Soboba Band of Luiseño Indians, the TDA will be incorporated by reference into the grading permit. Action RM-3e: The City shall require an assessment of the potential for development proposals to significantly impact paleontological resources pursuant to the California Environmental Quality Act Guidelines. If the project involves earthworks, the City may require a study conducted by a professional paleontologist to determine if paleontological assets are present, and if the project will significantly impact the resources. If significant impacts are identified, the City may require the pr oject to be modified to avoid impacting the paleontological materials, require monitoring of rock units with high potential to contain significant nonrenewable paleontologic resources, or require mitigation measures to mitigate the impacts, such as recovering the paleontological resources for preservation. Action RM-3f: The City shall make provisions for archeological resources accidentally discovered during construction for projects where the City has approval authority over the project. These provisions shall include an immediate evaluation of the find and contingency funding and time allotment sufficient to allow for the recovery of the archeological resource or implement measures to avoid disturbing the resource if the archeological resource is determined to be unique. Action RM-3o: Conduct a historic properties inventory that takes into consideration buildings, neighborhoods, and other features of historic, architectural, or cultural significance. H. HAZARDS AND HAZARDOUS MATERIALS 1. Transport, Use, and Disposal of Hazardous Materials Threshold: Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Finding: Less than significant. (Draft EIR, Impact HAZ-1, pages 5.9-15 through 5.9- 21) Explanation: Implementation of the General Plan Update would accommodate the future development of both residential and non-residential uses. Increased development would result in an increase in the routine transport, use, and storage of hazardous materials in the City, potentially resulting in accidental releases. Exposure of persons to hazardous materials could also occur through the operations of future developments associated with the improper handling of hazardous materials/waste. The use, transportation, and Findings Page 55 of 266 disposal of hazardous materials is regulated and monitored by local fire departments, CUPAs, Cal OSHA, and the DTSC consistent with the requirements of federal, State, and local regulations and policies. Facilities that store hazardous materials on-site are required to maintain a Hazardous Materials Business Plan in accordance with State regulations. In addition to the requirements associated with federal, State, and local regulations, the General Plan Update includes policies and actions to address potential impacts associated with hazardous materials among other issues. Policy PS- 4.1 would ensure that Riverside County Fire Department (RCFD) enforces the Uniform Fire Code relating to the use of hazardous materials and ensure that appropriate regulations are followed, and precautions are taken for the type and amount of hazard being created. Policy PS-4.2 requires that developers coordinate with the Riverside County Department of Public Health to confirm that hazardous waste cleanup sites located within the City are remediated by the property owner in a manner that keeps the public safe. Policy PS-4.4 promotes the routing of vehicles carrying potentially hazardous materials to transportation corridors posing the minimum risk to the public. Policy PS-4.6 requires appropriate environmental analysis to be conducted for any proposed hazardous waste materials treatment or transfer, in accordance with environmental review requirements. Action PS-4a requires, as part of the development review process, projects that result in significant risks associated with hazardous materials to include measures to address the risks and reduce the risks to an acceptable level. Action PS-4b requires the submittal of information regarding hazardous materials manufacturing, storage, use, transport, and/or disposal by existing and proposed businesses and developments to RCFD. Action PS-4d protects the community from hazards related to air pollution, hazardous materials, and ground and air transportation by requiring feasible mitigation to be incorporated into new development and redevelopment proposals to address safety impacts associated with those proposals. Action PS-4f minimizes public health risks and environmental risks from the use, transport, storage, and disposal of hazardous materials. Actions PS-4g and PS-4h work to inform the public about proper hazardous waste disposal and implements collection services for hazardous waste. These General Plan Update policies and actions would ensure that potential hazards are identified on a project site, that development is located in areas where potential exposure to hazards and hazardous materials can be mitigated to an acceptable level, and that business operations comply with federal and State regulations regarding the use, transport, storage, and disposal of hazardous materials. The General Plan Update also includes policies and actions to ensure that the City has adequate emergency response plans and measures to respond in the event of an accidental release of a hazardous substance. Policy PS- 5.1 ensures the provision of sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy PS-5.2 supports the development of local preparedness plans and multi-jurisdictional cooperation and Findings Page 56 of 266 communication agreements for emergency situations. Policy PS-5.5 directs the City to participate in automatic and mutual aid agreements with adjacent service providers to ensure efficient and adequate resources, facilities, and support services before, during, and after emergencies. Policy PS-5.7 directs the City to work with RCFD and the Riverside County Sheriff’s Department (RCSD) to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Action PS-5b ensures the City regularly practices implementation of the EOP and updates it regularly. Action PS-5f ensures the City annually reviews and updates the Emergency Preparedness Plan under the provision of the State Emergency Management System format to maximize the efforts of emergency service providers (e.g., fire, medical, and law enforcement) and minimize human suffering and property damage during disasters. It also supports high-level multi-jurisdictional cooperation and communication for emergency planning and management. Compliance with the requirements of federal, State, and local laws and regulations regarding the use and storage of hazardous materials would ensure that risks resulting from the routine transportation, use, storage, or disposal of hazardous materials or hazardous wastes associated with implementation of the General Plan Update would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: MOBILITY ELEMENT Policy M-1.4: Truck Routes. Maintain a truck route network that supports the efficient movement of goods within and beyond the City, while minimizing noise and safety hazards to the extent feasible. PUBLIC SAFETY ELEMENT Goal PS-4: Hazardous Materials and Waste. A community that is protected from the potential for hazardous waste and materials contamination. Policy PS-4.1: Regulations. Ensure that RCFD enforces the Uniform Fire Code relating to the use of hazardous materials and ensure that appropriate regulations are followed, and precautions are taken for the type and amount of hazard being created. Policy PS-4.2: Cleanup Sites. Require that developers coordinate with the Riverside County Department of Public Health to confirm that hazardous waste cleanup sites located within the City are remediated by the property owner in a manner that keeps the public safe. Policy PS-4.3: County Plans. Utilize the Riverside Countywide Integrated Waste Management Plan to ensure that local regulation and practices are consistent with the policy direction and action programs that the County recommends. Findings Page 57 of 266 Policy PS-4.4: Transportation. Promote the routing of vehicles carrying potentially hazardous materials to transportation corridors posing the minimum risk to the public. Policy PS-4.5: Household Hazardous Waste. Reduce the per capita production of household hazardous waste in San Jacinto in concert with the County of Riverside plans for reducing hazardous waste. Policy PS-4.6: Proposed Facilities. Require appropriate environmental analysis to be conducted for any proposed hazardous waste materials treatment or transfer, in accordance with environmental review requirements. Policy PS-4.7: Emergency Response. Work with RCFD and other responding agencies to ensure that emergency personnel respond safely and effectively to a hazardous materials incident in the city. Policy PS-4.8: Public Education. Coordinate with the City’s waste service provider(s) and the County of Riverside to increase public awareness about proper disposal related to household hazardous waste and inform the San Jacinto community regarding relevant services and programs to address issues related to hazardous waste and materials. Action PS-4a: As part of the development review process, require projects that result in significant risks associated with hazardous materials to include measures to address the risks and reduce the risks to an acceptable level. Action PS-4b: Require the submittal of information regarding hazardous materials manufacturing, storage, use, transport, and/or disposal by existing and proposed businesses and developments to RCFD. Action PS-4c: Promote off-site hazardous materials and/or electronic waste drop-off. Action PS-4d: Protect the community from hazards related to air pollution, hazardous materials, and ground and air transportation by requiring feasible mitigation to be incorporated into new development and redevelopment proposals to address safety impacts associated with those proposals. Action PS-4e: Continue to monitor regulations governing the use of pesticides and work with the County Agricultural Commissioner to promote the responsible use of pesticides. Action PS-4f: Minimize public health risks and environmental risks from the use, transport, storage, and disposal of hazardous materials. Action PS-4g: Continue to work with the County of Riverside Environmental Health Department to implement and advertise the Household Hazardous Waste Collection Program to protect residents from dangers resulting from the use, transport, and disposal of hazardous materials used in the home. Provide informational materials at public locations and links on the City’s website about the County’s Household Hazardous Waste Collection program, the County’s Antifreeze, Batteries, Oil, and Paint (ABOP) program, collection facilities, drop-off centers, and the 24-hour Household Hazardous Waste hotline. Findings Page 58 of 266 Action PS-4h: Continue to work with the County of Riverside’s Environmental Health Department to implement the Conditionally Exempt Small Quantity Generators (CESQG) program, which is a hazardous waste pick-up disposal service for eligible, businesses/non- profit organizations in the County of Riverside. This program provides an affordable way to legally dispose of this waste. Provide informational materials at public locations and links on the City’s website about the County’s CESQG program. Action PS-4i: Amend the Municipal Code to require that, prior to issuance of any grading or building permit (whichever occurs first) for a project on a site identified on any list of hazardous materials compiled pursuant to Government Code Section 65962.5, a formal Phase I Environmental Site Assessment (ESA) shall be prepared in accordance with ASTM Standard Practice E 1527-05 or the Standards and Practices for All Appropriate Inquiry (AAI) and submitted to the City’s Community Development Department. The Phase I ESA shall identify specific Recognized Environmental Conditions (RECs), which may require further sampling/remedial activities by a qualified Hazardous Materials Specialist with Phase II/site characterization experience prior to demolition, and/or construction. The Hazardous Materials Specialist shall identify proper remedial activities appropriate to the hazardous material(s) found (e.g., removal and disposal; bio-remediation; pump and treat; soil vapor extraction, and in situ oxidation), as necessary. Goal PS-5: Emergency Operations. A community that is highly prepared and equipped to handle emergency situations, in order to minimize loss of life, injury, property damage, and disruption of vital services. Policy PS-5.1: Emergency Response Services. Provide sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy PS-5.2: Emergency Preparedness Plans. Support the development of local preparedness plans and multi-jurisdictional cooperation and communication agreements for emergency situations. Policy PS-5.3: Critical Facilities. Coordinate with service providers to ensure the resilience of critical facilities, lifeline services, and infrastructure, and plan for the use of critical facilities during post-disaster response and recovery. Policy PS-5.4: Local Coordination. Coordinate with local key stakeholders (officials, schools, businesses, and organizations) within the community to make them aware of their role in the emergency plan and the necessary requirements in case of emergency. Policy PS-5.5: Automatic and Mutual Aid. Participate in automatic and mutual aid agreements with adjacent service providers to ensure efficient and adequate resources, facilities, and support services before, during, and after emergencies. Policy PS-5.6: Communications. Evaluate the potential to utilize a comprehensive emergency communication system that allows for efficient connection in case of emergency. Findings Page 59 of 266 Policy PS-5.7: Emergency Evacuation Routes and Access. Work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Policy PS-5.8: Emergency Shelters. Periodically coordinate with emergency shelter providers to ensure that necessary equipment supplies are available in case of emergency. Policy PS-5.9: Disaster Recovery. Work with emergency service providers to implement post-disaster recovery plans to return public services to a state of normalcy, address ongoing hazard-specific mitigations, and assist community members in recovering from disasters. Policy PS-5.11: Community Training Programs. Support community-based emergency training programs as a valuable asset to the community. Policy PS-5.12: Public Education. Educate residents and businesses through programs and outreach materials on hazards pertaining to San Jacinto and appropriate actions to safeguard life and property during and immediately after emergencies. Policy PS-5.13: School Safety. Coordinate with local schools related to their programs and practices regarding emergency preparedness. Action PS-5a: Coordinate with the County of Riverside to keep the Multi-Jurisdictional Local Hazard Mitigation Plan up to date. Action PS-5b: Regularly practice implementation of the City’s Emergency Operations Plan and update it regularly. Action PS-5c: Regularly review County and State emergency response procedures that must be coordinated with City procedures. Action PS-5f: Annually review and update the Emergency Preparedness Plan under the provision of the State Emergency Management System format to maximize the efforts of emergency service providers (e.g., fire, medical, and law enforcement) and minimize human suffering and property damage during disasters. Support high-level multi- jurisdictional cooperation and communication for emergency planning and management. Action PS-5g: Coordinate with local agencies and organizations to develop and distribute informational brochures and give presentations to civic groups and local schools to educate residents and businesses about appropriate actions to take during an emergency situation. RESOURCE MANAGEMENT ELEMENT Policy RM-6.1: Provision of Police and Fire Services. Encourage the Riverside County Sheriff’s Department and the Riverside County Fire Department to maintain adequate staff and equipment to provide efficient, high quality, and responsive public safety services to the San Jacinto community. Findings Page 60 of 266 Action RM-6c: In cooperation with the school districts, police and fire departments, and local, state, and federal emergency management agencies, implement an Emergency Operation Center (EOC) to respond to and manage disasters. Provide annual training for City staff in emergency management so that when they are called into action, they will be able to distribute information and resources to the public effectively. Policy RM-10.3: Hazardous Waste. Promote the proper disposal of hazardous waste, including paint, tires, medications, medical sharps, infectious waste, asbestos waste, construction waste, and electronic waste, through education, monitoring, and enforcement of proper use, storage, handling, and disposal. Action RM-10a: On an ongoing basis and in compliance with State law, ensure solid waste collection activities completed by franchise solid waste haulers, facility siting and construction of transfer and/or disposal facilities, operation of waste reduction and recycling programs, and household hazardous waste disposal and education programs are consistent with the County Solid Waste Management Plan. Action RM-10c: Encourage the expansion of recycling, reuse, and appropriate disposal of hazardous materials, including the following:  Increased participation in single family and multifamily residential curbside recycling programs;  Increased participation in commercial and industrial recycling programs for paper, cardboard, and plastics;  Reduce yard and landscaping waste through methods such as composting, grass recycling, and using resource efficient landscaping techniques; and  Encourage local businesses to provide electronic waste (e-waste) drop-off services and encourage residents and businesses to properly dispose of, or recycle, e-waste. 2. Hazardous Materials Release Threshold: Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Finding: Less than significant. (Draft EIR, Impact HAZ-2, pages 5.9-21 through 5.9- 28) Explanation: Short-Term Construction-Related Accidental Release of Hazardous Materials The General Plan Update would enable development of new residential, commercial, industrial, and public uses. Construction activities associated with new development could result in upset and/or accident conditions Findings Page 61 of 266 involving the release of hazardous materials into the environment. Future development accommodated through implementation of the General Plan Update could involve the demolition of existing structures and buildings as areas within the City are redeveloped. The presence of lead-based paint, asbestos-containing materials (ACM), and/or other contaminants are likely present in some structures. All demolition that could result in the release of ACMs or lead-based paint would be conducted according to federal and State regulations. In accordance with SCAQMD Rule 1403, if ACM material is found, abatement of asbestos would be required prior to any demolition activities. If paint is separated from building materials (chemically or physically) during demolition of the structures, the paint waste would be required to be evaluated independently from the building material by a qualified Environmental Professional in accordance with California Code of Regulations Title 8, Section 1532.1. If lead-based paint is found, abatement would be required to be completed by a qualified Lead Specialist prior to any demolition activities. Compliance with existing regulations related to ACM and lead-based paint would reduce potential impacts to a less than significant level. Future development accommodated through implementation of the General Plan Update could involve grading and excavation activities which could expose construction workers and the public to previously unknown hazardous substances present in the soil or groundwater. The public could also be exposed to hazardous materials if new development or redevelopment were to be located on a current or historical hazardous material site. Future development associated with implementation of the General Plan Update would be reviewed at the project-level to determine whether any development sites are listed on a hazardous materials site. Any development activities that may occur on documented hazardous materials sites would be required to undergo remediation and cleanup under the supervision of the regulatory agencies, such as DTSC and the Santa Ana RWQCB. In addition to the requirements associated with federal, State, and local regulations, the General Plan Update includes policies and actions to address potential impacts associated with potentially contaminated sites. Policy PS-4.1 would ensure that RCFD enforces the Uniform Fire Code relating to the use of hazardous materials and ensure that appropriate regulations are followed, and precautions are taken for the type and amount of hazard being created. Policy PS-4.2 requires that developers coordinate with the Riverside County Department of Public Health to confirm that hazardous waste cleanup sites located within the City are remediated by the property owner in a manner that keeps the public safe. Policy PS-4.4 promotes the routing of vehicles carrying potentially hazardous materials to transportation corridors posing the minimum risk to the public. Policy PS- 4.6 requires appropriate environmental analysis to be conducted for any proposed hazardous waste materials treatment or transfer, in accordance with environmental review requirements. Action PS-4a requires, as part of Findings Page 62 of 266 the development review process, projects that result in significant risks associated with hazardous materials to include measures to address the risks and reduce the risks to an acceptable level. Action PS-4f minimizes public health risks and environmental risks from the use, transport, storage, and disposal of hazardous materials. Actions PS-4g and PS-4h work to inform the public about proper hazardous waste disposal and implements collection services for hazardous waste. Compliance with General Plan Update goals, policies, and actions, and existing regulations would reduce potential impacts involving the release of hazardous materials into the environment as a result of on-site contamination to a less than significant level. Long-Term Operations-Related Accidental Release of Hazardous Materials Long-term operation activities associated with new development could result in upset and/or accident conditions involving the release of hazardous materials into the environment. The transport, storage, and handling of hazardous materials by developers, contractors, business owners, and others are required to comply with federal, State, and local regulations during project construction and operation. Facilities that use hazardous materials are required to obtain permits from the EPA under the RCRA, which gives the EPA the authority to control the generation, transportation, treatment, storage, and disposal of hazardous waste. Additionally, the hazardous materials regulations included in federal law govern the transportation of hazardous materials. Locally, the Riverside County Department of Environmental Health Hazardous Materials Branch is the CUPA for Riverside County and is responsible for consolidating, coordinating, and making consistent the administrative requirements, permits, inspections, and enforcement activities of state standards regarding the transportation, use, and disposal of hazardous materials in Riverside County, including the Study Area. The General Plan Update includes policies and actions to address potential accidental exposure of individuals as a consequence of unknown existing environmental contaminants. Action PS-4b requires the submittal of information regarding hazardous materials manufacturing, storage, use, transport, and/or disposal by existing and proposed businesses and developments to RCFD. Action PS-4d protects the community from hazards related to air pollution, hazardous materials, and ground and air transportation by requiring feasible mitigation to be incorporated into new development and redevelopment proposals to address safety impacts associated with those proposals. Compliance with all applicable federal, State, and local laws related to the transport, storage, and handling of hazardous materials would reduce the likelihood and severity of accidents, and impacts involving the release of hazardous materials into the environment would be less than significant. Findings Page 63 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: MOBILITY ELEMENT Policy M-1.4: Truck Routes. Maintain a truck route network that supports the efficient movement of goods within and beyond the City, while minimizing noise and safety hazards to the extent feasible. PUBLIC SAFETY ELEMENT Goal PS-4: Hazardous Materials and Waste. A community that is protected from the potential for hazardous waste and materials contamination. Policy PS-4.1: Regulations. Ensure that RCFD enforces the Uniform Fire Code relating to the use of hazardous materials and ensure that appropriate regulations are followed, and precautions are taken for the type and amount of hazard being created. Policy PS-4.2: Cleanup Sites. Require that developers coordinate with the Riverside County Department of Public Health to confirm that hazardous waste cleanup sites located within the City are remediated by the property owner in a manner that ke eps the public safe. Policy PS-4.3: County Plans. Utilize the Riverside Countywide Integrated Waste Management Plan to ensure that local regulation and practices are consistent with the policy direction and action programs that the County recommends. Policy PS-4.4: Transportation. Promote the routing of vehicles carrying potentially hazardous materials to transportation corridors posing the minimum risk to the public. Policy PS-4.5: Household Hazardous Waste. Reduce the per capita production of household hazardous waste in San Jacinto in concert with the County of Riverside plans for reducing hazardous waste. Policy PS-4.6: Proposed Facilities. Require appropriate environmental analysis to be conducted for any proposed hazardous waste materials treatment or transfer, in accordance with environmental review requirements. Policy PS-4.8: Public Education. Coordinate with the City’s waste service provider(s) and the County of Riverside to increase public awareness about proper disposal related to household hazardous waste and inform the San Jacinto community regarding relevant services and programs to address issues related to hazardous waste and materials. Action PS-4a: As part of the development review process, require projects that result in significant risks associated with hazardous materials to include measures to address the risks and reduce the risks to an acceptable level. Findings Page 64 of 266 Action PS-4b: Require the submittal of information regarding hazardous materials manufacturing, storage, use, transport, and/or disposal by existing and proposed businesses and developments to RCFD. Action PS-4c: Promote off-site hazardous materials and/or electronic waste drop-off. Action PS-4d: Protect the community from hazards related to air pollution, hazardous materials, and ground and air transportation by requiring feasible mitigation to be incorporated into new development and redevelopment proposals to address safety impacts associated with those proposals. Action PS-4e: Continue to monitor regulations governing the use of pesticides and work with the County Agricultural Commissioner to promote the responsible use of pesticides. Action PS-4f: Minimize public health risks and environmental risks from the use, transport, storage, and disposal of hazardous materials. Action PS-4g: Continue to work with the County of Riverside Environmental Health Department to implement and advertise the Household Hazardous Waste Collection Program to protect residents from dangers resulting from the use, transport, and disposal of hazardous materials used in the home. Provide informational materials at public locations and links on the City’s website about the County’s Household Hazardous Waste Collection program, the County’s Antifreeze, Batteries, Oil, and Paint (ABOP) program, collection facilities, drop-off centers, and the 24-hour Household Hazardous Waste hotline. Action PS-4h: Continue to work with the County of Riverside’s Environmental Health Department to implement the Conditionally Exempt Small Quantity Generators (CESQG) program, which is a hazardous waste pick-up disposal service for eligible, businesses/non- profit organizations in the County of Riverside. This program provides an affordable way to legally dispose of this waste. Provide informational materials at public locations and links on the City’s website about the County’s CESQG program. Action PS-4i: Amend the Municipal Code to require that, prior to issuance of any grading or building permit (whichever occurs first) for a project on a site identified on any list of hazardous materials compiled pursuant to Government Code Section 65962.5, a formal Phase I Environmental Site Assessment (ESA) shall be prepared in accordance with ASTM Standard Practice E 1527-05 or the Standards and Practices for All Appropriate Inquiry (AAI) and submitted to the City’s Community Development Department. The Phase I ESA shall identify specific Recognized Environmental Conditions (RECs), which may require further sampling/remedial activities by a qualified Hazardous Materials Specialist with Phase II/site characterization experience prior to demolition, and/or construction. The Hazardous Materials Specialist shall identify proper remedial activities appropriate to the hazardous material(s) found (e.g., removal and disposal; bio-remediation; pump and treat; soil vapor extraction, and in situ oxidation), as necessary. Findings Page 65 of 266 Goal PS-5: Emergency Operations. A community that is highly prepared and equipped to handle emergency situations, in order to minimize loss of life, injury, property damage, and disruption of vital services. Policy PS-5.1: Emergency Response Services. Provide sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy PS-5.2: Emergency Preparedness Plans. Support the development of local preparedness plans and multi-jurisdictional cooperation and communication agreements for emergency situations. Policy PS-5.3: Critical Facilities. Coordinate with service providers to ensure the resilience of critical facilities, lifeline services, and infrastructure, and plan for the use of critical facilities during post-disaster response and recovery. Policy PS-5.4: Local Coordination. Coordinate with local key stakeholders (officials, schools, businesses, and organizations) within the community to make them aware of their role in the emergency plan and the necessary requirements in case of emergency. Policy PS-5.5: Automatic and Mutual Aid. Participate in automatic and mutual aid agreements with adjacent service providers to ensure efficient and adequate resources, facilities, and support services before, during, and after emergencies. Policy PS-5.6: Communications. Evaluate the potential to utilize a comprehensive emergency communication system that allows for efficient connection in case of emergency. Policy PS-5.7: Emergency Evacuation Routes and Access. Work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Policy PS-5.8: Emergency Shelters. Periodically coordinate with emergency shelter providers to ensure that necessary equipment supplies are available in case of emergency. Policy PS-5.9: Disaster Recovery. Work with emergency service providers to implement post-disaster recovery plans to return public services to a state of normalcy, address ongoing hazard-specific mitigations, and assist community members in recovering from disasters. Policy PS-5.11: Community Training Programs. Support community-based emergency training programs as a valuable asset to the community. Policy PS-5.12: Public Education. Educate residents and businesses through programs and outreach materials on hazards pertaining to San Jacinto and appropriate actions to safeguard life and property during and immediately after emergencies. Findings Page 66 of 266 Policy PS-5.13: School Safety. Coordinate with local schools related to their programs and practices regarding emergency preparedness. Action PS-5a: Coordinate with the County of Riverside to keep the Multi-Jurisdictional Local Hazard Mitigation Plan up to date. Action PS-5b: Regularly practice implementation of the City’s Emergency Operations Plan and update it regularly. Action PS-5c: Regularly review County and State emergency response procedures that must be coordinated with City procedures. Action PS-5f: Annually review and update the Emergency Preparedness Plan under the provision of the State Emergency Management System format to maximize the efforts of emergency service providers (e.g., fire, medical, and law enforcement) and minimize human suffering and property damage during disasters. Support high-level multi- jurisdictional cooperation and communication for emergency planning and management. Action PS-5g: Coordinate with local agencies and organizations to develop and distribute informational brochures and give presentations to civic groups and local schools to educate residents and businesses about appropriate actions to take during an emergency situation. RESOURCE MANAGEMENT ELEMENT Policy RM-6.1: Provision of Police and Fire Services. Encourage the Riverside County Sheriff’s Department and the Riverside County Fire Department to maintain adequate staff and equipment to provide efficient, high quality, and responsive public safety services to the San Jacinto community. Action RM-6c: In cooperation with the school districts, police and fire departments, and local, state, and federal emergency management agencies, implement an Emergency Operation Center (EOC) to respond to and manage disasters. Provide annual training for City staff in emergency management so that when they are called into action, they will be able to distribute information and resources to the public effectively. Policy RM-10.3: Hazardous Waste. Promote the proper disposal of hazardous waste, including paint, tires, medications, medical sharps, infectious waste, asbestos waste, construction waste, and electronic waste, through education, monitoring, and enforcement of proper use, storage, handling, and disposal. Action RM-10a: On an ongoing basis and in compliance with State law, ensure solid waste collection activities completed by franchise solid waste haulers, facility siting and construction of transfer and/or disposal facilities, operation of waste reduction and recycling programs, and household hazardous waste disposal and education programs are consistent with the County Solid Waste Management Plan. Action RM-10c: Encourage the expansion of recycling, reuse, and appropriate disposal of hazardous materials, including the following: Findings Page 67 of 266  Increased participation in single family and multifamily residential curbside recycling programs;  Increased participation in commercial and industrial recycling programs for paper, cardboard, and plastics;  Reduce yard and landscaping waste through methods such as composting, grass recycling, and using resource efficient landscaping techniques; and  Encourage local businesses to provide electronic waste (e-waste) drop-off services and encourage residents and businesses to properly dispose of, or recycle, e-waste. 3. Hazards Near Schools Threshold: Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Finding: Less than significant. (Draft EIR, Impact HAZ-3, pages 5.9-28 through 5.9- 31) Explanation: Future development within the Study Area could potentially emit or handle hazardous materials within one-quarter mile of an existing or proposed school. In addition to the requirements associated with federal, State, and local regulations, the General Plan Update includes policies and actions to address potential impacts associated with hazardous materials. Policy PS- 4.1 would ensure that RCFD enforces the Uniform Fire Code relating to the use of hazardous materials and ensure that appropriate regulations are followed, and precautions are taken for the type and amount of hazard being created. Policy PS-4.2 requires that developers coordinate with the Riverside County Department of Public Health to confirm that hazardous waste cleanup sites located within the City are remediated by the property owner in a manner that keeps the public safe. Policy PS-4.4 promotes the routing of vehicles carrying potentially hazardous materials to transportation corridors posing the minimum risk to the public. Policy PS- 4.6 requires appropriate environmental analysis to be conducted for any proposed hazardous waste materials treatment or transfer, in accordance with environmental review requirements. Action PS-4a requires, as part of the development review process, projects that result in significant risks associated with hazardous materials to include measures to address the risks and reduce the risks to an acceptable level. Action PS-4b requires the submittal of information regarding hazardous materials manufacturing, storage, use, transport, and/or disposal by existing and proposed businesses and developments to RCFD. Action PS-4d protects the community from hazards related to air pollution, hazardous materials, and ground and air transportation by requiring feasible mitigation to be incorporated into new development and redevelopment proposals to address safety impacts Findings Page 68 of 266 associated with those proposals. Action PS-4f minimizes public health risks and environmental risks from the use, transport, storage, and disposal of hazardous materials. Actions PS-4g and PS-4h work to inform the public about proper hazardous waste disposal and implements collection services for hazardous waste. Implementation of the safety procedures and regulations mandated by applicable federal, State, and local laws and the General Plan Update policies and actions would ensure that potential risks resulting from the routine transportation, use, storage, or disposal of hazardous materials or hazardous wastes in proximity to a school associated with implementation of the General Plan Update would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: MOBILITY ELEMENT Policy M-1.4: Truck Routes. Maintain a truck route network that supports the efficient movement of goods within and beyond the City, while minimizing noise and safety hazards to the extent feasible. PUBLIC SAFETY ELEMENT Goal PS-4: Hazardous Materials and Waste. A community that is protected from the potential for hazardous waste and materials contamination. Policy PS-4.1: Regulations. Ensure that RCFD enforces the Uniform Fire Code relating to the use of hazardous materials and ensure that appropriate regulations are followed, and precautions are taken for the type and amount of hazard being created. Policy PS-4.2: Cleanup Sites. Require that developers coordinate with the Riverside County Department of Public Health to confirm that hazardous waste cleanup sites located within the City are remediated by the property owner in a manner that keeps the public safe. Policy PS-4.3: County Plans. Utilize the Riverside Countywide Integrated Waste Management Plan to ensure that local regulation and practices are consistent with the policy direction and action programs that the County recommends. Policy PS-4.4: Transportation. Promote the routing of vehicles carrying potentially hazardous materials to transportation corridors posing the minimum risk to the public. Policy PS-4.5: Household Hazardous Waste. Reduce the per capita production of household hazardous waste in San Jacinto in concert with the County of Riverside plans for reducing hazardous waste. Policy PS-4.6: Proposed Facilities. Require appropriate environmental analysis to be conducted for any proposed hazardous waste materials treatment or transfer, in accordance with environmental review requirements. Findings Page 69 of 266 Policy PS-4.8: Public Education. Coordinate with the City’s waste service provider(s) and the County of Riverside to increase public awareness about proper disposal related to household hazardous waste and inform the San Jacinto community regarding relevant services and programs to address issues related to hazardous waste and materials. Action PS-4a: As part of the development review process, require projects that result in significant risks associated with hazardous materials to include measures to address the risks and reduce the risks to an acceptable level. Action PS-4b: Require the submittal of information regarding hazardous materials manufacturing, storage, use, transport, and/or disposal by existing and proposed businesses and developments to RCFD. Action PS-4c: Promote off-site hazardous materials and/or electronic waste drop-off. Action PS-4d: Protect the community from hazards related to air pollution, hazardous materials, and ground and air transportation by requiring feasible mitigation to be incorporated into new development and redevelopment proposals to address safety impacts associated with those proposals. Action PS-4e: Continue to monitor regulations governing the use of pesticides and work with the County Agricultural Commissioner to promote the responsible use of pesticides. Action PS-4f: Minimize public health risks and environmental risks from the use, transport, storage, and disposal of hazardous materials. Action PS-4g: Continue to work with the County of Riverside Environmental Health Department to implement and advertise the Household Hazardous Waste Collection Program to protect residents from dangers resulting from the use, transport, and disposal of hazardous materials used in the home. Provide informational materials at public locations and links on the City’s website about the County’s Household Hazardous Waste Collection program, the County’s Antifreeze, Batteries, Oil, and Paint (ABOP) program, collection facilities, drop-off centers, and the 24-hour Household Hazardous Waste hotline. Action PS-4h: Continue to work with the County of Riverside’s Environmental Health Department to implement the Conditionally Exempt Small Quantity Generators (CESQG) program, which is a hazardous waste pick-up disposal service for eligible, businesses/non- profit organizations in the County of Riverside. This program provides an affordable way to legally dispose of this waste. Provide informational materials at public locations and links on the City’s website about the County’s CESQG program. Action PS-4i: Amend the Municipal Code to require that, prior to issuance of any grading or building permit (whichever occurs first) for a project on a site identified on any list of hazardous materials compiled pursuant to Government Code Section 65962.5, a formal Phase I Environmental Site Assessment (ESA) shall be prepared in accordance with ASTM Standard Practice E 1527-05 or the Standards and Practices for All Appropriate Inquiry (AAI) and submitted to the City’s Community Development Department. The Phase I ESA Findings Page 70 of 266 shall identify specific Recognized Environmental Conditions (RECs), which may require further sampling/remedial activities by a qualified Hazardous Materials Specialist with Phase II/site characterization experience prior to demolition, and/or construction. The Hazardous Materials Specialist shall identify proper remedial activities appropriate to the hazardous material(s) found (e.g., removal and disposal; bio-remediation; pump and treat; soil vapor extraction, and in situ oxidation), as necessary. RESOURCE MANAGEMENT ELEMENT Policy RM-10.3: Hazardous Waste. Promote the proper disposal of hazardous waste, including paint, tires, medications, medical sharps, infectious waste, asbestos waste, construction waste, and electronic waste, through education, monitoring, and enforcement of proper use, storage, handling, and disposal. Action RM-10a: On an ongoing basis and in compliance with State law, ensure solid waste collection activities completed by franchise solid waste haulers, facility siting and construction of transfer and/or disposal facilities, operation of waste reduction and recycling programs, and household hazardous waste disposal and education programs are consistent with the County Solid Waste Management Plan. Action RM-10c: Encourage the expansion of recycling, reuse, and appropriate disposal of hazardous materials, including the following:  Increased participation in single family and multifamily residential curbside recycling programs;  Increased participation in commercial and industrial recycling programs for paper, cardboard, and plastics;  Reduce yard and landscaping waste through methods such as composting, grass recycling, and using resource efficient landscaping techniques; and  Encourage local businesses to provide electronic waste (e-waste) drop-off services and encourage residents and businesses to properly dispose of, or recycle, e-waste. 4. Waste Sites Threshold: Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? Finding: Less than significant. (Draft EIR, Impact HAZ-4, pages 5.9-32 through 5.9- 33) Explanation: There are two site locations with a “certified” status listed on the Cortese list, compiled pursuant to Government Code Section 65962.5. Future Findings Page 71 of 266 development associated with implementation of the General Plan Update would be evaluated at the project-level to determine whether any development sites are listed on a hazardous materials site. Any development activities occurring on documented hazardous materials sites would be required to undergo remediation and cleanup under the supervision of the DTSC and the Santa Ana RWQCB prior to construction. The General Plan Update includes policies and actions to address potential impacts associated with hazardous materials. Policy PS-4.1 would ensure that RCFD enforces the Uniform Fire Code relating to the use of hazardous materials and ensure that appropriate regulations are followed, and precautions are taken for the type and amount of hazard being created. Policy PS-4.2 requires that developers coordinate with the Riverside County Department of Public Health to confirm that hazardous waste cleanup sites located within the City are remediated by the property owner in a manner that keeps the public safe. Policy PS-4.3 utilizes the Riverside Countywide Integrated Waste Management Plan to ensure that local regulation and practices are consistent with the policy direction and action programs that the County recommends. Policy PS-4.6 requires appropriate environmental analysis to be conducted for any proposed hazardous waste materials treatment or transfer, in accordance with environmental review requirements. Action PS-4a requires, as part of the development review process, projects that result in significant risks associated with hazardous materials to include measures to address the risks and reduce the risks to an acceptable level. Action PS-4b requires the submittal of information regarding hazardous materials manufacturing, storage, use, transport, and/or disposal by existing and proposed businesses and developments to RCFD. Action PS-4d protects the community from hazards related to air pollution, hazardous materials, and ground and air transportation by requiring feasible mitigation to be incorporated into new development and redevelopment proposals to address safety impacts associated with those proposals. Action PS-4f minimizes public health risks and environmental risks from the use, transport, storage, and disposal of hazardous materials. Compliance with General Plan Update goals, policies, and actions, and existing regulations would reduce potential impacts involving the hazardous materials sites. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-4: Hazardous Materials and Waste. A community that is protected from the potential for hazardous waste and materials contamination. Policy PS-4.1: Regulations. Ensure that RCFD enforces the Uniform Fire Code relating to the use of hazardous materials and ensure that appropriate regulations are followed, and precautions are taken for the type and amount of hazard being created. Policy PS-4.2: Cleanup Sites. Require that developers coordinate with the Riverside Findings Page 72 of 266 County Department of Public Health to confirm that hazardous waste cleanup sites located within the City are remediated by the property owner in a manner that keeps the public safe. Policy PS-4.3: County Plans. Utilize the Riverside Countywide Integrated Waste Management Plan to ensure that local regulation and practices are consistent with the policy direction and action programs that the County recommends. Policy PS-4.6: Proposed Facilities. Require appropriate environmental analysis to be conducted for any proposed hazardous waste materials treatment or transfer, in accordance with environmental review requirements. Action PS-4a: As part of the development review process, require projects that result in significant risks associated with hazardous materials to include measures to address the risks and reduce the risks to an acceptable level. Action PS-4b: Require the submittal of information regarding hazardous materials manufacturing, storage, use, transport, and/or disposal by existing and proposed businesses and developments to RCFD. Action PS-4d: Protect the community from hazards related to air pollution, hazardous materials, and ground and air transportation by requiring feasible mitigation to be incorporated into new development and redevelopment proposals to address safety impacts associated with those proposals. Action PS-4f: Minimize public health risks and environmental risks from the use, transport, storage, and disposal of hazardous materials. Action PS-4i: Amend the Municipal Code to require that, prior to issuance of any grading or building permit (whichever occurs first) for a project on a site identified on any list of hazardous materials compiled pursuant to Government Code Section 65962.5, a formal Phase I Environmental Site Assessment (ESA) shall be prepared in accordance with ASTM Standard Practice E 1527-05 or the Standards and Practices for All Appropriate Inquiry (AAI) and submitted to the City’s Community Development Department. The Phase I ESA shall identify specific Recognized Environmental Conditions (RECs), which may require further sampling/remedial activities by a qualified Hazardous Materials Specialist with Phase II/site characterization experience prior to demolition, and/or construction. The Hazardous Materials Specialist shall identify proper remedial activities appropriate to the hazardous material(s) found (e.g., removal and disposal; bio-remediation; pump and treat; soil vapor extraction, and in situ oxidation), as necessary. 5. Public Airports Threshold: For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Findings Page 73 of 266 Finding: Less than significant. (Draft EIR, Impact HAZ-5, pages 5.9-34) Explanation: There are no airports within the Study Area. The closest airport to the Study Area is the Hemet-Ryan Airport, located approximately seven miles south of the City of San Jacinto. According to the ALUCP, San Jacinto is not located within an Airport Influence Area. Because the Study Area is not within an airport land use plan or within two miles of a public use airport, impacts with regard to safety hazards to people residing or working in the Study Area would be less than significant. 6. Emergency Plans Threshold: Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Finding: Less than significant. (Draft EIR, Impact HAZ-6, pages 5.9-34 through 5.9- 38) Explanation: The General Plan Update would allow a variety of new development, including residential, commercial, industrial, and public projects, which would result in increased jobs and population in the Study Area. Road and infrastructure improvements would occur to accommodate the new growth. Implementation of the General Plan Update would not impair or physically interfere with an adopted emergency response plan or emergency evacuation plan. The Riverside County Fire Department (RCFD) provides fire and emergency response service to the City of San Jacinto. The RCFD Strategic Plan 2009-2029 outlines goals and strategies for fire protection services throughout the Riverside County OA, including facility needs and improvements, training requirements, and disaster preparedness. The City’s EOP addresses the planned response to extraordinary situations associated with natural disasters and/or human caused incidents. The EOP focuses on coordinating mutual aid and provides an overview of the operational concepts relating to various emergency situations, identifies components of the emergency response, and describes the overall responsibilities of the Riverside County OA for supporting OA Members in protecting life and property. The EOP does not provide a specific evacuation route map, as evacuation measures would be implemented based on the specific emergency and area affected. The General Plan Update would not require or result in revisions to the RCFD Strategic Plan or adopted EOP. The City prepared an analysis consistent with SB 99 to identify residential developments in hazard areas that do not have at least two emergency evacuation routes. The analysis found that out of 4,990 unique land parcels identified as residential and located within an identified hazard zone, the vast majority (approximately 77 percent) of the parcels have multiple exit points with access to multiple arterials, and another 13 percent of the parcels have multiple exit points with access to a single arterial, a loop road. Findings Page 74 of 266 Approximately 10 percent of the developed parcels have one exit point with access directly onto a single arterial. Parcels with one exit point with access directly onto a single arterial are widespread throughout the Study Area, and tend to be condominium, apartment, and mobile home communities, or large rural residential parcels. There are no parcels in the Study Area described as having “one exit point with some distance to a single arterial.” The General Plan Update includes policies and actions to address emergency evacuation routes. Specifically, Policy PS-5.7 directs the City to work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. The General Plan Update does not include any site-specific development. However, future development would be designed, constructed, and maintained in accordance with applicable standards, including vehicular access to ensure that adequate emergency access and evacuation would be maintained. Construction activities that may temporarily restrict vehicular traffic would be required to implement appropriate measures to facilitate the passage of persons and vehicles through/around any required road closures. The General Plan Update identifies major arterials as the primary routes for evacuation; however, evacuation routes would depend upon the emergency event and area affected. The General Plan Update includes policies and actions to address emergency response and evacuation. Action PS-2a implements the EOP to ensure the most effective allocation of resources for protection of people and property in time of an emergency, and update it as needed. Policy PS-5.1 ensures the provision of sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy PS-5.2 supports the development of local preparedness plans and multi- jurisdictional cooperation and communication agreements for emergency situations. Policy PS-5.5 directs the City to participate in automatic and mutual aid agreements with adjacent service providers to ensure efficient and adequate resources, facilities, and support services before, during, and after emergencies. Policy PS-5.7 directs the City to work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Action PS-5b ensures the City regularly practices implementation of the EOP and updates it regularly. Action PS-5f ensures the City annually reviews and updates the Emergency Preparedness Plan under the provision of the State Emergency Management System format to maximize the efforts of emergency service providers (e.g., fire, medical, and law enforcement) and minimize human suffering and property damage during disasters. It also supports high-level multi-jurisdictional cooperation and communication for emergency planning and management. Action RM- 6c implements an Emergency Operation Center to respond to and manage disasters in cooperation with the school districts, police and fire Findings Page 75 of 266 departments, and local, state, and federal emergency management agencies. It would also provide annual training for City staff in emergency management so that when they are called into action, they will be able to distribute information and resources to the public effectively. Primary access to all major roads would be maintained during construction of future developments within the Study Area. As part of the site plan and design review process (SJDC Chapter 17.630), future development projects would be reviewed for adequate infrastructure and access as well as consistency with adopted emergency and evacuation plans among many other environmental issues in order to ensure the safety of City residents and the physical environment. Therefore, impacts associated with adopted emergency response or evacuation plans would be less than significant GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Action PS-2a: Implement the City’s Emergency Operations Plan to ensure the most effective allocation of resources for protection of people and property in time of an emergency, and update it as needed. Goal PS-4: Hazardous Materials and Waste. A community that is protected from the potential for hazardous waste and materials contamination. Policy PS-4.7: Emergency Response. Work with RCFD and other responding agencies to ensure that emergency personnel respond safely and effectively to a hazardous materials incident in the city. Goal PS-5: Emergency Operations. A community that is highly prepared and equipped to handle emergency situations, in order to minimize loss of life, injury, property damage, and disruption of vital services. Policy PS-5.1: Emergency Response Services. Provide sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy PS-5.2: Emergency Preparedness Plans. Support the development of local preparedness plans and multi-jurisdictional cooperation and communication agreements for emergency situations. Policy PS-5.3: Critical Facilities. Coordinate with service providers to ensure the resilience of critical facilities, lifeline services, and infrastructure, and plan for the use of critical facilities during post-disaster response and recovery. Policy PS-5.4: Local Coordination. Coordinate with local key stakeholders (officials, schools, businesses, and organizations) within the community to make them aware of their role in the emergency plan and the necessary requirements in case of emergency. Findings Page 76 of 266 Policy PS-5.5: Automatic and Mutual Aid. Participate in automatic and mutual aid agreements with adjacent service providers to ensure efficient and adequate resources, facilities, and support services before, during, and after emergencies. Policy PS-5.6: Communications. Evaluate the potential to utilize a comprehensive emergency communication system that allows for efficient connection in case of emergency. Policy PS-5.7: Emergency Evacuation Routes and Access. Work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Policy PS-5.8: Emergency Shelters. Periodically coordinate with emergency shelter providers to ensure that necessary equipment supplies are available in case of emergency. Policy PS-5.9: Disaster Recovery. Work with emergency service providers to implement post-disaster recovery plans to return public services to a state of normalcy, address ongoing hazard-specific mitigations, and assist community members in recovering from disasters. Policy PS-5.11: Community Training Programs. Support community-based emergency training programs as a valuable asset to the community. Policy PS-5.12: Public Education. Educate residents and businesses through programs and outreach materials on hazards pertaining to San Jacinto and appropriate actions to safeguard life and property during and immediately after emergencies. Policy PS-5.13: School Safety. Coordinate with local schools related to their programs and practices regarding emergency preparedness. Action PS-5a: Coordinate with the County of Riverside to keep the Multi-Jurisdictional Local Hazard Mitigation Plan up to date. Action PS-5b: Regularly practice implementation of the City’s Emergency Operations Plan and update it regularly. Action PS-5c: Regularly review County and State emergency response procedures that must be coordinated with City procedures. Action PS-5f: Annually review and update the Emergency Preparedness Plan under the provision of the State Emergency Management System format to maximize the efforts of emergency service providers (e.g., fire, medical, and law enforcement) and minimize human suffering and property damage during disasters. Support high-level multi- jurisdictional cooperation and communication for emergency planning and management. Action PS-5g: Coordinate with local agencies and organizations to develop and distribute informational brochures and give presentations to civic groups and local schools to educate residents and businesses about appropriate actions to take during an emergency situation. Findings Page 77 of 266 RESOURCE MANAGEMENT ELEMENT Policy RM-6.1: Provision of Police and Fire Services. Encourage the Riverside County Sheriff’s Department and the Riverside County Fire Department to maintain adequate staff and equipment to provide efficient, high quality, and responsive public safety services to the San Jacinto community. Action RM-6c: In cooperation with the school districts, police and fire departments, and local, state, and federal emergency management agencies, implement an Emergency Operation Center (EOC) to respond to and manage disasters. Provide annual training for City staff in emergency management so that when they are called into action, they will be able to distribute information and resources to the public effectively. 7. Wildland Fires Threshold: Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires? Finding: Less than significant. (Draft EIR, Impact HAZ-7, pages 5.9-38 through 5.9- 42) Explanation: The Study Area and surrounding area contain designated Fire Hazard Severity Zones (FHSZ) in both Local Responsibility Areas (LRA) and State Responsibility Areas (SRA). The open space area on the western boundary of the City is designated as a Very High Fire Hazard Severity Zone (VHFHSZ) under local responsibility. In addition, a mountainous undeveloped area in the southeast portion of the City, known as Park Hill, is also identified as a VHFHSZ under local responsibility. There are no SRA found within City limits; however, there are SRA within the eastern portion of the Study Area and pockets of SRA to the east and west of City limits. Some of these areas are within the VHFHSZ in an SRA. All new construction is required to adhere to standards and requirements set forth in the San Jacinto Municipal Code, which incorporates the California Fire Code. In accordance with SJDC Section 17.300.050, all development located in or adjacent to wildfire prone areas would be required to prepare a fire management plan, which would be reviewed by RCFD and may include additional fire protection measures (e.g., landscape or open space buffers), maintenance programs for weed and vegetation abatement, installation of fire-resistant plants, and the use of noncombustible building materials. Additionally, special attention would be given to development in hillside areas in the City per Municipal Code Chapter 15.28. Further, the General Plan Update Public Safety Element includes goals and policies to reduce the risk of wildland hazards. Policy PS-2.1 requires that all buildings and facilities within the City comply with local, State, and federal regulatory standards such as the California Building and Fire Codes as well as other applicable fire safety standards. Policy PS-2.2 reduces the risk of fire to the Findings Page 78 of 266 community by coordinating emergency preparedness with the RCFD. Policy PS-2.3 directs the City to work with RCFD to maintain and regularly update the City’s Fire Hazard Severity Zone Map for changes in fire hazard severity zones consistent with changes in hazard designations by CAL FIRE. Policy PS-2.10 protect communities from unreasonable risk of wildfire within VHFHSZs through a variety of actions, including: minimizing new residential development in VHFHSZs when possible; requiring adequate fire protection services, fire protection plans, and emergency vehicle access for new development in VHFHSZs; assessing site constraints when considering land use designations near wildlands to avoid or minimize wildfire hazards as part of a land use update or amendment; requiring ongoing brush management, fuel management/modification, defensible space, fire retardant landscaping, and other project design features for new development located in areas of or adjacent to high wildfire risk; and working with RCFD to identify and maintain fire hazard reduction projects, including community fire breaks and private road and public road clearance. Policy PS-2.11 considers fire safe design (i.e., fire-resistant building and site design, materials, and landscaping) for development within VHFHSZs as part of the development review process. Action PS-2b mitigates, as feasible, existing non-conforming development to contemporary fire safe standards where feasible, including road standards and vegetative hazards. Action PS-2c requires that all new habitable structures be designed in accordance with the most recent California Building and Fire Code with local amendments adopted by the City, including the use of fire sprinklers in residential structures. Future development allowed under the General Plan Update would be required to comply with the provisions of federal, State, and local requirements related to wildland fire hazards, including State fire safety regulations associated with wildland-urban interfaces, fire-safe building standards, and defensible space requirements. As future development and infrastructure projects are considered by the City, each project would be evaluated for potential impacts, specific to the project, associated with wildland fire hazards as required under CEQA. Therefore, through compliance with existing federal, State, and local laws and regulations related to wildland fire hazards and implementation of the General Plan Update goals, policies, and actions, impact regarding the exposure of people or structures to significant loss, injury, or death involving wildland fires would be less than significant GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-2: Fire Safety. A City that is safe and adequately prepared for urban and wildfire emergencies. Findings Page 79 of 266 Policy PS-2.1: Building Fire Codes. Require that all buildings and facilities within San Jacinto comply with local, state, and federal regulatory standards such as the California Building and Fire Codes as well as other applicable fire safety standards. Policy PS-2.2: Fire Protection Services. Reduce the risk of fire to the community by coordinating emergency preparedness with the Riverside County Fire Department (RCFD). Policy PS-2.3: Fire Hazard Identification. Work with RCFD to maintain and regularly update the City’s Fire Hazard Severity Zone Map (Figure PS-2) for changes in fire hazard severity zones consistent with changes in hazard designations by CAL FIRE. Policy PS-2.5: Grant Funding. Seek grant funding, independently and in collaboration with regional partners, to mitigate potential wildfire threats to the community and to implement training workshops and projects related to defensible space and fuel reduction practices. Policy PS-2.6: Regional Coordination. Coordinate with the County of Riverside, neighboring cities, and other fire protection agencies to reduce the potential for wildfire hazards in the San Jacinto community. Policy PS-2.7: Interagency Support. Participate in the mutual aid system and automatic aid agreements to back up and supplement capabilities to respond to emergencies. Policy PS-2.8: Public Education. Work with RCFD to disseminate educational programs for residents on fire hazard risks and fire safety measures, such as defensible space and evacuation routes, with a special focus on at-risk populations. Policy PS-2.9: Post-fire Treatment. Work with CAL FIRE, United States Forest Service, United States Geologic Service, and applicable nongovernmental agencies to create a plan to address post-fire recovery activities and projects that allow burned areas to fully recover and minimize repetitive losses and further damage. Policy PS-2.10: Very High Fire Hazard Severity Zones. Protect communities from unreasonable risk of wildfire within very high fire hazard severity zones through the following actions: a. Minimize new residential development in very high fire hazard severity zones when possible. b. Require adequate fire protection services, fire protection plans, and emergency vehicle access for new development in very high fire hazard severity zones. c. Assess site constraints when considering land use designations near wildlands to avoid or minimize wildfire hazards as part of a land use update or amendment. d. Coordinate with RCFD to identify building and site design methods or other methods to minimize damage if new structures are proposed to be in very high fire hazard severity zones on undeveloped land and when rebuilding after a fire. Findings Page 80 of 266 e. As part of the RCFD review process, require ongoing brush management, fuel management/modification, defensible space, fire retardant landscaping, and other project design features for new development located in areas of or adjacent to high wildfire risk. f. Coordinate with the applicable water district to ensure necessary water supply systems and flow for structural fire suppression are provided and maintained. g. Work with RCFD to identify and maintain fire hazard reduction projects, including community fire breaks and private road and public road clearance. h. Coordinate with RCFD to define minimum standards for evacuation of residential areas in very high fire hazard severity zones. If areas with inadequate access/evacuation routes are identified, develop appropriate mitigation measures, improvement plans, or education programs to ensure safe evacuation. Policy PS-2.11: Fire Safe Design. Consider fire safe design (i.e., fire-resistant building and site design, materials, and landscaping) for development within very high fire hazard severity zones as part of the development review process. a. Locate, design and construct development to provide adequate defensibility and minimize the risk of structural loss from wildland fires. b. Design development on hillsides and canyons to reduce the increased risk of fires from topography features (i.e., steep slopes, ridge saddles). c. Minimize flammable vegetation and implement brush management best practices in accordance with the Development Code. d. Install visible home and street addressing and signage. Policy PS-2.12: Hazard Mitigation Plans. Coordinate with local, state, and federal agencies to update emergency, evacuation, and hazard mitigation plans, as necessary. Policy PS-2.13: Essential Public Facilities and Infrastructure. Locate, when feasible, new essential public facilities and infrastructure outside of very high fire hazard severity zones, including but not limited to, hospitals and health care facilities, emergency shelters, emergency command centers, emergency communication facilities, and utilities or identify construction methods or other methods to minimize damage if these facilities must be located in very high fire hazard severity zones. Action PS-2a: Implement the City’s Emergency Operations Plan to ensure the most effective allocation of resources for protection of people and property in time of an emergency, and update it as needed. Action PS-2b: Mitigate, as feasible, existing non-conforming development to contemporary fire safe standards where feasible, including road standards and vegetative hazards. Findings Page 81 of 266 Action PS-2c: Require that all new habitable structures be designed in accordance with the most recent California Building and Fire Code with local amendments adopted by the City, including the use of fire sprinklers in residential structures. Action PS-2d: Participate in Mutual Aid Agreements with neighboring cities and the Riverside County Operational Area, as required by RCFD. RESOURCE MANAGEMENT ELEMENT Policy RM-6.1: Provision of Police and Fire Services. Encourage the Riverside County Sheriff’s Department and the Riverside County Fire Department to maintain adequate staff and equipment to provide efficient, high quality, and responsive public safety services to the San Jacinto community. Policy RM-6.2: Department Consultation. Promote coordination between the City of San Jacinto and public safety services during the review of new development applications to ensure that adequate attention is being paid to fire and safety concerns during the design and planning of a project. Action RM-6f: In cooperation with the Riverside County Fire Department, adopt and maintain level of service (e.g., response times, call handling) and staffing standards, as well as a developer fee program for fire services. Review the level of services and funding levels at budget time, adjusting when necessary to ensure that adequate levels of service and facilities are provided and maintained. Future developers will contribute funds for fire services through the adopted developer fees. During the budget and CIP process, reserve future sites through purchase, eminent domain, dedication, donation, or a combination of these procedures. I. HYDROLOGY AND WATER QUALITY 1. Water Quality Standards Threshold: Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality? Finding: Less than significant. (Draft EIR, Impact HWQ-1, pages 5.10-16 through 5.10-20) Explanation: The General Plan Update sets policies and actions for build-out of the City, but it does not envision or authorize any specific development project. Because of this, the site-specific details of potential future development projects are currently unknown and analysis of potential impacts of such projects is not feasible and would be speculative. However, grading, excavation, removal of vegetation cover, and loading activities associated with future construction activities could temporarily increase runoff, erosion, and sedimentation. Construction activities also could result in soil Findings Page 82 of 266 compaction and wind erosion impacts that could adversely affect soils and reduce the revegetation potential at construction sites and staging areas. each future project must include detailed project specific drainage plans that control storm water runoff and erosion, both during and after construction. The RWQCB would require a project-specific SWPPP to be prepared for each future project that disturbs an area one acre or larger. The SWPPPs would include project-specific best management measures that are designed to control drainage and erosion. Pursuant to the Riverside County MS4 NPDES Permit and SJDC Section 17.600.100, qualifying new development and redevelopment projects are required by the City to prepare a WQMP or similar demonstration of post- construction BMPs to mitigate downstream impacts to flooding and water quality. BMPs identified in the WQMP would be required to address site design, source controls, and treatment controls. Projects not requiring a WQMP would be required to implement all of the minimum BMPs approved by the City Engineer. All new development and redevelopment projects must also be consistent with the Santa Ana River Region DAMP and would also be required to fulfill any conditions and requirements established by the City Engineer which are related to the reduction or elimination of pollutants in stormwater and urban runoff from the project site. Waters that are listed under Section 303(d) of the CWA are known as “impaired.” The City does not contain any CWA Section 303(d)-listed water bodies. The City manages local storm drain facilities and the RCFCWCD is responsible for regional flood control planning within the County. Provision of stormwater detention facilities as needed would reduce runoff rates and peak flows. General Plan Update Public Safety and Resource Management goals, policies, and actions aim to enhance stormwater quality and infiltration as well as ensure development projects are reviewed to identify potential stormwater and drainage impacts and require development to include measures to confirm off-site runoff is not increased beyond pre- development levels. Goal RM-2 aims to protect the City’s water resources. Policy RM-2.2 protects aquifers and encourages groundwater recharge within the Basin. Policy RM-2.5 ensures cooperation with local water agencies to manage stormwater runoff. Policy Action RM-1f would reduce soil erosion and pollutants in stormwater runoff by ensuring proper geotechnical and soil management techniques are implemented through the development review process. Action RM-2a further reduces soil erosion and pollutants in urban runoff by requiring new development and redevelopment projects to control stormwater runoff through implementation of BMPs and requiring projects of one acre or more to complete a SWPPP. Action RM-2b enhances water quality by cooperating with the RWQCB to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Actions RM-2g and Findings Page 83 of 266 RM-2h reduce potential impacts from septic systems on water sources by regulating new septic systems and encouraging the conversion from existing septic systems to sewer. Action RM-9e ensures cooperation with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. Existing regulatory requirements that manage water quality include requirements to obtain approval from the RWQCB for NPDES permits, other discharge permits, WQMPs, SWPPPs, and to implement BMPs. These regulatory requirements are intended to ensure that water quality does not degrade to levels that would violate water quality standards. Through implementation of the General Plan Update policies and actions, implementation of the Municipal Code requirements identified above, compliance with mandatory federal and State regulations, and compliance with the existing regulations for the San Jacinto River Watershed, future development projects associated with implementation of the General Plan Update would not violate water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the survey. Goal RM-2: Water Resources. A community that protects and conserves limited water resources. Policy RM-2.1: Regional Cooperation. Cooperate with federal, State, and county governments, and other agencies on the maintenance and improvement of the quality and quantity of local and regional groundwater resources. Policy RM-2.2: Groundwater Management. Protect aquifers within the Basin and encourage groundwater recharge. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Policy RM-2.6: Septic Systems. Discourage the use of septic systems to reduce potential negative impacts to groundwater. Findings Page 84 of 266 Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). Action RM-2b: Cooperate with the Regional Water Quality Control Board to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. Action RM-2g: During the development review process, the City shall allow new septic systems only for low density projects if they have met the RWQCB’s minimum lot size requirement of one-half acre per subsurface disposal system and where sewer connection is infeasible. Action RM-2h: Continue to encourage the conversion from existing septic systems to sewer by limiting the replacement or expansion/repair of existing septic systems as feasible. Action RM-9a: Continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. Specifically, the City should:  During the processing of development proposals, ensure the water districts are consulted regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development.  Ensure the project applicant has paid the required fees prior to occupancy of any new development.  Require water conservation devices and xeriscape water efficient landscaping in new public and private development and redevelopment projects. Action RM-9e: Cooperate with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable Findings Page 85 of 266 federal, State and local regulations. PUBLIC SAFETY ELEMENT Action PS-1g: During review of discretionary development and redevelopment proposals, require surveys of soil and geologic conditions by State licensed Engineering Geologists and Civil Engineers where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the geologic survey. Policy PS-3.7: Stormwater Runoff. Encourage new developments that add impervious surfaces to integrate low impact development best management practices to reduce stormwater runoff. Action PS-3b: Review projects for project-related flood control and stormwater management impacts to ensure that all proposed development comply with the City’s MS4 permit. 2. Groundwater Supplies Threshold: Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin? Finding: Less than significant. (Draft EIR, Impact HWQ-2, pages 5.10-20 through 5.10-23) Explanation: The Study Area is underlain by the San Jacinto Groundwater Basin of the San Jacinto River Watershed. Groundwater Basin resources in the San Jacinto River Watershed have been delineated into four separate groundwater sub-basins or groundwater management zones, of which the Study Area is within the Hemet/San Jacinto Groundwater Management Area. The Hemet/San Jacinto Management Area is in the western portion of Riverside County and includes the cities of San Jacinto and Hemet, and the unincorporated areas of Winchester, Valle Vista, and Cactus Valley. The Study Area is served by three water service providers: the City of San Jacinto Water Department, the Eastern Municipal Water District (EMWD), and the Lake Hemet Municipal Water District (LHMWD). The vast majority of the Study Area is located within the City’s and EMWD’s service area, while a small portion is located within the LHMWD service area. All three water service providers have concluded in their respective Urban Water Management Plans (UWMPs) that they will be able to meet projected future water demand. Subsequent development projects under the General Plan Update, such as residential, commercial, industrial, and roadway projects, would result in new impervious surfaces and could reduce rainwater infiltration and Findings Page 86 of 266 groundwater recharge. However, the majority of development anticipated by the General Plan Update is within areas currently developed with urban uses. The General Plan Land Use Map proposed under the General Plan Update redesignates a minimal amount (97 acres or less than two percent of the Study Area) of land currently designated for open spaces uses to urban uses. The amount of new pavement and impervious surfaces, and the extent to which they affect infiltration, depends on the site-specific features and soil types of a given project site. Projects located in urban areas would have less of an impact than projects converting open lands and spaces. Additionally, natural recharge to the San Jacinto Basin is primarily from percolation of flow in the San Jacinto River and its tributary stream. The proposed General Plan Land Use Map does not redesignate any land within the San Jacinto River; therefore, implementation under the General Plan Update would not significantly impact natural rainwater infiltration and groundwater recharge in the San Jacinto River beyond existing conditions. Given that implementation and future buildout under the General Plan Update would not appreciably add to the volume of imperious surfaces in the Study Area, when compared to the overall size of the regional groundwater basin recharge area, and that there are adequate water supplies (including groundwater) to serve the projected buildout demand of the General Plan, this potential impact would be less than significant, and no additional mitigation is required. The General Plan Update Public Safety Element and Resource Management Element includes policies that support water conservation, groundwater management, and coordination with local water districts when planning for adequate capacity to accommodate future growth. Goal RM-2 aims to protect the City’s water resources. Policy RM- 2.1 directs cooperation with regional governments and other agencies with regard to groundwater quality and quantity. Policy RM-2.2 protects aquifers and encourages groundwater recharge within the Basin. Policy RM-2.3 promotes water conservation. Policy RM-2.4 promotes groundwater recharge by avoiding development that would impact watershed areas and natural drainage channels. Policy RM-2.5 ensures cooperation with local water agencies to manage stormwater runoff. Policy RM-2.7 promotes the expanded use of reclaimed water, and Action RM-2c directs participation in programs that would expand the use of reclaimed water for urban and agricultural irrigation. Action RM-2d encourages conservation techniques, including aquifer and groundwater recharge programs, water conservation education, requiring drought resistant plant species in landscaping for public and private areas, expanding the use of reclaimed water, and requiring water conservation devises in public and private development projects. Action RM-2f incorporates open space and preservation areas in areas used for ground water recharge and drainage detention. Action RM- 9a directs cooperation with water districts to ensure the provision and maintenance of adequate water supply and sewage treatment facilities through analysis of impacts during the development proposal process, Findings Page 87 of 266 development impact fees, and requiring water conservation devices and water efficient landscaping. Action RM-9e ensures cooperation with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. Implementation of the General Plan policies, combined with continued management of the San Jacinto Groundwater Basin, would further ensure that future development anticipated by the General Plan Update would not substantially decrease groundwater supplies or interfere substantially with groundwater recharge. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Goal RM-2: Water Resources. A community that protects and conserves limited water resources. Policy RM-2.1: Regional Cooperation. Cooperate with federal, State, and county governments, and other agencies on the maintenance and improvement of the quality and quantity of local and regional groundwater resources. Policy RM-2.2: Groundwater Management. Protect aquifers within the Basin and encourage groundwater recharge. Policy RM-2.3: Conservation. Promote residential, commercial, and institutional water conservation strategies using multiple innovative strategies and contemporary best practices. Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Policy RM-2.7: Reclaimed Water. Promote the expanded use of reclaimed water, where feasible. Action RM-2c: In cooperation with the state, regional, and local water agencies and suppliers, participate in programs that seek to expand the availability and use of recycled water for irrigation where feasible and legally permitted. Specifically, support the expansion of the use of recycled water for urban and agricultural irrigation. Cooperate with Findings Page 88 of 266 these agencies to establish standards and regulations for the use of recycled water in development projects. Action RM-2d: Work with the water districts and private developers to encourage water conservation in the following ways:  Implementing aquifer and groundwater recharge programs  Participating in water conservation programs operated by the local and regional water districts  Establishing water conservation education programs  Requiring the use of drought resistant plant species in landscaping for public and private areas, including parks and recreational facilities, in accordance with the Water Efficient Landscaping requirements.  Expanding the production and use of reclaimed water  Requiring the incorporation of water conservation devices, including low flush toilets, flow restriction devices, and water conserving appliances in both new public and private development projects and rehabilitation projects. Action RM-2f: Whenever feasible, incorporate improved open space and preservation areas and quasi-active recreation facilities in areas used for ground water recharge and/or drainage detention. Action RM-9a: Continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. Specifically, the City should:  During the processing of development proposals, ensure the water districts are consulted regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development.  Ensure the project applicant has paid the required fees prior to occupancy of any new development.  Require water conservation devices and xeriscape water efficient landscaping in new public and private development and redevelopment projects. Action RM-9b: Cooperate with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Findings Page 89 of 266 Action RM-9e: Cooperate with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. PUBLIC SAFETY ELEMENT Policy PS-3.7: Stormwater Runoff. Encourage new developments that add impervious surfaces to integrate low impact development best management practices to reduce stormwater runoff. 3. Erosion, Siltation, Flooding, and Runoff Threshold: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would: result in substantial erosion or siltation on- or off-site; substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite; create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or impede or redirect flood flows? Finding: Less than significant. (Draft EIR, Impact HWQ-3, pages 5.10-24 through 5.10-28) Explanation: Erosion and Siltation Implementation under the General Plan Update would result in new development projects, such as residential, commercial, industrial, and roadway projects, which may increase the area of impervious surfaces and/or result in alteration of existing drainage patterns. Future development under the General Plan Update would be subject to NPDES permit requirements that address the control of erosion and siltation. This includes the Construction General Permit, which requires a SWPPP and the effective implementation of erosion control measures for projects greater than one acre in size (or part of a larger plan of development). The Santa Ana RWQCB conducts inspections and enforces the Construction General Permit at construction sites. Additionally, future development on hillside areas would be subject to Municipal Code Chapter 15.28, Hillside Development, which requires City approval of a development plan prior to development on hillsides in the City. Approval of a hillside development plan may require drainage and landscaping features to reduce water erosion and provide for groundwater recharge, in accordance with the general grading guidelines described in Municipal Code Section 15.28.050, Soils, Grading, and Drainage. Findings Page 90 of 266 Development under the General Plan Update would also be subject to the post-construction requirements of the MS4 NPDES permit. SJDC Section 17.600.100 requires as part of the permit application process preparation of a project-specific WQMP and drainage study for review and approval by the City prior to issuance of a grading permit(s). The WQMP ensures that implementing project designs have incorporated current LID methods (or adequately demonstrated why LID will not be feasible) for the effective treatment of pollutants of concern in stormwater runoff from a design storm event. Project-specific drainage studies would demonstrate the pre- and post-construction hydrology and hydraulics of implementing projects, and how the project and any incorporated elements, such as such detention basins, would ensure that adverse downstream impacts to receiving waters and/or receiving drainage facilities have been mitigated. Discharges that are not authorized by a NPDES permit must be permitted by other means by the Santa Ana RWQCB or SWRCB (e.g., filing a Report of Waste Discharge, Water Quality Certification). Further, the General Plan Update Public Safety Element and Resource Management Element includes goals, policies, and actions that address erosion and siltation from the addition of impervious surfaces and alteration of existing drainage patterns. Policy PS-3.7 encourages new developments that add impervious surfaces to integrate LID BMPs to reduce stormwater runoff. Actions PS-1G and RM-1f require surveys of soil and geologic conditions during review of discretionary development and redevelopment proposals, where appropriate, and requires mitigation if potential impacts are identified. Action PS-3b requires review of projects for project-related flood control and stormwater management impacts to ensure that all proposed development comply with the City’s MS4 permit. Action RM-2a reduces erosion and siltation by requiring new development and redevelopment projects to control stormwater runoff through implementation of BMPs and requiring projects of one acre or more to complete a SWPPP. Action RM-2b enhances water quality by cooperating with the RWQCB to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Through implementation of the General Plan Update policies and existing regulations, erosion/siltation impacts from changes to the existing drainage patterns and increasing impervious surfaces would be less than significant and no mitigation is required Surface Runoff Future development under the General Plan Update has the potential to result in changes to the existing drainage patterns and could exceed the capacity of stormwater drainage systems and/or cause flooding on- or off- site of a project. The RCFCWCD and the City operate and maintain a network of flood control facilities within the Study Area. As specified in Findings Page 91 of 266 SJDC Section 17.600.100, WQMPs would be required for qualifying projects to incorporate LID BMPs into the drainage system, slowing on- and off-site flow rates and decreasing flooding. WQMPs would also evaluate methods of on-site retention of runoff, such as cisterns, rain barrels, and basins which allow for a metered release of flows, typically after the rain event has passed, when capacity becomes available in the downstream pipes and channels. The General Plan Update contains goals, policies, and actions to provide adequate stormwater infrastructure for flood control and to reduce run-off quantity. Policy PS-3.7 encourages new developments that add impervious surfaces to integrate LID BMPs to reduce stormwater runoff. Policy PS-3.10 ensures coordination with the RCDCD to consider the expansion of flood control facilities based on changing flood conditions associated with climate change and extreme weather. Policy PS-3.12 directs the City to regularly assess and maintain local storm drainage infrastructure to ensure that the system is functioning property. Action PS-3f ensures the City regularly reviews county, State, and federal flood control best practices and incorporates appropriate standards into the Municipal Code. Policy RM-2.5 ensures cooperation with local water agencies to manage stormwater runoff. Action RM-2a requires new development and redevelopment projects to control stormwater runoff through implementation of BMPs and requiring projects of one acre or more to complete a SWPPP. Through implementation of the General Plan Update Plan goals, policies, and actions and existing federal, State, and local regulations discussed above, runoff would not exceed the capacity of drainage systems, provide substantial additional sources of polluted runoff, or cause flooding impacts from changes to the existing drainage patterns and increased impervious surfaces. Therefore, impacts would be less than significant and no mitigation is required. Flood Flows Several portions of the Study Area are subject to the 100-year flood and a small portion of the City is located within a mapped portion of the 500-year FEMA flood zone. Based on FEMA mapping, the northern portion of the City, generally located along the San Jacinto River and the Colorado River Aqueduct, is within a mapped portion of the 100-year FEMA flood zone. The General Plan Update sets policies and actions for buildout of the City, but does not envision or authorize any specific development project. Policy PS-3.1 directs City coordination with local, state, and federal agencies to ensure that the City’s regulations related to flood control are in compliance with federal, state, and local standards. Policy PS-3.6 ensures the City adheres to the latest building, site, and design codes in the California Building Code and FEMA flood control guidelines to avoid or minimize the risk of flooding hazards. Policy PS-3.8 protects the community from flood hazards by providing and maintaining flood control facilities and limiting development within the flood plain and flood way. Policy PS-3.11 requires Findings Page 92 of 266 all new development and redevelopment in areas susceptible to flooding to incorporate mitigation measures designed to reduce flood hazards. Policy PS-3.12 directs the City to regularly assess and maintain local storm drainage infrastructure to ensure that the system is functioning property. Policy RM-2.4 encourages development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Action PS-3f ensures the City regularly reviews county, State, and federal flood control best practices and incorporates appropriate standards into the Municipal Code. As described above, Municipal Code Chapter 15.40, Floodplain Management, provides land use and development regulations to all land within flood-prone, mudslide (i.e., mudflow), or flood-related erosion areas, including City review of development permits to ensure adherence to federal, State, and local flood-related regulations as well as additional standards applicable to all areas of special flood hazards in the City. Future development projects would be reviewed by the City to determine if a project site is located within areas of special flood hazards and thus subject to additional provisions set forth in Chapter 15.40. Additionally, construction of storm drainage improvements would occur as part of an overall development or infrastructure project, and would be considered in the environmental review associated with the specific project being proposed. With implementation of General Plan Update goals, policies, and implementation and compliance with existing regulations, the General Plan Update would not impede or redirect flood flows; impacts would be less than significant and no mitigation is required. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Action PS-1g: During review of discretionary development and redevelopment proposals, require surveys of soil and geologic conditions by State licensed Engineering Geologists and Civil Engineers where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the geologic survey. Policy PS-3.1: Regulatory Compliance. Coordinate with local, state, and federal agencies to ensure that the City’s regulations related to flood control are in compliance with federal, state, and local standards. Policy PS-3.6: Building Codes. Adhere to the latest building, site, and design codes in the California Building Code and FEMA flood control guidelines to avoid or minimize the risk of flooding hazards in the community. Policy PS-3.7: Stormwater Runoff. Encourage new developments that add impervious surfaces to integrate low impact development best management practices to reduce stormwater runoff. Findings Page 93 of 266 Policy PS-3.8: Development in the Flood Plain and Flood Way. Protect the community from flooding hazards by providing and maintaining flood control facilities and limiting development within the flood plain and flood way as necessary to protect public health and safety. Policy PS-3.9: Existing Flood Zones. Maintain dialogue with the RCFCD regarding regional flood facilities. Policy PS-3.10: Changing Conditions. Coordinate with the RCDCD to consider the need to expand the capacity of flood control facilities based on changing flood conditions associated with climate change and extreme weather. Policy PS-3.11: Mitigation. Require that all new development and redevelopment in areas susceptible to flooding incorporate mitigation measures designed to reduce flood hazards. Policy PS-3.12: Adequate Infrastructure. Maintain and regularly assess the status of local storm drainage infrastructure to ensure that the system is functioning property. Action PS-3b: Review projects for project-related flood control and stormwater management impacts to ensure that all proposed development comply with the City’s MS4 permit. Action PS-3f: Periodically review county, state, and federal flood control best practices and incorporate appropriate standards into the Municipal Code. RESOURCE MANAGEMENT ELEMENT Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the survey. Policy RM-2.1: Regional Cooperation. Cooperate with federal, State, and county governments, and other agencies on the maintenance and improvement of the quality and quantity of local and regional groundwater resources. Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through Findings Page 94 of 266 implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). Action RM-2b: Cooperate with the Regional Water Quality Control Board to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. 4. Flood Hazard, Tsunami, and Seiche Zones Threshold: In flood hazard, tsunami, or seiche zones, would the project risk release of pollutants due to project inundation? Finding: Less than significant. (Draft EIR, Impact HWQ-4, pages 5.10-28 through 5.10-32) Explanation: Several portions of the Study Area are subject to the 100-year flood and a small portion of the City is located within a mapped portion of the 500-year FEMA flood zone. Based on FEMA mapping, the northern portion of the City, generally located along the San Jacinto River and the Colorado River Aqueduct, is within a mapped portion of the 100-year FEMA flood zone. pursuant to the CWA, each subsequent development project or improvement project that disturbs more than one acre would be required to obtain NPDES coverage under the Construction General Permit, which would require an approved SWPPP that includes BMPs for grading and preservation of topsoil. SWPPPs are designed to control storm water quality degradation to the extent practicable using BMPs during and after construction. In addition, the regulations of San Jacinto Municipal Code Chapter 15.40 restrict land uses that are dangerous to public health, safety, and property due to water or erosion hazards and require land uses vulnerable to flood, mudslide, or flood-related erosion be protected against flood damage at the time of initial construction. Further, the General Plan Update Safet y Element includes goals, policies, and actions to reduce the risk of flooding and ensure compliance with regulatory requirements. Policy PS-3.1 directs City coordination with local, state, and federal agencies to ensure that the City’s regulations related to flood control are in compliance with federal, state, and local standards. Policy PS-3.4 directs coordination with FEMA to ensure that FIRMs correctly depict flood hazards in the City. Findings Page 95 of 266 Policy PS-3.5 reduces flood hazards and addresses flood-prone areas within San Jacinto through implementation of the standards and requirements defined in the Municipal Code. Policy PS-3.6 ensures the City adheres to the latest building, site, and design codes in the California Building Code and FEMA flood control guidelines to avoid or minimize the risk of flooding hazards. Policy PS-3.8 protects the community from flood hazards by providing and maintaining flood control facilities and limiting development within the flood plain and flood way. Policy PS-3.10 ensures coordination with the RCDCD to consider the expansion of flood control facilities based on changing flood conditions associated with climate change and extreme weather. Policy PS-3.11 requires all new development and redevelopment in areas susceptible to flooding to incorporate mitigation measures designed to reduce flood hazards. Policy PS-3.12 directs the City to regularly assess and maintain local storm drainage infrastructure to ensure that the system is functioning property. Action PS-3a monitors changes in federal and State laws and regulations related to local flood protection, including the NFIP and incorporates necessary changes into the Municipal Code, the City's Emergency Operations Plan, and building codes as required and ensures that the City’s regulations require that new development within flood hazard zones is consistent with the Public Safety Element and meets flood protection requirements of State law. Action PS- 3c disseminates information on flooding, flood control on private property, floodplains, and flood preparedness to the public. Action PS-3e requires all development located within a 100-year flood plain to be consistent with the requirements of FEMA. Action PS-3f ensures the City regularly reviews county, State, and federal flood control best practices and incorporates appropriate standards into the Municipal Code. Action PS-3h ensures continued City participation in the NFIP. Action PS-3i ensures continued implementation of the Flood Plain Management program, and ensures continued compliance with the rules and regulations for development in areas of special flood hazards as determined by the FEMA and as illustrated on the most recent FIRM. The Study Area is located approximately 41 miles from the Pacific Ocean; therefore, the Study Area is too far away from the nearest ocean to have any meaningful tsunami risk. Much of the western and eastern portions of San Jacinto have the potential to be inundated during failure of one or more dams. However, as described above, the dams potentially affecting the Study Area do not have a history of dam failure, and monitoring and mitigation of dam failure is constantly occurring at both the federal and State levels. Additionally, the General Plan Update Safety Element includes goals, policies, and actions to reduce the risks associated with dam inundation. Policy PS -3.2 ensures coordination with the agencies responsible for dam operation and maintenance to reduce the risk of dam inundation from the San Jacinto Reservoir, Diamond Valley Findings Page 96 of 266 Lake, Little Lake, and Hemet Lake dams. Policy PS-3.3 ensures coordination with Reflection Lake staff to manage overflow and prevent safety hazards on Warren Road and Cottonwood Avenue. Therefore, with implementation of General Plan Update goals, policies, and implementation and compliance with existing regulations, impacts associated with the risk of pollutants from seiches and flooding that may result from adoption and implementation of the General Plan Update would be less than significant and no mitigation is required. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Action PS-1g: During review of discretionary development and redevelopment proposals, require surveys of soil and geologic conditions by State licensed Engineering Geologists and Civil Engineers where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the geologic survey. Policy PS-3.1: Regulatory Compliance. Coordinate with local, state, and federal agencies to ensure that the City’s regulations related to flood control are in compliance with federal, state, and local standards. Policy PS-3.2: Dam Operation and Maintenance. Coordinate with the agencies responsible for dam operation and maintenance to reduce the risk of dam inundation from the San Jacinto Reservoir, Diamond Valley Lake, Little Lake, and Hemet Lake dams. Policy PS-3.3: Reflection Lake Overflow. Coordinate with Reflection Lake staff to manage overflow and prevent safety hazards on Warren Road and Cottonwood Avenue. Policy PS-3.4: FEMA Coordination. Coordinate with the Federal Emergency Management Agency (FEMA) to ensure that Federal Insurance Rate Maps correctly depict flood hazards in the City. Policy PS-3.5: Municipal Code. Implement the standards and requirements defined in the Municipal Code to reduce flood hazards and address flood-prone areas within San Jacinto. Policy PS-3.6: Building Codes. Adhere to the latest building, site, and design codes in the California Building Code and FEMA flood control guidelines to avoid or minimize the risk of flooding hazards in the community. Policy PS-3.7: Stormwater Runoff. Encourage new developments that add impervious surfaces to integrate low impact development best management practices to reduce stormwater runoff. Policy PS-3.8: Development in the Flood Plain and Flood Way. Protect the community from flooding hazards by providing and maintaining flood control facilities and limiting Findings Page 97 of 266 development within the flood plain and flood way as necessary to protect public health and safety. Policy PS-3.9: Existing Flood Zones. Maintain dialogue with the RCFCD regarding regional flood facilities. Policy PS-3.10: Changing Conditions. Coordinate with the RCDCD to consider the need to expand the capacity of flood control facilities based on changing flood conditions associated with climate change and extreme weather. Policy PS-3.11: Mitigation. Require that all new development and redevelopment in areas susceptible to flooding incorporate mitigation measures designed to reduce flood hazards. Policy PS-3.12: Adequate Infrastructure. Maintain and regularly assess the status of local storm drainage infrastructure to ensure that the system is functioning property. Action PS-3a: Monitor changes in Federal and State laws and regulations related to local flood protection, including the National Flood Insurance Program and incorporate necessary changes into the Municipal Code, the City's Emergency Operations Plan, and building codes as required and ensure that the City’s regulations require that new development within flood hazard zones is consistent with this Public Safety Element and is required to meet the flood protection requirements of State law, including but not limited to Government Code Sections 65007, 65865.5, 65962 and 66474.5. Action PS-3b: Review projects for project-related flood control and stormwater management impacts to ensure that all proposed development comply with the City’s MS4 permit. Action PS-3c: Disseminate information on flooding, flood control on private property, floodplains, and flood preparedness to the public. Action PS-3d: Communicate with FEMA periodically regarding updates to Flood Insurance Rate Maps and Letter of Map Revisions. Action PS-3e: All development located within a 100-year flood plain shall be consistent with the requirements of the Federal Emergency Management Agency. Action PS-3f: Periodically review county, state, and federal flood control best practices and incorporate appropriate standards into the Municipal Code. Action PS-3g: Work with the RCFCD and Regulatory Federal, State and local agencies and department to apply for grants that provide funding for local drainage controls. FEMA’s Hazard Mitigation Grant, Flood Mitigation Assistance Programs, and Pre-disaster Mitigation Program, CalEPA and the CA State Water Resources Control Board offer grants to municipalities throughout California. Action PS-3h: Continue to participate in the National Flood Insurance Program (NFIP). Findings Page 98 of 266 Action PS-3i: Continue to implement the Flood Plain Management program, which establishes rules and regulations for flood plain management. Continue to apply the rules and regulations to development in areas of special flood hazards as determined by the Federal Emergency Management Agency (FEMA) and as illustrated on the most recent Flood Insurance Rate Map (FIRM). RESOURCE MANAGEMENT ELEMENT Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the survey. Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). Action RM-2b: Cooperate with the Regional Water Quality Control Board to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. 5. Water Quality Control Plan and Groundwater Management Plan Threshold: Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? Finding: Less than significant. (Draft EIR, Impact HWQ-5, pages 5.10-32 through 5.10-36) Explanation: The local water quality control plan (Basin Plan) is maintained by the Santa Ana RWQCB. When permittees and projects comply with the provisions of applicable NPDES permits and water quality permitting, they are consistent with the Basin Plan. The General Plan Update includes policies to implement NPDES requirements and enforcement of said regulations, such Findings Page 99 of 266 as: Action RM-2a, which requires new development and redevelopment projects to control stormwater runoff through implementation of BMPs and requiring projects of one acre or more to complete a SWPPP, pursuant to California RWQCB Santa Ana Region – Order No. 00-65 and the City’s MS4 permit; and Action PS-3b which requires review of projects for project-related flood control and stormwater management impacts to ensure that all proposed development complies with the City’s MS4 permit. Through implementation of existing regulations and the General Plan Update policies and actions, implementation of the General Plan Update would not conflict or obstruct a water quality control plan. Therefore, impacts in this regard will be less than significant. The San Jacinto Basin was designated a high-priority basin in DWR’s 2019 SGMA Basin Prioritization report. The Groundwater Sustainability Plan for the San Jacinto Groundwater Basin applies to the entirety of the non- adjudicated portion of the Basin. The San Jacinto Basin Judgment and Groundwater Sustainability Plan together provide for the legal and practical means of ensuring that the waters of the Basin are put to maximum beneficial use. The General Plan Update does not propose site-specific development. New development and redevelopment projects accommodated by the General Plan Update would be subject to the Judgment and Groundwater Sustainability Plan. Subsequent development projects would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA. Therefore, the General Plan Update would not conflict with implementation of a sustainable groundwater management plan. The General Plan Update includes policies to support the monitoring, protection, and development of groundwater resources which is consistent with the tasks of the Watermaster. Policy RM-2.1 directs cooperation with regional governments and other agencies with regard to groundwater quality and quantity. Policy RM-2.2 protects aquifers and encourages groundwater recharge within the Basin. Policy RM-2.3 promotes water conservation. Policy RM-2.4 promotes groundwater recharge by avoiding development that would impact watershed areas and natural drainage channels. Policy RM-2.5 ensures cooperation with local water agencies to manage stormwater runoff. Action RM-2d encourages conservation techniques, including aquifer and groundwater recharge programs, water conservation education, requiring drought resistant plant species in landscaping for public and private areas, expanding the use of reclaimed water, and requiring water conservation devises in public and private development projects. Actions RM-2g and RM-2h reduce potential impacts from septic systems on water sources by regulating new septic systems and encouraging the conversion from existing septic systems to sewer. Action RM-9a directs cooperation with water districts to ensure the provision and maintenance of adequate water supply and sewage treatment facilities Findings Page 100 of 266 through analysis of impacts during the development proposal process, development impact fees, and requiring water conservation devices and water efficient landscaping. Action RM-9b ensures cooperation with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9e ensures cooperation with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. Thus, adoption and implementation of the General Plan Update will not conflict or obstruct a sustainable groundwater management plan and impacts would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the i mpacts per the recommendations contained within the survey. Goal RM-2: Water Resources. A community that protects and conserves limited water resources. Policy RM-2.1: Regional Cooperation. Cooperate with federal, State, and county governments, and other agencies on the maintenance and improvement of the quality and quantity of local and regional groundwater resources. Policy RM-2.2: Groundwater Management. Protect aquifers within the Basin and encourage groundwater recharge. Policy RM-2.3: Conservation. Promote residential, commercial, and institutional water conservation strategies using multiple innovative strategies and contemporary best practices. Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Policy RM-2.6: Septic Systems. Discourage the use of septic systems to reduce potential Findings Page 101 of 266 negative impacts to groundwater. Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). Action RM-2b: Cooperate with the Regional Water Quality Control Board to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. Action RM-2d: Work with the water districts and private developers to encourage water conservation in the following ways:  Implementing aquifer and groundwater recharge programs  Participating in water conservation programs operated by the local and regional water districts  Establishing water conservation education programs  Requiring the use of drought resistant plant species in landscaping for public and private areas, including parks and recreational facilities, in accordance with the Water Efficient Landscaping requirements.  Expanding the production and use of reclaimed water  Requiring the incorporation of water conservation devices, including low flush toilets, flow restriction devices, and water conserving appliances in both new public and private development projects and rehabilitation projects. Action RM-2e: Through the development review process, require that sufficient water supply and water infrastructure capacity is available to serve the development prior to approval of the project, pursuant to Water Code Section 10910 and Government Code Section 66473.7. Action RM-2f: Whenever feasible, incorporate improved open space and preservation Findings Page 102 of 266 areas and quasi-active recreation facilities in areas used for ground water recharge and/or drainage detention. Action RM-2g: During the development review process, the City shall allow new septic systems only for low density projects if they have met the RWQCB’s minimum lot size requirement of one-half acre per subsurface disposal system and where sewer connection is infeasible. Action RM-2h: Continue to encourage the conversion from existing septic systems to sewer by limiting the replacement or expansion/repair of existing septic systems as feasible. Action RM-9a: Continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. Specifically, the City should:  During the processing of development proposals, ensure the water districts are consulted regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development.  Ensure the project applicant has paid the required fees prior to occupancy of any new development.  Require water conservation devices and xeriscape water efficient landscaping in new public and private development and redevelopment projects. Action RM-9b: Cooperate with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9e: Cooperate with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. PUBLIC SAFETY ELEMENT Action PS-1g: During review of discretionary development and redevelopment proposals, require surveys of soil and geologic conditions by State licensed Engineering Geologists and Civil Engineers where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the geologic survey. Policy PS-3.7: Stormwater Runoff. Encourage new developments that add impervious surfaces to integrate low impact development best management practices to reduce Findings Page 103 of 266 stormwater runoff. Action PS-3b: Review projects for project-related flood control and stormwater management impacts to ensure that all proposed development comply with the City’s MS4 permit. J. LAND USE AND PLANNING 1. Established Communities Threshold: Would the project physically divide an established community? Finding: Less than significant. (Draft EIR, Impact LU-1, pages 5.11-1 through 5.11- 12) Explanation: The proposed General Plan Update establishes the City’s vision for future growth and development. Goal LU-1 of the General Plan Update aims to achieve “A community with a land use plan that accommodates a mix of uses to meet current and future needs.” The land uses allowed under the proposed General Plan provide opportunities for cohesive new growth at infill locations within existing urbanized areas of the City, as well as new growth adjacent to existing urbanized areas, but would not create physical division within the community. The proposed General Plan Update does not include any new areas designated for urbanization or new roadways, infrastructure, or other features that would divide existing communities. The General Plan Update Land Use Element includes policies and actions to support cohesive development that would not physically divide an established community. Specifically, Policy LU-2.6 would continue to annex land within the City’s SOI to promote compatibility between new and existing uses. Policy LU-3.1 considers as part of the development review process the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Action LU-3b, through the development review process, evaluates development proposals for land use and transportation network compatibility with existing surrounding or abutting development or neighborhoods. The proposed General Plan would have a less than significant impact associated with the physical division of an established community. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures Findings Page 104 of 266 compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). Policy LU-2.6: Annexation. Continue to annex land within the City’s Sphere of Influence to promote compatibility between new and existing uses. Policy LU-3.1: Surrounding Uses. Consider as part of the development review process the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Policy LU-3.2: Residential Uses. Require that new residential development be designed to protect residents from potential conflicts with adjacent land uses, and other features including rail corridors, and high-volume roadways. Action LU-3b: Through the development review process, evaluate development proposals for land use and transportation network compatibility with existing surrounding or abutting development or neighborhoods. 2. Conflicts With Plans Threshold: Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Finding: Less than significant. (Draft EIR, Impact LU-2, pages 5.11-13 through 5.11- 29) Explanation: The proposed General Plan Update was prepared in conformance with State laws and regulations associated with the preparation of general plans, including requirements for environmental protection. Discussion of the proposed General Plan’s consistency with State regulations, plans, and policies associated with specific environmental issues (e.g., air quality, transportation, water quality, etc.) is provided in the relevant chapters of this Draft EIR. The State would continue to have authority over any State- owned lands in the vicinity of the City and the proposed General Plan Update would not conflict with continued application of State land use plans, policies, and regulations adopted to avoid or mitigate environmental effects. The General Plan Update would be consistent with SCAG’s regional planning efforts and a less than significant impact would occur in this regard. As set forth by State law, the General Plan serves as the primary planning document for the City and subordinate documents and plans would be updated to be consistent with the General Plan. Similar to the existing General Plan, the proposed General Plan Update focuses on a balanced land use pattern, creating a community where new development blends with existing neighborhoods, and promoting the City as a desirable place to live and work. The proposed General Plan Update carries forward and enhances policies and measures from the City’s existing General Plan that were Findings Page 105 of 266 intended for environmental protection, and would not remove or conflict with City plans, policies, or regulations adopted for environmental protection. The proposed General Plan Update would require modifications to the City’s Development Code to provide consistency between the General Plan and zoning; however, these modifications will not remove or adversely alter portions of the San Jacinto Municipal Code that were adopted to mitigate an environmental effect. Subsequent development and infrastructure projects would be required to be consistent with all applicable policies, standards, and regulations, including those land use plans, policies, and regulations adopted to mitigate environmental effects by the City as well as those adopted by agencies with jurisdiction over components of future development projects. Any potential environmental impact associated with conflicts with land use requirements would be less than significant. The policies listed below would ensure that the General Plan Update does not conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). Policy LU-2.2: Infill Development. Encourage new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Policy LU-2.4: Agricultural Uses. Allow and support the continuation of agricultural operations on lands within the City limits that are designated for develo pment uses, until such time as new development is proposed for the land. Action LU-2e: Give priority to redevelopment and infill projects that reduce development pressure on agricultural lands and other sensitive resources. Action LU-2f: Work with property owners and agricultural operations interested in retaining agricultural land to identify feasible ways to maintain the land in agricultural production. Apply agricultural conservation easements to land desired by the City and the property owner to remain as agricultural land. Policy LU-4.4 Pedestrian Design. Support pedestrian-friendly and pedestrian-scaled development that encourages more social interaction and less automobile use, especially in the Downtown Village. Findings Page 106 of 266 MOBILITY ELEMENT Policy M-1.1: Balanced Circulation System. Provide for a balanced circulation system that promotes the safe and efficient movement of people and goods throughout the City (Figure M-1). Policy M-1.2: Access and Mobility. Strive to maintain sufficient access and mobility for all modes of travel and users of the roadway network. Policy M-1.3: Maintenance and Infrastructure. Support the circulation system with consistent maintenance and necessary infrastructure improvements, such as flood control and bridges, as funding is available. Policy M-1.4: Truck Routes. Maintain a truck route network that supports the efficient movement of goods within and beyond the City, while minimizing noise and safety hazards to the extent feasible. Policy M-1.5: Transportation Improvements for All Users. Encourage roadway, sidewalk, and median improvements that enhance the visual character of the roadway system and promote pedestrian and bicycle safety. Policy M-1.6: ADA Accessibility. Manage and improve the City's transportation network to be safe, accessible, and consistent with the Americans with Disabilities Act (ADA) to allow mobility-impaired users to safely travel within and beyond the City. Policy M-1.8: Traffic Calming. Encourage programming and design strategies to maintain safe vehicular speeds on roadways, including traffic calming measures, where applicable. Action M-1a Periodically review and assess the vehicular operating conditions along City facilities to determine what, if any, improvements are warranted to maintain a safe and efficient flow of traffic in the City. Improvements may be identified and included in the City’s Capital Improvement Plan and/or required as part of project approval through the development review process. Action M-1b: As part of development review and specific plans, review any existing gaps in active transportation infrastructure, including sidewalk gaps or trails previously identified in the Trails Master Plan, that inhibit mobility. Improvements may be recommended or required as part of projects to meet M-1 policies. Action M-1d: Include ADA-accessible facilities as part of roadway infrastructure projects. Goal M-2: Regional Circulation System. A circulation system that is integrated with the larger regional transportation system to support the economic well-being of the community. Policy M-2.1: Regional Agency Coordination. Coordinate with regional transportation agencies, including the California Department of Transportation (Caltrans), the Riverside Findings Page 107 of 266 County Transportation Commission (RCTC), and the Riverside Transit Agency (RTA) to implement roadway improvements that encourage the safe and efficient flow of traffic within and beyond the City—for example, State Route 79 (SR-79) and Mid County Parkway (Figure M-2). Policy M-2.2: Adjacent Jurisdictions. Coordinate with adjacent jurisdictions regarding the planning and construction of local nearby circulation improvements and public transit systems. Policy M-2.3: Regional Development. Coordinate with adjacent jurisdictions to reduce the impacts of proposed development projects outside the City on transportation facilities and services within the City. Policy M-2.4: Public Transit. Promote public transportation programs that effectively serve the City's residents and workers by connecting users to local and regional destinations, including jobs, recreation, retail, and other activity centers. Action M-2a: Periodically coordinate with RCTC and Caltrans to inform the City’s long- term mobility plans and priorities through regular communication and coordination. Action M-2b: Participate in regional planning forums to bring the City’s concerns to the regional level. Action M-2c: Monitor land use, circulation planning, and the development review process of neighboring jurisdictions, so that the City has an opportunity to recommend that impacts to the City are considered by those jurisdictions. Action M-2d: Periodically coordinate with RTA to actively engage on transit service planning and operational needs. Policy M-3.1: Complete Streets. Apply context-sensitive complete streets principles to new roadways and to transportation improvements to serve all modes of travel and users of all ages and abilities. Policy M-3.2: Multimodal Facilities. Incorporate facilities and design features into transportation improvement projects that support the use of public transit and active transportation. Action M-3a: When planning roadway facilities, incorporate the concept of complete streets. Consider design elements for all modes and users that use streets in a context- sensitive manner. Goal M-4: Active Transportation. An extensive and regionally linked network of trails, bicycle lanes, and sidewalk paths that encourage active transportation as viable for transportation and recreation Policy M-4.2: Active Transportation Network. Provide and maintain an extensive active transportation and trail network that supports bicycles, pedestrians, and equestrians and is Findings Page 108 of 266 linked to regional facilities and facilities of adjacent jurisdictions (Figure M-2). Policy M-4.5: Support Facilities. Encourage new developments to provide bicycle parking, lockers, and other support facilities for bicyclists. Action M-4a: Review and update the City’s Municipal Code, as necessary, to consider bicycle and pedestrian access as part of the site plan review for new development projects. Goal M-6: Transportation Management. Transportation management strategies that comply with the County Congestion Management Plan and regional and statewide greenhouse gas emissions targets. Policy M-6.1: Vehicle Miles Traveled. Maintain vehicle miles traveled (VMT) thresholds and Transportation Demand Management (TDM) mitigation requirements for the purpose of environmental review under the California Environmental Quality Act (CEQA). Policy M-6.2: Transportation Demand Management. Create and implement TDM and congestion management mitigation measures in areas experiencing high levels of congestion and VMT levels. Policy M-6.3: Regional Plans. Review development proposals for compliance with regional plans such as the RCTC Congestion Management Plan. Policy M-6.4: New Development. Work with developers to reduce greenhouse gas emissions and minimize congestion related to new development through improvements to the circulation system and on-site improvements that encourage non-vehicular modes of travel. Action M-6a: Review and update the City’s Municipal Code and related implementation documents, as necessary, to reflect TDM best practices. Action M-6b: Consider allowing for a reduction in parking standards for developments if comprehensive TDM programs and/or parking strategies are provided. Action M-6c: Require developments that are approved based on TDM plans to incorporate monitoring and enforcement of TDM targets as part of those plans. PUBLIC SAFETY ELEMENT Policy PS-7.1 Community Preparedness. Promote a well-prepared City that can effectively overcome natural disasters and scarcity of resources due to climate change. Policy PS-7.2 Collaboration. Collaborate with local, regional, state and/or federal jurisdictions and agencies on climate resiliency and adaptation strategies. Policy PS-7.3 Ecological Recovery. Coordinate with federal, state, and local agencies to establish ecological recovery programs. Findings Page 109 of 266 Policy PS-7.4: Air Pollution. Work with responsible federal, state, and county agencies to decrease air pollution emissions occurring within the air basin to reduce the risk posed by air pollution. Policy PS-7.5: Energy Supply. Promote plans and programs that increase sustainable energy sources. Policy PS-7.6: Programs. Implement necessary actions and programs to improve drought preparation and response for the most vulnerable community members. Policy PS-7.7: Cooling Centers. Designate public buildings, specific private buildings, or institutions with air conditioning as public cooling shelters; extend hours at air-conditioned sites during periods of extreme heat or power outage (if the site is supported by a backup generator). Policy PS-7.8: Storms. Provide access to flood protection resources and services (signage, sandbags, etc.) as feasible at designated public facilities during and after extreme weather events. Policy PS-7.9: Special Assistance. Address the needs of individuals with limited mobility or limited access to transportation for access to safe and comfortable shelter during extreme heat events or other severe weather events. Policy PS-7.10: Leadership. Demonstrate leadership in local climate planning efforts through a range of tangible actions and policies at the municipal operations level. Policy PS-7.11: Greenhouse Gas Reductions. Reduce communitywide greenhouse gas emissions locally by actively supporting regional efforts to reduce greenhouse gases throughout the county. Policy PS-7.12: Extreme Heat Vulnerabilities. Require that new developments, major remodels, and redevelopments address urban heat island issues and reduce urban heat island effects for the proposed project site and adjacent properties. Policy PS-7.13: Urban Forestry Plan. Minimize damage associated with wind-related hazards and address climate change and urban heat island effects through the development of an urban forestry plan and proper landscaping planting and management techniques. Policy PS-7.14: Ongoing Monitoring. Monitor climate change-related effects with local, regional, state, and/or federal partners to provide information of effectiveness of existing infrastructure and programs. Action PS-7a: Provide information and resources to the public and businesses regarding steps the City is taking to address the issue of climate change. Action PS-7d: Evaluate the feasibility for government-constructed and/or -operated new development to exceed the CalGreen Tier 1, or successor program, standards. Findings Page 110 of 266 Action PS-7e: Promote the use of sustainable and carbon-neutral energy sources in new development. Action PS-7f: Explore using renewable energy and clean generation technologies such as solar, wind, biogas, or fuel cells to power City facilities where appropriate. RESOURCE MANAGEMENT ELEMENT Goal RM-1: Natural Resources. A community that conserves and protects its natural resources. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3: Biological Resource Protection. Preserve and enhance biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with state and federal resource agency requirements. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Goal RM-4: Air Quality and Greenhouse Gas Emissions. Improved air quality in San Jacinto and the region through reductions in air pollutants and greenhouse gas (GHG) emissions. Policy RM-4.1: Regional Cooperation. Support regional efforts, including those organized through the South Coast Air Quality Management District (SCAQMD), the Southern California Association of Governments (SCAG), the Western Riverside Council of Governments (WRCOG), and the California Air Resource Board (CARB) to implement the regional Air Quality Management Plan. Policy RM-4.2: Measurement and Enforcement. Coordinate with the California Air Resources Board (CARB) and South Coast Air Quality Management District to support their ability to properly measure air quality at emission sources and enforce the standards of the Clean Air Act. Policy RM-4.4: Transportation Options. Promote alternative modes of transportation to reduce vehicular emissions and improve air quality. (See Mobility Element) Policy RM-4.5: Walkability. Encourage pedestrian-scale development and pedestrian- friendly design features to reduce vehicle emissions. (See Mobility Element) Policy RM-4.6: Sustainable Development. Encourage and incentivize higher density and Findings Page 111 of 266 mixed-use development opportunities within designated areas of the City to lessen the impacts of traffic congestion on local air quality. (See Land Use Element) Policy RM-4.7: Sensitive Receptors. Insulate sensitive receptors from areas of heightened air quality pollution, by utilizing land use planning to buffer and protect residential areas. Policy RM-4.8: Mitigation. Require the implementation of relevant mitigation measures for all future development upon identification of potential air quality impacts. Policy RM-4.9: Local Reduction Targets. The City of San Jacinto establishes the following per capita GHG reduction targets, in order to meet the requirements established by the state under AB 32 and SB 32, consistent with the CARB’s 2017 Scoping Plan:  1.83 MTCO2e per service population (SP) by 2030; and  0.62 MTCO2e per service population (SP) by 2050 Policy RM-4.10: GHG Reduction. Consider and adopt new local policies and programs that will help to provide energy efficient alternatives to fossil fuel use and reduce consumption in order to reduce greenhouse gas emissions consistent with the local measures identified in the Western Riverside County Subregional Climate Action Plan for San Jacinto. Policy RM-4.11: Carbon Reduction. Expand the number of parks and trees in San Jacinto to provide a larger carbon sink or area containing natural sources that retain more carbon than what those sources emit. Action RM-4a: Implement the local GHG reduction measures identified in the Western Riverside Council of Government’s Subregional Climate Action Plan (CAP) for San Jacinto, participate in future updates of the CAP, and on an annual basis record the status of each local measure and submit the results to WRCOG using the WRCOG Climate Action Plan Tracking Tool. Action RM-4b: As applicable, review new industrial and commercial development projects during the CEQA process for potential air quality impacts to residences and other sensitive receptors. Ensure that mitigation measures and best management practices are implemented to reduce significant emissions of criteria pollutants. Action RM-4c: Review development, infrastructure, and planning projects for consistency with SCAQMD requirements during the CEQA review process. Require project applicants to prepare air quality analyses to address SCAQMD and General Plan requirements, as appropriate, which include analysis and identification of: 1. Air pollutant emissions associated with the project during construction, project operation, and cumulative conditions. 2. Potential exposure of sensitive receptors to toxic air contaminants. Findings Page 112 of 266 3. Significant air quality impacts associated with the project for construction, project operation, and cumulative conditions. 4. Mitigation measures to reduce significant impacts to less than significant or the maximum extent feasible where impacts cannot be mitigated to less than significant. Action RM-4d: Work with the South Coast Air Quality Management District, Southern California Association of Governments, the Western Riverside Council of Governments, and the California Air Resource Board to implement programs aimed at improving regional air quality. Action RM-4e: Continue to review development projects to ensure that all new public and private development complies with the California Code of Regulations (CCR), Title 24 standards as well as the energy efficiency standards established by the San Jacinto Municipal Code. Action RM-4f: Monitor GHG emissions generated by the community over time for consistency with the established GHG reduction targets, and strive to update the City’s community GHG Inventory every five years. In the event that the City determines that ongoing efforts to reduce GHG emissions are not on track to meet the City’s adopted GHG reduction targets, the City shall establish and adopt new and/or revised GHG reductions measures that will effectively meet the established GHG reduction targets. Action RM-4g: Provide the necessary facilities and infrastructure to facilitate the use of City-owned low or zero-emission vehicles such as electric vehicle charging facilities at key City facilities as operations necessitate and/or as funding becomes available. Action RM-4h: Evaluate and consider multi-modal transportation benefits to all City employees, such as free or low-cost monthly public transportation (bus) passes. Encourage employer participation in similar programs. Encourage new transit/shuttle services and use. Action RM-4i: Evaluate and consider the feasibility of allowing private bicycle rental companies to operate in San Jacinto. Action RM-4j: Encourage community car-sharing and carpooling. Action RM-4k: Support the establishment and expansion of a regional network of electric vehicle charging stations and encourage the expanded use of electric vehicles. Action RM-4l: Establish and adopt standards and requirements for electric vehicle parking, including minimum requirements for the installation of electric vehicle charging stations in new multi-family residential and commercial, office, and light industrial development. Action RM-4m: Adopt a Green Building Program to promote the reduction of urban heat islands through vegetation management and cool surfaces. Encourage multi -family residential and non-residential development to increase the use of higher-albedo materials Findings Page 113 of 266 for surfaces including roofs, parking areas, driveways, roads, and sidewalks. Encourage developments with parking lot areas to shade these areas with vegetation or solar panels when appropriate. Support various programs to plant and maintain trees, which can also contribute to a reduction of urban heat islands. Action RM-4n: Future development projects will be required to demonstrate consistency with SCAQMD construction emission thresholds. Where emissions from individual projects exceed SCAQMD thresholds, the following actions should be incorporated as necessary to minimize impacts. These measures do not exclude the use of other, equally effective mitigation measures as determined by a project specific Air Quality Assessment.  Require all off-road diesel equipment greater than 50 horsepower (hp) used for this Project to meet USEPA Tier 4 final off-road emission standards or equivalent. Such equipment shall be outfitted with Best Available Control Technology (BACT) devices including a California Air Resources Board Certified Level 3 Diesel Particulate Filter (DPF) or equivalent. The DPF reduces diesel particulate matter and NOx emissions during construction activities.  Require a minimum of 50 percent of construction debris be diverted for recycling.  Require building materials to contain a minimum 10 percent recycled content.  Require materials such as paints, primers, sealants, coatings, and glues to have a low volatile organic compound concentration compared to conventional products. If low VOC materials are not available, architectural coating phasing should be extended sufficiently to reduce the daily emissions of VOCs. Action RM-4o: Future development projects will be required to demonstrate consistency with SCAQMD’s operational emission thresholds. For projects where operational emissions exceed regulatory thresholds, the following measures may be used to reduce impacts. Note the following measures are not all inclusive and developers have the option to add or substitute measures that are equally or more appropriate for the scope of the project.  Develop a project specific TDM program for residents and/or employees that provides opportunities for carpool/vanpools.  Provide onsite solar/renewable energy in excess of regulatory requirements.  Require that owners/tenants of non-residential or multi-family residential developments use architectural coatings that are 10 grams per liter or less when repainting/repairing properties.  Require dripless irrigation and irrigation sensor units that prevent watering during rain storms.  Ensure all parking areas are wired for capability of future EV charging and include Findings Page 114 of 266 EV charging stations that exceed regulatory requirements. ENVIRONMENTAL JUSTICE ELEMENT Policy EJ-1.1: Emission Sources. Encourage existing sources of emissions to use feasible measures to minimize air quality impacts in Environmental Justice Communities and avoid new sources of significant emissions in these communities as feasible. Policy EJ-1.2: Green Industry. Attract non-polluting industry and green technology companies to the City. Policy EJ-2.1: Convenient Access. Consider the ease of accessibility of public facilities in relation to Environmental Justice Communities during the review and evaluation of public facility expansion, replacement, and construction. Policy EJ-2.2: Prioritize Resources. Apply resources to meet parks, recreation, and open space needs in underserved areas of the City that have a demonstrably greater need for these amenities. Policy EJ-3.2: Access to Healthy Food. Strive to locate healthy food establishments so that all residences are within walking distance (quarter to a half-mile) of a healthy food store or a store with healthy options, where feasible and appropriate. Policy EJ-3:4: Farmers Markets. Support existing farmers markets and support the location of new farmers markets near Environmental Justice Communities wherever feasible. Policy EJ-5.1: Eliminate Barriers. Update the Development Code to eliminate any barriers to facilitating the development of complete neighborhoods with access to retail and recreation resources within walking distance of homes. Policy EJ-5.2: Accessibility. Endeavour to provide parks that are easily accessible to the surrounding neighborhood and beyond, and are as barrier-free as possible, particularly for those with limited mobility. K. MINERAL RESOURCES 1. Regional and Statewide Mineral Resources Threshold: Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? Finding: Less than significant. (Draft EIR, Impact MR-1, page 5.12-3) Explanation: The City has no known or identified mineral resources of regional or Statewide importance. The entire City of San Jacinto and a majority of the Sphere of Influence are classified as MRZ-3, indicating that the significance of the mineral deposits is undetermined. The eastern portion of the Sphere Findings Page 115 of 266 of Influence is classified as an MRZ-4, indicating unstudied areas or areas with inadequate information. The General Plan Update Resource Management Element includes policies and actions to protect mineral resources associated with mining activities. Policy RM-5.10 ensures that any future mining activities be in compliance with the State Mining Reclamation Act, federal and State environmental regulations, and local ordinances. There are no known mineral deposits or resources in the Study Area that are of significant value to the region or the State. As such, implementation of the proposed General Plan Update would have a less than significant impact on this environmental topic, and no mitigation is required. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-5: Energy and Mineral Resources. A community that safely manages its energy and mineral resources. Policy RM-5.10: Mineral Resources. Ensure that any future mining activities be in compliance with the State Mining Reclamation Act, federal and state environmental regulations, and local ordinances. 2. Locally-Important Mineral Resource Threshold: Would the project result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? Finding: Less than significant. (Draft EIR, Impact MR-2, page 5.12-3 through 5.12- 4) Explanation: The Study Area does not contain any “locally important mineral resource recovery sites.” The Study Area does not contain a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan. The General Plan Update Resource Management Element includes policies and actions to protect mineral resources associated with mining activities. Policy RM-5.10 ensures that any future mining activities be in compliance with the State Mining Reclamation Act, federal and State environmental regulations, and local ordinances. Implementation of the General Plan Update would not result in the loss of a designated mineral recovery site and as such, no impact would occur. Findings Page 116 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-5: Energy and Mineral Resources. A community that safely manages its energy and mineral resources. Policy RM-5.10 Mineral Resources. Ensure that any future mining activities be in compliance with the State Mining Reclamation Act, federal and state environmental regulations, and local ordinances. L. NOISE 1. Groundborne Vibration and Groundborne Noise Levels Threshold: Would the project result in the generation of excessive groundborne vibration or groundborne noise levels? Finding: Less than significant. (Draft EIR, Impact NOI-2, pages 5.13-45 through 5.13-47) Explanation: The main sources of vibration in the Study Area are related to vehicles and construction. Typical roadway traffic, including heavy trucks, rarely generates vibration amplitudes high enough to cause structural or cosmetic damage. However, there have been cases in which heavy trucks traveling over potholes or other discontinuities in the pavement have caused vibration high enough to result in complaints from nearby residents. These types of issues typically can be resolved by smoothing the roadway surface. Construction activities that produce vibration that can be felt by adjacent land uses include the use of vibratory equipment, large bulldozers, and pile drivers. The primary sources of vibration during construction are usually vibratory rollers and large bulldozers. Construction activities in the Study Area have the potential to result in significant impacts related to groundborne vibration associated with construction activities. This impact would be reduced to less than significant with the implementation of the General Plan Update Public Safety Element Action PS-6h, which limits vibration levels to 0.08 in/sec PPV for historical buildings and 0.3 in/sec PPV for contemporary buildings and requires vibration studies for new development projects that have the potential to generate vibration impacts which exceed the vibration limits. This would be less than the maximum PPV levels that would potentially damage structure. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Policy PS-6.7: Construction Noise. Require construction activities to reduce noise impacts on adjacent uses to the criteria identified in Tables PS-3 and PS-4, or, if the criteria Findings Page 117 of 266 cannot be met, to the maximum extent feasible complying with Chapter 8.40 of the San Jacinto Municipal Code (Noise Control) and use best practices. Construction activities outside of the permitted construction hours identified in the San Jacinto Municipal Code may be approved on a case-by-case basis by the Community Development Director. Action PS-6g: Require new residential projects located adjacent to railroad lines to follow the FTA vibration screening distance criteria to ensure that residential uses are not exposed to vibrations exceeding 72 VdB for frequent events (more than 70 events per day), 75 VdB for occasional events (30-70 events per day), or 80 VdB for infrequent events (less than 30 events per day). Action PS-6h: Require new development to minimize vibration impacts to adjacent uses during demolition and construction. Require vibration studies for all new discretionary projects, including those related to development and transportation, which have the potential to generate vibration impacts which exceeds the vibration limits. This includes projects requiring pile driving and/or construction on properties adjacent to historic structures. For sensitive historic structures, a vibration limit of 0.08 in/sec PPV (peak particle velocity) will be used to minimize the potential for cosmetic damage to the building. A vibration limit of 0.30 in/sec PPV will be used to minimize the potential for cosmetic damage at buildings of normal conventional construction. 2. Airport Noise Threshold: For a project located within the vicinity of a private airstrip land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise? Finding: No Impact. (Draft EIR, Impact NOI-3, page 5.13-47) Explanation: The City of San Jacinto is not located within any adopted airport land use plan, there are no private airstrips in the vicinity of the City, and there are no public airports located within two miles of the City. As such, there are no impacts related to private airports, public airports, airstrips, or adopted airport land use plans. M. POPULATION AND HOUSING 1. Population Growth Threshold: Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure? Finding: Less than significant. (Draft EIR, Impact POP-1, pages 5.14-7 through 5.14- 10) Findings Page 118 of 266 Explanation: The proposed General Plan Update accommodates future growth in San Jacinto, including new businesses, expansion of existing businesses, and new residential uses. Infrastructure and services would need to be extended to accommodate future growth. At 2040 buildout, the proposed General Plan Update could accommodate approximately 16,252 new housing units and 21,839,634 square feet of new non-residential building square footage within the Study Area compared to existing conditions. This new growth may increase the City’s population by approximately 54,280 residents and 19,674 jobs compared to the existing condition. Given the historical and current population, housing, and employment trends, growth in the City, as well as the entire state, is inevitable. The primary factors that account for population growth are natural increase and net migration. Other factors that affect growth include the cost of housing, the location of jobs, the economy, the climate, and transportation. While these factors would likely result in growth in San Jacinto during the planning period of the proposed General Plan Update, growth would continue to occur based primarily on the demand of the housing market and demand for new commercial, industrial, and other non-residential uses. Potential growth inducing impacts are also assessed based on a project’s consistency with adopted plans that have addressed growth management from a local and regional standpoint. SCAG is the responsible agency for developing and adopted regional housing, population, and employment growth forecasts for local Riverside County governments, among other counties. SCAG provides household, population, and employment projection estimates in five-year increments through 2045. SCAG projects that the City’s population will reach 69,900 persons by 2045. The General Plan Update is projected to result in a population of approximately 107,152 persons (2040). The City’s projected population would be approximately 53.3 percent greater than SCAG’s forecast. Similarly, the City’s projected housing stock and employment would be approximately 16.6 percent and 106 percent greater than SCAG forecasts, respectively. The General Plan Update growth projections would exceed SCAG’s 2045 population, housing stock, and employment projections for the City of San Jacinto. General Plan Update growth projections form the basis of SCAG’s planning and policy documents, including regional growth forecasts. Thus, the growth anticipated with the General Plan Update would be considered in SCAG’s updated growth forecasts for the City. The proposed General Plan Update is intended to accommodate the City’s fair share of statewide housing needs, which are allocated by the SCAG, based on regional numbers provided by the California Department of Housing and Community Development on a regular basis (every five to eight years). The City of San Jacinto 2021-2029 Housing Element was adopted February 1, 2022 and accommodates San Jacinto’s share of the regional housing need for the 2021-2029 RHNA period of 3,392 units. Findings Page 119 of 266 SCAG’s growth forecasts through 2045 do not take into account the regional housing need for the 2021-2029 period. The proposed General Plan Update includes policies and actions that mitigate environmental impacts associated with growth, such as air quality, noise, traffic, water supply, and water quality effects. Further, the General Plan Update accounts for the proposed Project’s anticipated population growth and establishes goals, policies, and actions to accommodate such growth. The proposed Land Use Element Goal LU-2 seeks to manage and direct growth so that the community and its neighborhoods are protected and enhanced. Policy LU-2.1 ensures that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements. With implementation of General Plan Update policies and actions intended to guide growth to appropriate areas and provide services necessary to accommodate growth, the land uses allowed under the proposed General Plan Update, the infrastructure anticipated to accommodate proposed land uses, and the goal and policy framework would not induce growth that would exceed adopted thresholds, beyond those disclosed and analyzed throughout this EIR. Therefore, population and housing growth associated with the proposed General Plan Update would result a less than significant impact, as there are no additional potential environmental impacts, beyond those analyzed and disclosed in this EIR, that would result from growth accommodated by the proposed project. No additional mitigation is required. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). Policy LU-1.3: Balancing Jobs and Housing. Balance levels of employment and housing within the community to provide more opportunities for San Jacinto Valley residents to work locally, cut commute times, and improve air quality. Goal LU-2: Managed Growth. A City that manages and directs growth so that the community and its neighborhoods are protected and enhanced. Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City Findings Page 120 of 266 requirements. Policy LU-2.6: Annexation. Continue to annex land within the City’s Sphere of Influence to promote compatibility between new and existing uses. Policy LU-3.1: Surrounding Uses. Consider as part of the development review process the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Action LU-3c: Analyze land use compatibility through the development review process to require adequate buffers and/or architectural enhancements that protect sensitive receptors from intrusion of development activities that may cause unwanted nuisances and health risks. 2. Displacement of Housing Threshold: Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere? Finding: Less than significant. (Draft EIR, Impact POP-2, pages 5.14-10 through 5.14-11) Explanation: The proposed General Plan Update would accommodate a mix of new residential and non-residential development in more dense and sustainable patterns. The General Plan Land Use Map was developed to support new higher-density residential and mixed-use development in key areas of the City. Due to the amount of vacant land in the City, it is anticipated that future develop would occur on vacant land and would not displace substantial number of existing housing units. Throughout the Study Area, the General Plan Update is projected to increase the overall number of dwelling units and provide housing to serve the diverse needs of the community at various socioeconomic levels. The General Plan Update establishes goals, policies, and actions to ensure the compatibility of new and existing development, including housing. The proposed Land Use Element Goal LU-2 seeks to manage and direct growth so that the community and its neighborhoods are protected and enhanced. Goal LU-3 promotes high-quality development and compatibility with surrounding land uses. Policy LU-3.1 ensures the City considers the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Therefore, impacts of the proposed General Plan Update on the displacement of people or housing are considered less than significant and no mitigation is required. The policies listed below would further ensure that a range of housing types are provided in the City, and that housing conditions are evaluated as the housing supply ages. Findings Page 121 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). Goal LU-2: Managed Growth. A City that manages and directs growth so that the community and its neighborhoods are protected and enhanced. Policy LU-2.2: Infill Development. Encourage new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Goal LU-3: Land Use Compatibility. A community that promotes high-quality development and compatibility with surrounding land uses and major transportation corridors. Policy LU-3.1: Surrounding Uses. Consider as part of the development review process the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Policy LU-3.2: Residential Uses. Require that new residential development be designed to protect residents from potential conflicts with adjacent land uses, and other features including rail corridors, and high-volume roadways. Action LU-3b: Through the development review process, evaluate development proposals for land use and transportation network compatibility with existing surrounding or abutting development or neighborhoods. Action LU-3c: Analyze land use compatibility through the development review process to require adequate buffers and/or architectural enhancements that protect sensitive receptors from intrusion of development activities that may cause unwanted nuisances and health risks. N. PUBLIC SERVICES 1. Fire Protection Threshold: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain Findings Page 122 of 266 acceptable service ratios, response times or other performance objectives for any of the public services: Fire Protection and Emergency Services? Finding: Less than significant. (Draft EIR, Impact PS-1, pages 5.15-15 through 5.15- 20) Explanation: Development accommodated under the General Plan Update would result in additional residents and businesses in the City. 2040 buildout under the General Plan Update could yield a net change over existing conditions of an additional 16,252 housing units, an additional population of 54,280 people, an additional 21,839,634 square feet of non-residential building square footage, and an additional 19,674 jobs within the Study Area. Future development projected in the General Plan Update may result in the need for additional Riverside County Fire Department (RCFD) resources (i.e., additional staffing, equipment, expanded/new facilities). At this time, it is unknown whether RCFD would need to expand or construct new facilities to meet the demand of future development in the Study Area. Future development is assumed to occur over time through 2040; thus, any increase in demand for fire protection services would occur gradually as additional development and associated population growth is added to the City. The General Plan Update includes a range of policies and actions to ensure that fire protection and emergency services are provided in a timely fashion, are adequately funded, are coordinated between the City and the RCFD, and that new development funds its fair share of services. Policy LU-1.5 ensures the City maintains appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-2.1 ensures that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements. Policy PS-2.1 requires that all buildings and facilities within San Jacinto comply with local, State, and federal regulatory standards such as the California Building and Fire Codes as well as other applicable fire safety standards. Policy PS-2.2 reduces the risk of fire to the community by coordinating emergency preparedness with the RCFD. Policy PS -2.4 ensures cooperation with RCFD to maintain an ongoing fire inspection program to reduce fire hazards associated with multifamily development, critical facilities, public assembly facilities, industrial buildings, and nonresidential buildings. Policy PS-2.10 protects communities from unreasonable risk of wildfire within very high fire hazard severity zones by requiring adequate fire protection services, fire protection plans, and emergency vehicle access for new development in very high fire hazard severity zones, and coordinating with RCFD to define minimum standards for evacuation of residential areas in very high fire hazard severity zones. Policy PS-5.1 ensures the provision of sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy RM 6.1 encourages the RCFD to Findings Page 123 of 266 maintain adequate staff and equipment to provide efficient, high quality, and responsive public safety services to the San Jacinto community. Policy RM-9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM- 9.2 maintains and finances the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3 ensures that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure, services, and facilities. Policy RM-9.5 ensures collaboration with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-6c ensures cooperation with fire departments, and local, State, and federal emergency management agencies, to implement an Emergency Operation Center to respond to and manage disasters. Action RM-6f directs the City, in cooperation with the RCFD, to adopt and maintain level of service (e.g., response times, call handling) and staffing standards, as well as a developer fee program for fire services. Action RM-6f also ensures future developers will contribute funds for fire services through the adopted developer fees. RCFD would continue to regularly monitor fire department resources to ensure that adequate facilities, staffing, and equipment are available to serve existing and future development and population increases. Further, as development occurs, a proportional increase in property tax, charges for RCFD services, and other funding sources would increase and offset impacts of new development on RCFD’s existing resources in the City. San Jacinto Municipal Code Chapter 15.08, Building Permits, requires any construction or alteration requiring a building permit and meeting specific conditions to pay certain fees prior to issuance of the building permit. For any new residential or non-residential project meeting certain conditions, the owner would be required to annex the property into the city’s Community Facilities District No. 2003-1 or into a separate new CFD, which would provide financing for fire protection services. Additionally, new development projected in the General Plan Update would be required to comply with all applicable California Fire Code requirements for construction, access, water mains, fire flows, and hydrants. Individual project development plans would be reviewed by RCFD to determine specific fire requirements (e.g., fire flow capacities, emergency access, fuel modification plans) applicable to the specific development and to ensure compliance with these requirements. The environmental effect of providing the fire protection and emergency services is associated with the physical impacts of providing new and Findings Page 124 of 266 expanded facilities. The specific impacts of providing new and expanded facilities cannot be determined at this time, as the General Plan Update does not propose or authorize development nor does it designate specific sites for new or expanded public facilities. However, the facilities would be primarily provided on sites with land use designations that allow such uses and the environmental impacts of constructing and operating the facilities would likely be similar to those associated with new development, redevelopment, and infrastructure projects under the General Plan Update. Any future development under the General Plan Update would be required to comply with regulations, policies, and standards included in the General Plan Update, and would be subject to CEQA review as appropriate. Therefore, impacts related to the provision of fire protection and emergency services are less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.5: Public Services for Quality of Life. Maintain appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development. PUBLIC SAFETY ELEMENT Goal PS-2: Fire Safety. A City that is safe and adequately prepared for urban and wildfire emergencies. Policy PS-2.1: Building Fire Codes. Require that all buildings and facilities within San Jacinto comply with local, state, and federal regulatory standards such as the California Building and Fire Codes as well as other applicable fire safety standards. Policy PS-2.2: Fire Protection Services. Reduce the risk of fire to the community by coordinating emergency preparedness with the Riverside County Fire Department (RCFD). Policy PS-2.4: Urban Fire Risks. Work with RCFD to maintain an ongoing fire inspection program to reduce fire hazards associated with multifamily development, critical facilities, public assembly facilities, industrial buildings, and nonresidential buildings. Policy PS-2.5 Grant Funding. Seek grant funding, independently and in collaboration with regional partners, to mitigate potential wildfire threats to the community and to implement training workshops and projects related to defensible space and fuel reduction practices. Policy PS-2.10: Very High Fire Hazard Severity Zones. Protect communities from Findings Page 125 of 266 unreasonable risk of wildfire within very high fire hazard severity zones through the following actions: a. Minimize new residential development in very high fire hazard severity zones when possible. b. Require adequate fire protection services, fire protection plans, and emergency vehicle access for new development in very high fire hazard severity zones. c. Assess site constraints when considering land use designations near wildlands to avoid or minimize wildfire hazards as part of a land use update or amendment. d. Coordinate with RCFD to identify building and site design methods or other methods to minimize damage if new structures are proposed to be in very high fire hazard severity zones on undeveloped land and when rebuilding after a fire. e. As part of the RCFD review process, require ongoing brush management, fuel management/modification, defensible space, fire retardant landscaping, and other project design features for new development located in areas of or adjacent to high wildfire risk. f. Coordinate with the applicable water district to ensure necessary water supply systems and flow for structural fire suppression are provided and maintained. g. Work with RCFD to identify and maintain fire hazard reduction projects, including community fire breaks and private road and public road clearance. h. Coordinate with RCFD to define minimum standards for evacuation of residential areas in very high fire hazard severity zones. If areas with inadequate access/evacuation routes are identified, develop appropriate mitigation measures, improvement plans, or education programs to ensure safe evacuation. Policy PS-2.11: Fire Safe Design. Consider fire safe design (i.e., fire-resistant building and site design, materials, and landscaping) for development within very high fire hazard severity zones as part of the development review process. a. Locate, design and construct development to provide adequate defensibility and minimize the risk of structural loss from wildland fires. b. Design development on hillsides and canyons to reduce the increased risk of fires from topography features (i.e., steep slopes, ridge saddles). c. Minimize flammable vegetation and implement brush management best practices in accordance with the Development Code. d. Install visible home and street addressing and signage. Policy PS-5.1: Emergency Response Services. Provide sufficient levels of all emergency Findings Page 126 of 266 response services to protect the health, safety, and welfare of all persons and to protect property in the City. Action PS-2c: Require that all new habitable structures be designed in accordance with the most recent California Building and Fire Code with local amendments adopted by the City, including the use of fire sprinklers in residential structures. RESOURCE MANAGEMENT ELEMENT Goal RM-6: Public Safety Resources. A community that safeguards persons and property through the provision of high-quality public safety services and crime prevention measures. Goal RM-9: Infrastructure Planning. A community that provides adequate, reliable infrastructure and facilities to support existing and future development. Policy RM-6.1: Provision of Police and Fire Services. Encourage the Riverside County Sheriff’s Department and the Riverside County Fire Department to maintain adequate staff and equipment to provide efficient, high quality, and responsive public safety services to the San Jacinto community. Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-6c: In cooperation with the school districts, police and fire departments, and local, state, and federal emergency management agencies, implement an Emergency Operation Center (EOC) to respond to and manage disasters. Provide annual training for City staff in emergency management so that when they are called into action, they will be able to distribute information and resources to the public effectively. Findings Page 127 of 266 Action RM-6f: In cooperation with the Riverside County Fire Department, adopt and maintain level of service (e.g., response times, call handling) and staffing standards, as well as a developer fee program for fire services. Review the level of services and funding levels at budget time, adjusting when necessary to ensure that adequate levels of service and facilities are provided and maintained. Future developers will contribute funds for fire services through the adopted developer fees. During the budget and CIP process, reserve future sites through purchase, eminent domain, dedication, donation, or a combination of these procedures. 2. Police Protection Threshold: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Law Enforcement Services? Finding: Less than significant. (Draft EIR, Impact PS-2, pages 5.15-20 through 5.15- 23) Explanation: Development accommodated under the General Plan Update would result in additional residents and businesses in the City, which would increase demand for police protection services provided by RCSD. Additional facilities, personnel, and equipment may be required to maintain adequate levels of police protection within the City. Development assumed by the General Plan Update is expected to occur gradually over time through 2040; thus, any increase in demand for police protection services would similarly occur gradually as additional development and associated population growth is added to the City, which also depends on the economic market demands. As individual projects are proposed within the City, Riverside County Sheriff Department service levels and staffing requirements would be evaluated on an annual basis to determine if additional staffing and/or facilities would be required. If the General Plan Update is adopted, the Riverside County Sheriff Department would be able to utilize the projected growth in population, dwelling units, and nonresidential development to effectively plan for increases in population and police protection service demand. The General Plan Update includes a range of policies and actions, to ensure that adequate police protection services are provided to serve growth associated with implementation of the General Plan Update. Policy LU-1.5 ensures the City maintains appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-2.1 ensures that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements. Policy RM 6.1 encourages the Riverside County Sheriff’s Department to maintain adequate staff and equipment to Findings Page 128 of 266 provide efficient, high quality, and responsive public safety services to the San Jacinto community. Policy RM-9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2 maintains and finances the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3 ensures that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure, services, and facilities. Policy RM-9.5 ensures collaboration with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Actions PS-5d and Action RM-6a adopt a level of service standard (e.g., response times, call handling) and staffing standards as well as a developer fee program for the Police Department, and directs the City to review the level of service standard during the annual budget and CIP process and revise as appropriate. Action RM-6a also ensures future developers will contribute funds for police services through the adopted developer fees. Action RM- 6e directs the City to work with the RCSD to promote the establishment and operation of Neighborhood Watch programs throughout the City. San Jacinto Municipal Code Chapter 15.08, Building Permits, requires any construction or alteration requiring a building permit and meeting specific conditions to pay certain fees prior to issuance of the building permit. For any new residential or non-residential project meeting certain conditions, the owner would be required to annex the propert y into the city’s Community Facilities District No. 2003-1 or into a separate new CFD, which would provide financing for police protection services. The environmental effect of providing police protection services is associated with the physical impacts of providing new and expanded facilities. The specific impacts of providing new and expanded facilities cannot be determined at this time, as the General Plan Update does not propose or authorize development nor does it designate specific sites for new or expanded public facilities. If new police facilities are needed to serve growth associated with future development anticipated by the General Plan Update, the facilities would most likely be provided on sites with land use designations that allow such uses and the environmental impacts of constructing and operating the facilities would likely be similar to those associated with new development, redevelopment, and infrastructure projects under the General Plan Update. Any future development under the General Plan Update would be required to comply with regulations, policies, and standards included in the General Plan Update, and would be subject to CEQA review as appropriate. Therefore, impacts related to the provision of police protection services are less than significant. Findings Page 129 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.5: Public Services for Quality of Life. Maintain appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. PUBLIC SAFETY ELEMENT Action PS-5d: Adopt a level of service standard for police protection. Protect residents and businesses from criminal activity by providing the adopted level of service and educating the public about methods to reduce criminal activity. During the annual budget and CIP process, review the level of service standard and revise as appropriate. RESOURCE MANAGEMENT ELEMENT Goal RM-6: Public Safety Resources. A community that safeguards persons and property through the provision of high-quality public safety services and crime prevention measures. Goal RM-9: Infrastructure Planning. A community that provides adequate, reliable infrastructure and facilities to support existing and future development. Policy RM-6.1: Provision of Police and Fire Services. Encourage the Riverside County Sheriff’s Department and the Riverside County Fire Department to maintain adequate staff and equipment to provide efficient, high quality, and responsive public safety services to the San Jacinto community. Policy RM-6.5: Crime Prevention. Promote and support community-based crime prevention programs, such as community policing, public education, youth crime prevention, and outreach programs, as an important tool to the provision of professional police services. Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Findings Page 130 of 266 Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreatio nal amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-6a: Adopt and maintain level of service (e.g., response times, call handling) and staffing standards as well as a developer fee program for the Police Department. Review the level of services and funding levels at budget time, adjusting when necessary to ensure that adequate levels of service and facilities are provided and maintained based on short-term and long-term growth projections. Future developers will contribute funds for police services through the adopted developer fees. Action RM-6b: Continue to work with the school districts to provide School Resource Officers (SROs) to assist the school districts with safety and security concerns. Review the success of the program and funding/staffing levels on an annual basis, adjusting when necessary to ensure that adequate levels of service are provided and maintained. Action RM-6d: During the development review process, require design features that reduce the potential for crime. New projects should: a. Provide well-lighted and visible streets and street names, building entrances and addresses, common areas, and parking facilities. b. Limit access into and between buildings to reduce escape routes and to make undetected entry difficult. c. Provide landscaping that permits the natural surveillance of open areas and entryways, and avoids creating places for concealment. d. Be designed to permit emergency vehicle access to all sides of buildings located in multi-family and non-residential developments. e. Be designed to allow for defensible space. Action RM-6e: Work with the Riverside County Sheriff’s Department to promote the establishment and operation of Neighborhood Watch programs throughout the City. Consider assigning a police officer or volunteer patrol person to each Neighborhood Watch group for assistance in launching and maintaining a successful program. Findings Page 131 of 266 3. Schools Threshold: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Schools? Finding: Less than significant. (Draft EIR, Impact PS-3, pages 5.15-24 through 5.15- 28) Explanation: Implementation of the General Plan Update could result in the development of up to 16,252 dwelling units (estimated reduction of 519 single-family units and an increase of 16,771 multi-family units) over existing conditions. Assuming all new development anticipated under the proposed General Plan Update occurs within SJUSD’s school boundary, the Project would generate approximately 10,895 students (5,463 elementary school students, 2,613 middle school students, and 2,818 high school students). SJUSD does not currently have excess capacity at the elementary or middle school levels, or have excess capacity overall. The high schools have an excess capacity of 382 seats, but as shown, that capacity is not sufficient for future growth assumed under the General Plan Update. As such, based on the conservative assumption that all 16,252 residential units would be constructed within SJUSD’s school boundary, SJUSD would not be able to adequately accommodate the increase in student population. Therefore, new facilities would need to be created, or existing facilities would need to be expanded, to accommodate for future population growth. It is likely that some portion of the proposed residential units would fall under the jurisdiction of Hemet Unified School District (HUSD) or Nuview Union School District (NUSD). The HUSD and NUSD Fee Justification Studies provide a framework to expand school facilities to accommodate future growth within the Districts. The exact location of future development and associated student generation is currently unknown. However, future development projected within the General Plan Update is anticipated to occur gradually through 2040 and would be largely based on market demand. Thus, any increase in demand for school services would occur gradually as additional development occurs in the Study Area. The General Plan Update includes policies and actions, to ensure that adequate services are provided to serve growth associated with implementation of the General Plan Update. Policy LU-1.5 ensures the City maintains appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy RM-8.2 directs the City to work with developers and the school district to ensure the payment of fees, construction, and expansion of school facilities to address expected increases in school-age population. Policy RM-9.1 maintains and implements public facility master plans, in Findings Page 132 of 266 collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM- 9.3 ensures that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure, services, and facilities. Policy RM-9.5 ensures collaboration with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-8a ensures the City will continue to work with school districts to ensure adequate school facilities are provided and maintained in the community, including the requirement for development projects to mitigate school impacts. School districts assess development impact fees against residential and non- residential development to mitigate impacts resulting from the increase in demand for school related services. Individual development projects in accordance with the General Plan Update would be required to pay the statutory fees, so that school facilities can be constructed/expanded, if necessary, at the nearest sites to accommodate the impact of project- generated students, reducing impacts to a less than significant level. The environmental effect of providing school services is associated with the physical impacts of providing new and expanded facilities. The specific impacts of providing new and expanded facilities cannot be determined at this time, as the General Plan Update does not propose or authorize development of new or expanded school facilities. If the school districts serving the City determine that new school facilities are needed to serve growth associated with future development anticipated by the General Plan Update, the schools would most likely be provided on sites with land use designations that allow such uses and the environmental impacts of constructing and operating the facilities would likely be similar to those associated with new development, redevelopment, and infrastructure projects under the General Plan Update. Any future development under the General Plan Update would be required to comply with regulations, policies, and standards included in the General Plan Update, and development of school facilities would be subject to CEQA review as appropriate. Therefore, impacts related to the provision of schools are less than significant. Overall, increased cooperation and coordination between the City and school districts would ensure high-quality school and community facilities throughout San Jacinto and would not result in significant impacts to school facilities. As such, the General Plan Update would result in a less than significant impact on school services and facilities. Findings Page 133 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.5: Public Services for Quality of Life. Maintain appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. RESOURCE MANAGEMENT ELEMENT Goal RM-8: Educational Resources. A community that supports the continued lifelong learning of all its residents with high-quality educational facilities and opportunities. Goal RM-9: Infrastructure Planning. A community that provides adequate, reliable infrastructure and facilities to support existing and future development. Policy RM-6.4: School Safety. Collaborate with San Jacinto schools to support the community’s youth through high quality after-school/summer programs, psychological counseling, and education about online safety. Policy RM-8.2: School Facilities. Work with developers and the school district to ensure the payment of fees, construction, and expansion of school facilities to address expected increases in school-age population. Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Findings Page 134 of 266 Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-8a: Continue to work with the school districts to ensure adequate school facilities are provided and maintained in the community. Specifically, the City should:  During the processing of residential and non-residential development proposals, ensure the school districts are consulted regarding the potential impact of the project on educational services and facilities. When proposed developments cannot be served by existing facilities and services, the City shall work with the developer and the school district in exploring options for service provision and facility funding.  Prior to approving a project that is likely to generate students, require the applicant to mitigate school impacts to the full extent permitted by State law through land dedications, payment of fees, participation in a special assessment district, or any combination of the above.  Cooperate with school districts to update population projections, student generation formulas, potential school sites, and facilities improvement plans in their Long Range Facility and Master Plans.  Work with school districts to expedite the construction of new schools, when necessary.  Cooperate with school districts and recommend appropriate sites for new school development as proposals for new school facilities come forward. 4. Libraries Threshold: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Library Facilities? Finding: Less than significant. (Draft EIR, Impact PS-4, pages 5.15-28 through 5.15- 30) Explanation: Development accommodated under the General Plan Update would result in additional residents and businesses in the City. An increase in population residents and businesses would increase the demand for public services, including library services. The San Jacinto Library is owned and operated by the Riverside County Library System (RCLS). Future development projected in the General Plan Update may result in the need for additional RCLS resources (i.e., additional staffing, equipment, expanded/new facilities). At this time, it is unknown whether RCLS would need to expand Findings Page 135 of 266 or construct new facilities to meet the demand of future development in the Study Area. Future development is assumed to occur over time through 2040; thus, any increase in demand for library services would occur gradually as additional development and associated population growth is added to the City. The County’s library system would continue receiving support for library facilities and resources through the General Plan Update policies and actions. The General Plan Update includes policies and actions to ensure that library services are adequately funded, are coordinated between the City and the RCLS, and that new development funds its fair share of services. Policy LU-1.5 ensures the City maintains appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-2.1 ensures that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements. Policy RM-8.6 ensures the City will work closely with the Riverside County Library System to provide library facilities and services necessary to meet the needs of all segments of the community. Policy RM-9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.3 ensures that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure, services, and facilities. Policy RM-9.5 ensures collaboration with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-8c ensures that library development keeps pace with overall City development and population growth and, as part of the development review process, ensures developers pay all required library fees prior to occupancy of their projects. The environmental effect of providing library services is associated with the physical impacts of providing new and expanded facilities. The specific impacts of providing new and expanded facilities cannot be determined at this time, as the General Plan Update does not propose or authorize development nor does it designate specific sites for new or expanded public facilities. However, the facilities would be primarily provided on sites with land use designations that allow such uses and the environmental impacts of constructing and operating the facilities would likely be similar to those associated with new development, redevelopment, and infrastructure projects under the General Plan Update. Any future development under the General Plan Update would be required to comply with regulations, policies, and standards included in the General Plan Update, and would be subject to CEQA review as appropriate. Therefore, impacts related to the provision of library services are less than significant. Findings Page 136 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.5: Public Services for Quality of Life. Maintain appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. RESOURCE MANAGEMENT ELEMENT Goal RM-9: Infrastructure Planning. A community that provides adequate, reliable infrastructure and facilities to support existing and future development. Policy RM-8.6: Libraries. Work closely with the Riverside County Library System to provide library facilities and services necessary to meet the needs of all segments of the community. Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-8c: Continue to work with the Riverside County Library System to ensure that library development keeps pace with overall City development and population growth. As part of the development review process, ensure developers pay all required library fees prior to occupancy of their projects. Findings Page 137 of 266 5. Parks Threshold: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Parks? Finding: Less than significant. (Draft EIR, Impact PS-5, page 5.15-30) Explanation: Refer to Recreation below. O. RECREATION 1. Increased Use of Parks/Recreation Facilities Threshold: Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? Finding: Less than significant. (Draft EIR, Impact REC-1, pages 5.16-7 through 5.16-13) Explanation: 2040 buildout under the General Plan Update could yield a net change over existing conditions of an additional 16,252 housing units, an additional population of 54,280 people, an additional 21,839,634 square feet of non- residential building square footage, and an additional 19,674 jobs within the Study Area. These new residents are expected to use park and recreational facilities, and this additional use may result in greater demands on parks and recreational facilities in the Study Area such that deterioration of these facilities could occur or be accelerated. The additional demand on existing parks and recreational facilities would increase the need for maintenance and improvements. These improvements could have environmental impacts, although the exact impacts cannot be determined since the potential improvements are currently unknown. The provision of new parks and recreation facilities would reduce the potential for adverse impacts and physical deterioration of existing parks and recreation facilities, by providing additional facilities to accommodate the demand for parks and recreation facilities. These new facilities would be provided at a pace and in locations appropriate to serve new development, as required to maintain the City adopted standard for park space acreage at five acres for every 1,000 residents. Development under the General Plan would indirectly lead to the construction of new parks and recreation facilities to serve new growth and Findings Page 138 of 266 to meet existing parks and recreation needs. The General Plan Update supports the creation of new parks and recreation facilities, including new parks and trails, to accommodate a wide range of activities for all age groups. Policy RM-1.1 supports a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM- 7.1 directs the City to collaborate with the Valley-Wide Recreation and Park District and other organizations to provide parks, recreational, and open space facilities that meet the needs and preferences of all segments of the community. Policy RM-7.2 ensures parks and recreational facilities are distributed throughout the community so that most residents are within walking distance (one-half mile) of a public open space and prioritizes the development of new public spaces in areas outside of this service radius. Policy RM-7.3 encourage the use of less developable or undevelopable lands such as utility corridors, fault zones, flood control facilities, channels, and easements for recreational uses, when feasible. Policy RM-7.4 requires future private development to incorporate parkland, open space, or green space to expand recreational opportunities in the community in accordance with standards set by the San Jacinto Municipal Code. Policy RM-7.8 ensures collaboration with school districts and other agencies to develop cooperative programs where the joint use of facilities would lead to enhanced and more efficient facility utilization. Policy RM-7.9 encourage outdoor gathering spaces, such as mini-parks and plazas, to be incorporated into nonresidential development. Policy RM-7.10 directs the City to actively pursue financing for parkland acquisition and maintenance, and allocate sufficient funding to park development to support the community’s recreational needs. Policy RM-9.3 ensures that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Action RM-7a ensures the City will review development proposals for their potential demand for and impact on parks and recreational facilities in the community, requiring developers of residential projects to provide adequate parkland equal to five acres per 1,000 residents and developers of non- residential development to provide parkland equal to 2.5 acres per 1,000 employees, or pay an in-lieu fee prior to occupancy of the project. Action RM-7b encourages projects located along the river levees or fault zones, or that include drainage courses, utility easements, and/or flood control facilities, to provide easements to the appropriate agency for the provision of linear parks, pathways, horseback riding trails, and/or hiking and biking trails within these areas. Action RM-7g maintains an up-to-date inventory of developed and proposed public park land and residences outside of one- half mile of a public park so that new park development can be directed to those areas. These new parks and recreation facilities would be distributed throughout areas proximate to new development in and around existing neighborhoods. Neighborhood and community parks and trails would Findings Page 139 of 266 generally be accommodated in the Open Space and Park land use designations. The City currently provides approximately 3.39 acres of parkland for every 1,000 people. The existing deficit in park land is currently being offset with the recreational opportunities available in two golf courses, the San Jacinto River Park, the Diamond Valley Lake recreational area, and other nearby regional parks. Based on the City’s adopted standard of five acres per 1,000 residents, the increase in population due to implementation of the General Plan Update would require approximately 271.4 acres of additional parkland, for a total of 535.76 acres of parkland, assuming a population of 107,152. It should be noted that new development would be required to fund its fair share for required parkland but would not make up for existing system deficiencies. The General Plan Update includes 176 acres of the Park land use designation and 6,188 acres of the Open Space land use designation. The Open Space land use designation allows for hiking, biking and equestrian trails; and outdoor recreational facilities, it also allows for passive and active recreation sites operated by the City and regional agencies. In addition to ensuring that new and expanded parks and recreation facilities are provided to accommodate new growth, the General Plan Update includes policies and actions to ensure that parks and recreation facilities are adequately maintained and improved to serve both existing and planned growth. Policy LU-2.1 ensures that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements. Policy LU-1.6 supports the provision of outdoor gathering places such as plazas, green space, and squares. Policy RM-7.5 requires that parks and recreational facilities be well-maintained by the responsible agency. Policy RM-7.10 directs the City to actively pursue financing for parkland acquisition and maintenance, and allocate sufficient funding to park development to support the community’s recreational needs. Policy RM-9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2 maintains and finances the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.5 ensures collaboration with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-7d directs the City to pursue available resources to fund recreation facilities and parkland acquisition, Findings Page 140 of 266 development, and maintenance, including but not limited to, State and federal grants, special districts, private donations, gifts, and endowments. Although implementation of the General Plan Update would cause an incremental increase in demand for parks in the future, this increase could be further reduced to a less than significant level by the provision of public parkland and private on-site recreational amenities and through the payment of park fees, as established in Municipal Code Chapter 15.36, Park and Open Space Development Fees. Compliance with and the implementation of applicable General Plan Update policies and actions and compliance with the City Municipal Code would ensure parks and recreational facilities would not be overused to the point of substantial deterioration. The General Plan Update does not propose or approve the construction or expansion of parks or recreational facilities. Any new parks or recreational facilities that may be constructed in the future would be primarily provided on sites with land use designations that allow such uses and the environmental impacts of constructing and operating the parks and recreational facilities would likely be similar to those associated with new development, redevelopment, and infrastructure projects under the General Plan. Any future development under the General Plan Update would be required to comply with regulations, policies, and standards included in the General Plan Update, and would be subject to CEQA review as appropriate. Therefore, impacts to parks and recreational facilities associated with implementation of the General Plan Update would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.5: Public Services for Quality of Life. Maintain appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-1.6: Gathering Spaces. Support the provision of attractive outdoor gathering places such as plazas, green space, and squares to strengthen social engagement and provide visual relief in developed areas. Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. Policy LU-5.4: Gathering Places. Encourage the provision of both formal and informal public gathering spaces through pedestrian-oriented street design; sidewalk furniture and pedestrian-oriented development; well-designed, multi-use public spaces of different sizes including pocket parks, plazas, and monuments; and community events. Findings Page 141 of 266 RESOURCE MANAGEMENT ELEMENT Goal RM-7: Parks and Recreational Resources. An integrated system of parks, recreational, and open space facilities that meet the community’s needs and preferences. Goal RM-9: Infrastructure Planning. A community that provides adequate, reliable infrastructure and facilities to support existing and future development. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-7.1: Regional Cooperation. Collaborate with the Valley-Wide Recreation and Park District and other organizations to provide parks, recreational, and open space facilities that meet the needs and preferences of all segments of the community. Policy RM-7.2: Service Area. Locate and distribute parks and recreational facilities throughout the community so that most residents are within walking distance (one-half mile) of a public open space and prioritize the development of new public spaces in areas outside of this service radius. Policy RM-7.3: New Facilities. Encourage the use of less developable or undevelopable lands such as utility corridors, fault zones, flood control facilities, channels, and easements for recreational uses, when feasible. Policy RM-7.4: Parkland Dedication. Require future private development to incorporate parkland, open space, or green space to expand recreational opportunities in the community in accordance with standards set by the San Jacinto Municipal Code. Policy RM-7.5: Maintenance. Require that parks and recreational facilities be well- maintained by the responsible agency. Policy RM-7.6: Safety. Enhance park safety through playground design, crime prevention technology, night lighting, natural surveillance, unobtrusive landscaping, and increased public safety patrols. Policy RM-7.7: Accessible Facilities. Require that new park facility construction and existing facility retrofits meet accessibility standards defined by the Americans with Disabilities Act (ADA) and playground safety requirements (Senate Bill 2733). Policy RM-7.8: Joint Use Facilities. Collaborate with school districts and other agencies to develop cooperative programs where the joint use of facilities would lead to enhanced and more efficient facility utilization. Policy RM-7.9: Open Space in Nonresidential Development. Encourage outdoor gathering spaces, such as mini-parks and plazas, be incorporated into nonresidential development to encourage social interaction, create experience-oriented centers, and enhance the visual character of the community. Findings Page 142 of 266 Policy RM-7.10: Parkland Funding. Actively pursue financing for parkland acquisition and maintenance, and allocate sufficient funding to park development to support the community’s recreational needs. Policy RM-7.11: Community Support. Collaborate with residents to ensure the City’s park and recreation facilities and programs reflect community preferences Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-1a: Work with public and private agencies to explore the joint venture use and management of open space areas. Action RM-7a: Review development proposals for their potential demand for and impact on parks and recreational facilities in the community by: • Requiring developers of residential projects to provide adequate parkland equal to five acres per 1,000 residents (0.005 acre per resident), or pay an in-lieu fee prior to occupancy of the project. • Requiring non-residential development to provide parkland equal to 2.5 acres per 1,000 employees (0.0025 acre per employee), or pay an in lieu fee prior to occupancy of the project. • Work with developers to identify the appropriate park type(s), size(s), facilities, and location(s) for required park facilities. • Ensure parkland facilities conform with City standards. Findings Page 143 of 266 Action RM-7b: For projects located along the river levees or fault zones, or that include drainage courses, utility easements, and/or flood control facilities, encourage the project to provide easements to the appropriate agency (the City of San Jacinto, homeowners association, Valleywide or other agency) for the provision of linear parks, pathways, horseback riding trails, and/or hiking and biking trails within these areas, linking to the regional park and trail system where possible. Action RM-7c: Cooperate with joint power authorities, special districts, and regional, State, and federal agencies to explore the development of a regional park that includes facilities such as hiking trails, camping, and fishing opportunities. Action RM-7d: Pursue available resources to fund recreation facilities and parkland acquisition, development, and maintenance, including but not limited to, State and federal grants, special districts, private donations, gifts, and endowments. Action RM-7e: Cooperate with the Valley-Wide Recreation and Park District, Mount San Jacinto Community College, and other public and private service providers to identify additional needed senior and youth programs and services in the community. Work with these organizations to develop programs and expand access to and participation in senior and youth programs without duplicating efforts. Encourage the use of public transit and alternative modes of travel to these facilities and programs. Action RM-7f: As more schools are built within the City, maximize the joint use of facilities by the City and the local school districts, including joint school/park sites, joint use of athletic fields, community meeting facilities, and provision of child and senior care facilities, where feasible. Action RM-7g: Maintain an up-to-date inventory of developed and proposed public park land and residences outside of one-half mile of a public park so that new park development can be directed to those areas. 2. Construction and Expansion of Parks/Recreation Facilities Threshold: Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? Finding: Less than significant. (Draft EIR, Impact REC-2, pages 5.16-7 through 5.16-13) Explanation: The General Plan Update designates a total of 175 acres as Parks and 6,188 acres as Open Space. No site-specific projects are proposed under the General Plan Update. Based on the anticipated 2040 buildout population of 107,152, which results in an increase of approximately 54,280 people, a total need of 535.76 acres of parkland will be needed to comply with the City’s park standard of five acres per 1,000 people. Construction of these future parks could result in environmental impacts, including disturbances Findings Page 144 of 266 or conversion of habitat, water pollution during construction, increased noise levels, and an increase in impermeable surfaces. At the time future parks are proposed, they would require a separate environmental review and compliance with regulations in existence at that time would address potential environmental impacts related to the construction and operation of new parks. Furthermore, these future parks would be subject to General Plan Update policies and actions intended to protect the environment and the programmatic mitigation framework established in this EIR. Policy LU-2.1 ensures that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements. Policy LU-1.6 supports the provision of outdoor gathering places such as plazas, green space, and squares. Policy RM-7.4 requires future private development to incorporate parkland, open space, or green space to expand recreational opportunities in the community in accordance with standards set by the San Jacinto Municipal Code. Action RM-7a ensures the City will review development proposals for their potential demand for and impact on parks and recreational facilities in the community, requiring developers of residential projects to provide adequate parkland equal to five acres per 1,000 residents and developers of non-residential development to provide parkland equal to 2.5 acres per 1,000 employees, or pay an in-lieu fee prior to occupancy of the project. Therefore, with compliance to environmental regulations established at the time of future park and recreational projects are proposed, and adherence to General Plan Update policies and actions, the environmental impacts associated with the construction or expansion of recreational facilities would less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.5: Public Services for Quality of Life. Maintain appropriate sites for institutional and public facility uses that can accommodate the infrastructure and facilities needed to serve the community. Policy LU-1.6: Gathering Spaces. Support the provision of attractive outdoor gathering places such as plazas, green space, and squares to strengthen social engagement and provide visual relief in developed areas. Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. Policy LU-5.4: Gathering Places. Encourage the provision of both formal and informal public gathering spaces through pedestrian-oriented street design; sidewalk furniture and pedestrian-oriented development; well-designed, multi-use public spaces of different sizes Findings Page 145 of 266 including pocket parks, plazas, and monuments; and community events. RESOURCE MANAGEMENT ELEMENT Goal RM-7: Parks and Recreational Resources. An integrated system of parks, recreational, and open space facilities that meet the community’s needs and preferences. Goal RM-9: Infrastructure Planning. A community that provides adequate, reliable infrastructure and facilities to support existing and future development. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-7.1: Regional Cooperation. Collaborate with the Valley-Wide Recreation and Park District and other organizations to provide parks, recreational, and open space facilities that meet the needs and preferences of all segments of the community. Policy RM-7.2: Service Area. Locate and distribute parks and recreational facilities throughout the community so that most residents are within walking distance (one-half mile) of a public open space and prioritize the development of new public spaces in areas outside of this service radius. Policy RM-7.3: New Facilities. Encourage the use of less developable or undevelopable lands such as utility corridors, fault zones, flood control facilities, channels, and easements for recreational uses, when feasible. Policy RM-7.4: Parkland Dedication. Require future private development to incorporate parkland, open space, or green space to expand recreational opportunities in the community in accordance with standards set by the San Jacinto Municipal Code. Policy RM-7.6: Safety. Enhance park safety through playground design, crime prevention technology, night lighting, natural surveillance, unobtrusive landscaping, and increased public safety patrols. Policy RM-7.7: Accessible Facilities. Require that new park facility construction and existing facility retrofits meet accessibility standards defined by the Americans with Disabilities Act (ADA) and playground safety requirements (Senate Bill 2733). Policy RM-7.8: Joint Use Facilities. Collaborate with school districts and other agencies to develop cooperative programs where the joint use of facilities would lead to enhanced and more efficient facility utilization. Policy RM-7.9: Open Space in Nonresidential Development. Encourage outdoor gathering spaces, such as mini-parks and plazas, be incorporated into nonresidential development to encourage social interaction, create experience-oriented centers, and enhance the visual character of the community. Findings Page 146 of 266 Policy RM-7.10: Parkland Funding. Actively pursue financing for parkland acquisition and maintenance, and allocate sufficient funding to park development to support the community’s recreational needs. Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-1a: Work with public and private agencies to explore the joint venture use and management of open space areas. Action RM-7a: Review development proposals for their potential demand for and impact on parks and recreational facilities in the community by: • Requiring developers of residential projects to provide adequate parkland equal to five acres per 1,000 residents (0.005 acre per resident), or pay an in-lieu fee prior to occupancy of the project. • Requiring non-residential development to provide parkland equal to 2.5 acres per 1,000 employees (0.0025 acre per employee), or pay an in lieu fee prior to occupancy of the project. • Work with developers to identify the appropriate park type(s), size(s), facilities, and location(s) for required park facilities. • Ensure parkland facilities conform with City standards. Action RM-7b: For projects located along the river levees or fault zones, or that include drainage courses, utility easements, and/or flood control facilities, encourage the project to provide easements to the appropriate agency (the City of San Jacinto, homeowners Findings Page 147 of 266 association, Valleywide or other agency) for the provision of linear parks, pathways, horseback riding trails, and/or hiking and biking trails within these areas, linking to the regional park and trail system where possible. Action RM-7c: Cooperate with joint power authorities, special districts, and regional, State, and federal agencies to explore the development of a regional park that includes facilities such as hiking trails, camping, and fishing opportunities. Action RM-7d: Pursue available resources to fund recreation facilities and parkland acquisition, development, and maintenance, including but not limited to, State and federal grants, special districts, private donations, gifts, and endowments. Action RM-7e: Cooperate with the Valley-Wide Recreation and Park District, Mount San Jacinto Community College, and other public and private service providers to identify additional needed senior and youth programs and services in the community. Work with these organizations to develop programs and expand access to and participation in senior and youth programs without duplicating efforts. Encourage the use of public transit and alternative modes of travel to these facilities and programs. Action RM-7g: Maintain an up-to-date inventory of developed and proposed public park land and residences outside of one-half mile of a public park so that new park development can be directed to those areas. P. TRANSPORTATION 1. Circulation System Conflicts Threshold: Would the project conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadways, bicycle and pedestrian facilities? Finding: Less than significant. (Draft EIR, Impact TR-1, pages 5.17-17 through 5.17- 21) Explanation: Circulation System The Project includes adoption of a new Circulation map that redefines and consolidates the City’s roadway classifications. As a result, some roadways are reclassified to better describe their intended function related to access and mobility. The Land Use, Economic Development, and Mobility Elements developed as part of the General Plan Update contain several policies that support access to and the performance of transit, bicycle, and pedestrian facilities. Specifically, proposed Mobility Element Policy M-1.5 encourages roadway, sidewalk, and median improvements that promotes pedestrian and bicycle safety. Proposed Mobility Element Goal M-3 encourages the planning and design of complete streets with policies that promote consideration for all users within all facility types. Policy M-3.2 Findings Page 148 of 266 promotes the incorporation of facilities and design features into transportation improvement projects that support the use of public transit and active transportation, such as walking and biking. The proposed Land Use Element includes Policy LU-1.1 which promotes an appropriate land use plan that promotes efficient development and multiple transportation options. Policy LU-2.2 encourages new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Policy LU-4.4 supports pedestrian-friendly and pedestrian- scaled development that encourages more social interaction and less automobile use, especially in the Downtown Village. Proposed Economic Development Element Policy ED-3.1 encourages higher density housing and higher intensity employment space to locate in mixed-use formats along the City’s commercial corridors, near transit nodes, and in areas well-served by the City’s multimodal transportation network. As a result, implementation of the General Plan Update would not conflict with applicable plans, polices, or ordinances related to vehicle circulation, and its impact is considered less than significant. Bicycle and Pedestrian Circulation The City of San Jacinto does not have an adopted bicycle or pedestrian master plan or defined measures of effectiveness for bicycle and pedestrian circulation. Proposed updated roadway classifications include descriptions of appropriate design features for people biking and walking in line with multimodal City goals. The updated Mobility Element includes recommended improvements from the Trails Master Plan, which if incorporated would improve bicycle and pedestrian circulation Citywide. The recommended trails and bicycle facilities are proposed as part of the proposed General Plan Update and are identified in the Trails Master Plan. Additionally, the Mobility Element developed as part of the plan update contains several policies that support access to and the performance bicycle and pedestrian facilities. The proposed Mobility Element contains Goal M- 4 which supports an extensive and regionally linked network of trails, bicycle lanes, and sidewalk paths that encourage active transportation, such as walking and bicycling, as viable for transportation and recreation. Mobility Element Policy M-4.3 encourages the use of open space and utility easements for bicycle, pedestrian, and equestrian trails. Policy M-4.5 encourages new development in the City to provide bicycle parking, lockers, and other support facilities for bicyclists. Therefore, the Project’s impact is considered less than significant. Public Transit System The City does not have defined measures of effectiveness for public transit service and circulation. The proposed General Plan Update would be expected to increase demand for travel given the proposed development and Findings Page 149 of 266 expected increase in residents and employees. This population and job growth within the City could increase the demand for public transit but also resulting in increased levels of vehicular traffic which could slow transit operations and impact transit reliability. The Mobility Element developed as part of the General Plan Update includes policies to support and enhance transit service. Specifically, Mobility Element Policy M-2.4 promotes public transportation programs that effectively serve the City’s residents and workers by connecting users to local and regional destinations, including jobs, recreation, retail and other activity centers. Therefore, the General Plan Update’s impact is considered less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). Policy LU-2.2: Infill Development. Encourage new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Policy LU-4.4: Pedestrian Design. Support pedestrian-friendly and pedestrian-scaled development that encourages more social interaction and less automobile use, especially in the Downtown Village. ECONOMIC DEVELOPMENT ELEMENT Policy ED-3.2: Higher Intensity Development. Encourage higher density housing and higher intensity employment space to locate in mixed-use formats along the City’s commercial corridors, near transit nodes, and in areas well-served by the City’s multimodal transportation network. Policy ED-3.3: Regional Coordination. Coordinate local infrastructure investments and initiatives with regional transportation improvements that enhance major corridors and nodes. Policy ED-4.3: Mixed-Use. Encourage the development and integration of a mix of uses in a “main street” setting that includes retail anchored stores, entertainment, office, retail, residential at various densities, and transit-oriented development and/or mix uses that provide regional draw. Findings Page 150 of 266 MOBILITY ELEMENT Policy M-1.1: Balanced Circulation System: Provide for a balanced circulation system that promotes the safe and efficient movement of people and goods throughout the City. Policy M-1.2: Access and Mobility: Strive to maintain sufficient access and mobility for all modes of travel and users of the roadway network. Policy M-1.5: Transportation Improvements for All Users: Encourage roadway, sidewalk, and median improvements that enhance the visual character of the roadway system and promote pedestrian and bicycle safety. Action M-1a: Periodically review and assess the vehicular operating conditions along City facilities to determine what, if any, improvements are warranted to maintain a safe and efficient flow of traffic in the City. Improvements may be identified and included in the City’s Capital Improvement Plan and/or required as part of project approval through the development review process. Policy M-2.4: Public Transit: Promote public transportation programs that effectively serve the City's residents and workers by connecting users to local and regional destinations, including jobs, recreation, retail, and other activity centers. Goal M-3: Complete Streets. A multi-modal transportation network that provides sufficient vehicular, pedestrian, bike and transit facilities. Policy M-3.1: Complete Streets: Apply context-sensitive complete streets principles to new roadways and to transportation improvements to serve all modes of travel and users of all ages and abilities. Policy M-3.2: Multimodal Facilities: Incorporate facilities and design features into transportation improvement projects that support the use of public transit and active transportation. Policy M-3.3: Multimodal Connectivity: Link commercial development, employment centers, public facilities, and community parks and open spaces to transit and active transportation facilities and trails, wherever feasible. Policy M-3.6: Park and Ride Facilities: Encourage the provision of regional public transportation services and support facilities such as park and ride lots. Goal M-4: Active Transportation. An extensive and regionally linked network of trails, bicycle lanes, and sidewalk paths that encourage active transportation as viable for transportation and recreation. Policy M-4.1: Trails Master Plan: Implement applicable goals, policies, and projects from the Trails Master Plan to provide trails and multimodal facilities that support active transportation within and beyond the City. Findings Page 151 of 266 Policy M-4.2: Active Transportation Network: Provide and maintain an extensive active transportation and trail network that supports bicycles, pedestrians, and equestrians and is linked to regional facilities and facilities of adjacent jurisdictions. Policy M-4.3: Trail Development: Encourage the use of open space and utility easements for bicycle, pedestrian, and equestrian trails, where feasible. Policy M-4.4: Trail Connectivity: Encourage Specific Plans and Planned Developments to include well-developed and designed trails that connect neighborhoods to parks, schools, jobs, and adjacent existing or planned local and/or regional trails. Policy M-4.5: Support Facilities: Encourage new developments to provide bicycle parking, lockers, and other support facilities for bicyclists. 2. CEQA Guidelines Section 15064.3(b) Threshold: Would the project conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b)? Finding: Less than significant. (Draft EIR, Impact TR-2, pages 5.17-21 through 5.17- 25) Explanation: The General Plan Update is not expected to increase VMT per person above the current General Plan/No Project conditions. Total VMT per service population is expected to decrease almost 12 percent under the General Plan Update in comparison to No Project conditions. The Land Use and Mobility elements developed as part of the General Plan Update includes policies to support the reduction of VMT, including increasing the balanced mix of residential and employment opportunities within the City with the proposed land uses. Specifically, the proposed Land Use Element includes Policy LU- 1.1 which promotes an appropriate land use plan that promotes efficient development and multiple transportation options. Policy LU-2.2 encourages new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Policy LU-4.4 supports pedestrian-friendly and pedestrian-scaled development that encourages more social interaction and less automobile use, especially in the Downtown Village. The proposed Mobility Element includes Goal M-6 which promotes transportation management strategies that comply with the County Congestion Management Plan and regional and Statewide greenhouse gas emissions targets. Mobility Element Policy M-6.1 supports maintaining VMT thresholds and TDM mitigation requirements for the purposes of environmental review under CEQA. Policy M-6.2 encourages the creation and implementation of TDM and congestion management mitigation measures in areas experiencing high levels of congestion and VMT levels. Additionally, Mobility Element Policy M-6.4 promotes working with developers to reduce greenhouse gas emissions and minimize Findings Page 152 of 266 congestion related to new development through improvements to the circulation system and on-site improvements that encourage non-vehicular modes of travel. Therefore, the VMT-related impacts of the General Plan Update would be considered less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). Policy LU-2.2: Infill Development. Encourage new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Policy LU-4.4: Pedestrian Design. Support pedestrian-friendly and pedestrian-scaled development that encourages more social interaction and less automobile use, especially in the Downtown Village. ECONOMIC DEVELOPMENT ELEMENT Policy ED-3.2: Higher Intensity Development. Encourage higher density housing and higher intensity employment space to locate in mixed-use formats along the City’s commercial corridors, near transit nodes, and in areas well-served by the City’s multimodal transportation network. Policy ED-3.3: Regional Coordination. Coordinate local infrastructure investments and initiatives with regional transportation improvements that enhance major corridors and nodes. Policy ED-4.3: Mixed-Use. Encourage the development and integration of a mix of uses in a “main street” setting that includes retail anchored stores, entertainment, office, retail, residential at various densities, and transit-oriented development and/or mix uses that provide regional draw. MOBILITY ELEMENT Policy M-1.1: Balanced Circulation System: Provide for a balanced circulation system that promotes the safe and efficient movement of people and goods throughout the City. Policy M-1.2: Access and Mobility: Strive to maintain sufficient access and mobility for all modes of travel and users of the roadway network. Findings Page 153 of 266 Policy M-1.5: Transportation Improvements for All Users: Encourage roadway, sidewalk, and median improvements that enhance the visual character of the roadway system and promote pedestrian and bicycle safety. Policy M-2.4: Public Transit: Promote public transportation programs that effectively serve the City's residents and workers by connecting users to local and regional destinations, including jobs, recreation, retail, and other activity centers. Policy M-3.1: Complete Streets: Apply context-sensitive complete streets principles to new roadways and to transportation improvements to serve all modes of travel and users of all ages and abilities. Policy M-3.2: Multimodal Facilities: Incorporate facilities and design features into transportation improvement projects that support the use of public transit and active transportation. Policy M-3.3: Multimodal Connectivity: Link commercial development, employment centers, public facilities, and community parks and open spaces to transit and active transportation facilities and trails, wherever feasible. Policy M-3.4: New Development: Encourage Specific Plans and Planned Developments to include well-developed and funded multimodal transportation facilities. Policy M-3.6: Park and Ride Facilities: Encourage the provision of regional public transportation services and support facilities such as park and ride lots. Policy M-4.1: Trails Master Plan: Implement applicable goals, policies, and projects from the Trails Master Plan to provide trails and multimodal facilities that support active transportation within and beyond the City. Policy M-4.2: Active Transportation Network: Provide and maintain an extensive active transportation and trail network that supports bicycles, pedestrians, and equestrians and is linked to regional facilities and facilities of adjacent jurisdictions. Policy M-4.3: Trail Development: Encourage the use of open space and utility easements for bicycle, pedestrian, and equestrian trails, where feasible. Policy M-4.4: Trail Connectivity: Encourage Specific Plans and Planned Developments to include well-developed and designed trails that connect neighborhoods to parks, schools, jobs, and adjacent existing or planned local and/or regional trails. Policy M-4.5: Support Facilities: Encourage new developments to provide bicycle parking, lockers, and other support facilities for bicyclists. Goal M-6: Transportation Management. Transportation management strategies that comply with the County Congestion Management Plan and regional and statewide greenhouse gas emissions targets. Findings Page 154 of 266 Policy M-6.1: Vehicle Miles Traveled: Maintain vehicle miles traveled (VMT) thresholds and Transportation Demand Management (TDM) mitigation requirements for the purpose of environmental review under the California Environmental Quality Act (CEQA). Policy M-6.2: Transportation Demand Management: Create and implement TDM and congestion management mitigation measures in areas experiencing high levels of congestion and VMT levels. Policy M-6.4: New Development: Work with developers to reduce greenhouse gas emissions and minimize congestion related to new development through improvements to the circulation system and on-site improvements that encourage non-vehicular modes of transportation. Action M-6c: Require developments that are approved based on TDM plans to incorporate monitoring and enforcement of TDM targets as part of those plans. 3. Design Features Threshold: Would the project substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Finding: Less than significant. (Draft EIR, Impact TR-3, pages 5.17-25 through 5.17- 27) Explanation: The City of San Jacinto maintains improvement standards that guide the construction of new transportation facilities to minimize design hazards for all users of the system. The types of uses included as part of the General Plan Update are generally similar to existing and surrounding uses and thereby are compatible with the existing uses in the Study Area and in the surrounding area. In addition, the Mobility Element developed as part of the General Plan Update contains policies in support of roadway network safety and reducing design hazards. This includes proposed Mobility Element Policy M-1.6 and Action M-1d which promotes managing and improving the City’s transportation network to be save, accessible and consistent with the ADA and to include ADA accessible features as part of roadway infrastructure projects. Proposed Mobility Element M-1.8 encourages roadway design to include traffic calming measures to maintain safe vehicular speeds. Proposed Land Use Element Policy LU-3.1 considers the compatibility of new development with surrounding uses when reviewing development proposals. Therefore, the impact of the Project with respect to design and incompatible use hazards would be considered less than significant. Findings Page 155 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). Goal LU-3: Land Use Compatibility. A community that promotes high-quality development and compatibility with surrounding land uses and major transportation corridors. Policy LU-3.1: Surrounding Uses. Consider as part of the development review process the compatibility of new development with surrounding uses and the ability of new development to enhance the character of the surrounding area. Policy LU-3.2: Residential Uses. Require that new residential development be designed to protect residents from potential conflicts with adjacent land uses, and other features including rail corridors, and high-volume roadways. Action LU-3b: Through the development review process, evaluate development proposals for land use and transportation network compatibility with existing surrounding or abutting development or neighborhoods. MOBILITY ELEMENT Policy M-1.1: Balanced Circulation System. Provide for a balanced circulation system that promotes the safe and efficient movement of people and goods throughout the City. Policy M-1.5: Transportation Improvements for All Users: Encourage roadway, sidewalk, and median improvements that enhance the visual character of the roadway system and promote pedestrian and bicycle safety. Policy M-1.6: ADA Accessibility: Manage and improve the City's transportation network to be safe, accessible, and consistent with the Americans with Disabilities Act (ADA) to allow mobility-impaired users to safely travel within and beyond the City. Policy M-1.7: Safe Routes to Schools: Work with the San Jacinto Unified School District and Hemet Unified School District in the City to maintain Safe Routes to School and encourage parents and children to walk or bike to schools. Policy M-1.8: Traffic Calming: Encourage programming and design strategies to maintain safe vehicular speeds on roadways, including traffic calming measures, where applicable. Findings Page 156 of 266 Action M-1a: Periodically review and assess the vehicular operating conditions along City facilities to determine what, if any, improvements are warranted to maintain a safe and efficient flow of traffic in the City. Improvements may be identified and included in the City’s Capital Improvement Plan and/or required as part of project approval through the development review process. Action M-1c: Consider roundabouts or other emerging design solutions when improvement needs are identified. Action M-1d: Include ADA-accessible facilities as part of roadway infrastructure projects. Policy M-3.1: Complete Streets: Apply context-sensitive complete streets principles to new roadways and to transportation improvements to serve all modes of travel and users of all ages and abilities. 4. Emergency Access Threshold: Would the project result in inadequate emergency access? Finding: Less than significant. (Draft EIR, Impact 5.17-27, page 5.17-28) Explanation: Implementation of the proposed General Plan Update would result in increased development which would result in new roadways and would increase the number of users on the City’s transportation system. There will be a need to ensure that adequate emergency access provisions are made to accommodate increased population and growth. The General Plan Update is a programmatic level document; emergency accessibility is typically assessed at the project level. At a programmatic level, the General Plan Update does not include any downgrading of facilities that would impede or obstruct emergency vehicle access along any roadways that currently provide existing emergency vehicle access. As part of the General Plan Update, the City prepared an analysis consistent with SB 99 to identify residential developments in hazard areas that do not have at least two emergency evacuation routes. The analysis found that out of 4,990 unique land parcels identified as residential and located within an identified hazard zone, the vast majority (approximately 77 percent) of the parcels have multiple exit points with access to multiple arterials, and another 13 percent of the parcels have multiple exit points with access to a single arterial, a loop road. Approximately 10 percent of the developed parcels have one exit point with access directly onto a single arterial. Parcels with one exit point with access directly onto a single arterial are widespread throughout the Study Area, and tend to be condominium, apartment, and mobile home communities, or large rural residential parcels. There are no parcels in the Study Area described as having “one exit point with some distance to a single arterial.” The General Plan Update includes policies and actions to address emergency evacuation routes. Specifically, Policy PS-5.7 Findings Page 157 of 266 directs the City to work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. The General Plan Update does not include any site-specific development. Construction activities that may temporarily restrict vehicular traffic would be required to implement appropriate measures to facilitate the passage of persons and vehicles through/around any required road closures. The General Plan Update identifies major arterials as the primary routes for evacuation; however, evacuation routes would depend upon the emergency event and area affected. Adequacy of emergency access associated with future development projects would be analyzed and evaluated in detail through the environmental review process. Future development would be designed, constructed, and maintained in accordance with applicable standards, including vehicular access to ensure that adequate emergency access and evacuation would be maintained. Construction activities that may temporarily restrict vehicular traffic would be required to implement appropriate measures to facilitate the passage of persons and vehicles through/around any required road closures. As part of the site plan and design review process (SJDC Chapter 17.630), future development projects would be reviewed for adequate access as well as consistency with adopted emergency and evacuation plans among many other environmental issues in order to ensure the safety of City residents and the physical environment. In addition, the Public Safety and Mobility Elements developed as part of the General Plan Update contains policies in support of emergency access along local roads. The proposed Mobility Element Policy M-1.2 promotes striving to maintain sufficient access and mobility for all modes of travel and users of the roadway network. The proposed Public Safety Element Policy PS-5.7 ensures the City works with the Riverside County Fire Department (RCFD) and Riverside County Sheriff’s Department (RCSD) to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Further, Policy PS-5.2 supports the development of local preparedness plans and multi-jurisdictional cooperation and communication agreements for emergency situations. Therefore, the impact of the General Plan Update with respect to emergency access would be considered less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: MOBILITY ELEMENT Policy M-1.2: Access and Mobility: Strive to maintain sufficient access and mobility for all modes of travel and users of the roadway network. Policy M-2.1: Regional Agency Coordination: Coordinate with regional transportation agencies, including the California Department of Transportation (Caltrans), the Riverside Findings Page 158 of 266 County Transportation Commission (RCTC), and the Riverside Transit Agency (RTA) to implement roadway improvements that encourage the safe and efficient flow of traffic within and beyond the City—for example, State Route 79 (SR-79) and Mid County Parkway (Figure M-2). Policy M-2.5: Freeway Coordination: Work with regional and State transportation agencies to minimize the impacts of regional roadways construction (e.g., SR 79) on local businesses and employment centers. SAFETY ELEMENT Policy PS-5.2: Emergency Preparedness Plans. Support the development of local preparedness plans and multi-jurisdictional cooperation and communication agreements for emergency situations. Policy PS-5.7: Emergency Evacuation Routes and Access. Work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Q. TRIBAL CULTURAL RESOURCES 1. Tribal Cultural Resources Threshold: Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:  Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)?  A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe. Finding: Less than significant. (Draft EIR, Impacts TCR-1 and TCR-2, pages 5.18- 11 through 5.18-14) Explanation: One tribal cultural resource (P-33-017364) has been identified within the Study Area. The City of San Jacinto is located within the traditional territory of the Soboba Band of Luiseño Indians. Information provided in the Cultural Resources Study, including the records search and documented Findings Page 159 of 266 history of the area, as well as consultation with the Soboba Band of Luiseño Indians, indicates the Study Area may contain tribal cultural resources. Grading of original in situ soils could expose buried tribal cultural resources and features including sacred sites. While the General Plan Update does not directly propose site-specific development with the potential to directly impact a tribal cultural resource, future development allowed under the General Plan Update could cause a substantial adverse change in the significance of a tribal cultural resource. The General Plan Update Resource Management Element includes goals, policies, and actions addressing tribal cultural resources. Policy RM-3.1 protects areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Code. Policy RM-3.4 requires consultation with Native American tribes that may be impacted by proposed development, as necessary, and in accordance with State, local, and tribal intergovernmental consultation requirements. Action RM-3a directs the City to continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to CEQA. Action RM-3d establishes that, in the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, the City shall halt excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the County Coroner has been informed and has determined that no investigation of the cause of death is required. If the remains are of Native American origin, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the descendants from the deceased Native Americans have made a recommendation to the landowner or the persons responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code section 5097.98, or the Native American Heritage Commission was unable to identify a descendant or the descendant failed to make a recommendation within 24 hours after being notified by the Commission. Action RM-3h requires, prior to adopting any general plan, specific plan, or any amendment thereto, the City to notify appropriate tribes of the opportunity for consultation for the purpose of preserving, or mitigating impacts to, cultural places located on land within the City’s jurisdiction that may be affected by the proposed plan or amendment. Action RM-3i ensures that, prior to the adoption or substantial amendment of a general plan or specific plan, the City shall refer the proposed action to those tribes that are on the NAHC contact list and have traditional lands located within the City’s jurisdiction for a 45 day comment period. Action RM-3j requires that, prior to designating open space, the City consult with tribes if the affected land contains a cultural place and if the affected tribe has requested public notice under Government Code section 65092. Action RM-3j ensures that, prior to designating open space, the City Findings Page 160 of 266 shall consult with tribes if the affected land contains a cultural place and if the affected tribe has requested public notice under Government Code section 65092. Potential impacts to tribal cultural resources associated with future development would be reduced through implementation of General Plan Update policies and actions. Subsequent development and infrastructure projects would be analyzed for potential environmental impacts, consistent with the requirements of CEQA, pursuant to the City’s entitlement review process. Subsequent projects implemented in accordance with the project would be subject to the provisions of AB 52 and may require tribal consultation with California Native American tribes that are traditionally and culturally affiliated with the Planning Area. Future AB 52 consultation may identify tribal cultural resources not yet found and formally recorded that could be impacted by subsequent projects. Additionally, SJDC Chapter 17.500 is intended to protect cultural resources, including tribal cultural resources. As conditions of approval for Conditional Use Permits and Subdivision Maps, a developer would be required to enter into a Treatment and Disposition Agreement (TDA) with the Soboba Band of Luiseño Indians to address treatment and disposition of archaeological/cultural resources and human remains associated with Soboba Band of Luiseño Indians that may be uncovered or otherwise discovered during construction of the project. The TDA may establish provisions for tribal monitors. If an archeological/cultural assessment demonstrates the potential for archeological/cultural resources to occur on the project site, tribal monitors, including the Soboba Band of Luiseño Indians may be allowed to monitor all grading, excavation, ground-disturbing activities, including further survey. Following the agreement of the developer, the designated archeologist, tribal monitor, and any applicable responsible or trustee agencies, grading, excavation, ground-disturbing activities would be stopped temporarily and redirected in the event that any archeological/cultural resources are discovered in order to evaluate the significance of any archeological/cultural resource discovered on the property. Compliance with the General Plan Update policies and actions and existing regulations would not cause a substantial adverse change in the significance of a tribal cultural resource and impacts would be less than significant GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-3: Heritage Resources. A community that celebrates and preserves its rich culture and historic assets. Policy RM-3.1: Preservation. Protect areas containing significant historic, archaeological, and paleontologic resources, as defined by the California Public Resources Findings Page 161 of 266 Code. Policy RM-3.4: Tribal Consultation. Consult with Native American tribes that may be impacted by proposed development, as necessary, and in accordance with state, local, and tribal intergovernmental consultation requirements. Action RM-3a: Continue to assess development proposals for potential impacts to sensitive historic, archaeological, and paleontological resources pursuant to the California Environmental Quality Act (CEQA). Action RM-3c: For all development proposals within areas with the potential to contain prehistoric/historic resources, the City shall require a study to be conducted by a professional archaeologist. The objective of the study will be to determine if significant archaeological resources are potentially present and if the project will significantly impact these resources. If significant impacts are identified, the City may require the project to be modified to avoid the impacts, or require mitigation measures to mitigate the impacts. Mitigation may involve archaeological investigation and resources recovery. Action RM-3d: For projects that involve ground disturbing activities on native soil, prior to the issuance of a grading permit, the developer shall enter a Treatment and Disposition Agreement (TDA) with the Soboba Band of Luiseño Indians to address treatment and disposition of archaeological/cultural resources and human remains associated with Soboba Band of Luiseño Indians that may be uncovered or otherwise discovered during construction of the project. The TDA may establish provisions for tribal monitors. Following execution of the TDA by the developer and Soboba Band of Luiseño Indians, the TDA will be incorporated by reference into the grading permit. Action RM-3g: In the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, the City shall halt excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the County Coroner has been informed and has determined that no investigation of the cause of death is required. If the remains are of Native American origin, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the descendants from the deceased Native Americans have made a recommendation to the landowner or the persons responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code section 5097.98, or the Native American Heritage Commission was unable to identify a descendant or the descendant failed to make a recommendation within 24 hours after being granted access to the site. Action RM-3h: Prior to adopting any general plan, specific plan, or any amendment thereto, the City shall notify appropriate tribes of the opportunity for consultation for the purpose of preserving, or mitigating impacts to, cultural places located on land within the City’s jurisdiction that may be affected by the proposed plan or amendment. Action RM-3i: Prior to the adoption or substantial amendment of a general plan or specific Findings Page 162 of 266 plan, the City shall refer the proposed action to those tribes that are on the NAHC contact list and have traditional lands located within the City’s jurisdiction for a 45 day comment period. Action RM-3j: Prior to designating open space, the City shall consult with tribes if the affected land contains a cultural place and if the affected tribe has requested public notice under Government Code section 65092. R. UTILITIES AND SERVICE SYSTEMS 1. Utilities and Service Systems Threshold: Would the Project require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Finding: Less than significant. (Draft EIR, Impact USS-1, pages 5.19-35 through 5.19-42) Explanation: Water In regard to water facilities, the General Plan Update is expected to result in population and employment growth within the Study Area, and thus, an overall increase in demand on water supply, which would necessitate construction of future water supply infrastructure. Buildout under the General Plan Update could yield a net change over existing conditions of an additional 16,252 housing units, an additional population of 54,280 people, an additional 21,839,634 square feet of non-residential building square footage, and an additional 19,674 jobs within the Study Area. This increased demand for water infrastructure would primarily be located within areas that are already developed and serviced by the City of San Jacinto Water Department and EMWD. Since no specific development projects are proposed as part of the General Plan Update, the environmental effects from constructing or expanding facilities are unknown at this time. All water infrastructure construction activities associated with future development would be subject to compliance with existing local, State, and federal laws, ordinances, and regulations, which would ensure impacts are reduced to less than significant levels. The City would continue to coordinate with EMWD to ensure adequate water distribution facilities are available to serve future development. Furthermore, these future water facilities would be subject to General Plan Update policies and actions intended to protect the environment. Policy RM-2.1 directs the City to cooperate with federal, State, and county governments, and other agencies on the maintenance and improvement of the quality and quantity of local and regional groundwater resources. Policy RM-2.2 protect aquifers within the Basin and encourages groundwater recharge. Policy RM-2.3 promotes Findings Page 163 of 266 residential, commercial, and institutional water conservation strategies using multiple innovative strategies and contemporary best practices. Action RM-2e requires, through the development review process, that sufficient water supply and water infrastructure capacity is available to serve the development prior to approval of the project, pursuant to Water Code Section 10910 and Government Code Section 66473.7. Policy RM- 9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Action RM-9a directs the City to continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. This would specifically involve, during the processing of development proposals, consultation with the water districts regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, it would also require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development. Action RM-9b directs cooperation with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9e directs cooperation with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. The implementation of existing regulations and General Plan Update policies and actions would reduce impacts associated with the relocation or construction of new or expanded water facilities to a level that is less than significant. Wastewater In regard to wastewater, the General Plan Update is expected to result in increased population and employment growth within the Study Area, and thus, an overall increase in demand on the existing sewer system associated with increased sewage flows. Buildout under the General Plan Update would accommodate a population of 107,152. Therefore, using the wastewater generation rate of 43 gpcd, as calculated in the 2018 Sewer Master Plan, the City’s total wastewater flow for 2040 under the General Plan Update would be 4.6 MGD. This is approximately 0.6 MGD less than the 5.2 MGD projected 2040 wastewater flow in the 2018 Sewer Master Plan Update. Therefore, the sewer system under the 2018 Sewer Master Plan accommodates the projected population growth of implementation of the General Plan Update. The ultimate capacity of the San Jacinto Valley RWRF, where San Jacinto sewer water is treated and/or disposed of, would Findings Page 164 of 266 be able to meet the project wastewater production from the City of San Jacinto. The General Plan Update does not include specific development proposals; therefore, the environmental effects of future wastewater collection systems are unknown at this time. Future developments would be reviewed by the City, during site plan review in order to determine if sufficient local and trunk sewer capacity exists to serve the specific development, in accordance with SJDC Chapter 17.630, Site Plan and Design Review. Additionally, the General Plan Update includes policies, and actions to ensure adequate wastewater services and facilities and that potential environmental impacts associated with the implementation of new or expanded infrastructure would be reduced. Policy RM-9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Action RM-9a directs the City to continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. This would specifically involve, during the processing of development proposals, consultation with the water districts regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, it would also require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development. Action RM-9b directs cooperation with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9c directs the City to work with the water districts to expedite the improvement and expansion of water, reclaimed water, and sewer facilities, when necessary. The implementation of existing regulations and General Plan Update policies and actions would reduce impacts associated with the relocation or construction of new or expanded wastewater facilities to a level that is less than significant. Stormwater Development under the proposed General Plan Update would result in increased areas of impervious surfaces throughout the Study Area, resulting in the need for additional or expanded stormwater drainage, conveyance and retention infrastructure. As described above, RCFCWCD provides flood control services within the Study Area, and is responsible for the regional drainage facilities, while the City controls the local facilities. The infrastructure and facilities necessary to serve new growth would involve development of some facilities on-site within new development projects, some facilities off-site on appropriately designated land, and may also Findings Page 165 of 266 involve improvements to existing facilities and disturbance of existing rights-of-way. The specific impacts of providing new and expanded drainage facilities cannot be determined at this time, as the General Plan Update does not propose or approve any specific development project nor does it designate specific sites for new or expanded public facilities. Stormwater drainage and conveyance facilities would be evaluated at the project-level in association with subsequent development projects. However, the facilities would be primarily provided on sites with land use designations that allow such uses and the environmental impacts of constructing and operating the facilities would likely be similar to those associated with new development, redevelopment, and infrastructure projects under the General Plan. As future development and infrastructure projects are considered by the City, each project will be evaluated for conformance with the General Plan, Municipal Code, and other applicable regulations. Subsequent development and infrastructure projects would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA. As such, this is a less than significant impact and no additional mitigation is required. The General Plan Update policies and actions would further ensure that there is adequate stormwater drainage and flood control infrastructure to serve future development under the General Plan Update, and would ensure that future drainage and flood control infrastructure projects do not result in adverse environmental impacts. Policy RM-2.5 directs the City to work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Action RM-2a requires new development and redevelopment projects to control stormwater runoff through implementation of BMPs. It also requires existing development to control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Policy RM-9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Action RM-9f ensures the City refers to the Master Drainage Plan during the annual budget and capital improvement program process to identify the resources needed to designate, preserve, and acquire land for necessary flood control and drainage facilities. The implementation of existing regulations and General Plan Update policies and actions would reduce impacts associated with the relocation or construction of new or expanded stormwater facilities to a level that is less than significant. Findings Page 166 of 266 Electrical, Natural Gas, and Telecommunications In regard to electrical, natural gas, and telecommunication services, the Study Area is within the service areas of SJP and SCE, SoCalGas, and various telecommunication providers. New growth anticipated by the General Plan Update would require increased electrical, natural gas, and telecommunications services, potentially resulting in the new construction or relocation of facilities. The environmental effects of future expansions of electrical, natural gas, and telecommunication facilities would be evaluated with each development proposal and would require a separate environmental review related to the construction and operation of new electrical, natural gas, and telecommunications infrastructure. Future implementing projects under the General Plan Update would have to coordinate with each utility provider to establish service, provide any necessary extensions of facilities, and comply with regulations in existence at that time. As future development and infrastructure projects are considered by the City, each project will be evaluated for conformance with the General Plan, Municipal Code, and other applicable regulations. Furthermore, these future facilities would be subject to General Plan Update goals and policies intended to protect the environment. Policy RM-5.4 promotes the use of energy-efficient materials, equipment, and design in public and private facilities and infrastructure. Policy RM-5.5 promotes energy conservation and recycling by the public and private sectors. Policy RM-5.6 directs the City to collaborate with local service providers in determining and meeting the needs of the community for energy in clean, modern, and cost-effective ways. Policy RM-9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. The implementation of existing regulations and General Plan Update policies and actions would reduce impacts associated with the relocation or construction of new or expanded electrical, natural gas, and telecommunications facilities to a level that is less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. Action LU-2a: Cooperate with LAFCo and the County of Riverside to direct growth outside the City limits on lands that are served, or planned to be served, with a full range of urban services, such as public water and sewer, an extensive road network, public transit, Findings Page 167 of 266 safety and emergency response services, parks, trails, and open space. Policy LU-3.8: Public Utilities. Ensure land uses and development are compatible with existing and proposed utility facilities including the San Jacinto Wastewater Treatment Facility. Action LU-3a: Ensure all projects are reviewed and processed per California Environmental Quality Act (CEQA) Guidelines. RESOURCE MANAGEMENT ELEMENT Goal RM-2: Water Resources. A community that protects and conserves limited water resources. Policy RM-2.1: Regional Cooperation. Cooperate with federal, State, and county governments, and other agencies on the maintenance and improvement of the quality and quantity of local and regional groundwater resources. Policy RM-2.2: Groundwater Management. Protect aquifers within the Basin and encourage groundwater recharge. Policy RM-2.3: Conservation. Promote residential, commercial, and institutional water conservation strategies using multiple innovative strategies and contemporary best practices. Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Policy RM-2.6: Septic Systems. Discourage the use of septic systems to reduce potential negative impacts to groundwater. Policy RM-2.7: Reclaimed Water. Promote the expanded use of reclaimed water, where feasible. Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game Findings Page 168 of 266 (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Co ntrol Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). Action RM-2b: Cooperate with the Regional Water Quality Control Board to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. Action RM-2c: In cooperation with the state, regional, and local water agencies and suppliers, participate in programs that seek to expand the availability and use of recycled water for irrigation where feasible and legally permitted. Specifically, support the expansion of the use of recycled water for urban and agricultural irrigation. Cooperate with these agencies to establish standards and regulations for the use of recycled water in development projects. Action RM-2d: Work with the water districts and private developers to encourage water conservation in the following ways:  Implementing aquifer and groundwater recharge programs  Participating in water conservation programs operated by the local and regional water districts  Establishing water conservation education programs  Requiring the use of drought resistant plant species in landscaping for public and private areas, including parks and recreational facilities, in accordance with the Water Efficient Landscaping requirements.  Expanding the production and use of reclaimed water  Requiring the incorporation of water conservation devices, including low flush toilets, flow restriction devices, and water conserving appliances in both new public and private development projects and rehabilitation projects. Action RM-2e: Through the development review process, require that sufficient water supply and water infrastructure capacity is available to serve the development prior to approval of the project, pursuant to Water Code Section 10910 and Government Code Section 66473.7. Action RM-2f: Whenever feasible, incorporate improved open space and preservation areas and quasi-active recreation facilities in areas used for ground water recharge and/or drainage detention. Action RM-2g: During the development review process, the City shall allow new septic Findings Page 169 of 266 systems only for low density projects if they have met the RWQCB’s minimum lot size requirement of one-half acre per subsurface disposal system and where sewer connection is infeasible. Action RM-2h: Continue to encourage the conversion from existing septic systems to sewer by limiting the replacement or expansion/repair of existing septic systems as feasible. Policy RM-5.4: Energy-Efficient Materials. Promote the use of energy-efficient materials, equipment, and design in public and private facilities and infrastructure. Policy RM-5.5: Energy Conservation. Promote energy conservation and recycling by the public and private sectors. Policy RM-5.6: Energy Needs. Collaborate with local service providers in determining and meeting the needs of the community for energy in clean, modern, and cost-effective ways. Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Policy RM-9.6: Telecommunications. Encourage service providers to make available the highest level of telecommunications infrastructure, along with a wide range of modern telecommunications services for San Jacinto’s residences, businesses, and institutions. Action RM-9a: Continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. Specifically, the City should: Findings Page 170 of 266  During the processing of development proposals, ensure the water districts are consulted regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development.  Ensure the project applicant has paid the required fees prior to occupancy of any new development.  Require water conservation devices and xeriscape water efficient landscaping in new public and private development and redevelopment projects. Action RM-9b: Cooperate with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9c: Work with the water districts to expedite the improvement and expansion of water, reclaimed water, and sewer facilities, when necessary. Action RM-9d: Whenever feasible, require the installation and use of reclaimed water systems for irrigation purposes in new developments. Action RM-9e: Cooperate with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. Action RM-9f: During the annual budget and CIP process, refer to the Master Drainage Plan to identify the resources needed to designate, preserve, and acquire land for necessary flood control and drainage facilities. 2. Water Supplies Threshold: Would the Project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years? Finding: Less than significant. (Draft EIR, Impact USS-2, pages 3.19-42 through 5.19-47) Explanation: The General Plan Update is expected to result in increased population and employment growth within the Study Area, and a corresponding increase in the demand for additional water supplies. Buildout under the General Plan could yield a total of 32,081 housing units, a population of 107,152 people, 24,413,227 square feet of non-residential building square footage, and 26,989 jobs within the Study Area. This represents development growth over existing conditions of up to 16,252 new housing units, 54,280 people, Findings Page 171 of 266 21,839,634 square feet of new non-residential building square footage, and 19,674 new jobs. Water service is provided in the vast majority of the Study Area by City of San Jacinto Water Department and EMWD, while LHMWD provides water services to only a small portion of the City. All three service providers have concluded in their respective UWMPs that they would be able to meet projected future water demands under normal, dry, and multiple dry water years. For future qualifying projects, a Water Supply Assessment would be required pursuant to SB 610 for inclusion in the project’s CEQA analysis. The Water Supply Assessment discerns whether the expected demand from the development being proposed has been accounted for in the forecasted demands in the most recent UWMP. A Written Verification of Supply per SB 221 is prepared as a condition of approval for a subdivision map of 500 units or more. Considered a fail-safe mechanism to provide sufficient evidence that adequate water supplies are available before construction begins, the Written Verification of Supply is also prepared/adopted by the water supplier and approved by the land use authority. Depending on the project, one or both of these analyses may be required. Development proposals that may not warrant a Water Supply Assessment and/or Written Verification of Supply, but meet the definition of a project under CEQA, would still require an analysis of sufficient water supplies in the CEQA process. Additionally, the General Plan Update includes goals, policies, and actions to ensure that adequate water supply, treatment, and distribution capacity is available to meet the needs of the proposed development without negatively impacting the existing community. Policy RM-2.1 directs the City to cooperate with federal, State, and county governments, and other agencies on the maintenance and improvement of the quality and quantity of local and regional groundwater resources. Policy RM-2.2 protect aquifers within the Basin and encourages groundwater recharge. Policy RM-2.3 promotes residential, commercial, and institutional water conservation strategies using multiple innovative strategies and contemporary best practices. Action RM-2e requires, through the development review process, that sufficient water supply and water infrastructure capacity is available to serve the development prior to approval of the project, pursuant to Water Code Section 10910 and Government Code Section 66473.7. Policy RM-9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Action RM-9a directs the City to continue to cooperate with the water districts to ensure adequate water suppl y and sewage treatment facilities are provided and maintained in the community. This would specifically involve, during the processing of development proposals, consultation with the water districts regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, it would also require Findings Page 172 of 266 proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development. Action RM-9b directs cooperation with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9c directs the City to work with the water districts to expedite the improvement and expansion of water, reclaimed water, and sewer facilities, when necessary. Action RM-9d requires, whenever feasible, the installation and use of reclaimed water systems for irrigation purposes in new developments. Action RM-9e directs cooperation with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. Through implementation of existing federal, State, and local regulations and the General Plan Update goals, policies, and actions, the environmental impacts to water supplies would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. Action LU-2a: Cooperate with LAFCo and the County of Riverside to direct growth outside the City limits on lands that are served, or planned to be served, with a full range of urban services, such as public water and sewer, an extensive road network, public transit, safety and emergency response services, parks, trails, and open space. Policy LU-3.8: Public Utilities. Ensure land uses and development are compatible with existing and proposed utility facilities including the San Jacinto Wastewater Treatment Facility. Action LU-3a: Ensure all projects are reviewed and processed per California Environmental Quality Act (CEQA) Guidelines. RESOURCE MANAGEMENT ELEMENT Goal RM-2: Water Resources. A community that protects and conserves limited water resources. Policy RM-2.1: Regional Cooperation. Cooperate with federal, State, and county governments, and other agencies on the maintenance and improvement of the quality and quantity of local and regional groundwater resources. Findings Page 173 of 266 Policy RM-2.2: Groundwater Management. Protect aquifers within the Basin and encourage groundwater recharge. Policy RM-2.3: Conservation. Promote residential, commercial, and institutional water conservation strategies using multiple innovative strategies and contemporary best practices. Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retainin g these resources in their natural condition if feasible. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Policy RM-2.6: Septic Systems. Discourage the use of septic systems to reduce potential negative impacts to groundwater. Policy RM-2.7: Reclaimed Water. Promote the expanded use of reclaimed water, where feasible. Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). Action RM-2b: Cooperate with the Regional Water Quality Control Board to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. Action RM-2c: In cooperation with the state, regional, and local water agencies and suppliers, participate in programs that seek to expand the availability and use of recycled water for irrigation where feasible and legally permitted. Specifically, support the expansion of the use of recycled water for urban and agricultural irrigation. Cooperate with these agencies to establish standards and regulations for the use of recycled water in development projects. Findings Page 174 of 266 Action RM-2d: Work with the water districts and private developers to encourage water conservation in the following ways:  Implementing aquifer and groundwater recharge programs  Participating in water conservation programs operated by the local and regional water districts  Establishing water conservation education programs  Requiring the use of drought resistant plant species in landscaping for public and private areas, including parks and recreational facilities, in accordance with the Water Efficient Landscaping requirements.  Expanding the production and use of reclaimed water  Requiring the incorporation of water conservation devices, including low flush toilets, flow restriction devices, and water conserving appliances in both new public and private development projects and rehabilitation projects. Action RM-2e: Through the development review process, require that sufficient water supply and water infrastructure capacity is available to serve the development prior to approval of the project, pursuant to Water Code Section 10910 and Government Code Section 66473.7. Action RM-2f: Whenever feasible, incorporate improved open space and preservation areas and quasi-active recreation facilities in areas used for ground water recharge and/or drainage detention. Action RM-2g: During the development review process, the City shall allow new septic systems only for low density projects if they have met the RWQCB’s minimum lot size requirement of one-half acre per subsurface disposal system and where sewer connection is infeasible. Action RM-2h: Continue to encourage the conversion from existing septic systems to sewer by limiting the replacement or expansion/repair of existing septic systems as feasible. Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Findings Page 175 of 266 Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-9a: Continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. Specifically, the City should:  During the processing of development proposals, ensure the water districts are consulted regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development.  Ensure the project applicant has paid the required fees prior to occupancy of any new development.  Require water conservation devices and xeriscape water efficient landscaping in new public and private development and redevelopment projects. Action RM-9b: Cooperate with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9c: Work with the water districts to expedite the improvement and expansion of water, reclaimed water, and sewer facilities, when necessary. Action RM-9d: Whenever feasible, require the installation and use of reclaimed water systems for irrigation purposes in new developments. Action RM-9e: Cooperate with the Hemet-San Jacinto Watermaster to proactively manage groundwater resources and comply with the Stipulated Judgment and other applicable federal, State and local regulations. 3. Wastewater Capacity Threshold: Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity Findings Page 176 of 266 to serve the project’s projected demand in addition to the provider’s existing commitments? Finding: Less than significant. (Draft EIR, Impact USS-3, pages 5.19-47 through 5.19-49) Explanation: The total amount of projected wastewater flow to EMWD’s San Jacinto Valley RWRF, where San Jacinto sewer water is treated and/or disposed of, for the year 2040 would be approximately 16.4 MGD. The current capacity for the San Jacinto Valley RWRF is 14 MGD and the maximum capacity for the treatment facility is 27 MGD. Therefore, the ultimate capacity of the facility would be able to meet the projected wastewater production from the City of San Jacinto. As noted above, the General Plan Update enables additional development but does not include specific development proposals. At the time future projects are proposed, they would require a separate environmental review and compliance with regulations in existence at that time to ensure adequate wastewater treatment capacity exists. Additionally, the General Plan Update includes goals, policies, and actions to ensure adequate wastewater facilities capacity to serve the Project’s projected demand. Policy LU-2.1 ensures that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. Policy RM- 9.1 maintains and implements public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Action RM-9a directs the City to continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. This would specifically involve, during the processing of development proposals, consultation with the water districts regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, it would also require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development. Action RM-9b directs cooperation with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9c directs the City to work with the water districts to expedite the improvement and expansion of water, reclaimed water, and sewer facilities, when necessary. The implementation of existing federal, State, and local regulations and the General Plan Update policies and actions would ensure adequate wastewater treatment capacity and impacts would be less than significant. Findings Page 177 of 266 GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-2.1: Plan for New Development. Ensure that new development corresponds to the provision of infrastructure, public services, and community facilities and that new development funds and constructs its fair share of improvements in accordance with City requirements. Action LU-2a: Cooperate with LAFCo and the County of Riverside to direct growth outside the City limits on lands that are served, or planned to be served, with a full range of urban services, such as public water and sewer, an extensive road network, public transit, safety and emergency response services, parks, trails, and open space. Policy LU-3.8: Public Utilities. Ensure land uses and development are compatible with existing and proposed utility facilities including the San Jacinto Wastewater Treatment Facility. Action LU-3a: Ensure all projects are reviewed and processed per California Environmental Quality Act (CEQA) Guidelines. RESOURCE MANAGEMENT ELEMENT Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3: Fair Share. Ensure that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure and services, recreational amenities, and facilities. Policy RM-9.4: Prioritization. Prioritize the placement of new infrastructure in areas targeted for near-term development and in areas designated as disadvantaged communities through the orderly extension of infrastructure. Policy RM-9.5: Regional Cooperation. Collaborate with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. Action RM-9a: Continue to cooperate with the water districts to ensure adequate water supply and sewage treatment facilities are provided and maintained in the community. Specifically, the City should: Findings Page 178 of 266  During the processing of development proposals, ensure the water districts are consulted regarding the potential impact of the project on water supplies and sewage treatment facilities. When requested by the district or City Engineer, require proposed developments to include a water quality assessment as part of the application materials, and implement identified mitigation measures during construction and development.  Ensure the project applicant has paid the required fees prior to occupancy of any new development.  Require water conservation devices and xeriscape water efficient landscaping in new public and private development and redevelopment projects. Action RM-9b: Cooperate with the water districts to update population projections, water use and sewer generation formulas, needed improvements, and programs within the Water and Sewer Master Plans at least every five years. Action RM-9c: Work with the water districts to expedite the improvement and expansion of water, reclaimed water, and sewer facilities, when necessary. 4. Solid Waste Generation Threshold: Would the Project generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Finding: Less than significant. (Draft EIR, Impact USS-4, page 5.19-49 through 5.19-52) Explanation: Future development of projects as contemplated under the General Plan Update may increase the population within the Study Area by an additional 54,280 people. The City of San Jacinto has achieved a disposal rate of 3.8 PPD per resident in 2019. Assuming these disposal rates remain constant throughout the life of the General Plan Update, the new growth under General Plan buildout would result in a net increase of approximately 206,264 PPD of solid waste over existing conditions, which equals 103.1 net TPD or 37,631.5 net tons of solid waste per year. The vast majority (95 percent) of solid waste disposed from the City of San Jacinto in 2019 went to two waste disposal facilities: Lamb Canyon Sanitary Landfill (69 percent) and El Sobrante Landfill (26 percent). The City’s projected increase in solid waste generation associated with 2040 buildout under the General Plan Update is within the permitted capacity of both the Lamb Canyon Sanitary Landfill and El Sobrante Landfill. Further, it is more likely that future solid waste would be distributed to the other landfills serving the City. All future development would be required to comply with the mandatory Findings Page 179 of 266 commercial and multifamily recycling requirements of AB 341, thus reducing the amount of landfill waste. Furthermore, the General Plan Update goals, policies, and actions that would reduce the demand for solid waste disposal. Policy RM-10.1 ensures compliance with local, regional and State regulations regarding waste diversion, source reduction, recycling, and composting. Policy RM-10.2 provides adequate waste disposal, recycling, and refuse services for present and future residents and businesses, including programs that improve public access to solid waste collection and recycling facilities. Policy RM-10.4 ensures participation in source reduction and recycling techniques to reduce the amount of solid waste sent to landfills and ensure adequate landfill capacity in the region. Policy RM-10.5 directs the City to work with appropriate service providers to collect and compost greenwaste, including landscaping, Christmas trees, composting and mulch, and other sources of organic waste, to distribute for use in parks, medians, and other municipal areas. Policy RM-10.7 promotes citywide educational programs to inform citizens of the benefits of recycling and appropriate recycling options and locations. Action RM-10a ensures solid waste collection activities completed by franchise solid waste haulers, facility siting and construction of transfer and/or disposal facilities, operation of waste reduction and recycling programs, and household hazardous waste disposal and education programs are consistent with the County Solid Waste Management Plan. Action RM-10b includes standard language in requests for services and in City agreements requiring contractors to use best management practices to maximize diversion of waste from the landfill in order to meet the City’s specified diversion rates. Action RM-10c encourages the expansion of recycling, reuse, and appropriate disposal of hazardous materials, including: increased participation in single family and multifamily residential curbside recycling programs; increased participation in commercial and industrial recycling programs for paper, cardboard, and plastics; and reduced yard and landscaping waste through methods such as composting, grass recycling, and using resource efficient landscaping techniques. Through the implementation of existing regulations and the General Plan Update policies and actions, this is a less than significant impact. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Policy RM-10.1: Compliance with State Legislation. Comply with local, regional and State regulations regarding waste diversion, source reduction, recycling, and composting. Policy RM-10.2: Solid Waste Collection. Provide adequate waste disposal, recycling, and refuse services for present and future residents and businesses, including programs that improve public access to solid waste collection and recycling facilities. Findings Page 180 of 266 Policy RM-10.4: Source Reduction and Recycling Efforts. Participate in source reduction and recycling techniques to reduce the amount of solid waste sent to landfills and ensure adequate landfill capacity in the region Policy RM-10.5: Organic Waste. Work with appropriate service providers to collect and compost greenwaste, including landscaping, Christmas trees, composting and mulch, and other sources of organic waste, to distribute for use in parks, medians, and other municipal areas. Policy RM-10.6: Fees and Funding. Work with appropriate service providers to periodically review collection, recycling, and disposal fees to achieve state and federal mandates, meet community expectations, and reflect cost efficiencies or increases for service delivery. Policy RM-10.7: Public Education. Promote citywide educational programs to inform citizens of the benefits of recycling and appropriate recycling options and locations. Action RM-10a: On an ongoing basis and in compliance with State law, ensure solid waste collection activities completed by franchise solid waste haulers, facility siting and construction of transfer and/or disposal facilities, operation of waste reduction and recycling programs, and household hazardous waste disposal and education programs are consistent with the County Solid Waste Management Plan. Action RM-10b: Include standard language in requests for services and in City agreements requiring contractors to use best management practices to maximize diversion of waste from the landfill in order to meet the City’s specified diversion rates. Action RM-10c: Encourage the expansion of recycling, reuse, and appropriate disposal of hazardous materials, including the following:  Increased participation in single family and multifamily residential curbside recycling programs;  Increased participation in commercial and industrial recycling programs for paper, cardboard, and plastics;  Reduce yard and landscaping waste through methods such as composting, grass recycling, and using resource efficient landscaping techniques; and  Encourage local businesses to provide electronic waste (e-waste) drop-off services and encourage residents and businesses to properly dispose of, or recycle, e-waste. 5. Solid Waste Regulations Threshold: Would the Project comply with federal, state, and local management and reduction statutes and regulations related to solid waste? Findings Page 181 of 266 Finding: Less than significant. (Draft EIR, Impact USS-5, pages 5.19-52 through 5.19-54) Explanation: Chapter 8.32 of the Municipal Code establishes mandatory solid waste and recycling collection to comply with the requirements of AB 939 and AB 341. The City has also established disposal and mandatory recycling requirements for commercial facilities, single family residential and multifamily residential premises to comply with State law diversion requirements. As permitted by AB 939, the City authorizes a private solid waste franchisee (i.e., CR&R) to handle the City’s solid waste and requires CR&R to cooperate in the preparation of solid waste disposal characterization studies and the preparation of waste stream audits. CR&R and the City work together to submit information to meet the reporting requirements of AB 939, or any other law or regulation, to reach the solid waste and recycling goals mandated by the AB 939. The General Plan Update goals, policies, and actions would reduce the demand for solid waste disposal. Policy RM-10.1 ensures compliance with local, regional and State regulations regarding waste diversion, source reduction, recycling, and composting. Policy RM -10.2 provides adequate waste disposal, recycling, and refuse services for present and future residents and businesses, including programs that improve public access to solid waste collection and recycling facilities. Policy RM-10.4 ensures participation in source reduction and recycling techniques to reduce the amount of solid waste sent to landfills and ensure adequate landfill capacity in the region. Policy RM-10.5 directs the City to work with appropriate service providers to collect and compost greenwaste, including landscaping, Christmas trees, composting and mulch, and other sources of organic waste, to distribute for use in parks, medians, and other municipal areas. Policy RM-10.7 promotes citywide educational programs to inform citizens of the benefits of recycling and appropriate recycling options and locations. Action RM-10a ensures solid waste collection activities completed by franchise solid waste haulers, facility siting and construction of transfer and/or disposal facilities, operation of waste reduction and recycling programs, and household hazardous waste disposal and education programs are consistent with the County Solid Waste Management Plan. Action RM- 10b includes standard language in requests for services and in City agreements requiring contractors to use best management practices to maximize diversion of waste from the landfill in order to meet the City’s specified diversion rates. Action RM-10c encourages the expansion of recycling, reuse, and appropriate disposal of hazardous materials, including: increased participation in single family and multifamily residential curbside recycling programs; increased participation in commercial and industrial recycling programs for paper, cardboard, and plastics; and reduced yard and landscaping waste through methods such as composting, grass recycling, and using resource efficient landscaping techniques. Through the Findings Page 182 of 266 implementation of existing regulations and the General Plan Update policies and actions, future development implemented by the General Plan Update would continue to comply with management and reduction statutes and regulations related to solid waste and impacts would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Policy RM-10.1: Compliance with State Legislation. Comply with local, regional and State regulations regarding waste diversion, source reduction, recycling, and composting. Policy RM-10.2: Solid Waste Collection. Provide adequate waste disposal, recycling, and refuse services for present and future residents and businesses, including programs that improve public access to solid waste collection and recycling facilities. Policy RM-10.4: Source Reduction and Recycling Efforts. Participate in source reduction and recycling techniques to reduce the amount of solid waste sent to landfills and ensure adequate landfill capacity in the region Policy RM-10.5: Organic Waste. Work with appropriate service providers to collect and compost greenwaste, including landscaping, Christmas trees, composting and mulch, and other sources of organic waste, to distribute for use in parks, medians, and other municipal areas. Policy RM-10.6: Fees and Funding. Work with appropriate service providers to periodically review collection, recycling, and disposal fees to achieve state and federal mandates, meet community expectations, and reflect cost efficiencies or increases for service delivery. Policy RM-10.7: Public Education. Promote citywide educational programs to inform citizens of the benefits of recycling and appropriate recycling options and locations. Action RM-10a: On an ongoing basis and in compliance with State law, ensure solid waste collection activities completed by franchise solid waste haulers, facility siting and construction of transfer and/or disposal facilities, operation of waste reduction and recycling programs, and household hazardous waste disposal and education programs are consistent with the County Solid Waste Management Plan. Action RM-10b: Include standard language in requests for services and in City agreements requiring contractors to use best management practices to maximize diversion of waste from the landfill in order to meet the City’s specified diversion rates. Action RM-10c: Encourage the expansion of recycling, reuse, and appropriate disposal of hazardous materials, including the following:  Increased participation in single family and multifamily residential curbside Findings Page 183 of 266 recycling programs;  Increased participation in commercial and industrial recycling programs for paper, cardboard, and plastics;  Reduce yard and landscaping waste through methods such as composting, grass recycling, and using resource efficient landscaping techniques; and  Encourage local businesses to provide electronic waste (e-waste) drop-off services and encourage residents and businesses to properly dispose of, or recycle, e-waste. S. WILDFIRE 1. Response Plans Threshold: If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project substantially impair an adopted emergency response plan or emergency evacuation plan? Finding: Less than significant. (Draft EIR, Impact WR-1, pages 5.20-10 through 5.20-14) Explanation: The Study Area contains both SRAs and LRAs that are classified as VHFHSZs (with SRAs also containing moderate to high FHSZs). The General Plan Update would allow a variety of new development, including residential, commercial, industrial, and public service uses, which would result in increased jobs and population in the Study Area. Implementation of the General Plan Update would not impair or physically interfere with an adopted emergency response plan or emergency evacuation plan. the Riverside County Fire Department (RCFD) provides fire and emergency response service to the City of San Jacinto. The RCFD Strategic Plan 2009- 2029 outlines goals and strategies for fire protection services throughout the Riverside County Operational Area, including facility needs and improvements, training requirements, and disaster preparedness. The City’s EOP addresses the planned response to extraordinary situations associated with natural disasters and/or human caused incidents, including wildfires. The EOP focuses on coordinating mutual aid and provides an overview of the operational concepts relating to various emergency situations, identifies components of the emergency response, and describes the overall responsibilities of the Riverside County Operational Area for supporting Operational Area Members in protecting life and property. The EOP does not provide a specific evacuation route map, as evacuation measures would be implemented based on the specific emergency and area affected. The General Plan Update would not require or result in revisions to the RCFD Strategic Plan or adopted EOP. The General Plan Update does not include any site-specific development. Findings Page 184 of 266 However, future development would be designed, constructed, and maintained in accordance with applicable standards, including vehicular access to ensure that adequate emergency access and evacuation would be maintained. Pursuant to Municipal Code Chapter 8.16, Fire Code, construction activities that may temporarily restrict fire apparatus access would be required to implement appropriate measures to facilitate the passage of fire apparatus and emergency vehicles through/around any effected roadways, as part of the building permit process. The General Plan Update identifies major arterials as the primary routes for evacuation; however, evacuation routes would depend upon the emergency event and area affected. As part of the General Plan Update, the City prepared an analysis consistent with Senate Bill 99 to identify residential developments in hazard areas that do not have at least two emergency evacuation routes. The analysis found that out of 4,990 unique land parcels identified as residential and located within an identified hazard zone, the vast majority (approximately 77 percent) of the parcels have multiple exit points with access to multiple arterials, and another 13 percent of the parcels have multiple exit points with access to a single arterial, a loop road. Approximately 10 percent of the developed parcels have one exit point with access directly onto a single arterial. Parcels with one exit point with access directly onto a single arterial are widespread throughout the Study Area, and tend to be condominium, apartment, and mobile home communities, or large rural residential parcels. There are no parcels in the Study Area described as having “one exit point with some distance to a single arterial.” The General Plan Update includes policies and actions to address emergency evacuation routes. Specifically, Policy PS-5.7 directs the City to work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Action PS-2a implements the EOP to ensure the most effective allocation of resources for protection of people and property in time of an emergency, and update it as needed. Policy PS-5.1 ensures the provision of sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. In addition, Policy PS-5.2 supports the development of local preparedness plans and multi- jurisdictional cooperation and communication agreements for emergency situations. Action RM-6c implements an Emergency Operation Center to respond to and manage disasters in cooperation with the school districts, police and fire departments, and local, state, and federal emergency management agencies. It would also provide annual training for City staff in emergency management so that when they are called into action, they will be able to distribute information and resources to the public effectively. Findings Page 185 of 266 Primary access to all major roads would be maintained during construction of future developments within the Study Area. As part of the site plan and design review process (SJDC Chapter 17.630), future development projects would be reviewed for adequate infrastructure and access as well as consistency with adopted emergency and evacuation plans among many other environmental issues in order to ensure the safety of City residents and the physical environment. Therefore, the General Plan Update would not substantially impair an adopted emergency response plan or emergency evacuation plan and impacts would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-2: Fire Safety: A City that is safe and adequately prepared for urban and wildfire emergencies. Policy PS-2.2: Fire Protection Services. Reduce the risk of fire to the community by coordinating emergency preparedness with the Riverside County Fire Department (RCFD). Policy PS-2.3: Fire Hazard Identification. Work with RCFD to maintain and regularly update the City’s Fire Hazard Severity Zone Map (Figure PS-2) for changes in fire hazard severity zones consistent with changes in hazard designations by CAL FIRE. Policy PS-2.7: Interagency Support. Participate in the mutual aid system and automatic aid agreements to back up and supplement capabilities to respond to emergencies Policy PS-2.10: Very High Fire Hazard Severity Zones. Protect communities from unreasonable risk of wildfire within very high fire hazard severity zones through the following actions: a. Minimize new residential development in very high fire hazard severity zones when possible. b. Require adequate fire protection services, fire protection plans, and emergency vehicle access for new development in very high fire hazard severity zones. c. Assess site constraints when considering land use designations near wildlands to avoid or minimize wildfire hazards as part of a land use update or amendment. d. Coordinate with RCFD to identify building and site design methods or other methods to minimize damage if new structures are proposed to be in very high fire hazard severity zones on undeveloped land and when rebuilding after a fire. e. As part of the RCFD review process, require ongoing brush management, fuel management/modification, defensible space, fire retardant landscaping, and other project design features for new development located in areas of or adjacent to high wildfire risk. Findings Page 186 of 266 f. Coordinate with the applicable water district to ensure necessary water supply systems and flow for structural fire suppression are provided and maintained. g. Work with RCFD to identify and maintain fire hazard reduction projects, including community fire breaks and private road and public road clearance. h. Coordinate with RCFD to define minimum standards for evacuation of residential areas in very high fire hazard severity zones. If areas with inadequate access/evacuation routes are identified, develop appropriate mitigation measures, improvement plans, or education programs to ensure safe evacuation. Policy PS-2.12: Hazard Mitigation Plans. Coordinate with local, state, and federal agencies to update emergency, evacuation, and hazard mitigation plans, as necessary. Policy PS-2.13: Essential Public Facilities and Infrastructure. Locate, when feasible, new essential public facilities and infrastructure outside of very high fire hazard severity zones, including but not limited to, hospitals and health care facilities, emergency shelters, emergency command centers, emergency communication facilities, and utilities or identify construction methods or other methods to minimize damage if these facilities must be located in very high fire hazard severity zones. Action PS-2a: Implement the City’s Emergency Operations Plan to ensure the most effective allocation of resources for protection of people and property in time of an emergency, and update it as needed Goal PS-5: Emergency Operations. A community that is highly prepared and equipped to handle emergency situations, in order to minimize loss of life, injury, property damage, and disruption of vital services. Policy PS-5.1: Emergency Response Services. Provide sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy PS-5.2: Emergency Preparedness Plans. Support the development of local preparedness plans and multi-jurisdictional cooperation and communication agreements for emergency situations Policy PS-5.3: Critical Facilities. Coordinate with service providers to ensure the resilience of critical facilities, lifeline services, and infrastructure, and plan for the use of critical facilities during post-disaster response and recovery Policy PS-5.4: Local Coordination. Coordinate with local key stakeholders (officials, schools, businesses, and organizations) within the community to make them aware of their role in the emergency plan and the necessary requirements in case of emergency. Policy PS-5.5: Automatic and Mutual Aid. Participate in automatic and mutual aid agreements with adjacent service providers to ensure efficient and adequate resources, facilities, and support services before, during, and after emergencies. Findings Page 187 of 266 Policy PS-5.6: Communications. Evaluate the potential to utilize a comprehensive emergency communication system that allows for efficient connection in case of emergency. Policy PS-5.7: Emergency Evacuation Routes and Access. Work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Policy PS-5.8: Emergency Shelters. Periodically coordinate with emergency shelter providers to ensure that necessary equipment supplies are available in case of emergency. Policy PS-5.9: Disaster Recovery. Work with emergency service providers to implement post-disaster recovery plans to return public services to a state of normalcy, address ongoing hazard-specific mitigations, and assist community members in recovering from disasters. Policy PS-5.13: School Safety. Coordinate with local schools related to their programs and practices regarding emergency preparedness. Action PS-5b: Regularly practice implementation of the City’s Emergency Operations Plan and update it regularly. Action PS-5c: Regularly review County and State emergency response procedures that must be coordinated with City procedures. Action PS-5f: Annually review and update the Emergency Preparedness Plan under the provision of the State Emergency Management System format to maximize the efforts of emergency service providers (e.g., fire, medical, and law enforcement) and minimize human suffering and property damage during disasters. Support high-level multi- jurisdictional cooperation and communication for emergency planning and management. Action PS-5g: Coordinate with local agencies and organizations to develop and distribute informational brochures and give presentations to civic groups and local schools to educate residents and businesses about appropriate actions to take during an emergency situation. Goal PS-7: Climate Change and Resiliency Planning: A resilient, sustainable, and equitable community where risks to life, property, the economy, and the environment resulting from climate change, including extreme weather events, are minimized Policy PS-7.1: Community Preparedness. Promote a well-prepared City that can effectively overcome natural disasters and scarcity of resources due to climate change. RESOURCE MANAGEMENT ELEMENT Goal RM-6: Public Safety Resources. A community that safeguards persons and property through the provision of high-quality public safety services and crime prevention measures. Policy RM-6.1: Provision of Police and Fire Services. Encourage the Riverside County Findings Page 188 of 266 Sheriff’s Department and the Riverside County Fire Department to maintain adequate staff and equipment to provide efficient, high quality, and responsive public safety services to the San Jacinto community. Action RM-6c: In cooperation with the school districts, police and fire departments, and local, state, and federal emergency management agencies, implement an Emergency Operation Center (EOC) to respond to and manage disasters. Provide annual training for City staff in emergency management so that when they are called into action, they will be able to distribute information and resources to the public effectively. 2. Pollutant Concentrations Threshold: Due to slope, prevailing winds, and other factors, would the project exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire? Finding: Less than significant. (Draft EIR, Impact WF-2, pages 5.20-14 through 5.20-17) Explanation: The Study Area contains both SRAs and LRAs that are classified as VHFHSZs (with SRAs also containing moderate to high FHSZs). The Study Area also contains areas that are considered between low to extreme fire threats to people. The General Plan Update land uses located within these SRA VHFHSZs are largely designated Open Space, which would preclude new development. Some portions of the Study Area within a FHSZ are currently designated Specific Plan and rural, low- and medium density residential. However, the General Plan Update does not propose changes to the types of land uses that could occur within these areas when compared to the existing General Plan. There are areas in the northwestern portion of the City, outside of, but in proximity to FHSZs, that would allow for medium density residential development under the proposed General Plan Update. Future development of medium density residential uses would introduce additional structures and people in proximity to open space areas identified as a VHFHSZ. However, these areas are not identified as having a fire threat. Implementation of the General Plan Update would not substantially alter the slope, prevailing winds, or other factors that would increase exposure to San Jacinto residents, employees or visitors to increased pollutant concentrations from wildfire or result in the uncontrollable spread of a wildfire. Depending upon the specific site and associated geographical conditions, future development within a FHSZ could exacerbate wildfire risks. The General Plan Update includes policies and actions to address wildfire hazards. For example, Policy RM-1.5 of the Resource Management Element, and Policy LU-3.7 of the Land Use Element regulate hillside development. Policy PS-2.1 protects communities from unreasonable risk of wildfire within very high fire hazard severity zones. Any future projects Findings Page 189 of 266 contemplated under the General Plan Update would be required to comply with the provisions of federal, State, and local requirements related to wildland fire hazards, including State fire safety regulations associated with wildland-urban interfaces, fire-safe building standards, and defensible space requirements as part of the project’s approval process. As future development and infrastructure projects are considered by the City, each project would be evaluated for potential impacts, specific to that project, associated with wildland fire hazards as required under CEQA. Potential development within or near FHSZs, would be required to comply with design and development standards set forth by the SJDC and Municipal Code, including SJDC Chapter 17.300.050, which addresses development of hillsides and requires preparation of fire management plans. Therefore, with implementation of the applicable General Plan goals, policies, implementation plans, and compliance to development and fire codes, impacts are considered less than significant in this regard. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU 3.7: Hillside Development. Conserve hillsides by limiting development on slopes greater than 25 percent and allowing unique planning techniques such as Specific Plans, Planned Unit Developments, and clustered development to reduce grading PUBLIC SAFETY ELEMENT Goal PS-2: Fire Safety. A City that is safe and adequately prepared for urban and wildfire emergencies. Policy PS-2.4: Urban Fire Risks. Work with RCFD to maintain an ongoing fire inspection program to reduce fire hazards associated with multifamily development, critical facilities, public assembly facilities, industrial buildings, and nonresidential buildings. Policy PS-2.10: Very High Fire Hazard Severity Zones. Protect communities from unreasonable risk of wildfire within very high fire hazard severity zones through the following actions: a. Minimize new residential development in very high fire hazard severity zones when possible. b. Require adequate fire protection services, fire protection plans, and emergency vehicle access for new development in very high fire hazard severity zones. c. Assess site constraints when considering land use designations near wildlands to avoid or minimize wildfire hazards as part of a land use update or amendment. d. Coordinate with RCFD to identify building and site design methods or other methods to minimize damage if new structures are proposed to be in very high fire Findings Page 190 of 266 hazard severity zones on undeveloped land and when rebuilding after a fire. e. As part of the RCFD review process, require ongoing brush management, fuel management/modification, defensible space, fire retardant landscaping, and other project design features for new development located in areas of or adjacent to high wildfire risk. f. Coordinate with the applicable water district to ensure necessary water supply systems and flow for structural fire suppression are provided and maintained. g. Work with RCFD to identify and maintain fire hazard reduction projects, including community fire breaks and private road and public road clearance. h. Coordinate with RCFD to define minimum standards for evacuation of residential areas in very high fire hazard severity zones. If areas with inadequate access/evacuation routes are identified, develop appropriate mitigation measures, improvement plans, or education programs to ensure safe evacuation. Policy PS-2.11: Fire Safe Design. Consider fire safe design (i.e., fire-resistant building and site design, materials, and landscaping) for development within very high fire hazard severity zones as part of the development review process. a. Locate, design and construct development to provide adequate defensibility and minimize the risk of structural loss from wildland fires. b. Design development on hillsides and canyons to reduce the increased risk of fires from topography features (i.e., steep slopes, ridge saddles). c. Minimize flammable vegetation and implement brush management best practices in accordance with the Development Code. d. Install visible home and street addressing and signage. Action PS-2b: Mitigate, as feasible, existing non-conforming development to contemporary fire safe standards where feasible, including road standards and vegetative hazards. Action PS-2c: Require that all new habitable structures be designed in accordance with the most recent California Building and Fire Code with local amendments adopted by the City, including the use of fire sprinklers in residential structures. RESOURCE MANAGEMENT ELEMENT Policy RM-1.5: Hillside Development. Require the orderly development of hillside areas through compliance with the City’s Hillside Development Ordinance. Action RM-1e: For Hillside Development Projects, implement the City's Hillside Development Standards to retain the significant hillsides and ridgelines on San Jacinto’s Findings Page 191 of 266 eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Policy RM-4.7: Sensitive Receptors. Insulate sensitive receptors from areas of heightened air quality pollution, by utilizing land use planning to buffer and protect residential areas. Policy RM-4.8: Mitigation. Require the implementation of relevant mitigation measures for all future development upon identification of potential air quality impacts. Policy RM-4.10: GHG Reduction. Consider and adopt new local policies and programs that will help to provide energy efficient alternatives to fossil fuel use and reduce consumption in order to reduce greenhouse gas emissions consistent with the local measures identified in the Western Riverside County Subregional Climate Action Plan for San Jacinto. Action RM-4b: As applicable, review new industrial and commercial development projects during the CEQA process for potential air quality impacts to residences and other sensitive receptors. Ensure that mitigation measures and best management practices are implemented to reduce significant emissions of criteria pollutants. 3. Infrastructure Risks Threshold: Would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines, or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? Finding: Less than significant. (Draft EIR, Impact WF-3, pages 5.20-17 through 5.20-21) Explanation: Future development anticipated by the General Plan Update would require the construction and installation of infrastructure, including roads water and sewer and power lines to serve increased growth and development. The General Plan Update land uses located within these SRA VHFHSZs are largely designated Open Space, which would preclude new development. The General Plan Update does not propose changes to the types of land uses that could occur within areas identified as FHSZ when compared to the existing General Plan. Development of infrastructure to serve new development would primarily occur outside of areas identified as FHSZs. The General Plan Update includes requirements for adequate water supply and water flow availability, emergency access, fire protection services, fire safe design site standards, and ensuring public awareness regarding fire safety. Policy PS-2.1 protects communities from unreasonable risk of wildfire within very high fire hazard severity zones. Policy PS-5.1 ensures the provision of sufficient levels of all emergency response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy RM-9.1 maintains and implements public facility master Findings Page 192 of 266 plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM- 9.2 maintains and finances the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. Policy RM-9.3 ensures that all new development provides for and funds its fair share of the costs for the expansion of public infrastructure, services, and facilities. Policy RM-9.5 ensures collaboration with the various regional facility and service providers to deliver high levels of service to San Jacinto, and to plan for new development. All future development projects would be required to be consistent with the City’s municipal code standards related to development in high fire hazard areas. Future development of utility infrastructure would be subject to the requirements established in Public Resources Code Section 4292, which requires clearing of flammable fuels for a minimum 10-foot radius from the outer circumference of poles and towers; and Section 4293, which sets basic requirements for clearances around electrical conductors. Furthermore, future development would be required to meet vegetation clearance requirements outlined in Title 14, Section 1104.1(d) of the California Code of Regulations for single overhead facilities. Maintenance of existing infrastructure and the potential installation of new infrastructure for future projects in the Study Area would be required to comply with Fire Code requirements found in the Municipal Code and SJDC for new development projects. Proposed development would be reviewed by the RCFD to determine the specific fire requirements applicable to ensure compliance with the Fire Code. The potential for future projects to impact environmental resources to meet compliance with fire development standards such (as fuel breaks and clearance requirements) would require site specific environmental evaluation under CEQA to identify any site- specific impacts. In addition, any development in the City would need to comply with the California Building Code, Public Resource Code, and the City Municipal Code to ensure that new developments have access to necessary utilities, and any additional utility construction complies with all code requirements. Municipal Code Chapter 12.16, Underground utility district, defines the process for which utility infrastructure can be erected or removed in the City. Further, Chapter 15.32, Utility installations, establishes the requirement of complying with the California Public Utilities Commission Rules and Regulations. As demonstrated throughout this EIR, implementation of the various policies and actions contained in the General Plan Update would reduce potential impacts associated with the construction and expansion of infrastructure. Implementation of the General Plan Update policies and actions, combined with local and State requirements, as discussed previously, would ensure that potential wildland Findings Page 193 of 266 fire hazards would not be exacerbated by local infrastructure, and this impact would be reduced to a less than significant level. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-2: Fire Safety. A City that is safe and adequately prepared for urban and wildfire emergencies. Policy PS-2.10: Very High Fire Hazard Severity Zones. Protect communities from unreasonable risk of wildfire within very high fire hazard severity zones through the following actions: a. Minimize new residential development in very high fire hazard severity zones when possible. b. Require adequate fire protection services, fire protection plans, and emergency vehicle access for new development in very high fire hazard severity zones. c. Assess site constraints when considering land use designations near wildlands to avoid or minimize wildfire hazards as part of a land use update or amendment. d. Coordinate with RCFD to identify building and site design methods or other methods to minimize damage if new structures are proposed to be in very high fire hazard severity zones on undeveloped land and when rebuilding after a fire. e. As part of the RCFD review process, require ongoing brush management, fuel management/modification, defensible space, fire retardant landscaping, and other project design features for new development located in areas of or adjacent to high wildfire risk. f. Coordinate with the applicable water district to ensure necessary water supply systems and flow for structural fire suppression are provided and maintained. g. Work with RCFD to identify and maintain fire hazard reduction projects, including community fire breaks and private road and public road clearance. h. Coordinate with RCFD to define minimum standards for evacuation of residential areas in very high fire hazard severity zones. If areas with inadequate access/evacuation routes are identified, develop appropriate mitigation measures, improvement plans, or education programs to ensure safe evacuation. Goal PS-5: Emergency Operations. A community that is highly prepared and equipped to handle emergency situations, in order to minimize loss of life, injury, property damage, and disruption of vital services. Policy PS-5.1: Emergency Response Services. Provide sufficient levels of all emergency Findings Page 194 of 266 response services to protect the health, safety, and welfare of all persons and to protect property in the City. Policy PS-5.2: Emergency Preparedness Plans. Support the development of local preparedness plans and multi-jurisdictional cooperation and communication agreements for emergency situations Policy PS-5.3: Critical Facilities. Coordinate with service providers to ensure the resilience of critical facilities, lifeline services, and infrastructure, and plan for the use of critical facilities during post-disaster response and recovery Policy PS-5.4: Local Coordination. Coordinate with local key stakeholders (officials, schools, businesses, and organizations) within the community to make them aware of their role in the emergency plan and the necessary requirements in case of emergency. Policy PS-5.5: Automatic and Mutual Aid. Participate in automatic and mutual aid agreements with adjacent service providers to ensure efficient and adequate resources, facilities, and support services before, during, and after emergencies. Policy PS-5.6: Communications. Evaluate the potential to utilize a comprehensive emergency communication system that allows for efficient connection in case of emergency. Policy PS-5.7: Emergency Evacuation Routes and Access. Work with RCFD and RCSD to maintain, update, and regularly exercise emergency access, protocols, and evacuation routes to assess their effectiveness under a range of emergency scenarios. Policy PS-5.8: Emergency Shelters. Periodically coordinate with emergency shelter providers to ensure that necessary equipment supplies are available in case of emergency. Policy PS-5.9: Disaster Recovery. Work with emergency service providers to implement post-disaster recovery plans to return public services to a state of normalcy, address ongoing hazard-specific mitigations, and assist community members in recovering from disasters. Policy PS-5.13: School Safety. Coordinate with local schools related to their programs and practices regarding emergency preparedness. Action PS-5b: Regularly practice implementation of the City’s Emergency Operations Plan and update it regularly. Action PS-5c: Regularly review County and State emergency response procedures that must be coordinated with City procedures. Action PS-5f: Annually review and update the Emergency Preparedness Plan under the provision of the State Emergency Management System form at to maximize the efforts of emergency service providers (e.g., fire, medical, and law enforcement) and minimize human suffering and property damage during disasters. Support high-level multi- Findings Page 195 of 266 jurisdictional cooperation and communication for emergency planning and management. Action PS-5g: Coordinate with local agencies and organizations to develop and distribute informational brochures and give presentations to civic groups and local schools to educate residents and businesses about appropriate actions to take during an emergency situation. RESOURCE MANAGEMENT ELEMENT Goal RM-9: Infrastructure Planning. A community that provides adequate, reliable infrastructure and facilities to support existing and future development. Policy RM-9.1: Public Facility Plans. Maintain and implement public facility master plans, in collaboration with appropriate outside service providers and agencies, to ensure compliance with appropriate regional, State, and federal laws and to identify infrastructure needs, funding sources, and implement improvements for public facilities and services in San Jacinto. Policy RM-9.2: Capital Improvements. Maintain and finance the capital improvement program to ensure the timely implementation of the General Plan and the adequate and the timely provision of public facility and municipal improvements. 4. Runoff Risks Threshold: Would the project expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post- fire slope instability, or drainage changes? Finding: Less than significant. (Draft EIR, Impact WF-4, pages 5.20-21 through 5.20-25) Explanation: The General Plan Update would allow development and improvement projects that would involve some land clearing, grading, and other ground- disturbing activities that could temporarily increase soil erosion rates during and shortly after project construction. All future developments located in or adjacent to wildfire prone areas (i.e., naturally vegetated hillsides) would be required to prepare a fire management plan pursuant to SJDC Section 17.300.050. The fire management plan is subject to the review and approval of the RCFD. The RCFD may require fire protection measures (e.g., landscape or open space buffers), maintenance programs for weed and vegetation abatement, installation of fire-resistant plants, and the use of noncombustible building materials, including roofing. Areas with slopes correspond with the areas identified as having greater landslide risk and correspond with areas that are designated as FHSZs. Within the Study Area, these include Park Hill, the western edge of the Study Area along Lakeview Mountains, and the eastern portion of the Sphere of Influence along the San Jacinto Mountains. Findings Page 196 of 266 Chapter 15.28 of the Municipal Code regulates development of hillside areas by relating the number and distribution of dwelling units and other buildings to the topography to prevent disfigurement of the terrain through extensive cut and fill. These regulations are also designed to minimize danger to life and property due to the hazards of fire, flood, soil erosion, seepage and destruction of natural topography and plant material. Subsequent development and infrastructure projects would also be analyzed for potential environmental impacts, consistent with the requirements of CEQA. With adherence to the Municipal and Development Codes, future development on sloped terrain prone to flooding, landslides, and instability will not have adverse effects on the environment. Future development resulting from implementation of the General Plan Update could increase the potential for flooding in a number of ways: new development and redevelopment could increase storm water velocity leading to off-site flooding; new development and redevelopment could impede or redirect flood flows; and the placement of new or redevelopment projects could create or contribute to runoff which would exceed the capacity of existing or planned stormwater drainage systems. However, future development and redevelopment projects would be required to comply with applicable federal, State, regional, and local plans, policies, and regulations to address site-specific drainage and potential flooding risks. Specifically, future site-specific development would be required to comply with Municipal Code Chapter 15.40, Floodplain Management, which provides land use and development regulations to all land within flood prone, mudslide (i.e., mudflow), or flood-related erosion areas, including City review of development permits to ensure adherence to federal, State, and local flood-related regulations as well as additional standards applicable to all areas of special flood hazards in the City. Future development projects would be reviewed by the City to determine if a project site is located within areas of special flood hazards and thus subject to additional provisions set forth in Chapter 15.40. Additionally, construction of storm drainage improvements would occur as part of an overall development or infrastructure project, and would be considered in the environmental review associated with the specific project being proposed. The General Plan Update Public Safety Element and Resource Management Element’s goals, policies, and actions would limit exposure between people and structures with wildfire risks. Policy PS-1.5 requires the assessment and mitigation of hazards related to liquefaction, landslides, and flooding for new development projects or City improvement projects that are identified by the City as susceptible to these hazards. Goal RM-2, Water Resources is intended to hinder potential threats related to flooding, runoff, and drainage. Through compliance with local, State, and federal regulations, and compliance with General Plan Update goals and policies, Findings Page 197 of 266 potential exposure of people or structures to significant risks resulting from runoff, post-fire slope instability, or drainage changes would be less than significant. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-1: Seismic and Geologic Hazards. A community that is adequately prepared for natural hazards related to landslides, geologic instability, and seismic activity. Policy PS-1.5: Development. Require assessment and mitigation of hazards related to liquefaction, landslides, and flooding for new development projects or City improvement projects that are identified by the City as susceptible to these hazards. Action PS-1d: Reduce the risk to the community from hazards related to geologic conditions, seismic activity, flooding, and wildfires by requiring feasible mitigation of such impacts on development projects. Assess development proposals for potential hazards pursuant to the California Environmental Quality Act. Require measures to mitigate all identified significant public safety hazards. Goal PS-2: Fire Safety. A City that is safe and adequately prepared for urban and wildfire emergencies. Policy PS-2.11: Fire Safe Design. Consider fire safe design (i.e., fire-resistant building and site design, materials, and landscaping) for development within very high fire hazard severity zones as part of the development review process. a. Locate, design and construct development to provide adequate defensibility and minimize the risk of structural loss from wildland fires. b. Design development on hillsides and canyons to reduce the increased risk of fires from topography features (i.e., steep slopes, ridge saddles). c. Minimize flammable vegetation and implement brush management best practices in accordance with the Development Code. d. Install visible home and street addressing and signage. Goal PS-3: Flood Hazards. A community that is protected from flood hazards. Policy PS-3.7: Stormwater Runoff. Encourage new developments that add impervious surfaces to integrate low impact development best management practices to reduce stormwater runoff. Policy PS-3.8: Development in the Flood Plain and Flood Way. Protect the community from flooding hazards by providing and maintaining flood control facilities and limiting development within the flood plain and flood way as necessary to protect public health and Findings Page 198 of 266 safety. Policy PS-3.10: Changing Conditions. Coordinate with the RCDCD to consider the need to expand the capacity of flood control facilities based on changing flood conditions associated with climate change and extreme weather. Policy PS-3.11: Mitigation. Require that all new development and redevelopment in areas susceptible to flooding incorporate mitigation measures designed to reduce flood hazards. Policy PS-3.12: Adequate Infrastructure. Maintain and regularly assess the status of local storm drainage infrastructure to ensure that the system is functioning property. Action PS-3i: Continue to implement the Flood Plain Management program, which establishes rules and regulations for flood plain management. Continue to apply the rules and regulations to development in areas of special flood hazards as determined by the Federal Emergency Management Agency (FEMA) and as illustrated on the most recent Flood Insurance Rate Map (FIRM). RESOURCE MANAGEMENT ELEMENT Goal RM-1: Natural Resources. A community that conserves and protects its natural resources. Policy RM-1.5: Hillside Development. Require the orderly development of hillside areas through compliance with the City’s Hillside Development Ordinance. Action RM-1c: Work closely with the U.S. Army Corps of Engineers (ACOE), U.S. Fish and Wildlife Service (FWS), and the California Department of Fish and Wildlife (CDFW) during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1e: For Hillside Development Projects, implement the City's Hillside Development Standards to retain the significant hillsides and ridgelines on San Jacinto’s eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Action RM-1f: During the development review process, ensure proper geotechnical and soil management techniques are implemented. To enforce this, the City Engineer or Director may request the completion of a survey of soil and geologic conditions by a State licensed Engineering Geologist and Civil Engineer, where appropriate. When potential geologic impacts are identified, require project applicants to mitigate the impacts per the recommendations contained within the survey. Action RM-1g: Where feasible, incorporate open space and passive recreational uses into areas identified to have significant hazards related to flooding, geologic conditions, and seismic events. Findings Page 199 of 266 Goal RM-2: Water Resources. A community that protects and conserves limited water resources. Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Policy RM-2.5: Stormwater. Work cooperatively with local water agencies to effectively and efficiently manage stormwater runoff as part of the City’s multipronged water conservation strategy. Action RM-2a: To reduce soil erosion and pollutants in urban runoff, require new development and redevelopment projects control stormwater runoff through implementation of Best Management Practices (BMPs) to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. Existing development shall control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing uses of the water. As specific development projects are implemented, project proponents will be required to consult with relevant agencies such as the U.S. Army Corps of Engineers (ACOE), Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Game (CDFG). Also, ensure that projects of one acre or more complete a Storm Water Pollution Prevention Plan (SWPPP) pursuant to California Regional Water Quality Control Board (RWQCB) Santa Ana Region – Order No. 00-65 and the City’s MS4 permit (order no. R8- 2002-0011 (NPDES No. CAS 618033). Findings Page 200 of 266 SECTION III IMPACTS THAT ARE LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED There are no impacts that require mitigation above and beyond implementation of the policies and actions included in the General Plan. SECTION IV IMPACTS THAN CANNOT BE FULLY MITIGATED TO A LESS THAN SIGNIFICANT LEVEL The City Council hereby finds that, despite the incorporation of General Plan goals, policies, and actions identified in the EIR and in these Findings, the following environmental impacts cannot be fully mitigated to a less than significant level and a Statement of Overriding Considerations is therefore included herein: A. AGRICULTURAL RESOURCES 1. Farmland Conversion Threshold: Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? Finding: Significant and Unavoidable. (Draft EIR, Impact AG-1, pages 5.2-7 through 5.2-9) Explanation: There are approximately 3,309 acres of Important Farmlands located within the Study Area, including approximately 413 acres of Prime Farmland, 1,758 acres of Statewide Importance, and 1,138 acres of Unique Farmland. However, not all land designated as Important Farmlands (Prime, Statewide Importance, and Unique) are currently being utilized for agricultural uses. Some of the agricultural lands in use or identified as Prime Farmland, Unique Farmland and Farmland of Statewide Importance by the FMMP are within adopted Specific Plan areas (The Villages of San Jacinto, The Trails, and The Esplanade). These Specific Plan areas have been identified for development and the conversion of farmlands to non-agricultural use were previously contemplated and analyzed as part of the environmental review for each Specific Plan area. Implementation of the proposed General Plan Update would not result in new or increased impacts to Prime Farmland, Unique Farmland and Farmland of Statewide Importance within the Villages of San Jacinto, The Trails or The Esplanade Specific Plan areas. Future development associated with the implementation of the General Plan Update and changes in the economy would likely result in the conversion of many of these areas for urban uses. Because there are no exclusive Findings Page 201 of 266 agricultural land use designations included as part of the General Plan Update, future development could convert existing agricultural resources and Prime Farmland, Unique Farmland, and Farmland of Statewide Importance to non-agricultural uses. It is assumed that as development occurs, the agricultural viability of the Important Farmlands within the Study Area would be reduced. However, it is anticipated that some agricultural uses would continue to operate during the 20-year life of the General Plan and the General Plan Update Land Use Element includes policies and actions to support continued agricultural activities. For example, Policy LU-2.4 which allows and supports for the continuation of agricultural operations on lands within the City limits that are designated for development uses. Action LU-2e gives priority to redevelopment and infill projects that reduce development pressure on agricultural lands. Action LU-2f directs the City to work with property owners and agricultural operations interested in retaining agricultural lands. Adoption of the proposed General Plan Update would not lead to the direct conversion of designated Important Farmland, but rather, would continue the existing land use pattern in San Jacinto that calls for ongoing infill development and urbanization within the City. However, since the General Plan Update does not require the preservation of designated farmland, implementation of the General Plan Update could result in the conversion of farmland to non-agricultural uses. Any additional mitigation measures, such as the preservation of designated farmland, are not feasible and conflict with the other objectives of the General Plan Update, specifically to “proactively plan for and accommodate local and regional growth in a responsible manner” and “attract and retain businesses and industries that provide jobs for local residents”, and would potentially discourage future development envisioned in the General Plan Update. Although the General Plan Update includes policies and actions to support continued agricultural use within the Study Area, the potential for the conversion of Prime Farmland, Unique Farmland and Farmland of Statewide Importance as identified by the FMMP to non-agricultural use would be a significant unavoidable impact. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-2.4: Agricultural Uses Allow and support the continuation of agricultural operations on lands within the City limits that are designated for development uses, until such time as new development is proposed for the land. Action LU-2e: Give priority to redevelopment and infill projects that reduce development pressure on agricultural lands and other sensitive resources. Findings Page 202 of 266 Action LU-2f: Work with property owners and agricultural operations interested in retaining agricultural land to identify feasible ways to maintain the land in agricultural production. Apply agricultural conservation easements to land desired by the City and the property owner to remain as agricultural land. 2. Williamson Act Lands Threshold: Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract? Finding: Significant and Unavoidable. (Draft EIR, Impact AG-2, pages 5.2-9 through 5.2-10) Explanation: Although the General Plan Update does not include any zone changes at this time, a future zoning update is anticipated to bring zoning into compliance with the General Plan Update. However, since the City does not have any zoning districts exclusive to agriculture uses, the General Plan Update, and subsequent zoning code update, would not conflict with existing zoning for agricultural use. Future development projects resulting from implementation of the General Plan Update could potentially conflict with parcels assessed as agriculturally preserved. 18 parcels totaling 514 acres located within the western portion of the Study Area, and within a pocket area towards the northern perimeter of the City limits, are currently assessed by the Riverside County Assessor as agriculturally preserved. The General Plan Update land use designations for these parcels allow for non-agricultural uses including mixed-use and residential. Additionally, lands within the surrounding area are identified for urban development. Because there are no exclusive agricultural land use designations included as part of the General Plan Update, it is possible that future development associated with the implementation of the General Plan Update and changes in the economy would result in the conversion of preserved agricultural properties to urban uses. The General Plan Update Land Use Element includes policies and actions to support continued agricultural activities, including Policy LU-2.4 which allows and supports the continuation of agricultural operations on lands within the City limits that are designated for development uses, until such time as new development is proposed for the land. Action LU-2f directs the City to work with property owners and agricultural operations interested in retaining agricultural land to identify ways to maintain agricultural production; agricultural conservation easements may be applied to land desired to remain as agricultural land. Adoption of the proposed General Plan Update would not lead to the direct conversion of preserved agricultural lands, but rather, would continue the existing land use pattern in San Jacinto that calls for ongoing infill development and urbanization within the City. Since the General Plan Findings Page 203 of 266 Update does not require the preservation of agricultural land, implementation of the General Plan Update could result in the conversion of agriculturally-utilized properties to non-agricultural uses as future development occurs. Development of land surrounding preserved parcels may indirectly cause these parcels to transition to non-agricultural use in the future. Any additional mitigation measures, such as the preservation of designated farmland, are not feasible and conflict with the other objectives of the General Plan Update, specifically to “proactively plan for and accommodate local and regional growth in a responsible manner” and “attract and retain businesses and industries that provide jobs for local residents”, and would potentially discourage future development envisioned in the General Plan Update. Although the General Plan Update includes policies and actions to support continued agricultural use within the Study Area, the potential for future development to conflict with a preserved or Williamson Act contract would be a significant unavoidable impact. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-2.4: Agricultural Uses. Allow and support the continuation of agricultural operations on lands within the City limits that are designated for development uses, until such time as new development is proposed for the land. Action LU-2f: Work with property owners and agricultural operations interested in retaining agricultural land to identify feasible ways to maintain the land in agricultural production. Apply agricultural conservation easements to land desired by the City and the property owner to remain as agricultural land. 3. Other Changes Threshold: Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use? Finding: Significant and Unavoidable. (Draft EIR, Impact AG-3, pages 5.2-10 through 5.2-11) Explanation: There are no forest lands within the Study Area, nor are there suitable environmental conditions for forest land to be developed; therefore, implementation of the proposed Project will not result in the conversion of forest land to non-forest use. The General Plan Update does not designate any lands specifically for agricultural use, nor does it propose the direct conversion of existing Farmland to non-agricultural use. Nonetheless, implementation of the General Plan Update could intensify uses within the Study Area in a manner Findings Page 204 of 266 that would further reduce the feasibility of agricultural production. Therefore, implementation of the proposed General Plan Update would result in other changes in the existing environment which, due to location or nature, could result in conversion of farmland to non-agricultural use. The General Plan Update Land Use Element includes policies and actions to support continued agricultural activities. For example, Policy LU-3.6 ensures that new urban uses proposed adjacent to lands designated for agricultural uses include adequate buffers to reduce potential land use conflicts and nuisance impacts to sensitive receptors. Action LU-3e states that during both redevelopment and new development projects, the provision and maintenance of setbacks an buffers, such as roadways, and topographic features is to be encouraged to prevent incompatibilities between agricultural and non-agricultural use. Additionally, SJDC Section 17.305.040, Agriculture Preservation (Right-to-Farm) provides the declared policy of the City to preserve, protect, and encourage development of its agricultural land consistent with Civil Code Section 3482.5. Section 3482.5 provides that no agricultural activity, operation, or facility, or appurtenances, conducted or maintained for commercial purposes, and in a manner consistent with proper and accepted customs and standards, as established and followed by similar agricultural operations in the same locality, shall be or become a nuisance, private or public, due to any changed condition in or about the locality, after it has been in operation for more than three years if it was not a nuisance at the time it began. Any additional mitigation measures, such as the preservation of designated farmland, are not feasible and conflict with the other objectives of the General Plan Update, specifically to “proactively plan for and accommodate local and regional growth in a responsible manner” and “attract and retain businesses and industries that provide jobs for local residents”, and would potentially discourage future development envisioned in the General Plan Update. Although implementation of the General Plan Update policies and actions and the SJDC would assist in reducing the potential for some existing Farmland to convert to non-agricultural uses, it is anticipated that changes in the existing environment associated with future development anticipated by the General Plan Update would result in the conversion of Farmland to non-agricultural use and impacts would be significant and unavoidable. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-3.6: Agricultural Compatibility. Ensure that new urban uses that are proposed adjacent to lands designated for agricultural uses include adequate buffers to reduce potential land use conflicts and nuisance impacts to sensitive receptors. Action LU-3e: During both redevelopment and the development of new projects, encourage the provision and maintenance of setbacks and buffers, such as roadways, Findings Page 205 of 266 topographic features, and open space, to prevent incompatibilities between agricultural and non-agricultural land uses. B. AIR QUALITY 1. Cumulatively Considerable Pollutant Emissions Threshold: Would the project result in cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under the applicable federal or state ambient air quality standard? Finding: Significant and Unavoidable. (Draft EIR, Impact AQ-2, pages 5.3-32 through 5.3-38) Explanation: The SCAQMD has established numerical significance thresholds for regional emissions during construction and operation. Daily emissions were estimated for the construction of the land uses provided in the General Plan Update. The calculations used to develop construction emissions incorporate compliance with applicable dust control measures required to be implemented during each phase of construction by SCAQMD Rule 403 (Control of Fugitive Dust), and fugitive VOC control measures required to be implemented by architectural coating emission factors based on SCAQMD Rule 1113 (Architectural Coatings); however, the construction- related daily emissions would exceed the SCAQMD significance thresholds for volatile organic compounds (VOCs). Therefore, short-term regional construction emissions would be potentially significant. Additionally, operation of future development accommodated by the General Plan Update would generate criteria air pollutant emissions from project-generated vehicle trips traveling within the City, energy sources such as natural gas combustion, and area sources such as landscaping equipment and consumer products usage. Operational emissions for future development accommodated by the General Plan Update would exceed regulatory thresholds for VOC, NOx, CO, PM10, and PM2.5. While these thresholds are the only thresholds available for numerically determining significance, it should be noted that these thresholds were specifically developed for use in determining significance for individual projects and not for program-level documents, such as the General Plan Update. However, as emissions for VOC, NOx, CO, PM10, and PM2.5 exceed regulatory thresholds, the regional operational emissions would be potentially significant. With respect to operational emissions, future development under the General Plan Update would be required to comply with AQMP, SIP, CARB, SCAQMD regulations, Title 24 energy efficiency standards, and the General Plan Update’s policies and actions. Policy RM-4.2 of the General Plan Update Resources Management Element requires the City to coordinate with CARB and SCAQMD to enforce the standards of the Clean Air Act. Policy RM-4.6 encourages and incentivizes higher density and mixed-use development opportunities to lessen the impacts of traffic congestion on Findings Page 206 of 266 local air quality. Policy RM-4.8 requires the implementation of relevant mitigation measures for all future development upon identification of potential air quality impacts. Action RM-5e provides for the continue review of development projects to ensure that all new public and private development complies with Title 24 energy standards, as well as the energy efficiency standards established by the General Plan Update and the Municipal Code. However, as there is no way to determine the effectiveness of such regulations, policies, and actions for individual projects, it is impossible to determine if potential impacts would be reduced to below regulatory thresholds. There are no feasible criteria air pollutant reduction measures beyond those identified in the General Plan Update that would reduce impacts. While implementation of these policies and actions would reduce criteria pollutant emissions, the extent to which the impacts would need to be determined on a project-by-project basis, as necessary. Therefore, this impact is significant and unavoidable. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). RESOURCE MANAGEMENT ELEMENT Goal RM-4: Air Quality and Greenhouse Gas Emissions. Improved air quality in San Jacinto and the region through reductions in air pollutants and greenhouse gas (GHG emissions). Policy RM-4.1: Regional Cooperation. Support regional efforts, including those organized through the South Coast Air Quality Management District, Southern California Association of Governments, the Western Riverside Council of Governments, and the California Air Resource Board (CARB) to implement the regional Air Quality Management Plan. Policy RM-4.2: Measurement and Enforcement. Coordinate with the California Air Resources Board and South Coast Air Quality Management District to properly measure air quality at emission sources and enforce the standards of the Clean Air Act. Policy RM-4.4: Transportation Options. Promote alternative modes of transportation to reduce vehicular emissions and improve air quality. (See Mobility Element) Policy RM-4.5: Walkability. Encourage pedestrian-scale development and pedestrian- Findings Page 207 of 266 friendly design features to reduce vehicle emissions. (See Mobility Element) Policy RM-4.6: Sustainable Development. Encourage and incentivize higher density and mixed-use development opportunities within designated areas of the City to lessen the impacts of traffic congestion on local air quality. (See Land Use Element) Policy RM-4.7: Sensitive Receptors. Insulate sensitive receptors from areas of heightened air quality pollution, by utilizing land use planning to buffer and protect residential areas. Policy RM-4.8: Mitigation. Require the implementation of relevant mitigation measures for all future development upon identification of potential air quality impacts. Policy RM-4.8: Public Engagement. Promote regional air quality programs in order to inform the public on regional air quality concerns and encourage the engagement of all San Jacinto residents in future planning decisions related to air quality. Action RM-4b: Review all new industrial and commercial development projects for potential air quality impacts to residences and other sensitive receptors. Ensure that mitigation measures and best management practices are implemented to reduce significant emissions of criteria pollutants. Action RM-4c: Review development, infrastructure, and planning projects for consistency with SCAQMD requirements during the CEQA review process. Require project applicants to prepare air quality analyses to address SCAQMD and General Plan requirements, which include analysis and identification of: 1. Air pollutant emissions associated with the project during construction, project operation, and cumulative conditions. 2. Potential exposure of sensitive receptors to toxic air contaminants. 3. Significant air quality impacts associated with the project for construction, project operation, and cumulative conditions. 4. Mitigation measures to reduce significant impacts to less than significant or the maximum extent feasible where impacts cannot be mitigated to less than significant. Action RM-4d: Work with the South Coast Air Quality Management District, Southern California Association of Governments, the Western Riverside Council of Governments, and the California Air Resource Board (CARB) to implement programs aimed at improving regional air quality. Action RM-4n: Future development projects implemented under the General Plan will be required to demonstrate consistency with SCAQMD construction emission thresholds. Where emissions from individual projects exceed SCAQMD thresholds, the following actions shall be incorporated as necessary to minimize impacts. These measures do not exclude the use of other, equally effective mitigation measures. Findings Page 208 of 266  Require all off-road diesel equipment greater than 50 horsepower (hp) used for this Project to meet USEPA Tier 4 final off-road emission standards or equivalent. Such equipment shall be outfitted with Best Available Control Technology (BACT) devices including a California Air Resources Board Certified Level 3 Diesel Particulate Filter (DPF) or equivalent. The DPF reduces diesel particulate matter and NOx emissions during construction activities.  Require a minimum of 50 percent of construction debris be diverted for recycling.  Require building materials to contain a minimum 10 percent recycled content.  Require materials such as paints, primers, sealants, coatings, and glues to have a low volatile organic compound concentration compared to conventional products. If low VOC materials are not available, architectural coating phasing should be extended sufficiently to reduce the daily emissions of VOCs. Action RM-4o: Future development projects implemented under the General Plan will be required to demonstrate consistency with SCAQMD’s operational emission thresholds. For projects where operational emissions exceed regulatory thresholds, the following measures may be used to reduce impacts. Note the following measures are not all inclusive and developers have the option to add or substitute measures that are equally or more appropriate for the scope of the project.  Develop a project specific TDM program for residents and/or employees that provides opportunities for carpool/vanpools.  Provide onsite solar/renewable energy in excess of regulatory requirements.  Require that owners/tenants of non-residential or multi-family residential developments use architectural coatings that are 10 grams per liter or less when repainting/repairing properties.  Require dripless irrigation and irrigation sensor units that prevent watering during rain storms.  Ensure all parking areas are wired for capability of future EV charging and include EV charging stations that exceed regulatory requirements. Goal RM-5: Energy and Mineral Resources. A community that safely manages its energy and mineral resources. Policy RM-5.1: San Jacinto Power. Continue to make clean, modern, and cost-effective energy options available to individuals who live and work in San Jacinto. Policy RM-5.2: Compliance with State Legislation. Comply with all state requirements regarding the generation of power and encourage energy providers to investigate the use or expansion of renewable sources of energy. Findings Page 209 of 266 Policy RM-5.3: Renewable Energy. Promote the development and use of renewable energy resources to reduce dependency on fossil fuels. Policy RM-5.4: Energy-Efficient Materials. Promote the use of energy-efficient materials, equipment, and design in public and private facilities and infrastructure. Policy RM-5.9: Promote Energy Conservation in Existing Building Stock. Promote energy conservation by residents and businesses in existing structures, through the City’s newsletter, flyers, and website, in close coordination with other agencies and local energy providers, including the SCAQMD and Southern California Edison. 2. Sensitive Receptors Threshold: Would the project expose sensitive receptors to substantial pollutant concentrations? Finding: Significant and Unavoidable. (Draft EIR, Impact 3.3-3, pages 3.3-35 through 3.3-37) Explanation: Criteria air pollutant emissions have the potential to result in health impacts on sensitive receptors located near new development within the Study Area. Based on the nature and extent of new development, nearby sensitive receptors could be exposed to levels of toxic air contaminants that could result in a potential increase in cancer, acute, and/or chronic risk. Because the exact nature, location, and operation of the future developments are unknown, and because health risk impacts from TACs are cumulative over the life of the nearby receptors, quantification of potential health risks would be speculative. However, as construction and operation of these future developments would occur within close proximity to sensitive receptors, there is the potential for risk to exceed regulatory levels. Additionally, without knowing the exact specifications for all projects that may be developed under the General Plan Update, there is no way to accurately calculate the potential for health impacts from the overall General Plan Update. Individual projects would be required to provide their own environmental assessments to determine health impacts from the construction and operation of their projects. The proposed policies of the General Plan Update would potentially reduce emissions, which could potentially reduce impacts related to conflicts with an applicable air quality plan. Goal RM-4 of the General Plan Update Resources Management Element addresses potential air quality impacts by supporting projects, programs, policies and regulations that reduce impacts to air quality by private and public construction projects. Specifically, Policy RM-4.7 addresses potential air quality impacts to sensitive receptors. Policy LU-1.1 of the General Plan Update Land Use Element promotes a land use pattern that would reduce pollution and air quality impacts. With respect to local air quality emissions, toxic air contaminant emissions, and health impacts, future development under the General Plan Update would be required to Findings Page 210 of 266 comply with AQMP, SIP, CARB, SCAQMD regulations, Title 24 energy efficiency standards, and the proposed General Plan Update policies and actions. However, the exact location, type, nature, and size of future projects that may expose sensitive receptors to pollutant concentrations cannot be calculated at this time, as the details of potential future projects are not currently known. As such, there is no way to determine the extent to which these regulations will be, or need to be, implemented, and it is impossible to determine if potential impacts would be reduced to below regulatory thresholds. Additionally, there are no feasible mitigation measures beyond the policies and actions listed in the General Plan Update. Therefore, localized operational impacts, construction and operational health and toxic air impacts would remain significant and unavoidable. C. BIOLOGICAL RESOURCES 1. Candidate, Sensitive, or Special Status Species Threshold: Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? Finding: Significant and Unavoidable. (Draft EIR, Impact BIO-1, pages 5.4-24 through 5.4-28) Explanation: Future development associated with the General Plan Update would increase urbanization throughout the City with the potential to result in direct or indirect impacts to candidate, sensitive, or special-status species. Pursuant to the special-status species search, 45 special-status plant species and 59 special-status wildlife species are located within a 12-quad search of San Jacinto and are considered candidate, sensitive, or special status under FESA, CESA and/or CNPS/CRPR designation. There are seven sensitive natural communities within the 12-quad search area. The implementation of the MSHCP for future implementing projects consistent with the General Plan Update at a project-specific level would minimize direct, indirect, and cumulative biological impacts. The MSHCP was prepared to provide for the take and mitigation of the 146 species covered under the MSHCP pursuant to the FESA, which includes most of the species identified in the special- status species search. The MSHCP allows for the issuance of take at the local level, by MSHCP Permittees including the City, thereby streamlining the take authorization process on a project by-project basis. Any open space set aside on a site or conserved elsewhere (for example, as part of MSHCP requirements) would provide protected habitat for the benefit of the common species as well as sensitive and protected species. As required by the MSHCP Implementing Agreement (Section 8.5), payment of the Local Development Mitigation Fee and compliance with all applicable Findings Page 211 of 266 requirements of the MSHCP provides full mitigation under CEQA, NEPA, FESA, and CESA for all direct, indirect and cumulative impacts to MSHCP covered species and habitats. The MSHCP also addresses indirect impacts through defined sub-areas consisting of habitats of appropriate size, configuration, and vegetation characteristics that specific covered species may live in or move through, as well as MSHCP fees. Furthermore, for MSHCP covered species, the Environmental Impact Report/Environmental Impact Statement (EIR/EIS) (State Clearinghouse No. 2001101108, CEQ Number 020463, ERP Number SFW-K99032-CA) prepared for the MSHCP was a project-specific EIR/EIS and found that with a combination of impact reduction features incorporated into the MSHCP, including reserve configuration, adaptive management and monitoring, and species survey and avoidance/minimization policies, development consistent with the MSHCP would have less than significant impacts to covered species. Subsequent development under the proposed General Plan Update could result in direct impacts to certain species found present on an individual project site, particularly those not covered by the MSHCP. Future development projects would be required to adhere to applicable federal, State, and local regulations that provide for sensitive species as part of the discretionary approval process for site-specific development projects. Compliance with applicable regulations at the time of future development would minimize adverse impacts to sensitive species. Additionally, the General Plan Update Resource Management Element includes policies and actions to preserve and protect biological resources within the Study Area. Policy RM-1.1 supports a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3 preserve and enhances biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with State and federal resource agency requirements. Policy RM-1.4 addresses regional cooperation by recognizing areas of overlapping jurisdiction with respect to open space and biological resources, such as the County MSHCP, and coordinating the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6 would conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1c directs the City to work closely with the USACE, USFWS, and the California Department of Fish and Wildlife (CDFW) during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d directs the City to cooperate with the County to develop and manage preserve areas within the urban landscape. During the review of Findings Page 212 of 266 development proposals, the City would use the MSHCP (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Further, Action RM-1i addresses potential resources outside of the MSHCP area to ensure they are identified and addressed as part of the development review process. Action RM-1j would ensure that surveys are conducted if vegetation and tree removal is proposed to occur during the nesting bird season and to provide for buffers if active nests are confirmed. Adherence to these policies and actions during the discretionary review of future development projects would serve to minimize impacts to sensitive species. Although numerous regulations including implementation of the MSHCP and General Plan Update policies and actions would minimize impacts to sensitive species, at a program level of review, it cannot be ensured that all impacts could be reduced to less than significant at the site-specific level. Therefore, potential impacts to candidate, sensitive, or special status species would be considered significant and unavoidable. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-1: Natural Resources. A community that conserves and protects its natural resources. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3: Biological Resource Protection. Preserve and enhance biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with state and federal resource agency requirements. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6: Native Vegetation. Conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Findings Page 213 of 266 Action RM-1c: Work closely with the U.S. Army Corps of Engineers (ACOE), U.S. Fish and Wildlife Service (FWS), and the California Department of Fish and Wildlife (CDFW) during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d: Cooperate with the County of Riverside to develop and manage preserve areas within the urban landscape. During the review of development proposals, use the Western Riverside County MSHCP Habitat Conservation Plan (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Action RM-1i: During the development review process, require Applicants of developments with the potential to reduce or eliminate habitat for native plant and wildlife species or sensitive habitats not covered by the MSHCP, as determined by the City of San Jacinto’s Community Development Department, to prepare a site-specific general biological resources survey to identify the presence of any sensitive biological resources, including any sensitive plant or wildlife species. The report shall identify the need for focused presence/absence surveys and identify the presence of state or federal regulated wetlands or waters. Required surveys shall be conducted by qualified biologists and/or botanists in accordance with California Department of Fish and Wildlife (CDFW) and/or United States Fish and Wildlife Services (USFWS) survey protocols for target species. If no sensitive species are observed during the field survey then no further mitigation will be required. If sensitive species or habitats, including wetlands are documented on the project site, the project applicant shall comply with the applicable requirements of the regulatory agencies and shall apply mitigation determined through the agency permitting process. Action RM-1j: Where feasible, vegetation and tree removal should occur outside of the bird nesting season (February 1 to August 31). If not feasible, the project applicant shall retain a qualified biologist to conduct a nesting bird survey no more than three days prior to the commencement of construction activities. The biologist conducting the clearance survey shall document the negative results if no active bird nests are observed on the project site or within the vicinity during the clearance survey with a brief letter report, submitted to the City of San Jacinto Community Development Department prior to construction, indicating that no impacts to active bird nests would occur before construction can proceed. If an active avian nest is discovered during the pre-construction clearance survey, construction activities shall stay outside a 300-foot buffer around the active nest. For listed and raptor species, this buffer shall be 500 feet. A biological monitor shall be present to delineate the boundaries of the buffer area and to monitor the active nest to ensure the nesting behavior is not adversely affected by construction activity, pursuant to the Migratory Bird Treaty Act (MBTA). Prior to the commencement of construction activities Findings Page 214 of 266 and the issuance of any permits, results of the pre-construction survey and any subsequent monitoring shall be provided to the City of San Jacinto Community Development Department, California Department of Fish and Wildlife (CDFW), and other appropriate agencies. 2. Riparian Habitat Threshold: Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? Finding: Significant and Unavoidable. (Draft EIR, Impact BIO-2, pages 5.4-28 through 5.4-31) Explanation: The Study Area contains numerous aquatic habitats that qualify as sensitive habitat. Subsequent development under the proposed General Plan Update could result in impacts to riparian habitat or other sensitive natural community. This is considered a potentially significant impact. Potential impacts would need to be assessed on a project-specific basis once site-specific development is proposed. Under the MSHCP, any proposed Project would require an assessment for impacts to riparian habitat to determine the presence/absence of such habitat and the measures necessary to mitigate potential direct and indirect impacts associated with the specific development. The General Plan Update Resource Management Element also includes policies and actions intended to protect sensitive natural communities, including riparian habitat, from adverse effects associated with future development and improvement projects within the Study Area. Policy RM-1.1 supports a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3 preserves and enhances biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with State and federal resource agency requirements. Policy RM-1.4 addresses regional cooperation by recognizing areas of overlapping jurisdiction with respect to open space and biological resources, such as the MSHCP, and coordinating the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6 would conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1c directs the City to work closely with the USACE, USFWS, and the CDFW during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive Findings Page 215 of 266 biological resources. Action RM-1d directs the City to cooperate with the County to develop and manage preserve areas within the urban landscape. During the review of development proposals, the City would use the MSHCP (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Further, Action RM-1i addresses potential resources outside of the MSHCP area to ensure they are identified and addressed as part of the development review process. Action RM-1j would ensure that vegetation and tree removal occurring during the nesting bird season conduct surveys prior to the commencement of construction activities and to provide for buffers if active nests are confirmed. Policy RM-2.4 encourages development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Action RM-2b directs the City to cooperate with the RWQCB to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. Future development projects would be required to comply with the General Plan Update and adopted federal, State, and local regulations for the protection of sensitive natural communities, including riparian habitat. Although numerous regulations including implementation of the MSHCP and General Plan Update policies and actions would minimize impacts to sensitive riparian habitat, at a program level of review, it cannot be ensured that all impacts could be reduced to less than significant at the site-specific level. Therefore, potential impacts to riparian habitat and other sensitive natural communities would be considered significant and unavoidable. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: RESOURCE MANAGEMENT ELEMENT Goal RM-1: Natural Resources. A community that conserves and protects its natural resources. Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.3: Biological Resource Protection. Preserve and enhance biological communities that contribute to the region’s biodiversity, with a special focus on sensitive, rare, or endangered plant and wildlife species in accordance with state and federal resource agency requirements. Findings Page 216 of 266 Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Policy RM-1.6: Native Vegetation. Conserve existing native vegetation where possible and integrate regionally native plant species into development and infrastructure projects where appropriate. Action RM-1c: Work closely with the U.S. Army Corps of Engineers (ACOE), U.S. Fish and Wildlife Service (FWS), and the California Department of Fish and Game (CDFG) during the discretionary project permitting and CEQA review of any project that may result in the alteration of a stream bed, involve the removal of vegetation in wetland and riparian habitats, disturb Waters of the United States or otherwise impact sensitive biological resources. Action RM-1d: Cooperate with the County of Riverside to develop and manage preserve areas within the urban landscape. During the review of development proposals, use the Western Riverside County MSHCP Habitat Conservation Plan (particularly Section 3.2.13 San Jacinto Valley Area Plan) to help assess potential project impacts and mitigation requirements. Development in the City shall be required to comply with the applicable terms of the MSHCP including, but not limited to, the payment of mitigation fees, narrow endemic surveys, riparian/riverine policy, and other applicable surveys. Projects located within criteria cell areas shall be reviewed through the MSHCP Joint Project Review as appropriate. Action RM-1i: During the development review process, require Applicants of developments with the potential to reduce or eliminate habitat for native plant and wildlife species or sensitive habitats not covered by the MSHCP, as determined by the City of San Jacinto’s Community Development Department, to prepare a site-specific general biological resources survey to identify the presence of any sensitive biological resources, including any sensitive plant or wildlife species. The report shall identify the need for focused presence/absence surveys and identify the presence of state or federal regulated wetlands or waters. Required surveys shall be conducted by qualified biologists and/or botanists in accordance with California Department of Fish and Wildlife (CDFW) and/or United States Fish and Wildlife Services (USFWS) survey protocols for target species. If no sensitive species are observed during the field survey then no further mitigation will be required. If sensitive species or habitats, including wetlands are documented on the project site, the project applicant shall comply with the applicable requirements of the regulatory agencies and shall apply mitigation determined through the agency permitting process. Action RM-1j: Where feasible, vegetation and tree removal should occur outside of the bird nesting season (February 1 to August 31). If not feasible, the project applicant shall retain a qualified biologist to conduct a nesting bird survey no more than three days prior to the commencement of construction activities. The biologist conducting the clearance survey shall document the negative results if no active bird nests are observed on the project Findings Page 217 of 266 site or within the vicinity during the clearance survey with a brief letter report, submitted to the City of San Jacinto Community Development Department prior to construction, indicating that no impacts to active bird nests would occur before construction can proceed. If an active avian nest is discovered during the pre-construction clearance survey, construction activities shall stay outside a 300-foot buffer around the active nest. For listed and raptor species, this buffer shall be 500 feet. A biological monitor shall be present to delineate the boundaries of the buffer area and to monitor the active nest to ensure the nesting behavior is not adversely affected by construction activity, pursuant to the Migratory Bird Treaty Act (MBTA). Prior to the commencement of construction activities and the issuance of any permits, results of the pre-construction survey and any subsequent monitoring shall be provided to the City of San Jacinto Community Development Department, California Department of Fish and Wildlife (CDFW), and other appropriate agencies. Policy RM-2.4: Natural Conditions. Encourage development that avoids impacts to watershed areas, wetlands, natural drainage channels, riparian areas, and creeks, retaining these resources in their natural condition if feasible. Action RM-2b: Cooperate with the Regional Water Quality Control Board to develop a plan to assist agricultural operations to reduce nitrate and sediment input to surface waters. Such a plan will enhance water quality and benefit aquatic plants and wildlife within the planning area as well as downstream. D. GREENHOUSE GAS EMISSIONS 1. Generation of Greenhouse Gas Emissions Threshold: Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? Finding: Significant and Unavoidable. (Draft EIR, Impact GHG-1, pages 5.8-18 through 5.8-37) Explanation: Implementation of the proposed Project would contribute to increases of GHG emissions that are associated with global climate change. Estimated GHG emissions attributable to future development would be primarily associated with increases of CO2 and other GHG pollutants, such as methane (CH4) and nitrous oxide (N2O), from mobile sources and utility usage. WRCOG has developed a subregional CAP with the participation of the City of San Jacinto, as well as other jurisdictions in the subregion, to achieve local GHG emissions levels that would be consistent with the Statewide reduction targets established by AB 32, SB 32, and CARB’s 2017 Scoping Plan. Additionally, the City of San Jacinto has set a target to reduce community-wide emissions to 1.83 MTCO2e per service population (SP) by the year 2030, consistent with the method used to establish the WRCOG Subregion’s 2030 target, as described in the WRCOG Subregional CAP, to achieve the target of 40 percent below 1990 GHG emission levels by 2030 Findings Page 218 of 266 as encapsulated by SB 32. This equates to total annual emissions target of 147,932 MTCO2e per year by the year 2030, based on the City’s population and jobs forecasts. The City also set a longer-range goal of 0.62 MTCO2e per SP by 2050, consistent with the State’s goal to achieve 80 percent below 1990 levels by 2050. Reductions associated with the City’s waste diversion efforts are accounted for by State measure SR-1 (Recycling and Waste Diversion Mandates), while reductions resulting from local water conservation and reuse are accounted for by State Measure SW -1 (Water Conservation Mandates). The City is also supporting statewide efforts to reduce emissions from agriculture through its support for local farms and community gardens. These measures implemented together result in an estimated 191,700 MTCO2e in community emissions for 2030, or 3.3 MTCO2e per capita, which is an approximate 6 percent reduction compared to the 2017 levels, but above the 2030 target of 147,932 MTCO2e by 43,768 MTCO2e. The City also set a longer-range goal of 0.62 MTCO2e per SP by 2050, consistent with the State’s goal to achieve 80 percent below 1990 levels by 2050. The reduction of GHG emissions puts the City on the path to achieve its 2050 emissions targets. However, the City would need additional actions to keep the City on a path that aligns with the State of California’s longer-term goal for 2050. The General Plan Update would not conflict with the implementation of the CARB’s 2017 Scoping Plan. General Plan Update policies and actions that support the implementation of the Scoping Plan would improve air quality, reduce GHG emissions, encourage alternative modes of transportation, such as walking, biking, and public transportation, and divert waste from landfills. Specifically, the proposed General Plan Update Land Use Element includes Policy LU-1.1 which promotes a land use plan that supports efficient development and multiple transportation options. Policy LU-2.2 encourages new development to occur in infill locations that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Proposed Economic Development Element Policy ED-3.1 encourages higher density housing and higher intensity employment space to locate in mixed-use formats along the City’s commercial corridors, near transit nodes, and in areas well-served by the City’s multimodal transportation network. The General Plan Update Resources Management Element includes Policy RM-4.3 to align the City’s local GHG reduction targets with the statewide GHG reduction targets of AB 32, and aligns the City’s GHG reduction goal with the statewide GHG reduction goal of Executive Order S-03-05. Policy RM-4.5 encourages pedestrian-scale development and pedestrian-friendly design features to reduce vehicle emissions. Policy RM-4.9 establishes the City’s per capita GHG reduction targets for 2030 and 2050. Policy RM-4.10 encourages the adoption of local policies and programs consistent with the local measures identified in the WRCOG Subregional CAP for the City to reduce GHG emissions. Policy RM-4.11 expands the number of parks and trees in the Findings Page 219 of 266 City to provide a larger carbon sink. The proposed Mobility Element includes goals and policies to encourage the reduction of VMT to lower GHG emissions. This includes Goal M-3, which supports a multi-modal transportation network that provides sufficient vehicular, pedestrian, bike and transit facilities. Policy M-3.2 incorporates facilities and design features into transportation improvement projects that support the use of public transit and active transportation. Policy M-3.3 links commercial development, employment centers, public facilities, and community parks and open spaces to transit and active transportation facilities and trails, wherever feasible. Overall, General Plan Update impacts related to consistency with the 2017 Scoping Plan would be less than significant. The General Plan Update would also not conflict with the implementation of 2022 Scoping Plan and its future programs. The proposed Project does not conflict with the implementation of the 2017 Scoping Plan; however, the Project does not meet the 2030 community emissions target and would therefore have a significant and unavoidable impact. WRCOG recommends additional reduction measures in the City’s CAP, including encouraging residents and businesses to enroll in SCE’s Green Rate program (currently offering 50 percent and 100 percent renewable options), and adopting a local building code beyond Title 24 that incentivizes electrification or limits the use of fossil natural gas in new buildings and major retrofits. The General Plan Update Resource Management Element Action RM-5j encourages SCE customers to participate in SCE’s 100% Green Tier. The City is not planning on adopting the additional measure recommended in the WRCOG Subregional CAP for the City to adopt a local building code beyond Title 24, since the measure is not feasible and conflicts with the other objectives of the General Plan Update, specifically to “attract and retain businesses and industries that provide jobs for local residents”, and would potentially discourage future development envisioned in the General Plan Update. The City will continue to participate in the regional efforts of the CAP and implement feasible measures, as specified in the General Plan Update Resource Management Element Policy RM-4.10 and Action RM-4a, which commits the City to continue participating with WRCOG’s Subregional CAP updates. In order to further reduce GHG emissions associated with buildout of the General Plan Update, the City has included numerous policies and actions aimed at reducing GHG emissions and promoting sustainability in San Jacinto. The General Plan Update proposes policies and actions that are specifically relevant to climate change and GHG emissions and energy consumption within the Study Area. Specifically, the General Plan Update Resources Management Element includes Policy RM-4.1, which supports regional efforts, including those organized through the SCAQMD, SCAG, the WRCOG, and CARB to implement the regional AQMP. Policy RM-4.3 aligns the City’s local GHG reduction targets with the statewide GHG Findings Page 220 of 266 reduction targets of AB 32, and aligns the City’s GHG reduction goal with the statewide GHG reduction goal of Executive Order S-03-05. Policy RM- 49 establishes the per capita GHG reduction targets to meet the requirements established by the state under AB 32 and SB 32, consistent with the CARB’s 2017 Scoping Plan. Policy RM-4.11 expands the number of parks and trees in San Jacinto to provide a larger carbon sink or area containing natural sources that retain more carbon than what those sources emit. Action RM-4a implements the local GHG reduction measures identified in the WRCOG’s Subregional CAP for San Jacinto, directs the City to participate in future updates of the CAP, and on an annual basis record the status of each local measure and submit the results to WRCOG using the WRCOG Climate Action Plan Tracking Tool. Action RM-5e provides for the continue review of development projects to ensure that all new public and private development complies with Title 24 energy standards, as well as the energy efficiency standards established by the General Plan Update and the Municipal code. Numerous policies and programs in the General Plan Update address sustainable development, which influence operational mobile, energy, and area-source emissions in the Study Area. Resource Management Element Policy RM-4.6 encourages and incentivizes higher density and mixed-use development opportunities within designated areas of the City to lessen the impacts of traffic congestion on local air quality. Additional policies and actions throughout the Land Use and Mobility Elements promote reductions in VMT through the mix and density of land uses, walkable neighborhood design, bicycle facilities and infrastructure, the expansion of trail networks, and public transportation facilities and infrastructure. Specifically, the proposed Land Use Element includes Policy LU-1.1 which promotes an appropriate land use plan that promotes efficient development and multiple transportation options. Policy LU-2.2 encourages new development to occur in infill locations to reduce sprawl, preserve open space, and create convenient connections to other land uses and activity centers. Policy LU- 4.4 supports pedestrian-friendly and pedestrian-scaled development that encourages more social interaction and less automobile use, especially in the Downtown Village. The proposed Mobility Element contains Policy M- 2.4 which promotes public transportation programs that effectively serve the City’s residents and workers by connecting users to local and regional destinations, including jobs, recreation, retail and other activity centers. Policy M-3.2 incorporates facilities and design features into transportation improvement projects that support the use of public transit and active transportation. Policy M-3.3 links commercial development, employment centers, public facilities, and community parks and open spaces to transit and active transportation facilities and trails, wherever feasible. Mobility Element Policy M-4.3 encourages the use of open space and utility easements for bicycle, pedestrian, and equestrian trails. Policy M-6.2 encourages the creation and implementation of TDM and congestion Findings Page 221 of 266 management mitigation measures in areas experiencing high levels of congestion and VMT levels. Additionally, Policy M-6.4 promotes working with developers to reduce greenhouse gas emissions and minimize congestion related to new development through improvements to the circulation system and on-site improvements that encourage non-vehicular modes of travel. Additionally, policies in the Resource Management Element promote conservation of open space. Policy RM-1.1 supports a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. While these policies and actions would further assist the City is reducing GHG emissions, the associated reduction of GHG emissions are not quantifiable. Because of this, the City cannot state with certainty whether implementation of the General Plan Update would meet the 2030 and 2050 community emissions targets. GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: LAND USE ELEMENT Policy LU-1.1: Land Use Pattern. Promote an appropriate land use plan that fosters and enhances community livability and public health; sustains economic vitality; promotes efficient development and multiple transportation options; reduces pollution, greenhouse gas emissions, and the expenditure of energy and other resources; and ensures compatibility between uses consistent with the land use designations identified in this Element and Land Use Map (LU-2). Policy LU-2.2: Infill Development. Encourage new development to occur in infill locations in a balanced and efficient pattern that reduces sprawl, preserves open space, and creates convenient connections to other land uses and activity centers. Policy LU-4.4: Pedestrian Design. Support pedestrian-friendly and pedestrian-scaled development that encourages more social interaction and less automobile use, especially in the Downtown Village. Policy LU-5.5: Sustainable Design. Support “green” and “sustainable” developments that respect and conserve the region’s important resources. MOBILITY ELEMENT Policy M-1.1: Balanced Circulation System: Provide for a balanced circulation system that promotes the safe and efficient movement of people and goods throughout the City. Policy M-1.2: Access and Mobility: Strive to maintain sufficient access and mobility for all modes of travel and users of the roadway network. Policy M-1.5: Transportation Improvements for All Users: Encourage roadway, sidewalk, and median improvements that enhance the visual character of the roadway Findings Page 222 of 266 system and promote pedestrian and bicycle safety. Action M-1a: Periodically review and assess the vehicular operating conditions along City facilities to determine what, if any, improvements are warranted to maintain a safe and efficient flow of traffic in the City. Improvements may be identified and included in the City’s Capital Improvement Plan and/or required as part of project approval through the development review process. Policy M-2.4: Public Transit: Promote public transportation programs that effectively serve the City’s residents and workers by connecting users to local and regional destinations, including jobs, recreation, retail, and other activity centers. Goal M-3: Complete Streets. A multi-modal transportation network that provides sufficient vehicular, pedestrian, bike and transit facilities. Policy M-3.1: Complete Streets: Apply context-sensitive complete streets principles to new roadways and to transportation improvements to serve all modes of travel and users of all ages and abilities. Policy M-3.2: Multimodal Facilities: Incorporate facilities and design features into transportation improvement projects that support the use of public transit and active transportation. Policy M-3.3: Multimodal Connectivity: Link commercial development, employment centers, public facilities, and community parks and open spaces to t ransit and active transportation facilities and trails, wherever feasible. Policy M-3.6: Park and Ride Facilities: Encourage the provision of regional public transportation services and support facilities such as park and ride lots. Goal M-4: Active Transportation. An extensive and regionally linked network of trails, bicycle lanes, and sidewalk paths that encourage active transportation as viable for transportation and recreation. Policy M-4.1: Trails Master Plan: Implement applicable goals, policies, and projects from the Trails Master Plan to provide trails and multimodal facilities that support active transportation within and beyond the City. Policy M-4.2: Active Transportation Network: Provide and maintain an extensive active transportation and trail network that supports bicycles, pedestrians, and equestrians and is linked to regional facilities and facilities of adjacent jurisdictions. Policy M-4.3: Trail Development: Encourage the use of open space and utility easements for bicycle, pedestrian, and equestrian trails, where feasible. Policy M-4.4: Trail Connectivity: Encourage Specific Plans and Planned Developments to include well-developed and designed trails that connect neighborhoods to parks, schools, jobs, and adjacent existing or planned local and/or regional trails. Findings Page 223 of 266 Policy M-4.5: Support Facilities: Encourage new developments to provide bicycle parking, lockers, and other support facilities for bicyclists. Goal M-6: Transportation Management. Transportation management strategies that comply with the County Congestion Management Plan and regional and statewide greenhouse gas emissions targets. Policy M-6.1: Vehicle Miles Traveled: Maintain vehicle miles traveled (VMT) thresholds and Transportation Demand Management (TDM) mitigation requirements for the purpose of environmental review under the California Environmental Quality Act (CEQA). Policy M-6.2: Transportation Demand Management: Create and implement TDM and congestion management mitigation measures in areas experiencing high levels of congestion and VMT levels. Policy M-6.4: New Development: Work with developers to reduce greenhouse gas emissions and minimize congestion related to new development through improvements to the circulation system and on-site improvements that encourage non-vehicular modes of transportation. Action M-6c: Require developments that are approved based on TDM plans to incorporate monitoring and enforcement of TDM targets as part of those plans. PUBLIC SAFETY ELEMENT Policy PS-7.5: Energy Supply. Promote plans and programs that increase sustainable energy sources. Policy PS-7.11: Greenhouse Gas Reductions. Reduce communitywide greenhouse gas emissions locally by actively supporting regional efforts to reduce greenhouse gases throughout the county. Action PS-7b: Expand the use of energy-efficient lighting, such as LEDs, for City-owned light facilities. Action PS-7c: Consider purchasing only electric or alternative-energy vehicles for the City vehicle fleet, as appropriate, based on the intended use of the vehicle. Action PS-7d: Evaluate the feasibility for government-constructed and/or -operated new development to exceed the CalGreen Tier 1, or successor program, standards. Action PS-7e: Promote the use of sustainable and carbon-neutral energy sources in new development. Action PS-7f: Explore using renewable energy and clean generation technologies such as solar, wind, biogas, or fuel cells to power City facilities where appropriate. Findings Page 224 of 266 RESOURCE MANAGEMENT ELEMENT Policy RM-1.1: Balanced Open Space System. Support a balanced and integrated open space system that reflects a variety of considerations, including resource conservation, recreation, aesthetics, and community identity. Policy RM-1.4: Regional Cooperation. Recognize areas of overlapping jurisdiction with respect to open space and biological resources, such as the County of Riverside Multiple Species Habitat Conservation Plan (MSHCP), and coordinate the City’s actions with efforts of surrounding cities, agencies, and Riverside County to protect and maximize regional open space. Action RM-1e: For Hillside Development Projects, implement the City’s Hillside Development Standards to retain the significant hillsides and ridgelines on San Jacinto’s eastern and western borders as Open Space, allowing areas of non-intensive development on the more gently sloped areas at the base of the eastern and western hillsides. Goal RM-4: Air Quality and Greenhouse Gas Emissions. Improved air quality in San Jacinto and the region through reductions in air pollutants and greenhouse gas (GHG emissions). Policy RM-4.1: Regional Cooperation. Support regional efforts, including those organized through the South Coast Air Quality Management District, Southern California Association of Governments, the Western Riverside Council of Governments, and the California Air Resource Board (CARB) to implement the regional Air Quality Management Plan. Policy RM-4.2: Measurement and Enforcement. Coordinate with the California Air Resources Board and South Coast Air Quality Management District to properly measure air quality at emission sources and enforce the standards of the Clean Air Act. Policy RM-4.4: Transportation Options. Promote alternative modes of transportation to reduce vehicular emissions and improve air quality. (See Mobility Element) Policy RM-4.5: Walkability. Encourage pedestrian-scale development and pedestrian- friendly design features to reduce vehicle emissions. (See Mobility Element) Policy RM-4.6: Sustainable Development. Encourage and incentivize higher density and mixed-use development opportunities within designated areas of the City to lessen the impacts of traffic congestion on local air quality. (See Land Use Element) Policy RM-4.7: Sensitive Receptors. Insulate sensitive receptors from areas of heightened air quality pollution, by utilizing land use planning to buffer and protect residential areas. Policy RM-4.8: Mitigation. Require the implementation of relevant mitigation measures for all future development upon identification of potential air quality impacts. Policy RM-4.12: Public Engagement. Promote regional air quality programs in order to Findings Page 225 of 266 inform the public on regional air quality concerns and encourage the engagement of all San Jacinto residents in future planning decisions related to air quality. Action RM-4b: Review all new industrial and commercial development projects for potential air quality impacts to residences and other sensitive receptors. Ensure that mitigation measures and best management practices are implemented to reduce significant emissions of criteria pollutants. Action RM-4c: Review development, infrastructure, and planning projects for consistency with SCAQMD requirements during the CEQA review process. Require project applicants to prepare air quality analyses to address SCAQMD and General Plan requirements, which include analysis and identification of: 1. Air pollutant emissions associated with the project during construction, project operation, and cumulative conditions. 2. Potential exposure of sensitive receptors to toxic air contaminants. 3. Significant air quality impacts associated with the project for construction, project operation, and cumulative conditions. 4. Mitigation measures to reduce significant impacts to less than significant or the maximum extent feasible where impacts cannot be mitigated to less than significant. Action RM-4d: Work with the South Coast Air Quality Management District, Southern California Association of Governments, the Western Riverside Council of Governments, and the California Air Resource Board (CARB) to implement programs aimed at improving regional air quality. Action RM-4g: Provide the necessary facilities and infrastructure to facilitate the use of City-owned low or zero-emission vehicles such as electric vehicle charging facilities at key City facilities as operations necessitate and/or as funding becomes available. Action RM-4k: Support the establishment and expansion of a regional network of electric vehicle charging stations and encourage the expanded use of electric vehicles. Action RM-4l: Establish and adopt standards and requirements for electric vehicle parking, including minimum requirements for the installation of electric vehicle charging stations in new multi-family residential and commercial, office, and light industrial development. Action RM-4n: Future development projects implemented under the General Plan will be required to demonstrate consistency with SCAQMD construction emission thresholds. Where emissions from individual projects exceed SCAQMD thresholds, the following actions shall be incorporated as necessary to minimize impacts. These measures do not exclude the use of other, equally effective mitigation measures. Findings Page 226 of 266  Require all off-road diesel equipment greater than 50 horsepower (hp) used for this Project to meet USEPA Tier 4 final off-road emission standards or equivalent. Such equipment shall be outfitted with Best Available Control Technology (BACT) devices including a California Air Resources Board Certified Level 3 Diesel Particulate Filter (DPF) or equivalent. The DPF reduces diesel particulate matter and NOx emissions during construction activities.  Require a minimum of 50 percent of construction debris be diverted for recycling.  Require building materials to contain a minimum 10 percent recycled content.  Require materials such as paints, primers, sealants, coatings, and glues to have a low volatile organic compound concentration compared to conventional products. If low VOC materials are not available, architectural coating phasing should be extended sufficiently to reduce the daily emissions of VOCs. Action RM-4o: Future development projects will be required to demonstrate consistency with SCAQMD’s operational emission thresholds. For projects where operational emissions exceed regulatory thresholds, the following measu res may be used to reduce impacts. Note the following measures are not all inclusive and developers have the option to add or substitute measures that are equally or more appropriate for the scope of the project.  Develop a project specific TDM program for residents and/or employees that provides opportunities for carpool/vanpools.  Provide onsite solar/renewable energy in excess of regulatory requirements.  Require that owners/tenants of non-residential or multi-family residential developments use architectural coatings that are 10 grams per liter or less when repainting/repairing properties.  Require dripless irrigation and irrigation sensor units that prevent watering during rain storms.  Ensure all parking areas are wired for capability of future EV charging and include EV charging stations that exceed regulatory requirements. Goal RM-5: Energy and Mineral Resources. A community that safely manages its energy and mineral resources Policy RM-5.1: San Jacinto Power. Continue to make clean, modern, and cost-effective energy options available to individuals who live and work in San Jacinto. Policy RM-5.2: Compliance with State Legislation. Comply with all state requirements regarding the generation of power and encourage energy providers to investigate the use or expansion of renewable sources of energy. Findings Page 227 of 266 Policy RM-5.3: Renewable Energy. Promote the development and use of renewable energy resources to reduce dependency on fossil fuels. Policy RM-5.4: Energy-Efficient Materials. Promote the use of energy-efficient materials, equipment, and design in public and private facilities and infrastructure. Policy RM-5.5: Energy Conservation. Promote energy conservation and recycling by the public and private sectors. Policy RM-5.6: Energy Needs. Collaborate with local service providers in determining and meeting the needs of the community for energy in clean, modern, and cost-effective ways. Policy RM-5.7: Business Community. Support the decisions of the San Jacinto business community as they select and implement the most appropriate, financially feasible, and responsible energy source for their individual operations. Policy RM-5.8: Public Education. Promote public education programs that advocate for reducing energy consumption, and promote renewable sources of energy. Policy RM-5.9: Promote Energy Conservation in Existing Building Stock. Promote energy conservation by residents and businesses in existing structures, in close coordination with other agencies and local energy providers, including the SCAQMD and Southern California Edison. Action RM-5a: Continue to implement the City’s Community Choice Aggregation (CCA) program; evaluate the effectiveness of the program every five years to identify programmatic changes necessary to continue meeting the City’s objectives. Action RM-5b: Implement energy conservation measures in public buildings through the following actions:  Promote energy efficient buildings and site design for all new public buildings during the site development permit process; and  Install energy saving devices in new public buildings and retrofit existing public buildings. Action RM-5c: During the development review process, encourage innovative building design, layout, and orientation techniques to minimize energy use by taking advantage of sun/shade patterns, prevailing winds, landscaping and building materials that control energy usage, and solar design. Action RM-5d: Promote retrofit programs by the City to reduce energy usage and consequently reduce emissions from energy consumption. Encourage utility companies to provide informational literature about available retrofit programs at public facilities such as City Hall, the Community Center , and libraries. Findings Page 228 of 266 Action RM-5e: Continue to review development projects to ensure that all new public and private development complies with the California Code of Regulations, Title 24 standards as well as the energy efficiency standards established by the General Plan and the Municipal Code. Action RM-5f: Promote the CEC Building Energy Benchmarking Program (AB 802) on the City’s website to help benchmark and monitor energy use for participating businesses seeking to increase energy efficiency and realize cost savings. Action RM-5g: Encourage new development projects to install electrified space (HVAC) and water heating systems in lieu of natural gas systems, above and beyond the requirements of Title 24, before and during the building plan check process. Action RM-5h: During the development review process, require that all new developments adjacent to or near natural gas lines, coordinate with So Cal Gas to install and connect to the lines, as feasible. Action RM-5i: Advertise the San Jacinto Power PureGreen program and encourage San Jacinto Power customers to enroll in the program and opt-up to 100 percent renewable energy content. Action RM-5j: Encourage Southern California Edison (SCE) customers to participate in SCE’s 100% Green tier. Policy RM-7.1: Regional Cooperation. Collaborate with the Valley-Wide Recreation and Park District and other organizations to provide parks, recreational, and open space facilities that meet the needs and preferences of all segments of the community. Policy RM-7.9: Open Space in Nonresidential Development. Encourage outdoor gathering spaces, such as mini-parks and plazas, be incorporated into nonresidential development to encourage social interaction, create experience-oriented centers, and enhance the visual character of the community. Policy RM-7.10: Parkland Funding. Actively pursue financing for parkland acquisition and maintenance, and allocate sufficient funding to park development to support the community’s recreational needs. Action RM-7a: Review development proposals for their potential demand for and impact on parks and recreational facilities in the community by:  Requiring developers of residential projects to provide adequate parkland equal to five acres per 1,000 residents (0.005 acre per resident), or pay an in-lieu fee prior to occupancy of the project.  Requiring non-residential development to provide parkland equal to 2.5 acres per 1,000 employees (0.0025 acre per employee), or pay an in lieu fee prior to occupancy of the project. Findings Page 229 of 266  Work with developers to identify the appropriate park type(s), size(s), facilities, and location(s) for required park facilities.  Ensure parkland facilities conform with City standards. Policy RM-10.1: Compliance with State Legislation. Comply with local, regional and State regulations regarding waste diversion, source reduction, recycling, and composting. Policy RM-10.2: Solid Waste Collection. Provide adequate waste disposal, recycling, and refuse services for present and future residents and businesses, including programs that improve public access to solid waste collection and recycling facilities. Policy RM-10.4: Source Reduction and Recycling Efforts. Participate in source reduction and recycling techniques to reduce the amount of solid waste sent to landfills and ensure adequate landfill capacity in the region Policy RM-10.5: Organic Waste. Work with appropriate service providers to collect and compost greenwaste, including landscaping, Christmas trees, composting and mulch, and other sources of organic waste, to distribute for use in parks, medians, and other municipal areas. Policy RM-10.6: Fees and Funding. Work with appropriate service providers to periodically review collection, recycling, and disposal fees to achieve state and federal mandates, meet community expectations, and reflect cost efficiencies or increases for service delivery. Policy RM-10.7: Public Education. Promote citywide educational programs to inform citizens of the benefits of recycling and appropriate recycling options and locations. Action RM-10a: On an ongoing basis and in compliance with State law, ensure solid waste collection activities completed by franchise solid waste haulers, facility siting and construction of transfer and/or disposal facilities, operation of waste reduction and recycling programs, and household hazardous waste disposal and education programs are consistent with the County Solid Waste Management Plan. Action RM-10b: Include standard language in requests for services and in City agreements requiring contractors to use best management practices to maximize diversion of waste from the landfill in order to meet the City’s specified diversion rates. Action RM-10c: Encourage the expansion of recycling, reuse, and appropriate disposal of hazardous materials, including the following:  Increased participation in single family and multifamily residential curbside recycling programs;  Increased participation in commercial and industrial recycling programs for paper, cardboard, and plastics; Findings Page 230 of 266  Reduce yard and landscaping waste through methods such as composting, grass recycling, and using resource efficient landscaping techniques; and  Encourage local businesses to provide electronic waste (e-waste) drop-off services and encourage residents and businesses to properly dispose of, or recycle, e-waste. 2. Conflict with Greenhouse Gas Regulations Threshold: Would the project conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases? Finding: Significant and Unavoidable. (Draft EIR, Impact 3.8-6, pages 3.8-26 through 3.8-28) Explanation: The General Plan Update would not satisfy the GHG reduction requirements established by SB 32 and AB 32. The GHG reduction targets developed for the proposed General Plan Update are consistent with the GHG reduction targets provided in the CARB’s 2017 Scoping Plan, which were developed by the CARB to ensure compliance with AB 32, SB 32, and consistent with Executive Order S-03-05. The proposed Project does not conflict with the implementation of the 2017 Scoping Plan; however, the Project does not meet the 2030 or 2050 community emissions target. The Project would not reduce emissions to below the community wide thresholds through buildout of the General Plan Update (i.e. for years 2030 and 2040), which ensures that the proposed Project is consistent with all GHG reduction targets established for the State. Therefore, the proposed Project would conflict with the State of California’s GHG reduction goals and targets. While the General Plan Update policies and actions would further assist the City in reducing GHG emissions, the associated reduction of GHG emissions are not quantifiable. Because of this, the City cannot state with certainty whether implementation of the General Plan Update would meet the 2030 and 2050 community emissions targets. At the regional level, the 2020 RTP/SCS is an applicable plan adopted for the purpose of reducing GHGs. The Project would be consistent with the 2020 RTP/SCS through various polices. The General Plan Update policies would support development that is encouraged by the RTP/SCS to reduce VMT and expand multi-modal transportation options in order for the region to achieve GHG reductions from the land use and transportation sectors required by SB 375, which, in turn, advances the State’s long-term climate policies. By furthering implementation of SB 375, the General Plan Update supports regional land use and transportation GHG reductions consistent with State regulatory requirements. Therefore, the Project would be consistent with the GHG reduction-related actions and strategies contained in the 2020 RTP/SCS. While the proposed Project is consistent with the CARB 2017 Scoping Plan and the SCAG 2020 RTP/SCS, the proposed Project would not meet the established reduction targets of SB 32, and AB Findings Page 231 of 266 32. There would be a significant and unavoidable impact relative to this topic. The City of San Jacinto will be implementing the additional GHG reductions strategies shown in the Draft EIR Response GHG-1 in order to further reduce emissions. E. NOISE 1. Ambient Noise Levels Threshold: Would the project result in the generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Finding: Significant and Unavoidable. (Draft EIR, Impact NOI-1, pages 5.13-27 through 5.13-44) Explanation: Transportation Noise Impacts The City of San Jacinto is proposing an updated General Plan Land Use Map and an updated Roadway Classification Map in anticipation of the expected growth in the City. The primary noise source in the Study Area would continue to be vehicle traffic. By the year 2040, existing land uses adjacent to the studied roadways would be exposed to noise levels that exceed the City’s exterior standards presented in the proposed General Plan Update Table PS-1. Compared to existing traffic noise levels, future (2040) traffic volumes are expected to be up to 11.9 dBA CNEL louder than existing ambient noise levels at existing land uses and would result in substantial increases in ambient noise along many of the studied road segments. Implementation of the proposed 2040 General Plan Update Land Use Plan and Roadway Classifications Map would result in substantial permanent increases in existing noise levels at existing and future sensitive receptors. Implementation of the proposed General Plan Update would result in significant impacts related to exceedances of the land use compatibility criteria and substantial increases in ambient noise levels. Where existing land uses would be impacted, the impact would be significant and unavoidable as setback distances of existing sensitive receptors are already established. In order to reduce these impacts, the use of sound walls or quiet pavements could be employed; however, use of new sound walls, or modifying sound walls is not considered to be practical or feasible as a mitigation strategy. Many of the noise impacts could potentially be reduced through the use of quiet pavement. However, not all of the impacted roadway segments could be mitigated through use of quiet pavements due to the magnitude of the traffic noise increases. Additionall y, widespread repaving of city streets with quiet pavements would be expensive and Findings Page 232 of 266 impractical. General Plan Policies PS-6.1 through PS-6.10, and Actions PS-6a through PS-6i, identified below, are intended to minimize exposure to excessive noise, including noise associated with traffic. Specifically, Policies PS-6.1 and PS-6.2 support noise-compatible land uses in the vicinity of traffic noise sources and require that new development and infrastructure projects be reviewed for consistency with the noise standards established in Tables PS-1 and PS-2. The proposed General Plan Update standards required under Policy PS-6.1, for exposure to traffic noise meet or exceed the noise level standards shown in General Plan Update Public Safety Element Tables PS-1 and PS-2. Policy PS-6.2 and Actions PS-6b would ensure that new development mitigates potential noise impacts through incorporating the noise control treatments necessary to achieve acceptable noise levels. Policy PS-6.3 sets criteria for evaluating future increases in traffic noise levels. Action PS-6a would ensure that the San Jacinto Municipal Code, including the updated noise ordinance, is consistent with the noise standards established in the General Plan Update. Implementation of the proposed policies and actions of the General Plan Update would reduce noise and land use compatibility impacts from vehicular traffic noise sources and would ensure that new development is designed to include noise-attenuating features. However, the traffic noise increases associated with the proposed General Plan Update exceed the applicable noise exposure criteria. Therefore, the proposed General Plan would have a significant and unavoidable impact relative to traffic noise on existing noise-sensitive uses in the City. Stationary Noise Sources Implementation of the General Plan could result in the future development of land uses that generate noise levels in excess of applicable City noise standards for non-transportation noise sources. Such land uses may include commercial area loading docks, industrial uses, HVAC equipment, car washes, daycare facilities, auto repair, and recreational uses. While the General Plan does not specifically propose any new noise generating uses, the Land Use Map includes industrial land use designations, which may result in new noise sources. Specific development projects and the details of future noise generating land uses that may be located in the City in the future are not known at this time. While no specific projects are proposed under the General Plan Update, changes in land use may allow for more intensive noise-generating uses in closer proximity to noise-sensitive uses. Where this occurs, detailed noise studies would be required to ensure that noise control measures are implemented into the project design. Such measures could include redesign of industrial buildings away from sensitive uses, construction of sound walls or berms between noise generating uses and sensitive uses, using buildings to create additional buffer distance and screening, or other site design measures to ensure that non-transportation (stationary) noise sources do not cause exterior noise levels to exceed Findings Page 233 of 266 allowable standards at sensitive receptors. The General Plan Update includes policies and actions that are intended to reduce noise associated with stationary sources. Specifically, Policies PS-6.1 through PS-6.3 and PS-6.6 through PS-6.10 and Actions PS-6b, PS-6c and PS-6d would reduce noise associated with stationary sources. Policy PS-6.2 and Action PS-6b require new development to mitigate excessive noise to the standards indicated in Tables PS-1, PS-2, PS-3, and PS-4 through best practices, including building location and orientation, building design features, placement of noise-generating equipment away from sensitive receptors, shielding of noise-generating equipment, placement of noise-tolerant features between noise sources and sensitive receptors, and use of noise- minimizing materials. Implementation of the proposed policies and actions of the General Plan Update would reduce noise impacts from stationary noise sources to a less than significant level. Construction Noise and Vibration Implementation of the proposed General Plan Land Use and Mobility Elements would result in short-term noise impacts associated with construction activities, both on- and off-site. Construction crew commute and the transport of construction equipment and materials to the site for the proposed project would incrementally increase noise levels on access roads leading to the site. Short-term construction-related impacts associated with worker commute and equipment transport on local streets leading to the project site would result in a less than significant impact on noise-sensitive receptors along the access routes. No mitigation is required. The site preparation phase of on-site construction activities, which includes grading and paving, tends to generate the highest noise levels since the noisiest construction equipment is earthmoving equipment. Site-specific construction activities associated with future development is expected to require the use of scrapers, bulldozers, motor graders, and water and pickup trucks. Noise reduction potential would be project and site-specific. Implementation of General Plan Update Public Safety Element Policy PS- 6.7, which requires construction activities to reduce noise impacts on adjacent uses to comply with the requirements of Chapter 8.40 of the San Jacinto Municipal Code and Action PS-6e which requires all construction activity to comply with the limits established in the City’ noise regulation would result in less than significant construction noise impacts. General Plan Public Safety Element Table PS-1, Land Use Compatibility for Community Noise Exposure, presents a land use compatibility chart for community noise derived from a similar table originally prepared by the California Office of Noise Control (2017). This table is proposed to be included in the 2040 General Plan Update Public Safety Element. The table identifies “normally acceptable,” “conditionally acceptable,” “normally unacceptable,” and “clearly unacceptable” exterior noise levels for various Findings Page 234 of 266 land uses. A “conditionally acceptable” designation implies new construction or development should be undertaken only after a detailed analysis of the noise reduction requirements for each land use is made and needed noise insulation features are incorporated in the design. By comparison, a “normally acceptable” designation indicates that standard construction can occur with no special noise reduction requirements. While this land use compatibility chart is based on a 24-hour value, the City is aware that some land uses are not occupied on a 24-hour basis, and a descriptor (such as Ldn or CNEL) may be overly restrictive in siting these types of sensitive land uses. Such uses may include but are not limited to, schools, libraries, and churches. In these cases, a more appropriate standard would consider the time of occupancy of the land use. Here, the City recommends the use of a 65 dBA, 12-hour Leq (Leq(12)) that includes those hours of actual use. (If a facility is to be used in excess of 12 hours per day, the CNEL standard should be used.) GENERAL PLAN UPDATE GOALS, POLICIES, AND ACTIONS: PUBLIC SAFETY ELEMENT Goal PS-1: Noise. A comfortable community environment that is free from excessive noise pollution. Policy PS-6.1: Noise Exposure. Consider the noise compatibility of existing and future development when making land use planning decisions. Require development and infrastructure projects to be consistent with the land use compatibility standards contained in Tables PS-1, PS-2, PS-3 and PS-4 to ensure acceptable noise exposure levels for existing and future development. Policy PS-6.2: Noise Mitigation. Require new development to mitigate excessive noise to the standards indicated in Tables PS-1, PS-2, PS-3 and PS-4 to the extent feasible through best practices, including building location and orientation, building design features, placement of noise-generating equipment away from sensitive receptors, shielding of noise-generating equipment, placement of noise-tolerant features between noise sources and sensitive receptors, and use of noise-minimizing materials. Policy PS-6.3: Acoustical Studies. Require acoustical studies for new discretionary developments and transportation improvements that have the potential to affect existing noise-sensitive uses such as schools, hospitals, libraries, care facilities, and residential areas, and for projects that would introduce new noise-sensitive uses into an area where existing noise levels may exceed the thresholds identified in this element. For projects that are required to prepare an acoustical study, the following mobile and stationary noise source criteria shall be used to determine the significance of those impacts. A. Mobile Noise Sources:  Where existing traffic noise levels are within or below the “normally acceptable” Findings Page 235 of 266 noise criteria at the affected land use (see Table PS-1), a readily perceptible 5 dBA CNEL or greater increase in roadway noise will be considered significant;  Where existing traffic noise levels falls within the “conditionally acceptable” noise criteria at the sensitive land use, a +3 dBA CNEL or greater increase in roadway noise levels will be considered significant; and  Where existing traffic noise levels exceed the “conditionally acceptable” noise criteria at the sensitive land use, a + 1.5 dBA CNEL or greater increase in roadway noise levels will be considered significant. B. Stationary and Non-Transportation Noise Sources  A significant impact will occur if the project results in an exceedance of the noise level standards contained in this element, or the project will result in an increase in ambient noise levels by more than 3 dB, whichever is greater. Policy PS-6.4: Roadway Noise. Encourage nonmotorized transportation alternatives for local trips and the implementation of noise sensitivity measures in the public realm, including traffic-calming road design, lateral separation, natural buffers, and setbacks to decrease excessive motor vehicle noise. Policy PS-6.5: Vehicular Traffic. Monitor and enforce existing speed limits and motor vehicle codes requiring adequate mufflers on all types of vehicles traveling through the city. Policy PS-6.6: Commercial Noise. Require the use of noise attenuation measures, including screening and buffering techniques, for all new commercial development expected to produce excessive noise; in existing cases where the City’s noise standards are exceeded, work with Code Enforcement to require compliance. Policy PS-6.7: Construction Noise. Require construction activities to reduce noise impacts on adjacent uses to the criteria identified in Tables PS-3 and PS-4, or, if the criteria cannot be met, to the maximum extent feasible complying with Chapter 8.40 of the San Jacinto Municipal Code (Noise Control) and use best practices. Construction activities outside of the permitted construction hours identified in the San Jacinto Municipal Code may be approved on a case-by-case basis by the Community Development Director. Policy PS-6.8: Temporary Special Events. Temporary special events including, but not limited to, festivals, concerts, parades, and other similar activities may be allowed to exceed the noise standards established in this General Plan and the standards established by Chapter 8.40 of the San Jacinto Municipal Code (Noise Control) through issuance of a temporary use permit (see Section 17.640 of the San Jacinto Municipal Code (Temporary Use Permits). Policy PS-6.9: Temporary Emergency Operations and Emergency Equipment Usage. Temporary emergency operations or emergency equipment usage is exempt from noise Findings Page 236 of 266 standard criteria set by this element. Policy PS-6.10: Interjurisdictional Coordination. Coordinate with neighboring cities to minimize noise conflicts between land uses along the City's boundaries. Action PS-6a: Review Chapter 8.40 of the San Jacinto Municipal Code and update as necessary to ensure that the noise standards are consistent with this General Plan, including Tables PS-1, PS-2, PS-3, and PS-4 and to require new residential, mixed-use with a residential component, and other noise-sensitive development to be designed to minimize noise exposure to noise sensitive uses through incorporation of site planning and architectural techniques. The update shall also include noise standards for residential uses within a mixed-use development, which may differ from other adopted residential noise standards. Action PS-6b: Review new development projects for compliance with the noise requirements established in this General Plan, including the standards established in Tables PS-1, PS-2, PS-3 and PS-4. Where necessary, require new development to mitigate excessive noise through best practices, including building location and orientation, building design features, placement of noise-generating equipment away from sensitive receptors, shielding of noise-generating equipment, placement of noise-tolerant features between noise sources and sensitive receptors, and use of noise-minimizing materials such as rubberized asphalt. Action PS-6c: Require acoustical studies for all new discretionary projects, including those related to development and transportation, which have the potential to generate noise impacts which exceed the standards identified in this General Plan. The studies shall include representative noise measurements, estimates of existing and projected noise levels, and mitigation measures necessary to ensure compliance with this element. Action PS-6d: Review the locations of proposed projects with the potential to generate stationary noise in relation to sensitive receptors through the discretionary project review process. Limit delivery or service hours for stores and businesses with loading areas, docks, or trash bins that front, side, border, or gain access on driveways next to residential and other noise sensitive areas. Only approve exceptions if full compliance with the nighttime limits of the noise regulations is achieved. Action PS-6e: Require all construction activity to comply with the limits (maximum noise levels, hours and days of allowed activity) established in the City noise regulations (Title 24 California Code of Regulations, Noise Ordinance) in order to reduce impacts associated with temporary construction noise to the extent feasible. Trucks associated with construction activities shall follow the designated truck routes described in the Mobility Element. Action PS-6f: Actively enforce the standards identified within the City's Noise Ordinance and Noise Plan in order to reduce impacts to the extent feasible. Update and amend the Noise Ordinance and Plan as appropriate. Provide a link on the City's website for those to file complaints against activities and uses that may be violating the Noise Ordinance. Findings Page 237 of 266 Action PS-6g: Require new residential projects located adjacent to railroad lines to follow the FTA vibration screening distance criteria to ensure that residential uses are not exposed to vibrations exceeding 72 VdB for frequent events (more than 70 events per day), 75 VdB for occasional events (30-70 events per day), or 80 VdB for infrequent events (less than 30 events per day). Action PS-6h: Require new development to minimize vibration impacts to adjacent uses during demolition and construction. Require vibration studies for all new discretionary projects, including those related to development and transportation, which have the potential to generate vibration impacts which exceeds the vibration limits. This includes projects requiring pile driving and/or construction on properties adjacent to historic structures. For sensitive historic structures, a vibration limit of 0.08 in/sec PPV (peak particle velocity) will be used to minimize the potential for cosmetic damage to the building. A vibration limit of 0.30 in/sec PPV will be used to minimize the potential for cosmetic damage at buildings of normal conventional construction. Action PS-6i: During subsequent updates to Section 8.40 of the Municipal Code, review and update Section 8.40.090, Construction Activity Noise Regulations, as needed in order to allow provisions for emergency repairs, exceptional circumstances, and reasonable Sunday construction and maintenance activities, while continuing to achieve the objectives of providing a nuisance-free noise environment. Findings Page 238 of 266 SECTION V CUMULATIVE IMPACTS Regarding the General Plan’s potential to result in cumulative impacts, the City hereby finds as follows: A. AESTHETICS Threshold: Would future development associated with implementation of the General Plan Update result in cumulatively considerable aesthetic and light/glare impacts? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.1.6, pages 5.1- 19 through 5.1-20) Explanation: The General Plan Update would support additional development beyond existing conditions and could increase residential densities and non- residential land use intensities in specific areas within the Study Area. This new development may result in changes to the skyline throughout the Study Area, which may obstruct or interfere with views of surrounding visual features. Furthermore, 2040 buildout under the proposed General Plan Update has the potential to result in new and expanded development along highway corridors with high scenic values, even though these corridors are not officially designated as State Scenic Highways. Additionally, expanded development could occur alongside County Eligible Scenic Highways within the Study Area designated by the Riverside County General Plan. Regional growth has and will continue to result in a cumulative aesthetic effect by converting undeveloped land into developed and occupied areas, and increasing overall levels of nighttime lighting. In general, the General Plan Update Land Use Element proposes an increase in building density and intensity, which could increase the number and distribution of dwelling units and other buildings, as well as supporting infrastructure. This is considered a potentially significant cumulative impact. Subsequent projects implemented under the General Plan Update would be required to be consistent with the General Plan Update policies and actions and adopted regulations pertaining to aesthetics and lighting in San Jacinto. With implementation of the adopted policies and regulations described above, the proposed General Plan Update would not considerably contribute to permanent changes in visual character, such as obstruction of scenic views, conversion of existing visual character, and increased lighting resulting in a substantial degradation. The polices and actions included within the General Plan Update and compliance with the SJDC would reduce the cumulative effect of the General Plan Update on visual character to a less-than- significant level. Therefore, the General Plan Update’s incremental contribution to aesthetic impacts would be less than cumulatively considerable. Findings Page 239 of 266 B. AGRICULTURAL RESOURCES Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to agricultural resources? Finding: Considerable Contribution and Significant and Unavoidable. (Draft EIR, Section 5.2.5, page 5.2-12) Explanation: The City does not have any zoning classifications for forestland, timberland, or timberland production zones, nor does the Study Area include any forestland; therefore, the General Plan Update would not contribute to a significant impact relative to forestland, timberland or timberland production zones. There are approximately 3,309 acres of Important Farmlands located within the Study Area, including approximately 413 acres of Prime Farmland, 1,758 acres of Statewide Importance, and 1,138 acres of Unique Farmland. As shown on the General Plan Update Land Use Map, all of the land within the Study Area is planned for urban development, with the exception of areas designated as Open Space, Park, or Water. While some agricultural uses would continue to operate, future development associated with the implementation of the General Plan Update and changes in the economy would likely result in the conversion of many of these areas for urban uses, including lands under a Williamson Act contract. Further, it is assumed that as development occurs, the agricultural viability of lands within the Study Area would be reduced. The General Plan Update includes policies and actions that support the continuance of agricultural activities within the Study Area. Although the General Plan Update would not result in the direct conversion of designated Important Farmland or agricultural land under a Williamson Act contract, the General Plan Update does not require the preservation of agricultural land. Additionally, any additional mitigation measures, such as the preservation of designated farmland, are not feasible and conflict with the other objectives of the General Plan Update, specifically to “proactively plan for and accommodate local and regional growth in a responsible manner” and “attract and retain businesses and industries that provide jobs for local residents”, and would potentially discourage future development envisioned in the General Plan Update. Therefore, implementation of the General Plan Update could result in the permanent loss of agricultural resources within the Study Area, resulting in a significant unavoidable cumulative impact. C. AIR QUALITY Threshold: Would development of the General Plan Update and related projects result in cumulatively considerable inconsistencies with the applicable air quality plan? Findings Page 240 of 266 Finding: Considerable Contribution and Significant and Unavoidable. (Draft EIR, Section 5.3.6, pages 5.3-42 through 5.3-43) Explanation: Construction of the growth anticipated by the General Plan Update has the potential to temporarily emit criteria air pollutant emissions through the use of heavy-duty construction equipment, and through vehicle trips generated by workers and haul trucks. In addition, fugitive dust emissions would result from demolition and various soil-handling activities. Mobile source emissions, primarily NOx and PM emissions (i.e., PM10 and PM2.5), would result from the use of diesel-powered on- and off-road vehicles and equipment. Construction emissions can vary substantially from day-to-day, depending on the level of activity and the specific type of construction activity. As shown in Table 5.3-4 in Section 5.3 of the Draft EIR, construction-related daily emissions would exceed the SCAQMD significance thresholds for VOCs. Additionally, as shown in Table 5.3-5 in Section 5.3 of the Draft EIR, potential operational emissions for the proposed Project would also exceed regulatory thresholds (for VOC, NOx, CO, PM10, and PM2.5). Feasible mitigation measures are incorporated into the policies and actions included within the General Plan Update. However, there are no feasible criteria air pollutant reduction measures beyond those identified within the policies and actions identified, that would reduce impacts. While implementation of these policies and actions would reduce criteria pollutant emissions, the extent to which the impacts would be generated by future development and infrastructure projects have to be determined on a project-by-project basis, as necessary. Moreover, with respect to local air quality emissions, toxic air contaminant emissions, and health impacts, future development under the General Plan Update would be required to comply with AQMP, SIP, CARB, SCAQMD regulations, Title 24 energy efficiency standards, and the proposed General Plan Update policies and actions. Implementation of the policies and actions listed above would mitigate and reduce such emissions. However, as there is no way to determine the extent to which these regulations would be, or need to be, implemented, it is impossible to determine if potential impacts would be reduced to below regulatory thresholds because the details and potential emissions levels of future development projects is not known at this time, as there are no specific development projects proposed as part of the General Plan Update. Additionally, there are no feasible mitigation measures beyond the policies and actions listed above. Therefore, localized operational impacts, construction and operational health and toxic air impacts would remain significant and unavoidable. Lastly, with respect to other emissions, future development under the General Plan Update would be required to comply with AQMP, SIP, CARB, SCAQMD regulations, Title 24 energy efficiency standards, and the proposed General Plan Update policies and actions. However, as there is no Findings Page 241 of 266 way to determine the extent to which these regulations would be, or need to be, implemented, it is impossible to determine if potential impacts would be reduced to below regulatory thresholds. There are no feasible mitigation measures except for those listed in above. Based on these impacts, the General Plan Update would contribute to a cumulative impact with regard to air quality in the region and within the air basin (i.e. the South Coast Air Basin) as a whole. Therefore, this impact is considered a cumulatively considerable and significant and unavoidable impact. D. BIOLOGICAL RESOURCES Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to biological resources? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.4.6, pages 5.4- 42 through 5.4-43) Explanation: Cumulative development anticipated throughout Riverside County would result in impacts to biological resources, including the permanent loss of habitat for special status species, corridor fragmentation, direct and indirect impacts to special status species, and reduction and degradation of sensitive habitat. Biological resources are a limited resource and the cumulative loss is considered significant. Subsequent projects implemented under the General Plan Update would be required to be consistent with the proposed General Plan policies and actions. The implementation of an individual project would require site-specific review to determine the presence or absence of movement corridors, special-status species, and sensitive habitat on a given project site. If movement corridors, special-status species, or sensitive habitat are present and disturbance is required, federal and State laws require measures to reduce, avoid, or compensate for impacts to these resources. Additionally, the implementation of the Western Riverside County MSHCP for future implementing projects consistent with the General Plan Update at a project-specific level would minimize direct, indirect, and cumulative biological impacts. Compliance with the provisions of the MSHCP fully mitigate impacts to covered species and habitats. An impact is not considered cumulatively considerable if a project is required to implement or fund its fair share of mitigation measures designed to alleviate a cumulative impact (CEQA Guidelines Section 15130 (a)(3)). Compliance with the MSHCP, as well as the polices and mitigation measures identified in Section 5.4.3 of the Draft EIR and State and federal regulations governing biological resources, will result in less than cumulatively considerable impacts. Therefore, the General Plan Update’s incremental contribution to this cumulative impact would be less than cumulatively considerable. Findings Page 242 of 266 E. CULTURAL RESOURCES Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to cultural resources? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.5.6, pages 5.5- 30 through 5.5-31) Explanation: Construction of individual development projects allowed under the land use designations of General Plan Update may result in the discovery and removal of cultural resources, including historic and archaeological resources, as well as the inadvertent discovery of human remains. The General Plan Update policies and actions, as well as federal, State, and local regulations, would reduce the risk to resources in the region. Adherence to the General Plan Update policies and actions, and existing federal, State, and local regulations would avoid and/or minimize a cumulative loss of these important resources if they are identified during project-specific surveys or construction activities. Therefore, the General Plan Update’s incremental contribution to cumulative cultural resource impacts would be less than cumulatively considerable. F. ENERGY Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to energy? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.6.6, page 5.6- 14) Explanation: As future development projects are received and reviewed by the City in subsequent years, those projects would be reviewed for consistency with the General Plan Update and all relevant State-level programs and requirements. All future projects must implement the most current version of the Title 24 energy efficiency requirements, as required by State law. Consistency with the General Plan Update and other mandatory State-level programs would ensure that future project-level contributions to inefficient, wasteful or unnecessary energy use would be less than significant. Moreover, buildout of the General Plan Update would not be expected cause an inefficient, wasteful, or unnecessary use of energy resources nor conflict with or obstruct a state or local plan for renewable energy or ener gy efficiency. As a result, the proposed General Plan Update’s incremental contribution to cumulative energy impacts would be less than cumulatively considerable. Findings Page 243 of 266 G. GEOLOGY AND SOILS Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to geologic resources? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.7.6, pages 5.7- 35 through 5.7-36) Explanation: Seismic, geologic, and soil conditions within the City of San Jacinto would vary by location and site-specific suitability for development would not be uniform. Geologic and seismic hazards would be reduced to less than significant levels following conformance with the established regulatory framework (i.e., CBC and Municipal Code requirements). If determined necessary, project-specific mitigation would be incorporated to reduce cumulative seismic, geologic, and soil impacts to a less than significant level. If a specific site were determined to create a significant impact that could not be feasibly mitigated, the site would not be appropriate for development. These processes, along with compliance with federal and State laws, local building codes, and public safety standards, would result in less than significant cumulative impacts related to potential seismic, geologic, and soil hazards. As a result, implementation of the General Plan Update would not result in cumulatively considerable impacts involving seismic and geologic hazards H. GREENHOUSE GAS EMISSIONS Threshold: Would future development associated with the General Plan Update and cumulative development result in cumulatively considerable impacts related to greenhouse gas emissions? Finding: Considerable Contribution and Significant and Unavoidable. (Draft EIR, Section 5.8.6, page 5.8-41) Explanation: The topic of GHG emissions is inherently a cumulative impact. Though significance thresholds can be developed by air districts, as well as State and federal regulatory agencies, these thresholds and their related goals are ultimately designed to effect change at a global level. As demonstrated in the analysis in Section 5.8.5 of the Draft EIR, the proposed Project is not consistent with WRCOG’s plan to reduce GHG emissions below a specific threshold and would therefore have a significant and unavoidable impact even with the implementation of General Plan Update goals, policies and actions. I. HAZARDS AND HAZARDOUS MATERIALS Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to hazardous materials? Findings Page 244 of 266 Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.9.6, page 5.9- 42) Explanation: Construction of individual development projects allowed under the land use designations of the General Plan Update may involve the transportation, use, and/or disposal of hazardous materials, which may involve the use of equipment that contains hazardous materials (e.g., solvents and fuels or diesel-fueled equipment), or the transportation of excavated soil and/or groundwater containing contaminants from areas that are identified as being contaminated. Furthermore, because of the regional nature of the General Plan Update, some future land uses could transport or use hazardous materials within one-quarter mile of a school, or other sensitive receptors such as hospitals and residences. As with specific projects resulting from implementation of the General Plan Update, cumulative development would be required to evaluate individual hazards and hazardous materials impacts at the project-level. While some cumulative impacts would potentially occur in the region as individual projects are constructed, the General Plan Update policies and actions, as well as local, State, and federal regulations would reduce the risk to people associated with hazards and hazardous materials in the region. Considering the protection granted by local, State, and federal agencies and their requirements for the use of hazardous materials and other potential hazards in the region, as described above, the overall cumulative impact for hazards impacts would not be significant. As a result, the General Plan Update’s incremental contribution to cumulative hazards and hazardous materials impacts would be less than cumulatively considerable. J. HYDROLOGY AND WATER QUALITY Threshold: Would future development associated with the General Plan Update and cumulative development result in cumulatively considerable impacts related to hydrologic resources? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.10-6, pages 5.10-36 through 5.10-37) Explanation: The General Plan Update does not propose site-specific development and would not significantly impact drainage courses and hydrologic flows throughout the City. Construction of the individual development projects allowed under the land use designations of the proposed General Plan Update has the potential to result in construction-related water quality impacts and operational-related impacts to groundwater recharge, and cause flooding, erosion, or siltation from the alteration of drainage patterns. Individual projects would be evaluated on a project-by-project basis to ensure compliance with the General Plan Update policies and actions, as well as federal, State, and local regulations to reduce hydrology and water quality impacts. Subsequent development projects under the General Plan Findings Page 245 of 266 Update would result in new impervious surfaces and could reduce rainwater infiltration and groundwater recharge; however, the General Plan Update would not appreciably add to the volume of imperious surfaces in the Study Area. As individual projects are constructed, the General Plan Update policies and actions, as well as federal, State, and local regulations, would substantially reduce potential cumulative impacts. Considering the protection granted by local, State, and federal agencies and their permit and monitoring requirements, as discussed above, and with implementation of the policies and actions included within the General Plan Update, the overall cumulative impact would not be significant. As a result, the General Plan Update's incremental contribution to cumulative hydrology impacts would be less than cumulatively considerable. K. LAND USE AND PLANNING Threshold: Would future development associated with the General Plan Update and cumulative development result in cumulatively considerable impacts related to land use and population? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.11.5, pages 5.11-29 through 5.11-30) Explanation: Development of cumulative projects in the City of San Jacinto would be required to mitigate land use impacts on a project-by-project basis. Each project would be evaluated for consistency with the project site’s General Plan land use designation and zoning, adopted General Plan goals, policies, and actions, and other applicable regional land use plans, such as SCAG’s RTP/SCS. As analyzed in Section 5.11.4 of the Draft EIR, the proposed General Plan Update would result in less than significant impact related to land use and relevant planning. Therefore, the incremental impact of the proposed Project, when considered in combination with development within the City and region, would not result in cumulatively considerable land use impacts. The land uses allowed under the proposed General Plan Update provide opportunities for cohesive new growth at infill locations within existing urbanized areas, as well as new growth adjacent to existing urbanized areas within the Study Area, but would not create physical division within existing communities. New development and redevelopment projects would be designed to complement the character of existing neighborhoods and provide connectivity between existing development and new development within the cumulative analysis area. The proposed General Plan Update does not include any new roadways, infrastructure, or other features that would divide existing communities. Moreover, with implementation of General Plan Update policies and actions intended to guide growth to appropriate areas and provide services necessary to accommodate growth, the land uses allowed under the proposed General Plan Update, the Findings Page 246 of 266 infrastructure anticipated to accommodate proposed land uses, and the goal and policy framework would not induce growth that would exceed adopted thresholds. Therefore, the proposed General Plan Update's incremental contribution to cumulative land use and population impacts would be less than cumulatively considerable. L. MINERAL RESOURCES Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to mineral resources? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.12.5, page 5.12-4) Explanation: The majority of land within the Study Area is designated as MRZ-3, land for which the significance of mineral resources cannot be determined, or MRZ-4, areas where available information is inadequate for assignment to any other MRZ classification. Neither of these MRZ categories are considered significant mineral resources. The Study Area does not possess any mineral resource recovery sites. Therefore, implementation of the General Plan Update would not contribute to a cumulative impact related to mineral resources. M. NOISE Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to noise? Finding: Considerable Contribution and Significant and Unavoidable. (Draft EIR, Section 5.13.6, pages 5.13-47 through 5.13-49) Explanation: Table 5.13-14 in the Draft EIR shows that cumulative conditions would contribute to an exceedance of the City’s transportation noise standards and would result in significant increases in traffic noise levels at existing sensitive receptors. The General Plan Update includes policies and actions to minimized exposure to excessive noise, including noise associated with traffic. General Plan Policies PS-6.1 through PS-6.10, and Actions PS-6a through PS-6i, are intended to minimize exposure to excessive noise, including noise associated with traffic. Specifically, Policies PS-6.1 and PS- 6.2 support noise-compatible land uses in the vicinity of traffic noise sources and require that new development and infrastructure projects be reviewed for consistency with the noise standards established in Tables PS- 1 and PS-2. Policy PS-6.2 and Actions PS-6b would ensure that new development mitigates potential noise impacts through incorporating the noise control treatments necessary to achieve acceptable noise levels. Policy PS-6.3 sets criteria for evaluating future increases in traffic noise levels. However, growth and development anticipated by the General Plan Update Findings Page 247 of 266 would result in increased traffic on roadways within the Study Area, which would cause an increase in traffic noise when compared to existing conditions. The associated increase in traffic noise would impact existing uses that occur within the Study Area. Even with the implementation of General Plan Update policies and actions, the proposed General Plan would have a cumulatively considerable impact relative to traffic noise. Implementation of land use planning and policies and actions can minimize cumulative noise impacts related to stationary sources by avoiding the placement of noise generating equipment near noise-sensitive land uses and where unavoidable, include design measures to the degree practicable to avoid violating the noise criteria presented in the General Plan Update Public Safety Element Tables PS-3 and PS-4. The General Plan Update also includes policies and actions that are intended to reduce noise associated with stationary sources. Policy PS-6.2 and Action PS-6b require new development to mitigate excessive noise to the standards indicated in Tables PS-1, PS-2, PS-3, and PS-4 through best practices, including building location and orientation, building design features, placement of noise- generating equipment away from sensitive receptors, shielding of noise- generating equipment, placement of noise-tolerant features between noise sources and sensitive receptors, and use of noise-minimizing materials. Implementation of the proposed policies and actions of the General Plan Update would reduce cumulative noise impacts from stationary noise sources to a less than significant level. Short-term construction noise and vibration is a localized activity and would affect only land uses that are immediately adjacent to a specific project site. Each construction project would have to comply with the local noise ordinance and General Plan Update policies and actions, including Action PS-6e which requires all construction activity to reduce impacts associated with temporary construction noise to the extent feasible and Action PS-6h, which requires vibration studies for projects that have the potential to generate vibration impacts which exceeds the vibration limits. Additionally, projects would comply with mitigation measures that may be prescribed pursuant to CEQA provisions that require significant impacts to be reduced to the extent feasible. In addition, it is unlikely that all construction projects would occur simultaneously within the City. Thus, a less than significant impact would occur. N. POPULATION AND HOUSING Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to population and housing? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.14.6, pages 5.14-11 through 5.14-12) Findings Page 248 of 266 Explanation: The land uses allowed under the proposed General Plan Update provide opportunities for cohesive new growth in key locations in the Study Area, but would not create physical division within existing communities. New development and redevelopment projects would be designed to complement the character of existing neighborhoods and provide connectivity between existing development and new development within the cumulative analysis area. The proposed General Plan Update does not include any new roadways, infrastructure, or other features that would divide existing communities. Moreover, with implementation of General Plan Update policies and actions intended to guide growth to appropriate areas and provide services necessary to accommodate growth, the land uses allowed under the proposed General Plan Update, the infrastructure anticipated to accommodate proposed land uses, and the goal and policy framework would not induce growth that would exceed adopted thresholds. Lastly, General Plan Update implementation would not displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere Therefore, the proposed General Plan Update's incremental contribution to cumulative land use and population impacts would be less than cumulatively considerable. O. PUBLIC SERVICES Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to public services? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.15.5, pages 5.15-30 through 5.15-31) Explanation: 2040 buildout under the General Plan Update could yield a net change over existing conditions of an additional 16,252 housing units, an additional population of 54,280 people, an additional 21,839,634 square feet of non- residential building square footage, and an additional 19,674 jobs within the Study Area. Development and growth facilitated by the General Plan Update would result in increased demand for public services, including fire protection, law enforcement, schools, parks, libraries, and other public and governmental services. As the demand for public services and recreation increases throughout the 2040 buildout, there will likely be a need to address acceptable service ratios, response times, and other performance standards. New or expanded service structures (e.g., offices, maintenance and administrative buildings, schools, parks, fire facilities, libraries, etc.) may be needed to provide for adequate staffing, equipment, and appropriate facilities to serve growth within the cumulative analysis area. The General Plan Update includes a range of policies and actions that would ensure that public services are provided in a timely fashion, are adequately funded and staffed, are coordinated between the City and appropriate service agency, and that new development funds its fair share of services. The General Plan Update includes policies to ensure that fire protection and law enforcement Findings Page 249 of 266 services keep pace with new development and that school, library, and governmental services are adequately planned and provided. Payment of applicable impact fees, and ongoing revenues that would come from property taxes, sales taxes, and other revenues generated by the future projects, would ensure that the City maintains acceptable service ratios. The proposed General Plan Update's incremental contribution to cumulative public services and recreation impacts would be less than significant. P. RECREATION Threshold: Would future development associated with the General Plan Update and cumulative development result in cumulatively considerable impacts related to recreation? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.16.5, page 5.16-17) Explanation: As discussed in Section 5.16.4 of the Draft EIR, the total parkland demand associated with future development is 535.76 acres. The General Plan Update proposes a total of 175 acres designated as Parks and 6,188 acres designated as Open Space to accommodate for the population increase. The General Plan Update includes policies and actions to ensure that public services are provided at acceptable levels and to ensure that development and growth does not outpace the provision of public services. With adherence to and compliance with the General Plan Update policies and actions, in addition to adherence to local and environmental regulations, the impact to recreational and park facilities is considered less than significant. The significance of impacts to recreational and park facilities resulting from specific future development would be evaluated on a project-by-project basis. If future project-level impacts are identified, specific mitigation measures may be required by CEQA. Therefore, adverse physical impacts to the environment as a result of newly constructed parks and recreational facilities associated with implementation of the General Plan Update is considered to be less than significant. Q. TRANSPORTATION Threshold: Would future development associated with the General Plan Update and cumulative development result in cumulatively considerable impacts related to transportation? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.17.6, page 5.17-29 Explanation: As described in the Draft EIR, Section 5.17.5, Impact TR-1, the Mobility Element developed as part of the General Plan Update contains several policies that support access to and the performance of transit, bicycle, and Findings Page 250 of 266 pedestrian facilities. The proposed Mobility Element contains Goal M-4 which supports an extensive and regionally linked network of trails, bicycle lanes, and sidewalk paths that encourage active transportation, such as walking and bicycling, as viable for transportation and recreation. The Mobility Element Policy M-2.4 promotes public transportation programs that effectively serve the City’s residents and workers by connecting users to local and regional destinations, including jobs, recreation, retail and other activity centers. As described in the Draft EIR, Section 5.17.5, Impact TR-2, the residential and commuter VMT under the previous General Plan and the proposed General Plan Update for the City of San Jacinto are shown in Table 5.17-3. As shown in Table 5.17-3, the General Plan Update is not expected to increase VMT per person above the current General Plan/No Project conditions. In fact, home-based VMT per resident, work-based VMT per employee, and total VMT per service population are expected to under the proposed General Plan Update. Part of this reduction could be attributed to the increasingly balanced mix of residential and employment opportunities within the City. The Land Use and Mobility elements developed as part of the General Plan Update includes policies to support the reduction of VMT, including increasing the balanced mix of residential and employment opportunities within the City with the proposed land uses. Therefore, the proposed General Plan Update is not expected to increase VMT per person above No Project conditions. Therefore, the VMT-related impacts of the General Plan Update would be considered less than significant. As described in the Draft EIR, Section 5.17.5, Impact TR-3, the types of uses included as part of the General Plan Update are generally similar to existing and surrounding uses and thereby are compatible with the existing uses in the Study Area and in the surrounding area. In addition, the Mobility Element developed as part of the General Plan Update contains policies in support of roadway network safety and reducing design hazards. Additionally, as described under Impact TR-4, as part of the site plan and design review process (SJDC Chapter 17.630), future development projects would be reviewed for adequate access as well as consistency with adopted emergency and evacuation plans among many other environmental issues in order to ensure the safety of City residents and the physical environment. In addition, the Safety and Mobility Elements developed as part of the General Plan Update contains policies in support of emergency access along local roads. Overall, implementation of the General Plan Update would not result in cumulatively considerable transportation impacts with implementation of the proposed General Plan Update goals and policies. Impacts would be less than significant in this regard. Findings Page 251 of 266 R. TRIBAL CULTURAL RESOURCES Threshold: Would future development associated with the General Plan Update and cumulative development result in cumulatively considerable impacts related to tribal cultural resources? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.18.6, page 5.18-14) Explanation: Construction of the individual development projects allowed under the land use designations of General Plan Update may result in the discovery and removal of tribal cultural resources. The General Plan Update policies and actions, as well as federal, State, and local regulations, would reduce the risk to tribal cultural resources in the region. As discussed above, site- specific development with the potential to impact tribal cultural resources would require a resource assessment and coordination with the tribes to determine the potential for tribal cultural resources and identification of mitigation measures to reduce potential impacts associated with the proposed development. Adherence to the General Plan Update policies and actions, and existing federal, State and local regulations would avoid and/or minimize a cumulative loss of tribal cultural resources. Therefore, the General Plan Update’s incremental contribution to cumulative tribal cultural resource impacts would be less than cumulatively considerable. S. UTILITIES AND SERVICE SYSTEMS Threshold: Would future development associated with the General Plan Update and cumulative development result in cumulatively considerable impacts related to utilities and service systems? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.19.6, pages 5.19-54 through 5.19-56) Explanation: Implementation of the General Plan Update along with other cumulative projects would increase demand for water, wastewater, stormwater, solid waste, electrical, natural gas, and telecommunications services within the Study Area. Water Implementation of the General Plan Update along with other cumulative projects would increase demand for water services within the City of San Jacinto Water District, EMWD, and/or LHMWD service area. All three water service providers in the Study Area have concluded in their respective UWMPs that they would be able to meet projected future water demands under normal, dry, and multiple dry water years. Future development projects accommodated through implementation of the General Plan Update Findings Page 252 of 266 would be evaluated by the City on a project-by-project basis to determine potential impacts to water supplies and infrastructure. The continued assessment of individual projects for impacts to the water supply system would assure projects would only be approved if adequate water supplies exist at the time of their implementation. All future development would be subject to all applicable federal, State, and local laws, ordinances, and regulations in place for water supply and infrastructure. Further, new development would be required to pay all applicable connection fees and ongoing user fees related to the provision of water services. Therefore, implementation of the General Plan Update would not result in cumulatively considerable water supply and infrastructure impacts. Wastewater Implementation of the General Plan Update along with other cumulative projects would increase demand for wastewater services within the sewer service area. As discussed above, the total amount of projected wastewater flow to EMWD’s San Jacinto Valley RWRF, where San Jacinto sewer water is treated and/or disposed of, for the year 2040 would be approximately 16.4 MGD. The current capacity for the San Jacinto Valley RWRF is 14 MGD and the maximum capacity for the treatment facility is 27 MGD. Therefore, the ultimate capacity of the facility would be able to meet the projected wastewater production from the City of San Jacinto. The General Plan Update does not include specific development proposals; individual development projects would be required to verify that existing capacity exists to convey and treat the potential wastewater generated with the new development. At the time future wastewater facilities are proposed, they would require a separate environmental review and compliance with regulations in existence at that time would address potential environmental impacts related to the construction and operation of new wastewater facilities. Additionally, the General Plan Update includes goals, policies, and actions to ensure adequate wastewater services and facilities. Therefore, cumulative impacts to wastewater services and facilities would be less than significant. Stormwater Implementation of the General Plan Update along with other cumulative projects would increase demand for stormwater services within the Study Area. As discussed above, the General Plan Update does not include specific development proposals; therefore, the environmental effects of future storm water drainage facilities are unknown at this time. At the time future stormwater facilities are proposed, they would require a separate environmental review and compliance with regulations in existence at that time would address potential environmental impacts related to the construction and operation of new stormwater facilities. Additionally, the General Plan Update includes goals, policies, and actions to ensure adequate Findings Page 253 of 266 stormwater service and facilities. Therefore, cumulative impacts to stormwater services and facilities would be less than significant. Solid Waste Implementation of the General Plan Update along with other cumulative projects would increase demand for solid waste collection and disposal services. San Jacinto, along with cities and County lands in the surrounding area, would continue to use common landfill resources, thereby gradually reducing the capacity of local landfills. The General Plan Update does not include specific development proposals; however, the increase in solid waste generation due to future individual and cumulative development projects together could significantly impact solid waste resources. Individual development projects and related cumulative projects would be required to meet current recycling goals, reducing the amount of solid waste requiring disposal at landfills. Future developments would be reviewed on a project-by-project basis and solid waste impacts would be evaluated based on existing and planned disposal facilities and capacities available at that time. In addition, all future development would be required to comply with the mandatory commercial and multifamily recycling requirements of AB 341, thus reducing the amount of landfill waste. Furthermore, the General Plan Update goals, policies, and actions would reduce the demand for solid waste disposal. Therefore, the contribution of the General Plan Update to cumulative impacts associated with increased solid waste would be less than significant. Electric Power, Natural Gas, and Telecommunications Implementation of the General Plan Update along with other cumulative projects would increase demand for electrical, natural gas, and telecommunications services within the Study Area. As noted above, the General Plan Update does not include specific development proposals; individual development projects would be required to verify that electric power, natural gas, and telecommunications usage generated with the new development would not create significant environmental impacts. Therefore, the contribution of the General Plan Update to cumulative impacts associated with increased electric power, natural gas, and telecommunications would be less than significant. T. WILDFIRE Threshold: Would future development associated with the General Plan Update result in cumulatively considerable impacts related to wildfire? Finding: Less than Cumulatively Considerable. (Draft EIR, Section 5.20.5, page 5.20-25 through 5.20-26) Findings Page 254 of 266 Explanation: The General Plan Update ensures that the City’s emergency access routes and public information regarding designated emergency facilities and routes are regularly reviewed to ensure that up to date information is available to the City and the public in the event of an emergency. Important new and expanded critical facilities would also be located in a way to ensure resiliency and functionality in the event of a natural disaster. Implementation of the General Plan Update would have a less than significant impact with regard to this issue. No specific aspect as a result of implementation of the General Plan Update will substantially alter the slope, prevailing winds, or other factors that would increase exposure to San Jacinto residents, employees or visitors to increased pollutant concentrations from wildfire or result in the uncontrollable spread of a wildfire. General Plan Update implementation would not exacerbate wildfire risks in VHFHSZs; therefore, these impacts would be less than significant. The General Plan Update is a long-range policy document that does not include site-specific designs or plans, and does not propose any entitlements for specific developments. However, future development may require extension and development of infrastructure such as roads, water and sewer utilities, and fuel breaks into areas designated as FHSZs. The potential for future projects to impact environmental resources are mitigated through compliance with fire development standards (such as fuel breaks and clearance requirements) and would require site-specific environmental analysis as required under CEQA. As demonstrated throughout this EIR, implementation of the various policies and actions contained in the General Plan Update would reduce potential impacts associated with the construction and expansion of infrastructure. Implementation of the General Plan Update policies and actions combined with local and State requirements, as detailed previously, would ensure that potential wildland fire hazards would not be exacerbated by new local infrastructure, and this impact would be considered less than significant. While the General Plan Update cannot state with certainty that future risks associated with post-fire flooding and debris flow would not occur in the Study Area, implementation of the General Plan Update would not exacerbate this risk. Implementation of General Plan Update policies and actions, as well as compliance with the City’s Municipal Code, would reduce this risk to the greatest extent feasible, resulting in an impact that is less than significant as a result of adoption and implementation of the proposed General Plan Update. Implementation of the goals and policies provided would ensure that the proposed General Plan Update’s incremental contribution to cumulative wildfire impacts would be less than cumulatively considerable. Findings Page 255 of 266 SECTION VI FINDINGS REGARDING SIGNIFICANT IRREVERSIBLE ENVIRONMENTAL CHANGES Sections 15126(c) and 15126.2(c) of the State CEQA Guidelines, require that an EIR address any significant irreversible environmental changes that would occur should the project be implemented. Generally, a project would result in significant irreversible environmental changes if any of the following would occur:  The project would involve a large commitment of non-renewable resources;  The primary and secondary impacts of the project would generally commit future generations to similar uses;  The project involves uses in which irreversible damage could result from any potential environmental accidents; or  The proposed consumption of resources is not justified. Consumption of Nonrenewable Resources Future development would consume limited, slowly renewable and non-renewable resources. This consumption would occur during each individual project’s construction phase and would continue throughout its operational lifetime. Future development would require a commitment of resources that would include: (1) building materials; (2) fuel and operational materials/resources; and (3) the transportation of goods and persons to and from individual development sites. Construction would require the consumption of resources that are not renewable or which may renew so slowly as to be considered non-renewable. These resources would include the following construction supplies: lumber and other forest products; aggregate materials used in concrete and asphalt; metals; and water. Fossil fuels such as gasoline and oil would also be consumed to power construction vehicles and equipment. Development accommodated through implementation of the General Plan Update would consume resources which would be similar to those currently consumed within the City (i.e., energy resources such as electricity and natural gas, petroleum-based fuels required for vehicle- trips, fossil fuels, and water). Fossil fuels would represent the primary energy source associated with both construction and ongoing operation, and the existing, finite supplies of these natural resources would be incrementally reduced. Future development operations would occur in accordance with California Code of Regulations (CCR) Title 24, Part 6, which sets forth conservation practices that would limit energy consumption. Nonetheless, t he proposed Project’s energy requirements would represent a long-term commitment of essentially non-renewable resources. Construction activities associated with implementation of the General Plan Update could release hazardous materials into the environment through reasonably foreseeable upset and accident conditions; refer to Section 5.9 in the Draft EIR. All potential demolition, grading, and excavation activities would be subject to the established regulatory framework to ensure that Findings Page 256 of 266 hazardous materials are not released into the environment. Compliance with the established regulatory framework and mitigation measures would protect against a significant and irreversible environmental change resulting from the accidental release of hazardous materials. In addition, there is the potential that individual future development projects would use and store limited amounts of potentially hazardous materials typical. All future development activities requiring the routine use, storage, transport, or disposal of hazardous materials would be subject to all applicable Federal, State, and local regulations and standards in place for hazardous materials. Compliance with these regulations and standards would protect against significant and irreversible environmental changes due to the accidental release of hazardous materials. In conclusion, future construction and operations would result in the irretrievable commitment of limited, slowly renewable, and nonrenewable resources, which would limit the availability of these resource quantities for future generations or for other uses during the life of the individual developments. It is noted that the continued use of such resources would be on a relatively small scale in a regional context. Irretrievable Commitments/Irreversible Physical Changes Implementation of the General Plan Update would result in a commitment of land uses designated for the foreseeable future. Land use and development consistent with the General Plan Update would result in irretrievable commitments by introducing development onto sites that are presently undeveloped. The conversion of agricultural lands to urban uses would result in an irretrievable loss of agricultural land, wildlife habitat, and open space. Additionally, development would physically change the environment in terms of aesthetics, air emission, noise, traffic, open space, and natural resources. These physical changes are irreversible after development occurs. Therefore, the General Plan Update would result in changes in land use within the Study Area that would commit future generations to these uses. In summary, the General Plan Update includes an extensive policy framework that is designed to address land use and environmental issues to the greatest extent feasible, while allowing growth and economic prosperity for the City. However, even with the policies and actions that would serve to reduce potential significant impacts, future development associated with implementation of the General Plan Update would result in significant irreversible changes. This impact is considered a significant and unavoidable impact under CEQA. Findings Page 257 of 266 SECTION VII GROWTH-INDUCING IMPACTS Section 15126.2(d) of the State CEQA Guidelines requires a Draft EIR to discuss the ways the Project could foster economic or population growth or the construction of additional housing, directly or indirectly, in the surrounding environment. In accordance with State CEQA Guidelines Section 15126.2(d), a Project would be considered to have a growth-inducing effect if it would:  Directly or indirectly foster economic or population growth, or the construction of additional housing in the surrounding environment;  Remove obstacles to population growth (e.g., construction of an infrastructure expansion to allow for more construction in service areas);  Tax existing community service facilities, requiring the construction of new facilities that could cause significant environmental effects; or  Encourage and facilitate other activities that could significantly affect the environment, either individually or cumulatively. In addition, CEQA Guidelines state that growth inducement must not be assumed. The General Plan Update accommodates future growth in San Jacinto, including new businesses, expansion of existing businesses, and new residential uses. Infrastructure and services would need to accommodate future growth. The General Plan Update is oriented toward the economic growth of the City, with emphasis given to encouraging development of a broader array of businesses, increasing local emplo yment opportunities, and providing residential development as necessary to serve economic growth. The cumulative development scenario addressed in this Draft EIR assumes a 20-year planning horizon (the level of development that could reasonably be expected by the year 2040), while the year 2060 is assumed to be the full buildout year of the General Plan (the point at which all parcels in the City are developed according to their General Plan land use designation). The 20-year planning horizon (2040) represents approximately 50 percent of total buildout; this expected pace of growth is based on historical development patterns in and around San Jacinto and development trends projected for Western Riverside County. As shown in Table 3-5 of the Draft EIR, buildout of the General Plan Update through 2040 could yield up to 16,252 new housing units and 21,839,634 square feet of new non -residential building square footage within the Study Area. With implementation of General Plan Update policies and actions intended to guide growth to appropriate areas and provide services necessary to accommodate growth, the land uses allowed under the General Plan Update, the infrastructure anticipated to accommodate proposed land uses, and the goal and policy framework would not induce growth that would exceed adopted thresholds. Therefore, population and housing growth associated with the General Plan Update would result a less than significant impact. Findings Page 258 of 266 SECTION VIII ALTERNATIVES A. BACKGROUND The Draft EIR analyzed three alternatives to the Project as proposed and evaluated these alternatives for their ability to avoid or reduce the Project’s significant environmental effects while also meeting the majority of the Project’s objectives. The City finds that it has considered and rejected as infeasible two of the three alternatives identified in the EIR and described below. This section sets forth the potential alternatives to the Project analyzed in the EIR and evaluates them in light of the Project objectives, as required by CEQA. Where significant impacts are identified, section 15126.6 of the State CEQA Guidelines requires EIRs to consider and discuss alternatives to the proposed actions. Subsection (a) states: (a) An EIR shall describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project, and evaluate the comparative merits of the alternatives. An EIR need not consider every conceivable alternative to a project. Rather it must consider a reasonable range of potentially feasible alternatives that will foster informed decision-making and public participation. An EIR is not required to consider alternatives which are infeasible. The lead agency is responsible for selecting a range of project alternatives for examination and must publicly disclose its reasoning for selecting those alternatives. There is no ironclad rule governing the nature or scope of the alternatives to be discussed other than the rule of reason. Subsection 15126.6(b) states the purpose of the alternatives analysis: (b) Because an EIR must identify ways to mitigate or avoid the significant effects that a project may have on the environment (Public Resources Code Section 21002.1), the discussion of alternatives shall focus on alternatives to the project or its location which are capable of avoiding or substantially lessening any significant effects of the project, even if these alternatives would impede to some degree the attainment of the project objectives, or would be more costly. In subsection 15126.6(c), the State CEQA Guidelines describe the selection process for a range of reasonable alternatives: (c) The range of potential alternatives to the proposed project shall include those that could feasibly accomplish most of the basic objectives of the Project and could avoid or substantially lessen one or more of the significant effects. The EIR should briefly describe the rationale for selecting the alternatives to be discussed. The EIR should also identify any alternatives that were considered by the lead agency but were rejected as infeasible during the scoping process Findings Page 259 of 266 and briefly explain the reasons underlying the lead agency’s determination. Additional information explaining the choice of alternatives may be included in the administrative record. Among the factors that may be used to eliminate alternatives from detailed consideration in an EIR are: (i) failure to meet most of the basic project objectives, (ii) infeasibility, or (iii) inability to avoid significant environmental impacts. The range of alternatives required is governed by a “rule of reason” that requires the EIR to set forth only those alternatives necessary to permit a reasoned choice. The EIR shall include sufficient information about each alternative to allow meaningful evaluation, analysis, and comparison with the proposed Project. Alternatives are limited to ones that would avoid or substantially lessen any of the significant effects of the Project. Of those alternatives, the EIR need examine in detail only the ones that the lead agency determines could feasibly attain most of the basic objectives of the Project. B. PROJECT OBJECTIVES The following objectives have been established for the Project (Draft EIR, page 3-4): 1. Reflect the current goals and vision expressed by city residents, businesses, decision- makers, and other stakeholders; 2. Protect and enhance San Jacinto’s unique history and character; 3. Promote San Jacinto as a safe, vibrant, and family-friendly community; 4. Proactively plan for and accommodate local and regional growth in a responsible manner; 5. Encourage the revitalization of San Jacinto’s Main Street and other community activity centers; 6. Allow for a range of housing options; 7. Attract and retain businesses and industries that provide jobs for local residents; 8. Create a more balanced jobs-housing ratio within the community; 9. Continue to maintain and improve multimodal transportation opportunities; 10. Maintain strong fiscal sustainability and continue to provide efficient and adequate public services; 11. Address new requirements of State law; and 12. Address emerging transportation, housing, and employment trends. C. ALTERNATIVES CONSIDERED BUT REJECTED FROM DETAILED ANALYSIS Section 15126.6(c) of the State CEQA Guidelines specifies that an EIR should (1) identify alternatives that were considered by the lead agency but were eliminated from detailed consideration because they were determined to be infeasible during the scoping process; and (2) briefly explain the reasons underlying the lead agency’s determination. Among the factors that may be used to eliminate alternatives from detailed consideration in an EIR are: (i) failure to meet most of the basic project objectives; (ii) infeasibility; and/or (iii) inability to avoid significant environmental impacts. There were no alternatives considered but rejected from detailed analysis in the EIR. Findings Page 260 of 266 D. EVALUATION OF ALTERNATIVES SELECTED FOR ANALYSIS The alternatives selected for further detailed review within the EIR focus on alternatives that could potentially reduce the Project’s significant environmental impacts, while still meeting most of the basic Project objectives. Those alternatives include:  Alternative 1: No Project Alternative (Draft EIR, pages 7-6 through 7-15)  Alternative 2: Reduced Growth Alternative (Draft EIR, pages 7-15 through 7- 23)  Alternative 3: Employment Focused Alternative (Draft EIR, pages 7-23 through 7-32) 1. Alternative 1: No Project Alternative Description: Under Alternative 1, the City would continue to implement the existing General Plan and no changes would be made to address updated OPR General Plan Guidelines, or the requirements of State law. Since adoption of the existing General Plan, State legislation has been passed requiring the City to address new safety and circulation requirements in the General Plan and to further address greenhouse gas emissions. Additionally, the City recently updated its Housing Element (adopted in February 2022), and the existing General Plan does not conform to State requirements regarding planning for future housing growth. The General Plan goals, policies, and actions, as well as the Land Use Map, would not be updated to address the vision and concerns of the City’s residents, property owners, decision-makers, and other stakeholders that actively participated in the visioning and goal and policy development process. Alternative 1 would result in the continuation of existing conditions and development levels. New growth would be allowed as envisioned under the existing General Plan, with land uses required to be consistent with the existing General Plan Land Use Map. Alternative 1 (No Project Alternative) would result in significantly less development within the City compared to the proposed Project. Under Alternative 1, the existing General Plan policy framework would still be in effect, which would constitute a status quo approach to land use regulation in the City. The Proposed Land Use Map, along with the policy framework proposed by the General Plan Update, encourages and aims to achieve a community with a balanced land use pattern that meets the City’s long-term housing, employment, and civic needs. The land uses allowed under the General Plan Update would provide opportunities for cohesive new growth at in-fill locations within existing urbanized areas of the City, as well as new growth adjacent to existing urbanized areas and along transportation corridors. A mix and balance of uses to provide an improved ratio of local jobs to population, would ensure that development pays its fair-share of necessary roadway, public service, and other infrastructure improvements, and that increased protection of natural resources would occur. The proposed General Plan Update was prepared in conformance with State laws and regulations associated with the preparation of general plans, including requirements for environmental protection. Alternative 1 would not include updated policies, particularly those related to housing, Findings Page 261 of 266 greenhouse gases, hazards, complete streets, and environmental justice to address environmental health concerns for disadvantaged communities, as required by State law. This alternative would not include policies proposed in the General Plan Update to ensure protection of environmental resources, both at a project level and under cumulative conditions, consistent with the objectives of CEQA. Impacts: As shown in Draft EIR Table 7-5, Alternative 1 would result in the same impacts as the proposed project for the environmental issues of: Agricultural Resources, Hydrology and Water Quality, and Mineral Resources. Alternative 1 would result in reduced impacts to Air Quality, Energy, Noise, Public Services and Recreation, Utilities and Servic e Systems, and Irreversible Effects. Alternative 1 would result in increased impacts to Aesthetics, Biological Resources, Cultural Resources, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Land Use and Planning, Population and Housing, Transportation, Tribal Cultural Resources, and Wildfire. This alternative would fail to reduce any significant and unavoidable impacts to a less than significant level. Additionally, this alternative would have a new significant and unavoidable impact in regards to Population and Housing, since it would not allow the City to meet its RHNA obligations and would preclude certification of the City’s Housing Element. Attainment of Project Objectives: This alternative would not meet most of the project objectives, including the following: reflect the current goals and vision expressed by City residents, businesses, decision-makers, and other stakeholders; proactively plan for and accommodate local and regional growth in a responsible manner; encourage the revitalization of San Jacinto’s Main Street and other community activity centers; allow for a range of housing options; attract and retain businesses and industries that provide jobs for local residents; continue to maintain and improve multimodal transportation opportunities; address new requirements of State law; and address emerging transportation, housing, and employment trends. Finding: The City Council rejects Alternative 1: No Project Alternative, on the following ground, which provides sufficient justification for rejection of this alternative: (1) the alternative fails to meet most of the Project objectives; (2) the alternative fails to avoid or reduce the Project’s significant and unavoidable impacts to a less than significant level; and (3) this alternative would have a new significand and unavoidable impact in regards to Population and Housing since it would not allow the City to meet its RHNA obligations and would preclude certification of the City’s Housing Element. 2. Alternative 2: Reduced Growth Alternative Description: Alternative 2 (Reduced Growth Alternative) continues to allow for new development in single-use and mixed-use formats, like those included in the proposed Project, but at lower densities and intensities that are more consistent with those allowed under the current General Plan. The goals, policies, and actions of the General Plan Update would apply to subsequent development, planning, and infrastructure projects under this alternative. This Alternative is defined by three major changes from the proposed General Plan Update: Findings Page 262 of 266 1. Reduction in the maximum density and intensity associated with the Mixed-Use (MU) land use designation; in Alternative 2, the maximum density for residential development in areas designated for MU is reduced from 36 du/ac to 22 du/ac (consistent with the maximum density proposed for the High Density Residential land use designation) and the maximum intensity for nonresidential development is reduced from 1.0 FAR to 0.50 FAR (consistent with the maximum intensity proposed for the Commercial land use designation). 2. Elimination of the Downtown Village (DV) land use designation; in Alternative 2, areas previously designated for DV are designated for High Density Residential (HDR). 3. Elimination of the Very High Density Residential (VHDR) land use designation; in Alternative 2, areas previously designated for VHDR are designated for High Density Residential (HDR). This alternative continues to allow for mixed-use opportunities with less development potential, and in more limited areas, than allowed under the General Plan Update. It also reflects a maximum residential density of 22 du/ac, consistent with the maximum residential density allowed under the current General Plan. Alternative 2 would result in approximately 4,339 fewer housing units and 14,493 fewer residents within San Jacinto when compared to the proposed General Plan Land Use Map. Nonresidential development potential would be reduced by 788,524 square feet and employment opportunities would be decreased under this alternative, with approximately 3,044 fewer jobs created within the City limits when compared to the proposed General Plan Update. Impacts: As shown in Draft EIR Table 7-5, Alternative 2 would result in the same impacts as the proposed project for the environmental issues of: Aesthetics, Agricultural Resources, Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Hydrology and Water Quality, Mineral Resources, Population and Housing, Tribal Cultural Resources, and Wildfire. Alternative 2 would result in reduced impacts to Air Quality, Energy, Greenhouse Gas Emissions, Land Use and Planning, Noise, Public Services and Recreation, Utilities and Service Systems, and Irreversible Effects. Alternative 2 would result in increased impacts to Transportation. This alternative would fail to reduce any significant and unavoidable impacts to a less than significant level. Attainment of Project Objectives: Alternative 2 meets most of the project objectives. Like the proposed project, Alternative 2 reflects the current goals and vision expressed by city residents, businesses, decision-makers, and other stakeholders; protects and enhances San Jacinto’s unique history and character; promotes San Jacinto as a safe, vibrant, and family- friendly community; proactively plans for and accommodates local and regional growth in a responsible manner; encourages the revitalization of San Jacinto’s Main Street and other community activity centers; allows for a range of housing options, although not to the same extent as the proposed Project; attracts and retains businesses and industries that provide jobs for local residents; creates a more balanced jobs-housing ratio within the community; Findings Page 263 of 266 continues to maintain and improve multimodal transportation opportunities; maintains strong fiscal sustainability and continues to provide efficient and adequate public services; and addresses emerging transportation, housing, and employment trends. Although Alternative 2 would address new requirements of State law, it would not allow the City to meet its RHNA obligations and would preclude certification of the City’s Housing Element. Finding: The City Council rejects Alternative 2: Reduced Growth Alternative, on the following ground, which provides sufficient justification for rejection of this alternative: (1) the alternative fails to meet all of the Project objectives; (2) the alternative fails to avoid or reduce the Project’s significant and unavoidable impacts to a less than significant level; and (3) the alternative would have a new significant and unavoidable impact in regards to Population and Housing since it would not allow the City to meet its RHNA obligations and would preclude certification of the City’s Housing Element. 3. Alternative 3: Employment Focused Alternative Description: Alternative 3 (Employment Focused Alternative) reflects a land use pattern designed to promote nonresidential development and employment opportunities. Alternative 3 modifies the uses allowed within the Mixed-Use land use designation to only allow for a mix of nonresidential (commercial, industrial, and business park) land uses while precluding residential development. Alternative 3 also eliminates the Downtown Village (DV) land use; for parcels designated as DV in the proposed Project, Alternative 3 designates these parcels for Commercial development. The goals, policies, and actions of the General Plan Update would apply to subsequent development, planning, and infrastructure projects under this alternative. Alternative 3 would result in approximately 12,649 fewer housing units and 42,250 fewer residents within San Jacinto when compared to the proposed General Plan Land Use Map. Nonresidential square feet would be reduced by 4,087,964 square feet and employment opportunities would be decreased under this alternative, with approximately 6,347 fewer jobs created within the City limits when compared to the proposed General Plan. Impacts: As shown in Draft EIR Table 7-5, Alternative 3 would result in the same impacts as the proposed project for the environmental issues of: Aesthetics, Agricultural Resources, Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Tribal Cultural Resources, and Wildfire. Alternative 3 would result in reduced impacts to Air Quality, Energy, Greenhouse Gas Emissions, Noise, Public Services and Recreation, Utilities and Service Systems, and Irreversible Effects. Alternative 3 would result in increased impacts to Population and Housing and Transportation. This alternative would fail to reduce an y significant and unavoidable impacts to a less than significant level. Additionally, this alternative would have a new significant and unavoidable impact in regards to Population and Housing, since it would not allow the City to meet its RHNA obligations and would preclude certification of the City’s Housing Element. Attainment of Project Objectives: Alternative 3 meets most of the project objectives, but Findings Page 264 of 266 not to the same extent as the Project. Like the proposed Project, Alternative 3 reflects the current goals and vision expressed by city residents, businesses, decision-makers, and other stakeholders; protects and enhances San Jacinto’s unique history and character; promotes San Jacinto as a safe, vibrant, and family-friendly communit y; proactively plans for and accommodates local and regional growth in a responsible manner; encourages the revitalization of San Jacinto’s Main Street and other community activity centers; allows for a range of housing options, although not to the same extent as the proposed Project; attracts and retains businesses and industries that provide jobs for local residents; creates a more balanced jobs-housing ratio within the community; continues to maintain and improve multimodal transportation opportunities; maintains strong fiscal sustainability and continues to provide efficient and adequate public services; and addresses emerging transportation, housing, and employment trends. Although Alternative 3 would address new requirements of State law, it would not allow the City to meet its RHNA obligations and would preclude certification of the City’s Housing Element. Finding: The City Council rejects Alternative 3: Employment Focused Alternative, on the following ground, which provides sufficient justification for rejection of this alternative: (1) the alternative fails to meet all of the Project objectives; (2) the alternative fails to avoid or reduce the Project’s significant and unavoidable impacts to a less than significant level; (3) the alternative would have a new significant and unavoidable impact in regards to Population and Housing since it would not allow the City to meet its RHNA obligations and would preclude certification of the City’s Housing Element. E. ENVIRONMENTALLY SUPERIOR ALTERNATIVE Section 15126.6(e)(2) of the State CEQA Guidelines indicates that an analysis of alternatives to a proposed Project shall identify an environmentally superior alternative among the alternatives evaluated in an EIR. Based on the alternatives analysis contained within the Draft EIR, Alternative 2 (Reduced Growth Alternative) is identified as the Environmentally Superior Alternative. Alternative 2 (Reduced Growth Alternative) is the environmentally superior alternative as it is the most effective in terms of overall reductions of impacts compared to the proposed General Plan Update and all other alternatives. Alternative 2 meets most of the project objectives. Like the proposed project, Alternative 2 reflects the current goals and vision expressed by city residents, businesses, decision-makers, and other stakeholders; protects and enhances San Jacinto’s unique history and character; promotes San Jacinto as a safe, vibrant, and family-friendly community; proactively plans for and accommodates local and regional growth in a responsible manner; encourages the revitalization of San Jacinto’s Main Street and other community activity centers; allows for a range of housing options, although not to the same extent as the proposed Project; attracts and retains businesses and industries that provide jobs for local residents; creates a more balanced jobs-housing ratio within the community; continues to maintain and improve multimodal transportation opportunities; maintains strong fiscal sustainability and continues to provide efficient and adequate public services; and addresses emerging transportation, housing, and employment trends. Although Alternative 2 would address new requirements of State law, it would not allow the City to meet its RHNA obligations and would preclude certification of the City’s Housing Element. Therefore, City Council rejects the environmentally superior alternative. Findings Page 265 of 266 SECTION IX ADOPTION OF STATEMENT OF OVERRIDING CONSIDERATIONS Pursuant to State CEQA Guidelines Section 15093(a), the City Council must balance, as applicable, the economic, legal, social, technological, or other benefits of the project against its unavoidable environmental risks in determining whether to approve the Project. If the specific benefits of the Project outweigh the unavoidable adverse environmental effects, those environmental effects may be considered acceptable. Having reduced the adverse significant environmental effects of the Project to the extent feasible through the implementation of the General Plan Update goals, policies, and actions; having considered the entire administrative record on the Project; the City Council has weighed the benefits of the Project against its unavoidable adverse impacts after mitigation in regards to agricultural resources, air quality, biological resources, greenhouse gas emissions, and noise. While recognizing that the unavoidable adverse impacts are significant under CEQA thresholds, the City Council nonetheless finds that the unavoidable adverse impacts that will result from the Project are acceptable and outweighed by specific social, economic and other benefits of the Project. In making this determination, the factors and public benefits specified below were considered. Any one of these reasons is sufficient to justify approval of the Project. Thus, even if a court were to conclude that not every reason is supported by substantial evidence, the City Council would be able to stand by its determination that each individual reason is sufficient. The substantial evidence supporting the various benefits can be found in the preceding findings, which are incorporated by reference into this section, and in the documents found in the Records of Proceeding. The City Council therefore finds that for each of the significant impacts which are subject to a finding under CEQA Section 21081(a)(3), that each of the following social, economic, and environmental benefits of the Project, independent of the other benefits, outweigh the potential significant unavoidable adverse impacts and render acceptable each and every one of these unavoidable adverse environmental impacts: 1. The General Plan Update promotes more compact, environmentally-sustainable, and equitable development through goals, policies, and actions that balance the need for adequate infrastructure, housing, economic vitality, and environmental justice with the need for resource management, environmental protection, and preservation of quality of life for San Jacinto residents. 2. The General Plan Update implements principles of sustainable growth by concentrating new urban development around existing urban development, and along key commercial and transportation corridors; thereby minimizing land consumption while maintaining open space, habitat, and recreation uses throughout the Study Area. Findings Page 266 of 266 3. The General Plan Update provides a land use map that accounts for existing development, physical constraints, economic development, hazards, and incompatible uses and assigns densities and use types accordingly to enhance the safety, livability, and economic vitality of San Jacinto. 4. The General Plan Update improves mobility options through the development of a multi- modal transportation network that enhances connectivity, supports community development patterns, limits traffic congestion, promotes public and alternative transportation methods, and supports the goals of adopted regional transportation plans. 5. The General Plan Update directs the preservation and environmental stewardship of the vast array of natural, cultural and historic resources that uniquely define the character and ecological importance of the City and greater region. 6. The General Plan Update addresses adverse environmental effects associated with global climate change by facilitating sustainable development, promoting energy efficiency, and promoting development that reduces greenhouse gas emissions. 7. The General Plan Update enhances the local economy and provides opportunities for future jobs and business development commensurate with forecasted growth by planning for commercial and industrial development near existing urbanized areas and transportation corridors. 8. The General Plan Update is the product of a comprehensive public planning effort driven by members of the public, city stakeholders, the Planning Commission and the City Council through a series of public meetings, hearings and workshops that resulted in a thoughtful balance of community, economic, social, and environmental interests.