Loading...
HomeMy WebLinkAboutAgenda - Agenda Packets - Regular Meeting 2/2/2021 Morton, Sherry From: Nydia Ibarra <nibarra@aqmd.gov> Sent: Friday, January 29, 2021 4:46 PM To: Nydia Ibarra Cc: Monika Kim; Cristina Lopez Subject: Public Comment-South Coast A.Q.M.D Attachments: wham-flyer.pdf; wham-brochure-2020-v2.pdf; 2021 Faith Based Event Save the Date (003).pdf Follow Up Flag: Follow up Flag Status: Flagged [NOTICE: This message originated outside of Cityof San Jacinto -- DO NOT CLICK on links or open attachments unless you are sure the content is safe.] Dear City Clerk, If possible, I would like to kindly request to submit the following information as a public comment on the next available agenda. Sincerely, Nydia Ibarra • Please join the South Coast Air Quality Management District for a virtual event "A Clean Air Conversation with Community Faith Leaders — Clean Air is a Matter of Life and Breath" on Thursday, February 18, 2021 from 9:30 am to 10:30 am. We welcome leaders of all faiths to join us for an open discussion on the impacts of air pollution in our communities. Come to learn, discuss and share your thoughts on improving air quality. For more information and/or to register, please contact communityleaders@agmd.gov or call (909) 396-2114. • The South Coast Air Quality Management District (South Coast AQMD) also has an exciting opportunity for middle and high schools in Riverside County. South Coast AQMD's air quality education program, the Why Healthy Air Matters (WHAM) program, is currently being offered at no cost to eligible middle and high schools within the South Coast AQMD's jurisdiction. The WHAM Program utilizes Kids Making Sense®, a Science, Technology, Engineering and Math (STEM)-based educational curriculum that teaches students about air quality issues. Students have the opportunity to conduct hands-on experiments, including measuring air quality with hand-held sensors. The program accommodates distance learning. Virtual options include guest speakers (via videoconference), video lectures, and PowerPoints for each unit. WHAM will also be available for teachers in summer school. Spaces are limited. For more information, please visit www.aqmd.gov/WHAM or contact Monika Kim at mkim(q agmd.gov. 1 CONFIDENTIALITY NOTICE: This e-mail message and all attachments transmitted with it may contain legally privileged and confidential information intended solely for the use of the addressee. If the reader of this message is not the intended recipient, you are hereby notified that any reading, dissemination, distribution,copying, or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by telephone(909-396-3086)or by electronic mail(nibarra(c�agmd.gov), and delete this message and all copies and backups thereof. Thank you. 2 • 310;°17- tit * ' Ili • 14. SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT 00 Middle l High School • Air Quality Education AUQnnao Program Fully Funded Free curriculum offered to qualified middle and high schools within the South Coast AQMD's jurisdiction (all of Orange County, and parts of Los Angeles, Riverside and San Bernardino Counties). Hands-on Experiments Students can measure air quality and interpret data of pollution in your community. Accommodates Distance Learning Virtual options include guest speakers, PowerPoints, pre-recorded video lectures& more! CLICK HERETO SIGN UP For more information visit agmd.gov/WHAM or contact Monika Kim at mkim@agmd.gov,909-396-2342. WHAM Curriculum Roadmapealthy Air Matters South Coast Air Quality 0 Management District 1. Our Air and Middle School and High School Pollution 2. Particle Pollution 9 South Coast (50100min.) (50-100min.) Education Program AQMD 3. Particle Sources 4. Health Effects of (50min. or more) Particles ,: (50-100min.) 5. Measuring Particles 6. Held ti. (50min.) Measurements (100min. or more) _ 7. Interpret Your Data 8. Be Part of the 1 (50min.) Solution ,, (50min. or more) .t. niva„ [KIDS MAKIM61 For more information H. II N. about the program or to refer a school for potential participation, tik, �!'' 4 please contact: Kids Making �� Sense®Kit Monika Kim Phone: (909) 396-2342 Email: mkim@agmd.gov Itiffilltel 0 South Coast Air Quality Stay connected with us • Management District @SouthCoastAQMD Why Healthy Air Matters South Coast www.aqmd.gov O AQMD 1-800-CUT-SMOG Iri YouTube What is South Coast Air Quality Management District's Does the program fit in with state standards? WHAM Program? Curriculum Workbook T KIDS MAKING South Coast AQMD's middle school The Kids Making Sense® curriculum is Kids Malting Sense eENSIC, and high school education program, aligned with the California State Core Science "`+N'* % 4,0 Why Healthy Air Matters (WHAM), Curriculum for middle school and high school. ` ,P is an exciting Science, Technology, The curriculum unites STEM education and ,: INMANEngineering and Math (STEM)-based Next Generation Science Standards (NGSS) 4!. -Ai education program that teaches students with hands-on experiential learning and F'� Why Healthy Air Matters about air quality. The program utilizes introduces Disciplinary Core Ideas (DCIs) r .\ Sonoma Technology, Inc.'s Kids Making through experiments that reinforce Science a Sense® curriculum, developed by air and Engineering Practices (SEPs) and �.atlr,G•d y. d® quality scientists and educators and Crosscutting Concepts (CCCs). - thoroughly tested by teachers and students around the world. What will each participating school receive? , .1 • • t AirBeam2 Air Monitor,AirCasting App Each participating school will receive a Kids .. Making Sense® kit, which includes AirBeam2 lJ portable air quality monitors, paired smartphones, n ' Why is the WHAM Program important? a teacher's guide, student workbooks and all r, 7 �.„4: supplies and materials needed to successfully ' • . ... South Coast AQMD's jurisdiction encompasses Orange County complete each experiment in the workbook. air- 1 and the urban portions of Los Angeles, Riverside and San - . Bernardino counties, and is home to more than 17 million people— '.-The WHAM program offers features and support the second most populated urban area in the United States.This to provide teachers with maximum flexibility and region suffers from some of the poorest air quality in the nation learning tools to accommodate their class and and does not meet federal standards for both ozone student needs. If circumstances allow, we offer (smog) and fine particulate matter (PM2.5). in-person guest speakers to visit all participating classrooms. Additionally, we offer the following flexible options to aid in This program will increase awareness of air quality issues within the successful implementation of the program: environmental justice communities in South Coast AQMD's • South Coast AQMD guest speaker via ZOOM; jurisdiction. It utilizes a community-focused approach, designed • PowerPoint presentations for each unit; to teach youth about the science of air quality, public policy and • Pre-recorded video lectures; and, technology-based solutions. • Air quality related videos. ,/0 1 + 1 - ,4 it. South Coast rj ► 0 t� AQMD l G, y �`,� �,� j .� N.... . � _ . ,, . .` . - South Coast Air Quality Management Distric �- • A Clean Air Conversation Tith Community Clean Air is a Matter of Life and Breath We welcome leaders of all faiths to join us for a virtual discussion on the impacts of air pollution in our communities. Come to learn, discuss and share your thoughts on improving air quality. Save the Date • February 18, 2021 • 9:30 AM - 10:30 AM ID Virtual For more information or to RSVP, please contact communityleaders@aqmd.gov or via phone at (909) 396-2114. Morton. Sherry From: Espinoza,Julia Sent Tuesday, February 2,2021 6:49 PM To: Morton,Sherry Subject FW:public comment 2.2.21 'ii/,d aginCs2Ca City of San Jacinto Deputy City Clerk P:(951)487-7330 ext. 754 #GoSanJacinto I #LifestyleWorthLiving "CITY HALL IS CLOSED TO THE PUBLIC ONLY DUE TO THE COVID-19 VIRUS.STAFF IS WORKING NORMAL BUSINESS HOURS WITH ALTERED SERVICES.PLEASE VISIT THE CITY'S WEBSITE FOR MORE DETAILS** • /Of sAN ,\\ sc 7.4 AC I N TO From:Susan Larkin [mailto:valleyrestart.susanl@yahoo.com] Sent:Tuesday, February 2,2021 6:46 PM To: Espinoza,Julia<jespinoza@sanjacintoca.gov> Subject:public comment 2.2.21 [NOTICE: This message originated outside of City of San Jacinto-- DO NOT CLICK on links or open attachments unless you are sure the content is safe.] Hello, I am Susan Larkin, the Grant Administrator for Valley Restart in Hemet. As you look to address homelessness please include the Valley Restart Outreach team as well as the shelter employees, We have a lot to offer. 951-766-7476 Susan Larkin Grants Administrator 951-766-7476 1 951-487-5027 (cell) www.valleyrestart.info 2 • Morton, Sherry From: TEACHER TEACHER <lpurposefamily@gmail.com> Sent: Monday, February 1, 2021 5:09 PM To: Morton, Sherry Subject: Re: Agenda - Feb 2, 2021 (Tue) - City Council [NOTICE: This message originated outside of City of San Jacinto -- DO NOT CLICK on links or open attachments unless you are sure the content is safe.] PLEASE READ MY NOTE TO THE CITY COUNCIL. I WILL NOT BE ABLE TO ATTEND. We facilitate a bible study every Tuesday, and that makes it hard for me to log into the meetings sometimes. So I will be sending my messages through email. I want to first start by saying we are always praying for the City Council. We understand all the things you are responsible for and we appreciate your diligence to serve. I do want to add that you also campaigned as a candidate, and made lots of promises. Please don't forget the promises you've made. Don't get into those seats and get so comfortable you turn a blind eye to what's going on in our city. We have had a large shift in demographics, and if things continue to be glossed over they are soon enough going to be so out of control you won't be able to get things back on track. Please pay close attention to the number of street vendors. It has grown exponentially(DO SOMETHING ABOUT IT BESIDE LIP SERVICE - WHAT IS YOUR ACTION FOR THIS?). Please pay close attention to the number of street racers who are present throughout the valley(DO SOMETHING ABOUT IT BESIDE LIP SERVICE -WHAT IS YOUR ACTION FOR THIS?). Please pay close attention to the huge homeless population who are out in the cold freezing(DO SOMETHING ABOUT IT BESIDE LIP SERVICE - WHAT IS YOUR ACTION FOR THIS?). I could go on and on with this: dumping up, crime up, gang activity up, drug activity up, stray animals up, littering up, weeds and overgrowth of trees and shrubs up, holding business responsible for keeping their areas clean is down, monitoring the "every Saturday morning yard sales" is down, and bringing in businesses to fill the empty buildings (I won't even mention the building on 5 corners which I am certain is just a tax right for someone). I have called the city engineer to explain to them that there is something going on with State Street between Ramona Park Expwy and Idyllwild Dr. I have lived 2 blocks away from there for 21 years and just recently I can now tell you every time a large vehicle goes down State Street from the sound, and oftentimes slight trimmers at my house. I guess we'll just have to wait for a huge sinkhole, and lots of lawsuits to occur, in order to do something about it. Maintenance the last time I checked means to maintain- to sustain-to keep constant. Is it possible for us to do that instead of waiting for things to be at their worst before we fix it. This is a city and just like your homes, or your own cars there should be anticipation of what is coming versus waiting for the storm to be upon us. Sorry to always complain,but believe me when I say I look forward to the day when I can call and give positive shout outs. I know the day is coming, and I am earnestly looking forward to it. Thank you for your time. Dei Blythe. On Thu, Jan 28, 2021, 2:57 PM Sherry Morton<NoReplv@igm2.com> wrote: Please see the attached Agenda document for the following meeting: City Council Regular Meeting Tuesday, February 2, 2021 6:30 PM Virtual Meeting, San Jacinto, CA 92583 i Download PDF Agenda I View Web Agenda Document Modified: 128/202I 2:56 PM If you no longer wish to be included in this distribution list you can remove yourself through the meeting web portal or reply to this message. 2 AGENDA CITY COUNCIL – REGULAR MEETING TUESDAY, FEBRUARY 2, 2021 6:30 PM OPEN SESSION PUBLIC TELECONFERENCE NUMBER (951) 465-7684, Conference ID #:860 406 004# LIVE STREAM LINK: https://bit.ly/2LNIVef SAN JACINTO CITY HALL 595 S. SAN JACINTO AVE SAN JACINTO, CA 92583 951-487-4330 City of San Jacinto Page 1 Updated 1/28/2021 2:42 PM ALONSO LEDEZMA, MAYOR CRYSTAL RUIZ, MAYOR PRO TEM JOEL LOPEZ, COUNCILMEMBER PHIL AYALA, COUNCILMEMBER BRIAN HAWKINS, COUNCILMEMBER IMPORTANT MESSAGE REGARDING FEBRUARY 2, 2021 CITY COUNCIL MEETING ***SPECIAL TELECONFERENCING MEETING PROCEDURES*** This meeting is being conducted utilizing teleconferencing and electronic means consistent with State of California Executive Order N-29-20 dated March 17, 2020, regarding the COVID-19 pandemic. The meeting may be joined telephonically by calling (951) 465-7684, Conference ID #:860 406 004#. Submission of Public Comments: For those wishing to make public comments at the February 2, 2021, City Council meeting, please submit your comments by email to be read aloud at the meeting by the Deputy City Clerk. Email comments to Julia Espinoza at jespinoza@sanjacintoca.gov. Please put “PUBLIC COMMENT” in the email subject line. Email comments on matters not on the agenda must be received prior to the time the Mayor calls the item for Public Comments. Email comments on the agenda items must be received prior to the time the Mayor closes public comments on the agenda item. All email comments shall be subject to the same rules as would otherwise govern speaker comments at the Council meeting. Electronic comments on agenda items for the February 2, 2021, may only be submitted via email. Comments via text and social media (Facebook, Twitter, etc.) will not be accepted. Submission of Public Hearing Comments: Please put “COMMENT FOR PUBLIC HEARING” in the subject line. Reading of Public Comments: The City Clerk shall read all email comments, provided that the reading shall not exceed three (3) minutes, or such other time as the Council may provide, consistent with the time limit for speakers at a Council meeting. The email comments submitted shall become part of the record of the Council meeting. In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the office of the City Clerk at 951-487-7339. Notification 48 hours prior to a meeting will enable the City to make reasonable arrangements to ensure accessibility to that meeting [28 CFR 35.102.35.104 ADA Title II]. City of San Jacinto Page 2 Updated 1/28/2021 2:42 PM 1. ORGANIZATION 1.1. Roll Call 1.2. Invocation 1.3. Pledge of Allegiance 1.4. Mayor / Council Member Reports / Discussions 1.5. Late Items 2. PUBLIC COMMENTS 3. CONSENT CALENDAR 3.A. Consent Calendar - City Council 3.A.1. Waiver of Full Reading of Ordinance(s), and Reading by Title Only 3.A.2. Minutes of the Regular City Council Meeting of January 19, 2021 RECOMMENDATION: Staff recommends that the City Council approve the minutes of the January 19, 2021, regular City Council meeting. Department: City Clerk 3.A.3. Treasurer’s Report at December 31, 2020 RECOMMENDATION: Staff recommends that the City Council receive and file the Treasurer’s Report for the month ending December 31, 2020. Department: Finance 4. DISCUSSION ITEMS 4.1. Final Local Road Safety Plan RECOMMENDATION: Staff recommends that the City Council accept the Local Road Safety Plan (LRSP) for receipt and file. Department: Engineering 4.2. Ramona Expressway Median Art Project, Phase 1 RECOMMENDATION: Staff recommends that the City Council approve the plans and specifications for the Ramona Expressway Median Art Project, Phase 1; Award the construction contract to Universal Construction and Engineering for $298,694.23; Allocate 10% of the bid amount for soft costs and 10% of the bid amount for construction contingencies; reject all other bids; and authorize the City Manager to execute the City of San Jacinto Page 3 Updated 1/28/2021 2:42 PM construction contract. Department: Engineering 5. FUTURE REQUESTS FROM CITY COUNCIL TO STAFF 6. ADJOURNMENT DOCUMENTS RELATED TO OPEN SESSION AGENDAS (SB343) - Any public record, relating to an open session agenda item, that is distributed within 72 hours prior to the meeting is available for public inspection at the public counter located in the Administration Building of City Hall, 595 S. San Jacinto Avenue, San Jacinto, CA 92583. I, Julia Espinoza, Deputy City Clerk of the City of San Jacinto, do hereby certify that I caused to be posted the foregoing agenda this 28th day of January, 2021 as requested by law. Julia Espinoza, Deputy City Clerk February 2, 2021 TO: City Council REQUESTED BY: Sherry Morton, City Clerk APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Minutes of January 19, 2021 Regular Meeting RECOMMENDATION: Staff recommends that the City Council approve the minutes of the January 19, 2021, regular City Council meeting. ATTACHMENTS: 1-19-21 Regular Meeting Minutes Draft 3.A.2 Packet Pg. 4 ACTION MINUTES CITY COUNCIL/SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY – REGULAR MEETING TUESDAY, JANUARY 19, 2021 6:30 PM OPEN SESSION – TELEPHONICALLY (951) 465-7684, Conference ID #:920 995 200# LIVE STREAM LINK: https://bit.ly/2LNIVef SAN JACINTO CITY HALL 595 SAN JACINTO AVE. SAN JACINTO, CA 92583 951-487-7330 1. ORGANIZATION Mayor Alonzo Ledezma called the meeting to order at 6:32 p.m. 1.1. Roll Call Interim City Clerk Sherry Morton conducted the roll call: Teleconferenced in: Mayor Alonso Ledezma, Mayor Pro Tem Crystal Ruiz, Councilmember Phil Ayala, Councilmember Brian Hawkins, Councilmember Joel Lopez Absent: None 1.2. Invocation Councilmember Hawkins gave the Invocation. 1.3. Pledge of Allegiance The Pledge of Allegiance was led by City Treasurer Mike Van Der Linden. 1.4. Special Presentation(s) There were no special presentations. ALONSO LEDEZMA, MAYOR CRYSTAL RUIZ, MAYOR PRO TEM PHIL AYALA, COUNCILMEMBER BRIAN HAWKINS, COUNCILMEMBER JOEL LOPEZ, COUNCILMEMBER 3.A.2.a Packet Pg. 5 Attachment: 1-19-21 Regular Meeting Minutes Draft (Minutes of January 19, 2021 Regular Meeting) 1.5. Mayor/Council Member Reports/Discussions Councilmembers provided their reports. 1.5. Late Items City Manager Rob Johnson introduced a late item regarding a request for a Temporary Use Permit for an existing storage facility located at 1340 W. Ramona Expressway to allow for the storage of COVID-related decedents. The item will be moved to the end of the Discussion Calendar as Agenda Item No. 4.2. 2. PUBLIC COMMENTS There were no public comments. 3. JOINT CONSENT CALENDAR 3.A Consent Calendar – City Council 3.A.1. Waiver of Full Reading of Ordinance(s), and Reading b y Title Onl y 3.A.2. Minutes of the Regular City Council Meeting of January 5, 2021/City Clerk/Approved 3.A.3. Warrants and Disbursements - November 2020/Finance/Approved 3.A.4. Treasurer’s Report as of November 2020/Finance/Approved 3.A.5. Approve ORDINANCE NO. 20-14, Levying a Special Tax within Community Facilities District 2003-1, Including Annexation Territory (Annexation No. 59)/Finance/Approved 3.A.6. FY 2019-20 Development Impact Fee Report/Finance/Approved 3.A.7. On-Call Professional Planning Services Consultant List through FY 2027 - 28/Community Development/Approved 3.B Consent Calendar – Successor Agency to the Redevelopment Agency 3.B.1. Confirming and Ratifying the Inclusion of Certain Enforceable Obligations to San Jacinto Unified School District on the ROPS 21- 22/Finance/Approved M/S/C (Ledezma/Lopez) moved to approve the Consent Calendar. Motion carried 4/0. Ayes: Ayala, Ruiz, Lopez, Ledezma Nays: None Absent: Hawkins Abstain: None 3.A.2.a Packet Pg. 6 Attachment: 1-19-21 Regular Meeting Minutes Draft (Minutes of January 19, 2021 Regular Meeting) 4. DISCUSSION ITEMS 4.1. Approval of Awarded Funding to Qualified Businesses for the San Jacinto Small Business Emergency Grant Program Economic Development and Special Projects Administrator Tara Magner, presented the staff report. M/S/C (Ruiz/Ayala) made a motion to approve the eligible businesses that applied for the one-time San Jacinto Small Business Emergency Grant Program in the total amount of $95,000 as listed in the staff report; authorize the City Manager to administer the individual grants, and execute all necessary documents; and request staff qualify additional businesses for the remaining San Jacinto Small Business Emergency Grant Program funds. Motion carried 5/0. Ayes: Hawkins, Ruiz, Ledezma, Ayala, Lopez Nays: None Absent: None Abstain: None 4.2. Late Item - Request for Temporary Use Permit - Storage Facility - 1340 W. Ramona Expressway City Attorney Maurer clarified the findings needed to add the item to the agenda (1) the item arose after the posting of the agenda; and (2) would require immediate Council action. Mayor Ledezma updated the City Council on the request from Assemblyman Chad Mayes and Miller Jones Mortuary for a Temporary Use Permit for an existing storage facility located at 1340 W. Ramona Expressway to allow for storage of COVID-related decedents. M/S/C (Lopez/Hawkins) made a motion to add to the City Council Agenda the request for a Temporary Use Permit for an existing storage facility located at 1340 W. Ramona Expressway to be used for COVID-related decedents. Motion failed 2/3. Ayes: Hawkins, Lopez Nays: Ruiz, Ledezma, Ayala Absent: None Abstain: None 5. CITY MANAGER UPDATE City Manager Robert A. Johnson provided updates on the following:  Community Development Department Overview  Planning Division Overview  Building and Safety Division  Code Enforcement Division  Department of Public Utilities – Streets Division  Department of Public Utilities – Parks Division  Department of Public Utilities – Storm Water Division  Department of Public Utilities – Water Division 3.A.2.a Packet Pg. 7 Attachment: 1-19-21 Regular Meeting Minutes Draft (Minutes of January 19, 2021 Regular Meeting)  Department of Public Utilities – Waste Water Division  City Manager’s Office Overview 6. FUTURE REQUESTS FROM CITY COUNCIL TO STAFF Councilmember Ayala requested staff work with the previously disqualified applicants to assist them with qualifying for the Small Business Emergency Grant Program and to expand the Programs outreach. Councilmember Hawkins requested staff look into allowing food trucks to operate within the City. 7. ADJOURNMENT With no further business before the City Council, Mayor Ledezma called for a moment of silence in honor of former City Manager Jim Conner, and adjourned the Regular Meeting of the City Council at 8:10 pm. CITY OF SAN JACINTO: ________________________ Alonso Ledezma, Mayor ATTEST: ________________________ Sherry Morton, MMC Interim City Clerk Approved as read: Approved as amended: 3.A.2.a Packet Pg. 8 Attachment: 1-19-21 Regular Meeting Minutes Draft (Minutes of January 19, 2021 Regular Meeting) February 2, 2021 TO: City Council REQUESTED BY: Tom Prill, Deputy City Manager APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Treasurer’s Report at December 31, 2020 RECOMMENDATION: Staff recommends that the City Council receive and file the Treasurer’s Report for the month ending December 31, 2020. BACKGROUND: The Treasurer’s Report is required to be presented to the governing body at least quarterly in accordance with California Government Code Section 53600 et. seq. DISCUSSION: Total Cash and City Investments decreased 1.87% during the month. This includes cash, cash in bank and cash with trustee. The attached Treasurer’s report is a “snapshot” report of our cash position on the last day of the month in all of our accounts. A section demonstrating compliance with the adopted Investment Policy and a chart depicting historical interest rates for certain positions is also included. Detailed statements of investments from Chandler Asset Management and Public Trust Advisors have also been included. FISCAL IMPACT: None. ATTACHMENTS: 2020-21 December Treasurers Report with signature 3.A.3 Packet Pg. 9 3.A.3.aPacket Pg. 10Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, 3.A.3.aPacket Pg. 11Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, - 0.500 1.000 1.500 2.000 2.500 3.0001/182/183/184/185/186/187/188/189/1810/1811/1812/181/192/193/194/195/196/197/198/199/1910/1911/1912/191/202/203/204/205/206/207/208/209/2010/2011/2012/20Interest Rates - 1/18 to 12/20LAIFLAMMA-BoHMMA-RaboPIMMA-RaboChandlerPTA3.A.3.aPacket Pg. 12Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, MONTHLY ACCOUNT STATEMENT City of San Jacinto - Account #10167 DECEMBER 1, 2020 THROUGH DECEMBER 31, 2020 Information contained herein is confidential. We urge you to compare this statement to the one you receive from your qualified custodian. Please see Important Disclosures. CHANDLER ASSET MANAGEMENT chandlerasset.com Chandler Team: For questions about your account, please call (800) 317-4747, or contact operations@chandlerasset.com Custodian US Bank Christopher Isles (503) 464-3685 3.A.3.a Packet Pg. 13 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, ACCOUNT SUMMARY Beg. Values as of 11/30/20 End Values as of 12/31/20 Market Value 11,287,567 11,307,197 Accrued Interest 54,330 49,411 Total Market Value 11,341,897 11,356,608 Income Earned 16,295 16,130 Cont/WD -1,049 Par 10,895,856 10,918,567 Book Value 10,952,545 10,974,552 Cost Value 10,948,633 10,971,532 TOP ISSUERS Government of United States 28.7% Federal National Mortgage Assoc 20.0% Federal Home Loan Bank 19.0% Federal Home Loan Mortgage Corp 9.0% Apple Inc 1.9% Honda ABS 1.8% Oracle Corp 1.8% Wal-Mart Stores 1.8% Total 83.9% PORTFOLIO CHARACTERISTICS Average Modified Duration 2.56 Average Coupon 1.83% Average Purchase YTM 1.72% Average Market YTM 0.24% Average S&P/Moody Rating AA+/Aa1 Average Final Maturity 2.72 yrs Average Life 2.63 yrs CREDIT QUALITY (S&P)MATURITY DISTRIBUTIONSECTOR ALLOCATION Portfolio Summary As of December 31, 2020 City of San Jacinto Account #10167 PERFORMANCE REVIEW Annualized TOTAL RATE OF RETURN 1M 3M YTD 1YR 2YRS 3YRS 5YRS 10YRS 6/30/2012 City of San Jacinto 0.14%0.16%4.08%4.08%3.98%3.22%2.33%N/A 1.62% City of San Jacinto 1-5 Year Govt Blended Index*0.07%0.03%3.28%3.28%3.41%2.80%1.94%N/A 1.35% City of San Jacinto 1-5 Yr Corp/Gov AAA-A Blend**0.10%0.10%3.29%3.29%3.55%2.91%2.10%N/A 1.53% *ICE BAML 1-3 Yr US Treasury Index to 3/31/2020; then ICE BAML 1-5 Yr US Treasury/Agency thereafter. **ICE BAML 1-3 Yr US Corp/Govt Rated AAA-A Index to 3/31/2020; then ICE BAML 1-5 Yr US Corp/Govt Rated AAA-A Index thereafter. Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 1 3.A.3.a Packet Pg. 14 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Category Standard Comment Municipal Securities "A" rating category or better by a NRSRO; 30% maximum; 5% max per issuer Complies Treasury Issues No Limitation Complies Agency Issues No Limitation Complies Supranationals "AA" rated or better by a NRSRO; 30% maximum; 10% max per issuer; U.S. dollar denominated senior unsecured unsubordinated obligations issued or unconditionally guaranteed by the International Bank for Reconstruction and Development ("IBRD"), the International Finance Corporation ("IFC") or the Inter-American Development Bank ("IADB") Complies Banker’s Acceptances "A-1" short term debt rated or higher by at least two NRSROs; and "A" long-term debt rated or higher by at least two NRSROs; 40% maximum; 5% max per issuer; 180 days max maturity Complies Commercial Paper "A-1" short term debt rated or higher by at least two NRSROs; and "A" long-term debt rated or higher by at least two NRSROs; 25% maximum; 5% max per issuer; 270 days max maturity; Issuer is a corporation organized and operating in the U.S. with assets > $500 million Complies Negotiable Certificates of Deposit "A" long-term issuer rated category or higher by at least two NRSROs; and/or "A-1" short term rated or higher by at least two NRSROs; 30% maximum; 5% max per issuer Complies Federally Insured Certificates of Deposit (CDs)/ Time Deposit (TDs) 20% maximum (combined FDIC insured and collateralized TD/ CD); Amount per institution is limited to maximum covered under federal insurance Complies Collateralized Certificates of Deposit (CDs)/Time Deposit (TDs)/ "A" long-term debt rated category or higher by at least two NRSROs; and/or "A-1" short term debt rated or higher by at least two NRSROs; 20% maximum (combined FDIC and collateralized TD/ CD)Complies Corporate Medium Term Notes "A" rated category or better by at least two NRSROs; 30% maximum; 5% max per issuer; Issued by corporations organized and operating within the U.S. or by depository institutions licensed by the U.S. or any state and operating within the U.S. Complies Mutual Fund & Money Market Mutual Fund Highest rating or "AAA" rated by two NRSROs; SEC registered adviser with AUM >$500 million and experience > 5 years; 20% maximum in Mutual Funds and Money Market Mutual Funds; 10% max per one Mutual Fund; 20% max in Money Market Mutual Fund Complies Asset-Backed (ABS), Mortgage-Backed Securities; Mortgage Pass-Throughs; Collateralized Mortgage Obligations (CMOs) "AA" rated category or better by at least two NRSROs; "A" issuer debt rated category or higher by at least two NRSROs; 20% maximum; 5% max per issuer Complies Local Agency Investment Fund (LAIF)70% of the portfolio may be invested in LAIF, up to the maximum permitted balance; Not used by investment adviser Complies Local Government Investment Pools and Joint Powers Authority Pools Riverside County Investment Fund- 70% max of the total portfolio JPA Pools- 50% max of the total portfolio Repurchase Agreements 102% collateralized; 1 year max maturity Complies Prohibited Securities Inverse floaters; Ranges notes, Interest-only strips from mortgaged backed securities; Zero interest accrual securities; Margin purchasing or selling; Reverse repurchase agreements; Foreign currency denominated securities Complies Max Callables 20% maximum callable securities (does not include "make whole call" securities)Complies Max Per Issuer 5% of portfolio per issuer (except U.S. Government, its Agencies and enterprises, Money Market Mutual Funds, Mutual Funds, LAIF, LGIP, Supranationals, or unless otherwise specified in the investment policy)Complies Maximum maturity 5 years Complies City of San Jacinto As of December 31, 2020 Assets managed by Chandler Asset Management are in full compliance with state law and with the City's investment policy. Statement of Compliance 3.A.3.a Packet Pg. 15 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, 2020) BOOK VALUE RECONCILIATION BEGINNING BOOK VALUE $10,952,545.26 Acquisition + Security Purchases $240,018.75 + Money Market Fund Purchases $154,937.19 + Money Market Contributions $0.00 + Security Contributions $0.00 + Security Transfers $0.00 Total Acquisitions $394,955.94 Dispositions - Security Sales $201,750.00 - Money Market Fund Sales $38,132.49 - MMF Withdrawals $1,048.85 - Security Withdrawals $0.00 - Security Transfers $0.00 - Other Dispositions $0.00 - Maturites $0.00 - Calls $125,000.00 - Principal Paydowns $8,044.56 Total Dispositions $373,975.90 Amortization/Accretion +/- Net Accretion ($980.38) ($980.38) Gain/Loss on Dispositions +/- Realized Gain/Loss $2,006.99 $2,006.99 ENDING BOOK VALUE $10,974,551.91 CASH TRANSACTION SUMMARY BEGINNING BALANCE $39,349.53 Acquisition Contributions $0.00 Security Sale Proceeds $201,750.00 Accrued Interest Received $175.82 Interest Received $20,668.46 Dividend Received $0.21 Principal on Maturities $0.00 Interest on Maturities $0.00 Calls/Redemption (Principal)$125,000.00 Interest from Calls/Redemption $1,223.96 Principal Paydown $8,044.56 Total Acquisitions $356,863.01 Dispositions Withdrawals $1,048.85 Security Purchase $240,018.75 Accrued Interest Paid $39.56 Total Dispositions $241,107.16 ENDING BOOK VALUE $155,105.38 Reconciliation Summary As of December 31, 2020 City of San Jacinto California Account #10167 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 3 3.A.3.a Packet Pg. 16 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Holdings Report As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration ABS 89238KAD4 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 11,870.95 10/17/2019 1.97% 11,868.17 11,869.65 100.19 0.19% 11,894.04 8.27 0.10% 24.39 Aaa / AAA NR 1.05 0.11 43815HAC1 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 8/22/2022 31,590.83 08/21/2018 2.98% 31,586.50 31,589.05 101.18 0.17% 31,965.02 25.89 0.28% 375.97 Aaa / NR AAA 1.64 0.43 43815NAC8 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 80,000.00 08/20/2019 1.79% 79,999.34 79,999.63 101.63 0.30% 81,305.84 63.29 0.72% 1,306.21 Aaa / AAA NR 2.62 1.09 477870AC3 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 40,000.00 07/16/2019 2.23% 39,991.51 39,994.30 101.93 0.17% 40,772.00 39.29 0.36% 777.70 Aaa / NR AAA 2.96 0.94 65479JAD5 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 85,000.00 10/16/2019 1.94% 84,995.51 84,996.64 102.04 0.43% 86,733.58 72.91 0.76% 1,736.94 Aaa / AAA NR 3.54 1.35 47789KAC7 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 60,000.00 03/04/2020 1.11% 59,996.33 59,997.00 101.25 0.30% 60,752.76 29.33 0.54% 755.76 Aaa / NR AAA 3.62 1.56 89237VAB5 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 55,000.00 07/21/2020 0.44% 54,995.77 54,996.20 100.35 0.23% 55,192.94 10.76 0.49% 196.74 Aaa / AAA NR 3.79 1.66 43813KAC6 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 90,000.00 09/22/2020 0.38% 89,986.78 89,987.87 100.17 0.29% 90,152.19 12.03 0.79% 164.32 NR / AAA AAA 3.80 2.01 47787NAC3 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 25,000.00 07/14/2020 0.52% 24,996.19 24,996.68 100.32 0.34% 25,080.38 5.67 0.22% 83.70 Aaa / NR AAA 3.88 1.87 89236XAC0 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 45,000.00 10/06/2020 0.36% 44,991.62 44,992.05 99.98 0.36% 44,992.05 7.00 0.40% 0.00 NR / AAA AAA 4.04 1.94 Total ABS 523,461.78 1.28% 523,407.72 523,419.07 0.30% 528,840.80 274.44 4.66% 5,421.73 Aaa / AAA AAA 3.32 1.44 AGENCY 3130A7CV5 FHLB Note 1.375% Due 2/18/2021 175,000.00 03/10/2016 1.61% 173,085.50 174,949.09 100.16 0.18% 175,273.53 888.98 1.55% 324.44 Aaa / AA+ AAA 0.13 0.13 3135G0N82 FNMA Note 1.25% Due 8/17/2021 315,000.00 01/26/2017 2.02% 304,579.80 313,567.93 100.72 0.11% 317,255.40 1,465.63 2.81% 3,687.47 Aaa / AA+ AAA 0.63 0.62 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 4 3.A.3.a Packet Pg. 17 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Holdings Report As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration AGENCY 313378WG2 FHLB Note 2.5% Due 3/11/2022 300,000.00 03/13/2018 2.65% 298,323.00 299,500.81 102.83 0.13% 308,490.60 2,291.67 2.74% 8,989.79 Aaa / AA+ NR 1.19 1.18 313379Q69 FHLB Note 2.125% Due 6/10/2022 200,000.00 06/20/2017 1.87% 202,370.00 200,685.54 102.89 0.12% 205,772.40 247.92 1.81% 5,086.86 Aaa / AA+ AAA 1.44 1.43 3135G0W33 FNMA Note 1.375% Due 9/6/2022 200,000.00 09/05/2019 1.49% 199,304.00 199,610.72 102.13 0.11% 204,255.80 878.47 1.81% 4,645.08 Aaa / AA+ AAA 1.68 1.66 3130A3KM5 FHLB Note 2.5% Due 12/9/2022 100,000.00 09/10/2019 1.60% 102,813.00 101,681.14 104.54 0.15% 104,541.90 152.78 0.92% 2,860.76 Aaa / AA+ NR 1.94 1.90 3135G0T94 FNMA Note 2.375% Due 1/19/2023 290,000.00 10/17/2018 3.07% 281,993.10 286,143.49 104.58 0.14% 303,282.29 3,099.38 2.70% 17,138.80 Aaa / AA+ AAA 2.05 1.99 3137EAEN5 FHLMC Note 2.75% Due 6/19/2023 200,000.00 11/13/2018 3.08% 197,176.00 198,487.02 106.32 0.18% 212,634.20 183.33 1.87% 14,147.18 Aaa / AA+ AAA 2.47 2.40 313383YJ4 FHLB Note 3.375% Due 9/8/2023 200,000.00 12/27/2018 2.73% 205,630.00 203,217.14 108.55 0.18% 217,105.80 2,118.75 1.93% 13,888.66 Aaa / AA+ NR 2.69 2.57 3137EAEY1 FHLMC Note 0.125% Due 10/16/2023 180,000.00 10/22/2020 0.26% 179,253.00 179,301.06 99.93 0.15% 179,876.88 46.88 1.58% 575.82 Aaa / AA+ AAA 2.79 2.78 3130A0F70 FHLB Note 3.375% Due 12/8/2023 220,000.00 01/30/2019 2.71% 226,593.40 223,985.06 109.25 0.21% 240,355.28 474.38 2.12% 16,370.22 Aaa / AA+ AAA 2.94 2.82 3135G0V34 FNMA Note 2.5% Due 2/5/2024 375,000.00 03/24/2020 0.82% 398,835.00 394,074.75 107.11 0.20% 401,649.00 3,802.08 3.57% 7,574.25 Aaa / AA+ AAA 3.10 2.97 3130A1XJ2 FHLB Note 2.875% Due 6/14/2024 210,000.00 Various 1.96% 219,055.20 216,258.68 109.16 0.21% 229,229.92 285.10 2.02% 12,971.24 Aaa / AA+ NR 3.45 3.31 3130A2UW4 FHLB Note 2.875% Due 9/13/2024 150,000.00 10/29/2019 1.76% 157,737.00 155,872.30 109.67 0.25% 164,502.45 1,293.75 1.46% 8,630.15 Aaa / AA+ AAA 3.70 3.51 3130A3GE8 FHLB Note 2.75% Due 12/13/2024 250,000.00 12/16/2019 1.77% 261,672.50 259,232.99 109.52 0.32% 273,812.00 343.75 2.41% 14,579.01 Aaa / AA+ NR 3.95 3.77 3135G0X24 FNMA Note 1.625% Due 1/7/2025 225,000.00 01/16/2020 1.69% 224,298.00 224,433.22 105.38 0.28% 237,097.80 1,767.19 2.10% 12,664.58 Aaa / AA+ AAA 4.02 3.87 3137EAEP0 FHLMC Note 1.5% Due 2/12/2025 245,000.00 02/13/2020 1.52% 244,811.35 244,844.64 104.90 0.30% 257,011.86 1,418.96 2.28% 12,167.22 Aaa / NR AAA 4.12 3.98 3135G03U5 FNMA Note 0.625% Due 4/22/2025 310,000.00 Various 0.63% 309,949.40 309,964.15 101.18 0.35% 313,644.05 371.35 2.77% 3,679.90 Aaa / AA+ AAA 4.31 4.25 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 5 3.A.3.a Packet Pg. 18 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Holdings Report As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration AGENCY 3130AJKW8 FHLB Note 0.5% Due 6/13/2025 225,000.00 06/24/2020 0.52% 224,824.50 224,842.88 100.61 0.36% 226,364.85 56.25 1.99% 1,521.97 Aaa / AA+ AAA 4.45 4.40 3137EAEU9 FHLMC Note 0.375% Due 7/21/2025 145,000.00 07/21/2020 0.48% 144,277.90 144,342.03 100.05 0.36% 145,076.56 238.65 1.28% 734.53 Aaa / AA+ AAA 4.56 4.51 3135G05X7 FNMA Note 0.375% Due 8/25/2025 230,000.00 08/25/2020 0.47% 228,923.60 228,998.55 99.98 0.38% 229,949.63 297.08 2.03% 951.08 Aaa / AA+ AAA 4.65 4.60 3137EAEX3 FHLMC Note 0.375% Due 9/23/2025 230,000.00 09/23/2020 0.44% 229,307.70 229,344.90 99.83 0.41% 229,617.28 230.00 2.02% 272.38 Aaa / AA+ AAA 4.73 4.68 3135G06G3 FNMA Note 0.5% Due 11/7/2025 250,000.00 11/09/2020 0.57% 249,105.00 249,129.57 100.42 0.41% 251,045.75 170.14 2.21% 1,916.18 Aaa / AA+ AAA 4.85 4.78 Total Agency 5,225,000.00 1.56% 5,263,917.95 5,262,467.66 0.24% 5,427,845.23 22,122.47 47.99% 165,377.57 Aaa / AA+ AAA 3.04 2.96 CORPORATE 17275RBD3 Cisco Systems Note 2.2% Due 2/28/2021 150,000.00 09/20/2017 1.98% 151,108.50 150,051.23 100.31 0.27% 150,466.50 1,127.50 1.33% 415.27 A1 / AA- NR 0.16 0.16 369550BE7 General Dynamics Corp Note 3% Due 5/11/2021 125,000.00 05/15/2018 3.25% 124,128.75 124,895.99 100.96 0.33% 126,204.13 520.83 1.12% 1,308.14 A2 / A NR 0.36 0.36 808513AW5 Charles Schwab Corp Callable Note Cont 4/21/2021 3.25% Due 5/21/2021 150,000.00 05/30/2018 3.01% 151,011.00 150,105.41 100.90 0.31% 151,342.95 541.67 1.34% 1,237.54 A2 / A A 0.39 0.31 931142EJ8 Wal-Mart Stores Note 3.125% Due 6/23/2021 200,000.00 Various 2.96% 200,929.00 200,148.79 101.37 0.25% 202,741.20 138.89 1.79% 2,592.41 Aa2 / AA AA 0.48 0.48 68389XBK0 Oracle Corp Callable Note Cont 8/15/2021 1.9% Due 9/15/2021 200,000.00 10/12/2017 2.11% 198,458.00 199,722.87 101.01 0.28% 202,014.00 1,118.89 1.79% 2,291.13 A3 / A A- 0.71 0.62 89236TDP7 Toyota Motor Credit Corp Note 2.6% Due 1/11/2022 130,000.00 01/28/2019 2.98% 128,629.80 129,522.91 102.36 0.30% 133,066.31 1,596.11 1.19% 3,543.40 A1 / A+ A+ 1.03 1.01 06051GEU9 Bank of America Corp Note 3.3% Due 1/11/2023 130,000.00 01/28/2019 3.29% 130,059.80 130,030.69 106.02 0.32% 137,827.30 2,025.83 1.23% 7,796.61 A2 / A- A+ 2.03 1.95 06406RAE7 Bank of NY Mellon Corp Callable Note Cont 12/29/2022 2.95% Due 1/29/2023 145,000.00 09/09/2019 1.97% 149,541.40 147,739.92 105.19 0.34% 152,520.57 1,806.06 1.36% 4,780.65 A1 / A AA- 2.08 1.93 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 6 3.A.3.a Packet Pg. 19 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Holdings Report As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration CORPORATE 084670BR8 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 3/15/2023 150,000.00 08/26/2019 1.83% 154,525.50 152,724.09 105.02 0.28% 157,524.30 1,214.58 1.40% 4,800.21 Aa2 / AA A+ 2.20 1.98 037833AK6 Apple Inc Note 2.4% Due 5/3/2023 200,000.00 05/20/2019 2.63% 198,284.00 198,986.11 104.90 0.30% 209,792.80 773.33 1.85% 10,806.69 Aa1 / AA+ NR 2.34 2.28 24422EUR8 John Deere Capital Corp Note 3.45% Due 1/10/2024 150,000.00 03/14/2019 2.95% 153,322.50 152,085.30 109.05 0.44% 163,567.50 2,458.13 1.46% 11,482.20 A2 / A A 3.03 2.86 46625HJX9 JP Morgan Chase Note 3.625% Due 5/13/2024 145,000.00 12/19/2019 2.20% 153,560.80 151,562.21 110.57 0.46% 160,321.43 700.83 1.42% 8,759.22 A2 / A- AA- 3.37 3.19 Total Corporate 1,875,000.00 2.57% 1,893,559.05 1,887,575.52 0.32% 1,947,388.99 14,022.65 17.27% 59,813.47 A1 / A+ A+ 1.53 1.44 MONEY MARKET FUND FI 31846V203 First American Govt Obligation Fund Class Y 155,105.38 Various 0.01% 155,105.38 155,105.38 1.00 0.01% 155,105.38 0.00 1.37% 0.00 Aaa / AAA AAA 0.00 0.00 Total Money Market Fund FI 155,105.38 0.01% 155,105.38 155,105.38 0.01% 155,105.38 0.00 1.37% 0.00 Aaa / AAA AAA 0.00 0.00 US TREASURY 912828S76 US Treasury Note 1.125% Due 7/31/2021 100,000.00 11/29/2017 1.98% 96,988.28 99,525.41 100.59 0.12% 100,585.90 470.79 0.89% 1,060.49 Aaa / AA+ AAA 0.58 0.58 912828T34 US Treasury Note 1.125% Due 9/30/2021 125,000.00 05/30/2018 2.59% 119,194.34 123,703.50 100.75 0.12% 125,942.38 359.29 1.11% 2,238.88 Aaa / AA+ AAA 0.75 0.74 912828G53 US Treasury Note 1.875% Due 11/30/2021 220,000.00 04/26/2017 1.81% 220,653.86 220,129.76 101.61 0.12% 223,532.10 362.64 1.97% 3,402.34 Aaa / AA+ AAA 0.92 0.91 912828W89 US Treasury Note 1.875% Due 3/31/2022 200,000.00 04/26/2018 2.75% 193,531.25 197,952.01 102.19 0.12% 204,375.00 958.10 1.81% 6,422.99 Aaa / AA+ AAA 1.25 1.23 912828L24 US Treasury Note 1.875% Due 8/31/2022 150,000.00 07/22/2019 1.77% 150,462.89 150,247.55 102.90 0.13% 154,347.60 955.63 1.37% 4,100.05 Aaa / AA+ AAA 1.67 1.63 912828M80 US Treasury Note 2% Due 11/30/2022 200,000.00 04/11/2019 2.31% 197,851.56 198,868.22 103.58 0.13% 207,164.00 351.65 1.83% 8,295.78 Aaa / AA+ AAA 1.92 1.88 9128284D9 US Treasury Note 2.5% Due 3/31/2023 210,000.00 Various 2.95% 206,053.12 208,033.79 105.30 0.14% 221,123.49 1,341.34 1.96% 13,089.70 Aaa / AA+ AAA 2.25 2.19 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 7 3.A.3.a Packet Pg. 20 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Holdings Report As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Par Value/Units Purchase Date Book Yield Cost Value Book Value Mkt Price Mkt YTM Market Value Accrued Int. % of Port. Gain/Loss Moody/S&P Fitch Maturity Duration US TREASURY 912828Y61 US Treasury Note 2.75% Due 7/31/2023 175,000.00 12/27/2018 2.59% 176,223.63 175,687.01 106.70 0.15% 186,716.78 2,013.93 1.66% 11,029.77 Aaa / AA+ AAA 2.58 2.49 912828W71 US Treasury Note 2.125% Due 3/31/2024 210,000.00 12/05/2019 1.63% 214,331.25 213,254.62 106.25 0.19% 223,116.81 1,140.14 1.97% 9,862.19 Aaa / AA+ AAA 3.25 3.14 912828Y87 US Treasury Note 1.75% Due 7/31/2024 220,000.00 01/17/2020 1.63% 221,160.16 220,917.32 105.48 0.22% 232,048.52 1,611.14 2.06% 11,131.20 Aaa / AA+ AAA 3.58 3.47 9128282U3 US Treasury Note 1.875% Due 8/31/2024 230,000.00 12/12/2019 1.76% 231,230.86 230,955.83 106.03 0.22% 243,871.76 1,465.30 2.16% 12,915.93 Aaa / AA+ AAA 3.67 3.54 912828YV6 US Treasury Note 1.5% Due 11/30/2024 230,000.00 12/12/2019 1.74% 227,421.48 227,968.74 104.86 0.25% 241,185.59 303.30 2.13% 13,216.85 Aaa / AA+ AAA 3.92 3.81 912828ZC7 US Treasury Note 1.125% Due 2/28/2025 400,000.00 03/24/2020 0.51% 412,046.88 410,160.58 103.53 0.27% 414,109.20 1,529.01 3.66% 3,948.62 Aaa / AA+ AAA 4.16 4.06 912828ZT0 US Treasury Note 0.25% Due 5/31/2025 230,000.00 06/04/2020 0.39% 228,373.83 228,561.36 99.81 0.29% 229,559.78 50.55 2.02% 998.42 Aaa / AA+ AAA 4.42 4.39 91282CAZ4 US Treasury Note 0.375% Due 11/30/2025 240,000.00 12/15/2020 0.37% 240,018.75 240,018.58 100.14 0.35% 240,337.44 79.12 2.12% 318.86 Aaa / AA+ AAA 4.92 4.86 Total US Treasury 3,140,000.00 1.64% 3,135,542.14 3,145,984.28 0.20% 3,248,016.35 12,991.93 28.71% 102,032.07 Aaa / AA+ AAA 2.94 2.88 TOTAL PORTFOLIO 10,918,567.16 1.72% 10,971,532.24 10,974,551.91 0.24% 11,307,196.75 49,411.49 100.00% 332,644.84 Aa1 / AA+ AAA 2.72 2.56 TOTAL MARKET VALUE PLUS ACCRUED 11,356,608.24 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 8 3.A.3.a Packet Pg. 21 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Transaction Ledger As of December 31, 2020 City of San Jacinto Account #10167 Transaction Type Settlement Date CUSIP Quantity Security Description Price Acq/Disp Yield Amount Interest Pur/Sold Total Amount Gain/Loss ACQUISITIONS Purchase 12/01/2020 31846V203 0.18 First American Govt Obligation Fund Class Y 1.000 0.01%0.18 0.00 0.18 0.00 Purchase 12/08/2020 31846V203 3,712.50 First American Govt Obligation Fund Class Y 1.000 0.01%3,712.50 0.00 3,712.50 0.00 Purchase 12/09/2020 31846V203 1,250.00 First American Govt Obligation Fund Class Y 1.000 0.01%1,250.00 0.00 1,250.00 0.00 Purchase 12/10/2020 31846V203 2,125.00 First American Govt Obligation Fund Class Y 1.000 0.01%2,125.00 0.00 2,125.00 0.00 Purchase 12/13/2020 31846V203 4,118.75 First American Govt Obligation Fund Class Y 1.000 0.01%4,118.75 0.00 4,118.75 0.00 Purchase 12/14/2020 31846V203 3,018.75 First American Govt Obligation Fund Class Y 1.000 0.01%3,018.75 0.00 3,018.75 0.00 Purchase 12/15/2020 31846V203 118.67 First American Govt Obligation Fund Class Y 1.000 0.01%118.67 0.00 118.67 0.00 Purchase 12/15/2020 31846V203 73.67 First American Govt Obligation Fund Class Y 1.000 0.01%73.67 0.00 73.67 0.00 Purchase 12/15/2020 31846V203 20.17 First American Govt Obligation Fund Class Y 1.000 0.01%20.17 0.00 20.17 0.00 Purchase 12/15/2020 31846V203 13.13 First American Govt Obligation Fund Class Y 1.000 0.01%13.13 0.00 13.13 0.00 Purchase 12/15/2020 31846V203 136.71 First American Govt Obligation Fund Class Y 1.000 0.01%136.71 0.00 136.71 0.00 Purchase 12/15/2020 31846V203 55.00 First American Govt Obligation Fund Class Y 1.000 0.01%55.00 0.00 55.00 0.00 Purchase 12/15/2020 31846V203 10.63 First American Govt Obligation Fund Class Y 1.000 0.01%10.63 0.00 10.63 0.00 Purchase 12/15/2020 31846V203 4,496.47 First American Govt Obligation Fund Class Y 1.000 0.01%4,496.47 0.00 4,496.47 0.00 Purchase 12/16/2020 91282CAZ4 240,000.00 US Treasury Note 0.375% Due 11/30/2025 100.008 0.37%240,018.75 39.56 240,058.31 0.00 Purchase 12/18/2020 31846V203 27.75 First American Govt Obligation Fund Class Y 1.000 0.01%27.75 0.00 27.75 0.00 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 9 3.A.3.a Packet Pg. 22 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Transaction Ledger As of December 31, 2020 City of San Jacinto Account #10167 Transaction Type Settlement Date CUSIP Quantity Security Description Price Acq/Disp Yield Amount Interest Pur/Sold Total Amount Gain/Loss ACQUISITIONS Purchase 12/19/2020 31846V203 2,750.00 First American Govt Obligation Fund Class Y 1.000 0.01%2,750.00 0.00 2,750.00 0.00 Purchase 12/21/2020 31846V203 3,660.82 First American Govt Obligation Fund Class Y 1.000 0.01%3,660.82 0.00 3,660.82 0.00 Purchase 12/23/2020 31846V203 3,125.00 First American Govt Obligation Fund Class Y 1.000 0.01%3,125.00 0.00 3,125.00 0.00 Purchase 12/29/2020 31846V203 126,223.96 First American Govt Obligation Fund Class Y 1.000 0.01%126,223.96 0.00 126,223.96 0.00 Purchase 12/29/2020 31846V203 0.03 First American Govt Obligation Fund Class Y 1.000 0.01%0.03 0.00 0.03 0.00 Subtotal 394,937.19 394,955.94 39.56 394,995.50 0.00 TOTAL ACQUISITIONS 394,937.19 394,955.94 39.56 394,995.50 0.00 DISPOSITIONS Sale 12/16/2020 31846V203 38,132.49 First American Govt Obligation Fund Class Y 1.000 0.01%38,132.49 0.00 38,132.49 0.00 Sale 12/16/2020 912828WN6 200,000.00 US Treasury Note 2% Due 5/31/2021 100.875 2.29%201,750.00 175.82 201,925.82 2,006.99 Subtotal 238,132.49 239,882.49 175.82 240,058.31 2,006.99 Call 12/29/2020 91159HHL7 125,000.00 US Bancorp Callable Note 1X 12/29/2020 2.35% Due 1/29/2021 100.000 2.12%125,000.00 1,223.96 126,223.96 0.00 Subtotal 125,000.00 125,000.00 1,223.96 126,223.96 0.00 Paydown 12/15/2020 43815NAC8 0.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 100.000 0.00 118.67 118.67 0.00 Paydown 12/15/2020 477870AC3 0.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 100.000 0.00 73.67 73.67 0.00 Paydown 12/15/2020 47787NAC3 0.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 100.000 0.00 10.63 10.63 0.00 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 10 3.A.3.a Packet Pg. 23 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Transaction Ledger As of December 31, 2020 City of San Jacinto Account #10167 Transaction Type Settlement Date CUSIP Quantity Security Description Price Acq/Disp Yield Amount Interest Pur/Sold Total Amount Gain/Loss DISPOSITIONS Paydown 12/15/2020 47789KAC7 0.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 100.000 0.00 55.00 55.00 0.00 Paydown 12/15/2020 65479JAD5 0.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 100.000 0.00 136.71 136.71 0.00 Paydown 12/15/2020 89236XAC0 0.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 100.000 0.00 13.13 13.13 0.00 Paydown 12/15/2020 89237VAB5 0.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 100.000 0.00 20.17 20.17 0.00 Paydown 12/15/2020 89238KAD4 4,470.19 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 100.000 4,470.19 26.28 4,496.47 0.00 Paydown 12/18/2020 43813KAC6 0.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 100.000 0.00 27.75 27.75 0.00 Paydown 12/21/2020 43815HAC1 3,574.37 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 8/22/2022 100.000 3,574.37 86.45 3,660.82 0.00 Subtotal 8,044.56 8,044.56 568.46 8,613.02 0.00 Security Withdrawal 12/04/2020 31846V203 944.68 First American Govt Obligation Fund Class Y 1.000 944.68 0.00 944.68 0.00 Security Withdrawal 12/24/2020 31846V203 104.17 First American Govt Obligation Fund Class Y 1.000 104.17 0.00 104.17 0.00 Subtotal 1,048.85 1,048.85 0.00 1,048.85 0.00 TOTAL DISPOSITIONS 372,225.90 373,975.90 1,968.24 375,944.14 2,006.99 OTHER TRANSACTIONS Interest 12/08/2020 3130A0F70 220,000.00 FHLB Note 3.375% Due 12/8/2023 0.000 3,712.50 0.00 3,712.50 0.00 Interest 12/09/2020 3130A3KM5 100,000.00 FHLB Note 2.5% Due 12/9/2022 0.000 1,250.00 0.00 1,250.00 0.00 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 11 3.A.3.a Packet Pg. 24 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Transaction Ledger As of December 31, 2020 City of San Jacinto Account #10167 Transaction Type Settlement Date CUSIP Quantity Security Description Price Acq/Disp Yield Amount Interest Pur/Sold Total Amount Gain/Loss OTHER TRANSACTIONS Interest 12/10/2020 313379Q69 200,000.00 FHLB Note 2.125% Due 6/10/2022 0.000 2,125.00 0.00 2,125.00 0.00 Interest 12/13/2020 3130A3GE8 250,000.00 FHLB Note 2.75% Due 12/13/2024 0.000 3,437.50 0.00 3,437.50 0.00 Interest 12/13/2020 3130AJKW8 225,000.00 FHLB Note 0.5% Due 6/13/2025 0.000 681.25 0.00 681.25 0.00 Interest 12/14/2020 3130A1XJ2 210,000.00 FHLB Note 2.875% Due 6/14/2024 0.000 3,018.75 0.00 3,018.75 0.00 Interest 12/19/2020 3137EAEN5 200,000.00 FHLMC Note 2.75% Due 6/19/2023 0.000 2,750.00 0.00 2,750.00 0.00 Interest 12/23/2020 931142EJ8 200,000.00 Wal-Mart Stores Note 3.125% Due 6/23/2021 0.000 3,125.00 0.00 3,125.00 0.00 Subtotal 1,605,000.00 20,100.00 0.00 20,100.00 0.00 Dividend 12/01/2020 31846V203 39,349.53 First American Govt Obligation Fund Class Y 0.000 0.18 0.00 0.18 0.00 Dividend 12/29/2020 31846V203 28,881.39 First American Govt Obligation Fund Class Y 0.000 0.03 0.00 0.03 0.00 Subtotal 68,230.92 0.21 0.00 0.21 0.00 TOTAL OTHER TRANSACTIONS 1,673,230.92 20,100.21 0.00 20,100.21 0.00 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 12 3.A.3.a Packet Pg. 25 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Income Earned As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income FIXED INCOME 037833AK6 Apple Inc Note 2.4% Due 05/03/2023 05/20/2019 05/22/2019 200,000.00 198,949.22 0.00 0.00 198,986.11 373.33 0.00 773.33 400.00 36.89 0.00 36.89 436.89 436.89 06051GEU9 Bank of America Corp Note 3.3% Due 01/11/2023 01/28/2019 01/30/2019 130,000.00 130,031.97 0.00 0.00 130,030.69 1,668.33 0.00 2,025.83 357.50 0.00 1.28 (1.28) 356.22 356.22 06406RAE7 Bank of NY Mellon Corp Callable Note Cont 12/29/2022 2.95% Due 01/29/2023 09/09/2019 09/11/2019 145,000.00 147,856.75 0.00 0.00 147,739.92 1,449.60 0.00 1,806.06 356.46 0.00 116.83 (116.83) 239.63 239.63 084670BR8 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 03/15/2023 08/26/2019 08/28/2019 150,000.00 152,837.59 0.00 0.00 152,724.09 870.83 0.00 1,214.58 343.75 0.00 113.50 (113.50) 230.25 230.25 17275RBD3 Cisco Systems Note 2.2% Due 02/28/2021 09/20/2017 09/22/2017 150,000.00 150,078.61 0.00 0.00 150,051.23 852.50 0.00 1,127.50 275.00 0.00 27.38 (27.38) 247.62 247.62 24422EUR8 John Deere Capital Corp Note 3.45% Due 01/10/2024 03/14/2019 03/18/2019 150,000.00 152,143.85 0.00 0.00 152,085.30 2,026.88 0.00 2,458.13 431.25 0.00 58.55 (58.55) 372.70 372.70 3130A0F70 FHLB Note 3.375% Due 12/08/2023 01/30/2019 01/31/2019 220,000.00 224,100.41 0.00 0.00 223,985.06 3,568.13 3,712.50 474.38 618.75 0.00 115.35 (115.35) 503.40 503.40 3130A1XJ2 FHLB Note 2.875% Due 06/14/2024 Various Various 210,000.00 216,412.66 0.00 0.00 216,258.68 2,800.72 3,018.75 285.10 503.13 0.00 153.98 (153.98) 349.15 349.15 3130A2UW4 FHLB Note 2.875% Due 09/13/2024 10/29/2019 10/30/2019 150,000.00 156,007.04 0.00 0.00 155,872.30 934.38 0.00 1,293.75 359.37 0.00 134.74 (134.74) 224.63 224.63 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 13 3.A.3.a Packet Pg. 26 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Income Earned As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 3130A3GE8 FHLB Note 2.75% Due 12/13/2024 12/16/2019 12/17/2019 250,000.00 259,431.48 0.00 0.00 259,232.99 3,208.33 3,437.50 343.75 572.92 0.00 198.49 (198.49) 374.43 374.43 3130A3KM5 FHLB Note 2.5% Due 12/09/2022 09/10/2019 09/13/2019 100,000.00 101,754.86 0.00 0.00 101,681.14 1,194.44 1,250.00 152.78 208.34 0.00 73.72 (73.72) 134.62 134.62 3130A7CV5 FHLB Note 1.375% Due 02/18/2021 03/10/2016 03/11/2016 175,000.00 174,916.21 0.00 0.00 174,949.09 688.45 0.00 888.98 200.53 32.88 0.00 32.88 233.41 233.41 3130AJKW8 FHLB Note 0.5% Due 06/13/2025 06/24/2020 06/25/2020 225,000.00 224,839.88 0.00 0.00 224,842.88 643.75 681.25 56.25 93.75 3.00 0.00 3.00 96.75 96.75 313378WG2 FHLB Note 2.5% Due 03/11/2022 03/13/2018 03/14/2018 300,000.00 299,465.15 0.00 0.00 299,500.81 1,666.67 0.00 2,291.67 625.00 35.66 0.00 35.66 660.66 660.66 313379Q69 FHLB Note 2.125% Due 06/10/2022 06/20/2017 06/21/2017 200,000.00 200,726.02 0.00 0.00 200,685.54 2,018.75 2,125.00 247.92 354.17 0.00 40.48 (40.48) 313.69 313.69 313383YJ4 FHLB Note 3.375% Due 09/08/2023 12/27/2018 12/28/2018 200,000.00 203,318.91 0.00 0.00 203,217.14 1,556.25 0.00 2,118.75 562.50 0.00 101.77 (101.77) 460.73 460.73 3135G03U5 FNMA Note 0.625% Due 04/22/2025 Various Various 310,000.00 309,963.44 0.00 0.00 309,964.15 209.90 0.00 371.35 161.45 7.36 6.65 0.71 162.16 162.16 3135G05X7 FNMA Note 0.375% Due 08/25/2025 08/25/2020 08/27/2020 230,000.00 228,980.25 0.00 0.00 228,998.55 225.21 0.00 297.08 71.87 18.30 0.00 18.30 90.17 90.17 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 14 3.A.3.a Packet Pg. 27 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Income Earned As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 3135G06G3 FNMA Note 0.5% Due 11/07/2025 11/09/2020 11/12/2020 250,000.00 249,114.34 0.00 0.00 249,129.57 65.97 0.00 170.14 104.17 15.23 0.00 15.23 119.40 119.40 3135G0N82 FNMA Note 1.25% Due 08/17/2021 01/26/2017 01/31/2017 315,000.00 313,373.22 0.00 0.00 313,567.93 1,137.50 0.00 1,465.63 328.13 194.71 0.00 194.71 522.84 522.84 3135G0T94 FNMA Note 2.375% Due 01/19/2023 10/17/2018 10/19/2018 290,000.00 285,983.66 0.00 0.00 286,143.49 2,525.42 0.00 3,099.38 573.96 159.83 0.00 159.83 733.79 733.79 3135G0V34 FNMA Note 2.5% Due 02/05/2024 03/24/2020 03/25/2020 375,000.00 394,598.04 0.00 0.00 394,074.75 3,020.83 0.00 3,802.08 781.25 0.00 523.29 (523.29) 257.96 257.96 3135G0W33 FNMA Note 1.375% Due 09/06/2022 09/05/2019 09/06/2019 200,000.00 199,591.04 0.00 0.00 199,610.72 649.31 0.00 878.47 229.16 19.68 0.00 19.68 248.84 248.84 3135G0X24 FNMA Note 1.625% Due 01/07/2025 01/16/2020 01/17/2020 225,000.00 224,421.25 0.00 0.00 224,433.22 1,462.50 0.00 1,767.19 304.69 11.97 0.00 11.97 316.66 316.66 3137EAEN5 FHLMC Note 2.75% Due 06/19/2023 11/13/2018 11/14/2018 200,000.00 198,434.85 0.00 0.00 198,487.02 2,475.00 2,750.00 183.33 458.33 52.17 0.00 52.17 510.50 510.50 3137EAEP0 FHLMC Note 1.5% Due 02/12/2025 02/13/2020 02/14/2020 245,000.00 244,841.43 0.00 0.00 244,844.64 1,112.71 0.00 1,418.96 306.25 3.21 0.00 3.21 309.46 309.46 3137EAEU9 FHLMC Note 0.375% Due 07/21/2025 07/21/2020 07/23/2020 145,000.00 144,329.76 0.00 0.00 144,342.03 193.33 0.00 238.65 45.32 12.27 0.00 12.27 57.59 57.59 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 15 3.A.3.a Packet Pg. 28 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Income Earned As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 3137EAEX3 FHLMC Note 0.375% Due 09/23/2025 09/23/2020 09/25/2020 230,000.00 229,333.13 0.00 0.00 229,344.90 158.13 0.00 230.00 71.87 11.77 0.00 11.77 83.64 83.64 3137EAEY1 FHLMC Note 0.125% Due 10/16/2023 10/22/2020 10/23/2020 180,000.00 179,279.78 0.00 0.00 179,301.06 28.13 0.00 46.88 18.75 21.28 0.00 21.28 40.03 40.03 369550BE7 General Dynamics Corp Note 3% Due 05/11/2021 05/15/2018 05/18/2018 125,000.00 124,871.19 0.00 0.00 124,895.99 208.33 0.00 520.83 312.50 24.80 0.00 24.80 337.30 337.30 43813KAC6 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 09/22/2020 09/29/2020 90,000.00 89,987.51 0.00 0.00 89,987.87 12.03 27.75 12.03 27.75 0.36 0.00 0.36 28.11 28.11 43815HAC1 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 08/22/2022 08/21/2018 08/28/2018 31,590.83 35,163.12 0.00 3,574.37 31,589.05 28.82 86.45 25.89 83.52 0.30 0.00 0.30 83.82 83.82 43815NAC8 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 08/15/2023 08/20/2019 08/27/2019 80,000.00 79,999.61 0.00 0.00 79,999.63 63.29 118.67 63.29 118.67 0.02 0.00 0.02 118.69 118.69 46625HJX9 JP Morgan Chase Note 3.625% Due 05/13/2024 12/19/2019 12/24/2019 145,000.00 151,727.87 0.00 0.00 151,562.21 262.81 0.00 700.83 438.02 0.00 165.66 (165.66) 272.36 272.36 477870AC3 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 07/16/2019 07/24/2019 40,000.00 39,994.13 0.00 0.00 39,994.30 39.29 73.67 39.29 73.67 0.17 0.00 0.17 73.84 73.84 47787NAC3 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 07/14/2020 07/22/2020 25,000.00 24,996.59 0.00 0.00 24,996.68 5.67 10.63 5.67 10.63 0.09 0.00 0.09 10.72 10.72 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 16 3.A.3.a Packet Pg. 29 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Income Earned As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 47789KAC7 John Deere Owner Trust 2020-A A3 1.1% Due 08/15/2024 03/04/2020 03/11/2020 60,000.00 59,996.93 0.00 0.00 59,997.00 29.33 55.00 29.33 55.00 0.07 0.00 0.07 55.07 55.07 65479JAD5 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 07/15/2024 10/16/2019 10/23/2019 85,000.00 84,996.56 0.00 0.00 84,996.64 72.91 136.71 72.91 136.71 0.08 0.00 0.08 136.79 136.79 68389XBK0 Oracle Corp Callable Note Cont 8/15/2021 1.9% Due 09/15/2021 10/12/2017 10/16/2017 200,000.00 199,689.44 0.00 0.00 199,722.87 802.22 0.00 1,118.89 316.67 33.43 0.00 33.43 350.10 350.10 808513AW5 Charles Schwab Corp Callable Note Cont 4/21/2021 3.25% Due 05/21/2021 05/30/2018 06/01/2018 150,000.00 150,135.12 0.00 0.00 150,105.41 135.42 0.00 541.67 406.25 0.00 29.71 (29.71) 376.54 376.54 89236TDP7 Toyota Motor Credit Corp Note 2.6% Due 01/11/2022 01/28/2019 01/30/2019 130,000.00 129,483.47 0.00 0.00 129,522.91 1,314.44 0.00 1,596.11 281.67 39.44 0.00 39.44 321.11 321.11 89236XAC0 Toyota Auto Receivables 2020-D A3 0.35% Due 01/15/2025 10/06/2020 10/13/2020 45,000.00 44,991.88 0.00 0.00 44,992.05 7.00 13.13 7.00 13.13 0.17 0.00 0.17 13.30 13.30 89237VAB5 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 07/21/2020 07/27/2020 55,000.00 54,996.12 0.00 0.00 54,996.20 10.76 20.17 10.76 20.17 0.08 0.00 0.08 20.25 20.25 89238KAD4 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 01/18/2022 10/17/2019 10/21/2019 11,870.95 16,339.21 0.00 4,470.19 11,869.65 11.39 26.28 8.27 23.16 0.63 0.00 0.63 23.79 23.79 91159HHL7 US Bancorp Callable Note 1X 12/29/2020 Due 01/29/2021 05/02/2017 05/05/2017 0.00 125,021.25 0.00 125,000.00 0.00 995.49 1,223.96 0.00 228.47 0.00 21.25 (21.25) 207.22 207.22 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 17 3.A.3.a Packet Pg. 30 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Income Earned As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 9128282U3 US Treasury Note 1.875% Due 08/31/2024 12/12/2019 12/13/2019 230,000.00 230,977.97 0.00 0.00 230,955.83 1,095.99 0.00 1,465.30 369.31 0.00 22.14 (22.14) 347.17 347.17 9128284D9 US Treasury Note 2.5% Due 03/31/2023 Various Various 210,000.00 207,959.36 0.00 0.00 208,033.79 894.23 0.00 1,341.34 447.11 74.43 0.00 74.43 521.54 521.54 912828G53 US Treasury Note 1.875% Due 11/30/2021 04/26/2017 04/27/2017 220,000.00 220,141.84 0.00 0.00 220,129.76 11.33 0.00 362.64 351.31 0.00 12.08 (12.08) 339.23 339.23 912828L24 US Treasury Note 1.875% Due 08/31/2022 07/22/2019 07/23/2019 150,000.00 150,260.20 0.00 0.00 150,247.55 714.78 0.00 955.63 240.85 0.00 12.65 (12.65) 228.20 228.20 912828M80 US Treasury Note 2% Due 11/30/2022 04/11/2019 04/15/2019 200,000.00 198,817.95 0.00 0.00 198,868.22 10.99 0.00 351.65 340.66 50.27 0.00 50.27 390.93 390.93 912828S76 US Treasury Note 1.125% Due 07/31/2021 11/29/2017 11/30/2017 100,000.00 99,455.69 0.00 0.00 99,525.41 376.02 0.00 470.79 94.77 69.72 0.00 69.72 164.49 164.49 912828T34 US Treasury Note 1.125% Due 09/30/2021 05/30/2018 05/31/2018 125,000.00 123,555.73 0.00 0.00 123,703.50 239.53 0.00 359.29 119.76 147.77 0.00 147.77 267.53 267.53 912828W71 US Treasury Note 2.125% Due 03/31/2024 12/05/2019 12/06/2019 210,000.00 213,339.76 0.00 0.00 213,254.62 760.10 0.00 1,140.14 380.04 0.00 85.14 (85.14) 294.90 294.90 912828W89 US Treasury Note 1.875% Due 03/31/2022 04/26/2018 04/27/2018 200,000.00 197,812.17 0.00 0.00 197,952.01 638.74 0.00 958.10 319.36 139.84 0.00 139.84 459.20 459.20 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 18 3.A.3.a Packet Pg. 31 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Income Earned As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income 912828WN6 US Treasury Note Due 05/31/2021 04/29/2019 04/30/2019 0.00 199,719.78 0.00 199,743.01 0.00 10.99 175.82 0.00 164.83 23.23 0.00 23.23 188.06 188.06 912828Y61 US Treasury Note 2.75% Due 07/31/2023 12/27/2018 12/28/2018 175,000.00 175,709.65 0.00 0.00 175,687.01 1,608.53 0.00 2,013.93 405.40 0.00 22.64 (22.64) 382.76 382.76 912828Y87 US Treasury Note 1.75% Due 07/31/2024 01/17/2020 01/21/2020 220,000.00 220,939.08 0.00 0.00 220,917.32 1,286.82 0.00 1,611.14 324.32 0.00 21.76 (21.76) 302.56 302.56 912828YV6 US Treasury Note 1.5% Due 11/30/2024 12/12/2019 12/13/2019 230,000.00 227,924.68 0.00 0.00 227,968.74 9.48 0.00 303.30 293.82 44.06 0.00 44.06 337.88 337.88 912828ZC7 US Treasury Note 1.125% Due 02/28/2025 03/24/2020 03/25/2020 400,000.00 410,367.94 0.00 0.00 410,160.58 1,143.65 0.00 1,529.01 385.36 0.00 207.36 (207.36) 178.00 178.00 912828ZT0 US Treasury Note 0.25% Due 05/31/2025 06/04/2020 06/05/2020 230,000.00 228,533.68 0.00 0.00 228,561.36 1.58 0.00 50.55 48.97 27.68 0.00 27.68 76.65 76.65 91282CAZ4 US Treasury Note 0.375% Due 11/30/2025 12/15/2020 12/16/2020 240,000.00 0.00 240,018.75 0.00 240,018.58 0.00 (39.56) 79.12 39.56 0.00 0.17 (0.17) 39.39 39.39 931142EJ8 Wal-Mart Stores Note 3.125% Due 06/23/2021 Various Various 200,000.00 200,175.45 0.00 0.00 200,148.79 2,743.05 3,125.00 138.89 520.84 0.00 26.66 (26.66) 494.18 494.18 Total Fixed Income 10,763,461.78 10,913,195.73 240,018.75 332,787.57 10,819,446.53 54,330.29 22,028.68 49,411.49 17,109.88 1,312.85 2,293.23 (980.38) 16,129.50 16,129.50 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 19 3.A.3.a Packet Pg. 32 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Income Earned As of December 31, 2020 City of San Jacinto Account #10167 CUSIP Security Description Trade Date Settle Date Units Book Value: Begin Book Value: Acq Book Value: Disp Book Value: End Prior Accrued Inc. Received Ending Accrued Total Interest Accr. Of Discount Amort. Of Premium Net Accret/Amort Income Earned Total Income CASH & EQUIVALENT 31846V203 First American Govt Obligation Fund Class Y Various Various 155,105.38 39,349.53 154,937.19 39,181.34 155,105.38 0.00 0.21 0.00 0.21 0.00 0.00 0.00 0.21 0.21 Total Cash & Equivalent 155,105.38 39,349.53 154,937.19 39,181.34 155,105.38 0.00 0.21 0.00 0.21 0.00 0.00 0.00 0.21 0.21 TOTAL PORTFOLIO 10,918,567.16 10,952,545.26 394,955.94 371,968.91 10,974,551.91 54,330.29 22,028.89 49,411.49 17,110.09 1,312.85 2,293.23 (980.38) 16,129.71 16,129.71 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 20 3.A.3.a Packet Pg. 33 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 01/07/2021 Interest 3135G0X24 225,000.00 FNMA Note 1.625% Due 1/7/2025 0.00 1,828.13 1,828.13 01/10/2021 Interest 24422EUR8 150,000.00 John Deere Capital Corp Note 3.45% Due 1/10/2024 0.00 2,587.50 2,587.50 01/11/2021 Interest 06051GEU9 130,000.00 Bank of America Corp Note 3.3% Due 1/11/2023 0.00 2,145.00 2,145.00 01/11/2021 Interest 89236TDP7 130,000.00 Toyota Motor Credit Corp Note 2.6% Due 1/11/2022 0.00 1,690.00 1,690.00 01/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,071.12 73.67 1,144.79 01/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 984.29 13.13 997.42 01/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 5,284.37 118.67 5,403.04 01/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 01/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,284.67 55.00 1,339.67 01/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,884.88 136.71 2,021.59 01/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 01/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 1,644.68 19.09 1,663.77 01/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 01/19/2021 Interest 3135G0T94 290,000.00 FNMA Note 2.375% Due 1/19/2023 0.00 3,443.75 3,443.75 01/21/2021 Interest 3137EAEU9 145,000.00 FHLMC Note 0.375% Due 7/21/2025 0.00 268.85 268.85 01/21/2021 Paydown 43815HAC1 31,590.83 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 8/22/2022 6,574.76 77.66 6,652.42 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 21 3.A.3.a Packet Pg. 34 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 01/29/2021 Interest 06406RAE7 145,000.00 Bank of NY Mellon Corp Callable Note Cont 12/29/2022 2.95% Due 1/29/2023 0.00 2,138.75 2,138.75 01/31/2021 Interest 912828S76 100,000.00 US Treasury Note 1.125% Due 7/31/2021 0.00 562.50 562.50 01/31/2021 Interest 912828Y87 220,000.00 US Treasury Note 1.75% Due 7/31/2024 0.00 1,925.00 1,925.00 01/31/2021 Interest 912828Y61 175,000.00 US Treasury Note 2.75% Due 7/31/2023 0.00 2,406.25 2,406.25 JAN 2021 18,728.77 19,548.21 38,276.98 02/05/2021 Interest 3135G0V34 375,000.00 FNMA Note 2.5% Due 2/5/2024 0.00 4,687.50 4,687.50 02/12/2021 Interest 3137EAEP0 245,000.00 FHLMC Note 1.5% Due 2/12/2025 0.00 1,837.50 1,837.50 02/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,288.21 53.82 1,342.03 02/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 02/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 5,139.14 110.83 5,249.97 02/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,073.36 71.69 1,145.05 02/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 02/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,889.12 133.68 2,022.80 02/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 982.00 12.84 994.84 02/17/2021 Interest 3135G0N82 315,000.00 FNMA Note 1.25% Due 8/17/2021 0.00 1,968.75 1,968.75 02/18/2021 Maturity 3130A7CV5 175,000.00 FHLB Note 1.375% Due 2/18/2021 175,000.00 1,203.13 176,203.13 02/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 22 3.A.3.a Packet Pg. 35 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 02/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 1,523.84 16.45 1,540.29 02/21/2021 Paydown 43815HAC1 31,590.83 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 8/22/2022 6,079.49 61.50 6,140.99 02/25/2021 Interest 3135G05X7 230,000.00 FNMA Note 0.375% Due 8/25/2025 0.00 426.46 426.46 02/28/2021 Interest 9128282U3 230,000.00 US Treasury Note 1.875% Due 8/31/2024 0.00 2,156.25 2,156.25 02/28/2021 Interest 912828ZC7 400,000.00 US Treasury Note 1.125% Due 2/28/2025 0.00 2,250.00 2,250.00 02/28/2021 Interest 912828L24 150,000.00 US Treasury Note 1.875% Due 8/31/2022 0.00 1,406.25 1,406.25 02/28/2021 Maturity 17275RBD3 150,000.00 Cisco Systems Note 2.2% Due 2/28/2021 150,000.00 1,650.00 151,650.00 FEB 2021 342,975.16 18,105.20 361,080.36 03/06/2021 Interest 3135G0W33 200,000.00 FNMA Note 1.375% Due 9/6/2022 0.00 1,375.00 1,375.00 03/08/2021 Interest 313383YJ4 200,000.00 FHLB Note 3.375% Due 9/8/2023 0.00 3,375.00 3,375.00 03/11/2021 Interest 313378WG2 300,000.00 FHLB Note 2.5% Due 3/11/2022 0.00 3,750.00 3,750.00 03/13/2021 Interest 3130A2UW4 150,000.00 FHLB Note 2.875% Due 9/13/2024 0.00 2,156.25 2,156.25 03/15/2021 Interest 084670BR8 150,000.00 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 3/15/2023 0.00 2,062.50 2,062.50 03/15/2021 Interest 68389XBK0 200,000.00 Oracle Corp Callable Note Cont 8/15/2021 1.9% Due 9/15/2021 0.00 1,900.00 1,900.00 03/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,893.37 130.64 2,024.01 03/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 979.67 12.55 992.22 03/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,075.59 69.72 1,145.31 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 23 3.A.3.a Packet Pg. 36 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 03/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 03/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,291.75 52.64 1,344.39 03/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 03/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 4,993.55 103.21 5,096.76 03/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 1,402.70 14.00 1,416.70 03/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 03/21/2021 Paydown 43815HAC1 31,590.83 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 8/22/2022 5,582.38 46.55 5,628.93 03/23/2021 Interest 3137EAEX3 230,000.00 FHLMC Note 0.375% Due 9/23/2025 0.00 426.46 426.46 03/31/2021 Interest 912828T34 125,000.00 US Treasury Note 1.125% Due 9/30/2021 0.00 703.13 703.13 03/31/2021 Interest 9128284D9 210,000.00 US Treasury Note 2.5% Due 3/31/2023 0.00 2,625.00 2,625.00 03/31/2021 Interest 912828W71 210,000.00 US Treasury Note 2.125% Due 3/31/2024 0.00 2,231.25 2,231.25 03/31/2021 Interest 912828W89 200,000.00 US Treasury Note 1.875% Due 3/31/2022 0.00 1,875.00 1,875.00 MAR 2021 17,219.01 22,967.45 40,186.46 04/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,295.30 51.46 1,346.76 04/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 04/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 04/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,897.64 127.59 2,025.23 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 24 3.A.3.a Packet Pg. 37 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 04/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 4,847.61 95.80 4,943.41 04/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,077.83 67.74 1,145.57 04/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 977.32 12.27 989.59 04/16/2021 Interest 3137EAEY1 180,000.00 FHLMC Note 0.125% Due 10/16/2023 0.00 112.50 112.50 04/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 04/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 1,281.27 11.74 1,293.01 04/21/2021 Call 808513AW5 150,000.00 Charles Schwab Corp Callable Note Cont 4/21/2021 3.25% Due 5/21/2021 150,000.00 2,031.25 152,031.25 04/21/2021 Paydown 43815HAC1 31,590.83 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 8/22/2022 5,083.44 32.83 5,116.27 04/22/2021 Interest 3135G03U5 310,000.00 FNMA Note 0.625% Due 4/22/2025 0.00 968.75 968.75 APR 2021 166,460.41 3,570.48 170,030.89 05/03/2021 Interest 037833AK6 200,000.00 Apple Inc Note 2.4% Due 5/3/2023 0.00 2,400.00 2,400.00 05/07/2021 Interest 3135G06G3 250,000.00 FNMA Note 0.5% Due 11/7/2025 0.00 607.64 607.64 05/11/2021 Maturity 369550BE7 125,000.00 General Dynamics Corp Note 3% Due 5/11/2021 125,000.00 1,875.00 126,875.00 05/13/2021 Interest 46625HJX9 145,000.00 JP Morgan Chase Note 3.625% Due 5/13/2024 0.00 2,628.13 2,628.13 05/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 05/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,298.86 50.27 1,349.13 05/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,901.90 124.54 2,026.44 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 25 3.A.3.a Packet Pg. 38 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 05/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 05/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,080.08 65.75 1,145.83 05/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 974.94 11.98 986.92 05/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 4,701.32 88.61 4,789.93 05/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 1,159.55 9.68 1,169.23 05/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 05/21/2021 Paydown 43815HAC1 31,590.83 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 8/22/2022 4,582.65 20.33 4,602.98 05/31/2021 Interest 912828G53 220,000.00 US Treasury Note 1.875% Due 11/30/2021 0.00 2,062.50 2,062.50 05/31/2021 Interest 912828M80 200,000.00 US Treasury Note 2% Due 11/30/2022 0.00 2,000.00 2,000.00 05/31/2021 Interest 912828ZT0 230,000.00 US Treasury Note 0.25% Due 5/31/2025 0.00 287.50 287.50 05/31/2021 Interest 912828YV6 230,000.00 US Treasury Note 1.5% Due 11/30/2024 0.00 1,725.00 1,725.00 05/31/2021 Interest 91282CAZ4 240,000.00 US Treasury Note 0.375% Due 11/30/2025 0.00 450.00 450.00 MAY 2021 140,699.30 14,465.48 155,164.78 06/08/2021 Interest 3130A0F70 220,000.00 FHLB Note 3.375% Due 12/8/2023 0.00 3,712.50 3,712.50 06/09/2021 Interest 3130A3KM5 100,000.00 FHLB Note 2.5% Due 12/9/2022 0.00 1,250.00 1,250.00 06/10/2021 Interest 313379Q69 200,000.00 FHLB Note 2.125% Due 6/10/2022 0.00 2,125.00 2,125.00 06/13/2021 Interest 3130A3GE8 250,000.00 FHLB Note 2.75% Due 12/13/2024 0.00 3,437.50 3,437.50 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 26 3.A.3.a Packet Pg. 39 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 06/13/2021 Interest 3130AJKW8 225,000.00 FHLB Note 0.5% Due 6/13/2025 0.00 562.50 562.50 06/14/2021 Interest 3130A1XJ2 210,000.00 FHLB Note 2.875% Due 6/14/2024 0.00 3,018.76 3,018.76 06/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 4,554.68 81.63 4,636.31 06/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,082.33 63.76 1,146.09 06/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 06/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,906.19 121.48 2,027.67 06/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,302.43 49.08 1,351.51 06/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 972.54 11.70 984.24 06/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 06/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 1,037.54 7.81 1,045.35 06/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 06/19/2021 Interest 3137EAEN5 200,000.00 FHLMC Note 2.75% Due 6/19/2023 0.00 2,750.00 2,750.00 06/21/2021 Paydown 43815HAC1 31,590.83 Honda Auto Receivables Trust 2018-3 A3 2.95% Due 8/22/2022 3,688.11 9.07 3,697.18 06/23/2021 Maturity 931142EJ8 200,000.00 Wal-Mart Stores Note 3.125% Due 6/23/2021 200,000.00 3,125.00 203,125.00 JUN 2021 214,543.82 20,384.34 234,928.16 07/07/2021 Interest 3135G0X24 225,000.00 FNMA Note 1.625% Due 1/7/2025 0.00 1,828.13 1,828.13 07/10/2021 Interest 24422EUR8 150,000.00 John Deere Capital Corp Note 3.45% Due 1/10/2024 0.00 2,587.50 2,587.50 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 27 3.A.3.a Packet Pg. 40 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 07/11/2021 Interest 06051GEU9 130,000.00 Bank of America Corp Note 3.3% Due 1/11/2023 0.00 2,145.00 2,145.00 07/11/2021 Interest 89236TDP7 130,000.00 Toyota Motor Credit Corp Note 2.6% Due 1/11/2022 0.00 1,690.00 1,690.00 07/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,910.47 118.42 2,028.89 07/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 4,407.68 74.88 4,482.56 07/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 970.11 11.41 981.52 07/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,084.58 61.77 1,146.35 07/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 07/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,306.01 47.89 1,353.90 07/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 07/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 07/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 915.22 6.15 921.37 07/19/2021 Interest 3135G0T94 290,000.00 FNMA Note 2.375% Due 1/19/2023 0.00 3,443.75 3,443.75 07/21/2021 Interest 3137EAEU9 145,000.00 FHLMC Note 0.375% Due 7/21/2025 0.00 271.88 271.88 07/29/2021 Interest 06406RAE7 145,000.00 Bank of NY Mellon Corp Callable Note Cont 12/29/2022 2.95% Due 1/29/2023 0.00 2,138.75 2,138.75 07/31/2021 Interest 912828Y87 220,000.00 US Treasury Note 1.75% Due 7/31/2024 0.00 1,925.00 1,925.00 07/31/2021 Interest 912828Y61 175,000.00 US Treasury Note 2.75% Due 7/31/2023 0.00 2,406.25 2,406.25 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 28 3.A.3.a Packet Pg. 41 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 07/31/2021 Maturity 912828S76 100,000.00 US Treasury Note 1.125% Due 7/31/2021 100,000.00 562.50 100,562.50 JUL 2021 110,594.07 19,377.83 129,971.90 08/05/2021 Interest 3135G0V34 375,000.00 FNMA Note 2.5% Due 2/5/2024 0.00 4,687.50 4,687.50 08/12/2021 Interest 3137EAEP0 245,000.00 FHLMC Note 1.5% Due 2/12/2025 0.00 1,837.50 1,837.50 08/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 4,260.32 68.34 4,328.66 08/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,086.84 59.77 1,146.61 08/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,309.60 46.69 1,356.29 08/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 967.65 11.13 978.78 08/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 08/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 08/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,914.77 115.34 2,030.11 08/17/2021 Maturity 3135G0N82 315,000.00 FNMA Note 1.25% Due 8/17/2021 315,000.00 1,968.75 316,968.75 08/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 08/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 792.62 4.67 797.29 08/25/2021 Interest 3135G05X7 230,000.00 FNMA Note 0.375% Due 8/25/2025 0.00 431.25 431.25 08/31/2021 Interest 912828L24 150,000.00 US Treasury Note 1.875% Due 8/31/2022 0.00 1,406.25 1,406.25 08/31/2021 Interest 912828ZC7 400,000.00 US Treasury Note 1.125% Due 2/28/2025 0.00 2,250.00 2,250.00 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 29 3.A.3.a Packet Pg. 42 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 08/31/2021 Interest 9128282U3 230,000.00 US Treasury Note 1.875% Due 8/31/2024 0.00 2,156.25 2,156.25 AUG 2021 325,331.80 15,101.99 340,433.79 09/06/2021 Interest 3135G0W33 200,000.00 FNMA Note 1.375% Due 9/6/2022 0.00 1,375.00 1,375.00 09/08/2021 Interest 313383YJ4 200,000.00 FHLB Note 3.375% Due 9/8/2023 0.00 3,375.00 3,375.00 09/11/2021 Interest 313378WG2 300,000.00 FHLB Note 2.5% Due 3/11/2022 0.00 3,750.00 3,750.00 09/13/2021 Interest 3130A2UW4 150,000.00 FHLB Note 2.875% Due 9/13/2024 0.00 2,156.25 2,156.25 09/15/2021 Interest 084670BR8 150,000.00 Berkshire Hathaway Callable Note Cont 1/15/2023 2.75% Due 3/15/2023 0.00 2,062.50 2,062.50 09/15/2021 Maturity 68389XBK0 200,000.00 Oracle Corp Callable Note Cont 8/15/2021 1.9% Due 9/15/2021 200,000.00 1,900.00 201,900.00 09/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 09/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 09/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,313.21 45.49 1,358.70 09/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,919.08 112.26 2,031.34 09/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 965.16 10.85 976.01 09/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 4,112.61 62.02 4,174.63 09/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,089.10 57.77 1,146.87 09/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 09/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 669.71 3.40 673.11 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 30 3.A.3.a Packet Pg. 43 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 09/23/2021 Interest 3137EAEX3 230,000.00 FHLMC Note 0.375% Due 9/23/2025 0.00 431.25 431.25 09/30/2021 Interest 912828W89 200,000.00 US Treasury Note 1.875% Due 3/31/2022 0.00 1,875.00 1,875.00 09/30/2021 Interest 912828W71 210,000.00 US Treasury Note 2.125% Due 3/31/2024 0.00 2,231.25 2,231.25 09/30/2021 Interest 9128284D9 210,000.00 US Treasury Note 2.5% Due 3/31/2023 0.00 2,625.00 2,625.00 09/30/2021 Maturity 912828T34 125,000.00 US Treasury Note 1.125% Due 9/30/2021 125,000.00 703.13 125,703.13 SEP 2021 335,068.87 22,834.72 357,903.59 10/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 3,964.54 55.92 4,020.46 10/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,091.38 55.76 1,147.14 10/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 10/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,316.82 44.28 1,361.10 10/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 962.65 10.57 973.22 10/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 10/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,923.39 109.18 2,032.57 10/16/2021 Interest 3137EAEY1 180,000.00 FHLMC Note 0.125% Due 10/16/2023 0.00 112.50 112.50 10/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 10/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 546.51 2.32 548.83 10/22/2021 Interest 3135G03U5 310,000.00 FNMA Note 0.625% Due 4/22/2025 0.00 968.75 968.75 OCT 2021 9,805.29 1,417.83 11,223.12 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 31 3.A.3.a Packet Pg. 44 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount 11/03/2021 Interest 037833AK6 200,000.00 Apple Inc Note 2.4% Due 5/3/2023 0.00 2,400.00 2,400.00 11/07/2021 Interest 3135G06G3 250,000.00 FNMA Note 0.5% Due 11/7/2025 0.00 625.00 625.00 11/13/2021 Interest 46625HJX9 145,000.00 JP Morgan Chase Note 3.625% Due 5/13/2024 0.00 2,628.13 2,628.13 11/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,093.65 53.75 1,147.40 11/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 11/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 11/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,927.73 106.08 2,033.81 11/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 3,816.11 50.04 3,866.15 11/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,320.44 43.08 1,363.52 11/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 960.10 10.29 970.39 11/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 11/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 423.01 1.44 424.45 11/30/2021 Interest 912828YV6 230,000.00 US Treasury Note 1.5% Due 11/30/2024 0.00 1,725.00 1,725.00 11/30/2021 Interest 91282CAZ4 240,000.00 US Treasury Note 0.375% Due 11/30/2025 0.00 450.00 450.00 11/30/2021 Interest 912828M80 200,000.00 US Treasury Note 2% Due 11/30/2022 0.00 2,000.00 2,000.00 11/30/2021 Interest 912828ZT0 230,000.00 US Treasury Note 0.25% Due 5/31/2025 0.00 287.50 287.50 11/30/2021 Maturity 912828G53 220,000.00 US Treasury Note 1.875% Due 11/30/2021 220,000.00 2,062.50 222,062.50 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 32 3.A.3.a Packet Pg. 45 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount NOV 2021 229,541.04 12,501.36 242,042.40 12/08/2021 Interest 3130A0F70 220,000.00 FHLB Note 3.375% Due 12/8/2023 0.00 3,712.50 3,712.50 12/09/2021 Interest 3130A3KM5 100,000.00 FHLB Note 2.5% Due 12/9/2022 0.00 1,250.00 1,250.00 12/10/2021 Interest 313379Q69 200,000.00 FHLB Note 2.125% Due 6/10/2022 0.00 2,125.00 2,125.00 12/13/2021 Interest 3130A3GE8 250,000.00 FHLB Note 2.75% Due 12/13/2024 0.00 3,437.50 3,437.50 12/13/2021 Interest 3130AJKW8 225,000.00 FHLB Note 0.5% Due 6/13/2025 0.00 562.50 562.50 12/14/2021 Interest 3130A1XJ2 210,000.00 FHLB Note 2.875% Due 6/14/2024 0.00 3,018.76 3,018.76 12/15/2021 Paydown 47787NAC3 25,000.00 John Deere Owner Trust 2020-B A3 0.51% Due 11/15/2024 0.00 10.63 10.63 12/15/2021 Paydown 65479JAD5 85,000.00 Nissan Auto Receivables Owner 2019-C A3 1.93% Due 7/15/2024 1,932.07 102.98 2,035.05 12/15/2021 Paydown 47789KAC7 60,000.00 John Deere Owner Trust 2020-A A3 1.1% Due 8/15/2024 1,324.07 41.87 1,365.94 12/15/2021 Paydown 89236XAC0 45,000.00 Toyota Auto Receivables 2020-D A3 0.35% Due 1/15/2025 957.53 10.01 967.54 12/15/2021 Paydown 89237VAB5 55,000.00 Toyota Auto Receivables Trust 2020-C A3 0.44% Due 10/15/2024 0.00 20.17 20.17 12/15/2021 Paydown 43815NAC8 80,000.00 Honda Auto Receivables Trust 2019-3 A3 1.78% Due 8/15/2023 3,667.32 44.38 3,711.70 12/15/2021 Paydown 477870AC3 40,000.00 John Deere Owner Trust 2019-B A3 2.21% Due 12/15/2023 1,095.93 51.74 1,147.67 12/18/2021 Paydown 43813KAC6 90,000.00 Honda Auto Receivables Trust 2020-3 A3 0.37% Due 10/18/2024 0.00 27.75 27.75 12/18/2021 Paydown 89238KAD4 11,870.95 Toyota Auto Receivables Trust 2017-D A3 1.93% Due 1/18/2022 299.21 0.76 299.97 12/19/2021 Interest 3137EAEN5 200,000.00 FHLMC Note 2.75% Due 6/19/2023 0.00 2,750.00 2,750.00 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 33 3.A.3.a Packet Pg. 46 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Cash Flow Report As of December 31, 2020 City of San Jacinto Account #10167 Payment Date Transaction Type CUSIP Quantity Security Description Principal Amount Income Total Amount DEC 2021 9,276.13 17,166.55 26,442.68 TOTAL 1,920,243.67 187,441.44 2,107,685.11 Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 34 3.A.3.a Packet Pg. 47 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Important DisclosuresCity of San Jacinto Account #10167 Chandler Asset Management, Inc. ;͞Chandler͟Ϳis an SEC registered investment adviser. For additional information about our firm, please see our current disclosures (Form ADV). To obtain a copy of our current disclosures, you may contact your client service representative by calling the number on the front of this statement or you may visit our website at www.chandlerasset.com. Information contained in this monthly statement is confidential and is provided for informational purposes only and should not be construed as specific investment or legal advice. The information contained herein was obtained from sources believed to be reliable as of the date of this statement, but may become outdated or superseded at any time without notice. Custody: Your qualified custodian bank maintains control of all assets reflected in this statement and we urge you to compare this statement to the one you receive from your qualified custodian. Chandler does not have any authority to withdraw or deposit funds from/to the custodian account. Valuation: Prices are provided by IDC, an independent pricing source. In the event IDC does not provide a price or if the price provided is not reflective of fair market value, Chandler will obtain pricing from an alternative approved third party pricing source in accordance with our written valuation policy and procedures. Our valuation procedures are also disclosed in Item 5 of our Form ADV Part 2A. Performance: Performance results are presented gross-of-advisory fees and represent the client ͛s Total Return. The deduction of advisory fees lowers performance results. These results include the reinvestment of dividends and other earnings. Past performance may not be indicative of future results. Therefore, clients should not assume that future performance of any specific investment or investment strategy will be profitable or equal to past performance levels. All investment strategies have the potential for profit or loss. Economic factors, market conditions or changes in investment strategies, contributions or withdrawals may materially alter the performance and results of your portfolio. Source ice Data Indices, LLC ("ICE"), used with permission. ICE PERMITS USE OF THE ICE INDICES AND RELATED DATA ON AN "AS IS" BASIS; ICE, ITS AFFILIATES AND THEIR RESPECTIVE THIRD PARTY SUPPLIERS DISCLAIM ANY AND ALL WARRANTIES AND REPRESENTATIONS, EXPRESS AND/OR IMPLIED, INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR USE, INCLUDING THE INDICES, INDEX DATA AND ANY DATA INCLUDED IN, RELATED TO, OR DERIVED THEREFROM. NEITHER ICE DATA, ITS AFFILIATES OR THEIR RESPECTIVE THIRD PARTY PROVIDERS GUARANTEE THE QUALITY, ADEQUACY, ACCURACY, TIMELINESS OR COMPLETENESS OF THE INDICES OR THE INDEX DATA OR ANY COMPONENT THEREOF, AND THE INDICES AND INDEX DATA AND ALL COMPONENTS THEREOF ARE PROVIDED ON AN "AS IS" BASIS AND LICENSEE'S USE IS AT LICENSEE'S OWN RISK. ICE DATA, ITS AFFILIATES AND THEIR RESPECTIVE THIRD PARTY DO NOT SPONSOR, ENDORSE, OR RECOMMEND CHANDLER, OR ANY OF ITS PRODUCTS OR SERVICES. Index returns assume reinvestment of all distributions. Historical performance results for investment indexes generally do not reflect the deduction of transaction and/or custodial charges or the deduction of an investment management fee, the incurrence of which would have the effect of decreasing historical performance results. It is not possible to invest directly in an index. Ratings: Ratings information have been provided by Moody͛s, S&P and Fitch through data feeds we believe to be reliable as of the date of this statement, however we cannot guarantee its accuracy. Security level ratings for U.S. Agency issued mortgage-backed securities ;͞MBS͟Ϳreflect the issuer rating because the securities themselves are not rated. The issuing U.S. Agency guarantees the full and timely payment of both principal and interest and carries a AA+/Aaa/AAA by S&P, Moody ͛s and Fitch respectively. Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 35 3.A.3.a Packet Pg. 48 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Benchmark Index & DisclosuresCity of San Jacinto California Account #10167 Benchmark Index Disclosure City of San Jacinto 1-5 Year Govt Blended Index* The ICE BAML 1-5 Year US Treasury & Agency Index tracks the performance of US dollar denominated US Treasury and nonsubordinated US agency debt issued in the US domestic market. Qualifying securities must have an investment grade rating (based on an average of Moody ͛s, S&P and Fitch). Qualifying securities must have at least one year remaining term to final maturity and less than five years remaining term to final maturity, at least 18 months to maturity at time of issuance, a fixed coupon schedule and a minimum amount outstanding of $1 billion for sovereigns and $250 million for agencies. (Index: GVA0. Please visit www.mlindex.ml.com for more information) The ICE BAML 1-3 Year US Treasury Index tracks the performance of US dollar denominated sovereign debt publicly issued by the US government in its domestic market. Qualifying securities must have at least one year remaining term to final maturity and less than three years remaining term to final maturity, a fixed coupon schedule and a minimum amount outstanding of $1 billion. Qualifying securities must have at least 18 months to final maturity at the time of issuance. (Index: G 1O2. Please visit www.mlindex.ml.com for more information) City of San Jacinto 1-5 Yr Corp/Gov AAA-A Blend* Execution Time: 1/4/2021 6:51:28 PMChandler Asset Management - CONFIDENTIAL Page 36 3.A.3.a Packet Pg. 49 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, City of San Jacinto Public Trust Advisors LLC 595 S. San Jacinto Ave.550 South Hope Street San Jacinto, CA 92583 Suite 560 Los Angeles, CA 90071 Monthly Investment Report for Period Ended December 31, 2020 3.A.3.a Packet Pg. 50 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Investment Management Portfolio Review Page Investment Portfolio Summary Comparison 3 Total Return Performance Summary 4 Investment Portfolio Maturity Distribution 6 Investment Portfolio Maturity Distribution By Security Type 7 Investment Portfolio Rating Distribution 8 Investment Portfolio Security Distribution - Market Value 9 Investment Portfolio Security Distribution - Historical Cost 10 Investment Portfolio Compliance 11 Additional Disclosure 12 Portfolio Holdings Detail 13 City of San Jacinto Summary 3.A.3.a Packet Pg. 51 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, City of San Jacinto December 1, 2020 Beginning Balance December 31, 2020 Ending Balance Portfolio Characteristic December 1, 2020 Beginning Balance December 31, 2020 Ending Balance Historical Cost 11,078,815.42$ 11,103,012.55$ Book Yield Gross 1.26%1.21% Book Value 11,067,908.38$ 11,087,613.81$ Market Yield Gross 0.25%0.22% Accrued Interest 41,266.15 37,583.17 Weighted Average Coupon 1.48%1.44% Book Value Plus Accrued 11,109,174.53$ 11,125,196.98$ Duration 2.58 Years 2.57 Years Net Unrealized Gain/Loss 237,220.87 234,734.80 Weighted Effective Maturity 2.64 Years 2.62 Years Market Value Plus Accrued(2)11,346,395.40$ 11,359,931.78$ Weighted Final Maturity 2.65 Years 2.64 Years Net Pending Transactions 0.13 0.12 Market Value Plus Accrued Net(2)11,346,395.53$ 11,359,931.90$ City of San Jacinto December 2020 Net Income Portfolio Compliance Compliant Interest Income 13,210.28$ Security Distribution YES Net Amortization/Accretion (2,040.72)Maturity Distribution YES Net Realized Gain/Loss(3)4,957.05 Rating Distribution YES Miscellaneous Income - Net Income 16,126.61$ City of San Jacinto Summary Comparison for the period December 1, 2020 to December 31, 2020 (1) Payables represent amounts due to settle security transactions that have been executed but have not settled as of period end. The funds used to settle these trades may come from a variety of sources including cash within the portfolio, proceeds from future security transactions including maturities and sales, or other sources including money market funds. For reporting purposes, a payable is created for over-period settlements which are reflected in the detailed holdings. (2) Market Value Plus Accrued Net represents the market value of the portfolio net payables and recievables from transactions that settle in the following reporting period. (3) MBS paydowns may result in negative realized losses rather than amortization in as a result of accounting method. Page 3 3.A.3.a Packet Pg. 52 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Trailing Month Trailing 3 Months Trailing 12 Months Year to Date Total Return Performance Periodic Periodic Periodic Periodic City of San Jacinto 0.12%0.13%4.50%4.50% Trailing 3 Years Trailing 5 Years Since Inception* Total Return Performance Annualized Annualized Annualized City of San Jacinto 3.26%2.23%1.61% *Total return since inception date: December 1, 2012 Annualized total return performance presented for investment periods longer than one year. Return information obtained from Bloomberg. City of San Jacinto Total Return December 1, 2020 to December 31, 2020 0.12% 0.13% 4.50% 4.50% 3.26% 1.61% 0.00% 0.50% 1.00% 1.50% 2.00% 2.50% 3.00% 3.50% 4.00% 4.50% 5.00% Trailing Month Trailing 3 Months Trailing 12 Months Year to Date Trailing 3 Years Trailing 5 Years Since Inception*YieldTotal Return Performance City of San Jacinto Page 4 3.A.3.a Packet Pg. 53 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Trailing Month Trailing 3 Months Trailing 12 Months Year to Date Total Return Performance Periodic Periodic Periodic Periodic City of San Jacinto 0.12%0.13%NA NA BofA ML 1-5 Year U.S. Treasury/Agency 0.07%0.03%NA NA Since Inception* Trailing 3 Years Trailing 5 Years February 1, 2020 Total Return Performance Annualized Annualized Annualized City of San Jacinto NA NA NA BofA ML 1-5 Year U.S. Treasury/Agency NA NA NA *Original Total return since inception date: December 1, 2012. The BofA ML 1-5 Year U.S. Treasury/Agency benchmark established on February 1, 2020. Annualized total return performance presented for investment periods longer than one year. Return information obtained from Bloomberg. City of San Jacinto Total Return December 1, 2020 to December 31, 2020 0.12% 0.13% 0.07% 0.03% 0.00% 0.25% 0.50% Trailing Month Trailing 3 Months Trailing 12 Months Year to Date Trailing 3 Years Trailing 5 Years February 1, 2020YieldTotal Return Performance vs. Benchmark City of San Jacinto BofA ML 1-5 Year U.S. Treasury/Agency Page 5 3.A.3.a Packet Pg. 54 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Maturity Distribution December 1, 2020 Beginning Balance December 31, 2020 Ending Balance Portfolio Allocation Distribution Change 0-3 Months 15,800.51$ 37,509.94$ 0.33%0.19% 3-6 Months - - 0.00%0.00% 6-9 Months - - 0.00%0.00% 9-12 Months 443,881.18 460,323.99 4.05%0.14% 1-2 Years 3,287,079.16 3,026,442.77 26.64%-2.33% 2-3 Years 3,562,676.78 3,863,860.86 34.01%2.61% 3-4 Years 2,296,574.16 1,994,789.19 17.56%-2.68% 4-5 Years 1,740,383.62 1,977,005.02 17.40%2.06% 5-6 Years - - 0.00%0.00% 6 Years +- - 0.00%0.00% Total Portfolio 11,346,395.40$ 11,359,931.78$ 100.00% City of San Jacinto Maturity Distribution Market Value Basis December 1, 2020 to December 31, 2020 $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 $4,500,000 0-3 M 3-6 M 6-9 M 9-12 M 1-2 Yr 2-3 Yr 3-4 Yr 4-5 Yr 5-6 Yr 6 Yr + Maturity Distribution Comparison December 1, 2020 December 31, 2020 0-3 M 0.33% 9-12 M 4.05% 1-2 Yr 26.64% 2-3 Yr 34.01% 3-4 Yr 17.56%4-5 Yr 17.40% Maturity Distribution Page 6 3.A.3.a Packet Pg. 55 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Security Distribution 0-3 Months 3-6 Months 6-9 Months 9-12 Months 1-2 Years 2-3 Years 3-4 Years 4-5 Years Total Portfolio Cash -$ -$ -$ -$ -$ -$ -$ -$ -$ Money Market Funds 37,510 - - - - - - - 37,510 Certificates of Deposit - - - - - - - - - Commercial Paper - - - - - - - - - U.S. Treasury Notes - - - 460,324 1,927,105 530,830 1,994,789 1,018,403 5,931,452 U.S. Agency Notes - - - - - - - - - Federal Inst. (GSE)*- - - - 1,021,645 2,443,066 - 958,602 4,423,313 Corporate Notes - - - - 77,693 889,964 - - 967,657 Asset Backed (ABS)- - - - - - - - - Municipal Bonds - - - - - - - - - Total 37,510$ -$ -$ 460,324$ 3,026,443$ 3,863,861$ 1,994,789$ 1,977,005$ 11,359,932$ *Mortgage backed securities shown to effective maturity. City of San Jacinto Maturity Distribution Market Value Basis as of December 31, 2020 $- $5,000,000 0-3 Months 3-6 Months 6-9 Months 9-12 Months 1-2 Years 2-3 Years 3-4 Years 4-5 Years Maturity Distribution By Type Municipal Bonds Asset Backed (ABS) Corporate Notes Federal Inst. (GSE)* U.S. Agency Notes U.S. Treasury Notes Commercial Paper Certificates of Deposit Money Market Funds Cash Page 7 3.A.3.a Packet Pg. 56 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, S&P Rating Distribution December 31, 2020 Ending Balance Portfolio Allocation Short Term Rating Distribution A-1+-$ 0.00% A-1 - 0.00% A-2 - 0.00% Total Short Term Ratings -$ 0.00% Long Term Rating Distribution AAA Rating 585,706.32$ 5.16% AA Rating 10,688,678.14 94.09% A Rating 85,547.32 0.75% Below A - 0.00% Not Rated - 0.00% Total Long Term Rating 11,359,931.78$ 100.00% Total Portfolio 11,359,931.78$ 100.00% Moody's Rating Distribution December 31, 2020 Ending Balance Portfolio Allocation Short Term Rating Distribution P-1 -$ 0.00% P-2 - 0.00% Total Short Term Ratings -$ 0.00% Long Term Rating Distribution Aaa Rating 10,638,816.59$ 93.65% Aa Rating 635,567.87 5.59% A Rating 85,547.32 0.75% Below A - 0.00% Not Rated - 0.00% Total Long Term Rating 11,359,931.78$ 100.00% Total Portfolio 11,359,931.78$ 100.00% City of San Jacinto Rating Distribution Market Value Basis as of December 31, 2020 AAA Rating 5.16% AA Rating 94.09% A Rating 0.75% Portfolio Allocation By Standard and Poors' Rating Aaa Rating 93.65% Aa Rating 5.59% A Rating 0.75% Portfolio Allocation By Moody's Rating Page 8 3.A.3.a Packet Pg. 57 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Security Distribution December 1, 2020 Beginning Balance Portfolio Allocation December 31, 2020 Ending Balance Book Yield Portfolio Allocation Change in Allocation Permitted by Policy*Compliant Cash -$ 0.00%-$ 0.00%0.00%0.00%YES LGIP - 0.00%- 0.00%0.00%0.00%YES U.S. Treasury Notes 5,942,132.36 52.37%5,931,451.64 1.38%52.21%-0.16%NO U.S. Agency Notes - 0.00%- 0.00%0.00%0.00%YES FNMA 868,896.08 7.66%870,756.29 0.74%7.67%0.01%NO FHLMC 2,121,973.33 18.70%2,124,137.13 1.34%18.70%0.00%NO FFCB 891,679.08 7.86%892,404.07 0.38%7.86%0.00%NO FHLB 535,372.31 4.72%536,015.68 1.08%4.72%0.00%NO Fed Instrumentality Subtotal 4,417,920.80$ 38.94%4,423,313.17$ 1.00%38.94%0.00%NO Asset Backed Securities - 0.00%- 0.00%0.00%0.00%YES Commercial Paper - 0.00%- 0.00%0.00%0.00%YES Corporate Notes 970,541.73 8.55%967,657.02 1.13%8.52%-0.04%NO Bankers Acceptances - 0.00%- 0.00%0.00%0.00%YES Money Market Funds 15,800.51 0.14%37,509.94 0.01%0.33%0.19%YES Municipal Bonds - 0.00%- 0.00%0.00%0.00%YES Intergovernmental Funds - 0.00%- 0.00%0.00%0.00%YES Certificates of Deposit - 0.00%- 0.00%0.00%0.00%YES Total Portfolio Market Value 11,346,395.40$ 100.00%11,359,931.78$ 1.21%100.00% *Permitted allocation based on aggregate assets as defined within the investment policy. City of San Jacinto Market Value Basis Security Distribution December 1, 2020 to December 31, 2020 $- $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 CashLGIPUSTAgencyFNMAFHLMCFFCBFHLBABSCPCorpBAMMFMuniInter GovCDAsset Balance By Security Type (in millions) December 1, 2020 December 31, 2020 UST 52.21% FNMA 7.67% FHLMC 18.70% FFCB 7.86% FHLB 4.72% Corp 8.52% MMF 0.33% Ending Portfolio Allocation Page 9 3.A.3.a Packet Pg. 58 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Security Distribution December 1, 2020 Beginning Balance Portfolio Allocation December 31, 2020 Ending Balance Book Yield Portfolio Allocation Change in Allocation Permitted by Policy*Compliant Cash -$ 0.00%-$ 0.00%0.00%0.00%YES U.S. Treasury Notes 5,763,933.59 52.03%5,766,421.29 1.38%51.94%-0.09%NO U.S. Agency Notes - 0.00%- 0.00%0.00%0.00%YES FNMA 862,599.40 7.79%862,599.40 0.74%7.77%-0.02%NO FHLMC 2,070,796.02 18.69%2,070,796.02 1.34%18.65%-0.04%NO FFCB 887,991.90 8.02%887,991.90 0.38%8.00%-0.02%NO FHLB 523,332.00 4.72%523,332.00 1.08%4.71%-0.01%NO Fed Instrumentality Subtotal 4,344,719.32$ 39.22%4,344,719.32$ 0.99%39.13%-0.09%NO Asset Backed Securities - 0.00%- 0.00%0.00%0.00%YES Commercial Paper - 0.00%- 0.00%0.00%0.00%YES Corporate Notes 954,362.00 8.61%954,362.00 1.13%8.60%-0.02%NO Bankers Acceptances - 0.00%- 0.00%0.00%0.00%YES Money Market Funds 15,800.51 0.14%37,509.94 0.01%0.34%0.20%YES Municipal Bonds - 0.00%- 0.00%0.00%0.00%YES Intergovernmental Funds - 0.00%- 0.00%0.00%0.00%YES Certificates of Deposit - 0.00%- 0.00%0.00%0.00%YES Total Portfolio Historical Cost 11,078,815.42$ 100.00%11,103,012.55$ 1.21%100.00% *Permitted allocation based on aggregate assets as defined within the investment policy. City of San Jacinto Historical Cost Basis Security Distribution December 1, 2020 to December 31, 2020 $- $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 CashUSTAgencyFNMAFHLMCFFCBFHLBABSCPCorpBAMMFMuniInter GovCDAsset Balance By Security Type (in millions) December 1, 2020 December 31, 2020 UST 51.94% FNMA 7.77% FHLMC 18.65% FFCB 8.00% FHLB 4.71% Corp 8.60% MMF 0.34% Ending Portfolio Allocation Page 10 3.A.3.a Packet Pg. 59 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Policy Section Description Compliance Requirement Compliant Policy Section Description Compliance Requirement Compliant IX. 1,2 Municipal Bonds Rated A or better by 1 NRSRO, 5% issuer limitation, 30% total portfolio limit, 5-year maturity limit Compliant IX. 14 Pass-Through Securities Issuer debt rated at least A by 2 NRSRO's; Must be rated in the AA category by 2 NRSRO's; 20% total portfolio limit, 5-year maturity limit Compliant IX. 1 U.S. Treasury No limitations Compliant IX. 2 Federal Agency No limitations Compliant IX. 3 Bankers Acceptances Rated A1 or better and have long term debt rated A or better by 2 NRSRO's; Maturity ≤ to 180 days, 40% total portfolio limit, 5% issuer limit Compliant IX. 4 Federally Insured Time Deposits Limited to amounts covered under federal insurance; 20% total portfolio limit in combination with IX.5; 5-year maturity limit Compliant IX. 17.b Money Market Funds Registered with SEC under 1940 Act, have highest ranking by 2 NRSRO's; retained advisor registered (or exempt from registration) with 5-years experience investing in securities authorized by CA 53601 and at least $500 million of assets; 20% total portfolio limit Compliant IX. 5 Time Deposits Fully collateralized per CA law, 20% limit when combined with IX.4; Issuer must have long-term debt rated A or higher and/or short-term debt rated A1 or higher by 2 NRSRO's, 5-year maturity limit Compliant IX. 18 Supranationals US dollar denominated senior unsecured unsubordinated obligations issued or unconditionally guaranteed by IBRD, IFC, or IADB; rated AA or higher by 1 NRSRO; 30% total portfolio limit; 10% issuer limit; 5-year maturity limit Compliant IX. 6 CDARS 30% limit in combination of CD's (including CDARS); 5-year maturity limit Compliant X.A.1 Futures and Options Prohibited Compliant IX. 7 Negotiable CD's Issuer must have long-term debt rated A or higher and/or short-term debt rated A1 or higher by 2 NRSRO's; Maturity ≤ to 5 years, 30% total portfolio limit, 5% issuer limit Compliant X.A.2 Inverse Floaters, Range Notes, and Mortgage Derived IO Strips Prohibited Compliant IX. 8 Collateralized Bank Deposits Collateralized with pleged securities per CA Government Code Section 53651 Compliant X.A.3 Potential Zero Accrual Securities Prohibited Compliant X.A.5 Purchasing Securities on Margin Prohibited Compliant X.A.6 Reverse Repos or other leverage Prohibited Compliant X.A.7 Foreign Currency Securities Prohibited Compliant X.B.2 Single Issuer Limitation 5% issuer limitation, except U.S. Government, its agencies & enterprises, Money Market Mutual Funds, Mutual Funds, LAIF, LGIP's, and Supranationals Compliant IX. 11 Local Agency Investment Fund 70% total portfolio limit, up to the maximum permitted balance Compliant X.C.2 Callable Security Limitation 20% of total portfolio (excluding Make Whole Call securities)Compliant IX. 12 Local Government Investment Pools Riveride County Investment Fund limited to 70% of the portfolio; JPA Pools limited to 50% of the portfolio Compliant X.C.3 Maximum Security Maturity Individual security maturities limited to 5-years or less Compliant IX. 13 Corporate Bonds Corporations organized and operating in the U.S. or depository institutions licensed by the U.S. or any state and operating in the U.S.; Rated in the A category or better by 2 NRSRO's, 5-year maturity limit; 30% total portfolio limit, 5% issuer limit Compliant X.C.4 Portfolio Duration Limitation Average portfolio duration will be managed to be approximatly equal to the Market Benchmark selected by the City (typically +/- 20 of benchmark duration) Compliant IX. 9 Repurchase Agreements Collateralized at 102% in accordance with policy; 1-year maturity limit, no % portfolio limit, collateral held by custodian bank; subject to master repurchase agreement substantially in SIFMA's form Compliant IX. 10 Commercial Paper Issuer is organized and operating in the U.S. with assets of at least $500 million; Issuer short-term ratings of A1 or higher and long-term ratings of A or higher by 2 NRSRO's; Maturity ≤ 270 days; 25% total portfolio limit; 5% issuer limit Compliant City of San Jacinto Portfolio Compliance December 1, 2020 to December 31, 2020 IX. 17.e Mutual Funds Invests in securities authorized by specified provisions in CA Government Code Section 53601; have highest ranking by 2 NRSRO's; retained advisor registered (or exempt from registration) with 5-years experience investing in securities authorized by CA 53601 and at least $500 million of assets; 10% per fund limit; 20% limit when combined with IX.17.b Compliant Page 11 3.A.3.a Packet Pg. 60 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Additional Disclosure This information is for the sole purposes of the client and is not intended to provide specific advice or recommendations. Please review the contents of this information carefully. Should you have any questions regarding the information presented, calculation methodology, investment portfolio, security detail, or any other facet of this information, please feel free to contact us. Public Trust Advisors, LLC (Public Trust) statements and reports are intended to detail our investment advisory activity as well as the activity of certain client accounts managed by Public Trust. The custodian bank maintains the control of assets and executes and settles all investment transactions. The custodian statement is the official record of security and cash holdings transactions. Public Trust recognizes that clients may use these reports to facilitate record keeping; therefore, it is recommended that the client reconcile this information with their custodian bank statement. Many custodians use a settlement date basis that may result in the need to reconcile due to a timing difference. The underlying market value, amortized cost, and accrued interest may differ between the custodian and this statement or report. This can be attributed to differences in calculation methodologies and pricing sources used. Public Trust does not have the authority to withdraw funds from or deposit funds to the custodian. Our clients retain responsibility for their internal accounting policies, implementing and enforcing internal controls, and generating ledger entries or otherwise recording transactions. The total market value represents prices obtained from various sources; it may be impacted by the frequency at which prices are reported, and such prices are not guaranteed. Prices received from pricing vendors are generally based on current market quotes but when such quotes are not available, the pricing vendors use a variety of techniques to estimate value. These estimates, particularly for fixed-income securities, may be based on certain minimum principal amounts (e.g. $1 million) and may not reflect all the factors that affect the value of the security including liquidity risk. The prices provided are not firm bids or offers. Certain securities may reflect N/A or unavailable where the price for such security is generally not available from a pricing source. The market value of a security, including those priced at par value, may differ from its purchase price and may not closely reflect the value at which the security may be sold or purchased based on various market factors. The securities in this investment portfolio, including shares of mutual funds, are not guaranteed or otherwise protected by Public Trust, the FDIC (except for certain non-negotiable certificates of deposit), or any government agency unless specifically stated otherwise. Clients may be permitted to establish one or more unmanaged accounts for the purposes of client reporting. Clients may also be permitted to provide externally managed assets for the purposes of client reporting. Public Trust defines unmanaged accounts or assets as one where the investment direction remains the sole responsibility of the client rather than the Investment Manager. Unmanaged accounts or external assets do not receive ongoing supervision and monitoring services. The Investment Manager does not make any investment recommendations and may not charge a fee for reporting on these accounts or assets. The primary purpose for this service is to include unmanaged accounts or assets owned by the client in the performance reports provided by the Investment Manager. The Investment Manager assumes no liability for the underlying performance of any unmanaged accounts or assets, and it is the client’s sole responsibility for the accuracy or correctness of any such performance. Beginning and ending balances are based on market value plus accrued interest on a trade date basis. Statements and reports made available to the end user either from Public Trust or through the online reporting platform may present information and portfolio analytics using various optional methods including, but not limited to, historical cost, amortized cost, and market value. All information is assumed to be correct, but the accuracy has not been confirmed and therefore is not guaranteed to be correct. Information is obtained from third party sources that may or may not be verified. The data in this report is unaudited and is only applicable for the date denoted on the report. Market values may change day-to-day based on numerous circumstances such as trading volume, news released about the underlying issuer, issuer performance, etc. Underlying market values may be priced via numerous aspects as certain securities are short term in nature and not readily traded. Performance results are shown net of all fees and expenses and reflect the reinvestment of dividends and other earnings. Many factors affect performance including changes in market conditions and interest rates and in response to other economic, political, or financial developments. Investment involves risk including the possible loss of principal. No assurance can be given that the performance objectives of a given strategy will be achieved. Past performance is no guarantee of future results. Any financial and/or investment decision may incur losses. The investment advisor providing these services is Public Trust Advisors, LLC, an investment adviser registered with the U.S.Securities and Exchange Commission (SEC) under the Investment Advisers Act of 1940, as amended. Registration with the SEC does not imply a certain level of skill or training. Public Trust is required to maintain a written disclosure brochure of our background and business experience. If you would like to receive a copy of our current disclosure brochure, Privacy Policy, or Code of Ethics, or have any questions regarding your account please contact us. Public Trust Advisors 717 17th Street, Suite 1850 Denver, CO 80202 Page 12 3.A.3.a Packet Pg. 61 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Portfolio Holdings Portfolio Income Portfolio Transactions Issuer Concentration Security Concentration Portfolio Activity Summary City of San Jacinto Detail Page 13 3.A.3.a Packet Pg. 62 Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Month End Report Trade Date copySan Jacinto, City of (66779)Month End (M12 Y2020)12/01/2020 - 12/31/2020Dated: 01/11/2021Locked Down3.A.3.aPacket Pg. 63Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Holdings Report Trade Date (San Jacinto, City of (66779))1Income Detail Report Trade Date (San Jacinto, City of (66779))4Transactions Realized Gain Loss Report (San Jacinto, City of (66779))6Issuer Concentration with Yield GASB 40 Trade Date (San Jacinto, City of(66779))7Security Type GASB 40 Trade Date (San Jacinto, City of (66779))12Portfolio Activity Summary (San Jacinto, City of (66779))16Table of ContentsDated: 01/11/20213.A.3.aPacket Pg. 64Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Description,Identifier,Security Type,CouponEffective Maturity,Final Maturity,Callable,Next Call DateOriginal Cost,Current Units,Market PriceTrade Date,Settle DateMoodysRating,S&P Rating,Fitch RatingBook Value,Book Value + AccruedAccrued Balance,Net Unrealized Gain/LossMarket Value,Market Value + AccruedFEDERAL NATIONAL MORTGAGE ASSOCIATION3135G0U92AGCY BOND2.62501/11/202201/11/2022N---129,906.40130,000.00102.562301/09/201901/11/2019AaaAA+---129,967.12131,578.581,611.463,363.92133,331.04134,942.50FEDERAL HOME LOAN MORTGAGE CORP3137EAEP0AGCY BOND1.50002/12/202502/12/2025N---299,769.00300,000.00104.902802/13/202002/14/2020AaaAA+---299,808.40301,545.901,737.5014,899.86314,708.26316,445.76FEDERAL HOME LOAN BANKS3130AJ7E3AGCY BOND1.37502/17/202302/17/2023N---299,448.00300,000.00102.589702/20/202002/21/2020AaaAA+---299,604.58301,139.991,535.428,164.46307,769.04309,304.45FEDERAL FARM CREDIT BANKS FUNDING CORP3133ELWD2AGCY BOND0.37504/08/202204/08/2022N---334,504.20335,000.00100.328104/03/202004/08/2020AaaAA+---334,685.56334,975.19289.641,413.65336,099.20336,388.84FEDERAL HOME LOAN BANKS3130AJHU6AGCY BOND0.50004/14/202504/14/2025N---223,884.00225,000.00100.653604/15/202004/16/2020AaaAA+---224,040.98224,281.60240.632,429.63226,470.60226,711.23FEDERAL HOME LOAN MORTGAGE CORP3137EAEQ8AGCY BOND0.37504/20/202304/20/2023N---334,162.50335,000.00100.505504/17/202004/20/2020AaaAA+---334,357.08334,604.84247.762,336.28336,693.36336,941.12FEDERAL HOME LOAN MORTGAGE CORP3137EAER6AGCY BOND0.37505/05/202305/05/2023N---334,859.30335,000.00100.513405/05/202005/07/2020AaaAA+---334,890.07335,085.48195.421,829.79336,719.86336,915.28FEDERAL FARM CREDIT BANKS FUNDING CORP3133ELG81AGCY BOND0.30006/08/202306/08/2023N---333,907.90335,000.00100.292706/05/202006/09/2020AaaAA+---334,112.10334,176.3164.211,868.30335,980.40336,044.61FEDERAL HOME LOAN MORTGAGE CORP3137EAEV7AGCY BOND0.25008/24/202308/24/2023N---234,760.30235,000.00100.197108/19/202008/21/2020AaaAA+---234,789.01235,001.16212.15674.27235,463.27235,675.43FEDERAL NATIONAL MORTGAGE ASSOCIATION3135G05X7AGCY BOND0.37508/25/202508/25/2025N---413,057.80415,000.0099.978108/25/202008/27/2020AaaAA+---413,190.55413,726.59536.041,718.50414,909.05415,445.09FEDERAL FARM CREDIT BANKS FUNDING CORP3133EMGX4AGCY BOND0.12511/23/202211/23/2022N---219,579.80220,000.0099.973511/16/202011/23/2020AaaAA+---219,602.40219,631.4329.03339.19219,941.59219,970.62FEDERAL NATIONAL MORTGAGE ASSOCIATION3135G06H1AGCY BOND0.25011/27/202311/27/2023N---319,635.20320,000.00100.090211/23/202011/25/2020AaaAA+---319,647.56319,727.5680.00641.14320,288.70320,368.70EXXON MOBIL CORP30231GBB7CORP1.90208/16/202208/16/2022N---75,000.0075,000.00102.877108/13/201908/16/2019Aa1AA---75,000.0075,534.94534.942,157.8277,157.8277,692.76APPLE INC037833DE7CORP2.40012/13/202201/13/2023Y12/13/2022304,260.00300,000.00104.257212/10/201912/12/2019Aa1AA+---302,795.26306,155.263,360.009,976.30312,771.56316,131.56MICROSOFT CORP594918AT1CORP2.37502/01/202305/01/2023Y02/01/2023246,484.45235,000.00104.515604/28/202004/30/2020AaaAAA---243,700.41244,630.62930.211,911.22245,611.63246,541.84WALMART INC931142EK5CORP3.40005/26/202306/26/2023Y05/26/2023243,666.00225,000.00107.394404/29/202005/01/2020Aa2AA---239,629.52239,735.77106.252,007.79241,637.31241,743.56Holdings Report Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/202113.A.3.aPacket Pg. 65Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Description,Identifier,Security Type,CouponEffective Maturity,Final Maturity,Callable,Next Call DateOriginal Cost,Current Units,Market PriceTrade Date,Settle DateMoodysRating,S&P Rating,Fitch RatingBook Value,Book Value + AccruedAccrued Balance,Net Unrealized Gain/LossMarket Value,Market Value + AccruedPEPSICO INC713448FB9CORP0.40010/07/202310/07/2023N---84,951.5585,000.00100.550610/06/202010/07/2020A1A+---84,955.3585,034.6879.33512.6485,467.9885,547.32FHMS K-033 A23137B4WB8FHLMC3.06006/08/202307/25/2023Y---258,544.92250,000.00106.209912/12/201912/17/2019AaaAA+---255,905.03256,542.53637.509,619.70265,524.72266,162.22FHMS K-725 A2US3137BWWD24FHLMC3.00212/25/202301/25/2024Y---289,012.50280,000.00107.483612/12/201912/17/2019AaaAAA---286,617.47287,317.94700.4714,336.61300,954.08301,654.55FHMS K-024 A23137AXHP1FHLMC CMO2.57308/16/202209/25/2022Y---319,687.50320,000.00103.017705/02/201905/07/2019AaaAA+---319,571.60320,257.74686.1310,085.04329,656.64330,342.77FIRST AMER:GVT OBLG Y31846V203MMFUND0.01012/31/202012/31/2020N---37,509.9437,509.941.0000------AaaAAAm---37,509.9437,509.940.000.0037,509.9437,509.94UNITED STATES TREASURY912828XG0US GOV2.12506/30/202206/30/2022N---148,089.85150,000.00102.992202/13/201902/15/2019AaaAA+---149,133.00149,141.818.815,355.30154,488.30154,497.11UNITED STATES TREASURY912828W55US GOV1.87502/28/202202/28/2022N---98,101.56100,000.00102.031202/13/201902/15/2019AaaAA+---99,257.9299,895.01637.092,773.28102,031.20102,668.29UNITED STATES TREASURY912828V72US GOV1.87501/31/202201/31/2022N---313,621.88315,000.00101.890605/29/201905/31/2019AaaAA+---314,433.99316,905.632,471.646,521.40320,955.39323,427.03UNITED STATES TREASURY912828SF8US GOV2.00002/15/202202/15/2022N---314,778.52315,000.00102.097705/29/201905/31/2019AaaAA+---314,908.47317,288.092,379.626,699.28321,607.76323,987.37UNITED STATES TREASURY912828L57US GOV1.75009/30/202209/30/2022N---174,890.63175,000.00102.824206/26/201906/27/2019AaaAA+---174,941.61175,724.07782.455,000.74179,942.35180,724.80UNITED STATES TREASURY912828J76US GOV1.75003/31/202203/31/2022N---179,374.22180,000.00102.031207/09/201907/11/2019AaaAA+---179,710.84180,515.64804.813,945.32183,656.16184,460.97UNITED STATES TREASURY9128287C8US GOV1.75007/15/202207/15/2022N---370,925.00370,000.00102.500010/29/201910/30/2019AaaAA+---370,532.00373,523.172,991.178,718.00379,250.00382,241.17UNITED STATES TREASURY912828Y87US GOV1.75007/31/202407/31/2024N---351,162.11350,000.00105.476612/06/201912/10/2019AaaAA+---350,906.57353,469.752,563.1818,261.53369,168.10371,731.28UNITED STATES TREASURY912828YE4US GOV1.25008/31/202408/31/2024N---294,257.81300,000.00103.734412/06/201912/10/2019AaaAA+---295,512.43296,786.601,274.1715,690.77311,203.20312,477.37UNITED STATES TREASURY9128286Z8US GOV1.75006/30/202406/30/2024N---351,121.09350,000.00105.390612/06/201912/10/2019AaaAA+---350,868.92350,885.8416.9217,998.18368,867.10368,884.02UNITED STATES TREASURY912828W71US GOV2.12503/31/202403/31/2024N---340,404.49335,000.00106.246112/12/201912/17/2019AaaAA+---339,129.10340,947.901,818.8016,795.34355,924.43357,743.24Holdings Report Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/202123.A.3.aPacket Pg. 66Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, * Filtered By: Description ¹ "Payable" and Description ¹ "Receivable". * Weighted by: Market Value + Accrued.Description,Identifier,Security Type,CouponEffective Maturity,Final Maturity,Callable,Next Call DateOriginal Cost,Current Units,Market PriceTrade Date,Settle DateMoodysRating,S&P Rating,Fitch RatingBook Value,Book Value + AccruedAccrued Balance,Net Unrealized Gain/LossMarket Value,Market Value + AccruedUNITED STATES TREASURY912828V80US GOV2.25001/31/202401/31/2024N---188,837.30185,000.00106.390612/12/201912/17/2019AaaAA+---187,894.98189,636.891,741.928,927.63196,822.61198,564.53UNITED STATES TREASURY912828YE4US GOV1.25008/31/202408/31/2024N---376,012.50370,000.00103.734403/02/202003/04/2020AaaAA+---374,919.84376,491.321,571.488,897.44383,817.28385,388.76UNITED STATES TREASURY912828YY0US GOV1.75012/31/202412/31/2024N---166,500.00160,000.00105.933603/02/202003/04/2020AaaAA+---165,406.01165,413.757.734,087.75169,493.76169,501.49UNITED STATES TREASURY912828T91US GOV1.62510/31/202310/31/2023N---266,146.29255,000.00104.175806/05/202006/09/2020AaaAA+---264,305.75265,015.46709.701,342.54265,648.29266,357.99UNITED STATES TREASURY912828T26US GOV1.37509/30/202309/30/2023N---263,835.35255,000.00103.363306/05/202006/09/2020AaaAA+---262,335.30263,231.13895.831,241.11263,576.41264,472.24UNITED STATES TREASURY912828ZC7US GOV1.12502/28/202502/28/2025N---226,943.75220,000.00103.527306/05/202006/09/2020AaaAA+---226,120.92226,961.87840.951,639.14227,760.06228,601.01UNITED STATES TREASURY912828F21US GOV2.12509/30/202109/30/2021N---197,007.81200,000.00101.492212/17/201812/20/2018AaaAA+---199,177.93200,263.781,085.853,806.47202,984.40204,070.25UNITED STATES TREASURY91282CAN1US GOV0.12509/30/202209/30/2022N---274,914.06275,000.00100.003910/13/202010/14/2020AaaAA+---274,923.56275,011.3987.8387.16275,010.72275,098.55UNITED STATES TREASURY912828Z52US GOV1.37501/31/202501/31/2025N---130,966.80125,000.00104.500010/13/202010/14/2020AaaAA+---130,670.27131,389.53719.26-45.27130,625.00131,344.26UNITED STATES TREASURY912828ZW3US GOV0.25006/30/202506/30/2025N---253,894.34255,000.0099.746111/02/202011/04/2020AaaAA+---253,931.56253,933.321.76421.00254,352.55254,354.32UNITED STATES TREASURY912828ZT0US GOV0.25005/31/202505/31/2025N---233,971.88235,000.0099.808612/03/202012/04/2020AaaAA+---233,989.38234,041.0251.65560.83234,550.21234,601.86UNITED STATES TREASURY9128285R7US GOV2.62512/15/202112/15/2021N---250,664.06250,000.00102.378901/10/201901/15/2019AaaAA+---250,223.47250,529.96306.495,723.78255,947.25256,253.74------------08/16/202308/22/2023------11,103,012.5511,017,509.94---------AaaAA+---11,087,613.8111,125,196.9837,583.17234,734.8011,322,348.6111,359,931.78Holdings Report Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/202133.A.3.aPacket Pg. 67Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Identifier,DescriptionFinal MaturityEnding Current UnitsEarned InterestIncomeRealized Gain,Realized LossAccretion IncomeAmortization ExpenseMisc IncomeNet Earned IncomeInterest PaymentReceived,Ending Interest Due3135G05X7FEDERAL NATIONAL MORTGAGE ASSOCIATION08/25/2025415,000.00129.690.000.0032.400.000.00162.090.000.00912828ZW3UNITED STATES TREASURY06/30/2025255,000.0053.730.000.0019.900.000.0073.63318.750.00912828ZT0UNITED STATES TREASURY05/31/2025235,000.0045.190.000.0017.500.000.0062.680.000.003130AJHU6FEDERAL HOME LOAN BANKS04/14/2025225,000.0093.750.000.0018.830.000.00112.580.000.00912828ZC7UNITED STATES TREASURY02/28/2025220,000.00211.950.000.000.00-124.780.0087.170.000.003137EAEP0FEDERAL HOME LOAN MORTGAGE CORP02/12/2025300,000.00375.000.000.003.790.000.00378.800.000.00912828Z52UNITED STATES TREASURY01/31/2025125,000.00144.790.000.000.00-116.360.0028.430.000.00912828YY0UNITED STATES TREASURY12/31/2024160,000.00236.000.000.000.00-111.750.00124.251,400.000.00912828YE4UNITED STATES TREASURY08/31/2024300,000.00321.130.000.00101.680.000.00422.820.000.00912828YE4UNITED STATES TREASURY08/31/2024370,000.00396.060.000.000.00-113.180.00282.880.000.00912828Y87UNITED STATES TREASURY07/31/2024350,000.00515.960.000.000.00-20.640.00495.330.000.009128286Z8UNITED STATES TREASURY06/30/2024350,000.00516.240.000.000.00-20.260.00495.983,062.500.00912828W71UNITED STATES TREASURY03/31/2024335,000.00606.270.000.000.00-105.390.00500.880.000.00912828V80UNITED STATES TREASURY01/31/2024185,000.00350.650.000.000.00-76.850.00273.800.000.00US3137BWWD24FHMS K-725 A201/25/2024280,000.00700.470.000.000.00-198.200.00502.27700.470.003135G06H1FEDERAL NATIONAL MORTGAGE ASSOCIATION11/27/2023320,000.0066.670.000.0010.360.000.0077.020.000.00912828T91UNITED STATES TREASURY10/31/2023255,000.00354.850.000.000.00-280.500.0074.360.000.00713448FB9PEPSICO INC10/07/202385,000.0028.330.000.001.370.000.0029.700.000.00912828T26UNITED STATES TREASURY09/30/2023255,000.00298.610.000.000.00-226.620.0071.980.000.003137EAEV7FEDERAL HOME LOAN MORTGAGE CORP08/24/2023235,000.0048.960.000.006.690.000.0055.650.000.003137B4WB8FHMS K-033 A207/25/2023250,000.00637.500.000.000.00-215.640.00421.86637.500.00931142EK5WALMART INC06/26/2023225,000.00637.500.000.000.00-512.100.00125.403,825.000.003133ELG81FEDERAL FARM CREDIT BANKS FUNDING CORP06/08/2023335,000.0083.750.000.0030.880.000.00114.63502.500.003137EAER6FEDERAL HOME LOAN MORTGAGE CORP05/05/2023335,000.00104.690.000.003.990.000.00108.680.000.00594918AT1MICROSOFT CORP05/01/2023235,000.00465.100.000.000.00-355.940.00109.170.000.003137EAEQ8FEDERAL HOME LOAN MORTGAGE CORP04/20/2023335,000.00104.690.000.0023.690.000.00128.380.000.003130AJ7E3FEDERAL HOME LOAN BANKS02/17/2023300,000.00343.750.000.0015.390.000.00359.140.000.00037833DE7APPLE INC01/13/2023300,000.00600.000.000.000.00-117.990.00482.010.000.003133EMGX4FEDERAL FARM CREDIT BANKS FUNDING CORP11/23/2022220,000.0022.920.000.0017.960.000.0040.880.000.00912828L57UNITED STATES TREASURY09/30/2022175,000.00260.820.000.002.810.000.00263.620.000.00Income Detail Report Trade DateSan Jacinto, City of (66779)12/01/2020 - 12/31/2020Return to Table of ContentsDated: 01/11/202143.A.3.aPacket Pg. 68Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, * Filtered By: Description ¹ "Payable" and Description ¹ "Receivable". * Weighted by: Ending Market Value + Accrued.Identifier,DescriptionFinal MaturityEnding Current UnitsEarned InterestIncomeRealized Gain,Realized LossAccretion IncomeAmortization ExpenseMisc IncomeNet Earned IncomeInterest PaymentReceived,Ending Interest Due91282CAN1UNITED STATES TREASURY09/30/2022275,000.0029.280.000.003.730.000.0033.000.000.003137AXHP1FHMS K-024 A209/25/2022320,000.00686.130.000.00-6.010.000.00680.12686.130.0030231GBB7EXXON MOBIL CORP08/16/202275,000.00118.880.000.000.000.000.00118.880.000.009128287C8UNITED STATES TREASURY07/15/2022370,000.00545.450.000.000.00-28.670.00516.780.000.00912828XG0UNITED STATES TREASURY06/30/2022150,000.00268.660.000.0047.610.000.00316.271,593.750.003133ELWD2FEDERAL FARM CREDIT BANKS FUNDING CORP04/08/2022335,000.00104.690.000.0021.090.000.00125.780.000.00912828J76UNITED STATES TREASURY03/31/2022180,000.00268.270.000.0019.570.000.00287.830.000.00912828W55UNITED STATES TREASURY02/28/2022100,000.00160.570.000.0053.890.000.00214.450.000.00912828SF8UNITED STATES TREASURY02/15/2022315,000.00530.710.000.006.780.000.00537.480.000.00912828V72UNITED STATES TREASURY01/31/2022315,000.00497.540.000.0043.470.000.00541.000.000.003135G0U92FEDERAL NATIONAL MORTGAGE ASSOCIATION01/11/2022130,000.00284.380.000.002.650.000.00287.020.000.009128285R7UNITED STATES TREASURY12/15/2021250,000.00557.510.000.000.00-19.670.00537.843,281.250.00912828F21UNITED STATES TREASURY09/30/2021200,000.00403.114,957.030.00103.790.000.005,463.930.000.0031846V203FIRST AMER:GVT OBLG Y12/31/202037,509.940.130.020.000.000.000.000.150.140.12------08/22/202311,017,509.9413,210.284,957.050.00603.81-2,644.530.0016,126.6116,007.990.12Income Detail Report Trade DateSan Jacinto, City of (66779)12/01/2020 - 12/31/2020Return to Table of ContentsDated: 01/11/202153.A.3.aPacket Pg. 69Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, * Does not Lock Down. * Filtered By: Type = Buy or Type = Sell or Type = Call Redemption or Type = Put Redemption or Type = Corporate Action Sell or Type = Cash Transfer or Type = Maturity or Type = Coupon or Type = Principal Paydown or Type = Money Market Funds. * Weighted by: AbsoluteValue of Principal. * MMF transactions are expanded. * The Transaction Detail/Trading Activity reports provide our most up-to-date transactional details. As such, these reports are subject to change even after the other reports on the website have been locked down. While these reports can be useful tools in understanding recent activity,due to their dynamic nature we do not recommend using them for booking journal entries or reconciliation.IdentifierDescriptionCurrent UnitsTypeSettle DatePricePrincipalRealized Gain/LossAmount31846V203FIRST AMER:GVT OBLG Y0.00Money Market Funds11/30/2020---0.000.000.133137AXHP1FHMS K-024 A20.00Coupon12/01/2020---0.000.00686.133137B4WB8FHMS K-033 A20.00Coupon12/01/2020---0.000.00637.50US3137BWWD24FHMS K-725 A20.00Coupon12/01/2020---0.000.00700.4731846V203FIRST AMER:GVT OBLG Y0.13Buy12/02/20201.0000.130.00-0.1331846V203FIRST AMER:GVT OBLG Y5,805.59Buy12/04/20201.0005,805.590.00-5,805.59912828F21UNITED STATES TREASURY-235,000.00Sell12/04/2020101.656-238,892.194,957.03239,783.93912828ZT0UNITED STATES TREASURY235,000.00Buy12/04/202099.563233,971.880.00-233,978.3431846V203FIRST AMER:GVT OBLG Y502.50Buy12/08/20201.000502.500.00-502.503133ELG81FEDERAL FARM CREDIT BANKS FUNDINGCORP0.00Coupon12/08/2020---0.000.00502.5031846V203FIRST AMER:GVT OBLG Y3,281.25Buy12/15/20201.0003,281.250.00-3,281.259128285R7UNITED STATES TREASURY0.00Coupon12/15/2020---0.000.003,281.25CCYUSDUS DOLLAR0.00Cash Transfer12/24/2020---0.000.00-104.1731846V203FIRST AMER:GVT OBLG Y-104.17Sell12/24/20201.000-104.170.00104.17931142EK5WALMART INC0.00Coupon12/26/2020---0.000.003,825.0031846V203FIRST AMER:GVT OBLG Y686.13Buy12/28/20201.000686.130.00-686.1331846V203FIRST AMER:GVT OBLG Y5,162.97Buy12/28/20201.0005,162.970.00-5,162.9731846V203FIRST AMER:GVT OBLG Y0.00Money Market Funds12/29/2020---0.000.000.0131846V203FIRST AMER:GVT OBLG Y0.01Buy12/29/20201.0000.010.00-0.0131846V203FIRST AMER:GVT OBLG Y0.02Buy12/30/20201.0000.020.00-0.0231846V203FIRST AMER:GVT OBLG Y6,375.00Buy12/31/20201.0006,375.000.00-6,375.0031846V203FIRST AMER:GVT OBLG Y0.00Money Market Funds12/31/2020---0.000.000.12912828XG0UNITED STATES TREASURY0.00Coupon12/31/2020---0.000.001,593.759128286Z8UNITED STATES TREASURY0.00Coupon12/31/2020---0.000.003,062.50912828YY0UNITED STATES TREASURY0.00Coupon12/31/2020---0.000.001,400.00912828ZW3UNITED STATES TREASURY0.00Coupon12/31/2020---0.000.00318.75------21,709.43---------16,789.124,957.030.10Transactions Realized Gain Loss ReportSan Jacinto, City of (66779)12/01/2020 - 12/31/2020Return to Table of ContentsDated: 01/11/202163.A.3.aPacket Pg. 70Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Apple Inc.Exxon Mobil CorporationFarm Credit SystemIdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue037833DE7CORPAPPLE INCApple Inc.300,000.00FixedY1.8961.9110.21112/13/202201/13/20233,360.00302,795.26306,155.26312,771.56316,131.562.762%037833DE7CORPAPPLE INCApple Inc.300,000.00FixedY1.8961.9110.21112/13/202201/13/20233,360.00302,795.26306,155.26312,771.56316,131.562.762%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue30231GBB7CORPEXXON MOBIL CORPExxon Mobil Corporation75,000.00FixedN1.5961.9020.12908/16/202208/16/2022534.9475,000.0075,534.9477,157.8277,692.760.681%30231GBB7CORPEXXON MOBIL CORPExxon Mobil Corporation75,000.00FixedN1.5961.9020.12908/16/202208/16/2022534.9475,000.0075,534.9477,157.8277,692.760.681%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue3133ELWD2AGCY BONDFEDERAL FARM CREDIT BANKSFUNDING CORPFarm Credit System335,000.00FixedN1.2660.4490.11604/08/202204/08/2022289.64334,685.56334,975.19336,099.20336,388.842.968%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/202173.A.3.aPacket Pg. 71Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Federal Home Loan BanksFederal National Mortgage AssociationFreddie MacIdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue3133ELG81AGCY BONDFEDERAL FARM CREDIT BANKSFUNDING CORPFarm Credit System335,000.00FixedN2.4260.4100.18006/08/202306/08/202364.21334,112.10334,176.31335,980.40336,044.612.967%3133EMGX4AGCY BONDFEDERAL FARM CREDIT BANKSFUNDING CORPFarm Credit System220,000.00FixedN1.8910.2210.13911/23/202211/23/202229.03219,602.40219,631.43219,941.59219,970.621.943%---AGCY BONDFEDERAL FARM CREDIT BANKSFUNDING CORPFarm Credit System890,000.00FixedN1.8570.3780.14611/11/202211/11/2022382.87888,400.06888,782.93892,021.20892,404.077.878%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue3130AJ7E3AGCY BONDFEDERAL HOME LOAN BANKSFederal Home Loan Banks300,000.00FixedN2.0931.4380.15502/17/202302/17/20231,535.42299,604.58301,139.99307,769.04309,304.452.718%3130AJHU6AGCY BONDFEDERAL HOME LOAN BANKSFederal Home Loan Banks225,000.00FixedN4.2340.6010.34604/14/202504/14/2025240.63224,040.98224,281.60226,470.60226,711.232.000%---AGCY BONDFEDERAL HOME LOAN BANKSFederal Home Loan Banks525,000.00FixedN2.9991.0810.23601/16/202401/16/20241,776.04523,645.55525,421.59534,239.64536,015.684.718%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue3135G0U92AGCY BONDFEDERAL NATIONAL MORTGAGEASSOCIATIONFederal National Mortgage Association130,000.00FixedN1.0082.6500.12901/11/202201/11/20221,611.46129,967.12131,578.58133,331.04134,942.501.178%3135G05X7AGCY BONDFEDERAL NATIONAL MORTGAGEASSOCIATIONFederal National Mortgage Association415,000.00FixedN4.5990.4700.38008/25/202508/25/2025536.04413,190.55413,726.59414,909.05415,445.093.665%3135G06H1AGCY BONDFEDERAL NATIONAL MORTGAGEASSOCIATIONFederal National Mortgage Association320,000.00FixedN2.8930.2880.21911/27/202311/27/202380.00319,647.56319,727.56320,288.70320,368.702.829%---AGCY BONDFEDERAL NATIONAL MORTGAGEASSOCIATIONFederal National Mortgage Association865,000.00FixedN3.4150.7340.28206/12/202406/12/20242,227.50862,805.24865,032.74868,528.79870,756.297.671%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue3137AXHP1FHLMC CMOFHMS K-024 A2Freddie Mac320,000.00FixedY1.5932.5630.60208/16/202209/25/2022686.13319,571.60320,257.74329,656.64330,342.772.912%3137B4WB8FHLMCFHMS K-033 A2Freddie Mac250,000.00VariableY2.3531.9890.41606/08/202307/25/2023637.50255,905.03256,542.53265,524.72266,162.222.345%US3137BWWD24FHLMCFHMS K-725 A2Freddie Mac280,000.00VariableY2.8592.1240.41012/25/202301/25/2024700.47286,617.47287,317.94300,954.08301,654.552.658%3137EAEP0AGCY BONDFEDERAL HOME LOAN MORTGAGECORPFreddie Mac300,000.00FixedN3.9801.5160.30002/12/202502/12/20251,737.50299,808.40301,545.90314,708.26316,445.762.780%3137EAEQ8AGCY BONDFEDERAL HOME LOAN MORTGAGECORPFreddie Mac335,000.00FixedN2.2920.4590.15504/20/202304/20/2023247.76334,357.08334,604.84336,693.36336,941.122.974%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/202183.A.3.aPacket Pg. 72Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Microsoft CorporationPepsiCo, Inc.U.S. BancorpUnited StatesIdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue3137EAER6AGCY BONDFEDERAL HOME LOAN MORTGAGECORPFreddie Mac335,000.00FixedN2.3330.3890.15605/05/202305/05/2023195.42334,890.07335,085.48336,719.86336,915.282.974%3137EAEV7AGCY BONDFEDERAL HOME LOAN MORTGAGECORPFreddie Mac235,000.00FixedN2.6360.2840.17508/24/202308/24/2023212.15234,789.01235,001.16235,463.27235,675.432.080%---------Freddie Mac2,055,000.00------2.5681.3280.31708/16/202309/02/20234,416.932,065,938.662,070,355.592,119,720.202,124,137.1318.722%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue594918AT1CORPMICROSOFT CORPMicrosoft Corporation235,000.00FixedY2.0410.5830.20202/01/202305/01/2023930.21243,700.41244,630.62245,611.63246,541.842.169%594918AT1CORPMICROSOFT CORPMicrosoft Corporation235,000.00FixedY2.0410.5830.20202/01/202305/01/2023930.21243,700.41244,630.62245,611.63246,541.842.169%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue713448FB9CORPPEPSICO INCPepsiCo, Inc.85,000.00FixedN2.7490.4190.20010/07/202310/07/202379.3384,955.3585,034.6885,467.9885,547.320.755%713448FB9CORPPEPSICO INCPepsiCo, Inc.85,000.00FixedN2.7490.4190.20010/07/202310/07/202379.3384,955.3585,034.6885,467.9885,547.320.755%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue31846V203MMFUNDFIRST AMER:GVT OBLG YU.S. Bancorp37,509.94FixedN0.0000.0100.01012/31/202012/31/20200.0037,509.9437,509.9437,509.9437,509.940.331%31846V203MMFUNDFIRST AMER:GVT OBLG YU.S. Bancorp37,509.94FixedN0.0000.0100.01012/31/202012/31/20200.0037,509.9437,509.9437,509.9437,509.940.331%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue912828XG0US GOVUNITED STATES TREASURYUnited States150,000.00FixedN1.4842.5210.12806/30/202206/30/20228.81149,133.00149,141.81154,488.30154,497.111.364%912828W55US GOVUNITED STATES TREASURYUnited States100,000.00FixedN1.1492.5280.12702/28/202202/28/2022637.0999,257.9299,895.01102,031.20102,668.290.901%912828V72US GOVUNITED STATES TREASURYUnited States315,000.00FixedN1.0702.0440.12901/31/202201/31/20222,471.64314,433.99316,905.63320,955.39323,427.032.835%912828SF8US GOVUNITED STATES TREASURYUnited States315,000.00FixedN1.1102.0260.13302/15/202202/15/20222,379.62314,908.47317,288.09321,607.76323,987.372.840%912828L57US GOVUNITED STATES TREASURYUnited States175,000.00FixedN1.7211.7700.13109/30/202209/30/2022782.45174,941.61175,724.07179,942.35180,724.801.589%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/202193.A.3.aPacket Pg. 73Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Walmart Inc.SummaryIdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue912828J76US GOVUNITED STATES TREASURYUnited States180,000.00FixedN1.2341.8810.12003/31/202203/31/2022804.81179,710.84180,515.64183,656.16184,460.971.622%9128287C8US GOVUNITED STATES TREASURYUnited States370,000.00FixedN1.5141.6550.12507/15/202207/15/20222,991.17370,532.00373,523.17379,250.00382,241.173.350%912828Y87US GOVUNITED STATES TREASURYUnited States350,000.00FixedN3.4651.6750.21507/31/202407/31/20242,563.18350,906.57353,469.75369,168.10371,731.283.261%912828YE4US GOVUNITED STATES TREASURYUnited States300,000.00FixedN3.5751.6730.22608/31/202408/31/20241,274.17295,512.43296,786.60311,203.20312,477.372.749%9128286Z8US GOVUNITED STATES TREASURYUnited States350,000.00FixedN3.4101.6770.20406/30/202406/30/202416.92350,868.92350,885.84368,867.10368,884.023.258%912828W71US GOVUNITED STATES TREASURYUnited States335,000.00FixedN3.1401.7330.19403/31/202403/31/20241,818.80339,129.10340,947.90355,924.43357,743.243.144%912828V80US GOVUNITED STATES TREASURYUnited States185,000.00FixedN2.9721.7260.17201/31/202401/31/20241,741.92187,894.98189,636.89196,822.61198,564.531.738%912828YE4US GOVUNITED STATES TREASURYUnited States370,000.00FixedN3.5750.8800.22608/31/202408/31/20241,571.48374,919.84376,491.32383,817.28385,388.763.390%912828YY0US GOVUNITED STATES TREASURYUnited States160,000.00FixedN3.8800.8880.25812/31/202412/31/20247.73165,406.01165,413.75169,493.76169,501.491.497%912828T91US GOVUNITED STATES TREASURYUnited States255,000.00FixedN2.7710.3280.14710/31/202310/31/2023709.70264,305.75265,015.46265,648.29266,357.992.346%912828T26US GOVUNITED STATES TREASURYUnited States255,000.00FixedN2.6960.3210.14809/30/202309/30/2023895.83262,335.30263,231.13263,576.41264,472.242.328%912828ZC7US GOVUNITED STATES TREASURYUnited States220,000.00FixedN4.0600.4490.27202/28/202502/28/2025840.95226,120.92226,961.87227,760.06228,601.012.012%912828F21US GOVUNITED STATES TREASURYUnited States200,000.00FixedN0.7422.6870.12609/30/202109/30/20211,085.85199,177.93200,263.78202,984.40204,070.251.793%91282CAN1US GOVUNITED STATES TREASURYUnited States275,000.00FixedN1.7440.1410.12309/30/202209/30/202287.83274,923.56275,011.39275,010.72275,098.552.429%912828Z52US GOVUNITED STATES TREASURYUnited States125,000.00FixedN3.9620.2570.26601/31/202501/31/2025719.26130,670.27131,389.53130,625.00131,344.261.154%912828ZW3US GOVUNITED STATES TREASURYUnited States255,000.00FixedN4.4710.3440.30706/30/202506/30/20251.76253,931.56253,933.32254,352.55254,354.322.246%912828ZT0US GOVUNITED STATES TREASURYUnited States235,000.00FixedN4.3860.3480.29405/31/202505/31/202551.65233,989.38234,041.02234,550.21234,601.862.072%9128285R7US GOVUNITED STATES TREASURYUnited States250,000.00FixedN0.9492.5290.13412/15/202112/15/2021306.49250,223.47250,529.96255,947.25256,253.742.261%---US GOVUNITED STATES TREASURYUnited States5,725,000.00FixedN2.6171.3730.18309/03/202309/03/202323,769.105,763,233.845,787,002.945,907,682.545,931,451.6452.177%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue931142EK5CORPWALMART INCWalmart Inc.225,000.00FixedY2.3220.6650.30905/26/202306/26/2023106.25239,629.52239,735.77241,637.31241,743.562.134%931142EK5CORPWALMART INCWalmart Inc.225,000.00FixedY2.3220.6650.30905/26/202306/26/2023106.25239,629.52239,735.77241,637.31241,743.562.134%IdentifierSecurity TypeDescription,Issuer ConcentrationEnding Current UnitsCoupon TypeCallableDurationBookYieldYieldEndingEffectiveMaturity,Final MaturityEnding AccruedBalanceEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued% of MarketValue------------11,017,509.94------2.5741.1960.21908/16/202308/22/202337,583.1711,087,613.8111,125,196.9811,322,348.6111,359,931.78100.000%Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/2021103.A.3.aPacket Pg. 74Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, * Grouped by: Issuer Concentration. * Groups Sorted by: Issuer Concentration. * Filtered By: Description ¹ "Payable" and Description ¹ "Receivable". * Weighted by: Ending Market Value + Accrued, except Book Yield by Base Book Value + Accrued.Issuer Concentration with Yield GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/2021113.A.3.aPacket Pg. 75Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, AGCY BONDIdentifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued3135G0U92FEDERAL NATIONAL MORTGAGEASSOCIATIONAGCY BOND1.188%FixedN1.008AA+Aaa130,000.0001/11/202201/11/20222.6500.1291,611.46129,906.40129,967.12131,578.58133,331.04134,942.503133ELWD2FEDERAL FARM CREDIT BANKS FUNDINGCORPAGCY BOND2.961%FixedN1.266AA+Aaa335,000.0004/08/202204/08/20220.4490.116289.64334,504.20334,685.56334,975.19336,099.20336,388.843133EMGX4FEDERAL FARM CREDIT BANKS FUNDINGCORPAGCY BOND1.936%FixedN1.891AA+Aaa220,000.0011/23/202211/23/20220.2210.13929.03219,579.80219,602.40219,631.43219,941.59219,970.623130AJ7E3FEDERAL HOME LOAN BANKSAGCY BOND2.723%FixedN2.093AA+Aaa300,000.0002/17/202302/17/20231.4380.1551,535.42299,448.00299,604.58301,139.99307,769.04309,304.453137EAEQ8FEDERAL HOME LOAN MORTGAGE CORPAGCY BOND2.966%FixedN2.292AA+Aaa335,000.0004/20/202304/20/20230.4590.155247.76334,162.50334,357.08334,604.84336,693.36336,941.123137EAER6FEDERAL HOME LOAN MORTGAGE CORPAGCY BOND2.966%FixedN2.333AA+Aaa335,000.0005/05/202305/05/20230.3890.156195.42334,859.30334,890.07335,085.48336,719.86336,915.283133ELG81FEDERAL FARM CREDIT BANKS FUNDINGCORPAGCY BOND2.958%FixedN2.426AA+Aaa335,000.0006/08/202306/08/20230.4100.18064.21333,907.90334,112.10334,176.31335,980.40336,044.61Security Type GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/2021123.A.3.aPacket Pg. 76Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, CORPFHLMCIdentifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued3137EAEV7FEDERAL HOME LOAN MORTGAGE CORPAGCY BOND2.075%FixedN2.636AA+Aaa235,000.0008/24/202308/24/20230.2840.175212.15234,760.30234,789.01235,001.16235,463.27235,675.433135G06H1FEDERAL NATIONAL MORTGAGEASSOCIATIONAGCY BOND2.820%FixedN2.893AA+Aaa320,000.0011/27/202311/27/20230.2880.21980.00319,635.20319,647.56319,727.56320,288.70320,368.703137EAEP0FEDERAL HOME LOAN MORTGAGE CORPAGCY BOND2.786%FixedN3.980AA+Aaa300,000.0002/12/202502/12/20251.5160.3001,737.50299,769.00299,808.40301,545.90314,708.26316,445.763130AJHU6FEDERAL HOME LOAN BANKSAGCY BOND1.996%FixedN4.234AA+Aaa225,000.0004/14/202504/14/20250.6010.346240.63223,884.00224,040.98224,281.60226,470.60226,711.233135G05X7FEDERAL NATIONAL MORTGAGEASSOCIATIONAGCY BOND3.657%FixedN4.599AA+Aaa415,000.0008/25/202508/25/20250.4700.380536.04413,057.80413,190.55413,726.59414,909.05415,445.09------AGCY BOND31.031%FixedN2.745AA+Aaa3,485,000.0010/11/202310/11/20230.6730.2116,779.243,477,474.403,478,695.393,485,474.643,518,374.393,525,153.63Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued30231GBB7EXXON MOBIL CORPCORP0.684%FixedN1.596AAAa175,000.0008/16/202208/16/20221.9020.129534.9475,000.0075,000.0075,534.9477,157.8277,692.76037833DE7APPLE INCCORP2.783%FixedY1.896AA+Aa1300,000.0012/13/202201/13/20231.9110.2113,360.00304,260.00302,795.26306,155.26312,771.56316,131.56594918AT1MICROSOFT CORPCORP2.170%FixedY2.041AAAAaa235,000.0002/01/202305/01/20230.5830.202930.21246,484.45243,700.41244,630.62245,611.63246,541.84931142EK5WALMART INCCORP2.128%FixedY2.322AAAa2225,000.0005/26/202306/26/20230.6650.309106.25243,666.00239,629.52239,735.77241,637.31241,743.56713448FB9PEPSICO INCCORP0.753%FixedN2.749A+A185,000.0010/07/202310/07/20230.4190.20079.3384,951.5584,955.3585,034.6885,467.9885,547.32------CORP8.518%Fixed---2.091AAAa2920,000.0002/22/202304/03/20231.1210.2265,010.73954,362.00946,080.53951,091.26962,646.29967,657.02Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued3137B4WB8FHMS K-033 A2FHLMC2.343%VariableY2.353AA+Aaa250,000.0006/08/202307/25/20231.9890.416637.50258,544.92255,905.03256,542.53265,524.72266,162.22US3137BWWD24FHMS K-725 A2FHLMC2.655%VariableY2.859AAAAaa280,000.0012/25/202301/25/20242.1240.410700.47289,012.50286,617.47287,317.94300,954.08301,654.55------FHLMC4.998%VariableY2.622AAAAaa530,000.0009/22/202310/31/20232.0600.4131,337.97547,557.42542,522.50543,860.47566,478.81567,816.77Security Type GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/2021133.A.3.aPacket Pg. 77Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, FHLMC CMOMMFUNDUS GOVIdentifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued3137AXHP1FHMS K-024 A2FHLMC CMO2.908%FixedY1.593AA+Aaa320,000.0008/16/202209/25/20222.5630.602686.13319,687.50319,571.60320,257.74329,656.64330,342.773137AXHP1FHMS K-024 A2FHLMC CMO2.908%FixedY1.593AA+Aaa320,000.0008/16/202209/25/20222.5630.602686.13319,687.50319,571.60320,257.74329,656.64330,342.77Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued31846V203FIRST AMER:GVT OBLG YMMFUND0.330%FixedN0.000AAAmAaa37,509.9412/31/202012/31/20200.0100.0100.0037,509.9437,509.9437,509.9437,509.9437,509.9431846V203FIRST AMER:GVT OBLG YMMFUND0.330%FixedN0.000AAAmAaa37,509.9412/31/202012/31/20200.0100.0100.0037,509.9437,509.9437,509.9437,509.9437,509.94Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued912828F21UNITED STATES TREASURYUS GOV1.796%FixedN0.742AA+Aaa200,000.0009/30/202109/30/20212.6870.1261,085.85197,007.81199,177.93200,263.78202,984.40204,070.259128285R7UNITED STATES TREASURYUS GOV2.256%FixedN0.949AA+Aaa250,000.0012/15/202112/15/20212.5290.134306.49250,664.06250,223.47250,529.96255,947.25256,253.74912828V72UNITED STATES TREASURYUS GOV2.847%FixedN1.070AA+Aaa315,000.0001/31/202201/31/20222.0440.1292,471.64313,621.88314,433.99316,905.63320,955.39323,427.03912828SF8UNITED STATES TREASURYUS GOV2.852%FixedN1.110AA+Aaa315,000.0002/15/202202/15/20222.0260.1332,379.62314,778.52314,908.47317,288.09321,607.76323,987.37912828W55UNITED STATES TREASURYUS GOV0.904%FixedN1.149AA+Aaa100,000.0002/28/202202/28/20222.5280.127637.0998,101.5699,257.9299,895.01102,031.20102,668.29912828J76UNITED STATES TREASURYUS GOV1.624%FixedN1.234AA+Aaa180,000.0003/31/202203/31/20221.8810.120804.81179,374.22179,710.84180,515.64183,656.16184,460.97912828XG0UNITED STATES TREASURYUS GOV1.360%FixedN1.484AA+Aaa150,000.0006/30/202206/30/20222.5210.1288.81148,089.85149,133.00149,141.81154,488.30154,497.119128287C8UNITED STATES TREASURYUS GOV3.365%FixedN1.514AA+Aaa370,000.0007/15/202207/15/20221.6550.1252,991.17370,925.00370,532.00373,523.17379,250.00382,241.17912828L57UNITED STATES TREASURYUS GOV1.591%FixedN1.721AA+Aaa175,000.0009/30/202209/30/20221.7700.131782.45174,890.63174,941.61175,724.07179,942.35180,724.8091282CAN1UNITED STATES TREASURYUS GOV2.422%FixedN1.744AA+Aaa275,000.0009/30/202209/30/20220.1410.12387.83274,914.06274,923.56275,011.39275,010.72275,098.55912828T26UNITED STATES TREASURYUS GOV2.328%FixedN2.696AA+Aaa255,000.0009/30/202309/30/20230.3210.148895.83263,835.35262,335.30263,231.13263,576.41264,472.24Security Type GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/2021143.A.3.aPacket Pg. 78Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Summary * Grouped by: Security Type. * Groups Sorted by: Security Type. * Filtered By: Description ¹ "Payable" and Description ¹ "Receivable". * Weighted by: Ending Market Value + Accrued, except Book Yield by Base Book Value + Accrued.Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued912828T91UNITED STATES TREASURYUS GOV2.345%FixedN2.771AA+Aaa255,000.0010/31/202310/31/20230.3280.147709.70266,146.29264,305.75265,015.46265,648.29266,357.99912828V80UNITED STATES TREASURYUS GOV1.748%FixedN2.972AA+Aaa185,000.0001/31/202401/31/20241.7260.1721,741.92188,837.30187,894.98189,636.89196,822.61198,564.53912828W71UNITED STATES TREASURYUS GOV3.149%FixedN3.140AA+Aaa335,000.0003/31/202403/31/20241.7330.1941,818.80340,404.49339,129.10340,947.90355,924.43357,743.249128286Z8UNITED STATES TREASURYUS GOV3.247%FixedN3.410AA+Aaa350,000.0006/30/202406/30/20241.6770.20416.92351,121.09350,868.92350,885.84368,867.10368,884.02912828Y87UNITED STATES TREASURYUS GOV3.272%FixedN3.465AA+Aaa350,000.0007/31/202407/31/20241.6750.2152,563.18351,162.11350,906.57353,469.75369,168.10371,731.28912828YE4UNITED STATES TREASURYUS GOV2.751%FixedN3.575AA+Aaa300,000.0008/31/202408/31/20241.6730.2261,274.17294,257.81295,512.43296,786.60311,203.20312,477.37912828YE4UNITED STATES TREASURYUS GOV3.393%FixedN3.575AA+Aaa370,000.0008/31/202408/31/20240.8800.2261,571.48376,012.50374,919.84376,491.32383,817.28385,388.76912828YY0UNITED STATES TREASURYUS GOV1.492%FixedN3.880AA+Aaa160,000.0012/31/202412/31/20240.8880.2587.73166,500.00165,406.01165,413.75169,493.76169,501.49912828Z52UNITED STATES TREASURYUS GOV1.156%FixedN3.962AA+Aaa125,000.0001/31/202501/31/20250.2570.266719.26130,966.80130,670.27131,389.53130,625.00131,344.26912828ZC7UNITED STATES TREASURYUS GOV2.012%FixedN4.060AA+Aaa220,000.0002/28/202502/28/20250.4490.272840.95226,943.75226,120.92226,961.87227,760.06228,601.01912828ZT0UNITED STATES TREASURYUS GOV2.065%FixedN4.386AA+Aaa235,000.0005/31/202505/31/20250.3480.29451.65233,971.88233,989.38234,041.02234,550.21234,601.86912828ZW3UNITED STATES TREASURYUS GOV2.239%FixedN4.471AA+Aaa255,000.0006/30/202506/30/20250.3440.3071.76253,894.34253,931.56253,933.32254,352.55254,354.32---UNITED STATES TREASURYUS GOV52.214%FixedN2.617AA+Aaa5,725,000.0009/03/202309/03/20231.3730.18323,769.105,766,421.295,763,233.845,787,002.945,907,682.545,931,451.64Identifier,Description,Security Type% of MarketValue +AccruedCoupon TypeCallableDurationS&PRating,Moody'sRatingEnding Current UnitsEndingEffectiveMaturity,Final MaturityBookYield,YieldEnding AccruedBalanceOriginal CostEnding Book Value,Book Value + AccruedMarket Value,Ending Market Value +Accrued---------100.000%------2.574AA+Aaa11,017,509.9408/16/202308/22/20231.1960.21937,583.1711,103,012.5511,087,613.8111,125,196.9811,322,348.6111,359,931.78Security Type GASB 40 Trade DateSan Jacinto, City of (66779)As of 12/31/2020Return to Table of ContentsDated: 01/11/2021153.A.3.aPacket Pg. 79Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Identifier,Description,Security TypeInterest/DividendReceivedTransfers In/OutPurchasesPurchasedAccruedIncomeSalesDisposed AccruedMaturities andRedemptionsPaydownsNet RealizedGain/LossBeginning OriginalCost,Ending Original CostBeginning MarketValue,Ending Market Value31846V203FIRST AMER:GVT OBLG YMMFUND0.140.0021,813.600.00-104.170.000.000.000.0215,800.5137,509.9415,800.5137,509.94CCYUSDReceivableCASH0.000.000.000.000.000.000.000.000.000.130.120.130.12CCYUSDCashCASH0.00-104.170.000.000.000.000.000.000.000.000.000.000.003135G0U92FEDERAL NATIONAL MORTGAGEASSOCIATIONAGCY BOND0.000.000.000.000.000.000.000.000.00129,906.40129,906.40133,595.80133,331.049128285R7UNITED STATES TREASURYUS GOV3,281.250.000.000.000.000.000.000.000.00250,664.06250,664.06256,474.50255,947.25912828XG0UNITED STATES TREASURYUS GOV1,593.750.000.000.000.000.000.000.000.00148,089.85148,089.85154,705.05154,488.30912828W55UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.0098,101.5698,101.56102,175.80102,031.203137AXHP1FHMS K-024 A2FHLMC CMO686.130.000.000.000.000.000.000.000.00319,687.50319,687.50330,245.95329,656.64912828V72UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00313,621.88313,621.88321,447.73320,955.39912828SF8UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00314,778.52314,778.52322,222.95321,607.76912828L57UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00174,890.63174,890.63180,154.27179,942.35912828J76UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00179,374.22179,374.22183,867.12183,656.1630231GBB7EXXON MOBIL CORPCORP0.000.000.000.000.000.000.000.000.0075,000.0075,000.0077,179.8877,157.829128287C8UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00370,925.00370,925.00379,611.49379,250.00912828Y87UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00351,162.11351,162.11369,250.00369,168.10912828YE4UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00294,257.81294,257.81311,156.40311,203.209128286Z8UNITED STATES TREASURYUS GOV3,062.500.000.000.000.000.000.000.000.00351,121.09351,121.09368,921.70368,867.10037833DE7APPLE INCCORP0.000.000.000.000.000.000.000.000.00304,260.00304,260.00312,942.47312,771.56912828W71UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00340,404.49340,404.49356,225.27355,924.433137B4WB8FHMS K-033 A2FHLMC637.500.000.000.000.000.000.000.000.00258,544.92258,544.92265,442.55265,524.72US3137BWWD24FHMS K-725 A2FHLMC700.470.000.000.000.000.000.000.000.00289,012.50289,012.50300,265.45300,954.08Portfolio Activity SummarySan Jacinto, City of (66779)12/01/2020 - 12/31/2020Return to Table of ContentsDated: 01/11/2021163.A.3.aPacket Pg. 80Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Identifier,Description,Security TypeInterest/DividendReceivedTransfers In/OutPurchasesPurchasedAccruedIncomeSalesDisposed AccruedMaturities andRedemptionsPaydownsNet RealizedGain/LossBeginning OriginalCost,Ending Original CostBeginning MarketValue,Ending Market Value912828V80UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00188,837.30188,837.30196,952.67196,822.613137EAEP0FEDERAL HOME LOAN MORTGAGECORPAGCY BOND0.000.000.000.000.000.000.000.000.00299,769.00299,769.00314,052.03314,708.263130AJ7E3FEDERAL HOME LOAN BANKSAGCY BOND0.000.000.000.000.000.000.000.000.00299,448.00299,448.00307,769.59307,769.04912828YE4UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00376,012.50376,012.50383,759.56383,817.28912828YY0UNITED STATES TREASURYUS GOV1,400.000.000.000.000.000.000.000.000.00166,500.00166,500.00169,524.96169,493.763133ELWD2FEDERAL FARM CREDIT BANKSFUNDING CORPAGCY BOND0.000.000.000.000.000.000.000.000.00334,504.20334,504.20335,907.04336,099.203130AJHU6FEDERAL HOME LOAN BANKSAGCY BOND0.000.000.000.000.000.000.000.000.00223,884.00223,884.00226,264.18226,470.603137EAEQ8FEDERAL HOME LOAN MORTGAGECORPAGCY BOND0.000.000.000.000.000.000.000.000.00334,162.50334,162.50336,493.03336,693.36594918AT1MICROSOFT CORPCORP0.000.000.000.000.000.000.000.000.00246,484.45246,484.45246,073.08245,611.63931142EK5WALMART INCCORP3,825.000.000.000.000.000.000.000.000.00243,666.00243,666.00242,067.53241,637.313137EAER6FEDERAL HOME LOAN MORTGAGECORPAGCY BOND0.000.000.000.000.000.000.000.000.00334,859.30334,859.30336,618.89336,719.86912828T91UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00266,146.29266,146.29265,727.85265,648.293133ELG81FEDERAL FARM CREDIT BANKSFUNDING CORPAGCY BOND502.500.000.000.000.000.000.000.000.00333,907.90333,907.90335,367.10335,980.40912828T26UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00263,835.35263,835.35263,626.14263,576.41912828ZC7UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00226,943.75226,943.75227,691.42227,760.063137EAEV7FEDERAL HOME LOAN MORTGAGECORPAGCY BOND0.000.000.000.000.000.000.000.000.00234,760.30234,760.30235,071.84235,463.273135G05X7FEDERAL NATIONAL MORTGAGEASSOCIATIONAGCY BOND0.000.000.000.000.000.000.000.000.00413,057.80413,057.80413,614.02414,909.05912828F21UNITED STATES TREASURYUS GOV0.000.000.000.00-238,892.19-891.740.000.004,957.03428,491.99197,007.81442,306.70202,984.40713448FB9PEPSICO INCCORP0.000.000.000.000.000.000.000.000.0084,951.5584,951.5585,292.8485,467.98Portfolio Activity SummarySan Jacinto, City of (66779)12/01/2020 - 12/31/2020Return to Table of ContentsDated: 01/11/2021173.A.3.aPacket Pg. 81Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, * Weighted by: Ending Market Value + Accrued. * Holdings Displayed by: Lot.Identifier,Description,Security TypeInterest/DividendReceivedTransfers In/OutPurchasesPurchasedAccruedIncomeSalesDisposed AccruedMaturities andRedemptionsPaydownsNet RealizedGain/LossBeginning OriginalCost,Ending Original CostBeginning MarketValue,Ending Market Value91282CAN1UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00274,914.06274,914.06274,914.20275,010.72912828Z52UNITED STATES TREASURYUS GOV0.000.000.000.000.000.000.000.000.00130,966.80130,966.80130,595.75130,625.00912828ZW3UNITED STATES TREASURYUS GOV318.750.000.000.000.000.000.000.000.00253,894.34253,894.34254,083.53254,352.553133EMGX4FEDERAL FARM CREDIT BANKSFUNDING CORPAGCY BOND0.000.000.000.000.000.000.000.000.00219,579.80219,579.80219,730.92219,941.593135G06H1FEDERAL NATIONAL MORTGAGEASSOCIATIONAGCY BOND0.000.000.000.000.000.000.000.000.00319,635.20319,635.20319,939.48320,288.70912828ZT0UNITED STATES TREASURYUS GOV0.000.00233,971.88-6.460.000.000.000.000.000.00233,971.880.00234,550.21---------16,007.99-104.17255,785.48-6.46-238,996.36-891.740.000.004,957.0511,078,815.5511,103,012.6711,305,129.3811,322,348.73Portfolio Activity SummarySan Jacinto, City of (66779)12/01/2020 - 12/31/2020Return to Table of ContentsDated: 01/11/2021183.A.3.aPacket Pg. 82Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, Additional Disclosure:This information is for the sole purposes of the client and is not intended to provide specific advice or recommendations. Please review the contents of this information carefully. Should you have any questions regarding theinformation presented, calculation methodology, investment portfolio, security detail, or any other facet of this information, please feel free to contact us.Public Trust Advisors, LLC (Public Trust) statements and reports are intended to detail our investment advisory activity as well as the activity of certain client accounts managed by Public Trust. The custodian bank maintainsthe control of assets and executes and settles all investment transactions. The custodian statement is the official record of security and cash holdings transactions. Public Trust recognizes that clients may use these reports tofacilitate record keeping; therefore, it is recommended that the client reconcile this information with their custodian bank statement. Many custodians use a settlement date basis that may result in the need to reconcile due to atiming difference. The underlying market value, amortized cost, and accrued interest may differ between the custodian and this statement or report. This can be attributed to differences in calculation methodologies and pricingsources used.Public Trust does not have the authority to withdraw funds from or deposit funds to the custodian. Our clients retain responsibility for their internal accounting policies, implementing and enforcing internal controls, andgenerating ledger entries or otherwise recording transactions. The total market value represents prices obtained from various sources; it may be impacted by the frequency at which prices are reported, and such prices are notguaranteed. Prices received from pricing vendors are generally based on current market quotes but when such quotes are not available, the pricing vendors use a variety of techniques to estimate value. These estimates,particularly for fixed-income securities, may be based on certain minimum principal amounts (e.g. $1 million) and may not reflect all the factors that affect the value of the security including liquidity risk. The prices provided arenot firm bids or offers. Certain securities may reflect N/A or unavailable where the price for such security is generally not available from a pricing source. The market value of a security, including those priced at par value, maydiffer from its purchase price and may not closely reflect the value at which the security may be sold or purchased based on various market factors. The securities in this investment portfolio, including shares of mutual funds,are not guaranteed or otherwise protected by Public Trust, the FDIC (except for certain non-negotiable certificates of deposit), or any government agency unless specifically stated otherwise.Clients may be permitted to establish one or more unmanaged accounts for the purposes of client reporting. Clients may also be permitted to provide externally managed assets for the purposes of client reporting. Public Trustdefines unmanaged accounts or assets as one where the investment direction remains the sole responsibility of the client rather than the Investment Manager. Unmanaged accounts or external assets do not receive ongoingsupervision and monitoring services. The Investment Manager does not make any investment recommendations and may not charge a fee for reporting on these accounts or assets. The primary purpose for this service is toinclude unmanaged accounts or assets owned by the client in the performance reports provided by the Investment Manager. The Investment Manager assumes no liability for the underlying performance of any unmanagedaccounts or assets, and it is the client’s sole responsibility for the accuracy or correctness of any such performance.Beginning and ending balances are based on market value plus accrued interest on a trade date basis. Statements and reports made available to the end user either from Public Trust or through the online reporting platformmay present information and portfolio analytics using various optional methods including, but not limited to, historical cost, amortized cost, and market value. All information is assumed to be correct, but the accuracy has notbeen confirmed and therefore is not guaranteed to be correct. Information is obtained from third party sources that may or may not be verified. The data in this report is unaudited and is only applicable for the date denoted onthe report. Market values may change day-to-day based on numerous circumstances such as trading volume, news released about the underlying issuer, issuer performance, etc. Underlying market values may be priced vianumerous aspects as certain securities are short term in nature and not readily traded. Performance results are shown net of all fees and expenses and reflect the reinvestment of dividends and other earnings.Many factors affect performance including changes in market conditions and interest rates and in response to other economic, political, or financial developments. Investment involves risk including the possible loss ofprincipal. No assurance can be given that the performance objectives of a given strategy will be achieved. Past performance is no guarantee of future results. Any financial and/or investment decision may incur losses.The investment advisor providing these services is Public Trust Advisors, LLC, an investment adviser registered with the U.S. Securities and Exchange Commission (SEC) under the Investment Advisers Act of 1940, asamended. Registration with the SEC does not imply a certain level of skill or training. Public Trust is required to maintain a written disclosure brochure of our background and business experience. If you would like to receive acopy of our current disclosure brochure, Privacy Policy, or Code of Ethics, or have any questions regarding your account please contact us.Public Trust Advisors717 17th St. Suite 1850Denver, CO 802023.A.3.aPacket Pg. 83Attachment: 2020-21 December Treasurers Report with signature (Treasurer’s Report at December 31, February 2, 2021 TO: City Council REQUESTED BY: Stuart McKibbin, City Engineer APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Final Local Road Safety Plan RECOMMENDATION: Staff recommends that the City Council accept the Local Road Safety Plan (LR SP) for receipt and file. DISCUSSION: The City has been exploring ways to enhance access and safety for all modes of travel. For example, in 2019, the Complete Streets Safety Assessment was completed with the goal of recommending future projects at select locations and citywide policies that increase safety for all modes of travel. The objectives of the LRSP creates a framework to systematically identify and analyze safety problems and recommend safety improvements citywide. Funding for this program was provided by a grant that the Engineering Department applied to from Caltrans. In 2022, the LRSP will be required for the Highway Safety Improvement Program (HSIP) Cycle 11. While not required for the current HSIP Cycle 10 application, the LRSP would improve the competitiveness of the City’s projects. The LRSP supplies the City with a ready list to select projects for other local, state, and federal grant applications. The LRSP also creates several policy recommendations for implementation. The final report consists of a safety analysis, countermeasure toolbox, emphasis area and strategies, and an evaluation and implementation section that identifies areas in the City for street improvements and policies that can be implemented. After a citywide evaluation from Fehr & Peers, the following hot spot locations and collision types were selected as the top priorities for the City using the Transportation Injury Mapping System data provided from UC Berkeley. 1. San Jacinto Avenue – Menlo Avenue to 7th Street 2. State Street – DeAnza Drive to 9th Street 3. Ramona Expressway – Lyon Avenue to Eagle Road 4. East Esplanade Avenue – Hewitt Street to Meridian Street 5. Ramona Expressway and Sanderson Avenue 6. Nighttime Collisions involving Bicyclists and Pedestrians 7. Collisions involving alcohol 8. Broadside Collisions at Major Unsignalized Intersections 9. Bicycle and Pedestrian Collisions near Schools 10. Collisions involving Pedestrians in Roadway 4.1 Packet Pg. 84 During the accompanying presentation, Fehr & Peers will present in detail the issues surrounding the hot spot locations and collision types. Fehr & Peers will also share the other sections of the report and be available for any questions during the presentation. The Local Road Safety Plan will serve as guidance for selection of future Capital Imp rovement Projects. The plan will also assist City staff with how to implement best practices in traffic safety. The Local Road Safety Plan will be updated every 3-5 years to ensure that the plan keeps up with the best practices in traffic safety and to reevaluate hot spot locations in the City. FISCAL IMPACT: There is no additional fiscal impact from adopting the final report. ATTACHMENTS: 21 - 02 02 Agenda re Final LRSP (PowerPoint Presentation) 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) 4.1 Packet Pg. 85 4.1.a Packet Pg. 86 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 87 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 88 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 89 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 90 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 91 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 92 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 93 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 94 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 95 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 96 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 97 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 98 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 99 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 100 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 101 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 102 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 103 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 104 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 105 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 106 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint 4.1.a Packet Pg. 107 Attachment: 21 - 02 02 Agenda re Final LRSP (PowerPoint LOCAL ROAD SAFETY PLAN January 2021 4.1.b Packet Pg. 108 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 2 Engineer's Seal & Acknowledgments SECTION 148 OF TITLE 23, UNITED STATES CODE REPORTS DISCOVERY AND ADMISSION INTO EVIDENCE OF CERTAIN REPORTS, SURVEYS, AND INFORMATION — Notwithstanding any other provisions of law, reports, surveys, schedules, lists, or data compiled or collected for any purpose relating to this section, shall not be subject to discovery or admitted into evidence in a Federal or State court proceeding or considered for other purposes in any action for damages arising from any occurrence at the location identified or addressed in the reports, surveys, schedules, lists, or other data. Statement of Protection of Data from Discovery and Admissions This study applies a systemic safety approach that identifies certain features on particular roadways that are correlated with specific collision types and frequencies. This broad approach is necessitated by the inherent nature of covering an entire agency’s facilities in one study and the limited scope/budget available to prepare LRSPs. Limited time is available to perform field observations throughout the study area to contextualize the data, and therefore, it is beyond the scope of work to perform in-depth “hot spot” evaluations at all locations. 4.1.b Packet Pg. 109 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 3 Acknowledgments The 2020 City of San Jacinto Local Roadway Safety Plan was funded through a Local Roadway Safety Plan (LRSP) grant provided by the California Department of Transportation (Caltrans). Input was sought from an advisory group consisting of staff from the City of San Jacinto and partner public agencies. Fehr & Peers assisted the City of San Jacinto in preparing the plan. CALTRANS LRSP GRANT ID: LRSP071, LRSPL-5075(022) ADVISORY GROUP MEMBERS Bernadette Reynolds Soboba Band of Luiseno Indians Brian Herritt Soboba Band of Luiseno Indians Gail Carlson Soboba Band of Luiseno Indians Kristin Warsinski Riverside Transit Agency Mauricio Alvarez Riverside Transit Agency Michael Castello Soboba Band of Luiseno Indians Michael Collins San Jacinto Unified School District Sergeant Michael Heath San Jacinto Sheriff Department Seth Heeren San Jacinto Unified School District CITY OF SAN JACINTO PROJECT MANAGEMENT Stuart McKibbin Tim Hamlin Grace Alvarez Bob Brady FEHR & PEERS TEAM Steve Brown, TE, RSP Emily Finkel Rachel Om Claude Strayer, PE Kendra Rowley, PE Lee Reis Saima Musharrat Melody Wu Erika Kulpa 4.1.b Packet Pg. 110 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4 Glossary & Table of Contents Glossary (A)ADT (annual) average daily traffic ADA Americans with Disabilities Act AHSC Affordable Housing and Sustainable Communities ATP Active Transportation Program AV Autonomous Vehicle B/C Benefit/Cost BTA Bicycle Transportation Account BUILD Better Utilizing Investments to Leverage Development CDBG Community Development Block Grant CIP Capital Improvement Plan CRF Crash Reduction Factor CSSA Complete Streets Safety Assessment CVC California Vehicle Code DOT Department of Transportation DUI Driving Under the Influence EMS Emergency Medical Services FHWA Federal Highway Administration GIS Geographic Information System HSIP Highway Safety Improvement Program ITE Institute of Transportation Engineers KSI Killed or Severely Injured LED Light-emitting Diode LPI Leading Pedestrian Interval LPP Local Partnership Program LRSM Local Roadway Safety Manual LRSP Local Road Safety Plan LSRP Local Streets and Roads Program LTF Local Transportation Fund MUT Median U-Turn MUTCD Manual on Uniform Traffic Control Devices OTS Office of Traffic Safety PCF Primary Collision Factor PHB Pedestrian Hybrid Beacon RCTC Riverside County Transportation Commission RCUT Restricted Crossing U-Turn RRFB Rectangular Rapid Flashing Beacon RTA Riverside Transit Agency SCAG Southern California Association of Goverments SGC Strategic Growth Council SCCP Solution for Congested Corridors Program SJUSD San Jacinto Unified School District SR2S/SRTS Safe Routes to School STIP State Transportation Improvement Program SWITRS Statewide Integrated Traffic Records System TCC Transportation Climate Communities TDA Transit Development Act TIGER Transportation Investment Generating Economic Recovery TIMS Transportation Injury Mapping System TMP Trails Master Plan TNC Transportation Network Company TUMF Transportation Uniform Mitigation Fee VMT Vehicle Miles Traveled WRCOG Western Riverside Council of Governments 4.1.b Packet Pg. 111 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 5 6 Countermeasure Toolbox 7 Emphasis Areas and Strategies 8 Evaluation and Implementation Table of Contents 7 11 13 17 21 37 71 95 1 Introduction 2 Vision and Goals Overview of Safe System Approach and Project Background Summary of Safety Partners Summary of Safety Vision and Goals for San Jacinto Summary of the City's Safety Efforts Summary of Safety Countermeasures Covering Engineering, Education, Enforcement, Emergency Services and Emerging Technology Summary of 10 Priority Location Project Recommendations 3 Safety Partners Summary of Safety Analysis Results, including the Historic Collision Landscape, Hot Spot Identification, and Development of Crash Types through Systemic Analysis 4 Existing Efforts 5 Safety Analysis 3Acknowledgments PAGE Funding Opportunities, and Considerations for Implementation and Evaluation of Safety Projects State Street between Sagecrest Drive and Quandt Ranch Road 4.1.b Packet Pg. 112 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4.1.b Packet Pg. 113 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Introduction Chapter 1 San Jacinto Local Roadway Safety Plan 7 The City of San Jacinto is committed to prioritizing safety and decreasing/ eliminating the amount of traffic related deaths and serious injuries on City streets. This Local Road Safety Plan (LRSP) proactively evaluates hot spots throughout the City to identify the proven countermeasures that can be implemented through the current and future Capital Improvement Plan (CIP). This section defines the Safe Systems approach, an idea which underlies this LRSP, and provides background on safety work in San Jacinto. What is the Safe System approach? Each day, people are killed and seriously injured on our roads. Crashes can irreversibly change the course of human lives, touching victims, their families and loved ones, and society as a whole. Through collective action on the part of all roadway system stakeholders—from system operators and vehicle manufacturers, to law enforcement and everyday users—we can move to a Safe System approach that anticipates human mistakes, with the goal of eliminating fatal & serious injuries for all road users. A Safe System acknowledges the vulnerability of the human body – in terms of the amount of kinetic energy transfer a body can withstand – when designing and operating a transportation network to minimize serious consequences of crashes. Figure 01: The Safe System Approach Source: Fehr & Peers for FHWA 4.1.b Packet Pg. 114 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 18 According to the World Health Organization, the goal of a Safe System is to ensure that if crashes occur, they “do not result in serious human injury.”1 A Safe System approach addresses the five elements of a safe transportation system – safe road users, safe vehicles, safe speeds, safe roads, and post-crash care – in an integrated manner, through a wide range of interventions (see Figure 1). The Safe System approach to road safety started internationally as part of the Vision Zero proclamation that, from an ethical standpoint, no one should be killed or seriously injured on the road system.2,3 It is founded on the principle that people make mistakes, and that the road system should be adapted to anticipate and accommodate human mistakes and the physiological and psychological limitations of humans.4 Countries that have adopted the Safe System approach have had significant success reducing highway fatalities, with reductions in fatalities between 50 and 70%.5 The Institute of Transportation Engineers (ITE) and the Road to Zero Coalition’s Safe Systems Explanation and Framework articulate that to anticipate human mistakes, a Safe System seeks to: ›Separate users in a physical space (e.g., sidewalks, dedicated bicycle facilities) ›Separate users in time (e.g., pedestrian scramble, dedicated turn phases) ›Alert users to potential hazards ›Accommodate human injury tolerance through interventions that reduce speed or impact force Creating a Safe System means shifting a major share of the responsibility from road users to those who design the road transport system. “Individual road users have the responsibility to abide by laws and regulations”6 and do so by exhibiting due care and proper behavior on the transportation system. While road users are responsible for their own behavior, this is a shared responsibility with those who design, operate, and maintain the transportation network: including the automotive industry, law enforcement, elected officials, and government bodies.7 In a Safe System, roadway system designers and operators take on the highest level of ethical responsibility. Background This will be the first comprehensive safety plan for the City of San Jacinto. The Complete Streets Safety Assessment (CSSA) was completed in 2019, covering four areas in the City. This LRSP builds on the CSSA and provides the City and its major stakeholders with a blueprint for a safe and more accessible community. This LRSP will assist the City when it applies for safety infrastructure funding sources. For example, the Cycle 11 Highway Safety Improvement Program (HSIP) funding cycle anticipated in 2022 will require an LRSP for an agency to be eligible to apply for funds. About San Jacinto The City of San Jacinto, located in Riverside County, is home to approximately 49,200 people.8 San Jacinto’s population is 54% Latino, 32% non-Latino white, 6% Black, 4% Asian, 3% two or more races, and 1% non-Latino Native American. 43% of residents speak a language other than English at home. Approximately 18% of San Jacinto residents are living in poverty, with a citywide median household income of $50,500.9 Some of the census tracts within the City fall within the State of California’s definition of Disadvantaged Communities, based on health, economic and environmental factors. Several of the City’s census tracts are also in the lowest quartile for healthcare access according to the California Healthy Places Index, including one tract in the 6th percentile.10 ITE Safe System Framework: Focus on Safe Speeds The ITE Safe System framework provides important context for the focus on safe speeds within a Safe System approach. For vulnerable users speed is a determining factor in survivability – a human’s chance of surviving being struck by a vehicle increases from 20% at 40 miles per hour to 60% at 30 miles per hour to 90% at 20 miles per hour. Reducing speed in the presence of vulnerable users is a key Safe System strategy. Approaches include: • Physical roadway designs (width, horizontal alignment) to limit free flow speeds, • Traffic calming treatments that induce slower speeds, • Traffic signal timing that minimizes high speed flow, • Traditional or automated enforcement that discourages speeding. 4.1.b Packet Pg. 115 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 9 Endnotes 1. World Health Organization (2011). Decade of Action for Road Safety 2011-2020. Retrieved from https://www.who.int/ roadsafety/decade_of_action/plan/plan_en.pdf, p. 9. 2. Johansson, R. (2009). Vision Zero - Implementing a policy for traffic safety. Safety Science, 47, 826-831. 3. Tingvall, C., & Haworth, N. (1999). An Ethical Approach to Safety and Mobility. Paper presented at the 6th ITE International Conference Road Safety and Traffic Enforcement. 6-7 September 1999, Melbourne, Australia. 4. Belin, M.-Å., Tillgren, P., & Vedung, E. (2012). Vision Zero - a road safety policy innovation. International Journal of Injury Control and Safety Promotion, 19, 171-179. 5. World Resources Institute (2018). Sustainable and Safe: A Vision and Guidance for Zero Road Deaths. Retrieved from https:// www.wri.org/publication/sustainable-and-safe-vision-and-guidance-zero-road-deaths 6. World Health Organization (2011). Decade of Action for Road Safety 2011-2020. Retrieved from https://www.who.int/ roadsafety/decade_of_action/plan/plan_en.pdf, p. 9. 7. World Health Organization (2011). Decade of Action for Road Safety 2011-2020. Retrieved from https://www.who.int/ roadsafety/decade_of_action/plan/plan_en.pdf 8. Census 2019 Population estimates 9. American Community Survey 2014-2018 10. https://map.healthyplacesindex.org/ Carroll Drive & Burns Lane 4.1.b Packet Pg. 116 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4.1.b Packet Pg. 117 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Vision & Goals Chapter 2 San Jacinto Local Roadway Safety Plan 11 SAN JACINTO SAFETY VISION STATEMENT Strive to eliminate fatalities and serious injuries on San Jacinto’s streets by making travel safer for all modes of transportation. The San Jacinto vision statement was developed at the first stakeholder meeting. Stakeholders acknowledged that eliminating all fatalities and serious injuries was a challenging and aspirational vision but to work towards anything less (e.g. reduce fatalities and serious injuries) did not feel acceptable because even one fatality or serious injury was unacceptable. Therefore, the stakeholder group suggested that noting the City is striving to eliminate fatalities and serious injuries would create a strong vision to shift roadway safety culture in the city, while also acknowledging the challenging nature of achieving the vision. The vision statement also calls out the importance of safety for all modes of transportation to foster a multi-modal transportation system where investments are made for all modes and the responsibility for safe and responsible behavior is on all road users. The City’s vision statement sets a concise yet comprehensive goal to guide the City’s investments in infrastructure, education, emergency services, and enforcement. The following goals were identified to support and guide the City’s efforts in achieving its vision: GOAL 1 Reduce the number of collisions involving people walking and biking, with separated bike and pedestrian facilities and increased driver awareness of people walking and biking. GOAL 2 Improve the visibility of people walking, biking, and driving at night. GOAL 3 Encourage people to drive at lower speeds with roadway design and signage. GOAL 4 Increase motorists’ awareness of curves along the roadway. GOAL 5 Discourage people from driving under the influence through educational and enforcement programs, and decrease the severity of DUI collisions through roadway infrastructure enhancements. GOAL 6 Foster a citywide culture of safety where all road users have shared responsibility. 4.1.b Packet Pg. 118 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4.1.b Packet Pg. 119 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Safety Partners Chapter 3 San Jacinto Local Roadway Safety Plan 13 The City is excited to have engaged stakeholders representing the four E’s (engineering, enforcement, education, and emergency medical services) and tribal governments to address the unique traffic safety concerns in the San Jacinto Valley. ›Soboba Tribal Administration, Soboba Band of Luiseño Indians – The Soboba people inhabited the area that includes San Jacinto prior to Mexican and American settlement, and the Soboba Indian Reservation is adjacent to the City. The Soboba Tribal Administration has multiple departments that are related to transportation safety, including Public Works, Public Safety, and Parks and Recreation. The Tribal Administration also recently received an Active Transportation Program (ATP) planning grant from the Southern California Association of Governments (SCAG). ›San Jacinto Unified School District (SJUSD) – Transportation habits are informed by our experiences as children, and schools are important partners in cultivating positive and safe transportation experiences for young people and families. Schools are also areas of concentrated activity during arrival and dismissal times, so including schools in safety conversations can lead to recommendations for improvements near schools. ›San Jacinto Sheriff’s Department – Law enforcement is the core partner representing the E of enforcement. Sworn officers provide valuable input into current behavior that they observe on the roads, and are important partners in safety conversations so that jurisdictions can focus enforcement time on behaviors that are most closely associated with injuries and fatalities. San Jacinto Avenue, south of Midway Street 4.1.b Packet Pg. 120 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 314 ›Riverside Transit Agency – Transit agencies expand mobility options for residents and provide a transportation option with professional drivers who are almost always safer than individuals driving cars. Transit agencies also bring a perspective to safety conversations based on their vehicles driving many miles on local streets. The Riverside Transit Agency provides transit service in San Jacinto, with four routes within the City. ›Riverside County Public Health Department – public health departments often run or are involved in safety programs that are directly related to transportation. The Riverside County Public Health Department has partnered with city and county public works departments to secure more than $2.5 million in infrastructure and non- infrastructure Safe Routes to School (SRTS) funding. It was also a partner for the Envision San Jacinto program described in the Existing Efforts chapter. FIRST STAKEHOLDER MEETING At the first stakeholder meeting on August 27, 2020, the group discussed the safety vision, priorities, and existing conditions in San Jacinto. As shown in Figure 1, roadway safety near schools was indicated as the top priority for two thirds of respondents, which was the most popular response. Relatedly, meeting attendees requested that this report includes an analysis by age. Five categories tied for the second-most popular safety priority with votes from half of respondents: Bicyclists, Crosswalks, Impaired Driving, Pedestrians, and Speed. Representatives from the Soboba Band of Luiseño Indians noted concerns about lighting, blind curves, and sidewalks on Soboba Road near the Soboba Reservation and casino. SECOND STAKEHOLDER MEETING At the second stakeholder meeting on November 3, 2020, the group discussed the proposed safety countermeasure toolbox for both engineering and non-engineering strategies, as well as the proposed emphasis areas and next steps for the project. Feedback from this group included: ›Median barriers could be helpful at schools to prevent parents from dropping off students across the street. ›The City has a process to upgrade/update intersection pavement markings, on an as-needed basis and whenever the City is rehabbing a street. ›The use of high-visibility crosswalks is supported by the schools and transit agencies. ›For raised crosswalks, working with emergency services is recommended to identify appropriate locations. TOTAL VOTES NearSchools Bicyclists Impaired DrivingCrosswalks Pedestrians Speed Lighting Near Parks Red light or stop sign running Sidewalks Enforcement Near Shops OlderPeople Younger People Traveling at Night Other Figure 02: Initial Stakeholder Meeting Priorities Source: Fehr & Peers 4.1.b Packet Pg. 121 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 15 State Street & Ramona Boulevard 4.1.b Packet Pg. 122 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4.1.b Packet Pg. 123 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Existing Efforts Chapter 4 San Jacinto Local Roadway Safety Plan 17 In recent years, the City’s efforts to improve safety have been most visible through a range of plans and programs. In 2019, the City finished a Complete Streets Safety Assessment, which included a benchmarking analysis of programs, policies, and practices for pedestrian and bicyclist safety. That plan highlighted some key strengths described in this section. Trails Master Plan The City published an updated Trails Master Plan (TMP) in 2018 detailing existing walking, biking, and multi-use paths within San Jacinto’s streets and open spaces. The TMP includes existing conditions for areas demographics, land use, activity centers, transit, health and more. The analysis of pedestrian and bicycle collisions found that they both had peaks in 2016 (the most recent data available at that time), and that 29% of those collisions resulted in severe or fatal injuries. The health and equity index summary found that San Jacinto has a higher pollution burden compared to Riverside County and the State of California. The TMP provides 38 improvements ranked using various inputs, recommendations on how to successfully implement and maintain the proposed corridor improvements, and potential infrastructure funding sources to finance enhancements. Safe Routes to School San Jacinto embarked on a citywide Safe Routes to School (SRTS) Plan in 2016. The plan aims to create safer and enjoyable options for walking and bicycling to and from school within the city. SRTS plans contain both infrastructure and program- bases recommendations that the city, local organizations, the school district, and other community members can use to improve the school’s surrounding environment. The San Jacinto SRTS contains designated Safe Routes to School corridors that are optimized with infrastructure improvements. These routes may connect City of SAN JACINTO Demonstration Project Envision San Jacinto brought the community together to experience a temporary pedestrian plaza on Main Street and test out safety improvements. The event featured improvements including nine creative crosswalks designed by San Jacinto Unified School District (SJUSD) students, a parklet by Riverside University Health System-Public Health, interactive chalk art by Mount San Jacinto College Art Club, curb extensions, placemaking and play features. The event also included a mural by SJUSD, a bike rodeo, and exercise demonstrations from local studios. September 29, 2018 4.1.b Packet Pg. 124 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 418 one or more schools and provide students and families options for multi-modal travel to and from their schools. The City offered pedestrian and bicycle safety education through SRTS, including youth safety projects in schools funded through Office of Transportation Safety (OTS) grants. Youth were provided with bicycle helmets and instructed in safe methods for crossing streets. Engagement The City conducted outreach as part of the Active Transportation Program and the General Plan update process. For the TMP, in addition to hosting meetings at schools and other public venues, an online feedback portal allowed members of the public to submit feedback digitally. In September 2018, the City partnered with SCAG and a Community Advisory Committee for an event called Envision San Jacinto, part of SCAG’s Go Human Active Transportation Safety and Encouragement Campaign. This demonstration project featured nine creative crosswalks designed by SJUSD students, a parklet by Riverside University Health System-Public Health, interactive chalk art by Mount San Jacinto College Art Club, curb extensions, placemaking, and play features. It also included a mural by SJUSD, a bike rodeo, and exercise demonstrations from local studios. The event attracted over 1,000 attendees and collected over 200 surveys that showed support for many of the demonstration elements, along with a desire for well maintained and clean sidewalks, sidewalk lighting, more bike lanes, and separated and protected bike lanes. Enforcement For the last five years, the City has used OTS grants to patrol for pedestrian violations by drivers, bicyclists, and pedestrians, finding that violations are fairly evenly distributed throughout the City. In 2019, the City conducted a speed survey to update speed limits on 44 roadway segments in San Jacinto. As a result of this survey, speed limits were increased at 13 locations and decreased at five locations, and no change to the remaining 26 locations. Since the speed limit is primarily based on the current speeds of drivers under California law, it is common for speed limits to increase after speed surveys when there have been limited roadway changes. Infrastructure The following existing infrastructure conditions and recent projects support safety within the City: ›In San Jacinto, a majority of intersections have pedestrian curb ramps. ›Safety improvements along Sanderson Avenue between Ramona Expressway and Cottonwood Avenue, including: rumble strips, speed radar signs, crush attenuators around power poles, and shoulder improvements. Construction of these improvements is underway as of 2020. ›The San Jacinto Valley Connect project, funded by ATP Cycle 2 and completed in 2020 provided for sidewalks and new bicycle facilities on Chase Street, Sagecrest Drive, College entrance, Community College Drive, Eagle Drive, Idyllwild Drive, Young Street, and Palm Avenue. ›Pedestrian upgrades and pedestrian push- button installation throughout the City utilizing HSIP Cycle 5 and 6 funding. ›Upgrading approximately 2,000 streetlights to light emitting diodes (LEDs) to improve night visibility in 2019. ›Construction of a raised two-way Class IV Cycle Track on Young Street adjacent to the De Anza Elementary School and Mountain View High School a few years ago. ›A new traffic signal and intersection improvements at the Ramona Boulevard & Sanderson Avenue intersection in 2017. ›Various pedestrian improvements along Main Street more than two decades ago. These improvements included angled parking, pedestrian bulb-outs for shorter pedestrian crossings, and additional lighting. ›Narrowing of the pedestrian crossing distance on North Ramona Boulevard between Monte Vista Avenue and South Grand Army Avenue with a concrete sidewalk extension near the Monte Vista Middle School and San Jacinto Elementary School, about a decade ago. There are also several planned infrastructure projects that support safety within the City as part of the Capital Improvement Program (CIP), including: ›Citywide Traffic Signal Upgrades, Phase 1: upgrading outdated traffic control devices and installing new signal equipment, including battery back-ups. 4.1.b Packet Pg. 125 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 19 ›Citywide Traffic Signal Upgrades, Phase 2: traffic signal timing updates, as well as electrical wiring upgrades at State Street & Seventh Street, State Street & Esplanade Avenue, and Hewitt Street & Esplanade Avenue. ›A new traffic signal at San Jacinto Avenue & Shaver Street: funded through a Highway Safety Improvement Program (HSIP) grant. ›Cottonwood Widening and Sidewalk: of installing approximately 4,100 linear feet of sidewalk, and a potential new pedestrian signal at Center Grove Way. ›Lyon Avenue Improvements: enhanced access to the proposed adjacent school site. ›Artesia Street Corridor Rehabilitation: pavement rehabilitation, sidewalk installation, and curb and gutter improvements. ›San Jacinto Avenue Safety Improvements: sidewalk installation, lighting improvements, and mid-block crossing enhancement. ›Hewitt Street Rehab: will include the addition of a bike lane. The City is currently in the planning stage for interconnecting and coordinating existing traffic signals at the following locations: ›San Jacinto Avenue & 7th Street ›San Jacinto Avenue & Shaver Street ›San Jacinto Avenue & Esplanade The Complete Streets Safety Assessment (CSSA) completed in 2019 noted infrastructure recommendations at the following locations: ›San Jacinto Avenue & Midway Street: sidewalk installation, sidewalk widening, and roadway lighting on approaches; consider signalizing the intersection and installing high visibility crosswalks; and installing Pedestrian Hybrid Beacons to the north and south of the intersection to reduce the distance between marked crossings. ›San Jacinto Avenue between Esplanade Avenue and Commonwealth Avenue: restriping to narrow curb lanes; installing sidewalks to fill gaps; various intersection improvements at San Jacinto Avenue & Commonwealth Avenue to improve pedestrian visibility; and installing a Pedestrian Hybrid Beacon to the north of Commonwealth Avenue. ›San Jacinto Avenue & 7th Street: centerline hardening; upgrading crosswalks; reducing curb radii and installing dual curb ramps; and installing a bicycle facility along 7th Street. This project will be completed with the installation of the signal at San Jacinto & Shaver. ›Megan Cope Elementary School: widening sidewalks; installing new sidewalks; and various reconfigurations for curbside parking and loading. State Street & Ramona Boulevard 4.1.b Packet Pg. 126 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4.1.b Packet Pg. 127 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Safety Analysis Chapter 5 San Jacinto Local Roadway Safety Plan 21 Chapter 2 of Caltrans’ Local Roadway Safety Manual (LRSM) instructs safety practitioners to “consider a wide range of data sources to get an overall picture of the safety needs.” Crash data and contextual data were collected and analyzed as part of this plan, as well as anecdotal input from City staff and community stakeholders. This section summarizes the results of a broad collision analysis for the City of San Jacinto, which will inform the project prioritization and countermeasures for the City. This analysis considers injury collisions from 2015 through 2019 available through the Transportation Injury Mapping System (TIMS) as of August 4, 2020. TIMS reports injury collisions from the Statewide Integrated Traffic Records System (SWITRS). Collision databases have been found to have certain reporting biases, including: ›Collision involving people walking, on bicycles, or on motorcycles are less likely to be reported than collisions with people driving ›Property damage collision are less likely to be reported compared to more severe collisions ›Younger victims are less likely to report collisions ›Alcohol-involved collisions may be under- reported Race, income, immigration status, and English proficiency may also impact reporting, but there is limited research on these factors. With those caveats in mind, this analysis identified several collision trends and risk factors in San Jacinto, including: ›People walking and biking are more likely to be fatally or severely injured. ›Drugs or alcohol increase the likelihood that a collision will be more severe ›A large share of injuries to people walking occur when people are crossing not in a crosswalk or walking in the road ›A much larger share of KSI collisions occur at night where there are no streetlights Table 01 provides a summary of collisions by mode and severity within the 5-year dataset. Caltrans’ Local Roadway Safety Manual (LRSM) Chapter 2 of Caltrans’ LRSM states that safety practitioners should “consider a wide range of data sources to get an overall picture of the safety needs” (p. 14). Both collision data and contextual data were collected and analyzed as part of this plan. Note: Collision data for 2018 and 2019 was considered provisional and subject to change at the time this analysis was conducted. Collisions Vehicle Bike Ped Total Total 849 66 60 975 Fatal or Severe 75 7 28 110 Table 01: Collision Summary 4.1.b Packet Pg. 128 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 52222 Collisions by Year by Mode From 2015 to 2019, there were 975 total injury collisions, and 110 collisions where victims were killed or severely injured (KSI). On average, seven people are killed each year in San Jacinto by traffic violence. The number of collisions for each year by mode in the figure to the right. Collisions by Mode People walking and biking are involved in 13 percent of total collisions but 31 percent of KSI collisions, as shown in the figure to the right. People walking are particularly over- represented in KSI collisions, as they are involved in only 6 percent of all collisions but 25 percent of KSI collisions. Figure 03: Collisions by Year by Mode, 2015-2019 Figure 04: Collisions by Mode, 2015-2019 Killed or Severely Injured in a Collision Severe injuries resulting from a traffic collision can result in a number of catastrophic impacts, including permanent disability, lost productivity and wages, and ongoing healthcare costs. These injuries can include: • Broken or fractured bones • Dislocated or distorted limbs • Severe lacerations • Severe burns • Skull, spinal, chest or abdominal injuries • Unconsciousness at or when taken from the collision scene Throughout this plan, the acronym KSI is used to denote collisions where someone was killed or severely injured. NUMBER OF COLLISIONS Pedestrian Bicycle Vehicle % % %%% % Pedestrian Bicycle ALL COLLISIONS KSI COLLISIONS Vehicle Pedestrian collisions in San Jacinto disproportionately result in a fatality or severe injury. 4.1.b Packet Pg. 129 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 23San Jacinto Local Roadway Safety Plan 23 Collision Type The three most common collision types in San Jacinto are Broadside (36%), Rear End (30%), and Hit Object (9%), shown in the figure to the right. For KSI collisions, Broadside collisions and Vehicle/Pedestrian collisions are tied for most common (25%), with Hit Object collisions again the third- most common (17%). This further illustrates the disproportionate share pedestrians make of KSI collisions in the City. It also shows that Hit Object collisions are more likely, compared to other collision types, to result in a KSI. Driving Under the Influence Drugs or alcohol increase the likelihood that a collision will be more severe in San Jacinto. While 11 percent of all collisions involve drugs or alcohol, 27 percent of KSI collisions involve drugs or alcohol. Figure 05: Collisions by Collision Type, 2015-2019 Figure 06: Collisions by Driving Under the Influence, 2015-2019 % OF COLLISIONS Broadside Read End Hit Object Head-On Sideswipe OtherVehicle/Pedestrian All Collisions KSI Collisions Drivers in All Collisions Drivers in KSI collisions 11% were under the influencewere under the influence 27% 4.1.b Packet Pg. 130 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 524 24 Primary Collision factor In San Jacinto, the most common PCFs are Unsafe Speed (29%), Vehicle Right of Way Violation (18%), Improper Turning (14%), and Traffic Signals and Signs (14%), as shown in the figure. For KSI collisions, the most common PCFs are Pedestrian Violation (19%), Improper Turning (18%), and Driving/Bicycling Under the Influence (13%). The Pedestrian Violation PCF indicates that the pedestrian violated a rule of the road, such as crossing outside of a crosswalk, as opposed to the Pedestrian Right of Way Violation PCF (4%), where the vehicle violates the pedestrian’s right of way. The Pedestrian Violation category overrepresentation in the data may be reflective of lack of clear information related to collision circumstances. Pedestrian Location A large share of injuries to people walking occur when people are crossing not in a crosswalk or walking in the road. Collisions with people walking most frequency involved pedestrian crossing not in a crosswalk (37%), followed by pedestrians in the road, including the shoulder (35%), as shown in the figure. For KSI collisions, pedestrians crossing not in a crosswalk are an even higher percentage (43%), again followed by pedestrians in the road, including the shoulder (32%). People crossing the street outside of crosswalks and walking in the road may indicate that there are unmet pedestrian desire lines, and could be evaluated to identify potential locations for new crosswalks and sidewalks. Figure 07: Collisions by Primary Collision Factor, 2015-2019 Figure 08: Pedestrian Action Preceding Collision, 2015-2019 % OF COLLISIONS Unsafe Speed Vehicle Right of Way Violation Improper Turning Trac Signals & Signs Pedestrian Violation Wrong Side of Road Unknown Unsafe Lane Change Other Than Driver (or Pedestrian) Pedestrian Right of Way Violation Unsafet Starting or Backing Improper Passing Driving/Bicycling Under the Influence All Collisions KSI Collisions % OF COLLISIONS Crossing in Crosswalk At Intersection Crossing Not in Crosswalk In Road, including Shoudler Not in Road All Collisions KSI Collisions 4.1.b Packet Pg. 131 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 25San Jacinto Local Roadway Safety Plan 25 Lighting Conditions Time of Day A much larger share of KSI collisions occur at night where there are no streetlights. Collisions between 6 PM and 6 AM are 32 percent of all collisions but 58 percent of KSI collisions, as shown in the figure. Street Lighting Areas noted without streetlights represent 25 percent of all overnight collisions but 40 percent of KSI collisions, shown in the figure. Crashes overnight disproportionately affect people walking, with 48 percent of people walking injured overnight. Figure 09: Collisions by Time of Day, 2015-2019 Figure 10: Collisions in the Dark by Lighting, 2015-2019 % OF COLLISIONS –am –6am 6–am am–pm –pm –6pm 6–pm pm–am All Collisions KSI Collisions % OF COLLISIONS With Street Lights No Street Lights All Collisions KSI Collisions Nighttime collisions in San Jacinto are more likely than daytime collisions to result in a fatality or severe injury. 4.1.b Packet Pg. 132 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 526 26 Victim Profile Vulnerable age groups have not experienced a disproportionate share of crashes in San Jacinto. People under the age of 15 are 32 percent of the City’s population but represent less than 10 percent of all injury and KSI injury crashes. People 65 years and older are 14 percent of the City’s population but represent 10 percent of all injury crashes and 12 percent of KSI crashes. People identified as Black, white, and other race are over-represented in crashes, as shown in the figure, although it is important to note that race is determined at the discretion of the reporting office and is only reported at the party level. This means that if people of multiple races are present in a vehicle, only the driver’s race will be reported. People identified as Black represent 11 percent of victims, but only 6 percent of the population of San Jacinto. People identified as “Other” for race by the reporting officer represent 6 percent of victims, but only 4 percent of the population of San Jacinto. And people identified as White represent 34 percent of victims, but only 32 percent of the population of San Jacinto. As noted at the beginning of this section, race, income, immigration status, and English proficiency may impact collision reporting, but there is limited research on these factors. In San Jacinto, 21% of residents are foreign-born and 90% are citizens. Figure 11: Parties and Victims by Race compared to Census Data, 2015-2019 Source: U.S. Census, American Community Survey (ACS) 2018 5-year estimate. % OF COLLISIONS Asian Black Hispanic White Other Not Stated CensusAll VictimsParties 4.1.b Packet Pg. 133 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 27San Jacinto Local Roadway Safety Plan 27 .Miles All Injury Collisions (2015 - 2019) Fatal Collisions (32) Severe Injury Collisions (78) Other Injury Collisions (865) Idyllwild Dr 7th St Washington Ave 1st StSanderson AveLyons AveState StSan Jacinto AveSanta Fe AveHewitt StMain St De Anza Dr N Warren RdRamona Blvd Ramona Ex p y Cottonwood Ave W Esplanade Ave Ramona Expy 7th St Ra mo n a Ex py S o boba RdPark Ave 79 E Es p l anade Ave ALL INJURY COLLISION LOCATIONS2015-2019 Figure 12 4.1.b Packet Pg. 134 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 52828 Systemic Analysis Systemic analysis is a proactive safety approach that focuses on evaluating an entire roadway network using a defined set of criteria. It looks at collision history on an aggregate basis to identify high-risk roadway characteristics in addition to looking at high collision locations. By merging adjacent road and intersection features with collision data, relationships can be uncovered between contextual factors and the risk of frequent and severe collisions. This systemic process relied on a twofold approach to identify key safety issues and locations to prioritize hot spot analysis and development of collision types. Collision Typing In developing systemic analysis, it is important to understand the relationship between collision characteristics and the contextual characteristics of the collision location. A systemic matrix illustrating the number of collisions at the intersection of a collision characteristic (e.g. location of pedestrian) and a contextual characteristic (e.g. posted speed of roadway) was identified. Each combination of a collision characteristic and a contextual characteristic represents a collision type. The highest occurring collision types and collision types with the largest share of severe collisions were mapped and considered for further study. This process evaluates risk across the entire roadway system, rather than only managing risk at certain locations where collisions have occurred. Hot Spot Analysis Following conventional collision mapping processes, the top intersections and corridors that account for a disproportionate share of collisions were identified. The location of fatal and severe injury (KSI) collisions were overlaid to see where the most severe collisions occurred and if there was overlap with the collision hotspots. 4.1.b Packet Pg. 135 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 29 Key Issues The hotspot identification, collision typing, and stakeholder feedback informed the development of key issues that are divided into violations, crash types, and locations. The key issues are listed below by category with an explanation of what makes each violation, crash type, or location a key safety issue. Violations ›Unsafe Speeding is the top violation for citywide collisions. ›Improper Turning is the top violation for citywide KSI vehicle-only collisions. ›Many collisions where someone is Driving Under the Influence result in a fatality or severe injury. ›Pedestrian Crossing Outside Crosswalk is a top violation for pedestrian collisions. ›Pedestrian in Road accounts for a high share of citywide KSI pedestrian collisions. ›Wrong Side of Road (Bicycle) is a top violation for bicycle collisions. Crash Types ›Broadside collisions account for the highest number of total collisions. ›Many collisions involving a Hit Object result in a fatality or severe injury. ›Nighttime collisions account for a high share of citywide KSI collisions, especially involving someone walking or biking. ›Driver at Fault Proceeding Straight is the top movement for the driver at fault in citywide and KSI collisions. ›Victims Under 19 are a key demographic identified through the stakeholder meetings for collisions occurring around schools. Locations ›Nearly a third of total and KSI collisions occur on 4 or 5 Lane Roads with 40+ MPH Speed Limit. ›Many nighttime collisions occurred in an area with No Streetlights. ›Curves were identified as a risk factor in the stakeholder meetings. ›A third of total collisions and a quarter of KSI collisions occurred at Signalized Intersection. ›A third of total collisions and a quarter of KSI collisions occur at Major Unsignalized Intersections. ›Nearly half of KSI collisions occurred midblock, or between intersections. ›Commercial Areas and Schools were identified as priority locations in the stakeholder meetings. 4.1.b Packet Pg. 136 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 530 Collisions Option East/West Street North/South Street Intersection Type Total KSI Bike Ped 1 Ramona Boulevard Sanderson Avenue Signal 14 7 0 0 2 Ramona Expressway Sanderson Avenue Signal 33 4 1 0 3 7th Street State Street Signal 22 2 1 3 4 Midway Street San Jacinto Avenue Two-Way Stop Control 17 2 1 2 5 Ramona Expressway State Street Signal 17 2 1 0 6 Ramona Expressway Eagle Drive Signal 11 2 1 1 7 Lyon Avenue Cottonwood Avenue All-Way Stop Control 8 2 1 0 Collisions Option Segment North/East Extent South/West Extent Total KSI Bike Ped 1 Sanderson Avenue Ramona Boulevard Cottonwood Avenue 32 7 0 1 2 San Jacinto Avenue Midway Street East Menlo Avenue 24 7 5 4 3 Sanderson Avenue Ramona Expressway Ramona Boulevard 14 6 0 0 4*Sanderson Avenue Gilman Springs Road Ramona Expressway 37 6 1 0 5 Ramona Expressway State Street Chase Street 17 5 4 1 6 Ramona Expressway Lake Park Drive San Jacinto Avenue 26 4 0 1 SYSTEMIC SAFETY ANALYSIS Hot Spot Analysis To summarize the total number of collisions by intersection, a set of non-overlapping areas of influence were generated based on a 50- foot radius around minor intersections and a 250-foot radius around major intersections. Major intersections are defined here as all intersections larger than where a two-lane road meets a two-lane road.To summarize the total number of collisions by roadway, collisions were matched to roadways based on the primary road name and a 50-foot search area. Not all collisions are associated with an intersection, but all collisions are associated with a roadway. The map on the following page identifies intersections and corridors with a concentration of fatal and severe injury (KSI) collisions. The top intersection and segment locations are listed on corresponding tables. Systemic Matrices Collision data was paired with geographic roadway and other contextual data to develop collision types using a series of systemic matrices. Outputs from the collision analysis were used to populate a set of matrices that allow us to look at crosstabs (collision data in rows and geographic data in columns) for collisions across the entire roadway network. The matrices allowed for identification of the combinations of factors that contributed to a high number of all collisions, and combinations that led to a high number of fatal and severe collisions. Matrices were created for each mode, as well as for the most severe collisions. From these matrices, we identified a set of collision types that represent the most frequent and most severe collision types across a broad range off roadway and land use contexts within San Jacinto. Table 02: KSI Hot Spot Locations, Intersections Table 03: KSI Hot Spot Locations, Segments The following matrices show the number of collisions for each cross-tab of factors. Factors related to collision data are displayed in rows and roadway or other contextual factors are displayed in columns. By combining the collision and roadway/conextual factors, we are able to start developing key collision types. Cells with a high number of collisions within each column grouping are highlighted. Note that most collisions fall into multiple categories, so rows and columns do not sum to 100% See appendix for matrices by mode. *Under Caltrans jurisdiction 4.1.b Packet Pg. 137 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 31 .Miles (2015 - 2019) KSI Collisions per Intersection 1 - 2 3-5 6-7 KSI Collisions per Mile 1 - 5 5 - 10 10 - 20 20 - 35 Idyllwild Dr 7th St Washington Ave 1st StSanderson AveLyons AveState StSan Jacinto AveSanta Fe AveHewitt StMain St De Anza Dr N Warren RdRamona Blvd Ramona Ex p y Cottonwood Ave W Esplanade Ave Ramona Expy 7th St Ra mo n a Ex py S o boba RdPark Ave 79 E Es p l anade Ave San Jacinto Local Roadway Safety Plan 31 KSI HOT SPOT LOCATIONS2015-2019 Figure 13 4.1.b Packet Pg. 138 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 532 Roadway Type Location Type No Street LightNear SchoolNear ParkNear RetailNear TransitIn Disadvantaged CommunityIn Low-Income CommunityTOTALLanes 3 Lanes or Less 4 or 5 Lanes 6 Lanes Signal Unsignalized Intersection Mid- blockSpeed (mph)15- 25 30- 35 40- 45 50- 60 30- 35 40- 45 50- 60 50- 60 Major Minor ViolationDriving Under Influence 10 7 20 6 0 18 19 1 30 22 7 22 53 18 36 45 24 28 41 81 Unsafe Speed 16 21 42 36 2 88 56 21 114 56 4 108 209 55 79 191 93 102 167 282 Improper Turning 22 13 26 18 0 33 18 7 33 37 4 63 94 32 59 74 44 48 71 137 Automobile Right of Way 24 15 54 8 0 54 14 2 39 81 16 36 64 55 82 125 68 59 116 172 Traffic Signs and Signals 6 11 31 9 0 41 26 12 86 38 2 10 90 35 53 98 58 38 87 136 TypeHead-On 8 5 16 5 0 19 15 0 27 16 2 23 46 19 24 43 25 23 42 68 Sideswipe 6 6 8 3 1 24 10 3 19 16 4 22 41 18 22 40 23 19 36 61 Rear End 13 23 47 37 2 91 58 23 124 57 2 111 222 60 87 198 97 106 168 294 Broadside 44 30 98 18 0 99 48 16 133 135 24 62 180 97 152 250 137 114 220 354 Hit Object 12 7 18 12 0 16 15 4 14 30 3 37 57 19 36 45 22 27 42 84 Time of Day12 am -3 am 2 2 5 1 0 2 11 4 7 5 0 15 22 4 6 11 6 11 9 27 3 am - 6 am 1 1 7 5 0 9 12 7 9 9 0 25 29 5 14 22 11 18 13 43 6 am - 9 am 17 13 23 17 2 18 14 8 32 38 10 32 68 24 53 64 34 31 58 112 9 am - 12 pm 8 8 26 17 0 37 20 6 50 30 2 40 83 31 48 78 41 46 78 122 12 pm - 3 pm 23 15 40 10 1 67 29 7 63 62 10 57 112 60 67 128 78 58 116 192 3 pm - 6 pm 30 17 50 18 0 79 29 10 79 63 10 81 146 66 90 167 84 71 145 233 6 pm - 9 pm 19 15 33 11 0 42 25 6 58 44 7 42 102 36 58 102 58 57 92 151 9 pm - 12 am 6 8 19 1 0 33 25 3 41 27 4 23 61 22 28 70 37 33 55 95 Driver at Fault Proceeding Straight 44 35 93 51 1 125 90 24 174 117 17 156 308 106 169 302 146 163 276 464 Making Right Turn 6 3 10 5 0 15 4 4 24 14 1 8 33 12 25 31 25 19 27 47 Making Left Turn 14 4 29 7 0 41 11 3 31 36 10 32 55 32 44 76 49 31 68 109 AgeUnder 19 31 18 40 7 0 39 28 5 56 55 17 40 93 49 80 110 62 57 100 168 60+5 7 27 11 0 45 30 11 54 38 2 42 95 22 46 92 50 42 85 136 DUIYes 14 13 21 5 0 34 20 5 42 30 8 32 73 31 47 70 39 33 62 112 TOTAL 106 79 203 80 3 287 165 51 339 278 43 315 623 248 364 642 349 325 566 Table 04: Systemic Matrix for All Collisions, 2015-2019 4.1.b Packet Pg. 139 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 33San Jacinto Local Roadway Safety Plan 33 Roadway Type Location Type No Street LightNear SchoolNear ParkNear RetailNear TransitIn Disadvantaged CommunityIn Low-Income CommunityTOTALLanes 3 Lanes or Less 4 or 5 Lanes 6 Lanes Signal Unsignalized Intersection Mid- blockSpeed (mph)15- 25 30- 35 40- 45 50- 60 30- 35 40- 45 50- 60 50- 60 Major Minor ViolationDriving Under Influence 2 1 6 0 0 1 4 0 2 5 2 5 7 3 6 8 2 6 3 14 Unsafe Speed 1 0 0 0 0 3 5 3 7 2 0 3 9 2 2 7 2 4 6 12 Improper Turning 1 0 4 2 0 4 6 3 6 4 0 10 14 2 4 11 4 8 4 20 Automobile Right of Way 1 1 2 0 0 5 3 1 5 4 1 3 7 2 7 12 6 6 6 13 Traffic Signs and Signals 0 0 1 1 0 3 2 1 6 2 0 0 5 3 1 6 3 3 6 8 TypeHead-On 0 1 1 0 0 3 7 0 5 2 0 5 11 3 2 7 5 4 6 12 Sideswipe 0 0 1 0 0 1 3 0 0 0 0 5 4 0 0 3 0 3 2 5 Rear End 1 0 1 0 0 2 5 3 5 1 0 6 9 4 0 11 2 4 1 12 Broadside 3 2 6 1 0 8 4 3 10 10 3 4 13 5 13 20 11 11 15 27 Hit Object 0 0 5 2 0 4 6 2 5 4 0 10 13 3 4 9 1 8 3 19 Time of Day12 am -3 am 1 0 3 0 0 0 3 1 1 2 0 5 6 0 2 3 0 4 2 8 3 am - 6 am 0 0 0 0 0 4 4 3 2 1 0 8 9 2 1 7 4 3 3 11 6 am - 9 am 1 0 0 1 0 5 5 2 6 2 1 5 9 2 6 8 4 6 4 14 9 am - 12 pm 0 1 0 2 0 3 2 0 4 2 0 2 4 1 3 5 2 4 5 8 12 pm - 3 pm 1 0 2 0 0 1 3 1 4 1 1 2 7 0 2 4 2 3 3 8 3 pm - 6 pm 1 0 3 0 0 9 3 1 5 2 0 10 14 9 0 13 6 3 10 17 6 pm - 9 pm 4 3 5 0 0 4 4 1 5 6 2 8 15 4 11 17 6 10 11 21 9 pm - 12 am 1 2 6 0 0 7 6 1 6 6 0 11 13 5 5 17 9 6 9 23 Driver at Fault Proceeding Straight 5 0 6 2 0 8 15 2 16 7 2 13 24 11 9 20 7 16 15 38 Making Right Turn 0 0 1 0 0 1 1 2 3 1 0 1 4 0 2 5 2 2 1 5 Making Left Turn 1 0 4 1 0 2 2 2 4 2 1 5 8 1 5 8 5 4 5 12 AgeUnder 19 4 1 3 0 0 2 10 0 7 6 3 4 10 3 9 11 3 9 7 20 60+0 1 2 1 0 7 4 1 7 3 0 6 12 3 4 11 6 6 9 16 DUIYes 3 3 7 0 0 5 7 2 7 8 2 10 18 6 11 19 7 10 12 27 TOTAL 9 6 19 3 0 33 30 10 33 22 4 51 77 23 30 74 33 39 47 Table 05: Systemic Matrix for KSI Collisions, 2015-2019 4.1.b Packet Pg. 140 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 534 0 10.5 Miles Bicycle and Pedestrian Collisions (2015 - 2019) KSI Bicycle Collisions (7) Other Injury Bicycle Collisions (59) KSI Pedestrian Collisions (28) Other Injury Pedestrian Collisions (32) Idyllwild Dr 7th St Washington Ave 1st StSanderson AveLyons AveState StSan Jacinto AveSanta Fe AveHewitt StMain St De Anza Dr N Warren RdRamona Blvd Ramona Ex p y Cottonwood Ave W Esplanade Ave Ramona Expy 7th St Ra mo n a Ex py S o boba RdPark Ave 79 E Es p l anade Ave Bicycle and Pedestrian Collisions 2015-2019 Figure 14 4.1.b Packet Pg. 141 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 35 Meridian Street & Faulkner Avenue 4.1.b Packet Pg. 142 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4.1.b Packet Pg. 143 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Countermeasure Toolbox Chapter 6 San Jacinto Local Roadway Safety Plan 37 This toolbox presents safety countermeasures covering engineering, education, enforcement, emergency services, and emerging technology. Considerations for equitable implementation of these countermeasures are also noted throughout the chapter. The safety strategies in this chapter also cover the five elements of a Safe System, as shown in the figure below. California is in the process of adopting the Safe System approach and a focus on equity as part of its Strategic Highway Safety Plan. 5 E's of Traffic Safety The following toolbox presents countermeasures that cover the 5 E's of traffic safety: Engineering, Education, Enforcement, Emergency Services, and Emerging Technology. WYOHERE ARE ONTHE SAFE SUYSTEMJOURNEY? Implementing the Safe System approach is our shared responsibility, and we all have a role. It requires shifting how we think about transportation safety and how we prioritize our transportation investments. Consider applying a Safe System lens to upcoming projects and plans in your community: put safety at the forefront and design to accommodate human mistakes and injury tolerances. Visit safety.fhwa.dot.gov/zerodeaths to learn more. Making a commitment to zero deaths means addressing every aspect of crash risks through the five elements of a Safe System, shown below. These layers of protection and shared responsibility promote a holistic approach to safety across the entire transportation system. The key focus of the Safe System approach is to reduce death and serious injuries through design that accommodates human mistakes and injury tolerances. The Safe System approach addresses the safety of all road users, including those who walk, bike, drive, ride transit, and travel by other modes. Vehicles are designed and regulated to minimize the occurrence and severity of collisions using safety measures that incorporate the latest technology. Humans are unlikely to survive high-speed crashes. Reducing speeds can accommodate human injury tolerances in three ways: reducing impact forces, providing additional time for drivers to stop, and improving visibility. Designing to accommodate human mistakes and injury tolerances can greatly reduce the severity of crashes that do occur. Examples include physically separating people traveling at different speeds, providing dedicated times for different users to move through a space, and alerting users to hazards and other road users. When a person is injured in a collision, they rely on emergency first responders to quickly locate them, stabilize their injury, and transport them to medical facilities. Post-crash care also includes forensic analysis at the crash site, traffic incident management, and other activities. Safe Road Users Safe Vehicles Safe Speeds Safe Roads Post-Crash Care THE SAFE SYSTEM APPROACH VS. TRADITIONAL ROAD SAFETY PRACTICES Traditional Prevent crashes Safe System Prevent deaths and serious injuries Improve human behavior Design for human mistakes/limitations Control speeding Reduce system kinetic energy Individuals are responsible Share responsibility React based on crash history Proactively identify and address risks Whereas traditional road safety strives to modify human behavior and prevent all crashes, the Safe System approach also refocuses transportation system design and operation on anticipating human mistakes and lessening impact forces to reduce crash severity and save lives. SAFE SYSTEM ELEMENTS Figure 15 Safe System Elements Source: Fehr & Peers for FHWA This plan's focus on the E's of traffic safety, as well as the Safe System approach and an emphasis on equity helps to provide alignment with current LRSP guidelines, but also sets the City of San Jacinto up for success in recognition of emerging safety best practices. 4.1.b Packet Pg. 144 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 638 GEOMETRIC MODIFICATIONS Directional Median Opening to Restrict Left Turns Intersection Reconstruction Lane Narrowing Median Barrier Raised Median/Access Control and Turn Restrictions Right Turn Slip Lane Road Diet Widen Shoulder SIGNAL MODIFICATIONS Advance Dilemma Zone Detection Extend Yellow and All Red Time Flashing Beacon as Advance Warning Improve Signal Timing Protected Left Turns Retroreflective Borders on Signals Shorten Cycle Length Signal interconnectivity and Coordination Supplemental Signal Heads CONTROL All-Way Stop Control Install Roundabout Install Signal LIGHTING Intersection Lighting Segment Lighting Summary of Countermeasures Local Road Safety Manual (LRSM) Countermeasure ENGINEERING REMOVE/SHIELD OBJECTS Guardrail Impact Attenuators 4.1.b Packet Pg. 145 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 39 PEDESTRIAN AND BICYCLE Advance Stop Bar Curb Extensions Green Conflict Striping High-Visibility Crosswalk Leading Pedestrian Interval and Pedestrian Recall Pedestrian Hybrid Beacon Raised Crosswalk Raised Median/Refuge Island Rectangular Rapid Flashing Beacon Separated Bike Lanes Uncontrolled Pedestrian Crossings with Enhanced Safety Features OPERATION/WARNING Centerline Hardening Curve Advance Warning Sign Chevron Signs on Horizontal Curves Daylight Intersection Delineators Also: Reflectors, Object Markers Dynamic Speed Warning Signs (Curves) Edgeline Rumble Strips/Stripes Painted Centerline and Raised Pavement Markers Speed Feedback Sign Speed Legends on Pavement at Neighborhood Entries Striping through Intersection Red Light Camera Update Markings on Speed Humps Upgrade Intersection Pavement Markings Upgrade to Larger or Install Additional Warning Signs Summary of Countermeasures Local Road Safety Manual (LRSM) Countermeasure ENGINEERING ENGINEERING 4.1.b Packet Pg. 146 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 640 What You'll See in This Toolbox Countermeasure Details LRSM Countermeasure Code LRSM CountermeasureCountermeasure Title Countermeasure Icon Countermeasure Description Crash Reduction Factor Mode(s) this Countermeasure Affects Indicates Reductions in Nighttime Crashes Applicable to LRSM Countermeasures NIGHT Key Issues in San Jacinto Most Relevant to Countermeasure Local Roadway Safety Manual Many of these countermeasures are recommended for the 10 emphasis areas included in this report. Most of the countermeasures are included in the 2020 Caltrans Local Roadway Safety Manual (LRSM) and can be advantageous for use in Caltrans Highway Safety Improvement Program (HSIP) grant funding applications. The toolbox identifies a Caltrans- approved Crash Reduction Factor (CRF), the expected life of the project, the federal funding eligibility, the systemic opportunity for countermeasure implementation, and applicable collision type (e.g., all modes, bicycle and pedestrian collisions only, etc.) as outlined in the LRSM. The higher the CRF, the greater the expected reduction in collisions. There are many effective safety countermeasures beyond those listed in the LRSM, and several are included in this toolbox. Intersection Lighting Adding Intersection Lighting at the intersection and on its approaches, improves the safety of an intersection during nighttime conditions by (1) making drivers more aware of the surroundings at an intersection, which improves drivers' perception-reaction times, (2) enhancing drivers' available sight distances, and (3) improving the visibility of non-motorists. Intersection lighting is of particular benefit to non-motorized users as lighting not only helps them navigate the intersection, but also helps drivers see them better. Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity Medium CRF 40% CRASH TYPE LRSM ID S01/NS01 NIGHT NIGHTTIME NO STREETLIGHTS Hot Spot Sample Location Midway Street & San Jacinto Avenue Hot Spot Sample Locations show applcability of some countermeasures at select KSI Hot Spots identified on pg 30 4.1.b Packet Pg. 147 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 41 LIGHTING Intersection Lighting Segment Lighting Adding Intersection Lighting at the intersection and on its approaches, improves the safety of an intersection during nighttime conditions by (1) making drivers more aware of the surroundings at an intersection, which improves drivers' perception-reaction times, (2) enhancing drivers' available sight distances, and (3) improving the visibility of non-motorists. Intersection lighting is of particular benefit to non-motorized users as lighting not only helps them navigate the intersection, but also helps drivers see them better. Providing segment lighting improves safety during nighttime conditions by making drivers more aware of the surroundings, which improves drivers' perception-reaction times; enhancing drivers' available sight distances to perceive roadway characteristic in advance of the change; and improving non-motorist's visibility and navigation. Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity Medium Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity Medium CRF 40% CRASH TYPE CRF 35% CRASH TYPE LRSM ID S01/NS01 LRSM ID R01 NIGHT NIGHT Figure 16 Guidance for Lighting on Curves Source: FHWA Figure 17 Guidance for Lighting at Midblock Crosswalks Source: FHWA NIGHTTIME NO STREETLIGHTS NIGHTTIME NO STREETLIGHTS Hot Spot Sample Location Midway Street & San Jacinto Avenue Hot Spot Sample Location Ramona Expressway b/t Lake Park Drive & San Jacinto Avenue 4.1.b Packet Pg. 148 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 642 CONTROL All-Way Stop Control An all-way stop-controlled intersection requires all vehicles to stop before crossing the intersection. An all-way stop-controlled intersection improves safety by removing the need for motorists, bicyclists, and pedestrians on a side-street stop-controlled intersection to cross free-flowing lanes of traffic, which reduces the risk of collision. An "All-Way Stop" sign should be placed under stop signs at all-way stop-controlled intersections as required by the California Manual on Uniform Traffic Control Devices (MUTCD). Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity High LRSM ID NS02 CRF 50% CRASH TYPE LEFT-TURN ANGLE BROADSIDE Install Signal Install Roundabout Traffic signals at intersections control the flow of traffic. Traffic signals have the potential to reduce the most severe type crashes but will likely cause an increase in rear-end collisions. A reduction in overall injury severity is likely the largest benefit of traffic signal installation. A roundabout is a type of circular intersection in which road traffic is permitted to flow in one direction around a central island, and priority is typically given to traffic already in the junction. The types of conflicts that occur at roundabouts are different from those occurring at conventional intersections; namely, conflicts from crossing and left-turn movements are not present in a roundabout. The geometry of a roundabout keeps the range of vehicle speed narrow, which helps reduce the severity of crashes when they do occur. Pedestrians only have to cross one direction of traffic at a time at roundabouts, thus reducing their potential for conflicts. See CA MUTCD Chapter 3C for details. Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity Low Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity Low LRSM ID NS03 LRSM ID S16/NS04/NS05 CRF 30% CRASH TYPE CRF VARIES CRASH TYPE MAJOR UNSIGNALIZED INTERSECTION BROADSIDE MAJOR UNSIGNALIZED INTERSECTION BROADSIDE Hot Spot Sample Location Lyon Avenue & Cottonwood Avenue 4.1.b Packet Pg. 149 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 43 REMOVE/ SHIELD OBSTACLES Impact Attenuators Guardrail Impact attenuators bring an errant vehicle to a more-controlled stop or redirect the vehicle away from a rigid object. Impact attenuators are typically used to shield rigid roadside objects such as concrete barrier ends, steel guardrail ends and bridge pillars from oncoming automobiles. Attenuators should only be installed where it is impractical for the objects to be removed. Guardrail redirects a vehicle away from embankment slopes or fixed objects and dissipates the energy of an errant vehicle. Guardrail is installed to reduce the severity of lane departure crashes. However, guardrail can reduce crash severity only for those conditions where striking the guardrail is less severe than going down an embankment or striking a fixed object. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity High Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity High CRF 25% CRASH TYPE CRF 25% CRASH TYPE LRSM ID R05LRSM ID R04 FIXED OBJECT FIXED OBJECT RUN-OFF ROAD RUN-OFF ROAD HIT OBJECT HIT OBJECT Figure 18 Examples Markings for One-Lane Roundabouts Source: CA MUTCD Hot Spot Sample Location Ramona Expressway b/t Lake Park Drive & San Jacinto Avenue Hot Spot Sample Location Sanderson Avenue b/t Ramona Boulevard & Cottonwood Avenue 4.1.b Packet Pg. 150 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 644 Lane Narrowing Lane narrowing reduces lane widths to encourage motorists to travel at slower speeds. Lane Narrowing improves safety by lowering the risk of collision among bicyclists, pedestrians, and other motorists. GEOMETRIC MODIFICATIONS UNSAFE SPEED Directional Median Opening to Restrict Left Turns A directional median opening restricts specific turning movements, such as allowing a left-turn from a major street but not from a minor street. A directional median opening to restrict left turns improves safety by reducing the number of conflict points. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity Medium LRSM ID S14/NS15 CRF 50% CRASH TYPE IMPROPER TURNING BROADSIDE MAJOR UNSIGNALIZED INTERSECTIONS Intersection Reconstruction Irregular intersections can be overbuilt and confusing, presenting safety hazards to all users. "Squaring up" an intersection as close to 90 degrees as possible involves major intersection reconstruction to provide better visibility for all road users, reducing high speed turns and reducing pedestrian crossing length. SIGNALIZED INTERSECTIONS Hot Spot Sample Location San Jacinto Avenue b/t Midway Street & Menlo Avenue 4.1.b Packet Pg. 151 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 45 Median Barrier This strategy is designed to prevent head- on collisions by providing a barrier between opposing lanes of traffic. The variety of median barriers available makes it easier to choose a site-specific solution. The main advantage is the reduction of the severity of the crashes. Median Barriers can also be used at locations to discourage pedestrian crossings where a safe crossing cannot be provided. Expected Life (Years)20 Federal Funding Eligibility 100%/90% Systemic Opportunity Medium/Low CRF 25%/35% CRASH TYPE LRSM ID R03/S13PB HEAD-ON PEDESTRIAN CROSSING OUTSIDE CROSSWALK Right Turn Slip Lane A right turn slip lane is a traffic lane provided at an intersection to allow vehicles to turn right without actually entering it and interfering with through traffic. Where the main intersection is controlled by traffic signals, a slip lane is often controlled by yield or stop sign. Slip lanes should be designed with safe speeds and pedestrian safety in mind, providing high-visibility crosswalks and enhanced pedestrian crossing signage, ensuring pedestrian visibility to drivers through crosswalk placement, and reducing turning radii to support safe turning speeds. Raised Median/Access Control and Turn Restrictions Access control and turn restrictions balances traffic safety and efficiency with reasonable property access. Installing a raised median can restrict turning movements and reduce head-on collisions by number of vehicles that cross the centerline. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity Medium LRSM ID R08 CRF 25% CRASH TYPE IMPROPER TURNING BROADSIDE MAJOR UNSIGNALIZED INTERSECTIONS GEOMETRIC MODIFICATIONS SIGNALIZED INTERSECTIONS Hot Spot Sample Location Ramona Expressway & State Street Hot Spot Sample Location San Jacinto Avenue b/t Midway Street & Menlo Avenue 4.1.b Packet Pg. 152 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 646 GEOMETRIC MODIFICATIONS Widen Shoulder Widened and paved shoulders, which may also include flattening the slopes along the sides of the roadway, create a separated space for bicyclists and also provide motor vehicle safety benefits, such as space for inoperable vehicles to pull out of the travel lane. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity Medium CRF 30% CRASH TYPE LRSM ID R15 FIXED OBJECT RUN-OFF ROAD SIDE- SWIPE PEDESTRIAN IN ROAD Road Diet A road diet reduces roadway space dedicated to vehicle travel lanes to create room for bicycle facilities, wider sidewalks, or center turn lanes. A Road Diet improves safety by reducing vehicle speeds and creating designated space for all road users. FHWA advises that streets with 20,000 ADT or less may be good candidates for road diets, though road diets have been implemented successfully on roadways with higher traffic volumes in urban settings. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity Medium CRF 30% CRASH TYPE LRSM ID R14 UNSAFE SPEED ES2 EXECUTIVE SUMMARY local economies, such as property values or business revenues. In other words, while there are myriad voices linking road diets to both positive and negative economic outcomes, there is very little concrete evidence to support either claim. York Boulevard: The Economics of a Road Diet explores this relationship through case research in the Highland Park neighborhood of northeast Los Angeles, California. The backbone of a low- to moderate-density, mixed residential and commercial neighborhood, York Boulevard is an ideal corridor for studying the economic effects of road diets because it creates a natural experiment. Land uses, socioeconomic characteristics, and the quantity and types of businesses remain fairly comparable over the entire the study corridor, but half of the corridor has a road diet and bicycle lanes and the other half does not. As Figure ES2 illustrates, the western portion of the corridor—between Eagle Rock Boulevard and Avenue 55—received a road diet in 2006 and bike lanes in 2010. The eastern half of the York Boulevard corridor, from Avenue 55 to Figueroa Street, retains its original, Pre-Road Diet Two auto lanes in each direction, shared with bicycles Post-Road DietOne auto lane and one bike lane in each direction, plus a center turn laneFigureTypical road diet conversionES1Figure 19 Typical Road Diet Configuration Source: Fehr & Peers Hot Spot Sample Location San Jacinto Avenue b/t Midway Street & Menlo Avenue 4.1.b Packet Pg. 153 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 47San Jacinto Local Roadway Safety Plan 47 Advance Dilemma-Zone Detection Extend Yellow and All Red Time Flashing Beacon as Advance Warning An advanced dilemma-zone detection system minimizes the number of vehicles the intersection traffic control signal system exposes to an intersection-approach dilemma zone. This is accomplished by adjusting the start time of the yellow- signal phase either earlier or later, based on observed vehicle locations and speeds. Extending yellow and all red time increases the time allotted for the yellow and red lights during a signal phase. Extending yellow and red time improves safety by allowing drivers and bicyclists to safely cross through a signalized intersection before conflicting traffic movements are permitted to enter the intersection. See CA MUTCD Section 4D.26 for more detail. A flashing beacon as advance warning is a blinking light with signage to notify motorists of an upcoming intersection or crosswalk. A Flashing Beacon improves safety by providing motorists more time to be aware of and slow down for an intersection or yield to pedestrians crossing a crosswalk. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity High Expected Life (Years)10 Federal Funding Eligibility 50% Systemic Opportunity Very High Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Medium SIGNAL MODIFICATIONS CRF 40% CRASH TYPE CRF 15% CRASH TYPE CRF 30% CRASH TYPE LRSM ID S04 LRSM ID S03 LRSM ID S10 REAR-END ANGLE SIGNALIZED INTERSECTION BROADSIDE SIGNALIZED INTERSECTION BROADSIDE SIGNALIZED INTERSECTION Hot Spot Sample Location Ramona Expressway & State Street Hot Spot Sample Location Ramona Expressway & State Street 4.1.b Packet Pg. 154 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 648 Improve Signal Timing Protected Left Turns Certain timing, phasing, and control strategies can produce multiple safety benefits. Signalization improvements may include adding phases, lengthening clearance intervals, eliminating or restricting higher-risk movements, and coordinating signals at multiple locations. A protected left turn can be implemented at signalized intersections s (with existing left turns pockets) that currently have a permissive left-turn or no left-turn protection that have a high frequency of angle crashes involving left turning, opposing through vehicles, and non- motorized road users. Left turns are widely recognized as the highest-risk movements at signalized intersections. Providing protected left-turn phases for signalized intersections significantly improve the safety for left- turn maneuvers by removing the need for the drivers to navigate through gaps in oncoming/opposing through vehicles. Expected Life (Years)10 Federal Funding Eligibility 50% Systemic Opportunity Very High Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity High CRF 15% CRASH TYPE CRF 30% CRASH TYPE SIGNAL MODIFICATIONS LRSM ID S03 LRSM ID S07 Retroreflective Borders on Signals Retroreflective borders enhance the visibility of traffic signals for aging and color vision impaired drivers enabling them to understand which signal indication is illuminated. Retroreflective borders may also alert drivers to signalized intersections during periods of power outages when the signals would otherwise be dark, and non– reflective signal heads and backplates would not be visible. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High CRF 15% CRASH TYPE LRSM ID S02 REAR-END ANGLE SIGNALIZED INTERSECTION SIGNALIZED INTERSECTION BROADSIDE SIGNALIZED INTERSECTION BROADSIDE NIGHTTIME Hot Spot Sample Location Ramona Expressway & State Street Hot Spot Sample Location 7th Street & State Street 4.1.b Packet Pg. 155 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 49San Jacinto Local Roadway Safety Plan 49 Shorten Cycle Length Traffic signal cycle lengths have a significant impact on the quality of the urban realm and consequently, the opportunities for bicyclists, pedestrians, and transit vehicles to operate safely along a corridor. Long signal cycles, compounded over multiple intersections, can make crossing a street or walking even a short distance prohibitive and frustrating. Short cycle lengths of 60–90 seconds are ideal for urban areas. SIGNAL MODIFICATIONS SIGNALIZED INTERSECTION Signal Interconnectivity and Coordination Certain timing, phasing, and control strategies can produce multiple safety benefits. Sometimes capacity improvements come along with the safety improvements and other times adverse effects on delay or capacity occur. The emphasis of improving signal coordination for this countermeasure is to provide an opportunity for slow speed signal coordination. Expected Life (Years)10 Federal Funding Eligibility 50% Systemic Opportunity Very High CRF 15% CRASH TYPE LRSM ID S03 REAR-END ANGLE SIGNALIZED INTERSECTION UNSAFE SPEED Supplemental Signal Heads Additional signal heads allow drivers to anticipate signal changes farther away from intersections. Supplemental traffic signals may be placed on the near side of an intersection, far-left, far-right, or very high. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High CRF 15% CRASH TYPE LRSM ID S02 REAR-END ANGLE SIGNALIZED INTERSECTION Hot Spot Sample Location Ramona Expressway & Eagle Drive Hot Spot Sample Location Ramona Expressway & Sanderson Avenue 4.1.b Packet Pg. 156 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 650 OPERATION / WARNING Chevron Signs on Horizontal Curves Post-mounted chevrons are intended to warn drivers of an approaching curve and provide tracking information and guidance to the drivers. They can be beneficial on roadways that have an unacceptable level of crashes on relatively sharp curves during periods of light and darkness. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High CRF 40% CRASH TYPE LRSM ID R23 RUN-OFF ROAD CURVES Curve Advance Warning Sign A curve advance warning sign notifies drivers of an approaching curve and may include an advisory speed limit as drivers navigate around the curve. This warning sign is ideally combined with other infrastructure that alerts drivers of the curve, such as chevron signs, delineators, and flashing beacons. A curve advance warning sign improves safety by giving drivers additional time to slow down for the curve. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High CRF 25% CRASH TYPE LRSM ID R24 RUN-OFF ROAD CURVES Centerline Hardening Centerline hardening is a technique to make intersections safer by encouraging drivers to make left turns at slower speeds and encourage safe turning behavior. Bollards and rubber curbs are used to block the diagonal path through the intersection, modifying the turning angle of the vehicle, and increasing visibility of pedestrians in the crosswalk for drivers. IMPROPER TURNING Hot Spot Sample Location Ramona Expressway b/t Lake Park Drive & San Jacinto Avenue Hot Spot Sample Location Ramona Expressway b/t Lake Park Drive & San Jacinto Avenue 4.1.b Packet Pg. 157 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 51 OPERATION / WARNING Delineators Also: Reflectors, Object Markers Delineators, reflectors and object markers are intended to warn drivers of an approaching curve or fixed object that cannot easily be removed. They are generally less costly than Chevron Signs as they don't require posts to place along the roadside, avoiding an additional object with which an errant vehicle can crash into. See CA MUTCD Section 3F for more details. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High LRSM ID R27 CRF 15% CRASH TYPE HIT OBJECT CURVES NIGHTTIME Dynamic Speed Warning Signs (Curves) A dynamic speed warning sign notifies drivers of their current speed, usually followed by a reminder of the posted speed limit. A Speed Feedback Sign improves safety by providing a cue for drivers to check their speed and slow down, if necessary. This countermeasure is applicable on curvilinear roadways that have an unacceptable level of crashes due to excessive speeds on relatively sharp curves. This countermeasure does not apply to Radar Speed Feedback Signs, which do not have a nationally accepted crash reduction factor. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity High CRF 30% CRASH TYPE LRSM ID R26 CURVES Daylight Intersection To “daylight” an intersection is to clear sight lines between pedestrian crossings and oncoming cars, usually by creating no-parking zones at the curbs in front of crosswalks at that intersection. By removing sight distance restrictions (e.g., vegetation, parked vehicles, signs, buildings) from the sight triangles at stop or yield-controlled intersection approaches, drivers will be able see approaching vehicles on the main line, without obstruction and therefore make better decisions about entering the intersection safely Expected Life (Years)10 Federal Funding Eligibility 90% Systemic Opportunity High LRSM ID NS11 CRF 20% CRASH TYPE BROADSIDE VICTIMS UNDER 19 Hot Spot Sample Location Ramona Expressway b/t Lake Park Drive & San Jacinto Avenue Hot Spot Sample Location Sanderson Avenue b/t Ramona Boulevard & Cottonwood Avenue 4.1.b Packet Pg. 158 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 652 OPERATION / WARNING Speed Feedback Sign A speed feedback sign notifies drivers of their current speed, usually followed by a reminder of the posted speed limit. A Speed Feedback Sign improves safety by providing a cue for drivers to check their speed and slow down, if necessary. UNSAFE SPEED Painted Centerline and Raised Pavement Markers A raised pavement marker is a small device attached to the road and used as a positioning guide for drivers. These markers, along with painted centerlines can assist drivers in understanding the limits of travel lanes and he roadway. New pavement marking products tend to be more durable, are allweather, more visible, and have a higher retroreflectivity than traditional pavement markings. See CA MUTCD Section 3B.01 and 3B.11-14 for additional detail. NIGHTTIME Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High LRSM ID R28 CRF 25% CRASH TYPE RUN-OFF ROAD HEAD-ON Edgeline Rumble Strips Rumble strips can be installed along the edge line or center line to address roadway departure and head-on crashes caused by distracted, drowsy, or otherwise inattentive drivers who drift from their lane. See CA MUTCD Section 3J for more details. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity High LRSM ID R31 CRF 15% CRASH TYPE RUN-OFF ROAD HIT OBJECT NIGHTTIME UNDER THE INFLUENCE Hot Spot Sample Location Sanderson Avenue b/t Ramona Boulevard & Cottonwood Avenue 4.1.b Packet Pg. 159 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 53 Striping through Intersection Adding clear striping through the intersection can guide motorists through complex intersections. Intersections where the lane designations are not clearly visible to approaching motorists and/ or intersections noted as being complex and experiencing crashes that could be attributed to a driver’s unsuccessful attempt to navigate the intersection can benefit from this treatment. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High CRF 10% CRASH TYPE OPERATION / WARNING LRSM ID S09 NIGHT WET SIGNALIZED INTERSECTION Speed Legends on Pavementat Neighborhood Entries Speed legends are numerals painted on the roadway indicating the current speed limit in miles per hour. They are usually placed near speed limit signposts. Red Light Camera A red light camera enforces traffic signal compliance by capturing the image of a vehicle that has entered an intersection in spite of the traffic signal indicating red. The automatic photographic evidence is used by authorities to enforce traffic laws and issue traffic violation tickets. UNSAFE SPEED SIGNALIZED INTERSECTION BROADSIDE Hot Spot Sample Location Ramona Expressway & Sanderson Avenue Hot Spot Sample Location Ramona Expressway & Sanderson Avenue 4.1.b Packet Pg. 160 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 654 OPERATION / WARNING Update Markings on Speed Humps Speed humps are the common name for traffic calming devices that use vertical deflection to slow motor-vehicle traffic in order to improve safety conditions. Refreshed markings on speed humps can help to bring drivers' awareness to their location. See Section 3B.25 of the CA MUTCD for more information. Figure 20 Pavement Markings for Speed Humps without Crosswalks Source: CA MUTCD Upgrade Intersection Pavement Markings Upgrading intersection pavement markings can include "Stop Ahead" markings and the addition of centerlines and stop bars. Upgrading intersection pavement markings improve safety by increasing the visibility of intersections for drivers approaching and at the intersection. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High CRF 25% CRASH TYPE LRSM ID NS07 BROADSIDE MAJOR UNSIGNALIZED INTERSECTIONS Upgrade to Larger or Install Additional Warning Signs Upgrading to larger warning signs replaces existing signs with physically larger signs with larger warning information. Installing additional warning signs can help bring awareness to an intersection. These enhancements improve safety by increasing visibility of the information provided. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High CRF 15% CRASH TYPE LRSM ID NS06 BROADSIDE MAJOR UNSIGNALIZED INTERSECTIONS UNSAFE SPEED Hot Spot Sample Location Midway Street & San Jacinto Avenue Hot Spot Sample Location Midway Street & San Jacinto Avenue 4.1.b Packet Pg. 161 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 55 PEDESTRIAN & BICYCLE Advance Stop Bar An advance stop bar is a horizontal stripe painted ahead of the crosswalk at stop signs and signals to indicate where drivers should stop. An advanced stop bar improves safety by reducing instances of vehicles encroaching on the crosswalk. Creating a wider stop bar or setting the stop bar further back may be appropriate for locations with known crosswalk encroachment issues. See CA MUTCD Section 3B.16 for more information. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity Very High CRF 15% CRASH TYPE LRSM ID S20PB SIGNALIZED INTERSECTION Green Conflict Striping Green conflict striping is green markings painted in a dashed pattern on bike lanes approaching an intersection and/or going through an intersection. Green conflict striping improves safety by increasing the visibility bicyclists and identifying potential conflict points so bicyclists and motorists use caution when traveling toward and through an intersection. BROADSIDE Curb Extensions A curb extension is a traffic calming measure which widens the sidewalk for a short distance to enhance the pedestrian crossing. This reduces the crossing distance and allowing pedestrians and drivers to see each other when parked vehicles would otherwise block visibility. Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity Medium CRF 35% CRASH TYPE LRSM ID S20PB PEDESTRIANS CROSSING OUTSIDE CROSSWALK UNSAFE SPEED SCHOOLS VICTIMS UNDER 19 Hot Spot Sample Location 7th Street & State Street 4.1.b Packet Pg. 162 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 656 PEDESTRIAN & BICYCLE Install Sidewalk Installing Sidewalks provides a separated and continuous facility for people to walk along the roadway. Adding sidewalks improves safety by minimizing collisions with pedestrians walking in the road. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity Medium CRF 80% CRASH TYPE LRSM ID R34PB Leading Pedestrian Interval andPedestrian Recall At intersection locations that have a high volume of turning vehicle and have high pedestrian vs. vehicle crashes, a leading pedestrian interval gives pedestrians the opportunity to enter an intersection 3 - 7 seconds before vehicles are given a green indication. With this head start, pedestrians can better establish their presence in the crosswalk before vehicles have priority to turn left or right. Pedestrian recall timing automatically provides a pedestrian crossing phase, without having to press the pedestrian call button. Expected Life (Years)10 Federal Funding Eligibility 100% Systemic Opportunity High LRSM ID S21PB CRF 60% CRASH TYPE SIGNALIZED INTERSECTION High-Visibility Crosswalk A high-visibility crosswalk has a striped pattern with markings made of high- visibility material, such as thermoplastic tape, instead of paint. A high-visibility crosswalk improves safety with a clearly marked pedestrian crossing so motorists exercise caution and yield to pedestrians. The crash reduction factor noted here only applies to locations currently without a marked crosswalk, but High-Visibility Crosswalk upgrades can be implemented globally at existing marked crosswalks. See further information on crosswalks later in this document, and Section 3B.18 of the CA MUTCD for more detail. Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity High CRF 25% CRASH TYPE LRSM ID S18PB PEDESTRIANS CROSSING OUTSIDE CROSSWALK PEDESTRIAN IN ROAD Hot Spot Sample Location 7th Street & State Street Hot Spot Sample Location San Jacinto Avenue b/t Midway Street & Menlo Avenue 4.1.b Packet Pg. 163 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 57 Pedestrian Hybrid Beacon Pedestrian hybrid beacon (PHB), also known as a HAWK, is a flashing light that is activated by a pedestrian pushing a button or some other form of detection. A PHB is used at unsignalized intersections or mid-block crosswalks to notify oncoming motorists to stop with a series of red and yellow lights. Unlike a traffic signal, the PHB rests in dark until a pedestrian activates it via pushbutton or other form of detection. See CA MUTCD Section 4F for more detail. Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity Low CRF 55% CRASH TYPE LRSM ID NS23PB PEDESTRIAN CROSSING OUTSIDE CROSSWALK MIDBLOCK MAJOR UNSIGNALIZED INTERSECTION Raised Crosswalk Raised crosswalks are ramped speed tables spanning the entire width of the roadway, often placed at midblock crossing locations. The crosswalk is demarcated with paint and/or special paving materials. These crosswalks act as traffic-calming measures that allow the pedestrian to cross at grade with the sidewalk. A Raised Crosswalk improves safety by increasing crosswalk and pedestrian visibility and slowing down motorists. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity Medium CRF 35% CRASH TYPE LRSM ID R36PB PEDESTRIAN CROSSING OUTSIDE CROSSWALK SCHOOLS VICTIMS UNDER 19 Raised Median/Refuge Island A raised median/refuge island, is raised curb in the center of the roadway that can restrict certain turning movements and provide a place for pedestrians to wait if they are unable to finish crossing the intersection. A Raised Median improves safety by reducing the number of potential conflict points with designated zones for vehicles to turn, and a pedestrian refuge island improves safety by reducing the exposure time for pedestrians crossing the intersection. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity Medium CRF 45% CRASH TYPE LRSM ID NS19PB PEDESTRIAN CROSSING OUTSIDE CROSSWALK 4-5 LANE ROADS WITH 40+ MPH SPEEDS PEDESTRIAN & BICYCLE Hot Spot Sample Location San Jacinto Avenue b/t Midway Street & Menlo Avenue 4.1.b Packet Pg. 164 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 658 Rectangular Rapid Flashing Beacon A rectangular rapid flashing beacon (RRFB) is a pedestrian-activated flashing light with additional signage to alert motorists of a pedestrian crossing. An RRFB improves safety by increasing the visibility of marked crosswalks and provides motorists a cue to slow down and yield to pedestrians. Expected Life (Years)20 Federal Funding Eligibility 100% Systemic Opportunity Medium CRF 35% CRASH TYPE LRSM ID NS22PB PEDESTRIAN CROSSING OUTSIDE CROSSWALK SCHOOLS Separated Bike Lanes A separated bike lane provides dedicated street space, typically adjacent to outer vehicle travel lanes, with separation from vehicle traffic, designated lane markings, pavement legends, and signage. Bike lanes improve safety by reducing conflicts between bicycles and vehicles on the road and by creating a road-narrowing effect with buffers or vertical barriers, which may reduce vehicle speeds. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity High LRSM ID R33PB CRF 45% CRASH TYPE Uncontrolled Pedestrian Crossings with Enhanced Safety Features An uncontrolled pedestrian crossing at an intersection or on a segment provides a formalized location for people to cross the street, reducing the risk of people crossing outside crosswalks where drivers are not expecting them. Crosswalk striping, signs, and other enhanced safety features alert drivers that there may be a pedestrian crossing. See further information on crosswalks later in this document for more detail. Expected Life (Years)20 Federal Funding Eligibility 90% Systemic Opportunity Medium CRF 35% CRASH TYPE LRSM ID R35PB PEDESTRIANS CROSSING OUTSIDE CROSSWALK SCHOOLS COMMERCIAL AREAS PEDESTRIAN & BICYCLE WRONG SIDE OF ROAD (BICYCLE) 4.1.b Packet Pg. 165 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 59 Raised Crosswalk Curb Extension COMMERCIAL AREAS Widen Sidewalk Widening sidewalks provides a more comfortable space for pedestrians, particularly in locations with high volumes of pedestrians, and provides space to accommodate people in wheelchairs. Widening sidewalks improves safety by minimizing collisions with pedestrians walking in the road. PEDESTRIAN & BICYCLE PEDESTRIAN IN ROAD Hot Spot Sample Location San Jacinto Avenue b/t Midway Street & Menlo Avenue 4.1.b Packet Pg. 166 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 660 ENGINEERING CROSSWALK POLICY BEST PRACTICES Uncontrolled pedestrian crossings occur where sidewalks or designated walkways intersect a roadway at a location where no traffic control (e.g., traffic signal or stop sign) exists. This crossing type occurs at intersections (marked or unmarked) and at mid-block locations (where they must be marked). Research has demonstrated the importance of marking uncontrolled crossings to facilitate access to key destinations while ensuring that additional safety treatments are applied at these locations if they have higher traffic speeds and volumes. The FHWA Guide for Improving Pedestrian Safety at Uncontrolled Crossing Locations proposes Figure 21 Application of Pedestrian Crash Countermeasures by Roadway Features Source: FHWA countermeasures based on road conditions, crash causes, and pedestrian safety issues. Figure 21 summarizes recommendations from the guide, includes a comprehensive matrix and list of FHWA-approved pedestrian crash countermeasures suggested for application at uncontrolled crossing locations per roadway and traffic features. POSTED SPEED LIMIT AND AADT Vehicle AADT <9,000 Vehicle AADT 9,000-15,000 Vehicle AADT >15,000 Roadway Configuration ≤30 mph 35mph ≥40mph ≤30 mph 35mph ≥40mph ≤30 mph 35mph ≥40mph 2 lanes 1 lane in each direction 1 2 1 1 1 1 1 1 1 1 4 5 6 5 6 5 6 4 5 6 5 6 5 6 4 5 6 5 6 5 6 7 9 7 9 7 9 7 9 7 9 7 9 9 3 lanes WITH RAISED MEDIAN 1 lane in each direction 1 2 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 4 5 5 5 4 5 5 5 4 5 5 5 7 9 7 9 7 9 7 9 7 9 7 9 7 9 9 3 lanes WITHOUT RAISED MEDIAN 1 lane in each direction with a two-way left-turn lane 1 2 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 4 5 6 5 6 5 6 4 5 6 4 5 6 5 6 4 5 6 5 6 5 6 7 9 7 9 9 7 9 7 9 9 7 9 9 9 4+ lanes WITH RAISED MEDIAN 2 or more lanes in each direction 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 5 5 5 5 5 5 5 5 5 7 8 9 7 8 9 8 9 7 8 9 7 8 9 8 9 7 8 9 8 9 8 9 4+ lanes WITHOUT RAISED MEDIAN 2 or more lanes in each direction 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 5 6 5 6 5 6 5 6 5 6 5 6 5 6 5 6 5 6 7 8 9 7 8 9 8 9 7 8 9 7 8 9 8 9 7 8 9 8 9 8 9 Signifies that crosswalk visibility enhancements should always occur in conjunction with other identified countermeasures Signifies that the countermeasure is a candidate treatment at a marked uncontrolled crossing location Signifies that the countermeasure should always be considered, but not mandated or required, based upon engineering judgment at a marked uncontrolled crossing locationThe absence of a number (#) signifies that the countermeasure is generally not an appropriate treatment, but exceptions may be considered following engineering judgment. # *It should be noted that the PHB and RRFB are not both installed at the same crossing location High-visibility crosswalk markings, parking restrictions on crosswalk approach, adequate nighttime lighting levels, and crossing warning signs Raised crosswalk Advance “Yield Here To (Stop Here For) Pedestrians” sign and yield (stop) line In-street pedestrian crossing sign Curb extension Pedestrian refuge island Rectangular rapid- flashing beacon (RRFB)* Road diet Pedestrian hybrid beacon (PHB)* 1 2 3 4 5 6 7 8 9 KEY 4.1.b Packet Pg. 167 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 61 DEMAND CONSIDERATIONS FOR CROSSWALKS Uncontrolled and mid-block crossings should be identified as a candidate for marking if there is a demonstrated need for a crosswalk. Figure 22 provides a protocol for deciding if a crosswalk is appropriate. Engineering judgment should ultimately be used to select locations appropriate for a marked, uncontrolled crossing. Enhanced treatments beyond basic striping and signing should be considered for uncontrolled locations, as shown on the facing page. OR NO NO NO NO NO NO YES YES YES YES YES FEASIBLE OR 25 20 pedestrians per hour cross (in any two hours, not necessarily consecutive) Location connects two pedestrian generators such as a school, park, bus stop, hospital, neighborhood serving commercial center, or multi-family residential Insucient need to justify marked crossing Nearest appropriately marked or protected crosswalk is at least 300 ft or more away Low speed (posted or prima facie 25 MPH), 2-lane roadway Direct pedestrians to the nearest marked or protected crossing Pedestrians can be easily seen from a feasible stopping sight distance It is feasible to remove sight obstruction or lower the speed limit Consider installing a stop sign, signal, or grade separation Use Crossing Guidance to determine treatment options Should a crosswalk be installed? Figure 22 Samples of Decision Tree for Marking Crosswalks Source: Fehr & Peers ENGINEERING 4.1.b Packet Pg. 168 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 662 CROSSWALK MARKINGS Crosswalk markings help driver know where to expect pedestrians, and provide guidance for pedestrians crossing the roadway by defining and delineating paths on approaches to uncontrolled and mid-block locations. The use of high visibility striping is appropriate at both uncontrolled crossing locations, and signalized locations as traffic volumes, speeds, and vehicle-pedestrian conflicts require. There are several treatments for high visibility markings, including the continental and triple-four (also called double continental) markings, shown in Figure 23. San Jacinto should choose a preferred style to use, so it is consistently applied. San Jacinto may also want to adopt a policy of using high visibility Figure 23 Crosswalk Marking Examples • Triple-four markings include two dashed lines on the outside with a clear space in the center to direct pedestrian traffic, and are often enhanced with outer rows of raised pavement markers. They may be less costly to install and maintain as they require less paint than a standard high visibility crosswalk. Triple-FourContinentalStandard markings at all marked crosswalks, when intersection upgrades occur. Continental striping is often chosen to communicate sensitive pedestrian crossing areas as the designated high visibility tool. Research shows that continental crosswalk markings are more visible to drivers at night than parallel line markings (1). Crosswalks with longitudinal lines parallel to traffic flow allow drivers to see the marked crosswalk from a greater distance, when compared with standard markings. This increased visibility distance gives drivers more time to safely stop for a pedestrian waiting to cross. Additional resources: (1) Fitzpatrick, K., S. Chrysler, V. Iragavarapu, and E.S. Park. Detection Distances to Crosswalk Markings: Transverse Lines, Continental Markings, and Bar Pairs. Transportation Research Record: Journal of the Transportation Research Board, No. 2250. Transportation Research Board of the National Academies, Washington, DC, 2011. ENGINEERING 4.1.b Packet Pg. 169 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 63San Jacinto Local Roadway Safety Plan 63 EDUCATION Traffic safety education plays an important role in shaping and shifting behavior. Many cities, such as Seattle, Oakland, and Los Angeles, are including community engagement and education to make streets safer for all. Education on traffic safety requires a collaborative process among many stakeholders to achieve the goal of increased safety. Targeted education can be directed at vulnerable populations, with the help of local partners, and at certain behaviors of drivers, pedestrian, and bicyclists to deter specific collision types. Such programs can be structured classes, such as road school for cyclists or outreach campaigns such as signs that discourage distracted driving. There are existing regional and statewide programs that San Jacinto can deploy locally, such as the Southern California Association of Governments (SCAG) and Caltrans campaigns listed below. ›SCAG Go Human is an outreach and advertising campaign that aims to reduce crashes and promote walking and biking. Individual cities can participate in this effort by working with SCAG to deploy co-branded signs, banners and postcards within their jurisdiction. SCAG also makes available a media kit and radio ads for local use. As discussed in Chapter 5, San Jacinto developed the Envision San Jacinto event in September 2018 in partnership with the Go Human campaign. ›The California Office of Traffic Safety has developed educational materials for local use as part of their Go Safely California campaign. Public Education Media Campaign A public education media campaign focused on discouraging drinking and driving and/ or speeding, along with encouraging increased awareness of pedestrians and bicyclists at night and appropriate crosswalk behaviors can help promote behavior change. Messages about safe and responsible driving, moving over for EMS vehicles, awareness of bicyclists and pedestrians, and increasing visibility at night can help promote behaviors that prevent fatal and severe collisions. As an example, collaborating with local radio stations can help spread the message to drivers. San Jacinto can develop targeted outreach education campaigns that focus on the common violations that lead to fatalities and severe injuries in San Jacinto. Based on common crash types over the past five years in San Jacinto, education and outreach campaigns may include the programs listed here. For drivers this may include: ›Education campaign around driving under the influence, as 27 percent of KSI crashes involve drugs or alcohol. ›Education campaign that emphasizes that speeding is deadly because unsafe speeding caused 29 percent of crashes and 11 percent of KSI crashes. ›Education campaign reinforcing which road user has the right-of-way in different scenarios because vehicle right-of-way violation caused 18 percent and improper turning caused 14 percent of total crashes. ›Education campaign encouraging drivers to be aware of pedestrians in the road because during the analysis period, 35 percent of pedestrian crashes involved someone in the road, including on the shoulder. For people biking: ›Classes that teach bicyclists how to use on-street bike facilities, especially for those facility types that are new to the City. For people walking: ›Education campaign encouraging crossing in crosswalks because during the analysis period, 22 pedestrian crashes occurred when a pedestrian was crossing not in a crosswalk. However, other approaches are also needed to mitigate pedestrian crashes because as many pedestrian crashes occurred when a pedestrian was crossing in a crosswalk. Partner with Local Schools on Traffic Safety Local schools can be partners in promoting safe driver behavior during school pick-up and drop offs. Education campaigns can involve students promoting safer driving to their parents, such as holding signs during pick-up and drop offs that encourage safer driving. Educational campaigns that involve both students and parents can be more impactful as they involve parents, who are actually driving, and students, who may not only remind their parents but also retain safe driving behavior if they eventually drive. Community Engagement Examples 4.1.b Packet Pg. 170 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 664 EDUCATION Culturally Relevant Engagement Community engagement is not a one-size-fits-all model as different communities have different needs. By developing culturally relevant engagement strategies, all participants are invited into conversations about safety. Culturally relevant engagement strategies can help education and programming around traffic safety reach a larger audience and be more impactful. For example, including cultural markers of a local community, such as contracting with popular local food vendors to cater engagement activities, can be a creative and welcoming way of engaging residents. Meeting people "where they are" to gather input on safety issues at local parks can more effectively engage parents and children rather than expecting families to attend a meeting at a government building. Developing Education Materials Related to Roadway Design Changes Temporary demonstrations, like pop-up installations, can physically showcase proposed safety infrastructure to the public and emergency response in a tangible way. Lastly, preparing materials and videos focused on new types of roadway design and San Jacinto’s major violation issues (e.g. speed, pedestrian crossings and nighttime driving) can direct community conversations for meaningful outcomes. Partner with Community Experts Local partners can serve as community liaisons between the City and the public. Working with community partners and public institutions, such as the San Jacinto Public Library, that have relationships with residents strengthens the engagement process by building trust and engaging an established base of stakeholders. Local partners can help tailor the engagement process or help incorporate engagement into existing programs and resources to educate people more effectively about roadway safety. Education Program Efficacy NHTSA has compiled a comprehensive report on efficacy for programmatic safety countermeasures in their Countermeasures that Work (2017) report. This report includes many education strategies, such as: ›Education regarding medication ›Driver education for younger and older drivers ›Driver training for pedestrian and bicyclist safety ›Bicycle safety education for children and adults However, research on the efficacy of education programs is limited, and each of these education countermeasures is rated in the report as having still undetermined effectiveness or limited/no high-quality evaluation evidence. LADOT Pop-Up Installation Enforcement SFMTA Vision Zero Informational Signs City of Sacramento Education Videos Sources: LA Streetsblog Vision Zero SF City of Sacramento 4.1.b Packet Pg. 171 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 65San Jacinto Local Roadway Safety Plan 65 Automated Speed Enforcement Source: Traffic Technology Today ENFORCEMENT Equity Considerations Enforcement of traffic laws is a common strategy to increase street safety, but historical enforcement techniques and strategies have raised concerns about racial profiling, police violence, and the impacts of policing on communities of color. A 2020 study conducted by the California Racial Identity Profiling Advisory Board using data from the largest law enforcement agencies in the State, including Riverside County Sheriff, highlights the following: ›Traffic stops are the most frequent point of contact between law enforcement and the community. 79% of Riverside County Sheriff stops are for a traffic violation. ›When compared to the overall share of population, Black people account for a disproportionate share of police stops by Riverside County Sheriffs. According to the US Department of Justice, Black and Hispanic people are more likely than white people to experience use of force when they are stopped by police. To ensure that efforts to improve safety recognize that all people have the right to move about their communities safely, cities have shifted to equity-based strategies that target specific reckless behaviors that pose the highest safety risk while working to mitigate potential inequities in enforcement. In 2020, the Safe Routes to School Partnership removed enforcement as part of its 6 E’s for Safe Routes to School and replaced it with engagement as a strategy for encouraging safe travel to school. Also this year, the Governor's Highway Safety Association made recommendations to invest in social programs to alleviate enforcement burdens and prevent recidivism, along with training for officers on topics of racism, bias, and de-escalation. Equity considerations can be considered in a range of enforcement strategies, including: ›Progressive traffic fine structures, such as a sliding scale for traffic fines based on a driver’s income, developing payment plans, or giving first offenders the opportunity to take a safety class focuses enforcement on behavior change. ›Analyzing available demographic data in traffic citations can help the City of San Jacinto understand if traffic enforcement is being implemented universally or if specific communities are experiencing disparities in enforcement. ›Since enforcement practices, like traffic stops, require the discretion of police officers, it is possible for implicit bias to affect how and to whom officers issue traffic citations. Assessing traffic citation demographic and geographic data can help uncover inequities in policing and the enforcement of traffic safety. High Visibility Enforcement High visibility enforcement is a multifaceted approach to enforcement that involves garnering public attention to traffic safety laws through highly visibly patrols, such as checkpoints: saturation patrols, or message boards. Across several topic areas, high- visibility enforcement is often the most effective form of enforcement, in terms of safety outcomes, according to NHTSA research. The goal of high visibility enforcement is to promote voluntary compliance with traffic laws. High visibility enforcement can target specific traffic violations for a short period of time to encourage drivers 4.1.b Packet Pg. 172 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 666 to stop engaging in a traffic violation. For example, speeding can be targeted in an area so that the public is aware that speed limits are enforced in the area. Another high visibility enforcement strategy is publicized sobriety checkpoints which are used to deter impaired driving on national holidays or weekends where more people are likely to drink and drive. Automated Enforcement Automated enforcement, such as red- light cameras or speed cameras, target the specific drivers who are behaving dangerously. A strictly data-driven approach to automated enforcement might place red-light or speed cameras in locations with the highest number of collisions. California is currently considering legislation to allow automated speed enforcement. Automated speed enforcement is highly effective. According to a 2010 study on the effectiveness of automated enforcement, all 28 case-studies found a lower number of crashes in the speed camera areas after implementation of the program. Studies of longer duration showed that these positive trends were either maintained or improved with time. Seattle saw the average number of traffic violations decrease by 64% in a two-year period after installation of speed cameras. 90% of offenders in Seattle did not receive another citation after being cited one time for speeding. Speed Limit Setting The California Zero Traffic Fatalities Task Force conducted a year-long study to assess the existing speed limit setting methodology in California. The Task Force found that the existing methodology, which sets speed limits as the 85th percentile of speed and traffic surveys, is not flexible enough to meet the needs of urban areas, and recommends the development of a new context-sensitive approach that sets speed limits to prioritize safety for all users. Lower maximum speed limits reduce crashes and fatalities. While lower posted speeds can help reduce crashes, they are more effective at encouraging driving at desired speeds when implemented through comprehensive efforts including installation of road safety improvements or enforcement. While no statewide change to the 85th percentile has been made yet, there is a near-term opportunity for San Jacinto to conduct speed surveys after safety-related roadway improvements have been implemented, which may result in an opportunity for setting lower posted speeds. Beyond Traditional Enforcement Alternatives to law enforcement involve investing in cross-sector partnerships to promote traffic safety. Alternatives include: ›Community partners can be hired as Street Safety Ambassadors and canvas along corridors where there are severe traffic fatalities or where communities are experiencing the most traffic stops or tickets for traffic violations. Hiring community members as Street Safety Ambassadors also serves as an opportunity to build trust between government agencies and the public since community partners typically have pre- existing relationships in the community. ›Hiring Social Workers, Mental Health Counselors, Addiction Specialists, and other unarmed specifically trained professionals can serve as a supplement to traffic enforcement. ›Partnering with local departments of mental health and public health can de- escalate traffic enforcement by treating traffic safety violations as a public safety issue. ›De-escalating traffic enforcement through government partnerships with public- facing agencies can also work to foster trust with the public during moments where there are national discussions on public safety regarding the police. For example, the City of Oakland partners with parking enforcement to enforce traffic laws in a deliberate effort to disarm the enforcement of traffic violations. This approach shifts traffic safety to non- sworn officers while still enforcing traffic laws. Lower Speed Limits in School Zone Source: Tim Berger/ Burbank Leader 4.1.b Packet Pg. 173 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 67 Enforcement Efficacy NHTSA has compiled a comprehensive report on efficacy for enforcement safety countermeasures in their Countermeasures that Work (2017) report. This report includes many enforcement strategies, and those with the highest safety efficacy rating are listed below: ›Publicized sobriety checkpoints ›High-visibility DUI patrols ›High-Visibility seat belt laws enforcement ›Communications and outreach supporting enforcement efforts ›High-visibility child restraint laws enforcement ›Automated speed enforcement ›Speed limits ›High-visibility cell phone laws enforcement ›Learner's permit and intermediate driver license restrictions, including nighttime and passengers ›License screening, testing and restrictions for older drivers ›Pedestrian Safety Zones, pairing enforcement and education with engineering countermeasures at a specific location State Street & 7th Street Strategies for DUI Collisions Driving under the influence is a major factor in fatal and severe collisions that is most effectively addressed through enforcement and related strategies. Three types of policy instruments have been used to reduce rates of driving under the influence: ›deterrence ›prevention ›limited access Deterrence policies focus on raising the actual and perceived risk of detection of driving under the influence. These policies should be highly visible to increase awareness of the risks of driving under the influence. Publicized sobriety checkpoints, saturation patrol, and other forms of high visibility enforcement are effective for safety outcomes. Prevention and education policies focus on mobilizing and educating the community, and intervening before driving under the influence takes place. According to NHTSA research, alcohol problem assessment and treatment programs, as well as alcohol intervention in settings such as a doctor's office, are highly effective strategies for improving safety outcomes. Partnerships with healthcare providers in San Jacinto can be an important piece of combating DUIs. Other opportunities include partnering with TNCs (e.g. Lyft or Uber) to reduce drinking and driving can help promote safety on the road and prevent fatal and severe collisions. Limited access policies focus on making underage access to alcohol and drugs more difficult and limiting excessive alcohol consumption. 4.1.b Packet Pg. 174 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 668 Trauma Care Effective emergency trauma care can increase crash survival rates by as much as 25 percent, and an effective county- wide trauma care coordination system can reduce fatalities by 50 percent. Key factors that influence the survivability of crashes are: proximity to care (how near is an appropriate trauma care center), response time, equipment, technology, and EMS training. The faster a traumatic injury victim receives medical care, the higher the chances are of preventing death. Recommended strategies to improve trauma care include providing funding for appropriate first responder equipment (e.g. hydraulic and pneumatic extrication tools), research and adoption of technology aimed at reducing triage time (e.g. automatic vehicle reporting of severe crashes to EMS, EMS vehicle collision avoidance systems, and geolocation of nearest appropriate EMS vehicles), and promotion of federal and state-certified training programs. Expanded access to and number of trauma care facilities is another major factor in improving outcomes for crash victims (Riverside Community Hospital is now a Level 1 trauma center). Enhanced partnership between the City and Riverside County along with the development of public education campaigns (regarding the “move over” law) can ensure greater safety for victims, first responders and other road users. Data Sharing Sharing data regarding on-scene time, patient destination and patient outcomes (as allowable by privacy law) would allow San Jacinto to effectively monitor triage performance and EMS system effectiveness. Issuing annual research regarding the findings could assist with increasing transparency and accountability to the public. Other strategies for improving data sharing could include comparing and merging EMS and hospital data with police and other relevant agency records to better inform policies, projects, programs and needed data quality improvements. Equity variables could be evaluated to document potential inequities related to homelessness, race/ethnicity, language, income, and immigration status to guide policy for addressing disproportionate trauma and fatalities. Fatal Crash Response Team In the event of a traffic fatality, analysis and evaluation is a key towards addressing the burden of traffic mortality and tracking progress towards eliminating fatalities on San Jacinto’s roads. One strategy is to establish a cross-agency fatal crash team of EMS, police, transportation, public health, and City officials to convene at the crash site after a fatal crash. This would assist with accurate investigation and documentation of potentially relevant infrastructural and environmental crash factors, while identifying other additional response factors that may have contributed to the fatal crash outcome. EMERGENCY SERVICES Traffic collision victims have a higher chance of survival if they can quickly receive medical care. In many cases, law enforcement officers and fire department staff are the first responders to arrive at a collision location. In addition to equipping all first responders with the appropriate training, improving response times for Emergency Medical Services will help improve collision victims’ chances of survival. Traffic crashes can also put first responders’ and other road users’ lives at risk due to increased congestion, which may lead to secondary crashes. Strategies to improve response time and safety for EMS include designing emergency vehicles to be highly visible (e.g. retroreflective striping and chevrons, high-visibility paint, and built-in passive light) and implementing emergency vehicle signal preemption, which allows emergency vehicles to break a normal signal cycle and proceed through an intersection. Lastly, emergency responders can use data collected on historical medical care in the City to improve care and use best practices. An Additional E: Epidemic The COVID-19 pandemic has deeply impacted travel behavior, with more people traveling less frequently and/or changing transportation modes in order to follow social distancing mandates. What this means for traffic safety is currently being examined by public health and transportation experts— preliminary reports state that while the overall number of crashes are down due to less driving, overall crash rates per vehicle miles traveled (VMT) are higher. In California, the number of severe and fatal crash rates is estimated to have gone up by 14.6%. One suggested strategy to curb dangerous driving behaviors and provide safe space for physically- distant walking and biking include implementing a program like Oakland’s and Los Angeles’s Slow Streets (soft street closures on local streets). To ensure that residents have safe access to essential services, as part of its Slow Streets program, Oakland has also temporarily improved pedestrian crossings at key destinations (e.g. grocery stores and COVID-19 testing sites) in high-priority neighborhoods selected using equity indicators such as race and income. Public education campaigns focused on discouraging speeding and drinking and driving can also aid in changing travel behaviors formed as a result of COVID-19. 4.1.b Packet Pg. 175 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 69 EMERGING TECHNOLOGY Recent advancements in transportation technology have not only introduced new transportation modes and travel patterns, but have also presented opportunities to better understand travel behavior and encourage safe behavior. The proliferation of new mobility devices, services and technologies (e.g. ridehailing services) have presented numerous needs and options for addressing road safety. Among these new technologies, artificial intelligence allows for more detailed data collection and the proliferation of autonomous vehicle (AV) usage. AVs have potential to reduce human error and improve street safety, but AVs also incur different challenges. The following represent a summary of emerging technology trends related to safety. Near Miss Data Near misses have historically been difficult to study in practical safety applications due to an overall lack of reported information. In the absence of sufficient crash data, near miss data is an important indicator for guiding crash prevention. There are several technologies detailed below that are closing the gap and providing key safety insights regarding near misses: Video Data ›Video machine learning is an effective means of classifying collisions and collecting near miss data. The City should consider investing in these technologies (e.g. along key roadways and intersections) to proactively enact safety countermeasures. Incidence Data from Connected Vehicles ›With the capability of vehicles to capture and transmit real-time data on driver behavior wirelessly, these data are increasingly becoming an integral part of reporting near misses especially given the introduction of AVs on public roadways. Public Crowdsourcing ›Online web crowdsourcing platforms, like UC Berkeley’s SafeTREC Street Story tool, allow anyone to anecdotally report incidents of near misses. These data are available publicly for analysis and contain important contextual information based on geographic location (e.g. road conditions, street lighting and travel mode). Utilizing a platform like Street Story could also advance community education and engagement around road safety. Data Collection and Management Up-to-date data on transportation infrastructure, including roadway characteristics, intersection characteristics, and signs, is valuable for planning and implementing future improvements. Service providers that can assist with this work include: ›Mapillary, uses crowdsourced or privately provided street level imagery to extract and map signs, street lamps, sidewalks, signals, and other objects. https://www. mapillary.com/ ›EcopiaTech uses satellite imagery to extract features such as road centerlines, roadway cross-sections, sidewalks, and more. https://www.ecopiatech.com/ Smart Signal Technology As part of its strategy to bolster road safety, San Jacinto could explore the feasibility of deploying smart signal technology on its roads. Smart signal technology enables cities to collect data along multiple intersections, providing high-resolution data on how people are using the roadway in real time. Connected vehicles are another part of this system. They wirelessly communicate with other vehicles and infrastructure (like signals) to provide data for instantaneous decision-making (e.g. reporting driver speed or collisions). Data from signals in combination with data from vehicles can allow for real time speed-related signal operations, allowing for enhanced safety through adaptable systems. AV Readiness Planning Having strategies prepared to meet and address the oncoming challenges posed by AV technology will be crucial in advancing road safety in San Jacinto. Fully automated vehicles have the potential to transform travel behavior and safety outcomes given that AVs are ultimately designed to operate without any human intervention. Some strategies for preparation include educating the public on current and future safety features and limitations, developing signing and striping standards, and conducting reviews of equity implications. Without appropriate research and guidance, AVs could widen accessibility and safety gaps for vulnerable communities. AV technology is still developing, and there will be an adoption period where people will need time to grow accustomed to interacting with AVs. Cities will be faced with making decisions if AVs will be allowed to operate on local streets and will need to create policies and programs to respond to the proliferation of AVs. 4.1.b Packet Pg. 176 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4.1.b Packet Pg. 177 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Emphasis Areas & Strategies Chapter 7 San Jacinto Local Roadway Safety Plan 71 The following ten emphasis areas are a combination of five priority locations and five collision types that were selected based on the number of total collisions, number of fatal and severe injury (KSI) collisions, and stakeholder input. Each emphasis area is presented on a cutsheet that includes a collision summary, location summary, safety goals, strategies to help the City achieve the identified goals, and relevant grant opportunities. 1. San Jacinto Ave | Menlo Ave to 7th St 2. State St | De Anza Dr to 9th St 3. Ramona Expwy | Lyon Ave to Eagle Rd 4. E Esplanade Ave | Hewitt St to Merdian St 5. Ramona Expwy & Sanderson Ave 6. Nighttme Collisions Involving Bicyclists or Pedestrians 7. Collisons Involving Alcohol 8. Broadside Collisons at Major Unsignalized Intersections 9. Bicycle and Pedestrian Collisions Near Schools 10. Collisions Involving Pedestrians In Road The location summary for each emphasis area includes the violations and collision types that account for the most severe or highest number of collisions, which are included in the key issues in Chapter 5. The strategies, which were selected to address the collision types and violations and contribute to achieving the safety-related goals, are separated into primary countermeasures and secondary countermeasures. Primary countermeasures correspond to the factors identified in the location summary and are best suited for competitive HSIP grant applications. Secondary countermeasures are additional recommended strategies based on the existing infrastructure, field observations, and stakeholder input. Each emphasis area also indicates if the collisions are located in or near a school, retail, park or a census tract that is categorized as a Disadvantaged Community, defined by Senate Bill 535 and Assembly Bill 1550. Proximity to schools, parks and retail was defined as within a 1,000 ft radius. Unit cost estimates represent general unit costs based on prior Southern California or statewide projects, and are not specific to the location. High-level benefit estimates assume a crash cost-based benefit related to all relevant (e.g. bike/ped or nighttime) collisions for a location or collision type, to allow for an apples-to-apples comparison of countermeasures. More information on benefit calculations can be found in the LRSM, page A-55. Further engineering studies will be required to develop more detailed estimates and designs. CONSIDERATIONS FOR SANDERSON Sanderson Avenue, from Cottonwood Avenue to Ramona Expressway, was under consideration as a corridor hotspot emphasis area due to the high number of total collisions (55) and KSI collisions (15). This corridor was ultimately not included as one of the ten emphasis areas because the City is in the process of implementing safety improvements that address the top collision types along this corridor, which include collisions with a hit object, overturned vehicle, and occurring at night. The City is installing rumble strips, speed radar signs, crash attenuators around power poles, and shoulder improvements. The City upgraded approximately 2,000 streetlights throughout the city, including along Sanderson Avenue, to LED in 2019. The City also installed a traffic signal at the Ramona Boulevard & Sanderson Avenue intersection in late 2017. 13 of the 14 collisions at this intersection occurred prior to the signal installation. The City may consider installing additional object markers along Sanderson, to further denote culvert headwall locations for driver awareness. 4.1.b Packet Pg. 178 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 772 NEAR SCHOOL San Jacinto Avenue Menlo Avenue to 7th Street COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES VIOLATIONS HSIP ATPIN DISADVANTAGED COMMUNITY SECONDARY COUNTERMEASURES GOALS TYPE OF EMPHASIS AREA CORRIDOR HOT SPOT NEAR RETAIL OF CITYWIDE BICYCLE AND PEDESTRIAN KSI COLLISIONS 31% KSI COLLISIONS11 TOTAL COLLISIONS25 ›Advanced Stop Bar ›High-Visibility Crosswalks ›Pedestrian Refuge Island ›Refresh pavement markings ›Widen sidewalks ›Speed feedback signs ›Signal interconnectivity and coordination ›Green conflict striping at intersections COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Install Additional Warning Signs To Address Broadside Short $350 each $7.4m Add Lighting To Address Nighttime, Gaps in Lighting Medium $10,000 each $18.6m Pedestrian Hybrid Beacon To Address Pedestrian Crossing Outside Crosswalk Medium $200,000 per location $54.3m Road Diet To Address Unsafe Speed Long $80,000 per mile $29.6m Separated Bike Lanes To Address Wrong Side of the Road (Bicycle)Long $1,250,000 per mile $44.5m Install Sidewalk To Address Pedestrian in Road Long $45 per sf $79m Turn Restrictions/Medians To Address Improper Turning Long $60 per sf $49.4m ›Reduce the number of collisions involving pedestrians and bicyclists. ›Improve pedestrian safety with infrastructure improvements that fill pedestrian network gaps and enhance visibility between people who are driving and people who are walking. ›Improve pedestrian and bicyclist visibility at night. ›Encourage lower vehicle speeds with roadway design and signage.ROADWAY AND CONTEXTUAL FACTORS ›4 travel lanes ›45 mph speed limit ›Gaps in lighting ›Broadside ›Nighttime COLLISION TYPES ›Unsafe speed ›Improper turning ›Pedestrian crossing outside of crosswalk ›Pedestrian in road ›Wrong side of the road (bicycle) COLLISIONS INVOLVING SOMEONE WALKING OR BIKING SB821NEAR PARK See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 179 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 14.1.b Packet Pg. 180 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 774 COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES VIOLATIONS HSIP IN DISADVANTAGED COMMUNITY SECONDARY COUNTERMEASURES GOALS TYPE OF EMPHASIS AREA CORRIDOR HOT SPOT BICYCLE AND PEDESTRIANCOLLISIONS 10 BICYCLE AND PEDESTRIAN KSI COLLISIONS4 KSI COLLISIONS9 TOTAL COLLISIONS53 COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Extend Yellow/All Red Time To Address Broadside, Signal and Sign Violations Short $500 per location $7.1m Leading Pedestrian Interval and Pedestrian Recall To Address Pedestrian Crossing in Crosswalk, Pedestrian Crossing Outside Crosswalk Short $500 per location $10.9m Speed Feedback Signs To Address Unsafe Speed Short $22,500 each N/A Retroreflective Tape on Signals To Address Broadside, Signal and Sign Violations Short $150 per signal head $7.2m Advance Stop Bar To Address Pedestrian Crossing in Crosswalk Short $200 each $2.7m High Visibility Crosswalk (+ straighten crosswalks)To Address Pedestrian Crossing in Crosswalk, Pedestrian Crossing Outside Crosswalk Short $35 per lf $9.1m Protected Left Turns To Address Broadside Medium $150,000 per approach $28.6m Turn Restrictions/Medians To Address Broadside, Improper Turning Medium $60 per sf $47.7m Lighting To Address Nighttime Medium $10,000 each $16.4m ›Consider Major Intersection Reconstruction to Provide Two Squared Up Intersections ›Extended Striping Through Intersection ›Install Slip Lanes for Right Turns ›Consider New Pedestrian Crossing with Enhanced Safety Features ›Centerline Hardening ›Install Sidewalks ›Signal Interconnectivity and Coordination ›Improve visibility, particularly at skewed intersections. ›Increase convenience and comfort for pedestrians crossing at intersections. ›Decrease prevelance of red light running and improper turning violations. NEAR SCHOOL ›45 mph ›4-5 lanes ROADWAY AND CONTEXTUAL FACTORS ›Broadside ›Nighttime COLLISION TYPES ›Unsafe Speeds ›Improper Turning ›Pedestrian Crossing (both in crosswalk and outside of crosswalk) ›Note: High level of “traffic signal and sign” violations (not a top citywide violation) State Street De Anza Drive to 9th Street OTS ATPNEAR PARKNEAR RETAIL SB821 See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 181 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 24.1.b Packet Pg. 182 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 776 COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES VIOLATIONS HSIP ATPNEAR PARK SECONDARY COUNTERMEASURES GOALS TYPE OF EMPHASIS AREA CORRIDOR HOT SPOT ROADWAY AND CONTEXTUAL FACTORS KSI COLLISIONS11 TOTAL COLLISIONS56 ›Narrow Lanes ›Separated Bike Lanes ›High-Visibility Crosswalks ›Speed feedback signs ›Advanced Stop Bar ›Pedestrian Refuge Island ›Signal interconnectivity and coordination ›Install delineators, reflectors and/or object markers COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Shorten Signal Cycle Length and Pedestrian Recall To Address Pedestrian Crossing Outside Crosswalk Short $500 per location $8.4m Green Conflict Striping To Address Broadside (Bicycle)Short $9 per sf N/A Extend Yellow and Red Timing To Address Broadside Short $500 per location $8.4m Lighting To Address Nighttime, Hit Object Medium $10,000 each $23.3m Retroreflective Tape on Signals To Address Unsafe Speed Medium $150 per signal head $8.4m Dynamic Speed Warning Sign To Address Curves Medium $22,500 each $16.9m Median Barrier To Address Pedestrian Crossing Outside Crosswalk Long $75 per lf $28.2m ›Improve bicycle visibility at intersections. ›Decrease speeding and increase driver awareness as the roadway transitions between a more rural and residential/ commercial context. ›Increase driver awareness of curves. NEAR RETAILNEAR SCHOOL IN DISADVANTAGED COMMUNITY COLLISION TYPES ›6 travel lanes ›55 mph speed limit ›Curves ›Gaps in lighting ›Broadside (incl. Bicycle) ›Hit Object ›Nighttime ›Driver at Fault Proceeding Straight ›Unsafe Speed ›Improper Turning ›Crossing Outside Crosswalk (Ped) ›Wrong Side of the Road (Bicycle) Ramona Expressway Lyon Avenue to Eagle Road BICYCLE AND PEDESTRIANCOLLISIONS 7 BICYCLE AND PEDESTRIAN KSI COLLISIONS 3 SB821 See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 183 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 34.1.b Packet Pg. 184 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 778 COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES VIOLATIONS NEAR RETAIL HSIP ATPNEAR PARK IN DISADVANTAGED COMMUNITY SECONDARY COUNTERMEASURES GOALS TYPE OF EMPHASIS AREA CORRIDOR HOT SPOT KSI COLLISIONS3 TOTAL COLLISIONS28 COLLISION TYPES ROADWAY AND CONTEXTUAL FACTORS COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Speed Feedback Sign To Address Unsafe Speeding Short $22,500 each N/A Flashing Beacons as Advanced Warning To Address Broadside, Curves Medium $20,000 each $2.7m Rectangular Rapid Flashing Beacon To Address Pedestrian Crossing Outside Crosswalk Medium $40,000 per crossing $3.7m Install Additional Warning Signs To Address Broadside Medium $350 each $2.7m Uncontrolled Pedestrian Crossing with Enhanced Safety Features To Address Pedestrian Crossing Outside Crosswalk Medium $35 lf + add'l elements $3.7m Turn Restrictions/Medians To Address Broadside Medium $60 per sf $18.2m All-Way Stop Control To Address Broadside, Pedestrian Crossing Outside Crosswalk Medium $800 per location $9.1m Road Diet To Address Unsafe Speed Long $80,000 per mile $10.9m ›Raised Pedestrian Crossing ›Pedestrian Refuge Island ›Curb Extensions ›Separated Bike Lanes ›Increase pedestrian visibility with enhanced striping and signage, especially near schools and parks. ›Identify locations with high pedestrian activity without marked crossing opportunities. ›Encourage multi-modal transportation with multi-modal infrastructure and lower vehicle speeds. ›Increase driver awareness of curves. ›4 Lanes ›40 mph speed limit ›Curves ›Major unsignalized intersections ›Broadside ›Victims Under 19 ›Unsafe speed ›Pedestrian Crossing Outside Crosswalk East Esplanade Avenue Hewitt Street to Meridian Street NEAR SCHOOL BICYCLE AND PEDESTRIANCOLLISIONS 6 BICYCLE AND PEDESTRIAN KSI COLLISIONS 1 SB821 See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 185 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 44.1.b Packet Pg. 186 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 780 NEAR SCHOOL COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES HSIP IN DISADVANTAGED COMMUNITY SECONDARY COUNTERMEASURES GOALS NEAR RETAIL BICYCLE AND PEDESTRIAN COLLISION (NON-KSI) 1 KSI COLLISIONS4 TOTAL COLLISIONS33 COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Retroreflective Tape on Signals To Address Unsafe Speed, Broadside Short $150 per signal head $3.5m Extend Yellow and All Red Time To Address Broadside Short $500 per location $3.5m Advanced Dilemma-Zone Detection To Address Unsafe Speed, Broadside Short $50,000 per location $9.3m Lighting To Address Nighttime Medium $10,000 each $9.4m Supplemental Signal Heads To Address Unsafe Speed, Broadside Long $1,095 each $3.5m ›Install lane line extensions at intersection for left-turning vehicles ›Flashing beacon to alert vehicles traveling eastbound on Ramona Expressway of the upcoming intersection ›Signal Interconnectivity and Coordination ›Remove 1 Left-Turn Lane NB and SB ›Red Light Camera ›Reduce frequency of intersection conflicts using traffic control and intersection enhancements. ›Increase driver awareness of intersection and signal controls with advance warning signs and by enhancing signal visibility. NEAR PARK ROADWAY AND CONTEXTUAL FACTORS ›4 lanes ›55+ mph speed limit COLLISION TYPES ›Broadside ›Nighttime ›Driver at fault proceeding straight VIOLATIONS ›Unsafe Speed TYPE OF EMPHASIS AREA INTERSECTION HOT SPOT Ramona Expressway & Sanderson Avenue See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 187 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 54.1.b Packet Pg. 188 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 782 COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES COLLISION TYPES VIOLATIONS NEAR PARK IN DISADVANTAGED COMMUNITY ›Unsafe Speed ›Wrong Side of Road (Bicycle) ›Crossing Outside of Crosswalk (Ped) ›Pedestrian In Road SECONDARY COUNTERMEASURES GOALS OF CITYWIDE BICYCLE AND PEDESTRIAN KSI COLLISIONS 74% KSI COLLISIONS26 TOTAL COLLISIONS57 At existing crossings, enhance with: ›Advanced Stop Bar ›High-Visibility Crosswalks COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Green-Conflict Striping at Intersection To Address Broadside Short $9 per sf N/A Reflectors Along Shoulder in Rural Areas To Address Nighttime and Pedestrian in Road Short $40 each $17.4m Rectangular Rapid Flashing Beacon To Address Pedestrian Crossing Outside of Crosswalk Medium $40,000 per crossing $81.4m Pedestrian Hybrid Beacon To Address Pedestrian Crossing Outside of Crosswalk Long $200,000 per crossing $127.9m Road Diet To Address Unsafe Speed Long $80,000 per mile $69.8m Add Lighting To Address Nighttime Long $10,000 each $81.4m Separated Bike Lanes To Address Wrong Side of Road (Bicycle)Long $1,250,000 per mile $104.6m Add Sidewalks To Address Pedestrian in Road Long $45 per sf $186.1m ›Provide separate and protected facilities for people who walk and bike. ›Increase visibility for people who drive, walk, and bike at night with intersection, roadway, and pedestrian lighting. ›Improve visibility of bicyclists and pedestrians at intersections.ROADWAY AND CONTEXTUAL FACTORS ›Unsignalized intersections and midblock ›Primarily along roads with 4+ travel lanes and a few in residential neighborhoods (2 lanes) ›Primarily 40+ mph speed limit ›Gaps in Lighting or Missing Lighting ›Broadside ›Nighttime Nighttime Collisions Involving Bicyclists or Pedestrians 6PM TO 6AM TYPE OF EMPHASIS AREA COLLISION TYPE RELEVANT GRANTS OPPORTUNITIES NEAR RETAILNEAR SCHOOL HSIP ATP SB821 See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 189 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 83 RECOMMENDATIONS Install Sidewalks, Pedestrian Hybrid Beacons, Rectangular Rapid Flashing Beacon to provide safer pedestrian facilities and additional crossing opportunities. Consider installing Separated Bike Lanes and Green Conflicting Striping at Intersection to provide separated space for bikes and reduce conflicts at intersections. Reference the Trails Master Plan for more guidance on design and proposed facility locations. Install Intersection Lighting and Segment Lighting where gaps currently exist. Consider Road Diet where ADT allows. Idyllwild Dr 7th St Washington Ave 1st StSanderson AveLyons AveState StSan Jacinto AveSanta Fe AveHewitt StMain St De Anza Dr N Warren RdRamona Blvd Ramona Ex p y Cottonwood Ave W Esplanade Ave Ramona Expy 7th St R a mona ExpyS o boba RdPark Ave 79 E Es p l anade Ave .Miles Nighttime Collisions Involving Bicyclists Fatal and Severe Collisions (4) All Other Collisions (21) Nighttime Collisions Involving Pedestrians Fatal and Severe Collisions (22) All Other Collisions (10) As an interim measure, consider installing Reflectors Along Shoulder in Rural Areas to mark separation of bicycle and pedestrian spaces when sidewalk or bike facilities are not available. 4.1.b Packet Pg. 190 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 784 COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES VIOLATIONS NEAR RETAIL HSIP NEAR PARK IN DISADVANTAGED COMMUNITY SECONDARY COUNTERMEASURES GOALS OF CITYWIDE KSI COLLISIONS 27% KSI COLLISIONS30 TOTAL COLLISIONS126 ›Publicized Sobriety Checkpoints and Patrols ›Alcohol Penalty Policies (e.g. License Suspension) ›Public Health Partnerships (e.g. Alcohol Screening and Intervention) COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Extend Yellow and All Red Time To Address Broadside Short $500 per location $22.1m Impact Attenuators To Address Hit Object Medium $50,000 each $36.9m Median Barrier To Address Under the Influence Medium $75 per lf $73.8m Guard Rails To Address Hit Object Medium $50 per lf $73.8m Edgeline Rumble Strips To Address Hit Object Medium $1 per lf $22.1m Add Lighting To Address Nighttime Long $10,000 each $79m OTS ›Reduce severity of collisions caused by driving under the influence with roadway design. ›Reduce Driving Under the Influence with Enforcement and Partnerships. ROADWAY AND CONTEXTUAL FACTORS: COLLISION TYPES ›Primarily on roads with 4+ travel lanes ›Primarily at Major intersections and midblock ›Broadside ›Hit Object ›Nighttime ›Under the Influence ›Unsafe Speed TYPE OF EMPHASIS AREA COLLISION TYPE Collisions Involving Alcohol NEAR SCHOOL See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 191 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 85 Install Edgleline Rumble Strips to help drivers correct for lane departures before a collision occurs. RECOMMENDATIONS Install Guard Rails, Impact Attenuators and Median Barriers to help mitigate severity of lane departure collisions. Consider Extending Yellow and All Red Time to mitigate potential conflicts at signals. Installing Intersection Lighting and Segment Lighting to support visibility at night.Idyllwild Dr 7th St Washington Ave 1st StSanderson AveLyons AveState StSan Jacinto AveSanta Fe AveHewitt StMain St De Anza Dr N Warren RdRamona Blvd Ramona Ex p y Cottonwood Ave W Esplanade Ave Ramona Expy 7th St R a mona ExpyS o boba RdPark Ave 79 E Es p l anade Ave .Miles Collisions Involving Alcohol Fatal and Severe Collisions (30) All Other Collisions (96) 4.1.b Packet Pg. 192 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 786 COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES NEAR RETAIL HSIP NEAR PARK IN DISADVANTAGED COMMUNITY SECONDARY COUNTERMEASURES GOALS OF CITYWIDEKSI COLLISIONS9% KSI COLLISIONS10 TOTAL COLLISIONS135 COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Upgrade to Larger or Install Additional Warning Signs To Address Broadside Short $350 each $10.5m Upgrade Intersection Pavement Markings To Address Broadside Short $4 per sf $17.5m Turn Restrictions/Medians To Address Broadside Medium $60 per sf $70m Directional Median Opening To Address Broadside Medium $60 per sf $70m Reduced Left-Turn Conflict Intersections To Address Broadside Long $60 per sf $70m Install Signal To Address Broadside Long $350,000 per location $42m Roundabout To Address Broadside Long $400,000 each Varies COLLISION TYPES ROADWAY AND CONTEXTUAL FACTORS: ›Major Unsignalized Intersections ›Broadside (31% of collisions involved a vehicle making a left turn) TYPE OF EMPHASIS AREA COLLISION TYPE Broadside Collisions at Major Unsignalized Intersections NEAR SCHOOL ›Reduce number and severity of broadside collisions at major unsignalized intersections. ›Reduce number and severity of left- turn collisions at major unsignalized intersections. ›Improve sightlines at major unsignalized intersections through vegetation management program See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 193 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 87 Consider installing New Signals or Roundabouts ,where warranted, to provide additional control for opposing movements at intersections. Consider roundabout size - one-lane roundabouts may offer more safety benefit than multi-lane. Roundabouts and signals should be designed with enhanced bicycle and pedestrian safety features to mitigate conflict issues and provide comfortable crossings. RECOMMENDATIONS Upgrade Intersection Pavement Markings and upgrade to Larger or Install Additional Warning Signs to bring driver awareness to two-way stop controlled intersections. Consider installing Directional Median Openings and Turn Restrictions to mitigate left-turn broadside collisions at driveways and two-way stop controlled intersections. Consider installing Reduced Left-Turn Conflict Intersections to mitigate left-turn conflicts at driveways and minor roadways. Idyllwild Dr 7th St Washington Ave 1st StSanderson AveLyons AveState StSan Jacinto AveSanta Fe AveHewitt StMain St De Anza Dr N Warren RdRamona Blvd Ramona Ex p y Cottonwood Ave W Esplanade Ave Ramona Expy 7th St R a mona ExpyS o boba RdPark Ave 79 E Es p l anade Ave .Miles Broadside Collisions at Major Unsignalized Intersections Fatal and Severe Collisions (10) All Other Collisions (125) 4.1.b Packet Pg. 194 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 788 COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES COLLISION TYPES VIOLATIONS RISK FACTORS NEAR RETAIL HSIP NEAR PARK IN DISADVANTAGED COMMUNITY SECONDARY COUNTERMEASURES GOALS For higher pedestrian volume locations or larger roadways: ›Pedestrian Refuge Island ›Pedestrian Hybrid Beacon ›Widen Sidewalk COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Green Conflict Striping To Address Broadside (Bicycle)Short $9 per sf N/A Daylight Intersection To Address Victims Under 19 Short $2 per lf $1.7m Uncontrolled Pedestrian Crossing with Enhanced Safety Features To Address Pedestrian Crossing Outside Crosswalk Short $35 lf + add'l elements $6.1m Curb Extensions To Address Victims Under 19 Medium $45 per sf $6.1m Rectangular Rapid Flashing Beacon To Address Pedestrian Crossing Outside Crosswalk Medium $40,000 per crossing $6.1m Raised Pedestrian Crossing To Address Pedestrian Crossing Outside Crosswalk, Victims Under 19 Long $30,000 per location $6.1m Install Sidewalks To Address Pedestrian In Road Long $45 per sf $13.9m Separated Bike Lanes Bicycle Collisions Long $1,250,000 per mile $7.8m ›Reduce pedestrian and bicyclist exposure to vehicular traffic by upgrading or filling gaps in facilities, such as bike lanes, sidewalks and crosswalks. ›Improve sight distance and/or visibility between motor vehicles and pedestrians/bicyclists ›Encourage safe behavior with community-wide sustained outreach safety campaigns and targeted outreach (e.g. partner with the school district to enhance Safe Routes to School) OTS ATP ›2-3 lane roads with 25-35 mph speed limit ›Major unsignalized intersections ›Broadside (Bicycle) ›Victims Under 19 ›Pedestrian Crossing Outside of Crosswalk ›Pedestrian in Road OF CITYWIDE BICYCLE AND PEDESTRIAN COLLISIONS 17% KSI COLLISIONS1 TOTAL COLLISIONS21 TYPE OF EMPHASIS AREA COLLISION TYPE6AM TO 6PM Bicycle and Pedestrian Collisions near Schools NEAR SCHOOL SB821 See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 195 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 89 Consider installing Separated Bike Lanes and Green Conflicting Striping at Intersection to provide separated space for bikes on faster roadways and reduce conflicts at intersections. Reference the Trails Master Plan for more guidance on design and proposed facility locations. RECOMMENDATIONS Enhance pedestrian crossings by Daylighting Intersections with red curb and installing Curb Extensions. Both of these strategies improve sightlines at intersections and allow for chldren to be seen more easily. Idyllwild Dr 7th St Washington Ave 1st StSanderson AveLyons AveState StSan Jacinto AveSanta Fe AveHewitt StMain St De Anza Dr N Warren RdRamona Blvd Ramona Ex p y Cottonwood Ave W Esplanade Ave Ramona Expy 7th St R a mona ExpyS o boba RdPark Ave 79 E Es p l anade Ave .Miles Bicycle and Pedestrian Collisions near Schools Fatal and Severe Collisions (1) All Other Collisions (20) Install Sidewalks where gaps currently exist to provide access to and from schools. Consider installing Uncontrolled Pedestrian Crossing with Enhanced Safety Features such as Rectangular Rapid Flashing Beacons or Raised Pedestrian Crossings along two- lane roadways near schools. 4.1.b Packet Pg. 196 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 790 COLLISION SUMMARY LOCATION SUMMARY PRIMARY COUNTERMEASURES RELEVANT GRANT OPPORTUNITIES VIOLATIONS HSIP NEAR PARK IN DISADVANTAGED COMMUNITY SECONDARY COUNTERMEASURES GOALS COLLISION TYPES ROADWAY AND CONTEXTUAL FACTORS TYPE OF EMPHASIS AREA COLLISION TYPE COUNTERMEASURE ISSUE AREA TIME FRAME UNIT COST BENEFIT Delineators Along Paved Shoulder To Address Pedestrian In Road Short $40 each $6.1m Pave Shoulder To Address Pedestrian In Road Medium $200 per ton $24.3m Add Sidewalks To Address Pedestrian In Road Long $45 per sf $64.9m Add Lighting To Address Nighttime Long $10,000 each $24.3m For residential roadway locations: ›Painted centerline and raised pavement markers at curves on residential streets ›Daylight Intersection ›Speed legends on pavement at neighborhood entries ›Update markings on speed humps OTS ATPNEAR RETAIL ›Improve pedestrian visibility at night with lighting. ›Improve pedestrian safety with infrastructure improvements that fill pedestrian network gaps and enhance existing pedestrian facilities. ›Increase awareness of people walking, especially in residential areas. ›Residential roads (2-3 lanes with 15-25 mph speed limit) and larger arterials (4-5 lanes with 40+ mph speed limit) ›Primarily mid-block ›Gaps in Lighting ›Nighttime ›Pedestrian in Road Collisions Involving Pedestrian in Road OF CITYWIDE PEDESTRIAN KSI COLLISIONS 32% KSI COLLISIONS9 TOTAL COLLISIONS21 NEAR SCHOOL SB821 See pg 71 for source and limitations of data, including costs. 4.1.b Packet Pg. 197 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 91 RECOMMENDATIONS Install Delineators along Paved Shoulder as an interim measure where sidewalks are not available, to provide separated space that is visible at night. Consider Paving Shoulder as an interim measure where sidewalks are not available. Install Sidewalks to provide separated space.Idyllwild Dr 7th St Washington Ave 1st StSanderson AveLyons AveState StSan Jacinto AveSanta Fe AveHewitt StMain St De Anza Dr N Warren RdRamona Blvd Ramona Ex p y Cottonwood Ave W Esplanade Ave Ramona Expy 7th St R a mona ExpyS o boba RdPark Ave 79 E Es p l anade Ave .Miles Collisions Involving Pedestrians in Road Fatal and Severe Injuries (9) All Other Collisions (12) Install Intersection Lighting and Segment Lighting where current gaps exist, because many of these collisions occur at night. 4.1.b Packet Pg. 198 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 792 GLOBAL RECOMMENDATIONS Based on the collision analysis, stakeholder meetings, and field observation, several countermeasures were identified to be “global countermeasures,” or countermeasures that can be applied throughout the City. Each countermeasure is accompanied by a brief description of the safety benefit and applicability. Detailed descriptions are in the countermeasure toolbox (Chapter 6). ›Add or Upgrade to High-Visibility Crosswalks: High-visibility crosswalks have a striped pattern with markings made of high-visibility material. All existing and new marked crosswalks should have high-visibility markings to enhance pedestrian visibility and safety. ›Check Clearance Times: The City can revisit yellow and all-red clearance times based on the latest guidance. Additional clearance time can allow for vehicles that entered the intersection during the yellow-change interval to clear the intersection prior to the next phase. The Traffic Control Devices Handbook, 2nd Edition (Institute of Traffic Engineers, 2013) cites that calculating the duration of red clearance intervals using the current ITE guidelines has been shown to reduce total crashes between 8 and 14 percent while reducing injury crashes by approximately 12 percent. ›Pedestrian Crossing Time: Per the CA MUTCD, crossing times should reflect a 3.5 ft/sec walking speed, though a slower 2.8 ft/sec timing may be appropriate in some locations. ›Install Pedestrian Countdown Signals: A pedestrian countdown signal displays the number of seconds remaining for a pedestrian to cross the intersection and can help someone walking determine if they have enough time to cross the intersection. While the CA MUTCD Section 4E.07 mandates the countdowns be used in all locations where the pedestrian change interval is more than seven seconds, pedestrian countdown signals can be installed at all signalized intersections. ›Install or Upgrade ADA-Compliant Facilities: To provide for the safe and comfortable travel of all roadway users, regardless of ability, new and upgraded facilities throughout the City should comply with the Americans with Disabilities Act Accessibility Guidelines (ADAAG). The California Disabled Accessibility Guidebook (CalDAG) provides synthesized recommendations. These facilities include: › Curb Ramps: Directional curb ramps are recommended over diagonal ramps. Ramps should have a detectable warning surface (e.g. truncated domes). ›Sidewalks should be at least five ft wide, or with at least five ft of passing space at regular intervals (less than 200 ft). ›Upgrade to 12-Inch Signal Heads: Upgrading from existing 8-inch signal heads to 12-inch signal heads complies with the CA MUTCD guidelines and improves visibility of traffic signals. ›Install Reflective Tape on Signals: Retroreflective borders enhance the visibility of traffic signals and can help drivers recognize signals in areas where they don’t expect to see a signal (e.g. after a long stretch of roadway) or at nighttime when visibility is limited. ›Upgrade Asphalt and Striping: Repaving a road with fresh asphalt and upgrading striping from paint to thermoplastic can extend the lifetime and visibility of roadway striping. Clearly visible centerlines and lane lines can help drivers stay in the appropriate lane and minimize the potential for head-on and sideswipe collisions. ›Upgrade Raised Pavement Markers: Upgrading broken and replacing missing raised pavement markers enhance the visibility of centerlines and lane lines along roadways. Clearly visible centerlines and lane lines can help drivers stay in the appropriate lane and minimize the potential for head-on and sideswipe collisions. Raised pavement markers can also be added to striping through intersections to provide enhanced guidance at night. ›Install Advanced Stop Bars: An advanced stop bar can be placed at signalized and stop-controlled intersections to provide a buffer between vehicles and pedestrians crossing the intersection. 4.1.b Packet Pg. 199 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 93 San Jacinto Avenue & Midway Avenue 4.1.b Packet Pg. 200 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) 4.1.b Packet Pg. 201 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Evaluation and Implementation Chapter 8 San Jacinto Local Roadway Safety Plan 95 While the primary purpose of this study is to prepare the City of San Jacinto to submit successful Highway Safety Improvement Program (HSIP) applications, safety projects can be funded through a wide range of additional sources at the regional, state, and federal levels. HSIP funds are largely awarded based on a benefit/cost analysis using a set of Caltrans-approved countermeasures with documented collision reduction factors and historic collision data. While many safety projects will perform well in the HSIP process, others may be successfully funded through other sources that consider additional factors, such as the Active Transportation Program (ATP). The sources in this chapter may be used to fund a broad scope of projects targeting air quality and sustainability, affordable housing, and transportation. Successful projects often entail creative solutions that address impact areas beyond transportation safety alone. FUNDING OPPORTUNITIES LOCAL AND REGIONAL SOURCES Riverside County Transportation Commission (RCTC) Transportation Development Act (TDA) Article 3 Bicycle and Pedestrian Facilities Program (SB 821) Each year, 2% of the Local Transportation Fund (LTF) revenue is made available for bicycle and pedestrian facility projects under TDA Article 3, also known as SB 821. Eligible projects include sidewalks, access ramps, bicycle facilities, and bicycle plan development. A Call for Projects is issued biennially in February, and funds are allocated each June. NEXT FUNDING OPPORTUNITY February 2021 (approx. $3.5 m available) Riverside County Transportation Commission (RCTC) Measure A Riverside County’s first half-cent sales tax for transportation improvements through 2039. NEXT FUNDING OPPORTUNITY -- SCAG Sustainable Communities Program The Sustainable Communities Program provides direct technical assistance to SCAG member jurisdictions to complete planning and policy efforts that enable implementation of the regional SCS). Grants are available in three categories: Integrated Land Use, Active Transportation, and Green Region. NEXT FUNDING OPPORTUNITY Applications for the Active Transportation and Safety (AT&S) grant were due December 11, 2020 4.1.b Packet Pg. 202 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 896 STATE SOURCES California Strategic Growth Council (SGC) Transformative Climate Communities (TCC) Program The Transformative Climate Communities (TCC) Program empowers the communities most impacted by pollution to choose their own goals, strategies, and projects to reduce greenhouse gas emissions and local air pollution. NEXT FUNDING OPPORTUNITY Round 3 applications were due February 28, 2020 SGC Affordable Housing and Sustainable Communities (AHSC) Program The Affordable Housing and Sustainable Communities (AHSC) Program makes it easier for Californians to drive less by making sure housing, jobs, and key destinations are accessible by walking, biking, and transit. NEXT FUNDING OPPORTUNITY Round 6 applications will be due in 2021, date TBD Active Transportation Program (ATP) ATP is a statewide competitive grant application process with the goal of encouraging increased use of active modes of transportation. The ATP consolidates existing federal and state transportation programs, including the Transportation Alternatives Program (TAP), Bicycle Transportation Account (BTA), and State Safe Routes to School (SR2S), into a single program with a focus to make California a national leader in active transportation. The ATP administered by the Division of Local Assistance, Office of State Programs. NEXT FUNDING OPPORTUNITY Cycle 5 applications were due June 15, 2020. The next cycle is expected in 2022. SB 1 Local Streets and Roads Program (LSRP) SB 1 dedicated approximately $1.5 billion per year in new formula revenues apportioned by the State Controller to cities and counties for basic road maintenance, rehabilitation, and critical safety projects on the local streets and roads system. NEXT FUNDING OPPORTUNITY Project Lists were due to California Transportation Commission May 1, 2020. The next cycle is expected in 2021. Caltrans Sustainable Communities Grants To encourage local and regional planning that furthers state goals, including, but not limited to, the goals and best practices cited in the Regional Transportation Plan Guidelines adopted by the California Transportation Commission. NEXT FUNDING OPPORTUNITY Grant application due January 2021 California Office of Traffic Safety (OTS) Grant Programs OTS administers traffic safety grants in the following areas: Alcohol Impaired Driving, Distracted Driving, Drug-Impaired Driving, Emergency Medical Services, Motorcycle Safety, Occupant Protection, Pedestrian and Bicycle Safety, Police Traffic Services, Public Relations, Advertising, and Roadway Safety and Traffic Records. NEXT FUNDING OPPORTUNITY FY 2022 application period is December 7, 2020 - January 31, 2021 4.1.b Packet Pg. 203 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 97 SB 1 Solutions for Congested Corridors Program (SCCP) The Solutions for Congested Corridors Program funds projects designed to reduce congestion in highly traveled and highly congested corridors. This statewide, competitive program makes $250 million available annually for projects that implement specific transportation performance improvements and are part of a comprehensive corridor plan by providing more transportation choices while preserving the character of local communities and creating opportunities for neighborhood enhancement. NEXT FUNDING OPPORTUNITY Applications were due July 17, 2020 SB1 Local Partnership Program (LPP) The purpose of this program is to provide local and regional transportation agencies that have passed sales tax measures, developer fees, or other imposed transportation fees with a continuous appropriation of $200 million annually from the Road Maintenance and Rehabilitation Account to fund road maintenance and rehabilitation, sound walls, and active transportation projects. There is also a competitive grant portion of this project. NEXT FUNDING OPPORTUNITY Applications were due June 12, 2020 SB 1 State Transportation Improvement Program (STIP) The State Transportation Improvement Program (STIP) is the biennial five-year plan for future allocations of certain state transportation funds for state highway improvements, intercity rail, and regional highway and transit improvements. NEXT FUNDING OPPORTUNITY Proposed fund estimate will likely be released July 2021 Caltrans Strategic Partnerships Grants To identify and address statewide, interregional, or regional transportation deficiencies on the State highway system in partnership with Caltrans. The transit component that will fund planning projects that address multimodal transportation deficiencies with a focus on transit. NEXT FUNDING OPPORTUNITY Grant applications due January 2021 California Natural Resources Agency Environmental Enhancement and Mitigation Program This program supports projects that "contribute to mitigation of the environmental effects of transportation facilities." According to the program guidelines, projects that fall under the following category can apply: "Mitigation Projects Beyond the Scope of the Lead Agency responsible for assessing the environmental impact of the proposed transportation improvement." NEXT FUNDING OPPORTUNITY 2021 EEM Program Solicitation anticipated January 2021 California Natural Resources Agency Urban Greening Program This program supports projects that "use natural systems or systems that mimic natural systems to achieve multiple benefits." Eligible projects include "Non- motorized urban trails that provide safe routes for travel between residences, workplaces, commercial centers, and schools." NEXT FUNDING OPPORTUNITY Proposals were due July 15, 2020 4.1.b Packet Pg. 204 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 898 FEDERAL SOURCES Community Development Block Grant (CDBG) Program The Community Development Block Grant (CDBG) program is a flexible program that provides communities with resources to address a wide range of unique community development needs. Communities often use CDBG funds to construct and repair streets and sidewalks. NEXT FUNDING OPPORTUNITY Housing and Community Development program application was due April 15, 2020 (competitive) and September 30, 2020 (OTC). Better Utilizing Investments to Leverage Development (BUILD) Transportation Discretionary Grant Program This program supports projects that are "road or bridge projects eligible under title 23, United States Code;" and "intermodal projects." This program replaces the TIGER program. NEXT FUNDING OPPORTUNITY The application for FY 2020 was due May 18, 2020 Congestion Mitigation and Air Quality (CMAQ) Improvement Program The FAST Act continued the CMAQ program to provide a flexible funding source to State and local governments for transportation projects and programs to help meet the requirements of the Clean Air Act. Funding is available to reduce congestion and improve air quality for areas that do not meet the National Ambient Air Quality Standards for ozone, carbon monoxide, or particulate matter (nonattainment areas) and for former nonattainment areas that are now in compliance (maintenance areas). NEXT FUNDING OPPORTUNITY Funding is distributed through SCAG based on a formula Highway Safety Improvement Program (HSIP) California's Local HSIP focuses on infrastructure projects with nationally recognized crash reduction factors (CRFs). Local HSIP projects must be identified on the basis of collision experience, collision potential, collision rate, or other data- supported means. NEXT FUNDING OPPORTUNITY HSIP Cycle 11 will start around April 2022 4.1.b Packet Pg. 205 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 99 IMPLEMENTATION CONSIDERATIONS Implementation of the LRSP is a vital step in the process where identified strategies and projects are executed. To successfully implement programs and projects, partnerships, trust, funding and coordination need to be proactively managed. Successful implementation requires sustained and coordinated support from key stakeholders, elected officials and City staff. Some strategies are outlined below: Oversight & Accountability To ensure effective delivery of safety project and programs, establishing a committee or Task Force with key officials and stakeholders (in and outside of the City) that meets bi-annually or quarterly is recommended. Having appointed leadership will be a crucial part of maintaining buy- in and support for the LRSP from not only officials, but the community as well. Leadership could additionally include members from identified LRSP partners (the Soboba Tribal Administration, SJUSD, Sheriff’s Department, Riverside Transit Agency, and Riverside County Public Health Department). Holding the City’s Community Development, Engineering, and Public Safety Departments accountable is crucial for effective implementation, along with holding County departments like the Riverside Public Health Department, Riverside Transit Agency and Sheriff’s Department accountable as well. Some duties could include conducting briefings and presentations at board and agency meetings, collecting and sharing information on a regular basis and updating a public- facing database (or scorecard) on LRSP goal progress. Coordination & Partnership Throughout the lifetime of the LRSP, coordination and partnership amongst diverse stakeholders will be essential for effective delivery of the LRSP. Some strategies include regularly informing leaders and stakeholders from the Soboba Tribal Administration, SJUSD, Sheriff’s Department, Riverside Transit Agency, and Riverside County Public Health Department on progress and key milestones, consulting partner agencies early on in the implementation process to gather suggestions and feedback, and finding opportunities for partnership via project bundling (e.g. integrating LRSP projects with pavement resurfacing and maintenance). Funding One major hurdle to plan implementation is often funding. As part of an implementation strategy it is recommended that the City stay up to date on potential grant opportunities and place the most competitive projects forward as grant sources evolve. Additionally, reviewing an updated list of current capital projects to find where LRSP projects could overlap for possible project bundling. See previous section 8.1 Funding for more details. Communication Having continued communication and transparency with stakeholders and community members can allow for greater trust and support of the LRSP’s goals. Some strategies include communication across diverse channels (e.g. updated webpage, news, and social media), actively addressing community concerns, publishing updating factsheets on plan progress, and regular public meetings using effective community engagement techniques. An oversight committee or Task Force (as proposed above) could aid with leading efforts on communication and trust-building. 4.1.b Packet Pg. 206 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) Chapter 8100 EVALUATION STRATEGIES Evaluation identifies possible opportunities to inform future decision-making, it will allow the City to understand how it is doing with regards to meeting its safety goals. It provides the basis for determining selection of emphasis of priority areas, countermeasures, and locations to reduce crashes (and the harm resulting from them). Recommendations include: Update the Plan Regularly For example, scheduling an update every two years could assist with organizing and directing evaluation efforts. As conditions within the City and County could change, it will be necessary to update the LRSP in the future. Identify Target Metrics and Measure Goal Performance in Priority Areas In order to understand progress and safety conditions, several metrics should be used in LRSP evaluation. Examples of measuring goal performance include: ›monitoring collision and crashes, specific to the goals outlined in this plan ›monitoring the number of safety infrastructure improvements installed Additional regular measurement of goal progress in priority areas can be performed every year (e.g. safety scorecard). Safety scorecards that are released annually can be a powerful tool for measuring effectiveness, highlighting areas that need further attention and resources, and identifying tasks and deadlines for responsible stakeholder parties (e.g. the City, Sheriff’s Department, and Riverside County Public Health Department). Safety scorecard examples can be found at the following links: https://www1.nyc.gov/content/visionzero/ pages/vision-zero-scorecard https://roadsafetyatwork.ca/tool-kits/road- safety-snapshot/ Continue Engagement of Stakeholders Efforts around evaluation should include expanding partnership from diverse sources (e.g. officials, agencies, community advocacy groups). Input from identified partners (Soboba Tribal Administration, SJUSD, Sheriff’s Department, Riverside Transit Agency, and Riverside County Public Health Department) and future partners, along with collected target metrics, could be used to adapt the plan based on community feedback and expert insight as projects and programs are rolled out. Conduct pre- and post- surveys with community members to measure how their actions and views have shifted after engagement around traffic safety. Local partners can be tasked with disseminating the pre- and post-surveys to residents. Surveys should evaluate whether respondents express a shift in behavior after having participated in traffic safety programming. The metrics for evaluation can also be developed in partnership with local partners to ensure accessibility for the public. Cawston Avenue & Via La Sierra Lane 4.1.b Packet Pg. 207 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) San Jacinto Local Roadway Safety Plan 1014.1.b Packet Pg. 208 Attachment: 21 - 02 02 Agenda re Final LRSP (Final LRSP Report) (Final Local Road Safety Plan) February 2, 2021 TO: City Council REQUESTED BY: Stuart McKibbin, City Engineer APPROVED BY: Robert A. Johnson, City Manager SUBJECT: Ramona Expressway Median Art Project, Phase 1 RECOMMENDATION: Staff recommends that the City Council approve the plans and specifications for the Ramona Expressway Median Art Project, Phase 1; Award the construction contract to Universal Construction and Engineering for $298,694.23; Allocate 10% of the bid amount for soft costs and 10% of the bid amount for construction contingencies; reject all other bids; and authorize the City Manager to execute the construction contract. BACKGROUND/DISCUSSION: Ramona Expressway is the primary western entryway to the City. It connects residents and visitors to Mt. San Jacinto College, shopping centers, residential areas, and the Soboba Casino. Currently, travelers entering the City see a barren median from Sanderson to State Street. While many cities have landscaped entries, staff proposes to transform the median into something special, something no other city has --- providing a unique platform for public art. When Ramona Expressway was improved from Sanderson to Eagle, by way of Transportation Uniform Mitigation Funds, the medians were created and the installation of those median, inclu ding all funds for design, install and on -going maintenance issues (in perpetuity) were left to the City to fund. The City has struggled for years to creatively design and install the median in an aesthetic way that would not use an exorbitant amount of w ater, electricity to power the sprinkler system, or create a financial hardship on the City to continue to maintain these long stretches of median on one of the most traveled roadways in the City. The City Manager brought several key staff together to con sider a new approach – one that would not use water, electricity and would have minimal operational and maintenance costs, and introduce a public art approach to the roadway stretch of nearly 2.5 miles. For many years, the City Council considered the form ation of a public art program, which was established last October 2020, and came on the heels of the creative design of this project. The conceptual design for the Ramona Expressway Median is a fresh approach. A team of seven City employees assembled by the City Manager developed the idea for an attractive, functional, 4.2 Packet Pg. 209 and creative landscape median without landscaping needing water, electricity, or monthly on- going landscape maintenance. At its heart, their idea for the median included metal art pieces in the form of agave. The group envisioned that the agave art pieces would be highlighted by solar lighting and be surrounded by rock and colored decomposed granite. The median would also feature City entry monuments. The conceptual design was approved and funding for the project was allocated by the City Council on April 21, 2020. (Ramona Expressway Median Art Project, Phase 1 Conceptual Design) A landscape consultant fleshed out this vision into the plans that the City Council approved on April 21, 2020. The result has been one of the most creative landscape median designs in Riverside County, if not the State. The staff team believes that this one-of-a-kind design will not only brighten up the Ramona Expressway median, but the entire corridor from Lyon Avenue to State Street and put the City of San Jacinto at the forefront of public art, water conservation, and solar lighting. The Ramona Expressway Median Art Project will be constructed in two phases. This first phase will improve the medians from State Street to Lyon Avenue. Sixty agave art pieces have already been procured by the City and upon Council approval of the contract will be installed by the Contractor. Phase 2 would upgrade the median segment between Lyon Avenue and Sanderson Avenue. On December 28, 2020, the notice inviting bids was advertised online with Planet Bids and in the Press Enterprise. On January 14, 2021, five bids were received ranging from $298,694.23 to $945,398.10. Universal Construction and Engineering was the low bid for the sum of $298,694.23. The bid proposal has been reviewed and found responsive and responsible. Staff contacted the Contractor’s references, and these agencies found their work satisfactory. 60 working days are allocated to the Contractor to complete construction following the anticipated start date of February 16, 2021. 4.2 Packet Pg. 210 The project does not use any Measure V funding. The idea and concept was designed without the intent or idea of using the approved ballot measure funding in any way. Funds for the project will come from two main sources. The Community Amenities Fund is derived from developer impact fee deposits over the previous several years geared toward public art projects, and the Gaming Funds were allocated to the City by the State based on an application from the City to enhance the medians as a connection to the roadway leading up to the Soboba Casino. Staff recommends that the City Council approve the plans and specifications for the Ramona Expressway Median Art Project, Phase 1; Award the construction contract to Universal Construction and Engineering for $298,694.23; Allocate 10% of the bid amount for soft costs and 10% of the bid amount for construction contingencies; reject all other bids; and authorize the City Manager to execute the construction contract. FISCAL IMPACT: There is sufficient funding in the Gaming Fund and DIF: Community Amenities Fund to cover the construction, soft costs and construction contingency. Construction Cost: $298,694.34 Soft Cost 10%: $ 29,869.43 Contingency 10%: $ 29,869.43 Total: $358,433.21 Gaming fund (068): $ 52,397.89 DIF: Comm. Amen. (131): $306,035.32 Total: $358,433.21 ATTACHMENTS: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (Bid Results) 21 - 02 02 Agenda re Ramona Expressway Median Art Project (Project Plans) 21 - 02 02 Agenda re Ramona Expressway Median Art Project (PowerPoint Presentation) 4.2 Packet Pg. 211 4.2.a Packet Pg. 212 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (Bid Results) (Ramona Expressway Median Art Project, Phase 1) 4.2.b Packet Pg. 213 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (Project Plans) (Ramona Expressway Median Art Project, Phase 1) 4.2.b Packet Pg. 214 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (Project Plans) (Ramona Expressway Median Art Project, Phase 1) 4.2.b Packet Pg. 215 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (Project Plans) (Ramona Expressway Median Art Project, Phase 1) 4.2.b Packet Pg. 216 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (Project Plans) (Ramona Expressway Median Art Project, Phase 1) 4.2.b Packet Pg. 217 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (Project Plans) (Ramona Expressway Median Art Project, Phase 1) City of San Jacinto Ramona Expressway Median Art Project Phase 1 Engineering Department 4.2.c Packet Pg. 218 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (PowerPoint Presentation) Overview •Ramona Expressway is a major corridor that connects residents with many important areas in the City. •This project will create a one of a kind entry to the City with agave art pieces,City monuments,colored granite, and crushed rocks in the median on Ramona Expressway. •The project will be separated in two phases. •Phase 1 -State Street to Lyon Avenue •Phase 2 –Lyon Avenue to Sanderson Avenue 4.2.c Packet Pg. 219 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (PowerPoint Presentation) Sanderson AvenueState Street2nd Phase 1st Phase 4.2.c Packet Pg. 220 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (PowerPoint Presentation) Conceptual Design We st of State Street going to Lyon Avenue (Phase 1) 4.2.c Packet Pg. 221 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (PowerPoint Presentation) Picture of Metal Agave 4.2.c Packet Pg. 222 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (PowerPoint Presentation) Project Information •Contractor: Universal Construction and Engineering •Bid Amount:$298,694.23 •Number of days given to complete:60 •Anticipated Start Date:February 16,2021 4.2.c Packet Pg. 223 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (PowerPoint Presentation) QUESTIONS? 4.2.c Packet Pg. 224 Attachment: 21 - 02 02 Agenda re Ramona Expressway Median Art Project (PowerPoint Presentation)